6-K 1 ebr20240508_6k2.htm 6-K

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

 


 

FORM 6-K

 

Report of Foreign Private Issuer
Pursuant to Rule 13a-16 or 15d-16 of the

Securities Exchange Act of 1934

 

For the month of May, 2024

 

Commission File Number 1-34129

 


 

CENTRAIS ELÉTRICAS BRASILEIRAS S.A. - ELETROBRÁS

(Exact name of registrant as specified in its charter)




BRAZILIAN ELECTRIC POWER COMPANY

(Translation of Registrant's name into English)




Rua da Quitanda, 196 – 24th floor,
Centro, CEP 20091-005,
Rio de Janeiro, RJ, Brazil

(Address of principal executive office)



Indicate by check mark whether the registrant files or will file annual reports under cover Form 20-F or Form 40-F. 

Form 20-F ___X___ Form 40-F _______

Indicate by check mark whether the registrant by furnishing the information contained in this Form is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934.

Yes _______ No___X____

 
 

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

 

I. Market Data of Eletrobras Companies
                         
I.1 Installed Capacity and Physical Guarantee – MW
Company Comprehensive Responsibility (a) Comprehensive Liability under Law 13.182/15 (b) Comprehensive Liability under O&M (c) Regime SPE (d) SPE under O&M (e) Regime Net aggregation 2024 Total (a+b+c+d+e)
  Installed Capacity Physical Guarantee Installed Capacity Physical Guarantee Installed Capacity Physical Guarantee Installed Capacity Physical Guarantee Installed Capacity Physical Guarantee Installed Capacity Physical Guarantee Installed Capacity Physical Guarantee
Eletrobras Holding  -   -  185  99  -   185 99
Eletronorte 9,815 4,897  -   -  78 62  4,948 2,146  -  14,840  7,105
Chesf 1,015 1,839  1,050 458  8,395  2,499  2,579 1,188  -  13,039  5,983
Furnas 2,152 1,303  2,082 949  4,645  2,351  5,257 3,228  403  103  -  14,539  7,935
CGT Eletrosul  476  242  -   -   1,225  668 -350 - 262 1,701 910
Total  13,458 8,282  3,132 1,406  13,117  4,912  14,194 7,330 403 103 -350 -262 44,304 22,033

 

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

II. Generation Data
                           
II.1 Installed Capacity - MW
                           
II.1.2 Generation Assets and Generated Energy
                           
II.1.2.1 Hydraulic Generation Assets and Generated Energy – Projects under Full Responsibility
                           
Eletrobras Company Undertaking Location Source Start of Concession Start of Operation End of Operation Installed Capacity Physical Guarantee Generated Energy (MWh)  
 
(State) (MW) (Average MW) 1Q24 2Q24 3Q24 4Q24  
Eletronorte Tucuruí Complex (12) PA Hydraulics Jun-22 Dec-84 Jun-52 8,535.00 3,995.50 8,444,661        
HPP Samuel RO Hydraulics Sep-79 Jul-89 Jul-32 216.75 88.10  161,986        
HPP Curuá-Una (12) PA Hydraulics Jun-22 Jan-77 Jun-52 42.80  30.40  63,065        
HPP Balbina AM Hydraulics Mar-77 Jan-89 Mar-27  249.75  125.70  172,248        
Chesf Curemas PB Hydraulics (1) Jan-57 Feb-26 3.52 1.00        
Furnas Jaguari (15) (16) SP Hydraulics Jan-21 Jan-72 (5) 27.6 12.70  25,553        
Mascarenhas de Moraes (13) MG Hydraulics Jun-22 Apr-57 Jun-52 476.00 299.80  701,707        
Simplício (16) RJ Hydraulics Aug-06 Jun-13 Dec-43 305.70 166.70  420,150        
Anta RJ Hydraulics Aug-06 Aug-18 Dec-43 28.00 15.90  40,074        
Batalha (16) MG Hydraulics Aug-06 May-14 Apr-43 52.50 47.00  22,442        
Serra da Mesa (48.46%) (2) (3) (15) GO Hydraulics May/81 and Nov/04 Apr-98 May-46 1,275.00 605.70 1,434,404        
Manso (70%) (3) (15) MT Hydraulics Feb-00 Nov-00 Sep-37 210.00 83.50  109,422        
CGT Eletrosul HPP Governador Jayme Canet Júnior (4) (17) PR Hydraulics Jul-07 Nov-12 Jun-49 177.94 92.37  217,294        
HPP Passo São João (18) RS Hydraulics Aug-06 Mar-12 May-46 77.00 39.10  126,608        
HPP São Domingos MS Hydraulics Dec-02 Jun-13 Aug-39 48.00 36.40  62,579        
PCH Barra do Rio Chapéu SC Hydraulics May-04 Feb-13 May-38 15.15 8.61  27,772        
PCH João Borges SC Hydraulics Dec-05 Jul-13 Sep-39 19.00 10.14  25,187        

 

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

II.1.2.2 Thermal Generation Assets and Generated Energy – Enterprises under Full Responsibility
                                             
Eletrobras Company Undertaking Location Source Start of Concession Start of Operation End of Operation Installed Capacity Physical Guarantee Generated Energy (MWh) Fuel Type Metric Unit Fuel used for electric power production
1Q24 2Q24 3Q24 4Q24
(State) (MW) (Average MW) 1Q24 2Q24 3Q24 4Q24 Qty. BRL Million Qty. BRL Million Qty. BRL Million Qty. BRL Million
Eletronorte TPP Araguaia (5) MT Thermal Jul-15 Apr-16 Jun-20  (6)  NA  -         NA  NA  NA  NA            
TPP Senador Arnon Afonso Farias de Mello (6) RR Thermal Nov-00 Dec-90 (7)  NA  NA  -         NA  NA  NA  NA            
TPP Aparecida AM Thermal N/D Feb-84 Jul-30  166.00  150.00  188,551        Natural Gas  m3 56,795,397 105.66            
TPP MAUÁ 3 AM Thermal Nov-14 Sep-17 Nov-44  590.75  507.40  885,762        Natural Gas  m3 178,766,597 332.65            
Isolated System                                          
TPP ANAMÃ AM Thermal N/D Dec-18 Nov-30  2.17  NA  2,771        Natural Gas  m3  984,271 1.94            
TPP ANORI AM Thermal N/D Dec-18 Nov-30  4.57  NA  5,152        Natural Gas  m3 1,707,495 3.37            
TPP CAAPIRANGA AM Thermal N/D Dec-18 Nov-30  2.17  NA  2,663        Natural Gas  m3  923,685 1.82            
TPP CODAJÁS AM Thermal N/D Dec-18 Nov-30  4.57  NA  7,574        Natural Gas  m3 1,959,223 3.86            
Furnas Santa Cruz (7) (8) (14) RJ Thermal Aug/63 and Mar/67 Jul-67 Jul-15 500.00 401.20  -         Natural Gas  m3  - -            
Roberto Silveira (Campos) (9) RJ Thermal Jul-07 Dec-68 Jul-27 25.00 20.90  -         ND  ND  ND  ND            
                                             
                                             
II.1.2.3 Thermal Generation Assets of PIEs and Generated Energy – Enterprises under Full Responsibility
                                             
Eletrobras Company Undertaking Location Source Start of Concession Start of Operation End of Operation Installed Capacity Physical Guarantee Generated Energy (MWh) Fuel Type Metric Unit Fuel used for electric power production
1Q24 2Q24 3Q24 4Q24
(State) (MW) (Average MW) 1Q24 2Q24 3Q24 4Q24 Qty. BRL Million Qty. BRL Million Qty. BRL Million Qty. BRL Million
Eletronorte TPP Ponta Negra (PIE Gera) (10) AM Thermal NA NA NA  NA  NA  NA        NA  NA  NA  NA            
TPP Manauara (PIE Manauara) (10) AM Thermal NA NA NA  NA  NA  NA        NA  NA  NA  NA            
TPP Jaraqui (PIE Breitener Jaraqui) (10) AM Thermal NA NA NA  NA  NA  NA        NA  NA  NA  NA            
TPP Tambaqui (PIE Breitner Tambaqui) (10) AM Thermal NA NA NA  NA  NA  NA        NA  NA  NA  NA            
TPP Cristiano Rocha (PIE RAESA) (10) AM Thermal NA NA NA  NA  NA  NA        NA  NA  NA  NA            

 

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

II.1.2.4 Wind Generation Assets and Generated Energy – Enterprises under Full Responsibility
                         
Eletrobras Company Undertaking Location Source Start of Concession Start of Operation End of Operation Installed Capacity Physical Guarantee Generated Energy (MWh)
(State) (MW) (Average MW) 1Q24 2Q24 3Q24 4Q24
Chesf Casa Nova I A (11) BA Wind Jun-19 Dec-20 Jun-54 27.00 6.80  7,646      
Casa Nova II BA Wind May-14 Dec-17 May-49 32.90 9.40  9,257      
Casa Nova III BA Wind May-14 Feb-18 May-49 28.20 9.40  9,339      
Acauã BA Wind Apr-14 Nov-19 Apr-49 6.00 3.10  2,720      
Angical 2 BA Wind Apr-14 Sep-19 Apr-49 10.00 5.10  2,506      
Arapapá BA Wind Apr-14 Nov-19 Apr-49 4.00 2.20  1,058      
Caititu 2 BA Wind Apr-14 Jan-20 Apr-49 10.00 5.10  3,071      
Caititu 3 BA Wind Apr-14 Jan-20 Apr-49 10.00 4.70  1,793      
Carcará BA Wind Apr-14 Feb-20 Apr-49 10.00 4.60  2,136      
Coqueirinho 2 BA Wind May-14 Sep-19 May-49 16.00 7.40  3,177      
Corrupião 3 BA Wind Apr-14 Feb-20 Apr-49 10.00 4.20  1,833      
Papagaio BA Wind May-14 Oct-19 May-49 10.00 4.90  3,003      
Tamanduá Mirim 2 BA Wind Jun-14 Nov-19 Jun-49 16.00 7.40  3,532      
Teiú 2 BA Wind Apr-14 Nov-19 Apr-49 8.00 4.20 954      
CGT Eletrosul Cerro Chato I Wind Farm RS Wind Aug-10 Jan-12 Aug-45 30.00 11.33  18,683      
Cerro Chato II Wind Farm RS Wind Aug-10 Aug-11 Aug-45 30.00 11.33  18,960      
Cerro Chato III Wind Farm RS Wind Aug-10 Jun-11 Aug-45 30.00 11.33  20,624      
WPP Coxilha Seca RS Wind May-14 Dec-15 May-49 30.00 13.20  23,746      
WPP Capão do Inglês RS Wind May-14 Dec-15 May-49 10.00 4.50  7,495      
WPP Galpões RS Wind May-14 Dec-15 May-49 8.00 3.70  5,743      
                         
                         
II.1.2.4 Solar Generation Assets and Generated Energy – Enterprises under Full Responsibility
                         
Eletrobras Company Undertaking Location Source Start of Concession Start of Operation End of Operation Installed Capacity Physical Guarantee Generated Energy (MWh)
(State) (MW) (Average MW) 1Q24 2Q24 3Q24 4Q24
CGT Eletrosul Solar Megawatt SC Solar Jun-14 Sep-14 - 0.93  NA 306      
                         
(1) The concession for the exploration of the PCH Coremas was initially granted to the National Department of Works Against Droughts - DNOCS through Decree No. 53,417, of 1/20/1964 and later transferred to Companhia Hidro Elétrica do São Francisco - CHESF through Decree No. 74,971, of 11/26/1974.
(2) Decree No. 85,983, of May 6, 1981. Grant to FURNAS - Centrais Elétricas S.A. concession for a set of use of hydraulic energy of the stretch of the main course of the Tocantins River and its tributaries on the right and left banks, in the State of Goiás. 11.12.2004 - CC 05/2004 - HPP Serra da Mesa
(3) Shared HPPs, but FURNAS acquires the partner fraction through energy purchase contracts - considered GF and total generation of each HPP.
(4) The reported amounts refer to the Company's participation in the enterprise (Consórcio Governador Jayme Canet Júnior 49% Eletrosul).
(5)Ordinance MME 331 of 08.14.2018 - Dou 08.15.2018, Authorize the decontracting, in its entirety, of the Thermoelectric Generating Power Plant called TPP Araguaia. Eletronorte, through CE-CRR-0118, of 06.20.2018, requested ANEEL to revoke the authorization grant of TPP Araguaia. However, the Association of Municipalities of Araguaia - AMA filed Public Civil Action No. 2803-97.2018.811.008 against Eletronorte in the Court and Justice of Mato Grosso, having been granted urgent relief. Eletronorte, through CE-CRR-0144, dated 08.07.2018, requested ANEEL to suspend the process. On 10.11.2018 Eletronorte filed a lawsuit before the Federal Court (Case No. 1021506-05.2018.4.01.3400) to discuss the matter but still pending judgment.
By determination of RD-0249/2019 of 08.08.2019, Eletronorte through CE-CRR-0157/2019 of 08.30.2019 requested SCG/ANEEL to resume the process aiming at the revocation of the authorization grant of TPP Araguaia, pursuant to MME Ordinance No. 331 of 08.14.2018. On 11.06.2019, SCG/ANEEL requested Eletronorte to demonstrate that said Public Civil Action has no more effects. Through correspondence s/n of 11.11.2019, Eletronorte's Legal Counsel presented the requested clarifications. SCG/ANEEL sent Memorandum No. 281/2019-SCG/ANEEL to the Federal Attorney's Office with ANEEL. Considering that there was no manifestation, Eletronorte reiterated the claim of CE-CRR-0157/2019, through CE-CRR-0079/2020, of 05.26.2020. Eletronorte, through letter CE-PR-0077/2021, of 06/17/2021, informed that it carried out the administrative closure of the Contract and completed the demobilization of the plant in June/2020.
(6) TPP Senador Arnon Afonso Farias de Mello is assigned to Roraima Energia S.A., successor of Boa Vista Energia S.A., through a loan agreement. This project is not being considered in the installed capacity of Eletronorte.
(7) Aneel was requested to extend the concession in accordance with the legal terms and deadline through the request REQ.GCO.P.027.2013, dated 07.05.2013. The conditions of said concession remain in force.
(8) Decree No. 52,394 of 08/22/1963 - authorizes Companhia Hidreletrica do Vale do Paraiba to assemble a thermoelectric plant. Decree No. 60,350 of 03/10/1967 - grants to Central Elétrica de Furnas S.A. a concession for the use of hydraulic energy, authorization for the establishment of a thermoelectric plant and other measures.
(9) TPP Roberto Silveira (Campos) is out of commercial operation, as stated in ANEEL Order 708/2019. Installed power of 25.00 MW according to ANEEL Order 484/2016.
(10) TPP Cristiano Rocha, Manauara, Ponta Negra, Tambaqui and Jaraqui are not part of Amazonas GT's own generation assets, they belong to the Independent Energy Producers – PIE, of which Amazonas GT buys its energy and resells them to Amazonas D through Power Purchase and Sale Agreements – CCVE. These energy purchase agreements of the PIE by Amazonas GT when it ends in May/2025, by contractual force, the PIE plants will be reverted to the equity of Amazonas GT (05/05/2025 reversal of the assets of the TPPs Tambaqui and Jaraqui and 05/21/2025 reversal of the assets of the TPPs Manauara, Ponta Negra and Cristiano Rocha), and it is up to them to operate them until November 30, 2030.
(11) Authorizing Resolution 7,907, of 06/18/2019, makes reference to the installed power of the Casa Nova A plant, but makes no reference to the physical guarantee of such plant. This is due to the fact that the Casa Nova A Plant does not have a Physical Guarantee defined by the MME. The amount presented of 6.8 MW comes from the plant's certification study, being only one reference.
(12) CONCESSION AGREEMENT No. 002/2022 – ANEEL - ELETRONORTE - New concession agreement for HPPs Tucuruí, Curuá-una and Coaracy Nunes, moving to 30 years.
(13) The Masc. de Moraes, Corumbá I, Estreito, Funil, Furnas, Marimbondo and P. Colômbia plants were granted the concession determined by Clause Two of Concession Agreement No. 003/2022 signed between Furnas and ANEEL on 06/17/2022 as the date of signature of the contract: 06/17/2022; the final term of the concession on 06/17/2052 was determined in Annex II of Concession Agreement No. 003/2022 signed between Furnas and ANEEL on 06/17/2022.
(14) By means of Order No. 481, of February 23, 2023, ANEEL released the generating unit and UG31, of 150,000.00 kW of TPP Santa Cruz to start commercial operation as of February 24, 2023. Through Order No. 1991, of June 23, 2023, ANEEL extended, for an indefinite period, the commercial operation of the generating unit and UG31, of 150,000.00 kW of TPP Santa Cruz.
(15) Alteration of Physical Guarantee through Ordinance No. 709/GM/MME, of November 30, 2022.
(16) According to Ordinance No. 409, of November 13, 2020, of the Ministry of Mines and Energy (MME), as of January 1, 2021, Furnas was designated as responsible for the Provision of the Electric Power Generation Service through the Jaguari Hydroelectric Power Plant, until the assumption of the winning concessionaire of the Plant bidding.
(17) According to concession and REH 2,932/2021. It is noteworthy that Authorizing Resolution No. 14.435/2023 added 469 days to the concession term. Therefore, the additional time granted by REH 2.932/2021, of 1,789 days, which would result in maturity on 09/07/2048, will need to be recalculated and approved by Aneel.

 

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

II.1.2.1.2 Generation Losses - %
Eletrobras Companies 1Q24 2Q24 3Q24 4Q24
In the quarter Accumulated In the quarter Accumulated In the quarter Accumulated In the quarter Accumulated
Eletronorte 2.30 2.30            
Chesf 2.27 2.27            
Furnas 1.86 1.86            
CGT Eletrosul 1.21 1.21            
                 

 

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

  II.1.2.2 Hydraulic Generation Assets and Generated Energy – Enterprises under Full Responsibility under O&M Regime - renewed by law 14.182/21
Eletrobras Company Undertaking Location Source Start of Concession Start of Operation End of Operation Installed Capacity Total Physical Guarantee Decoupled Physical Guarantee (6) Total Generated Energy (MWh)
(State) (MW) (Average MW) (Average MW) 1Q24 2Q24 3Q24 4Q24
Eletronorte HPP Coaracy Nunes (2) AP Hydraulics Jun-22 Dec-75 Jun-52 78.00 62.20 24.88 149,175      
Chesf Funil (1) BA Hydraulics Jun-22 Aug-62 Jun-52 30.00 4.80 1.99 3,202      
Pedra (1) BA Hydraulics Jun-22 Nov-78 Jun-52 20.01 1.74 0.72 16,132      
Complexo de Paulo Afonso (1) BA Hydraulics Jun-22 Jan-55 Jun-52 4,279.60 1,658.80 685.52  2,569,973      
Luiz Gonzaga (Itaparica) (1) PE Hydraulics Jun-22 Jun-88 Jun-52  1,479.60 727.00 300.44  1,150,898      
Boa Esperança (Castelo Branco) (1) PI Hydraulics Jun-22 Apr-70 Jun-52 237.30 136.20 56.29 317,152      
Xingó (1) SS Hydraulics Jun-22 Dec-94 Jun-52 3,162.00 1,729.80 714.86  2,927,339      
Furnas Furnas (3) MG Hydraulics Jun-22 Sep-63 Jun-52 1,216.00 625.00 250.00 1,335,822      
Luis Carlos Barreto (Estreito) (3) SP/MG Hydraulics Jun-22 Mar-69 Jun-52 1,050.00 497.20 198.88 856,038      
Porto Colômbia (3) MG/SP Hydraulics Jun-22 Jun-73 Jun-52 320.00 205.40 82.16 467,313      
Marimbondo (3) SP/MG Hydraulics Jun-22 Oct-75 Jun-52 1,440.00 688.70 275.48 1,396,316      
Funil (3) RJ Hydraulics Jun-22 Mar-70 Jun-52 216.00 102.40 40.96 287,244      
Corumbá I (3) GO Hydraulics Jun-22 Oct-96 Jun-52 375.00 219.50 87.80 423,028      
                           
                           
II.1.2.3 Hydraulic Generation Assets and Generated Energy – Projects under Full Responsibility renewed by law 13.182/15
Eletrobras Company Undertaking Location Source Start of Concession Start of Operation End of Operation Installed Capacity Total Physical Guarantee Physical Guarantee (Law 13,182) Total Generated Energy (MWh)
(State) (MW) (Average MW) (Average MW) 1Q24 2Q24 3Q24 4Q24
Chesf Sobradinho (1) (4) BA Hydraulics Jun-22 Nov-79 Jun-52  1,050.30 457.50 411.75 646,744      
Funil (4) BA Hydraulics Jun-22 Aug-62 Jun-52 30.00 4.80 0.11 3,202      
Pedra (4) BA Hydraulics Jun-22 Nov-78 Jun-52 20.01 1.74 0.04 16,132      
Complexo de Paulo Afonso (4) BA Hydraulics Jun-22 Jan-55 Jun-52  4,279.60  1,658.80 36.66  2,569,973      
Luiz Gonzaga (Itaparica) (4) PE Hydraulics Jun-22 Jun-88 Jun-52  1,479.60 727.00 16.07  1,150,898      
Boa Esperança (Castelo Branco) (4) PI Hydraulics Jun-22 Apr-70 Jun-52 237.30 136.20 3.01 317,152      
Xingó (4) SS Hydraulics Jun-22 Dec-94 Jun-52  3,162.00  1,729.80 38.23  2,927,339      
Furnas Itumbiara (3) (5) GO/MG Hydraulics Jun-22 Apr-80 Jun-52 2,082.00 948.90 759.12  1,642,240      
                           
                           
(1) The hydraulic plants had their old concession contract 006/2004 replaced by the new concession contract 001/2022. The new concessions were granted through the privatization of Eletrobras, under the terms of Law 14,182, of July 12, 2021.
(2) CONCESSION AGREEMENT No. 002/2022 – ANEEL - ELETRONORTE - New concession agreement for HPPs Tucuruí, Curuá-una and Coaracy Nunes, moving to 30 years.
(3) The plants of Corumbá I, Estreito, Funil, Furnas, Marimbondo, P. Colombia and Itumbiara were granted the concession determined by Clause Two of the Concession Agreement No. 003/2022 signed between Furnas and ANEEL on 06/17/2022 as the date of signature of the agreement: 06/17/2022; the final term of the concession on 06/17/2052 was determined in Annex II of Concession Agreement No. 003/2022 signed between Furnas and ANEEL on 06/17/2022.
(4) To comply with Law 13.182/2015, Sobradinho plant provides 90% of its Physical Guarantee and the other CHESF shareholder plants provide 2.21% of their physical guarantees to serve industrial consumers served by this law.
(5) In order to comply with Law 13.182/2015, the Itumbiara plant provides 80% of its Physical Guarantee to serve industrial consumers located in the Southeast/Midwest submarket.
(6) decoupling is equivalent to 40% of the total value of the physical guarantee for the year 2024.
                           

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

ACR Contracts - Quantity
                     
Eletrobras Company Auction
(if Bilateral Contract Regulated inform client)
Compromised Plants Source Start Date End Date Submarket Current Volume
(MWaverage)
Price Updated
(BRL/MWh)
Accounting Position
(Procurement
/Supply)
Indexed
Eletronorte CBR - OC 87495/2013 (Amazonas D) Balbina (Own) HYDRO 7/1/2021 3/1/2027  N 125.92 400.01 Procurement IPCA
CCVE 004/2018 (Amazonas D) Tambaqui (Resale)(1) TERM 7/1/2021 5/18/2025  N 60.00 1036.23 Procurement IGP-M
CCVE 003/2018 (Amazonas D) Jaraqui (Resale)(1) TERM 7/1/2021 5/18/2025  N 60.00 1037.42 Procurement IGP-M
CCVE 002/2018 (Amazonas D) Manauara (Reseller)(1) TERM 7/1/2021 5/18/2025  N 60.00 942.81 Procurement IGP-M
CCVE 001/2018 (Amazonas D) Ponta Negra (Resale)(1) TERM 7/1/2021 5/18/2025  N 60.00 954.19 Procurement IGP-M
CCVE 005/2018 (Amazonas D) Cristiano Rocha (Resale)(1) TERM 7/1/2021 5/18/2025  N 65.00 971.46 Procurement IGP-M
CCVE 008/2018 (Amazonas D - Sist. Isolated) Caapiranga  (Own) TERM 7/1/2021 11/30/2030  N 1.19 1338.17 Procurement IPCA
CCVE 006/2018 (Amazonas D - Sist. Isolated) Anamã (Own) TERM 7/1/2021 11/30/2030  N 1.27 1335.11 Procurement IPCA
CCVE 009/2018 (Amazonas D - Sist. Isolated) Codajás (Own) TERM 7/1/2021 11/30/2030  N 3.01 1263.36 Procurement IPCA
CCVE 007/2018 (Amazonas D - Sist. Isolated) Anori (Own) TERM 7/1/2021 11/30/2030  N 2.51 1314.89 Procurement IPCA
CCESI 001/2019 (Amazonas D - Sist. Isolated) Coari (Reseller)(1) TERM 7/1/2021 11/30/2030  N 12.00 928.28 Procurement IPCA
27th Existing Energy Auction Tucuruí HYDRO 1/1/2023 12/31/2024  N 51.00 200.00 Procurement IPCA
12th Existing Energy Auction (2) Tucuruí HYDRO 7/12/2024 8/30/2024  N 2,887.81 264.24 Procurement IPCA
13th Existing Energy Auction (2) Tucuruí HYDRO 7/12/2024 8/30/2024  N 1,032.68 462.97 Procurement IPCA
11th New Energy Auction Teles Pires HYDRO 1/1/2015 12/31/2044  SS 576.00 131.78 Procurement IPCA
CGT Eletrosul 1st New Energy Auction Passo São João HYDRO 1/1/2010 12/31/2039 S 37.00 297.90 Procurement IPCA
3rd New Energy Auction Governador Jayme Canet Júnior HYDRO 1/1/2011 12/31/2040 S 94.08 290.49 Procurement IPCA
5th New Energy Auction São Domingos HYDRO 1/1/2012 12/31/2041 SE/CO 36.00 312.50 Procurement IPCA
2nd Reserve Energy Auction CERRO CHATO I EOL 7/1/2012 6/30/2032 S 10.73 289.12 Procurement IPCA
2nd Reserve Energy Auction CERRO CHATO II EOL 7/1/2012 6/30/2032 S 11.09 289.12 Procurement IPCA
2nd Reserve Energy Auction CERRO CHATO III EOL 7/1/2012 6/30/2032 S 11.11 289.12 Procurement IPCA
Chesf 5th Reserve Energy Auction Acauã EOL 9/1/2015 8/31/2035  NE 2.60 190.04 Procurement IPCA
5th Reserve Energy Auction Angical 2 EOL 9/1/2015 8/31/2035  NE 4.90 190.04 Procurement IPCA
5th Reserve Energy Auction Arapapá EOL 9/1/2015 8/31/2035  NE 1.90 190.04 Procurement IPCA
5th Reserve Energy Auction Caititu 2 EOL 9/1/2015 8/31/2035  NE 5.10 190.04 Procurement IPCA
5th Reserve Energy Auction Caititu 3 EOL 9/1/2015 8/31/2035  NE 4.70 190.04 Procurement IPCA
5th Reserve Energy Auction Carcará EOL 9/1/2015 8/31/2035  NE 4.60 190.04 Procurement IPCA
5th Reserve Energy Auction Corrupião 3 EOL 9/1/2015 8/31/2035  NE 4.20 190.04 Procurement IPCA
5th Reserve Energy Auction Teiú 2 EOL 9/1/2015 8/31/2035  NE 3.70 190.04 Procurement IPCA
Furnas 1st New Energy Auction Manso HYDRO 1/1/2008 12/31/2037  SE/CO 35.00 257.46 Procurement IPCA
1st New Energy Auction Manso HYDRO 1/1/2010 12/31/2039  SE/CO 55.00 297.00 Procurement IPCA
1st New Energy Auction Batalha HYDRO 1/1/2010 12/31/2039  SE/CO 47.10 301.76 Procurement IPCA
1st New Energy Auction Simplício HYDRO 1/1/2010 12/31/2039  SE/CO 185.20 304.86 Procurement IPCA
13th Existing Energy Auction (2) HPP Mascarenhas de Moraes HYDRO 11/1/2023 01/29/204  SE/CO 158.05 459.58 Procurement IPCA
4th Existing Energy Auction (2) HPP Mascarenhas de Moraes HYDRO 11/1/2023 01/29/204  SE/CO 127.35 254.35 Procurement IPCA
Saesa - Structuring auction HPP Santo Antonio HYDRO 12/1/2012 12/31/2041  SE/CO 1,551.24 195.64 Procurement IPCA
Saesa - 19th New Energy Auction HPP Santo Antonio Expansion HYDRO 1/1/2017 12/31/2046  SE/CO 129.60 207.43 Procurement IPCA
1st New Energy Auction HPP Baguari HYDRO 1/1/2010 12/31/2039  SE/CO 77.00 302.41 Procurement IPCA
1st New Energy Auction HPP Retiro Baixo HYDRO 1/1/2009 12/31/2038  SE/CO 36.00 302.92 Procurement IPCA
                     
(1) Energy sales contracts resulting from the process of unbundling of Amazonas Distribuidora -> Process: 48500.004245/2012-43 -ANEEL. The amounts of energy traded come from the purchase of PIEs.
(2) Extension of the grant period for signing an energy contract in the Regulated Contracting Environment, due to the renegotiation of the hydrological risk of electricity generation, according to ANEEL Order No. 1,395, of May 20, 2019.

 

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

ACR Contracts - Availability
                     
Eletrobras Company Auction
(if Bilateral Contract Regulated inform client)
Compromised Plants Source Start Date End Date Submarket Current Volume
(MWaverage)
Updated Fixed Revenue
(BRL thousand/year)
Accounting Position
(Procurement
/Supply)
Indexed
Eletronorte 20th New Energy Auction Mauá 3 TERM 7/1/2021 11/30/2030 N 484.4 1,445,433.23 Procurement IPCA
20th New Energy Auction Aparecida TERM 7/1/2021 11/30/2030  N 145.00 430,217.38 Procurement IPCA
CGT Eletrosul 17th New Energy Auction WPP Coxilha Seca EOL 1/1/2016 12/31/2035 S 8.3 16,651.27 Procurement IPCA
17th New Energy Auction WPP Capão do Inglês EOL 1/1/2016 12/31/2035 S 2.8 5,631.81 Procurement IPCA
17th New Energy Auction WPP Galpões EOL 1/1/2016 12/31/2035  S 2.10 4,254.66 Procurement IPCA
Chesf 18th New Energy Auction Casa Nova II EOL 1/1/2018 12/31/2037 NE 7.1 14,251.34 Procurement IPCA
18th New Energy Auction Casa Nova III EOL 3/1/2018 12/31/2037  NE 5.50 11,037.35 Procurement IPCA
17th New Energy Auction Coqueirinho 2 EOL 9/19/2019 12/31/2035 NE 7.30 14,332.56 Procurement IPCA
17th New Energy Auction Papagaio EOL 10/4/2019 12/31/2035  NE 4.70 9,191.74 Procurement IPCA
18th New Energy Auction Tamanduá Mirim 2 EOL 11/14/2019 12/31/2037  NE 7.20 13,785.84 Procurement IPCA
Furnas 5th New Energy Auction Santa Cruz Nova TERM 1/1/2012 12/31/2026  SE/CO 245.70 323,284.74 Procurement IPCA
                     

 

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

PIEs resulting from the process of deverticalization of Amazonas Distribuidora      
                             
The Power Purchase and Sale Agreements from the PIEs (quantity contracts) are due to the process of unbundling of Amazonas Distribuidora -> Process: 48500.004245/2012-43 -ANEEL.
Eletronorte buys energy from the PIEs, the price of which does not include the cost of fuel (gas). Eletronorte sells the same amount purchased from the PIEs to the distributor Amazonas Energia, including the fuel cost in the fee, so that the energy purchase and sale operations do not reflect the economic impact for Eletronorte ("pass-through"). The gas supply contact that serves the Amazon thermal plants was made between Eletronorte and Petrobras.
Eletronorte's energy purchase contracts for the PIEs expire in May 2025, as well as the current sales contracts for Amazonas Energia. From that date, the assets will be converted to Eletronorte.
As a result of MP 855/2018, new energy sales contracts will be entered into with Amazonas Energia for supply after that date, of the CCEAR type, with a term until November 2030 (date linked to the Gas supply contract).
                             
                             
Power Purchase Agreements from PIEs (contracts by quantity)
                      1Q24 2Q24 3Q24 4Q24
Eletrobras Company Counterparty Compromised Plants Source Start Date End Date Submarket Current Volume
(MWaverage)
Price Updated
(BRL/MWh)
Accounting Position
(Procurement
/Supply)
Indexed BRL Million BRL Million BRL Million BRL Million
Eletronorte PIE TAMBAQUI Tambaqui TERM 7/1/2021 5/18/2025  N 60.00 427.14 Procurement IGP-M 58,871.72      
PIE JARAQUI Jaraqui TERM 7/1/2021 5/18/2025  N 60.00 427.58 Procurement IGP-M 58,936.95      
PIE MANAUARA Manauara TERM 7/1/2021 5/18/2025  N 60.00 383.73 Procurement IGP-M 52,957.22      
PIE Gera Ponta Negra TERM 7/1/2021 5/18/2025  N 60.00 398.66 Procurement IGP-M 54,799.37      
PIE Cristiano Rocha Cristiano Rocha TERM 7/1/2021 5/18/2025  N 65.00 415.16 Procurement IGP-M 61,962.72      
PIE Coari Coari TERM 7/1/2021 11/30/2030  N 12.00 408.48 Procurement IGP-M 12,732.25      
                             
                             
Energy Sale Contracts, from the Energy Purchases of the PIEs, for the distributor (quantity contracts)
                      1Q24 2Q24 3Q24 4Q24
Eletrobras Company Auction
(if Bilateral Contract Regulated inform client)
Compromised Plants Source Start Date End Date Submarket Current Volume
(MWaverage)
Price Updated
(BRL/MWh)
Accounting Position
(Procurement
/Supply)
Indexed BRL Million BRL Million BRL Million BRL Million
Eletronorte CCVE 004/2018 (Amazonas D) Tambaqui TERM 7/1/2021 5/18/2025  N 60.00 1036.23 Procurement IGP-M 140,894.66      
CCVE 003/2018 (Amazonas D) Jaraqui TERM 7/1/2021 5/18/2025  N 60.00 1037.42 Procurement IGP-M 140,393.11      
CCVE 002/2018 (Amazonas D) Manauara TERM 7/1/2021 5/18/2025  N 60.00 942.81 Procurement IGP-M 128,313.90      
CCVE 001/2018 (Amazonas D) Ponta Negra TERM 7/1/2021 5/18/2025  N 60.00 954.19 Procurement IGP-M 128,197.83      
CCVE 005/2018 (Amazonas D) Cristiano Rocha TERM 7/1/2021 5/18/2025  N 65.00 971.46 Procurement IGP-M 142,627.17      
CCESI 001/2019 (Amazonas D - Sist. Isolated) Coari TERM 7/1/2021 11/30/2030  N 12.00 928.28 Procurement IPCA 29,004.61      
                             
                             
ACR Contracts - Availability - Thermal
                      1Q24 2Q24 3Q24 4Q24
Eletrobras Company Auction
(if Bilateral Contract Regulated inform client)
Compromised Plants Source Start Date End Date Submarket Current Volume
(MWaverage)
Updated Fixed Revenue
(BRL thousand/year)
Accounting Position
(Procurement
/Supply)
Indexed BRL Million BRL Million BRL Million BRL Million
Eletronorte 20th New Energy Auction Mauá 3 TERM 7/1/2021 11/30/2030 N 484.4 1,445,433.23 Procurement IPCA 280,536.42      
20th New Energy Auction Aparecida TERM 7/1/2021 11/30/2030  N 145.00 430,217.38 Procurement IPCA 80,730.13      
Furnas 5th New Energy Auction Santa Cruz Nova TERM 1/1/2012 12/31/2026  SE/CO 245.70 323,284.74 Procurement IPCA 80,821.19      
                             
                             
                             
CVU and Thermal Inflexibility with Availability Contracts        
                             
Eletrobras Company Power plant Installed Capacity 1Q24 2Q24 3Q24 4Q24        
(MW)  Average inflexibility (MWavg) Average CVU
(BRL/MWh)
 Average inflexibility (MWavg) Average CVU
(BRL/MWh)
 Average inflexibility (MWavg) Average CVU
(BRL/MWh)
 Average inflexibility (MWavg) Average CVU
(BRL/MWh)
       
Eletronorte TPP Mauá 3 590.8 252.1 80.5                    
TPP Aparecida 166.0 72.5 80.5                    
Furnas TPP Santa Cruz 500.0 0 145.39                    

 

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

Furnas Total Furnas Unit 1Q24 2Q24 3Q24 4Q24
  Physical Guarantee  MWaverage 1,415.62      
  GAGO&M  BRL million 61.46      
  GAGImprovements  BRL million 67.47      
  CAIMI BRL million 7.65      
  Adjustment by Unavailability BRL million 7.89      
  R&D BRL million 2.25      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) BRL million 83.39      
  CFURH BRL million 32.05      
  PIS/COFINS BRL million 26.44      
  TOTAL BRL million 288.60      
             
  Furnas Unit 1Q24 2Q24 3Q24 4Q24
  Physical Guarantee  MWaverage 375.00      
  GAGO&M  BRL million 15.39      
  GAGImprovements  BRL million 13.92      
  CAIMI BRL million 1.99      
  Adjustment by Unavailability BRL million 2.25      
  R&D BRL million 0.54      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) BRL million 23.05      
  CFURH BRL million 8.65      
  PIS/COFINS BRL million 6.42      
  TOTAL BRL million 72.20      
             
  Luis Carlos Barreto (Estreito) Unit 1Q24 2Q24 3Q24 4Q24
  Physical Guarantee  MWaverage 298.32      
  GAGO&M  BRL million 12.61      
  GAGImprovements  BRL million 15.57      
  CAIMI BRL million 1.72      
  Adjustment by Unavailability BRL million 1.97      
  R&D BRL million 0.52      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) BRL million 20.21      
  CFURH BRL million 6.68      
  PIS/COFINS BRL million 6.04      
  TOTAL BRL million 65.32      
             
  Porto Colômbia Unit 1Q24 2Q24 3Q24 4Q24
  Physical Guarantee  MWaverage 123.24      
  GAGO&M  BRL million 5.47      
  GAGImprovements  BRL million 5.91      
  CAIMI BRL million 0.52      
  Adjustment by Unavailability BRL million 0.16      
  R&D BRL million 0.15      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) BRL million 3.10      
  CFURH BRL million 2.82      
  PIS/COFINS BRL million 1.85      
  TOTAL BRL million 19.99      
             
  Marimbondo Unit 1Q24 2Q24 3Q24 4Q24
  Physical Guarantee  MWaverage 413.22      
  GAGO&M  BRL million 16.90      
  GAGImprovements  BRL million 21.40      
  CAIMI BRL million 2.36      
  Adjustment by Unavailability BRL million 2.92      
  R&D BRL million 0.72      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) BRL million 28.06      
  CFURH BRL million 9.64      
  PIS/COFINS BRL million 8.36      
  TOTAL BRL million 90.36      
             
  Funil Unit 1Q24 2Q24 3Q24 4Q24
  Physical Guarantee  MWaverage 61.44      
  GAGO&M  BRL million 3.92      
  GAGImprovements  BRL million 3.76      
  CAIMI BRL million 0.35      
  Adjustment by Unavailability BRL million 0.12      
  R&D BRL million 0.10      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) BRL million 1.82      
  CFURH BRL million 1.65      
  PIS/COFINS BRL million 1.20      
  TOTAL BRL million 12.92      
             
  Corumbá I Unit 1Q24 2Q24 3Q24 4Q24
  Physical Guarantee  MWaverage 131.70      
  GAGO&M  BRL million 5.59      
  GAGImprovements  BRL million 5.71      
  CAIMI BRL million 0.61      
  Adjustment by Unavailability BRL million 0.46      
  R&D BRL million 0.19      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) BRL million 6.86      
  CFURH BRL million 2.47      
  PIS/COFINS BRL million 2.23      
  TOTAL BRL million 24.14      
             
  Jaguari Unit 1Q24 2Q24 3Q24 4Q24
  Physical Guarantee  MWaverage 12.70      
  GAGO&M  BRL million 1.58      
  GAGImprovements  BRL million 1.21      
  CAIMI BRL million 0.09      
  Adjustment by Unavailability BRL million 0.00      
  R&D BRL million 0.03      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) BRL million 0.28      
  CFURH BRL million 0.14      
  PIS/COFINS BRL million 0.34      
  TOTAL BRL million 3.67      

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

Eletronorte Total Eletronorte Unit 1Q24 2Q24 3Q24 4Q24
  Physical Guarantee  MWaverage 37.32      
  GAGO&M  BRL million 2,051.60      
  GAGImprovements  BRL million 1,825.71      
  CAIMI BRL million 127.74      
  Adjustment by Unavailability BRL million 233.49      
  R&D BRL million 51.96      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) BRL million 949.48      
  CFURH BRL million 857.67      
  PIS/COFINS BRL million 621.52      
  TOTAL BRL million 6,719.17      
             
  Coaracy Nunes Unit 1Q24 2Q24 3Q24 4Q24
  Physical Guarantee  MWaverage 37.32      
  GAGO&M  BRL million 2,051.60      
  GAGImprovements  BRL million 1,825.71      
  CAIMI BRL million 127.74      
  Adjustment by Unavailability BRL million 233.49      
  R&D BRL million 51.96      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) BRL million 949.48      
  CFURH BRL million 857.67      
  PIS/COFINS BRL million 621.52      
  TOTAL BRL million 6,719.17      

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

Chesf Total Chesf Unit 1Q24 2Q24 3Q24 4Q24
  Physical Guarantee  MWaverage 2,498.54      
  GAGO&M  BRL million 93.19      
  GAGImprovements  BRL million 125.16      
  CAIMI BRL million 14.75      
  Adjustment by Unavailability BRL million 22.41      
  R&D BRL million 4.19      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) BRL million 164.96      
  CFURH BRL million 45.12      
  PIS/COFINS BRL million 47.88      
  TOTAL BRL million 517.66      
             
  Boa Esperança Unit 1Q24 2Q24 3Q24 4Q24
  Physical Guarantee  MWaverage 2.82      
  GAGO&M  BRL million 0.74      
  GAGImprovements  BRL million 0.81      
  CAIMI BRL million 0.05      
  Adjustment by Unavailability BRL million -0.16      
  R&D BRL million 0.02      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) BRL million 1.04      
  CFURH BRL million 0.04      
  PIS/COFINS BRL million 0.26      
  TOTAL BRL million 2.80      
             
  Complexo Paulo Afonso Unit 1Q24 2Q24 3Q24 4Q24
  Physical Guarantee  MWaverage 973.28      
  GAGO&M  BRL million 46.93      
  GAGImprovements  BRL million 67.07      
  CAIMI BRL million 6.85      
  Adjustment by Unavailability BRL million 9.89      
  R&D BRL million 2.07      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) BRL million 76.86      
  CFURH BRL million 16.68      
  PIS/COFINS BRL million 23.07      
  TOTAL BRL million 249.42      
             
  Pedra Unit 1Q24 2Q24 3Q24 4Q24
  Physical Guarantee  MWaverage 1.02      
  GAGO&M  BRL million 0.46      
  GAGImprovements  BRL million 0.43      
  CAIMI BRL million 0.03      
  Adjustment by Unavailability BRL million -0.09      
  R&D BRL million 0.01      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) BRL million 0.35      
  CFURH BRL million 0.07      
  PIS/COFINS BRL million 0.13      
  TOTAL BRL million 1.39      
             
  Funil Unit 1Q24 2Q24 3Q24 4Q24
  Physical Guarantee  MWaverage 426.56      
  GAGO&M  BRL million 15.79      
  GAGImprovements  BRL million 19.32      
  CAIMI BRL million 2.37      
  Adjustment by Unavailability BRL million 4.66      
  R&D BRL million 0.69      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) BRL million 26.79      
  CFURH BRL million 7.46      
  PIS/COFINS BRL million 7.86      
  TOTAL BRL million 84.93      
             
  Luiz Gonzaga Unit 1Q24 2Q24 3Q24 4Q24
  Physical Guarantee  MWaverage 79.91      
  GAGO&M  BRL million 4.47      
  GAGImprovements  BRL million 3.76      
  CAIMI BRL million 0.38      
  Adjustment by Unavailability BRL million 0.71      
  R&D BRL million 0.13      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) BRL million 4.10      
  CFURH BRL million 1.90      
  PIS/COFINS BRL million 1.58      
  TOTAL BRL million 17.04      
             
  Xingó Unit 1Q24 2Q24 3Q24 4Q24
  Physical Guarantee  MWaverage 1,014.94      
  GAGO&M  BRL million 24.80      
  GAGImprovements  BRL million 33.76      
  CAIMI BRL million 5.06      
  Adjustment by Unavailability BRL million 7.41      
  R&D BRL million 1.26      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) BRL million 55.82      
  CFURH BRL million 18.97      
  PIS/COFINS BRL million 14.99      
  TOTAL BRL million 162.08      

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

II.1.3.Sold Energy
                   
II.1.3.1 Energy Sold by enterprises not renewed by Law 12.783/13 and Law 13.182/15
Eletrobras Company Buyer 1Q24 2Q24 3Q24 4Q24
BRL Million MWh BRL Million MWh BRL Million MWh BRL Million MWh
Eletronorte (1) Eletrobras System  -   -             
Other 2,226.51  8,914,806.78            
Chesf Eletrobras System  3.31 43,680.00            
Other  157.01  1,386,770.61            
Furnas (2) Eletrobras System  36.27 173,017.14            
Other 2,001.48  10,912,201.84            
CGT Eletrosul Eletrobras System  3.31 45,441.57            
Other  194.39  1,071,277.37            
                   
Notes:         
(1) Includes the SPE consolidated by Eletronorte: HPPs Teles Pires (from 4Q24)
(2) Includes SPEs consolidated by Furnas: HPP Santo Antônio (from 3Q22), HPPs Baguari and Retiro Baixo (from 4Q24)
                   
                   
II.1.3.2 Energy Sold by the renewed enterprises under Law 12.783/13 – O&M Regime
Eletrobras Company Buyer 1Q24 2Q24 3Q24 4Q24
BRL Million MWh BRL Million MWh BRL Million MWh BRL Million MWh
Eletronorte Eletrobras System  -  -            
Other 6.72 81,506.88            
Chesf  Eletrobras System  -  -            
Other 517.66 5,456,804.81            
Furnas  Eletrobras System  -  -            
Other 288.60 3,091,714.08            
CGT Eletrosul Eletrobras System  -  -            
Other  -  -            
                   
                   
                   
II.1.3.2 Energy Sold by renewed enterprises under Law 13,182
Eletrobras Company Buyer 1Q24 2Q24 3Q24 4Q24
BRL Million MWh BRL Million MWh BRL Million MWh BRL Million MWh
Eletronorte Eletrobras System  -  -            
Other  -  -            
Chesf  Eletrobras System  -  -            
Other 40.23 211,174.71            
Furnas  Eletrobras System  -  -            
Other 129.48 649,593.20            
CGT Eletrosul Eletrobras System  -  -            
Other  -  -            

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

Energy Balance              
               
  2024 2025 2026 2027
Resources without impact on the balance sheet (1) 1,192 1,192 1,192 946
               
Resources (A) 14,213 15,356 16,529 17,621
Own Resources (2) (3) (4) (5) 12,861 14,155 15,416 16,590
    Hydraulics 12,668 13,905 15,166 16,340
    Wind 193 250 250 250
Purchase of Energy 1,352 1,201 1,112 1,031
Limit =>   Inferior Superior Inferior Superior Inferior Superior
Sales (B) 11,658 7,994 9,994 6,594 8,094 5,749 6,749
ACR – Except quotas 3,707 3,094 3,094 2,999
ACL – Bilateral Contracts + MCP performed (range) 7,951 4,900 6,900 3,500 5,000 2,750 3,750
Average Prices Contracts signed        
Limit =>   Inferior Superior Inferior Superior Inferior Superior
Average Price of Sales Contracts  (ACR and ACL - BRL/MWh) - lagged by 1 quarter 189 165 175 175 195 180 210
 Balance (A - B) 2,555 7,362 5,362 9,935 8,435 11,872 10,872
 Balance considering hedge estimate (8) 1,242 4,831 2,831 7,174 5,674 8,898 7,898
    Decontracted Energy considering hedge estimate (8) 8% 29% 17% 40% 32% 48% 43%
     
Contracts entered into as of 03/31/2024.     
It should be noted that the balance sheet takes into account the SPEs consolidated by Furnas: HPP Santo Antônio (as of 3Q22), HPPs Baguari and Retiro Baixo (as of 4Q23), whether in resources, sales or average prices. Likewise, the SPE consolidated by Eletronorte is being considered: HPP Teles Pires (as of 4Q23).    
The balance sheet does not include, whether in resources, requirements(sales) or average prices, the PIEs contracts arising from the process of unbundling of Amazonas Distribuidora, the contracts of thermal plants by availability and the Physical Guarantee Quotas. These resources are presented in order to compose the total resources considered.    
The Own Resources include the Decoupling plants (new PIEs) and the New Grants (Sobradinho, Itumbiara, Tucuruí, Curuá-Una and Mascarenhas de Moraes). For hydroelectric projects, an estimate of GFIS2 was considered, that is, the Physical Guarantee considering the Adjustment Factors due to Internal Losses, Losses in the Basic Network and Availability and adjustments due to the particularities of the portfolio.    
The revised Physical Guarantee values are considered as defined in Ordinance No. 709/GM/MME, of November 30, 2022    
With the decoupling, the plants currently under quota regime now have a new concession under the Independent Energy Producer - PIE regime, gradually occurring in a period of 5 years from 2023. The Physical Guarantee values were defined in Ordinance GM/MME No. 544/21.    
Considering the new concession grants from 2023 for the Sobradinho, Itumbiara, Tucuruí, Curuá-Una and Mascarenhas de Moraes plants, whose Physical Guarantee values were defined in GM/MME Ordinance No. 544/21.    
     
               
Physical Guarantee Quotas of Hydroelectric Plants (MWavg)   2024 2025 2026 2027    
  Physical Guarantee Quotas (6) (7) 3,939 2,626 1,313 -    
 The Physical Guarantee of the HPP Jaguari, of 12.7 MWavg, whose concession is under the provisional administration of Furnas, is not included here.    
Decoupling occurs gradually over a period of 5 years from 2023. The Physical Guarantee values considered from 2023 were those defined in Ordinance GM/MME No. 544/21.    
The values present an estimate of the energy decontracted. For the year 2024, the estimated value of 87.1% was considered. For the other years, a historical average value of GSF, from 2018 to 2023, of 81.8% was considered. Source: CCEE, obtained on the CCEE website, at the following link: https://www.ccee.org.br/dados-e-analises/dados-geracao, in the MRE option on the panel.
It is important to note that this amount is merely an estimate based on events that have occurred in the past. The graph with the historical GSF values is shown below.
   

 

 

Source: CCEE

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

II.1.4 Energy Purchased for Resale
Eletrobras Company Buyer 1Q24 2Q24 3Q24 4Q24
BRL Million MWh BRL Million MWh BRL Million MWh BRL Million MWh
Eletronorte (1) Eletrobras System - -            
Other 313.78 782,560.29            
Chesf Eletrobras System 4.65 43,680.00            
Other 68.45 245,969.33            
Furnas (2) Eletrobras System 24.07 164,079.86            
Other 525.05 2,399,617.63            
CGT Eletrosul Eletrobras System 29.97 227,415.86            
Other 93.68 354,253.80            
                   
Note: Gross values. The accounting publishes net amounts of recoverable PIS/COFINS.
Note: It includes only purchase contracts, not considering the negative values of the CCEE accounting.
(1) Includes the SPE consolidated by Eletronorte: HPP Teles Pires (as of 4Q23).
(2) Includes SPEs consolidated by Furnas: HPP Santo Antônio (from 3Q22), HPPs Baguari and Retiro Baixo (from 4Q23)

 

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

II.1.5 Average fee – BRL/MWh          
           
II.1.5.1 Projects not renewed under Law No. 12.783/13
Eletrobras Company 1Q24 2Q24 3Q24 4Q24 2024
Eletronorte  249.75        
Chesf (1) 122.16        
Furnas (1) 184.68        
CGT Eletrosul 177.04        
           
(1) Includes enterprises affected by Law 13,182.      
- Selling prices calculated from the total revenue divided by the energy sold.
- Purchase prices calculated from the total expenditure divided by the energy purchased.
- Does not include projects not renewed by Law 12,783/13.
- Includes SPEs consolidated by Furnas: HPP Santo Antônio (from 3Q22), HPPs Baguari and Retiro Baixo (from 4Q23).  Includes the SPE consolidated by Eletronorte: HPP Teles Pires (as of 4Q23).
           
           
           
II.1.5.2 Projects renewed under the terms of Law No. 12,783 – O&M Regime  
Eletrobras Company 1Q24 2Q24 3Q24 4Q24 2024
Eletronorte 82.44        
Chesf  94.87        
Furnas  93.35        
CGT Eletrosul -        
           
Note: Estimated rates considering the ratio between the Total Revenue in the period and the Physical Guarantee in the period (MWh).

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

III.1.1 Extension of Transmission Lines - Undertakings not renewed under Law 12,783/13 –km
Eletrobras Company  765 KV 750 KV 600 KV 525 KV 500 KV 440 KV 345 KV 230 KV 138 KV <138 KV Total
Eletronorte  -   -   1,735.20  -   111.00  1,846.20
Chesf  -  255.97  -   2,359.82  -   -   2,615.80
Furnas  -  844.00  161.00 331.70  -   -   1,336.70
CGT Eletrosul  -   1,956.60  -   1,070.70  -   -   3,027.30
Total  -   1,956.60  1,099.97  161.00  5,497.42  -   111.00  8,826.00
                       
III.1.2 Extension of Transmission Lines – Projects renewed pursuant to Law 12.783/13 - km
Eletrobras Company 765 KV 750 KV 600 KV 525 KV 500 KV 440 KV 345 KV 230 KV 138 KV <138 KV Total
Eletronorte  -   3,236.46  -   5,189.40 222.17  2.30  8,650.30
Chesf  -   5,436.14  -   13,257.99 368.60  173.58  19,236.30
Furnas 2,698.00  -   3,224.00  4,049.30 6,276.60  2,041.60  1,335.50  165.00  19,790.00
CGT Eletrosul  -   2,720.20  -   4,950.68  1,020.10  -   8,691.00
Total 2,698.00  -   3,224.00  2,720.20  12,721.90 6,276.60  25,439.67  2,946.37  340.90  56,367.60
                       
III.1.3 Other - lines without RAP defined in REH - km
Eletrobras Company 765 KV 750 KV 600 KV 525 KV 500 KV 440 KV 345 KV 230 KV 138 KV <138 KV Total
Eletronorte  -  10.71  -  193.05 218.09  2.80 424.60
Chesf  -   -  75.70 93.80  21.30 190.80
Furnas  -   -  66.00 419.30  -  485.30
CGT Eletrosul  -  59.30  -  45.91 53.40  89.00 247.60
Total  -  59.30 10.71  -  380.66 784.59  113.10  1,348.40
                       
I.2 Transmission Lines - Km  
Company Bidding Agreements
(a)
Renewed Contracts (b) Other Contracts (c) SPEs (d) Net variation 4Q23
Total
Corporate voltage ≥ 230 KV SPE voltage ≥ 230 KV TOTAL SPE Total Corporate Corporate + SPE  
Chesf 2,615.79  19,236.31 190.80  1,830.51 20.00  21,385.60 1,830.51  1,830.51  22,042.90 23,873.41  
Eletrobras Holding  -   -   -   -   
Eletronorte 1,846.20  8,650.33 424.65  1,072.64 18.00  10,364.80 1,072.64  1,072.64  10,921.18 11,993.82  
CGT Eletrosul 3,027.30  8,690.98 247.61 4.60 31.80  10,803.40  4.60 4.60  11,965.89 11,970.49  
Furnas 1,336.70  19,790.00 485.30  4,345.40 - 34.00  19,692.20 4,107.32  4,345.40  21,612.00 25,957.40  
Total 8,825.99 56,367.62  1,348.36  7,253.15  35.80  62,246.03 7,015.07  7,253.15 66,541.97 73,795.12  

 

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

Projects renewed pursuant to Law 12.783/13
Company Contract Readjustment index No. of associated substations Total Km RBSE PRC RAP OTHERS
 *
Total Gross RAP for Contract
cycle 2023/2024
Duration of the contract Reduction Date of RAP 50% after 15 years Next readjustment date
PRT MME 579/12 (O&M) PRT MME 120/16 (Indemnity) PRT MME 579/12 (O&M) PRT MME 120/16 (Indemnity) Start Date End Date
CHESF 061/2001 IPCA 112  19,236.3 935,422,213.08 2,971,005,544.89 91,358,457.95 204,453,619.64 531,236,818.39 4,733,476,653.95 1/1/2013 1/1/1943 N/A 1-Jul-24
FURNAS 062/2001 IPCA 64  19,790.0 800,912,245.75 3,400,912,991.75 452,346,065.32 1,710,288,770.10 601,350,269.82 6,965,810,342.74 1/1/2013 1/1/1943 N/A  
ELETRONORTE 058/2001 IPCA 48  8,650.3 573,361,934.42 1,505,647,763.09 28,277,974.42 36,112,964.90 383,086,649.45 2,526,487,286.28 1/1/2013 1/1/1943 N/A  
CGT ELETROSUL 057/2001 IPCA 58  8,691.0 319,372,007.43 572,251,153.81 41,493,125.41 59,304,870.32 206,627,709.95 1,199,048,866.92 1/1/2013 1/1/1943 N/A  
Total        56,367.6 2,629,068,400.68 8,449,817,453.54 613,475,623.10 2,010,160,224.96 1,722,301,447.61 15,424,823,149.89        
                             
Notes                            
1. Substations may be associated with more than one contract.
2. There are RAPs that exceed the effective date of the contract and there is still no regulation of the form of payment, that is, via indemnity or contract extension. For verification of these RAPs, see the list of modules attached to Aneel's approval resolution for the current cycle, available on the Eletrobras website.
3. PRT MME 579/12 - Defined the initial RAP, referred to in art. 13 of Provisional Measure No. 579, of 2012, of the facilities that are part of the electric power transmission concessions framed in art. 6 of said Provisional Measure, subject to the decision provided for in art. 12.
4. PRT MME 120/16 - Determined that the amounts approved by the National Electric Energy Agency - ANEEL related to the assets provided for in art. 15, § 2, of Law No. 12,783, of January 11, 2013, became part of the Regulatory Remuneration Base of electric power transmission concessionaires and that the cost of capital was added to the respective Annual Permitted Revenues.
5. (*) Other revenue: RBNI, RBNIA, RCDM, RCDMA, REQ, RICG, RICGNI, RMEL, RMELP and RPEC.
                             
                             
Projects not renewed under Law 12.783/13
                             
Company Contract Readjustment index No. of associated substations Total Km Total Rap for Contract
cycle 2023/2024
Duration of the contract Reduction Date of RAP 50% after 15 years
(***)
Next readjustment date          
Start Date End Date   Totals
CHESF 007/2005 IGPM  2 208.1 30,650,822.27 4/3/2005 4/3/2035 Dec-22 1-Jul-24   Company RAP Renewed RAP Bidders Regulatory RAP
008/2005 IGPM  2 119.8 13,450,130.04 4/3/2005 4/3/2035 Sep-24   CHESF 4,733,476,653.95 593,369,423.61 5,326,846,077.56
010/2007 IPCA  2 94.5 21,666,038.38 6/14/2007 6/14/2037 Aug-27   FURNAS 6,965,810,342.74 384,019,865.41 7,349,830,208.15
012/2007 IPCA  4 316.0 16,756,892.39 6/14/2007 6/14/2037 Sep/25 and Apr/29   ELETRONORTE 2,526,487,286.28 659,111,066.93 3,185,598,353.21
005/2008 IPCA  3 110.2 6,282,399.85 3/17/2008 3/17/2038 N/A   CGT ELETROSUL 1,199,048,866.92 640,212,014.57 1,839,260,881.49
014/2008 IPCA  2 145.0 9,541,805.53 10/16/2008 10/16/2038 N/A   Total 15,424,823,149.89 2,276,712,370.5 17,701,535,520.4
006/2009 IPCA  3 49.0 29,805,791.28 1/28/2009 1/28/2039 N/A          
017/2009 IPCA  5 95.8 42,824,810.07 3/8/2009 3/8/2039 N/A   Company km Renewed km Not Renewed (*) km Total
018/2009 IPCA  2 144.8 10,663,418.14 3/8/2009 3/8/2039 N/A   CHESF 19,236.3 2,806.6 22,042.9
004/2010 IPCA  4 34.3 49,114,059.76 12/7/2010 11/7/2040 N/A   FURNAS 19,790.0 1,822.0 21,612.0
007/2010 IPCA  1 0.0 15,480,960.67 12/7/2010 12/7/2040 N/A   ELETRONORTE 8,650.3 2,270.8 10,921.2
013/2010 IPCA  1 0.0 15,370,375.34 6/10/2010 6/10/2040 N/A   CGT ELETROSUL 8,691.0 3,274.9 11,965.9
014/2010 IPCA  1 0.0 9,075,226.25 6/10/2010 6/10/2040 N/A   Total 56,367.6 10,174.4 66,542.0
019/2010 IPCA  7 321.0 33,739,144.55 11/23/2010 11/23/2040 N/A   (*) Includes TLs of contracts without approved RAP  
020/2010 IPCA  2 115.0 13,629,391.50 11/23/2010 11/23/2040 N/A          
021/2010 IPCA  2 91.3 10,962,107.37 11/23/2010 11/23/2040 N/A          
008/2011 IPCA  5 285.8 90,110,950.40 10/13/2011 10/13/2041 N/A          
009/2011 IPCA  2 64.1 7,985,271.91 10/13/2011 10/13/2041 N/A          
010/2011 IPCA  3 65.4 19,390,778.28 10/13/2011 10/13/2041 N/A          
017/2011 IPCA  2 45.6 17,825,483.62 9/12/2011 9/12/2041 N/A          
005/2012 IPCA  4 42.0 28,012,447.55 10/5/2012 10/5/2042 N/A          
017/2012 IPCA  2 0.0 16,117,810.97 1/6/2012 1/6/2042 N/A          
018/2012 IPCA  6 207.8 23,480,169.38 1/6/2012 1/6/2042 N/A          
019/2012 IPCA  3 60.3 61,433,138.11 1/6/2012 1/6/2042 N/A          

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

FURNAS 034/2001 IGPM  2 664.0 253,065,937.73 9/5/2001 9/5/2031 Mar-18 1-Jul-24            
006/2005 IGPM  2 90.0 32,811,482.49 4/3/2005 4/3/2035 Jun-25            
007/2006 IPCA  3 71.0 26,570,201.11 4/27/2006 4/27/2036 jan/28 and jan/30            
003/2009 IPCA  2 180.0 14,504,780.19 1/28/2009 1/28/2039 N/A            
028/2009 IPCA  3 187.0 16,597,200.37 11/19/2009 11/18/2039 N/A            
006/2010 IPCA  2 94.7 11,690,300.43 12/7/2010 12/7/2040 N/A            
014/2011 IPCA  2 50.0 5,792,344.70 9/12/2011 9/12/2041 N/A            
016/2012 IPCA  1 0.0 22,987,618.39 10/5/2012 10/5/2042 N/A            
ELETRONORTE 007/2008 IPCA  3 35.9 12,880,015.49 3/17/2008 3/17/2038 N/A 1-Jul-24            
001/2009 IPCA  2 95.0 28,971,540.60 1/28/2009 1/28/2039 N/A            
002/2009 IPCA  1 0.0 21,966,066.05 1/28/2009 1/28/2039 N/A            
010/2009 IPCA  2 44.0 94,514,130.75 2/26/2009 2/26/2039 N/A            
012/2009 IPCA  2 111.0 305,815,263.66 2/26/2009 2/26/2039 N/A            
021/2009 IPCA  7 985.6 99,153,858.27 11/19/2009 11/19/2039 N/A            
022/2009 IPCA  3 486.0 53,376,474.21 11/19/2009 11/19/2039 N/A            
009/2010 IPCA  2 59.1 7,663,301.70 12/7/2010 12/7/2040 N/A            
004/2011 IPCA  1 0.0 9,128,446.29 6/28/2011 6/28/2041 N/A            
012/2011 IPCA  2 0.0 8,776,253.91 9/12/2011 9/12/2041 N/A            
013/2011 IPCA  1 0.0 2,806,235.13 9/12/2011 9/12/2041 N/A            
014/2012 IPCA  2 29.5 14,059,480.87 7/5/2012 7/5/2042 N/A            
CGT ELETROSUL 004/2004 IGPM  3 371.9 83,663,978.44 2/18/2004 2/18/2034 Nov-20 1-Jul-24            
010/2005 IGPM  4 361.2 153,846,370.93 4/3/2005 4/3/2035 Apr-23            
005/2006 IPCA  2 257.4 54,101,206.06 4/27/2006 4/27/2036 May-24            
004/2008 IPCA  2 238.0 8,189,673.24 3/17/2008 3/17/2038 N/A            
005/2009 IPCA  1 0.0 7,442,795.54 1/28/2009 1/28/2039 N/A            
011/2010 IPCA  4 0.0 29,358,931.93 6/10/2010 6/10/2040 N/A            
012/2010 IPCA  3 36.6 5,380,964.70 6/10/2010 6/10/2040 N/A            
002/2011 IPCA  3 231.3 13,874,683.67 6/16/2011 6/16/2041 N/A            
004/2012 IPCA  6 783.1 93,955,009.72 9/5/2014 9/5/2042 N/A            
020/2012 IPCA  4 473.2 156,680,187.65 8/27/2012 8/26/2042 N/A            
007/2014 IPCA  5 274.6 29,178,296.84 1/29/2014 1/29/2044 N/A            
008/2014 IPCA  1 0.0 4,539,915.85 1/29/2014 1/29/2044 N/A            
Total        8,825.9  2,276,712,370.52                    
                               
Other contracts (**)                            
                               
Company Total Km                            
                           
CHESF 190.8                            
FURNAS 485.3                            
ELETRONORTE 424.6                            
CGT ELETROSUL 247.6                            
                               
Notes                              
1. Substations may be associated with more than one contract.
2. There are RAPs that exceed the effective date of the contract and there is still no regulation of the form of payment, that is, via indemnity or contract extension. For verification of these RAPs, see the list of modules attached to Aneel's approval resolution for the current cycle, available on the Eletrobras website.
3. (**) Transmission lines associated with connection of power plants, free consumers, sectionings, etc., without revenue contract approved by REH 3216/2023
4. (***) RAP value considers part of the cycle with integral value and the rest of the cycle with a 50% reduction

 

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

Revenue Concessionaire Construction Module Classification Transmission Function Revenue Contract Index Revenue Type RAP Act Effective Date End of Validity Cycle RAP
CGT ELETROSUL ABDON BATISTA EL 500 kV ABDON BATISTA LT 500 kV BIGUACU /ABDON BATISTA C-1 SC  RB FT LT 500 kV BIGUACU /ABDON BATISTA C-1 SC 010/2005 IGPM RBNI REA 5904/2016 01/07/2016 30/06/2043  R$427,739.46
ABDON BATISTA EL 500 kV ABDON BATISTA LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC  RB FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC 010/2005 IGPM RBNI REA 5904/2016 01/07/2016 30/06/2043  R$427,739.46
ALEGRETE TR 69/13,8 kV ALEGRETE TR4 RS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$21,242.92
ALEGRETE MG 138 kV ALEGRETE MG1 RS DIT   057/2001 IPCA RCDM REA 5861/2016 31/05/2019 30/05/2036  R$32,256.31
ALEGRETE MC 69 kV TR 69/13,8 kV ALEGRETE TR3 RS  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$48,874.58
ALEGRETE TR 69/13,8 kV ALEGRETE TR3 RS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$21,242.92
ALEGRETE TR 69/13,8 kV ALEGRETE TF7 RS DIT   057/2001 IPCA RCDM REA 3815/2012 24/12/2014 23/12/2047  R$496,683.76
ALEGRETE TR 138/69 kV ALEGRETE TR6 RS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$102,016.01
ALEGRETE TR 138/69 kV ALEGRETE TR5 RS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$102,016.01
ALEGRETE MG 138 kV ALEGRETE MG1 RS DIT   057/2001 IPCA RCDM REA 3815/2012 24/12/2014 23/12/2042  R$105,595.16
ALEGRETE MG 138 kV ALEGRETE MG1 RS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$297,092.86
ALEGRETE MC 69 kV TR 69/13,8 kV ALEGRETE TF7 RS DIT   057/2001 IPCA RCDM REA 3815/2012 24/12/2014 23/12/2044  R$339,015.28
ALEGRETE MC 69 kV TR 69/13,8 kV ALEGRETE TR4 RS  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$48,874.58
ALEGRETE MC 13,8 kV TR 69/13,8 kV ALEGRETE TR4 RS DIT   057/2001 IPCA RCDM REA 3815/2012 24/12/2014 23/12/2044  R$54,705.07
ALEGRETE MC 13,8 kV TR 69/13,8 kV ALEGRETE TR4 RS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$34,820.75
ALEGRETE MC 69 kV TR 138/69 kV ALEGRETE TR6 RS  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$48,874.58
ALEGRETE MC 69 kV TR 138/69 kV ALEGRETE TR5 RS  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$48,874.58
ALEGRETE MC 138 kV TR 138/69 kV ALEGRETE TR6 RS  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$80,234.15
ALEGRETE MC 138 kV TR 138/69 kV ALEGRETE TR5 RS  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$80,234.15
ALEGRETE MC 13,8 kV TR 69/13,8 kV ALEGRETE TR3 RS DIT   057/2001 IPCA RCDM REA 3815/2012 24/12/2014 23/12/2044  R$54,705.07
ALEGRETE EL 69 kV ALEGRETE LT 69 kV MACAMBARA /ALEGRETE C-1 RS  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$57,137.95
ALEGRETE EL 69 kV ALEGRETE LT 69 kV HARMONIA /ALEGRETE C-2 RS  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$57,137.95
ALEGRETE MC 13,8 kV TR 69/13,8 kV ALEGRETE TR3 RS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$34,820.75
ALEGRETE MC 13,8 kV TR 69/13,8 kV ALEGRETE TF7 RS DIT   057/2001 IPCA RCDM REA 3815/2012 24/12/2014 23/12/2044  R$338,370.63
ALEGRETE IB 69 kV MG 138 kV ALEGRETE MG1 RS IB1 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$32,849.28
ALEGRETE EL 69 kV ALEGRETE LT 69 kV HARMONIA /ALEGRETE C-2 RS  DIT   057/2001 IPCA RMEL REN 643/2014 19/11/2013 18/11/2036  R$6,560.66
ALEGRETE EL 69 kV ALEGRETE LT 69 kV HARMONIA /ALEGRETE C-1 RS  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$57,137.95
ALEGRETE EL 69 kV ALEGRETE LT 69 kV ALEGRETE 2 /ALEGRETE C-1 RS  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$57,137.95
ALEGRETE EL 138 kV ALEGRETE LT 138 kV SANTA MARIA 3 /ALEGRETE C-1 RS  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$90,811.37
ALEGRETE EL 69 kV ALEGRETE LT 69 kV HARMONIA /ALEGRETE C-1 RS  DIT   057/2001 IPCA RMEL REN 643/2014 19/11/2013 18/11/2036  R$6,560.66
ALEGRETE EL 13,8 kV ALEGRETEDIST4 DIT   057/2001 IPCA RCDM REA 3815/2012 24/12/2014 23/12/2045  R$56,995.42
ALEGRETE EL 13,8 kV ALEGRETEDIST3 DIT   057/2001 IPCA RCDM REA 3815/2012 24/12/2014 23/12/2045  R$56,995.42
ALEGRETE EL 138 kV ALEGRETE LT 138 kV SANTA MARIA 3 /ALEGRETE C-1 RS  DIT   057/2001 IPCA RMEL REN 443/2011 16/11/2014 15/11/2037  R$13,189.12
ALEGRETE EL 13,8 kV ALEGRETEDIST3 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$40,992.90
ALEGRETE EL 13,8 kV ALEGRETEDIST4 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$40,992.90
ALEGRETE EL 13,8 kV ALEGRETEDIST2 DIT   057/2001 IPCA RCDM REA 3815/2012 24/12/2014 23/12/2045  R$56,995.42
ALEGRETE EL 13,8 kV ALEGRETEDIST2 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$40,992.90
ALEGRETE EL 13,8 kV ALEGRETEDIST1 DIT   057/2001 IPCA RCDM REA 3815/2012 24/12/2014 23/12/2045  R$56,995.42
ALEGRETE EL 13,8 kV ALEGRETEDIST1 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$40,992.90
ANASTACIO TR 230/138 kV ANASTACIO TR2 MS RBF FT TR 230/138 kV ANASTACIO TR2 MS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$252,944.84
ANASTACIO TR 230/138 kV ANASTACIO TR1 MS RBF FT TR 230/138 kV ANASTACIO TR1 MS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$252,944.84
ANASTACIO TR 230/138 kV ANASTACIO TR1 MS RBF FT TR 230/138 kV ANASTACIO TR1 MS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$525,820.31
ANASTACIO TR 230/138 kV ANASTACIO TR1 MS RBF FT TR 230/138 kV ANASTACIO TR1 MS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$387,197.57
ANASTACIO MG 230 kV ANASTACIO MG1 MS RB FT MG 230 kV ANASTACIO MG1 MS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$359,286.81
ANASTACIO MG 230 kV ANASTACIO MG1 MS RB FT MG 230 kV ANASTACIO MG1 MS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$746,883.41
ANASTACIO MC 230 kV TR 230/138 kV ANASTACIO TR1 MS RBF FT TR 230/138 kV ANASTACIO TR1 MS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
ANASTACIO MG 230 kV ANASTACIO MG1 MS RB FT MG 230 kV ANASTACIO MG1 MS 057/2001 IPCA RBNI REA 5861/2016 19/04/2018 18/04/2035  R$23,238.17
ANASTACIO MC 230 kV TR 230/138 kV ANASTACIO TR2 MS RBF FT TR 230/138 kV ANASTACIO TR2 MS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
ANASTACIO MC 230 kV TR 230/138 kV ANASTACIO TR2 MS RBF FT TR 230/138 kV ANASTACIO TR2 MS 057/2001 IPCA RMEL REN 643/2014 16/05/2016 15/05/2039  R$ 435.23
ANASTACIO MC 230 kV TR 230/138 kV ANASTACIO TR1 MS RBF FT TR 230/138 kV ANASTACIO TR1 MS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$249,073.03
ANASTACIO MC 230 kV TR 230/138 kV ANASTACIO TR1 MS RBF FT TR 230/138 kV ANASTACIO TR1 MS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$183,409.56
ANASTACIO MC 230 kV TR 230/138 kV ANASTACIO TR1 MS RBF FT TR 230/138 kV ANASTACIO TR1 MS 057/2001 IPCA RMEL REN 643/2014 16/05/2016 15/05/2039  R$2,718.89
ANASTACIO MC 138 kV TR 230/138 kV ANASTACIO TR2 MS RBF FT TR 230/138 kV ANASTACIO TR2 MS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$80,234.15
ANASTACIO MC 138 kV TR 230/138 kV ANASTACIO TR1 MS RBF FT TR 230/138 kV ANASTACIO TR1 MS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$80,234.15
ANASTACIO MC 138 kV TR 230/138 kV ANASTACIO TR1 MS RBF FT TR 230/138 kV ANASTACIO TR1 MS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$166,790.30
ANASTACIO IB 230 kV MG 230 kV ANASTACIO MG1 MS IB1 RB FT MG 230 kV ANASTACIO MG1 MS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$103,749.99
ANASTACIO EL 230 kV ANASTACIO LT 230 kV ANASTACIO /DOURADOS C-1 MS RB FT LT 230 kV ANASTACIO /DOURADOS C-1 MS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
ANASTACIO EL 230 kV ANASTACIO LT 230 kV ANASTACIO /DOURADOS C-1 MS RB FT LT 230 kV ANASTACIO /DOURADOS C-1 MS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$353,874.34
ANASTACIO EL 230 kV ANASTACIO LT 230 kV ANASTACIO /DOURADOS C-1 MS RB FT LT 230 kV ANASTACIO /DOURADOS C-1 MS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$260,581.95
ARAQUARI (HYOSUNG) EL 138 kV ARAQUARI (HYOSUNG) LT 138 kV ILHOTA /ARAQUARI (HYOSUNG) C-1 SC  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,634.74
ARAQUARI (HYOSUNG) EL 138 kV ARAQUARI (HYOSUNG) LT 138 kV ARAQUARI (HYOSUNG) /JOINVILLE SANTA CATARINA C-1 SC  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,634.74
AREIA TR 500/230 kV AREIA TRR1 PR RB FT TR 500/230 kV AREIA TRR1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$502,776.61
AREIA TR 500/230 kV AREIA TR2 PR RB FT TR 500/230 kV AREIA TR2 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,508,329.83
AREIA TR 500/230 kV AREIA TR2 PR RB FT TR 500/230 kV AREIA TR2 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,135,507.60
AREIA MG 500 kV AREIA MG2 PR RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,549,708.17
AREIA MG 500 kV AREIA MG2 PR RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RMEL REN 643/2014 08/12/2013 07/12/2030  R$22,417.36
AREIA MG 500 kV AREIA MG2 PR RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RMEL REN 643/2014 13/10/2014 12/10/2031  R$15,993.09
AREIA MG 500 kV AREIA MG2 PR RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RMEL REN 643/2014 14/10/2014 13/10/2031  R$15,995.23
AREIA MG 500 kV AREIA MG2 PR RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RMEL REN 643/2014 20/10/2014 19/10/2034  R$2,731.17
AREIA MG 500 kV AREIA MG2 PR RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RBNI REA 6882/2018 30/03/2021 30/03/2046  R$129,169.37
AREIA MG 500 kV AREIA MG2 PR RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$13,243.51
AREIA MG 500 kV AREIA MG2 PR RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RMEL REN 643/2014 22/10/2014 21/10/2034  R$2,731.79
AREIA MC 500 kV TR 500/230 kV AREIA TR2 PR  RB FT TR 500/230 kV AREIA TR2 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$323,135.88
AREIA MC 500 kV TR 500/230 kV AREIA TR2 PR  RB FT TR 500/230 kV AREIA TR2 PR 057/2001 IPCA RMEL REN 643/2014 14/12/2014 13/12/2039  R$2,674.12
AREIA MC 230 kV TR 500/230 kV AREIA TR2 PR  RB FT TR 500/230 kV AREIA TR2 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$114,101.11
AREIA MC 230 kV TR 500/230 kV AREIA TR2 PR  RB FT TR 500/230 kV AREIA TR2 PR 057/2001 IPCA RBNI REA 6882/2018 30/03/2021 30/03/2046  R$477,912.49
AREIA MC 230 kV TR 230/138 kV AREIA TR3 PR RBF FT TR 230/138 kV AREIA TR3 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$114,101.11
AREIA MC 230 kV TR 230/138 kV AREIA TR3 PR RBF FT TR 230/138 kV AREIA TR3 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$237,192.75
AREIA MC 230 kV TR 230/138 kV AREIA TR3 PR RBF FT TR 230/138 kV AREIA TR3 PR 057/2001 IPCA RBNI REA 6882/2018 20/01/2021 20/01/2042  R$259,426.75
AREIA MC 230 kV TR 230/138 kV AREIA TR3 PR RBF FT TR 230/138 kV AREIA TR3 PR 057/2001 IPCA RBNI REA 4347/2013 22/03/2015 21/03/2045  R$42,732.91
AREIA MC 230 kV TR 230/138 kV AREIA TR1 PR RBF FT TR 230/138 kV AREIA TR1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$114,101.11
AREIA MC 230 kV TR 230/138 kV AREIA TR1 PR RBF FT TR 230/138 kV AREIA TR1 PR 057/2001 IPCA RMEL REN 643/2014 18/05/2014 17/05/2044  R$13,675.27
AREIA MC 230 kV TR 230/138 kV AREIA TR1 PR RBF FT TR 230/138 kV AREIA TR1 PR 057/2001 IPCA RMEL REN 643/2014 18/05/2014 17/05/2044  R$13,675.27
AREIA MC 230 kV TR 230/138 kV AREIA TR1 PR RBF FT TR 230/138 kV AREIA TR1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$237,192.75
AREIA MC 230 kV TR 230/138 kV AREIA TR1 PR RBF FT TR 230/138 kV AREIA TR1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$174,661.29
AREIA MC 230 kV TR 230/138 kV AREIA TR1 PR RBF FT TR 230/138 kV AREIA TR1 PR 057/2001 IPCA RBNI REA 6882/2018 20/01/2021 20/01/2041  R$249,828.81
AREIA IB 500 kV MG 500 kV AREIA MG2 PR IB4 RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
AREIA IB 500 kV MG 500 kV AREIA MG2 PR IB3 RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
AREIA IB 500 kV MG 500 kV AREIA MG2 PR IB5 RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
AREIA IB 500 kV MG 500 kV AREIA MG2 PR IB1 RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
AREIA IB 230 kV MG 500 kV AREIA MG2 PR IB1 RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$90,304.02
AREIA IB 500 kV MG 500 kV AREIA MG2 PR IB2 RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
AREIA IB 230 kV MG 500 kV AREIA MG2 PR IB1 RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RBNI REA 6882/2018 30/03/2021 30/03/2036  R$176,517.85
AREIA IB 230 kV MG 500 kV AREIA MG2 PR IB1 RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RMEL REN 443/2011 22/10/2014 21/10/2039  R$2,909.81
AREIA EL 500 kV AREIA LT 500 kV AREIA /SEGREDO C-1 PR  RB FT LT 500 kV AREIA /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
AREIA EL 500 kV AREIA LT 500 kV AREIA /SEGREDO C-1 PR  RB FT LT 500 kV AREIA /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$560,443.41
AREIA EL 500 kV AREIA LT 500 kV AREIA /SEGREDO C-1 PR  RB FT LT 500 kV AREIA /SEGREDO C-1 PR 057/2001 IPCA RMEL REN 643/2014 29/12/2014 28/12/2046  R$1,795.73
AREIA EL 500 kV AREIA LT 500 kV AREIA /SEGREDO C-1 PR  RB FT LT 500 kV AREIA /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$761,090.85
AREIA EL 500 kV AREIA LT 500 kV AREIA /SEGREDO C-1 PR  RB FT LT 500 kV AREIA /SEGREDO C-1 PR 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$13,243.51
AREIA EL 500 kV AREIA LT 500 kV AREIA /CURITIBA C-1 PR  RB FT LT 500 kV AREIA /CURITIBA C-1 PR 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$13,243.51
AREIA EL 500 kV AREIA LT 500 kV AREIA /C.NOVOS C-1 PR/SC  RB FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
AREIA EL 500 kV AREIA LT 500 kV AREIA /IVAIPORA C-1 PR  RB FT LT 500 kV AREIA /IVAIPORA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
AREIA EL 500 kV AREIA LT 500 kV AREIA /IVAIPORA C-1 PR  RB FT LT 500 kV AREIA /IVAIPORA C-1 PR 057/2001 IPCA RMEL REN 643/2014 27/02/2016 26/02/2048  R$2,695.81
AREIA EL 500 kV AREIA LT 500 kV AREIA /IVAIPORA C-1 PR  RB FT LT 500 kV AREIA /IVAIPORA C-1 PR 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$13,243.51
AREIA EL 500 kV AREIA LT 500 kV AREIA /CURITIBA C-1 PR  RB FT LT 500 kV AREIA /CURITIBA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
AREIA EL 500 kV AREIA LT 500 kV AREIA /CURITIBA C-1 PR  RB FT LT 500 kV AREIA /CURITIBA C-1 PR 057/2001 IPCA RMEL REN 643/2014 01/09/2015 31/08/2046  R$2,669.65
AREIA EL 500 kV AREIA LT 500 kV AREIA /CURITIBA C-1 PR  RB FT LT 500 kV AREIA /CURITIBA C-1 PR 057/2001 IPCA RBNI REA 5484/2015 28/10/2015 27/10/2043  R$73,406.90
AREIA EL 500 kV AREIA LT 500 kV AREIA /BENTO MUNHOZ C-2 PR  DIT   057/2001 IPCA RCDM REA 5861/2016 31/05/2019 30/05/2034  R$13,243.51
AREIA EL 500 kV AREIA LT 500 kV AREIA /BENTO MUNHOZ C-1 PR  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
AREIA EL 500 kV AREIA LT 500 kV AREIA /C.NOVOS C-1 PR/SC  RB FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC 057/2001 IPCA RMEL REN 643/2014 29/03/2015 28/03/2046  R$2,637.89
AREIA EL 500 kV AREIA LT 500 kV AREIA /C.NOVOS C-1 PR/SC  RB FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC 057/2001 IPCA RBNI REA 5484/2015 28/10/2015 27/10/2038  R$42,169.95
AREIA EL 500 kV AREIA LT 500 kV AREIA /C.NOVOS C-1 PR/SC  RB FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$13,243.51
AREIA EL 500 kV AREIA LT 500 kV AREIA /BENTO MUNHOZ C-2 PR  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
AREIA EL 500 kV AREIA LT 500 kV AREIA /BENTO MUNHOZ C-2 PR  DIT   057/2001 IPCA RMEL REN 643/2014 04/07/2015 03/07/2047  R$2,648.87
AREIA EL 500 kV AREIA LT 500 kV AREIA /BATEIAS C-1 PR  RB FT LT 500 kV AREIA /BATEIAS C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
AREIA EL 230 kV AREIA LT 230 kV AREIA /S. OSORIO C-1 PR RB FT LT 230 kV AREIA /S. OSORIO C-1 PR 057/2001 IPCA RMEL REN 643/2014 09/06/2013 08/06/2036  R$20,318.93
AREIA EL 500 kV AREIA LT 500 kV AREIA /BENTO MUNHOZ C-1 PR  DIT   057/2001 IPCA RMEL REN 643/2014 29/03/2015 28/03/2047  R$2,629.72
AREIA EL 500 kV AREIA LT 500 kV AREIA /BENTO MUNHOZ C-1 PR  DIT   057/2001 IPCA RCDM REA 5861/2016 31/05/2019 30/05/2034  R$13,243.51
AREIA EL 230 kV AREIA LT 230 kV AREIA /S. OSORIO C-1 PR RB FT LT 230 kV AREIA /S. OSORIO C-1 PR 057/2001 IPCA RMEL REN 643/2014 29/12/2014 28/12/2043  R$2,636.32
AREIA EL 500 kV AREIA LT 500 kV AREIA /BATEIAS C-1 PR  RB FT LT 500 kV AREIA /BATEIAS C-1 PR 057/2001 IPCA RMEL REN 643/2014 26/04/2015 25/04/2046  R$1,279.16
AREIA EL 500 kV AREIA LT 500 kV AREIA /BATEIAS C-1 PR  RB FT LT 500 kV AREIA /BATEIAS C-1 PR 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$13,243.51
AREIA EL 230 kV AREIA LT 230 kV AREIA /S.MATEUS SUL C-1 PR RB FT LT 230 kV AREIA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
AREIA EL 230 kV AREIA LT 230 kV AREIA /S.MATEUS SUL C-1 PR RB FT LT 230 kV AREIA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$344,716.94
AREIA EL 230 kV AREIA LT 230 kV AREIA /S.MATEUS SUL C-1 PR RB FT LT 230 kV AREIA /S.MATEUS SUL C-1 PR 057/2001 IPCA RMEL REN 643/2014 22/10/2014 21/10/2043  R$2,169.53
AREIA EL 230 kV AREIA LT 230 kV AREIA /S.MATEUS SUL C-1 PR RB FT LT 230 kV AREIA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBNI REA 6882/2018 20/01/2021 20/01/2041  R$245,809.89
AREIA EL 230 kV AREIA LT 230 kV AREIA /S.MATEUS SUL C-1 PR RB FT LT 230 kV AREIA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBNI REA 5484/2015 18/08/2017 17/08/2047  R$45,731.36
AREIA EL 230 kV AREIA LT 230 kV AREIA /S. OSORIO C-2 PR RB FT LT 230 kV AREIA /S. OSORIO C-2 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
AREIA EL 230 kV AREIA LT 230 kV AREIA /S. OSORIO C-2 PR RB FT LT 230 kV AREIA /S. OSORIO C-2 PR 057/2001 IPCA RMEL REN 643/2014 13/04/2014 12/04/2037  R$20,969.49
AREIA EL 230 kV AREIA LT 230 kV AREIA /S. OSORIO C-2 PR RB FT LT 230 kV AREIA /S. OSORIO C-2 PR 057/2001 IPCA RMEL REN 643/2014 11/09/2015 10/09/2044  R$2,692.06
AREIA EL 230 kV AREIA LT 230 kV AREIA /S. OSORIO C-2 PR RB FT LT 230 kV AREIA /S. OSORIO C-2 PR 057/2001 IPCA RBNI REA 6882/2018 05/03/2021 05/03/2042  R$275,871.73
AREIA EL 230 kV AREIA LT 230 kV AREIA /S. OSORIO C-1 PR RB FT LT 230 kV AREIA /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
AREIA EL 230 kV AREIA LT 230 kV AREIA /S. OSORIO C-1 PR RB FT LT 230 kV AREIA /S. OSORIO C-1 PR 057/2001 IPCA RBNI REA 6882/2018 25/01/2021 25/01/2042  R$275,871.85
AREIA EL 230 kV AREIA LT 230 kV AREIA /PONTA GROSSA C-1 PR  RB FT LT 230 kV AREIA /PONTA GROSSA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
AREIA EL 230 kV AREIA LT 230 kV AREIA /PONTA GROSSA C-1 PR  RB FT LT 230 kV AREIA /PONTA GROSSA C-1 PR 057/2001 IPCA RMEL REN 643/2014 10/12/2013 09/12/2036  R$20,707.57
AREIA EL 230 kV AREIA LT 230 kV AREIA /PONTA GROSSA C-1 PR  RB FT LT 230 kV AREIA /PONTA GROSSA C-1 PR 057/2001 IPCA RMEL REN 643/2014 03/12/2015 02/12/2044  R$2,710.13
AREIA EL 230 kV AREIA LT 230 kV AREIA /PONTA GROSSA C-1 PR  RB FT LT 230 kV AREIA /PONTA GROSSA C-1 PR 057/2001 IPCA RBNI REA 6882/2018 17/02/2021 17/02/2042  R$286,748.56
ASSIS TR 440/230 kV ASSIS TRR1 SP RB FT TR 440/230 kV ASSIS TRR1 SP 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$395,631.37
ASSIS TR 440/230 kV ASSIS TRR1 SP RB FT TR 440/230 kV ASSIS TRR1 SP 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$822,436.27
ASSIS TR 440/230 kV ASSIS TR1 SP RB FT TR 440/230 kV ASSIS TR1 SP 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,186,894.11
ASSIS TR 440/230 kV ASSIS TR1 SP RB FT TR 440/230 kV ASSIS TR1 SP 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,467,308.81
ASSIS MG 440 kV ASSIS MG2 SP RB FT MG 440 kV ASSIS MG2 SP 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$296,510.40
ASSIS MC 230 kV TR 440/230 kV ASSIS TR1 SP  RB FT TR 440/230 kV ASSIS TR1 SP 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$126,266.78
ASSIS MC 230 kV TR 440/230 kV ASSIS TR1 SP  RB FT TR 440/230 kV ASSIS TR1 SP 057/2001 IPCA RMEL REN 643/2014 20/10/2013 19/10/2036  R$20,530.90
ASSIS IB 230 kV MG 440 kV ASSIS MG1 SP IB1 RB FT MG 440 kV ASSIS MG2 SP 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$103,749.99
ASSIS EL 230 kV ASSIS LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR  RB FT LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
ASSIS EL 230 kV ASSIS LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR  RB FT LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR 057/2001 IPCA RMEL REN 443/2011 01/09/2016 31/08/2039  R$22,734.94
ASSIS EL 230 kV ASSIS LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR  RB FT LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
ASSIS EL 230 kV ASSIS LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR  RB FT LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$366,078.59
ASSIS EL 230 kV ASSIS LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR  RB FT LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR 057/2001 IPCA RMEL REN 643/2014 05/04/2016 04/04/2045  R$2,737.12
ASSIS EL 230 kV ASSIS LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR  RB FT LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR 057/2001 IPCA RBNI REA 7576/2019 14/12/2020 14/12/2043  R$111,030.43
ASSIS EL 230 kV ASSIS LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR  RB FT LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$366,078.59
ATLANTIDA 2 TR 230/69 kV ATLANTIDA 2 TR3 RS RBF FT TR 230/69 kV ATLANTIDA 2 TR3 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$253,196.59
ATLANTIDA 2 MG 230 kV ATLANTIDA 2 MG1 RS RB FT MG 230 kV ATLANTIDA 2 MG1 RS 057/2001 IPCA RMEL REN 643/2014 06/10/2014 05/10/2031  R$26,300.17
ATLANTIDA 2 MG 230 kV ATLANTIDA 2 MG1 RS RB FT MG 230 kV ATLANTIDA 2 MG1 RS 057/2001 IPCA RBNI REA 5861/2016 02/05/2019 01/05/2036  R$7,341.21
ATLANTIDA 2 TR 230/69 kV ATLANTIDA 2 TR2 RS RBF FT TR 230/69 kV ATLANTIDA 2 TR2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$253,196.59
ATLANTIDA 2 TR 230/69 kV ATLANTIDA 2 TR1 RS RBF FT TR 230/69 kV ATLANTIDA 2 TR1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$253,196.59
ATLANTIDA 2 MG 230 kV ATLANTIDA 2 MG1 RS RB FT MG 230 kV ATLANTIDA 2 MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$390,944.80
ATLANTIDA 2 MC 69 kV TR 230/69 kV ATLANTIDA 2 TR2 RS  RBF FT TR 230/69 kV ATLANTIDA 2 TR2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,874.58
ATLANTIDA 2 MC 69 kV TR 230/69 kV ATLANTIDA 2 TR1 RS  RBF FT TR 230/69 kV ATLANTIDA 2 TR1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,874.58
ATLANTIDA 2 MC 69 kV TR 230/69 kV ATLANTIDA 2 TR3 RS  RBF FT TR 230/69 kV ATLANTIDA 2 TR3 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,874.58
ATLANTIDA 2 IB 230 kV MG 230 kV ATLANTIDA 2 MG1 RS IB1 RB FT MG 230 kV ATLANTIDA 2 MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$103,749.99
ATLANTIDA 2 EL 69 kV ATLANTIDA 2DIST4 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$57,137.95
ATLANTIDA 2 MC 230 kV TR 230/69 kV ATLANTIDA 2 TR3 RS  RBF FT TR 230/69 kV ATLANTIDA 2 TR3 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
ATLANTIDA 2 MC 230 kV TR 230/69 kV ATLANTIDA 2 TR2 RS  RBF FT TR 230/69 kV ATLANTIDA 2 TR2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
ATLANTIDA 2 MC 230 kV TR 230/69 kV ATLANTIDA 2 TR1 RS  RBF FT TR 230/69 kV ATLANTIDA 2 TR1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
ATLANTIDA 2 IB 69 kV MG 230 kV ATLANTIDA 2 MG1 RS IB2 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$32,849.28
ATLANTIDA 2 EL 69 kV ATLANTIDA 2DIST3 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$57,137.95
ATLANTIDA 2 EL 69 kV ATLANTIDA 2DIST1 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$57,137.95
ATLANTIDA 2 EL 69 kV ATLANTIDA 2DIST2 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$57,137.95
ATLANTIDA 2 EL 230 kV ATLANTIDA 2 LT 230 kV ATLANTIDA 2 /OSORIO 2 C-1 RS  RB FT LT 230 kV ATLANTIDA 2 /OSORIO 2 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
ATLANTIDA 2 EL 230 kV ATLANTIDA 2 LT 230 kV ATLANTIDA 2 /GRAVATAI 3 C-1 RS  RB FT LT 230 kV ATLANTIDA 2 /GRAVATAI 3 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
BIGUACU TR 525/230 kV BIGUACU TR3 SC RB FT TR 500/230 kV BIGUACU TR3 SC 010/2005 IGPM RBNI REA 4802/2014 19/02/2017 18/02/2052  R$ 6,687,378.63
BIGUACU TR 500/230 kV BIGUACU TR2 SC RB FT TR 500/230 kV BIGUACU TR2 SC 010/2005 IGPM RBNI REA 2383/2010 01/03/2012 28/02/2047  R$ 10,233,306.41
BIGUACU TR 500/230 kV BIGUACU TR1 SC RB FT TR 500/230 kV BIGUACU TR1 SC 010/2005 IGPM RBNI REA 485/2006 05/07/2008 04/07/2043  R$ 10,546,467.21
BIGUACU TR 500/230 kV BIGUACU TRR1 SC RB FT TR 500/230 kV BIGUACU TRR1 SC 010/2005 IGPM RBNI REA 485/2006 05/07/2008 04/07/2043  R$ 3,515,489.07
BIGUACU TR 230/138 kV BIGUACU TR3 SC RBF FT TR 230/138 kV BIGUACU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$340,018.74
BIGUACU TR 230/138 kV BIGUACU TR2 SC RBF FT TR 230/138 kV BIGUACU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$340,018.74
BIGUACU TR 230/138 kV BIGUACU TF8 SC RBF FT TR 230/138 kV BIGUACU TF8 SC 057/2001 IPCA RBNI REA 4618/2014 15/04/2016 14/04/2050  R$ 1,738,144.22
BIGUACU TR 230/138 kV BIGUACU TF7 SC RBF FT TR 230/138 kV BIGUACU TF7 SC 057/2001 IPCA RBNI REA 2589/2010 12/11/2012 11/11/2046  R$ 1,608,991.88
BIGUACU RTB 525 kV 0 Mvar BIGUACU RTR1 SC RB FT RTB 500 kV 50 Mvar BIGUACU RTR1 SC 010/2005 IGPM RBNI REA 5239/2015 25/05/2017 24/05/2053  R$948,452.99
BIGUACU RTB 525 kV 0 Mvar BIGUACU RT2 SC RB FT RTB 500 kV 150 Mvar BIGUACU RT2 SC 010/2005 IGPM RBNI REA 5239/2015 25/05/2017 24/05/2053  R$ 2,845,358.97
BIGUACU RTB 500 kV 150 Mvar BIGUACU RT1 SC RB FT RTB 500 kV 150 Mvar BIGUACU RT1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 24/05/2044  R$ 4,219,069.49
BIGUACU MG 500 kV BIGUACU MG1 SC RB FT MG 500 kV BIGUACU MG1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 24/05/2032  R$194,982.87
BIGUACU MG 500 kV BIGUACU MG1 SC RB FT MG 500 kV BIGUACU MG1 SC 010/2005 IGPM RBNI REA 2383/2010 01/03/2012 28/02/2037  R$85,237.75
BIGUACU MG 500 kV BIGUACU MG1 SC RB FT MG 500 kV BIGUACU MG1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 24/05/2032  R$ 7,032,222.99
BIGUACU MG 500 kV BIGUACU MG1 SC RB FT MG 500 kV BIGUACU MG1 SC 010/2005 IGPM RBNI REA 4802/2014 19/02/2017 18/02/2046  R$227,362.05
BIGUACU MG 500 kV BIGUACU MG1 SC RB FT MG 500 kV BIGUACU MG1 SC 010/2005 IGPM RBNI REA 5239/2015 25/05/2017 24/05/2047  R$838,863.34
BIGUACU MG 230 kV BIGUACU MG1 SC RB FT MG 230 kV BIGUACU MG1 SC 057/2001 IPCA RBNI REA 2589/2010 12/11/2012 11/11/2040  R$284,077.81
BIGUACU MG 230 kV BIGUACU MG1 SC RB FT MG 230 kV BIGUACU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$452,374.90
BIGUACU MG 230 kV BIGUACU MG1 SC RB FT MG 230 kV BIGUACU MG1 SC 057/2001 IPCA RBNI REA 4618/2014 15/04/2016 14/04/2044  R$190,451.69
BIGUACU MG 230 kV BIGUACU MG1 SC RB FT MG 230 kV BIGUACU MG1 SC 057/2001 IPCA RBNI REA 4618/2014 15/04/2016 14/04/2044  R$120,864.17
BIGUACU MG 230 kV BIGUACU MG1 SC RB FT MG 230 kV BIGUACU MG1 SC 057/2001 IPCA RBNI REA 6090/2016 28/09/2018 28/09/2049  R$71,147.66
BIGUACU MG 230 kV BIGUACU MG1 SC RB FT MG 230 kV BIGUACU MG1 SC 057/2001 IPCA RBNI REA 5861/2016 11/10/2018 10/10/2035  R$27,921.54
BIGUACU MG 230 kV BIGUACU MG1 SC RB FT MG 230 kV BIGUACU MG1 SC 057/2001 IPCA RBNI DSP 4033/2021 22/12/2021 21/12/2036  R$6,194.50
BIGUACU MC 525 kV TR 525/230 kV BIGUACU TR3 SC RB FT TR 500/230 kV BIGUACU TR3 SC 010/2005 IGPM RBNI REA 4802/2014 19/02/2017 18/02/2048  R$ 2,522,217.13
BIGUACU MC 525 kV RTB 525 kV 0 Mvar BIGUACU RT2 SC RB FT RTB 500 kV 150 Mvar BIGUACU RT2 SC 010/2005 IGPM RBNI REA 5239/2015 25/05/2017 24/05/2048  R$ 1,681,350.82
BIGUACU MC 500 kV TR 500/230 kV BIGUACU TRR1 SC  RB FT TR 500/230 kV BIGUACU TRR1 SC 010/2005 IGPM RBNI REA 2383/2010 01/03/2012 29/02/2040  R$101,430.38
BIGUACU MC 500 kV TR 500/230 kV BIGUACU TR2 SC  RB FT TR 500/230 kV BIGUACU TR2 SC 010/2005 IGPM RBNI REA 2383/2010 01/03/2012 29/02/2040  R$ 2,316,006.44
BIGUACU MC 500 kV TR 500/230 kV BIGUACU TR1 SC  RB FT TR 500/230 kV BIGUACU TR1 SC 010/2005 IGPM RBNI REA 485/2006 05/07/2008 04/07/2036  R$ 2,363,590.80
BIGUACU MC 500 kV RTB 500 kV 150 Mvar BIGUACU RT1 SC  RB FT RTB 500 kV 150 Mvar BIGUACU RT1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 24/05/2036  R$ 2,365,340.05
BIGUACU MC 230 kV TR 525/230 kV BIGUACU TR3 SC RB FT TR 500/230 kV BIGUACU TR3 SC 010/2005 IGPM RBNI REA 4802/2014 19/02/2017 18/02/2048  R$ 1,555,927.07
BIGUACU MC 230 kV TR 500/230 kV BIGUACU TRR1 SC  RB FT TR 500/230 kV BIGUACU TRR1 SC 010/2005 IGPM RBNI REA 2383/2010 01/03/2012 28/02/2035  R$42,346.82
BIGUACU MC 230 kV TR 500/230 kV BIGUACU TR2 SC  RB FT TR 500/230 kV BIGUACU TR2 SC 010/2005 IGPM RBNI REA 2383/2010 01/03/2012 28/02/2035  R$908,432.13
BIGUACU MC 230 kV TR 500/230 kV BIGUACU TR1 SC  RB FT TR 500/230 kV BIGUACU TR1 SC 010/2005 IGPM RBNI REA 485/2006 05/07/2008 04/07/2031  R$926,140.30
BIGUACU MC 230 kV TR 230/138 kV BIGUACU TR3 SC  RBF FT TR 230/138 kV BIGUACU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
BIGUACU MC 230 kV TR 230/138 kV BIGUACU TR2 SC  RBF FT TR 230/138 kV BIGUACU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
BIGUACU MC 230 kV TR 230/138 kV BIGUACU TF8 SC RBF FT TR 230/138 kV BIGUACU TF8 SC 057/2001 IPCA RBNI REA 4618/2014 15/04/2016 14/04/2046  R$ 1,141,671.98
BIGUACU MC 230 kV TR 230/138 kV BIGUACU TF7 SC  RBF FT TR 230/138 kV BIGUACU TF7 SC 057/2001 IPCA RBNI REA 2589/2010 12/11/2012 11/11/2042  R$ 1,046,478.60
BIGUACU MC 230 kV BC 230 kV 0 Mvar BIGUACU BC1 SC RB FT BC 230 kV 100 Mvar BIGUACU BC1 SC 057/2001 IPCA RBNI REA 6090/2016 28/09/2018 28/09/2042  R$813,150.93
BIGUACU MC 138 kV TR 230/138 kV BIGUACU TR3 SC  RBF FT TR 230/138 kV BIGUACU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$90,882.76
BIGUACU MC 138 kV TR 230/138 kV BIGUACU TR2 SC  RBF FT TR 230/138 kV BIGUACU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$90,882.76
BIGUACU MC 138 kV TR 230/138 kV BIGUACU TF8 SC RBF FT TR 230/138 kV BIGUACU TF8 SC 057/2001 IPCA RBNI REA 4618/2014 15/04/2016 14/04/2046  R$ 1,206,110.95
BIGUACU MC 138 kV TR 230/138 kV BIGUACU TF7 SC  RBF FT TR 230/138 kV BIGUACU TF7 SC 057/2001 IPCA RBNI REA 2589/2010 12/11/2012 11/11/2042  R$ 1,104,218.75
BIGUACU IB 525 kV MG 500 kV BIGUACU MG1 SC IB4 RB FT MG 500 kV BIGUACU MG1 SC 010/2005 IGPM RBNI REA 5239/2015 25/05/2017 24/05/2049  R$ 2,069,853.09
BIGUACU IB 500 kV MG 500 kV BIGUACU MG1 SC IB3 RB FT MG 500 kV BIGUACU MG1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 24/05/2039  R$ 2,462,679.16
BIGUACU IB 500 kV MG 500 kV BIGUACU MG1 SC IB2 RB FT MG 500 kV BIGUACU MG1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 24/05/2039  R$ 2,462,679.16
BIGUACU IB 500 kV MG 500 kV BIGUACU MG1 SC IB1 RB FT MG 500 kV BIGUACU MG1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 24/05/2039  R$ 2,462,679.16
BIGUACU IB 230 kV MG 230 kV BIGUACU MG1 SC IB1 RB FT MG 230 kV BIGUACU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$103,749.99
BIGUACU IB 138 kV MG 230 kV BIGUACU MG1 SC IB2 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$75,711.46
BIGUACU EL 500 kV BIGUACU LT 500 kV BIGUACU /BLUMENAU C-1 SC  RB FT LT 500 kV BIGUACU /BLUMENAU C-1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 24/05/2035  R$ 2,684,771.22
BIGUACU EL 500 kV BIGUACU LT 500 kV BIGUACU /ABDON BATISTA C-1 SC  RB FT LT 500 kV BIGUACU /ABDON BATISTA C-1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 24/05/2035  R$ 2,684,771.22
BIGUACU EL 230 kV BIGUACU LT 230 kV BIGUACU /J.LACERDA-B C-1 SC  RB FT LT 230 kV BIGUACU /J.LACERDA-B C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
BIGUACU EL 138 kV BIGUACU LT 138 kV BIGUACU /TIJUCAS C-1 SC  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$134,367.35
BIGUACU EL 230 kV BIGUACU LT 230 kV BIGUACU /PALHOCA ESU C-1 SC  RB FT LT 230 kV BIGUACU /PALHOCA ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
BIGUACU EL 138 kV BIGUACU LT 138 kV BIGUACU /ITAJAIFAZENDA C-1 SC  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$134,367.35
BIGUACU EL 230 kV BIGUACU LT 230 kV BIGUACU /GASPAR 2 C-1 SC  RB FT LT 230 kV BIGUACU /GASPAR 2 C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
BIGUACU EL 230 kV BIGUACU LT 230 kV BIGUACU /DESTERRO C-1 SC  RB FT LT 230 kV BIGUACU /DESTERRO C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
BIGUACU EL 138 kV BIGUACU LT 138 kV BIGUACU /FLORIANOPOLIS C-2 SC  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$134,367.35
BIGUACU BC 230 kV 0 Mvar BIGUACU BC1 SC RB FT BC 230 kV 100 Mvar BIGUACU BC1 SC 057/2001 IPCA RBNI REA 6090/2016 28/09/2018 28/09/2038  R$ 1,115,560.57
BIGUACU EL 138 kV BIGUACU LT 138 kV BIGUACU /FLORIANOPOLIS C-1 SC  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$134,367.35
BIGUACU EL 138 kV BIGUACU LT 138 kV BIGUACU /B.Q.BOCAIUVA C-1 SC  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$134,367.35
BIGUACU EL 138 kV BIGUACUTIJUC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$134,367.35
BLUMENAU TR 500/230 kV BLUMENAU TR6 SC RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,508,329.83
BLUMENAU TR 500/230 kV BLUMENAU TR6 SC RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,135,507.60
BLUMENAU TR 230/138 kV BLUMENAU TR4 SC RBF FT TR 230/138 kV BLUMENAU TR4 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$736,423.74
BLUMENAU TR 500/230 kV BLUMENAU TR6 SC RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,308,889.34
BLUMENAU TR 500/230 kV BLUMENAU TR5 SC RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,508,329.83
BLUMENAU TR 500/230 kV BLUMENAU TR5 SC RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,135,507.60
BLUMENAU TR 500/230 kV BLUMENAU TR5 SC RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,308,889.34
BLUMENAU TR 230/138 kV BLUMENAU TR4 SC RBF FT TR 230/138 kV BLUMENAU TR4 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$354,255.21
BLUMENAU TR 230/138 kV BLUMENAU TR3 SC RBF FT TR 230/138 kV BLUMENAU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$340,018.74
BLUMENAU TR 230/138 kV BLUMENAU TR4 SC RBF FT TR 230/138 kV BLUMENAU TR4 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$542,279.32
BLUMENAU TR 230/138 kV BLUMENAU TR3 SC RBF FT TR 230/138 kV BLUMENAU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$706,829.04
BLUMENAU TR 230/138 kV BLUMENAU TR3 SC RBF FT TR 230/138 kV BLUMENAU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$520,486.71
BLUMENAU TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$340,018.74
BLUMENAU TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$706,829.04
BLUMENAU TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$340,018.74
BLUMENAU TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$706,829.04
BLUMENAU TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$520,486.71
BLUMENAU TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$520,486.71
BLUMENAU RTB 525 kV 0 Mvar BLUMENAU RT2 SC RB FT RTB 525 kV 150 Mvar BLUMENAU RT2 SC 057/2001 IPCA RBNI REA 7151/2018 05/06/2020 05/06/2055  R$ 3,165,931.03
BLUMENAU RTB 500 kV 50 Mvar BLUMENAU RTR1 SC RB FT RTB 500 kV 50 Mvar BLUMENAU RTR1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$418,068.43
BLUMENAU RTL 500 kV 150 Mvar BLUMENAU RT2 SC RB FT LT 500 kV BLUMENAU /C.NOVOS C-1 SC 010/2005 IGPM RBL CC 010/2005 17/09/2006 04/03/2035  R$ 1,812,169.22
BLUMENAU RTB 500 kV 50 Mvar BLUMENAU RTR1 SC RB FT RTB 500 kV 50 Mvar BLUMENAU RTR1 SC 057/2001 IPCA RBNI REA 7151/2018 05/06/2020 05/06/2053  R$16,804.57
BLUMENAU RTB 500 kV 50 Mvar BLUMENAU RTR1 SC RB FT RTB 500 kV 50 Mvar BLUMENAU RTR1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$201,111.00
BLUMENAU RTB 500 kV 150 Mvar BLUMENAU RT1 SC RB FT RTB 500 kV 150 Mvar BLUMENAU RT1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$603,333.01
BLUMENAU RTB 500 kV 150 Mvar BLUMENAU RT1 SC RB FT RTB 500 kV 150 Mvar BLUMENAU RT1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,254,205.28
BLUMENAU MG 500 kV BLUMENAU MG2 SC RB FT MG 500 kV BLUMENAU MG2 SC 010/2005 IGPM RBL CC 010/2005 17/09/2006 04/03/2035  R$ 1,231,358.28
BLUMENAU MG 500 kV BLUMENAU MG1 SC RB FT MG 500 kV BLUMENAU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,267,301.40
BLUMENAU MG 500 kV BLUMENAU MG1 SC RB FT MG 500 kV BLUMENAU MG1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,634,459.04
BLUMENAU MG 500 kV BLUMENAU MG1 SC RB FT MG 500 kV BLUMENAU MG1 SC 057/2001 IPCA RBNI REA 7151/2018 05/06/2020 05/06/2043  R$92,104.24
BLUMENAU MC 525 kV RTB 525 kV 0 Mvar BLUMENAU RT2 SC RB FT RTB 525 kV 150 Mvar BLUMENAU RT2 SC 057/2001 IPCA RBNI REA 7151/2018 05/06/2020 05/06/2048  R$ 1,767,522.69
BLUMENAU MC 500 kV TR 500/230 kV BLUMENAU TR6 SC  RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$323,135.88
BLUMENAU MC 500 kV TR 500/230 kV BLUMENAU TR6 SC  RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RMEL REN 643/2014 23/04/2015 22/04/2038  R$45,245.07
BLUMENAU MC 500 kV TR 500/230 kV BLUMENAU TR6 SC  RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$671,733.05
BLUMENAU MC 500 kV TR 500/230 kV BLUMENAU TR6 SC  RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$494,643.13
BLUMENAU MC 500 kV TR 500/230 kV BLUMENAU TR6 SC  RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RMEL REN 643/2014 14/09/2016 13/09/2046  R$22,671.97
BLUMENAU MC 500 kV TR 500/230 kV BLUMENAU TR6 SC  RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RMEL REN 643/2014 25/06/2014 24/06/2042  R$1,718.30
BLUMENAU MC 500 kV TR 500/230 kV BLUMENAU TR5 SC  RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$323,135.88
BLUMENAU MC 500 kV TR 500/230 kV BLUMENAU TR5 SC  RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RMEL REN 643/2014 25/06/2014 24/06/2042  R$2,260.93
BLUMENAU MC 500 kV RTB 500 kV 150 Mvar BLUMENAU RT1 SC  RB FT RTB 500 kV 150 Mvar BLUMENAU RT1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$302,550.62
BLUMENAU MC 500 kV TR 500/230 kV BLUMENAU TR5 SC  RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RMEL REN 643/2014 27/07/2014 26/07/2037  R$44,059.39
BLUMENAU MC 500 kV TR 500/230 kV BLUMENAU TR5 SC  RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$671,733.05
BLUMENAU MC 500 kV TR 500/230 kV BLUMENAU TR5 SC  RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RMEL REN 643/2014 14/09/2016 13/09/2046  R$22,671.97
BLUMENAU MC 500 kV RTB 500 kV 150 Mvar BLUMENAU RT1 SC  RB FT RTB 500 kV 150 Mvar BLUMENAU RT1 SC 057/2001 IPCA RMEL REN 643/2014 22/08/2014 21/08/2037  R$44,173.56
BLUMENAU MC 500 kV RTB 500 kV 150 Mvar BLUMENAU RT1 SC  RB FT RTB 500 kV 150 Mvar BLUMENAU RT1 SC 057/2001 IPCA RMEL REN 643/2014 13/03/2016 12/03/2051  R$1,679.00
BLUMENAU MC 500 kV RTB 500 kV 150 Mvar BLUMENAU RT1 SC  RB FT RTB 500 kV 150 Mvar BLUMENAU RT1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$628,940.53
BLUMENAU MC 500 kV RTB 500 kV 150 Mvar BLUMENAU RT1 SC  RB FT RTB 500 kV 150 Mvar BLUMENAU RT1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$463,132.05
BLUMENAU MC 230 kV TR 500/230 kV BLUMENAU TR5 SC  RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$114,101.11
BLUMENAU MC 230 kV TR 500/230 kV BLUMENAU TR5 SC  RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RMEL REN 643/2014 26/08/2014 25/08/2037  R$21,254.63
BLUMENAU MC 230 kV TR 500/230 kV BLUMENAU TR6 SC  RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$114,101.11
BLUMENAU MC 230 kV TR 500/230 kV BLUMENAU TR6 SC  RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RMEL REN 643/2014 30/03/2014 29/03/2037  R$20,939.92
BLUMENAU MC 230 kV TR 500/230 kV BLUMENAU TR6 SC  RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$237,192.75
BLUMENAU MC 230 kV TR 500/230 kV BLUMENAU TR6 SC  RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$174,661.29
BLUMENAU MC 230 kV TR 500/230 kV BLUMENAU TR5 SC  RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RMEL REN 643/2014 28/09/2014 27/09/2044  R$13,823.96
BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR4 SC  RBF FT TR 230/138 kV BLUMENAU TR4 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$114,101.11
BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR4 SC  RBF FT TR 230/138 kV BLUMENAU TR4 SC 057/2001 IPCA RMEL REN 643/2014 13/06/2014 12/06/2037  R$2,577.02
BLUMENAU MC 230 kV TR 500/230 kV BLUMENAU TR5 SC  RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$237,192.75
BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR3 SC  RBF FT TR 230/138 kV BLUMENAU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$114,101.11
BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR4 SC  RBF FT TR 230/138 kV BLUMENAU TR4 SC 057/2001 IPCA RMEL REN 643/2014 29/11/2013 28/11/2036  R$20,684.33
BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR4 SC  RBF FT TR 230/138 kV BLUMENAU TR4 SC 057/2001 IPCA RBNI REA 3578/2012 24/08/2014 23/08/2044  R$42,017.37
BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR3 SC  RBF FT TR 230/138 kV BLUMENAU TR3 SC 057/2001 IPCA RBNI REA 3578/2012 17/08/2014 16/08/2044  R$41,993.52
BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$114,101.11
BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$237,192.75
BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR3 SC  RBF FT TR 230/138 kV BLUMENAU TR3 SC 057/2001 IPCA RMEL REN 643/2014 28/03/2016 27/03/2039  R$2,751.66
BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RMEL REN 643/2014 25/06/2014 24/06/2037  R$1,907.13
BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RMEL REN 643/2014 25/11/2013 24/11/2036  R$20,675.90
BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RBNI REA 3578/2012 03/08/2014 02/08/2044  R$41,945.83
BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$114,101.11
BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$174,661.29
BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RMEL REN 643/2014 14/08/2013 13/08/2036  R$20,458.33
BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RBNI REA 3578/2012 26/07/2014 25/07/2044  R$41,918.57
BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$237,192.75
BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$174,661.29
BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RMEL REN 643/2014 25/06/2014 24/06/2037  R$1,907.13
BLUMENAU MC 230 kV BC 230 kV 125 Mvar BLUMENAU BC2 SC  RB FT BC 230 kV 125 Mvar BLUMENAU BC2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$129,994.25
BLUMENAU MC 230 kV BC 230 kV 125 Mvar BLUMENAU BC2 SC  RB FT BC 230 kV 125 Mvar BLUMENAU BC2 SC 057/2001 IPCA RMEL REN 643/2014 13/06/2014 12/06/2048  R$ 215.49
BLUMENAU MC 230 kV BC 230 kV 125 Mvar BLUMENAU BC1 SC  RB FT BC 230 kV 125 Mvar BLUMENAU BC1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$129,994.25
BLUMENAU MC 230 kV BC 230 kV 125 Mvar BLUMENAU BC1 SC  RB FT BC 230 kV 125 Mvar BLUMENAU BC1 SC 057/2001 IPCA RMEL REN 643/2014 13/06/2014 12/06/2048  R$ 215.49
BLUMENAU MC 138 kV TR 230/138 kV BLUMENAU TR4 SC  RBF FT TR 230/138 kV BLUMENAU TR4 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$87,609.97
BLUMENAU MC 138 kV TR 230/138 kV BLUMENAU TR3 SC  RBF FT TR 230/138 kV BLUMENAU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$87,609.97
BLUMENAU MC 138 kV TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$87,609.97
BLUMENAU MC 138 kV TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$182,123.12
BLUMENAU MC 138 kV TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$134,109.75
BLUMENAU MC 138 kV TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$87,609.97
BLUMENAU MC 138 kV TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$182,123.12
BLUMENAU MC 138 kV TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$134,109.75
BLUMENAU IB 500 kV MG 500 kV BLUMENAU MG2 SC IB4 RB FT MG 500 kV BLUMENAU MG2 SC 010/2005 IGPM RBL CC 010/2005 17/09/2006 04/03/2035  R$ 1,697,178.12
BLUMENAU IB 500 kV MG 500 kV BLUMENAU MG1 SC IB2 RB FT MG 500 kV BLUMENAU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
BLUMENAU IB 500 kV MG 500 kV BLUMENAU MG1 SC IB1 RB FT MG 500 kV BLUMENAU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
BLUMENAU IB 230 kV MG 500 kV BLUMENAU MG1 SC IB2 RB FT MG 500 kV BLUMENAU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$90,304.02
BLUMENAU IB 230 kV MG 500 kV BLUMENAU MG1 SC IB1 RB FT MG 500 kV BLUMENAU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$90,304.02
BLUMENAU IB 138 kV MG 500 kV BLUMENAU MG1 SC IB1 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$67,687.04
BLUMENAU EL 500 kV BLUMENAU LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR  RB FT LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
BLUMENAU EL 500 kV BLUMENAU LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR  RB FT LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR 057/2001 IPCA RMEL REN 643/2014 25/06/2014 24/06/2045  R$2,024.89
BLUMENAU EL 500 kV BLUMENAU LT 500 kV BIGUACU /BLUMENAU C-1 SC  RB FT LT 500 kV BIGUACU /BLUMENAU C-1 SC 010/2005 IGPM RBL CC 010/2005 17/09/2006 04/03/2035  R$ 1,697,178.12
BLUMENAU EL 500 kV BLUMENAU LT 500 kV BIGUACU /BLUMENAU C-1 SC  RB FT LT 500 kV BIGUACU /BLUMENAU C-1 SC 010/2005 IGPM RMEL REN 643/2014 25/06/2014 24/06/2045  R$2,472.68
BLUMENAU EL 230 kV BLUMENAU LT 230 kV GASPAR 2 /BLUMENAU C-2 SC  RB FT LT 230 kV GASPAR 2 /BLUMENAU C-2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
BLUMENAU EL 230 kV BLUMENAU LT 230 kV GASPAR 2 /BLUMENAU C-2 SC  RB FT LT 230 kV GASPAR 2 /BLUMENAU C-2 SC 057/2001 IPCA RBNI REA 2837/2011 02/08/2014 01/08/2044  R$41,942.41
BLUMENAU EL 230 kV BLUMENAU LT 230 kV GASPAR 2 /BLUMENAU C-2 SC  RB FT LT 230 kV GASPAR 2 /BLUMENAU C-2 SC 057/2001 IPCA RMEL REN 643/2014 25/06/2014 24/06/2044  R$2,517.51
BLUMENAU EL 230 kV BLUMENAU LT 230 kV GASPAR 2 /BLUMENAU C-1 SC  RB FT LT 230 kV GASPAR 2 /BLUMENAU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
BLUMENAU EL 230 kV BLUMENAU LT 230 kV GASPAR 2 /BLUMENAU C-1 SC  RB FT LT 230 kV GASPAR 2 /BLUMENAU C-1 SC 057/2001 IPCA RMEL REN 443/2011 01/12/2014 30/11/2044  R$2,550.06
BLUMENAU EL 230 kV BLUMENAU LT 230 kV GASPAR 2 /BLUMENAU C-1 SC  RB FT LT 230 kV GASPAR 2 /BLUMENAU C-1 SC 057/2001 IPCA RMEL REN 443/2011 09/11/2016 08/11/2039  R$22,957.04
BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /JOINVILLE C-1 SC  RB FT LT 230 kV BLUMENAU /JOINVILLE C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /JOINVILLE C-1 SC  RB FT LT 230 kV BLUMENAU /JOINVILLE C-1 SC 057/2001 IPCA RBNI REA 3578/2012 30/08/2014 29/08/2044  R$42,037.81
BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /JOINVILLE C-1 SC  RB FT LT 230 kV BLUMENAU /JOINVILLE C-1 SC 057/2001 IPCA RMEL REN 643/2014 25/06/2014 24/06/2044  R$2,517.51
BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /JOINVILLE C-1 SC  RB FT LT 230 kV BLUMENAU /JOINVILLE C-1 SC 057/2001 IPCA RBNI REA 7761/2019 30/04/2019 29/04/2049  R$18,975.14
BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC  RB FT LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC  RB FT LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC 057/2001 IPCA RBNI REA 3578/2012 23/08/2014 22/08/2044  R$42,013.97
BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC  RB FT LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC 057/2001 IPCA RMEL REN 643/2014 01/12/2014 30/11/2044  R$2,550.06
BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC  RB FT LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC 057/2001 IPCA RBNI REA 7761/2019 30/04/2019 29/04/2049  R$18,975.14
BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /ITAJAI C-2 SC  RB FT LT 230 kV BLUMENAU /ITAJAI C-2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /ITAJAI C-2 SC  RB FT LT 230 kV BLUMENAU /ITAJAI C-2 SC 057/2001 IPCA RMEL REN 643/2014 25/06/2014 24/06/2044  R$ 402.80
BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /ITAJAI C-1 SC  RB FT LT 230 kV BLUMENAU /ITAJAI C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /ITAJAI C-1 SC  RB FT LT 230 kV BLUMENAU /ITAJAI C-1 SC 057/2001 IPCA RMEL REN 643/2014 25/06/2014 24/06/2044  R$ 402.80
BLUMENAU EL 138 kV BLUMENAU LT 138 kV BLUMENAU DOIS /BLUMENAU C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,634.74
BLUMENAU EL 138 kV BLUMENAU LT 138 kV BLUMENAU /ILHOTA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,634.74
BLUMENAU EL 138 kV BLUMENAU LT 138 kV BLUMENAU /GASPAR C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,634.74
BLUMENAU EL 138 kV BLUMENAU LT 138 kV BLUMENAU DOIS /BLUMENAU C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,634.74
BLUMENAU EL 138 kV BLUMENAU LT 138 kV BLUMENAU /GASPAR C-1 SC DIT   057/2001 IPCA RCDM REA 7761/2019 18/08/2021 17/08/2051  R$22,331.25
BLUMENAU BC 230 kV 125 Mvar BLUMENAU BC2 SC RB FT BC 230 kV 125 Mvar BLUMENAU BC2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,888.22
BLUMENAU BC 230 kV 125 Mvar BLUMENAU BC1 SC RB FT BC 230 kV 125 Mvar BLUMENAU BC1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,888.22
C.MOURAO MG 230 kV C.MOURAO MG1 PR RB FT MG 230 kV C.MOURAO MG1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$339,634.96
C.MOURAO MC 230 kV TR 230/138 kV C.MOURAO TR1 PR  RBF FT TR 230/138 kV C.MOURAO TR1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$114,101.11
C.MOURAO IB 230 kV MG 230 kV C.MOURAO MG1 PR IB1 RB FT MG 230 kV C.MOURAO MG1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$90,304.02
C.MOURAO EL 230 kV C.MOURAO LT 230 kV C.MOURAO /S. OSORIO C-2 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-2 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
C.MOURAO EL 230 kV C.MOURAO LT 230 kV C.MOURAO /S. OSORIO C-1 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
C.MOURAO EL 230 kV C.MOURAO LT 230 kV C.MOURAO /MARINGA C-1 PR RB FT LT 230 kV C.MOURAO /MARINGA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
C.MOURAO EL 230 kV C.MOURAO LT 230 kV C.MOURAO /APUCARANA C-1 PR  RB FT LT 230 kV C.MOURAO /APUCARANA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
C.NOVOS MC 230 kV TR230/138kV C.NOVOSTR4 SC RBF FT TR230/138kV C.NOVOSTR4 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$249,073.03
C.NOVOS MC 230 kV TR230/138kV C.NOVOSTR3 SC RBF FT TR230/138kV C.NOVOSTR3 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$249,073.03
C.NOVOS TR 500/230 kV C.NOVOS TRR1 SC RB FT TR 500/230 kV C.NOVOS TRR1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$502,776.61
C.NOVOS TR 500/230 kV C.NOVOS TR7 SC RB FT TR 500/230 kV C.NOVOS TR7 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,508,329.83
C.NOVOS TR 500/230 kV C.NOVOS TR2 SC RB FT TR 500/230 kV C.NOVOS TR2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,508,329.83
C.NOVOS TR 500/230 kV C.NOVOS TR1 SC RB FT TR 500/230 kV C.NOVOS TR1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,508,329.83
C.NOVOS TR230/138kV C.NOVOSTR5 SC RBF FT TR230/138kV C.NOVOSTR5 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$340,018.74
C.NOVOS TR230/138kV C.NOVOSTR5 SC RBF FT TR230/138kV C.NOVOSTR5 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$706,829.04
C.NOVOS TR230/138kV C.NOVOSTR5 SC RBF FT TR230/138kV C.NOVOSTR5 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$520,486.71
C.NOVOS TR230/138kV C.NOVOSTR4 SC RBF FT TR230/138kV C.NOVOSTR4 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$340,018.74
C.NOVOS TR230/138kV C.NOVOSTR4 SC RBF FT TR230/138kV C.NOVOSTR4 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$706,829.04
C.NOVOS TR230/138kV C.NOVOSTR4 SC RBF FT TR230/138kV C.NOVOSTR4 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$520,486.71
C.NOVOS TR230/138kV C.NOVOSTR3 SC RBF FT TR230/138kV C.NOVOSTR3 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$340,018.74
C.NOVOS TR230/138kV C.NOVOSTR3 SC RBF FT TR230/138kV C.NOVOSTR3 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$706,829.04
C.NOVOS TR230/138kV C.NOVOSTR3 SC RBF FT TR230/138kV C.NOVOSTR3 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$520,486.71
C.NOVOS RTL 500 kV 75 Mvar C.NOVOS RT4 SC RB FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS 005/2006 IPCA RBL CC 005/2006 27/04/2006 27/04/2036  R$ 1,572,045.00
C.NOVOS RTL 500 kV 75 Mvar C.NOVOS RT4 SC RB FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS 005/2006 IPCA RMEL REN 443/2011 13/06/2014 12/06/2047  R$ 350.06
C.NOVOS RTL 500 kV 25 Mvar C.NOVOS RTR1 SC RB FT RTL 500 kV 25 Mvar C.NOVOS RTR1 SC 005/2006 IPCA RBL CC 005/2006 27/04/2006 27/04/2036  R$524,015.90
C.NOVOS RTL 500 kV 150 Mvar C.NOVOS RT3 SC RB FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC 010/2005 IGPM RBL CC 010/2005 17/09/2006 04/03/2035  R$ 1,812,169.22
C.NOVOS RTL 500 kV 150 Mvar C.NOVOS RT3 SC RB FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC 010/2005 IGPM RMEL REN 643/2014 13/06/2014 12/06/2050  R$ 663.07
C.NOVOS RTL 500 kV 100 Mvar C.NOVOS RT1 SC RB FT RTL 500 kV 100 Mvar C.NOVOS RT1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$525,715.87
C.NOVOS RTL 500 kV 100 Mvar C.NOVOS RT1 SC RB FT RTL 500 kV 100 Mvar C.NOVOS RT1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,092,855.21
C.NOVOS RTL 500 kV 100 Mvar C.NOVOS RT1 SC RB FT RTL 500 kV 100 Mvar C.NOVOS RT1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$804,744.26
C.NOVOS RTB 500 kV 33,3 Mvar C.NOVOS RTR1 SC RB FT RTB 500 kV 33,3 Mvar C.NOVOS RTR1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$175,174.78
C.NOVOS RTB 500 kV 33,3 Mvar C.NOVOS RTR1 SC RB FT RTB 500 kV 33,3 Mvar C.NOVOS RTR1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$364,152.36
C.NOVOS RTB 500 kV 33,3 Mvar C.NOVOS RTR1 SC RB FT RTB 500 kV 33,3 Mvar C.NOVOS RTR1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$268,150.36
C.NOVOS RTB 500 kV 100 Mvar C.NOVOS RT2 SC RB FT RTB 500 kV 100 Mvar C.NOVOS RT2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$525,715.87
C.NOVOS RTB 500 kV 100 Mvar C.NOVOS RT2 SC RB FT RTB 500 kV 100 Mvar C.NOVOS RT2 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,092,855.21
C.NOVOS RTB 500 kV 100 Mvar C.NOVOS RT2 SC RB FT RTB 500 kV 100 Mvar C.NOVOS RT2 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$804,744.26
C.NOVOS MG 500 kV C.NOVOS MG1 SC RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,631,418.75
C.NOVOS MG 500 kV C.NOVOS MG1 SC RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RMEL REN 643/2014 13/08/2014 12/08/2031  R$31,725.81
C.NOVOS MG 500 kV C.NOVOS MG1 SC RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RMEL REN 643/2014 13/06/2014 12/06/2034  R$2,690.45
C.NOVOS MG 500 kV C.NOVOS MG1 SC RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RMEL REN 643/2014 13/06/2014 12/06/2034  R$2,690.45
C.NOVOS MG 500 kV C.NOVOS MG1 SC RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RMEL REN 643/2014 13/06/2014 12/06/2034  R$2,690.45
C.NOVOS MG 500 kV C.NOVOS MG1 SC RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RMEL REN 643/2014 13/06/2014 12/06/2034  R$2,690.45
C.NOVOS MG 500 kV C.NOVOS MG1 SC RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RMEL REN 443/2011 01/04/2015 31/03/2032  R$11,955.99
C.NOVOS MG 500 kV C.NOVOS MG1 SC RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RMEL REN 443/2011 01/04/2015 31/03/2032  R$11,955.99
C.NOVOS MG 500 kV C.NOVOS MG1 SC RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$13,243.51
C.NOVOS MC 500 kV TR 500/230 kV C.NOVOS TR7 SC  RB FT TR 500/230 kV C.NOVOS TR7 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$323,135.88
C.NOVOS MC 500 kV TR 500/230 kV C.NOVOS TR7 SC  RB FT TR 500/230 kV C.NOVOS TR7 SC 057/2001 IPCA RMEL REN 643/2014 15/09/2014 14/09/2042  R$ 214.02
C.NOVOS MC 500 kV TR 500/230 kV C.NOVOS TR2 SC  RB FT TR 500/230 kV C.NOVOS TR2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$323,135.88
C.NOVOS MC 500 kV TR 500/230 kV C.NOVOS TR2 SC  RB FT TR 500/230 kV C.NOVOS TR2 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$671,733.05
C.NOVOS MC 500 kV TR 500/230 kV C.NOVOS TR2 SC  RB FT TR 500/230 kV C.NOVOS TR2 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$494,643.13
C.NOVOS MC 500 kV TR 500/230 kV C.NOVOS TR1 SC  RB FT TR 500/230 kV C.NOVOS TR1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$323,135.88
C.NOVOS MC 500 kV RTL 500 kV 75 Mvar C.NOVOS RT4 SC  RB FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS 005/2006 IPCA RBL CC 005/2006 27/04/2006 27/04/2036  R$614,409.47
C.NOVOS MC 500 kV RTL 500 kV 100 Mvar C.NOVOS RT1 SC  RB FT RTL 500 kV 100 Mvar C.NOVOS RT1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$195,769.91
C.NOVOS MC 500 kV RTB 500 kV 100 Mvar C.NOVOS RT2 SC  RB FT RTB 500 kV 100 Mvar C.NOVOS RT2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$150,466.84
C.NOVOS MC 500 kV RTB 500 kV 100 Mvar C.NOVOS RT2 SC  RB FT RTB 500 kV 100 Mvar C.NOVOS RT2 SC 057/2001 IPCA RMEL REN 643/2014 31/01/2014 30/01/2037  R$43,282.08
C.NOVOS MC 230 kV TR 500/230 kV C.NOVOS TR7 SC  RB FT TR 500/230 kV C.NOVOS TR7 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
C.NOVOS MC 230 kV TR 500/230 kV C.NOVOS TR2 SC  RB FT TR 500/230 kV C.NOVOS TR2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
C.NOVOS MC 230 kV TR 500/230 kV C.NOVOS TR1 SC  RB FT TR 500/230 kV C.NOVOS TR1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
C.NOVOS MC 230 kV TR230/138kV C.NOVOSTR5 SC RBF FT TR230/138kV C.NOVOSTR5 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
C.NOVOS MC 230 kV TR230/138kV C.NOVOSTR5 SC RBF FT TR230/138kV C.NOVOSTR5 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$249,073.03
C.NOVOS MC 230 kV TR230/138kV C.NOVOSTR5 SC RBF FT TR230/138kV C.NOVOSTR5 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$183,409.56
C.NOVOS MC 230 kV TR230/138kV C.NOVOSTR5 SC RBF FT TR230/138kV C.NOVOSTR5 SC 057/2001 IPCA RBNI REA 5484/2015 29/09/2017 28/09/2050  R$104,347.16
C.NOVOS MC 230 kV TR230/138kV C.NOVOSTR4 SC RBF FT TR230/138kV C.NOVOSTR4 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
C.NOVOS MC 230 kV TR230/138kV C.NOVOSTR3 SC RBF FT TR230/138kV C.NOVOSTR3 SC 057/2001 IPCA RBNI REA 5484/2015 29/09/2017 28/09/2050  R$104,347.16
C.NOVOS MC 230 kV TR230/138kV C.NOVOSTR4 SC RBF FT TR230/138kV C.NOVOSTR4 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$183,409.56
C.NOVOS MC 230 kV TR230/138kV C.NOVOSTR4 SC RBF FT TR230/138kV C.NOVOSTR4 SC 057/2001 IPCA RBNI REA 5484/2015 29/09/2017 28/09/2050  R$104,347.16
C.NOVOS MC 230 kV TR230/138kV C.NOVOSTR3 SC RBF FT TR230/138kV C.NOVOSTR3 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
C.NOVOS MC 138 kV TR230/138kV C.NOVOSTR4 SC RBF FT TR230/138kV C.NOVOSTR4 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$87,609.97
C.NOVOS MC 230 kV TR230/138kV C.NOVOSTR3 SC RBF FT TR230/138kV C.NOVOSTR3 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$183,409.56
C.NOVOS IB 500 kV MG 500 kV C.NOVOS MG1 SC IB5 RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
C.NOVOS MC 138 kV TR230/138kV C.NOVOSTR5 SC RBF FT TR230/138kV C.NOVOSTR5 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$87,609.97
C.NOVOS IB 500 kV MG 500 kV C.NOVOS MG1 SC IB5 RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$712,852.36
C.NOVOS MC 138 kV TR230/138kV C.NOVOSTR3 SC RBF FT TR230/138kV C.NOVOSTR3 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$87,609.97
C.NOVOS IB 500 kV MG 500 kV C.NOVOS MG1 SC IB4 RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
C.NOVOS IB 500 kV MG 500 kV C.NOVOS MG1 SC IB4 RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$712,852.36
C.NOVOS IB 500 kV MG 500 kV C.NOVOS MG1 SC IB2 RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
C.NOVOS IB 500 kV MG 500 kV C.NOVOS MG1 SC IB1 RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
C.NOVOS IB 500 kV MG 500 kV C.NOVOS MG1 SC IB3 RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
C.NOVOS IB 230 kV MG 500 kV C.NOVOS MG1 SC IB1 RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$103,749.99
C.NOVOS IB 230 kV MG 500 kV C.NOVOS MG1 SC IB1 RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RBNI REA 5484/2015 29/09/2017 28/09/2050  R$104,347.16
C.NOVOS EL 500 kV C.NOVOS LT 500 kV C.NOVOS /MACHADINHO C-1 SC  RB FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
C.NOVOS EL 500 kV C.NOVOS LT 500 kV C.NOVOS /MACHADINHO C-1 SC  RB FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC 057/2001 IPCA RMEL REN 643/2014 13/04/2014 12/04/2044  R$67,901.51
C.NOVOS IB 138 kV MG 500 kV C.NOVOS MG1 SC IB1 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$67,687.04
C.NOVOS EL 525 kV C.NOVOS LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS  RB FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS 005/2006 IPCA RBL CC 005/2006 27/04/2006 27/04/2036  R$ 1,837,925.64
C.NOVOS EL 525 kV C.NOVOS LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS  RB FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS 005/2006 IPCA RMEL REN 643/2014 13/06/2014 12/06/2045  R$ 375.88
C.NOVOS EL 525 kV C.NOVOS LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS  RB FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS 005/2006 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$11,208.11
C.NOVOS EL 500 kV C.NOVOS LT 500 kV C.NOVOS /MACHADINHO C-1 SC  RB FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$560,443.41
C.NOVOS EL 500 kV C.NOVOS LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS  RB FT LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS 057/2001 IPCA RMEL REN 643/2014 01/02/2015 31/01/2045  R$60,376.94
C.NOVOS EL 500 kV C.NOVOS LT 500 kV C.NOVOS /MACHADINHO C-1 SC  RB FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC 057/2001 IPCA RMEL REN 643/2014 20/07/2014 19/07/2037  R$44,028.63
C.NOVOS EL 500 kV C.NOVOS LT 500 kV C.NOVOS /MACHADINHO C-1 SC  RB FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$761,090.85
C.NOVOS EL 500 kV C.NOVOS LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS  RB FT LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS 057/2001 IPCA RMEL REN 643/2014 02/09/2014 01/09/2037  R$44,221.86
C.NOVOS EL 500 kV C.NOVOS LT 500 kV C.NOVOS /MACHADINHO C-1 SC  RB FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC 057/2001 IPCA RMEL REN 443/2011 15/11/2015 14/11/2030  R$21,984.05
C.NOVOS EL 500 kV C.NOVOS LT 500 kV C.NOVOS /MACHADINHO C-1 SC  RB FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$13,243.51
C.NOVOS EL 500 kV C.NOVOS LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS  RB FT LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
C.NOVOS EL 500 kV C.NOVOS LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS  RB FT LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$13,243.51
C.NOVOS EL 500 kV C.NOVOS LT 500 kV AREIA /C.NOVOS C-1 PR/SC  RB FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
C.NOVOS EL 500 kV C.NOVOS LT 500 kV AREIA /C.NOVOS C-1 PR/SC  RB FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC 057/2001 IPCA RMEL REN 643/2014 05/12/2014 04/12/2045  R$2,277.29
C.NOVOS EL 500 kV C.NOVOS LT 500 kV AREIA /C.NOVOS C-1 PR/SC  RB FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC 057/2001 IPCA RMEL REN 443/2011 15/05/2016 14/05/2039  R$46,948.98
C.NOVOS EL 500 kV C.NOVOS LT 500 kV AREIA /C.NOVOS C-1 PR/SC  RB FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$13,243.51
C.NOVOS EL 500 kV C.NOVOS LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC  RB FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC 010/2005 IGPM RBL CC 010/2005 17/09/2006 04/03/2035  R$ 1,697,178.12
C.NOVOS EL 500 kV C.NOVOS LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC  RB FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC 010/2005 IGPM RMEL REN 443/2011 13/06/2014 12/06/2045  R$3,066.08
C.NOVOS EL 500 kV C.NOVOS LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC  RB FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC 010/2005 IGPM RBNI REA 5861/2016 31/05/2019 30/05/2033  R$3,599.48
C.NOVOS EL 138 kV C.NOVOS LT 138 kV VIDAL R. JR /C.NOVOS C-2 SC  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,634.74
C.NOVOS EL 138 kV C.NOVOS LT 138 kV VIDAL R. JR /C.NOVOS C-2 SC  DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$199,970.29
C.NOVOS EL 138 kV C.NOVOS LT 138 kV VIDAL R. JR /C.NOVOS C-1 SC  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,634.74
C.NOVOS EL 138 kV C.NOVOS LT 138 kV VIDAL R. JR /C.NOVOS C-2 SC  DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$271,562.76
C.NOVOS EL 138 kV C.NOVOS LT 138 kV VIDAL R. JR /C.NOVOS C-1 SC  DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$271,562.76
C.NOVOS EL 138 kV C.NOVOS LT 138 kV VIDAL R. JR /C.NOVOS C-1 SC  DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$199,970.29
CAMAQUA 3 TR 230/69 kV CAMAQUA 3 TR2 RS RBF FT TR 230/69 kV CAMAQUA 3 TR2 RS 004/2012 IPCA RBL CC 004/2012 09/12/2014 10/05/2042  R$890,252.83
CAMAQUA 3 TR 230/69 kV CAMAQUA 3 TR1 RS RBF FT TR 230/69 kV CAMAQUA 3 TR1 RS 004/2012 IPCA RBL CC 004/2012 09/12/2014 10/05/2042  R$890,252.83
CAMAQUA 3 MG 230 kV CAMAQUA 3 MG1 RS RB FT MG 230 kV CAMAQUA 3 MG1 RS 004/2012 IPCA RBL CC 004/2012 09/12/2014 10/05/2042  R$849,377.21
CAMAQUA 3 MG 230 kV CAMAQUA 3 MG1 RS RB FT MG 230 kV CAMAQUA 3 MG1 RS 004/2012 IPCA RBNI DSP 1430/2021 27/05/2021 26/05/2036  R$3,943.72
CAMAQUA 3 MC 69 kV TR 230/69 kV CAMAQUA 3 TR2 RS RBF FT TR 230/69 kV CAMAQUA 3 TR2 RS 004/2012 IPCA RBL CC 004/2012 09/12/2014 10/05/2042  R$154,082.65
CAMAQUA 3 MC 69 kV TR 230/69 kV CAMAQUA 3 TR1 RS RBF FT TR 230/69 kV CAMAQUA 3 TR1 RS 004/2012 IPCA RBL CC 004/2012 09/12/2014 10/05/2042  R$154,082.65
CAMAQUA 3 MC 230 kV TR 230/69 kV CAMAQUA 3 TR2 RS RBF FT TR 230/69 kV CAMAQUA 3 TR2 RS 004/2012 IPCA RBL CC 004/2012 09/12/2014 10/05/2042  R$377,967.90
CAMAQUA 3 MC 230 kV TR 230/69 kV CAMAQUA 3 TR1 RS RBF FT TR 230/69 kV CAMAQUA 3 TR1 RS 004/2012 IPCA RBL CC 004/2012 09/12/2014 10/05/2042  R$377,967.90
CAMAQUA 3 IB 69 kV MG 230 kV CAMAQUA 3 MG1 RS IB1 DIT   004/2012 IPCA RPEC CC 004/2012 09/12/2014 10/05/2042  R$155,518.85
CAMAQUA 3 IB 230 kV MG 230 kV CAMAQUA 3 MG1 RS IB1 RB FT MG 230 kV CAMAQUA 3 MG1 RS 004/2012 IPCA RBL CC 004/2012 09/12/2014 10/05/2042  R$328,412.52
CAMAQUA 3 EL 69 kV CAMAQUA 3DIST3 DIT   004/2012 IPCA RPEC CC 004/2012 09/12/2014 10/05/2042  R$268,685.19
CAMAQUA 3 EL 69 kV CAMAQUA 3DIST2 DIT   004/2012 IPCA RPEC CC 004/2012 09/12/2014 10/05/2042  R$268,685.19
CAMAQUA 3 EL 69 kV CAMAQUA 3DIST1 DIT   004/2012 IPCA RPEC CC 004/2012 09/12/2014 10/05/2042  R$268,685.19
CAMAQUA 3 EL 230 kV CAMAQUA 3 LT 230 kV CAMAQUA 3 /POVO NOVO C-1 RS  RB FT LT 230 kV CAMAQUA 3 /POVO NOVO C-1 RS 004/2012 IPCA RBL CC 004/2012 09/12/2014 10/05/2042  R$532,318.31
CAMAQUA 3 EL 230 kV CAMAQUA 3 LT 230 kV CAMAQUA 3 /NOVA STA RITA C-1 RS RB FT LT 230 kV CAMAQUA 3 /NOVA STA RITA C-1 RS 004/2012 IPCA RBL CC 004/2012 09/12/2014 10/05/2042  R$532,318.31
CAMPO GRANDE MG 138 kV CAMPO GRANDE MG1 MS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$283,572.19
CAMPO GRANDE MG 138 kV CAMPO GRANDE MG1 MS DIT   057/2001 IPCA RMEL REN 643/2014 14/02/2013 13/02/2030  R$22,296.16
CAMPO GRANDE MC 138 kV BC 138 kV 30 MVAr CAMPO GRANDE BC1 MS  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$90,947.28
CAMPO GRANDE MC 138 kV BC 138 kV 30 MVAr CAMPO GRANDE BC1 MS  DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$189,060.70
CAMPO GRANDE MC 138 kV BC 138 kV 30 MVAr CAMPO GRANDE BC1 MS  DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$139,218.36
CAMPO GRANDE IB 138 kV MG 138 kV CAMPO GRANDE MG1 MS IB1 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$75,711.46
CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /U.MIMOSO C-4 MS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$137,916.89
CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /U.MIMOSO C-4 MS DIT   057/2001 IPCA RMEL REN 643/2014 29/08/2013 28/08/2036  R$12,672.36
CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /U.MIMOSO C-3 MS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$137,916.89
CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /U.MIMOSO C-3 MS DIT   057/2001 IPCA RMEL REN 643/2014 29/08/2013 28/08/2036  R$12,672.36
CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /U.MIMOSO C-2 MS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$137,916.89
CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /U.MIMOSO C-2 MS DIT   057/2001 IPCA RMEL REN 643/2014 09/12/2013 08/12/2036  R$12,805.61
CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /U.MIMOSO C-1 MS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$137,916.89
CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /SIDROLANDIA C-1 MS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$137,916.89
CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /SIDROLANDIA C-1 MS DIT   057/2001 IPCA RMEL REN 643/2014 09/12/2013 08/12/2036  R$12,805.61
CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /SIDROLANDIA C-1 MS DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$286,700.85
CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /CG M.COUTO C-2 MS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$137,916.89
CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /CG M.COUTO C-2 MS DIT   057/2001 IPCA RMEL REN 643/2014 09/12/2013 08/12/2036  R$12,805.61
CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /CG M.COUTO C-1 MS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$137,916.89
CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /CG M.COUTO C-1 MS DIT   057/2001 IPCA RMEL REN 643/2014 09/12/2013 08/12/2036  R$12,805.61
CAMPO GRANDE EL 138 kV CAMPO GRANDEDIST1 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$137,916.89
CAMPO GRANDE BC 138 kV 30 MVAr CAMPO GRANDE BC1 MS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$111,304.05
CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV A.GUARIROBA /CAMPO GRANDE C-1 MS  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$137,916.89
CANOINHAS ESU EL 230 kV CANOINHAS ESU LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR RB FT LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$344,716.94
CANOINHAS ESU TR 230/138 kV CANOINHAS ESU TR3 SC RBF FT TR 230/138 kV CANOINHAS ESU TR3 SC 057/2001 IPCA RBNI REA 4892/2014 03/12/2017 02/12/2051  R$ 1,920,979.30
CANOINHAS ESU TR 230/138 kV CANOINHAS ESU TR2 SC RBF FT TR 230/138 kV CANOINHAS ESU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$340,018.74
CANOINHAS ESU TR 230/138 kV CANOINHAS ESU TR1 SC RBF FT TR 230/138 kV CANOINHAS ESU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$340,018.74
CANOINHAS ESU MG 230 kV CANOINHAS ESU MG1 SC RB FT MG 230 kV CANOINHAS ESU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,988.92
CANOINHAS ESU MG 230 kV CANOINHAS ESU MG1 SC RB FT MG 230 kV CANOINHAS ESU MG1 SC 057/2001 IPCA RBNI REA 4802/2014 22/08/2016 21/08/2044  R$192,165.83
CANOINHAS ESU MG 230 kV CANOINHAS ESU MG1 SC RB FT MG 230 kV CANOINHAS ESU MG1 SC 057/2001 IPCA RBNI REA 6630/2017 07/08/2017 06/08/2045  R$48,477.99
CANOINHAS ESU MC 230 kV TR 230/138 kV CANOINHAS ESU TR3 SC  RBF FT TR 230/138 kV CANOINHAS ESU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$114,101.11
CANOINHAS ESU MC 230 kV TR 230/138 kV CANOINHAS ESU TR3 SC  RBF FT TR 230/138 kV CANOINHAS ESU TR3 SC 057/2001 IPCA RBNI REA 4892/2014 03/12/2017 02/12/2044  R$133,457.92
CANOINHAS ESU MC 230 kV TR 230/138 kV CANOINHAS ESU TR3 SC  RBF FT TR 230/138 kV CANOINHAS ESU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$237,192.75
CANOINHAS ESU MC 230 kV TR 230/138 kV CANOINHAS ESU TR3 SC  RBF FT TR 230/138 kV CANOINHAS ESU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$174,661.29
CANOINHAS ESU MC 230 kV TR 230/138 kV CANOINHAS ESU TR3 SC  RBF FT TR 230/138 kV CANOINHAS ESU TR3 SC 057/2001 IPCA RMEL REN 643/2014 22/11/2015 21/11/2045  R$2,516.92
CANOINHAS ESU MC 230 kV TR 230/138 kV CANOINHAS ESU TR2 SC RBF FT TR 230/138 kV CANOINHAS ESU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$114,101.11
CANOINHAS ESU MC 230 kV TR 230/138 kV CANOINHAS ESU TR2 SC RBF FT TR 230/138 kV CANOINHAS ESU TR2 SC 057/2001 IPCA RMEL REN 643/2014 23/11/2015 22/11/2045  R$2,517.12
CANOINHAS ESU MC 230 kV TR 230/138 kV CANOINHAS ESU TR1 SC RBF FT TR 230/138 kV CANOINHAS ESU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$114,101.11
CANOINHAS ESU MC 230 kV TR 230/138 kV CANOINHAS ESU TR1 SC RBF FT TR 230/138 kV CANOINHAS ESU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$237,192.75
CANOINHAS ESU MC 230 kV TR 230/138 kV CANOINHAS ESU TR1 SC RBF FT TR 230/138 kV CANOINHAS ESU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$174,661.29
CANOINHAS ESU MC 230 kV BC 230 kV 50 Mvar CANOINHAS ESU BC1 SC  RB FT BC 230 kV 50 Mvar CANOINHAS ESU BC1 SC 057/2001 IPCA RBNI REA 4802/2014 22/08/2016 21/08/2046  R$ 1,069,949.38
CANOINHAS ESU MC 138 kV TR 230/138 kV CANOINHAS ESU TR3 SC  RBF FT TR 230/138 kV CANOINHAS ESU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$80,234.15
CANOINHAS ESU MC 138 kV TR 230/138 kV CANOINHAS ESU TR3 SC  RBF FT TR 230/138 kV CANOINHAS ESU TR3 SC 057/2001 IPCA RBNI REA 4892/2014 03/12/2017 02/12/2045  R$151,854.08
CANOINHAS ESU MC 138 kV TR 230/138 kV CANOINHAS ESU TR3 SC  RBF FT TR 230/138 kV CANOINHAS ESU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$166,790.30
CANOINHAS ESU MC 138 kV TR 230/138 kV CANOINHAS ESU TR3 SC  RBF FT TR 230/138 kV CANOINHAS ESU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$122,819.14
CANOINHAS ESU MC 138 kV TR 230/138 kV CANOINHAS ESU TR2 SC RBF FT TR 230/138 kV CANOINHAS ESU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$80,234.15
CANOINHAS ESU MC 138 kV TR 230/138 kV CANOINHAS ESU TR1 SC RBF FT TR 230/138 kV CANOINHAS ESU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$80,234.15
CANOINHAS ESU MC 138 kV TR 230/138 kV CANOINHAS ESU TR1 SC RBF FT TR 230/138 kV CANOINHAS ESU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$166,790.30
CANOINHAS ESU MC 138 kV TR 230/138 kV CANOINHAS ESU TR1 SC RBF FT TR 230/138 kV CANOINHAS ESU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$122,819.14
CANOINHAS ESU IB 230 kV MG 230 kV CANOINHAS ESU MG1 SC IB1 RB FT MG 230 kV CANOINHAS ESU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$90,304.02
CANOINHAS ESU IB 230 kV MG 230 kV CANOINHAS ESU MG1 SC IB1 RB FT MG 230 kV CANOINHAS ESU MG1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$187,723.50
CANOINHAS ESU BC 230 kV 50 Mvar CANOINHAS ESU BC1 SC RB FT BC 230 kV 50 Mvar CANOINHAS ESU BC1 SC 057/2001 IPCA RBNI REA 4802/2014 22/08/2016 21/08/2039  R$393,171.50
CANOINHAS ESU EL 230 kV CANOINHAS ESU LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR RB FT LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
CASCAVEL OEST MG 525 kV CASCAVEL OEST MG1 PR RB FT MG 525 kV CASCAVEL OEST MG1 PR 057/2001 IPCA RBNI REA 8795/2020 08/05/2023 08/05/2041  R$457,218.64
CASCAVEL OEST EL 525 kV CASCAVEL OEST LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR RB FT LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR 057/2001 IPCA RBNI REA 8795/2020 08/05/2023 08/05/2052  R$ 1,550,869.89
CASCAVEL OEST EL 500 kV CASCAVEL OEST LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR  RB FT LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR 004/2004 IGPM RBL CC 004/2004 31/10/2005 18/02/2034  R$ 4,768,674.03
CAXIAS TR 525/230 kV CAXIAS TRR1 RS RB FT TR 525/230 kV CAXIAS TRR1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$502,776.61
CAXIAS TR 525/230 kV CAXIAS TR3 RS RB FT TR 525/230 kV CAXIAS TR3 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,508,329.83
CAXIAS TR 525/230 kV CAXIAS TR1 RS RB FT TR 525/230 kV CAXIAS TR1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,508,329.83
CAXIAS TR 525/230 kV CAXIAS TR1 RS RB FT TR 525/230 kV CAXIAS TR1 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,135,507.60
CAXIAS TR 525/230 kV CAXIAS TR2 RS RB FT TR 525/230 kV CAXIAS TR2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,508,329.83
CAXIAS TR 525/230 kV CAXIAS TR1 RS RB FT TR 525/230 kV CAXIAS TR1 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,308,889.34
CAXIAS RTB 525 kV 50 Mvar CAXIAS RTR2 RS RB FT RTB 525 kV 50 Mvar CAXIAS RTR2 RS 057/2001 IPCA RBNI REA 8795/2020 08/05/2022 08/05/2056  R$615,479.97
CAXIAS RTB 525 kV 50 Mvar CAXIAS RTR1 RS RB FT RTB 525 kV 50 Mvar CAXIAS RTR1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$201,111.00
CAXIAS RTB 525 kV 150 Mvar CAXIAS RT2 RS RB FT RTB 525 kV 150 Mvar CAXIAS RT2 RS 057/2001 IPCA RBNI REA 8795/2020 08/05/2022 08/05/2056  R$ 1,846,439.94
CAXIAS RTB 525 kV 150 Mvar CAXIAS RT1 RS RB FT RTB 525 kV 150 Mvar CAXIAS RT1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$603,333.01
CAXIAS MG 525 kV CAXIAS MG1 RS RB FT MG 525 kV CAXIAS MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,356,193.82
CAXIAS MG 525 kV CAXIAS MG1 RS RB FT MG 525 kV CAXIAS MG1 RS 057/2001 IPCA RBNI REA 8795/2020 08/05/2022 08/05/2053  R$692,472.13
CAXIAS MG 525 kV CAXIAS MG1 RS RB FT MG 525 kV CAXIAS MG1 RS 057/2001 IPCA RBNI REA 5861/2016 03/06/2019 02/06/2036  R$21,915.27
CAXIAS MC 525 kV TR 525/230 kV CAXIAS TR3 RS  RB FT TR 525/230 kV CAXIAS TR3 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$323,135.88
CAXIAS MC 525 kV TR 525/230 kV CAXIAS TR3 RS  RB FT TR 525/230 kV CAXIAS TR3 RS 057/2001 IPCA RMEL REN 643/2014 09/04/2016 08/04/2049  R$ 247.37
CAXIAS MC 525 kV TR 525/230 kV CAXIAS TR2 RS  RB FT TR 525/230 kV CAXIAS TR2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$323,135.88
CAXIAS MC 525 kV TR 525/230 kV CAXIAS TR2 RS  RB FT TR 525/230 kV CAXIAS TR2 RS 057/2001 IPCA RMEL REN 643/2014 25/11/2015 24/11/2038  R$47,392.65
CAXIAS MC 525 kV TR 525/230 kV CAXIAS TR1 RS  RB FT TR 525/230 kV CAXIAS TR1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$323,135.88
CAXIAS MC 525 kV RTB 525 kV 150 Mvar CAXIAS RT2 RS  RB FT RTB 525 kV 150 Mvar CAXIAS RT2 RS 057/2001 IPCA RBNI REA 8795/2020 08/05/2022 08/05/2050  R$ 1,437,237.46
CAXIAS MC 525 kV RTB 525 kV 150 Mvar CAXIAS RT1 RS  RB FT RTB 525 kV 150 Mvar CAXIAS RT1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$302,550.62
CAXIAS MC 525 kV RTB 525 kV 150 Mvar CAXIAS RT1 RS  RB FT RTB 525 kV 150 Mvar CAXIAS RT1 RS 057/2001 IPCA RMEL REN 643/2014 25/01/2016 24/01/2049  R$ 354.32
CAXIAS MC 230 kV TR 525/230 kV CAXIAS TR3 RS  RB FT TR 525/230 kV CAXIAS TR3 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
CAXIAS MC 230 kV TR 525/230 kV CAXIAS TR2 RS  RB FT TR 525/230 kV CAXIAS TR2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
CAXIAS MC 230 kV TR 525/230 kV CAXIAS TR1 RS  RB FT TR 525/230 kV CAXIAS TR1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
CAXIAS IB 525 kV MG 525 kV CAXIAS MG1 RS IB5 RB FT MG 525 kV CAXIAS MG1 RS 057/2001 IPCA RBNI REA 8795/2020 08/05/2022 08/05/2053  R$ 1,642,658.07
CAXIAS IB 525 kV MG 525 kV CAXIAS MG1 RS IB4 RB FT MG 525 kV CAXIAS MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
CAXIAS IB 525 kV MG 525 kV CAXIAS MG1 RS IB2 RB FT MG 525 kV CAXIAS MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
CAXIAS IB 230 kV MG 525 kV CAXIAS MG1 RS IB1 RB FT MG 525 kV CAXIAS MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$103,749.99
CAXIAS IB 525 kV MG 525 kV CAXIAS MG1 RS IB3 RB FT MG 525 kV CAXIAS MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
CAXIAS EL 525 kV CAXIAS LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS  RB FT LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
CAXIAS IB 525 kV MG 525 kV CAXIAS MG1 RS IB1 RB FT MG 525 kV CAXIAS MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
CAXIAS EL 525 kV CAXIAS LT 525 kV CAXIAS /GRAVATAI C-1 RS  RB FT LT 525 kV CAXIAS /GRAVATAI C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
CAXIAS EL 525 kV CAXIAS LT 525 kV CAXIAS /GRAVATAI C-1 RS  RB FT LT 525 kV CAXIAS /GRAVATAI C-1 RS 057/2001 IPCA RBNI REA 8314/2019 12/06/2019 11/06/2034  R$112,534.59
CAXIAS EL 525 kV CAXIAS LT 500 kV CAXIAS /ITA C-1 RS/SC  RB FT LT 500 kV CAXIAS /ITA C-1 RS/SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
CAXIAS EL 230 kV CAXIAS LT 230 kV CAXIAS /CAXIAS SUL 5 C-1 RS  RB FT LT 230 kV CAXIAS /CAXIAS SUL 5 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
CAXIAS EL 230 kV CAXIAS LT 230 kV CAXIAS /CAXIAS SUL 5 C-1 RS  RB FT LT 230 kV CAXIAS /CAXIAS SUL 5 C-1 RS 057/2001 IPCA RMEL REN 643/2014 11/01/2016 10/01/2045  R$ 158.40
CAXIAS SUL 5 TR 230/69 kV CAXIAS SUL 5 TRR1 RS RBF FT TR 230/69 kV CAXIAS SUL 5 TRR1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$162,226.24
CAXIAS SUL 5 MG 230 kV CAXIAS SUL 5 MG1 RS RB FT MG 230 kV CAXIAS SUL 5 MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$429,789.73
CAXIAS SUL 5 TR 230/69 kV CAXIAS SUL 5 TR3 RS RBF FT TR 230/69 kV CAXIAS SUL 5 TR3 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$486,678.73
CAXIAS SUL 5 TR 230/13,8 kV CAXIAS SUL 5 TR2 RS RBF FT TR 230/13,8 kV CAXIAS SUL 5 TR2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$192,712.96
CAXIAS SUL 5 MC 69 kV TR 230/69 kV CAXIAS SUL 5 TR3 RS  RBF FT TR 230/69 kV CAXIAS SUL 5 TR3 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,874.58
CAXIAS SUL 5 MC 230 kV TR 230/69 kV CAXIAS SUL 5 TR3 RS  RBF FT TR 230/69 kV CAXIAS SUL 5 TR3 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
CAXIAS SUL 5 MG 230 kV CAXIAS SUL 5 MG1 RS RB FT MG 230 kV CAXIAS SUL 5 MG1 RS 057/2001 IPCA RBNI REA 5861/2016 15/05/2019 14/05/2036  R$33,178.29
CAXIAS SUL 5 MC 230 kV TR 230/13,8 kV CAXIAS SUL 5 TR2 RS  RBF FT TR 230/13,8 kV CAXIAS SUL 5 TR2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
CAXIAS SUL 5 IB 13,8 kV MG 230 kV CAXIAS SUL 5 MG1 RS IB4 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$23,930.32
CAXIAS SUL 5 MC 13,8 kV TR 230/13,8 kV CAXIAS SUL 5 TR2 RS  RBF FT TR 230/13,8 kV CAXIAS SUL 5 TR2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$37,791.49
CAXIAS SUL 5 IB 69 kV MG 230 kV CAXIAS SUL 5 MG1 RS IB2 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$32,849.28
CAXIAS SUL 5 IB 230 kV MG 230 kV CAXIAS SUL 5 MG1 RS IB1 RB FT MG 230 kV CAXIAS SUL 5 MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$103,749.99
CAXIAS SUL 5 EL 13,8 kV CAXIAS SUL 5DIST7 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$40,992.90
CAXIAS SUL 5 EL 13,8 kV CAXIAS SUL 5DIST6 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$40,992.90
CAXIAS SUL 5 IB 13,8 kV MG 230 kV CAXIAS SUL 5 MG1 RS IB3 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$23,930.32
CAXIAS SUL 5 EL 69 kV CAXIAS SUL 5DIST3 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$57,137.95
CAXIAS SUL 5 EL 69 kV CAXIAS SUL 5DIST2 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$57,137.95
CAXIAS SUL 5 EL 69 kV CAXIAS SUL 5DIST1 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$57,137.95
CAXIAS SUL 5 EL 230 kV CAXIAS SUL 5 LT 230 kV L.GRANDE /CAXIAS SUL 5 C-1 RS  RB FT LT 230 kV L.GRANDE /CAXIAS SUL 5 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
CAXIAS SUL 5 EL 230 kV CAXIAS SUL 5 LT 230 kV FARROUPILHA /CAXIAS SUL 5 C-1 RS  RB FT LT 230 kV FARROUPILHA /CAXIAS SUL 5 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
CAXIAS SUL 5 EL 230 kV CAXIAS SUL 5 LT 230 kV CAXIAS /CAXIAS SUL 5 C-1 RS RB FT LT 230 kV CAXIAS /CAXIAS SUL 5 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
CAXIAS SUL 5 EL 13,8 kV CAXIAS SUL 5DIST9 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$40,992.90
CAXIAS SUL 5 EL 13,8 kV CAXIAS SUL 5DIST8 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$40,992.90
CAXIAS SUL 5 EL 13,8 kV CAXIAS SUL 5DIST4 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$40,992.90
CAXIAS SUL 5 EL 13,8 kV CAXIAS SUL 5DIST5 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$40,992.90
CAXIAS SUL 5 EL 13,8 kV CAXIAS SUL 5DIST10 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$40,992.90
CAXIAS SUL 6 TR 230/69 kV CAXIAS SUL 6 TRR1 RS RBF FT TR 230/69 kV CAXIAS SUL 6 TRR1 RS 011/2010 IPCA RBL CC 011/2010 29/05/2013 06/10/2040  R$497,193.83
CAXIAS SUL 6 TR 230/69 kV CAXIAS SUL 6 TR2 RS RBF FT TR 230/69 kV CAXIAS SUL 6 TR2 RS 011/2010 IPCA RBL CC 011/2010 29/05/2013 06/10/2040  R$ 1,491,581.48
CAXIAS SUL 5 BC 13,8 kV 3,6 MVAr CAXIAS SUL 5 BC4 RS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$23,186.62
CAXIAS SUL 5 BC 13,8 kV 3,6 MVAr CAXIAS SUL 5 BC3 RS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$23,186.62
CAXIAS SUL 5 BC 13,8 kV 3,6 MVAr CAXIAS SUL 5 BC2 RS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$23,186.62
CAXIAS SUL 5 BC 13,8 kV 3,6 MVAr CAXIAS SUL 5 BC1 RS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$23,186.62
CAXIAS SUL 6 MG 230 kV CAXIAS SUL 6 MG1 RS RB FT MG 230 kV CAXIAS SUL 6 MG1 RS 011/2010 IPCA RBNI REN 1020/2022 22/10/2022 21/10/2053  R$38,471.41
CAXIAS SUL 6 MC 69 kV TR 230/69 kV CAXIAS SUL 6 TR1 RS  RBF FT TR 230/69 kV CAXIAS SUL 6 TR1 RS 011/2010 IPCA RBL CC 011/2010 29/05/2013 06/10/2040  R$151,243.19
CAXIAS SUL 6 TR 230/69 kV CAXIAS SUL 6 TR1 RS RBF FT TR 230/69 kV CAXIAS SUL 6 TR1 RS 011/2010 IPCA RBL CC 011/2010 29/05/2013 06/10/2040  R$ 1,491,581.48
CAXIAS SUL 6 MG 230 kV CAXIAS SUL 6 MG1 RS RB FT MG 230 kV CAXIAS SUL 6 MG1 RS 011/2010 IPCA RBL CC 011/2010 29/05/2013 06/10/2040  R$ 1,164,330.99
CAXIAS SUL 6 MG 230 kV CAXIAS SUL 6 MG1 RS RB FT MG 230 kV CAXIAS SUL 6 MG1 RS 011/2010 IPCA RBNI REN 1020/2022 22/10/2022 21/10/2053  R$38,471.41
CAXIAS SUL 6 MC 230 kV TR 230/69 kV CAXIAS SUL 6 TR2 RS  RBF FT TR 230/69 kV CAXIAS SUL 6 TR2 RS 011/2010 IPCA RBL CC 011/2010 29/05/2013 06/10/2040  R$380,291.61
CAXIAS SUL 6 MC 69 kV TR 230/69 kV CAXIAS SUL 6 TR2 RS  RBF FT TR 230/69 kV CAXIAS SUL 6 TR2 RS 011/2010 IPCA RBL CC 011/2010 29/05/2013 06/10/2040  R$151,243.19
CAXIAS SUL 6 MC 230 kV TR 230/69 kV CAXIAS SUL 6 TR1 RS  RBF FT TR 230/69 kV CAXIAS SUL 6 TR1 RS 011/2010 IPCA RBL CC 011/2010 29/05/2013 06/10/2040  R$380,291.61
CAXIAS SUL 6 IB 69 kV MG 230 kV CAXIAS SUL 6 MG1 RS IB1 DIT   011/2010 IPCA RPEC CC 011/2010 06/10/2010 06/10/2040  R$78,584.78
CAXIAS SUL 6 IB 230 kV MG 230 kV CAXIAS SUL 6 MG1 RS IB1 RB FT MG 230 kV CAXIAS SUL 6 MG1 RS 011/2010 IPCA RBL CC 011/2010 29/05/2013 06/10/2040  R$280,732.98
CAXIAS SUL 6 EL 69 kV CAXIAS SUL 6DIST4 DIT   011/2010 IPCA RCDM REN 1020/2022 22/10/2022 21/10/2050  R$524,783.41
CAXIAS SUL 6 EL 69 kV CAXIAS SUL 6DIST3 DIT   011/2010 IPCA RCDM REN 1020/2022 22/10/2022 21/10/2050  R$524,783.41
CAXIAS SUL 6 EL 69 kV CAXIAS SUL 6DIST2 DIT   011/2010 IPCA RPEC CC 011/2010 06/10/2010 06/10/2040  R$137,505.13
CAXIAS SUL 6 EL 69 kV CAXIAS SUL 6DIST1 DIT   011/2010 IPCA RPEC CC 011/2010 06/10/2010 06/10/2040  R$137,505.13
CHARQUEADAS MG 230 kV CHARQUEADAS MG1 RS RB FT MG 230 kV CHARQUEADAS MG1 RS 057/2001 IPCA RMEL REN 643/2014 12/09/2014 11/09/2031  R$11,896.64
CHARQUEADAS MC 230 kV TR 230/69 kV CHARQUEADAS TR5 RS  RBF FT TR 230/69 kV CHARQUEADAS TR5 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$106,914.72
CHARQUEADAS TR 230/69 kV CHARQUEADAS TR5 RS RBF FT TR 230/69 kV CHARQUEADAS TR5 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$260,177.53
CHARQUEADAS MG 230 kV CHARQUEADAS MG1 RS RB FT MG 230 kV CHARQUEADAS MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$426,988.21
CHARQUEADAS MG 230 kV CHARQUEADAS MG1 RS RB FT MG 230 kV CHARQUEADAS MG1 RS 057/2001 IPCA RMEL REN 643/2014 30/05/2014 29/05/2031  R$11,729.25
CHARQUEADAS MG 230 kV CHARQUEADAS MG1 RS RB FT MG 230 kV CHARQUEADAS MG1 RS 057/2001 IPCA RMEL REN 643/2014 06/11/2014 05/11/2031  R$11,984.32
CHARQUEADAS MC 230 kV TR 230/69 kV CHARQUEADAS TR5 RS  RBF FT TR 230/69 kV CHARQUEADAS TR5 RS 057/2001 IPCA RMEL REN 643/2014 18/12/2013 17/12/2036  R$20,724.48
CHARQUEADAS MC 69 kV TR 230/69 kV CHARQUEADAS TR5 RS  RBF FT TR 230/69 kV CHARQUEADAS TR5 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,874.58
CHARQUEADAS IB 69 kV MG 230 kV CHARQUEADAS MG1 RS IB2 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$32,849.28
CHARQUEADAS IB 69 kV MG 230 kV CHARQUEADAS MG1 RS IB2 DIT   057/2001 IPCA RMEL REN 643/2014 28/07/2014 27/07/2044  R$7,833.90
CHARQUEADAS IB 69 kV MG 230 kV CHARQUEADAS MG1 RS IB1 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$32,849.28
CHARQUEADAS IB 230 kV MG 230 kV CHARQUEADAS MG1 RS IB1 RB FT MG 230 kV CHARQUEADAS MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$103,749.99
CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV TRIUNFO /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$57,137.95
CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV TRIUNFO /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$118,778.05
CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV TAQUARI /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$57,137.95
CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV SAO JERONIMO /CHARQUEADAS C-1 RS  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$57,137.95
CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV GUAIBA /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$57,137.95
CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV GUAIBA /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RMEL REN 643/2014 28/07/2014 27/07/2044  R$23,501.73
CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV GUAIBA /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RMEL REN 643/2014 11/10/2014 10/10/2047  R$44,097.05
CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV CHARQUEADAS 2 /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$57,137.95
CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV CHARQUEADAS 2 /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RMEL REN 643/2014 26/11/2015 25/11/2045  R$8,143.33
CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV CHARQUEADAS 2 /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$118,778.05
CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV CHARQUEADAS 2 /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$87,464.42
CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV ACOS FINOS PI /CHARQUEADAS C-2 RS  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$57,137.95
CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV ACOS FINOS PI /CHARQUEADAS C-2 RS  DIT   057/2001 IPCA RMEL REN 643/2014 10/12/2015 09/12/2045  R$8,152.24
CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV ACOS FINOS PI /CHARQUEADAS C-2 RS  DIT   057/2001 IPCA RMEL REN 643/2014 28/07/2014 27/07/2044  R$15,667.83
CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV ACOS FINOS PI /CHARQUEADAS C-1 RS  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$57,137.95
CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV ACOS FINOS PI /CHARQUEADAS C-1 RS  DIT   057/2001 IPCA RMEL REN 643/2014 10/12/2015 09/12/2045  R$16,304.50
CHARQUEADAS EL 230 kV CHARQUEADAS LT 230 kV SCHARLAU /CHARQUEADAS C-1 RS  RB FT LT 230 kV SCHARLAU /CHARQUEADAS C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
CHARQUEADAS EL 230 kV CHARQUEADAS LT 230 kV CHARQUEADAS /SANTA CRUZ 1 C-1 RS  RB FT LT 230 kV CHARQUEADAS /SANTA CRUZ 1 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
CHARQUEADAS EL 230 kV CHARQUEADAS LT 230 kV C.INDUSTRIAL /CHARQUEADAS C-1 RS RB FT LT 230 kV C.INDUSTRIAL /CHARQUEADAS C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
CHARQUEADAS EL 230 kV CHARQUEADAS LT 230 kV C.INDUSTRIAL /CHARQUEADAS C-1 RS RB FT LT 230 kV C.INDUSTRIAL /CHARQUEADAS C-1 RS 057/2001 IPCA RMEL REN 443/2011 16/03/2013 15/03/2036  R$20,139.41
CURITIBA RTL 500 kV 150 Mvar CURITIBA RT2 PR RB FT RTL 500 kV 150 Mvar CURITIBA RT2 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,254,205.28
CURITIBA RTB 500 kV 50 Mvar CURITIBA RTR2 PR RB FT RTB 500 kV 50 Mvar CURITIBA RTR2 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$307,852.46
CURITIBA TR 500/230 kV CURITIBA TRR1 PR RB FT TR 500/230 kV CURITIBA TRR1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$502,776.61
CURITIBA TR 500/230 kV CURITIBA TRR1 PR RB FT TR 500/230 kV CURITIBA TRR1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,045,169.20
CURITIBA TR 500/230 kV CURITIBA TR2 PR RB FT TR 500/230 kV CURITIBA TR2 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,508,329.83
CURITIBA TR 500/230 kV CURITIBA TR2 PR RB FT TR 500/230 kV CURITIBA TR2 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,135,507.60
CURITIBA TR 500/230 kV CURITIBA TR2 PR RB FT TR 500/230 kV CURITIBA TR2 PR 057/2001 IPCA RMEL REN 443/2011 02/07/2015 01/07/2045  R$20,368.91
CURITIBA TR 500/230 kV CURITIBA TR2 PR RB FT TR 500/230 kV CURITIBA TR2 PR 057/2001 IPCA RMEL REN 443/2011 26/09/2015 25/09/2043  R$48,387.65
CURITIBA TR 500/230 kV CURITIBA TR1 PR RB FT TR 500/230 kV CURITIBA TR1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,508,329.83
CURITIBA TR 500/230 kV CURITIBA TR1 PR RB FT TR 500/230 kV CURITIBA TR1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,135,507.60
CURITIBA TR 500/230 kV CURITIBA TR1 PR RB FT TR 500/230 kV CURITIBA TR1 PR 057/2001 IPCA RMEL REN 443/2011 25/10/2015 24/10/2043  R$48,489.92
CURITIBA RTL 500 kV 150 Mvar CURITIBA RT2 PR RB FT RTL 500 kV 150 Mvar CURITIBA RT2 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$603,333.01
CURITIBA RTL 500 kV 150 Mvar CURITIBA RT2 PR RB FT RTL 500 kV 150 Mvar CURITIBA RT2 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$923,557.39
CURITIBA RTB 500 kV 50 Mvar CURITIBA RTR2 PR RB FT RTB 500 kV 50 Mvar CURITIBA RTR2 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$201,111.00
CURITIBA RTB 500 kV 50 Mvar CURITIBA RTR2 PR RB FT RTB 500 kV 50 Mvar CURITIBA RTR2 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$418,068.43
CURITIBA RTB 500 kV 150 Mvar CURITIBA RT1 PR RB FT RTB 500 kV 150 Mvar CURITIBA RT1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$603,333.01
CURITIBA RTB 500 kV 150 Mvar CURITIBA RT1 PR RB FT RTB 500 kV 150 Mvar CURITIBA RT1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,254,205.28
CURITIBA MG 500 kV CURITIBA MG1 PR RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,293,881.53
CURITIBA MG 500 kV CURITIBA MG1 PR RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RMEL REN 643/2014 06/03/2016 05/03/2036  R$2,889.97
CURITIBA MG 500 kV CURITIBA MG1 PR RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RMEL REN 443/2011 14/11/2015 13/11/2032  R$12,310.16
CURITIBA MG 500 kV CURITIBA MG1 PR RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RMEL REN 643/2014 01/12/2013 30/11/2028  R$825,780.96
CURITIBA MG 500 kV CURITIBA MG1 PR RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RMEL REN 443/2011 14/11/2015 13/11/2032  R$12,310.16
CURITIBA MG 500 kV CURITIBA MG1 PR RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RMEL REN 643/2014 13/03/2016 12/03/2036  R$2,892.17
CURITIBA MG 500 kV CURITIBA MG1 PR RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RBNI REA 5861/2016 24/08/2018 23/08/2033  R$9,802.77
CURITIBA MC 500 kV TR 500/230 kV CURITIBA TR2 PR  RB FT TR 500/230 kV CURITIBA TR2 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$323,135.88
CURITIBA MC 500 kV TR 500/230 kV CURITIBA TR2 PR  RB FT TR 500/230 kV CURITIBA TR2 PR 057/2001 IPCA RMEL REN 643/2014 01/09/2013 31/08/2036  R$42,614.58
CURITIBA MC 500 kV TR 500/230 kV CURITIBA TR2 PR  RB FT TR 500/230 kV CURITIBA TR2 PR 057/2001 IPCA RMEL REN 643/2014 19/06/2014 18/06/2047  R$2,567.90
CURITIBA MC 500 kV TR 500/230 kV CURITIBA TR1 PR  RB FT TR 500/230 kV CURITIBA TR1 PR 057/2001 IPCA RMEL REN 643/2014 22/08/2013 21/08/2036  R$42,570.66
CURITIBA MC 500 kV TR 500/230 kV CURITIBA TR1 PR  RB FT TR 500/230 kV CURITIBA TR1 PR 057/2001 IPCA RMEL REN 643/2014 10/06/2014 09/06/2047  R$2,566.17
CURITIBA MC 500 kV TR 500/230 kV CURITIBA TR1 PR  RB FT TR 500/230 kV CURITIBA TR1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$323,135.88
CURITIBA MC 500 kV RTB 500 kV 150 Mvar CURITIBA RT1 PR  RB FT RTB 500 kV 150 Mvar CURITIBA RT1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$302,550.62
CURITIBA MC 230 kV TR 500/230 kV CURITIBA TR2 PR  RB FT TR 500/230 kV CURITIBA TR2 PR 057/2001 IPCA RBNI REA 8314/2019 27/11/2020 26/11/2053  R$188,885.97
CURITIBA MC 500 kV RTL 500 kV 150 Mvar CURITIBA RT2 PR  RB FT RTL 500 kV 150 Mvar CURITIBA RT2 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$195,769.91
CURITIBA MC 500 kV RTL 500 kV 150 Mvar CURITIBA RT2 PR  RB FT RTL 500 kV 150 Mvar CURITIBA RT2 PR 057/2001 IPCA RMEL REN 643/2014 17/12/2013 16/12/2036  R$43,084.47
CURITIBA MC 230 kV TR 500/230 kV CURITIBA TR1 PR  RB FT TR 500/230 kV CURITIBA TR1 PR 057/2001 IPCA RMEL REN 643/2014 12/10/2013 11/10/2036  R$20,582.95
CURITIBA MC 230 kV TR 500/230 kV CURITIBA TR2 PR  RB FT TR 500/230 kV CURITIBA TR2 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$139,615.78
CURITIBA MC 230 kV TR 500/230 kV CURITIBA TR2 PR  RB FT TR 500/230 kV CURITIBA TR2 PR 057/2001 IPCA RMEL REN 643/2014 10/11/2013 09/11/2036  R$20,644.20
CURITIBA MC 230 kV TR 500/230 kV CURITIBA TR1 PR  RB FT TR 500/230 kV CURITIBA TR1 PR 057/2001 IPCA RBNI REA 8314/2019 11/11/2020 10/11/2053  R$188,759.12
CURITIBA MC 230 kV TR 500/230 kV CURITIBA TR1 PR  RB FT TR 500/230 kV CURITIBA TR1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$139,615.78
CURITIBA IB 500 kV MG 500 kV CURITIBA MG1 PR IB3 RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
CURITIBA IB 500 kV MG 500 kV CURITIBA MG1 PR IB2 RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
CURITIBA IB 500 kV MG 500 kV CURITIBA MG1 PR IB1 RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
CURITIBA IB 230 kV MG 500 kV CURITIBA MG1 PR IB1 RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$90,304.02
CURITIBA IB 230 kV MG 500 kV CURITIBA MG1 PR IB1 RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RBNI REA 4347/2013 30/11/2015 29/11/2048  R$99,559.05
CURITIBA EL 500 kV CURITIBA LT 500 kV CURITIBA /BATEIAS C-1 PR  RB FT LT 500 kV CURITIBA /BATEIAS C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
CURITIBA EL 500 kV CURITIBA LT 500 kV CURITIBA /BATEIAS C-1 PR  RB FT LT 500 kV CURITIBA /BATEIAS C-1 PR 057/2001 IPCA RMEL REN 643/2014 21/09/2014 20/09/2045  R$2,599.39
CURITIBA EL 500 kV CURITIBA LT 500 kV CURITIBA /BATEIAS C-1 PR  RB FT LT 500 kV CURITIBA /BATEIAS C-1 PR 057/2001 IPCA RBNI DSP 386/2021 09/12/2021 08/12/2051  R$98,014.54
CURITIBA EL 500 kV CURITIBA LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR  RB FT LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
CURITIBA EL 500 kV CURITIBA LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR  RB FT LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR 057/2001 IPCA RMEL REN 643/2014 09/05/2015 08/05/2046  R$2,646.24
CURITIBA EL 500 kV CURITIBA LT 500 kV AREIA /CURITIBA C-1 PR  RB FT LT 500 kV AREIA /CURITIBA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
CURITIBA EL 500 kV CURITIBA LT 500 kV AREIA /CURITIBA C-1 PR  RB FT LT 500 kV AREIA /CURITIBA C-1 PR 057/2001 IPCA RMEL REN 643/2014 04/04/2015 03/04/2046  R$2,639.11
CURITIBA EL 500 kV CURITIBA LT 500 kV AREIA /CURITIBA C-1 PR  RB FT LT 500 kV AREIA /CURITIBA C-1 PR 057/2001 IPCA RBNI REA 5484/2015 28/10/2015 27/10/2043  R$57,883.49
CURITIBA EL 230 kV CURITIBA LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR RB FT LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
CURITIBA EL 230 kV CURITIBA LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC 057/2001 IPCA RBNI REA 7761/2019 30/04/2019 29/04/2049  R$18,975.14
CURITIBA EL 230 kV CURITIBA LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR RB FT LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBNI REA 4347/2013 30/11/2015 29/11/2048  R$99,559.05
CURITIBA EL 230 kV CURITIBA LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR RB FT LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$344,716.94
CURITIBA EL 230 kV CURITIBA LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
CURITIBA EL 230 kV CURITIBA LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC 057/2001 IPCA RBNI REA 4347/2013 30/11/2015 29/11/2048  R$99,559.05
CURITIBA EL 230 kV CURITIBA LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC 057/2001 IPCA RBNI REA 7761/2019 30/04/2019 29/04/2049  R$18,975.14
CURITIBA EL 230 kV CURITIBA LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
CURITIBA EL 230 kV CURITIBA LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC 057/2001 IPCA RBNI REA 4347/2013 30/11/2015 29/11/2048  R$99,559.05
D.SANTA CRUZ EL 138 kV D.SANTA CRUZ LT 138 kV DOURADOS /D.SANTA CRUZ C-2 MS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$134,367.35
DESTERRO TR 230/138 kV DESTERRO TR1 SC RBF FT TR 230/138 kV DESTERRO TR1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$340,018.74
DESTERRO TR 230/138 kV DESTERRO ATF2 SC RBF FT TR 230/138 kV DESTERRO ATF2 SC 057/2001 IPCA RBNI REA 4802/2014 29/07/2016 28/07/2050  R$ 1,748,993.01
DESTERRO RTB 230 kV 0 Mvar DESTERRO RB2 SC RB FT RTB 230 kV 50 Mvar DESTERRO RB2 SC 057/2001 IPCA RBNI REA 7529/2018 23/12/2020 23/12/2055  R$ 1,006,565.16
DESTERRO RTB 230 kV 0 Mvar DESTERRO RB1 SC RB FT RTB 230 kV 50 Mvar DESTERRO RB1 SC 057/2001 IPCA RBNI REA 7529/2018 23/12/2020 23/12/2055  R$ 1,006,565.16
DESTERRO MG 230 kV DESTERRO MG1 SC RB FT MG 230 kV DESTERRO MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$361,566.47
DESTERRO MG 230 kV DESTERRO MG1 SC RB FT MG 230 kV DESTERRO MG1 SC 057/2001 IPCA RBNI REA 4802/2014 29/07/2016 28/07/2044  R$191,846.93
DESTERRO MG 230 kV DESTERRO MG1 SC RB FT MG 230 kV DESTERRO MG1 SC 057/2001 IPCA RBNI REA 4802/2014 29/07/2016 28/07/2044  R$121,756.96
DESTERRO MG 230 kV DESTERRO MG1 SC RB FT MG 230 kV DESTERRO MG1 SC 057/2001 IPCA RBNI REA 7529/2018 23/12/2020 23/12/2051  R$203,633.37
DESTERRO MC 230 kV TR 230/138 kV DESTERRO TR1 SC RBF FT TR 230/138 kV DESTERRO TR1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
DESTERRO MC 230 kV TR 230/138 kV DESTERRO ATF2 SC RBF FT TR 230/138 kV DESTERRO ATF2 SC 057/2001 IPCA RBNI REA 4802/2014 29/07/2016 28/07/2046  R$ 1,123,823.48
DESTERRO MC 230 kV RTB 230 kV 50 Mvar DESTERRO RB1 SC RB FT RTB 230 kV 50 Mvar DESTERRO RB1 SC 057/2001 IPCA RBNI REA 7529/2018 23/12/2020 23/12/2043  R$767,976.65
DESTERRO MC 230 kV RTB 230 kV 0 Mvar DESTERRO RB2 SC RB FT RTB 230 kV 50 Mvar DESTERRO RB2 SC 057/2001 IPCA RBNI REA 7529/2018 23/12/2020 23/12/2043  R$767,976.65
DESTERRO MC 138 kV TR 230/138 kV DESTERRO TR1 SC RBF FT TR 230/138 kV DESTERRO TR1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$90,882.76
DESTERRO MC 138 kV TR 230/138 kV DESTERRO ATF2 SC RBF FT TR 230/138 kV DESTERRO ATF2 SC 057/2001 IPCA RBNI REA 4802/2014 29/07/2016 28/07/2046  R$906,987.49
DESTERRO IB 230 kV MG 230 kV DESTERRO MG1 SC IB1 RB FT MG 230 kV DESTERRO MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$103,749.99
DESTERRO IB 138 kV MG 230 kV DESTERRO MG1 SC IB2 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$75,711.46
DESTERRO EL 230 kV DESTERRO LT 230 kV BIGUACU /DESTERRO C-1 SC  RB FT LT 230 kV BIGUACU /DESTERRO C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
DESTERRO EL 138 kV DESTERRODIST2 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$134,367.35
DESTERRO EL 138 kV DESTERRODIST1 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$134,367.35
DOURADOS TR 230/138 kV DOURADOS TRR1 MS RBF FT TR 230/138 kV DOURADOS TRR1 MS 057/2001 IPCA RBNI REA 5969/2016 07/08/2017 06/08/2044  R$141,354.54
DOURADOS TR 230/138 kV DOURADOS TRR1 MS RBF FT TR 230/138 kV DOURADOS TRR1 MS 057/2001 IPCA RBNI REA 5969/2016 07/08/2017 31/12/2042  R$790,824.78
DOURADOS TR 230/138 kV DOURADOS TR5 MS RBF FT TR 230/138 kV DOURADOS TR5 MS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$252,944.84
DOURADOS TR 230/138 kV DOURADOS TR5 MS RBF FT TR 230/138 kV DOURADOS TR5 MS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$525,820.31
DOURADOS TR 230/138 kV DOURADOS TR4 MS RBF FT TR 230/138 kV DOURADOS TR4 MS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$252,944.84
DOURADOS TR 230/138 kV DOURADOS TR3 MS RBF FT TR 230/138 kV DOURADOS TR3 MS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$252,944.84
DOURADOS TR 230/138 kV DOURADOS TR3 MS RBF FT TR 230/138 kV DOURADOS TR3 MS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$525,820.31
DOURADOS TR 230/138 kV DOURADOS TR3 MS RBF FT TR 230/138 kV DOURADOS TR3 MS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$387,197.57
DOURADOS TR 230/138 kV DOURADOS TR2 MS RBF FT TR 230/138 kV DOURADOS TR2 MS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$252,944.84
DOURADOS TR 230/138 kV DOURADOS TR2 MS RBF FT TR 230/138 kV DOURADOS TR2 MS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$525,820.31
DOURADOS TR 230/138 kV DOURADOS TR2 MS RBF FT TR 230/138 kV DOURADOS TR2 MS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$387,197.57
DOURADOS RTL 230 kV 27 Mvar DOURADOS RT2 MS RB FT RTL 230 kV 27 Mvar DOURADOS RT2 MS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$267,151.25
DOURADOS RTL 230 kV 27 Mvar DOURADOS RT2 MS RB FT RTL 230 kV 27 Mvar DOURADOS RT2 MS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$555,352.52
DOURADOS RTL 230 kV 27 Mvar DOURADOS RT2 MS RB FT RTL 230 kV 27 Mvar DOURADOS RT2 MS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$408,944.16
DOURADOS RTB 230 kV 27 Mvar DOURADOS RT1 MS RB FT RTB 230 kV 27 Mvar DOURADOS RT1 MS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,894.80
DOURADOS RTB 230 kV 27 Mvar DOURADOS RT1 MS RB FT RTB 230 kV 27 Mvar DOURADOS RT1 MS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$367,727.92
DOURADOS RTB 230 kV 27 Mvar DOURADOS RT1 MS RB FT RTB 230 kV 27 Mvar DOURADOS RT1 MS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$270,783.29
DOURADOS MG 230 kV DOURADOS MG1 MS RB FT MG 230 kV DOURADOS MG1 MS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$447,815.60
DOURADOS MG 230 kV DOURADOS MG1 MS RB FT MG 230 kV DOURADOS MG1 MS 057/2001 IPCA RMEL REN 643/2014 22/03/2013 21/03/2030  R$11,089.40
DOURADOS MG 230 kV DOURADOS MG1 MS RB FT MG 230 kV DOURADOS MG1 MS 057/2001 IPCA RMEL REN 643/2014 17/10/2013 16/10/2030  R$11,424.17
DOURADOS MG 230 kV DOURADOS MG1 MS RB FT MG 230 kV DOURADOS MG1 MS 057/2001 IPCA RBNI REA 5744/2016 02/05/2018 02/05/2050  R$120,573.52
DOURADOS MG 230 kV DOURADOS MG1 MS RB FT MG 230 kV DOURADOS MG1 MS 057/2001 IPCA RBNI REA 5744/2016 02/05/2018 02/05/2042  R$61,246.51
DOURADOS MC 230 kV TR 230/138 kV DOURADOS TR5 MS  RBF FT TR 230/138 kV DOURADOS TR5 MS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
DOURADOS MC 230 kV TR 230/138 kV DOURADOS TR5 MS  RBF FT TR 230/138 kV DOURADOS TR5 MS 057/2001 IPCA RBNI REA 5744/2016 02/05/2018 02/05/2033  R$28,339.20
DOURADOS MC 230 kV TR 230/138 kV DOURADOS TR4 MS RBF FT TR 230/138 kV DOURADOS TR4 MS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
DOURADOS MC 230 kV TR 230/138 kV DOURADOS TR4 MS RBF FT TR 230/138 kV DOURADOS TR4 MS 057/2001 IPCA RBNI REA 5744/2016 02/05/2018 02/05/2033  R$28,339.20
DOURADOS MC 230 kV TR 230/138 kV DOURADOS TR4 MS RBF FT TR 230/138 kV DOURADOS TR4 MS 057/2001 IPCA RBNI DSP 386/2021 17/02/2021 16/02/2036  R$16,684.50
DOURADOS MC 230 kV TR 230/138 kV DOURADOS TR3 MS  RBF FT TR 230/138 kV DOURADOS TR3 MS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
DOURADOS MC 230 kV TR 230/138 kV DOURADOS TR3 MS  RBF FT TR 230/138 kV DOURADOS TR3 MS 057/2001 IPCA RBNI DSP 386/2021 17/02/2021 16/02/2036  R$16,684.50
DOURADOS MC 230 kV TR 230/138 kV DOURADOS TR2 MS  RBF FT TR 230/138 kV DOURADOS TR2 MS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
DOURADOS MC 230 kV TR 230/138 kV DOURADOS TR2 MS  RBF FT TR 230/138 kV DOURADOS TR2 MS 057/2001 IPCA RMEL REN 643/2014 19/08/2012 18/08/2035  R$ 536.41
DOURADOS MC 230 kV RTL 230 kV 27 Mvar DOURADOS RT2 MS  RB FT RTL 230 kV 27 Mvar DOURADOS RT2 MS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$71,612.88
DOURADOS MC 230 kV RTL 230 kV 27 Mvar DOURADOS RT2 MS  RB FT RTL 230 kV 27 Mvar DOURADOS RT2 MS 057/2001 IPCA RBNI DSP 386/2021 17/02/2021 16/02/2036  R$16,684.50
DOURADOS MC 230 kV RTB 230 kV 27 Mvar DOURADOS RT1 MS RB FT RTB 230 kV 27 Mvar DOURADOS RT1 MS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$115,219.56
DOURADOS MC 230 kV RTB 230 kV 27 Mvar DOURADOS RT1 MS RB FT RTB 230 kV 27 Mvar DOURADOS RT1 MS 057/2001 IPCA RBNI REA 5744/2016 02/05/2018 02/05/2033  R$28,339.20
DOURADOS MC 230 kV RTB 230 kV 27 Mvar DOURADOS RT1 MS RB FT RTB 230 kV 27 Mvar DOURADOS RT1 MS 057/2001 IPCA RBNI DSP 386/2021 17/02/2021 16/02/2036  R$16,684.50
DOURADOS MC 230 kV BC 230 kV 0 Mvar DOURADOS BC2 MS RB FT BC 230 kV 50 Mvar DOURADOS BC2 MS 057/2001 IPCA RBNI REA 5744/2016 02/05/2018 02/05/2041  R$705,319.90
DOURADOS MC 230 kV BC 230 kV 0 Mvar DOURADOS BC1 MS RB FT BC 230 kV 50 Mvar DOURADOS BC1 MS 057/2001 IPCA RBNI REA 5744/2016 02/05/2018 02/05/2041  R$705,319.90
DOURADOS MC 138 kV TR 230/138 kV DOURADOS TR5 MS  RBF FT TR 230/138 kV DOURADOS TR5 MS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$80,234.15
DOURADOS MC 138 kV TR 230/138 kV DOURADOS TR4 MS  RBF FT TR 230/138 kV DOURADOS TR4 MS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$80,234.15
DOURADOS MC 138 kV TR 230/138 kV DOURADOS TR3 MS  RBF FT TR 230/138 kV DOURADOS TR3 MS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$80,234.15
DOURADOS MC 138 kV TR 230/138 kV DOURADOS TR2 MS  RBF FT TR 230/138 kV DOURADOS TR2 MS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$80,234.15
DOURADOS IB 230 kV MG 230 kV DOURADOS MG1 MS IB1 RB FT MG 230 kV DOURADOS MG1 MS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$103,749.99
DOURADOS IB 230 kV MG 230 kV DOURADOS MG1 MS IB1 RB FT MG 230 kV DOURADOS MG1 MS 057/2001 IPCA RBNI REA 5744/2016 02/05/2018 02/05/2039  R$130,430.16
DOURADOS EL 230 kV DOURADOS LT 230 kV DOURADOS /GUAIRA C-1 MS/PR RB FT LT 230 kV DOURADOS /GUAIRA C-1 MS/PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
DOURADOS EL 230 kV DOURADOS LT 230 kV DOURADOS /GUAIRA C-1 MS/PR RB FT LT 230 kV DOURADOS /GUAIRA C-1 MS/PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$353,874.34
DOURADOS EL 230 kV DOURADOS LT 230 kV DOURADOS /GUAIRA C-1 MS/PR RB FT LT 230 kV DOURADOS /GUAIRA C-1 MS/PR 057/2001 IPCA RMEL REN 643/2014 18/08/2012 17/08/2041  R$1,773.00
DOURADOS EL 230 kV DOURADOS LT 230 kV ANASTACIO /DOURADOS C-1 MS RB FT LT 230 kV ANASTACIO /DOURADOS C-1 MS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
DOURADOS EL 230 kV DOURADOS LT 230 kV ANASTACIO /DOURADOS C-1 MS RB FT LT 230 kV ANASTACIO /DOURADOS C-1 MS 057/2001 IPCA RBNI REA 5744/2016 02/05/2018 02/05/2033  R$28,339.20
DOURADOS EL 230 kV DOURADOS LT 230 kV ANASTACIO /DOURADOS C-1 MS RB FT LT 230 kV ANASTACIO /DOURADOS C-1 MS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$353,874.34
DOURADOS EL 230 kV DOURADOS LT 230 kV ANASTACIO /DOURADOS C-1 MS RB FT LT 230 kV ANASTACIO /DOURADOS C-1 MS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$260,581.95
DOURADOS EL 230 kV DOURADOS LT 230 kV ANASTACIO /DOURADOS C-1 MS RB FT LT 230 kV ANASTACIO /DOURADOS C-1 MS 057/2001 IPCA RBNI DSP 386/2021 17/02/2021 16/02/2036  R$16,684.50
DOURADOS BC 230 kV 0 Mvar DOURADOS BC2 MS RB FT BC 230 kV 50 Mvar DOURADOS BC2 MS 057/2001 IPCA RBNI REA 5744/2016 02/05/2018 02/05/2038  R$815,334.61
DOURADOS BC 230 kV 0 Mvar DOURADOS BC1 MS RB FT BC 230 kV 50 Mvar DOURADOS BC1 MS 057/2001 IPCA RBNI REA 5744/2016 02/05/2018 02/05/2038  R$815,334.61
FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV FARROUPILHA /CAXIAS SUL 5 C-1 RS RB FT LT 230 kV FARROUPILHA /CAXIAS SUL 5 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV FARROUPILHA /CAXIAS SUL 5 C-1 RS RB FT LT 230 kV FARROUPILHA /CAXIAS SUL 5 C-1 RS 057/2001 IPCA RBNI REA 9599/2021 09/05/2021 08/05/2054  R$79,322.77
FARROUPILHA TR 230/69 kV FARROUPILHA TR3 RS RBF FT TR 230/69 kV FARROUPILHA TR3 RS 057/2001 IPCA RBNI REA 6688/2017 03/07/2020 03/07/2054  R$ 1,357,395.19
FARROUPILHA TR 230/69 kV FARROUPILHA TR2 RS RBF FT TR 230/69 kV FARROUPILHA TR2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$260,177.53
FARROUPILHA TR 230/69 kV FARROUPILHA TR2 RS RBF FT TR 230/69 kV FARROUPILHA TR2 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$540,855.59
FARROUPILHA TR 230/69 kV FARROUPILHA TR1 RS RBF FT TR 230/69 kV FARROUPILHA TR1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$260,177.53
FARROUPILHA TR 230/69 kV FARROUPILHA TR1 RS RBF FT TR 230/69 kV FARROUPILHA TR1 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$540,855.59
FARROUPILHA TR 230/69 kV FARROUPILHA TR1 RS RBF FT TR 230/69 kV FARROUPILHA TR1 RS 057/2001 IPCA RMEL REN 643/2014 18/10/2015 17/10/2048  R$2,660.88
FARROUPILHA MG 230 kV FARROUPILHA MG1 RS RB FT MG 230 kV FARROUPILHA MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$440,937.96
FARROUPILHA MG 230 kV FARROUPILHA MG1 RS RB FT MG 230 kV FARROUPILHA MG1 RS 057/2001 IPCA RBNI REA 6688/2017 28/06/2020 28/06/2050  R$7,985.72
FARROUPILHA MG 230 kV FARROUPILHA MG1 RS RB FT MG 230 kV FARROUPILHA MG1 RS 057/2001 IPCA RBNI REA 6688/2017 28/06/2020 28/06/2050  R$3,940.47
FARROUPILHA MG 230 kV FARROUPILHA MG1 RS RB FT MG 230 kV FARROUPILHA MG1 RS 057/2001 IPCA RBNI REA 6688/2017 28/06/2020 28/06/2050  R$153,072.63
FARROUPILHA MG 230 kV FARROUPILHA MG1 RS RB FT MG 230 kV FARROUPILHA MG1 RS 057/2001 IPCA RBNI REA 5861/2016 20/12/2018 19/12/2033  R$9,908.50
FARROUPILHA MC 69 kV TR 230/69 kV FARROUPILHA TR3 RS RBF FT TR 230/69 kV FARROUPILHA TR3 RS 057/2001 IPCA RBNI REA 6688/2017 03/07/2020 03/07/2042  R$ 1,273,522.00
FARROUPILHA MC 69 kV TR 230/69 kV FARROUPILHA TR2 RS  RBF FT TR 230/69 kV FARROUPILHA TR2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$43,779.08
FARROUPILHA MC 69 kV TR 230/69 kV FARROUPILHA TR1 RS RBF FT TR 230/69 kV FARROUPILHA TR1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$43,779.08
FARROUPILHA MC 230 kV TR 230/69 kV FARROUPILHA TR3 RS RBF FT TR 230/69 kV FARROUPILHA TR3 RS 057/2001 IPCA RBNI REA 6688/2017 03/07/2020 03/07/2044  R$757,811.17
FARROUPILHA MC 230 kV TR 230/69 kV FARROUPILHA TR2 RS  RBF FT TR 230/69 kV FARROUPILHA TR2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$126,266.78
FARROUPILHA MC 230 kV TR 230/69 kV FARROUPILHA TR1 RS  RBF FT TR 230/69 kV FARROUPILHA TR1 RS 057/2001 IPCA RBNI REA 5484/2015 28/09/2017 27/09/2050  R$104,339.98
FARROUPILHA IB 230 kV MG 230 kV FARROUPILHA MG1 RS IB1 RB FT MG 230 kV FARROUPILHA MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$103,749.99
FARROUPILHA EL 69 kV FARROUPILHA LT 69 kV FARROUPILHA 1 /FARROUPILHA C-2 RS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$54,026.81
FARROUPILHA EL 69 kV FARROUPILHA LT 69 kV FARROUPILHA 1 /FARROUPILHA C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$54,026.81
FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV GARIBALDI 1 /FARROUPILHA C-1 RS  RB FT LT 230 kV GARIBALDI 1 /FARROUPILHA C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV GARIBALDI 1 /FARROUPILHA C-1 RS  RB FT LT 230 kV GARIBALDI 1 /FARROUPILHA C-1 RS 057/2001 IPCA RMEL REN 643/2014 20/10/2013 19/10/2036  R$20,599.86
FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV GARIBALDI 1 /FARROUPILHA C-1 RS  RB FT LT 230 kV GARIBALDI 1 /FARROUPILHA C-1 RS 057/2001 IPCA RBNI REA 5484/2015 25/09/2017 24/09/2047  R$45,860.84
FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV FARROUPILHA /SCHARLAU C-1 RS  RB FT LT 230 kV FARROUPILHA /SCHARLAU C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV FARROUPILHA /MONTE CLARO C-2 RS RB FT LT 230 kV FARROUPILHA /MONTE CLARO C-2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV FARROUPILHA /MONTE CLARO C-2 RS RB FT LT 230 kV FARROUPILHA /MONTE CLARO C-2 RS 057/2001 IPCA RBNI REA 5484/2015 25/09/2017 24/09/2047  R$45,860.84
FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV FARROUPILHA /MONTE CLARO C-2 RS RB FT LT 230 kV FARROUPILHA /MONTE CLARO C-2 RS 057/2001 IPCA RBNI REA 5484/2015 28/09/2017 27/09/2050  R$104,339.98
FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS  RB FT LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS  RB FT LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS 057/2001 IPCA RBNI REA 5484/2015 25/09/2017 24/09/2047  R$45,860.84
FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS  RB FT LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS 057/2001 IPCA RBNI REA 5484/2015 28/09/2017 27/09/2050  R$114,400.42
FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV CAXIAS SUL 2 /FARROUPILHA C-1 RS RB FT LT 230 kV CAXIAS SUL 2 /FARROUPILHA C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV CAXIAS SUL 2 /FARROUPILHA C-1 RS RB FT LT 230 kV CAXIAS SUL 2 /FARROUPILHA C-1 RS 057/2001 IPCA RBNI REA 7761/2019 09/08/2021 08/08/2051  R$61,359.70
FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV CAXIAS /FARROUPILHA C-2 RS RB FT LT 230 kV CAXIAS /FARROUPILHA C-2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV CAXIAS /FARROUPILHA C-1 RS RB FT LT 230 kV CAXIAS /FARROUPILHA C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV CAXIAS /FARROUPILHA C-2 RS RB FT LT 230 kV CAXIAS /FARROUPILHA C-2 RS 057/2001 IPCA RMEL REN 643/2014 02/02/2014 01/02/2037  R$20,821.64
FLORIANOPOLIS EL 138 kV FLORIANOPOLIS LT 138 kV BIGUACU /FLORIANOPOLIS C-2 SC  DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$271,943.34
FLORIANOPOLIS EL 138 kV FLORIANOPOLIS LT 138 kV BIGUACU /FLORIANOPOLIS C-2 SC  DIT   057/2001 IPCA RMEL REN 443/2011 27/04/2014 26/04/2037  R$12,925.22
FLORIANOPOLIS TR 138/69 kV FLORIANOPOLIS TR3 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$102,016.01
FLORIANOPOLIS TR 138/69 kV FLORIANOPOLIS TR3 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$212,070.30
FLORIANOPOLIS TR 138/69 kV FLORIANOPOLIS TR2 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$102,016.01
FLORIANOPOLIS TR 138/69 kV FLORIANOPOLIS TR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$102,016.01
FLORIANOPOLIS MG 138 kV FLORIANOPOLIS MG1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$281,614.58
FLORIANOPOLIS MG 138 kV FLORIANOPOLIS MG1 SC DIT   057/2001 IPCA RCDM DSP 4033/2021 22/12/2021 21/12/2036  R$6,194.50
FLORIANOPOLIS MC 69 kV TR 138/69 kV FLORIANOPOLIS TR3 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$43,779.08
FLORIANOPOLIS MC 69 kV TR 138/69 kV FLORIANOPOLIS TR2 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$43,779.08
FLORIANOPOLIS MC 69 kV TR 138/69 kV FLORIANOPOLIS TR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$43,779.08
FLORIANOPOLIS MC 138 kV TR 138/69 kV FLORIANOPOLIS TR3 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$87,333.22
FLORIANOPOLIS MC 138 kV TR 138/69 kV FLORIANOPOLIS TR3 SC DIT   057/2001 IPCA RCDM REA 5484/2015 19/04/2018 18/04/2048  R$29,642.46
FLORIANOPOLIS MC 138 kV TR 138/69 kV FLORIANOPOLIS TR2 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$87,333.22
FLORIANOPOLIS MC 138 kV TR 138/69 kV FLORIANOPOLIS TR2 SC DIT   057/2001 IPCA RCDM REA 5484/2015 19/04/2018 18/04/2048  R$29,642.46
FLORIANOPOLIS MC 138 kV TR 138/69 kV FLORIANOPOLIS TR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$87,333.22
FLORIANOPOLIS MC 138 kV TR 138/69 kV FLORIANOPOLIS TR1 SC DIT   057/2001 IPCA RCDM REA 5484/2015 19/04/2018 18/04/2048  R$29,642.46
FLORIANOPOLIS EL 69 kV FLORIANOPOLISDIST2 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$54,026.81
FLORIANOPOLIS EL 69 kV FLORIANOPOLISDIST2 DIT   057/2001 IPCA RMEL REN 443/2011 29/04/2014 28/04/2037  R$6,668.65
FLORIANOPOLIS EL 69 kV FLORIANOPOLISDIST1 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$54,026.81
FLORIANOPOLIS EL 138 kV FLORIANOPOLIS LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-2 SC  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,817.81
FLORIANOPOLIS EL 138 kV FLORIANOPOLIS LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-2 SC  DIT   057/2001 IPCA RCDM REA 3578/2012 19/04/2018 18/04/2048  R$23,322.79
FLORIANOPOLIS EL 138 kV FLORIANOPOLIS LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-1 SC  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,817.81
FLORIANOPOLIS EL 138 kV FLORIANOPOLIS LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-1 SC  DIT   057/2001 IPCA RMEL REN 443/2011 26/04/2014 25/04/2037  R$12,923.91
FLORIANOPOLIS EL 138 kV FLORIANOPOLIS LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-1 SC  DIT   057/2001 IPCA RCDM REA 3578/2012 19/04/2018 18/04/2048  R$23,322.79
FLORIANOPOLIS EL 138 kV FLORIANOPOLIS LT 138 kV BIGUACU /FLORIANOPOLIS C-2 SC  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,817.81
FLORIANOPOLIS EL 138 kV FLORIANOPOLIS LT 138 kV BIGUACU /FLORIANOPOLIS C-1 SC  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,817.81
FLORIANOPOLIS EL 138 kV FLORIANOPOLIS LT 138 kV BIGUACU /FLORIANOPOLIS C-1 SC  DIT   057/2001 IPCA RMEL REN 443/2011 27/04/2014 26/04/2037  R$12,925.22
FORQUILHINHA EL 230 kV FORQUILHINHA LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
FORQUILHINHA EL 230 kV FORQUILHINHA LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS RB FT LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
FORQUILHINHA EL 230 kV FORQUILHINHA LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS RB FT LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS 057/2001 IPCA RMEL REN 643/2014 27/07/2014 26/07/2043  R$ 27.85
FORQUILHINHA EL 230 kV FORQUILHINHA LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RMEL REN 643/2014 19/10/2014 18/10/2043  R$ 28.04
FORQUILHINHA EL 230 kV FORQUILHINHA LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBNI REA 5861/2016 29/04/2019 28/04/2036  R$11,494.30
FOZ DO CHAPECO TR 230/138 kV FOZ DO CHAPECO TR4 RS RBF FT TR 230/138 kV FOZ DO CHAPECO TR4 RS 002/2011 IPCA RBNI REA 8795/2020 06/05/2022 06/05/2056  R$913,100.05
FOZ DO CHAPECO MG 230 kV FOZ DO CHAPECO MG2 RS RB FT MG 230 kV FOZ DO CHAPECO MG2 RS 002/2011 IPCA RBL CC 002/2011 21/02/2013 16/06/2041  R$712,146.59
FOZ DO CHAPECO MG 230 kV FOZ DO CHAPECO MG1 RS RB FT MG 230 kV FOZ DO CHAPECO MG1 RS 002/2011 IPCA RBNI REN 443/2011 29/04/2015 28/04/2046  R$78,543.46
FOZ DO CHAPECO TR 230/138 kV FOZ DO CHAPECO TR3 RS RBF FT TR 230/138 kV FOZ DO CHAPECO TR3 RS 002/2011 IPCA RBNI REA 4056/2013 15/05/2015 15/05/2050  R$949,177.22
FOZ DO CHAPECO TR 230/138 kV FOZ DO CHAPECO TR2 RS RBF FT TR 230/138 kV FOZ DO CHAPECO TR2 RS 002/2011 IPCA RBL CC 002/2011 21/02/2013 16/06/2041  R$748,453.29
FOZ DO CHAPECO TR 230/138 kV FOZ DO CHAPECO TR1 RS RBF FT TR 230/138 kV FOZ DO CHAPECO TR1 RS 002/2011 IPCA RBL CC 002/2011 21/02/2013 16/06/2041  R$748,453.29
FOZ DO CHAPECO MG 230 kV FOZ DO CHAPECO MG1 RS RB FT MG 230 kV FOZ DO CHAPECO MG1 RS 002/2011 IPCA RBNI REA 8795/2020 06/05/2022 06/05/2053  R$140,270.39
FOZ DO CHAPECO MG 230 kV FOZ DO CHAPECO MG2 RS RB FT MG 230 kV FOZ DO CHAPECO MG2 RS 002/2011 IPCA RBNI REA 6454/2017 01/07/2017 15/06/2040  R$56,098.09
FOZ DO CHAPECO MG 230 kV FOZ DO CHAPECO MG1 RS RB FT MG 230 kV FOZ DO CHAPECO MG1 RS 002/2011 IPCA RBNI REA 4056/2013 15/05/2015 15/05/2047  R$104,673.36
FOZ DO CHAPECO MG 230 kV FOZ DO CHAPECO MG1 RS RB FT MG 230 kV FOZ DO CHAPECO MG1 RS 002/2011 IPCA RBNI REA 6427/2017 01/07/2017 27/10/2047  R$45,416.57
FOZ DO CHAPECO MC 230 kV TR 230/138 kV FOZ DO CHAPECO TR3 RS RBF FT TR 230/138 kV FOZ DO CHAPECO TR3 RS 002/2011 IPCA RBNI REA 4056/2013 15/05/2015 15/05/2039  R$652,337.92
FOZ DO CHAPECO MC 230 kV TR 230/138 kV FOZ DO CHAPECO TR2 RS RBF FT TR 230/138 kV FOZ DO CHAPECO TR2 RS 002/2011 IPCA RBL CC 002/2011 21/02/2013 16/06/2041  R$334,018.64
FOZ DO CHAPECO MG 230 kV FOZ DO CHAPECO MG1 RS RB FT MG 230 kV FOZ DO CHAPECO MG1 RS 002/2011 IPCA RBNI REA 8795/2020 06/05/2022 06/05/2053  R$98,082.11
FOZ DO CHAPECO MC 230 kV TR 230/138 kV FOZ DO CHAPECO TR4 RS RBF FT TR 230/138 kV FOZ DO CHAPECO TR4 RS 002/2011 IPCA RBNI REA 8795/2020 06/05/2022 06/05/2049  R$917,100.63
FOZ DO CHAPECO MC 138 kV TR 230/138 kV FOZ DO CHAPECO TR4 RS RBF FT TR 230/138 kV FOZ DO CHAPECO TR4 RS 002/2011 IPCA RBNI REA 8795/2020 06/05/2022 06/05/2048  R$733,461.69
FOZ DO CHAPECO MC 138 kV TR 230/138 kV FOZ DO CHAPECO TR3 RS RBF FT TR 230/138 kV FOZ DO CHAPECO TR3 RS 002/2011 IPCA RBNI REA 4056/2013 15/05/2015 15/05/2037  R$515,351.71
FOZ DO CHAPECO MC 230 kV TR 230/138 kV FOZ DO CHAPECO TR1 RS RBF FT TR 230/138 kV FOZ DO CHAPECO TR1 RS 002/2011 IPCA RBL CC 002/2011 21/02/2013 16/06/2041  R$334,018.64
FOZ DO CHAPECO MC 138 kV TR 230/138 kV FOZ DO CHAPECO TR2 RS RBF FT TR 230/138 kV FOZ DO CHAPECO TR2 RS 002/2011 IPCA RBL CC 002/2011 21/02/2013 16/06/2041  R$254,364.62
FOZ DO CHAPECO MC 138 kV TR 230/138 kV FOZ DO CHAPECO TR1 RS RBF FT TR 230/138 kV FOZ DO CHAPECO TR1 RS 002/2011 IPCA RBL CC 002/2011 21/02/2013 16/06/2041  R$254,364.62
FOZ DO CHAPECO IB 138 kV MG 230 kV FOZ DO CHAPECO MG1 RS IB1 DIT   002/2011 IPCA RPEC CC 002/2011 16/06/2011 16/06/2041  R$178,483.76
FOZ DO CHAPECO EL 230 kV FOZ DO CHAPECO LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-2 RS/SC  RB FT LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-2 RS/SC 002/2011 IPCA RBNI REA 6454/2017 01/07/2017 15/06/2047  R$175,778.04
FOZ DO CHAPECO EL 230 kV FOZ DO CHAPECO LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-1 RS/SC  RB FT LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-1 RS/SC 002/2011 IPCA RBNI REA 6454/2017 01/07/2017 15/06/2047  R$175,778.04
FOZ DO CHAPECO EL 230 kV FOZ DO CHAPECO LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-2 RS/SC RB FT LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-2 RS/SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044  R$628,245.02
FOZ DO CHAPECO EL 230 kV FOZ DO CHAPECO LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-1 RS/SC RB FT LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-1 RS/SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044  R$628,245.02
FOZ DO CHAPECO EL 230 kV FOZ DO CHAPECO LT 230 kV FOZ DO CHAPECO /GUARITA C-1 RS  RB FT LT 230 kV FOZ DO CHAPECO /GUARITA C-1 RS 002/2011 IPCA RBNI REA 6427/2017 01/07/2017 27/10/2040  R$175,339.29
FOZ DO CHAPECO EL 138 kV FOZ DO CHAPECOPLANALTO DIT   002/2011 IPCA RPEC CC 002/2011 16/06/2011 16/06/2041  R$349,570.27
FOZ DO CHAPECO EL 138 kV FOZ DO CHAPECOCHAPECO 2 DIT   002/2011 IPCA RCDM REN 443/2011 29/04/2015 28/04/2037  R$818,792.76
GARIBALDI 1 EL 230 kV GARIBALDI 1 LT 230 kV VINHEDOS /GARIBALDI 1 C-1 RS  RB FT LT 230 kV VINHEDOS /GARIBALDI 1 C-1 RS 012/2010 IPCA RBL CC 012/2010 19/07/2013 06/10/2040  R$755,544.70
GASPAR 2 MG 230 kV GASPAR 2 MG2 SC RB FT MG 230 kV GASPAR 2 MG2 SC 057/2001 IPCA RBNI REA 4802/2014 30/09/2016 29/09/2043  R$538,044.14
GASPAR 2 EL 230 kV GASPAR 2 LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC RB FT LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC 057/2001 IPCA RBNI REA 4802/2014 30/09/2016 29/09/2046  R$ 1,210,837.15
GASPAR 2 EL 230 kV GASPAR 2 LT 230 kV GASPAR 2 /BLUMENAU C-2 SC  RB FT LT 230 kV GASPAR 2 /BLUMENAU C-2 SC 057/2001 IPCA RBNI REA 4802/2014 30/09/2016 29/09/2046  R$ 1,210,837.15
GASPAR 2 EL 230 kV GASPAR 2 LT 230 kV GASPAR 2 /BLUMENAU C-1 SC  RB FT LT 230 kV GASPAR 2 /BLUMENAU C-1 SC 057/2001 IPCA RBNI REA 7009/2018 01/07/2018 22/01/2040  R$128,560.41
GASPAR 2 EL 230 kV GASPAR 2 LT 230 kV BIGUACU /GASPAR 2 C-1 SC  RB FT LT 230 kV BIGUACU /GASPAR 2 C-1 SC 057/2001 IPCA RBNI REA 7009/2018 01/07/2018 22/01/2040  R$128,560.41
GRAVATAI TR 525/230 kV GRAVATAI TRR1 RS RB FT TR 525/230 kV GRAVATAI TRR1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$502,776.61
GRAVATAI TR 525/230 kV GRAVATAI TRR1 RS RB FT TR 525/230 kV GRAVATAI TRR1 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,045,169.20
GRAVATAI TR 525/230 kV GRAVATAI TR3 RS RB FT TR 525/230 kV GRAVATAI TR3 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,508,329.83
GRAVATAI TR 525/230 kV GRAVATAI TR3 RS RB FT TR 525/230 kV GRAVATAI TR3 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,135,507.60
GRAVATAI TR 525/230 kV GRAVATAI TR3 RS RB FT TR 525/230 kV GRAVATAI TR3 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,308,889.34
GRAVATAI TR 525/230 kV GRAVATAI TR2 RS RB FT TR 525/230 kV GRAVATAI TR2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,508,329.83
GRAVATAI TR 525/230 kV GRAVATAI TR2 RS RB FT TR 525/230 kV GRAVATAI TR2 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,135,507.60
GRAVATAI TR 525/230 kV GRAVATAI TR2 RS RB FT TR 525/230 kV GRAVATAI TR2 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,308,889.34
GRAVATAI TR 525/230 kV GRAVATAI TR1 RS RB FT TR 525/230 kV GRAVATAI TR1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,508,329.83
GRAVATAI TR 525/230 kV GRAVATAI TR1 RS RB FT TR 525/230 kV GRAVATAI TR1 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,135,507.60
GRAVATAI TR 525/230 kV GRAVATAI TR1 RS RB FT TR 525/230 kV GRAVATAI TR1 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,308,889.34
GRAVATAI TR 525/230 kV GRAVATAI TR1 RS RB FT TR 525/230 kV GRAVATAI TR1 RS 057/2001 IPCA RMEL REA 9918/2021 27/05/2021 27/05/2056  R$ 1,664,279.59
GRAVATAI RTL 525 kV 150 Mvar GRAVATAI RT1 RS RB FT RTL 525 kV 150 Mvar GRAVATAI RT1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$603,333.01
GRAVATAI RTL 525 kV 150 Mvar GRAVATAI RT1 RS RB FT RTL 525 kV 150 Mvar GRAVATAI RT1 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,254,205.28
GRAVATAI RTL 525 kV 150 Mvar GRAVATAI RT1 RS RB FT RTL 525 kV 150 Mvar GRAVATAI RT1 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$923,557.39
GRAVATAI RTB 525 kV 50 Mvar GRAVATAI RTR1 RS RB FT RTB 525 kV 50 Mvar GRAVATAI RTR1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$201,111.00
GRAVATAI RTB 525 kV 50 Mvar GRAVATAI RTR1 RS RB FT RTB 525 kV 50 Mvar GRAVATAI RTR1 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$418,068.43
GRAVATAI RTB 525 kV 50 Mvar GRAVATAI RTR1 RS RB FT RTB 525 kV 50 Mvar GRAVATAI RTR1 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$307,852.46
GRAVATAI RTB 525 kV 150 Mvar GRAVATAI RT2 RS RB FT RTB 525 kV 150 Mvar GRAVATAI RT2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$603,333.01
GRAVATAI RTB 525 kV 150 Mvar GRAVATAI RT2 RS RB FT RTB 525 kV 150 Mvar GRAVATAI RT2 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,254,205.28
GRAVATAI RTB 525 kV 150 Mvar GRAVATAI RT2 RS RB FT RTB 525 kV 150 Mvar GRAVATAI RT2 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$923,557.39
GRAVATAI RTB 525 kV 150 Mvar GRAVATAI RT2 RS RB FT RTB 525 kV 150 Mvar GRAVATAI RT2 RS 057/2001 IPCA RMEL REA 9918/2021 27/05/2021 27/05/2057  R$585,714.67
GRAVATAI MG 525 kV GRAVATAI MG1 RS RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,252,547.67
GRAVATAI MG 525 kV GRAVATAI MG1 RS RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RMEL REN 643/2014 27/10/2014 26/10/2031  R$11,712.62
GRAVATAI MG 525 kV GRAVATAI MG1 RS RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RMEL REN 643/2014 17/10/2014 16/10/2031  R$11,697.02
GRAVATAI MC 525 kV TR 525/230 kV GRAVATAI TR3 RS  RB FT TR 525/230 kV GRAVATAI TR3 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$323,135.88
GRAVATAI MC 525 kV TR 525/230 kV GRAVATAI TR3 RS  RB FT TR 525/230 kV GRAVATAI TR3 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$671,733.05
GRAVATAI MC 525 kV TR 525/230 kV GRAVATAI TR3 RS  RB FT TR 525/230 kV GRAVATAI TR3 RS 057/2001 IPCA RMEL REN 643/2014 08/04/2015 07/04/2039  R$62,405.18
GRAVATAI MC 525 kV TR 525/230 kV GRAVATAI TR3 RS  RB FT TR 525/230 kV GRAVATAI TR3 RS 057/2001 IPCA RBNI REA 5861/2016 03/06/2019 02/06/2034  R$54,037.16
GRAVATAI MC 525 kV TR 525/230 kV GRAVATAI TR2 RS  RB FT TR 525/230 kV GRAVATAI TR2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$323,135.88
GRAVATAI MC 525 kV TR 525/230 kV GRAVATAI TR2 RS  RB FT TR 525/230 kV GRAVATAI TR2 RS 057/2001 IPCA RMEL REN 643/2014 01/05/2014 30/04/2037  R$43,677.32
GRAVATAI MC 525 kV RTL 525 kV 150 Mvar GRAVATAI RT1 RS  RB FT RTL 525 kV 150 Mvar GRAVATAI RT1 RS 057/2001 IPCA RMEL REN 443/2011 15/12/2016 14/12/2039  R$15,962.91
GRAVATAI MC 525 kV RTB 525 kV 150 Mvar GRAVATAI RT2 RS  RB FT RTB 525 kV 150 Mvar GRAVATAI RT2 RS 057/2001 IPCA RMEL REN 643/2014 08/04/2015 07/04/2038  R$45,179.20
GRAVATAI MC 525 kV TR 525/230 kV GRAVATAI TR2 RS  RB FT TR 525/230 kV GRAVATAI TR2 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$671,733.05
GRAVATAI MC 525 kV TR 525/230 kV GRAVATAI TR2 RS  RB FT TR 525/230 kV GRAVATAI TR2 RS 057/2001 IPCA RBNI REA 5861/2016 03/06/2019 02/06/2034  R$54,037.16
GRAVATAI MC 525 kV TR 525/230 kV GRAVATAI TR1 RS  RB FT TR 525/230 kV GRAVATAI TR1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$323,135.88
GRAVATAI MC 525 kV TR 525/230 kV GRAVATAI TR1 RS  RB FT TR 525/230 kV GRAVATAI TR1 RS 057/2001 IPCA RMEL REN 643/2014 10/04/2016 09/04/2039  R$46,795.27
GRAVATAI MC 525 kV TR 525/230 kV GRAVATAI TR1 RS  RB FT TR 525/230 kV GRAVATAI TR1 RS 057/2001 IPCA RBNI REA 5861/2016 03/06/2019 02/06/2034  R$54,037.16
GRAVATAI MC 525 kV RTL 525 kV 150 Mvar GRAVATAI RT1 RS  RB FT RTL 525 kV 150 Mvar GRAVATAI RT1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$195,769.91
GRAVATAI MC 525 kV RTB 525 kV 150 Mvar GRAVATAI RT2 RS  RB FT RTB 525 kV 150 Mvar GRAVATAI RT2 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$628,940.53
GRAVATAI MC 525 kV RTL 525 kV 150 Mvar GRAVATAI RT1 RS  RB FT RTL 525 kV 150 Mvar GRAVATAI RT1 RS 057/2001 IPCA RBNI REA 5861/2016 17/06/2019 16/06/2034  R$47,068.24
GRAVATAI MC 525 kV RTB 525 kV 150 Mvar GRAVATAI RT2 RS  RB FT RTB 525 kV 150 Mvar GRAVATAI RT2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$302,550.62
GRAVATAI MC 230 kV TR 525/230 kV GRAVATAI TR3 RS  RB FT TR 525/230 kV GRAVATAI TR3 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$81,206.77
GRAVATAI MC 230 kV TR 525/230 kV GRAVATAI TR3 RS  RB FT TR 525/230 kV GRAVATAI TR3 RS 057/2001 IPCA RBNI REA 4347/2013 12/04/2015 11/04/2045  R$42,804.45
GRAVATAI MC 525 kV RTB 525 kV 150 Mvar GRAVATAI RT2 RS  RB FT RTB 525 kV 150 Mvar GRAVATAI RT2 RS 057/2001 IPCA RBNI REA 5861/2016 17/06/2019 16/06/2034  R$47,068.24
GRAVATAI MC 230 kV TR 525/230 kV GRAVATAI TR2 RS  RB FT TR 525/230 kV GRAVATAI TR2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$81,206.77
GRAVATAI MC 230 kV TR 525/230 kV GRAVATAI TR2 RS  RB FT TR 525/230 kV GRAVATAI TR2 RS 057/2001 IPCA RMEL REN 643/2014 08/12/2013 07/12/2036  R$20,703.34
GRAVATAI MC 230 kV TR 525/230 kV GRAVATAI TR2 RS  RB FT TR 525/230 kV GRAVATAI TR2 RS 057/2001 IPCA RBNI REA 4347/2013 12/04/2015 11/04/2045  R$42,804.45
GRAVATAI IB 525 kV MG 525 kV GRAVATAI MG1 RS IB3 RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$712,852.36
GRAVATAI MC 230 kV TR 525/230 kV GRAVATAI TR1 RS  RB FT TR 525/230 kV GRAVATAI TR1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$81,206.77
GRAVATAI MC 230 kV TR 525/230 kV GRAVATAI TR1 RS  RB FT TR 525/230 kV GRAVATAI TR1 RS 057/2001 IPCA RMEL REN 643/2014 20/10/2013 19/10/2036  R$20,599.86
GRAVATAI MC 230 kV TR 525/230 kV GRAVATAI TR1 RS  RB FT TR 525/230 kV GRAVATAI TR1 RS 057/2001 IPCA RBNI REA 4347/2013 12/04/2015 11/04/2045  R$42,804.45
GRAVATAI IB 525 kV MG 525 kV GRAVATAI MG1 RS IB1 RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RBNI REA 5861/2016 07/06/2019 06/06/2034  R$21,975.56
GRAVATAI IB 525 kV MG 525 kV GRAVATAI MG1 RS IB3 RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
GRAVATAI EL 525 kV GRAVATAI LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS  RB FT LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
GRAVATAI IB 525 kV MG 525 kV GRAVATAI MG1 RS IB3 RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RBNI REA 5861/2016 07/06/2019 06/06/2034  R$21,975.56
GRAVATAI IB 525 kV MG 525 kV GRAVATAI MG1 RS IB2 RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
GRAVATAI IB 525 kV MG 525 kV GRAVATAI MG1 RS IB2 RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$712,852.36
GRAVATAI IB 525 kV MG 525 kV GRAVATAI MG1 RS IB2 RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RBNI REA 5861/2016 07/06/2019 06/06/2034  R$21,975.56
GRAVATAI IB 525 kV MG 525 kV GRAVATAI MG1 RS IB1 RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
GRAVATAI IB 525 kV MG 525 kV GRAVATAI MG1 RS IB1 RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$712,852.36
GRAVATAI EL 525 kV GRAVATAI LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS  RB FT LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$761,090.85
GRAVATAI EL 525 kV GRAVATAI LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS  RB FT LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$560,443.41
GRAVATAI EL 525 kV GRAVATAI LT 525 kV CAXIAS /GRAVATAI C-1 RS  RB FT LT 525 kV CAXIAS /GRAVATAI C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
GRAVATAI EL 525 kV GRAVATAI LT 525 kV CAXIAS /GRAVATAI C-1 RS  RB FT LT 525 kV CAXIAS /GRAVATAI C-1 RS 057/2001 IPCA RMEL REN 643/2014 18/05/2014 17/05/2037  R$43,751.96
GRAVATAI EL 525 kV GRAVATAI LT 525 kV CAXIAS /GRAVATAI C-1 RS  RB FT LT 525 kV CAXIAS /GRAVATAI C-1 RS 057/2001 IPCA RMEL REN 643/2014 13/03/2016 12/03/2046  R$62,339.15
GRAVATAI EL 525 kV GRAVATAI LT 525 kV CAXIAS /GRAVATAI C-1 RS  RB FT LT 525 kV CAXIAS /GRAVATAI C-1 RS 057/2001 IPCA RBNI REA 5861/2016 05/06/2019 04/06/2034  R$36,031.31
GRAVATAI 2 MC 230 kV BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS  RB FT BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$140,866.12
GRAVATAI 2 MC 230 kV BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS  RB FT BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS 057/2001 IPCA RBNI REA 4347/2013 10/09/2015 09/09/2045  R$43,318.97
GRAVATAI 2 MC 230 kV BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS  RB FT BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS 057/2001 IPCA RBNI REA 5861/2016 07/06/2019 06/06/2034  R$99,490.50
GRAVATAI 2 MC 230 kV BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS  RB FT BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$140,866.12
GRAVATAI 2 MC 230 kV BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS  RB FT BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS 057/2001 IPCA RBNI REA 4347/2013 10/09/2015 09/09/2045  R$43,318.97
GRAVATAI 2 MC 230 kV BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS  RB FT BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS 057/2001 IPCA RBNI REA 5861/2016 07/06/2019 06/06/2034  R$99,490.50
GRAVATAI 2 BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS RB FT BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$192,732.17
GRAVATAI 2 BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS RB FT BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS 057/2001 IPCA RMEL REN 643/2014 16/08/2015 15/08/2043  R$24,257.02
GRAVATAI 2 BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS RB FT BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS 057/2001 IPCA RMEL REN 643/2014 23/08/2015 22/08/2043  R$24,268.22
GRAVATAI 2 BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS RB FT BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$192,732.17
GRAVATAI 3 TR 230/69 kV GRAVATAI 3 TRR1 RS RBF FT TR 230/69 kV GRAVATAI 3 TRR1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$162,226.24
GRAVATAI 3 TR 230/69 kV GRAVATAI 3 TR1 RS RBF FT TR 230/69 kV GRAVATAI 3 TR1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$486,678.73
GRAVATAI 3 MG 230 kV GRAVATAI 3 MG1 RS RB FT MG 230 kV GRAVATAI 3 MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$365,629.39
GRAVATAI 3 MC 69 kV TR 230/69 kV GRAVATAI 3 TR1 RS  RBF FT TR 230/69 kV GRAVATAI 3 TR1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,874.58
GRAVATAI 3 MC 230 kV TR 230/69 kV GRAVATAI 3 TR1 RS  RBF FT TR 230/69 kV GRAVATAI 3 TR1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
GRAVATAI 3 IB 69 kV MG 230 kV GRAVATAI 3 MG1 RS IB2 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$32,849.28
GRAVATAI 3 IB 230 kV MG 230 kV GRAVATAI 3 MG1 RS IB1 RB FT MG 230 kV GRAVATAI 3 MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$103,749.99
GRAVATAI 3 EL 69 kV GRAVATAI 3DIST3 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$57,137.95
GRAVATAI 3 EL 69 kV GRAVATAI 3DIST2 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$57,137.95
GRAVATAI 3 EL 69 kV GRAVATAI 3DIST1 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$57,137.95
GRAVATAI 3 EL 230 kV GRAVATAI 3 LT 230 kV GRAVATAI 2 /GRAVATAI 3 C-1 RS  RB FT LT 230 kV GRAVATAI 2 /GRAVATAI 3 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
GRAVATAI 3 EL 230 kV GRAVATAI 3 LT 230 kV GRAVATAI 2 /GRAVATAI 3 C-1 RS  RB FT LT 230 kV GRAVATAI 2 /GRAVATAI 3 C-1 RS 057/2001 IPCA RBNI REA 7761/2019 01/04/2021 31/03/2036  R$17,813.63
GRAVATAI 3 EL 230 kV GRAVATAI 3 LT 230 kV C.I.AUT.GRA /GRAVATAI 3 C-1 RS  RB FT LT 230 kV C.I.AUT.GRA /GRAVATAI 3 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
GRAVATAI 3 EL 230 kV GRAVATAI 3 LT 230 kV ATLANTIDA 2 /GRAVATAI 3 C-1 RS  RB FT LT 230 kV ATLANTIDA 2 /GRAVATAI 3 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
GUAIRA MG 525 kV GUAIRA MG2 PR RB FT MG 525 kV GUAIRA MG2 PR 057/2001 IPCA RBNI REA 8795/2020 08/05/2023 08/05/2041  R$457,218.64
GUAIRA EL 525 kV GUAIRA LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR RB FT LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR 057/2001 IPCA RBNI REA 8795/2020 08/05/2023 08/05/2052  R$ 1,550,869.89
GUARITA MG 230 kV GUARITA MG2 RS RB FT MG 230 kV GUARITA MG2 RS 002/2011 IPCA RBNI REA 6427/2017 01/07/2017 27/10/2047  R$45,416.57
GUARITA EL 230 kV GUARITA LT 230 kV FOZ DO CHAPECO /GUARITA C-1 RS  RB FT LT 230 kV FOZ DO CHAPECO /GUARITA C-1 RS 002/2011 IPCA RBNI REA 6427/2017 01/07/2017 27/10/2040  R$175,339.29
IJUI 2 TR 230/69 kV IJUI 2 TR3 RS RBF FT TR 230/69 kV IJUI 2 TR3 RS 011/2010 IPCA RBNI REA 7152/2018 09/01/2021 09/01/2055  R$ 1,384,521.35
IJUI 2 MG 230 kV IJUI 2 MG1 RS RB FT MG 230 kV IJUI 2 MG1 RS 011/2010 IPCA RBL CC 011/2010 06/10/2010 06/10/2040  R$ 1,230,386.06
IJUI 2 MG 230 kV IJUI 2 MG1 RS RB FT MG 230 kV IJUI 2 MG1 RS 011/2010 IPCA RBNI REA 7152/2018 09/01/2021 09/01/2052  R$39,179.36
IJUI 2 TR 230/69 kV IJUI 2 TR2 RS RBF FT TR 230/69 kV IJUI 2 TR2 RS 011/2010 IPCA RBL CC 011/2010 06/10/2010 06/10/2040  R$987,981.63
IJUI 2 TR 230/69 kV IJUI 2 TR1 RS RBF FT TR 230/69 kV IJUI 2 TR1 RS 011/2010 IPCA RBL CC 011/2010 06/10/2010 06/10/2040  R$987,981.63
IJUI 2 MG 230 kV IJUI 2 MG1 RS RB FT MG 230 kV IJUI 2 MG1 RS 011/2010 IPCA RBNI REN 1020/2022 05/05/2021 04/05/2052  R$38,471.41
IJUI 2 MG 230 kV IJUI 2 MG1 RS RB FT MG 230 kV IJUI 2 MG1 RS 011/2010 IPCA RBNI REA 7152/2018 09/01/2021 09/01/2052  R$139,316.41
IJUI 2 MC 69 kV TR 230/69 kV IJUI 2 TR3 RS RBF FT TR 230/69 kV IJUI 2 TR3 RS 011/2010 IPCA RBNI REA 7152/2018 09/01/2021 09/01/2044  R$439,795.25
IJUI 2 MC 69 kV TR 230/69 kV IJUI 2 TR2 RS  RBF FT TR 230/69 kV IJUI 2 TR2 RS 011/2010 IPCA RBL CC 011/2010 06/10/2010 06/10/2040  R$159,823.55
IJUI 2 MC 230 kV TR 230/69 kV IJUI 2 TR2 RS  RBF FT TR 230/69 kV IJUI 2 TR2 RS 011/2010 IPCA RBL CC 011/2010 06/10/2010 06/10/2040  R$401,868.53
IJUI 2 MC 230 kV TR 230/69 kV IJUI 2 TR1 RS  RBF FT TR 230/69 kV IJUI 2 TR1 RS 011/2010 IPCA RBL CC 011/2010 06/10/2010 06/10/2040  R$401,868.53
IJUI 2 MC 69 kV TR 230/69 kV IJUI 2 TR1 RS  RBF FT TR 230/69 kV IJUI 2 TR1 RS 011/2010 IPCA RBL CC 011/2010 06/10/2010 06/10/2040  R$159,823.55
IJUI 2 MC 230 kV TR 230/69 kV IJUI 2 TR3 RS RBF FT TR 230/69 kV IJUI 2 TR3 RS 011/2010 IPCA RBNI REA 7152/2018 09/01/2021 09/01/2044  R$ 1,233,339.08
IJUI 2 IB 69 kV MG 230 kV IJUI 2 MG1 RS IB1 DIT   011/2010 IPCA RPEC CC 011/2010 06/10/2010 06/10/2040  R$78,584.78
IJUI 2 IB 230 kV MG 230 kV IJUI 2 MG1 RS IB1 RB FT MG 230 kV IJUI 2 MG1 RS 011/2010 IPCA RBL CC 011/2010 06/10/2010 06/10/2040  R$296,659.58
IJUI 2 EL 69 kV IJUI 2PARA PANAMBI DIT   011/2010 IPCA RPEC CC 011/2010 06/10/2010 06/10/2040  R$137,505.13
IJUI 2 EL 69 kV IJUI 2PARA IJUI 1 DIT   011/2010 IPCA RPEC CC 011/2010 06/10/2010 06/10/2040  R$137,505.13
IJUI 2 EL 69 kV IJUI 2CERILUZ 3 DIT   011/2010 IPCA RCDM REN 1020/2022 05/05/2021 04/05/2049  R$524,783.41
IJUI 2 EL 69 kV IJUI 2CERILUZ DIT   011/2010 IPCA RPEC CC 011/2010 06/10/2010 06/10/2040  R$137,505.13
IJUI 2 EL 69 kV IJUI 2PARA DEMEI DIT   011/2010 IPCA RPEC CC 011/2010 06/10/2010 06/10/2040  R$137,505.13
ILHOTA TR 138/69 kV ILHOTA TRR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$161,473.66
ILHOTA TR 138/69 kV ILHOTA TR2 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$161,473.66
ILHOTA TR 138/69 kV ILHOTA TR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$161,473.66
ILHOTA MG 138 kV ILHOTA MG1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$301,131.95
ILHOTA MG 138 kV ILHOTA MG1 SC DIT   057/2001 IPCA RMEL REN 643/2014 13/05/2013 12/05/2030  R$22,473.29
ILHOTA MC 69 kV TR 138/69 kV ILHOTA TR2 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$48,874.58
ILHOTA MC 69 kV TR 138/69 kV ILHOTA TR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$48,874.58
ILHOTA MC 138 kV TR 138/69 kV ILHOTA TR2 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$87,333.22
ILHOTA MC 138 kV TR 138/69 kV ILHOTA TR2 SC DIT   057/2001 IPCA RCDM REA 5484/2015 19/04/2018 18/04/2048  R$29,636.70
ILHOTA MC 138 kV TR 138/69 kV ILHOTA TR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$87,333.22
ILHOTA MC 138 kV TR 138/69 kV ILHOTA TR1 SC DIT   057/2001 IPCA RCDM REA 5484/2015 19/04/2018 18/04/2048  R$29,636.70
ILHOTA MC 13,8 kV TR 138/69 kV ILHOTA TR2 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$34,820.75
ILHOTA MC 13,8 kV TR 138/69 kV ILHOTA TR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$34,820.75
ILHOTA EL 69 kV ILHOTADIST3 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$57,137.95
ILHOTA EL 69 kV ILHOTADIST2 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$57,137.95
ILHOTA EL 69 kV ILHOTADIST1 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$57,137.95
ILHOTA EL 138 kV ILHOTA LT 138 kV ILHOTA /PICARRAS C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,817.81
ILHOTA EL 138 kV ILHOTA LT 138 kV ILHOTA /PICARRAS C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$271,943.34
ILHOTA EL 138 kV ILHOTA LT 138 kV ILHOTA /ITAJAI C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,817.81
ILHOTA EL 138 kV ILHOTA LT 138 kV ILHOTA /ITAJAI C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,817.81
ILHOTA EL 138 kV ILHOTA LT 138 kV ILHOTA /ARAQUARI (HYOSUNG) C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,817.81
ILHOTA EL 138 kV ILHOTA LT 138 kV ILHOTA /ARAQUARI (HYOSUNG) C-1 SC DIT   057/2001 IPCA RCDM REA 2837/2011 08/12/2012 07/12/2042  R$30,499.04
ILHOTA EL 138 kV ILHOTA LT 138 kV ILHOTA /ARAQUARI (HYOSUNG) C-1 SC DIT   057/2001 IPCA RMEL REN 643/2014 15/03/2014 14/03/2037  R$12,869.32
ILHOTA EL 138 kV ILHOTA LT 138 kV GASPAR /ILHOTA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,817.81
ILHOTA EL 138 kV ILHOTA LT 138 kV BLUMENAU /ILHOTA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,817.81
ILHOTA CS 20/-20 Mvar ILHOTA CS2 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$639,652.25
ILHOTA CS 20/-20 Mvar ILHOTA CS1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$639,652.25
ITA RTB 500 kV 50 Mvar ITA RTR1 SC RB FT RTB 500 kV 50 Mvar ITA RTR1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$201,111.00
ITA RTB 500 kV 50 Mvar ITA RTR1 SC RB FT RTB 500 kV 50 Mvar ITA RTR1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$418,068.43
ITA RTB 500 kV 50 Mvar ITA RTR1 SC RB FT RTB 500 kV 50 Mvar ITA RTR1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$307,852.46
ITA RTB 500 kV 150 Mvar ITA RT1 SC RB FT RTB 500 kV 150 Mvar ITA RT1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$603,333.01
ITA RTB 500 kV 150 Mvar ITA RT1 SC RB FT RTB 500 kV 150 Mvar ITA RT1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,254,205.28
ITA RTB 500 kV 150 Mvar ITA RT1 SC RB FT RTB 500 kV 150 Mvar ITA RT1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$923,557.39
ITA MG 500 kV ITA MG1 SC RB FT MG 500 kV ITA MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,085,484.16
ITA MG 500 kV ITA MG1 SC RB FT MG 500 kV ITA MG1 SC 057/2001 IPCA RMEL REN 443/2011 30/05/2015 29/05/2032  R$12,048.04
ITA MG 500 kV ITA MG1 SC RB FT MG 500 kV ITA MG1 SC 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$13,243.51
ITA MC 500 kV RTB 500 kV 150 Mvar ITA RT1 SC  RB FT RTB 500 kV 150 Mvar ITA RT1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$302,550.62
ITA MC 500 kV RTB 500 kV 150 Mvar ITA RT1 SC  RB FT RTB 500 kV 150 Mvar ITA RT1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$628,940.53
ITA MC 500 kV RTB 500 kV 150 Mvar ITA RT1 SC  RB FT RTB 500 kV 150 Mvar ITA RT1 SC 057/2001 IPCA RMEL REN 643/2014 11/06/2014 10/06/2047  R$2,099.74
ITA IB 500 kV MG 500 kV ITA MG4 SC IB7 RB FT MG 500 kV ITA MG4 SC 004/2012 IPCA RBL CC 004/2012 06/08/2014 10/05/2042  R$ 1,088,619.50
ITA IB 500 kV MG 500 kV ITA MG1 SC IB6 RB FT MG 500 kV ITA MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
ITA IB 500 kV MG 500 kV ITA MG1 SC IB6 RB FT MG 500 kV ITA MG1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$712,852.36
ITA IB 500 kV MG 500 kV ITA MG1 SC IB6 RB FT MG 500 kV ITA MG1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$524,922.10
ITA IB 500 kV MG 500 kV ITA MG1 SC IB5 RB FT MG 500 kV ITA MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
ITA IB 500 kV MG 500 kV ITA MG1 SC IB5 RB FT MG 500 kV ITA MG1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$712,852.36
ITA IB 500 kV MG 500 kV ITA MG1 SC IB5 RB FT MG 500 kV ITA MG1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$524,922.10
ITA IB 500 kV MG 500 kV ITA MG1 SC IB2 RB FT MG 500 kV ITA MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
ITA IB 500 kV MG 500 kV ITA MG1 SC IB1 RB FT MG 500 kV ITA MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
ITA EL 525 kV ITA LT 525 kV ITA /NOVA STA RITA C-2 SC/RS  RB FT LT 525 kV ITA /NOVA STA RITA C-2 SC/RS 004/2012 IPCA RBL CC 004/2012 06/08/2014 10/05/2042  R$ 1,148,849.81
ITA EL 525 kV ITA LT 525 kV ITA /NOVA STA RITA C-2 SC/RS  RB FT LT 525 kV ITA /NOVA STA RITA C-2 SC/RS 004/2012 IPCA RBNI REA 5861/2016 26/04/2020 25/04/2034  R$29,579.70
ITA EL 525 kV ITA LT 525 kV ITA /NOVA STA RITA C-2 SC/RS  RB FT LT 525 kV ITA /NOVA STA RITA C-2 SC/RS 004/2012 IPCA RBNI REA 8314/2019 26/04/2020 25/04/2034  R$29,579.70
ITA EL 525 kV ITA LT 525 kV ITA /NOVA STA RITA C-1 SC/RS  RB FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
ITA EL 525 kV ITA LT 525 kV ITA /NOVA STA RITA C-1 SC/RS  RB FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$761,090.85
ITA EL 525 kV ITA LT 525 kV ITA /NOVA STA RITA C-1 SC/RS  RB FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS 057/2001 IPCA RMEL REN 643/2014 28/01/2015 27/01/2046  R$ 762.30
ITA EL 525 kV ITA LT 525 kV ITA /NOVA STA RITA C-1 SC/RS  RB FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS 057/2001 IPCA RBNI REA 3578/2012 05/05/2017 04/05/2040  R$44,400.86
ITA EL 525 kV ITA LT 525 kV ITA /NOVA STA RITA C-1 SC/RS  RB FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$13,243.51
ITA EL 500 kV ITA LT 500 kV S.SANTIAGO /ITA C-2 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-2 PR/SC 004/2012 IPCA RBL CC 004/2012 04/02/2014 10/05/2042  R$ 1,148,849.81
ITA EL 500 kV ITA LT 500 kV S.SANTIAGO /ITA C-2 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-2 PR/SC 004/2012 IPCA RBNI REA 8314/2019 26/04/2020 25/04/2034  R$29,579.70
ITA EL 500 kV ITA LT 500 kV S.SANTIAGO /ITA C-2 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-2 PR/SC 004/2012 IPCA RBNI REA 5861/2016 26/04/2020 25/04/2034  R$29,579.70
ITA EL 500 kV ITA LT 500 kV S.SANTIAGO /ITA C-1 PR/SC  RB FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
ITA EL 500 kV ITA LT 500 kV S.SANTIAGO /ITA C-1 PR/SC  RB FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$761,090.85
ITA EL 500 kV ITA LT 500 kV S.SANTIAGO /ITA C-1 PR/SC  RB FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC 057/2001 IPCA RMEL REN 643/2014 25/08/2014 24/08/2045  R$2,259.19
ITA EL 500 kV ITA LT 500 kV S.SANTIAGO /ITA C-1 PR/SC  RB FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$13,243.51
ITA EL 500 kV ITA LT 500 kV ITA /MACHADINHO C-1 SC  RB FT LT 500 kV ITA /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
ITA EL 500 kV ITA LT 500 kV ITA /MACHADINHO C-1 SC  RB FT LT 500 kV ITA /MACHADINHO C-1 SC 057/2001 IPCA RMEL REN 643/2014 14/05/2014 13/05/2037  R$43,734.40
ITA EL 500 kV ITA LT 500 kV ITA /MACHADINHO C-1 SC  RB FT LT 500 kV ITA /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$761,090.85
ITA EL 500 kV ITA LT 500 kV ITA /MACHADINHO C-1 SC  RB FT LT 500 kV ITA /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$560,443.41
ITA EL 500 kV ITA LT 500 kV ITA /MACHADINHO C-1 SC  RB FT LT 500 kV ITA /MACHADINHO C-1 SC 057/2001 IPCA RMEL REN 443/2011 30/05/2015 29/05/2032  R$12,048.04
ITA EL 500 kV ITA LT 500 kV ITA /MACHADINHO C-1 SC  RB FT LT 500 kV ITA /MACHADINHO C-1 SC 057/2001 IPCA RMEL REN 443/2011 18/04/2016 17/04/2031  R$21,162.23
ITA EL 500 kV ITA LT 500 kV ITA /MACHADINHO C-1 SC  RB FT LT 500 kV ITA /MACHADINHO C-1 SC 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$13,243.51
ITA EL 500 kV ITA LT 500 kV CAXIAS /ITA C-1 RS/SC  RB FT LT 500 kV CAXIAS /ITA C-1 RS/SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
ITA EL 500 kV ITA LT 500 kV CAXIAS /ITA C-1 RS/SC  RB FT LT 500 kV CAXIAS /ITA C-1 RS/SC 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$13,243.51
ITAJAI TR 230/138 kV ITAJAI TR4 SC RBF FT TR 230/138 kV ITAJAI TR4 SC 057/2001 IPCA RBNI REA 3339/2012 22/11/2014 21/11/2048  R$ 1,798,749.51
ITAJAI TR 230/138 kV ITAJAI TR3 SC RBF FT TR 230/138 kV ITAJAI TR3 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$340,018.74
ITAJAI TR 230/138 kV ITAJAI TR2 SC RBF FT TR 230/138 kV ITAJAI TR2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$340,018.74
ITAJAI TR 230/138 kV ITAJAI TR1 SC RBF FT TR 230/138 kV ITAJAI TR1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$340,018.74
ITAJAI MG 230 kV ITAJAI MG1 SC RB FT MG 230 kV ITAJAI MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$477,356.66
ITAJAI MG 230 kV ITAJAI MG1 SC RB FT MG 230 kV ITAJAI MG1 SC 057/2001 IPCA RBNI REN 443/2011 19/06/2019 18/06/2050  R$94,649.40
ITAJAI MG 230 kV ITAJAI MG1 SC RB FT MG 230 kV ITAJAI MG1 SC 057/2001 IPCA RBNI REN 443/2011 19/06/2019 18/06/2050  R$94,649.40
ITAJAI MG 230 kV ITAJAI MG1 SC RB FT MG 230 kV ITAJAI MG1 SC 057/2001 IPCA RBNI DSP 4033/2021 22/12/2021 21/12/2036  R$13,882.41
ITAJAI MC 230 kV TR 230/138 kV ITAJAI TR4 SC  RBF FT TR 230/138 kV ITAJAI TR4 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
ITAJAI MC 230 kV TR 230/138 kV ITAJAI TR3 SC  RBF FT TR 230/138 kV ITAJAI TR3 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
ITAJAI MC 230 kV TR 230/138 kV ITAJAI TR2 SC  RBF FT TR 230/138 kV ITAJAI TR2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
ITAJAI MC 230 kV TR 230/138 kV ITAJAI TR1 SC  RBF FT TR 230/138 kV ITAJAI TR1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
ITAJAI MC 138 kV TR 230/138 kV ITAJAI TR4 SC  RBF FT TR 230/138 kV ITAJAI TR4 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$90,882.76
ITAJAI MC 138 kV TR 230/138 kV ITAJAI TR3 SC  RBF FT TR 230/138 kV ITAJAI TR3 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$90,882.76
ITAJAI MC 138 kV TR 230/138 kV ITAJAI TR2 SC  RBF FT TR 230/138 kV ITAJAI TR2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$90,882.76
ITAJAI MC 138 kV TR 230/138 kV ITAJAI TR1 SC  RBF FT TR 230/138 kV ITAJAI TR1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$90,882.76
ITAJAI IB 230 kV MG 230 kV ITAJAI MG1 SC IB1 RB FT MG 230 kV ITAJAI MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$103,749.99
ITAJAI IB 138 kV MG 230 kV ITAJAI MG1 SC IB2 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$75,711.46
ITAJAI EL 138 kV ITAJAI LT 138 kV ILHOTA /ITAJAI C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$134,367.35
ITAJAI EL 138 kV ITAJAI LT 138 kV CAMBORIU M.B. /ITAJAI C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$134,367.35
ITAJAI EL 230 kV ITAJAI LT 230 kV BLUMENAU /ITAJAI C-2 SC  RB FT LT 230 kV BLUMENAU /ITAJAI C-2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
ITAJAI EL 230 kV ITAJAI LT 230 kV BLUMENAU /ITAJAI C-1 SC  RB FT LT 230 kV BLUMENAU /ITAJAI C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
ITAJAI EL 138 kV ITAJAI LT 138 kV ITAJAI /ITAJAIFAZENDA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$134,367.35
ITAJAI EL 138 kV ITAJAI LT 138 kV ILHOTA /ITAJAI C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$134,367.35
ITAJAI EL 138 kV ITAJAIITAIPAVA C2 DIT   057/2001 IPCA RCDM REN 443/2011 19/06/2019 18/06/2047  R$888,548.87
ITAJAI EL 138 kV ITAJAIDIST2 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$134,367.35
ITAJAI EL 138 kV ITAJAIDIST1 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$134,367.35
ITAJAI EL 138 kV ITAJAIBRUSQUE C2 DIT   057/2001 IPCA RCDM REN 443/2011 19/06/2019 18/06/2047  R$888,548.87
IVAIPORA RTL 500 kV 150 Mvar IVAIPORA RT1 PR RB FT LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR 004/2004 IGPM RBL CC 004/2004 31/10/2005 18/02/2034  R$ 2,685,335.11
IVAIPORA RTL 500 kV 150 Mvar IVAIPORA RT1 PR RB FT LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR 004/2004 IGPM RMEL REN 643/2014 12/08/2015 11/08/2051  R$ 872.86
IVAIPORA MG 500 kV IVAIPORA MG1 PR RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,465,935.39
IVAIPORA MG 500 kV IVAIPORA MG1 PR RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,047,378.27
IVAIPORA MG 500 kV IVAIPORA MG1 PR RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$13,243.51
IVAIPORA IB 500 kV MG 500 kV IVAIPORA MG1 PR IB5 RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
IVAIPORA IB 500 kV MG 500 kV IVAIPORA MG1 PR IB3 RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
IVAIPORA IB 500 kV MG 500 kV IVAIPORA MG1 PR IB1 RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$712,852.36
IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR  RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR 004/2004 IGPM RBL CC 004/2004 31/10/2005 18/02/2034  R$ 3,227,749.42
IVAIPORA IB 500 kV MG 500 kV IVAIPORA MG1 PR IB3 RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$712,852.36
IVAIPORA IB 500 kV MG 500 kV IVAIPORA MG1 PR IB3 RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$524,922.10
IVAIPORA IB 500 kV MG 500 kV IVAIPORA MG1 PR IB2 RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
IVAIPORA IB 500 kV MG 500 kV IVAIPORA MG1 PR IB2 RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$712,852.36
IVAIPORA IB 500 kV MG 500 kV IVAIPORA MG1 PR IB2 RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$524,922.10
IVAIPORA IB 500 kV MG 500 kV IVAIPORA MG1 PR IB1 RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR  RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR 004/2004 IGPM RMEL REN 643/2014 30/11/2014 29/11/2045  R$ 928.37
IVAIPORA IB 500 kV MG 500 kV IVAIPORA MG1 PR IB1 RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$524,922.10
IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR  RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$13,243.51
IVAIPORA EL 500 kV IVAIPORA LT 500 kV AREIA /IVAIPORA C-1 PR  RB FT LT 500 kV AREIA /IVAIPORA C-1 PR 057/2001 IPCA RMEL REN 443/2011 17/10/2015 16/10/2038  R$46,022.36
IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR  RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR 004/2004 IGPM RBNI REA 5861/2016 31/05/2019 30/05/2034  R$15,993.96
IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR  RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR  RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR 057/2001 IPCA RMEL REN 643/2014 16/02/2014 15/02/2037  R$43,352.34
IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR  RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR 057/2001 IPCA RMEL REN 643/2014 02/11/2014 01/11/2045  R$2,607.95
IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR  RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$13,243.51
IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR  RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR  RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$761,090.85
IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR  RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$560,443.41
IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR  RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RMEL REN 643/2014 22/09/2014 21/09/2045  R$2,180.29
IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR  RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RMEL REN 443/2011 13/09/2015 12/09/2038  R$45,873.06
IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-3 PR  RB FT LT 500 kV IVAIPORA /IVAIPORA C-3 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-3 PR  RB FT LT 500 kV IVAIPORA /IVAIPORA C-3 PR 057/2001 IPCA RMEL REN 643/2014 16/06/2014 15/06/2045  R$ 268.42
IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-3 PR  RB FT LT 500 kV IVAIPORA /IVAIPORA C-3 PR 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$13,243.51
IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-2 PR  RB FT LT 500 kV IVAIPORA /IVAIPORA C-2 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-2 PR  RB FT LT 500 kV IVAIPORA /IVAIPORA C-2 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$761,090.85
IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-2 PR  RB FT LT 500 kV IVAIPORA /IVAIPORA C-2 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$560,443.41
IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-2 PR  RB FT LT 500 kV IVAIPORA /IVAIPORA C-2 PR 057/2001 IPCA RMEL REN 643/2014 09/04/2014 08/04/2045  R$1,820.88
IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-2 PR  RB FT LT 500 kV IVAIPORA /IVAIPORA C-2 PR 057/2001 IPCA RMEL REN 443/2011 14/12/2016 13/12/2039  R$47,884.36
IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-2 PR  RB FT LT 500 kV IVAIPORA /IVAIPORA C-2 PR 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$13,243.51
IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-1 PR  RB FT LT 500 kV IVAIPORA /IVAIPORA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-1 PR  RB FT LT 500 kV IVAIPORA /IVAIPORA C-1 PR 057/2001 IPCA RMEL REN 643/2014 21/10/2015 20/10/2046  R$2,679.85
IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-1 PR  RB FT LT 500 kV IVAIPORA /IVAIPORA C-1 PR 057/2001 IPCA RMEL REN 443/2011 16/12/2016 15/12/2039  R$47,893.14
IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-1 PR  RB FT LT 500 kV IVAIPORA /IVAIPORA C-1 PR 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$13,243.51
IVAIPORA EL 500 kV IVAIPORA LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR  RB FT LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR 004/2004 IGPM RBL CC 004/2004 31/10/2005 18/02/2034  R$ 3,227,749.42
IVAIPORA EL 500 kV IVAIPORA LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR  RB FT LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR 004/2004 IGPM RMEL REN 643/2014 16/06/2014 15/06/2045  R$ 927.56
IVAIPORA EL 500 kV IVAIPORA LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR  RB FT LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR 004/2004 IGPM RBNI REA 8314/2019 13/10/2019 12/10/2034  R$14,979.12
IVAIPORA EL 500 kV IVAIPORA LT 500 kV AREIA /IVAIPORA C-1 PR  RB FT LT 500 kV AREIA /IVAIPORA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
IVAIPORA EL 500 kV IVAIPORA LT 500 kV AREIA /IVAIPORA C-1 PR  RB FT LT 500 kV AREIA /IVAIPORA C-1 PR 057/2001 IPCA RBNI REA 8314/2019 13/10/2019 12/10/2034  R$13,217.91
J.LACERDA-A TR 230/138 kV J.LACERDA-A TR7 SC RBF FT TR 230/138 kV J.LACERDA-A TR7 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$540,707.99
J.LACERDA-A TR 230/138 kV J.LACERDA-A TR5 SC RBF FT TR 230/138 kV J.LACERDA-A TR5 SC 057/2001 IPCA RMEL REN 643/2014 07/09/2014 06/09/2042  R$91,617.78
IVINHEMA 2 TR 230/138 kV IVINHEMA 2 TR2 MS RBF FT TR 230/138 kV IVINHEMA 2 TR2 MS 008/2014 IPCA RBL CC 008/2014 29/01/2016 29/01/2044  R$828,638.43
IVINHEMA 2 TR 230/138 kV IVINHEMA 2 TR1 MS RBF FT TR 230/138 kV IVINHEMA 2 TR1 MS 008/2014 IPCA RBL CC 008/2014 29/01/2016 29/01/2044  R$828,638.43
IVINHEMA 2 MG 230 kV IVINHEMA 2 MG3 MS RB FT MG 230 kV IVINHEMA 2 MG3 MS 008/2014 IPCA RBL CC 008/2014 29/01/2016 29/01/2044  R$ 1,497,644.61
IVINHEMA 2 MC 230 kV TR 230/138 kV IVINHEMA 2 TR2 MS RBF FT TR 230/138 kV IVINHEMA 2 TR2 MS 008/2014 IPCA RBL CC 008/2014 29/01/2016 29/01/2044  R$289,937.78
IVINHEMA 2 MC 230 kV TR 230/138 kV IVINHEMA 2 TR1 MS RBF FT TR 230/138 kV IVINHEMA 2 TR1 MS 008/2014 IPCA RBL CC 008/2014 29/01/2016 29/01/2044  R$289,937.78
IVINHEMA 2 MC 138 kV TR 230/138 kV IVINHEMA 2 TR2 MS RBF FT TR 230/138 kV IVINHEMA 2 TR2 MS 008/2014 IPCA RBL CC 008/2014 29/01/2016 29/01/2044  R$219,667.56
IVINHEMA 2 MC 138 kV TR 230/138 kV IVINHEMA 2 TR1 MS RBF FT TR 230/138 kV IVINHEMA 2 TR1 MS 008/2014 IPCA RBL CC 008/2014 29/01/2016 29/01/2044  R$219,667.56
IVINHEMA 2 IB 138 kV MG 230 kV IVINHEMA 2 MG3 MS IB1 DIT   008/2014 IPCA RPEC CC 008/2014 29/01/2016 29/01/2044  R$365,783.70
J.LACERDA-A TR 230/69 kV J.LACERDA-A TR11 SC RBF FT TR 230/69 kV J.LACERDA-A TR11 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$253,196.59
J.LACERDA-A TR 230/69 kV J.LACERDA-A TR10 SC RBF FT TR 230/69 kV J.LACERDA-A TR10 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$253,196.59
J.LACERDA-A TR 230/69 kV J.LACERDA-A TR10 SC RBF FT TR 230/69 kV J.LACERDA-A TR10 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$526,343.65
J.LACERDA-A TR 230/69 kV J.LACERDA-A TR10 SC RBF FT TR 230/69 kV J.LACERDA-A TR10 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$387,582.94
J.LACERDA-A TR 230/138 kV J.LACERDA-A TR7 SC RBF FT TR 230/138 kV J.LACERDA-A TR7 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$260,106.53
J.LACERDA-A IB 230 kV MG 230 kV J.LACERDA-A MG1 SC IB2 RB FT MG 230 kV J.LACERDA-A MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$90,304.02
J.LACERDA-A TR 230/138 kV J.LACERDA-A TR5 SC RBF FT TR 230/138 kV J.LACERDA-A TR5 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$260,106.53
J.LACERDA-A IB 138 kV MG 230 kV J.LACERDA-A MG1 SC IB1 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$75,711.46
J.LACERDA-A TR 138/69 kV J.LACERDA-A TRR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$102,016.01
J.LACERDA-A TR 138/69 kV J.LACERDA-A TR9 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$161,473.66
J.LACERDA-A TR 138/69 kV J.LACERDA-A TR9 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$335,670.53
J.LACERDA-A TR 138/69 kV J.LACERDA-A TR8 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$102,016.01
J.LACERDA-A TR 138/69 kV J.LACERDA-A TR8 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$212,070.30
J.LACERDA-A MG 230 kV J.LACERDA-A MG1 SC RB FT MG 230 kV J.LACERDA-A MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$550,122.51
J.LACERDA-A MG 230 kV J.LACERDA-A MG1 SC RB FT MG 230 kV J.LACERDA-A MG1 SC 057/2001 IPCA RMEL REN 643/2014 25/11/2016 24/11/2048  R$2,749.48
J.LACERDA-A MG 230 kV J.LACERDA-A MG1 SC RB FT MG 230 kV J.LACERDA-A MG1 SC 057/2001 IPCA RMEL REN 643/2014 11/09/2014 10/09/2046  R$2,590.47
J.LACERDA-A MC 69 kV TR 230/69 kV J.LACERDA-A TR11 SC RBF FT TR 230/69 kV J.LACERDA-A TR11 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$43,779.08
J.LACERDA-A MC 69 kV TR 230/69 kV J.LACERDA-A TR10 SC RBF FT TR 230/69 kV J.LACERDA-A TR10 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$43,779.08
J.LACERDA-A MC 69 kV TR 230/69 kV J.LACERDA-A TR10 SC RBF FT TR 230/69 kV J.LACERDA-A TR10 SC 057/2001 IPCA RMEL REN 643/2014 04/08/2013 03/08/2036  R$6,488.91
J.LACERDA-A MC 69 kV TR 230/69 kV J.LACERDA-A TR10 SC RBF FT TR 230/69 kV J.LACERDA-A TR10 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$91,007.70
J.LACERDA-A MC 69 kV TR 138/69 kV J.LACERDA-A TR9 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$43,779.08
J.LACERDA-A MC 69 kV TR 138/69 kV J.LACERDA-A TR8 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$43,779.08
J.LACERDA-A MC 230 kV TR 230/69 kV J.LACERDA-A TR11 SC RBF FT TR 230/69 kV J.LACERDA-A TR11 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$114,101.11
J.LACERDA-A MC 230 kV TR 230/69 kV J.LACERDA-A TR11 SC RBF FT TR 230/69 kV J.LACERDA-A TR11 SC 057/2001 IPCA RMEL REN 643/2014 30/11/2014 29/11/2048  R$ 80.75
J.LACERDA-A MC 230 kV TR 230/69 kV J.LACERDA-A TR10 SC RBF FT TR 230/69 kV J.LACERDA-A TR10 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$114,101.11
J.LACERDA-A MC 230 kV TR 230/69 kV J.LACERDA-A TR10 SC RBF FT TR 230/69 kV J.LACERDA-A TR10 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$237,192.75
J.LACERDA-A MC 230 kV TR 230/69 kV J.LACERDA-A TR10 SC RBF FT TR 230/69 kV J.LACERDA-A TR10 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$174,661.29
J.LACERDA-A MC 230 kV TR 230/69 kV J.LACERDA-A TR10 SC RBF FT TR 230/69 kV J.LACERDA-A TR10 SC 057/2001 IPCA RMEL REN 643/2014 02/11/2014 01/11/2048  R$1,445.97
J.LACERDA-A MC 230 kV TR 230/138 kV J.LACERDA-A TR7 SC RBF FT TR 230/138 kV J.LACERDA-A TR7 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$114,101.11
J.LACERDA-A MC 230 kV TR 230/138 kV J.LACERDA-A TR7 SC RBF FT TR 230/138 kV J.LACERDA-A TR7 SC 057/2001 IPCA RBNI REA 7761/2019 06/04/2022 05/04/2052  R$16,114.12
J.LACERDA-A MC 230 kV TR 230/138 kV J.LACERDA-A TR5 SC RBF FT TR 230/138 kV J.LACERDA-A TR5 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$114,101.11
J.LACERDA-A MC 230 kV TR 230/138 kV J.LACERDA-A TR5 SC RBF FT TR 230/138 kV J.LACERDA-A TR5 SC 057/2001 IPCA RMEL REN 643/2014 10/09/2014 09/09/2037  R$21,286.31
J.LACERDA-A MC 138 kV TR 230/138 kV J.LACERDA-A TR7 SC RBF FT TR 230/138 kV J.LACERDA-A TR7 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$87,333.22
J.LACERDA-A MC 138 kV TR 230/138 kV J.LACERDA-A TR5 SC RBF FT TR 230/138 kV J.LACERDA-A TR5 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$87,333.22
J.LACERDA-A EL 69 kV J.LACERDA-ATUBARAO C2 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$54,026.81
J.LACERDA-B MG 230 kV J.LACERDA-B MG1 SC RB FT MG 230 kV J.LACERDA-B MG1 SC 057/2001 IPCA RMEL REN 643/2014 25/11/2016 24/11/2036  R$2,973.31
J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-C C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$366,078.59
J.LACERDA-A EL 69 kV J.LACERDA-ATUBARAO C1 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$54,026.81
J.LACERDA-A EL 69 kV J.LACERDA-ABRACO NORTE DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$54,026.81
J.LACERDA-A EL 230 kV J.LACERDA-A LT 230 kV J.LACERDA-A /U.JLACERDA-A C-6 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
J.LACERDA-A EL 230 kV J.LACERDA-A LT 230 kV J.LACERDA-A /U.JLACERDA-A C-4 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
J.LACERDA-A EL 230 kV J.LACERDA-A LT 230 kV J.LACERDA-A /J.LACERDA-B C-2 SC  RB FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
J.LACERDA-A EL 230 kV J.LACERDA-A LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC RB FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
J.LACERDA-A EL 138 kV J.LACERDA-A LT 138 kV PALHOCA ESU /J.LACERDA-A C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,817.81
J.LACERDA-A EL 138 kV J.LACERDA-A LT 138 kV PALHOCA ESU /J.LACERDA-A C-1 SC DIT   057/2001 IPCA RMEL REN 643/2014 10/07/2013 09/07/2036  R$12,546.90
J.LACERDA-A EL 138 kV J.LACERDA-A LT 138 kV LAGES /J.LACERDA-A C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,817.81
J.LACERDA-A EL 138 kV J.LACERDA-A LT 138 kV J.LACERDA-A /U.JLACERDA-A C-3 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,817.81
J.LACERDA-A EL 138 kV J.LACERDA-A LT 138 kV J.LACERDA-A /U.JLACERDA-A C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,817.81
J.LACERDA-A EL 138 kV J.LACERDA-A LT 138 kV J.LACERDA-A /U.JLACERDA-A C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,817.81
J.LACERDA-A EL 138 kV J.LACERDA-A LT 138 kV IMBITUBA /J.LACERDA-A C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,817.81
J.LACERDA-A EL 138 kV J.LACERDA-A LT 138 kV C.B.CATARINEN /J.LACERDA-A C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,817.81
J.LACERDA-B MG 230 kV J.LACERDA-B MG1 SC RB FT MG 230 kV J.LACERDA-B MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$440,258.95
J.LACERDA-B MG 230 kV J.LACERDA-B MG1 SC RB FT MG 230 kV J.LACERDA-B MG1 SC 057/2001 IPCA RMEL REN 643/2014 25/11/2016 24/11/2036  R$2,973.31
J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-B C-4 SC DIT   057/2001 IPCA RMEL REN 643/2014 27/10/2014 26/10/2031  R$11,968.38
J.LACERDA-B MG 230 kV J.LACERDA-B MG1 SC RB FT MG 230 kV J.LACERDA-B MG1 SC 057/2001 IPCA RBNI REA 6630/2017 28/11/2017 27/11/2034  R$20,614.66
J.LACERDA-B IB 230 kV MG 230 kV J.LACERDA-B MG1 SC IB1 RB FT MG 230 kV J.LACERDA-B MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$103,749.99
J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-C C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$159,954.59
J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-C C-2 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$332,512.70
J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-C C-2 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$244,851.91
J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-C C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-B C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$164,359.73
J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-C C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$269,568.78
J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-B C-4 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$164,359.73
J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-B C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$164,359.73
J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-B C-4 SC DIT   057/2001 IPCA RMEL REN 643/2014 17/10/2014 16/10/2031  R$11,952.44
J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-B C-3 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$164,359.73
J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-A /J.LACERDA-B C-2 SC  RB FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC 057/2001 IPCA RBNI REA 8314/2019 19/12/2021 18/12/2036  R$27,015.31
J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-A /J.LACERDA-B C-2 SC  RB FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-2 SC 057/2001 IPCA RMEL REN 643/2014 23/07/2014 22/07/2044  R$2,594.19
J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBNI REA 8314/2019 06/12/2021 05/12/2036  R$26,996.15
J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC  RB FT LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC RB FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC RB FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC 057/2001 IPCA RMEL REN 643/2014 17/09/2014 16/09/2044  R$2,605.97
J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC RB FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC 057/2001 IPCA RMEL REN 643/2014 09/12/2015 08/12/2045  R$2,700.27
J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV BIGUACU /J.LACERDA-B C-1 SC  RB FT LT 230 kV BIGUACU /J.LACERDA-B C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
JOINV.NORTE TR 230/138 kV JOINV.NORTE TR4 SC RBF FT TR 230/138 kV JOINV.NORTE TR4 SC 057/2001 IPCA RBNI REA 4802/2014 17/08/2016 16/08/2050  R$ 1,750,956.13
JOINV.NORTE TR 230/138 kV JOINV.NORTE TR3 SC RBF FT TR 230/138 kV JOINV.NORTE TR3 SC 057/2001 IPCA RBNI REA 3161/2011 26/10/2013 25/10/2047  R$ 1,644,809.70
JOINV.NORTE TR 230/138 kV JOINV.NORTE TR2 SC RBF FT TR 230/138 kV JOINV.NORTE TR2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$340,018.74
JOINV.NORTE TR 230/138 kV JOINV.NORTE TR1 SC RBF FT TR 230/138 kV JOINV.NORTE TR1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$340,018.74
JOINV.NORTE MG 230 kV JOINV.NORTE MG1 SC RB FT MG 230 kV JOINV.NORTE MG1 SC 057/2001 IPCA RBNI REA 3161/2011 26/10/2013 25/10/2041  R$178,466.03
JOINV.NORTE MG 230 kV JOINV.NORTE MG1 SC RB FT MG 230 kV JOINV.NORTE MG1 SC 057/2001 IPCA RBNI REA 3161/2011 26/10/2013 25/10/2041  R$113,194.67
JOINV.NORTE MG 230 kV JOINV.NORTE MG1 SC RB FT MG 230 kV JOINV.NORTE MG1 SC 057/2001 IPCA RBNI REA 3915/2013 27/02/2015 26/02/2043  R$184,963.81
JOINV.NORTE MG 230 kV JOINV.NORTE MG1 SC RB FT MG 230 kV JOINV.NORTE MG1 SC 057/2001 IPCA RBNI REA 3915/2013 22/04/2015 21/04/2043  R$185,681.35
JOINV.NORTE MG 230 kV JOINV.NORTE MG1 SC RB FT MG 230 kV JOINV.NORTE MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$429,672.79
JOINV.NORTE MG 230 kV JOINV.NORTE MG1 SC RB FT MG 230 kV JOINV.NORTE MG1 SC 057/2001 IPCA RBNI REA 4802/2014 17/08/2016 16/08/2044  R$192,099.40
JOINV.NORTE MG 230 kV JOINV.NORTE MG1 SC RB FT MG 230 kV JOINV.NORTE MG1 SC 057/2001 IPCA RBNI REA 4802/2014 17/08/2016 16/08/2044  R$121,918.52
JOINV.NORTE MC 230 kV TR 230/138 kV JOINV.NORTE TR4 SC RBF FT TR 230/138 kV JOINV.NORTE TR4 SC 057/2001 IPCA RBNI REA 4802/2014 17/08/2016 16/08/2046  R$ 1,110,346.07
JOINV.NORTE MC 230 kV TR 230/138 kV JOINV.NORTE TR3 SC RBF FT TR 230/138 kV JOINV.NORTE TR3 SC 057/2001 IPCA RBNI REA 3161/2011 26/10/2013 25/10/2043  R$ 1,012,645.84
JOINV.NORTE MC 230 kV TR 230/138 kV JOINV.NORTE TR2 SC RBF FT TR 230/138 kV JOINV.NORTE TR2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
JOINV.NORTE MC 230 kV TR 230/138 kV JOINV.NORTE TR2 SC RBF FT TR 230/138 kV JOINV.NORTE TR2 SC 057/2001 IPCA RMEL REN 643/2014 17/07/2016 16/07/2050  R$ 114.59
JOINV.NORTE MC 230 kV TR 230/138 kV JOINV.NORTE TR1 SC RBF FT TR 230/138 kV JOINV.NORTE TR1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
JOINV.NORTE MC 230 kV TR 230/138 kV JOINV.NORTE TR1 SC RBF FT TR 230/138 kV JOINV.NORTE TR1 SC 057/2001 IPCA RMEL REN 643/2014 11/04/2016 10/04/2050  R$ 113.82
JOINV.NORTE MC 230 kV BC 230 kV 100 Mvar JOINV.NORTE BC2 SC  RB FT BC 230 kV 100 Mvar JOINV.NORTE BC2 SC 057/2001 IPCA RBNI REA 3915/2013 22/04/2015 21/04/2045  R$ 1,073,136.02
JOINV.NORTE MC 230 kV BC 230 kV 100 Mvar JOINV.NORTE BC1 SC  RB FT BC 230 kV 100 Mvar JOINV.NORTE BC1 SC 057/2001 IPCA RBNI REA 3915/2013 27/02/2015 26/02/2045  R$ 1,023,660.83
JOINV.NORTE MC 138 kV TR 230/138 kV JOINV.NORTE TR4 SC RBF FT TR 230/138 kV JOINV.NORTE TR4 SC 057/2001 IPCA RBNI REA 4802/2014 17/08/2016 16/08/2046  R$883,489.26
JOINV.NORTE MC 138 kV TR 230/138 kV JOINV.NORTE TR3 SC RBF FT TR 230/138 kV JOINV.NORTE TR3 SC 057/2001 IPCA RBNI REA 3161/2011 26/10/2013 25/10/2043  R$805,282.62
JOINV.NORTE MC 138 kV TR 230/138 kV JOINV.NORTE TR2 SC RBF FT TR 230/138 kV JOINV.NORTE TR2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$90,882.76
JOINV.NORTE MC 138 kV TR 230/138 kV JOINV.NORTE TR1 SC RBF FT TR 230/138 kV JOINV.NORTE TR1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$90,882.76
JOINV.NORTE IB 230 kV MG 230 kV JOINV.NORTE MG1 SC IB1 RB FT MG 230 kV JOINV.NORTE MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$103,749.99
JOINV.NORTE IB 230 kV MG 230 kV JOINV.NORTE MG1 SC IB1 RB FT MG 230 kV JOINV.NORTE MG1 SC 057/2001 IPCA RMEL REN 643/2014 04/05/2016 03/05/2050  R$ 114.00
JOINV.NORTE IB 138 kV MG 230 kV JOINV.NORTE MG1 SC IB1 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$75,711.46
JOINV.NORTE EL 230 kV JOINV.NORTE LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC  RB FT LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
JOINV.NORTE EL 230 kV JOINV.NORTE LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC  RB FT LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC 057/2001 IPCA RMEL REN 443/2011 20/03/2016 19/03/2040  R$ 261.44
JOINVILLE TR 138/69 kV JOINVILLE TR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$161,473.66
JOINVILLE TR 138/69 kV JOINVILLE TR1 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$335,670.53
JOINV.NORTE EL 230 kV JOINV.NORTE LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
JOINV.NORTE EL 230 kV JOINV.NORTE LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC 057/2001 IPCA RMEL REN 643/2014 31/01/2016 30/01/2045  R$ 158.66
JOINV.NORTE EL 230 kV JOINV.NORTE LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC  RB FT LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
JOINV.NORTE EL 230 kV JOINV.NORTE LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC  RB FT LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC 057/2001 IPCA RMEL REN 643/2014 27/02/2016 26/02/2045  R$ 159.00
JOINV.NORTE EL 138 kV JOINV.NORTEDIST4 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$134,367.35
JOINV.NORTE EL 138 kV JOINV.NORTEDIST3 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$134,367.35
JOINV.NORTE EL 138 kV JOINV.NORTEDIST2 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$134,367.35
JOINV.NORTE EL 138 kV JOINV.NORTEDIST1 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$134,367.35
JOINV.NORTE BC 230 kV 100 Mvar JOINV.NORTE BC2 SC RB FT BC 230 kV 100 Mvar JOINV.NORTE BC2 SC 057/2001 IPCA RBNI REA 3915/2013 22/04/2015 21/04/2037  R$424,555.66
JOINV.NORTE BC 230 kV 100 Mvar JOINV.NORTE BC1 SC RB FT BC 230 kV 100 Mvar JOINV.NORTE BC1 SC 057/2001 IPCA RBNI REA 3915/2013 27/02/2015 26/02/2037  R$422,528.12
JOINVILLE TR 230/69 kV JOINVILLE TR8 SC RBF FT TR 230/69 kV JOINVILLE TR8 SC 057/2001 IPCA RBNI REA 7576/2019 17/09/2021 17/09/2056  R$ 1,820,832.74
JOINVILLE TR 230/138 kV JOINVILLE TRR2 SC RBF FT TR 230/138 kV JOINVILLE TRR2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$252,944.84
JOINVILLE TR 230/138 kV JOINVILLE TRR2 SC RBF FT TR 230/138 kV JOINVILLE TRR2 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$525,820.31
JOINVILLE TR 230/138 kV JOINVILLE TRR1 SC RBF FT TR 230/138 kV JOINVILLE TRR1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$252,944.84
JOINVILLE TR 230/138 kV JOINVILLE TRR1 SC RBF FT TR 230/138 kV JOINVILLE TRR1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$525,820.31
JOINVILLE TR 230/138 kV JOINVILLE TR7 SC RBF FT TR 230/138 kV JOINVILLE TR7 SC 057/2001 IPCA RBNI REA 7576/2019 24/07/2021 24/07/2056  R$ 1,652,604.42
JOINVILLE TR 230/138 kV JOINVILLE TR6 SC RBF FT TR 230/138 kV JOINVILLE TR6 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$340,018.74
JOINVILLE TR 230/138 kV JOINVILLE TR4 SC RBF FT TR 230/138 kV JOINVILLE TR4 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$340,018.74
JOINVILLE TR 230/138 kV JOINVILLE TR4 SC RBF FT TR 230/138 kV JOINVILLE TR4 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$706,829.04
JOINVILLE TR 230/138 kV JOINVILLE TR4 SC RBF FT TR 230/138 kV JOINVILLE TR4 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$520,486.71
JOINVILLE TR 230/138 kV JOINVILLE TR3 SC RBF FT TR 230/138 kV JOINVILLE TR3 SC 057/2001 IPCA RBNI REA 7576/2019 21/11/2021 21/11/2056  R$ 1,652,604.42
JOINVILLE TR 138/69 kV JOINVILLE TRR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$125,831.05
JOINVILLE TR 138/69 kV JOINVILLE TRR1 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$261,576.88
JOINVILLE TR 138/69 kV JOINVILLE TRR1 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$192,617.00
JOINVILLE TR 138/69 kV JOINVILLE TR5 SC DIT   057/2001 IPCA RCDM REA 7576/2019 15/06/2021 15/06/2056  R$912,865.77
JOINVILLE TR 138/69 kV JOINVILLE TR2 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$125,831.05
JOINVILLE TR 138/69 kV JOINVILLE TR2 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$261,576.88
JOINVILLE MC 69 kV TR 230/69 kV JOINVILLE TR8 SC RBF FT TR 230/69 kV JOINVILLE TR8 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$43,779.08
JOINVILLE MC 69 kV TR 230/69 kV JOINVILLE TR8 SC RBF FT TR 230/69 kV JOINVILLE TR8 SC 057/2001 IPCA RBNI REA 7576/2019 17/09/2021 17/09/2049  R$182,382.11
JOINVILLE MG 230 kV JOINVILLE MG1 SC RB FT MG 230 kV JOINVILLE MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$612,181.23
JOINVILLE MG 230 kV JOINVILLE MG1 SC RB FT MG 230 kV JOINVILLE MG1 SC 057/2001 IPCA RMEL REN 643/2014 08/03/2013 07/03/2030  R$22,030.05
JOINVILLE MG 230 kV JOINVILLE MG1 SC RB FT MG 230 kV JOINVILLE MG1 SC 057/2001 IPCA RBNI REA 7576/2019 28/01/2022 28/01/2037  R$45,889.79
JOINVILLE MG 230 kV JOINVILLE MG1 SC RB FT MG 230 kV JOINVILLE MG1 SC 057/2001 IPCA RBNI REA 7576/2019 28/01/2022 28/01/2062  R$75,206.53
JOINVILLE MC 69 kV TR 138/69 kV JOINVILLE TR2 SC DIT   057/2001 IPCA RCDM REA 5484/2015 19/04/2018 18/04/2048  R$20,514.26
JOINVILLE MC 69 kV TR 230/69 kV JOINVILLE TR8 SC RBF FT TR 230/69 kV JOINVILLE TR8 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$91,007.70
JOINVILLE MC 230 kV TR 230/69 kV JOINVILLE TR8 SC RBF FT TR 230/69 kV JOINVILLE TR8 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$237,192.75
JOINVILLE MC 69 kV TR 138/69 kV JOINVILLE TR5 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$43,779.08
JOINVILLE MC 69 kV TR 138/69 kV JOINVILLE TR5 SC DIT   057/2001 IPCA RCDM REA 7576/2019 15/06/2021 15/06/2047  R$104,977.72
JOINVILLE MC 69 kV TR 138/69 kV JOINVILLE TR5 SC DIT   057/2001 IPCA RCDM REA 5484/2015 19/04/2018 18/04/2048  R$20,514.26
JOINVILLE MC 69 kV TR 138/69 kV JOINVILLE TR2 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$43,779.08
JOINVILLE MC 230 kV TR 230/69 kV JOINVILLE TR8 SC RBF FT TR 230/69 kV JOINVILLE TR8 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$174,661.29
JOINVILLE MC 69 kV TR 138/69 kV JOINVILLE TR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$43,779.08
JOINVILLE MC 230 kV TR 230/69 kV JOINVILLE TR8 SC RBF FT TR 230/69 kV JOINVILLE TR8 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$114,101.11
JOINVILLE MC 230 kV TR 230/69 kV JOINVILLE TR8 SC RBF FT TR 230/69 kV JOINVILLE TR8 SC 057/2001 IPCA RMEL REN 643/2014 06/10/2013 05/10/2036  R$20,570.29
JOINVILLE MC 230 kV TR 230/69 kV JOINVILLE TR8 SC RBF FT TR 230/69 kV JOINVILLE TR8 SC 057/2001 IPCA RMEL REN 643/2014 13/06/2014 12/06/2044  R$1,551.47
JOINVILLE MC 230 kV TR 230/69 kV JOINVILLE TR8 SC RBF FT TR 230/69 kV JOINVILLE TR8 SC 057/2001 IPCA RBNI REA 7576/2019 17/09/2021 17/09/2042  R$413,839.92
JOINVILLE MC 230 kV TR 230/138 kV JOINVILLE TR7 SC RBF FT TR 230/138 kV JOINVILLE TR7 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$114,101.11
JOINVILLE MC 230 kV TR 230/138 kV JOINVILLE TR7 SC RBF FT TR 230/138 kV JOINVILLE TR7 SC 057/2001 IPCA RBNI REA 7576/2019 24/07/2021 24/07/2036  R$216,488.39
JOINVILLE MC 230 kV TR 230/138 kV JOINVILLE TR6 SC RBF FT TR 230/138 kV JOINVILLE TR6 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$114,101.11
JOINVILLE MC 230 kV TR 230/138 kV JOINVILLE TR6 SC RBF FT TR 230/138 kV JOINVILLE TR6 SC 057/2001 IPCA RMEL REN 643/2014 13/06/2014 12/06/2044  R$ 689.55
JOINVILLE MC 230 kV TR 230/138 kV JOINVILLE TR6 SC RBF FT TR 230/138 kV JOINVILLE TR6 SC 057/2001 IPCA RBNI REA 7576/2019 01/12/2021 01/12/2038  R$28,489.46
JOINVILLE MC 230 kV TR 230/138 kV JOINVILLE TR3 SC RBF FT TR 230/138 kV JOINVILLE TR3 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$114,101.11
JOINVILLE MC 230 kV TR 230/138 kV JOINVILLE TR3 SC RBF FT TR 230/138 kV JOINVILLE TR3 SC 057/2001 IPCA RBNI REA 7576/2019 21/11/2021 21/11/2050  R$311,794.80
JOINVILLE MC 230 kV TR 230/138 kV JOINVILLE TR4 SC RBF FT TR 230/138 kV JOINVILLE TR4 SC 057/2001 IPCA RBNI REA 7576/2019 02/12/2021 02/12/2038  R$29,243.32
JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR7 SC RBF FT TR 230/138 kV JOINVILLE TR7 SC 057/2001 IPCA RBNI REA 2879/2011 28/06/2012 27/06/2040  R$254,195.89
JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR7 SC RBF FT TR 230/138 kV JOINVILLE TR7 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$87,333.22
JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR7 SC RBF FT TR 230/138 kV JOINVILLE TR7 SC 057/2001 IPCA RBNI REA 2837/2011 19/08/2012 18/08/2042  R$30,209.88
JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR7 SC RBF FT TR 230/138 kV JOINVILLE TR7 SC 057/2001 IPCA RBNI REA 7576/2019 24/07/2021 24/07/2045  R$91,158.80
JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR6 SC RBF FT TR 230/138 kV JOINVILLE TR6 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$87,333.22
JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR4 SC RBF FT TR 230/138 kV JOINVILLE TR4 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$87,333.22
JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR4 SC RBF FT TR 230/138 kV JOINVILLE TR4 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$181,547.81
JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR4 SC RBF FT TR 230/138 kV JOINVILLE TR4 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$133,686.11
JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR3 SC RBF FT TR 230/138 kV JOINVILLE TR3 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$87,333.22
JOINVILLE MC 138 kV TR 138/69 kV JOINVILLE TR5 SC DIT   057/2001 IPCA RCDM REA 2879/2011 17/08/2012 16/08/2040  R$147,821.12
JOINVILLE EL 69 kV JOINVILLEDIST6 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$54,026.81
JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR3 SC RBF FT TR 230/138 kV JOINVILLE TR3 SC 057/2001 IPCA RBNI REA 2837/2011 19/08/2012 18/08/2042  R$30,209.88
JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR3 SC RBF FT TR 230/138 kV JOINVILLE TR3 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$181,547.81
JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR3 SC RBF FT TR 230/138 kV JOINVILLE TR3 SC 057/2001 IPCA RBNI REA 7576/2019 21/11/2021 21/11/2045  R$80,243.30
JOINVILLE EL 230 kV JOINVILLE LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
JOINVILLE MC 138 kV TR 138/69 kV JOINVILLE TR5 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$87,333.22
JOINVILLE MC 138 kV TR 138/69 kV JOINVILLE TR5 SC DIT   057/2001 IPCA RCDM REA 2837/2011 19/08/2012 18/08/2042  R$30,209.88
JOINVILLE MC 138 kV TR 138/69 kV JOINVILLE TR5 SC DIT   057/2001 IPCA RMEL REN 643/2014 03/12/2015 02/12/2045  R$2,699.01
JOINVILLE MC 138 kV TR 138/69 kV JOINVILLE TR5 SC DIT   057/2001 IPCA RCDM REA 7576/2019 15/06/2021 15/06/2038  R$197,220.51
JOINVILLE MC 138 kV TR 138/69 kV JOINVILLE TR2 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$87,333.22
JOINVILLE MC 138 kV TR 138/69 kV JOINVILLE TR2 SC DIT   057/2001 IPCA RCDM REA 2837/2011 19/08/2012 18/08/2042  R$30,209.88
JOINVILLE MC 138 kV TR 138/69 kV JOINVILLE TR2 SC DIT   057/2001 IPCA RCDM REA 7576/2019 01/12/2021 01/12/2037  R$25,632.81
JOINVILLE MC 138 kV TR 138/69 kV JOINVILLE TR2 SC DIT   057/2001 IPCA RCDM REA 8314/2019 01/12/2021 30/11/2054  R$49,025.29
JOINVILLE MC 138 kV TR 138/69 kV JOINVILLE TR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$87,333.22
JOINVILLE MC 138 kV TR 138/69 kV JOINVILLE TR1 SC DIT   057/2001 IPCA RCDM REA 2837/2011 19/08/2012 18/08/2042  R$30,209.88
JOINVILLE MC 138 kV TR 138/69 kV JOINVILLE TR1 SC DIT   057/2001 IPCA RCDM REA 7576/2019 01/12/2021 01/12/2037  R$25,632.81
JOINVILLE IB 230 kV MG 230 kV JOINVILLE MG1 SC IB1 RB FT MG 230 kV JOINVILLE MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$90,304.02
JOINVILLE IB 138 kV MG 230 kV JOINVILLE MG1 SC IB1 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$75,711.46
JOINVILLE IB 138 kV MG 230 kV JOINVILLE MG1 SC IB1 DIT   057/2001 IPCA RCDM REA 7576/2019 12/01/2022 12/01/2046  R$81,525.33
JOINVILLE EL 69 kV JOINVILLEDIST7 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$54,026.81
JOINVILLE EL 138 kV JOINVILLE LT 138 kV JOINVILLE GM /JOINVILLE C-1 SC DIT   057/2001 IPCA RCDM REA 2837/2011 19/08/2012 18/08/2042  R$30,209.88
JOINVILLE EL 230 kV JOINVILLE LT 230 kV JOINVILLE /VEGA DO SUL C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
JOINVILLE EL 230 kV JOINVILLE LT 230 kV JOINVILLE /VEGA DO SUL C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
JOINVILLE EL 230 kV JOINVILLE LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC  RB FT LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
JOINVILLE EL 230 kV JOINVILLE LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC  RB FT LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC 057/2001 IPCA RMEL REN 643/2014 19/09/2014 18/09/2043  R$ 450.75
JOINVILLE EL 230 kV JOINVILLE LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC  RB FT LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC 057/2001 IPCA RBNI REA 7761/2019 30/04/2018 29/04/2048  R$18,975.14
JOINVILLE EL 138 kV JOINVILLE LT 138 kV JOINVILLE /J.S.CATARINA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,817.81
JOINVILLE EL 230 kV JOINVILLE LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC 057/2001 IPCA RBNI REA 7761/2019 30/04/2018 29/04/2048  R$18,975.14
JOINVILLE EL 230 kV JOINVILLE LT 230 kV BLUMENAU /JOINVILLE C-1 SC  RB FT LT 230 kV BLUMENAU /JOINVILLE C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
JOINVILLE EL 138 kV JOINVILLE LT 138 kV JOINVILLE GM /JOINVILLE C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,817.81
JOINVILLE EL 138 kV JOINVILLE LT 138 kV JOINVILLE /J.S.CATARINA C-1 SC DIT   057/2001 IPCA RCDM REA 2837/2011 19/08/2012 18/08/2042  R$30,209.88
JOINVILLE EL 138 kV JOINVILLE LT 138 kV JOINVILLE /J.S.CATARINA C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$271,943.34
JOINVILLE EL 138 kV JOINVILLEDIST4 DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$200,250.54
JOINVILLE EL 138 kV JOINVILLEDIST1 DIT   057/2001 IPCA RCDM REA 8314/2019 01/12/2021 30/11/2054  R$18,346.63
JOINVILLE EL 138 kV JOINVILLE LT 138 kV JOINVILLE /J.S.CATARINA C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$200,250.54
JOINVILLE EL 138 kV JOINVILLEDIST5 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,817.81
JOINVILLE EL 138 kV JOINVILLEDIST5 DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$271,943.34
JOINVILLE EL 138 kV JOINVILLEDIST5 DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$200,250.54
JOINVILLE EL 138 kV JOINVILLEDIST4 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,817.81
JOINVILLE EL 138 kV JOINVILLEDIST4 DIT   057/2001 IPCA RCDM REA 2837/2011 19/08/2012 18/08/2042  R$30,209.88
JOINVILLE EL 138 kV JOINVILLEDIST4 DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$271,943.34
JOINVILLE EL 138 kV JOINVILLEDIST3 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,817.81
JOINVILLE EL 138 kV JOINVILLEDIST3 DIT   057/2001 IPCA RCDM REA 2837/2011 19/08/2012 18/08/2042  R$30,209.88
JOINVILLE EL 138 kV JOINVILLEDIST3 DIT   057/2001 IPCA RCDM REA 8314/2019 01/12/2021 30/11/2054  R$50,675.83
JOINVILLE EL 138 kV JOINVILLEDIST2 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,817.81
JOINVILLE EL 138 kV JOINVILLEDIST2 DIT   057/2001 IPCA RCDM REA 2837/2011 19/08/2012 18/08/2042  R$30,209.88
JOINVILLE EL 138 kV JOINVILLEDIST2 DIT   057/2001 IPCA RCDM REA 8314/2019 01/12/2021 30/11/2054  R$53,308.58
JOINVILLE EL 138 kV JOINVILLEDIST1 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,817.81
JOINVILLE GM MG 138 kV JOINVILLE GM MG1 SC DIT   057/2001 IPCA RCDM REA 2589/2010 20/05/2012 19/05/2039  R$125,654.75
JOINVILLE GM EL 138 kV JOINVILLE GM LT 138 kV JOINVILLE SANTA CATARINA /JOINVILLE GM C-1 SC  DIT   057/2001 IPCA RCDM REA 2589/2010 20/05/2012 19/05/2041  R$792,867.36
JOINVILLE GM EL 138 kV JOINVILLE GM LT 138 kV JOINVILLE SANTA CATARINA /JOINVILLE GM C-1 SC  DIT   057/2001 IPCA RMEL REN 643/2014 01/06/2014 31/05/2037  R$12,970.71
JOINVILLE GM EL 138 kV JOINVILLE GM LT 138 kV JOINVILLE GM /JOINVILLE C-1 SC DIT   057/2001 IPCA RCDM REA 2589/2010 20/05/2012 19/05/2041  R$792,867.36
JOINVILLE GM EL 138 kV JOINVILLE GM LT 138 kV JOINVILLE GM /JOINVILLE C-1 SC DIT   057/2001 IPCA RMEL REN 643/2014 31/01/2014 30/01/2037  R$12,813.41
JOINVILLE SANTA CATARINA MG 138 kV JOINVILLE SANTA CATARINA MG1 SC DIT   057/2001 IPCA RCDM REA 4325/2013 20/10/2015 19/10/2041  R$278,652.49
JOINVILLE SANTA CATARINA EL 138 kV JOINVILLE SANTA CATARINA LT 138 kV JOINVILLE SANTA CATARINA /JOINVILLE GM C-1 SC  DIT   057/2001 IPCA RCDM REA 4325/2013 20/10/2015 19/10/2044  R$874,601.92
JOINVILLE SANTA CATARINA EL 138 kV JOINVILLE SANTA CATARINA LT 138 kV ARAQUARI (HYOSUNG) /JOINVILLE SANTA CATARINA C-1 SC  DIT   057/2001 IPCA RCDM REA 4325/2013 20/10/2015 19/10/2044  R$874,601.92
L.GRANDE TR 230/138 kV L.GRANDE TR2 RS RBF FT TR 230/138 kV L.GRANDE TR2 RS 011/2010 IPCA RBNI REA 4892/2014 29/09/2016 29/09/2050  R$ 1,254,258.37
L.GRANDE MG 230 kV L.GRANDE MG1 RS RB FT MG 230 kV L.GRANDE MG1 RS 057/2001 IPCA RMEL REN 643/2014 13/03/2013 12/03/2030  R$24,848.61
L.GRANDE MG 230 kV L.GRANDE MG1 RS RB FT MG 230 kV L.GRANDE MG1 RS 057/2001 IPCA RBNI REA 5861/2016 17/05/2019 16/05/2036  R$28,758.54
L.GRANDE TR 230/138 kV L.GRANDE TR1 RS RBF FT TR 230/138 kV L.GRANDE TR1 RS 011/2010 IPCA RBL CC 011/2010 06/10/2010 06/10/2040  R$517,576.63
L.GRANDE MG 230 kV L.GRANDE MG2 RS RB FT MG 230 kV L.GRANDE MG2 RS 011/2010 IPCA RBL CC 011/2010 06/10/2010 06/10/2040  R$703,224.31
L.GRANDE MG 230 kV L.GRANDE MG2 RS RB FT MG 230 kV L.GRANDE MG2 RS 011/2010 IPCA RBNI REA 4892/2014 29/09/2016 29/09/2048  R$157,061.33
L.GRANDE MG 230 kV L.GRANDE MG2 RS RB FT MG 230 kV L.GRANDE MG2 RS 011/2010 IPCA RBNI REA 4892/2014 29/09/2016 29/09/2047  R$91,429.14
L.GRANDE MC 230 kV TR 230/138 kV L.GRANDE TR1 RS RBF FT TR 230/138 kV L.GRANDE TR1 RS 011/2010 IPCA RBL CC 011/2010 06/10/2010 06/10/2040  R$321,312.39
L.GRANDE MC 230 kV TR 230/138 kV L.GRANDE TR1 RS RBF FT TR 230/138 kV L.GRANDE TR1 RS 011/2010 IPCA RBNI DSP 386/2021 17/02/2021 16/02/2036  R$36,971.96
L.GRANDE MC 230 kV TR 230/138 kV L.GRANDE TR2 RS RBF FT TR 230/138 kV L.GRANDE TR2 RS 011/2010 IPCA RBNI REA 4892/2014 29/09/2016 29/09/2040  R$ 1,071,820.27
L.GRANDE MC 138 kV TR 230/138 kV L.GRANDE TR2 RS RBF FT TR 230/138 kV L.GRANDE TR2 RS 011/2010 IPCA RBNI REA 4892/2014 29/09/2016 29/09/2038  R$819,728.28
L.GRANDE MC 138 kV TR 230/138 kV L.GRANDE TR1 RS RBF FT TR 230/138 kV L.GRANDE TR1 RS 011/2010 IPCA RBL CC 011/2010 06/10/2010 06/10/2040  R$249,692.57
L.GRANDE IB 230 kV MG 230 kV L.GRANDE MG1 RS IB1 RB FT MG 230 kV L.GRANDE MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$90,304.02
L.GRANDE IB 138 kV MG 230 kV L.GRANDE MG2 RS IB1 DIT   011/2010 IPCA RPEC CC 011/2010 06/10/2010 06/10/2040  R$171,256.81
L.GRANDE EL 230 kV L.GRANDE LT 230 kV L.GRANDE /CAXIAS SUL 5 C-1 RS  RB FT LT 230 kV L.GRANDE /CAXIAS SUL 5 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
L.GRANDE EL 230 kV L.GRANDE LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS  RB FT LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
L.GRANDE EL 138 kV L.GRANDEVACARIA DIT   011/2010 IPCA RPEC CC 011/2010 06/10/2010 06/10/2040  R$332,591.03
L.GRANDE EL 138 kV L.GRANDEJAQUIRANA DIT   011/2010 IPCA RPEC CC 011/2010 06/10/2010 06/10/2040  R$332,591.03
LIVRAMENTO 2 EL 230 kV LIVRAMENTO 2 LT 230 kV LIVRAMENTO 2 /Rivera URU C-1 RS  RB   057/2001 IPCA RBNI PRT 657/2022 23/04/2023 01/02/2049  R$216,043.08
LONDRINA COT MG 230 kV LONDRINA COT MG2 PR RB FT MG 230 kV LONDRINA COT MG2 PR 057/2001 IPCA RBNI REA 7576/2019 14/12/2020 14/12/2042  R$261,435.90
LONDRINA COT MG 230 kV LONDRINA COT MG2 PR RB FT MG 230 kV LONDRINA COT MG2 PR 057/2001 IPCA RBNI REA 7576/2019 14/12/2020 14/12/2051  R$128,873.53
LONDRINA COT EL 230 kV LONDRINA COT LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR 057/2001 IPCA RBNI REA 7576/2019 14/12/2020 14/12/2043  R$ 1,043,883.73
LONDRINA ESU TR 500/230 kV LONDRINA ESU TR4 PR RB FT TR 500/230 kV LONDRINA ESU TR4 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,508,329.83
LONDRINA COT EL 230 kV LONDRINA COT LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR RB FT LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR 057/2001 IPCA RBNI REA 7576/2019 14/12/2020 14/12/2043  R$ 1,043,883.73
LONDRINA ESU TR 500/230 kV LONDRINA ESU TRR1 PR RB FT TR 500/230 kV LONDRINA ESU TRR1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$502,776.61
LONDRINA ESU TR 500/230 kV LONDRINA ESU TR3 PR RB FT TR 500/230 kV LONDRINA ESU TR3 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,508,329.83
LONDRINA ESU TR 500/230 kV LONDRINA ESU TR3 PR RB FT TR 500/230 kV LONDRINA ESU TR3 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,135,507.60
LONDRINA ESU TR 500/230 kV LONDRINA ESU TR3 PR RB FT TR 500/230 kV LONDRINA ESU TR3 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,308,889.34
LONDRINA ESU RTB 525 kV 0 Mvar LONDRINA ESU RBR PR RB FT RTB 525 kV 50 Mvar LONDRINA ESU RBR PR 057/2001 IPCA RBNI REA 7152/2018 27/06/2020 27/06/2055  R$974,825.00
LONDRINA ESU IB 500 kV MG 500 kV LONDRINA ESU MG1 PR IB1 RB FT MG 500 kV LONDRINA ESU MG1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$524,922.10
LONDRINA ESU RTB 525 kV 0 Mvar LONDRINA ESU RB2 PR RB FT RTB 525 kV 150 Mvar LONDRINA ESU RB2 PR 057/2001 IPCA RBNI REA 7152/2018 28/06/2020 28/06/2055  R$ 2,924,475.03
LONDRINA ESU RTB 525 kV 0 Mvar LONDRINA ESU RB1 PR RB FT RTB 525 kV 150 Mvar LONDRINA ESU RB1 PR 057/2001 IPCA RBNI REA 7152/2018 27/06/2020 27/06/2055  R$ 2,924,475.03
LONDRINA ESU IB 230 kV MG 500 kV LONDRINA ESU MG1 PR IB1 RB FT MG 500 kV LONDRINA ESU MG1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$103,749.99
LONDRINA ESU MG 500 kV LONDRINA ESU MG1 PR RB FT MG 500 kV LONDRINA ESU MG1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$940,986.19
LONDRINA ESU MG 500 kV LONDRINA ESU MG1 PR RB FT MG 500 kV LONDRINA ESU MG1 PR 057/2001 IPCA RBNI REA 7152/2018 27/06/2020 27/06/2039  R$25,230.57
LONDRINA ESU MC 525 kV RTB 525 kV 0 Mvar LONDRINA ESU RB2 PR RB FT RTB 525 kV 150 Mvar LONDRINA ESU RB2 PR 057/2001 IPCA RBNI REA 7152/2018 28/06/2020 28/06/2047  R$ 1,756,165.84
LONDRINA ESU MC 525 kV RTB 525 kV 0 Mvar LONDRINA ESU RB1 PR RB FT RTB 525 kV 150 Mvar LONDRINA ESU RB1 PR 057/2001 IPCA RBNI REA 7152/2018 27/06/2020 27/06/2047  R$ 1,756,165.84
LONDRINA ESU MC 500 kV TR 500/230 kV LONDRINA ESU TR4 PR  RB FT TR 500/230 kV LONDRINA ESU TR4 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$323,135.88
LONDRINA ESU MC 500 kV TR 500/230 kV LONDRINA ESU TR4 PR  RB FT TR 500/230 kV LONDRINA ESU TR4 PR 057/2001 IPCA RMEL REN 643/2014 13/06/2014 12/06/2042  R$ 477.70
LONDRINA ESU MC 500 kV TR 500/230 kV LONDRINA ESU TR3 PR  RB FT TR 500/230 kV LONDRINA ESU TR3 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$323,135.88
LONDRINA ESU MC 500 kV TR 500/230 kV LONDRINA ESU TR3 PR  RB FT TR 500/230 kV LONDRINA ESU TR3 PR 057/2001 IPCA RMEL REN 643/2014 26/04/2015 25/04/2038  R$45,258.24
LONDRINA ESU MC 500 kV TR 500/230 kV LONDRINA ESU TR3 PR  RB FT TR 500/230 kV LONDRINA ESU TR3 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$671,733.05
LONDRINA ESU MC 500 kV TR 500/230 kV LONDRINA ESU TR3 PR  RB FT TR 500/230 kV LONDRINA ESU TR3 PR 057/2001 IPCA RMEL REN 643/2014 12/06/2014 11/06/2042  R$2,414.76
LONDRINA ESU MC 230 kV TR 500/230 kV LONDRINA ESU TR4 PR  RB FT TR 500/230 kV LONDRINA ESU TR4 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
LONDRINA ESU MC 230 kV TR 500/230 kV LONDRINA ESU TR3 PR  RB FT TR 500/230 kV LONDRINA ESU TR3 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
LONDRINA ESU IB 500 kV MG 500 kV LONDRINA ESU MG1 PR IB2 RB FT MG 500 kV LONDRINA ESU MG1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
LONDRINA ESU IB 500 kV MG 500 kV LONDRINA ESU MG1 PR IB1 RB FT MG 500 kV LONDRINA ESU MG1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
LONDRINA ESU IB 500 kV MG 500 kV LONDRINA ESU MG1 PR IB1 RB FT MG 500 kV LONDRINA ESU MG1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$712,852.36
LONDRINA ESU IB 230 kV MG 500 kV LONDRINA ESU MG1 PR IB1 RB FT MG 500 kV LONDRINA ESU MG1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$215,674.89
LONDRINA ESU EL 500 kV LONDRINA ESU LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR  RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$560,443.41
LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /SARANDI C-1130 PR  RB FT LT 230 kV LONDRINA ESU /SARANDI C-1130 PR 057/2001 IPCA RMEL REN 643/2014 27/04/2014 26/04/2044  R$ 231.83
LONDRINA ESU EL 500 kV LONDRINA ESU LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR  RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
LONDRINA ESU EL 500 kV LONDRINA ESU LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR  RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RMEL REN 643/2014 02/08/2014 01/08/2037  R$44,085.72
LONDRINA ESU EL 500 kV LONDRINA ESU LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR  RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$761,090.85
LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /SARANDI C-1130 PR  RB FT LT 230 kV LONDRINA ESU /SARANDI C-1130 PR 057/2001 IPCA RBNI REA 8795/2020 31/03/2023 31/03/2051  R$82,060.50
LONDRINA ESU EL 500 kV LONDRINA ESU LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR  RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RMEL REN 643/2014 26/10/2014 25/10/2045  R$2,270.19
LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /SARANDI C-1130 PR  RB FT LT 230 kV LONDRINA ESU /SARANDI C-1130 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR  RB FT LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR  RB FT LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR 057/2001 IPCA RBNI REA 7761/2019 13/08/2021 12/08/2051  R$34,016.28
LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR  RB FT LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR  RB FT LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR 057/2001 IPCA RMEL REN 643/2014 16/12/2013 15/12/2041  R$44,106.95
LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR  RB FT LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$353,874.34
LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR  RB FT LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR 057/2001 IPCA RMEL REN 643/2014 12/09/2015 11/09/2045  R$ 893.91
LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR 057/2001 IPCA RBNI REA 7761/2019 17/08/2021 16/08/2051  R$6,745.44
LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR  RB FT LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR 057/2001 IPCA RBNI REA 7576/2019 14/12/2020 14/12/2043  R$111,030.43
LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$353,874.34
LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV IBIPORA /LONDRINA ESU C-1 PR  RB FT LT 230 kV IBIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV IBIPORA /LONDRINA ESU C-1 PR  RB FT LT 230 kV IBIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$353,874.34
LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV IBIPORA /LONDRINA ESU C-1 PR  RB FT LT 230 kV IBIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RMEL REN 643/2014 17/05/2016 16/05/2046  R$ 911.32
LONDRINA SUL MG 230 kV LONDRINA SUL MG2 PR RB FT MG 230 kV LONDRINA SUL MG2 PR 057/2001 IPCA RBNI DSP 1302/2022 01/07/2022 30/06/2053  R$41,973.57
LONDRINA SUL EL 230 kV LONDRINA SUL LT 230 kV LONDRINA SUL /APUCARANA C-1 PR RB FT LT 230 kV LONDRINA SUL /APUCARANA C-1 PR 057/2001 IPCA RBNI DSP 1302/2022 01/07/2022 30/06/2051  R$212,417.18
LONDRINA SUL EL 230 kV LONDRINA SUL LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR 057/2001 IPCA RBNI DSP 1302/2022 01/07/2022 30/06/2051  R$212,417.18
LT138 kV J.S.CATARINA /PICARRASSC LT 138 kV J.S.CATARINA /PICARRAS C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$628,940.77
LT138 kV JUPIA/U.MIMOSOSP/MS LT 138 kV JUPIA /U.MIMOSO C-4 SP/MS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 1,694,289.79
LT138 kV JUPIA/U.MIMOSOSP/MS LT 138 kV JUPIA /U.MIMOSO C-4 SP/MS DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 3,522,080.11
LT138 kV JUPIA/U.MIMOSOSP/MS LT 138 kV JUPIA /U.MIMOSO C-4 SP/MS DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 2,593,549.20
LT138 kV JUPIA/U.MIMOSOSP/MS LT 138 kV JUPIA /U.MIMOSO C-3 SP/MS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 1,694,289.79
LT138 kV JUPIA/U.MIMOSOSP/MS LT 138 kV JUPIA /U.MIMOSO C-3 SP/MS DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 3,522,080.11
LT138 kV JUPIA/U.MIMOSOSP/MS LT 138 kV JUPIA /U.MIMOSO C-3 SP/MS DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 2,593,549.20
LT138 kV JUPIA/U.MIMOSOSP/MS LT 138 kV JUPIA /U.MIMOSO C-2 SP/MS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 2,750,986.92
LT138 kV JUPIA/U.MIMOSOSP/MS LT 138 kV JUPIA /U.MIMOSO C-2 SP/MS DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 5,718,736.18
LT138 kV JUPIA/U.MIMOSOSP/MS LT 138 kV JUPIA /U.MIMOSO C-2 SP/MS DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 4,211,097.76
LT230 kV CASCAVEL OEST/GUAIRAPR LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR RB FT LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,795,770.50
LT230 kV CASCAVEL OEST/GUAIRAPR LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR RB FT LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,733,037.65
LT230 kV CASCAVEL OEST/CASCAVELPR LT 230 kV CASCAVEL OEST /CASCAVEL C-1 PR RB FT LT 230 kV CASCAVEL OEST /CASCAVEL C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$169,047.18
LT230 kV CASCAVEL OEST/CASCAVELPR LT 230 kV CASCAVEL OEST /CASCAVEL C-1 PR RB FT LT 230 kV CASCAVEL OEST /CASCAVEL C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$351,414.32
LT230 kV CASCAVEL OEST/CASCAVELPR LT 230 kV CASCAVEL OEST /CASCAVEL C-1 PR RB FT LT 230 kV CASCAVEL OEST /CASCAVEL C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$258,770.47
LT230 kV CASCAVEL OEST/GUAIRAPR LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR RB FT LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR 057/2001 IPCA RBNI REA 3232/2011 19/03/2013 18/03/2041  R$128,764.29
LT230 kV CASCAVEL OEST/GUAIRAPR LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR RB FT LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,748,891.71
LT230 kV CASCAVEL OEST/GUAIRAPR LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR RB FT LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR 057/2001 IPCA RBNI REA 8795/2020 08/05/2023 08/05/2051  R$709,608.79
LT230 kV CASCAVEL OEST/GUAIRAPR LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR RB FT LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR 057/2001 IPCA RBNI REA 8795/2020 08/05/2023 08/05/2051  R$522,645.98
LT230 kV CASCAVEL OEST/GUAIRAPR LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR RB FT LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR 057/2001 IPCA RBNI REA 8795/2020 08/05/2023 08/05/2056  R$272,667.17
LT230 kV PASSO FUNDO/U.PASSO FUNDO RS LT 230 kV PASSO FUNDO /U.PASSO FUNDO C-2 RS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$6,570.37
LT230 kV PASSO FUNDO/U.PASSO FUNDO RS LT 230 kV PASSO FUNDO /U.PASSO FUNDO C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$6,570.37
LT 138 kV ANASTACIO /AQUIDAUANA MS LT 138 kV ANASTACIO /AQUIDAUANA C-2 MS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$103,191.31
LT 138 kV ANASTACIO /AQUIDAUANA MS LT 138 kV ANASTACIO /AQUIDAUANA C-1 MS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$103,191.31
LT 138 kV ANASTACIO /AQUIDAUANA MS LT 138 kV ANASTACIO /AQUIDAUANA C-1 MS DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$214,513.52
LT 138 kV ANASTACIO /AQUIDAUANA MS LT 138 kV ANASTACIO /AQUIDAUANA C-1 MS DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$157,961.02
LT 138 kV ARAQUARI (HYOSUNG) /JOINVILLE SANTA CATARINA SC LT 138 kV ARAQUARI (HYOSUNG) /JOINVILLE SANTA CATARINA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$183,256.92
LT 138 kV ARAQUARI (HYOSUNG) /JOINVILLE SANTA CATARINA SC LT 138 kV ARAQUARI (HYOSUNG) /JOINVILLE SANTA CATARINA C-1 SC DIT   057/2001 IPCA RCDM REA 4325/2013 20/10/2015 19/10/2054  R$588,068.80
LT 138 kV ARAQUARI (HYOSUNG) /JOINVILLE SANTA CATARINA SC LT 138 kV ARAQUARI (HYOSUNG) /JOINVILLE SANTA CATARINA C-1 SC DIT   057/2001 IPCA RCDM REA 4325/2013 20/10/2015 19/10/2054  R$138,074.20
LT 138 kV BIGUACU /ITAJAIFAZENDA SC LT 138 kV BIGUACU /ITAJAIFAZENDA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$643,849.19
LT 138 kV BIGUACU /ITAJAIFAZENDA SC LT 138 kV BIGUACU /ITAJAIFAZENDA C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,338,430.09
LT 138 kV BIGUACU /ITAJAIFAZENDA SC LT 138 kV BIGUACU /ITAJAIFAZENDA C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$985,577.89
LT 138 kV BIGUACU /ITAJAIFAZENDA SC LT 138 kV BIGUACU /ITAJAIFAZENDA C-1 SC DIT   057/2001 IPCA RCDM REA 8314/2019 13/07/2020 12/07/2035  R$ 323.09
LT 138 kV BIGUACU /TIJUCAS SC LT 138 kV BIGUACU /TIJUCAS C-1 SC DIT   057/2001 IPCA RCDM REA 2879/2011 20/11/2012 19/11/2043  R$40,097.51
LT 138 kV BIGUACU /TIJUCAS SC LT 138 kV BIGUACU /TIJUCAS C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$338,954.15
LT 138 kV BLUMENAU /ILHOTA SC LT 138 kV BLUMENAU /ILHOTA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$505,668.38
LT 138 kV BLUMENAU /ILHOTA SC LT 138 kV BLUMENAU /ILHOTA C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,051,180.59
LT 138 kV BLUMENAU /ILHOTA SC LT 138 kV BLUMENAU /ILHOTA C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$774,056.38
LT 138 kV CAMPO GRANDE /U.MIMOSO MS LT 138 kV CAMPO GRANDE /U.MIMOSO C-4 MS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$839,010.44
LT 138 kV CAMPO GRANDE /U.MIMOSO MS LT 138 kV CAMPO GRANDE /U.MIMOSO C-4 MS DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,744,130.20
LT 138 kV CAMBORIU M.B. /ITAJAI SC LT 138 kV CAMBORIU M.B. /ITAJAI C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$167,424.03
LT 138 kV CAMBORIU M.B. /ITAJAI SC LT 138 kV CAMBORIU M.B. /ITAJAI C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$348,040.14
LT 138 kV CAMBORIU M.B. /ITAJAI SC LT 138 kV CAMBORIU M.B. /ITAJAI C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$256,285.83
LT 138 kV CAMPO GRANDE /U.MIMOSO MS LT 138 kV CAMPO GRANDE /U.MIMOSO C-2 MS DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 2,831,911.88
LT 138 kV CAMPO GRANDE /U.MIMOSO MS LT 138 kV CAMPO GRANDE /U.MIMOSO C-2 MS DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 2,085,330.99
LT 138 kV CAMPO GRANDE /U.MIMOSO MS LT 138 kV CAMPO GRANDE /U.MIMOSO C-4 MS DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 1,284,322.72
LT 138 kV CAMPO GRANDE /U.MIMOSO MS LT 138 kV CAMPO GRANDE /U.MIMOSO C-3 MS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$839,010.44
LT 138 kV CAMPO GRANDE /U.MIMOSO MS LT 138 kV CAMPO GRANDE /U.MIMOSO C-3 MS DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,744,130.20
LT 138 kV CAMPO GRANDE /U.MIMOSO MS LT 138 kV CAMPO GRANDE /U.MIMOSO C-3 MS DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 1,284,322.72
LT 138 kV CAMPO GRANDE /U.MIMOSO MS LT 138 kV CAMPO GRANDE /U.MIMOSO C-2 MS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 1,362,285.70
LT 138 kV D.DAS NACOES /IVINHEMA MS LT 138 kV D.DAS NACOES /IVINHEMA C-1 MS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$928,044.42
LT 138 kV D.DAS NACOES /IVINHEMA MS LT 138 kV D.DAS NACOES /IVINHEMA C-1 MS DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,929,213.54
LT 138 kV D.DAS NACOES /IVINHEMA MS LT 138 kV D.DAS NACOES /IVINHEMA C-1 MS DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 1,420,612.28
LT 138 kV ELDORADO /GUAIRA MS/PR LT 138 kV ELDORADO /GUAIRA C-1 MS/PR DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$212,581.98
LT 138 kV ELDORADO /GUAIRA MS/PR LT 138 kV ELDORADO /GUAIRA C-1 MS/PR DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$441,914.23
LT 138 kV ELDORADO /GUAIRA MS/PR LT 138 kV ELDORADO /GUAIRA C-1 MS/PR DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$325,411.76
LT 138 kV GASPAR /ILHOTA SC LT 138 kV GASPAR /ILHOTA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$140,882.73
LT 138 kV FLORIANOPOLIS /PALHOCA ESU SC LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$89,246.54
LT 138 kV FLORIANOPOLIS /PALHOCA ESU SC LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-2 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$185,525.21
LT 138 kV FLORIANOPOLIS /PALHOCA ESU SC LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-2 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$136,614.94
LT 138 kV FLORIANOPOLIS /PALHOCA ESU SC LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$89,246.54
LT 138 kV FLORIANOPOLIS /PALHOCA ESU SC LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$185,525.21
LT 138 kV FLORIANOPOLIS /PALHOCA ESU SC LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$136,614.94
LT 138 kV GASPAR /ILHOTA SC LT 138 kV GASPAR /ILHOTA C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$292,866.23
LT 138 kV GASPAR /ILHOTA SC LT 138 kV GASPAR /ILHOTA C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$215,657.50
LT 138 kV ILHOTA /ARAQUARI (HYOSUNG) SC LT 138 kV ILHOTA /ARAQUARI (HYOSUNG) C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$466,080.18
LT 138 kV ILHOTA /ITAJAI SC LT 138 kV ILHOTA /ITAJAI C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$99,246.85
LT 138 kV ILHOTA /ITAJAI SC LT 138 kV ILHOTA /ITAJAI C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$206,313.80
LT 138 kV ILHOTA /PICARRAS SC LT 138 kV ILHOTA /PICARRAS C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$186,166.47
LT 138 kV ILHOTA /PICARRAS SC LT 138 kV ILHOTA /PICARRAS C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$387,001.81
LT 138 kV ILHOTA /PICARRAS SC LT 138 kV ILHOTA /PICARRAS C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$284,975.98
LT 138 kV ITAJAI /ITAJAIFAZENDA SC LT 138 kV ITAJAI /ITAJAIFAZENDA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$67,296.66
LT 138 kV ITAJAI /ITAJAIFAZENDA SC LT 138 kV ITAJAI /ITAJAIFAZENDA C-1 SC DIT   057/2001 IPCA RCDM REA 8314/2019 13/07/2020 12/07/2035  R$ 323.09
LT 138 kV IVINHEMA /IVINHEMA 2 MS LT 138 kV IVINHEMA /IVINHEMA 2 C-1 MS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$238,870.99
LT 138 kV IVINHEMA /IVINHEMA 2 MS LT 138 kV IVINHEMA /IVINHEMA 2 C-1 MS DIT   057/2001 IPCA RCDM REA 4543/2014 20/07/2016 19/07/2080  R$662,630.10
LT 138 kV IVINHEMA /IVINHEMA 2 MS LT 138 kV IVINHEMA /IVINHEMA 2 C-1 MS DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$496,563.68
LT 138 kV IVINHEMA /IVINHEMA 2 MS LT 138 kV IVINHEMA /IVINHEMA 2 C-1 MS DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$365,653.90
LT 138 kV IVINHEMA 2 /NOVA ANDRADINA MS LT 138 kV IVINHEMA 2 /NOVA ANDRADINA C-1 MS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$207,021.53
LT 138 kV IVINHEMA 2 /NOVA ANDRADINA MS LT 138 kV IVINHEMA 2 /NOVA ANDRADINA C-1 MS DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$430,355.19
LT 138 kV IVINHEMA 2 /NOVA ANDRADINA MS LT 138 kV IVINHEMA 2 /NOVA ANDRADINA C-1 MS DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$316,900.05
LT 138 kV IVINHEMA 2 /NOVA ANDRADINA MS LT 138 kV IVINHEMA 2 /NOVA ANDRADINA C-1 MS DIT   057/2001 IPCA RCDM REA 4543/2014 20/07/2016 19/07/2045  R$714,955.89
LT 138 kV JOINVILLE /J.S.CATARINA SC LT 138 kV JOINVILLE /J.S.CATARINA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$139,121.70
LT 138 kV JOINVILLE /J.S.CATARINA SC LT 138 kV JOINVILLE /J.S.CATARINA C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$289,205.40
LT 138 kV JOINVILLE /J.S.CATARINA SC LT 138 kV JOINVILLE /J.S.CATARINA C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$212,961.78
LT 138 kV JOINVILLE GM /JOINVILLE SC LT 138 kV JOINVILLE GM /JOINVILLE C-1 SC DIT   057/2001 IPCA RCDM REA 2589/2010 20/05/2012 19/05/2043  R$910,592.75
LT 138 kV JOINVILLE GM /JOINVILLE SC LT 138 kV JOINVILLE GM /JOINVILLE C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$97,018.37
LT 138 kV JOINVILLE SANTA CATARINA /JOINVILLE GM SC LT 138 kV JOINVILLE SANTA CATARINA /JOINVILLE GM C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$27,596.34
LT 138 kV JOINVILLE SANTA CATARINA /JOINVILLE GM SC LT 138 kV JOINVILLE SANTA CATARINA /JOINVILLE GM C-1 SC DIT   057/2001 IPCA RCDM REA 4325/2013 20/10/2015 19/10/2054  R$24,235.94
LT 138 kV JOINVILLE SANTA CATARINA /JOINVILLE GM SC LT 138 kV JOINVILLE SANTA CATARINA /JOINVILLE GM C-1 SC DIT   057/2001 IPCA RCDM REA 4325/2013 20/10/2015 19/10/2054  R$327,767.31
LT 138 kV NOVA ANDRADINA /PORTO PRIMAVERA MS/SP LT 138 kV NOVA ANDRADINA /PORTO PRIMAVERA C-1 MS/SP DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$445,892.52
LT 138 kV NOVA ANDRADINA /PORTO PRIMAVERA MS/SP LT 138 kV NOVA ANDRADINA /PORTO PRIMAVERA C-1 MS/SP DIT   057/2001 IPCA RCDM REA 4543/2014 20/07/2016 19/07/2050  R$701,777.60
LT 138 kV NOVA ANDRADINA /PORTO PRIMAVERA MS/SP LT 138 kV NOVA ANDRADINA /PORTO PRIMAVERA C-1 MS/SP DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$926,918.86
LT 138 kV NOVA ANDRADINA /PORTO PRIMAVERA MS/SP LT 138 kV NOVA ANDRADINA /PORTO PRIMAVERA C-1 MS/SP DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$682,553.94
LT 138 kV TIJUCAS /CAMBORIU M.B. SC LT 138 kV TIJUCAS /CAMBORIU M.B. C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$293,760.26
LT 230 kV ANASTACIO /DOURADOS MS LT 230 kV ANASTACIO /DOURADOS C-1 MS RB FT LT 230 kV ANASTACIO /DOURADOS C-1 MS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,001,014.25
LT 230 kV ANASTACIO /DOURADOS MS LT 230 kV ANASTACIO /DOURADOS C-1 MS RB FT LT 230 kV ANASTACIO /DOURADOS C-1 MS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 6,238,491.60
LT 230 kV ANASTACIO /DOURADOS MS LT 230 kV ANASTACIO /DOURADOS C-1 MS RB FT LT 230 kV ANASTACIO /DOURADOS C-1 MS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,593,829.33
LT 230 kV AREIA /S. OSORIO PR LT 230 kV AREIA /S. OSORIO C-1 PR RB FT LT 230 kV AREIA /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,622,518.17
LT 230 kV AREIA /S.MATEUS SUL PR LT 230 kV AREIA /S.MATEUS SUL C-1 PR RB FT LT 230 kV AREIA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,815,862.57
LT 230 kV AREIA /GUARAPUAVA OESTE PR LT 230 kV AREIA /GUARAPUAVA OESTE C-3315 PR RB FT LT 230 kV AREIA /GUARAPUAVA OESTE C-3315 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$255,514.90
LT 230 kV AREIA /GUARAPUAVA OESTE PR LT 230 kV AREIA /GUARAPUAVA OESTE C-3315 PR RB FT LT 230 kV AREIA /GUARAPUAVA OESTE C-3315 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$531,162.94
LT 230 kV AREIA /GUARAPUAVA OESTE PR LT 230 kV AREIA /GUARAPUAVA OESTE C-3315 PR RB FT LT 230 kV AREIA /GUARAPUAVA OESTE C-3315 PR 057/2001 IPCA RBNI DSP 1281/2022 01/07/2022 30/06/2056  R$4,757.12
LT 230 kV AREIA /S. OSORIO PR LT 230 kV AREIA /S. OSORIO C-2 PR RB FT LT 230 kV AREIA /S. OSORIO C-2 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,222,088.12
LT 230 kV AREIA /S. OSORIO PR LT 230 kV AREIA /S. OSORIO C-2 PR RB FT LT 230 kV AREIA /S. OSORIO C-2 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,619,264.33
LT 230 kV AREIA /S. OSORIO PR LT 230 kV AREIA /S. OSORIO C-1 PR RB FT LT 230 kV AREIA /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,223,653.38
LT 230 kV AREIA /S.MATEUS SUL PR LT 230 kV AREIA /S.MATEUS SUL C-1 PR RB FT LT 230 kV AREIA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,809,881.38
LT 230 kV AREIA /S.MATEUS SUL PR LT 230 kV AREIA /S.MATEUS SUL C-1 PR RB FT LT 230 kV AREIA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,835,613.27
LT 230 kV ASSIS /LONDRINA COT SP/PR LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR RB FT LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,878,363.82
LT 230 kV ASSIS /LONDRINA COT SP/PR LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR RB FT LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,904,732.17
LT 230 kV ASSIS /LONDRINA COT SP/PR LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR RB FT LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,875,322.16
LT 230 kV ASSIS /LONDRINA COT SP/PR LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR RB FT LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,626,438.73
LT 230 kV ASSIS /LONDRINA COT SP/PR LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR RB FT LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,381,031.72
LT 230 kV ASSIS /LONDRINA COT SP/PR LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR RB FT LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,489,685.59
LT 230 kV ATLANTIDA 2 /GRAVATAI 3 RS LT 230 kV ATLANTIDA 2 /GRAVATAI 3 C-1 RS RB FT LT 230 kV ATLANTIDA 2 /GRAVATAI 3 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,425,375.05
LT 230 kV ATLANTIDA 2 /OSORIO 2 RS LT 230 kV ATLANTIDA 2 /OSORIO 2 C-1 RS RB FT LT 230 kV ATLANTIDA 2 /OSORIO 2 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$638,280.56
LT 230 kV BIGUACU /DESTERRO SC LT 230 kV BIGUACU /DESTERRO C-1 SC RB FT LT 230 kV BIGUACU /DESTERRO C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$805,108.52
LT 230 kV BIGUACU /GASPAR 2 SC LT 230 kV BIGUACU /GASPAR 2 C-1 SC RB FT LT 230 kV BIGUACU /GASPAR 2 C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,499,795.65
LT 230 kV BIGUACU /GASPAR 2 SC LT 230 kV BIGUACU /GASPAR 2 C-1 SC RB FT LT 230 kV BIGUACU /GASPAR 2 C-1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,117,766.78
LT 230 kV BIGUACU /GASPAR 2 SC LT 230 kV BIGUACU /GASPAR 2 C-1 SC RB FT LT 230 kV BIGUACU /GASPAR 2 C-1 SC 057/2001 IPCA RBNI REA 7009/2018 01/07/2018 22/01/2055  R$31,412.90
LT 230 kV BIGUACU /J.LACERDA-B SC LT 230 kV BIGUACU /J.LACERDA-B C-1 SC RB FT LT 230 kV BIGUACU /J.LACERDA-B C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,842,728.05
LT 230 kV BIGUACU /J.LACERDA-B SC LT 230 kV BIGUACU /J.LACERDA-B C-1 SC RB FT LT 230 kV BIGUACU /J.LACERDA-B C-1 SC 057/2001 IPCA RMEL REN 643/2014 30/08/2014 29/08/2051  R$365,844.37
LT 230 kV BIGUACU /J.LACERDA-B SC LT 230 kV BIGUACU /J.LACERDA-B C-1 SC RB FT LT 230 kV BIGUACU /J.LACERDA-B C-1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,830,652.73
LT 230 kV BIGUACU /J.LACERDA-B SC LT 230 kV BIGUACU /J.LACERDA-B C-1 SC RB FT LT 230 kV BIGUACU /J.LACERDA-B C-1 SC 057/2001 IPCA RMEL REA 7759/2019 07/05/2020 07/05/2051  R$272,594.12
LT 230 kV BIGUACU /PALHOCA ESU SC LT 230 kV BIGUACU /PALHOCA ESU C-1 SC RB FT LT 230 kV BIGUACU /PALHOCA ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$361,692.32
LT 230 kV BLUMENAU /ITAJAI SC LT 230 kV BLUMENAU /ITAJAI C-2 SC RB FT LT 230 kV BLUMENAU /ITAJAI C-2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$421,739.19
LT 230 kV BLUMENAU /ITAJAI SC LT 230 kV BLUMENAU /ITAJAI C-1 SC RB FT LT 230 kV BLUMENAU /ITAJAI C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$421,739.19
LT 230 kV BLUMENAU /JOINV.NORTE SC LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC RB FT LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,036,623.46
LT 230 kV BLUMENAU /JOINV.NORTE SC LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC RB FT LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,154,927.04
LT 230 kV BLUMENAU /JOINVILLE SC LT 230 kV BLUMENAU /JOINVILLE C-1 SC RB FT LT 230 kV BLUMENAU /JOINVILLE C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$953,380.53
LT 230 kV BLUMENAU /JOINVILLE SC LT 230 kV BLUMENAU /JOINVILLE C-1 SC RB FT LT 230 kV BLUMENAU /JOINVILLE C-1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,981,882.11
LT 230 kV C.I.AUT.GRA /GRAVATAI 3 RS LT 230 kV C.I.AUT.GRA /GRAVATAI 3 C-1 RS RB FT LT 230 kV C.I.AUT.GRA /GRAVATAI 3 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$38,106.76
LT 230 kV C.MOURAO /APUCARANA PR LT 230 kV C.MOURAO /APUCARANA C-1 PR RB FT LT 230 kV C.MOURAO /APUCARANA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,386,947.78
LT 230 kV C.MOURAO /MARINGA PR LT 230 kV C.MOURAO /MARINGA C-1 PR RB FT LT 230 kV C.MOURAO /MARINGA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,136,941.86
LT 230 kV C.MOURAO /APUCARANA PR LT 230 kV C.MOURAO /APUCARANA C-1 PR RB FT LT 230 kV C.MOURAO /APUCARANA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,629,284.65
LT 230 kV C.MOURAO /S. OSORIO PR LT 230 kV C.MOURAO /S. OSORIO C-2 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-2 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,579,819.27
LT 230 kV C.MOURAO /S. OSORIO PR LT 230 kV C.MOURAO /S. OSORIO C-2 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-2 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,362,913.83
LT 230 kV C.MOURAO /MARINGA PR LT 230 kV C.MOURAO /MARINGA C-1 PR RB FT LT 230 kV C.MOURAO /MARINGA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,363,468.37
LT 230 kV C.MOURAO /S. OSORIO PR LT 230 kV C.MOURAO /S. OSORIO C-1 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,578,396.31
LT 230 kV C.MOURAO /S. OSORIO PR LT 230 kV C.MOURAO /S. OSORIO C-1 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,359,955.80
LT 230 kV CAMAQUA 3 /NOVA STA RITA RS LT 230 kV CAMAQUA 3 /NOVA STA RITA C-1 RS RB FT LT 230 kV CAMAQUA 3 /NOVA STA RITA C-1 RS 004/2012 IPCA RBL CC 004/2012 09/12/2014 10/05/2042  R$ 8,694,790.26
LT 230 kV CAMAQUA 3 /POVO NOVO RS LT 230 kV CAMAQUA 3 /POVO NOVO C-1 RS RB FT LT 230 kV CAMAQUA 3 /POVO NOVO C-1 RS 004/2012 IPCA RBL CC 004/2012 09/12/2014 10/05/2042  R$ 9,159,104.20
LT 230 kV CAMAQUA 3 /POVO NOVO RS LT 230 kV CAMAQUA 3 /POVO NOVO C-1 RS RB FT LT 230 kV CAMAQUA 3 /POVO NOVO C-1 RS 004/2012 IPCA RBNI DSP 1446/2022 30/09/2015 29/09/2049  R$31,423.97
LT 230 kV CANOINHAS ESU /S.MATEUS SUL SC/PR LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR RB FT LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$678,750.02
LT 230 kV CANOINHAS ESU /S.MATEUS SUL SC/PR LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR RB FT LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,410,981.74
LT 230 kV CANOINHAS ESU /S.MATEUS SUL SC/PR LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR RB FT LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,039,002.65
LT 230 kV CAXIAS /CAXIAS SUL 5 RS LT 230 kV CAXIAS /CAXIAS SUL 5 C-1 RS RB FT LT 230 kV CAXIAS /CAXIAS SUL 5 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$352,025.09
LT 230 kV CURITIBA /JOINV.NORTE PR/SC LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,371,160.42
LT 230 kV CURITIBA /JOINV.NORTE PR/SC LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,850,360.60
LT 230 kV CURITIBA /JOINVILLE PR/SC LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,418,687.15
LT 230 kV CURITIBA /JOINVILLE PR/SC LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,949,158.90
LT 230 kV CURITIBA /S.MATEUS SUL PR LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR RB FT LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,660,589.68
LT 230 kV CURITIBA /S.MATEUS SUL PR LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR RB FT LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,452,024.51
LT 230 kV CURITIBA /S.MATEUS SUL PR LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR RB FT LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,541,962.46
LT 230 kV DOURADOS /GUAIRA MS/PR LT 230 kV DOURADOS /GUAIRA C-1 MS/PR RB FT LT 230 kV DOURADOS /GUAIRA C-1 MS/PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,222,995.39
LT 230 kV DOURADOS /GUAIRA MS/PR LT 230 kV DOURADOS /GUAIRA C-1 MS/PR RB FT LT 230 kV DOURADOS /GUAIRA C-1 MS/PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 6,699,944.74
LT 230 kV DOURADOS /GUAIRA MS/PR LT 230 kV DOURADOS /GUAIRA C-1 MS/PR RB FT LT 230 kV DOURADOS /GUAIRA C-1 MS/PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,933,628.93
LT 230 kV FARROUPILHA /CAXIAS SUL 5 RS LT 230 kV FARROUPILHA /CAXIAS SUL 5 C-1 RS RB FT LT 230 kV FARROUPILHA /CAXIAS SUL 5 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$280,180.04
LT 230 kV FARROUPILHA /MONTE CLARO RS LT 230 kV FARROUPILHA /MONTE CLARO C-2 RS RB FT LT 230 kV FARROUPILHA /MONTE CLARO C-2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$441,116.37
LT 230 kV FARROUPILHA /MONTE CLARO RS LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS RB FT LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$440,547.18
LT 230 kV FARROUPILHA /MONTE CLARO RS LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS RB FT LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS 057/2001 IPCA RMEL REA 7759/2019 09/03/2020 09/03/2051  R$152,975.76
LT 230 kV FORQUILHINHA /L.GRANDE SC/RS LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS RB FT LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$195,030.17
LT 230 kV FORQUILHINHA /L.GRANDE SC/RS LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS RB FT LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS 057/2001 IPCA RMEL REN 643/2014 21/03/2016 20/03/2044  R$11,322.31
LT 230 kV FORQUILHINHA /SIDEROPOL.ESU SC LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$195,030.17
LT 230 kV FOZ DO CHAPECO /GUARITA RS LT 230 kV FOZ DO CHAPECO /GUARITA C-1 RS RB FT LT 230 kV FOZ DO CHAPECO /GUARITA C-1 RS 002/2011 IPCA RBNI REA 6427/2017 01/07/2017 27/10/2045  R$735,095.37
LT 230 kV FOZ DO CHAPECO /PINHALZINHO RS/SC LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-2 RS/SC RB FT LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-2 RS/SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044  R$ 1,885,495.65
LT 230 kV FOZ DO CHAPECO /PINHALZINHO RS/SC LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-1 RS/SC RB FT LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-1 RS/SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044  R$ 1,885,495.66
LT 230 kV FOZ DO CHAPECO /XANXERE ESU RS/SC LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-2 RS/SC RB FT LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-2 RS/SC 002/2011 IPCA RBNI REA 6454/2017 01/07/2017 15/06/2052  R$ 1,024,937.81
LT 230 kV FOZ DO CHAPECO /XANXERE ESU RS/SC LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-1 RS/SC RB FT LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-1 RS/SC 002/2011 IPCA RBNI REA 6454/2017 01/07/2017 15/06/2052  R$ 1,024,937.81
LT 230 kV GASPAR 2 /BLUMENAU SC LT 230 kV GASPAR 2 /BLUMENAU C-1 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$156,525.16
LT 230 kV GASPAR 2 /PALHOCA ESU SC LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC RB FT LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,720,211.54
LT 230 kV GASPAR 2 /BLUMENAU SC LT 230 kV GASPAR 2 /BLUMENAU C-2 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$185,126.58
LT 230 kV GASPAR 2 /BLUMENAU SC LT 230 kV GASPAR 2 /BLUMENAU C-2 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-2 SC 057/2001 IPCA RBNI REA 4802/2014 30/09/2016 29/09/2064  R$629,019.02
LT 230 kV GASPAR 2 /BLUMENAU SC LT 230 kV GASPAR 2 /BLUMENAU C-2 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-2 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$384,840.09
LT 230 kV GASPAR 2 /BLUMENAU SC LT 230 kV GASPAR 2 /BLUMENAU C-2 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-2 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$283,384.16
LT 230 kV GASPAR 2 /BLUMENAU SC LT 230 kV GASPAR 2 /BLUMENAU C-1 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$325,383.63
LT 230 kV GASPAR 2 /BLUMENAU SC LT 230 kV GASPAR 2 /BLUMENAU C-1 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-1 SC 057/2001 IPCA RBNI REA 7009/2018 01/07/2018 22/01/2055  R$31,412.90
LT 230 kV GASPAR 2 /PALHOCA ESU SC LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC RB FT LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC 057/2001 IPCA RBNI REA 4802/2014 30/09/2016 29/09/2044  R$664,238.42
LT 230 kV GASPAR 2 /PALHOCA ESU SC LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC RB FT LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,575,966.09
LT 230 kV GASPAR 2 /PALHOCA ESU SC LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC RB FT LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,633,229.15
LT 230 kV GRAVATAI 2 /GRAVATAI 3 RS LT 230 kV GRAVATAI 2 /GRAVATAI 3 C-1 RS RB FT LT 230 kV GRAVATAI 2 /GRAVATAI 3 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$39,586.64
LT 230 kV GUARAPUAVA OESTE /PONTA GROSSA PR LT 230 kV GUARAPUAVA OESTE /PONTA GROSSA C-3312 PR RB FT LT 230 kV GUARAPUAVA OESTE /PONTA GROSSA C-3312 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,100,900.28
LT 230 kV GUARAPUAVA OESTE /PONTA GROSSA PR LT 230 kV GUARAPUAVA OESTE /PONTA GROSSA C-3312 PR RB FT LT 230 kV GUARAPUAVA OESTE /PONTA GROSSA C-3312 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,367,339.71
LT 230 kV GUARAPUAVA OESTE /PONTA GROSSA PR LT 230 kV GUARAPUAVA OESTE /PONTA GROSSA C-3312 PR RB FT LT 230 kV GUARAPUAVA OESTE /PONTA GROSSA C-3312 PR 057/2001 IPCA RBNI DSP 1281/2022 01/07/2022 30/06/2056  R$39,114.13
LT 230 kV J.LACERDA-A /J.LACERDA-B SC LT 230 kV J.LACERDA-A /J.LACERDA-B C-2 SC RB FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$11,680.66
LT 230 kV J.LACERDA-A /J.LACERDA-B SC LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC RB FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$11,680.66
LT 230 kV J.LACERDA-A /J.LACERDA-B SC LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC RB FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$24,281.69
LT 230 kV J.LACERDA-B /PALHOCA ESU SC LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,716,084.96
LT 230 kV J.LACERDA-B /PALHOCA ESU SC LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,567,387.80
LT 230 kV J.LACERDA-B /PALHOCA ESU SC LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC 057/2001 IPCA RMEL REA 7759/2019 04/12/2019 04/12/2050  R$55,620.58
LT 230 kV J.LACERDA-B /SIDEROPOL.ESU SC LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$673,058.20
LT 230 kV J.LACERDA-B /SIDEROPOL.ESU SC LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,399,149.61
LT 230 kV J.LACERDA-B /SIDEROPOL.ESU SC LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$702,940.28
LT 230 kV J.LACERDA-B /SIDEROPOL.ESU SC LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,461,268.30
LT 230 kV J.LACERDA-B /U.JLACERDA-C SC LT 230 kV J.LACERDA-B /U.JLACERDA-C C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$15,176.06
LT 230 kV J.LACERDA-B /U.JLACERDA-C SC LT 230 kV J.LACERDA-B /U.JLACERDA-C C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$7,300.41
LT 230 kV J.LACERDA-B /U.JLACERDA-C SC LT 230 kV J.LACERDA-B /U.JLACERDA-C C-2 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$15,176.06
LT 230 kV J.LACERDA-B /U.JLACERDA-C SC LT 230 kV J.LACERDA-B /U.JLACERDA-C C-2 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$11,175.17
LT 230 kV J.LACERDA-B /U.JLACERDA-C SC LT 230 kV J.LACERDA-B /U.JLACERDA-C C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$7,300.41
LT 230 kV J.LACERDA-B /U.JLACERDA-C SC LT 230 kV J.LACERDA-B /U.JLACERDA-C C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$11,175.17
LT 230 kV JOINVILLE /JOINV.NORTE SC LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC RB FT LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$89,987.74
LT 230 kV JOINVILLE /JOINV.NORTE SC LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC RB FT LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$187,066.01
LT 230 kV JOINVILLE /VEGA DO SUL SC LT 230 kV JOINVILLE /VEGA DO SUL C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$495,304.88
LT 230 kV JOINVILLE /VEGA DO SUL SC LT 230 kV JOINVILLE /VEGA DO SUL C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$495,304.88
LT 230 kV L.GRANDE /CAXIAS SUL 5 RS LT 230 kV L.GRANDE /CAXIAS SUL 5 C-1 RS RB FT LT 230 kV L.GRANDE /CAXIAS SUL 5 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$933,459.15
LT 230 kV LIVRAMENTO 2 /Rivera URU RS LT 230 kV LIVRAMENTO 2 /Rivera URU C-1 RS RB   057/2001 IPCA RBNI PRT 657/2022 24/03/2023 01/02/2054  R$39,545.98
LT 230 kV LONDRINA ESU /LONDRINA COT PR LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$348,562.36
LT 230 kV LONDRINA ESU /LONDRINA COT PR LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$724,589.47
LT 230 kV LONDRINA ESU /LONDRINA COT PR LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$533,564.94
LT 230 kV LONDRINA ESU /LONDRINA COT PR LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR 057/2001 IPCA RMEL REA 7759/2019 27/05/2019 27/05/2050  R$113,431.95
LT 230 kV LONDRINA ESU /LONDRINA COT PR LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$449,654.10
LT 230 kV LONDRINA ESU /LONDRINA COT PR LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$934,738.43
LT 230 kV LONDRINA ESU /LONDRINA COT PR LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$688,312.03
LT 230 kV LONDRINA ESU /LONDRINA SUL PR LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$432,578.63
LT 230 kV LONDRINA ESU /LONDRINA SUL PR LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$899,242.03
LT 230 kV LONDRINA ESU /LONDRINA SUL PR LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$662,173.60
LT 230 kV LONDRINA ESU /LONDRINA SUL PR LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR 057/2001 IPCA RBNI DSP 1302/2022 01/07/2022 30/06/2057  R$21,333.60
LT 230 kV LONDRINA ESU /SARANDI PR LT 230 kV LONDRINA ESU /SARANDI C-1130 PR RB FT LT 230 kV LONDRINA ESU /SARANDI C-1130 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,111,150.03
LT 230 kV LONDRINA ESU /SARANDI PR LT 230 kV LONDRINA ESU /SARANDI C-1130 PR RB FT LT 230 kV LONDRINA ESU /SARANDI C-1130 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,309,852.45
LT 230 kV LONDRINA ESU /SARANDI PR LT 230 kV LONDRINA ESU /SARANDI C-1130 PR RB FT LT 230 kV LONDRINA ESU /SARANDI C-1130 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,700,902.82
LT 230 kV LONDRINA ESU /SARANDI PR LT 230 kV LONDRINA ESU /SARANDI C-1130 PR RB FT LT 230 kV LONDRINA ESU /SARANDI C-1130 PR 057/2001 IPCA RBNI REA 8795/2020 31/03/2023 31/03/2051  R$74,429.09
LT 230 kV LONDRINA ESU /SARANDI PR LT 230 kV LONDRINA ESU /SARANDI C-1130 PR RB FT LT 230 kV LONDRINA ESU /SARANDI C-1130 PR 057/2001 IPCA RBNI REA 8795/2020 31/03/2023 31/03/2056  R$9,618.71
LT 230 kV LONDRINA SUL /APUCARANA PR LT 230 kV LONDRINA SUL /APUCARANA C-1 PR RB FT LT 230 kV LONDRINA SUL /APUCARANA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$142,295.60
LT 230 kV LONDRINA SUL /APUCARANA PR LT 230 kV LONDRINA SUL /APUCARANA C-1 PR RB FT LT 230 kV LONDRINA SUL /APUCARANA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$295,803.30
LT 230 kV LONDRINA SUL /APUCARANA PR LT 230 kV LONDRINA SUL /APUCARANA C-1 PR RB FT LT 230 kV LONDRINA SUL /APUCARANA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$217,820.26
LT 230 kV LONDRINA SUL /APUCARANA PR LT 230 kV LONDRINA SUL /APUCARANA C-1 PR RB FT LT 230 kV LONDRINA SUL /APUCARANA C-1 PR 057/2001 IPCA RBNI DSP 1302/2022 01/07/2022 30/06/2057  R$21,333.60
LT 230 kV MACAMBARA /SANTO ANGELO RS LT 230 kV MACAMBARA /SANTO ANGELO C-2 RS RB FT LT 230 kV MACAMBARA /SANTO ANGELO C-2 RS 007/2014 IPCA RBL CC 007/2014 06/12/2019 29/01/2044  R$ 8,601,769.42
LT 230 kV MONTE CLARO /NOVA PRATA 2 RS LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS RB FT LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS 057/2001 IPCA RBNI REA 3161/2011 25/09/2015 24/09/2049  R$ 1,207,389.73
LT 230 kV MONTE CLARO /NOVA PRATA 2 RS LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS RB FT LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$348,639.23
LT 230 kV MONTE CLARO /NOVA PRATA 2 RS LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS RB FT LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS 057/2001 IPCA RBNI REA 8795/2020 24/05/2022 24/05/2050  R$ 1,491,576.85
LT 230 kV MONTE CLARO /NOVA PRATA 2 RS LT 230 kV MONTE CLARO /NOVA PRATA 2 C-1 RS RB FT LT 230 kV MONTE CLARO /NOVA PRATA 2 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$439,693.41
LT 230 kV MONTE CLARO /NOVA PRATA 2 RS LT 230 kV MONTE CLARO /NOVA PRATA 2 C-1 RS RB FT LT 230 kV MONTE CLARO /NOVA PRATA 2 C-1 RS 057/2001 IPCA RBNI REA 8795/2020 15/06/2022 15/06/2050  R$ 1,544,663.64
LT 230 kV MONTE CLARO /VINHEDOS RS LT 230 kV MONTE CLARO /VINHEDOS C-1 RS RB FT LT 230 kV MONTE CLARO /VINHEDOS C-1 RS 012/2010 IPCA RBL CC 012/2010 19/07/2013 06/10/2040  R$ 1,596,176.38
LT 230 kV MONTE CLARO /VINHEDOS RS LT 230 kV MONTE CLARO /VINHEDOS C-1 RS RB FT LT 230 kV MONTE CLARO /VINHEDOS C-1 RS 012/2010 IPCA RBNI DSP 1247/2022 01/07/2022 30/06/2057  R$32,605.57
LT 230 kV PASSO FUNDO /VILA MARIA RS LT 230 kV PASSO FUNDO /VILA MARIA C-3228 RS RB FT LT 230 kV PASSO FUNDO /VILA MARIA C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,558,207.99
LT 230 kV PASSO FUNDO /VILA MARIA RS LT 230 kV PASSO FUNDO /VILA MARIA C-3228 RS RB FT LT 230 kV PASSO FUNDO /VILA MARIA C-1 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,239,194.04
LT 230 kV PASSO FUNDO /VILA MARIA RS LT 230 kV PASSO FUNDO /VILA MARIA C-3228 RS RB FT LT 230 kV PASSO FUNDO /VILA MARIA C-1 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,385,240.78
LT 230 kV PASSO FUNDO /VILA MARIA RS LT 230 kV PASSO FUNDO /VILA MARIA C-3228 RS RB FT LT 230 kV PASSO FUNDO /VILA MARIA C-1 RS 057/2001 IPCA RBNI REA 8795/2020 18/11/2022 18/11/2050  R$ 6,601,905.35
LT 230 kV PASSO FUNDO /VILA MARIA RS LT 230 kV PASSO FUNDO /VILA MARIA C-3228 RS RB FT LT 230 kV PASSO FUNDO /VILA MARIA C-3228 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,409,449.62
LT 230 kV PASSO FUNDO /VILA MARIA RS LT 230 kV PASSO FUNDO /VILA MARIA C-3228 RS RB FT LT 230 kV PASSO FUNDO /VILA MARIA C-3228 RS 057/2001 IPCA RBNI REA 3161/2011 05/12/2022 24/09/2050  R$316,599.49
LT 230 kV PASSO FUNDO /VILA MARIA RS LT 230 kV PASSO FUNDO /VILA MARIA C-3228 RS RB FT LT 230 kV PASSO FUNDO /VILA MARIA C-3228 RS 057/2001 IPCA RBNI REA 8795/2020 05/12/2022 05/12/2050  R$ 6,625,969.48
LT 230 kV PASSO FUNDO /XANXERE ESU RS/SC LT 230 kV PASSO FUNDO /XANXERE ESU C-2 RS/SC RB FT LT 230 kV PASSO FUNDO /XANXERE ESU C-2 RS/SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,126,981.17
LT 230 kV PASSO FUNDO /XANXERE ESU RS/SC LT 230 kV PASSO FUNDO /XANXERE ESU C-2 RS/SC RB FT LT 230 kV PASSO FUNDO /XANXERE ESU C-2 RS/SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,342,762.14
LT 230 kV PASSO FUNDO /XANXERE ESU RS/SC LT 230 kV PASSO FUNDO /XANXERE ESU C-1 RS/SC RB FT LT 230 kV PASSO FUNDO /XANXERE ESU C-1 RS/SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,128,404.13
LT 230 kV PATO BRANCO /XANXERE ESU PR/SC LT 230 kV PATO BRANCO /XANXERE ESU C-1 PR/SC RB FT LT 230 kV PATO BRANCO /XANXERE ESU C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,132,672.99
LT 230 kV PATO BRANCO /XANXERE ESU PR/SC LT 230 kV PATO BRANCO /XANXERE ESU C-1 PR/SC RB FT LT 230 kV PATO BRANCO /XANXERE ESU C-1 PR/SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,354,594.27
LT 230 kV PONTA GROSSA /PONTA G NORTE PR LT 230 kV PONTA GROSSA /PONTA G NORTE C-1 PR RB FT LT 230 kV PONTA GROSSA /PONTA G NORTE C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$227,672.96
LT 230 kV PONTA GROSSA /PONTA G NORTE PR LT 230 kV PONTA GROSSA /PONTA G NORTE C-1 PR RB FT LT 230 kV PONTA GROSSA /PONTA G NORTE C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$473,285.28
LT 230 kV PONTA GROSSA /PONTA G NORTE PR LT 230 kV PONTA GROSSA /PONTA G NORTE C-1 PR RB FT LT 230 kV PONTA GROSSA /PONTA G NORTE C-1 PR 057/2001 IPCA RBNI DSP 1281/2022 01/07/2022 30/06/2056  R$43,871.25
LT 230 kV POVO NOVO /QUINTA RS LT 230 kV POVO NOVO /QUINTA C-1 RS RB FT LT 230 kV POVO NOVO /QUINTA C-1 RS 004/2012 IPCA RBL CC 004/2012 09/12/2014 10/05/2042  R$964,116.23
LT 230 kV POVO NOVO /QUINTA RS LT 230 kV POVO NOVO /QUINTA C-1 RS RB FT LT 230 kV POVO NOVO /QUINTA C-1 RS 004/2012 IPCA RBNI DSP 1446/2022 30/09/2015 29/09/2049  R$31,423.97
LT 230 kV PRE.MEDICI /SANTA CRUZ 1 RS LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS RB FT LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS 004/2008 IPCA RBL CC 004/2008 17/03/2008 17/03/2038  R$ 7,213,516.01
LT 230 kV S. OSORIO /PATO BRANCO PR LT 230 kV S. OSORIO /PATO BRANCO C-1 PR RB FT LT 230 kV S. OSORIO /PATO BRANCO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,222,319.22
LT 230 kV S. OSORIO /PATO BRANCO PR LT 230 kV S. OSORIO /PATO BRANCO C-1 PR RB FT LT 230 kV S. OSORIO /PATO BRANCO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,540,950.35
LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-6 PR DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$5,694.32
LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-6 PR DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$11,837.32
LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-6 PR DIT   057/2001 IPCA RCDM REA 4347/2013 06/05/2019 05/05/2049  R$54,707.29
LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-5 PR DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$5,694.32
LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-5 PR DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$11,837.32
LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-5 PR DIT   057/2001 IPCA RCDM REA 4347/2013 06/05/2019 05/05/2049  R$54,707.29
LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-4 PR DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$5,548.31
LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-4 PR DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$11,533.80
LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-3 PR DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$5,548.31
LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-3 PR DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$11,533.80
LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-2 PR DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$5,402.30
LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-1 PR DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$5,402.30
LT 230 kV S. OSORIO /XANXERE ESU PR/SC LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC RB FT LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,305,188.76
LT 230 kV VILA MARIA /NOVA PRATA 2 RS LT 230 kV VILA MARIA /NOVA PRATA 2 C-1543 RS RB FT LT 230 kV VILA MARIA /NOVA PRATA 2 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,274,897.45
LT 230 kV VILA MARIA /NOVA PRATA 2 RS LT 230 kV VILA MARIA /NOVA PRATA 2 C-1543 RS RB FT LT 230 kV VILA MARIA /NOVA PRATA 2 C-1 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,650,249.67
LT 230 kV VILA MARIA /NOVA PRATA 2 RS LT 230 kV VILA MARIA /NOVA PRATA 2 C-1543 RS RB FT LT 230 kV VILA MARIA /NOVA PRATA 2 C-1 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,951,560.64
LT 230 kV VILA MARIA /NOVA PRATA 2 RS LT 230 kV VILA MARIA /NOVA PRATA 2 C-1543 RS RB FT LT 230 kV VILA MARIA /NOVA PRATA 2 C-1 RS 057/2001 IPCA RBNI REA 8795/2020 18/11/2022 18/11/2050  R$ 3,110,733.43
LT 230 kV VILA MARIA /NOVA PRATA 2 RS LT 230 kV VILA MARIA /NOVA PRATA 2 C-1543 RS RB FT LT 230 kV VILA MARIA /NOVA PRATA 2 C-1543 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,251,463.13
LT 230 kV VILA MARIA /NOVA PRATA 2 RS LT 230 kV VILA MARIA /NOVA PRATA 2 C-1543 RS RB FT LT 230 kV VILA MARIA /NOVA PRATA 2 C-1543 RS 057/2001 IPCA RBNI REA 3161/2011 05/12/2022 24/09/2050  R$281,111.55
LT 230 kV VILA MARIA /NOVA PRATA 2 RS LT 230 kV VILA MARIA /NOVA PRATA 2 C-1543 RS RB FT LT 230 kV VILA MARIA /NOVA PRATA 2 C-1543 RS 057/2001 IPCA RBNI REA 8795/2020 05/12/2022 05/12/2050  R$ 2,997,175.54
LT 230 kV VINHEDOS /GARIBALDI 1 RS LT 230 kV VINHEDOS /GARIBALDI 1 C-1 RS RB FT LT 230 kV VINHEDOS /GARIBALDI 1 C-1 RS 012/2010 IPCA RBL CC 012/2010 19/07/2013 06/10/2040  R$ 1,695,937.40
LT 230 kV VINHEDOS /GARIBALDI 1 RS LT 230 kV VINHEDOS /GARIBALDI 1 C-1 RS RB FT LT 230 kV VINHEDOS /GARIBALDI 1 C-1 RS 012/2010 IPCA RBNI DSP 1247/2022 01/07/2022 30/06/2057  R$32,605.57
LT 500 kV ABDON BATISTA /C.NOVOS SC LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC RB FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC 010/2005 IGPM RBL CC 010/2005 17/09/2006 04/03/2035  R$ 7,182,823.97
LT 500 kV ABDON BATISTA /C.NOVOS SC LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC RB FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 24/05/2041  R$139,943.56
LT 500 kV ABDON BATISTA /C.NOVOS SC LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC RB FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 24/05/2041  R$5,366.80
LT 500 kV ABDON BATISTA /C.NOVOS SC LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC RB FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC 010/2005 IGPM RBNI REA 5904/2016 01/07/2016 30/06/2044  R$63,400.72
LT 500 kV AREIA /BATEIAS PR LT 500 kV AREIA /BATEIAS C-1 PR RB FT LT 500 kV AREIA /BATEIAS C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 7,651,849.59
LT 500 kV AREIA /BATEIAS PR LT 500 kV AREIA /BATEIAS C-1 PR RB FT LT 500 kV AREIA /BATEIAS C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 15,906,622.02
LT 500 kV AREIA /BATEIAS PR LT 500 kV AREIA /BATEIAS C-1 PR RB FT LT 500 kV AREIA /BATEIAS C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 11,713,136.99
LT 500 kV AREIA /BENTO MUNHOZ PR LT 500 kV AREIA /BENTO MUNHOZ C-2 PR DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$454,317.71
LT 500 kV AREIA /BENTO MUNHOZ PR LT 500 kV AREIA /BENTO MUNHOZ C-2 PR DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$944,433.12
LT 500 kV AREIA /BENTO MUNHOZ PR LT 500 kV AREIA /BENTO MUNHOZ C-2 PR DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$695,450.89
LT 500 kV AREIA /BENTO MUNHOZ PR LT 500 kV AREIA /BENTO MUNHOZ C-2 PR DIT   057/2001 IPCA RMEL REA 7759/2019 27/05/2019 27/05/2050  R$23,721.48
LT 500 kV AREIA /BENTO MUNHOZ PR LT 500 kV AREIA /BENTO MUNHOZ C-1 PR DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$445,981.61
LT 500 kV AREIA /BENTO MUNHOZ PR LT 500 kV AREIA /BENTO MUNHOZ C-1 PR DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$927,104.07
LT 500 kV AREIA /C.NOVOS PR/SC LT 500 kV AREIA /C.NOVOS C-1 PR/SC RB FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 6,123,563.70
LT 500 kV AREIA /C.NOVOS PR/SC LT 500 kV AREIA /C.NOVOS C-1 PR/SC RB FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 12,729,629.87
LT 500 kV AREIA /C.NOVOS PR/SC LT 500 kV AREIA /C.NOVOS C-1 PR/SC RB FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 9,373,699.74
LT 500 kV AREIA /CURITIBA PR LT 500 kV AREIA /CURITIBA C-1 PR RB FT LT 500 kV AREIA /CURITIBA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 8,190,917.71
LT 500 kV AREIA /CURITIBA PR LT 500 kV AREIA /CURITIBA C-1 PR RB FT LT 500 kV AREIA /CURITIBA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 17,027,233.79
LT 500 kV AREIA /IVAIPORA PR LT 500 kV AREIA /IVAIPORA C-1 PR RB FT LT 500 kV AREIA /IVAIPORA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 6,015,889.01
LT 500 kV AREIA /IVAIPORA PR LT 500 kV AREIA /IVAIPORA C-1 PR RB FT LT 500 kV AREIA /IVAIPORA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 12,505,796.34
LT 500 kV AREIA /IVAIPORA PR LT 500 kV AREIA /IVAIPORA C-1 PR RB FT LT 500 kV AREIA /IVAIPORA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 9,208,875.75
LT 500 kV AREIA /SEGREDO PR LT 500 kV AREIA /SEGREDO C-1 PR RB FT LT 500 kV AREIA /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,007,611.92
LT 500 kV AREIA /SEGREDO PR LT 500 kV AREIA /SEGREDO C-1 PR RB FT LT 500 kV AREIA /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,173,412.40
LT 500 kV AREIA /SEGREDO PR LT 500 kV AREIA /SEGREDO C-1 PR RB FT LT 500 kV AREIA /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,073,169.85
LT 500 kV BIGUACU /ABDON BATISTA SC LT 500 kV BIGUACU /ABDON BATISTA C-1 SC RB FT LT 500 kV BIGUACU /ABDON BATISTA C-1 SC 010/2005 IGPM RBL CC 010/2005 17/09/2006 04/03/2035  R$ 41,193,495.46
LT 500 kV BIGUACU /ABDON BATISTA SC LT 500 kV BIGUACU /ABDON BATISTA C-1 SC RB FT LT 500 kV BIGUACU /ABDON BATISTA C-1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 24/05/2041  R$802,576.27
LT 500 kV BIGUACU /ABDON BATISTA SC LT 500 kV BIGUACU /ABDON BATISTA C-1 SC RB FT LT 500 kV BIGUACU /ABDON BATISTA C-1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 24/05/2041  R$30,778.61
LT 500 kV BIGUACU /ABDON BATISTA SC LT 500 kV BIGUACU /ABDON BATISTA C-1 SC RB FT LT 500 kV BIGUACU /ABDON BATISTA C-1 SC 010/2005 IGPM RBNI REA 5904/2016 01/07/2016 30/06/2044  R$64,477.12
LT 500 kV BIGUACU /BLUMENAU SC LT 500 kV BIGUACU /BLUMENAU C-1 SC RB FT LT 500 kV BIGUACU /BLUMENAU C-1 SC 010/2005 IGPM RBL CC 010/2005 17/09/2006 04/03/2035  R$ 15,587,925.15
LT 500 kV BIGUACU /BLUMENAU SC LT 500 kV BIGUACU /BLUMENAU C-1 SC RB FT LT 500 kV BIGUACU /BLUMENAU C-1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 24/05/2041  R$942,519.83
LT 500 kV BIGUACU /BLUMENAU SC LT 500 kV BIGUACU /BLUMENAU C-1 SC RB FT LT 500 kV BIGUACU /BLUMENAU C-1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 24/05/2041  R$36,145.41
LT 500 kV BLUMENAU /CURITIBA SC/PR LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR RB FT LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 4,713,372.63
LT 500 kV BLUMENAU /CURITIBA SC/PR LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR RB FT LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 9,798,132.58
LT 500 kV BLUMENAU /CURITIBA SC/PR LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR RB FT LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 7,215,037.18
LT 500 kV C.NOVOS /CAXIAS SC/RS LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS RB FT LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 7,061,375.50
LT 500 kV C.NOVOS /CAXIAS SC/RS LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS RB FT LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 14,679,147.78
LT 500 kV C.NOVOS /CAXIAS SC/RS LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS RB FT LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 10,809,263.51
LT 500 kV C.NOVOS /MACHADINHO SC LT 500 kV C.NOVOS /MACHADINHO C-1 SC RB FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,747,803.32
LT 500 kV C.NOVOS /MACHADINHO SC LT 500 kV C.NOVOS /MACHADINHO C-1 SC RB FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,633,323.74
LT 500 kV C.NOVOS /MACHADINHO SC LT 500 kV C.NOVOS /MACHADINHO C-1 SC RB FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,675,465.52
LT 500 kV CASCAVEL OEST /IVAIPORA PR LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR RB FT LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR 004/2004 IGPM RBL CC 004/2004 31/10/2005 18/02/2034  R$ 34,136,051.65
LT 500 kV CAXIAS /ITA RS/SC LT 500 kV CAXIAS /ITA C-1 RS/SC RB FT LT 500 kV CAXIAS /ITA C-1 RS/SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 8,891,845.19
LT 500 kV CURITIBA /BATEIAS PR LT 500 kV CURITIBA /BATEIAS C-1 PR RB FT LT 500 kV CURITIBA /BATEIAS C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,163,581.30
LT 500 kV CURITIBA /BATEIAS PR LT 500 kV CURITIBA /BATEIAS C-1 PR RB FT LT 500 kV CURITIBA /BATEIAS C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,418,846.29
LT 500 kV CURITIBA /BATEIAS PR LT 500 kV CURITIBA /BATEIAS C-1 PR RB FT LT 500 kV CURITIBA /BATEIAS C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,781,162.46
LT 500 kV ITA /MACHADINHO SC LT 500 kV ITA /MACHADINHO C-1 SC RB FT LT 500 kV ITA /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,747,441.23
LT 500 kV ITA /MACHADINHO SC LT 500 kV ITA /MACHADINHO C-1 SC RB FT LT 500 kV ITA /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,711,365.42
LT 500 kV ITA /MACHADINHO SC LT 500 kV ITA /MACHADINHO C-1 SC RB FT LT 500 kV ITA /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,205,670.16
LT 500 kV IVAIPORA /IVAIPORA PR LT 500 kV IVAIPORA /IVAIPORA C-3 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-3 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$34,316.96
LT 500 kV IVAIPORA /IVAIPORA PR LT 500 kV IVAIPORA /IVAIPORA C-2 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-2 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$34,316.96
LT 500 kV IVAIPORA /IVAIPORA PR LT 500 kV IVAIPORA /IVAIPORA C-2 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-2 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$71,337.91
LT 500 kV IVAIPORA /IVAIPORA PR LT 500 kV IVAIPORA /IVAIPORA C-2 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-2 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$52,531.00
LT 500 kV IVAIPORA /IVAIPORA PR LT 500 kV IVAIPORA /IVAIPORA C-1 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$35,671.58
LT 500 kV IVAIPORA /IVAIPORA PR LT 500 kV IVAIPORA /IVAIPORA C-1 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$74,153.88
LT 500 kV IVAIPORA /IVAIPORA PR LT 500 kV IVAIPORA /IVAIPORA C-1 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$54,604.59
LT 500 kV IVAIPORA /LONDRINA ESU PR LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 4,234,046.60
LT 500 kV IVAIPORA /LONDRINA ESU PR LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 8,801,712.32
LT 500 kV IVAIPORA /LONDRINA ESU PR LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 6,481,304.58
LT 500 kV IVAIPORA /S.SANTIAGO PR LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR 004/2004 IGPM RBL CC 004/2004 31/10/2005 18/02/2034  R$ 31,204,589.98
LT 500 kV IVAIPORA /S.SANTIAGO PR LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 5,750,175.67
LT 500 kV IVAIPORA /S.SANTIAGO PR LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 11,953,432.93
LT 500 kV IVAIPORA /S.SANTIAGO PR LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 8,802,132.68
LT 500 kV S.SANTIAGO /ITA PR/SC LT 500 kV S.SANTIAGO /ITA C-2 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-2 PR/SC 004/2012 IPCA RBL CC 004/2012 04/02/2014 10/05/2042  R$ 22,028,017.33
LT 500 kV S.SANTIAGO /ITA PR/SC LT 500 kV S.SANTIAGO /ITA C-1 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 6,488,268.29
LT 500 kV S.SANTIAGO /ITA PR/SC LT 500 kV S.SANTIAGO /ITA C-1 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 13,487,775.73
LT 500 kV S.SANTIAGO /ITA PR/SC LT 500 kV S.SANTIAGO /ITA C-1 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 9,931,974.54
LT 500 kV S.SANTIAGO /SEGREDO PR LT 500 kV S.SANTIAGO /SEGREDO C-1 PR RB FT LT 500 kV S.SANTIAGO /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,115,286.61
LT 500 kV S.SANTIAGO /SEGREDO PR LT 500 kV S.SANTIAGO /SEGREDO C-1 PR RB FT LT 500 kV S.SANTIAGO /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,397,245.94
LT 500 kV S.SANTIAGO /SEGREDO PR LT 500 kV S.SANTIAGO /SEGREDO C-1 PR RB FT LT 500 kV S.SANTIAGO /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,237,993.84
LT 500 kV S.SANTIAGO /U.S.SANTIAGO PR LT 500 kV S.SANTIAGO /U.S.SANTIAGO C-2 PR DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$29,801.57
LT 500 kV S.SANTIAGO /U.S.SANTIAGO PR LT 500 kV S.SANTIAGO /U.S.SANTIAGO C-2 PR DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$61,951.35
LT 500 kV S.SANTIAGO /U.S.SANTIAGO PR LT 500 kV S.SANTIAGO /U.S.SANTIAGO C-2 PR DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$45,619.03
LT 500 kV S.SANTIAGO /U.S.SANTIAGO PR LT 500 kV S.SANTIAGO /U.S.SANTIAGO C-1 PR DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,446.96
LT 500 kV S.SANTIAGO /U.S.SANTIAGO PR LT 500 kV S.SANTIAGO /U.S.SANTIAGO C-1 PR DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$59,135.38
LT 525 kV C.NOVOS /NOVA STA RITA SC/RS LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS 005/2006 IPCA RBL CC 005/2006 27/04/2006 27/04/2036  R$ 43,139,892.27
LT 525 kV CAXIAS /GRAVATAI RS LT 525 kV CAXIAS /GRAVATAI C-1 RS RB FT LT 525 kV CAXIAS /GRAVATAI C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,733,547.72
LT 525 kV CAXIAS /GRAVATAI RS LT 525 kV CAXIAS /GRAVATAI C-1 RS RB FT LT 525 kV CAXIAS /GRAVATAI C-1 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,682,483.67
LT 525 kV CAXIAS /GRAVATAI RS LT 525 kV CAXIAS /GRAVATAI C-1 RS RB FT LT 525 kV CAXIAS /GRAVATAI C-1 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,184,402.55
LT 525 kV GRAVATAI /NOVA STA RITA RS LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS RB FT LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,109,153.49
LT 525 kV GRAVATAI /NOVA STA RITA RS LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS RB FT LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,305,702.05
LT 525 kV GRAVATAI /NOVA STA RITA RS LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS RB FT LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,697,846.59
LT 525 kV GUAIBA 3 /POVO NOVO RS LT 525 kV GUAIBA 3 /POVO NOVO C-3134 RS RB FT LT 525 kV GUAIBA 3 /POVO NOVO C-1 RS 020/2012 IPCA RBL CC 020/2012 24/03/2015 27/08/2042  R$ 34,372,597.58
LT 525 kV ITA /NOVA STA RITA SC/RS LT 525 kV ITA /NOVA STA RITA C-2 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-2 SC/RS 004/2012 IPCA RBL CC 004/2012 06/08/2014 10/05/2042  R$ 35,360,765.89
LT 525 kV ITA /NOVA STA RITA SC/RS LT 525 kV ITA /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 10,934,190.88
LT 525 kV ITA /NOVA STA RITA SC/RS LT 525 kV ITA /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 22,729,934.68
LT 525 kV ITA /NOVA STA RITA SC/RS LT 525 kV ITA /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 16,737,610.19
LT 525 kV MARMELEIRO /STA V.PALMAR RS LT 525 kV MARMELEIRO /STA V.PALMAR C-1 RS RB FT LT 525 kV MARMELEIRO /STA V.PALMAR C-1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$ 7,399,257.42
LT 525 kV NOVA STA RITA /GUAIBA 3 RS LT 525 kV NOVA STA RITA /GUAIBA 3 C-3231 RS RB FT LT 525 kV NOVA STA RITA /GUAIBA 3 C-2 RS 020/2012 IPCA RBL CC 020/2012 24/03/2015 27/08/2042  R$ 5,611,852.66
LT 525 kV POVO NOVO /MARMELEIRO RS LT 525 kV POVO NOVO /MARMELEIRO C-1 RS RB FT LT 525 kV POVO NOVO /MARMELEIRO C-1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$ 23,139,284.11
MACAMBARA RTL 230 kV 30 Mvar MACAMBARA RT2 RS RB FT LT 230 kV MACAMBARA /SANTO ANGELO C-2 RS 007/2014 IPCA RBL CC 007/2014 06/12/2019 29/01/2044  R$437,812.51
MACAMBARA MC 230 kV RTL 230 kV 30 Mvar MACAMBARA RT2 RS  RB FT LT 230 kV MACAMBARA /SANTO ANGELO C-2 RS 007/2014 IPCA RBL CC 007/2014 06/12/2019 29/01/2044  R$178,389.09
MACAMBARA EL 230 kV MACAMBARA LT 230 kV MACAMBARA /SANTO ANGELO C-2 RS  RB FT LT 230 kV MACAMBARA /SANTO ANGELO C-2 RS 007/2014 IPCA RBL CC 007/2014 06/12/2019 29/01/2044  R$617,369.86
MACHADINHO MG 500 kV MACHADINHO MG1 SC RB FT MG 500 kV MACHADINHO MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$628,942.68
MARINGA EL 230 kV MARINGA LT 230 kV MARINGA /SARANDI C-1130 PR  RB FT LT 230 kV MARINGA /SARANDI C-1130 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
MARINGA EL 230 kV MARINGA LT 230 kV MARINGA /SARANDI C-1130 PR  RB FT LT 230 kV MARINGA /SARANDI C-1130 PR 057/2001 IPCA RMEL REN 643/2014 31/12/2016 30/12/2045  R$1,156.92
MARMELEIRO RTL 525 kV 33 Mvar MARMELEIRO RTR1 RS RB FT RTL 525 kV 33 Mvar MARMELEIRO RTR1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$613,568.94
MARMELEIRO RTL 525 kV 100 Mvar MARMELEIRO RT1 RS RB FT LT 525 kV POVO NOVO /MARMELEIRO C-1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$ 1,840,708.86
MARMELEIRO RTB 525 kV 100 Mvar MARMELEIRO RT2 RS RB FT RTB 525 kV 100 Mvar MARMELEIRO RT2 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$ 1,840,708.86
MARMELEIRO MG 525 kV MARMELEIRO MG1 RS RB FT MG 525 kV MARMELEIRO MG1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$ 1,963,427.54
MARMELEIRO MC 525 kV RTL 525 kV 100 Mvar MARMELEIRO RT1 RS  RB FT LT 525 kV POVO NOVO /MARMELEIRO C-1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$688,994.11
MARMELEIRO MC 525 kV RTB 525 kV 100 Mvar MARMELEIRO RT2 RS  RB FT RTB 525 kV 100 Mvar MARMELEIRO RT2 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$ 1,068,388.96
MARMELEIRO MC 525 kV CS 200/-200 Mvar MARMELEIRO CS1 RS  RB FT CS 200/-200 Mvar MARMELEIRO CS1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$ 4,199,795.65
MARMELEIRO IB 525 kV MG 525 kV MARMELEIRO MG1 RS IB2 RB FT MG 525 kV MARMELEIRO MG1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$ 1,213,324.04
MARMELEIRO IB 525 kV MG 525 kV MARMELEIRO MG1 RS IB1 RB FT MG 525 kV MARMELEIRO MG1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$ 1,213,324.04
MARMELEIRO EL 525 kV MARMELEIRO LT 525 kV POVO NOVO /MARMELEIRO C-1 RS  RB FT LT 525 kV POVO NOVO /MARMELEIRO C-1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$ 1,288,783.90
MARMELEIRO EL 525 kV MARMELEIRO LT 525 kV MARMELEIRO /STA V.PALMAR C-1 RS  RB FT LT 525 kV MARMELEIRO /STA V.PALMAR C-1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$ 1,288,783.90
MARMELEIRO CS 200/-200 Mvar MARMELEIRO CS1 RS RB FT CS 200/-200 Mvar MARMELEIRO CS1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$ 14,763,392.61
MISSOES TR 230/69 kV MISSOES TR3 RS RBF FT TR 230/69 kV MISSOES TR3 RS 005/2009 IPCA RBL CC 005/2009 19/06/2010 28/01/2039  R$490,467.63
MISSOES TR 230/69 kV MISSOES TR2 RS RBF FT TR 230/69 kV MISSOES TR2 RS 005/2009 IPCA RBL CC 005/2009 19/06/2010 28/01/2039  R$490,467.63
MISSOES TR 230/69 kV MISSOES TR1 RS RBF FT TR 230/69 kV MISSOES TR1 RS 005/2009 IPCA RBL CC 005/2009 28/01/2009 28/01/2039  R$744,505.24
MISSOES MG 230 kV MISSOES MG1 RS RB FT MG 230 kV MISSOES MG1 RS 005/2009 IPCA RBL CC 005/2009 19/06/2010 28/01/2039  R$ 3,124,107.72
MISSOES MG 230 kV MISSOES MG1 RS RB FT MG 230 kV MISSOES MG1 RS 005/2009 IPCA RBL CC 005/2009 28/01/2009 28/01/2039  R$137,485.09
MISSOES MG 230 kV MISSOES MG1 RS RB FT MG 230 kV MISSOES MG1 RS 005/2009 IPCA RMEL REN 643/2014 25/11/2015 24/11/2047  R$ 449.32
MISSOES MG 230 kV MISSOES MG1 RS RB FT MG 230 kV MISSOES MG1 RS 005/2009 IPCA RMEL REN 643/2014 25/11/2015 24/11/2047  R$ 449.32
MISSOES MG 230 kV MISSOES MG1 RS RB FT MG 230 kV MISSOES MG1 RS 005/2009 IPCA RBNI REA 5861/2016 10/05/2019 09/05/2036  R$26,522.92
MISSOES MG 230 kV MISSOES MG1 RS RB FT MG 230 kV MISSOES MG1 RS 005/2009 IPCA RBNI REN 1020/2022 06/02/2023 05/02/2054  R$38,471.41
MISSOES MC 69 kV TR 230/69 kV MISSOES TR3 RS RBF FT TR 230/69 kV MISSOES TR3 RS 005/2009 IPCA RBL CC 005/2009 19/06/2010 28/01/2039  R$90,731.93
MISSOES MC 69 kV TR 230/69 kV MISSOES TR2 RS RBF FT TR 230/69 kV MISSOES TR2 RS 005/2009 IPCA RBL CC 005/2009 19/06/2010 28/01/2039  R$90,731.93
MISSOES MC 69 kV TR 230/69 kV MISSOES TR1 RS RBF FT TR 230/69 kV MISSOES TR1 RS 005/2009 IPCA RBL CC 005/2009 28/01/2009 28/01/2039  R$89,692.62
MISSOES MC 230 kV TR 230/69 kV MISSOES TR3 RS RBF FT TR 230/69 kV MISSOES TR3 RS 005/2009 IPCA RBL CC 005/2009 19/06/2010 28/01/2039  R$496,451.41
MISSOES MC 230 kV TR 230/69 kV MISSOES TR3 RS RBF FT TR 230/69 kV MISSOES TR3 RS 005/2009 IPCA RMEL REN 643/2014 25/11/2015 24/11/2047  R$ 449.32
MISSOES MC 230 kV TR 230/69 kV MISSOES TR2 RS RBF FT TR 230/69 kV MISSOES TR2 RS 005/2009 IPCA RBL CC 005/2009 19/06/2010 28/01/2039  R$496,451.41
MISSOES MC 230 kV TR 230/69 kV MISSOES TR2 RS RBF FT TR 230/69 kV MISSOES TR2 RS 005/2009 IPCA RMEL REN 643/2014 25/11/2015 24/11/2047  R$ 449.32
MISSOES MC 230 kV TR 230/69 kV MISSOES TR1 RS RBF FT TR 230/69 kV MISSOES TR1 RS 005/2009 IPCA RBL CC 005/2009 28/01/2009 28/01/2039  R$225,146.79
MISSOES MC 230 kV TR 230/69 kV MISSOES TR1 RS RBF FT TR 230/69 kV MISSOES TR1 RS 005/2009 IPCA RMEL REN 643/2014 25/11/2015 24/11/2047  R$ 449.32
MISSOES IB 69 kV MG 230 kV MISSOES MG1 RS IB1 DIT   005/2009 IPCA RPEC CC 005/2009 19/06/2010 28/01/2039  R$54,335.24
MISSOES IB 230 kV MG 230 kV MISSOES MG1 RS IB1 RB FT MG 230 kV MISSOES MG1 RS 005/2009 IPCA RBL CC 005/2009 19/06/2010 28/01/2039  R$274,510.55
MISSOES EL 69 kV MISSOESDIST2 DIT   005/2009 IPCA RCDM REN 1020/2022 06/02/2023 05/02/2051  R$524,783.41
MISSOES EL 69 kV MISSOESDIST1 DIT   005/2009 IPCA RPEC CC 005/2009 19/06/2010 28/01/2039  R$45,686.01
MONTE CLARO IB 230 kV MG 230 kV MONTE CLARO MG1 RS IB1 RB FT MG 230 kV MONTE CLARO MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$90,304.02
MONTE CLARO EL 230 kV MONTE CLARO LT 230 kV MONTE CLARO /VINHEDOS C-1 RS  RB FT LT 230 kV MONTE CLARO /VINHEDOS C-1 RS 012/2010 IPCA RBL CC 012/2010 19/07/2013 06/10/2040  R$788,644.44
MONTE CLARO EL 230 kV MONTE CLARO LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS  RB FT LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS 057/2001 IPCA RBNI REA 3161/2011 25/09/2015 24/09/2043  R$28,758.21
MONTE CLARO EL 230 kV MONTE CLARO LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS  RB FT LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
MONTE CLARO EL 230 kV MONTE CLARO LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS  RB FT LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
N. PETROPOLIS 2 TR 230/69 kV N. PETROPOLIS 2 TR2 RS RBF FT TR 230/69 kV N. PETROPOLIS 2 TR2 RS 011/2010 IPCA RBNI REA 6042/2016 22/09/2018 22/09/2052  R$ 1,397,072.62
N. PETROPOLIS 2 TR 230/69 kV N. PETROPOLIS 2 TR1 RS RBF FT TR 230/69 kV N. PETROPOLIS 2 TR1 RS 011/2010 IPCA RBL CC 011/2010 06/10/2010 06/10/2040  R$ 1,091,876.99
N. PETROPOLIS 2 MG 230 kV N. PETROPOLIS 2 MG1 RS RB FT MG 230 kV N. PETROPOLIS 2 MG1 RS 011/2010 IPCA RBL CC 011/2010 06/10/2010 06/10/2040  R$ 1,318,111.25
N. PETROPOLIS 2 MG 230 kV N. PETROPOLIS 2 MG1 RS RB FT MG 230 kV N. PETROPOLIS 2 MG1 RS 011/2010 IPCA RBNI REA 6042/2016 22/09/2018 22/09/2049  R$192,755.64
N. PETROPOLIS 2 MC 69 kV TR 230/69 kV N. PETROPOLIS 2 TR2 RS RBF FT TR 230/69 kV N. PETROPOLIS 2 TR2 RS 011/2010 IPCA RBNI REA 6042/2016 22/09/2018 22/09/2040  R$406,399.77
N. PETROPOLIS 2 MC 69 kV TR 230/69 kV N. PETROPOLIS 2 TR1 RS RBF FT TR 230/69 kV N. PETROPOLIS 2 TR1 RS 011/2010 IPCA RBL CC 011/2010 06/10/2010 06/10/2040  R$176,630.46
N. PETROPOLIS 2 MC 230 kV TR 230/69 kV N. PETROPOLIS 2 TR2 RS RBF FT TR 230/69 kV N. PETROPOLIS 2 TR2 RS 011/2010 IPCA RBNI REA 6042/2016 22/09/2018 22/09/2041  R$ 1,067,993.96
N. PETROPOLIS 2 MC 230 kV TR 230/69 kV N. PETROPOLIS 2 TR1 RS RBF FT TR 230/69 kV N. PETROPOLIS 2 TR1 RS 011/2010 IPCA RBL CC 011/2010 06/10/2010 06/10/2040  R$444,126.34
N. PETROPOLIS 2 IB 69 kV MG 230 kV N. PETROPOLIS 2 MG1 RS IB1 DIT   011/2010 IPCA RPEC CC 011/2010 06/10/2010 06/10/2040  R$78,584.78
N. PETROPOLIS 2 IB 230 kV MG 230 kV N. PETROPOLIS 2 MG1 RS IB1 RB FT MG 230 kV N. PETROPOLIS 2 MG1 RS 011/2010 IPCA RBL CC 011/2010 06/10/2010 06/10/2040  R$327,856.07
N. PETROPOLIS 2 EL 69 kV N. PETROPOLIS 2DIST2 DIT   011/2010 IPCA RPEC CC 011/2010 06/10/2010 06/10/2040  R$137,505.13
N. PETROPOLIS 2 EL 69 kV N. PETROPOLIS 2DIST1 DIT   011/2010 IPCA RPEC CC 011/2010 06/10/2010 06/10/2040  R$137,505.13
NOVA ANDRADINA MG 138 kV NOVA ANDRADINA MG1 MS DIT   057/2001 IPCA RCDM REA 4543/2014 20/07/2016 19/07/2042  R$310,212.06
NOVA ANDRADINA EL 138 kV NOVA ANDRADINA LT 138 kV NOVA ANDRADINA /PORTO PRIMAVERA C-1 MS/SP DIT   057/2001 IPCA RCDM REA 4543/2014 20/07/2016 19/07/2045  R$777,228.76
NOVA ANDRADINA EL 138 kV NOVA ANDRADINA LT 138 kV IVINHEMA 2 /NOVA ANDRADINA C-1 MS DIT   057/2001 IPCA RCDM REA 4543/2014 20/07/2016 19/07/2046  R$758,312.13
NOVA PRATA 2 MG 230 kV NOVA PRATA 2 MG2 RS RB FT MG 230 kV NOVA PRATA 2 MG2 RS 057/2001 IPCA RBNI REA 3161/2011 25/09/2015 24/09/2041  R$243,066.28
NOVA PRATA 2 EL 230 kV NOVA PRATA 2 LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-2 RS  RB FT LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-2 RS 057/2001 IPCA RBNI REA 3161/2011 25/09/2015 24/09/2045  R$ 1,180,814.43
NOVA PRATA 2 EL 230 kV NOVA PRATA 2 LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS  RB FT LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS 057/2001 IPCA RBNI REA 3161/2011 25/09/2015 24/09/2045  R$ 1,180,814.43
NOVA STA RITA TR 525/230 kV NOVA STA RITA TRR1 RS RB FT TR 525/230 kV NOVA STA RITA TRR1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$502,776.61
NOVA STA RITA TR 525/230 kV NOVA STA RITA TR4 RS RB FT TR 525/230 kV NOVA STA RITA TR4 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,508,329.83
NOVA STA RITA TR 525/230 kV NOVA STA RITA TR4 RS RB FT TR 525/230 kV NOVA STA RITA TR4 RS 057/2001 IPCA RMEL REN 443/2011 29/07/2015 28/07/2050  R$ 189.09
NOVA STA RITA TR 525/230 kV NOVA STA RITA TR3 RS RB FT TR 525/230 kV NOVA STA RITA TR3 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,508,329.83
NOVA STA RITA TR 525/230 kV NOVA STA RITA TR3 RS RB FT TR 525/230 kV NOVA STA RITA TR3 RS 057/2001 IPCA RMEL REN 443/2011 05/06/2016 04/06/2051  R$ 238.61
NOVA STA RITA TR 525/230 kV NOVA STA RITA TR2 RS RB FT TR 525/230 kV NOVA STA RITA TR2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,508,329.83
NOVA STA RITA TR 525/230 kV NOVA STA RITA TR2 RS RB FT TR 525/230 kV NOVA STA RITA TR2 RS 057/2001 IPCA RMEL REN 443/2011 16/06/2017 15/06/2052  R$ 198.01
NOVA STA RITA TR 525/230 kV NOVA STA RITA TR1 RS RB FT TR 525/230 kV NOVA STA RITA TR1 RS 057/2001 IPCA RBNI REA 3339/2012 22/12/2013 21/12/2048  R$ 5,313,043.97
NOVA STA RITA TR 525/230 kV NOVA STA RITA TR1 RS RB FT TR 525/230 kV NOVA STA RITA TR1 RS 057/2001 IPCA RMEL REN 443/2011 03/09/2015 02/09/2050  R$ 9.09
NOVA STA RITA RTL 525 kV 50 Mvar NOVA STA RITA RTR4 RS RB FT RTL 525 kV 50 Mvar NOVA STA RITA RTR4 RS 020/2012 IPCA RBL CC 020/2012 24/03/2015 27/08/2042  R$704,056.70
NOVA STA RITA RTL 525 kV 50 Mvar NOVA STA RITA RTR3 RS RB FT RTL 525 kV 50 Mvar NOVA STA RITA RTR3 RS 004/2012 IPCA RBL CC 004/2012 06/08/2014 10/05/2042  R$634,352.14
NOVA STA RITA RTL 525 kV 50 Mvar NOVA STA RITA RTR2 RS RB FT RTL 525 kV 50 Mvar NOVA STA RITA RTR2 RS 005/2006 IPCA RBL CC 005/2006 27/04/2006 27/04/2036  R$762,382.40
NOVA STA RITA RTL 525 kV 150 Mvar NOVA STA RITA RT4 RS RB FT LT 525 kV NOVA STA RITA /POVO NOVO C-1 RS 020/2012 IPCA RBL CC 020/2012 24/03/2015 27/08/2042  R$ 2,112,170.10
NOVA STA RITA RTL 525 kV 150 Mvar NOVA STA RITA RT3 RS RB FT RTL 525 kV 150 Mvar NOVA STA RITA RT3 RS 004/2012 IPCA RBL CC 004/2012 06/08/2014 10/05/2042  R$ 1,903,054.80
NOVA STA RITA RTL 525 kV 150 Mvar NOVA STA RITA RT2 RS RB FT RTL 525 kV 150 Mvar NOVA STA RITA RT2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$603,333.01
NOVA STA RITA RTL 525 kV 150 Mvar NOVA STA RITA RT2 RS RB FT RTL 525 kV 150 Mvar NOVA STA RITA RT2 RS 057/2001 IPCA RMEL REN 443/2011 29/10/2015 28/10/2051  R$ 79.53
NOVA STA RITA RTL 525 kV 150 Mvar NOVA STA RITA RT1 RS RB FT RTL 525 kV 150 Mvar NOVA STA RITA RT1 RS 005/2006 IPCA RBL CC 005/2006 27/04/2006 27/04/2036  R$ 2,287,149.90
NOVA STA RITA RTL 525 kV 150 Mvar NOVA STA RITA RT1 RS RB FT RTL 525 kV 150 Mvar NOVA STA RITA RT1 RS 005/2006 IPCA RMEL REN 443/2011 14/06/2017 13/06/2053  R$ 717.80
NOVA STA RITA MG 525 kV NOVA STA RITA MG1 RS RB FT MG 525 kV NOVA STA RITA MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,348,993.33
NOVA STA RITA MG 525 kV NOVA STA RITA MG1 RS RB FT MG 525 kV NOVA STA RITA MG1 RS 057/2001 IPCA RMEL REN 643/2014 05/10/2014 04/10/2031  R$25,736.83
NOVA STA RITA MG 525 kV NOVA STA RITA MG1 RS RB FT MG 525 kV NOVA STA RITA MG1 RS 057/2001 IPCA RMEL REN 643/2014 15/06/2014 14/06/2031  R$25,676.05
NOVA STA RITA MG 525 kV NOVA STA RITA MG1 RS RB FT MG 525 kV NOVA STA RITA MG1 RS 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$13,243.51
NOVA STA RITA MG 525 kV NOVA STA RITA MG1 RS RB FT MG 525 kV NOVA STA RITA MG1 RS 057/2001 IPCA RBNI DSP 386/2021 17/02/2021 16/02/2036  R$39,616.11
NOVA STA RITA MC 525 kV TR 525/230 kV NOVA STA RITA TR4 RS  RB FT TR 525/230 kV NOVA STA RITA TR4 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$323,135.88
NOVA STA RITA MC 525 kV TR 525/230 kV NOVA STA RITA TR3 RS  RB FT TR 525/230 kV NOVA STA RITA TR3 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$323,135.88
NOVA STA RITA MC 525 kV TR 525/230 kV NOVA STA RITA TR2 RS  RB FT TR 525/230 kV NOVA STA RITA TR2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$323,135.88
NOVA STA RITA MC 525 kV TR 525/230 kV NOVA STA RITA TR1 RS  RB FT TR 525/230 kV NOVA STA RITA TR1 RS 057/2001 IPCA RBNI REA 3339/2012 22/12/2013 21/12/2044  R$ 1,634,069.83
NOVA STA RITA MC 525 kV RTL 525 kV 150 Mvar NOVA STA RITA RT4 RS  RB FT LT 525 kV NOVA STA RITA /POVO NOVO C-1 RS 020/2012 IPCA RBL CC 020/2012 24/03/2015 27/08/2042  R$688,994.11
NOVA STA RITA MC 525 kV RTL 525 kV 150 Mvar NOVA STA RITA RT3 RS  RB FT RTL 525 kV 150 Mvar NOVA STA RITA RT3 RS 004/2012 IPCA RBL CC 004/2012 06/08/2014 10/05/2042  R$614,553.04
NOVA STA RITA MC 525 kV RTL 525 kV 150 Mvar NOVA STA RITA RT2 RS  RB FT RTL 525 kV 150 Mvar NOVA STA RITA RT2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$195,769.91
NOVA STA RITA MC 525 kV RTL 525 kV 150 Mvar NOVA STA RITA RT1 RS  RB FT RTL 525 kV 150 Mvar NOVA STA RITA RT1 RS 005/2006 IPCA RBL CC 005/2006 27/04/2006 27/04/2036  R$ 1,500,999.99
NOVA STA RITA MC 230 kV TR 525/230 kV NOVA STA RITA TR4 RS  RB FT TR 525/230 kV NOVA STA RITA TR4 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
NOVA STA RITA MC 230 kV TR 525/230 kV NOVA STA RITA TR3 RS  RB FT TR 525/230 kV NOVA STA RITA TR3 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
NOVA STA RITA MC 230 kV TR 525/230 kV NOVA STA RITA TR2 RS  RB FT TR 525/230 kV NOVA STA RITA TR2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
NOVA STA RITA MC 230 kV TR 525/230 kV NOVA STA RITA TR1 RS  RB FT TR 525/230 kV NOVA STA RITA TR1 RS 057/2001 IPCA RBNI REA 3339/2012 22/12/2013 21/12/2043  R$ 1,017,585.05
NOVA STA RITA IB 525 kV MG 525 kV NOVA STA RITA MG2 RS IB7 RB FT MG 525 kV NOVA STA RITA MG2 RS 020/2012 IPCA RBL CC 020/2012 24/03/2015 27/08/2042  R$ 1,213,324.04
NOVA STA RITA IB 525 kV MG 525 kV NOVA STA RITA MG1 RS IB6 RB FT MG 525 kV NOVA STA RITA MG1 RS 057/2001 IPCA RBNI REA 3339/2012 22/12/2013 21/12/2044  R$ 1,528,709.96
NOVA STA RITA IB 525 kV MG 525 kV NOVA STA RITA MG1 RS IB4 RB FT MG 525 kV NOVA STA RITA MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
NOVA STA RITA IB 525 kV MG 525 kV NOVA STA RITA MG1 RS IB3 RB FT MG 525 kV NOVA STA RITA MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
NOVA STA RITA IB 525 kV MG 525 kV NOVA STA RITA MG1 RS IB2 RB FT MG 525 kV NOVA STA RITA MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
NOVA STA RITA IB 525 kV MG 525 kV NOVA STA RITA MG1 RS IB1 RB FT MG 525 kV NOVA STA RITA MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
NOVA STA RITA IB 230 kV MG 525 kV NOVA STA RITA MG1 RS IB5 RB FT MG 525 kV NOVA STA RITA MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$103,749.99
NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV NOVA STA RITA /POVO NOVO C-1 RS  RB FT LT 525 kV NOVA STA RITA /POVO NOVO C-1 RS 020/2012 IPCA RBL CC 020/2012 24/03/2015 27/08/2042  R$ 1,288,783.90
NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV ITA /NOVA STA RITA C-2 SC/RS  RB FT LT 525 kV ITA /NOVA STA RITA C-2 SC/RS 004/2012 IPCA RBL CC 004/2012 06/08/2014 10/05/2042  R$ 1,148,849.81
NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV ITA /NOVA STA RITA C-2 SC/RS  RB FT LT 525 kV ITA /NOVA STA RITA C-2 SC/RS 004/2012 IPCA RBNI REA 5861/2016 26/04/2020 25/04/2034  R$29,579.70
NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV ITA /NOVA STA RITA C-2 SC/RS  RB FT LT 525 kV ITA /NOVA STA RITA C-2 SC/RS 004/2012 IPCA RBNI REA 8314/2019 26/04/2020 25/04/2034  R$29,579.70
NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV ITA /NOVA STA RITA C-1 SC/RS  RB FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV ITA /NOVA STA RITA C-1 SC/RS  RB FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS 057/2001 IPCA RMEL REN 443/2011 08/10/2016 07/10/2043  R$ 509.87
NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV ITA /NOVA STA RITA C-1 SC/RS  RB FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$13,243.51
NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS  RB FT LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS  RB FT LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS 057/2001 IPCA RMEL REN 443/2011 22/05/2016 21/05/2043  R$ 416.54
NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS  RB FT LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$13,243.51
NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS  RB FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS 005/2006 IPCA RBL CC 005/2006 27/04/2006 27/04/2036  R$ 1,837,925.64
NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS  RB FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS 005/2006 IPCA RMEL REN 443/2011 30/08/2015 29/08/2042  R$ 599.89
NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS  RB FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS 005/2006 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$11,208.11
NOVA STA RITA EL 230 kV NOVA STA RITA LT 230 kV CAMAQUA 3 /NOVA STA RITA C-1 RS RB FT LT 230 kV CAMAQUA 3 /NOVA STA RITA C-1 RS 004/2012 IPCA RBL CC 004/2012 09/12/2014 10/05/2042  R$532,318.31
OSORIO 2 MG 230 kV OSORIO 2 MG2 RS RB FT MG 230 kV OSORIO 2 MG2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$267,760.68
OSORIO 2 MG 230 kV OSORIO 2 MG2 RS RB FT MG 230 kV OSORIO 2 MG2 RS 057/2001 IPCA RBNI REA 5861/2016 07/05/2019 06/05/2036  R$26,137.74
OSORIO 2 EL 230 kV OSORIO 2 LT 230 kV ATLANTIDA 2 /OSORIO 2 C-1 RS  RB FT LT 230 kV ATLANTIDA 2 /OSORIO 2 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
PALHOCA ESU TR 230/138 kV PALHOCA ESU TR4 SC RBF FT TR 230/138 kV PALHOCA ESU TR4 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$340,018.74
PALHOCA ESU TR 230/138 kV PALHOCA ESU TR4 SC RBF FT TR 230/138 kV PALHOCA ESU TR4 SC 057/2001 IPCA RBNI REA 7529/2018 03/12/2021 03/12/2036  R$5,177.15
PALHOCA ESU TR 230/138 kV PALHOCA ESU TR3 SC RBF FT TR 230/138 kV PALHOCA ESU TR3 SC 057/2001 IPCA RBNI REA 7529/2018 20/11/2021 20/11/2056  R$ 1,693,875.72
PALHOCA ESU TR 230/138 kV PALHOCA ESU TR2 SC RBF FT TR 230/138 kV PALHOCA ESU TR2 SC 057/2001 IPCA RBNI REA 7529/2018 02/10/2021 02/10/2056  R$ 1,693,875.72
PALHOCA ESU TR 230/138 kV PALHOCA ESU TR1 SC RBF FT TR 230/138 kV PALHOCA ESU TR1 SC 057/2001 IPCA RBNI REA 7529/2018 28/07/2021 28/07/2056  R$ 1,693,875.72
PALHOCA ESU MG 230 kV PALHOCA ESU MG1 SC RB FT MG 230 kV PALHOCA ESU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$522,760.88
PALHOCA ESU MG 230 kV PALHOCA ESU MG1 SC RB FT MG 230 kV PALHOCA ESU MG1 SC 057/2001 IPCA RMEL REN 643/2014 11/04/2013 10/04/2030  R$11,069.23
PALHOCA ESU MG 230 kV PALHOCA ESU MG1 SC RB FT MG 230 kV PALHOCA ESU MG1 SC 057/2001 IPCA RMEL REN 643/2014 15/09/2014 14/09/2031  R$11,901.42
PALHOCA ESU MG 230 kV PALHOCA ESU MG1 SC RB FT MG 230 kV PALHOCA ESU MG1 SC 057/2001 IPCA RBNI DSP 4033/2021 22/12/2021 21/12/2036  R$5,542.14
PALHOCA ESU MC 230 kV TR 230/138 kV PALHOCA ESU TR4 SC  RBF FT TR 230/138 kV PALHOCA ESU TR4 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
PALHOCA ESU MC 230 kV TR 230/138 kV PALHOCA ESU TR3 SC RBF FT TR 230/138 kV PALHOCA ESU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
PALHOCA ESU MC 230 kV TR 230/138 kV PALHOCA ESU TR3 SC RBF FT TR 230/138 kV PALHOCA ESU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$249,073.03
PALHOCA ESU MC 230 kV TR 230/138 kV PALHOCA ESU TR3 SC RBF FT TR 230/138 kV PALHOCA ESU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$183,409.56
PALHOCA ESU MC 230 kV TR 230/138 kV PALHOCA ESU TR3 SC RBF FT TR 230/138 kV PALHOCA ESU TR3 SC 057/2001 IPCA RBNI REA 7529/2018 20/11/2021 20/11/2041  R$320,260.29
PALHOCA ESU MC 230 kV TR 230/138 kV PALHOCA ESU TR2 SC RBF FT TR 230/138 kV PALHOCA ESU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
PALHOCA ESU MC 230 kV TR 230/138 kV PALHOCA ESU TR2 SC RBF FT TR 230/138 kV PALHOCA ESU TR2 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$249,073.03
PALHOCA ESU MC 230 kV TR 230/138 kV PALHOCA ESU TR2 SC RBF FT TR 230/138 kV PALHOCA ESU TR2 SC 057/2001 IPCA RBNI REA 7529/2018 02/10/2021 02/10/2042  R$387,162.75
PALHOCA ESU MC 230 kV TR 230/138 kV PALHOCA ESU TR1 SC RBF FT TR 230/138 kV PALHOCA ESU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
PALHOCA ESU MC 230 kV TR 230/138 kV PALHOCA ESU TR1 SC RBF FT TR 230/138 kV PALHOCA ESU TR1 SC 057/2001 IPCA RBNI REA 5484/2015 28/10/2015 27/10/2043  R$20,391.81
PALHOCA ESU MC 230 kV TR 230/138 kV PALHOCA ESU TR1 SC RBF FT TR 230/138 kV PALHOCA ESU TR1 SC 057/2001 IPCA RBNI REA 7529/2018 28/07/2021 28/07/2051  R$188,597.82
PALHOCA ESU MC 230 kV BC 230 kV 50 Mvar PALHOCA ESU BC1 SC  RB FT BC 230 kV 50 Mvar PALHOCA ESU BC1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$135,865.08
PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR4 SC  RBF FT TR 230/138 kV PALHOCA ESU TR4 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$87,609.97
PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR3 SC RBF FT TR 230/138 kV PALHOCA ESU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$87,609.97
PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR3 SC RBF FT TR 230/138 kV PALHOCA ESU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$182,123.12
PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR3 SC RBF FT TR 230/138 kV PALHOCA ESU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$134,109.75
PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR3 SC RBF FT TR 230/138 kV PALHOCA ESU TR3 SC 057/2001 IPCA RBNI REA 7529/2018 20/11/2021 20/11/2053  R$112,805.37
PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR2 SC RBF FT TR 230/138 kV PALHOCA ESU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$87,609.97
PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR2 SC RBF FT TR 230/138 kV PALHOCA ESU TR2 SC 057/2001 IPCA RMEL REN 643/2014 09/10/2013 08/10/2036  R$12,665.20
PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR2 SC RBF FT TR 230/138 kV PALHOCA ESU TR2 SC 057/2001 IPCA RBNI REA 5484/2015 08/08/2017 07/08/2047  R$34,938.11
PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR2 SC RBF FT TR 230/138 kV PALHOCA ESU TR2 SC 057/2001 IPCA RBNI REA 7529/2018 02/10/2021 02/10/2055  R$71,636.34
PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR1 SC RBF FT TR 230/138 kV PALHOCA ESU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$87,609.97
PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR1 SC RBF FT TR 230/138 kV PALHOCA ESU TR1 SC 057/2001 IPCA RBNI REA 5484/2015 08/08/2017 07/08/2047  R$34,938.11
PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR1 SC RBF FT TR 230/138 kV PALHOCA ESU TR1 SC 057/2001 IPCA RBNI REA 5484/2015 28/10/2015 27/10/2043  R$20,467.27
PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR1 SC RBF FT TR 230/138 kV PALHOCA ESU TR1 SC 057/2001 IPCA RBNI REA 7529/2018 28/07/2021 28/07/2054  R$59,054.77
PALHOCA ESU IB 230 kV MG 230 kV PALHOCA ESU MG1 SC IB1 RB FT MG 230 kV PALHOCA ESU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$103,749.99
PALHOCA ESU IB 230 kV MG 230 kV PALHOCA ESU MG1 SC IB1 RB FT MG 230 kV PALHOCA ESU MG1 SC 057/2001 IPCA RBNI REA 7529/2018 16/12/2021 16/12/2052  R$77,060.16
PALHOCA ESU IB 138 kV MG 230 kV PALHOCA ESU MG1 SC IB1 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$67,687.04
PALHOCA ESU IB 138 kV MG 230 kV PALHOCA ESU MG1 SC IB1 DIT   057/2001 IPCA RCDM REA 7529/2018 03/12/2021 03/12/2054  R$69,458.41
PALHOCA ESU EL 230 kV PALHOCA ESU LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC  RB FT LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
PALHOCA ESU EL 230 kV PALHOCA ESU LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC  RB FT LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
PALHOCA ESU EL 230 kV PALHOCA ESU LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC  RB FT LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC 057/2001 IPCA RMEL REN 643/2014 09/10/2013 08/10/2036  R$20,576.62
PALHOCA ESU EL 230 kV PALHOCA ESU LT 230 kV BIGUACU /PALHOCA ESU C-1 SC  RB FT LT 230 kV BIGUACU /PALHOCA ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
PALHOCA ESU EL 138 kV PALHOCA ESU LT 138 kV TRINDADE (DIST) /PALHOCA ESU C-1 SC  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,634.74
PALHOCA ESU EL 138 kV PALHOCA ESU LT 138 kV TRINDADE (DIST) /PALHOCA ESU C-1 SC  DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$271,562.76
PALHOCA ESU EL 138 kV PALHOCA ESU LT 138 kV PALHOCA ESU /J.LACERDA-A C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,634.74
PALHOCA ESU EL 138 kV PALHOCA ESU LT 138 kV PALHOCA CSC /PALHOCA ESU C-1 SC  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,634.74
PALHOCA ESU EL 138 kV PALHOCA ESU LT 138 kV PAL.PINHEIRA /PALHOCA ESU C-1 SC  DIT   057/2001 IPCA RCDM REA 2879/2011 06/02/2016 05/02/2044  R$29,384.53
PALHOCA ESU EL 138 kV PALHOCA ESU LT 138 kV PAL.PINHEIRA /PALHOCA ESU C-1 SC  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,634.74
PALHOCA ESU EL 138 kV PALHOCA ESU LT 138 kV ILHA CENTRO /PALHOCA ESU C-1 SC  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,634.74
PALHOCA ESU EL 138 kV PALHOCA ESU LT 138 kV ILHA CENTRO /PALHOCA ESU C-1 SC  DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$271,562.76
PALHOCA ESU EL 138 kV PALHOCA ESU LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-2 SC  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,634.74
PALHOCA ESU EL 138 kV PALHOCA ESU LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-2 SC  DIT   057/2001 IPCA RMEL REN 643/2014 28/08/2013 27/08/2036  R$11,542.87
PALHOCA ESU EL 138 kV PALHOCA ESU LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-1 SC  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,634.74
PALHOCA ESU EL 138 kV PALHOCA ESUSJS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,634.74
PALHOCA ESU EL 138 kV PALHOCA ESUDIST1 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,634.74
PALHOCA ESU BC 230 kV 50 Mvar PALHOCA ESU BC1 SC RB FT BC 230 kV 50 Mvar PALHOCA ESU BC1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$148,759.45
PASSO FUNDO TR 230/138 kV PASSO FUNDO TR5 RS RBF FT TR 230/138 kV PASSO FUNDO TR5 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$396,056.72
PASSO FUNDO TR230/138kV PASSO FUNDOTR3 RS RBF FT TR230/138kV PASSO FUNDOTR3 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$396,056.72
PASSO FUNDO TR230/138kV PASSO FUNDOTR3 RS RBF FT TR230/138kV PASSO FUNDOTR3 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$823,320.49
PASSO FUNDO TR230/138kV PASSO FUNDOTR3 RS RBF FT TR230/138kV PASSO FUNDOTR3 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$606,267.36
PASSO FUNDO MG 230 kV PASSO FUNDO MG1 RS RB FT MG 230 kV PASSO FUNDO MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$488,448.67
PASSO FUNDO MG 230 kV PASSO FUNDO MG1 RS RB FT MG 230 kV PASSO FUNDO MG1 RS 057/2001 IPCA RMEL REN 643/2014 23/12/2014 22/12/2031  R$24,118.51
PASSO FUNDO MG 230 kV PASSO FUNDO MG1 RS RB FT MG 230 kV PASSO FUNDO MG1 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,015,384.35
PASSO FUNDO MG 230 kV PASSO FUNDO MG1 RS RB FT MG 230 kV PASSO FUNDO MG1 RS 057/2001 IPCA RMEL REN 643/2014 21/09/2015 20/09/2035  R$2,837.23
PASSO FUNDO MG 230 kV PASSO FUNDO MG1 RS RB FT MG 230 kV PASSO FUNDO MG1 RS 057/2001 IPCA RMEL REN 643/2014 15/09/2014 14/09/2034  R$2,720.10
PASSO FUNDO MG 230 kV PASSO FUNDO MG1 RS RB FT MG 230 kV PASSO FUNDO MG1 RS 057/2001 IPCA RBNI REA 5861/2016 24/05/2019 23/05/2036  R$43,030.43
PASSO FUNDO MC 230 kV TR 230/138 kV PASSO FUNDO TR5 RS  RBF FT TR 230/138 kV PASSO FUNDO TR5 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$126,266.78
PASSO FUNDO MC 230 kV TR 230/138 kV PASSO FUNDO TR5 RS  RBF FT TR 230/138 kV PASSO FUNDO TR5 RS 057/2001 IPCA RMEL REN 643/2014 24/11/2014 23/11/2046  R$ 254.40
PASSO FUNDO MC 230 kV TR230/138kV PASSO FUNDOTR3 RS  RBF FT TR230/138kV PASSO FUNDOTR3 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$126,266.78
PASSO FUNDO MC 230 kV TR230/138kV PASSO FUNDOTR3 RS  RBF FT TR230/138kV PASSO FUNDOTR3 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$262,482.68
PASSO FUNDO MC 230 kV TR230/138kV PASSO FUNDOTR3 RS  RBF FT TR230/138kV PASSO FUNDOTR3 RS 057/2001 IPCA RMEL REN 643/2014 11/06/2014 10/06/2046  R$2,572.30
PASSO FUNDO MC 138 kV TR 230/138 kV PASSO FUNDO TR5 RS  RBF FT TR 230/138 kV PASSO FUNDO TR5 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$87,609.97
PASSO FUNDO MC 138 kV TR230/138kV PASSO FUNDOTR3 RS  RBF FT TR230/138kV PASSO FUNDOTR3 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$87,609.97
PASSO FUNDO MC 138 kV TR230/138kV PASSO FUNDOTR3 RS  RBF FT TR230/138kV PASSO FUNDOTR3 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$182,123.12
PASSO FUNDO IB 230 kV MG 230 kV PASSO FUNDO MG1 RS IB1 RB FT MG 230 kV PASSO FUNDO MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$103,749.99
PASSO FUNDO IB 230 kV MG 230 kV PASSO FUNDO MG1 RS IB1 RB FT MG 230 kV PASSO FUNDO MG1 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$215,674.89
PASSO FUNDO IB 138 kV MG 230 kV PASSO FUNDO MG1 RS IB1 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$67,687.04
PASSO FUNDO IB 138 kV MG 230 kV PASSO FUNDO MG1 RS IB1 DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$140,707.44
PASSO FUNDO EL 230 kV PASSO FUNDO LT 230 kV PASSO FUNDO /XANXERE ESU C-2 RS/SC RB FT LT 230 kV PASSO FUNDO /XANXERE ESU C-2 RS/SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
PASSO FUNDO EL 230 kV PASSO FUNDO LT 230 kV PASSO FUNDO /XANXERE ESU C-1 RS/SC RB FT LT 230 kV PASSO FUNDO /XANXERE ESU C-1 RS/SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
PASSO FUNDO EL 230 kV PASSO FUNDO LT 230 kV PASSO FUNDO /VILA MARIA C-3228 RS  RB FT LT 230 kV PASSO FUNDO /VILA MARIA C-3228 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
PASSO FUNDO EL 230 kV PASSO FUNDO LT 230 kV PASSO FUNDO /VILA MARIA C-3228 RS  RB FT LT 230 kV PASSO FUNDO /VILA MARIA C-3228 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$366,078.59
PASSO FUNDO EL 230 kV PASSO FUNDO LT 230 kV PASSO FUNDO /VILA MARIA C-3228 RS  RB FT LT 230 kV PASSO FUNDO /VILA MARIA C-3228 RS 057/2001 IPCA RMEL REN 643/2014 06/12/2014 05/12/2043  R$2,631.31
PASSO FUNDO EL 230 kV PASSO FUNDO LT 230 kV PASSO FUNDO /U.PASSO FUNDO C-2 RS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
PASSO FUNDO EL 230 kV PASSO FUNDO LT 230 kV PASSO FUNDO /U.PASSO FUNDO C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
PASSO FUNDO EL 230 kV PASSO FUNDO LT 230 kV PASSO FUNDO /SANTA MARTA C-1 RS RB FT LT 230 kV PASSO FUNDO /SANTA MARTA C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
PASSO FUNDO EL 230 kV PASSO FUNDO LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-2 RS  RB FT LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-2 RS 057/2001 IPCA RBNI REA 3161/2011 25/09/2015 24/09/2043  R$28,758.21
PASSO FUNDO EL 230 kV PASSO FUNDO LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-2 RS  RB FT LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
PASSO FUNDO EL 230 kV PASSO FUNDO LT 230 kV PASSO FUNDO /GUARITA C-1 RS RB FT LT 230 kV PASSO FUNDO /GUARITA C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
PASSO FUNDO EL 138 kV PASSO FUNDO LT 138 kV EREXIM 1 /PASSO FUNDO C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,634.74
PASSO FUNDO EL 138 kV PASSO FUNDODIST1 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$87,609.97
PASSO FUNDO EL 138 kV PASSO FUNDODIST1 DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$182,123.12
PINHALZINHO TR 230/138 kV PINHALZINHO TR3 SC RBF FT TR 230/138 kV PINHALZINHO TR3 SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044  R$823,663.07
PINHALZINHO TR 230/138 kV PINHALZINHO TR2 SC RBF FT TR 230/138 kV PINHALZINHO TR2 SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044  R$823,663.07
PINHALZINHO TR 230/138 kV PINHALZINHO TR1 SC RBF FT TR 230/138 kV PINHALZINHO TR1 SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044  R$823,663.08
PINHALZINHO MG 230 kV PINHALZINHO MG1 SC RB FT MG 230 kV PINHALZINHO MG1 SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044  R$ 1,835,006.63
PINHALZINHO MC 230 kV TR 230/138 kV PINHALZINHO TR3 SC RBF FT TR 230/138 kV PINHALZINHO TR3 SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044  R$298,039.76
PINHALZINHO MC 230 kV TR 230/138 kV PINHALZINHO TR2 SC RBF FT TR 230/138 kV PINHALZINHO TR2 SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044  R$298,039.76
PINHALZINHO MC 230 kV TR 230/138 kV PINHALZINHO TR1 SC  RBF FT TR 230/138 kV PINHALZINHO TR1 SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044  R$298,039.76
PINHALZINHO MC 138 kV TR 230/138 kV PINHALZINHO TR3 SC RBF FT TR 230/138 kV PINHALZINHO TR3 SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044  R$229,061.79
PINHALZINHO MC 138 kV TR 230/138 kV PINHALZINHO TR2 SC RBF FT TR 230/138 kV PINHALZINHO TR2 SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044  R$229,061.79
PINHALZINHO MC 138 kV TR 230/138 kV PINHALZINHO TR1 SC  RBF FT TR 230/138 kV PINHALZINHO TR1 SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044  R$229,061.79
PINHALZINHO IB 230 kV MG 230 kV PINHALZINHO MG1 SC IB1 RB FT MG 230 kV PINHALZINHO MG1 SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044  R$257,029.63
PINHALZINHO IB 138 kV MG 230 kV PINHALZINHO MG1 SC IB1 DIT   007/2014 IPCA RPEC CC 007/2014 28/02/2018 29/01/2044  R$190,339.98
PINHALZINHO EL 230 kV PINHALZINHO LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-2 RS/SC RB FT LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-2 RS/SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044  R$457,843.55
PINHALZINHO EL 230 kV PINHALZINHO LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-1 RS/SC  RB FT LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-1 RS/SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044  R$423,305.08
PINHALZINHO EL 138 kV PINHALZINHODIST4 DIT   007/2014 IPCA RPEC CC 007/2014 28/02/2018 29/01/2044  R$339,150.18
PINHALZINHO EL 138 kV PINHALZINHODIST3 DIT   007/2014 IPCA RPEC CC 007/2014 28/02/2018 29/01/2044  R$339,150.18
PINHALZINHO EL 138 kV PINHALZINHODIST2 DIT   007/2014 IPCA RPEC CC 007/2014 28/02/2018 29/01/2044  R$339,150.18
PINHALZINHO EL 138 kV PINHALZINHODIST1 DIT   007/2014 IPCA RPEC CC 007/2014 28/02/2018 29/01/2044  R$339,150.18
PONTA GROSSA MG 230 kV PONTA GROSSA MG3 PR RB FT MG 230 kV PONTA GROSSA MG3 PR 057/2001 IPCA RBNI DSP 1281/2022 01/07/2022 30/06/2053  R$41,973.57
PONTA GROSSA EL 230 kV PONTA GROSSA LT 230 kV PONTA GROSSA /PONTA G NORTE C-1 PR  RB FT LT 230 kV PONTA GROSSA /PONTA G NORTE C-1 PR 057/2001 IPCA RBNI DSP 1281/2022 01/07/2022 30/06/2051  R$213,212.61
PONTA GROSSA EL 230 kV PONTA GROSSA LT 230 kV AREIA /PONTA GROSSA C-1 PR  RB FT LT 230 kV AREIA /PONTA GROSSA C-1 PR 057/2001 IPCA RBNI DSP 1281/2022 01/07/2022 30/06/2051  R$213,212.61
POVO NOVO TR 525/230 kV POVO NOVO TRR1 RS RB FT TR 525/230 kV POVO NOVO TRR1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$ 1,866,600.10
POVO NOVO TR 525/230 kV POVO NOVO TR1 RS RB FT TR 525/230 kV POVO NOVO TR1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$ 5,599,802.35
POVO NOVO TR 500/230 kV POVO NOVO TR2 RS RB FT TR 525/230 kV POVO NOVO TR2 RS 020/2012 IPCA RBNI REA 4916/2014 22/01/2018 22/01/2053  R$ 5,664,305.20
POVO NOVO RTL 525 kV 50 Mvar POVO NOVO RTR1 RS RB FT RTL 525 kV 50 Mvar POVO NOVO RTR1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$704,056.70
POVO NOVO RTL 525 kV 50 Mvar POVO NOVO RT2 RS RB FT RTL 525 kV 50 Mvar POVO NOVO RT2 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$ 1,379,787.90
POVO NOVO RTL 525 kV 16,67 Mvar POVO NOVO RTR2 RS RB FT RTL 525 kV 16,67 Mvar POVO NOVO RTR2 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$459,929.30
POVO NOVO RTL 525 kV 150 Mvar POVO NOVO RT1 RS RB FT LT 525 kV NOVA STA RITA /POVO NOVO C-1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$ 2,112,170.10
POVO NOVO MG 525 kV POVO NOVO MG1 RS RB FT MG 525 kV POVO NOVO MG1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$ 2,054,676.39
POVO NOVO MG 525 kV POVO NOVO MG1 RS RB FT MG 525 kV POVO NOVO MG1 RS 020/2012 IPCA RBNI DSP 1430/2021 10/01/2022 09/01/2037  R$17,472.59
POVO NOVO MG 230 kV POVO NOVO MG5 RS RB FT MG 230 kV POVO NOVO MG5 RS 004/2012 IPCA RBNI DSP 1446/2022 01/07/2022 30/06/2053  R$43,110.36
POVO NOVO MG 230 kV POVO NOVO MG2 RS RB FT MG 230 kV POVO NOVO MG2 RS 020/2012 IPCA RBNI REA 4916/2014 22/01/2018 22/01/2042  R$360,184.69
POVO NOVO MC 525 kV TR 525/230 kV POVO NOVO TR1 RS  RB FT TR 525/230 kV POVO NOVO TR1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$ 1,142,224.62
POVO NOVO MC 525 kV RTL 525 kV 50 Mvar POVO NOVO RT2 RS  RB FT RTL 525 kV 50 Mvar POVO NOVO RT2 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$ 1,068,388.96
POVO NOVO MC 525 kV RTL 525 kV 150 Mvar POVO NOVO RT1 RS  RB FT LT 525 kV NOVA STA RITA /POVO NOVO C-1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$688,994.11
POVO NOVO MC 500 kV TR 500/230 kV POVO NOVO TR2 RS RB FT TR 525/230 kV POVO NOVO TR2 RS 020/2012 IPCA RBNI REA 4916/2014 22/01/2018 22/01/2049  R$ 1,868,688.19
POVO NOVO MC 230 kV TR 525/230 kV POVO NOVO TR1 RS  RB FT TR 525/230 kV POVO NOVO TR1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$424,372.45
POVO NOVO MC 230 kV TR 500/230 kV POVO NOVO TR2 RS RB FT TR 525/230 kV POVO NOVO TR2 RS 020/2012 IPCA RBNI REA 4916/2014 22/01/2018 22/01/2046  R$ 1,560,398.50
POVO NOVO IB 525 kV MG 525 kV POVO NOVO MG1 RS IB2 RB FT MG 525 kV POVO NOVO MG1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$ 1,213,324.04
POVO NOVO IB 525 kV MG 525 kV POVO NOVO MG1 RS IB1 RB FT MG 525 kV POVO NOVO MG1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$ 1,213,324.04
POVO NOVO IB 230 kV MG 525 kV POVO NOVO MG1 RS IB1 RB FT MG 525 kV POVO NOVO MG1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$367,854.07
POVO NOVO EL 525 kV POVO NOVO LT 525 kV POVO NOVO /MARMELEIRO C-1 RS  RB FT LT 525 kV POVO NOVO /MARMELEIRO C-1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$ 1,288,783.90
POVO NOVO EL 525 kV POVO NOVO LT 525 kV NOVA STA RITA /POVO NOVO C-1 RS  RB FT LT 525 kV NOVA STA RITA /POVO NOVO C-1 RS 020/2012 IPCA RBL CC 020/2012 24/03/2015 27/08/2042  R$ 1,288,783.90
POVO NOVO EL 230 kV POVO NOVO LT 230 kV POVO NOVO /QUINTA C-1 RS  RB FT LT 230 kV POVO NOVO /QUINTA C-1 RS 004/2012 IPCA RBNI DSP 1446/2022 01/07/2022 30/06/2050  R$209,524.75
POVO NOVO EL 230 kV POVO NOVO LT 230 kV CAMAQUA 3 /POVO NOVO C-1 RS  RB FT LT 230 kV CAMAQUA 3 /POVO NOVO C-1 RS 004/2012 IPCA RBNI DSP 1446/2022 01/07/2022 30/06/2050  R$209,524.75
PRE.MEDICI RTL 230 kV 10 Mvar PRE.MEDICI RT2 RS RB FT LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS 004/2008 IPCA RBL CC 004/2008 17/03/2008 17/03/2038  R$74,808.05
PRE.MEDICI MC 230 kV RTL 230 kV 10 Mvar PRE.MEDICI RT2 RS RB FT LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS 004/2008 IPCA RBL CC 004/2008 17/03/2008 17/03/2038  R$82,945.09
PRE.MEDICI EL 230 kV PRE.MEDICI LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS  RB FT LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS 004/2008 IPCA RBL CC 004/2008 17/03/2008 17/03/2038  R$347,256.16
QUINTA EL 230 kV QUINTA LT 230 kV POVO NOVO /QUINTA C-1 RS  RB FT LT 230 kV POVO NOVO /QUINTA C-1 RS 004/2012 IPCA RBL CC 004/2012 09/12/2014 10/05/2042  R$532,318.31
QUINTA EL 230 kV QUINTA LT 230 kV POVO NOVO /QUINTA C-1 RS  RB FT LT 230 kV POVO NOVO /QUINTA C-1 RS 004/2012 IPCA RBNI DSP 1430/2021 27/05/2021 26/05/2036  R$3,943.72
S. OSORIO TR 230/69 kV S. OSORIO TR7 PR DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$144,205.35
S. OSORIO TR 230/69 kV S. OSORIO TR7 PR DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$299,773.27
S. OSORIO MG 230 kV S. OSORIO MG1 PR RB FT MG 230 kV S. OSORIO MG1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$433,584.57
S. OSORIO MG 230 kV S. OSORIO MG1 PR RB FT MG 230 kV S. OSORIO MG1 PR 057/2001 IPCA RMEL REN 643/2014 08/10/2013 07/10/2030  R$22,712.38
S. OSORIO MG 230 kV S. OSORIO MG1 PR RB FT MG 230 kV S. OSORIO MG1 PR 057/2001 IPCA RMEL REN 643/2014 09/12/2014 08/12/2034  R$2,746.94
S. OSORIO MC 69 kV TR 230/69 kV S. OSORIO TR7 PR  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$43,779.08
S. OSORIO MC 69 kV TR 230/69 kV S. OSORIO TR7 PR  DIT   057/2001 IPCA RMEL REN 643/2014 27/08/2013 26/08/2036  R$6,504.35
S. OSORIO MC 69 kV TR 230/69 kV S. OSORIO TR7 PR  DIT   057/2001 IPCA RMEL REN 643/2014 03/09/2013 02/09/2036  R$6,509.04
S. OSORIO MC 230 kV TR 230/69 kV S. OSORIO TR7 PR  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$126,266.78
S. OSORIO MC 230 kV TR 230/69 kV S. OSORIO TR7 PR  DIT   057/2001 IPCA RMEL REN 643/2014 10/07/2013 09/07/2036  R$20,384.41
S. OSORIO MC 230 kV TR 230/69 kV S. OSORIO TR7 PR  DIT   057/2001 IPCA RMEL REN 643/2014 14/08/2014 13/08/2046  R$2,584.93
S. OSORIO MC 230 kV TR 230/69 kV S. OSORIO TR7 PR  DIT   057/2001 IPCA RCDM REA 4347/2013 20/05/2015 19/05/2045  R$35,864.40
S. OSORIO IB 230 kV MG 230 kV S. OSORIO MG1 PR IB1 RB FT MG 230 kV S. OSORIO MG1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$103,749.99
S. OSORIO EL 230 kV S. OSORIO LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC RB FT LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
S. OSORIO EL 230 kV S. OSORIO LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC RB FT LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC 057/2001 IPCA RMEL REN 643/2014 28/05/2014 27/05/2047  R$104,459.88
S. OSORIO EL 230 kV S. OSORIO LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC RB FT LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC 057/2001 IPCA RMEL REN 643/2014 13/03/2016 12/03/2045  R$2,732.12
S. OSORIO EL 230 kV S. OSORIO LT 230 kV S. OSORIO /PATO BRANCO C-1 PR RB FT LT 230 kV S. OSORIO /PATO BRANCO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
S. OSORIO EL 230 kV S. OSORIO LT 230 kV S. OSORIO /PATO BRANCO C-1 PR RB FT LT 230 kV S. OSORIO /PATO BRANCO C-1 PR 057/2001 IPCA RMEL REN 643/2014 27/03/2014 26/03/2047  R$103,975.11
S. OSORIO EL 230 kV S. OSORIO LT 230 kV S. OSORIO /PATO BRANCO C-1 PR RB FT LT 230 kV S. OSORIO /PATO BRANCO C-1 PR 057/2001 IPCA RMEL REN 643/2014 14/12/2014 13/12/2043  R$2,633.05
S. OSORIO EL 230 kV S. OSORIO LT 230 kV FOZ DO CHOPIM /S. OSORIO C-1 PR  RB FT LT 230 kV FOZ DO CHOPIM /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
S. OSORIO EL 230 kV S. OSORIO LT 230 kV FOZ DO CHOPIM /S. OSORIO C-1 PR  RB FT LT 230 kV FOZ DO CHOPIM /S. OSORIO C-1 PR 057/2001 IPCA RMEL REN 643/2014 16/04/2014 15/04/2047  R$104,131.50
S. OSORIO EL 230 kV S. OSORIO LT 230 kV FOZ DO CHOPIM /S. OSORIO C-1 PR  RB FT LT 230 kV FOZ DO CHOPIM /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$366,078.59
S. OSORIO EL 230 kV S. OSORIO LT 230 kV FOZ DO CHOPIM /S. OSORIO C-1 PR  RB FT LT 230 kV FOZ DO CHOPIM /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$269,568.78
S. OSORIO EL 230 kV S. OSORIO LT 230 kV FOZ DO CHOPIM /S. OSORIO C-1 PR  RB FT LT 230 kV FOZ DO CHOPIM /S. OSORIO C-1 PR 057/2001 IPCA RMEL REN 643/2014 23/11/2014 22/11/2043  R$2,628.50
S. OSORIO EL 230 kV S. OSORIO LT 230 kV CASCAVEL /S. OSORIO C-1 PR  RB FT LT 230 kV CASCAVEL /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
S. OSORIO EL 230 kV S. OSORIO LT 230 kV CASCAVEL /S. OSORIO C-1 PR  RB FT LT 230 kV CASCAVEL /S. OSORIO C-1 PR 057/2001 IPCA RMEL REN 643/2014 28/02/2013 27/02/2046  R$100,910.01
S. OSORIO EL 230 kV S. OSORIO LT 230 kV CASCAVEL /S. OSORIO C-1 PR  RB FT LT 230 kV CASCAVEL /S. OSORIO C-1 PR 057/2001 IPCA RMEL REN 643/2014 17/08/2014 16/08/2043  R$2,607.15
S. OSORIO EL 230 kV S. OSORIO LT 230 kV C.MOURAO /S. OSORIO C-2 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-2 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
S. OSORIO EL 230 kV S. OSORIO LT 230 kV C.MOURAO /S. OSORIO C-2 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-2 PR 057/2001 IPCA RMEL REN 643/2014 06/02/2013 05/02/2046  R$100,737.97
S. OSORIO EL 230 kV S. OSORIO LT 230 kV C.MOURAO /S. OSORIO C-2 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-2 PR 057/2001 IPCA RMEL REN 643/2014 20/07/2014 19/07/2043  R$2,601.06
S. OSORIO EL 230 kV S. OSORIO LT 230 kV C.MOURAO /S. OSORIO C-1 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
S. OSORIO EL 230 kV S. OSORIO LT 230 kV C.MOURAO /S. OSORIO C-1 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-1 PR 057/2001 IPCA RMEL REN 643/2014 09/04/2014 08/04/2047  R$104,076.75
S. OSORIO EL 230 kV S. OSORIO LT 230 kV C.MOURAO /S. OSORIO C-1 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-1 PR 057/2001 IPCA RMEL REN 643/2014 14/12/2014 13/12/2043  R$2,633.05
S. OSORIO EL 230 kV S. OSORIO LT 230 kV AREIA /S. OSORIO C-2 PR RB FT LT 230 kV AREIA /S. OSORIO C-2 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
S. OSORIO EL 230 kV S. OSORIO LT 230 kV AREIA /S. OSORIO C-2 PR RB FT LT 230 kV AREIA /S. OSORIO C-2 PR 057/2001 IPCA RMEL REN 643/2014 20/03/2014 19/03/2047  R$103,920.37
S. OSORIO EL 230 kV S. OSORIO LT 230 kV AREIA /S. OSORIO C-2 PR RB FT LT 230 kV AREIA /S. OSORIO C-2 PR 057/2001 IPCA RMEL REN 643/2014 06/12/2014 05/12/2043  R$2,631.31
S. OSORIO EL 230 kV S. OSORIO LT 230 kV AREIA /S. OSORIO C-1 PR RB FT LT 230 kV AREIA /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,101.39
S. OSORIO EL 230 kV S. OSORIO LT 230 kV AREIA /S. OSORIO C-1 PR RB FT LT 230 kV AREIA /S. OSORIO C-1 PR 057/2001 IPCA RMEL REN 643/2014 11/09/2014 10/09/2047  R$105,288.73
S. OSORIO EL 230 kV S. OSORIO LT 230 kV AREIA /S. OSORIO C-1 PR RB FT LT 230 kV AREIA /S. OSORIO C-1 PR 057/2001 IPCA RMEL REN 643/2014 06/12/2014 05/12/2043  R$2,631.31
S. OSORIO EL 13,8 kV S. OSORIODIST1 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$38,944.15
S.SANTIAGO MG 500 kV S.SANTIAGO MG1 PR RB FT MG 500 kV S.SANTIAGO MG1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,118,378.24
S.SANTIAGO MG 500 kV S.SANTIAGO MG1 PR RB FT MG 500 kV S.SANTIAGO MG1 PR 057/2001 IPCA RMEL REN 643/2014 11/10/2013 10/10/2030  R$11,118.18
S.SANTIAGO MC 69 kV TR 69/13,8 kV S.SANTIAGO TR4 PR DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$43,779.08
S.SANTIAGO MC 13,8 kV TR 69/13,8 kV S.SANTIAGO TR4 PR DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$34,820.75
S.SANTIAGO IB 500 kV MG 500 kV S.SANTIAGO MG2 PR IB5 RB FT MG 500 kV S.SANTIAGO MG2 PR 004/2012 IPCA RBL CC 004/2012 04/02/2014 10/05/2042  R$ 1,088,619.50
S.SANTIAGO IB 500 kV MG 500 kV S.SANTIAGO MG1 PR IB3 RB FT MG 500 kV S.SANTIAGO MG1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
S.SANTIAGO IB 500 kV MG 500 kV S.SANTIAGO MG1 PR IB2 RB FT MG 500 kV S.SANTIAGO MG1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
S.SANTIAGO IB 500 kV MG 500 kV S.SANTIAGO MG1 PR IB1 RB FT MG 500 kV S.SANTIAGO MG1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV S.SANTIAGO /U.S.SANTIAGO C-2 PR  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV S.SANTIAGO /U.S.SANTIAGO C-1 PR  DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV S.SANTIAGO /SEGREDO C-1 PR  RB FT LT 500 kV S.SANTIAGO /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV S.SANTIAGO /SEGREDO C-1 PR  RB FT LT 500 kV S.SANTIAGO /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$761,090.85
S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV S.SANTIAGO /SEGREDO C-1 PR  RB FT LT 500 kV S.SANTIAGO /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$560,443.41
S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV S.SANTIAGO /ITA C-2 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-2 PR/SC 004/2012 IPCA RBL CC 004/2012 04/02/2014 10/05/2042  R$ 1,148,849.81
S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV S.SANTIAGO /ITA C-1 PR/SC  RB FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV S.SANTIAGO /ITA C-1 PR/SC  RB FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC 057/2001 IPCA RMEL REN 643/2014 14/11/2013 13/11/2036  R$42,939.55
S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV S.SANTIAGO /ITA C-1 PR/SC  RB FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$761,090.85
S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV S.SANTIAGO /ITA C-1 PR/SC  RB FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC 057/2001 IPCA RMEL REN 643/2014 24/08/2014 23/08/2045  R$2,259.01
S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR  RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR 004/2004 IGPM RBL CC 004/2004 31/10/2005 18/02/2034  R$ 4,380,126.96
S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR  RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR  RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR 057/2001 IPCA RMEL REN 643/2014 30/11/2014 29/11/2045  R$2,613.65
S.SANTIAGO EL 13,8 kV S.SANTIAGODIST1 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$38,944.15
SANTA CRUZ 1 RTL 230 kV 5 Mvar SANTA CRUZ 1 RT1 RS RB FT LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS 004/2008 IPCA RBL CC 004/2008 17/03/2008 17/03/2038  R$37,404.75
SANTA CRUZ 1 MC 230 kV RTL 230 kV 5 Mvar SANTA CRUZ 1 RT1 RS  RB FT LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS 004/2008 IPCA RBL CC 004/2008 17/03/2008 17/03/2038  R$82,945.09
SANTA CRUZ 1 EL 230 kV SANTA CRUZ 1 LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS  RB FT LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS 004/2008 IPCA RBL CC 004/2008 17/03/2008 17/03/2038  R$311,059.01
SANTA CRUZ 1 EL 230 kV SANTA CRUZ 1 LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS  RB FT LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS 004/2008 IPCA RBNI REA 5861/2016 24/05/2019 23/05/2036  R$39,739.08
SANTA MARIA 3 TR 230/138 kV SANTA MARIA 3 TR4 RS RBF FT TR 230/138 kV SANTA MARIA 3 TR4 RS 007/2014 IPCA RBL CC 007/2014 19/05/2016 29/01/2044  R$647,867.05
SANTA MARIA 3 TR 230/138 kV SANTA MARIA 3 TR3 RS RBF FT TR 230/138 kV SANTA MARIA 3 TR3 RS 007/2014 IPCA RBL CC 007/2014 19/05/2016 29/01/2044  R$647,867.05
SANTA MARIA 3 MG 230 kV SANTA MARIA 3 MG2 RS RB FT MG 230 kV SANTA MARIA 3 MG2 RS 007/2014 IPCA RBL CC 007/2014 19/05/2016 29/01/2044  R$ 1,217,907.58
SANTA MARIA 3 MC 230 kV TR 230/138 kV SANTA MARIA 3 TR4 RS RBF FT TR 230/138 kV SANTA MARIA 3 TR4 RS 007/2014 IPCA RBL CC 007/2014 19/05/2016 29/01/2044  R$298,039.76
SANTA MARIA 3 MC 230 kV TR 230/138 kV SANTA MARIA 3 TR3 RS RBF FT TR 230/138 kV SANTA MARIA 3 TR3 RS 007/2014 IPCA RBL CC 007/2014 19/05/2016 29/01/2044  R$298,039.76
SANTA MARIA 3 MC 138 kV TR 230/138 kV SANTA MARIA 3 TR4 RS RBF FT TR 230/138 kV SANTA MARIA 3 TR4 RS 007/2014 IPCA RBL CC 007/2014 19/05/2016 29/01/2044  R$229,061.78
SANTA MARIA 3 MC 138 kV TR 230/138 kV SANTA MARIA 3 TR3 RS RBF FT TR 230/138 kV SANTA MARIA 3 TR3 RS 007/2014 IPCA RBL CC 007/2014 19/05/2016 29/01/2044  R$229,061.78
SANTA MARIA 3 IB 138 kV MG 230 kV SANTA MARIA 3 MG2 RS IB1 DIT   007/2014 IPCA RPEC CC 007/2014 19/05/2016 29/01/2044  R$553,853.37
SANTA MARIA 3 EL 138 kV SANTA MARIA 3FORMIGUEIRO 2 DIT   007/2014 IPCA RPEC CC 007/2014 19/05/2016 29/01/2044  R$993,087.33
SANTO ANGELO TR 525/230 kV SANTO ANGELO TR1 RS RB FT TR 500/230 kV SANTO ANGELO TR1 RS 057/2001 IPCA RBNI REA 5616/2016 04/02/2018 03/02/2053  R$ 7,995,860.51
SANTO ANGELO TR 500/230 kV SANTO ANGELO TRR1 RS RB FT TR 500/230 kV SANTO ANGELO TRR1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$502,776.61
SANTO ANGELO TR 500/230 kV SANTO ANGELO TR3 RS RB FT TR 500/230 kV SANTO ANGELO TR3 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,508,329.83
SANTO ANGELO TR 500/230 kV SANTO ANGELO TR2 RS RB FT TR 500/230 kV SANTO ANGELO TR2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,508,329.83
SANTO ANGELO RTB 500 kV 50 Mvar SANTO ANGELO RTR1 RS RB FT RTB 500 kV 50 Mvar SANTO ANGELO RTR1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$201,111.00
SANTO ANGELO RTB 500 kV 150 Mvar SANTO ANGELO RT2 RS RB FT RTB 500 kV 150 Mvar SANTO ANGELO RT2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$603,333.01
SANTO ANGELO RTB 500 kV 150 Mvar SANTO ANGELO RT1 RS RB FT RTB 500 kV 150 Mvar SANTO ANGELO RT1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$603,333.01
SANTO ANGELO RTB 500 kV 150 Mvar SANTO ANGELO RT1 RS RB FT RTB 500 kV 150 Mvar SANTO ANGELO RT1 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,254,205.28
SANTO ANGELO RTB 500 kV 150 Mvar SANTO ANGELO RT1 RS RB FT RTB 500 kV 150 Mvar SANTO ANGELO RT1 RS 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$923,557.39
SANTO ANGELO MG 500 kV SANTO ANGELO MG1 RS RB FT MG 500 kV SANTO ANGELO MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,293,881.53
SANTO ANGELO MG 500 kV SANTO ANGELO MG1 RS RB FT MG 500 kV SANTO ANGELO MG1 RS 057/2001 IPCA RBNI REA 5616/2016 04/02/2018 03/02/2050  R$72,573.47
SANTO ANGELO MG 500 kV SANTO ANGELO MG1 RS RB FT MG 500 kV SANTO ANGELO MG1 RS 057/2001 IPCA RMEL REN 643/2014 06/10/2014 05/10/2031  R$32,607.05
SANTO ANGELO MG 500 kV SANTO ANGELO MG1 RS RB FT MG 500 kV SANTO ANGELO MG1 RS 057/2001 IPCA RMEL REN 643/2014 22/12/2014 21/12/2041  R$ 819.12
SANTO ANGELO MG 500 kV SANTO ANGELO MG1 RS RB FT MG 500 kV SANTO ANGELO MG1 RS 057/2001 IPCA RBNI REA 5861/2016 21/11/2018 20/11/2035  R$32,670.31
SANTO ANGELO MC 525 kV TR 525/230 kV SANTO ANGELO TR1 RS RB FT TR 500/230 kV SANTO ANGELO TR1 RS 057/2001 IPCA RBNI REA 5616/2016 04/02/2018 03/02/2046  R$ 1,967,818.09
SANTO ANGELO MC 500 kV TR 500/230 kV SANTO ANGELO TR3 RS  RB FT TR 500/230 kV SANTO ANGELO TR3 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$323,135.88
SANTO ANGELO MC 500 kV TR 500/230 kV SANTO ANGELO TR2 RS  RB FT TR 500/230 kV SANTO ANGELO TR2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$323,135.88
SANTO ANGELO MC 500 kV TR 500/230 kV SANTO ANGELO TR2 RS  RB FT TR 500/230 kV SANTO ANGELO TR2 RS 057/2001 IPCA RMEL REN 643/2014 10/03/2016 09/03/2039  R$31,835.88
SANTO ANGELO MC 500 kV RTB 500 kV 150 Mvar SANTO ANGELO RT2 RS  RB FT RTB 500 kV 150 Mvar SANTO ANGELO RT2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$302,550.62
SANTO ANGELO MC 500 kV RTB 500 kV 150 Mvar SANTO ANGELO RT2 RS  RB FT RTB 500 kV 150 Mvar SANTO ANGELO RT2 RS 057/2001 IPCA RMEL REN 643/2014 12/03/2015 11/03/2048  R$ 117.82
SANTO ANGELO MC 500 kV RTB 500 kV 150 Mvar SANTO ANGELO RT1 RS  RB FT RTB 500 kV 150 Mvar SANTO ANGELO RT1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$302,550.62
SANTO ANGELO MC 500 kV RTB 500 kV 150 Mvar SANTO ANGELO RT1 RS  RB FT RTB 500 kV 150 Mvar SANTO ANGELO RT1 RS 057/2001 IPCA RMEL REN 643/2014 10/12/2014 09/12/2037  R$46,981.55
SANTO ANGELO MC 230 kV TR 525/230 kV SANTO ANGELO TR1 RS RB FT TR 500/230 kV SANTO ANGELO TR1 RS 057/2001 IPCA RBNI REA 5616/2016 04/02/2018 03/02/2041  R$769,532.52
SANTO ANGELO MC 230 kV TR 500/230 kV SANTO ANGELO TR3 RS  RB FT TR 500/230 kV SANTO ANGELO TR3 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
SANTO ANGELO MC 230 kV TR 500/230 kV SANTO ANGELO TR2 RS  RB FT TR 500/230 kV SANTO ANGELO TR2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
SANTO ANGELO MC 230 kV TR 500/230 kV SANTO ANGELO TR2 RS  RB FT TR 500/230 kV SANTO ANGELO TR2 RS 057/2001 IPCA RMEL REN 643/2014 10/10/2014 09/10/2037  R$22,417.77
SANTO ANGELO IB 500 kV MG 500 kV SANTO ANGELO MG1 RS IB4 RB FT MG 500 kV SANTO ANGELO MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
SANTO ANGELO IB 500 kV MG 500 kV SANTO ANGELO MG1 RS IB3 RB FT MG 500 kV SANTO ANGELO MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
SANTO ANGELO IB 500 kV MG 500 kV SANTO ANGELO MG1 RS IB2 RB FT MG 500 kV SANTO ANGELO MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
SANTO ANGELO IB 500 kV MG 500 kV SANTO ANGELO MG1 RS IB1 RB FT MG 500 kV SANTO ANGELO MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$342,916.24
SANTO ANGELO IB 230 kV MG 500 kV SANTO ANGELO MG1 RS IB5 RB FT MG 500 kV SANTO ANGELO MG1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$103,749.99
SANTO ANGELO EL 500 kV SANTO ANGELO LT 500 kV SANTO ANGELO /ITA C-1 RS/SC  RB FT LT 500 kV SANTO ANGELO /ITA C-1 RS/SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
SANTO ANGELO EL 500 kV SANTO ANGELO LT 500 kV SANTO ANGELO /ITA C-1 RS/SC  RB FT LT 500 kV SANTO ANGELO /ITA C-1 RS/SC 057/2001 IPCA RMEL REN 643/2014 06/09/2016 05/09/2047  R$ 825.57
SANTO ANGELO EL 500 kV SANTO ANGELO LT 500 kV CV.GARABI 1 /SANTO ANGELO C-1 RS  RB FT LT 500 kV CV.GARABI 1 /SANTO ANGELO C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$366,121.27
SANTO ANGELO EL 230 kV SANTO ANGELO LT 230 kV SANTO ANGELO /SANTO ANGELO 2 C-1 RS  RB FT LT 230 kV SANTO ANGELO /SANTO ANGELO 2 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
SANTO ANGELO EL 230 kV SANTO ANGELO LT 230 kV SANTO ANGELO /SANTO ANGELO 2 C-1 RS  RB FT LT 230 kV SANTO ANGELO /SANTO ANGELO 2 C-1 RS 057/2001 IPCA RMEL REN 643/2014 23/09/2013 22/09/2036  R$21,991.74
SANTO ANGELO EL 230 kV SANTO ANGELO LT 230 kV SANTO ANGELO /SANTO ANGELO 2 C-1 RS  RB FT LT 230 kV SANTO ANGELO /SANTO ANGELO 2 C-1 RS 057/2001 IPCA RBNI REA 5861/2016 12/06/2019 11/06/2034  R$95,810.75
SANTO ANGELO EL 230 kV SANTO ANGELO LT 230 kV SANTO ANGELO /SANTA ROSA 1 C-1 RS  RB FT LT 230 kV SANTO ANGELO /SANTA ROSA 1 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
SANTO ANGELO EL 230 kV SANTO ANGELO LT 230 kV SANTO ANGELO /SANTA ROSA 1 C-1 RS  RB FT LT 230 kV SANTO ANGELO /SANTA ROSA 1 C-1 RS 057/2001 IPCA RMEL REN 643/2014 03/12/2013 02/12/2036  R$22,080.22
SANTO ANGELO EL 230 kV SANTO ANGELO LT 230 kV SANTO ANGELO /MISSOES C-1 RS RB FT LT 230 kV SANTO ANGELO /MISSOES C-1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
SANTO ANGELO EL 230 kV SANTO ANGELO LT 230 kV SANTO ANGELO /MISSOES C-1 RS RB FT LT 230 kV SANTO ANGELO /MISSOES C-1 RS 057/2001 IPCA RMEL REN 643/2014 23/10/2013 22/10/2036  R$22,028.59
SANTO ANGELO EL 230 kV SANTO ANGELO LT 230 kV SANTO ANGELO /MISSOES C-1 RS RB FT LT 230 kV SANTO ANGELO /MISSOES C-1 RS 057/2001 IPCA RMEL REN 643/2014 22/11/2015 21/11/2044  R$ 824.24
SANTO ANGELO EL 230 kV SANTO ANGELO LT 230 kV MACAMBARA /SANTO ANGELO C-2 RS  RB FT LT 230 kV MACAMBARA /SANTO ANGELO C-2 RS 007/2014 IPCA RBL CC 007/2014 06/12/2019 29/01/2044  R$628,269.69
SARANDI MG 230 kV SARANDI MG2 PR RB FT MG 230 kV SARANDI MG2 PR 057/2001 IPCA RBNI REA 8795/2020 31/03/2023 31/03/2041  R$433,537.39
SARANDI MG 230 kV SARANDI MG2 PR RB FT MG 230 kV SARANDI MG2 PR 057/2001 IPCA RBNI REA 8795/2020 31/03/2023 31/03/2054  R$151,508.39
SARANDI MG 230 kV SARANDI MG2 PR RB FT MG 230 kV SARANDI MG2 PR 057/2001 IPCA RBNI REA 8795/2020 31/03/2023 31/03/2054  R$151,508.39
SARANDI EL 230 kV SARANDI LT 230 kV MARINGA /SARANDI C-1130 PR RB FT LT 230 kV MARINGA /SARANDI C-1130 PR 057/2001 IPCA RBNI REA 8795/2020 31/03/2023 31/03/2051  R$ 1,252,048.45
SARANDI EL 230 kV SARANDI LT 230 kV LONDRINA ESU /SARANDI C-1130 PR RB FT LT 230 kV LONDRINA ESU /SARANDI C-1130 PR 057/2001 IPCA RBNI REA 8795/2020 31/03/2023 31/03/2051  R$ 1,252,048.45
SIDEROPOL.ESU TR 230/69 kV SIDEROPOL.ESU TRR1 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TRR1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,125.34
SIDEROPOL.ESU TR 230/69 kV SIDEROPOL.ESU TRR1 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TRR1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$297,528.16
SIDEROPOL.ESU TR 230/69 kV SIDEROPOL.ESU TR4 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBNI REA 8795/2020 13/11/2020 13/11/2054  R$ 1,924,076.23
SIDEROPOL.ESU TR 230/69 kV SIDEROPOL.ESU TR3 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR3 SC 057/2001 IPCA RBNI REA 10935/2021 24/10/2022 24/10/2057  R$ 2,434,946.55
SIDEROPOL.ESU TR 230/69 kV SIDEROPOL.ESU TR2 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$260,177.53
SIDEROPOL.ESU TR 230/69 kV SIDEROPOL.ESU TR1 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR1 SC 057/2001 IPCA RBNI REA 10935/2021 24/11/2022 24/11/2057  R$ 2,434,946.55
SIDEROPOL.ESU MG 230 kV SIDEROPOL.ESU MG1 SC RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RBNI REA 1535/2008 06/06/2012 05/06/2040  R$48,832.27
SIDEROPOL.ESU MG 230 kV SIDEROPOL.ESU MG1 SC RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$412,613.36
SIDEROPOL.ESU MG 230 kV SIDEROPOL.ESU MG1 SC RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RBNI REN 443/2011 29/11/2015 28/11/2043  R$53,780.79
SIDEROPOL.ESU MG 230 kV SIDEROPOL.ESU MG1 SC RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RMEL REN 643/2014 01/12/2016 30/11/2036  R$2,975.20
SIDEROPOL.ESU MG 230 kV SIDEROPOL.ESU MG1 SC RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RMEL REN 643/2014 11/09/2014 10/09/2034  R$2,718.86
SIDEROPOL.ESU MG 230 kV SIDEROPOL.ESU MG1 SC RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RBNI REA 8795/2020 13/11/2020 13/11/2053  R$11,359.81
SIDEROPOL.ESU MG 230 kV SIDEROPOL.ESU MG1 SC RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RBNI REA 7528/2018 14/01/2021 13/01/2061  R$32,747.78
SIDEROPOL.ESU MG 230 kV SIDEROPOL.ESU MG1 SC RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RBNI REA 7528/2018 03/10/2021 02/10/2061  R$70,149.54
SIDEROPOL.ESU MG 230 kV SIDEROPOL.ESU MG1 SC RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RBNI REA 8314/2019 07/11/2021 06/11/2036  R$52,101.47
SIDEROPOL.ESU MG 230 kV SIDEROPOL.ESU MG1 SC RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RBNI REA 8314/2019 21/11/2021 20/11/2036  R$170,999.29
SIDEROPOL.ESU MG 230 kV SIDEROPOL.ESU MG1 SC RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RBNI REA 8314/2019 27/02/2022 26/02/2052  R$25,713.12
SIDEROPOL.ESU MG 230 kV SIDEROPOL.ESU MG1 SC RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RBNI REA 8314/2019 28/03/2022 27/03/2050  R$180,520.63
SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,874.58
SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBNI REA 8795/2020 13/11/2020 13/11/2057  R$12,815.33
SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBNI REA 8314/2019 08/11/2020 07/11/2035  R$88,726.46
SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBNI REA 8314/2019 08/11/2020 07/11/2035  R$85,412.21
SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBNI REA 7528/2018 25/04/2021 24/04/2051  R$79,548.76
SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBNI DSP 1425/2021 26/05/2021 25/05/2036  R$ 525.11
SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBNI REA 7528/2018 21/08/2021 20/08/2054  R$34,580.58
SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBNI REA 8314/2019 21/08/2021 20/08/2051  R$65,139.09
SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR3 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,874.58
SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR3 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR3 SC 057/2001 IPCA RBNI REA 10935/2021 24/10/2022 24/10/2050  R$55,759.11
SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR3 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR3 SC 057/2001 IPCA RBNI REA 7528/2018 02/05/2021 01/05/2051  R$30,692.91
SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR3 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR3 SC 057/2001 IPCA RBNI DSP 1425/2021 26/05/2021 25/05/2036  R$ 525.11
SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR3 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR3 SC 057/2001 IPCA RBNI REA 8314/2019 03/10/2021 02/10/2051  R$65,812.29
SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR2 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,874.58
SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR2 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR2 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$101,600.20
SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR2 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR2 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$74,815.20
SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR2 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR2 SC 057/2001 IPCA RBNI REA 8314/2019 20/05/2021 19/05/2051  R$22,059.05
SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR2 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR2 SC 057/2001 IPCA RBNI DSP 1425/2021 26/05/2021 25/05/2036  R$ 525.11
SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR2 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR2 SC 057/2001 IPCA RBNI REA 8314/2019 21/03/2022 20/03/2037  R$21,667.42
SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR2 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR2 SC 057/2001 IPCA RBNI REA 8314/2019 21/03/2022 20/03/2037  R$21,667.42
SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR1 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,874.58
SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR1 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR1 SC 057/2001 IPCA RBNI REA 10935/2021 24/11/2022 24/11/2050  R$55,759.11
SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR1 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR1 SC 057/2001 IPCA RBNI DSP 1425/2021 26/05/2021 25/05/2036  R$ 525.11
SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR1 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR1 SC 057/2001 IPCA RBNI REA 7528/2018 23/06/2021 22/06/2051  R$114,246.12
SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR1 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR1 SC 057/2001 IPCA RBNI REA 8314/2019 12/10/2021 11/10/2051  R$65,308.66
SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR1 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR1 SC 057/2001 IPCA RBNI REA 8314/2019 10/04/2022 09/04/2037  R$133,899.54
SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR1 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR1 SC 057/2001 IPCA RBNI REA 8314/2019 10/04/2022 09/04/2037  R$133,075.62
SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$114,101.11
SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBNI REA 8795/2020 13/11/2020 13/11/2057  R$23,780.91
SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBNI REA 8314/2019 08/11/2020 07/11/2035  R$14,774.57
SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBNI REA 8314/2019 08/11/2020 07/11/2035  R$167,207.29
SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBNI REA 8314/2019 08/11/2020 07/11/2035  R$222,040.51
SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBNI REA 7528/2018 25/04/2021 24/04/2051  R$190,554.60
SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR3 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$114,101.11
SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR3 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR3 SC 057/2001 IPCA RBNI REA 10935/2021 24/10/2022 24/10/2050  R$21,146.51
SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR3 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR3 SC 057/2001 IPCA RBNI REA 7528/2018 02/05/2021 01/05/2051  R$49,216.14
SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR3 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR3 SC 057/2001 IPCA RBNI REA 8314/2019 17/10/2021 16/10/2051  R$48,685.26
SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR3 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR3 SC 057/2001 IPCA RBNI REA 8314/2019 15/11/2021 14/11/2036  R$47,148.74
SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR1 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$114,101.11
SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR1 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR1 SC 057/2001 IPCA RBNI REA 10935/2021 24/11/2022 24/11/2050  R$29,479.56
SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR1 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR1 SC 057/2001 IPCA RBNI REA 7528/2018 23/05/2021 22/05/2051  R$190,063.43
SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR1 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR1 SC 057/2001 IPCA RBNI REA 8314/2019 27/02/2022 26/02/2037  R$87,721.18
SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR1 SC  RBF FT TR 230/69 kV SIDEROPOL.ESU TR1 SC 057/2001 IPCA RBNI REA 8314/2019 10/04/2022 09/04/2037  R$86,889.18
SIDEROPOL.ESU IB 69 kV MG 230 kV SIDEROPOL.ESU MG1 SC IB1 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$32,849.28
SIDEROPOL.ESU IB 69 kV MG 230 kV SIDEROPOL.ESU MG1 SC IB1 DIT   057/2001 IPCA RCDM REA 8314/2019 28/10/2021 27/10/2036  R$52,072.98
SIDEROPOL.ESU IB 230 kV MG 230 kV SIDEROPOL.ESU MG1 SC IB1 RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$90,304.02
SIDEROPOL.ESU IB 230 kV MG 230 kV SIDEROPOL.ESU MG1 SC IB1 RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RBNI REA 7528/2018 23/02/2020 22/02/2053  R$199,970.93
SIDEROPOL.ESU IB 230 kV MG 230 kV SIDEROPOL.ESU MG1 SC IB1 RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RBNI REA 7528/2018 03/10/2021 02/10/2051  R$50,158.95
SIDEROPOL.ESU IB 230 kV MG 230 kV SIDEROPOL.ESU MG1 SC IB1 RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RBNI REA 8314/2019 21/10/2021 20/10/2036  R$53,863.70
SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV SIDEROPOL.CSC /SIDEROPOL.ESU C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$57,137.95
SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV SIDEROPOL.CSC /SIDEROPOL.ESU C-2 SC DIT   057/2001 IPCA RCDM REA 8314/2019 24/04/2022 23/04/2037  R$197,667.04
SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV SIDEROPOL.CSC /SIDEROPOL.ESU C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$57,137.95
SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV SIDEROPOL.CSC /SIDEROPOL.ESU C-1 SC DIT   057/2001 IPCA RCDM REA 7528/2018 16/07/2021 15/07/2051  R$36,219.06
SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV SIDEROPOL.CSC /SIDEROPOL.ESU C-1 SC DIT   057/2001 IPCA RCDM REA 7528/2018 16/07/2021 15/07/2054  R$59,361.96
SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV SIDEROPOL.CSC /SIDEROPOL.ESU C-1 SC DIT   057/2001 IPCA RCDM REA 8314/2019 17/07/2021 16/07/2051  R$42,774.60
SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV CRICIUMA /SIDEROPOL.ESU C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$57,137.95
SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV CRICIUMA /SIDEROPOL.ESU C-2 SC DIT   057/2001 IPCA RCDM REA 8314/2019 06/06/2021 05/06/2051  R$21,179.00
SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV CRICIUMA /SIDEROPOL.ESU C-2 SC DIT   057/2001 IPCA RCDM REA 7528/2018 14/06/2021 13/06/2054  R$34,614.78
SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV CRICIUMA /SIDEROPOL.ESU C-2 SC DIT   057/2001 IPCA RCDM REA 8314/2019 24/04/2022 23/04/2037  R$21,658.51
SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV CRICIUMA /SIDEROPOL.ESU C-2 SC DIT   057/2001 IPCA RCDM REA 8314/2019 24/04/2022 23/04/2037  R$23,758.42
SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV CRICIUMA /SIDEROPOL.ESU C-2 SC DIT   057/2001 IPCA RCDM REA 8314/2019 24/04/2022 23/04/2037  R$21,658.51
SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV CRICIUMA /SIDEROPOL.ESU C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$57,137.95
SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV CRICIUMA /SIDEROPOL.ESU C-1 SC DIT   057/2001 IPCA RCDM REA 7528/2018 08/07/2021 07/07/2054  R$34,545.22
SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV CRICIUMA /SIDEROPOL.ESU C-1 SC DIT   057/2001 IPCA RCDM REA 8314/2019 08/07/2021 07/07/2051  R$36,209.24
SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV CRIC.FLORESTA /SIDEROPOL.ESU C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$57,137.95
SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV CRIC.FLORESTA /SIDEROPOL.ESU C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$118,778.05
SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV CRIC.FLORESTA /SIDEROPOL.ESU C-1 SC DIT   057/2001 IPCA RCDM REA 7528/2018 01/08/2021 31/07/2054  R$34,562.03
SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV CRIC.FLORESTA /SIDEROPOL.ESU C-1 SC DIT   057/2001 IPCA RCDM REA 8314/2019 06/08/2021 05/08/2051  R$23,293.67
SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESUDIST1 DIT   057/2001 IPCA RCDM REN 443/2011 29/11/2015 28/11/2045  R$500,459.20
SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESUDIST1 DIT   057/2001 IPCA RCDM REA 7528/2018 22/06/2021 21/06/2051  R$29,035.07
SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESUDIST1 DIT   057/2001 IPCA RCDM REA 7528/2018 22/06/2021 21/06/2054  R$34,024.86
SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESUDIST1 DIT   057/2001 IPCA RCDM REA 8314/2019 22/06/2021 21/06/2051  R$41,096.88
SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESUDIST1 DIT   057/2001 IPCA RCDM REA 8314/2019 29/04/2022 28/04/2037  R$22,731.86
SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESUDIST1 DIT   057/2001 IPCA RCDM REA 8314/2019 29/04/2022 28/04/2037  R$22,731.86
SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESUDIST1 DIT   057/2001 IPCA RCDM REA 8314/2019 29/04/2022 28/04/2037  R$23,571.20
SIDEROPOL.ESU EL 230 kV SIDEROPOL.ESU LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
SIDEROPOL.ESU EL 230 kV SIDEROPOL.ESU LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC 057/2001 IPCA RBNI REA 8314/2019 19/12/2021 18/12/2036  R$21,580.78
SIDEROPOL.ESU EL 230 kV SIDEROPOL.ESU LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC 057/2001 IPCA RBNI REA 8314/2019 19/12/2021 18/12/2036  R$20,952.03
SIDEROPOL.ESU EL 230 kV SIDEROPOL.ESU LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC 057/2001 IPCA RBNI REA 8314/2019 19/12/2021 18/12/2036  R$27,772.92
SIDEROPOL.ESU EL 230 kV SIDEROPOL.ESU LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
SIDEROPOL.ESU EL 230 kV SIDEROPOL.ESU LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBNI REA 7528/2018 22/08/2021 21/08/2054  R$73,001.68
SIDEROPOL.ESU EL 230 kV SIDEROPOL.ESU LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBNI REA 8314/2019 06/12/2021 05/12/2036  R$113,023.45
SIDEROPOL.ESU EL 230 kV SIDEROPOL.ESU LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBNI REA 8314/2019 06/12/2021 05/12/2036  R$99,296.25
SIDEROPOL.ESU EL 230 kV SIDEROPOL.ESU LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBNI REA 8314/2019 06/12/2021 05/12/2036  R$211,297.33
SIDEROPOL.ESU EL 230 kV SIDEROPOL.ESU LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,825.41
SIDEROPOL.ESU EL 230 kV SIDEROPOL.ESU LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBNI REA 7528/2018 29/05/2021 28/05/2051  R$48,376.46
SIDEROPOL.ESU EL 230 kV SIDEROPOL.ESU LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBNI REA 7528/2018 10/08/2021 09/08/2054  R$299,548.99
SIDEROPOL.ESU EL 230 kV SIDEROPOL.ESU LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBNI REA 8314/2019 10/08/2021 09/08/2051  R$51,451.10
SIDEROPOL.ESU EL 230 kV SIDEROPOL.ESU LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBNI REA 8314/2019 13/04/2022 12/04/2037  R$47,585.03
SIDEROPOL.ESU EL 230 kV SIDEROPOL.ESU LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBNI REA 8314/2019 13/04/2022 12/04/2037  R$24,151.07
STA V.PALMAR TR 525/138 kV STA V.PALMAR TR2 RS RB FT TR 525/138 kV STA V.PALMAR TR2 RS 020/2012 IPCA RBNI REA 8377/2019 15/07/2022 15/07/2057  R$ 1,332,733.77
STA V.PALMAR TR 525/138 kV STA V.PALMAR TR1 RS RBF FT TR 525/138 kV STA V.PALMAR TR1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$ 1,689,685.07
STA V.PALMAR RTL 525 kV 50 Mvar STA V.PALMAR RT1 RS RB FT RTL 525 kV 50 Mvar STA V.PALMAR RT1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$ 1,379,787.90
STA V.PALMAR RTL 525 kV 16,67 Mvar STA V.PALMAR RTR1 RS RB FT RTL 525 kV 16,67 Mvar STA V.PALMAR RTR1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$459,929.30
STA V.PALMAR MG 525 kV STA V.PALMAR MG1 RS RB FT MG 525 kV STA V.PALMAR MG1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$ 1,830,649.45
STA V.PALMAR MG 525 kV STA V.PALMAR MG1 RS RB FT MG 525 kV STA V.PALMAR MG1 RS 020/2012 IPCA RBNI REA 8377/2019 07/07/2022 07/07/2053  R$86,822.35
STA V.PALMAR MG 525 kV STA V.PALMAR MG1 RS RB FT MG 525 kV STA V.PALMAR MG1 RS 020/2012 IPCA RBNI REA 8377/2019 07/07/2022 07/07/2053  R$533,831.33
STA V.PALMAR MC 525 kV TR 525/138 kV STA V.PALMAR TR2 RS RB FT TR 525/138 kV STA V.PALMAR TR2 RS 020/2012 IPCA RBNI REA 8377/2019 15/07/2022 15/07/2051  R$ 1,260,238.46
STA V.PALMAR MC 525 kV TR 525/138 kV STA V.PALMAR TR1 RS  RBF FT TR 525/138 kV STA V.PALMAR TR1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$ 1,142,224.62
STA V.PALMAR MC 525 kV RTL 525 kV 50 Mvar STA V.PALMAR RT1 RS  RB FT RTL 525 kV 50 Mvar STA V.PALMAR RT1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$ 1,068,388.96
STA V.PALMAR MC 138 kV TR 525/138 kV STA V.PALMAR TR2 RS RB FT TR 525/138 kV STA V.PALMAR TR2 RS 020/2012 IPCA RBNI REA 8377/2019 15/07/2022 15/07/2049  R$633,415.95
STA V.PALMAR MC 138 kV TR 525/138 kV STA V.PALMAR TR1 RS  RBF FT TR 525/138 kV STA V.PALMAR TR1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$311,409.15
STA V.PALMAR IB 525 kV MG 525 kV STA V.PALMAR MG1 RS IB1 RB FT MG 525 kV STA V.PALMAR MG1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$ 1,213,324.04
STA V.PALMAR IB 138 kV MG 525 kV STA V.PALMAR MG1 RS IB1 DIT   020/2012 IPCA RPEC CC 020/2012 19/12/2014 27/08/2042  R$400,694.21
STA V.PALMAR EL 525 kV STA V.PALMAR LT 525 kV MARMELEIRO /STA V.PALMAR C-1 RS  RB FT LT 525 kV MARMELEIRO /STA V.PALMAR C-1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042  R$ 1,288,783.90
STA V.PALMAR EL 138 kV STA V.PALMARDIST2 DIT   020/2012 IPCA RPEC CC 020/2012 19/12/2014 27/08/2042  R$595,312.53
STA V.PALMAR EL 138 kV STA V.PALMARDIST1 DIT   020/2012 IPCA RPEC CC 020/2012 19/12/2014 27/08/2042  R$595,312.53
TAPERA 2 TR 230/69 kV TAPERA 2 TR2 RS RBF FT TR 230/69 kV TAPERA 2 TR2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$253,196.59
TAPERA 2 TR 230/69 kV TAPERA 2 TR1 RS RBF FT TR 230/69 kV TAPERA 2 TR1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$253,196.59
TAPERA 2 TR 230/69 kV TAPERA 2 TF3 RS RBF FT TR 230/69 kV TAPERA 2 TF3 RS 057/2001 IPCA RBNI REA 2589/2010 09/11/2012 08/11/2046  R$ 1,345,942.82
TAPERA 2 MG 230 kV TAPERA 2 MG2 RS RB FT MG 230 kV TAPERA 2 MG2 RS 057/2001 IPCA RBNI REA 2589/2010 14/11/2012 13/11/2037  R$444,254.56
TAPERA 2 MG 230 kV TAPERA 2 MG2 RS RB FT MG 230 kV TAPERA 2 MG2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$329,798.52
TAPERA 2 MG 230 kV TAPERA 2 MG2 RS RB FT MG 230 kV TAPERA 2 MG2 RS 057/2001 IPCA RBNI REA 5603/2016 25/01/2018 24/01/2046  R$199,088.82
TAPERA 2 MG 230 kV TAPERA 2 MG2 RS RB FT MG 230 kV TAPERA 2 MG2 RS 057/2001 IPCA RMEL REN 643/2014 13/04/2014 12/04/2034  R$ 540.92
TAPERA 2 MG 230 kV TAPERA 2 MG2 RS RB FT MG 230 kV TAPERA 2 MG2 RS 057/2001 IPCA RMEL REN 643/2014 12/04/2014 11/04/2034  R$ 540.85
TAPERA 2 MG 230 kV TAPERA 2 MG2 RS RB FT MG 230 kV TAPERA 2 MG2 RS 057/2001 IPCA RBNI REA 6630/2017 20/03/2018 19/03/2035  R$12,068.99
TAPERA 2 MC 69 kV TR 230/69 kV TAPERA 2 TR2 RS  RBF FT TR 230/69 kV TAPERA 2 TR2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,874.58
TAPERA 2 MC 69 kV TR 230/69 kV TAPERA 2 TR1 RS  RBF FT TR 230/69 kV TAPERA 2 TR1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,874.58
TAPERA 2 MC 69 kV TR 230/69 kV TAPERA 2 TF3 RS RBF FT TR 230/69 kV TAPERA 2 TF3 RS 057/2001 IPCA RBNI REA 2589/2010 09/11/2012 08/11/2045  R$675,041.34
TAPERA 2 MC 230 kV TR 230/69 kV TAPERA 2 TR2 RS  RBF FT TR 230/69 kV TAPERA 2 TR2 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
TAPERA 2 MC 230 kV TR 230/69 kV TAPERA 2 TR2 RS  RBF FT TR 230/69 kV TAPERA 2 TR2 RS 057/2001 IPCA RMEL REN 643/2014 17/05/2015 16/05/2049  R$ 226.98
TAPERA 2 MC 230 kV TR 230/69 kV TAPERA 2 TR1 RS  RBF FT TR 230/69 kV TAPERA 2 TR1 RS 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
TAPERA 2 MC 230 kV TR 230/69 kV TAPERA 2 TR1 RS  RBF FT TR 230/69 kV TAPERA 2 TR1 RS 057/2001 IPCA RMEL REN 643/2014 12/04/2014 11/04/2048  R$ 178.66
TAPERA 2 MC 230 kV TR 230/69 kV TAPERA 2 TF3 RS RBF FT TR 230/69 kV TAPERA 2 TF3 RS 057/2001 IPCA RBNI REA 2589/2010 09/11/2012 08/11/2042  R$972,746.03
TAPERA 2 MC 230 kV TR 230/69 kV TAPERA 2 TF3 RS RBF FT TR 230/69 kV TAPERA 2 TF3 RS 057/2001 IPCA RMEL REN 643/2014 13/04/2014 12/04/2048  R$ 2.20
TAPERA 2 MC 230 kV BC 230 kV 0 Mvar TAPERA 2 BC1 RS RB FT BC 230 kV 50 Mvar TAPERA 2 BC1 RS 057/2001 IPCA RBNI REA 5603/2016 25/01/2018 24/01/2048  R$ 1,152,095.13
TAPERA 2 IB 69 kV MG 230 kV TAPERA 2 MG2 RS IB1 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$32,849.28
TAPERA 2 EL 69 kV TAPERA 2TAPERA 1 DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$57,137.95
TAPERA 2 EL 69 kV TAPERA 2SOLEIDADE DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$57,137.95
TAPERA 2 EL 69 kV TAPERA 2NAO-ME-TOQUE DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$57,137.95
TAPERA 2 EL 69 kV TAPERA 2IBIRUBA DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$57,137.95
TAPERA 2 EL 69 kV TAPERA 2CARAZINHO C2 DIT   057/2001 IPCA RCDM REA 2589/2010 07/01/2014 06/01/2043  R$361,998.98
TAPERA 2 EL 69 kV TAPERA 2CARAZINHO C1 DIT   057/2001 IPCA RCDM REA 2589/2010 07/01/2014 06/01/2043  R$399,545.76
TAPERA 2 BC 230 kV 0 Mvar TAPERA 2 BC1 RS RB FT BC 230 kV 50 Mvar TAPERA 2 BC1 RS 057/2001 IPCA RBNI REA 5603/2016 25/01/2018 24/01/2041  R$410,271.05
TIJUCAS EL 138 kV TIJUCAS LT 138 kV TIJUCAS /CAMBORIU M.B. C-1 SC DIT   057/2001 IPCA RCDM REA 2879/2011 20/11/2012 19/11/2040  R$637,841.02
TIJUCAS EL 138 kV TIJUCAS LT 138 kV BIGUACU /TIJUCAS C-1 SC  DIT   057/2001 IPCA RCDM REA 2879/2011 20/11/2012 19/11/2042  R$896,398.74
U.MIMOSO EL 138 kV U.MIMOSO LT 138 kV CAMPO GRANDE /U.MIMOSO C-4 MS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$90,811.37
U.MIMOSO EL 138 kV U.MIMOSO LT 138 kV CAMPO GRANDE /U.MIMOSO C-4 MS DIT   057/2001 IPCA RMEL REN 643/2014 29/08/2013 28/08/2036  R$12,672.36
U.MIMOSO EL 138 kV U.MIMOSO LT 138 kV CAMPO GRANDE /U.MIMOSO C-4 MS DIT   057/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$188,778.17
U.MIMOSO EL 138 kV U.MIMOSO LT 138 kV CAMPO GRANDE /U.MIMOSO C-3 MS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$90,811.37
U.MIMOSO EL 138 kV U.MIMOSO LT 138 kV CAMPO GRANDE /U.MIMOSO C-3 MS DIT   057/2001 IPCA RMEL REN 643/2014 29/08/2013 28/08/2036  R$12,672.36
U.MIMOSO EL 138 kV U.MIMOSO LT 138 kV CAMPO GRANDE /U.MIMOSO C-2 MS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$90,811.37
U.MIMOSO EL 138 kV U.MIMOSO LT 138 kV CAMPO GRANDE /U.MIMOSO C-2 MS DIT   057/2001 IPCA RMEL REN 643/2014 25/10/2013 24/10/2036  R$12,746.83
U.MIMOSO EL 138 kV U.MIMOSO LT 138 kV CAMPO GRANDE /U.MIMOSO C-1 MS DIT   057/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$90,811.37
U.MIMOSO EL 138 kV U.MIMOSO LT 138 kV CAMPO GRANDE /U.MIMOSO C-1 MS DIT   057/2001 IPCA RMEL REN 643/2014 25/10/2013 24/10/2036  R$12,746.83
VINHEDOS MG 230 kV VINHEDOS MG2 RS RB FT MG 230 kV VINHEDOS MG2 RS 012/2010 IPCA RBNI DSP 1247/2022 01/07/2022 30/06/2053  R$43,110.36
VINHEDOS EL 230 kV VINHEDOS LT 230 kV VINHEDOS /GARIBALDI 1 C-1 RS RB FT LT 230 kV VINHEDOS /GARIBALDI 1 C-1 RS 012/2010 IPCA RBNI DSP 1247/2022 01/07/2022 30/06/2051  R$218,170.14
VINHEDOS EL 230 kV VINHEDOS LT 230 kV MONTE CLARO /VINHEDOS C-1 RS RB FT LT 230 kV MONTE CLARO /VINHEDOS C-1 RS 012/2010 IPCA RBNI DSP 1247/2022 01/07/2022 30/06/2051  R$218,170.14
XANXERE ESU TR 230/138 kV XANXERE ESU TR4 SC RBF FT TR 230/138 kV XANXERE ESU TR4 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$340,018.74
XANXERE ESU TR 230/138 kV XANXERE ESU TR3 SC RBF FT TR 230/138 kV XANXERE ESU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$340,018.74
XANXERE ESU TR 230/138 kV XANXERE ESU TR2 SC RBF FT TR 230/138 kV XANXERE ESU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$340,018.74
XANXERE ESU TR 230/138 kV XANXERE ESU TR2 SC RBF FT TR 230/138 kV XANXERE ESU TR2 SC 057/2001 IPCA RMEL REN 643/2014 17/11/2014 16/11/2054  R$ 39.98
XANXERE ESU TR 230/138 kV XANXERE ESU TR1 SC RBF FT TR 230/138 kV XANXERE ESU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$340,018.74
XANXERE ESU TR 230/138 kV XANXERE ESU TR1 SC RBF FT TR 230/138 kV XANXERE ESU TR1 SC 057/2001 IPCA RMEL REN 643/2014 16/08/2015 15/08/2055  R$ 520.23
XANXERE ESU MG 230 kV XANXERE ESU MG2 SC RB FT MG 230 kV XANXERE ESU MG2 SC 002/2011 IPCA RBNI REA 6454/2017 01/07/2017 15/06/2040  R$56,098.09
XANXERE ESU MG 230 kV XANXERE ESU MG1 SC RB FT MG 230 kV XANXERE ESU MG1 SC 057/2001 IPCA RBNI REA 2164/2009 31/05/2012 30/05/2037  R$173,379.99
XANXERE ESU MG 230 kV XANXERE ESU MG1 SC RB FT MG 230 kV XANXERE ESU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$462,190.45
XANXERE ESU MG 230 kV XANXERE ESU MG1 SC RB FT MG 230 kV XANXERE ESU MG1 SC 057/2001 IPCA RMEL REN 643/2014 29/06/2015 28/06/2035  R$2,810.73
XANXERE ESU MG 230 kV XANXERE ESU MG1 SC RB FT MG 230 kV XANXERE ESU MG1 SC 057/2001 IPCA RMEL REN 643/2014 29/06/2015 28/06/2035  R$2,810.73
XANXERE ESU MC 230 kV TR 230/138 kV XANXERE ESU TR4 SC RBF FT TR 230/138 kV XANXERE ESU TR4 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
XANXERE ESU MC 230 kV TR 230/138 kV XANXERE ESU TR4 SC RBF FT TR 230/138 kV XANXERE ESU TR4 SC 057/2001 IPCA RMEL REN 643/2014 01/11/2014 31/10/2048  R$ 228.30
XANXERE ESU MC 230 kV TR 230/138 kV XANXERE ESU TR3 SC RBF FT TR 230/138 kV XANXERE ESU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,816.10
XANXERE ESU MC 230 kV TR 230/138 kV XANXERE ESU TR3 SC RBF FT TR 230/138 kV XANXERE ESU TR3 SC 057/2001 IPCA RMEL REN 643/2014 19/10/2014 18/10/2048  R$ 228.08
XANXERE ESU MC 230 kV BC 230 kV 100 Mvar XANXERE ESU BC1 SC  RB FT BC 230 kV 100 Mvar XANXERE ESU BC1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$135,865.08
XANXERE ESU MC 230 kV BC 230 kV 100 Mvar XANXERE ESU BC1 SC  RB FT BC 230 kV 100 Mvar XANXERE ESU BC1 SC 057/2001 IPCA RMEL REN 643/2014 01/12/2014 30/11/2046  R$ 40.72
XANXERE ESU MC 138 kV TR 230/138 kV XANXERE ESU TR4 SC RBF FT TR 230/138 kV XANXERE ESU TR4 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$80,234.15
XANXERE ESU MC 138 kV TR 230/138 kV XANXERE ESU TR3 SC RBF FT TR 230/138 kV XANXERE ESU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$80,234.15
XANXERE ESU MC 138 kV TR 230/138 kV XANXERE ESU TR2 SC RBF FT TR 230/138 kV XANXERE ESU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$80,234.15
XANXERE ESU MC 138 kV TR 230/138 kV XANXERE ESU TR1 SC RBF FT TR 230/138 kV XANXERE ESU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$80,234.15
XANXERE ESU MC 138 kV TR 230/138 kV XANXERE ESU TR1 SC RBF FT TR 230/138 kV XANXERE ESU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$166,790.30
XANXERE ESU IB 230 kV MG 230 kV XANXERE ESU MG1 SC IB1 RB FT MG 230 kV XANXERE ESU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$103,749.99
XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC RB FT LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC RB FT LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC 057/2001 IPCA RMEL REN 643/2014 21/08/2013 20/08/2036  R$20,473.13
XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC RB FT LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC 057/2001 IPCA RMEL REN 643/2014 11/01/2015 10/01/2045  R$2,630.40
XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV PATO BRANCO /XANXERE ESU C-1 PR/SC RB FT LT 230 kV PATO BRANCO /XANXERE ESU C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV PATO BRANCO /XANXERE ESU C-1 PR/SC RB FT LT 230 kV PATO BRANCO /XANXERE ESU C-1 PR/SC 057/2001 IPCA RMEL REN 643/2014 10/01/2015 09/01/2045  R$2,630.19
XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV PASSO FUNDO /XANXERE ESU C-2 RS/SC RB FT LT 230 kV PASSO FUNDO /XANXERE ESU C-2 RS/SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV PASSO FUNDO /XANXERE ESU C-2 RS/SC RB FT LT 230 kV PASSO FUNDO /XANXERE ESU C-2 RS/SC 057/2001 IPCA RMEL REN 643/2014 13/09/2014 12/09/2044  R$2,605.13
XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV PASSO FUNDO /XANXERE ESU C-1 RS/SC RB FT LT 230 kV PASSO FUNDO /XANXERE ESU C-1 RS/SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,230.56
XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV PASSO FUNDO /XANXERE ESU C-1 RS/SC RB FT LT 230 kV PASSO FUNDO /XANXERE ESU C-1 RS/SC 057/2001 IPCA RMEL REN 643/2014 17/08/2013 16/08/2036  R$20,464.68
XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV PASSO FUNDO /XANXERE ESU C-1 RS/SC RB FT LT 230 kV PASSO FUNDO /XANXERE ESU C-1 RS/SC 057/2001 IPCA RMEL REN 643/2014 28/09/2015 27/09/2045  R$2,685.11
XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-2 RS/SC  RB FT LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-2 RS/SC 002/2011 IPCA RBNI REA 6454/2017 01/07/2017 15/06/2047  R$174,841.84
BLUMENAU TR 230/138 kV BLUMENAU TR4 SC RBF FT TR 230/138 kV BLUMENAU TR4 SC 057/2001 IPCA RMELP REA 10921/2021      R$ 2,685,466.62
BLUMENAU TR 230/138 kV BLUMENAU TR3 SC RBF FT TR 230/138 kV BLUMENAU TR3 SC 057/2001 IPCA RMELP REA 10921/2021      R$ 2,685,466.62
LT230 kV MARINGA/SARANDI PR LT 230 kV MARINGA /SARANDI C-1130 PR RB FT LT 230 kV MARINGA /SARANDI C-1130 PR 057/2001 IPCA RBNIA REA 8795/2020      R$12,377.03
LT230 kV MARINGA/SARANDI PR LT 230 kV MARINGA /SARANDI C-1130 PR RB FT LT 230 kV MARINGA /SARANDI C-1130 PR 057/2001 IPCA RBNIA REA 8795/2020      R$121,685.35
LT 230 kV BLUMENAU /JOINVILLE SC LT 230 kV BLUMENAU /JOINVILLE C-1 SC RB FT LT 230 kV BLUMENAU /JOINVILLE C-1 SC 057/2001 IPCA RBNIA REA 9655/2021      R$ 1,633,046.36
LT 230 kV LONDRINA ESU /SARANDI PR LT 230 kV LONDRINA ESU /SARANDI C-1130 PR RB FT LT 230 kV LONDRINA ESU /SARANDI C-1130 PR 057/2001 IPCA RBNIA REA 8795/2020      R$88,709.23
XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-1 RS/SC  RB FT LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-1 RS/SC 002/2011 IPCA RBNI REA 6454/2017 01/07/2017 15/06/2047  R$174,841.84
XANXERE ESU BC 230 kV 100 Mvar XANXERE ESU BC1 SC RB FT BC 230 kV 100 Mvar XANXERE ESU BC1 SC 057/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$192,732.17
LT 230 kV BLUMENAU /JOINV.NORTE SC LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC RB FT LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC 057/2001 IPCA RBNIA REA 9655/2021      R$ 2,299,869.32
ANASTACIO RTB 230 kV 27 Mvar ANASTACIO RT1 MS RB FT RTB 230 kV 27 Mvar ANASTACIO RT1 MS 057/2001 IPCA RBNIA REA 10889/2021      R$951,212.85
ANASTACIO MC 230 kV RTB 230 kV 27 Mvar ANASTACIO RT1 MS  RB FT RTB 230 kV 27 Mvar ANASTACIO RT1 MS 057/2001 IPCA RBNIA REA 10889/2021      R$ 1,471,704.45
ANASTACIO EL 230 kV ANASTACIO LT 230 kV ANASTACIO /DOURADOS C-1 MS RB FT LT 230 kV ANASTACIO /DOURADOS C-1 MS 057/2001 IPCA RBNIA REA 10889/2021      R$77,956.72
ANASTACIO MG 230 kV ANASTACIO MG1 MS RB FT MG 230 kV ANASTACIO MG1 MS 057/2001 IPCA RBNIA REA 10889/2021      R$158,853.56
ANASTACIO IB 230 kV MG 230 kV ANASTACIO MG1 MS IB1 RB FT MG 230 kV ANASTACIO MG1 MS 057/2001 IPCA RBNIA REA 10889/2021      R$205,348.65
ANASTACIO MC 230 kV TR 230/138 kV ANASTACIO TR1 MS RBF FT TR 230/138 kV ANASTACIO TR1 MS 057/2001 IPCA RBNIA REA 10889/2021      R$72,713.71
ANASTACIO MC 230 kV TR 230/138 kV ANASTACIO TR2 MS RBF FT TR 230/138 kV ANASTACIO TR2 MS 057/2001 IPCA RBNIA REA 10889/2021      R$72,713.71
CHESF ABAIXADORA TT 69/13,8 kV ABAIXADORA TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
ABAIXADORA TT 69/13,8 kV ABAIXADORA TA1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$281,516.05
ABAIXADORA TT 69/13,8 kV ABAIXADORA TA1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$288,094.94
ABAIXADORA MC 13,8 kV TR 69/13,8 kV ABAIXADORA TR6 BA  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
ABAIXADORA IB 69 kV MG 230 kV ABAIXADORA MG1 BA IB2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
ABAIXADORA TR 69/69 kV ABAIXADORA TREG1 BA RBF FT TR 230/69 kV ABAIXADORA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$179,108.49
ABAIXADORA TR 69/13,8 kV ABAIXADORA TR3 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
ABAIXADORA TR 230/69 kV ABAIXADORA TRR1 BA RBF FT TR 230/69 kV ABAIXADORA TRR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$198,003.71
ABAIXADORA TR 230/69 kV ABAIXADORA TR2 BA RBF FT TR 230/69 kV ABAIXADORA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
ABAIXADORA TR 230/69 kV ABAIXADORA TR2 BA RBF FT TR 230/69 kV ABAIXADORA TR2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
ABAIXADORA TR 230/69 kV ABAIXADORA TR2 BA RBF FT TR 230/69 kV ABAIXADORA TR2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
ABAIXADORA TR 230/69 kV ABAIXADORA TR1 BA RBF FT TR 230/69 kV ABAIXADORA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$198,003.71
ABAIXADORA MG 230 kV ABAIXADORA MG1 BA RB FT MG 230 kV ABAIXADORA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$471,137.16
ABAIXADORA MG 230 kV ABAIXADORA MG1 BA RB FT MG 230 kV ABAIXADORA MG1 BA 061/2001 IPCA RMEL REN 643/2014 09/11/2015 08/11/2032  R$32,278.91
ABAIXADORA MG 230 kV ABAIXADORA MG1 BA RB FT MG 230 kV ABAIXADORA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,390,297.89
ABAIXADORA MG 230 kV ABAIXADORA MG1 BA RB FT MG 230 kV ABAIXADORA MG1 BA 061/2001 IPCA RBNI DSP 386/2021 02/12/2021 01/12/2036  R$381,388.56
ABAIXADORA MC 69 kV TR 69/13,8 kV ABAIXADORA TR6 BA  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
ABAIXADORA MC 69 kV TR 69/13,8 kV ABAIXADORA TR6 BA  DIT   061/2001 IPCA RMEL REN 443/2011 26/07/2016 25/07/2046  R$7,640.35
ABAIXADORA MC 69 kV TR 69/13,8 kV ABAIXADORA TR3 BA  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
ABAIXADORA MC 69 kV TR 69/13,8 kV ABAIXADORA TR3 BA  DIT   061/2001 IPCA RMEL REN 443/2011 26/07/2016 25/07/2046  R$7,640.35
ABAIXADORA MC 69 kV TR 230/69 kV ABAIXADORA TR2 BA  RBF FT TR 230/69 kV ABAIXADORA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
ABAIXADORA MC 69 kV TR 230/69 kV ABAIXADORA TR2 BA  RBF FT TR 230/69 kV ABAIXADORA TR2 BA 061/2001 IPCA RBNI REA 2040/2009 24/03/2013 23/03/2044  R$80,770.55
ABAIXADORA MC 69 kV TR 230/69 kV ABAIXADORA TR2 BA  RBF FT TR 230/69 kV ABAIXADORA TR2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
ABAIXADORA MC 230 kV TR 230/69 kV ABAIXADORA TR2 BA  RBF FT TR 230/69 kV ABAIXADORA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$112,343.78
ABAIXADORA MC 230 kV TR 230/69 kV ABAIXADORA TR2 BA  RBF FT TR 230/69 kV ABAIXADORA TR2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$331,519.86
ABAIXADORA EL 69 kV ABAIXADORA LT 69 kV ABAIXADORA /MULUNGU C-1 BA  DIT   061/2001 IPCA RMEL REN 443/2011 26/07/2016 25/07/2046  R$10,187.14
ABAIXADORA MC 13,8 kV TR 69/13,8 kV ABAIXADORA TR3 BA  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
ABAIXADORA EL 69 kV ABAIXADORA LT 69 kV ABAIXADORA /MOXOTO C-1 BA  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ABAIXADORA IB 230 kV MG 230 kV ABAIXADORA MG1 BA IB1 RB FT MG 230 kV ABAIXADORA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,929.18
ABAIXADORA EL 69 kV ABAIXADORA LT 69 kV ABAIXADORA /ZEBU C-1 BA/AL  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
CAMACARI II TR 500/230 kV CAMACARI II TR3 BA RB FT TR 500/230 kV CAMACARI II TR3 BA 061/2001 IPCA RMELP REA 14107/2023      R$ 2,261,150.05
LT 230 kV IBIAPINA II /SOBRAL II CE LT 230 kV IBIAPINA II /SOBRAL II C-1 CE RB FT LT 230 kV IBIAPINA II /SOBRAL II C-1 CE 061/2001 IPCA RBNIA REA 5987/2016      R$878,870.37
MESSIAS IB 230 kV MG 500 kV MESSIAS MG1 AL IB1 RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBNIA REA 8328/2019      R$186,163.70
MESSIAS IB 500 kV MG 500 kV MESSIAS MG1 AL IB3 RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBNIA REA 8328/2019      R$ 1,451,071.81
MESSIAS MC 230 kV TR 500/230 kV MESSIAS TR4 AL  RB FT TR 500/230 kV MESSIAS TR4 AL 061/2001 IPCA RBNIA REA 8328/2019      R$ 2,260,820.70
MESSIAS MC 500 kV TR 500/230 kV MESSIAS TR4 AL  RB FT TR 500/230 kV MESSIAS TR4 AL 061/2001 IPCA RBNIA REA 8328/2019      R$ 1,605,567.09
MESSIAS MG 500 kV MESSIAS MG1 AL RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBNIA REA 8328/2019      R$929,110.38
MESSIAS TR 500/230 kV MESSIAS TR4 AL RB FT TR 500/230 kV MESSIAS TR4 AL 061/2001 IPCA RBNIA REA 8328/2019      R$ 4,106,439.10
RECIFE II TR 500/230 kV RECIFE II TR4 PE RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RMELP REA 14107/2023      R$ 1,475,458.61
S.JOAO PIAUI RTB 500 kV 33,33 Mvar S.JOAO PIAUI RTR5 PI RB FT RTB 500 kV 33,33 Mvar S.JOAO PIAUI RTR5 PI 061/2001 IPCA RMELP REA 9706/2021      R$530,105.94
U.SOBRADINHO RTL 500 kV 50 Mvar U.SOBRADINHO RTR3 BA RB FT RTL 500 kV 50 Mvar U.SOBRADINHO RTR3 BA 061/2001 IPCA RMELP REA 14107/2023      R$823,435.45
ABAIXADORA EL 69 kV ABAIXADORA LT 69 kV ABAIXADORA /ZEBU C-1 BA/AL  DIT   061/2001 IPCA RMEL REN 443/2011 26/07/2016 25/07/2046  R$5,093.57
ABAIXADORA EL 69 kV ABAIXADORA LT 69 kV ABAIXADORA /MULUNGU C-1 BA  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ABAIXADORA EL 69 kV ABAIXADORA LT 69 kV ABAIXADORA /MOXOTO C-1 BA  DIT   061/2001 IPCA RMEL REN 443/2011 26/07/2016 25/07/2046  R$10,187.14
ABAIXADORA EL 69 kV ABAIXADORADELMIRO GOUVEIA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ABAIXADORA EL 69 kV ABAIXADORADELMIRO GOUVEIA DIT   061/2001 IPCA RMEL REN 443/2011 26/07/2016 25/07/2046  R$5,093.57
ACARAU II TT 69/0 kV ACARAU II TT1 CE ICG   021/2010 IPCA RICG CC 021/2010 23/11/2010 23/11/2040  R$93,546.86
ACARAU II TR 230/69 kV ACARAU II TR2 CE ICG   021/2010 IPCA RICG CC 021/2010 23/11/2010 23/11/2040  R$ 1,071,591.74
ACARAU II RTB 230 kV 20 Mvar ACARAU II RT1 CE RB FT RTB 230 kV 20 Mvar ACARAU II RT1 CE 021/2010 IPCA RBL CC 021/2010 08/04/2014 23/11/2040  R$497,497.87
ACARAU II MC 230 kV TR 230/69 kV ACARAU II TR1 CE  ICG   021/2010 IPCA RICG CC 021/2010 23/11/2010 23/11/2040  R$416,948.59
ACARAU II TR 230/69 kV ACARAU II TR1 CE ICG   021/2010 IPCA RICG CC 021/2010 23/11/2010 23/11/2040  R$ 1,071,591.74
ACARAU II IB 69 kV MG 69 kV ACARAU II MG1 CE IB1 ICG   021/2010 IPCA RICG CC 021/2010 23/11/2010 23/11/2040  R$115,675.27
ACARAU II MG 69 kV ACARAU II MG1 CE ICG   021/2010 IPCA RICG CC 021/2010 23/11/2010 23/11/2040  R$72,861.60
ACARAU II MG 230 kV ACARAU II MG1 CE RB FT MG 230 kV ACARAU II MG1 CE 021/2010 IPCA RBL CC 021/2010 08/04/2014 23/11/2040  R$740,737.19
ACARAU II MG 230 kV ACARAU II MG1 CE RB FT MG 230 kV ACARAU II MG1 CE 021/2010 IPCA RBNI REN 905/2020 16/10/2020 15/10/2051  R$33,855.15
ACARAU II MG 230 kV ACARAU II MG1 CE RB FT MG 230 kV ACARAU II MG1 CE 021/2010 IPCA RBNI REN 905/2020 16/10/2020 15/10/2051  R$33,855.15
ACARAU II MC 69 kV TT 69/0 kV ACARAU II TT1 CE  ICG   021/2010 IPCA RICG CC 021/2010 23/11/2010 23/11/2040  R$72,353.24
ACARAU II MC 69 kV TR 230/69 kV ACARAU II TR2 CE  ICG   021/2010 IPCA RICG CC 021/2010 23/11/2010 23/11/2040  R$169,641.38
ACARAU II MC 69 kV TR 230/69 kV ACARAU II TR1 CE  ICG   021/2010 IPCA RICG CC 021/2010 23/11/2010 23/11/2040  R$169,641.38
ACARAU II MC 230 kV TR 230/69 kV ACARAU II TR2 CE  ICG   021/2010 IPCA RICG CC 021/2010 23/11/2010 23/11/2040  R$416,948.59
ACARAU II EL 230 kV ACARAU II LT 230 kV SOBRAL III /ACARAU II C-1 CE RB FT LT 230 kV SOBRAL III /ACARAU II C-1 CE 021/2010 IPCA RBL CC 021/2010 08/04/2014 23/11/2040  R$489,113.45
ACARAU II MC 230 kV RTB 230 kV 20 Mvar ACARAU II RT1 CE  RB FT RTB 230 kV 20 Mvar ACARAU II RT1 CE 021/2010 IPCA RBL CC 021/2010 08/04/2014 23/11/2040  R$335,115.83
ACARAU II EL 69 kV ACARAU IIDIST02 DIT   021/2010 IPCA RCDM REN 905/2020 16/10/2020 15/10/2047  R$350,964.36
ACARAU II EL 69 kV ACARAU IIDIST01 DIT   021/2010 IPCA RCDM REN 905/2020 16/10/2020 15/10/2047  R$350,964.36
ACU II TT 69/13,8 kV ACU II TA1 RN DIT   061/2001 IPCA RCDM REA 3578/2012 11/10/2015 10/10/2045  R$224,877.00
ACU II TR 230/69 kV ACU II TR7 RN RBF FT TR 230/69 kV ACU II TR7 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$266,604.65
ACU II TR 230/69 kV ACU II TR6 RN RBF FT TR 230/69 kV ACU II TR6 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$805,120.16
ACU II TR 230/69 kV ACU II TR5 RN RBF FT TR 230/69 kV ACU II TR5 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,584.08
ACU II TR 230/69 kV ACU II TR6 RN RBF FT TR 230/69 kV ACU II TR6 RN 061/2001 IPCA RBNI REA 2968/2011 05/04/2013 04/04/2043  R$402,084.78
ACU II TR 230/69 kV ACU II TR6 RN RBF FT TR 230/69 kV ACU II TR6 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$266,604.65
ACU II TR 230/69 kV ACU II TR6 RN RBF FT TR 230/69 kV ACU II TR6 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$786,734.57
ACU II MG 230 kV ACU II MG1 RN RB FT MG 230 kV ACU II MG1 RN 061/2001 IPCA RBNI REA 2837/2011 26/03/2013 25/03/2053  R$4,577.28
ACU II TR 230/69 kV ACU II TR5 RN RBF FT TR 230/69 kV ACU II TR5 RN 061/2001 IPCA RBNI REA 2460/2010 08/04/2013 07/04/2043  R$402,171.24
ACU II MG 230 kV ACU II MG1 RN RB FT MG 230 kV ACU II MG1 RN 061/2001 IPCA RMEL REN 643/2014 03/12/2013 02/12/2030  R$29,440.38
ACU II TR 230/69 kV ACU II TR4 RN RBF FT TR 230/69 kV ACU II TR4 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,584.08
ACU II TR 230/138 kV ACU II TR3 RN RBF FT TR 230/138 kV ACU II TR3 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$399,926.80
ACU II TR 230/138 kV ACU II TR2 RN RBF FT TR 230/138 kV ACU II TR2 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$399,926.80
ACU II RTB 13,8 kV 5 MVAr ACU II RT1 RN RBF FT RTB 13,8 kV 5 MVAr ACU II RT1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$135,222.37
ACU II MG 230 kV ACU II MG1 RN RB FT MG 230 kV ACU II MG1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$743,521.71
ACU II MG 230 kV ACU II MG1 RN RB FT MG 230 kV ACU II MG1 RN 061/2001 IPCA RMEL REN 643/2014 23/05/2015 22/05/2043  R$75,350.16
ACU II MG 230 kV ACU II MG1 RN RB FT MG 230 kV ACU II MG1 RN 061/2001 IPCA RMEL REN 643/2014 17/12/2015 16/12/2029  R$44,392.00
ACU II MG 230 kV ACU II MG1 RN RB FT MG 230 kV ACU II MG1 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,194,088.59
ACU II MG 230 kV ACU II MG1 RN RB FT MG 230 kV ACU II MG1 RN 061/2001 IPCA RMEL REN 443/2011 04/10/2016 03/10/2033  R$33,605.73
ACU II MC 69 kV TR 230/69 kV ACU II TR7 RN RBF FT TR 230/69 kV ACU II TR7 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
ACU II MG 230 kV ACU II MG1 RN RB FT MG 230 kV ACU II MG1 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,245,363.33
ACU II MC 69 kV TR 230/69 kV ACU II TR6 RN  RBF FT TR 230/69 kV ACU II TR6 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
ACU II MC 230 kV TR 230/138 kV ACU II TR2 RN RBF FT TR 230/138 kV ACU II TR2 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$515,473.59
ACU II MC 13,8 kV RTB 13,8 kV 5 MVAr ACU II RT1 RN  RBF FT RTB 13,8 kV 5 MVAr ACU II RT1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,511.84
ACU II MC 69 kV TR 230/69 kV ACU II TR6 RN  RBF FT TR 230/69 kV ACU II TR6 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
ACU II MC 69 kV TR 230/69 kV ACU II TR6 RN  RBF FT TR 230/69 kV ACU II TR6 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$204,189.21
ACU II MC 69 kV TR 230/69 kV ACU II TR5 RN  RBF FT TR 230/69 kV ACU II TR5 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
ACU II MC 69 kV TR 230/69 kV ACU II TR4 RN RBF FT TR 230/69 kV ACU II TR4 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
ACU II MC 230 kV TR 230/69 kV ACU II TR7 RN RBF FT TR 230/69 kV ACU II TR7 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
ACU II MC 230 kV TR 230/69 kV ACU II TR6 RN  RBF FT TR 230/69 kV ACU II TR6 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
ACU II MC 230 kV TR 230/69 kV ACU II TR6 RN  RBF FT TR 230/69 kV ACU II TR6 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$515,473.59
ACU II MC 230 kV TR 230/69 kV ACU II TR6 RN  RBF FT TR 230/69 kV ACU II TR6 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$527,519.95
ACU II MC 230 kV TR 230/69 kV ACU II TR5 RN  RBF FT TR 230/69 kV ACU II TR5 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
ACU II MC 230 kV TR 230/69 kV ACU II TR4 RN RBF FT TR 230/69 kV ACU II TR4 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
ACU II MC 230 kV TR 230/138 kV ACU II TR3 RN  RBF FT TR 230/138 kV ACU II TR3 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
ACU II MC 230 kV TR 230/138 kV ACU II TR2 RN RBF FT TR 230/138 kV ACU II TR2 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
ACU II MC 13,8 kV BC 13,8 kV 3,6 MVAr ACU II BC4 RN  RBF FT BC 13,8 kV 3,6 MVAr ACU II BC4 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
ACU II MC 138 kV TR 230/138 kV ACU II TR3 RN  RBF FT TR 230/138 kV ACU II TR3 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$121,202.15
ACU II MC 138 kV TR 230/138 kV ACU II TR2 RN RBF FT TR 230/138 kV ACU II TR2 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$121,202.15
ACU II MC 138 kV TR 230/138 kV ACU II TR2 RN RBF FT TR 230/138 kV ACU II TR2 RN 061/2001 IPCA RMEL REN 443/2011 10/04/2016 09/04/2046  R$12,569.72
ACU II MC 13,8 kV TR 230/69 kV ACU II TR5 RN  RBF FT TR 230/69 kV ACU II TR5 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
ACU II MC 13,8 kV TR 230/69 kV ACU II TR4 RN RBF FT TR 230/69 kV ACU II TR4 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
ACU II MC 13,8 kV BC 13,8 kV 3,6 MVAr ACU II BC3 RN  RBF FT BC 13,8 kV 3,6 MVAr ACU II BC3 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
ACU II MC 13,8 kV BC 13,8 kV 3,6 MVAr ACU II BC4 RN  RBF FT BC 13,8 kV 3,6 MVAr ACU II BC4 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
ACU II MC 13,8 kV BC 13,8 kV 3,6 MVAr ACU II BC3 RN  RBF FT BC 13,8 kV 3,6 MVAr ACU II BC3 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
ACU II MC 13,8 kV BC 13,8 kV 3,1 MVAr ACU II BC2 RN  RBF FT BC 13,8 kV 3,1 MVAr ACU II BC2 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
ACU II IB 69 kV MG 230 kV ACU II MG1 RN IB2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
ACU II IB 69 kV MG 230 kV ACU II MG1 RN IB2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$134,104.45
ACU II MC 13,8 kV BC 13,8 kV 3,1 MVAr ACU II BC1 RN  RBF FT BC 13,8 kV 3,1 MVAr ACU II BC1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
ACU II IB 230 kV MG 230 kV ACU II MG1 RN IB1 RB FT MG 230 kV ACU II MG1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
ACU II IB 230 kV MG 230 kV ACU II MG1 RN IB1 RB FT MG 230 kV ACU II MG1 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$423,550.65
ACU II EL 69 kV ACU IIDIST3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
ACU II EL 69 kV ACU IIDIST2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
ACU II IB 138 kV MG 230 kV ACU II MG1 RN IB3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$93,640.20
ACU II IB 13,8 kV MG 230 kV ACU II MG1 RN IB4 RBF FT TR 230/69 kV ACU II TR5 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$30,025.46
ACU II IB 13,8 kV MG 230 kV ACU II MG1 RN IB4 RBF FT TR 230/69 kV ACU II TR5 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$88,603.37
ACU II EL 69 kV ACU IIDIST5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ACU II EL 69 kV ACU IIDIST5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
ACU II EL 69 kV ACU IIDIST4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ACU II EL 69 kV ACU IIDIST4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
ACU II EL 69 kV ACU IIDIST3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ACU II EL 69 kV ACU IIDIST3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
ACU II EL 69 kV ACU IIDIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ACU II EL 69 kV ACU IIDIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ACU II EL 230 kV ACU II LT 230 kV PARAISO /ACU II C-1395 RN RB FT LT 230 kV PARAISO /ACU II C-3 RN 019/2010 IPCA RBL CC 019/2010 23/11/2010 23/11/2040  R$369,593.42
ACU II EL 230 kV ACU II LT 230 kV ACU III /ACU II C-3 RN RB FT LT 230 kV ACU III /ACU II C-3 RN 019/2010 IPCA RBL CC 019/2010 23/11/2010 23/11/2040  R$369,593.42
ACU II EL 69 kV ACU IIDIST1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
ACU II EL 230 kV ACU II LT 230 kV PARAISO /ACU II C-2 RN RB FT LT 230 kV PARAISO /ACU II C-2 RN 012/2007 IPCA RBL CC 012/2007 14/06/2007 14/06/2037  R$520,503.54
ACU II EL 230 kV ACU II LT 230 kV ACU III /ACU II C-1 RN  RB FT LT 230 kV ACU III /ACU II C-1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
ACU II EL 230 kV ACU II LT 230 kV ACU III /ACU II C-1 RN  RB FT LT 230 kV ACU III /ACU II C-1 RN 061/2001 IPCA RBNI REA 5861/2016 10/06/2016 09/06/2044  R$28,900.49
ACU II EL 230 kV ACU II LT 230 kV ACU III /ACU II C-1 RN  RB FT LT 230 kV ACU III /ACU II C-1 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
ACU II EL 230 kV ACU II LT 230 kV ACU III /ACU II C-1 RN  RB FT LT 230 kV ACU III /ACU II C-1 RN 061/2001 IPCA RBNI REA 5861/2016 10/06/2016 09/06/2031  R$120,229.77
ACU II EL 138 kV ACU II LT 138 kV ACU II /SAN.MATOS II C-1 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$180,723.85
ACU II EL 138 kV ACU IIDIST4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$180,723.85
ACU II EL 138 kV ACU IIDIST3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$180,723.85
ACU II BC 13,8 kV 3,6 MVAr ACU II BC4 RN RBF FT BC 13,8 kV 3,6 MVAr ACU II BC4 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
ACU II BC 13,8 kV 3,6 MVAr ACU II BC4 RN RBF FT BC 13,8 kV 3,6 MVAr ACU II BC4 RN 061/2001 IPCA RMEL REN 643/2014 15/01/2014 14/01/2028  R$48,710.69
ACU II BC 13,8 kV 3,6 MVAr ACU II BC4 RN RBF FT BC 13,8 kV 3,6 MVAr ACU II BC4 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$94,657.45
ACU II BC 13,8 kV 3,6 MVAr ACU II BC3 RN RBF FT BC 13,8 kV 3,6 MVAr ACU II BC3 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
ACU II BC 13,8 kV 3,6 MVAr ACU II BC3 RN RBF FT BC 13,8 kV 3,6 MVAr ACU II BC3 RN 061/2001 IPCA RMEL REN 643/2014 24/01/2014 23/01/2028  R$48,777.17
ACU II BC 13,8 kV 3,6 MVAr ACU II BC3 RN RBF FT BC 13,8 kV 3,6 MVAr ACU II BC3 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$94,657.45
ACU II BC 13,8 kV 3,1 MVAr ACU II BC2 RN RBF FT BC 13,8 kV 3,1 MVAr ACU II BC2 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
ACU II BC 13,8 kV 3,1 MVAr ACU II BC2 RN RBF FT BC 13,8 kV 3,1 MVAr ACU II BC2 RN 061/2001 IPCA RMEL REN 643/2014 17/01/2014 16/01/2028  R$48,725.46
ACU II BC 13,8 kV 3,1 MVAr ACU II BC1 RN RBF FT BC 13,8 kV 3,1 MVAr ACU II BC1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
ACU II BC 13,8 kV 3,1 MVAr ACU II BC1 RN RBF FT BC 13,8 kV 3,1 MVAr ACU II BC1 RN 061/2001 IPCA RMEL REN 643/2014 22/01/2014 21/01/2028  R$48,762.39
ACU III MG 230 kV ACU III MG7 RN RB FT MG 230 kV ACU III MG7 RN 061/2001 IPCA RBNI DSP 1307/2022 01/07/2022 30/06/2053  R$40,256.74
ACU III MG 230 kV ACU III MG6 RN RB FT MG 230 kV ACU III MG6 RN 019/2010 IPCA RBNI DSP 1269/2022 01/07/2022 30/06/2053  R$40,256.74
ACU III EL 230 kV ACU III LT 230 kV ACU III /ACU II C-1 RN  RB FT LT 230 kV ACU III /ACU II C-1 RN 061/2001 IPCA RBNI DSP 1307/2022 01/07/2022 30/06/2051  R$204,753.60
ACU III EL 230 kV ACU III LT 230 kV MOSSORO II /ACU III C-2 RN RB FT LT 230 kV MOSSORO II /ACU III C-2 RN 019/2010 IPCA RBNI DSP 1269/2022 01/07/2022 30/06/2051  R$204,753.60
ACU III EL 230 kV ACU III LT 230 kV MOSSORO II /ACU III C-1 RN RB FT LT 230 kV MOSSORO II /ACU III C-1 RN 061/2001 IPCA RBNI DSP 1307/2022 01/07/2022 30/06/2051  R$204,753.60
ACU III EL 230 kV ACU III LT 230 kV ACU III /ACU II C-3 RN RB FT LT 230 kV ACU III /ACU II C-3 RN 019/2010 IPCA RBNI DSP 1269/2022 01/07/2022 30/06/2051  R$204,753.60
ALEX MG 230 kV ALEX MG1 CE RB FT MG 230 kV ALEX MG1 CE 061/2001 IPCA RBNI DSP 1183/2022 01/07/2022 30/06/2053  R$60,385.08
ALEX MG 230 kV ALEX MG1 CE RB FT MG 230 kV ALEX MG1 CE 061/2001 IPCA RBNI DSP 1183/2022 01/07/2022 30/06/2040  R$58,396.52
ALEX IB 230 kV MG 230 kV ALEX MG1 CE IB1 RB FT MG 230 kV ALEX MG1 CE 061/2001 IPCA RBNI DSP 1183/2022 01/07/2022 30/06/2052  R$146,339.36
ALEX EL 230 kV ALEX LT 230 kV BANABUIU /ALEX C-1 CE  RB FT LT 230 kV BANABUIU /ALEX C-1 CE 061/2001 IPCA RBNI DSP 1183/2022 01/07/2022 30/06/2051  R$203,728.71
ALEX EL 230 kV ALEX LT 230 kV ALEX /MOSSORO II C-1 CE/RN  RB FT LT 230 kV ALEX /MOSSORO II C-1 CE/RN 061/2001 IPCA RBNI DSP 1183/2022 01/07/2022 30/06/2051  R$203,728.71
ANGELIM TT 69/13,8 kV ANGELIM TA2 PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
ANGELIM TT 69/13,8 kV ANGELIM TA2 PE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$281,516.05
ANGELIM TT 69/13,8 kV ANGELIM TA2 PE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$288,094.94
ANGELIM TT 69/13,8 kV ANGELIM TA1 PE DIT   061/2001 IPCA RCDM REA 3578/2012 27/11/2015 26/11/2045  R$225,580.71
ANGELIM TR 69/13,8 kV ANGELIM TR4B PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
ANGELIM TR 69/13,8 kV ANGELIM TR4A PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
ANGELIM TR 230/69 kV ANGELIM TR6 PE RBF FT TR 230/69 kV ANGELIM TR6 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
ANGELIM TR 69/13,8 kV ANGELIM TR4B PE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$86,722.45
ANGELIM TR 69/13,8 kV ANGELIM TR4B PE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$88,749.11
ANGELIM TR 230/69 kV ANGELIM TR5 PE RBF FT TR 230/69 kV ANGELIM TR5 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
ANGELIM TR 230/69 kV ANGELIM TR5 PE RBF FT TR 230/69 kV ANGELIM TR5 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
ANGELIM TR 230/69 kV ANGELIM TR5 PE RBF FT TR 230/69 kV ANGELIM TR5 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
ANGELIM TR 230/69 kV ANGELIM TR3 PE RBF FT TR 230/69 kV ANGELIM TR3 PE 061/2001 IPCA RMEL REA 9918/2021 05/12/2022 05/12/2057  R$ 1,704,578.54
ANGELIM MG 230 kV ANGELIM MG1 PE RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$814,548.37
ANGELIM MG 230 kV ANGELIM MG1 PE RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,403,684.06
ANGELIM MG 230 kV ANGELIM MG1 PE RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,459,856.94
ANGELIM MG 230 kV ANGELIM MG1 PE RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2029  R$38,745.79
ANGELIM MG 230 kV ANGELIM MG1 PE RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RMEL REN 443/2011 04/08/2016 03/08/2033  R$33,360.47
ANGELIM MG 230 kV ANGELIM MG1 PE RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RMEL REN 443/2011 18/07/2016 17/07/2046  R$4,026.18
ANGELIM MG 230 kV ANGELIM MG1 PE RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RMEL REN 443/2011 01/04/2016 31/03/2030  R$56,251.50
ANGELIM MC 69 kV TR 69/13,8 kV ANGELIM TR4A PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
ANGELIM MC 69 kV TR 69/13,8 kV ANGELIM TR4A PE DIT   061/2001 IPCA RMEL REN 643/2014 26/10/2015 25/10/2029  R$5,394.54
ANGELIM MC 69 kV TR 69/13,8 kV ANGELIM TR4A PE DIT   061/2001 IPCA RMEL REN 643/2014 27/10/2015 26/10/2029  R$2,590.76
ANGELIM MC 69 kV TR 230/69 kV ANGELIM TR6 PE RBF FT TR 230/69 kV ANGELIM TR6 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
ANGELIM MC 69 kV TR 230/69 kV ANGELIM TR5 PE RBF FT TR 230/69 kV ANGELIM TR5 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
ANGELIM MC 69 kV TR 230/69 kV ANGELIM TR5 PE RBF FT TR 230/69 kV ANGELIM TR5 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$204,189.21
ANGELIM MC 69 kV TR 230/69 kV ANGELIM TR5 PE RBF FT TR 230/69 kV ANGELIM TR5 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
ANGELIM MC 69 kV TR 230/69 kV ANGELIM TR3 PE  RBF FT TR 230/69 kV ANGELIM TR3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
ANGELIM MC 69 kV TR 230/69 kV ANGELIM TR3 PE  RBF FT TR 230/69 kV ANGELIM TR3 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$204,189.21
ANGELIM MC 230 kV TR 230/69 kV ANGELIM TR6 PE RBF FT TR 230/69 kV ANGELIM TR6 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
ANGELIM MC 69 kV TR 230/69 kV ANGELIM TR3 PE  RBF FT TR 230/69 kV ANGELIM TR3 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
ANGELIM MC 230 kV TR 230/69 kV ANGELIM TR5 PE RBF FT TR 230/69 kV ANGELIM TR5 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
ANGELIM MC 230 kV TR 230/69 kV ANGELIM TR5 PE RBF FT TR 230/69 kV ANGELIM TR5 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$515,473.59
ANGELIM MC 230 kV TR 230/69 kV ANGELIM TR5 PE RBF FT TR 230/69 kV ANGELIM TR5 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$527,519.95
ANGELIM MC 230 kV TR 230/69 kV ANGELIM TR3 PE  RBF FT TR 230/69 kV ANGELIM TR3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
ANGELIM MC 230 kV TR 230/69 kV ANGELIM TR3 PE  RBF FT TR 230/69 kV ANGELIM TR3 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$527,519.95
ANGELIM MC 13,8 kV TR 69/13,8 kV ANGELIM TR4A PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
ANGELIM MC 230 kV TR 230/69 kV ANGELIM TR3 PE  RBF FT TR 230/69 kV ANGELIM TR3 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$515,473.59
ANGELIM IB 69 kV MG 230 kV ANGELIM MG1 PE IB3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$134,104.45
ANGELIM IB 230 kV MG 230 kV ANGELIM MG1 PE IB1 RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
ANGELIM IB 69 kV MG 230 kV ANGELIM MG1 PE IB3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
ANGELIM IB 230 kV MG 230 kV ANGELIM MG1 PE IB1 RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$423,550.65
ANGELIM IB 69 kV MG 230 kV ANGELIM MG1 PE IB3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$137,238.41
ANGELIM IB 230 kV MG 230 kV ANGELIM MG1 PE IB2 RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
ANGELIM EL 69 kV ANGELIMDIST8 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ANGELIM EL 69 kV ANGELIMDIST8 DIT   061/2001 IPCA RMEL REN 643/2014 26/10/2015 25/10/2029  R$7,433.29
ANGELIM EL 69 kV ANGELIMDIST8 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
ANGELIM EL 69 kV ANGELIMDIST8 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
ANGELIM EL 69 kV ANGELIMDIST7 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ANGELIM EL 69 kV ANGELIMDIST7 DIT   061/2001 IPCA RMEL REN 643/2014 22/10/2015 21/10/2029  R$10,130.70
ANGELIM EL 69 kV ANGELIMDIST7 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
ANGELIM EL 69 kV ANGELIMDIST7 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
ANGELIM EL 69 kV ANGELIMDIST6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ANGELIM EL 69 kV ANGELIMDIST6 DIT   061/2001 IPCA RMEL REN 643/2014 19/10/2015 18/10/2029  R$9,901.47
ANGELIM EL 69 kV ANGELIMDIST6 DIT   061/2001 IPCA RMEL REN 443/2011 13/06/2016 12/06/2039  R$2,427.09
ANGELIM EL 69 kV ANGELIMDIST6 DIT   061/2001 IPCA RMEL REN 443/2011 12/06/2016 11/06/2039  R$2,426.88
ANGELIM EL 69 kV ANGELIMDIST6 DIT   061/2001 IPCA RMEL REN 443/2011 12/06/2016 11/06/2039  R$2,426.88
ANGELIM EL 69 kV ANGELIMDIST5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ANGELIM EL 69 kV ANGELIMDIST5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
ANGELIM EL 69 kV ANGELIMDIST5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
ANGELIM EL 69 kV ANGELIMDIST5 DIT   061/2001 IPCA RMEL REN 443/2011 02/05/2016 01/05/2030  R$2,395.98
ANGELIM EL 69 kV ANGELIMDIST4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ANGELIM EL 69 kV ANGELIMDIST4 DIT   061/2001 IPCA RMEL REN 643/2014 21/10/2015 20/10/2029  R$9,904.20
ANGELIM EL 69 kV ANGELIMDIST4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
ANGELIM EL 69 kV ANGELIMDIST4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
ANGELIM EL 69 kV ANGELIMDIST3 DIT   061/2001 IPCA RMEL REN 643/2014 27/10/2015 26/10/2029  R$2,478.09
ANGELIM EL 69 kV ANGELIMDIST3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
ANGELIM EL 69 kV ANGELIMDIST3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ANGELIM EL 69 kV ANGELIMDIST3 DIT   061/2001 IPCA RMEL REN 643/2014 24/10/2015 23/10/2029  R$4,954.15
ANGELIM EL 69 kV ANGELIMDIST3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
ANGELIM EL 69 kV ANGELIMDIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ANGELIM EL 69 kV ANGELIMDIST2 DIT   061/2001 IPCA RMEL REN 643/2014 27/10/2015 26/10/2029  R$2,478.09
ANGELIM EL 69 kV ANGELIMDIST2 DIT   061/2001 IPCA RMEL REN 643/2014 23/10/2015 22/10/2029  R$4,953.47
ANGELIM EL 69 kV ANGELIMDIST2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
ANGELIM EL 69 kV ANGELIMDIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ANGELIM EL 69 kV ANGELIMDIST1 DIT   061/2001 IPCA RMEL REN 643/2014 20/10/2015 19/10/2029  R$10,015.37
ANGELIM EL 69 kV ANGELIMDIST2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
ANGELIM EL 230 kV ANGELIM LT 230 kV SANTANA II /ANGELIM C-1 AL/PE  RB FT LT 230 kV SANTANA II /ANGELIM C-1 AL/PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
ANGELIM EL 230 kV ANGELIM LT 230 kV SANTANA II /ANGELIM C-1 AL/PE  RB FT LT 230 kV SANTANA II /ANGELIM C-1 AL/PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
ANGELIM EL 230 kV ANGELIM LT 230 kV SANTANA II /ANGELIM C-1 AL/PE  RB FT LT 230 kV SANTANA II /ANGELIM C-1 AL/PE 061/2001 IPCA RBNI REA 2837/2011 20/03/2015 19/03/2045  R$43,989.94
ANGELIM EL 230 kV ANGELIM LT 230 kV GARANHUNS II /ANGELIM C-3 PE  RB FT LT 230 kV GARANHUNS II /ANGELIM C-3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
ANGELIM EL 230 kV ANGELIM LT 230 kV GARANHUNS II /ANGELIM C-3 PE  RB FT LT 230 kV GARANHUNS II /ANGELIM C-3 PE 061/2001 IPCA RBNI REA 2837/2011 14/04/2015 13/04/2045  R$44,075.93
ANGELIM EL 230 kV ANGELIM LT 230 kV GARANHUNS II /ANGELIM C-1 PE  RB FT LT 230 kV GARANHUNS II /ANGELIM C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-3 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
ANGELIM EL 230 kV ANGELIM LT 230 kV GARANHUNS II /ANGELIM C-2 PE  RB FT LT 230 kV GARANHUNS II /ANGELIM C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-3 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-3 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-2 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-2 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-3 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-3 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$735,719.99
ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-2 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$735,719.99
ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-1 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-1 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-1 PE 061/2001 IPCA RBNI REA 2837/2011 30/04/2015 29/04/2045  R$44,130.98
ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-1 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-1 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$735,719.99
ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /RIBEIRAO C-2 PE  RB FT LT 230 kV ANGELIM /RIBEIRAO C-2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$735,719.99
ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /RIBEIRAO C-1 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /RIBEIRAO C-2 PE  RB FT LT 230 kV ANGELIM /RIBEIRAO C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /RIBEIRAO C-2 PE  RB FT LT 230 kV ANGELIM /RIBEIRAO C-2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /RIBEIRAO C-1 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /RIBEIRAO C-1 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$735,719.99
ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /RECIFE II C-1 PE RB FT LT 230 kV ANGELIM /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /RECIFE II C-1 PE RB FT LT 230 kV ANGELIM /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /RECIFE II C-1 PE RB FT LT 230 kV ANGELIM /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$735,719.99
ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-3 PE/AL  RB FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-3 PE/AL  RB FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-3 PE/AL  RB FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL 061/2001 IPCA RMEL REN 443/2011 02/06/2016 01/06/2046  R$2,016.54
ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-2 PE/AL  RB FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-2 PE/AL  RB FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL 061/2001 IPCA RBNI REA 2837/2011 26/03/2015 25/03/2045  R$44,010.57
ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-2 PE/AL  RB FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-2 PE/AL  RB FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL 061/2001 IPCA RMEL REN 443/2011 29/04/2016 28/04/2046  R$2,034.14
ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-1 PE/AL  RB FT LT 230 kV ANGELIM /MESSIAS C-1 PE/AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-1 PE/AL  RB FT LT 230 kV ANGELIM /MESSIAS C-1 PE/AL 061/2001 IPCA RBNI REA 2837/2011 13/03/2015 12/03/2045  R$29,310.56
ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-1 PE/AL  RB FT LT 230 kV ANGELIM /MESSIAS C-1 PE/AL 061/2001 IPCA RMEL REN 443/2011 04/08/2015 03/08/2045  R$16,128.71
ANGELIM EL 13,8 kV ANGELIMPALMERINA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
ANGELIM II RTL 500 kV 150 MVAr ANGELIM II RT3 PE RB FT LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$834,668.23
ANGELIM EL 13,8 kV ANGELIMAUXIL2 RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
ANGELIM EL 13,8 kV ANGELIMAUXIL1 RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
ANGELIM II RTL 500 kV 150 MVAr ANGELIM II RT3 PE RB FT LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,463,056.59
ANGELIM II RTB 500 kV 50 MVAr ANGELIM II RTR1 PE RB FT RTB 500 kV 50 MVAr ANGELIM II RTR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$278,222.74
ANGELIM II RTL 500 kV 150 MVAr ANGELIM II RT2 PE RB FT LT 230 kV GARANHUNS II /ANGELIM C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$834,668.23
ANGELIM II RTL 500 kV 150 MVAr ANGELIM II RT2 PE RB FT LT 230 kV GARANHUNS II /ANGELIM C-1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,463,056.59
ANGELIM II RTB 500 kV 50 MVAr ANGELIM II RTR1 PE RB FT RTB 500 kV 50 MVAr ANGELIM II RTR1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$821,018.86
ANGELIM II MG 500 kV ANGELIM II MG1 PE RB FT MG 500 kV ANGELIM II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,291,159.11
ANGELIM II RTB 500 kV 150 MVAr ANGELIM II RT1 PE RB FT RTB 500 kV 150 MVAr ANGELIM II RT1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$834,668.23
ANGELIM II MG 500 kV ANGELIM II MG1 PE RB FT MG 500 kV ANGELIM II MG1 PE 061/2001 IPCA RMEL REN 643/2014 17/12/2015 16/12/2032  R$31,744.79
ANGELIM II MG 500 kV ANGELIM II MG1 PE RB FT MG 500 kV ANGELIM II MG1 PE 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2043  R$52,729.91
ANGELIM II MG 500 kV ANGELIM II MG1 PE RB FT MG 500 kV ANGELIM II MG1 PE 061/2001 IPCA RBNI REA 7761/2019 30/11/2021 29/11/2036  R$170,798.88
ANGELIM II IB 500 kV MG 500 kV ANGELIM II MG1 PE IB2 RB FT MG 500 kV ANGELIM II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
ANGELIM II IB 500 kV MG 500 kV ANGELIM II MG1 PE IB1 RB FT MG 500 kV ANGELIM II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
ANGELIM II MC 500 kV RTB 500 kV 150 MVAr ANGELIM II RT1 PE RB FT RTB 500 kV 150 MVAr ANGELIM II RT1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$418,557.22
ANGELIM II MC 500 kV RTB 500 kV 150 MVAr ANGELIM II RT1 PE RB FT RTB 500 kV 150 MVAr ANGELIM II RT1 PE 061/2001 IPCA RMEL REN 643/2014 02/02/2013 01/02/2043  R$33,743.55
ANGELIM II EL 500 kV ANGELIM II LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
ANGELIM II EL 500 kV ANGELIM II LT 500 kV GARANHUNS II /ANGELIM II C-1 PE  RB FT LT 500 kV GARANHUNS II /ANGELIM II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
ANGELIM II EL 500 kV ANGELIM II LT 500 kV ANGELIM II /RECIFE II C-2 PE  RB FT LT 500 kV ANGELIM II /RECIFE II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
ANGELIM II EL 500 kV ANGELIM II LT 500 kV ANGELIM II /PAU FERRO C-1 PE  RB FT LT 500 kV ANGELIM II /PAU FERRO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
ANGELIM II EL 500 kV ANGELIM II LT 500 kV ANGELIM II /PAU FERRO C-1 PE  RB FT LT 500 kV ANGELIM II /PAU FERRO C-1 PE 061/2001 IPCA RBNI REA 5861/2016 08/06/2016 07/06/2044  R$28,215.83
AQUIRAZ II TT 69/0 kV AQUIRAZ II TT1 CE DIT   004/2010 IPCA RPEC CC 004/2010 12/07/2010 11/07/2040  R$58,381.45
AQUIRAZ II TR 230/69 kV AQUIRAZ II TR3 CE RBF FT TR 230/69 kV AQUIRAZ II TR3 CE 004/2010 IPCA RBL CC 004/2010 12/07/2010 11/07/2040  R$ 1,169,019.90
AQUIRAZ II MG 230 kV AQUIRAZ II MG2 CE RB FT MG 230 kV AQUIRAZ II MG2 CE 061/2001 IPCA RBNI REA 2823/2011 02/10/2020 02/10/2057  R$122,034.66
AQUIRAZ II MG 230 kV AQUIRAZ II MG2 CE RB FT MG 230 kV AQUIRAZ II MG2 CE 061/2001 IPCA RBNI REA 3631/2012 09/11/2020 09/11/2053  R$118,102.83
AQUIRAZ II TR 230/69 kV AQUIRAZ II TR2 CE RBF FT TR 230/69 kV AQUIRAZ II TR2 CE 004/2010 IPCA RBL CC 004/2010 12/07/2010 11/07/2040  R$ 1,169,019.90
AQUIRAZ II TR 230/69 kV AQUIRAZ II TR1 CE RBF FT TR 230/69 kV AQUIRAZ II TR1 CE 004/2010 IPCA RBL CC 004/2010 12/07/2010 11/07/2040  R$ 1,169,019.90
AQUIRAZ II MG 230 kV AQUIRAZ II MG2 CE RB FT MG 230 kV AQUIRAZ II MG2 CE 061/2001 IPCA RMEL REN 443/2011 07/10/2016 06/10/2033  R$35,483.78
AQUIRAZ II MG 230 kV AQUIRAZ II MG1 CE RB FT MG 230 kV AQUIRAZ II MG1 CE 004/2010 IPCA RBL CC 004/2010 12/07/2010 11/07/2040  R$ 1,272,475.59
AQUIRAZ II MG 230 kV AQUIRAZ II MG1 CE RB FT MG 230 kV AQUIRAZ II MG1 CE 004/2010 IPCA RBNI REA 2837/2011 11/12/2013 10/12/2044  R$45,562.90
AQUIRAZ II MG 230 kV AQUIRAZ II MG1 CE RB FT MG 230 kV AQUIRAZ II MG1 CE 004/2010 IPCA RBNI REA 7761/2019 30/09/2015 29/09/2030  R$23,548.12
AQUIRAZ II MC 69 kV TT 69/0 kV AQUIRAZ II TT1 CE  DIT   004/2010 IPCA RPEC CC 004/2010 12/07/2010 11/07/2040  R$66,560.73
AQUIRAZ II MC 69 kV TR 230/69 kV AQUIRAZ II TR3 CE  RBF FT TR 230/69 kV AQUIRAZ II TR3 CE 004/2010 IPCA RBL CC 004/2010 12/07/2010 11/07/2040  R$224,425.44
AQUIRAZ II MC 69 kV TR 230/69 kV AQUIRAZ II TR2 CE  RBF FT TR 230/69 kV AQUIRAZ II TR2 CE 004/2010 IPCA RBL CC 004/2010 12/07/2010 11/07/2040  R$224,425.44
AQUIRAZ II MC 69 kV TR 230/69 kV AQUIRAZ II TR1 CE  RBF FT TR 230/69 kV AQUIRAZ II TR1 CE 004/2010 IPCA RBL CC 004/2010 12/07/2010 11/07/2040  R$224,425.44
AQUIRAZ II MC 230 kV TR 230/69 kV AQUIRAZ II TR3 CE  RBF FT TR 230/69 kV AQUIRAZ II TR3 CE 004/2010 IPCA RBL CC 004/2010 12/07/2010 11/07/2040  R$563,082.51
AQUIRAZ II MC 230 kV TR 230/69 kV AQUIRAZ II TR2 CE  RBF FT TR 230/69 kV AQUIRAZ II TR2 CE 004/2010 IPCA RBL CC 004/2010 12/07/2010 11/07/2040  R$563,082.51
AQUIRAZ II MC 230 kV TR 230/69 kV AQUIRAZ II TR1 CE  RBF FT TR 230/69 kV AQUIRAZ II TR1 CE 004/2010 IPCA RBL CC 004/2010 12/07/2010 11/07/2040  R$563,082.51
AQUIRAZ II IB 69 kV MG 230 kV AQUIRAZ II MG1 CE IB1 DIT   004/2010 IPCA RPEC CC 004/2010 12/07/2010 11/07/2040  R$96,802.17
AQUIRAZ II IB 230 kV MG 230 kV AQUIRAZ II MG1 CE IB1 RB FT MG 230 kV AQUIRAZ II MG1 CE 004/2010 IPCA RBL CC 004/2010 12/07/2010 11/07/2040  R$413,466.49
AQUIRAZ II EL 69 kV AQUIRAZ IIEUZEBIO 3 DIT   004/2010 IPCA RCDM REA 2837/2011 11/12/2013 10/12/2037  R$276,515.36
AQUIRAZ II EL 69 kV AQUIRAZ IIEUZEBIO 1 DIT   004/2010 IPCA RCDM REA 2837/2011 11/12/2013 10/12/2037  R$276,515.36
AQUIRAZ II EL 69 kV AQUIRAZ IIDIST4 DIT   004/2010 IPCA RPEC CC 004/2010 12/07/2010 11/07/2040  R$171,766.74
AQUIRAZ II EL 69 kV AQUIRAZ IIEUZEBIO 2 DIT   004/2010 IPCA RCDM REA 2837/2011 11/12/2013 10/12/2037  R$276,515.36
AQUIRAZ II EL 69 kV AQUIRAZ IIDIST2 DIT   004/2010 IPCA RPEC CC 004/2010 12/07/2010 11/07/2040  R$171,766.74
AQUIRAZ II EL 69 kV AQUIRAZ IIDIST1 DIT   004/2010 IPCA RPEC CC 004/2010 12/07/2010 11/07/2040  R$171,766.74
AQUIRAZ II EL 69 kV AQUIRAZ IIDIST3 DIT   004/2010 IPCA RPEC CC 004/2010 12/07/2010 11/07/2040  R$171,766.74
AQUIRAZ II EL 230 kV AQUIRAZ II LT 230 kV BANABUIU /AQUIRAZ II C-2 CE  RB FT LT 230 kV BANABUIU /AQUIRAZ II C-2 CE 061/2001 IPCA RBNI REA 10140/2021 31/12/2015 31/12/2043  R$153,279.46
AQUIRAZ II EL 230 kV AQUIRAZ II LT 230 kV BANABUIU /AQUIRAZ II C-1 CE  RB FT LT 230 kV BANABUIU /AQUIRAZ II C-1 CE 061/2001 IPCA RBNI REA 2823/2011 02/10/2020 02/10/2049  R$801,042.15
AQUIRAZ II EL 230 kV AQUIRAZ II LT 230 kV BANABUIU /AQUIRAZ II C-3 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-3 CE 061/2001 IPCA RBNI REA 3631/2012 06/11/2020 06/11/2045  R$767,108.60
AQUIRAZ II EL 230 kV AQUIRAZ II LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE 061/2001 IPCA RBNI REA 3631/2012 27/08/2021 27/08/2046  R$767,108.60
AQUIRAZ II EL 230 kV AQUIRAZ II LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE 061/2001 IPCA RBNI REA 2823/2011 02/10/2020 02/10/2049  R$801,042.15
AQUIRAZ II EL 230 kV AQUIRAZ II LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE  RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE 061/2001 IPCA RBNI REA 10140/2021 31/12/2015 31/12/2043  R$153,279.46
ARAPIRACA III TT 69/0 kV ARAPIRACA III TT1 AL DIT   013/2010 IPCA RPEC CC 013/2010 06/10/2010 06/10/2040  R$81,611.02
ARAPIRACA III TR 230/69 kV ARAPIRACA III TR2 AL RBF FT TR 230/69 kV ARAPIRACA III TR2 AL 013/2010 IPCA RBNI REA 5211/2015 24/10/2016 24/10/2050  R$ 1,474,155.98
ARAPIRACA III TR 230/69 kV ARAPIRACA III TR1 AL RBF FT TR 230/69 kV ARAPIRACA III TR1 AL 013/2010 IPCA RBL CC 013/2010 17/06/2013 06/10/2040  R$ 2,694,216.76
ARAPIRACA III RTL 230 kV 15 Mvar ARAPIRACA III RT1 AL RB FT RTL 230 kV 15 Mvar ARAPIRACA III RT1 AL 013/2010 IPCA RBNI REA 10134/2021 15/08/2016 14/08/2051  R$80,239.61
ARAPIRACA III MG 230 kV ARAPIRACA III MG1 AL RB FT MG 230 kV ARAPIRACA III MG1 AL 013/2010 IPCA RBL CC 013/2010 17/06/2013 06/10/2040  R$ 2,327,307.44
ARAPIRACA III MG 230 kV ARAPIRACA III MG1 AL RB FT MG 230 kV ARAPIRACA III MG1 AL 013/2010 IPCA RBNI REA 5211/2015 24/10/2016 24/10/2048  R$169,644.25
ARAPIRACA III MG 230 kV ARAPIRACA III MG1 AL RB FT MG 230 kV ARAPIRACA III MG1 AL 013/2010 IPCA RMEL REN 643/2014 22/05/2015 21/05/2030  R$81,321.00
ARAPIRACA III MG 230 kV ARAPIRACA III MG1 AL RB FT MG 230 kV ARAPIRACA III MG1 AL 013/2010 IPCA RMEL REN 443/2011 18/04/2016 17/04/2031  R$11,078.71
ARAPIRACA III MG 230 kV ARAPIRACA III MG1 AL RB FT MG 230 kV ARAPIRACA III MG1 AL 013/2010 IPCA RBNI REN 443/2011 16/10/2016 15/10/2047  R$37,944.02
ARAPIRACA III MC 69 kV TT 69/0 kV ARAPIRACA III TT1 AL DIT   013/2010 IPCA RPEC CC 013/2010 06/10/2010 06/10/2040  R$88,227.99
ARAPIRACA III MC 69 kV TR 230/69 kV ARAPIRACA III TR2 AL RBF FT TR 230/69 kV ARAPIRACA III TR2 AL 013/2010 IPCA RBNI REA 5211/2015 24/10/2016 24/10/2039  R$413,363.94
ARAPIRACA III MC 69 kV TR 230/69 kV ARAPIRACA III TR1 AL  RBF FT TR 230/69 kV ARAPIRACA III TR1 AL 013/2010 IPCA RBL CC 013/2010 17/06/2013 06/10/2040  R$413,101.41
ARAPIRACA III MC 230 kV TR 230/69 kV ARAPIRACA III TR2 AL RBF FT TR 230/69 kV ARAPIRACA III TR2 AL 013/2010 IPCA RBNI REA 5211/2015 24/10/2016 24/10/2040  R$ 1,120,047.51
ARAPIRACA III MC 230 kV TR 230/69 kV ARAPIRACA III TR1 AL  RBF FT TR 230/69 kV ARAPIRACA III TR1 AL 013/2010 IPCA RBL CC 013/2010 17/06/2013 06/10/2040  R$ 1,038,844.66
ARAPIRACA III MC 230 kV RTL 230 kV 15 Mvar ARAPIRACA III RT1 AL RB FT RTL 230 kV 15 Mvar ARAPIRACA III RT1 AL 013/2010 IPCA RBNI REA 10134/2021 15/08/2016 14/08/2042  R$77,553.95
ARAPIRACA III MC 230 kV BC 230 kV 30 Mvar ARAPIRACA III BC2 AL  RB FT BC 230 kV 30 Mvar ARAPIRACA III BC2 AL 013/2010 IPCA RBL CC 013/2010 17/06/2013 06/10/2040  R$ 1,153,197.64
ARAPIRACA III MC 230 kV BC 230 kV 30 Mvar ARAPIRACA III BC1 AL  RB FT BC 230 kV 30 Mvar ARAPIRACA III BC1 AL 013/2010 IPCA RBL CC 013/2010 17/06/2013 06/10/2040  R$ 1,153,197.64
ARAPIRACA III IB 69 kV MG 230 kV ARAPIRACA III MG1 AL IB1 DIT   013/2010 IPCA RPEC CC 013/2010 06/10/2010 06/10/2040  R$132,517.82
ARAPIRACA III IB 230 kV MG 230 kV ARAPIRACA III MG1 AL IB1 RB FT MG 230 kV ARAPIRACA III MG1 AL 013/2010 IPCA RBL CC 013/2010 17/06/2013 06/10/2040  R$768,308.72
ARAPIRACA III EL 69 kV ARAPIRACA IIIDIST1 DIT   013/2010 IPCA RPEC CC 013/2010 06/10/2010 06/10/2040  R$229,445.79
ARAPIRACA III EL 69 kV ARAPIRACA IIIARAPIRACA II DIT   013/2010 IPCA RCDM REN 443/2011 16/10/2016 15/10/2039  R$443,795.68
ARAPIRACA III EL 230 kV ARAPIRACA III LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL  RB FT LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL 061/2001 IPCA RBNI REA 10134/2021 15/08/2016 14/08/2044  R$153,279.46
ARAPIRACA III EL 230 kV ARAPIRACA III LT 230 kV ARAPIRACA III /PENEDO C-1 AL  RB FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL 061/2001 IPCA RBNI REA 10134/2021 15/08/2016 14/08/2044  R$153,279.46
ARAPIRACA III BC 230 kV 30 Mvar ARAPIRACA III BC2 AL RB FT BC 230 kV 30 Mvar ARAPIRACA III BC2 AL 013/2010 IPCA RBL CC 013/2010 17/06/2013 06/10/2040  R$690,626.90
ARAPIRACA III BC 230 kV 30 Mvar ARAPIRACA III BC1 AL RB FT BC 230 kV 30 Mvar ARAPIRACA III BC1 AL 013/2010 IPCA RBL CC 013/2010 17/06/2013 06/10/2040  R$690,626.90
B. ESPERANCA TR 500/230 kV B. ESPERANCA TRR1 PI RB FT TR 500/230 kV B. ESPERANCA TRR1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,543,615.76
B. ESPERANCA TR 500/230 kV B. ESPERANCA TR1 PI RB FT TR 500/230 kV B. ESPERANCA TR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,569,278.24
B. ESPERANCA TR 500/230 kV B. ESPERANCA TRR1 PI RB FT TR 500/230 kV B. ESPERANCA TRR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$523,092.75
B. ESPERANCA TR 500/230 kV B. ESPERANCA TRR1 PI RB FT TR 500/230 kV B. ESPERANCA TRR1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,579,689.28
B. ESPERANCA RTS 13,8 kV 5 Mvar B. ESPERANCA RT1 PI RB FT TR 500/230 kV B. ESPERANCA TR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$135,222.37
B. ESPERANCA TR 500/230 kV B. ESPERANCA TR1 PI RB FT TR 500/230 kV B. ESPERANCA TR1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,630,847.29
B. ESPERANCA TR 500/230 kV B. ESPERANCA TR1 PI RB FT TR 500/230 kV B. ESPERANCA TR1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,739,067.85
B. ESPERANCA RTS 13,8 kV 5 Mvar B. ESPERANCA RT1 PI RB FT TR 500/230 kV B. ESPERANCA TR1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$399,033.22
B. ESPERANCA RTL 500 kV 33 Mvar B. ESPERANCA RTR2 PI RB FT RTL 500 kV 33 Mvar B. ESPERANCA RTR2 PI 061/2001 IPCA RMEL REA 9174/2020 18/04/2023 18/04/2059  R$544,175.42
B. ESPERANCA RTL 500 kV 33 Mvar B. ESPERANCA RT2 PI RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$727,290.45
B. ESPERANCA RTL 500 kV 100 Mvar B. ESPERANCA RT1 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$727,290.45
B. ESPERANCA RTL 500 kV 100 Mvar B. ESPERANCA RT1 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,146,191.10
B. ESPERANCA RTL 500 kV 33 Mvar B. ESPERANCA RT2 PI RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 061/2001 IPCA RMEL REN 643/2014 30/01/2014 29/01/2049  R$10,793.28
B. ESPERANCA RTL 500 kV 33 Mvar B. ESPERANCA RT2 PI RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,146,191.10
B. ESPERANCA RTL 500 kV 33 Mvar B. ESPERANCA RT2 PI RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 061/2001 IPCA RMEL REA 9174/2020 31/03/2023 31/03/2057  R$ 1,282,412.51
B. ESPERANCA RTB 500 kV 33,3 Mvar B. ESPERANCA RTR1 PI RB FT RTB 500 kV 33,3 Mvar B. ESPERANCA RTR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$242,341.83
B. ESPERANCA RTB 500 kV 33,3 Mvar B. ESPERANCA RTR1 PI RB FT RTB 500 kV 33,3 Mvar B. ESPERANCA RTR1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$715,136.41
B. ESPERANCA MG 500 kV B. ESPERANCA MG1 PI RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RMEL REN 643/2014 20/08/2014 19/08/2031  R$27,574.92
B. ESPERANCA MG 500 kV B. ESPERANCA MG1 PI RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RMEL REN 643/2014 11/08/2015 10/08/2040  R$240,034.21
B. ESPERANCA RTB 500 kV 33 Mvar B. ESPERANCA RT3 PI RB FT RTB 500 kV 33 Mvar B. ESPERANCA RT3 PI 061/2001 IPCA RMEL REA 9174/2020 07/03/2023 07/03/2057  R$ 1,923,618.75
B. ESPERANCA MG 500 kV B. ESPERANCA MG1 PI RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,368,931.15
B. ESPERANCA MG 500 kV B. ESPERANCA MG1 PI RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,039,634.88
B. ESPERANCA MG 500 kV B. ESPERANCA MG1 PI RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,134,039.10
B. ESPERANCA MG 500 kV B. ESPERANCA MG1 PI RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RBNI REA 8314/2019 25/05/2018 24/05/2033  R$8,540.01
B. ESPERANCA MG 500 kV B. ESPERANCA MG1 PI RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RMEL REN 443/2011 13/01/2016 12/01/2033  R$31,851.04
B. ESPERANCA MG 500 kV B. ESPERANCA MG1 PI RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RBNI REA 7761/2019 30/09/2015 29/09/2030  R$121,514.85
B. ESPERANCA MC 500 kV TR 500/230 kV B. ESPERANCA TR1 PI  RB FT TR 500/230 kV B. ESPERANCA TR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
B. ESPERANCA MC 500 kV TR 500/230 kV B. ESPERANCA TR1 PI  RB FT TR 500/230 kV B. ESPERANCA TR1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,319,175.21
B. ESPERANCA MC 500 kV RTB 500 kV 33 Mvar B. ESPERANCA RT3 PI  RB FT RTB 500 kV 33 Mvar B. ESPERANCA RT3 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$418,557.22
B. ESPERANCA MC 230 kV TR 500/230 kV B. ESPERANCA TR1 PI MC2 RB FT TR 500/230 kV B. ESPERANCA TR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
B. ESPERANCA MC 500 kV TR 500/230 kV B. ESPERANCA TR1 PI  RB FT TR 500/230 kV B. ESPERANCA TR1 PI 061/2001 IPCA RMEL REN 443/2011 04/06/2016 03/06/2046  R$37,165.34
B. ESPERANCA MC 230 kV TR 500/230 kV B. ESPERANCA TR1 PI MC1 RB FT TR 500/230 kV B. ESPERANCA TR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
B. ESPERANCA MC 13,8 kV RTS 13,8 kV 5 Mvar B. ESPERANCA RT1 PI  RB FT TR 500/230 kV B. ESPERANCA TR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$40,324.83
B. ESPERANCA IB 500 kV MG 500 kV B. ESPERANCA MG1 PI IB3 RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
B. ESPERANCA IB 500 kV MG 500 kV B. ESPERANCA MG1 PI IB2 RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
B. ESPERANCA IB 500 kV MG 500 kV B. ESPERANCA MG1 PI IB1 RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,399,926.89
B. ESPERANCA IB 500 kV MG 500 kV B. ESPERANCA MG1 PI IB2 RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,399,926.89
B. ESPERANCA IB 500 kV MG 500 kV B. ESPERANCA MG1 PI IB1 RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
B. ESPERANCA IB 500 kV MG 500 kV B. ESPERANCA MG1 PI IB1 RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,432,642.48
B. ESPERANCA IB 230 kV MG 500 kV B. ESPERANCA MG1 PI IB1 RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
B. ESPERANCA EL 230 kV B. ESPERANCA LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI  RB FT LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
B. ESPERANCA EL 230 kV B. ESPERANCA LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI  RB FT LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI 061/2001 IPCA RMEL REN 643/2014 22/09/2014 21/09/2044  R$61,797.61
B. ESPERANCA EL 500 kV B. ESPERANCA LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI  RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
B. ESPERANCA EL 500 kV B. ESPERANCA LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI  RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RMEL REN 443/2011 01/08/2017 31/07/2045  R$16,258.72
B. ESPERANCA EL 500 kV B. ESPERANCA LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI  RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
B. ESPERANCA EL 500 kV B. ESPERANCA LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI  RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 061/2001 IPCA RMEL REN 443/2011 04/06/2016 03/06/2046  R$18,582.66
B. ESPERANCA EL 230 kV B. ESPERANCA LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI  RB FT LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI 061/2001 IPCA RMEL REN 443/2011 21/02/2016 20/02/2044  R$25,369.16
B. ESPERANCA EL 230 kV B. ESPERANCA LT 230 kV B. ESPERANCA /TERESINA C-2 PI  RB FT LT 230 kV B. ESPERANCA /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
B. ESPERANCA EL 230 kV B. ESPERANCA LT 230 kV B. ESPERANCA /TERESINA C-2 PI  RB FT LT 230 kV B. ESPERANCA /TERESINA C-2 PI 061/2001 IPCA RMEL REN 643/2014 07/12/2014 06/12/2044  R$43,746.76
B. ESPERANCA EL 230 kV B. ESPERANCA LT 230 kV B. ESPERANCA /TERESINA C-2 PI  RB FT LT 230 kV B. ESPERANCA /TERESINA C-2 PI 061/2001 IPCA RBNI REA 5861/2016 10/06/2016 09/06/2031  R$120,229.77
B. ESPERANCA EL 230 kV B. ESPERANCA LT 230 kV B. ESPERANCA /TERESINA C-1 PI  RB FT LT 230 kV B. ESPERANCA /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
B. ESPERANCA EL 230 kV B. ESPERANCA LT 230 kV B. ESPERANCA /TERESINA C-1 PI  RB FT LT 230 kV B. ESPERANCA /TERESINA C-1 PI 061/2001 IPCA RMEL REN 643/2014 25/05/2014 24/05/2042  R$40,434.15
B. ESPERANCA EL 230 kV B. ESPERANCA LT 230 kV B. ESPERANCA /TERESINA C-1 PI  RB FT LT 230 kV B. ESPERANCA /TERESINA C-1 PI 061/2001 IPCA RMEL REN 643/2014 08/11/2014 07/11/2044  R$20,674.61
B.JESUS LAPA TT 69/13,8 kV B.JESUS LAPA TA1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$281,516.05
B.J.LAPA II EL 230 kV B.J.LAPA II LT 230 kV IGAPORA II /B.J.LAPA II C-1 BA RB FT LT 230 kV IGAPORA II /B.J.LAPA II C-1 BA 020/2010 IPCA RBL CC 020/2010 26/06/2014 23/11/2040  R$300,915.54
B.JESUS LAPA TR 69/69 kV B.JESUS LAPA TREG4 BA RBF FT TR 230/69 kV B.JESUS LAPA TR4 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$179,108.49
B.JESUS LAPA TT 69/13,8 kV B.JESUS LAPA TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
B.JESUS LAPA TR 230/69 kV B.JESUS LAPA TR4 BA RBF FT TR 230/69 kV B.JESUS LAPA TR4 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$198,003.71
B.JESUS LAPA TT 69/0 kV B.JESUS LAPA TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
B.JESUS LAPA TR 230/69 kV B.JESUS LAPA TR3 BA RBF FT TR 230/69 kV B.JESUS LAPA TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,584.08
B.JESUS LAPA TR 69/69 kV B.JESUS LAPA TREG2 BA RBF FT TR 230/69 kV B.JESUS LAPA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$179,108.49
B.JESUS LAPA TR 230/69 kV B.JESUS LAPA TR3 BA RBF FT TR 230/69 kV B.JESUS LAPA TR3 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$665,685.27
B.JESUS LAPA TR 230/69 kV B.JESUS LAPA TR1 BA RBF FT TR 230/69 kV B.JESUS LAPA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$266,604.65
B.JESUS LAPA TR 230/69 kV B.JESUS LAPA T5 BA RBF FT TR 230/69 kV B.JESUS LAPA T5 BA 061/2001 IPCA RBNI REA 6168/2017 16/12/2019 16/12/2053  R$ 1,612,448.50
B.JESUS LAPA TR 230/69 kV B.JESUS LAPA TR2 BA RBF FT TR 230/69 kV B.JESUS LAPA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,474.83
B.JESUS LAPA TR 230/69 kV B.JESUS LAPA TR2 BA RBF FT TR 230/69 kV B.JESUS LAPA TR2 BA 061/2001 IPCA RMEL REN 443/2011 27/05/2017 26/05/2051  R$28,747.43
B.JESUS LAPA TR 230/13,8 kV B.JESUS LAPA TR6 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,039,455.13
B.JESUS LAPA RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA RB FT RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$255,413.38
B.JESUS LAPA TR 230/13,8 kV B.JESUS LAPA TR6 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$344,201.51
B.JESUS LAPA TR 230/13,8 kV B.JESUS LAPA TR6 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,015,718.31
B.JESUS LAPA RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA RB FT RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$207,097.25
B.JESUS LAPA RTS 69 kV 40 Mvar B.JESUS LAPA RT2 BA RBF FT TR 230/69 kV B.JESUS LAPA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$194,298.88
B.JESUS LAPA RTL 230 kV 5 Mvar B.JESUS LAPA RTR1 BA RB FT RTL 230 kV 5 Mvar B.JESUS LAPA RTR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$85,137.79
B.JESUS LAPA RTL 230 kV 5 Mvar B.JESUS LAPA RTR1 BA RB FT RTL 230 kV 5 Mvar B.JESUS LAPA RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$251,236.60
B.JESUS LAPA RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA RB FT RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$255,413.38
B.JESUS LAPA RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA RB FT RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$753,709.79
B.JESUS LAPA RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA RB FT RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA 061/2001 IPCA RMEL REN 443/2011 13/09/2017 12/09/2052  R$28,836.49
B.JESUS LAPA RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA RB FT RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$753,709.79
B.JESUS LAPA MG 230 kV B.JESUS LAPA MG1 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2029  R$91,381.31
B.JESUS LAPA MG 230 kV B.JESUS LAPA MG1 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RBNI REA 6168/2017 12/05/2021 12/05/2052  R$18,435.67
B.JESUS LAPA RTB 13,8 kV 5 MVAr B.JESUS LAPA RT2 BA RBF FT RTB 13,8 kV 5 MVAr B.JESUS LAPA RT2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$135,222.37
B.JESUS LAPA RTB 13,8 kV 5 MVAr B.JESUS LAPA RT2 BA RBF FT RTB 13,8 kV 5 MVAr B.JESUS LAPA RT2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$399,033.22
B.JESUS LAPA RTB 13,8 kV 5 MVAr B.JESUS LAPA RT1 BA RBF FT RTB 13,8 kV 5 MVAr B.JESUS LAPA RT1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$135,222.37
B.JESUS LAPA RTB 13,8 kV 5 MVAr B.JESUS LAPA RT1 BA RBF FT RTB 13,8 kV 5 MVAr B.JESUS LAPA RT1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$399,033.22
B.JESUS LAPA MG 230 kV B.JESUS LAPA MG1 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$625,729.84
B.JESUS LAPA MG 230 kV B.JESUS LAPA MG1 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RMEL REN 643/2014 23/01/2014 22/01/2031  R$16,372.75
B.JESUS LAPA MG 230 kV B.JESUS LAPA MG1 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RMEL REN 643/2014 28/11/2014 27/11/2031  R$17,058.89
B.JESUS LAPA MG 230 kV B.JESUS LAPA MG1 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RMEL REN 643/2014 20/12/2013 19/12/2027  R$519,904.74
B.JESUS LAPA MG 230 kV B.JESUS LAPA MG1 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RBNI REA 6168/2017 12/05/2021 12/05/2061  R$55,172.08
B.JESUS LAPA MG 230 kV B.JESUS LAPA MG1 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RBNI REA 6168/2017 12/05/2021 12/05/2053  R$70,102.33
B.JESUS LAPA MG 230 kV B.JESUS LAPA MG1 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,846,491.75
B.JESUS LAPA MG 230 kV B.JESUS LAPA MG1 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,889,643.32
B.JESUS LAPA MG 230 kV B.JESUS LAPA MG1 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RBNI REA 6168/2017 12/05/2021 12/05/2061  R$94,984.42
B.JESUS LAPA MC 69 kV TT 69/0 kV B.JESUS LAPA TA2 BA  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
B.JESUS LAPA MC 69 kV TR 230/69 kV B.JESUS LAPA TR3 BA RBF FT TR 230/69 kV B.JESUS LAPA TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
B.JESUS LAPA MC 69 kV TT 69/13,8 kV B.JESUS LAPA TA1 BA  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
B.JESUS LAPA MC 69 kV TR 230/69 kV B.JESUS LAPA TR2 BA  RBF FT TR 230/69 kV B.JESUS LAPA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
B.JESUS LAPA MC 69 kV TR 230/69 kV B.JESUS LAPA TR4 BA RBF FT TR 230/69 kV B.JESUS LAPA TR4 BA 061/2001 IPCA RBNI REA 2173/2009 27/09/2012 26/09/2042  R$422,478.82
B.JESUS LAPA MC 230 kV TR 230/69 kV B.JESUS LAPA TR4 BA RBF FT TR 230/69 kV B.JESUS LAPA TR4 BA 061/2001 IPCA RBNI REA 2173/2009 27/09/2012 26/09/2042  R$ 1,084,043.08
B.JESUS LAPA MC 230 kV TR 230/69 kV B.JESUS LAPA TR2 BA  RBF FT TR 230/69 kV B.JESUS LAPA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
B.JESUS LAPA MC 69 kV TR 230/69 kV B.JESUS LAPA TR1 BA RBF FT TR 230/69 kV B.JESUS LAPA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
B.JESUS LAPA MC 69 kV TR 230/69 kV B.JESUS LAPA TR1 BA RBF FT TR 230/69 kV B.JESUS LAPA TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
B.JESUS LAPA MC 69 kV TR 230/69 kV B.JESUS LAPA TR1 BA RBF FT TR 230/69 kV B.JESUS LAPA TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$204,189.21
B.JESUS LAPA MC 69 kV TR 230/69 kV B.JESUS LAPA T5 BA RBF FT TR 230/69 kV B.JESUS LAPA T5 BA 061/2001 IPCA RBNI REA 6168/2017 16/12/2019 16/12/2042  R$318,885.13
B.JESUS LAPA MC 230 kV TR 230/69 kV B.JESUS LAPA TR1 BA RBF FT TR 230/69 kV B.JESUS LAPA TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
B.JESUS LAPA MC 230 kV TR 230/69 kV B.JESUS LAPA TR3 BA RBF FT TR 230/69 kV B.JESUS LAPA TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
B.JESUS LAPA MC 230 kV TR 230/69 kV B.JESUS LAPA TR3 BA RBF FT TR 230/69 kV B.JESUS LAPA TR3 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
B.JESUS LAPA MC 230 kV TR 230/69 kV B.JESUS LAPA TR3 BA RBF FT TR 230/69 kV B.JESUS LAPA TR3 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$476,693.95
B.JESUS LAPA MC 230 kV TR 230/69 kV B.JESUS LAPA TR3 BA RBF FT TR 230/69 kV B.JESUS LAPA TR3 BA 061/2001 IPCA RMEL REN 443/2011 21/05/2017 20/05/2047  R$70,185.30
B.JESUS LAPA MC 230 kV TR 230/69 kV B.JESUS LAPA TR1 BA RBF FT TR 230/69 kV B.JESUS LAPA TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$476,693.95
B.JESUS LAPA MC 230 kV TR 230/69 kV B.JESUS LAPA TR1 BA RBF FT TR 230/69 kV B.JESUS LAPA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
B.JESUS LAPA MC 230 kV TR 230/13,8 kV B.JESUS LAPA TR6 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
B.JESUS LAPA MC 230 kV TR 230/13,8 kV B.JESUS LAPA TR6 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RMEL REN 443/2011 19/05/2017 18/05/2047  R$70,175.10
B.JESUS LAPA MC 230 kV TR 230/69 kV B.JESUS LAPA T5 BA RBF FT TR 230/69 kV B.JESUS LAPA T5 BA 061/2001 IPCA RBNI REA 6168/2017 16/12/2019 16/12/2042  R$686,151.39
B.JESUS LAPA MC 230 kV TR 230/13,8 kV B.JESUS LAPA TR6 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
B.JESUS LAPA MC 230 kV RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA RB FT RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$99,071.31
B.JESUS LAPA MC 230 kV TR 230/13,8 kV B.JESUS LAPA TR6 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$476,693.95
B.JESUS LAPA MC 230 kV RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA RB FT RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$292,353.58
B.JESUS LAPA MC 230 kV RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA RB FT RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$299,185.73
B.JESUS LAPA MC 230 kV RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA RB FT RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$99,071.31
B.JESUS LAPA MC 230 kV RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA RB FT RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$292,353.58
B.JESUS LAPA MC 230 kV RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA RB FT RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$299,185.73
B.JESUS LAPA MC 230 kV RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA  RB FT RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$151,491.77
B.JESUS LAPA MC 230 kV RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA  RB FT RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$447,043.25
B.JESUS LAPA MC 230 kV RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA  RB FT RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$457,490.43
B.JESUS LAPA MC 230 kV RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA  RB FT RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA 061/2001 IPCA RMEL REN 443/2011 02/06/2017 01/06/2047  R$23,415.48
B.JESUS LAPA MC 13,8 kV TR 230/69 kV B.JESUS LAPA TR2 BA RBF FT TR 230/69 kV B.JESUS LAPA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
B.JESUS LAPA MC 13,8 kV TR 230/13,8 kV B.JESUS LAPA TR6 BA  RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
B.JESUS LAPA MC 13,8 kV TR 13,8/0,22 kV B.JESUS LAPA TR5 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
B.JESUS LAPA MC 13,8 kV RTB 13,8 kV 5 MVAr B.JESUS LAPA RT2 BA RBF FT RTB 13,8 kV 5 MVAr B.JESUS LAPA RT2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,511.84
B.JESUS LAPA MC 13,8 kV RTB 13,8 kV 5 MVAr B.JESUS LAPA RT1 BA RBF FT RTB 13,8 kV 5 MVAr B.JESUS LAPA RT1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,511.84
B.JESUS LAPA MC 13,8 kV CS 30/-15 MVAr B.JESUS LAPA CS1 BA  RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$65,134.54
B.JESUS LAPA MC 13,8 kV CS 30/-15 MVAr B.JESUS LAPA CS1 BA  RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$192,208.19
B.JESUS LAPA IB 230 kV MG 230 kV B.JESUS LAPA MG1 BA IB1 RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,929.18
B.JESUS LAPA IB 230 kV MG 230 kV B.JESUS LAPA MG1 BA IB1 RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$377,273.99
B.JESUS LAPA MC 13,8 kV CS 30/-15 MVAr B.JESUS LAPA CS1 BA  RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$196,700.00
B.JESUS LAPA IB 69 kV MG 230 kV B.JESUS LAPA MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
B.JESUS LAPA IB 69 kV MG 230 kV B.JESUS LAPA MG1 BA IB1 DIT   061/2001 IPCA RCDM REA 6168/2017 12/05/2021 12/05/2052  R$41,535.57
B.JESUS LAPA EL 69 kV B.JESUS LAPADIST8 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
B.JESUS LAPA IB 230 kV MG 230 kV B.JESUS LAPA MG1 BA IB1 RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$368,658.63
B.JESUS LAPA EL 69 kV B.JESUS LAPADIST6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
B.JESUS LAPA EL 69 kV B.JESUS LAPADIST4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
B.JESUS LAPA EL 69 kV B.JESUS LAPADIST7 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
B.JESUS LAPA EL 69 kV B.JESUS LAPADIST3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
B.JESUS LAPA EL 69 kV B.JESUS LAPADIST5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
B.JESUS LAPA EL 69 kV B.JESUS LAPADIST3 DIT   061/2001 IPCA RMEL REN 443/2011 30/08/2015 29/08/2045  R$8,552.72
B.JESUS LAPA EL 69 kV B.JESUS LAPADIST3 DIT   061/2001 IPCA RMEL REN 443/2011 30/08/2015 29/08/2045  R$8,552.72
B.JESUS LAPA EL 69 kV B.JESUS LAPADIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
B.JESUS LAPA EL 69 kV B.JESUS LAPADIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
B.JESUS LAPA EL 69 kV B.JESUS LAPADIST1 DIT   061/2001 IPCA RMEL REN 443/2011 22/11/2015 21/11/2045  R$8,608.20
B.JESUS LAPA EL 230 kV B.JESUS LAPA LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA  RB FT LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
B.JESUS LAPA EL 230 kV B.JESUS LAPA LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA  RB FT LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA 061/2001 IPCA RMEL REN 443/2011 09/07/2017 08/07/2047  R$46,956.63
B.JESUS LAPA EL 230 kV B.JESUS LAPA LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA  RB FT LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
B.JESUS LAPA EL 230 kV B.JESUS LAPA LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA  RB FT LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
B.JESUS LAPA EL 230 kV B.JESUS LAPA LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA  RB FT LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$692,788.80
B.JESUS LAPA CS 30/-15 MVAr B.JESUS LAPA CS1 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$884,913.31
B.JESUS LAPA CS 30/-15 MVAr B.JESUS LAPA CS1 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,672,352.23
B.JESUS LAPA CS 30/-15 MVAr B.JESUS LAPA CS1 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBNI REA 5861/2016 30/06/2013 29/06/2042  R$97,691.25
B.JESUS LAPA CS 30/-15 MVAr B.JESUS LAPA CS1 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,611,326.85
B.JESUS LAPA CR 230 kV 34,9 MVAr B.JESUS LAPA BC1 BA RB FT CR 230 kV 34,9 MVAr B.JESUS LAPA BC1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$201,812.66
BANABUIU RTL 230 kV 10 MVAr BANABUIU RT3 CE RB FT LT 230 kV BANABUIU /ICO C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$521,301.65
BANABUIU RTL 230 kV 10 Mvar BANABUIU RT1 CE RB FT LT 230 kV MILAGRES /BANABUIU C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,656.08
BANABUIU TT 69/13,8 kV BANABUIU TA1 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
BANABUIU TT 69/0 kV BANABUIU TT2 CE DIT   061/2001 IPCA RCDM REA 5809/2016 06/07/2020 06/07/2050  R$273,273.57
BANABUIU TR 69/13,8 kV BANABUIU TR7 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
BANABUIU TR 69/13,8 kV BANABUIU TR4 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
BANABUIU TR 230/69 kV BANABUIU TR4 CE RBF FT TR 230/69 kV BANABUIU TR4 CE 061/2001 IPCA RBNI REA 2823/2011 23/09/2019 23/09/2059  R$ 1,434,684.96
BANABUIU TR 230/69 kV BANABUIU TR3 CE RBF FT TR 230/69 kV BANABUIU TR3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$266,604.65
BANABUIU TR 230/69 kV BANABUIU TR2 CE RBF FT TR 230/69 kV BANABUIU TR2 CE 061/2001 IPCA RBNI REA 5809/2016 13/06/2020 13/06/2054  R$ 1,664,498.27
BANABUIU TR 230/69 kV BANABUIU TR1 CE RBF FT TR 230/69 kV BANABUIU TR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$198,003.71
BANABUIU RTS 69 kV 40 MVAr BANABUIU RT2 CE RBF FT TR 230/69 kV BANABUIU TR2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$194,298.88
BANABUIU RTS 69 kV 40 MVAr BANABUIU RT2 CE RBF FT TR 230/69 kV BANABUIU TR2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$573,364.49
BANABUIU RTS 69 kV 40 MVAr BANABUIU RT2 CE RBF FT TR 230/69 kV BANABUIU TR2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$586,763.73
BANABUIU RTS 69 kV 40 MVAr BANABUIU RT1 CE RBF FT TR 230/69 kV BANABUIU TR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$194,298.88
BANABUIU RTS 13,8 kV 18,75 Mvar BANABUIU RT1 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$172,773.18
BANABUIU RTL 230 kV 10 MVAr BANABUIU RT3 CE RB FT LT 230 kV BANABUIU /ICO C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,656.08
BANABUIU RTB 230 kV 3,33 MVAr BANABUIU RTR1 CE RB FT RTB 230 kV 3,33 MVAr BANABUIU RTR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$58,820.58
BANABUIU RTL 230 kV 10 MVAr BANABUIU RT2 CE RB FT LT 230 kV MILAGRES /BANABUIU C-2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,656.08
BANABUIU RTL 230 kV 10 MVAr BANABUIU RT2 CE RB FT LT 230 kV MILAGRES /BANABUIU C-2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$521,301.65
BANABUIU RTL 230 kV 10 MVAr BANABUIU RT2 CE RB FT LT 230 kV MILAGRES /BANABUIU C-2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$533,484.21
BANABUIU RTB 230 kV 20 MVAr BANABUIU RT4 CE RB FT RTB 230 kV 20 MVAr BANABUIU RT4 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$233,353.47
BANABUIU MG 230 kV BANABUIU MG1 CE RB FT MG 230 kV BANABUIU MG1 CE 061/2001 IPCA RBNI REA 2823/2011 23/09/2019 23/09/2052  R$78,266.75
BANABUIU MG 230 kV BANABUIU MG1 CE RB FT MG 230 kV BANABUIU MG1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$764,684.87
BANABUIU MG 230 kV BANABUIU MG1 CE RB FT MG 230 kV BANABUIU MG1 CE 061/2001 IPCA RMEL REN 643/2014 19/09/2013 18/09/2030  R$32,185.94
BANABUIU MC 69 kV TR 69/13,8 kV BANABUIU TR7 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
BANABUIU MC 230 kV BC 230 kV 50,5 MVAr BANABUIU BC2 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$530,690.67
BANABUIU MG 230 kV BANABUIU MG1 CE RB FT MG 230 kV BANABUIU MG1 CE 061/2001 IPCA RBNI REA 5809/2016 05/07/2020 05/07/2051  R$18,984.57
BANABUIU MG 230 kV BANABUIU MG1 CE RB FT MG 230 kV BANABUIU MG1 CE 061/2001 IPCA RMEL REN 443/2011 30/09/2016 29/09/2033  R$33,589.65
BANABUIU MC 69 kV TT 69/0 kV BANABUIU TT2 CE DIT   061/2001 IPCA RCDM REA 5809/2016 06/07/2020 06/07/2040  R$130,222.41
BANABUIU MC 230 kV BC 230 kV 50,5 MVAr BANABUIU BC2 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$543,092.64
BANABUIU MC 69 kV TR 69/13,8 kV BANABUIU TR7 CE DIT   061/2001 IPCA RCDM REA 6845/2018 01/01/2021 31/12/2053  R$21,883.70
BANABUIU MC 69 kV TR 230/69 kV BANABUIU TR4 CE RBF FT TR 230/69 kV BANABUIU TR4 CE 061/2001 IPCA RBNI REA 2823/2011 23/09/2019 23/09/2053  R$249,150.96
BANABUIU MC 69 kV TR 230/69 kV BANABUIU TR3 CE  RBF FT TR 230/69 kV BANABUIU TR3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
BANABUIU MC 69 kV TR 230/69 kV BANABUIU TR2 CE  RBF FT TR 230/69 kV BANABUIU TR2 CE 061/2001 IPCA RBNI REA 5809/2016 13/06/2020 13/06/2042  R$303,265.34
BANABUIU MC 69 kV TR 230/69 kV BANABUIU TR1 CE  RBF FT TR 230/69 kV BANABUIU TR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
BANABUIU MC 230 kV TR 230/69 kV BANABUIU TR4 CE RBF FT TR 230/69 kV BANABUIU TR4 CE 061/2001 IPCA RBNI REA 2823/2011 23/09/2019 23/09/2053  R$247,626.26
BANABUIU MC 230 kV TR 230/69 kV BANABUIU TR3 CE  RBF FT TR 230/69 kV BANABUIU TR3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
BANABUIU MC 230 kV TR 230/69 kV BANABUIU TR2 CE  RBF FT TR 230/69 kV BANABUIU TR2 CE 061/2001 IPCA RBNI REA 5809/2016 13/06/2020 13/06/2043  R$702,271.87
BANABUIU MC 230 kV TR 230/69 kV BANABUIU TR1 CE  RBF FT TR 230/69 kV BANABUIU TR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
BANABUIU MC 230 kV TR 230/69 kV BANABUIU TR1 CE  RBF FT TR 230/69 kV BANABUIU TR1 CE 061/2001 IPCA RBNI REA 5484/2015 23/09/2021 22/09/2054  R$273,003.56
BANABUIU MC 230 kV RTB 230 kV 20 MVAr BANABUIU RT4 CE RB FT RTB 230 kV 20 MVAr BANABUIU RT4 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$151,491.77
BANABUIU MC 230 kV BC 230 kV 50,5 MVAr BANABUIU BC2 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$179,837.78
BANABUIU MC 230 kV BC 230 kV 50,5 MVAr BANABUIU BC1 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$179,837.78
BANABUIU MC 230 kV BC 230 kV 50,5 MVAr BANABUIU BC1 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$530,690.67
BANABUIU MC 230 kV BC 230 kV 50,5 MVAr BANABUIU BC2 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC2 CE 061/2001 IPCA RMEL REN 443/2011 16/05/2017 15/05/2049  R$123,536.86
BANABUIU MC 13,8 kV TR 69/13,8 kV BANABUIU TR7 CE DIT   061/2001 IPCA RMEL REN 443/2011 08/12/2017 07/12/2049  R$27,403.35
BANABUIU IB 230 kV MG 230 kV BANABUIU MG1 CE IB1 RB FT MG 230 kV BANABUIU MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$377,273.99
BANABUIU MC 230 kV BC 230 kV 50,5 MVAr BANABUIU BC1 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$543,092.64
BANABUIU MC 230 kV BC 230 kV 50,5 MVAr BANABUIU BC1 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC1 CE 061/2001 IPCA RMEL REN 443/2011 14/07/2017 13/07/2049  R$124,032.88
BANABUIU MC 13,8 kV TR 69/13,8 kV BANABUIU TR7 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
BANABUIU EL 69 kV BANABUIUDIST6 DIT   061/2001 IPCA RCDM REA 3817/2013 15/07/2013 14/07/2041  R$31,049.43
BANABUIU IB 69 kV MG 230 kV BANABUIU MG1 CE IB1 DIT   061/2001 IPCA RCDM REA 5809/2016 06/07/2020 06/07/2048  R$189,813.19
BANABUIU IB 230 kV MG 230 kV BANABUIU MG1 CE IB1 RB FT MG 230 kV BANABUIU MG1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,929.18
BANABUIU IB 230 kV MG 230 kV BANABUIU MG1 CE IB1 RB FT MG 230 kV BANABUIU MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$368,658.63
BANABUIU EL 69 kV BANABUIUDIST5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
BANABUIU EL 69 kV BANABUIUDIST3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
BANABUIU EL 69 kV BANABUIUDIST6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
BANABUIU EL 69 kV BANABUIUDIST6 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
BANABUIU EL 69 kV BANABUIUDIST6 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
BANABUIU EL 69 kV BANABUIUDIST6 DIT   061/2001 IPCA RCDM REA 5484/2015 16/08/2020 15/08/2050  R$38,651.06
BANABUIU EL 69 kV BANABUIUDIST5 DIT   061/2001 IPCA RCDM REA 3817/2013 15/07/2013 14/07/2041  R$31,049.43
BANABUIU EL 230 kV BANABUIU LT 230 kV RUSSAS II /BANABUIU C-1 CE  RB FT LT 230 kV RUSSAS II /BANABUIU C-1 CE 018/2012 IPCA RBL CC 018/2012 15/12/2020 01/06/2042  R$558,840.27
BANABUIU EL 69 kV BANABUIUDIST4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
BANABUIU EL 230 kV BANABUIU LT 230 kV MILAGRES /BANABUIU C-2 CE RB FT LT 230 kV MILAGRES /BANABUIU C-2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
BANABUIU EL 69 kV BANABUIUDIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
BANABUIU EL 69 kV BANABUIUDIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
BANABUIU EL 230 kV BANABUIU LT 230 kV MILAGRES /BANABUIU C-2 CE RB FT LT 230 kV MILAGRES /BANABUIU C-2 CE 061/2001 IPCA RMEL REN 643/2014 26/11/2013 25/11/2041  R$39,812.82
BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /RUSSAS II C-1 CE RB FT LT 230 kV BANABUIU /RUSSAS II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /MOSSORO II C-2 CE/RN RB FT LT 230 kV BANABUIU /MOSSORO II C-2 CE/RN 061/2001 IPCA RBNI REA 2173/2009 06/06/2016 05/06/2046  R$ 1,313,586.66
BANABUIU EL 230 kV BANABUIU LT 230 kV MILAGRES /BANABUIU C-1 CE RB FT LT 230 kV MILAGRES /BANABUIU C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /ICO C-1 CE  RB FT LT 230 kV BANABUIU /ICO C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /AQUIRAZ II C-3 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-3 CE 061/2001 IPCA RBNI REA 2823/2011 29/07/2019 29/07/2053  R$471,002.54
BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /AQUIRAZ II C-3 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-3 CE 061/2001 IPCA RBNI REA 3631/2012 06/11/2020 06/11/2045  R$146,227.48
BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /AQUIRAZ II C-3 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /AQUIRAZ II C-3 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-3 CE 061/2001 IPCA RBNI REA 2823/2011 02/10/2020 02/10/2054  R$383,679.24
BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /AQUIRAZ II C-1 CE  RB FT LT 230 kV BANABUIU /FORTALEZA C-3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /ALEX C-1 CE  RB FT LT 230 kV BANABUIU /ALEX C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /AQUIRAZ II C-2 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /ALEX C-1 CE  RB FT LT 230 kV BANABUIU /ALEX C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$692,788.80
BANABUIU EL 230 kV BANABUIULIBRA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /ALEX C-1 CE  RB FT LT 230 kV BANABUIU /ALEX C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
BANABUIU EL 13,8 kV BANABUIUDIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
BANABUIU BC 230 kV 50,5 MVAr BANABUIU BC2 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,671.37
BANABUIU BC 230 kV 50,5 MVAr BANABUIU BC2 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$609,874.99
BANABUIU BC 230 kV 50,5 MVAr BANABUIU BC2 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$624,127.46
BANABUIU BC 230 kV 50,5 MVAr BANABUIU BC1 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,671.37
BANABUIU BC 230 kV 50,5 MVAr BANABUIU BC1 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$609,874.99
BANABUIU BC 230 kV 50,5 MVAr BANABUIU BC1 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$624,127.46
BARREIRAS RTB 230 kV 10 Mvar BARREIRAS RT2 BA RB FT RTB 230 kV 10 Mvar BARREIRAS RT2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$533,484.21
BARREIRAS TT 69/13,8 kV BARREIRAS TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
BARREIRAS TT 69/13,8 kV BARREIRAS TA1 BA DIT   061/2001 IPCA RCDM REA 4347/2013 07/05/2017 06/05/2053  R$345,722.67
BARREIRAS TR 230/69 kV BARREIRAS TR2 BA RBF FT TR 230/69 kV BARREIRAS TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
BARREIRAS TR 230/69 kV BARREIRAS TR1 BA RBF FT TR 230/69 kV BARREIRAS TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
BARREIRAS TR 230/69 kV BARREIRAS TR1 BA RBF FT TR 230/69 kV BARREIRAS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
BARREIRAS TR 230/69 kV BARREIRAS TR1 BA RBF FT TR 230/69 kV BARREIRAS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
BARREIRAS TR 230/138 kV BARREIRAS TRR1 BA RBF FT TR 230/138 kV BARREIRAS TRR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$207,254.75
BARREIRAS TR 230/138 kV BARREIRAS TR4 BA RBF FT TR 230/138 kV BARREIRAS TR4 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$399,926.80
BARREIRAS TR 230/138 kV BARREIRAS TR3 BA RBF FT TR 230/138 kV BARREIRAS TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$399,926.80
BARREIRAS RTB 230 kV 10 Mvar BARREIRAS RT2 BA RB FT RTB 230 kV 10 Mvar BARREIRAS RT2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,656.08
BARREIRAS RTB 230 kV 10 Mvar BARREIRAS RT2 BA RB FT RTB 230 kV 10 Mvar BARREIRAS RT2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$521,301.65
BARREIRAS MG 230 kV BARREIRAS MG1 BA RB FT MG 230 kV BARREIRAS MG1 BA 061/2001 IPCA RMEL REN 643/2014 14/02/2014 13/02/2031  R$27,476.84
BARREIRAS MG 230 kV BARREIRAS MG1 BA RB FT MG 230 kV BARREIRAS MG1 BA 061/2001 IPCA RMEL REN 643/2014 20/12/2013 19/12/2027  R$26,845.01
BARREIRAS MG 230 kV BARREIRAS MG1 BA RB FT MG 230 kV BARREIRAS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$647,284.49
BARREIRAS MG 230 kV BARREIRAS MG1 BA RB FT MG 230 kV BARREIRAS MG1 BA 061/2001 IPCA RMEL REN 643/2014 09/12/2015 08/12/2032  R$32,399.55
BARREIRAS MG 230 kV BARREIRAS MG1 BA RB FT MG 230 kV BARREIRAS MG1 BA 061/2001 IPCA RMEL REN 643/2014 31/03/2015 30/03/2043  R$51,202.18
BARREIRAS MG 230 kV BARREIRAS MG1 BA RB FT MG 230 kV BARREIRAS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,910,098.26
BARREIRAS MG 230 kV BARREIRAS MG1 BA RB FT MG 230 kV BARREIRAS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,954,736.29
BARREIRAS MC 69 kV TT 69/13,8 kV BARREIRAS TA1 BA  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
BARREIRAS MC 69 kV TR 230/69 kV BARREIRAS TR2 BA  RBF FT TR 230/69 kV BARREIRAS TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
BARREIRAS MC 69 kV TR 230/69 kV BARREIRAS TR1 BA RBF FT TR 230/69 kV BARREIRAS TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
BARREIRAS MC 69 kV TR 230/69 kV BARREIRAS TR1 BA RBF FT TR 230/69 kV BARREIRAS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
BARREIRAS MC 69 kV TR 230/69 kV BARREIRAS TR1 BA RBF FT TR 230/69 kV BARREIRAS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$204,189.21
BARREIRAS MC 230 kV TR 230/69 kV BARREIRAS TR2 BA  RBF FT TR 230/69 kV BARREIRAS TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
BARREIRAS MC 230 kV TR 230/69 kV BARREIRAS TR1 BA RBF FT TR 230/69 kV BARREIRAS TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
BARREIRAS MC 230 kV TR 230/69 kV BARREIRAS TR1 BA RBF FT TR 230/69 kV BARREIRAS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
BARREIRAS MC 230 kV TR 230/69 kV BARREIRAS TR1 BA RBF FT TR 230/69 kV BARREIRAS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$476,693.95
BARREIRAS MC 230 kV TR 230/138 kV BARREIRAS TR4 BA  RBF FT TR 230/138 kV BARREIRAS TR4 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
BARREIRAS MC 230 kV RTB 230 kV 10 Mvar BARREIRAS RT2 BA  RB FT RTB 230 kV 10 Mvar BARREIRAS RT2 BA 061/2001 IPCA RBNI REA 5824/2016 12/10/2018 12/10/2040  R$428,306.10
BARREIRAS MC 138 kV TR 230/138 kV BARREIRAS TR3 BA  RBF FT TR 230/138 kV BARREIRAS TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$121,202.15
BARREIRAS MC 230 kV TR 230/138 kV BARREIRAS TR3 BA  RBF FT TR 230/138 kV BARREIRAS TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
BARREIRAS MC 230 kV RTB 230 kV 10 Mvar BARREIRAS RT2 BA  RB FT RTB 230 kV 10 Mvar BARREIRAS RT2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$99,071.31
BARREIRAS MC 138 kV TR 230/138 kV BARREIRAS TR4 BA  RBF FT TR 230/138 kV BARREIRAS TR4 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$121,202.15
BARREIRAS IB 69 kV MG 230 kV BARREIRAS MG1 BA IB3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
BARREIRAS IB 230 kV MG 230 kV BARREIRAS MG1 BA IB1 RB FT MG 230 kV BARREIRAS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,929.18
BARREIRAS IB 230 kV MG 230 kV BARREIRAS MG1 BA IB1 RB FT MG 230 kV BARREIRAS MG1 BA 061/2001 IPCA RBNI REA 5824/2016 14/11/2018 14/11/2051  R$99,345.14
BARREIRAS IB 138 kV MG 230 kV BARREIRAS MG1 BA IB2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$93,640.20
BARREIRAS EL 69 kV BARREIRASDIST4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
BARREIRAS EL 69 kV BARREIRASDIST3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
BARREIRAS EL 69 kV BARREIRASDIST4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
BARREIRAS EL 69 kV BARREIRASDIST4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
BARREIRAS EL 69 kV BARREIRASDIST2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
BARREIRAS EL 69 kV BARREIRASDIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
BARREIRAS EL 69 kV BARREIRASDIST3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
BARREIRAS EL 69 kV BARREIRASDIST3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
BARREIRAS EL 69 kV BARREIRASDIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
BARREIRAS EL 69 kV BARREIRASDIST2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
BARREIRAS EL 69 kV BARREIRASDIST1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
BARREIRAS EL 69 kV BARREIRASDIST1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
BARREIRAS II RTL 230 kV 3 Mvar BARREIRAS II RTR1 BA RB FT RTL 230 kV 3 Mvar BARREIRAS II RTR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$58,820.58
BARREIRAS EL 230 kV BARREIRAS LT 230 kV BARREIRAS II /BARREIRAS C-1 BA  RB FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
BARREIRAS EL 230 kV BARREIRAS LT 230 kV BARREIRAS II /BARREIRAS C-1 BA  RB FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
BARREIRAS EL 230 kV BARREIRAS LT 230 kV BARREIRAS II /BARREIRAS C-1 BA  RB FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$692,788.80
BARREIRAS EL 230 kV BARREIRAS LT 230 kV BARREIRAS II /BARREIRAS C-1 BA  RB FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA 061/2001 IPCA RBNI REA 5861/2016 19/04/2014 18/04/2042  R$37,040.12
BARREIRAS EL 138 kV BARREIRASDIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$180,723.85
BARREIRAS EL 138 kV BARREIRASDIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$180,723.85
BARREIRAS II RTL 230 kV 3 Mvar BARREIRAS II RTR1 BA RB FT RTL 230 kV 3 Mvar BARREIRAS II RTR1 BA 061/2001 IPCA RBNI REA 5824/2016 11/06/2019 11/06/2051  R$115,496.15
BARREIRAS II RTL 230 kV 3 Mvar BARREIRAS II RTR1 BA RB FT RTL 230 kV 3 Mvar BARREIRAS II RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$173,576.06
BARREIRAS II RTL 230 kV 3 Mvar BARREIRAS II RTR1 BA RB FT RTL 230 kV 3 Mvar BARREIRAS II RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$177,632.44
BARREIRAS II RTL 230 kV 10 Mvar BARREIRAS II RT1 BA RB FT RTL 230 kV 10 Mvar BARREIRAS II RT1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,656.08
BARREIRAS II RTL 230 kV 10 Mvar BARREIRAS II RT1 BA RB FT RTL 230 kV 10 Mvar BARREIRAS II RT1 BA 061/2001 IPCA RBNI REA 5824/2016 11/06/2019 11/06/2051  R$346,488.47
BARREIRAS II RTL 230 kV 10 Mvar BARREIRAS II RT1 BA RB FT RTL 230 kV 10 Mvar BARREIRAS II RT1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$521,301.65
BARREIRAS II RTL 230 kV 10 Mvar BARREIRAS II RT1 BA RB FT RTL 230 kV 10 Mvar BARREIRAS II RT1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$533,484.21
BARREIRAS II MG 230 kV BARREIRAS II MG2 BA RB FT MG 230 kV BARREIRAS II MG2 BA 061/2001 IPCA RBNI REA 5824/2016 11/06/2019 11/06/2049  R$16,354.12
BARREIRAS II MG 230 kV BARREIRAS II MG2 BA RB FT MG 230 kV BARREIRAS II MG2 BA 061/2001 IPCA RBNI REA 5824/2016 11/06/2019 11/06/2038  R$397,906.75
BARREIRAS II MC 230 kV RTL 230 kV 10 Mvar BARREIRAS II RT1 BA  RB FT RTL 230 kV 10 Mvar BARREIRAS II RT1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$99,071.31
BARREIRAS II MC 230 kV RTL 230 kV 10 Mvar BARREIRAS II RT1 BA  RB FT RTL 230 kV 10 Mvar BARREIRAS II RT1 BA 061/2001 IPCA RBNI REA 5824/2016 11/06/2019 11/06/2037  R$270,142.80
BARREIRAS II MC 230 kV RTL 230 kV 10 Mvar BARREIRAS II RT1 BA  RB FT RTL 230 kV 10 Mvar BARREIRAS II RT1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$292,353.58
BARREIRAS II EL 230 kV BARREIRAS II LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA  RB FT LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA 061/2001 IPCA RBNI REA 9680/2021 19/11/2019 18/11/2047  R$153,279.46
BARREIRAS II EL 230 kV BARREIRAS II LT 230 kV BARREIRAS II /BARREIRAS C-1 BA RB FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA 061/2001 IPCA RBNI REA 9680/2021 19/11/2019 18/11/2047  R$153,279.46
BOM NOME TR 230/69 kV BOM NOME TR2 PE RBF FT TR 230/69 kV BOM NOME TR2 PE 061/2001 IPCA RBNI REA 5166/2015 08/02/2018 07/02/2053  R$ 1,398,733.85
BOM NOME TR 230/69 kV BOM NOME TR1 PE RBF FT TR 230/69 kV BOM NOME TR1 PE 061/2001 IPCA RBNI REA 5166/2015 29/12/2017 28/12/2051  R$ 1,490,559.15
BOM NOME TT 69/13,8 kV BOM NOME TA1 PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
BOM NOME TR 69/13,8 kV BOM NOME TR3B PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
BOM NOME TR 69/13,8 kV BOM NOME TR3A PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
BOM NOME TR 230/138 kV BOM NOME TR6 PE RBF FT TR 230/138 kV BOM NOME TR6 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$399,926.80
BOM NOME TR 230/138 kV BOM NOME TR5 PE RBF FT TR 230/138 kV BOM NOME TR5 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$399,926.80
BOM NOME TR 230/138 kV BOM NOME TR4 PE RBF FT TR 230/138 kV BOM NOME TR4 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$399,926.80
BOM NOME TR 230/138 kV BOM NOME TR4 PE RBF FT TR 230/138 kV BOM NOME TR4 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,180,160.33
BOM NOME TR 230/138 kV BOM NOME TR4 PE RBF FT TR 230/138 kV BOM NOME TR4 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,207,740.08
BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$802,679.31
BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,368,659.17
BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,424,013.54
BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RBNI REA 3229/2011 30/01/2013 29/01/2041  R$124,286.28
BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RBNI REA 5166/2015 06/06/2018 06/06/2058  R$240,623.81
BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RBNI REA 5166/2015 06/06/2018 06/06/2051  R$112,139.33
BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RMEL REN 643/2014 19/07/2013 18/07/2030  R$26,696.61
BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RMEL REN 643/2014 30/12/2013 29/12/2041  R$83,087.83
BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RMEL REN 643/2014 17/12/2015 16/12/2032  R$35,823.15
BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RMEL REN 643/2014 31/01/2015 30/01/2043  R$50,950.93
BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RBNI REA 12075/2022 01/07/2022 30/06/2053  R$20,128.37
BOM NOME MC 69 kV TT 69/13,8 kV BOM NOME TA1 PE  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RMEL REN 443/2011 05/03/2016 04/03/2030  R$47,864.20
BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033  R$33,465.01
BOM NOME MC 69 kV TR 69/13,8 kV BOM NOME TR3A PE  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
BOM NOME MC 69 kV TR 230/69 kV BOM NOME TR1 PE  RBF FT TR 230/69 kV BOM NOME TR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
BOM NOME MC 69 kV TR 69/13,8 kV BOM NOME TR3B PE  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$60,565.23
BOM NOME MC 69 kV TR 230/69 kV BOM NOME TR1 PE  RBF FT TR 230/69 kV BOM NOME TR1 PE 061/2001 IPCA RBNI REA 5166/2015 29/12/2017 28/12/2047  R$203,125.85
BOM NOME MC 69 kV TR 230/69 kV BOM NOME TR2 PE  RBF FT TR 230/69 kV BOM NOME TR2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
BOM NOME MC 69 kV TR 230/69 kV BOM NOME TR2 PE  RBF FT TR 230/69 kV BOM NOME TR2 PE 061/2001 IPCA RBNI REA 5166/2015 08/02/2018 07/02/2039  R$205,396.94
BOM NOME MC 69 kV TR 230/69 kV BOM NOME TR1 PE  RBF FT TR 230/69 kV BOM NOME TR1 PE 061/2001 IPCA RMEL REN 643/2014 24/05/2013 23/05/2046  R$31,709.06
BOM NOME MC 230 kV TR 230/69 kV BOM NOME TR2 PE  RBF FT TR 230/69 kV BOM NOME TR2 PE 061/2001 IPCA RMEL REN 643/2014 20/09/2013 19/09/2046  R$108,215.94
BOM NOME MC 230 kV TR 230/138 kV BOM NOME TR6 PE  RBF FT TR 230/138 kV BOM NOME TR6 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
BOM NOME MC 230 kV TR 230/69 kV BOM NOME TR2 PE  RBF FT TR 230/69 kV BOM NOME TR2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
BOM NOME MC 230 kV TR 230/138 kV BOM NOME TR5 PE RBF FT TR 230/138 kV BOM NOME TR5 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
BOM NOME MC 230 kV TR 230/69 kV BOM NOME TR1 PE  RBF FT TR 230/69 kV BOM NOME TR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
BOM NOME MC 230 kV TR 230/138 kV BOM NOME TR4 PE RBF FT TR 230/138 kV BOM NOME TR4 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
BOM NOME MC 138 kV TR 230/138 kV BOM NOME TR6 PE  RBF FT TR 230/138 kV BOM NOME TR6 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$121,202.15
BOM NOME MC 138 kV TR 230/138 kV BOM NOME TR5 PE RBF FT TR 230/138 kV BOM NOME TR5 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$121,202.15
BOM NOME MC 230 kV TR 230/138 kV BOM NOME TR4 PE RBF FT TR 230/138 kV BOM NOME TR4 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
BOM NOME MC 138 kV TR 230/138 kV BOM NOME TR4 PE  RBF FT TR 230/138 kV BOM NOME TR4 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$121,202.15
BOM NOME MC 13,8 kV TR 69/13,8 kV BOM NOME TR3A PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
BOM NOME MC 13,8 kV TR 69/13,8 kV BOM NOME TR3A PE DIT   061/2001 IPCA RCDM REA 2040/2009 30/09/2012 29/09/2042  R$9,087.27
BOM NOME IB 69 kV MG 230 kV BOM NOME MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
BOM NOME IB 69 kV MG 230 kV BOM NOME MG1 PE IB1 DIT   061/2001 IPCA RCDM REA 5166/2015 06/06/2018 06/06/2049  R$31,200.76
BOM NOME IB 69 kV MG 230 kV BOM NOME MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$134,104.45
BOM NOME IB 69 kV MG 230 kV BOM NOME MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$137,238.41
BOM NOME IB 230 kV MG 230 kV BOM NOME MG1 PE IB1 RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,929.18
BOM NOME IB 230 kV MG 230 kV BOM NOME MG1 PE IB1 RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$368,658.63
BOM NOME IB 230 kV MG 230 kV BOM NOME MG1 PE IB1 RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$377,273.99
BOM NOME IB 138 kV MG 230 kV BOM NOME MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$93,640.20
BOM NOME EL 69 kV BOM NOMEVAGO1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
BOM NOME EL 69 kV BOM NOMEVAGO (CELPE) DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
BOM NOME EL 69 kV BOM NOMESERRA TALHADA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
BOM NOME EL 69 kV BOM NOMESALGUEIRO DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
BOM NOME EL 230 kV BOM NOME LT 230 kV TACARUTU /BOM NOME C-1 PE  RB FT LT 230 kV TACARUTU /BOM NOME C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
BOM NOME EL 230 kV BOM NOME LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE RB FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
BOM NOME EL 230 kV BOM NOME LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE RB FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
BOM NOME EL 230 kV BOM NOME LT 230 kV FLORESTA II /BOM NOME C-1 PE  RB FT LT 230 kV FLORESTA II /BOM NOME C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
BOM NOME EL 230 kV BOM NOME LT 230 kV FLORESTA II /BOM NOME C-1 PE  RB FT LT 230 kV FLORESTA II /BOM NOME C-1 PE 061/2001 IPCA RMEL REN 643/2014 30/09/2013 29/09/2046  R$108,296.62
BOM NOME EL 230 kV BOM NOME LT 230 kV BOM NOME /MILAGRES C-3 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-3 PE/CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
BOM NOME EL 230 kV BOM NOME LT 230 kV BOM NOME /MILAGRES C-3 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-3 PE/CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
BOM NOME EL 230 kV BOM NOME LT 230 kV BOM NOME /MILAGRES C-2 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-2 PE/CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
BOM NOME EL 230 kV BOM NOME LT 230 kV BOM NOME /MILAGRES C-2 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-2 PE/CE 061/2001 IPCA RMEL REN 643/2014 02/07/2015 01/07/2045  R$3,051.04
BOM NOME EL 230 kV BOM NOME LT 230 kV BOM NOME /MILAGRES C-1 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
BOM NOME EL 230 kV BOM NOME LT 230 kV BOM NOME /MILAGRES C-1 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE 061/2001 IPCA RMEL REN 643/2014 10/09/2013 09/09/2046  R$108,135.27
BOM NOME EL 230 kV BOM NOMETRANSPOSICAO N3 DIT   061/2001 IPCA RCDM REA 12075/2022 01/07/2022 30/06/2051  R$204,491.60
BOM NOME EL 138 kV BOM NOMESALGUEIRO-03C3 DIT   061/2001 IPCA RCDM REA 3229/2011 30/01/2013 29/01/2043  R$928,279.18
BOM NOME EL 138 kV BOM NOMESALGUEIRO 03C2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$180,723.85
BOM NOME EL 138 kV BOM NOMEFLORES-03C1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$180,723.85
BOM NOME EL 13,8 kV BOM NOME01Y3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
BOM NOME EL 13,8 kV BOM NOME01Y2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
BOM NOME EL 13,8 kV BOM NOME01Y1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
BONGI TT 69/13,8 kV BONGI TA2 PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
BONGI TT 69/13,8 kV BONGI TA2 PE DIT   061/2001 IPCA RCDM REA 3578/2012 22/03/2015 21/03/2045  R$221,837.57
BONGI TT 69/13,8 kV BONGI TA2 PE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$281,516.05
BONGI TT 69/13,8 kV BONGI TA2 PE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$288,094.94
BONGI TT 69/13,8 kV BONGI TA1 PE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$281,516.05
BONGI TT 69/13,8 kV BONGI TA1 PE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$288,094.94
BONGI TT 69/13,8 kV BONGI TA1 PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
BONGI TT 69/13,8 kV BONGI TA1 PE DIT   061/2001 IPCA RCDM REA 3578/2012 30/03/2015 29/03/2045  R$221,957.34
BONGI TR 230/69 kV BONGI TR4 PE RBF FT TR 230/69 kV BONGI TR4 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
BONGI TR 230/69 kV BONGI TR3 PE RBF FT TR 230/69 kV BONGI TR3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
BONGI TR 230/69 kV BONGI TR4 PE RBF FT TR 230/69 kV BONGI TR4 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
BONGI TR 230/69 kV BONGI TR4 PE RBF FT TR 230/69 kV BONGI TR4 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
BONGI TR 230/69 kV BONGI TR2 PE RBF FT TR 230/69 kV BONGI TR2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
BONGI TR 230/69 kV BONGI TR1 PE RBF FT TR 230/69 kV BONGI TR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
BONGI TR 230/13,8 kV BONGI TR7 PE RBF FT TR 230/13,8 kV BONGI TR7 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,764.01
BONGI TR 230/13,8 kV BONGI TR6 PE RBF FT TR 230/13,8 kV BONGI TR6 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,764.01
BONGI TR 230/13,8 kV BONGI TR6 PE RBF FT TR 230/13,8 kV BONGI TR6 PE 061/2001 IPCA RMEL REN 443/2011 07/04/2016 06/04/2046  R$1,394.51
BONGI RTS 13,8 kV 5 MVAr BONGI RT2 PE RBF FT TR 230/69 kV BONGI TR2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$399,033.22
BONGI RTS 13,8 kV 5 MVAr BONGI RT2 PE RBF FT TR 230/69 kV BONGI TR2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$408,358.42
BONGI TR 230/13,8 kV BONGI TR5 PE RBF FT TR 230/13,8 kV BONGI TR5 PE 061/2001 IPCA RBNI REA 3402/2012 14/01/2016 13/01/2050  R$ 1,069,620.79
BONGI RTS 13,8 kV 5 MVAr BONGI RT2 PE RBF FT TR 230/69 kV BONGI TR2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$135,222.37
BONGI RTS 13,8 kV 5 MVAr BONGI RT1 PE RBF FT TR 230/69 kV BONGI TR3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$135,222.37
BONGI RTS 13,8 kV 5 MVAr BONGI RT1 PE RBF FT TR 230/69 kV BONGI TR3 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$399,033.22
BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$754,558.33
BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RBNI REA 2376/2010 06/05/2012 05/05/2026  R$25,771.29
BONGI RTS 13,8 kV 5 MVAr BONGI RT1 PE RBF FT TR 230/69 kV BONGI TR3 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$408,358.42
BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RBNI REA 3402/2012 14/01/2016 13/01/2044  R$271,590.08
BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RBNI REA 2376/2010 06/05/2012 05/05/2045  R$22,546.29
BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RBNI REA 1814/2009 01/01/2013 31/12/2045  R$33,708.81
BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RMEL REN 643/2014 04/07/2013 03/07/2030  R$26,640.86
BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RMEL REN 643/2014 19/12/2015 18/12/2047  R$431,233.74
BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2029  R$15,558.47
BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RMEL REN 643/2014 06/09/2013 05/09/2030  R$32,128.22
BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RMEL REN 443/2011 28/03/2016 27/03/2030  R$30,284.60
BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033  R$33,465.01
BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,226,657.02
BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,278,692.87
BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2030  R$204,411.60
BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RMEL REN 443/2011 18/11/2016 17/11/2033  R$35,058.89
BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RMEL REN 443/2011 06/06/2017 05/06/2047  R$ 422.52
BONGI MC 69 kV TR 230/69 kV BONGI TR4 PE RBF FT TR 230/69 kV BONGI TR4 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
BONGI MC 69 kV TR 230/69 kV BONGI TR4 PE RBF FT TR 230/69 kV BONGI TR4 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$204,189.21
BONGI MC 69 kV TR 230/69 kV BONGI TR3 PE RBF FT TR 230/69 kV BONGI TR3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
BONGI MC 69 kV TR 230/69 kV BONGI TR4 PE RBF FT TR 230/69 kV BONGI TR4 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
BONGI EL 69 kV BONGIRIO JORDAO 02J5 DIT   061/2001 IPCA RCDM REA 1814/2009 12/12/2013 11/12/2045  R$37,212.61
BONGI EL 69 kV BONGIRIO JORDAO 02J5 DIT   061/2001 IPCA RCDM REA 1814/2009 03/08/2014 02/08/2044  R$15,242.16
BONGI MC 69 kV TR 230/69 kV BONGI TR3 PE RBF FT TR 230/69 kV BONGI TR3 PE 061/2001 IPCA RBNI REA 2040/2009 29/01/2014 28/01/2046  R$37,345.57
BONGI MC 69 kV TR 230/69 kV BONGI TR2 PE RBF FT TR 230/69 kV BONGI TR2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
BONGI MC 69 kV TR 230/69 kV BONGI TR2 PE RBF FT TR 230/69 kV BONGI TR2 PE 061/2001 IPCA RBNI REA 2040/2009 28/03/2014 27/03/2046  R$37,506.21
BONGI MC 69 kV TR 230/69 kV BONGI TR1 PE RBF FT TR 230/69 kV BONGI TR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
BONGI MC 69 kV TR 230/69 kV BONGI TR1 PE RBF FT TR 230/69 kV BONGI TR1 PE 061/2001 IPCA RBNI REA 2040/2009 12/02/2014 11/02/2046  R$37,384.35
BONGI MC 69 kV BC 69 kV 20,3 Mvar BONGI BC1 PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
BONGI MC 69 kV BC 69 kV 20,3 Mvar BONGI BC1 PE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
BONGI MC 69 kV BC 69 kV 20,3 Mvar BONGI BC1 PE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$235,271.08
BONGI MC 69 kV BC 69 kV 20,3 Mvar BONGI BC1 PE DIT   061/2001 IPCA RCDM REA 5861/2016 27/03/2015 26/03/2043  R$22,297.58
BONGI MC 69 kV BC 69 kV 20,3 Mvar BONGI BC1 PE DIT   061/2001 IPCA RCDM REA 7761/2019 06/04/2018 05/04/2054  R$51,140.54
BONGI MC 230 kV TR 230/69 kV BONGI TR4 PE RBF FT TR 230/69 kV BONGI TR4 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
BONGI MC 230 kV TR 230/69 kV BONGI TR4 PE RBF FT TR 230/69 kV BONGI TR4 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
BONGI MC 230 kV TR 230/69 kV BONGI TR4 PE RBF FT TR 230/69 kV BONGI TR4 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$476,693.95
BONGI MC 230 kV TR 230/69 kV BONGI TR4 PE RBF FT TR 230/69 kV BONGI TR4 PE 061/2001 IPCA RMEL REN 443/2011 04/06/2017 03/06/2047  R$5,868.92
BONGI MC 230 kV TR 230/69 kV BONGI TR3 PE RBF FT TR 230/69 kV BONGI TR3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
BONGI MC 230 kV TR 230/69 kV BONGI TR2 PE RBF FT TR 230/69 kV BONGI TR2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
BONGI MC 230 kV TR 230/69 kV BONGI TR1 PE RBF FT TR 230/69 kV BONGI TR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
BONGI MC 230 kV TR 230/13,8 kV BONGI TR7 PE RBF FT TR 230/13,8 kV BONGI TR7 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
BONGI MC 230 kV TR 230/13,8 kV BONGI TR6 PE RBF FT TR 230/13,8 kV BONGI TR6 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
BONGI MC 230 kV TR 230/13,8 kV BONGI TR6 PE RBF FT TR 230/13,8 kV BONGI TR6 PE 061/2001 IPCA RMEL REN 643/2014 16/02/2014 15/02/2044  R$64,122.21
BONGI MC 230 kV TR 230/13,8 kV BONGI TR6 PE RBF FT TR 230/13,8 kV BONGI TR6 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
BONGI MC 230 kV TR 230/13,8 kV BONGI TR5 PE  RBF FT TR 230/13,8 kV BONGI TR5 PE 061/2001 IPCA RBNI REA 3402/2012 14/01/2016 13/01/2046  R$ 1,176,087.79
BONGI MC 13,8 kV TR 230/13,8 kV BONGI TR7 PE RBF FT TR 230/13,8 kV BONGI TR7 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
BONGI MC 13,8 kV TR 230/13,8 kV BONGI TR6 PE RBF FT TR 230/13,8 kV BONGI TR6 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
BONGI MC 13,8 kV TR 230/13,8 kV BONGI TR5 PE  RBF FT TR 230/13,8 kV BONGI TR5 PE 061/2001 IPCA RBNI REA 3402/2012 14/01/2016 13/01/2047  R$393,971.47
BONGI MC 13,8 kV TR 13,8/0,22 kV BONGI TR3 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
BONGI MC 13,8 kV TR 13,8/0,22 kV BONGI TR2 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
BONGI IB 69 kV MG 230 kV BONGI MG1 PE IB2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
BONGI IB 69 kV MG 230 kV BONGI MG1 PE IB2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$134,104.45
BONGI IB 69 kV MG 230 kV BONGI MG1 PE IB2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$137,238.41
BONGI IB 69 kV MG 230 kV BONGI MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
BONGI IB 69 kV MG 230 kV BONGI MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$134,104.45
BONGI IB 69 kV MG 230 kV BONGI MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$137,238.41
BONGI IB 230 kV MG 230 kV BONGI MG1 PE IB1 RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,929.18
BONGI IB 230 kV MG 230 kV BONGI MG1 PE IB1 RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RMEL REN 443/2011 26/07/2017 25/07/2047  R$ 423.05
BONGI IB 230 kV MG 230 kV BONGI MG1 PE IB1 RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RMEL REN 443/2011 26/07/2017 25/07/2047  R$ 423.05
BONGI IB 13,8 kV MG 230 kV BONGI MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$33,105.90
BONGI IB 13,8 kV MG 230 kV BONGI MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$97,693.54
BONGI EL 69 kV BONGIVARZEA 02J4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
BONGI EL 69 kV BONGIVARZEA 02J4 DIT   061/2001 IPCA RCDM REA 1814/2009 18/11/2013 17/11/2045  R$37,146.15
BONGI EL 69 kV BONGIVARZEA 02J4 DIT   061/2001 IPCA RCDM REA 2376/2010 14/09/2014 13/09/2044  R$30,985.56
BONGI EL 69 kV BONGIVARZEA 02J4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
BONGI EL 69 kV BONGIVARZEA 02J4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
BONGI EL 69 kV BONGIVARZEA 02J3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
BONGI EL 69 kV BONGIVARZEA 02J3 DIT   061/2001 IPCA RCDM REA 2040/2009 25/02/2014 24/02/2046  R$37,420.36
BONGI EL 69 kV BONGIVARZEA 02J3 DIT   061/2001 IPCA RMEL REN 643/2014 27/05/2015 26/05/2029  R$ 419.50
BONGI EL 69 kV BONGIVARZEA 02J3 DIT   061/2001 IPCA RMEL REN 643/2014 28/05/2015 27/05/2029  R$ 419.54
BONGI EL 69 kV BONGIVARZEA 02J3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
BONGI EL 69 kV BONGIVARZEA 02J3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
BONGI EL 69 kV BONGITAMARIN 02J2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
BONGI EL 69 kV BONGITAMARIN 02J2 DIT   061/2001 IPCA RMEL REN 643/2014 26/05/2015 25/05/2029  R$ 419.43
BONGI EL 69 kV BONGITAMARIN 02J2 DIT   061/2001 IPCA RCDM REA 1814/2009 12/12/2013 11/12/2045  R$37,212.61
BONGI EL 69 kV BONGITAMARIN 02J2 DIT   061/2001 IPCA RMEL REN 443/2011 18/04/2016 17/04/2046  R$ 853.40
BONGI EL 69 kV BONGIRIO JORDAO 02J5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
BONGI EL 69 kV BONGIRIO JORDAO 02J5 DIT   061/2001 IPCA RCDM REA 2376/2010 14/09/2014 13/09/2044  R$30,985.56
BONGI EL 69 kV BONGIRETIRO 02J1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
BONGI EL 69 kV BONGIRETIRO 02J1 DIT   061/2001 IPCA RMEL REN 643/2014 25/05/2015 24/05/2029  R$ 419.37
BONGI EL 69 kV BONGIRETIRO 02J1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
BONGI EL 69 kV BONGIRETIRO 02J1 DIT   061/2001 IPCA RCDM REA 2040/2009 30/01/2013 29/01/2046  R$33,783.32
BONGI EL 69 kV BONGIRETIRO 02J1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
BONGI EL 69 kV BONGIIMBIRI 02L2 DIT   061/2001 IPCA RCDM REA 1814/2009 30/01/2013 29/01/2046  R$33,783.32
BONGI EL 69 kV BONGIIMBIRI 02L2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
BONGI EL 69 kV BONGIIMBIRI 02L2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
BONGI EL 69 kV BONGIIMBIRI 02L1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
BONGI EL 69 kV BONGIIMBIRI 02L2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
BONGI EL 69 kV BONGIIMBIRI 02L1 DIT   061/2001 IPCA RMEL REN 643/2014 28/05/2015 27/05/2045  R$ 573.68
BONGI EL 69 kV BONGIGAZ-PORT 02L6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
BONGI EL 69 kV BONGIGAZ-PINA 02J7 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
BONGI EL 69 kV BONGIGAZ-PINA 02J7 DIT   061/2001 IPCA RCDM REA 1814/2009 01/11/2013 31/10/2045  R$37,099.05
BONGI EL 69 kV BONGIGAZ-PINA 02J7 DIT   061/2001 IPCA RCDM REA 1814/2009 27/09/2014 26/09/2044  R$15,308.91
BONGI EL 69 kV BONGIGAZ 02L5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
BONGI EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-2 PE RB FT LT 230 kV BONGI /JOAIRAM C-2 PE 061/2001 IPCA RMEL REN 443/2011 08/04/2016 07/04/2046  R$1,394.61
BONGI EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-2 PE RB FT LT 230 kV BONGI /JOAIRAM C-2 PE 061/2001 IPCA RMEL REN 443/2011 10/12/2017 09/12/2049  R$125,285.55
BONGI EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-3 PE RB FT LT 230 kV BONGI /JOAIRAM C-3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
BONGI EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-3 PE RB FT LT 230 kV BONGI /JOAIRAM C-3 PE 061/2001 IPCA RMEL REN 443/2011 08/04/2016 07/04/2046  R$1,821.01
BONGI EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-2 PE RB FT LT 230 kV BONGI /JOAIRAM C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
BONGI EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-1 PE RB FT LT 230 kV BONGI /JOAIRAM C-1 PE 061/2001 IPCA RMEL REN 443/2011 07/04/2016 06/04/2046  R$1,820.85
BONGI EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-1 PE RB FT LT 230 kV BONGI /JOAIRAM C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
BONGI EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-1 PE RB FT LT 230 kV BONGI /JOAIRAM C-1 PE 061/2001 IPCA RMEL REN 443/2011 19/11/2017 18/11/2049  R$125,109.01
BONGI EL 230 kV BONGI LT 230 kV BONGI /ACONORTE C-1 PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
BONGI EL 13,8 kV BONGIDIST9 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
BONGI EL 13,8 kV BONGIDIST8 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
BONGI EL 13,8 kV BONGIDIST7 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
BONGI EL 13,8 kV BONGIDIST6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
BONGI EL 13,8 kV BONGIDIST5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
BONGI EL 13,8 kV BONGIDIST4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
BONGI EL 13,8 kV BONGIDIST3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
BONGI EL 13,8 kV BONGIDIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
BONGI EL 13,8 kV BONGIDIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
BONGI EL 13,8 kV BONGIDIS11 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
BONGI EL 13,8 kV BONGIDIS10 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
BONGI BC 69 kV 20,3 Mvar BONGI BC1 PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$116,409.25
BONGI BC 69 kV 20,3 Mvar BONGI BC1 PE DIT   061/2001 IPCA RMEL REN 643/2014 29/11/2013 28/11/2033  R$101,176.73
BROT.MACAUBAS MG 230 kV BROT.MACAUBAS MG1 BA RB FT MG 230 kV BROT.MACAUBAS MG1 BA 061/2001 IPCA RBNI REA 4629/2014 27/09/2013 31/12/2042  R$426,391.50
BROT.MACAUBAS IB 230 kV MG 230 kV BROT.MACAUBAS MG1 BA IB1 RB FT MG 230 kV BROT.MACAUBAS MG1 BA 061/2001 IPCA RBNI REA 4629/2014 27/09/2013 31/12/2042  R$148,522.37
BROT.MACAUBAS EL 230 kV BROT.MACAUBAS LT 230 kV IRECE /BROT.MACAUBAS C-1 BA  RB FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA 061/2001 IPCA RBNI REA 4629/2014 27/09/2013 31/12/2042  R$242,410.50
BROT.MACAUBAS EL 230 kV BROT.MACAUBAS LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA  RB FT LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA 061/2001 IPCA RBNI REA 4629/2014 27/09/2013 31/12/2042  R$242,410.50
BRUMADO II EL 230 kV BRUMADO II LT 230 kV BRUMADO II /IBICOARA C-1 BA RB FT LT 230 kV BRUMADO II /IBICOARA C-1 BA 010/2007 IPCA RBL CC 010/2007 11/06/2007 11/06/2037  R$493,032.84
BRUMADO II EL 230 kV BRUMADO II LT 230 kV BRUMADO II /IBICOARA C-1 BA RB FT LT 230 kV BRUMADO II /IBICOARA C-1 BA 010/2007 IPCA RMEL REN 443/2011 26/10/2016 25/10/2044  R$3,337.01
C.GRANDE II EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /SANTA CRUZ II C-1 PB/RN DIT   061/2001 IPCA RCDM REA 4809/2014 17/02/2017 16/02/2047  R$91,101.78
C.GRANDE II EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /PILOES C-1 PB DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$533,305.40
C.GRANDE II TT 69/13,8 kV C.GRANDE II TA2 PB DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
C.GRANDE II TT 69/13,8 kV C.GRANDE II TA1 PB DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
C.GRANDE II TT 69/13,8 kV C.GRANDE II TA1 PB DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$281,516.05
C.GRANDE II TT 69/13,8 kV C.GRANDE II TA1 PB DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$288,094.94
C.GRANDE II TR 230/69 kV C.GRANDE II TR6 PB RBF FT TR 230/69 kV C.GRANDE II TR6 PB 061/2001 IPCA RBNI REA 8328/2019 12/12/2022 12/12/2057  R$ 1,329,259.73
C.GRANDE II TR 230/69 kV C.GRANDE II TR5 PB RBF FT TR 230/69 kV C.GRANDE II TR5 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
C.GRANDE II TR 230/69 kV C.GRANDE II TR5 PB RBF FT TR 230/69 kV C.GRANDE II TR5 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
C.GRANDE II TR 230/69 kV C.GRANDE II TR5 PB RBF FT TR 230/69 kV C.GRANDE II TR5 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
C.GRANDE II TR 230/69 kV C.GRANDE II TR4 PB RBF FT TR 230/69 kV C.GRANDE II TR4 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
C.GRANDE II TR 230/69 kV C.GRANDE II TR3 PB RBF FT TR 230/69 kV C.GRANDE II TR3 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
C.GRANDE II TR 230/69 kV C.GRANDE II TR3 PB RBF FT TR 230/69 kV C.GRANDE II TR3 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
C.GRANDE II TR 230/138 kV C.GRANDE II TR2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$296,030.01
C.GRANDE II TR 230/138 kV C.GRANDE II TR1 PB RBF FT TR 230/138 kV C.GRANDE II TR1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$296,030.01
C.GRANDE II RTS 13,8 kV 5 Mvar C.GRANDE II RT2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$135,222.37
C.GRANDE II RTS 13,8 kV 5 Mvar C.GRANDE II RT2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$399,033.22
C.GRANDE II RTS 13,8 kV 5 Mvar C.GRANDE II RT2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$408,358.42
C.GRANDE II RTS 13,8 kV 5 Mvar C.GRANDE II RT1 PB RBF FT TR 230/138 kV C.GRANDE II TR1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$135,222.37
C.GRANDE II RTS 13,8 kV 5 Mvar C.GRANDE II RT1 PB RBF FT TR 230/138 kV C.GRANDE II TR1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$399,033.22
C.GRANDE II RTS 13,8 kV 5 Mvar C.GRANDE II RT1 PB RBF FT TR 230/138 kV C.GRANDE II TR1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$408,358.42
C.GRANDE II RTB 230 kV 30 MVAr C.GRANDE II RT2 PB RB FT RTB 230 kV 30 MVAr C.GRANDE II RT2 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$248,712.38
C.GRANDE II RTB 230 kV 10 Mvar C.GRANDE II RT1 PB RB FT RTB 230 kV 10 Mvar C.GRANDE II RT1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$207,097.25
C.GRANDE II RTB 13,8 kV 5 MVAr C.GRANDE II RT2 PB RBF FT RTB 13,8 kV 5 MVAr C.GRANDE II RT2 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$135,222.37
C.GRANDE II RTB 13,8 kV 5 MVAr C.GRANDE II RT1 PB RBF FT RTB 13,8 kV 5 MVAr C.GRANDE II RT1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$135,222.37
C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,025,093.44
C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RMEL REN 643/2014 16/08/2013 15/08/2030  R$26,800.63
C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RMEL REN 643/2014 07/02/2014 06/02/2046  R$6,498.70
C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RMEL REN 643/2014 26/12/2015 25/12/2032  R$32,467.89
C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RMEL REN 643/2014 27/12/2015 26/12/2029  R$81,388.24
C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RMEL REN 643/2014 21/07/2014 20/07/2044  R$38,010.21
C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,024,990.14
C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,095,682.63
C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RMEL REN 443/2011 23/09/2016 22/09/2033  R$33,561.49
C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RMEL REN 443/2011 01/02/2016 31/01/2033  R$33,844.82
C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RBNI REA 8328/2019 12/12/2022 12/12/2053  R$179,681.89
C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RBNI REA 8328/2019 12/12/2022 12/12/2053  R$50,340.27
C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RBNI REA 7761/2019 29/04/2019 28/04/2049  R$109,978.03
C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RBNI REA 7761/2019 28/07/2020 27/07/2035  R$31,133.33
C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RBNI REN 905/2020 11/12/2014 10/12/2045  R$46,432.74
C.GRANDE II MC 69 kV TT 69/13,8 kV C.GRANDE II TA1 PB  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
C.GRANDE II MC 69 kV TR 69/13,8 kV C.GRANDE II TR7A PB TR7B/TR7C DIT   061/2001 IPCA RMEL REN 643/2014 08/10/2015 07/10/2029  R$ 427.75
C.GRANDE II MC 69 kV TR 69/13,8 kV C.GRANDE II TR7A PB TR7B/TR7C DIT   061/2001 IPCA RMEL REN 643/2014 09/10/2015 08/10/2029  R$ 427.82
C.GRANDE II MC 69 kV TR 230/69 kV C.GRANDE II TR6 PB RBF FT TR 230/69 kV C.GRANDE II TR6 PB 061/2001 IPCA RBNI REA 8328/2019 12/12/2022 12/12/2050  R$383,970.32
C.GRANDE II MC 69 kV TR 230/69 kV C.GRANDE II TR5 PB  RBF FT TR 230/69 kV C.GRANDE II TR5 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
C.GRANDE II MC 69 kV TR 230/69 kV C.GRANDE II TR4 PB RBF FT TR 230/69 kV C.GRANDE II TR4 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
C.GRANDE II MC 69 kV TR 230/69 kV C.GRANDE II TR3 PB RBF FT TR 230/69 kV C.GRANDE II TR3 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
C.GRANDE II MC 69 kV BC 69 kV 21,2 Mvar C.GRANDE II BC2 PB DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
C.GRANDE II MC 69 kV BC 69 kV 21,2 Mvar C.GRANDE II BC2 PB DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
C.GRANDE II MC 69 kV BC 69 kV 21,2 Mvar C.GRANDE II BC2 PB DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$235,271.08
C.GRANDE II MC 69 kV BC 69 kV 20,3 Mvar C.GRANDE II BC1 PB DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
C.GRANDE II MC 69 kV BC 69 kV 20,3 Mvar C.GRANDE II BC1 PB DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
C.GRANDE II MC 69 kV BC 69 kV 20,3 Mvar C.GRANDE II BC1 PB DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$235,271.08
C.GRANDE II MC 69 kV BC 69 kV 20,3 Mvar C.GRANDE II BC1 PB DIT   061/2001 IPCA RCDM REA 7761/2019 29/04/2019 28/04/2055  R$16,686.86
C.GRANDE II MC 230 kV TR 230/69 kV C.GRANDE II TR6 PB RBF FT TR 230/69 kV C.GRANDE II TR6 PB 061/2001 IPCA RBNI REA 8328/2019 12/12/2022 12/12/2050  R$892,529.82
C.GRANDE II MC 230 kV TR 230/69 kV C.GRANDE II TR5 PB  RBF FT TR 230/69 kV C.GRANDE II TR5 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
C.GRANDE II MC 230 kV TR 230/69 kV C.GRANDE II TR4 PB RBF FT TR 230/69 kV C.GRANDE II TR4 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
C.GRANDE II MC 230 kV TR 230/69 kV C.GRANDE II TR4 PB RBF FT TR 230/69 kV C.GRANDE II TR4 PB 061/2001 IPCA RMEL REN 443/2011 13/08/2017 12/08/2049  R$124,285.11
C.GRANDE II MC 230 kV TR 230/69 kV C.GRANDE II TR3 PB RBF FT TR 230/69 kV C.GRANDE II TR3 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
C.GRANDE II MC 230 kV TR 230/69 kV C.GRANDE II TR3 PB RBF FT TR 230/69 kV C.GRANDE II TR3 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
C.GRANDE II MC 230 kV TR 230/69 kV C.GRANDE II TR3 PB RBF FT TR 230/69 kV C.GRANDE II TR3 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$476,693.95
C.GRANDE II MC 230 kV TR 230/138 kV C.GRANDE II TR2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
C.GRANDE II MC 230 kV TR 230/138 kV C.GRANDE II TR2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RMEL REN 443/2011 01/11/2017 31/10/2049  R$124,957.68
C.GRANDE II MC 230 kV TR 230/138 kV C.GRANDE II TR1 PB RBF FT TR 230/138 kV C.GRANDE II TR1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
C.GRANDE II MC 230 kV RTB 230 kV 30 MVAr C.GRANDE II RT2 PB  RB FT RTB 230 kV 30 MVAr C.GRANDE II RT2 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$151,491.77
C.GRANDE II MC 230 kV RTB 230 kV 10 Mvar C.GRANDE II RT1 PB RB FT RTB 230 kV 10 Mvar C.GRANDE II RT1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$151,491.77
C.GRANDE II MC 230 kV RTB 230 kV 10 Mvar C.GRANDE II RT1 PB RB FT RTB 230 kV 10 Mvar C.GRANDE II RT1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$447,043.25
C.GRANDE II MC 230 kV RTB 230 kV 10 Mvar C.GRANDE II RT1 PB RB FT RTB 230 kV 10 Mvar C.GRANDE II RT1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$457,490.43
C.GRANDE II MC 230 kV CE 100/-0 Mvar C.GRANDE II CE1 PB CE2 RB FT CE 100/-0 Mvar C.GRANDE II CE1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$163,065.57
C.GRANDE II MC 230 kV BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB RB FT BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$179,837.78
C.GRANDE II MC 230 kV BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB RB FT BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$530,690.67
C.GRANDE II MC 230 kV BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB RB FT BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$543,092.64
C.GRANDE II MC 230 kV BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB RB FT BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB 061/2001 IPCA RMEL REN 443/2011 22/11/2017 21/11/2049  R$125,134.24
C.GRANDE II MC 138 kV TR 230/138 kV C.GRANDE II TR2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$121,202.15
C.GRANDE II MC 138 kV TR 230/138 kV C.GRANDE II TR2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$357,660.38
C.GRANDE II MC 138 kV TR 230/138 kV C.GRANDE II TR2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$366,018.73
C.GRANDE II MC 138 kV TR 230/138 kV C.GRANDE II TR2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RMEL REN 443/2011 18/05/2016 17/05/2046  R$12,605.98
C.GRANDE II MC 138 kV TR 230/138 kV C.GRANDE II TR2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RMEL REN 443/2011 18/05/2016 17/05/2046  R$12,605.98
C.GRANDE II MC 138 kV TR 230/138 kV C.GRANDE II TR2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RMEL REN 443/2011 18/05/2016 17/05/2046  R$12,605.98
C.GRANDE II MC 138 kV TR 230/138 kV C.GRANDE II TR1 PB RBF FT TR 230/138 kV C.GRANDE II TR1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$121,202.15
C.GRANDE II MC 138 kV TR 230/138 kV C.GRANDE II TR1 PB RBF FT TR 230/138 kV C.GRANDE II TR1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$357,660.38
C.GRANDE II MC 138 kV TR 230/138 kV C.GRANDE II TR1 PB RBF FT TR 230/138 kV C.GRANDE II TR1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$366,018.73
C.GRANDE II MC 13,8 kV TR 230/138 kV C.GRANDE II TR1 PB 16T1 RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
C.GRANDE II MC 13,8 kV TR 230/138 kV C.GRANDE II TR1 PB 16T1 RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$142,152.79
C.GRANDE II MC 13,8 kV TR 230/138 kV C.GRANDE II TR1 PB 16T1 RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$145,474.83
C.GRANDE II MC 13,8 kV TR 230/138 kV C.GRANDE II TR1 PB 11T1 RBF FT TR 230/138 kV C.GRANDE II TR1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
C.GRANDE II MC 13,8 kV RTB 13,8 kV 5 MVAr C.GRANDE II RT2 PB RBF FT RTB 13,8 kV 5 MVAr C.GRANDE II RT2 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,511.84
C.GRANDE II MC 13,8 kV RTB 13,8 kV 5 MVAr C.GRANDE II RT1 PB RBF FT RTB 13,8 kV 5 MVAr C.GRANDE II RT1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,511.84
C.GRANDE II MC 13,8 kV RTB 13,8 kV 5 MVAr C.GRANDE II RT1 PB RBF FT RTB 13,8 kV 5 MVAr C.GRANDE II RT1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,223.45
C.GRANDE II MC 13,8 kV RTB 13,8 kV 5 MVAr C.GRANDE II RT1 PB RBF FT RTB 13,8 kV 5 MVAr C.GRANDE II RT1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$203,879.20
C.GRANDE II MC 13,8 kV CS 20/-10 MVAr C.GRANDE II CS1 PB  RBF FT CS 20/-10 MVAr C.GRANDE II CS1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$65,134.54
C.GRANDE II IB 69 kV MG 230 kV C.GRANDE II MG1 PB IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
C.GRANDE II IB 230 kV MG 230 kV C.GRANDE II MG1 PB IB3 RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
C.GRANDE II IB 230 kV MG 230 kV C.GRANDE II MG1 PB IB2 RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
C.GRANDE II IB 230 kV MG 230 kV C.GRANDE II MG1 PB IB1 RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,929.18
C.GRANDE II IB 138 kV MG 230 kV C.GRANDE II MG1 PB IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$93,640.20
C.GRANDE II IB 138 kV MG 230 kV C.GRANDE II MG1 PB IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$276,326.68
C.GRANDE II IB 138 kV MG 230 kV C.GRANDE II MG1 PB IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$282,784.30
C.GRANDE II EL 69 kV C.GRANDE II LT 69 kV C.GRANDE II /C.GRANDE I C-1 PB  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
C.GRANDE II EL 69 kV C.GRANDE II LT 69 kV C.GRANDE II /C.GRANDE I C-1 PB  DIT   061/2001 IPCA RMEL REN 643/2014 09/10/2015 08/10/2029  R$ 427.82
C.GRANDE II EL 69 kV C.GRANDE II LT 69 kV C.GRANDE II /C.GRANDE I C-1 PB  DIT   061/2001 IPCA RMEL REN 643/2014 08/10/2015 07/10/2029  R$ 427.75
C.GRANDE II EL 69 kV C.GRANDE II LT 69 kV C.GRANDE II /BELA VISTA C-1 PB  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
C.GRANDE II EL 69 kV C.GRANDE II LT 69 kV C.GRANDE II /BELA VISTA C-1 PB  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
C.GRANDE II EL 69 kV C.GRANDE IIQUEIMADAS DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
C.GRANDE II EL 69 kV C.GRANDE IIJUAZEIRINHO DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
C.GRANDE II EL 69 kV C.GRANDE IIJUAZEIRINHO DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
C.GRANDE II EL 69 kV C.GRANDE IIJUAZEIRINHO DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
C.GRANDE II EL 69 kV C.GRANDE IIESPERANCA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
C.GRANDE II EL 69 kV C.GRANDE IIESPERANCA DIT   061/2001 IPCA RMEL REN 643/2014 10/10/2015 09/10/2029  R$ 855.76
C.GRANDE II EL 69 kV C.GRANDE IIESPERANCA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
C.GRANDE II EL 69 kV C.GRANDE IIESPERANCA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
C.GRANDE II EL 69 kV C.GRANDE IIEMBRATEX DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
C.GRANDE II EL 69 kV C.GRANDE IIEMBRATEX DIT   061/2001 IPCA RMEL REN 443/2011 31/03/2017 30/03/2048  R$32,726.90
C.GRANDE II EL 69 kV C.GRANDE IIBOQUEIRAO DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
C.GRANDE II EL 69 kV C.GRANDE IIBOA VISTA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
C.GRANDE II EL 69 kV C.GRANDE IIAEROCLUBE DIT   061/2001 IPCA RCDM REN 905/2020 11/12/2014 10/12/2042  R$550,755.16
C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$694,952.04
C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$711,192.72
C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$694,952.04
C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$711,192.72
C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB 061/2001 IPCA RMEL REN 443/2011 12/07/2017 11/07/2047  R$21,324.09
C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBNI REA 2040/2009 05/01/2016 04/01/2047  R$193,833.52
C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RMEL REN 443/2011 14/02/2016 13/02/2046  R$14,411.22
C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RMEL REN 443/2011 14/02/2016 13/02/2046  R$14,411.22
C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB  RB FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB  RB FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB 061/2001 IPCA RMEL REN 443/2011 30/01/2016 29/01/2046  R$14,394.74
C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB  RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB 061/2001 IPCA RBNI REA 3208/2011 09/12/2019 09/12/2048  R$ 675.66
C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB  RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB  RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$694,952.04
C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB  RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$711,192.72
C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB  RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB  RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$694,952.04
C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB  RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$711,192.72
C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE III /C.GRANDE II C-1 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041  R$295,712.91
C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN  RB FT LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN RB FT LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN RB FT LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN 061/2001 IPCA RBNI REA 3578/2012 21/11/2020 20/11/2053  R$150,469.64
C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE II /COTEMINAS C-1 PB  RB FT LT 230 kV C.GRANDE II /COTEMINAS C-1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
C.GRANDE II EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /SANTA CRUZ II C-1 PB/RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$180,723.85
C.GRANDE II EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /SANTA CRUZ II C-1 PB/RN DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$533,305.40
C.GRANDE II EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /SANTA CRUZ II C-1 PB/RN DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$545,768.47
C.GRANDE II EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /PILOES C-1 PB DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$545,768.47
C.GRANDE II EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /PILOES C-1 PB DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$180,723.85
C.GRANDE II EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /PILOES C-1 PB DIT   061/2001 IPCA RCDM REA 4809/2014 17/02/2017 16/02/2047  R$91,101.78
C.GRANDE II CE 100/-0 Mvar C.GRANDE II CE2 PB RB FT CE 100/-0 Mvar C.GRANDE II CE1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,444,997.28
C.GRANDE II CE 100/-0 Mvar C.GRANDE II CE2 PB RB FT CE 100/-0 Mvar C.GRANDE II CE1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 7,215,042.38
C.GRANDE II CS 20/-10 MVAr C.GRANDE II CS1 PB RBF FT CS 20/-10 MVAr C.GRANDE II CS1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$827,609.80
C.GRANDE II CE 100/-0 Mvar C.GRANDE II CE2 PB RB FT CE 100/-0 Mvar C.GRANDE II CE1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 7,383,654.28
C.GRANDE II CE 100/-0 Mvar C.GRANDE II CE1 PB RB FT CE 100/-0 Mvar C.GRANDE II CE1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,444,997.28
C.GRANDE II CE 100/-0 Mvar C.GRANDE II CE1 PB RB FT CE 100/-0 Mvar C.GRANDE II CE1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 7,215,042.38
C.GRANDE II CE 100/-0 Mvar C.GRANDE II CE2 PB RB FT CE 100/-0 Mvar C.GRANDE II CE1 PB 061/2001 IPCA RMEL REN 443/2011 16/03/2017 15/03/2050  R$20,171.61
C.GRANDE II BC 69 kV 21,2 Mvar C.GRANDE II BC2 PB DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$119,845.26
C.GRANDE II BC 69 kV 21,2 Mvar C.GRANDE II BC2 PB DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$353,656.29
C.GRANDE II CE 100/-0 Mvar C.GRANDE II CE1 PB RB FT CE 100/-0 Mvar C.GRANDE II CE1 PB 061/2001 IPCA RMEL REN 443/2011 16/03/2017 15/03/2050  R$20,171.61
C.GRANDE II BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB RB FT BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$609,874.99
C.GRANDE II BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB RB FT BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$624,127.46
C.GRANDE II BC 69 kV 21,2 Mvar C.GRANDE II BC2 PB DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$361,921.06
C.GRANDE II BC 69 kV 20,3 Mvar C.GRANDE II BC1 PB DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$116,409.25
C.GRANDE II BC 69 kV 20,3 Mvar C.GRANDE II BC1 PB DIT   061/2001 IPCA RMEL REN 643/2014 11/12/2013 10/12/2033  R$101,320.15
C.GRANDE II BC 69 kV 20,3 Mvar C.GRANDE II BC1 PB DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$343,516.83
C.GRANDE II BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB RB FT BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,671.37
C.GRANDE III RTL 500 kV 33,33 Mvar C.GRANDE III RTR2 PB RB FT RTL 500 kV 33,33 Mvar C.GRANDE III RTR2 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041  R$313,326.47
C.GRANDE III TR 500/230 kV C.GRANDE III TRR1 PB RB FT TR 500/230 kV C.GRANDE III TRR1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041  R$864,969.98
C.GRANDE III TR 500/230 kV C.GRANDE III TR2 PB RB FT TR 500/230 kV C.GRANDE III TR2 PB 008/2011 IPCA RBNI REA 3738/2012 13/05/2015 12/05/2050  R$ 5,394,394.27
C.GRANDE III TR 500/230 kV C.GRANDE III TR1 PB RB FT TR 500/230 kV C.GRANDE III TR1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041  R$ 2,594,910.99
C.GRANDE III RTL 500 kV 100 Mvar C.GRANDE III RTL2 PB RB FT LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041  R$939,980.44
C.GRANDE III RTB 500 kV 150 Mvar C.GRANDE III RT1 PB RB FT RTB 500 kV 150 Mvar C.GRANDE III RT1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041  R$ 1,078,157.27
C.GRANDE III RTB 500 kV 50 Mvar C.GRANDE III RTR1 PB RB FT RTB 500 kV 50 Mvar C.GRANDE III RTR1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041  R$359,385.76
C.GRANDE III MG 500 kV C.GRANDE III MG1 PB RB FT MG 500 kV C.GRANDE III MG1 PB 008/2011 IPCA RBNI REA 3738/2012 13/05/2015 12/05/2046  R$327,438.94
C.GRANDE III MC 500 kV TR 500/230 kV C.GRANDE III TR1 PB RB FT TR 500/230 kV C.GRANDE III TR1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041  R$573,099.24
C.GRANDE III MC 500 kV RTL 500 kV 100 Mvar C.GRANDE III RTL2 PB RB FT LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041  R$343,117.27
C.GRANDE III MG 500 kV C.GRANDE III MG1 PB RB FT MG 500 kV C.GRANDE III MG1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041  R$ 1,100,877.12
C.GRANDE III MC 500 kV TR 500/230 kV C.GRANDE III TR2 PB RB FT TR 500/230 kV C.GRANDE III TR2 PB 008/2011 IPCA RBNI REA 3738/2012 13/05/2015 12/05/2043  R$ 1,262,631.13
C.GRANDE III IB 500 kV MG 500 kV C.GRANDE III MG1 PB IB2 RB FT MG 500 kV C.GRANDE III MG1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041  R$613,007.12
C.GRANDE III MC 500 kV RTB 500 kV 150 Mvar C.GRANDE III RT1 PB  RB FT RTB 500 kV 150 Mvar C.GRANDE III RT1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041  R$535,570.14
C.GRANDE III MC 230 kV TR 500/230 kV C.GRANDE III TR2 PB RB FT TR 500/230 kV C.GRANDE III TR2 PB 008/2011 IPCA RBNI REA 3738/2012 13/05/2015 12/05/2039  R$496,721.91
C.GRANDE III MC 230 kV TR 500/230 kV C.GRANDE III TR1 PB RB FT TR 500/230 kV C.GRANDE III TR1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041  R$210,638.30
C.GRANDE III IB 500 kV MG 500 kV C.GRANDE III MG1 PB IB1 RB FT MG 500 kV C.GRANDE III MG1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041  R$613,007.12
C.GRANDE III IB 230 kV MG 500 kV C.GRANDE III MG1 PB IB1 RB FT MG 500 kV C.GRANDE III MG1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041  R$159,615.95
C.GRANDE III EL 500 kV C.GRANDE III LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB RB FT LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041  R$642,678.57
C.GRANDE III EL 230 kV C.GRANDE III LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN 061/2001 IPCA RBNI REA 10226/2021 27/01/2017 26/01/2045  R$153,279.46
C.GRANDE III EL 230 kV C.GRANDE III LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB  RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB 061/2001 IPCA RBNI REA 10226/2021 27/01/2017 26/01/2045  R$153,279.46
C.GRANDE III EL 230 kV C.GRANDE III LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB 061/2001 IPCA RBNI REA 10226/2021 27/01/2017 26/01/2045  R$153,279.46
C.GRANDE III EL 230 kV C.GRANDE III LT 230 kV C.GRANDE III /C.GRANDE II C-1 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041  R$295,712.91
CAMACARI II TR 500/230 kV CAMACARI II TRR1 BA RB FT TR 500/230 kV CAMACARI II TRR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,981,027.26
CAMACARI II TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,013,961.67
CAMACARI II TT 69/13,8 kV CAMACARI II TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
CAMACARI II TT 69/13,8 kV CAMACARI II TA2 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$281,516.05
CAMACARI II TT 69/13,8 kV CAMACARI II TA2 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$288,094.94
CAMACARI II TT 69/13,8 kV CAMACARI II TA1 BA DIT   061/2001 IPCA RCDM REA 3578/2012 08/08/2015 07/08/2045  R$223,918.76
CAMACARI II TR 69/13,8 kV CAMACARI II TR8 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
CAMACARI II TR 69/13,8 kV CAMACARI II TR8 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$86,722.45
CAMACARI II TR 69/13,8 kV CAMACARI II TR8 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$88,749.11
CAMACARI II TR 500/230 kV CAMACARI II TRR1 BA RB FT TR 500/230 kV CAMACARI II TRR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$671,320.56
CAMACARI II TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RMEL REN 643/2014 22/09/2013 21/09/2047  R$31,566.10
CAMACARI II TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RMEL REN 643/2014 22/09/2013 21/09/2047  R$26,253.09
CAMACARI II TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 6,081,968.60
CAMACARI II TR 500/230 kV CAMACARI II TR3 BA RB FT TR 500/230 kV CAMACARI II TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,013,961.67
CAMACARI II TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,943,081.78
CAMACARI II TR 500/230 kV CAMACARI II TR3 BA RB FT TR 500/230 kV CAMACARI II TR3 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,943,081.78
CAMACARI II TR 500/230 kV CAMACARI II TR3 BA RB FT TR 500/230 kV CAMACARI II TR3 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 6,081,968.60
CAMACARI II TR 230/69 kV CAMACARI II TR6 BA RBF FT TR 230/69 kV CAMACARI II TR6 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
CAMACARI II TR 230/69 kV CAMACARI II TR6 BA RBF FT TR 230/69 kV CAMACARI II TR6 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
CAMACARI II TR 500/230 kV CAMACARI II TR2 BA RB FT TR 500/230 kV CAMACARI II TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,013,961.67
CAMACARI II TR 500/230 kV CAMACARI II TR2 BA RB FT TR 500/230 kV CAMACARI II TR2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,943,081.78
CAMACARI II TR 500/230 kV CAMACARI II TR1 BA RB FT TR 500/230 kV CAMACARI II TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,013,961.67
CAMACARI II TR 500/230 kV CAMACARI II TR1 BA RB FT TR 500/230 kV CAMACARI II TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,943,081.78
CAMACARI II TR 500/230 kV CAMACARI II TR1 BA RB FT TR 500/230 kV CAMACARI II TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 6,081,968.60
CAMACARI II TR 230/69 kV CAMACARI II TR6 BA RBF FT TR 230/69 kV CAMACARI II TR6 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
CAMACARI II TR 230/69 kV CAMACARI II TR5 BA RBF FT TR 230/69 kV CAMACARI II TR5 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
CAMACARI II TR 230/69 kV CAMACARI II TR5 BA RBF FT TR 230/69 kV CAMACARI II TR5 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
CAMACARI II TR 230/69 kV CAMACARI II TR5 BA RBF FT TR 230/69 kV CAMACARI II TR5 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
CAMACARI II TR 230/13,8 kV CAMACARI II TRR1 BA RB FT TR 230/13,8 kV CAMACARI II TRR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$772,205.15
CAMACARI II TR 230/13,8 kV CAMACARI II TR7 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$767,115.89
CAMACARI II TR 230/13,8 kV CAMACARI II TRR1 BA RB FT TR 230/13,8 kV CAMACARI II TRR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$255,705.30
CAMACARI II TR 230/13,8 kV CAMACARI II TRR1 BA RB FT TR 230/13,8 kV CAMACARI II TRR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$754,571.21
CAMACARI II RTL 500 kV 33,3 Mvar CAMACARI II RTR1 BA RB FT RTL 500 kV 33,3 Mvar CAMACARI II RTR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$242,341.83
CAMACARI II RTL 500 kV 33,3 Mvar CAMACARI II RTR1 BA RB FT RTL 500 kV 33,3 Mvar CAMACARI II RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$715,136.41
CAMACARI II TR 230/13,8 kV CAMACARI II TR7 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,263,713.62
CAMACARI II TR 230/13,8 kV CAMACARI II TR7 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,316,615.46
CAMACARI II RTL 500 kV 60 Mvar CAMACARI II RTR2 BA RB FT RTL 500 kV 60 Mvar CAMACARI II RTR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$294,317.25
CAMACARI II RTL 500 kV 60 Mvar CAMACARI II RTR2 BA RB FT RTL 500 kV 60 Mvar CAMACARI II RTR2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$868,512.81
CAMACARI II RTL 500 kV 60 Mvar CAMACARI II RTR2 BA RB FT RTL 500 kV 60 Mvar CAMACARI II RTR2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$888,809.51
CAMACARI II RTL 500 kV 100 Mvar CAMACARI II RT1 BA RB FT RTL 500 kV 100 Mvar CAMACARI II RT1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,146,191.10
CAMACARI II RTL 500 kV 100 Mvar CAMACARI II RT1 BA RB FT RTL 500 kV 100 Mvar CAMACARI II RT1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,196,346.50
CAMACARI II RTL 500 kV 33,3 Mvar CAMACARI II RTR1 BA RB FT RTL 500 kV 33,3 Mvar CAMACARI II RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$731,848.78
CAMACARI II RTL 500 kV 100 Mvar CAMACARI II RT1 BA RB FT RTL 500 kV 100 Mvar CAMACARI II RT1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$727,290.45
CAMACARI II MG 500 kV CAMACARI II MG1 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,318,924.62
CAMACARI II MG 500 kV CAMACARI II MG1 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 643/2014 30/09/2013 29/09/2030  R$26,396.63
CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$527,519.95
CAMACARI II MG 500 kV CAMACARI II MG1 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 643/2014 07/02/2014 06/02/2028  R$323,597.97
CAMACARI II MG 500 kV CAMACARI II MG1 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 6,843,009.41
CAMACARI II MG 500 kV CAMACARI II MG1 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 7,002,927.08
CAMACARI II MG 500 kV CAMACARI II MG1 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 443/2011 21/02/2016 20/02/2033  R$64,009.05
CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR3 BA  RB FT TR 500/230 kV CAMACARI II TR3 BA 061/2001 IPCA RBNI REA 6137/2016 20/01/2021 20/01/2051  R$363,106.36
CAMACARI II MC 69 kV TT 69/13,8 kV CAMACARI II TA2 BA  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
CAMACARI II MC 69 kV TT 69/13,8 kV CAMACARI II TA1 BA  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
CAMACARI II MC 69 kV TR 69/13,8 kV CAMACARI II TR8 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$60,565.23
CAMACARI II MC 69 kV TR 230/69 kV CAMACARI II TR6 BA RBF FT TR 230/69 kV CAMACARI II TR6 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
CAMACARI II MC 69 kV TR 230/69 kV CAMACARI II TR5 BA RBF FT TR 230/69 kV CAMACARI II TR5 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
CAMACARI II MC 500 kV TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
CAMACARI II MC 500 kV TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RMEL REN 443/2011 12/09/2015 11/09/2045  R$18,209.04
CAMACARI II MC 500 kV TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RMEL REN 443/2011 12/09/2015 11/09/2045  R$18,209.04
CAMACARI II MC 500 kV TR 500/230 kV CAMACARI II TR3 BA  RB FT TR 500/230 kV CAMACARI II TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
CAMACARI II MC 500 kV TR 500/230 kV CAMACARI II TR2 BA RB FT TR 500/230 kV CAMACARI II TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
CAMACARI II MC 500 kV TR 500/230 kV CAMACARI II TR1 BA RB FT TR 500/230 kV CAMACARI II TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
CAMACARI II MC 500 kV RTL 500 kV 100 Mvar CAMACARI II RT1 BA  RB FT RTL 500 kV 100 Mvar CAMACARI II RT1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$382,925.27
CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$515,473.59
CAMACARI II MC 230 kV TR 230/69 kV CAMACARI II TR6 BA RBF FT TR 230/69 kV CAMACARI II TR6 BA 061/2001 IPCA RBNI REA 6137/2016 29/06/2020 29/06/2046  R$125,069.45
CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RBNI REA 6137/2016 03/01/2021 03/01/2047  R$125,069.45
CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR3 BA  RB FT TR 500/230 kV CAMACARI II TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$210,996.61
CAMACARI II MC 230 kV TR 230/13,8 kV CAMACARI II TR7 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$515,473.59
CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR2 BA RB FT TR 500/230 kV CAMACARI II TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$210,996.61
CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR2 BA RB FT TR 500/230 kV CAMACARI II TR2 BA 061/2001 IPCA RMEL REN 643/2014 22/02/2014 21/02/2044  R$64,152.78
CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR2 BA RB FT TR 500/230 kV CAMACARI II TR2 BA 061/2001 IPCA RMEL REN 643/2014 23/02/2014 22/02/2044  R$64,157.86
CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR2 BA RB FT TR 500/230 kV CAMACARI II TR2 BA 061/2001 IPCA RBNI REA 6137/2016 20/12/2020 20/12/2051  R$237,035.19
CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR1 BA RB FT TR 500/230 kV CAMACARI II TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$210,996.61
CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR1 BA RB FT TR 500/230 kV CAMACARI II TR1 BA 061/2001 IPCA RMEL REN 643/2014 08/06/2014 07/06/2044  R$64,692.85
CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR1 BA RB FT TR 500/230 kV CAMACARI II TR1 BA 061/2001 IPCA RMEL REN 643/2014 07/06/2014 06/06/2044  R$64,687.75
CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR1 BA RB FT TR 500/230 kV CAMACARI II TR1 BA 061/2001 IPCA RBNI REA 6137/2016 20/12/2020 20/12/2051  R$237,035.19
CAMACARI II MC 230 kV TR 230/69 kV CAMACARI II TR6 BA RBF FT TR 230/69 kV CAMACARI II TR6 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
CAMACARI II MC 230 kV TR 230/69 kV CAMACARI II TR5 BA RBF FT TR 230/69 kV CAMACARI II TR5 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
CAMACARI II MC 230 kV TR 230/69 kV CAMACARI II TR5 BA RBF FT TR 230/69 kV CAMACARI II TR5 BA 061/2001 IPCA RBNI REA 6137/2016 20/01/2021 20/01/2047  R$125,069.45
CAMACARI II MC 230 kV TR 230/69 kV CAMACARI II TR5 BA RBF FT TR 230/69 kV CAMACARI II TR5 BA 061/2001 IPCA RBNI REA 2040/2009 20/02/2022 19/02/2055  R$74,450.53
CAMACARI II MC 230 kV TR 230/13,8 kV CAMACARI II TR7 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 443/2011 13/11/2015 12/11/2045  R$18,296.10
CAMACARI II MC 13,8 kV TR 69/13,8 kV CAMACARI II TR8 BA MC2 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
CAMACARI II MC 13,8 kV TR 69/13,8 kV CAMACARI II TR8 BA MC1 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
CAMACARI II MC 13,8 kV TR 13,8/0,46 kV CAMACARI II TR2 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
CAMACARI II MC 13,8 kV TR 13,8/0,46 kV CAMACARI II TR1 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
CAMACARI II MC 13,8 kV CS 150/-105 MVAr CAMACARI II CS2 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$65,134.54
CAMACARI II MC 13,8 kV CS 150/-105 MVAr CAMACARI II CS1 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$65,134.54
CAMACARI II IB 69 kV MG 500 kV CAMACARI II MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 443/2011 13/11/2015 12/11/2045  R$18,296.10
CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,399,926.89
CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,432,642.48
CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 443/2011 13/11/2015 12/11/2045  R$18,296.10
CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 443/2011 17/11/2015 16/11/2045  R$18,301.73
CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 443/2011 13/11/2015 12/11/2045  R$18,296.10
CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 443/2011 17/11/2015 16/11/2045  R$18,301.73
CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB3 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,399,926.89
CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB3 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,432,642.48
CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB3 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB2 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB1 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB1 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,399,926.89
CAMACARI II IB 230 kV MG 500 kV CAMACARI II MG1 BA IB2 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
CAMACARI II IB 230 kV MG 500 kV CAMACARI II MG1 BA IB2 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBNI REA 2040/2009 20/02/2022 19/02/2055  R$74,450.53
CAMACARI II IB 230 kV MG 500 kV CAMACARI II MG1 BA IB1 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
CAMACARI II IB 230 kV MG 500 kV CAMACARI II MG1 BA IB1 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 643/2014 09/02/2014 08/02/2044  R$42,724.36
CAMACARI II IB 230 kV MG 500 kV CAMACARI II MG1 BA IB1 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 643/2014 09/02/2014 08/02/2044  R$21,362.19
CAMACARI II IB 230 kV MG 500 kV CAMACARI II MG1 BA IB1 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBNI REA 7761/2019 31/12/2019 30/12/2034  R$27,436.40
CAMACARI II EL 69 kV CAMACARI IISTA HELENA-02F2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
CAMACARI II EL 69 kV CAMACARI IISTA HELENA-02F1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
CAMACARI II EL 69 kV CAMACARI IISTA HELENA-02F1 DIT   061/2001 IPCA RMEL REN 443/2011 16/01/2016 15/01/2046  R$1,328.72
CAMACARI II EL 69 kV CAMACARI IICTG CTU-02J6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
CAMACARI II EL 69 kV CAMACARI IICTG CTU-02J6 DIT   061/2001 IPCA RMEL REN 443/2011 16/01/2016 15/01/2046  R$1,328.72
CAMACARI II EL 500 kV CAMACARI II LT 500 kV CAMACARI IV /CAMACARI II C-1 BA  RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
CAMACARI II EL 69 kV CAMACARI IICTG CTU-02J6 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
CAMACARI II EL 500 kV CAMACARI II LT 500 kV CAMACARI IV /CAMACARI II C-1 BA  RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,494,659.50
CAMACARI II EL 500 kV CAMACARI II LT 500 kV OLINDINA /CAMACARI II C-2 BA RB FT LT 500 kV OLINDINA /CAMACARI II C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
CAMACARI II EL 500 kV CAMACARI II LT 500 kV OLINDINA /CAMACARI II C-1 BA RB FT LT 500 kV OLINDINA /CAMACARI II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
CAMACARI II EL 500 kV CAMACARI II LT 500 kV OLINDINA /CAMACARI II C-1 BA RB FT LT 500 kV OLINDINA /CAMACARI II C-1 BA 061/2001 IPCA RMEL REN 443/2011 26/01/2017 25/01/2047  R$3,500.42
CAMACARI II EL 500 kV CAMACARI II LT 500 kV CAMACARI IV /CAMACARI II C-1 BA  RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RMEL REN 443/2011 23/05/2015 22/05/2045  R$18,051.69
CAMACARI II EL 500 kV CAMACARI II LT 500 kV CAMACARI IV /CAMACARI II C-1 BA  RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RMEL REN 443/2011 11/10/2015 10/10/2045  R$18,249.75
CAMACARI II EL 500 kV CAMACARI II LT 500 kV CAMACARI IV /CAMACARI II C-1 BA  RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,529,588.93
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /US.CAMACARI C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /PITUACU C-1 BA  RB FT LT 230 kV CAMACARI II /PITUACU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
CAMACARI II EL 500 kV CAMACARI II LT 500 kV CAMACARI IV /CAMACARI II C-1 BA  RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RMEL REN 443/2011 11/10/2015 10/10/2045  R$18,249.75
CAMACARI II EL 500 kV CAMACARI II LT 500 kV CAMACARI IV /CAMACARI II C-1 BA  RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RBNI REA 7761/2019 10/06/2019 09/06/2034  R$41,600.32
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /PITUACU C-1 BA  RB FT LT 230 kV CAMACARI II /PITUACU C-1 BA 061/2001 IPCA RBNI REA 6137/2016 26/06/2020 26/06/2047  R$95,659.77
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /US.CAMACARI C-1 BA DIT   061/2001 IPCA RCDM REA 2040/2009 20/02/2022 19/02/2055  R$74,450.53
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /PITUACU C-1 BA  RB FT LT 230 kV CAMACARI II /PITUACU C-1 BA 061/2001 IPCA RBNI REA 2040/2009 20/02/2022 19/02/2055  R$74,450.53
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /MATATU C-1 BA RB FT LT 230 kV CAMACARI II /MATATU C-1 BA 061/2001 IPCA RBNI REA 2376/2010 25/07/2014 24/07/2044  R$43,171.17
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /MATATU C-1 BA RB FT LT 230 kV CAMACARI II /MATATU C-1 BA 061/2001 IPCA RMEL REN 643/2014 10/11/2013 09/11/2041  R$39,757.59
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /MATATU C-1 BA RB FT LT 230 kV CAMACARI II /MATATU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA  RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA 061/2001 IPCA RMEL REN 643/2014 18/05/2014 17/05/2042  R$40,409.96
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /MATATU C-1 BA RB FT LT 230 kV CAMACARI II /MATATU C-1 BA 061/2001 IPCA RMEL REN 643/2014 01/05/2014 30/04/2044  R$71,490.35
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /MATATU C-1 BA RB FT LT 230 kV CAMACARI II /MATATU C-1 BA 061/2001 IPCA RBNI REA 2040/2009 20/02/2022 19/02/2055  R$74,450.53
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA  RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA 061/2001 IPCA RBNI REA 2891/2011 30/11/2015 29/11/2041  R$95,432.01
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA  RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA 061/2001 IPCA RBNI REA 6845/2018 15/09/2019 14/09/2052  R$111,360.52
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA  RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA 061/2001 IPCA RBNI REA 7761/2019 31/12/2019 30/12/2034  R$127,246.13
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA 061/2001 IPCA RBNI REA 2376/2010 25/07/2014 24/07/2044  R$43,171.17
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$735,719.99
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA 061/2001 IPCA RBNI REA 6137/2016 26/08/2020 26/08/2047  R$95,659.77
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /COTEGIPE C-1 BA  RB FT LT 230 kV CAMACARI II /COTEGIPE C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /COTEGIPE C-1 BA  RB FT LT 230 kV CAMACARI II /COTEGIPE C-1 BA 061/2001 IPCA RMEL REN 643/2014 02/02/2014 01/02/2042  R$57,046.18
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /COTEGIPE C-1 BA  RB FT LT 230 kV CAMACARI II /COTEGIPE C-1 BA 061/2001 IPCA RBNI REA 6258/2017 27/11/2020 27/11/2050  R$148,791.26
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /COTEGIPE C-1 BA  RB FT LT 230 kV CAMACARI II /COTEGIPE C-1 BA 061/2001 IPCA RBNI REA 6137/2016 17/08/2020 17/08/2047  R$95,659.77
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /COTEGIPE C-1 BA  RB FT LT 230 kV CAMACARI II /COTEGIPE C-1 BA 061/2001 IPCA RBNI REA 2040/2009 20/02/2022 19/02/2055  R$74,450.53
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /CARAIBAS C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /CARAIBAS C-1 BA DIT   061/2001 IPCA RCDM REA 6137/2016 28/07/2020 28/07/2047  R$95,659.77
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /CARAIBAS C-1 BA DIT   061/2001 IPCA RCDM REA 2040/2009 20/02/2022 19/02/2055  R$74,450.53
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRASKEM C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRASKEM C-2 BA DIT   061/2001 IPCA RCDM REA 6137/2016 07/08/2020 07/08/2047  R$95,659.77
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRASKEM C-2 BA DIT   061/2001 IPCA RCDM REA 2040/2009 20/02/2022 19/02/2055  R$74,450.53
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRASKEM C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRASKEM C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRASKEM C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$735,719.99
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRASKEM C-1 BA DIT   061/2001 IPCA RCDM REA 6137/2016 30/06/2020 30/06/2047  R$95,659.77
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRAS.C.SODA C-1 BA DIT   061/2001 IPCA RCDM REA 2040/2009 20/02/2022 19/02/2055  R$74,450.53
CAMACARI II EL 230 kV CAMACARI IIVAGO8 RB FT EL 230 kV CAMACARI IIVAGO1 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRAS.C.SODA C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
CAMACARI II EL 230 kV CAMACARI IIVAGO7 RB FT EL 230 kV CAMACARI IIVAGO1 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
CAMACARI II EL 230 kV CAMACARI IIVAGO6 RB FT EL 230 kV CAMACARI IIVAGO1 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
CAMACARI II EL 230 kV CAMACARI IIVAGO6 RB FT EL 230 kV CAMACARI IIVAGO1 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
CAMACARI II EL 230 kV CAMACARI IIVAGO6 RB FT EL 230 kV CAMACARI IIVAGO1 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$735,719.99
CAMACARI II EL 230 kV CAMACARI IIVAGO5 RB FT EL 230 kV CAMACARI IIVAGO1 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
CAMACARI II EL 230 kV CAMACARI IIVAGO4 RB FT EL 230 kV CAMACARI IIVAGO1 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
CAMACARI II EL 230 kV CAMACARI IIVAGO3 RB FT EL 230 kV CAMACARI IIVAGO1 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
CAMACARI II EL 230 kV CAMACARI IIVAGO2 RB FT EL 230 kV CAMACARI IIVAGO1 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
CAMACARI II EL 230 kV CAMACARI IIVAGO1 RB FT EL 230 kV CAMACARI IIVAGO1 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
CAMACARI II CS 150/-105 MVAr CAMACARI II CS2 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,744,465.94
CAMACARI II CS 150/-105 MVAr CAMACARI II CS2 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,147,815.84
CAMACARI II CS 150/-105 MVAr CAMACARI II CS2 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 5,268,117.69
CAMACARI II CS 150/-105 MVAr CAMACARI II CS1 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,744,465.94
CAMACARI II CS 150/-105 MVAr CAMACARI II CS1 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,147,815.84
CAMACARI II CS 150/-105 MVAr CAMACARI II CS1 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 5,268,117.69
CAMACARI II CS 150/-105 MVAr CAMACARI II CS1 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RMEL REN 443/2011 17/12/2016 16/12/2041  R$15,632.34
CAMACARI IV TR 500/230 kV CAMACARI IV TRR1 BA RB FT TR 500/230 kV CAMACARI IV TRR1 BA 007/2010 IPCA RBL CC 007/2010 19/12/2012 12/07/2040  R$ 1,360,549.23
CAMACARI IV TR 500/230 kV CAMACARI IV TR2 BA RB FT TR 500/230 kV CAMACARI IV TR2 BA 007/2010 IPCA RBL CC 007/2010 19/12/2012 12/07/2040  R$ 4,081,649.82
CAMACARI IV TR 500/230 kV CAMACARI IV TR1 BA RB FT TR 500/230 kV CAMACARI IV TR1 BA 007/2010 IPCA RBL CC 007/2010 19/12/2012 12/07/2040  R$ 4,081,649.82
CAMACARI IV RTL 500 kV 148 Mvar CAMACARI IV RT1 BA RB FT RTL 500 kV 148 Mvar CAMACARI IV RT1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$831,113.46
CAMACARI IV RTL 500 kV 148 Mvar CAMACARI IV RT1 BA RB FT RTL 500 kV 148 Mvar CAMACARI IV RT1 BA 061/2001 IPCA RBNI REA 2376/2010 24/03/2014 23/03/2045  R$107,872.40
CAMACARI IV RTL 500 kV 148 Mvar CAMACARI IV RT1 BA RB FT RTL 500 kV 148 Mvar CAMACARI IV RT1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,452,566.68
CAMACARI IV RTL 500 kV 148 Mvar CAMACARI IV RT1 BA RB FT RTL 500 kV 148 Mvar CAMACARI IV RT1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,509,881.92
CAMACARI IV MG 500 kV CAMACARI IV MG1 BA RB FT MG 500 kV CAMACARI IV MG1 BA 007/2010 IPCA RBL CC 007/2010 19/12/2012 12/07/2040  R$ 1,505,065.91
CAMACARI IV MC 500 kV TR 500/230 kV CAMACARI IV TR2 BA RB FT TR 500/230 kV CAMACARI IV TR2 BA 007/2010 IPCA RBL CC 007/2010 19/12/2012 12/07/2040  R$823,659.26
CAMACARI IV MC 500 kV TR 500/230 kV CAMACARI IV TR1 BA RB FT TR 500/230 kV CAMACARI IV TR1 BA 007/2010 IPCA RBL CC 007/2010 19/12/2012 12/07/2040  R$823,659.26
CAMACARI IV MC 500 kV RTL 500 kV 148 Mvar CAMACARI IV RT1 BA  RB FT RTL 500 kV 148 Mvar CAMACARI IV RT1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$382,925.27
CAMACARI IV MC 500 kV RTL 500 kV 148 Mvar CAMACARI IV RT1 BA  RB FT RTL 500 kV 148 Mvar CAMACARI IV RT1 BA 061/2001 IPCA RMEL REN 643/2014 20/03/2014 19/03/2044  R$75,896.49
CAMACARI IV MC 500 kV RTL 500 kV 148 Mvar CAMACARI IV RT1 BA  RB FT RTL 500 kV 148 Mvar CAMACARI IV RT1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,129,989.82
CAMACARI IV IB 500 kV MG 500 kV CAMACARI IV MG1 BA IB2 RB FT MG 500 kV CAMACARI IV MG1 BA 007/2010 IPCA RBL CC 007/2010 19/12/2012 12/07/2040  R$819,760.29
CAMACARI IV MC 500 kV RTL 500 kV 148 Mvar CAMACARI IV RT1 BA  RB FT RTL 500 kV 148 Mvar CAMACARI IV RT1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,156,397.11
CAMACARI IV MC 230 kV TR 500/230 kV CAMACARI IV TR2 BA RB FT TR 500/230 kV CAMACARI IV TR2 BA 007/2010 IPCA RBL CC 007/2010 19/12/2012 12/07/2040  R$426,145.84
CAMACARI IV MC 230 kV TR 500/230 kV CAMACARI IV TR1 BA RB FT TR 500/230 kV CAMACARI IV TR1 BA 007/2010 IPCA RBL CC 007/2010 19/12/2012 12/07/2040  R$426,145.84
CAMACARI IV IB 230 kV MG 500 kV CAMACARI IV MG1 BA IB1 RB FT MG 500 kV CAMACARI IV MG1 BA 007/2010 IPCA RBL CC 007/2010 19/12/2012 12/07/2040  R$312,915.11
CAMACARI IV EL 500 kV CAMACARI IV LT 500 kV CAMACARI IV /CAMACARI II C-1 BA RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RBNI REA 10135/2021 15/08/2016 15/08/2044  R$191,257.58
CAMACARI IV IB 500 kV MG 500 kV CAMACARI IV MG1 BA IB1 RB FT MG 500 kV CAMACARI IV MG1 BA 007/2010 IPCA RBL CC 007/2010 19/12/2012 12/07/2040  R$819,760.29
CAMACARI IV EL 500 kV CAMACARI IV LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA  RB FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA 061/2001 IPCA RBNI REA 10135/2021 15/08/2016 15/08/2044  R$191,257.58
CAMACARI IV EL 230 kV CAMACARI IV LT 230 kV CATU /CAMACARI IV C-2 BA  RB FT LT 230 kV CATU /CAMACARI IV C-2 BA 061/2001 IPCA RBNI REA 2891/2011 05/11/2014 04/11/2044  R$ 1,325,957.68
CAMACARI IV EL 230 kV CAMACARI IV LT 230 kV CATU /CAMACARI IV C-1 BA  RB FT LT 230 kV CATU /CAMACARI IV C-1 BA 061/2001 IPCA RBNI REA 2891/2011 13/10/2014 12/10/2044  R$ 1,323,909.91
CAMACARI IV EL 230 kV CAMACARI IV LT 230 kV CAMACARI IV /PITUACU C-1 BA  RB FT LT 230 kV CAMACARI IV /PITUACU C-1 BA 061/2001 IPCA RBNI REA 2891/2011 05/05/2014 04/05/2044  R$ 1,309,575.44
CAMACARI IV EL 230 kV CAMACARI IV LT 230 kV CAMACARI IV /JACARACANGA C-2 BA  RB FT LT 230 kV CAMACARI IV /JACARACANGA C-2 BA 061/2001 IPCA RBNI REA 2891/2011 11/08/2014 10/08/2044  R$ 1,318,300.76
CAMACARI IV EL 230 kV CAMACARI IV LT 230 kV CAMACARI IV /JACARACANGA C-1 BA  RB FT LT 230 kV CAMACARI IV /JACARACANGA C-1 BA 061/2001 IPCA RBNI REA 2891/2011 01/09/2014 31/08/2044  R$ 1,320,170.49
CAMACARI IV EL 230 kV CAMACARI IV LT 230 kV CAMACARI IV /COTEGIPE C-1 BA  RB FT LT 230 kV CAMACARI IV /COTEGIPE C-1 BA 061/2001 IPCA RBNI REA 2891/2011 02/06/2014 01/06/2044  R$ 1,312,068.38
CAMPO FORMOSO MG 230 kV CAMPO FORMOSO MG1 BA RB FT MG 230 kV CAMPO FORMOSO MG1 BA 061/2001 IPCA RBNI DSP 1172/2022 01/07/2022 30/06/2053  R$60,385.08
CAMPO FORMOSO MG 230 kV CAMPO FORMOSO MG1 BA RB FT MG 230 kV CAMPO FORMOSO MG1 BA 061/2001 IPCA RBNI DSP 1172/2022 01/07/2022 30/06/2040  R$58,396.52
CAMPO FORMOSO IB 230 kV MG 230 kV CAMPO FORMOSO MG1 BA  RB FT MG 230 kV CAMPO FORMOSO MG1 BA 061/2001 IPCA RBNI DSP 1172/2022 01/07/2022 30/06/2052  R$146,339.36
CAMPO FORMOSO EL 230 kV CAMPO FORMOSO LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA  RB FT LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA 061/2001 IPCA RBNI DSP 1172/2022 01/07/2022 30/06/2051  R$203,728.71
CAMPO FORMOSO EL 230 kV CAMPO FORMOSO LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA  RB FT LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA 061/2001 IPCA RBNI DSP 1172/2022 01/07/2022 30/06/2051  R$203,728.71
CATU RTS 13,8 kV 5 MVAr CATU RT1 BA RBF FT TR 230/69 kV CATU TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$135,222.37
CATU RTS 13,8 kV 5 MVAr CATU RT1 BA RBF FT TR 230/69 kV CATU TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$399,033.22
CATU TT 69/13,8 kV CATU TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
CATU TT 69/0 kV CATU TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
CATU TR 230/69 kV CATU TR3 BA RBF FT TR 230/69 kV CATU TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
CATU TR 230/69 kV CATU TR2 BA RBF FT TR 230/69 kV CATU TR2 BA 061/2001 IPCA RBNI REA 2173/2009 24/09/2013 23/09/2047  R$ 1,521,176.43
CATU TR 230/69 kV CATU TR1 BA RBF FT TR 230/69 kV CATU TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
CATU RTS 13,8 kV 5 Mvar CATU RT2 BA RBF FT TR 230/69 kV CATU TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$135,222.37
CATU RTS 13,8 kV 5 Mvar CATU RT2 BA RBF FT TR 230/69 kV CATU TR2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$399,033.22
CATU RTS 13,8 kV 5 Mvar CATU RT2 BA RBF FT TR 230/69 kV CATU TR2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$408,358.42
CATU RTS 13,8 kV 5 MVAr CATU RT1 BA RBF FT TR 230/69 kV CATU TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$408,358.42
CATU MG 230 kV CATU MG1 BA RB FT MG 230 kV CATU MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,166,734.67
CATU MG 230 kV CATU MG1 BA RB FT MG 230 kV CATU MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,217,370.17
CATU MG 230 kV CATU MG1 BA RB FT MG 230 kV CATU MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$734,252.15
CATU MG 230 kV CATU MG1 BA RB FT MG 230 kV CATU MG1 BA 061/2001 IPCA RMEL REN 443/2011 15/04/2016 14/04/2044  R$3,757.15
CATU MG 230 kV CATU MG1 BA RB FT MG 230 kV CATU MG1 BA 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033  R$33,465.01
CATU MG 230 kV CATU MG1 BA RB FT MG 230 kV CATU MG1 BA 061/2001 IPCA RBNI REN 905/2020 28/05/2021 27/05/2052  R$49,445.27
CATU MG 230 kV CATU MG1 BA RB FT MG 230 kV CATU MG1 BA 061/2001 IPCA RBNI REN 905/2020 28/05/2021 27/05/2052  R$49,445.27
CATU MC 69 kV TT 69/13,8 kV CATU TA1 BA  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
CATU MC 69 kV TT 69/0 kV CATU TA2 BA  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
CATU MC 69 kV TR 230/69 kV CATU TR3 BA RBF FT TR 230/69 kV CATU TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
CATU MC 69 kV TR 230/69 kV CATU TR2 BA  RBF FT TR 230/69 kV CATU TR2 BA 061/2001 IPCA RBNI REA 2173/2009 24/09/2013 23/09/2043  R$375,672.27
CATU MC 69 kV TR 230/69 kV CATU TR2 BA  RBF FT TR 230/69 kV CATU TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
CATU MC 69 kV TR 230/69 kV CATU TR1 BA RBF FT TR 230/69 kV CATU TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
CATU MC 230 kV TR 230/69 kV CATU TR3 BA RBF FT TR 230/69 kV CATU TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,757.03
CATU MC 230 kV TR 230/69 kV CATU TR2 BA  RBF FT TR 230/69 kV CATU TR2 BA 061/2001 IPCA RBNI REA 2173/2009 24/09/2013 23/09/2041  R$288,572.50
CATU MC 230 kV TR 230/69 kV CATU TR2 BA  RBF FT TR 230/69 kV CATU TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,757.03
CATU MC 230 kV TR 230/69 kV CATU TR2 BA  RBF FT TR 230/69 kV CATU TR2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$489,139.20
CATU MC 230 kV TR 230/69 kV CATU TR2 BA  RBF FT TR 230/69 kV CATU TR2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$500,570.14
CATU MC 230 kV TR 230/69 kV CATU TR1 BA RBF FT TR 230/69 kV CATU TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,757.03
CATU MC 230 kV TR 230/69 kV CATU TR1 BA RBF FT TR 230/69 kV CATU TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$489,139.20
CATU MC 230 kV TR 230/69 kV CATU TR1 BA RBF FT TR 230/69 kV CATU TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$500,570.14
CATU MC 13,8 kV TR 230/69 kV CATU TR2 BA  RBF FT TR 230/69 kV CATU TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$52,281.83
CATU MC 13,8 kV TR 230/69 kV CATU TR1 BA RBF FT TR 230/69 kV CATU TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$52,281.83
CATU IB 69 kV MG 230 kV CATU MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
CATU IB 230 kV MG 230 kV CATU MG1 BA IB2 RB FT MG 230 kV CATU MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
CATU IB 230 kV MG 230 kV CATU MG1 BA IB1 RB FT MG 230 kV CATU MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
CATU IB 13,8 kV MG 230 kV CATU MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$33,105.90
CATU EL 69 kV CATU LT 69 kV CATU /COTEGIPE C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
CATU EL 69 kV CATU LT 69 kV CATU /COTEGIPE C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
CATU EL 69 kV CATUDIST8 DIT   061/2001 IPCA RCDM REN 905/2020 28/05/2021 27/05/2049  R$589,703.94
CATU EL 69 kV CATUDIST5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
CATU EL 69 kV CATUDIST4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
CATU EL 69 kV CATUDIST7 DIT   061/2001 IPCA RCDM REN 905/2020 28/05/2021 27/05/2049  R$589,703.94
CATU EL 69 kV CATUDIST6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
CATU EL 230 kV CATU LT 230 kV CIC. DANTAS /CATU C-2 BA  RB FT LT 230 kV CIC. DANTAS /CATU C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
CATU EL 230 kV CATU LT 230 kV CIC. DANTAS /CATU C-2 BA  RB FT LT 230 kV CIC. DANTAS /CATU C-2 BA 061/2001 IPCA RMEL REN 443/2011 21/09/2017 20/09/2047  R$7,249.51
CATU EL 69 kV CATUDIST3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
CATU EL 69 kV CATUDIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
CATU EL 69 kV CATUDIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
CATU EL 230 kV CATU LT 230 kV ITABAIANINHA /CATU C-1 SE/BA  RB FT LT 230 kV ITABAIANINHA /CATU C-1 SE/BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
CATU EL 230 kV CATU LT 230 kV CATU /CAMACARI IV C-2 BA  RB FT LT 230 kV CATU /CAMACARI IV C-2 BA 061/2001 IPCA RBNI REA 2891/2011 05/11/2014 04/11/2040  R$92,250.46
CATU EL 230 kV CATU LT 230 kV CATU /CAMACARI IV C-2 BA  RB FT LT 230 kV CATU /CAMACARI IV C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
CATU EL 230 kV CATU LT 230 kV CIC. DANTAS /CATU C-1 BA RB FT LT 230 kV CIC. DANTAS /CATU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
CATU EL 230 kV CATU LT 230 kV CATU /G.MANGABEIRA C-1 BA  RB FT LT 230 kV CATU /G.MANGABEIRA C-1 BA 061/2001 IPCA RBNI REA 2891/2011 30/11/2015 29/11/2041  R$95,432.01
CATU EL 230 kV CATU LT 230 kV CATU /G.MANGABEIRA C-1 BA  RB FT LT 230 kV CATU /G.MANGABEIRA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
CATU EL 13,8 kV CATUPOJUCA 01Y5 DIT   061/2001 IPCA RCDM REA 5484/2015 22/11/2016 21/11/2048  R$36,181.68
CATU EL 13,8 kV CATUPOJUCA 01Y5 DIT   061/2001 IPCA RCDM REA 5484/2015 21/11/2016 20/11/2049  R$27,854.29
CATU EL 230 kV CATU LT 230 kV CATU /CAMACARI IV C-2 BA  RB FT LT 230 kV CATU /CAMACARI IV C-2 BA 061/2001 IPCA RMEL REN 443/2011 29/09/2017 28/09/2047  R$7,253.74
CATU EL 230 kV CATU LT 230 kV CATU /CAMACARI IV C-2 BA  RB FT LT 230 kV CATU /CAMACARI IV C-2 BA 061/2001 IPCA RMEL REN 443/2011 01/10/2017 30/09/2047  R$7,224.45
CATU EL 230 kV CATU LT 230 kV CATU /CAMACARI IV C-1 BA  RB FT LT 230 kV CATU /CAMACARI IV C-1 BA 061/2001 IPCA RBNI REA 2891/2011 13/10/2014 12/10/2040  R$92,062.82
CATU EL 230 kV CATU LT 230 kV CATU /CAMACARI IV C-1 BA  RB FT LT 230 kV CATU /CAMACARI IV C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
CATU EL 230 kV CATU LT 230 kV CATU /CAMACARI IV C-1 BA  RB FT LT 230 kV CATU /CAMACARI IV C-1 BA 061/2001 IPCA RMEL REN 443/2011 14/06/2017 13/06/2047  R$7,239.69
CATU EL 230 kV CATU LT 230 kV CATU /CAMACARI IV C-1 BA  RB FT LT 230 kV CATU /CAMACARI IV C-1 BA 061/2001 IPCA RMEL REN 443/2011 04/10/2017 03/10/2047  R$3,403.07
CATU EL 230 kV CATUSCHIN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
CATU EL 230 kV CATUFERBASA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
CATU EL 13,8 kV CATUPOJUCA 01Y5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$56,710.76
CATU EL 13,8 kV CATUPOJUCA 01Y5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$167,350.09
CATU EL 13,8 kV CATUPOJUCA 01Y5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$171,260.97
CATU EL 13,8 kV CATUPOJUCA 01Y4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$56,710.76
CATU EL 13,8 kV CATUPOJUCA 01Y4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$171,260.97
CATU EL 13,8 kV CATUCID. CATU DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$167,350.09
CATU EL 13,8 kV CATUPOJUCA 01Y4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$167,350.09
CATU EL 13,8 kV CATUCID. CATU DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$171,260.97
CATU EL 13,8 kV CATUPOJUCA 01Y4 DIT   061/2001 IPCA RCDM REA 5484/2015 22/11/2016 21/11/2048  R$40,074.51
CATU EL 13,8 kV CATUPOJUCA 01Y4 DIT   061/2001 IPCA RCDM REA 5484/2015 21/11/2016 20/11/2049  R$27,854.29
CATU EL 13,8 kV CATUCID. CATU DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$56,710.76
CATU EL 13,8 kV CATUCID. CATU DIT   061/2001 IPCA RCDM REA 5484/2015 22/11/2016 21/11/2047  R$43,967.29
CATU EL 13,8 kV CATUCATU 01Y1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$56,710.76
CAUIPE TT 69/13,8 kV CAUIPE TA1 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
CATU EL 13,8 kV CATUCID. CATU DIT   061/2001 IPCA RCDM REA 5484/2015 21/11/2016 20/11/2049  R$27,854.29
CAUIPE TT 69/13,8 kV CAUIPE TA1 CE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$281,516.05
CATU EL 13,8 kV CATUCATU 01Y1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$167,350.09
CATU EL 13,8 kV CATUCATU 01Y1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$171,260.97
CATU EL 13,8 kV CATUCATU 01Y1 DIT   061/2001 IPCA RCDM REA 5484/2015 22/11/2016 21/11/2048  R$28,011.43
CATU EL 13,8 kV CATUCATU 01Y1 DIT   061/2001 IPCA RCDM REA 5484/2015 21/11/2016 20/11/2049  R$27,854.29
CAUIPE TT 69/13,8 kV CAUIPE TA1 CE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$288,094.94
CAUIPE TR 230/69 kV CAUIPE TR3 CE RBF FT TR 230/69 kV CAUIPE TR3 CE 061/2001 IPCA RBNI REA 2968/2011 17/06/2018 17/06/2058  R$ 1,086,113.10
CAUIPE TR 230/69 kV CAUIPE TR2 CE RBF FT TR 230/69 kV CAUIPE TR2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
CAUIPE TR 230/69 kV CAUIPE TR1 CE RBF FT TR 230/69 kV CAUIPE TR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
CAUIPE TR 230/69 kV CAUIPE TR1 CE RBF FT TR 230/69 kV CAUIPE TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
CAUIPE TR 230/69 kV CAUIPE TR1 CE RBF FT TR 230/69 kV CAUIPE TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
CAUIPE MG 230 kV CAUIPE MG1 CE RB FT MG 230 kV CAUIPE MG1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$570,821.18
CAUIPE MG 230 kV CAUIPE MG1 CE RB FT MG 230 kV CAUIPE MG1 CE 061/2001 IPCA RMEL REN 643/2014 31/10/2013 30/10/2030  R$29,307.71
CAUIPE MG 230 kV CAUIPE MG1 CE RB FT MG 230 kV CAUIPE MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,684,459.54
CAUIPE MG 230 kV CAUIPE MG1 CE RB FT MG 230 kV CAUIPE MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,723,824.51
CAUIPE MG 230 kV CAUIPE MG1 CE RB FT MG 230 kV CAUIPE MG1 CE 061/2001 IPCA RMEL REN 443/2011 09/07/2016 08/07/2033  R$33,255.93
CAUIPE MC 69 kV TT 69/13,8 kV CAUIPE TA1 CE  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
CAUIPE MC 69 kV TR 230/69 kV CAUIPE TR3 CE RBF FT TR 230/69 kV CAUIPE TR3 CE 061/2001 IPCA RBNI REA 2968/2011 17/06/2018 17/06/2052  R$217,313.66
CAUIPE MC 69 kV TR 230/69 kV CAUIPE TR2 CE  RBF FT TR 230/69 kV CAUIPE TR2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
CAUIPE MC 69 kV TR 230/69 kV CAUIPE TR1 CE RBF FT TR 230/69 kV CAUIPE TR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
CAUIPE MC 69 kV TR 230/69 kV CAUIPE TR1 CE RBF FT TR 230/69 kV CAUIPE TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
CAUIPE MC 69 kV TR 230/69 kV CAUIPE TR1 CE RBF FT TR 230/69 kV CAUIPE TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$204,189.21
CAUIPE MC 230 kV TR 230/69 kV CAUIPE TR3 CE RBF FT TR 230/69 kV CAUIPE TR3 CE 061/2001 IPCA RBNI REA 2968/2011 17/06/2018 17/06/2052  R$507,040.58
CAUIPE MC 230 kV TR 230/69 kV CAUIPE TR2 CE  RBF FT TR 230/69 kV CAUIPE TR2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
CAUIPE MC 230 kV TR 230/69 kV CAUIPE TR1 CE RBF FT TR 230/69 kV CAUIPE TR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
CAUIPE MC 230 kV TR 230/69 kV CAUIPE TR1 CE RBF FT TR 230/69 kV CAUIPE TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
CAUIPE IB 69 kV MG 230 kV CAUIPE MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$134,104.45
CAUIPE IB 69 kV MG 230 kV CAUIPE MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$137,238.41
CAUIPE MC 230 kV TR 230/69 kV CAUIPE TR1 CE RBF FT TR 230/69 kV CAUIPE TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$476,693.95
CAUIPE IB 69 kV MG 230 kV CAUIPE MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
CAUIPE IB 230 kV MG 230 kV CAUIPE MG1 CE IB1 RB FT MG 230 kV CAUIPE MG1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,929.18
CAUIPE EL 69 kV CAUIPEDIST4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
CAUIPE EL 69 kV CAUIPEDIST4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
CAUIPE EL 69 kV CAUIPEDIST7 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
CAUIPE EL 69 kV CAUIPEDIST6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
CAUIPE EL 69 kV CAUIPEDIST6 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
CAUIPE EL 69 kV CAUIPEDIST6 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
CAUIPE EL 69 kV CAUIPEDIST5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
CAUIPE EL 69 kV CAUIPEDIST5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
CAUIPE EL 69 kV CAUIPEDIST5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
CAUIPE EL 69 kV CAUIPEDIST4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
CAUIPE EL 69 kV CAUIPEDIST3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
CAUIPE EL 69 kV CAUIPEDIST3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
CAUIPE EL 69 kV CAUIPEDIST3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
CAUIPE EL 69 kV CAUIPEDIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /SOBRAL II C-1 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$692,788.80
CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /MARACANAU C-1 CE  RB FT LT 230 kV CAUIPE /MARACANAU C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
CAUIPE EL 69 kV CAUIPEDIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /SOBRAL II C-1 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RBNI REA 2460/2010 21/11/2013 20/11/2042  R$312,600.53
CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /SOBRAL II C-1 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /SOBRAL II C-1 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /MARACANAU C-1 CE  RB FT LT 230 kV CAUIPE /MARACANAU C-1 CE 061/2001 IPCA RBNI REA 5861/2016 10/06/2016 09/06/2044  R$28,900.49
CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /MARACANAU C-1 CE  RB FT LT 230 kV CAUIPE /MARACANAU C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /MARACANAU C-1 CE  RB FT LT 230 kV CAUIPE /MARACANAU C-1 CE 061/2001 IPCA RMEL REN 643/2014 16/08/2014 15/08/2044  R$21,681.47
CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /FORTALEZA II C-2 CE  RB FT LT 230 kV CAUIPE /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /MARACANAU C-1 CE  RB FT LT 230 kV CAUIPE /MARACANAU C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$692,788.80
CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /FORTALEZA II C-2 CE  RB FT LT 230 kV CAUIPE /FORTALEZA II C-2 CE 061/2001 IPCA RBNI REA 5861/2016 10/06/2016 09/06/2044  R$28,900.49
CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /FORTALEZA II C-1 CE  RB FT LT 230 kV CAUIPE /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /FORTALEZA II C-1 CE  RB FT LT 230 kV CAUIPE /FORTALEZA II C-1 CE 061/2001 IPCA RBNI REA 5861/2016 10/06/2016 09/06/2044  R$28,900.49
CEARA MIRIM II TR 500/230 kV CEARA MIRIM II TRR1 RN RB FT TR 500/230 kV CEARA MIRIM II TRR1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041  R$785,824.68
CEARA MIRIM II TR 500/230 kV CEARA MIRIM II TR2 RN RB FT TR 500/230 kV CEARA MIRIM II TR2 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041  R$ 2,357,475.08
CEARA MIRIM II TR 500/230 kV CEARA MIRIM II TR1 RN RB FT TR 500/230 kV CEARA MIRIM II TR1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041  R$ 2,357,475.08
CEARA MIRIM II RTB 500 kV 50 Mvar CEARA MIRIM II RTR1 RN RB FT RTB 500 kV 50 Mvar CEARA MIRIM II RTR1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041  R$359,385.76
CEARA MIRIM II RTB 500 kV 150 Mvar CEARA MIRIM II RTB1 RN RB FT RTB 500 kV 150 Mvar CEARA MIRIM II RTB1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041  R$ 1,078,157.27
CEARA MIRIM II RTL 500 kV 33,33 Mvar CEARA MIRIM II RTR2 RN RB FT RTL 500 kV 33,33 Mvar CEARA MIRIM II RTR2 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041  R$313,326.47
CEARA MIRIM II RTL 500 kV 100 Mvar CEARA MIRIM II RTL2 RN RB FT LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041  R$939,980.44
CEARA MIRIM II MG 500 kV CEARA MIRIM II MG1 RN RB FT MG 500 kV CEARA MIRIM II MG1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041  R$ 1,086,286.85
CEARA MIRIM II MC 500 kV TR 500/230 kV CEARA MIRIM II TR2 RN RB FT TR 500/230 kV CEARA MIRIM II TR2 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041  R$573,099.24
CEARA MIRIM II MC 500 kV TR 500/230 kV CEARA MIRIM II TR1 RN RB FT TR 500/230 kV CEARA MIRIM II TR1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041  R$573,099.24
CEARA MIRIM II MG 500 kV CEARA MIRIM II MG1 RN RB FT MG 500 kV CEARA MIRIM II MG1 RN 008/2011 IPCA RBNI REA 7761/2019 28/07/2020 27/07/2035  R$27,535.98
CEARA MIRIM II MG 230 kV CEARA MIRIM II MG4 RN RB FT MG 230 kV CEARA MIRIM II MG4 RN 019/2010 IPCA RBNI DSP 1169/2022 01/07/2022 30/06/2055  R$41,347.02
CEARA MIRIM II MC 500 kV RTL 500 kV 100 Mvar CEARA MIRIM II RTL2 RN  RB FT LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041  R$343,117.27
CEARA MIRIM II MC 500 kV RTB 500 kV 150 Mvar CEARA MIRIM II RTB1 RN  RB FT RTB 500 kV 150 Mvar CEARA MIRIM II RTB1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041  R$535,570.14
CEARA MIRIM II MC 230 kV TR 500/230 kV CEARA MIRIM II TR2 RN RB FT TR 500/230 kV CEARA MIRIM II TR2 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041  R$210,638.30
CEARA MIRIM II MC 230 kV TR 500/230 kV CEARA MIRIM II TR1 RN RB FT TR 500/230 kV CEARA MIRIM II TR1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041  R$210,638.30
CEARA MIRIM II MC 230 kV CE 150/-75 Mvar CEARA MIRIM II CE1 RN  RB FT CE 150/-75 Mvar CEARA MIRIM II CE1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041  R$214,475.28
CEARA MIRIM II IB 500 kV MG 500 kV CEARA MIRIM II MG1 RN IB3 RB FT MG 500 kV CEARA MIRIM II MG1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041  R$613,007.12
CEARA MIRIM II IB 500 kV MG 500 kV CEARA MIRIM II MG1 RN IB2 RB FT MG 500 kV CEARA MIRIM II MG1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041  R$613,007.12
CEARA MIRIM II IB 500 kV MG 500 kV CEARA MIRIM II MG1 RN IB1 RB FT MG 500 kV CEARA MIRIM II MG1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041  R$613,007.12
CEARA MIRIM II IB 230 kV MG 500 kV CEARA MIRIM II MG1 RN IB1 RB FT MG 500 kV CEARA MIRIM II MG1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041  R$159,615.95
CEARA MIRIM II EL 500 kV CEARA MIRIM II LT 500 kV JOAO CAMARA III /CEARA MIRIM II C-1 RN RB FT LT 500 kV JOAO CAMARA III /CEARA MIRIM II C-1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041  R$642,678.57
CEARA MIRIM II EL 500 kV CEARA MIRIM II LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB RB FT LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041  R$642,678.57
CEARA MIRIM II EL 230 kV CEARA MIRIM II LT 230 kV TOUROS /CEARA MIRIM II C-1 RN RB FT LT 230 kV TOUROS /CEARA MIRIM II C-1 RN 018/2012 IPCA RBL CC 018/2012 12/05/2017 01/06/2042  R$558,840.27
CEARA MIRIM II EL 230 kV CEARA MIRIM II LT 230 kV CEARA MIRIM II /JOAO CAMARA II C-1 RN RB FT LT 230 kV CEARA MIRIM II /JOAO CAMARA II C-1 RN 019/2010 IPCA RBNI DSP 1169/2022 01/07/2022 30/06/2051  R$209,246.38
CEARA MIRIM II EL 230 kV CEARA MIRIM II LT 230 kV CEARA MIRIM II /EXTREMOZ II C-2 RN RB FT LT 230 kV CEARA MIRIM II /EXTREMOZ II C-2 RN 019/2010 IPCA RBNI DSP 1169/2022 01/07/2022 30/06/2051  R$209,246.38
CEARA MIRIM II EL 230 kV CEARA MIRIM II LT 230 kV CEARA MIRIM II /EXTREMOZ II C-1 RN RB FT LT 230 kV CEARA MIRIM II /EXTREMOZ II C-1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041  R$295,712.91
CEARA MIRIM II CE 150/-75 Mvar CEARA MIRIM II CE1 RN RB FT CE 150/-75 Mvar CEARA MIRIM II CE1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041  R$ 3,740,654.88
CIC. DANTAS TT 69/13,8 kV CIC. DANTAS TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
CIC. DANTAS MG 230 kV CIC. DANTAS MG1 BA RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RBNI REA 5211/2015 17/03/2018 17/03/2050  R$92,820.64
CIC. DANTAS MG 230 kV CIC. DANTAS MG1 BA RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RMEL REN 643/2014 25/11/2015 24/11/2032  R$35,725.46
CIC. DANTAS TR 69/13,8 kV CIC. DANTAS TR3 BA RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
CIC. DANTAS TR 69/13,8 kV CIC. DANTAS TR3 BA RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$86,722.45
CIC. DANTAS TR 69/13,8 kV CIC. DANTAS TR3 BA RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$88,749.11
CIC. DANTAS TR 230/69 kV CIC. DANTAS TR5 BA RBF FT TR 230/69 kV CIC. DANTAS TR5 BA 061/2001 IPCA RBNI REA 2823/2011 30/12/2012 29/12/2046  R$ 1,235,639.21
CIC. DANTAS TR 230/69 kV CIC. DANTAS TR4 BA RBF FT TR 230/69 kV CIC. DANTAS TR4 BA 061/2001 IPCA RBNI REA 5211/2015 17/03/2018 17/03/2052  R$988,730.19
CIC. DANTAS TR 230/69 kV CIC. DANTAS TR3 BA RBF FT TR 230/69 kV CIC. DANTAS TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$266,604.65
CIC. DANTAS RTS 69 kV 40 Mvar CIC. DANTAS RT1 BA RBF FT TR 230/69 kV CIC. DANTAS TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$194,298.88
CIC. DANTAS MG 230 kV CIC. DANTAS MG1 BA RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RBNI REA 2823/2011 30/12/2012 29/12/2040  R$249,951.47
CIC. DANTAS MG 230 kV CIC. DANTAS MG1 BA RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$545,595.38
CIC. DANTAS MG 230 kV CIC. DANTAS MG1 BA RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,610,019.69
CIC. DANTAS MC 69 kV TR 69/13,8 kV CIC. DANTAS TR3 BA RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
CIC. DANTAS MC 69 kV TR 230/69 kV CIC. DANTAS TR5 BA RBF FT TR 230/69 kV CIC. DANTAS TR5 BA 061/2001 IPCA RBNI REA 2823/2011 30/12/2012 29/12/2042  R$256,318.52
CIC. DANTAS MG 230 kV CIC. DANTAS MG1 BA RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RMEL REN 443/2011 22/09/2016 21/09/2049  R$11,314.46
CIC. DANTAS MG 230 kV CIC. DANTAS MG1 BA RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RBNI REN 905/2020 09/03/2023 08/03/2054  R$46,959.44
CIC. DANTAS MC 69 kV TR 230/69 kV CIC. DANTAS TR4 BA RBF FT TR 230/69 kV CIC. DANTAS TR4 BA 061/2001 IPCA RBNI REA 5211/2015 17/03/2018 17/03/2041  R$362,012.06
CIC. DANTAS MC 69 kV TR 230/69 kV CIC. DANTAS TR3 BA  RBF FT TR 230/69 kV CIC. DANTAS TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
CIC. DANTAS MC 230 kV TR 230/69 kV CIC. DANTAS TR5 BA RBF FT TR 230/69 kV CIC. DANTAS TR5 BA 061/2001 IPCA RBNI REA 2823/2011 30/12/2012 29/12/2042  R$773,204.72
CIC. DANTAS MC 230 kV TR 230/69 kV CIC. DANTAS TR4 BA RBF FT TR 230/69 kV CIC. DANTAS TR4 BA 061/2001 IPCA RBNI REA 5211/2015 17/03/2018 17/03/2041  R$680,702.36
CIC. DANTAS MC 230 kV TR 230/69 kV CIC. DANTAS TR3 BA  RBF FT TR 230/69 kV CIC. DANTAS TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
CIC. DANTAS IB 69 kV MG 230 kV CIC. DANTAS MG1 BA IB2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
CIC. DANTAS IB 230 kV MG 230 kV CIC. DANTAS MG1 BA IB1 RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,929.18
CIC. DANTAS IB 230 kV MG 230 kV CIC. DANTAS MG1 BA IB1 RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RMEL REN 643/2014 04/12/2013 03/12/2046  R$108,821.02
CIC. DANTAS EL 69 kV CIC. DANTASDIST2 DIT   061/2001 IPCA RCDM REN 905/2020 09/03/2023 08/03/2051  R$643,769.49
CIC. DANTAS EL 69 kV CIC. DANTASDIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
CIC. DANTAS EL 69 kV CIC. DANTASDIST1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
CIC. DANTAS EL 230 kV CIC. DANTAS LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
CIC. DANTAS EL 230 kV CIC. DANTAS LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA 061/2001 IPCA RMEL REN 643/2014 08/11/2013 07/11/2046  R$108,611.27
CIC. DANTAS EL 230 kV CIC. DANTAS LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
CIC. DANTAS EL 230 kV CIC. DANTAS LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA 061/2001 IPCA RMEL REN 643/2014 01/11/2013 31/10/2046  R$108,554.79
CIC. DANTAS EL 230 kV CIC. DANTAS LT 230 kV CIC. DANTAS /CATU C-2 BA  RB FT LT 230 kV CIC. DANTAS /CATU C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
CIC. DANTAS EL 230 kV CIC. DANTAS LT 230 kV CIC. DANTAS /CATU C-2 BA  RB FT LT 230 kV CIC. DANTAS /CATU C-2 BA 061/2001 IPCA RMEL REN 643/2014 23/10/2013 22/10/2046  R$108,482.17
CIC. DANTAS EL 230 kV CIC. DANTAS LT 230 kV CIC. DANTAS /CATU C-1 BA RB FT LT 230 kV CIC. DANTAS /CATU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
CIC. DANTAS EL 230 kV CIC. DANTAS LT 230 kV CIC. DANTAS /CATU C-1 BA RB FT LT 230 kV CIC. DANTAS /CATU C-1 BA 061/2001 IPCA RMEL REN 643/2014 20/11/2013 19/11/2046  R$108,708.07
COREMAS TR 230/69 kV COREMAS TR2 PB RBF FT TR 230/69 kV COREMAS TR2 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
COREMAS TR 230/69 kV COREMAS TR1 PB RBF FT TR 230/69 kV COREMAS TR1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
COREMAS TT 69/13,8 kV COREMAS TA1 PB DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
COREMAS TT 69/13,8 kV COREMAS TA1 PB DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$281,516.05
COREMAS TT 69/13,8 kV COREMAS TA1 PB DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$288,094.94
COREMAS TR 230/69 kV COREMAS TR3 PB RBF FT TR 230/69 kV COREMAS TR3 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
COREMAS TR 230/69 kV COREMAS TR1 PB RBF FT TR 230/69 kV COREMAS TR1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
COREMAS TR 230/69 kV COREMAS TR1 PB RBF FT TR 230/69 kV COREMAS TR1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
COREMAS RTB 13,8 kV 5 MVAr COREMAS RT1 PB RBF FT RTB 13,8 kV 5 MVAr COREMAS RT1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$135,222.37
COREMAS MC 69 kV TR 230/69 kV COREMAS TR1 PB RBF FT TR 230/69 kV COREMAS TR1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
COREMAS EL 69 kV COREMASDIST4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
COREMAS RTB 13,8 kV 5 MVAr COREMAS RT1 PB RBF FT RTB 13,8 kV 5 MVAr COREMAS RT1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$399,033.22
COREMAS RTB 13,8 kV 5 MVAr COREMAS RT1 PB RBF FT RTB 13,8 kV 5 MVAr COREMAS RT1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$408,358.42
COREMAS MG 230 kV COREMAS MG1 PB RB FT MG 230 kV COREMAS MG1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$550,977.56
COREMAS MG 230 kV COREMAS MG1 PB RB FT MG 230 kV COREMAS MG1 PB 061/2001 IPCA RMEL REN 643/2014 30/11/2013 29/11/2041  R$82,900.65
COREMAS MG 230 kV COREMAS MG1 PB RB FT MG 230 kV COREMAS MG1 PB 061/2001 IPCA RMEL REN 643/2014 16/10/2015 15/10/2032  R$32,182.44
COREMAS MG 230 kV COREMAS MG1 PB RB FT MG 230 kV COREMAS MG1 PB 061/2001 IPCA RMEL REN 643/2014 17/12/2015 16/12/2029  R$15,669.02
COREMAS MG 230 kV COREMAS MG1 PB RB FT MG 230 kV COREMAS MG1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,625,902.21
COREMAS MG 230 kV COREMAS MG1 PB RB FT MG 230 kV COREMAS MG1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,663,898.72
COREMAS MG 230 kV COREMAS MG1 PB RB FT MG 230 kV COREMAS MG1 PB 061/2001 IPCA RBNI REA 7761/2019 31/08/2015 30/08/2030  R$24,623.49
COREMAS MC 69 kV TT 69/13,8 kV COREMAS TA1 PB  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
COREMAS MC 69 kV TR 230/69 kV COREMAS TR3 PB  RBF FT TR 230/69 kV COREMAS TR3 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
COREMAS MC 69 kV TR 230/69 kV COREMAS TR2 PB  RBF FT TR 230/69 kV COREMAS TR2 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
COREMAS MC 69 kV TR 230/69 kV COREMAS TR1 PB RBF FT TR 230/69 kV COREMAS TR1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
COREMAS EL 69 kV COREMASDIST3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
COREMAS MC 230 kV TR 230/69 kV COREMAS TR3 PB  RBF FT TR 230/69 kV COREMAS TR3 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
COREMAS MC 230 kV TR 230/69 kV COREMAS TR2 PB  RBF FT TR 230/69 kV COREMAS TR2 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
COREMAS MC 230 kV TR 230/69 kV COREMAS TR1 PB RBF FT TR 230/69 kV COREMAS TR1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
COREMAS MC 230 kV TR 230/69 kV COREMAS TR1 PB RBF FT TR 230/69 kV COREMAS TR1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$515,473.59
COREMAS MC 13,8 kV TR 230/69 kV COREMAS TR1 PB  RBF FT TR 230/69 kV COREMAS TR1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
COREMAS MC 13,8 kV RTB 13,8 kV 5 MVAr COREMAS RT1 PB  RBF FT RTB 13,8 kV 5 MVAr COREMAS RT1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,511.84
COREMAS IB 69 kV MG 230 kV COREMAS MG1 PB IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
COREMAS IB 69 kV MG 230 kV COREMAS MG1 PB IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$134,104.45
COREMAS IB 69 kV MG 230 kV COREMAS MG1 PB IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$137,238.41
COREMAS IB 230 kV MG 230 kV COREMAS MG1 PB IB1 RB FT MG 230 kV COREMAS MG1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
COREMAS IB 230 kV MG 230 kV COREMAS MG1 PB IB1 RB FT MG 230 kV COREMAS MG1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$423,550.65
COREMAS EL 69 kV COREMASDIST8 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
COREMAS EL 69 kV COREMASDIST8 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
COREMAS EL 69 kV COREMASDIST7 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
COREMAS EL 69 kV COREMASDIST7 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
COREMAS EL 69 kV COREMASDIST6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
COREMAS EL 69 kV COREMASDIST6 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
COREMAS EL 69 kV COREMASDIST5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
COREMAS EL 69 kV COREMASDIST5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
COREMAS EL 69 kV COREMASDIST4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
COREMAS EL 69 kV COREMASDIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
COREMAS EL 69 kV COREMASDIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
COREMAS EL 230 kV COREMAS LT 230 kV MILAGRES /COREMAS C-2 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-2 CE/PB 008/2005 IGPM RBL CC 008/2005 25/09/2009 04/03/2035  R$433,093.46
COREMAS EL 230 kV COREMAS LT 230 kV MILAGRES /COREMAS C-1 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB 061/2001 IPCA RBNI REA 5861/2016 08/12/2013 07/12/2041  R$36,621.44
COREMAS EL 230 kV COREMAS LT 230 kV MILAGRES /COREMAS C-1 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
COREMAS EL 230 kV COREMAS LT 230 kV MILAGRES /COREMAS C-1 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
COTEGIPE TT 69/13,8 kV COTEGIPE TA1 BA DIT   061/2001 IPCA RCDM REA 3578/2012 17/01/2016 16/01/2046  R$226,344.32
COTEGIPE TT 69/13,8 kV COTEGIPE TA1 BA DIT   061/2001 IPCA RMEL REN 443/2011 19/01/2016 18/01/2046  R$2,538.62
COTEGIPE TT 69/69 kV COTEGIPE TA2 BA DIT   061/2001 IPCA RCDM REA 7806/2019 18/06/2021 18/06/2051  R$227,903.61
COTEGIPE TR 69/13,8 kV COTEGIPE TR8 BA RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
COTEGIPE MG 230 kV COTEGIPE MG1 BA RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$696,068.03
COTEGIPE MG 230 kV COTEGIPE MG1 BA RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RBNI REA 5166/2015 29/12/2017 28/12/2045  R$220,716.55
COTEGIPE TR 230/69 kV COTEGIPE TR5 BA RBF FT TR 230/69 kV COTEGIPE TR5 BA 061/2001 IPCA RBNI REA 7806/2019 14/06/2021 14/06/2056  R$ 1,321,373.40
COTEGIPE TR 230/69 kV COTEGIPE TR4 BA RBF FT TR 230/69 kV COTEGIPE TR4 BA 061/2001 IPCA RBNI REA 5166/2015 29/12/2017 28/12/2051  R$ 1,587,772.48
COTEGIPE TR 230/69 kV COTEGIPE TR3 BA RBF FT TR 230/69 kV COTEGIPE TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
COTEGIPE TR 230/69 kV COTEGIPE TR2 BA RBF FT TR 230/69 kV COTEGIPE TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
COTEGIPE TR 230/69 kV COTEGIPE TR2 BA RBF FT TR 230/69 kV COTEGIPE TR2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
COTEGIPE TR 230/69 kV COTEGIPE TR1 BA RBF FT TR 230/69 kV COTEGIPE TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
COTEGIPE MG 230 kV COTEGIPE MG1 BA RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RMEL REN 443/2011 05/02/2016 04/02/2046  R$7,557.71
COTEGIPE MG 230 kV COTEGIPE MG1 BA RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RBNI REA 7806/2019 22/06/2021 22/06/2052  R$40,677.45
COTEGIPE MG 230 kV COTEGIPE MG1 BA RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RBNI REA 5166/2015 29/12/2017 28/12/2045  R$63,619.35
COTEGIPE MG 230 kV COTEGIPE MG1 BA RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RMEL REN 643/2014 30/09/2013 29/09/2030  R$26,967.83
COTEGIPE MG 230 kV COTEGIPE MG1 BA RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,054,055.59
COTEGIPE MC 69 kV TR 69/13,8 kV COTEGIPE TR8 BA  RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RBNI REA 1814/2009 30/01/2013 29/01/2046  R$33,783.32
COTEGIPE MG 230 kV COTEGIPE MG1 BA RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RBNI REA 7806/2019 22/06/2021 22/06/2052  R$188,700.43
COTEGIPE MC 69 kV TR 230/69 kV COTEGIPE TR4 BA RBF FT TR 230/69 kV COTEGIPE TR4 BA 061/2001 IPCA RBNI REA 5166/2015 29/12/2017 28/12/2047  R$479,835.07
COTEGIPE MG 230 kV COTEGIPE MG1 BA RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RBNI REA 7806/2019 22/06/2021 22/06/2061  R$58,935.60
COTEGIPE MC 69 kV TT 69/69 kV COTEGIPE TA2 BA  DIT   061/2001 IPCA RCDM REA 7806/2019 18/06/2021 18/06/2036  R$39,249.18
COTEGIPE MC 69 kV TR 69/13,8 kV COTEGIPE TR8 BA  RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
COTEGIPE MC 69 kV TR 230/69 kV COTEGIPE TR3 BA  RBF FT TR 230/69 kV COTEGIPE TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
COTEGIPE MC 69 kV TR 230/69 kV COTEGIPE TR5 BA RBF FT TR 230/69 kV COTEGIPE TR5 BA 061/2001 IPCA RBNI REA 7806/2019 14/06/2021 14/06/2049  R$442,755.77
COTEGIPE MC 69 kV TR 230/69 kV COTEGIPE TR2 BA RBF FT TR 230/69 kV COTEGIPE TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
COTEGIPE MC 69 kV TR 230/69 kV COTEGIPE TR2 BA RBF FT TR 230/69 kV COTEGIPE TR2 BA 061/2001 IPCA RMEL REN 443/2011 04/02/2016 03/02/2046  R$7,557.13
COTEGIPE MC 69 kV TR 230/69 kV COTEGIPE TR1 BA  RBF FT TR 230/69 kV COTEGIPE TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
COTEGIPE MC 69 kV BC 69 kV 27,1 Mvar COTEGIPE BC2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
COTEGIPE MC 69 kV TR 230/69 kV COTEGIPE TR2 BA RBF FT TR 230/69 kV COTEGIPE TR2 BA 061/2001 IPCA RBNI REA 7806/2019 14/06/2021 14/06/2044  R$132,280.93
COTEGIPE MC 69 kV BC 69 kV 27,1 Mvar COTEGIPE BC2 BA DIT   061/2001 IPCA RMEL REN 443/2011 04/02/2016 03/02/2046  R$2,519.04
COTEGIPE MC 69 kV BC 69 kV 20,3 Mvar COTEGIPE BC1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
COTEGIPE MC 69 kV BC 69 kV 20,3 Mvar COTEGIPE BC1 BA DIT   061/2001 IPCA RMEL REN 443/2011 24/05/2016 23/05/2046  R$4,989.04
COTEGIPE MC 230 kV TR 230/69 kV COTEGIPE TR5 BA RBF FT TR 230/69 kV COTEGIPE TR5 BA 061/2001 IPCA RBNI REA 7806/2019 14/06/2021 14/06/2049  R$894,145.06
COTEGIPE MC 230 kV TR 230/69 kV COTEGIPE TR3 BA  RBF FT TR 230/69 kV COTEGIPE TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
COTEGIPE MC 230 kV TR 230/69 kV COTEGIPE TR2 BA  RBF FT TR 230/69 kV COTEGIPE TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
COTEGIPE MC 230 kV TR 230/69 kV COTEGIPE TR4 BA RBF FT TR 230/69 kV COTEGIPE TR4 BA 061/2001 IPCA RBNI REA 5166/2015 29/12/2017 28/12/2047  R$ 1,230,748.89
COTEGIPE MC 230 kV TR 230/69 kV COTEGIPE TR4 BA RBF FT TR 230/69 kV COTEGIPE TR4 BA 061/2001 IPCA RMEL REN 443/2011 05/02/2016 04/02/2046  R$7,557.70
COTEGIPE MC 230 kV TR 230/69 kV COTEGIPE TR2 BA  RBF FT TR 230/69 kV COTEGIPE TR2 BA 061/2001 IPCA RBNI REA 2837/2011 06/06/2014 05/06/2045  R$44,323.89
COTEGIPE MC 230 kV TR 230/69 kV COTEGIPE TR1 BA  RBF FT TR 230/69 kV COTEGIPE TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
COTEGIPE MC 230 kV TR 230/69 kV COTEGIPE TR1 BA  RBF FT TR 230/69 kV COTEGIPE TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
COTEGIPE IB 69 kV MG 230 kV COTEGIPE MG1 BA IB2 DIT   061/2001 IPCA RCDM REA 1814/2009 30/01/2014 29/01/2046  R$37,348.34
COTEGIPE IB 230 kV MG 230 kV COTEGIPE MG1 BA IB1 RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,929.18
COTEGIPE IB 69 kV MG 230 kV COTEGIPE MG1 BA IB2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
COTEGIPE IB 230 kV MG 230 kV COTEGIPE MG1 BA IB1 RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RBNI REA 2837/2011 04/09/2014 03/09/2046  R$105,906.66
COTEGIPE IB 69 kV MG 230 kV COTEGIPE MG1 BA IB2 DIT   061/2001 IPCA RCDM REA 7806/2019 18/06/2021 18/06/2039  R$57,343.32
COTEGIPE IB 69 kV MG 230 kV COTEGIPE MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
COTEGIPE IB 69 kV MG 230 kV COTEGIPE MG1 BA IB1 DIT   061/2001 IPCA RCDM REA 1814/2009 01/02/2013 31/01/2045  R$36,342.89
COTEGIPE IB 230 kV MG 230 kV COTEGIPE MG1 BA IB1 RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RMEL REN 443/2011 14/01/2016 13/01/2046  R$5,075.29
COTEGIPE EL 69 kV COTEGIPE LT 69 kV PITUACU /COTEGIPE C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
COTEGIPE EL 69 kV COTEGIPE LT 69 kV PITUACU /COTEGIPE C-2 BA DIT   061/2001 IPCA RCDM REA 1814/2009 11/08/2013 10/08/2045  R$36,871.93
COTEGIPE EL 69 kV COTEGIPE LT 69 kV PITUACU /COTEGIPE C-2 BA DIT   061/2001 IPCA RCDM REA 2376/2010 11/08/2013 10/08/2044  R$85,579.54
COTEGIPE EL 69 kV COTEGIPE LT 69 kV PITUACU /COTEGIPE C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
COTEGIPE EL 69 kV COTEGIPE LT 69 kV CATU /COTEGIPE C-1 BA  DIT   061/2001 IPCA RCDM REA 2376/2010 28/02/2014 27/02/2045  R$59,282.37
COTEGIPE EL 69 kV COTEGIPE LT 69 kV CATU /COTEGIPE C-1 BA  DIT   061/2001 IPCA RMEL REN 443/2011 25/01/2016 24/01/2046  R$10,159.10
COTEGIPE EL 69 kV COTEGIPE LT 69 kV CATU /COTEGIPE C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
COTEGIPE EL 69 kV COTEGIPE LT 69 kV CATU /COTEGIPE C-2 BA DIT   061/2001 IPCA RCDM REA 1814/2009 30/01/2013 29/01/2046  R$33,783.32
COTEGIPE EL 69 kV COTEGIPE LT 69 kV CATU /COTEGIPE C-2 BA DIT   061/2001 IPCA RMEL REN 443/2011 26/01/2016 25/01/2046  R$7,619.92
COTEGIPE EL 69 kV COTEGIPE LT 69 kV CATU /COTEGIPE C-1 BA  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
COTEGIPE EL 69 kV COTEGIPE LT 69 kV CATU /COTEGIPE C-1 BA  DIT   061/2001 IPCA RCDM REA 1814/2009 30/01/2013 29/01/2046  R$33,783.32
COTEGIPE EL 69 kV COTEGIPEPARIPE 02L2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
COTEGIPE EL 69 kV COTEGIPEPARIPE 02L2 DIT   061/2001 IPCA RCDM REA 1814/2009 05/05/2013 04/05/2045  R$36,600.49
COTEGIPE EL 69 kV COTEGIPEMILLENIUM02C2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
COTEGIPE EL 69 kV COTEGIPEMILLENIUM02C1 DIT   061/2001 IPCA RCDM REA 1814/2009 30/01/2013 29/01/2046  R$33,783.32
COTEGIPE EL 69 kV COTEGIPEEMBASA 02L3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
COTEGIPE EL 69 kV COTEGIPEMILLENIUM02C2 DIT   061/2001 IPCA RCDM REA 1814/2009 30/01/2013 29/01/2046  R$33,783.32
COTEGIPE EL 69 kV COTEGIPEMILLENIUM02C2 DIT   061/2001 IPCA RMEL REN 443/2011 18/01/2016 17/01/2046  R$10,153.67
COTEGIPE EL 69 kV COTEGIPEMILLENIUM02C1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
COTEGIPE EL 69 kV COTEGIPEEMBASA 02L3 DIT   061/2001 IPCA RCDM REA 1814/2009 13/06/2013 12/06/2045  R$36,708.51
COTEGIPE EL 69 kV COTEGIPEMILLENIUM02C1 DIT   061/2001 IPCA RMEL REN 443/2011 15/01/2016 14/01/2046  R$10,151.34
COTEGIPE EL 69 kV COTEGIPECIM-ARATU 02L1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
COTEGIPE EL 69 kV COTEGIPECIM-ARATU 02L1 DIT   061/2001 IPCA RCDM REA 1814/2009 14/04/2013 13/04/2045  R$36,542.32
COTEGIPE EL 69 kV COTEGIPECIM-ARATU 02L1 DIT   061/2001 IPCA RMEL REN 443/2011 03/02/2016 02/02/2046  R$10,075.41
COTEGIPE EL 69 kV COTEGIPECIA II 02L8 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
COTEGIPE EL 69 kV COTEGIPECIA II 02L8 DIT   061/2001 IPCA RCDM REA 1814/2009 25/10/2013 24/10/2045  R$37,079.67
COTEGIPE EL 69 kV COTEGIPECIA II 02L8 DIT   061/2001 IPCA RCDM REA 2376/2010 28/10/2013 27/10/2044  R$120,112.80
COTEGIPE EL 69 kV COTEGIPECIA II 02L7 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
COTEGIPE EL 69 kV COTEGIPECIA II 02L7 DIT   061/2001 IPCA RCDM REA 1814/2009 19/09/2013 18/09/2045  R$36,979.95
COTEGIPE EL 69 kV COTEGIPECIA II 02L7 DIT   061/2001 IPCA RCDM REA 2376/2010 19/09/2013 18/09/2044  R$85,842.99
COTEGIPE EL 69 kV COTEGIPECIA II 02L7 DIT   061/2001 IPCA RCDM REA 2376/2010 19/09/2013 18/09/2043  R$33,900.45
COTEGIPE EL 69 kV COTEGIPECIA I 02C9 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
COTEGIPE EL 69 kV COTEGIPECIA I 02C9 DIT   061/2001 IPCA RCDM REA 1814/2009 14/12/2013 13/12/2045  R$37,218.15
COTEGIPE EL 69 kV COTEGIPECIA I 02C9 DIT   061/2001 IPCA RCDM REA 2040/2009 14/12/2013 13/12/2044  R$86,423.92
COTEGIPE EL 69 kV COTEGIPECIA I 02C6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
COTEGIPE EL 69 kV COTEGIPECIA I 02C6 DIT   061/2001 IPCA RCDM REA 1814/2009 15/10/2013 14/10/2045  R$37,051.96
COTEGIPE EL 69 kV COTEGIPECIA I 02C6 DIT   061/2001 IPCA RCDM REA 2040/2009 15/10/2013 14/10/2044  R$86,018.62
COTEGIPE EL 69 kV COTEGIPECIA I 02C6 DIT   061/2001 IPCA RCDM REA 2040/2009 15/10/2013 14/10/2043  R$33,814.78
COTEGIPE EL 69 kV COTEGIPECAMACARI I 02J4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
COTEGIPE EL 69 kV COTEGIPECAMACARI I 02J4 DIT   061/2001 IPCA RCDM REA 1814/2009 30/01/2013 29/01/2046  R$33,783.32
COTEGIPE EL 69 kV COTEGIPECAMACARI I 02J4 DIT   061/2001 IPCA RMEL REN 443/2011 22/01/2016 21/01/2046  R$10,156.78
COTEGIPE EL 69 kV COTEGIPECAMACARI I 02J3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
COTEGIPE EL 69 kV COTEGIPECAMACARI I 02J3 DIT   061/2001 IPCA RCDM REA 1814/2009 30/01/2013 29/01/2046  R$33,783.32
COTEGIPE EL 69 kV COTEGIPECAMACARI I 02J3 DIT   061/2001 IPCA RMEL REN 443/2011 21/01/2016 20/01/2046  R$10,156.00
COTEGIPE EL 230 kV COTEGIPE LT 230 kV COTEGIPE /USIBA C-1 BA  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
COTEGIPE EL 230 kV COTEGIPE LT 230 kV COTEGIPE /USIBA C-1 BA  DIT   061/2001 IPCA RCDM REA 2837/2011 27/12/2013 26/12/2044  R$215,979.73
COTEGIPE EL 230 kV COTEGIPE LT 230 kV COTEGIPE /SIBRA C-1 BA  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
COTEGIPE EL 230 kV COTEGIPE LT 230 kV COTEGIPE /SIBRA C-1 BA  DIT   061/2001 IPCA RCDM REA 2837/2011 23/09/2013 22/09/2043  R$59,666.29
COTEGIPE EL 230 kV COTEGIPE LT 230 kV COTEGIPE /SIBRA C-1 BA  DIT   061/2001 IPCA RCDM REA 2837/2011 26/09/2013 25/09/2046  R$98,053.23
COTEGIPE EL 230 kV COTEGIPE LT 230 kV COTEGIPE /MATATU C-1 BA RB FT LT 230 kV COTEGIPE /MATATU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
COTEGIPE EL 230 kV COTEGIPE LT 230 kV COTEGIPE /JACARACANGA C-1 BA RB FT LT 230 kV COTEGIPE /JACARACANGA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
COTEGIPE EL 230 kV COTEGIPE LT 230 kV CAMACARI IV /COTEGIPE C-1 BA  RB FT LT 230 kV CAMACARI IV /COTEGIPE C-1 BA 061/2001 IPCA RBNI REA 2891/2011 02/06/2014 01/06/2040  R$90,977.83
COTEGIPE EL 230 kV COTEGIPE LT 230 kV CAMACARI IV /COTEGIPE C-1 BA  RB FT LT 230 kV CAMACARI IV /COTEGIPE C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
COTEGIPE EL 230 kV COTEGIPE LT 230 kV CAMACARI II /COTEGIPE C-1 BA  RB FT LT 230 kV CAMACARI II /COTEGIPE C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
COTEGIPE EL 230 kV COTEGIPE LT 230 kV CAMACARI II /COTEGIPE C-1 BA  RB FT LT 230 kV CAMACARI II /COTEGIPE C-1 BA 061/2001 IPCA RBNI REA 6258/2017 27/11/2020 27/11/2050  R$203,315.55
COTEGIPE BC 69 kV 27,1 Mvar COTEGIPE BC2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$139,293.08
COTEGIPE BC 69 kV 20,3 Mvar COTEGIPE BC1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$116,409.25
COTEGIPE BC 69 kV 20,3 Mvar COTEGIPE BC1 BA DIT   061/2001 IPCA RMEL REN 643/2014 18/09/2013 17/09/2033  R$100,316.25
COTEMINAS MG 230 kV COTEMINAS MG1 PB RB FT MG 230 kV COTEMINAS MG1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$410,201.00
COTEMINAS IB 230 kV MG 230 kV COTEMINAS MG1 PB IB1 RB FT MG 230 kV COTEMINAS MG1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
COTEMINAS EL 230 kV COTEMINAS LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE  RB FT LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
COTEMINAS EL 230 kV COTEMINAS LT 230 kV C.GRANDE II /COTEMINAS C-1 PB  RB FT LT 230 kV C.GRANDE II /COTEMINAS C-1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
DELM. GOUVEIA TT 69/13,8 kV DELM. GOUVEIA TA2 CE DIT   061/2001 IPCA RCDM REA 3578/2012 04/12/2016 03/12/2046  R$231,165.49
DELM. GOUVEIA TT 69/13,8 kV DELM. GOUVEIA TA1 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
DELM. GOUVEIA TT 69/13,8 kV DELM. GOUVEIA TA1 CE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$281,516.05
DELM. GOUVEIA TT 69/13,8 kV DELM. GOUVEIA TA1 CE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$288,094.94
DELM. GOUVEIA TR 69/13,8 kV DELM. GOUVEIA TR5 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
DELM. GOUVEIA TR 69/13,8 kV DELM. GOUVEIA TR5 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$86,722.45
DELM. GOUVEIA TR 69/13,8 kV DELM. GOUVEIA TR5 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$88,749.11
DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR4 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR4 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR4 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR4 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR4 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR4 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR3 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR3 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR3 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR3 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR3 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR2 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR2 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR2 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
DELM. GOUVEIA MG 230 kV DELM. GOUVEIA MG1 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$631,069.05
DELM. GOUVEIA MG 230 kV DELM. GOUVEIA MG1 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RBNI REA 2040/2009 26/01/2014 25/01/2045  R$27,584.15
DELM. GOUVEIA MG 230 kV DELM. GOUVEIA MG1 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RBNI REA 2040/2009 26/01/2014 25/01/2044  R$18,119.73
DELM. GOUVEIA MG 230 kV DELM. GOUVEIA MG1 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RBNI REA 2040/2009 10/10/2012 09/10/2043  R$26,569.59
DELM. GOUVEIA MG 230 kV DELM. GOUVEIA MG1 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RMEL REN 643/2014 15/12/2013 14/12/2030  R$29,488.64
DELM. GOUVEIA MG 230 kV DELM. GOUVEIA MG1 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RMEL REN 643/2014 28/01/2014 27/01/2031  R$27,413.67
DELM. GOUVEIA MG 230 kV DELM. GOUVEIA MG1 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RMEL REN 643/2014 28/02/2015 27/02/2043  R$51,070.18
DELM. GOUVEIA MG 230 kV DELM. GOUVEIA MG1 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,862,247.45
DELM. GOUVEIA MG 230 kV DELM. GOUVEIA MG1 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,905,767.23
DELM. GOUVEIA MG 230 kV DELM. GOUVEIA MG1 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RMEL REN 443/2011 29/12/2016 28/12/2044  R$79,006.23
DELM. GOUVEIA MC 69 kV TT 69/13,8 kV DELM. GOUVEIA TA2 CE  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
DELM. GOUVEIA MC 69 kV TT 69/13,8 kV DELM. GOUVEIA TA2 CE  DIT   061/2001 IPCA RCDM REA 2040/2009 30/05/2013 29/05/2044  R$27,067.21
DELM. GOUVEIA MC 69 kV TT 69/13,8 kV DELM. GOUVEIA TA1 CE  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
DELM. GOUVEIA MC 69 kV TT 69/13,8 kV DELM. GOUVEIA TA1 CE  DIT   061/2001 IPCA RCDM REA 2040/2009 26/01/2014 25/01/2045  R$27,584.15
DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR4 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR4 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR4 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR4 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR4 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR4 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$204,189.21
DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR4 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR4 CE 061/2001 IPCA RBNI REA 2040/2009 03/03/2013 02/03/2043  R$369,545.12
DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR3 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR3 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR3 CE 061/2001 IPCA RBNI REA 2040/2009 11/12/2012 10/12/2043  R$80,107.78
DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR2 CE  RBF FT TR 230/69 kV DELM. GOUVEIA TR2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR2 CE  RBF FT TR 230/69 kV DELM. GOUVEIA TR2 CE 061/2001 IPCA RBNI REA 2040/2009 24/03/2013 23/03/2044  R$80,770.55
DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR2 CE  RBF FT TR 230/69 kV DELM. GOUVEIA TR2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$204,189.21
DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RMEL REN 443/2011 20/12/2015 19/12/2038  R$7,163.90
DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC4 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC4 CE DIT   061/2001 IPCA RCDM REA 2040/2009 30/01/2013 29/01/2043  R$8,561.14
DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC4 CE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC3 CE  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC3 CE  DIT   061/2001 IPCA RCDM REA 2040/2009 09/04/2013 08/04/2043  R$22,898.68
DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC3 CE  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC2 CE  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC2 CE  DIT   061/2001 IPCA RCDM REA 2040/2009 09/04/2013 08/04/2043  R$45,797.38
DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC2 CE  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC1 CE  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC1 CE  DIT   061/2001 IPCA RCDM REA 2040/2009 30/01/2013 29/01/2043  R$8,561.14
DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC1 CE  DIT   061/2001 IPCA RCDM REA 2040/2009 09/04/2013 08/04/2043  R$11,449.35
DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC1 CE  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR4 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR4 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR4 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR4 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$515,473.59
DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR4 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR4 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$527,519.95
DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR3 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR3 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR3 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$515,473.59
DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR2 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR2 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR2 CE 061/2001 IPCA RMEL REN 643/2014 08/02/2014 07/02/2044  R$21,360.48
DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RMEL REN 443/2011 26/06/2017 25/06/2047  R$4,049.37
DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RMEL REN 443/2011 25/06/2017 24/06/2047  R$4,049.07
DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR2 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$515,473.59
DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$515,473.59
DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$527,519.95
DELM. GOUVEIA MC 230 kV BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE  RB FT BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$194,878.24
DELM. GOUVEIA MC 230 kV BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE  RB FT BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$575,074.17
DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RMEL REN 443/2011 25/06/2017 24/06/2047  R$4,049.07
DELM. GOUVEIA MC 230 kV BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE  RB FT BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$588,513.36
DELM. GOUVEIA IB 69 kV MG 230 kV DELM. GOUVEIA MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
DELM. GOUVEIA IB 69 kV MG 230 kV DELM. GOUVEIA MG1 CE IB1 DIT   061/2001 IPCA RCDM REA 2040/2009 30/01/2013 29/01/2043  R$17,122.28
DELM. GOUVEIA IB 69 kV MG 230 kV DELM. GOUVEIA MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$134,104.45
DELM. GOUVEIA IB 230 kV MG 230 kV DELM. GOUVEIA MG1 CE IB1 RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
DELM. GOUVEIA IB 230 kV MG 230 kV DELM. GOUVEIA MG1 CE IB1 RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$423,550.65
DELM. GOUVEIA EL 69 kV DELM. GOUVEIATAUAPE 02J9 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
DELM. GOUVEIA EL 69 kV DELM. GOUVEIATAUAPE 02J9 DIT   061/2001 IPCA RCDM REA 2040/2009 30/01/2013 29/01/2043  R$17,122.28
DELM. GOUVEIA EL 69 kV DELM. GOUVEIATAUAPE 02J9 DIT   061/2001 IPCA RCDM REA 2040/2009 13/03/2013 12/03/2043  R$33,384.45
DELM. GOUVEIA EL 69 kV DELM. GOUVEIATAUAPE 02J9 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
DELM. GOUVEIA EL 69 kV DELM. GOUVEIATAUAPE 02J8 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
DELM. GOUVEIA EL 69 kV DELM. GOUVEIATAUAPE 02J8 DIT   061/2001 IPCA RCDM REA 2040/2009 30/12/2012 29/12/2042  R$29,453.50
DELM. GOUVEIA EL 69 kV DELM. GOUVEIATAUAPE 02J8 DIT   061/2001 IPCA RCDM REA 2040/2009 21/03/2013 20/03/2043  R$33,406.18
DELM. GOUVEIA EL 69 kV DELM. GOUVEIATAUAPE 02J8 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
DELM. GOUVEIA EL 69 kV DELM. GOUVEIATAUAPE 02J7 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
DELM. GOUVEIA EL 69 kV DELM. GOUVEIATAUAPE 02J7 DIT   061/2001 IPCA RCDM REA 2040/2009 30/12/2012 29/12/2042  R$29,453.50
DELM. GOUVEIA EL 69 kV DELM. GOUVEIATAUAPE 02J7 DIT   061/2001 IPCA RCDM REA 2040/2009 27/03/2013 26/03/2043  R$33,422.48
DELM. GOUVEIA EL 69 kV DELM. GOUVEIATAUAPE 02J7 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
DELM. GOUVEIA EL 69 kV DELM. GOUVEIATAUAPE 02J7 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
DELM. GOUVEIA EL 69 kV DELM. GOUVEIAFORTALEZA 02J4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
DELM. GOUVEIA EL 69 kV DELM. GOUVEIAFORTALEZA 02J4 DIT   061/2001 IPCA RCDM REA 2040/2009 30/12/2012 29/12/2042  R$29,453.50
DELM. GOUVEIA EL 69 kV DELM. GOUVEIAFORTALEZA 02J4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
DELM. GOUVEIA EL 69 kV DELM. GOUVEIAFORTALEZA 02J4 DIT   061/2001 IPCA RMEL REN 443/2011 03/07/2016 02/07/2039  R$7,294.60
DELM. GOUVEIA EL 69 kV DELM. GOUVEIAFORTALEZA 02J3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
DELM. GOUVEIA EL 69 kV DELM. GOUVEIAFORTALEZA 02J3 DIT   061/2001 IPCA RMEL REN 443/2011 20/12/2015 19/12/2038  R$4,775.93
DELM. GOUVEIA EL 69 kV DELM. GOUVEIAFORTALEZA 02J3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
DELM. GOUVEIA EL 69 kV DELM. GOUVEIAFORTALEZA 02J3 DIT   061/2001 IPCA RCDM REA 2040/2009 30/12/2012 29/12/2042  R$29,453.50
DELM. GOUVEIA EL 69 kV DELM. GOUVEIADIA MACEDO 02J6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
DELM. GOUVEIA EL 69 kV DELM. GOUVEIADIA MACEDO 02J6 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
DELM. GOUVEIA EL 69 kV DELM. GOUVEIADIA MACEDO 02J6 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
DELM. GOUVEIA EL 69 kV DELM. GOUVEIADIA MACEDO 02J6 DIT   061/2001 IPCA RCDM REA 2040/2009 03/03/2013 02/03/2044  R$26,878.47
DELM. GOUVEIA EL 69 kV DELM. GOUVEIADIA MACEDO 02J6 DIT   061/2001 IPCA RCDM REA 2040/2009 03/03/2013 02/03/2043  R$33,203.72
DELM. GOUVEIA EL 69 kV DELM. GOUVEIAALDEOTA 02N1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
DELM. GOUVEIA EL 69 kV DELM. GOUVEIAALDEOTA 02N1 DIT   061/2001 IPCA RCDM REA 2040/2009 30/01/2013 29/01/2043  R$51,391.64
DELM. GOUVEIA EL 69 kV DELM. GOUVEIAALDEOTA 02N1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
DELM. GOUVEIA EL 69 kV DELM. GOUVEIAALDEOTA 02N1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
DELM. GOUVEIA EL 69 kV DELM. GOUVEIAAGUA FRIA 02N3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
DELM. GOUVEIA EL 69 kV DELM. GOUVEIAAGUA FRIA 02N3 DIT   061/2001 IPCA RCDM REA 2040/2009 30/12/2012 29/12/2042  R$29,453.50
DELM. GOUVEIA EL 69 kV DELM. GOUVEIAAGUA FRIA 02N3 DIT   061/2001 IPCA RCDM REA 2040/2009 09/04/2013 08/04/2043  R$33,457.77
DELM. GOUVEIA EL 69 kV DELM. GOUVEIAAGUA FRIA 02N3 DIT   061/2001 IPCA RMEL REN 443/2011 12/01/2016 11/01/2039  R$4,950.36
DELM. GOUVEIA EL 69 kV DELM. GOUVEIAAGUA FRIA 02N2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
DELM. GOUVEIA EL 69 kV DELM. GOUVEIAAGUA FRIA 02N2 DIT   061/2001 IPCA RCDM REA 2040/2009 05/02/2013 04/02/2044  R$84,316.34
DELM. GOUVEIA EL 69 kV DELM. GOUVEIAAGUA FRIA 02N2 DIT   061/2001 IPCA RCDM REA 2040/2009 05/02/2013 04/02/2043  R$33,286.69
DELM. GOUVEIA EL 69 kV DELM. GOUVEIAAGUA FRIA 02N2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
DELM. GOUVEIA EL 230 kV DELM. GOUVEIA LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
DELM. GOUVEIA EL 230 kV DELM. GOUVEIA LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE 061/2001 IPCA RMEL REN 643/2014 10/08/2014 09/08/2044  R$21,671.28
DELM. GOUVEIA EL 230 kV DELM. GOUVEIA LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
DELM. GOUVEIA EL 230 kV DELM. GOUVEIA LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
DELM. GOUVEIA EL 230 kV DELM. GOUVEIA LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
DELM. GOUVEIA BC 69 kV 24,4 Mvar DELM. GOUVEIA BC2 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,980.29
DELM. GOUVEIA BC 69 kV 24,4 Mvar DELM. GOUVEIA BC4 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,980.29
DELM. GOUVEIA BC 69 kV 24,4 Mvar DELM. GOUVEIA BC3 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,980.29
DELM. GOUVEIA BC 69 kV 24,4 Mvar DELM. GOUVEIA BC1 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,980.29
DELM. GOUVEIA BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE RB FT BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,671.37
DELM. GOUVEIA BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE RB FT BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$609,874.99
DELM. GOUVEIA BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE RB FT BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$624,127.46
ELISEU MARTIN TT 69/0 kV ELISEU MARTIN TA1 PI DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
ELISEU MARTIN TR 230/69 kV ELISEU MARTIN TR2 PI RBF FT TR 230/69 kV ELISEU MARTIN TR2 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$266,604.65
ELISEU MARTIN TR 230/69 kV ELISEU MARTIN TR1 PI RBF FT TR 230/69 kV ELISEU MARTIN TR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$266,604.65
ELISEU MARTIN MG 230 kV ELISEU MARTIN MG1 PI RB FT MG 230 kV ELISEU MARTIN MG1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$490,980.77
ELISEU MARTIN MG 230 kV ELISEU MARTIN MG1 PI RB FT MG 230 kV ELISEU MARTIN MG1 PI 061/2001 IPCA RMEL REN 443/2011 15/01/2016 14/01/2033  R$33,921.49
ELISEU MARTIN MC 69 kV TT 69/0 kV ELISEU MARTIN TA1 PI  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
ELISEU MARTIN MC 69 kV TR 230/69 kV ELISEU MARTIN TR2 PI  RBF FT TR 230/69 kV ELISEU MARTIN TR2 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
ELISEU MARTIN MC 69 kV TR 230/69 kV ELISEU MARTIN TR1 PI  RBF FT TR 230/69 kV ELISEU MARTIN TR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
ELISEU MARTIN MC 230 kV TR 230/69 kV ELISEU MARTIN TR2 PI  RBF FT TR 230/69 kV ELISEU MARTIN TR2 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,757.03
ELISEU MARTIN MC 230 kV TR 230/69 kV ELISEU MARTIN TR1 PI  RBF FT TR 230/69 kV ELISEU MARTIN TR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,757.03
ELISEU MARTIN IB 69 kV MG 230 kV ELISEU MARTIN MG1 PI IB2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
ELISEU MARTIN IB 230 kV MG 230 kV ELISEU MARTIN MG1 PI IB1 RB FT MG 230 kV ELISEU MARTIN MG1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
ELISEU MARTIN EL 69 kV ELISEU MARTINBOM JESUS-02L2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ELISEU MARTIN EL 69 kV ELISEU MARTINBERTOLINEA-02L1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ELISEU MARTIN EL 230 kV ELISEU MARTIN LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI  RB FT LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
EUNAPOLIS TR 230/138 kV EUNAPOLIS TR3 BA RBF FT TR 230/138 kV EUNAPOLIS TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$399,926.80
EUNAPOLIS TR 230/138 kV EUNAPOLIS TR2 BA RBF FT TR 230/138 kV EUNAPOLIS TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$399,926.80
EUNAPOLIS TR 230/138 kV EUNAPOLIS TR4 BA RBF FT TR 230/138 kV EUNAPOLIS TR4 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$329,470.59
EUNAPOLIS TR 230/138 kV EUNAPOLIS TR4 BA RBF FT TR 230/138 kV EUNAPOLIS TR4 BA 061/2001 IPCA RBNI REA 4542/2014 24/11/2014 23/11/2045  R$34,296.67
EUNAPOLIS TR 230/138 kV EUNAPOLIS TR1 BA RBF FT TR 230/138 kV EUNAPOLIS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,180,160.33
EUNAPOLIS TR 230/138 kV EUNAPOLIS TR1 BA RBF FT TR 230/138 kV EUNAPOLIS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,207,740.08
EUNAPOLIS TR 230/138 kV EUNAPOLIS TR2 BA RBF FT TR 230/138 kV EUNAPOLIS TR2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,180,160.33
EUNAPOLIS TR 230/138 kV EUNAPOLIS TR2 BA RBF FT TR 230/138 kV EUNAPOLIS TR2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,207,740.08
EUNAPOLIS TR 230/138 kV EUNAPOLIS TR1 BA RBF FT TR 230/138 kV EUNAPOLIS TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$399,926.80
EUNAPOLIS RTL 230 kV 3,7 Mvar EUNAPOLIS RTR1 BA RB FT RTL 230 kV 3,7 Mvar EUNAPOLIS RTR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$65,642.30
EUNAPOLIS RTL 230 kV 3,7 Mvar EUNAPOLIS RTR1 BA RB FT RTL 230 kV 3,7 Mvar EUNAPOLIS RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$193,706.55
EUNAPOLIS RTL 230 kV 11,1 Mvar EUNAPOLIS RT1 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$581,119.66
EUNAPOLIS RTL 230 kV 11,1 Mvar EUNAPOLIS RT1 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$594,700.14
EUNAPOLIS RTL 230 kV 3,7 Mvar EUNAPOLIS RTR1 BA RB FT RTL 230 kV 3,7 Mvar EUNAPOLIS RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$198,233.38
EUNAPOLIS RTL 230 kV 11,1 Mvar EUNAPOLIS RT2 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$196,926.91
EUNAPOLIS RTL 230 kV 11,1 Mvar EUNAPOLIS RT2 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$581,119.66
EUNAPOLIS RTL 230 kV 11,1 Mvar EUNAPOLIS RT2 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$594,700.14
EUNAPOLIS RTL 230 kV 11,1 Mvar EUNAPOLIS RT1 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$196,926.91
EUNAPOLIS RTB 230 kV 7,4 Mvar EUNAPOLIS RTR1 BA RB FT RTB 230 kV 7,4 Mvar EUNAPOLIS RTR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$110,521.14
EUNAPOLIS RTB 230 kV 7,4 Mvar EUNAPOLIS RTR1 BA RB FT RTB 230 kV 7,4 Mvar EUNAPOLIS RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$326,141.33
EUNAPOLIS RTB 230 kV 7,4 Mvar EUNAPOLIS RTR1 BA RB FT RTB 230 kV 7,4 Mvar EUNAPOLIS RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$333,763.09
EUNAPOLIS MC 230 kV TR 230/138 kV EUNAPOLIS TR2 BA RBF FT TR 230/138 kV EUNAPOLIS TR2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$476,693.95
EUNAPOLIS IB 138 kV MG 230 kV EUNAPOLIS MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$276,326.68
EUNAPOLIS RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA RB FT RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$331,563.40
EUNAPOLIS RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA RB FT RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA 061/2001 IPCA RMEL REN 643/2014 14/10/2013 13/10/2048  R$35,006.48
EUNAPOLIS RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA RB FT RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$978,424.00
EUNAPOLIS RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA RB FT RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,001,289.28
EUNAPOLIS MG 230 kV EUNAPOLIS MG1 BA RB FT MG 230 kV EUNAPOLIS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$614,308.28
EUNAPOLIS MG 230 kV EUNAPOLIS MG1 BA RB FT MG 230 kV EUNAPOLIS MG1 BA 061/2001 IPCA RMEL REN 643/2014 30/09/2013 29/09/2030  R$26,967.83
EUNAPOLIS MG 230 kV EUNAPOLIS MG1 BA RB FT MG 230 kV EUNAPOLIS MG1 BA 061/2001 IPCA RMEL REN 643/2014 20/12/2015 19/12/2043  R$11,172.72
EUNAPOLIS MG 230 kV EUNAPOLIS MG1 BA RB FT MG 230 kV EUNAPOLIS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,812,787.41
EUNAPOLIS MG 230 kV EUNAPOLIS MG1 BA RB FT MG 230 kV EUNAPOLIS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,855,151.33
EUNAPOLIS MG 230 kV EUNAPOLIS MG1 BA RB FT MG 230 kV EUNAPOLIS MG1 BA 061/2001 IPCA RMEL REN 443/2011 01/03/2016 28/02/2033  R$32,733.26
EUNAPOLIS MG 230 kV EUNAPOLIS MG1 BA RB FT MG 230 kV EUNAPOLIS MG1 BA 061/2001 IPCA RBNI REA 7761/2019 28/07/2020 27/07/2035  R$28,330.18
EUNAPOLIS MC 230 kV TR 230/138 kV EUNAPOLIS TR3 BA  RBF FT TR 230/138 kV EUNAPOLIS TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
EUNAPOLIS MC 230 kV TR 230/138 kV EUNAPOLIS TR2 BA RBF FT TR 230/138 kV EUNAPOLIS TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
EUNAPOLIS MC 230 kV TR 230/138 kV EUNAPOLIS TR2 BA RBF FT TR 230/138 kV EUNAPOLIS TR2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
EUNAPOLIS IB 138 kV MG 230 kV EUNAPOLIS MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$282,784.30
EUNAPOLIS MC 230 kV TR 230/138 kV EUNAPOLIS TR1 BA RBF FT TR 230/138 kV EUNAPOLIS TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
EUNAPOLIS MC 230 kV TR 230/138 kV EUNAPOLIS TR1 BA RBF FT TR 230/138 kV EUNAPOLIS TR1 BA 061/2001 IPCA RBNI REA 4542/2014 24/11/2014 23/11/2044  R$258,865.71
EUNAPOLIS MC 230 kV TR 230/138 kV EUNAPOLIS TR1 BA RBF FT TR 230/138 kV EUNAPOLIS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
EUNAPOLIS MC 230 kV TR 230/138 kV EUNAPOLIS TR1 BA RBF FT TR 230/138 kV EUNAPOLIS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$476,693.95
EUNAPOLIS MC 230 kV RTL 230 kV 11,1 Mvar EUNAPOLIS RT2 BA  RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$99,071.31
EUNAPOLIS MC 230 kV RTL 230 kV 11,1 Mvar EUNAPOLIS RT1 BA  RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$99,071.31
EUNAPOLIS MC 230 kV RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA  RB FT RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$151,491.77
EUNAPOLIS MC 230 kV RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA  RB FT RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$447,043.25
EUNAPOLIS MC 230 kV RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA  RB FT RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$457,490.43
EUNAPOLIS MC 138 kV TR 230/138 kV EUNAPOLIS TR3 BA  RBF FT TR 230/138 kV EUNAPOLIS TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$121,202.15
EUNAPOLIS MC 138 kV TR 230/138 kV EUNAPOLIS TR2 BA RBF FT TR 230/138 kV EUNAPOLIS TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$121,202.15
EUNAPOLIS MC 138 kV TR 230/138 kV EUNAPOLIS TR2 BA RBF FT TR 230/138 kV EUNAPOLIS TR2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$357,660.38
EUNAPOLIS MC 138 kV TR 230/138 kV EUNAPOLIS TR2 BA RBF FT TR 230/138 kV EUNAPOLIS TR2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$366,018.73
EUNAPOLIS MC 138 kV TR 230/138 kV EUNAPOLIS TR1 BA RBF FT TR 230/138 kV EUNAPOLIS TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$121,202.15
EUNAPOLIS MC 138 kV TR 230/138 kV EUNAPOLIS TR1 BA RBF FT TR 230/138 kV EUNAPOLIS TR1 BA 061/2001 IPCA RBNI REA 4542/2014 24/11/2014 23/11/2045  R$242,972.53
EUNAPOLIS MC 138 kV TR 230/138 kV EUNAPOLIS TR1 BA RBF FT TR 230/138 kV EUNAPOLIS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$357,660.38
EUNAPOLIS MC 138 kV TR 230/138 kV EUNAPOLIS TR1 BA RBF FT TR 230/138 kV EUNAPOLIS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$366,018.73
EUNAPOLIS IB 230 kV MG 230 kV EUNAPOLIS MG1 BA IB1 RB FT MG 230 kV EUNAPOLIS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,929.18
EUNAPOLIS IB 230 kV MG 230 kV EUNAPOLIS MG1 BA IB1 RB FT MG 230 kV EUNAPOLIS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$368,658.63
EUNAPOLIS IB 230 kV MG 230 kV EUNAPOLIS MG1 BA IB1 RB FT MG 230 kV EUNAPOLIS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$377,273.99
EUNAPOLIS IB 138 kV MG 230 kV EUNAPOLIS MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$93,640.20
EUNAPOLIS EL 230 kV EUNAPOLIS LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA  RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
EUNAPOLIS EL 230 kV EUNAPOLIS LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA  RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RMEL REN 443/2011 03/04/2016 02/04/2046  R$49,295.86
EUNAPOLIS EL 230 kV EUNAPOLIS LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA  RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
EUNAPOLIS EL 230 kV EUNAPOLIS LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA  RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
EUNAPOLIS EL 230 kV EUNAPOLIS LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA  RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$692,788.80
EUNAPOLIS EL 230 kV EUNAPOLIS LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA  RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
EUNAPOLIS EL 230 kV EUNAPOLIS LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-2 BA RB FT LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-2 BA 018/2009 IPCA RBL CC 018/2009 03/08/2009 03/08/2039  R$761,435.02
EUNAPOLIS EL 138 kV EUNAPOLISDIST2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$545,768.47
EUNAPOLIS EL 230 kV EUNAPOLIS LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA  RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$692,788.80
EUNAPOLIS EL 230 kV EUNAPOLIS LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA  RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RMEL REN 443/2011 20/03/2016 19/03/2046  R$14,449.68
EUNAPOLIS EL 230 kV EUNAPOLIS LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-1 BA RB FT LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-1 BA 014/2008 IPCA RBL CC 014/2008 16/10/2008 16/10/2038  R$255,364.85
EUNAPOLIS EL 138 kV EUNAPOLISDIST3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$180,723.85
EUNAPOLIS EL 138 kV EUNAPOLISDIST3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$533,305.40
EUNAPOLIS EL 138 kV EUNAPOLISDIST3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$545,768.47
EUNAPOLIS EL 138 kV EUNAPOLISDIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$180,723.85
EUNAPOLIS EL 138 kV EUNAPOLISDIST2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$533,305.40
EUNAPOLIS EL 138 kV EUNAPOLISDIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$180,723.85
EUNAPOLIS EL 138 kV EUNAPOLISDIST1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$533,305.40
EUNAPOLIS EL 138 kV EUNAPOLISDIST1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$545,768.47
EXTREMOZ II MG 230 kV EXTREMOZ II MG2 RN RB FT MG 230 kV EXTREMOZ II MG2 RN 061/2001 IPCA RBNI REA 3208/2011 09/12/2019 09/12/2052  R$113,808.88
EXTREMOZ II MG 230 kV EXTREMOZ II MG1 RN RB FT MG 230 kV EXTREMOZ II MG1 RN 019/2010 IPCA RBL CC 019/2010 17/02/2014 23/11/2040  R$537,491.09
EXTREMOZ II MG 230 kV EXTREMOZ II MG1 RN RB FT MG 230 kV EXTREMOZ II MG1 RN 019/2010 IPCA RMEL REN 643/2014 31/03/2015 30/03/2030  R$81,302.72
EXTREMOZ II MG 230 kV EXTREMOZ II MG1 RN RB FT MG 230 kV EXTREMOZ II MG1 RN 019/2010 IPCA RBNI REN 443/2011 16/05/2016 15/05/2047  R$15,638.21
EXTREMOZ II MG 230 kV EXTREMOZ II MG1 RN RB FT MG 230 kV EXTREMOZ II MG1 RN 019/2010 IPCA RBNI REA 8314/2019 31/08/2018 30/08/2033  R$6,784.64
EXTREMOZ II MC 230 kV CE 150/-75 Mvar EXTREMOZ II CE1 RN  RB FT CE 150/-75 Mvar EXTREMOZ II CE1 RN 019/2010 IPCA RBL CC 019/2010 17/02/2014 23/11/2040  R$258,832.09
EXTREMOZ II IB 230 kV MG 230 kV EXTREMOZ II MG1 RN IB1 RB FT MG 230 kV EXTREMOZ II MG1 RN 019/2010 IPCA RBL CC 019/2010 17/02/2014 23/11/2040  R$192,399.16
EXTREMOZ II EL 230 kV EXTREMOZ II LT 230 kV EXTREMOZ II /NATAL III C-2 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-2 RN 061/2001 IPCA RBNI REA 3208/2011 06/01/2020 06/01/2049  R$854,257.72
EXTREMOZ II EL 230 kV EXTREMOZ II LT 230 kV EXTREMOZ II /NATAL III C-1 RN  RB FT LT 230 kV EXTREMOZ II /NATAL III C-1 RN 061/2001 IPCA RBNI REA 10141/2021 15/08/2016 15/08/2044  R$153,279.46
EXTREMOZ II EL 230 kV EXTREMOZ II LT 230 kV CEARA MIRIM II /EXTREMOZ II C-2 RN RB FT LT 230 kV CEARA MIRIM II /EXTREMOZ II C-2 RN 019/2010 IPCA RBL CC 019/2010 17/02/2014 23/11/2040  R$358,058.93
EXTREMOZ II EL 230 kV EXTREMOZ II LT 230 kV CEARA MIRIM II /EXTREMOZ II C-1 RN RB FT LT 230 kV CEARA MIRIM II /EXTREMOZ II C-1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041  R$295,712.91
EXTREMOZ II EL 230 kV EXTREMOZ II LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN 061/2001 IPCA RBNI REA 3208/2011 06/01/2020 06/01/2049  R$854,257.72
EXTREMOZ II EL 230 kV EXTREMOZ II LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN 061/2001 IPCA RBNI REA 10226/2021 27/01/2017 26/01/2045  R$153,279.46
EXTREMOZ II EL 230 kV EXTREMOZ II LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN  RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN 061/2001 IPCA RBNI REA 10141/2021 15/08/2016 15/08/2044  R$153,279.46
EXTREMOZ II CE 150/-75 Mvar EXTREMOZ II CE1 RN RB FT CE 150/-75 Mvar EXTREMOZ II CE1 RN 019/2010 IPCA RBL CC 019/2010 17/02/2014 23/11/2040  R$ 5,033,675.33
FEIRA DE SANTANA III MG 230 kV FEIRA DE SANTANA III MG2 BA RB FT MG 230 kV FEIRA DE SANTANA III MG2 BA 061/2001 IPCA RBNI DSP 337/2023 01/07/2023 25/09/2053  R$20,103.70
FEIRA DE SANTANA III MG 230 kV FEIRA DE SANTANA III MG2 BA RB FT MG 230 kV FEIRA DE SANTANA III MG2 BA 061/2001 IPCA RBNI DSP 337/2023 01/07/2023 25/09/2053  R$20,103.70
FEIRA DE SANTANA III EL 230 kV FEIRA DE SANTANA III LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA C-2 BA RB FT LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA C-2 BA 061/2001 IPCA RBNI DSP 337/2023 01/07/2023 25/09/2050  R$205,702.01
FEIRA DE SANTANA III EL 230 kV FEIRA DE SANTANA III LT 230 kV CAMACARI II /FEIRA DE SANTANA III C-2 BA RB FT LT 230 kV CAMACARI II /FEIRA DE SANTANA III C-2 BA 061/2001 IPCA RBNI DSP 337/2023 01/07/2023 25/09/2050  R$205,702.01
FLORESTA II MG 230 kV FLORESTA II MG1 PE RB FT MG 230 kV FLORESTA II MG1 PE 061/2001 IPCA RBNI REA 10264/2021 05/04/2019 04/04/2037  R$53,199.30
FLORESTA II MG 230 kV FLORESTA II MG1 PE RB FT MG 230 kV FLORESTA II MG1 PE 061/2001 IPCA RBNI REA 10264/2021 05/04/2019 04/04/2050  R$56,608.73
FLORESTA II IB 230 kV MG 230 kV FLORESTA II MG1 PE IB1 RB FT MG 230 kV FLORESTA II MG1 PE 061/2001 IPCA RBNI REA 10264/2021 05/04/2019 04/04/2048  R$108,297.35
FLORESTA II EL 230 kV FLORESTA II LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE  RB FT LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE 061/2001 IPCA RBNI REA 10264/2021 05/04/2019 04/04/2047  R$153,279.46
FLORESTA II EL 230 kV FLORESTA II LT 230 kV FLORESTA II /BOM NOME C-1 PE  RB FT LT 230 kV FLORESTA II /BOM NOME C-1 PE 061/2001 IPCA RBNI REA 10264/2021 05/04/2019 04/04/2047  R$153,279.46
FORTALEZA TT 69/13,8 kV FORTALEZA TA2 CE DIT   061/2001 IPCA RCDM REA 3578/2012 27/11/2016 26/11/2046  R$231,060.67
FORTALEZA TT 69/13,8 kV FORTALEZA TA1 CE DIT   061/2001 IPCA RCDM REA 3578/2012 27/11/2016 26/11/2046  R$231,060.67
FORTALEZA TR 230/69000 kV FORTALEZA TR5 CE RBF FT TR 230/69 kV FORTALEZA TR5 CE 061/2001 IPCA RBNI REA 6043/2016 03/03/2023 03/03/2057  R$ 1,440,381.22
FORTALEZA TR 230/69 kV FORTALEZA TR4 CE RBF FT TR 230/69 kV FORTALEZA TR4 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
FORTALEZA TR 230/69 kV FORTALEZA TR4 CE RBF FT TR 230/69 kV FORTALEZA TR4 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
FORTALEZA TR 230/69 kV FORTALEZA TR3 CE RBF FT TR 230/69 kV FORTALEZA TR3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
FORTALEZA TR 230/69 kV FORTALEZA TR3 CE RBF FT TR 230/69 kV FORTALEZA TR3 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
FORTALEZA TR 230/69 kV FORTALEZA TR2 CE RBF FT TR 230/69 kV FORTALEZA TR2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
FORTALEZA TR 230/69 kV FORTALEZA TR2 CE RBF FT TR 230/69 kV FORTALEZA TR2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
FORTALEZA TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
FORTALEZA TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
FORTALEZA TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
FORTALEZA RTL 230 kV 10 Mvar FORTALEZA RT4 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,656.08
FORTALEZA RTL 230 kV 10 Mvar FORTALEZA RT2 CE RB FT RTL 230 kV 10 Mvar FORTALEZA RT2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,656.08
FORTALEZA RTL 230 kV 10 Mvar FORTALEZA RT1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,656.08
FORTALEZA RTL 230 kV 10 Mvar FORTALEZA RT3 CE RB FT LT 230 kV BANABUIU /FORTALEZA C-3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,656.08
FORTALEZA RTL 230 kV 10 Mvar FORTALEZA RT1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$521,301.65
FORTALEZA RTL 230 kV 10 Mvar FORTALEZA RT1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$533,484.21
FORTALEZA MG 230 kV FORTALEZA MG1 CE RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$824,810.58
FORTALEZA MG 230 kV FORTALEZA MG1 CE RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RMEL REN 643/2014 30/06/2015 29/06/2043  R$75,587.24
FORTALEZA RTB 230 kV 3,33 Mvar FORTALEZA RTR1 CE RB FT RTB 230 kV 3,33 Mvar FORTALEZA RTR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$58,820.58
FORTALEZA RTB 230 kV 10 Mvar FORTALEZA RT5 CE RB FT RTB 230 kV 10 Mvar FORTALEZA RT5 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,656.08
FORTALEZA RTB 230 kV 10 Mvar FORTALEZA RT5 CE RB FT RTB 230 kV 10 Mvar FORTALEZA RT5 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$521,301.65
FORTALEZA RTB 13,8 kV 5 Mvar FORTALEZA RT2 CE RBF FT RTB 13,8 kV 5 Mvar FORTALEZA RT2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$135,222.37
FORTALEZA RTB 13,8 kV 10 Mvar FORTALEZA RT1 CE RBF FT RTB 13,8 kV 10 Mvar FORTALEZA RT1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$154,914.54
FORTALEZA MG 230 kV FORTALEZA MG1 CE RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RBNI REA 6043/2016 03/03/2023 03/03/2055  R$69,916.35
FORTALEZA MG 230 kV FORTALEZA MG1 CE RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RBNI REA 6043/2016 03/03/2023 03/03/2054  R$55,414.85
FORTALEZA MG 230 kV FORTALEZA MG1 CE RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RMEL REN 443/2011 10/10/2016 09/10/2033  R$33,629.85
FORTALEZA MC 69 kV TR 230/69000 kV FORTALEZA TR5 CE RBF FT TR 230/69 kV FORTALEZA TR5 CE 061/2001 IPCA RBNI REA 6043/2016 03/03/2023 03/03/2046  R$293,541.43
FORTALEZA MG 230 kV FORTALEZA MG1 CE RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,433,967.25
FORTALEZA MG 230 kV FORTALEZA MG1 CE RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,490,847.83
FORTALEZA MG 230 kV FORTALEZA MG1 CE RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RMEL REN 443/2011 23/07/2016 22/07/2033  R$36,795.75
FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR4 CE  RBF FT TR 230/69 kV FORTALEZA TR4 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
FORTALEZA MG 230 kV FORTALEZA MG1 CE RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RMEL REN 443/2011 01/08/2016 31/07/2046  R$13,958.08
FORTALEZA MC 69 kV TT 69/13,8 kV FORTALEZA TA2 CE  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
FORTALEZA MC 69 kV TT 69/13,8 kV FORTALEZA TA1 CE  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
FORTALEZA MC 69 kV TT 69/13,8 kV FORTALEZA TA1 CE  DIT   061/2001 IPCA RCDM REA 2040/2009 03/01/2014 02/01/2045  R$27,534.81
FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR3 CE RBF FT TR 230/69 kV FORTALEZA TR3 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR4 CE  RBF FT TR 230/69 kV FORTALEZA TR4 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR3 CE RBF FT TR 230/69 kV FORTALEZA TR3 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$204,189.21
FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR4 CE  RBF FT TR 230/69 kV FORTALEZA TR4 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$204,189.21
FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR3 CE RBF FT TR 230/69 kV FORTALEZA TR3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR2 CE  RBF FT TR 230/69 kV FORTALEZA TR2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR2 CE  RBF FT TR 230/69 kV FORTALEZA TR2 CE 061/2001 IPCA RBNI REA 2040/2009 30/01/2013 29/01/2043  R$8,561.14
FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR3 CE RBF FT TR 230/69 kV FORTALEZA TR3 CE 061/2001 IPCA RBNI REA 2040/2009 16/03/2014 15/03/2044  R$34,383.86
FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR2 CE  RBF FT TR 230/69 kV FORTALEZA TR2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR2 CE  RBF FT TR 230/69 kV FORTALEZA TR2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$204,189.21
FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC6 CE  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC6 CE  DIT   061/2001 IPCA RCDM REA 2040/2009 08/03/2013 07/03/2043  R$8,587.52
FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RBNI REA 2040/2009 30/01/2013 29/01/2043  R$8,561.14
FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$204,189.21
FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RMEL REN 443/2011 16/12/2017 15/12/2045  R$7,266.48
FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RMEL REN 443/2011 16/12/2017 15/12/2045  R$7,266.48
FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RMEL REN 443/2011 16/12/2017 15/12/2045  R$7,266.48
FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC5 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
FORTALEZA MC 230 kV TR 230/69000 kV FORTALEZA TR5 CE RBF FT TR 230/69 kV FORTALEZA TR5 CE 061/2001 IPCA RBNI REA 6043/2016 03/03/2023 03/03/2046  R$686,503.28
FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC6 CE  DIT   061/2001 IPCA RMEL REN 643/2014 14/07/2014 13/07/2044  R$12,926.55
FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC6 CE  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC6 CE  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$235,271.08
FORTALEZA MC 230 kV TR 230/69 kV FORTALEZA TR4 CE  RBF FT TR 230/69 kV FORTALEZA TR4 CE 061/2001 IPCA RBNI REA 2244/2010 05/09/2014 04/09/2046  R$121,809.37
FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC5 CE DIT   061/2001 IPCA RCDM REA 2040/2009 08/03/2013 07/03/2043  R$8,587.52
FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC5 CE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC5 CE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$235,271.08
FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC5 CE DIT   061/2001 IPCA RMEL REN 443/2011 30/06/2016 29/06/2046  R$9,108.60
FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC5 CE DIT   061/2001 IPCA RMEL REN 443/2011 30/06/2016 29/06/2046  R$9,108.60
FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC5 CE DIT   061/2001 IPCA RMEL REN 443/2011 30/06/2016 29/06/2046  R$9,108.60
FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC4 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC4 CE DIT   061/2001 IPCA RCDM REA 2040/2009 30/01/2013 29/01/2043  R$8,561.14
FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC4 CE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC4 CE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$235,271.08
FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC4 CE DIT   061/2001 IPCA RMEL REN 443/2011 01/07/2016 30/06/2046  R$9,109.30
FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC4 CE DIT   061/2001 IPCA RMEL REN 443/2011 01/07/2016 30/06/2046  R$9,109.30
FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC4 CE DIT   061/2001 IPCA RMEL REN 443/2011 01/07/2016 30/06/2046  R$9,109.30
FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC3 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC3 CE DIT   061/2001 IPCA RCDM REA 2040/2009 30/01/2013 29/01/2043  R$8,561.14
FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC3 CE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC3 CE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$235,271.08
FORTALEZA MC 230 kV TR 230/69 kV FORTALEZA TR4 CE  RBF FT TR 230/69 kV FORTALEZA TR4 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
FORTALEZA MC 230 kV TR 230/69 kV FORTALEZA TR3 CE RBF FT TR 230/69 kV FORTALEZA TR3 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$476,693.95
FORTALEZA MC 230 kV TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
FORTALEZA MC 230 kV TR 230/69 kV FORTALEZA TR3 CE RBF FT TR 230/69 kV FORTALEZA TR3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
FORTALEZA MC 230 kV TR 230/69 kV FORTALEZA TR3 CE RBF FT TR 230/69 kV FORTALEZA TR3 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
FORTALEZA MC 230 kV TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
FORTALEZA MC 230 kV TR 230/69 kV FORTALEZA TR2 CE  RBF FT TR 230/69 kV FORTALEZA TR2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
FORTALEZA MC 230 kV TR 230/69 kV FORTALEZA TR2 CE  RBF FT TR 230/69 kV FORTALEZA TR2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
FORTALEZA MC 230 kV TR 230/69 kV FORTALEZA TR2 CE  RBF FT TR 230/69 kV FORTALEZA TR2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$476,693.95
FORTALEZA MC 230 kV RTL 230 kV 10 Mvar FORTALEZA RT4 CE  RB FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$99,071.31
FORTALEZA MC 230 kV RTL 230 kV 10 Mvar FORTALEZA RT3 CE  RB FT LT 230 kV BANABUIU /FORTALEZA C-3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$99,071.31
FORTALEZA MC 230 kV TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$476,693.95
FORTALEZA MC 230 kV RTL 230 kV 10 Mvar FORTALEZA RT1 CE  RB FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$99,071.31
FORTALEZA MC 230 kV BC 230 kV 50,5 MVAr FORTALEZA BC1 CE  RB FT BC 230 kV 50,5 MVAr FORTALEZA BC1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$530,690.67
FORTALEZA MC 230 kV RTL 230 kV 10 Mvar FORTALEZA RT3 CE  RB FT LT 230 kV BANABUIU /FORTALEZA C-3 CE 061/2001 IPCA RMEL REN 443/2011 25/01/2016 24/01/2046  R$16,345.84
FORTALEZA MC 230 kV RTL 230 kV 10 Mvar FORTALEZA RT3 CE  RB FT LT 230 kV BANABUIU /FORTALEZA C-3 CE 061/2001 IPCA RMEL REN 443/2011 25/01/2016 24/01/2046  R$16,345.84
FORTALEZA MC 230 kV RTL 230 kV 10 Mvar FORTALEZA RT2 CE  RB FT RTL 230 kV 10 Mvar FORTALEZA RT2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$99,071.31
FORTALEZA MC 230 kV BC 230 kV 50,5 MVAr FORTALEZA BC1 CE  RB FT BC 230 kV 50,5 MVAr FORTALEZA BC1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$543,092.64
FORTALEZA MC 230 kV RTB 230 kV 10 Mvar FORTALEZA RT5 CE  RB FT RTB 230 kV 10 Mvar FORTALEZA RT5 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$151,491.77
FORTALEZA MC 230 kV CE 100/-70 MvAr FORTALEZA CE1 CE CE2 RB FT CE 100/-70 MvAr FORTALEZA CE1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$163,065.57
FORTALEZA MC 230 kV BC 230 kV 50,5 MVAr FORTALEZA BC1 CE  RB FT BC 230 kV 50,5 MVAr FORTALEZA BC1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$179,837.78
FORTALEZA MC 13,8 kV TR 230/69 kV FORTALEZA TR4 CE  RBF FT TR 230/69 kV FORTALEZA TR4 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
FORTALEZA MC 13,8 kV TR 230/69 kV FORTALEZA TR3 CE RBF FT TR 230/69 kV FORTALEZA TR3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
FORTALEZA MC 13,8 kV RTB 13,8 kV 5 Mvar FORTALEZA RT2 CE  RBF FT RTB 13,8 kV 5 Mvar FORTALEZA RT2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,511.84
FORTALEZA MC 13,8 kV BC 13,8 kV 3,1 MVAr FORTALEZA BC9 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC9 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
FORTALEZA MC 13,8 kV BC 13,8 kV 3,1 MVAr FORTALEZA BC8 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC8 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
FORTALEZA MC 13,8 kV RTB 13,8 kV 10 Mvar FORTALEZA RT1 CE  RBF FT RTB 13,8 kV 10 Mvar FORTALEZA RT1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,511.84
FORTALEZA MC 13,8 kV BC 13,8 kV 3,1 MVAr FORTALEZA BC12 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC12 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
FORTALEZA IB 69 kV MG 230 kV FORTALEZA MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
FORTALEZA MC 13,8 kV BC 13,8 kV 3,1 MVAr FORTALEZA BC7 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC7 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
FORTALEZA IB 230 kV MG 230 kV FORTALEZA MG1 CE IB1 RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$368,658.63
FORTALEZA MC 13,8 kV BC 13,8 kV 3,1 MVAr FORTALEZA BC11 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC11 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
FORTALEZA MC 13,8 kV BC 13,8 kV 3,1 MVAr FORTALEZA BC10 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC10 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
FORTALEZA IB 230 kV MG 230 kV FORTALEZA MG1 CE IB1 RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$377,273.99
FORTALEZA IB 69 kV MG 230 kV FORTALEZA MG1 CE IB1 DIT   061/2001 IPCA RCDM REA 2040/2009 30/01/2013 29/01/2043  R$17,122.28
FORTALEZA IB 69 kV MG 230 kV FORTALEZA MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$134,104.45
FORTALEZA IB 69 kV MG 230 kV FORTALEZA MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$137,238.41
FORTALEZA IB 230 kV MG 230 kV FORTALEZA MG1 CE IB3 RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,929.18
FORTALEZA IB 230 kV MG 230 kV FORTALEZA MG1 CE IB2 RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,929.18
FORTALEZA IB 230 kV MG 230 kV FORTALEZA MG1 CE IB1 RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,929.18
FORTALEZA EL 69 kV FORTALEZATBM 02J5 DIT   061/2001 IPCA RCDM REA 2040/2009 24/05/2013 23/05/2043  R$22,386.67
FORTALEZA EL 69 kV FORTALEZATBM 02J5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
FORTALEZA IB 13,8 kV MG 230 kV FORTALEZA MG1 CE IB2 RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC9 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$30,025.46
FORTALEZA IB 13,8 kV MG 230 kV FORTALEZA MG1 CE IB2 RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC9 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$88,603.37
FORTALEZA IB 13,8 kV MG 230 kV FORTALEZA MG1 CE IB1 RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC8 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$30,025.46
FORTALEZA IB 13,8 kV MG 230 kV FORTALEZA MG1 CE IB1 RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC8 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$88,603.37
FORTALEZA EL 69 kV FORTALEZATBM 02J5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
FORTALEZA EL 69 kV FORTALEZATBM 02J5 DIT   061/2001 IPCA RCDM REA 2040/2009 24/05/2013 23/05/2044  R$85,045.89
FORTALEZA EL 69 kV FORTALEZATBM 02J5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
FORTALEZA EL 69 kV FORTALEZAPARANGABA 02J8 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
FORTALEZA EL 69 kV FORTALEZAPARANGABA 02J8 DIT   061/2001 IPCA RCDM REA 2040/2009 26/08/2013 25/08/2044  R$27,255.98
FORTALEZA EL 69 kV FORTALEZATBM 02J5 DIT   061/2001 IPCA RMEL REN 443/2011 29/11/2015 28/11/2038  R$7,149.91
FORTALEZA EL 69 kV FORTALEZAPARANGABA 02J8 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
FORTALEZA EL 69 kV FORTALEZAPARANGABA 02J7 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
FORTALEZA EL 69 kV FORTALEZAPARANGABA 02J7 DIT   061/2001 IPCA RCDM REA 2040/2009 30/01/2013 29/01/2043  R$17,122.28
FORTALEZA EL 69 kV FORTALEZAPARANGABA 02J8 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
FORTALEZA EL 69 kV FORTALEZAPARANGABA 02J7 DIT   061/2001 IPCA RCDM REA 2040/2009 30/04/2014 29/04/2044  R$23,004.05
FORTALEZA EL 69 kV FORTALEZAPARANGABA 02J7 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
FORTALEZA EL 69 kV FORTALEZAMONDUBIM 02J6 DIT   061/2001 IPCA RCDM REA 2040/2009 06/09/2013 05/09/2043  R$22,576.77
FORTALEZA EL 69 kV FORTALEZAPARANGABA 02J7 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
FORTALEZA EL 69 kV FORTALEZAMONDUBIM 02J6 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
FORTALEZA EL 69 kV FORTALEZAMONDUBIM 02J6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
FORTALEZA EL 69 kV FORTALEZAMONDUBIM 02J6 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
FORTALEZA EL 69 kV FORTALEZAMONDUBIM 02J6 DIT   061/2001 IPCA RMEL REN 443/2011 29/11/2015 28/11/2038  R$7,149.91
FORTALEZA EL 69 kV FORTALEZAMESSEJANA 02J2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
FORTALEZA EL 69 kV FORTALEZAMESSEJANA 02J2 DIT   061/2001 IPCA RCDM REA 2040/2009 15/03/2014 14/03/2045  R$109,959.40
FORTALEZA EL 69 kV FORTALEZAMESSEJANA 02J2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
FORTALEZA EL 69 kV FORTALEZAMESSEJANA 02J2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
FORTALEZA EL 69 kV FORTALEZAMESSEJANA 02J2 DIT   061/2001 IPCA RMEL REN 443/2011 29/11/2015 28/11/2038  R$7,149.91
FORTALEZA EL 69 kV FORTALEZAJABOTI 02N1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
FORTALEZA EL 69 kV FORTALEZAJABOTI 02N1 DIT   061/2001 IPCA RCDM REA 2040/2009 17/01/2014 16/01/2045  R$27,564.84
FORTALEZA EL 69 kV FORTALEZAJABOTI 02N1 DIT   061/2001 IPCA RCDM REA 2040/2009 27/01/2014 26/01/2045  R$59,134.85
FORTALEZA EL 69 kV FORTALEZAJABOTI 02N1 DIT   061/2001 IPCA RCDM REA 6043/2016 03/03/2023 03/03/2046  R$91,996.45
FORTALEZA EL 69 kV FORTALEZAJABOTI 02N1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
FORTALEZA EL 69 kV FORTALEZAJABOTI 02N1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
FORTALEZA EL 69 kV FORTALEZAJABOTI 02J1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
FORTALEZA EL 69 kV FORTALEZAJABOTI 02J1 DIT   061/2001 IPCA RCDM REA 2040/2009 22/09/2013 21/09/2043  R$22,605.73
FORTALEZA EL 69 kV FORTALEZAJABOTI 02J1 DIT   061/2001 IPCA RCDM REA 2040/2009 23/09/2013 22/09/2044  R$85,869.99
FORTALEZA EL 69 kV FORTALEZAJABOTI 02J1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
FORTALEZA EL 69 kV FORTALEZAJABOTI 02J1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
FORTALEZA EL 69 kV FORTALEZAJABOTI 02J1 DIT   061/2001 IPCA RMEL REN 443/2011 29/11/2015 28/11/2038  R$4,766.61
FORTALEZA EL 69 kV FORTALEZADISTRITO 02J9 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
FORTALEZA EL 69 kV FORTALEZADISTRITO 02J9 DIT   061/2001 IPCA RCDM REA 2040/2009 06/12/2013 05/12/2044  R$31,420.35
FORTALEZA EL 69 kV FORTALEZADISTRITO 02J9 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
FORTALEZA EL 69 kV FORTALEZADISTR. II 02L4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
FORTALEZA EL 69 kV FORTALEZADISTRITO 02J9 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
FORTALEZA EL 69 kV FORTALEZADISTR. II 02L4 DIT   061/2001 IPCA RCDM REA 2040/2009 24/11/2013 23/11/2043  R$34,079.70
FORTALEZA EL 69 kV FORTALEZADISTR. II 02L4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
FORTALEZA EL 69 kV FORTALEZADISTR. II 02L4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
FORTALEZA EL 69 kV FORTALEZADISTR. II 02L3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
FORTALEZA EL 69 kV FORTALEZADISTR. II 02L3 DIT   061/2001 IPCA RCDM REA 2040/2009 30/01/2013 29/01/2043  R$17,122.28
FORTALEZA EL 69 kV FORTALEZADISTR. II 02L3 DIT   061/2001 IPCA RCDM REA 2040/2009 08/03/2013 07/03/2044  R$30,747.37
FORTALEZA EL 69 kV FORTALEZADISTR. II 02L3 DIT   061/2001 IPCA RCDM REA 2040/2009 28/11/2013 27/11/2043  R$34,090.56
FORTALEZA EL 69 kV FORTALEZADISTR. II 02L3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
FORTALEZA EL 69 kV FORTALEZADISTR. II 02L3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
FORTALEZA EL 69 kV FORTALEZAD. GOUVEIA 02J4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
FORTALEZA EL 69 kV FORTALEZAD. GOUVEIA 02J4 DIT   061/2001 IPCA RCDM REA 2040/2009 01/06/2013 31/05/2044  R$85,099.92
FORTALEZA EL 69 kV FORTALEZAD. GOUVEIA 02J4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
FORTALEZA EL 69 kV FORTALEZAD. GOUVEIA 02J4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
FORTALEZA EL 69 kV FORTALEZAD. GOUVEIA 02J4 DIT   061/2001 IPCA RMEL REN 443/2011 29/11/2015 28/11/2038  R$7,149.91
FORTALEZA EL 69 kV FORTALEZAD. GOUVEIA 02J3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
FORTALEZA EL 69 kV FORTALEZAD. GOUVEIA 02J3 DIT   061/2001 IPCA RCDM REA 2040/2009 30/04/2013 29/04/2044  R$54,005.75
FORTALEZA EL 69 kV FORTALEZAD. GOUVEIA 02J3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
FORTALEZA EL 69 kV FORTALEZAD. GOUVEIA 02J3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
FORTALEZA EL 69 kV FORTALEZAD. GOUVEIA 02J3 DIT   061/2001 IPCA RMEL REN 443/2011 29/11/2015 28/11/2038  R$7,149.91
FORTALEZA EL 69 kV FORTALEZACOLUNA 02L2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
FORTALEZA EL 69 kV FORTALEZACOLUNA 02L2 DIT   061/2001 IPCA RCDM REA 2040/2009 17/11/2013 16/11/2043  R$34,060.70
FORTALEZA EL 69 kV FORTALEZACOLUNA 02L2 DIT   061/2001 IPCA RCDM REA 2040/2009 19/12/2013 18/12/2044  R$86,457.70
FORTALEZA EL 69 kV FORTALEZACOLUNA 02L1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
FORTALEZA EL 69 kV FORTALEZACOLUNA 02L1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
FORTALEZA EL 69 kV FORTALEZACOLUNA 02L2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
FORTALEZA EL 69 kV FORTALEZACOLUNA 02L2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
FORTALEZA EL 69 kV FORTALEZACOLUNA 02L1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
FORTALEZA EL 69 kV FORTALEZACOLUNA 02L1 DIT   061/2001 IPCA RCDM REA 2040/2009 03/01/2014 02/01/2045  R$55,069.63
FORTALEZA EL 69 kV FORTALEZACOLUNA 02L1 DIT   061/2001 IPCA RCDM REA 2040/2009 02/11/2013 01/11/2043  R$11,339.97
FORTALEZA EL 69 kV FORTALEZACOLUNA 02L1 DIT   061/2001 IPCA RCDM REA 2040/2009 02/11/2013 01/11/2043  R$22,679.96
FORTALEZA EL 69 kV FORTALEZACOLUNA 02L1 DIT   061/2001 IPCA RCDM REA 6043/2016 03/03/2023 03/03/2046  R$91,996.45
FORTALEZA EL 230 kV FORTALEZA LT 230 kV FORTALEZA /FORTALEZA II C-3 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
FORTALEZA EL 230 kV FORTALEZA LT 230 kV FORTALEZA /FORTALEZA II C-3 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE 061/2001 IPCA RBNI REA 2040/2009 24/04/2014 23/04/2044  R$42,283.32
FORTALEZA EL 230 kV FORTALEZA LT 230 kV FORTALEZA /FORTALEZA II C-2 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
FORTALEZA EL 230 kV FORTALEZA LT 230 kV FORTALEZA /FORTALEZA II C-2 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE 061/2001 IPCA RBNI REA 2040/2009 24/04/2014 23/04/2044  R$42,283.32
FORTALEZA EL 230 kV FORTALEZA LT 230 kV FORTALEZA /FORTALEZA II C-2 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE 061/2001 IPCA RBNI REA 2837/2011 06/05/2021 05/05/2054  R$300,164.37
FORTALEZA BC 69 kV 20,3 Mvar FORTALEZA BC6 CE DIT   061/2001 IPCA RMEL REN 643/2014 19/09/2014 18/09/2040  R$280,488.81
FORTALEZA BC 69 kV 20,3 Mvar FORTALEZA BC5 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$116,409.25
FORTALEZA EL 230 kV FORTALEZA LT 230 kV FORTALEZA /FORTALEZA II C-1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
FORTALEZA EL 230 kV FORTALEZA LT 230 kV FORTALEZA /FORTALEZA II C-1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE 061/2001 IPCA RBNI REA 2040/2009 24/04/2014 23/04/2044  R$42,283.32
FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE 061/2001 IPCA RBNI REA 2823/2011 29/07/2019 28/07/2048  R$562,384.82
FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE 061/2001 IPCA RBNI REA 2823/2011 02/10/2020 02/10/2049  R$555,023.14
FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE 061/2001 IPCA RBNI REA 3631/2012 27/08/2021 27/08/2046  R$280,470.59
FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE  RB FT LT 230 kV BANABUIU /FORTALEZA C-3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE  RB FT LT 230 kV BANABUIU /FORTALEZA C-3 CE 061/2001 IPCA RMEL REN 643/2014 31/08/2015 30/08/2045  R$22,326.85
FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE  RB FT LT 230 kV BANABUIU /FORTALEZA C-3 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE 061/2001 IPCA RBNI REA 2244/2010 05/09/2014 04/09/2034  R$ 603.84
FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE 061/2001 IPCA RBNI REA 2823/2011 02/10/2020 02/10/2049  R$562,384.82
FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$692,788.80
FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE 061/2001 IPCA RMEL REN 443/2011 25/06/2017 24/06/2047  R$19,382.41
FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE 061/2001 IPCA RMEL REN 443/2011 25/06/2017 24/06/2047  R$2,215.27
FORTALEZA CE 100/-70 Mvar FORTALEZA CE2 CE RB FT CE 100/-70 MvAr FORTALEZA CE1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,430,081.54
FORTALEZA CE 100/-70 Mvar FORTALEZA CE2 CE RB FT CE 100/-70 MvAr FORTALEZA CE1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 7,171,026.94
FORTALEZA CE 100/-70 MvAr FORTALEZA CE1 CE RB FT CE 100/-70 MvAr FORTALEZA CE1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,430,081.54
FORTALEZA BC 69 kV 20,3 Mvar FORTALEZA BC6 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$116,409.25
FORTALEZA II RTL 500 kV 148 MVAr FORTALEZA II RT2 CE RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,452,566.68
FORTALEZA II RTL 500 kV 148 MVAr FORTALEZA II RT2 CE RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,509,881.92
FORTALEZA BC 69 kV 20,3 Mvar FORTALEZA BC5 CE DIT   061/2001 IPCA RMEL REN 643/2014 26/09/2014 25/09/2040  R$280,664.71
FORTALEZA BC 69 kV 20,3 Mvar FORTALEZA BC4 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$116,409.25
FORTALEZA BC 69 kV 20,3 Mvar FORTALEZA BC4 CE DIT   061/2001 IPCA RMEL REN 643/2014 19/09/2014 18/09/2040  R$280,488.81
FORTALEZA BC 69 kV 20,3 Mvar FORTALEZA BC3 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$116,409.25
FORTALEZA BC 69 kV 20,3 Mvar FORTALEZA BC3 CE DIT   061/2001 IPCA RMEL REN 643/2014 19/09/2014 18/09/2040  R$280,488.81
FORTALEZA BC 230 kV 50,5 MVAr FORTALEZA BC1 CE RB FT BC 230 kV 50,5 MVAr FORTALEZA BC1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,671.37
FORTALEZA BC 230 kV 50,5 MVAr FORTALEZA BC1 CE RB FT BC 230 kV 50,5 MVAr FORTALEZA BC1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$609,874.99
FORTALEZA BC 230 kV 50,5 MVAr FORTALEZA BC1 CE RB FT BC 230 kV 50,5 MVAr FORTALEZA BC1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$624,127.46
FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC9 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC9 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC9 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC9 CE 061/2001 IPCA RMEL REN 643/2014 12/09/2014 11/09/2028  R$8,924.07
FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC8 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC8 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC8 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC8 CE 061/2001 IPCA RMEL REN 643/2014 05/09/2014 04/09/2028  R$8,914.93
FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC7 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC7 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC7 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC7 CE 061/2001 IPCA RMEL REN 643/2014 05/09/2014 04/09/2028  R$8,914.93
FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC12 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC12 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC12 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC12 CE 061/2001 IPCA RMEL REN 643/2014 19/09/2014 18/09/2028  R$8,933.20
FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC11 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC11 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC11 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC11 CE 061/2001 IPCA RMEL REN 643/2014 12/09/2014 11/09/2028  R$8,924.07
FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC10 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC10 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC10 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC10 CE 061/2001 IPCA RMEL REN 643/2014 12/09/2014 11/09/2028  R$8,924.07
FORTALEZA II TR 500/230 kV FORTALEZA II TRR1 CE RB FT TR 500/230 kV FORTALEZA II TRR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$671,320.56
FORTALEZA II TR 500/230 kV FORTALEZA II TRR1 CE RB FT TR 500/230 kV FORTALEZA II TRR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,981,027.26
FORTALEZA II TR 500/230 kV FORTALEZA II TRR1 CE RB FT TR 500/230 kV FORTALEZA II TRR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,027,322.87
FORTALEZA II TR 500/230 kV FORTALEZA II TR4 CE RB FT TR 500/230 kV FORTALEZA II TR4 CE 061/2001 IPCA RBNI REA 5211/2015 07/05/2017 06/05/2052  R$ 5,681,921.98
FORTALEZA II TR 500/230 kV FORTALEZA II TR3 CE RB FT TR 500/230 kV FORTALEZA II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,013,961.67
FORTALEZA II TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,013,961.67
FORTALEZA II TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RMEL REN 643/2014 13/10/2013 12/10/2047  R$77,206.78
FORTALEZA II TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,943,081.78
FORTALEZA II TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 6,081,968.60
FORTALEZA II TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,013,961.67
FORTALEZA II TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RMEL REN 643/2014 20/10/2013 19/10/2047  R$57,933.73
FORTALEZA II TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,943,081.78
FORTALEZA II TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 6,081,968.60
FORTALEZA II RTL 500 kV 148 MVAr FORTALEZA II RT2 CE RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$831,113.46
FORTALEZA II RTL 500 kV 148 MVAr FORTALEZA II RT2 CE RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RMEL REN 643/2014 17/10/2013 16/10/2048  R$32,147.77
FORTALEZA II RTL 500 kV 148 MVAr FORTALEZA II RT1 CE RB FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$831,113.46
FORTALEZA II RTL 500 kV 148 MVAr FORTALEZA II RT1 CE RB FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE 061/2001 IPCA RMEL REN 643/2014 18/10/2013 17/10/2048  R$46,087.30
FORTALEZA II RTL 500 kV 148 MVAr FORTALEZA II RT1 CE RB FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE 061/2001 IPCA RMEL REN 443/2011 20/03/2016 19/03/2046  R$56,829.09
FORTALEZA II RTB 500 kV 60 MVAr FORTALEZA II RTR1 CE RB FT RTB 500 kV 60 MVAr FORTALEZA II RTR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$294,317.25
FORTALEZA II RTB 500 kV 60 MVAr FORTALEZA II RTR1 CE RB FT RTB 500 kV 60 MVAr FORTALEZA II RTR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$868,512.81
FORTALEZA II RTB 500 kV 60 MVAr FORTALEZA II RTR1 CE RB FT RTB 500 kV 60 MVAr FORTALEZA II RTR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$888,809.51
FORTALEZA II RTB 500 kV 150 Mvar FORTALEZA II RT4 CE RB FT RTB 500 kV 150 Mvar FORTALEZA II RT4 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$834,668.23
FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$500,570.14
FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RBNI REA 6137/2016 03/02/2021 03/02/2048  R$85,286.70
FORTALEZA II MG 500 kV FORTALEZA II MG1 CE RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,837,213.96
FORTALEZA II MG 500 kV FORTALEZA II MG1 CE RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBNI REA 2376/2010 01/05/2012 30/04/2040  R$48,847.43
FORTALEZA II MG 500 kV FORTALEZA II MG1 CE RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBNI REA 5211/2015 07/05/2017 06/05/2045  R$217,284.62
FORTALEZA II MG 500 kV FORTALEZA II MG1 CE RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,421,509.74
FORTALEZA II MG 500 kV FORTALEZA II MG1 CE RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 5,548,207.69
FORTALEZA II MG 500 kV FORTALEZA II MG1 CE RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RMEL REN 443/2011 11/10/2016 10/10/2033  R$30,422.47
FORTALEZA II MG 500 kV FORTALEZA II MG1 CE RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBNI REA 6137/2016 01/10/2021 01/10/2053  R$206,818.59
FORTALEZA II MC 500 kV TR 500/230 kV FORTALEZA II TR4 CE RB FT TR 500/230 kV FORTALEZA II TR4 CE 061/2001 IPCA RBNI REA 5211/2015 07/05/2017 06/05/2048  R$ 2,224,631.19
FORTALEZA II MC 500 kV TR 500/230 kV FORTALEZA II TR3 CE  RB FT TR 500/230 kV FORTALEZA II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
FORTALEZA II MC 500 kV TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
FORTALEZA II MC 500 kV TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,319,175.21
FORTALEZA II MC 500 kV TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,350,003.67
FORTALEZA II MC 500 kV TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RMEL REN 443/2011 20/03/2016 19/03/2046  R$55,427.74
FORTALEZA II MC 500 kV TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
FORTALEZA II MC 500 kV TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,319,175.21
FORTALEZA II MC 500 kV TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,350,003.67
FORTALEZA II MC 500 kV TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RMEL REN 443/2011 20/03/2016 19/03/2046  R$55,427.74
FORTALEZA II MC 500 kV RTB 500 kV 150 Mvar FORTALEZA II RT4 CE  RB FT RTB 500 kV 150 Mvar FORTALEZA II RT4 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$418,557.22
FORTALEZA II MC 500 kV RTB 500 kV 150 Mvar FORTALEZA II RT4 CE  RB FT RTB 500 kV 150 Mvar FORTALEZA II RT4 CE 061/2001 IPCA RMEL REN 443/2011 20/03/2016 19/03/2046  R$57,830.06
FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR4 CE RB FT TR 500/230 kV FORTALEZA II TR4 CE 061/2001 IPCA RBNI REA 5211/2015 07/05/2017 06/05/2047  R$ 1,226,736.08
FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR3 CE  RB FT TR 500/230 kV FORTALEZA II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,757.03
FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RBNI REA 2244/2010 05/09/2014 04/09/2044  R$56,886.32
FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,757.03
FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$489,139.20
FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RBNI REA 2244/2010 05/09/2014 04/09/2044  R$56,886.32
FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,757.03
FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$489,139.20
FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$500,570.14
FORTALEZA II IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB2 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
FORTALEZA II IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB2 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,399,926.89
FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RBNI REA 6137/2016 03/02/2021 03/02/2048  R$85,286.70
FORTALEZA II IB 230 kV MG 500 kV FORTALEZA II MG1 CE IB2 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBNI REA 6137/2016 01/10/2021 01/10/2045  R$527,649.56
FORTALEZA II EL 500 kV FORTALEZA II LT 500 kV PECEM II /FORTALEZA II C-1 CE  RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,529,588.93
FORTALEZA II IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB2 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,432,642.48
FORTALEZA II IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB2 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RMEL REN 443/2011 20/03/2016 19/03/2046  R$110,855.45
FORTALEZA II IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB1 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
FORTALEZA II IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB1 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,399,926.89
FORTALEZA II IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB1 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,432,642.48
FORTALEZA II IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB1 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RMEL REN 443/2011 20/03/2016 19/03/2046  R$110,855.45
FORTALEZA II IB 230 kV MG 500 kV FORTALEZA II MG1 CE IB1 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
FORTALEZA II IB 230 kV MG 500 kV FORTALEZA II MG1 CE IB1 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$423,550.65
FORTALEZA II IB 230 kV MG 500 kV FORTALEZA II MG1 CE IB1 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$433,448.81
FORTALEZA II IB 230 kV MG 500 kV FORTALEZA II MG1 CE IB1 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RMEL REN 443/2011 09/06/2017 08/06/2048  R$52,339.19
FORTALEZA II IB 230 kV MG 500 kV FORTALEZA II MG1 CE IB1 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBNI REA 6137/2016 01/10/2021 01/10/2051  R$94,846.93
FORTALEZA II IB 230 kV MG 500 kV FORTALEZA II MG1 CE BARRA2 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBNI REA 6137/2016 01/10/2021 01/10/2051  R$930,774.50
FORTALEZA II IB 230 kV MG 500 kV FORTALEZA II MG1 CE BARRA1 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBNI REA 6137/2016 01/10/2021 01/10/2051  R$930,774.50
FORTALEZA II EL 500 kV FORTALEZA II LT 500 kV QUIXADA /FORTALEZA II C-1 CE  RB FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
FORTALEZA II EL 500 kV FORTALEZA II LT 500 kV QUIXADA /FORTALEZA II C-1 CE  RB FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE 061/2001 IPCA RMEL REN 443/2011 20/03/2016 19/03/2046  R$56,829.09
FORTALEZA II EL 500 kV FORTALEZA II LT 500 kV PECEM II /FORTALEZA II C-1 CE  RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
FORTALEZA II EL 500 kV FORTALEZA II LT 500 kV PECEM II /FORTALEZA II C-1 CE  RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,494,659.50
FORTALEZA II EL 500 kV FORTALEZA II LT 500 kV PECEM II /FORTALEZA II C-1 CE  RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RMEL REN 443/2011 20/03/2016 19/03/2046  R$55,427.74
FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV MARACANAU /FORTALEZA II C-1 CE  RB FT LT 230 kV MARACANAU /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV MARACANAU /FORTALEZA II C-1 CE  RB FT LT 230 kV MARACANAU /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$694,952.04
FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV MARACANAU /FORTALEZA II C-1 CE  RB FT LT 230 kV MARACANAU /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$711,192.72
FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV MARACANAU /FORTALEZA II C-1 CE  RB FT LT 230 kV MARACANAU /FORTALEZA II C-1 CE 061/2001 IPCA RBNI REA 6137/2016 03/02/2021 03/02/2048  R$79,251.53
FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-2 CE RB FT LT 230 kV FORTALEZA II /PICI II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-2 CE RB FT LT 230 kV FORTALEZA II /PICI II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$694,952.04
FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-2 CE RB FT LT 230 kV FORTALEZA II /PICI II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$711,192.72
FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-2 CE RB FT LT 230 kV FORTALEZA II /PICI II C-2 CE 061/2001 IPCA RBNI REA 6137/2016 21/01/2021 21/01/2048  R$79,251.53
FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RMEL REN 643/2014 02/07/2014 01/07/2044  R$20,467.65
FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$694,952.04
FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$711,192.72
FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RBNI REA 6137/2016 03/02/2021 03/02/2048  R$79,251.53
FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-2 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$711,192.72
FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-2 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE 061/2001 IPCA RBNI REA 6137/2016 03/02/2021 03/02/2048  R$79,251.53
FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-3 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-3 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$694,952.04
FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-3 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$711,192.72
FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-3 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE 061/2001 IPCA RBNI REA 6137/2016 01/10/2021 01/10/2048  R$79,251.53
FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-2 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-2 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$694,952.04
FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-2 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE 061/2001 IPCA RBNI REA 7761/2019 31/12/2019 30/12/2034  R$42,655.31
FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$694,952.04
FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$711,192.72
FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE 061/2001 IPCA RBNI REA 6137/2016 03/02/2021 03/02/2048  R$79,251.53
FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE 061/2001 IPCA RBNI REA 7761/2019 31/12/2019 30/12/2034  R$42,655.31
FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE  RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE  RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV CAUIPE /FORTALEZA II C-2 CE RB FT LT 230 kV CAUIPE /FORTALEZA II C-2 CE 061/2001 IPCA RBNI REA 6137/2016 20/01/2021 20/01/2048  R$79,251.53
FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV CAUIPE /FORTALEZA II C-1 CE  RB FT LT 230 kV CAUIPE /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV CAUIPE /FORTALEZA II C-2 CE RB FT LT 230 kV CAUIPE /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
FUNIL TR 230/138 kV FUNIL TR6 BA RBF FT TR 230/138 kV FUNIL TR6 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$399,926.80
FUNIL TR 230/138 kV FUNIL TR6 BA RBF FT TR 230/138 kV FUNIL TR6 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,180,160.33
FUNIL TR 230/138 kV FUNIL TR3 BA RBF FT TR 230/138 kV FUNIL TR3 BA 061/2001 IPCA RBNI REA 2173/2009 24/01/2013 23/01/2047  R$ 1,500,581.81
FUNIL TR 230/138 kV FUNIL TR2 BA RBF FT TR 230/138 kV FUNIL TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$399,926.80
FUNIL TR 230/138 kV FUNIL TR2 BA RBF FT TR 230/138 kV FUNIL TR2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,180,160.33
FUNIL TR 230/138 kV FUNIL TR2 BA RBF FT TR 230/138 kV FUNIL TR2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,207,740.08
FUNIL TR 230/138 kV FUNIL TR1 BA RBF FT TR 230/138 kV FUNIL TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$399,926.80
FUNIL TR 230/138 kV FUNIL TR1 BA RBF FT TR 230/138 kV FUNIL TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,180,160.33
FUNIL TR 230/138 kV FUNIL TR1 BA RBF FT TR 230/138 kV FUNIL TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,207,740.08
FUNIL TR 138/13,8 kV FUNIL TRR1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$167,539.96
FUNIL TR 138/13,8 kV FUNIL TRR1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$494,400.50
FUNIL TR 138/13,8 kV FUNIL TRR1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$505,954.39
FUNIL TR 138/13,8 kV FUNIL TR9 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$167,539.96
FUNIL TR 138/13,8 kV FUNIL TR9 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$494,400.50
FUNIL TR 138/13,8 kV FUNIL TR9 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$505,954.39
FUNIL TR 138/115 kV FUNIL TR7 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$223,387.30
FUNIL TR 138/115 kV FUNIL TR7 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$659,202.71
FUNIL TR 138/115 kV FUNIL TR7 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$674,607.94
FUNIL RTB 230 kV 7,4 MVAr FUNIL RTR1 BA RB FT RTB 230 kV 7,4 MVAr FUNIL RTR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$110,521.14
FUNIL RTB 230 kV 7,4 MVAr FUNIL RTR1 BA RB FT RTB 230 kV 7,4 MVAr FUNIL RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$326,141.33
FUNIL RTB 230 kV 7,4 MVAr FUNIL RTR1 BA RB FT RTB 230 kV 7,4 MVAr FUNIL RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$333,763.09
FUNIL RTB 230 kV 22,2 Mvar FUNIL RT2 BA RB FT RTB 230 kV 22,2 Mvar FUNIL RT2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$331,563.40
FUNIL RTB 230 kV 22,2 Mvar FUNIL RT2 BA RB FT RTB 230 kV 22,2 Mvar FUNIL RT2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$978,424.00
FUNIL RTB 230 kV 22,2 Mvar FUNIL RT2 BA RB FT RTB 230 kV 22,2 Mvar FUNIL RT2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,001,289.28
FUNIL RTB 230 kV 20 Mvar FUNIL RT1 BA RB FT RTB 230 kV 20 Mvar FUNIL RT1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$233,353.47
FUNIL RTB 230 kV 20 Mvar FUNIL RT1 BA RB FT RTB 230 kV 20 Mvar FUNIL RT1 BA 061/2001 IPCA RMEL REN 643/2014 12/02/2014 11/02/2049  R$35,297.74
FUNIL MG 230 kV FUNIL MG1 BA RB FT MG 230 kV FUNIL MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$857,280.82
FUNIL MG 230 kV FUNIL MG1 BA RB FT MG 230 kV FUNIL MG1 BA 061/2001 IPCA RMEL REN 643/2014 07/02/2014 06/02/2028  R$20,159.09
FUNIL MG 230 kV FUNIL MG1 BA RB FT MG 230 kV FUNIL MG1 BA 061/2001 IPCA RMEL REN 643/2014 20/12/2015 19/12/2029  R$19,114.91
FUNIL MG 230 kV FUNIL MG1 BA RB FT MG 230 kV FUNIL MG1 BA 061/2001 IPCA RMEL REN 643/2014 17/08/2014 16/08/2044  R$65,049.51
FUNIL MG 230 kV FUNIL MG1 BA RB FT MG 230 kV FUNIL MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,529,785.00
FUNIL MG 230 kV FUNIL MG1 BA RB FT MG 230 kV FUNIL MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,588,904.79
FUNIL MC 230 kV TR 230/138 kV FUNIL TR3 BA  RBF FT TR 230/138 kV FUNIL TR3 BA 061/2001 IPCA RBNI REA 2173/2009 24/01/2013 23/01/2041  R$167,380.19
FUNIL MC 230 kV TR 230/138 kV FUNIL TR3 BA  RBF FT TR 230/138 kV FUNIL TR3 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$515,473.59
FUNIL MG 230 kV FUNIL MG1 BA RB FT MG 230 kV FUNIL MG1 BA 061/2001 IPCA RMEL REN 443/2011 30/06/2016 29/06/2044  R$53,148.21
FUNIL MG 230 kV FUNIL MG1 BA RB FT MG 230 kV FUNIL MG1 BA 061/2001 IPCA RMEL REN 443/2011 26/02/2016 25/02/2033  R$32,717.18
FUNIL MC 230 kV TR 230/138 kV FUNIL TR6 BA RBF FT TR 230/138 kV FUNIL TR6 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
FUNIL MC 230 kV TR 230/138 kV FUNIL TR6 BA RBF FT TR 230/138 kV FUNIL TR6 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$515,473.59
FUNIL MC 230 kV TR 230/138 kV FUNIL TR6 BA RBF FT TR 230/138 kV FUNIL TR6 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$527,519.95
FUNIL MC 230 kV TR 230/138 kV FUNIL TR2 BA RBF FT TR 230/138 kV FUNIL TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
FUNIL MC 230 kV TR 230/138 kV FUNIL TR3 BA  RBF FT TR 230/138 kV FUNIL TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
FUNIL MC 230 kV TR 230/138 kV FUNIL TR2 BA RBF FT TR 230/138 kV FUNIL TR2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$515,473.59
FUNIL MC 230 kV TR 230/138 kV FUNIL TR3 BA  RBF FT TR 230/138 kV FUNIL TR3 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$527,519.95
FUNIL MC 230 kV RTB 230 kV 22,2 Mvar FUNIL RT2 BA  RB FT RTB 230 kV 22,2 Mvar FUNIL RT2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$167,519.92
FUNIL MC 230 kV RTB 230 kV 22,2 Mvar FUNIL RT2 BA  RB FT RTB 230 kV 22,2 Mvar FUNIL RT2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$494,341.37
FUNIL MC 230 kV TR 230/138 kV FUNIL TR2 BA RBF FT TR 230/138 kV FUNIL TR2 BA 061/2001 IPCA RMEL REN 443/2011 25/03/2015 24/03/2038  R$22,000.19
FUNIL MC 230 kV TR 230/138 kV FUNIL TR1 BA RBF FT TR 230/138 kV FUNIL TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
FUNIL MC 230 kV RTB 230 kV 22,2 Mvar FUNIL RT2 BA  RB FT RTB 230 kV 22,2 Mvar FUNIL RT2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$505,893.88
FUNIL MC 230 kV RTB 230 kV 20 Mvar FUNIL RT1 BA  RB FT RTB 230 kV 20 Mvar FUNIL RT1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$167,519.92
FUNIL MC 230 kV RTB 230 kV 20 Mvar FUNIL RT1 BA  RB FT RTB 230 kV 20 Mvar FUNIL RT1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$494,341.37
FUNIL MC 230 kV RTB 230 kV 20 Mvar FUNIL RT1 BA  RB FT RTB 230 kV 20 Mvar FUNIL RT1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$505,893.88
FUNIL MC 230 kV BC 230 kV 50,5 MVAr FUNIL BC2 BA  RB FT BC 230 kV 50,5 MVAr FUNIL BC2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$166,000.61
FUNIL MC 230 kV BC 230 kV 50,5 MVAr FUNIL BC2 BA  RB FT BC 230 kV 50,5 MVAr FUNIL BC2 BA 061/2001 IPCA RMEL REN 443/2011 15/04/2016 14/04/2049  R$116,911.82
FUNIL MC 230 kV BC 230 kV 50,5 MVAr FUNIL BC1 BA RB FT BC 230 kV 50,5 MVAr FUNIL BC1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$166,000.61
FUNIL MC 230 kV BC 230 kV 50,5 MVAr FUNIL BC1 BA RB FT BC 230 kV 50,5 MVAr FUNIL BC1 BA 061/2001 IPCA RMEL REN 643/2014 07/12/2015 06/12/2047  R$119,114.63
FUNIL MC 230 kV BC 230 kV 50,5 MVAr FUNIL BC1 BA RB FT BC 230 kV 50,5 MVAr FUNIL BC1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$489,857.99
FUNIL MC 230 kV BC 230 kV 50,5 MVAr FUNIL BC1 BA RB FT BC 230 kV 50,5 MVAr FUNIL BC1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$501,305.72
FUNIL MC 230 kV BC 230 kV 50,5 MVAr FUNIL BC1 BA RB FT BC 230 kV 50,5 MVAr FUNIL BC1 BA 061/2001 IPCA RMEL REN 443/2011 15/04/2016 14/04/2049  R$39,887.48
FUNIL MC 138 kV TR 230/138 kV FUNIL TR6 BA RBF FT TR 230/138 kV FUNIL TR6 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$130,640.35
FUNIL MC 138 kV TR 230/138 kV FUNIL TR6 BA RBF FT TR 230/138 kV FUNIL TR6 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$385,511.95
FUNIL MC 138 kV TR 230/138 kV FUNIL TR6 BA RBF FT TR 230/138 kV FUNIL TR6 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$394,521.16
FUNIL MC 138 kV TR 230/138 kV FUNIL TR3 BA  RBF FT TR 230/138 kV FUNIL TR3 BA 061/2001 IPCA RBNI REA 2173/2009 24/01/2013 23/01/2041  R$159,714.61
FUNIL MC 138 kV TR 230/138 kV FUNIL TR1 BA RBF FT TR 230/138 kV FUNIL TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$394,521.16
FUNIL MC 138 kV TR 138/13,8 kV FUNIL TR9 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$385,511.95
FUNIL MC 138 kV TR 230/138 kV FUNIL TR3 BA  RBF FT TR 230/138 kV FUNIL TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$130,640.35
FUNIL MC 138 kV TR 230/138 kV FUNIL TR3 BA  RBF FT TR 230/138 kV FUNIL TR3 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$385,511.95
FUNIL MC 138 kV TR 230/138 kV FUNIL TR3 BA  RBF FT TR 230/138 kV FUNIL TR3 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$394,521.16
FUNIL MC 138 kV TR 230/138 kV FUNIL TR2 BA RBF FT TR 230/138 kV FUNIL TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$130,640.35
FUNIL MC 138 kV TR 230/138 kV FUNIL TR2 BA RBF FT TR 230/138 kV FUNIL TR2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$385,511.95
FUNIL MC 138 kV TR 230/138 kV FUNIL TR1 BA RBF FT TR 230/138 kV FUNIL TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$130,640.35
FUNIL MC 138 kV TR 230/138 kV FUNIL TR1 BA RBF FT TR 230/138 kV FUNIL TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$385,511.95
FUNIL MC 138 kV TR 138/13,8 kV FUNIL TR9 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$394,521.16
FUNIL MC 138 kV TR 138/13,8 kV FUNIL TR9 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,640.35
FUNIL MC 138 kV TR 138/115 kV FUNIL TR7 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$385,511.95
FUNIL MC 13,8 kV TR 138/13,8 kV FUNIL TR9 BA MC2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
FUNIL MC 138 kV TR 138/115 kV FUNIL TR7 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,640.35
FUNIL MC 13,8 kV TR 138/13,8 kV FUNIL TR9 BA MC1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$142,152.79
FUNIL MC 13,8 kV TR 138/13,8 kV FUNIL TR9 BA MC1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$145,474.83
FUNIL MC 13,8 kV TR 138/13,8 kV FUNIL TR9 BA MC2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$142,152.79
FUNIL MC 13,8 kV TR 138/13,8 kV FUNIL TR9 BA MC2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$145,474.83
FUNIL MC 13,8 kV TR 138/13,8 kV FUNIL TR9 BA MC1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
FUNIL MC 13,8 kV BC 13,8 kV 3,1 Mvar FUNIL BC2 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
FUNIL MC 13,8 kV BC 13,8 kV 3,1 Mvar FUNIL BC2 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$235,271.08
FUNIL MC 13,8 kV BC 13,8 kV 3,1 Mvar FUNIL BC2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
FUNIL MC 13,8 kV BC 13,8 kV 3,1 Mvar FUNIL BC1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
FUNIL MC 13,8 kV BC 13,8 kV 3,1 Mvar FUNIL BC1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$235,271.08
FUNIL MC 115 kV TR 138/115 kV FUNIL TR7 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,640.35
FUNIL MC 13,8 kV BC 13,8 kV 3,1 Mvar FUNIL BC1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
FUNIL IB 230 kV MG 230 kV FUNIL MG1 BA IB1 RB FT MG 230 kV FUNIL MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
FUNIL IB 230 kV MG 230 kV FUNIL MG1 BA IB1 RB FT MG 230 kV FUNIL MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$433,448.81
FUNIL IB 138 kV MG 230 kV FUNIL MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$104,741.41
FUNIL IB 230 kV MG 230 kV FUNIL MG1 BA IB1 RB FT MG 230 kV FUNIL MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$423,550.65
FUNIL EL 13,8 kV FUNILDIST1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$158,986.22
FUNIL IB 13,8 kV MG 230 kV FUNIL MG1 BA IB2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$33,105.90
FUNIL IB 13,8 kV MG 230 kV FUNIL MG1 BA IB2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$97,693.54
FUNIL IB 13,8 kV MG 230 kV FUNIL MG1 BA IB2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$99,976.59
FUNIL IB 13,8 kV MG 230 kV FUNIL MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$33,105.90
FUNIL IB 13,8 kV MG 230 kV FUNIL MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$97,693.54
FUNIL IB 13,8 kV MG 230 kV FUNIL MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$99,976.59
FUNIL EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-2 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
FUNIL EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-2 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
FUNIL EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-2 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA 061/2001 IPCA RMEL REN 443/2011 01/05/2016 30/04/2046  R$16,466.90
FUNIL EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-2 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA 061/2001 IPCA RMEL REN 443/2011 01/05/2016 30/04/2046  R$16,466.90
FUNIL EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-2 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA 061/2001 IPCA RMEL REN 443/2011 01/05/2016 30/04/2046  R$16,466.90
FUNIL EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-1 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
FUNIL EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-1 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
FUNIL EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-1 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$735,719.99
FUNIL EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-1 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA 061/2001 IPCA RBNI REA 5861/2016 10/06/2016 09/06/2044  R$28,900.49
FUNIL EL 230 kV FUNIL LT 230 kV SAPEACU /FUNIL C-1 BA  RB FT LT 230 kV SAPEACU /FUNIL C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
FUNIL EL 230 kV FUNIL LT 230 kV SAPEACU /FUNIL C-1 BA  RB FT LT 230 kV SAPEACU /FUNIL C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
FUNIL EL 230 kV FUNIL LT 230 kV SAPEACU /FUNIL C-1 BA  RB FT LT 230 kV SAPEACU /FUNIL C-1 BA 061/2001 IPCA RMEL REN 443/2011 13/03/2016 12/03/2046  R$16,405.75
FUNIL EL 230 kV FUNIL LT 230 kV SAPEACU /FUNIL C-1 BA  RB FT LT 230 kV SAPEACU /FUNIL C-1 BA 061/2001 IPCA RMEL REN 443/2011 13/03/2016 12/03/2046  R$16,405.75
FUNIL EL 230 kV FUNIL LT 230 kV SAPEACU /FUNIL C-1 BA  RB FT LT 230 kV SAPEACU /FUNIL C-1 BA 061/2001 IPCA RMEL REN 443/2011 13/03/2016 12/03/2046  R$16,405.75
FUNIL EL 230 kV FUNIL LT 230 kV SAPEACU /FUNIL C-1 BA  RB FT LT 230 kV SAPEACU /FUNIL C-1 BA 061/2001 IPCA RMEL REN 443/2011 24/04/2016 23/04/2039  R$22,832.04
FUNIL EL 230 kV FUNIL LT 230 kV FUNIL /ITAPEBI C-1 BA  RB FT LT 230 kV FUNIL /ITAPEBI C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
FUNIL EL 230 kV FUNIL LT 230 kV FUNIL /ITAPEBI C-1 BA  RB FT LT 230 kV FUNIL /ITAPEBI C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
FUNIL EL 230 kV FUNIL LT 230 kV FUNIL /ITAPEBI C-1 BA  RB FT LT 230 kV FUNIL /ITAPEBI C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$735,719.99
FUNIL EL 230 kV FUNIL LT 230 kV FUNIL /ITABUNA III C-1 BA  RB FT LT 230 kV FUNIL /ITABUNA III C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
FUNIL EL 230 kV FUNIL LT 230 kV FUNIL /ITABUNA III C-1 BA  RB FT LT 230 kV FUNIL /ITABUNA III C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
FUNIL EL 230 kV FUNIL LT 230 kV FUNIL /ITABUNA III C-1 BA  RB FT LT 230 kV FUNIL /ITABUNA III C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$735,719.99
FUNIL EL 230 kV FUNIL LT 230 kV FUNIL /ITABUNA III C-1 BA  RB FT LT 230 kV FUNIL /ITABUNA III C-1 BA 061/2001 IPCA RBNI REA 5861/2016 09/06/2016 08/06/2044  R$10,269.44
FUNIL EL 138 kV FUNILDIST6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$190,798.18
FUNIL EL 138 kV FUNILDIST5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$190,798.18
FUNIL EL 138 kV FUNILDIST5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$563,034.16
FUNIL EL 138 kV FUNILDIST5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$576,191.98
FUNIL EL 138 kV FUNILDIST4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$190,798.18
FUNIL EL 138 kV FUNILDIST4 DIT   061/2001 IPCA RMEL REN 643/2014 23/02/2014 22/02/2044  R$16,312.55
FUNIL EL 138 kV FUNILDIST3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$190,798.18
FUNIL EL 138 kV FUNILDIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$190,798.18
FUNIL EL 138 kV FUNILDIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$190,798.18
FUNIL EL 138 kV FUNILDIST1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$563,034.16
FUNIL EL 13,8 kV FUNILGER1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
FUNIL EL 13,8 kV FUNILGER1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$158,986.22
FUNIL EL 13,8 kV FUNILGER1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$162,701.65
FUNIL EL 13,8 kV FUNILDIST4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
FUNIL EL 13,8 kV FUNILDIST4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$158,986.22
FUNIL EL 13,8 kV FUNILDIST4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$162,701.65
FUNIL EL 13,8 kV FUNILDIST3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
FUNIL EL 13,8 kV FUNILDIST3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$158,986.22
FUNIL EL 13,8 kV FUNILDIST3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$162,701.65
FUNIL EL 13,8 kV FUNILDIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
FUNIL EL 13,8 kV FUNILDIST2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$158,986.22
FUNIL EL 13,8 kV FUNILDIST2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$162,701.65
FUNIL EL 13,8 kV FUNILDIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
FUNIL EL 13,8 kV FUNILDIST1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$162,701.65
FUNIL CE 200/-100 MvAr FUNIL CE1 BA RB FT CE 200/-100 MvAr FUNIL CE1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,616,285.40
FUNIL BC 230 kV 50,5 MVAr FUNIL BC2 BA RB FT BC 230 kV 50,5 MVAr FUNIL BC2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,671.37
FUNIL BC 230 kV 50,5 MVAr FUNIL BC1 BA RB FT BC 230 kV 50,5 MVAr FUNIL BC1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,671.37
FUNIL BC 230 kV 50,5 MVAr FUNIL BC1 BA RB FT BC 230 kV 50,5 MVAr FUNIL BC1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$609,874.99
FUNIL BC 230 kV 50,5 MVAr FUNIL BC1 BA RB FT BC 230 kV 50,5 MVAr FUNIL BC1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$624,127.46
FUNIL BC 13,8 kV 3,1 Mvar FUNIL BC2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
FUNIL BC 13,8 kV 3,1 Mvar FUNIL BC1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
G.MANGABEIRA TT 69/13,8 kV G.MANGABEIRA TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
G.MANGABEIRA TT 69/0 kV G.MANGABEIRA TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
G.MANGABEIRA TR 230/69 kV G.MANGABEIRA TR2 BA RBF FT TR 230/69 kV G.MANGABEIRA TR2 BA 061/2001 IPCA RBNI REA 2823/2011 18/05/2015 17/05/2049  R$ 1,508,258.96
G.MANGABEIRA TR 230/69 kV G.MANGABEIRA TR1 BA RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
G.MANGABEIRA TR 230/69 kV G.MANGABEIRA TR1 BA RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
G.MANGABEIRA RTS 13,8 kV 5 Mvar G.MANGABEIRA RT1 BA RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$135,222.37
G.MANGABEIRA RTS 13,8 kV 5 Mvar G.MANGABEIRA RT1 BA RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$399,033.22
G.MANGABEIRA RTS 13,8 kV 5 Mvar G.MANGABEIRA RT1 BA RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$408,358.42
G.MANGABEIRA MG 230 kV G.MANGABEIRA MG1 BA RB FT MG 230 kV G.MANGABEIRA MG1 BA 061/2001 IPCA RBNI REA 2823/2011 18/05/2015 17/05/2043  R$266,324.11
G.MANGABEIRA MG 230 kV G.MANGABEIRA MG1 BA RB FT MG 230 kV G.MANGABEIRA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$639,860.99
G.MANGABEIRA MG 230 kV G.MANGABEIRA MG1 BA RB FT MG 230 kV G.MANGABEIRA MG1 BA 061/2001 IPCA RMEL REN 643/2014 30/03/2014 29/03/2042  R$83,649.34
G.MANGABEIRA MG 230 kV G.MANGABEIRA MG1 BA RB FT MG 230 kV G.MANGABEIRA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,888,191.95
G.MANGABEIRA MG 230 kV G.MANGABEIRA MG1 BA RB FT MG 230 kV G.MANGABEIRA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,932,318.04
G.MANGABEIRA MG 230 kV G.MANGABEIRA MG1 BA RB FT MG 230 kV G.MANGABEIRA MG1 BA 061/2001 IPCA RMEL REN 443/2011 15/02/2016 14/02/2046  R$ 250.58
G.MANGABEIRA MG 230 kV G.MANGABEIRA MG1 BA RB FT MG 230 kV G.MANGABEIRA MG1 BA 061/2001 IPCA RBNI REA 7761/2019 28/07/2020 27/07/2035  R$25,087.24
G.MANGABEIRA MC 69 kV TT 69/13,8 kV G.MANGABEIRA TA1 BA  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
G.MANGABEIRA MC 69 kV TT 69/0 kV G.MANGABEIRA TA2 BA  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
G.MANGABEIRA MC 69 kV TR 230/69 kV G.MANGABEIRA TR2 BA RBF FT TR 230/69 kV G.MANGABEIRA TR2 BA 061/2001 IPCA RBNI REA 2823/2011 18/05/2015 17/05/2045  R$480,598.02
G.MANGABEIRA MC 69 kV TR 230/69 kV G.MANGABEIRA TR1 BA  RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
G.MANGABEIRA MC 230 kV TR 230/69 kV G.MANGABEIRA TR2 BA RBF FT TR 230/69 kV G.MANGABEIRA TR2 BA 061/2001 IPCA RBNI REA 2823/2011 18/05/2015 17/05/2046  R$ 1,124,946.03
G.MANGABEIRA MC 230 kV TR 230/69 kV G.MANGABEIRA TR1 BA  RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
G.MANGABEIRA MC 230 kV TR 230/69 kV G.MANGABEIRA TR1 BA  RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RMEL REN 443/2011 19/06/2016 18/06/2046  R$16,528.04
G.MANGABEIRA MC 230 kV TR 230/69 kV G.MANGABEIRA TR1 BA  RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RMEL REN 443/2011 19/06/2016 18/06/2046  R$16,528.04
G.MANGABEIRA MC 230 kV TR 230/69 kV G.MANGABEIRA TR1 BA  RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RMEL REN 443/2011 19/06/2016 18/06/2046  R$16,528.04
G.MANGABEIRA MC 13,8 kV TR 230/69 kV G.MANGABEIRA TR1 BA MC2 RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
G.MANGABEIRA MC 13,8 kV TR 230/69 kV G.MANGABEIRA TR1 BA MC1 RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
G.MANGABEIRA MC 13,8 kV BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC6 BA  RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC6 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
G.MANGABEIRA EL 69 kV G.MANGABEIRADIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV TOMBA /G.MANGABEIRA C-2 BA  RB FT LT 230 kV TOMBA /G.MANGABEIRA C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
G.MANGABEIRA MC 13,8 kV BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC5 BA  RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC5 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
G.MANGABEIRA MC 13,8 kV BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC4 BA  RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC4 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
G.MANGABEIRA MC 13,8 kV BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC3 BA  RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
G.MANGABEIRA MC 13,8 kV BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC2 BA  RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
G.MANGABEIRA MC 13,8 kV BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC1 BA  RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
G.MANGABEIRA IB 69 kV MG 230 kV G.MANGABEIRA MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
G.MANGABEIRA IB 230 kV MG 230 kV G.MANGABEIRA MG1 BA IB1 RB FT MG 230 kV G.MANGABEIRA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,929.18
G.MANGABEIRA EL 69 kV G.MANGABEIRADIST6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
G.MANGABEIRA EL 69 kV G.MANGABEIRADIST6 DIT   061/2001 IPCA RMEL REN 443/2011 07/07/2016 06/07/2046  R$1,709.57
G.MANGABEIRA EL 69 kV G.MANGABEIRADIST5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
G.MANGABEIRA EL 69 kV G.MANGABEIRADIST4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
G.MANGABEIRA EL 69 kV G.MANGABEIRADIST3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
G.MANGABEIRA EL 69 kV G.MANGABEIRADIST3 DIT   061/2001 IPCA RMEL REN 443/2011 07/07/2016 06/07/2046  R$1,709.57
G.MANGABEIRA EL 69 kV G.MANGABEIRADIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
G.MANGABEIRA EL 69 kV G.MANGABEIRADIST2 DIT   061/2001 IPCA RMEL REN 443/2011 07/07/2016 06/07/2046  R$1,709.57
G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV P.DO CAVALO /G.MANGABEIRA C-1 BA DIT   061/2001 IPCA RMEL REN 443/2011 28/02/2016 27/02/2046  R$14,426.60
G.MANGABEIRA EL 69 kV G.MANGABEIRADIST1 DIT   061/2001 IPCA RMEL REN 443/2011 07/07/2016 06/07/2046  R$ 246.60
G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA  RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV TOMBA /G.MANGABEIRA C-1 BA RB FT LT 230 kV TOMBA /G.MANGABEIRA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV P.DO CAVALO /G.MANGABEIRA C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV P.DO CAVALO /G.MANGABEIRA C-1 BA DIT   061/2001 IPCA RMEL REN 443/2011 28/02/2016 27/02/2046  R$14,426.60
G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA 061/2001 IPCA RMEL REN 643/2014 02/02/2014 01/02/2042  R$40,047.55
G.MANGABEIRA BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC6 BA RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC6 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA  RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA  RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA  RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA  RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA  RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$692,788.80
G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA  RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA 061/2001 IPCA RMEL REN 443/2011 18/03/2016 17/03/2049  R$113,914.85
G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV CATU /G.MANGABEIRA C-1 BA  RB FT LT 230 kV CATU /G.MANGABEIRA C-1 BA 061/2001 IPCA RBNI REA 2891/2011 30/11/2015 29/11/2045  R$ 1,303,730.68
G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA  RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA 061/2001 IPCA RBNI REA 2891/2011 30/11/2015 29/11/2045  R$ 1,303,730.68
G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA  RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA 061/2001 IPCA RMEL REN 443/2011 15/07/2016 14/07/2046  R$16,835.98
G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
G.MANGABEIRA BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC5 BA RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC5 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
G.MANGABEIRA BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC4 BA RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC4 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
G.MANGABEIRA BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC3 BA RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
G.MANGABEIRA BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC2 BA RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
G.MANGABEIRA BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC1 BA RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
GARANHUNS II MC 500 kV RTL 500 kV 150 Mvar GARANHUNS II RT1 PE  RB FT RTL 500 kV 150 Mvar GARANHUNS II RT1 PE 061/2001 IPCA RBNI REA 10140/2021 18/11/2015 18/11/2041  R$89,333.70
GARANHUNS II RTL 500 kV 50 Mvar GARANHUNS II RTR1 PE RB FT RTL 500 kV 50 Mvar GARANHUNS II RTR1 PE 061/2001 IPCA RBNI REA 10140/2021 18/11/2015 18/11/2051  R$80,764.29
GARANHUNS II RTL 500 kV 150 Mvar GARANHUNS II RT1 PE RB FT RTL 500 kV 150 Mvar GARANHUNS II RT1 PE 061/2001 IPCA RBNI REA 10140/2021 18/11/2015 18/11/2051  R$242,292.83
GARANHUNS II EL 500 kV GARANHUNS II LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE  RB FT LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE 061/2001 IPCA RBNI REA 10140/2021 18/11/2015 18/11/2043  R$191,257.58
GARANHUNS II EL 500 kV GARANHUNS II LT 500 kV GARANHUNS II /ANGELIM II C-1 PE  RB FT LT 500 kV GARANHUNS II /ANGELIM II C-1 PE 061/2001 IPCA RBNI REA 10140/2021 18/11/2015 18/11/2043  R$191,257.58
GARANHUNS II EL 230 kV GARANHUNS II LT 230 kV P.AFONSO III /GARANHUNS II C-3 AL/PE RB FT LT 230 kV P.AFONSO III /GARANHUNS II C-3 AL/PE 061/2001 IPCA RBNI REA 10140/2021 18/11/2015 18/11/2043  R$153,279.46
GARANHUNS II EL 230 kV GARANHUNS II LT 230 kV P.AFONSO III /GARANHUNS II C-2 AL/PE RB FT LT 230 kV P.AFONSO III /GARANHUNS II C-2 AL/PE 061/2001 IPCA RBNI REA 10140/2021 18/11/2015 18/11/2043  R$153,279.46
GARANHUNS II EL 230 kV GARANHUNS II LT 230 kV P.AFONSO III /GARANHUNS II C-1 AL/PE  RB FT LT 230 kV P.AFONSO III /GARANHUNS II C-1 AL/PE 061/2001 IPCA RBNI REA 10140/2021 18/11/2015 18/11/2043  R$153,279.46
GARANHUNS II EL 230 kV GARANHUNS II LT 230 kV GARANHUNS II /ANGELIM C-3 PE  RB FT LT 230 kV GARANHUNS II /ANGELIM C-3 PE 061/2001 IPCA RBNI REA 10140/2021 18/11/2015 18/11/2043  R$153,279.46
GARANHUNS II EL 230 kV GARANHUNS II LT 230 kV GARANHUNS II /ANGELIM C-2 PE  RB FT LT 230 kV GARANHUNS II /ANGELIM C-2 PE 061/2001 IPCA RBNI REA 10140/2021 18/11/2015 18/11/2043  R$153,279.46
GOIANINHA TR 230/69 kV GOIANINHA TR2 PE RBF FT TR 230/69 kV GOIANINHA TR2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
GOIANINHA TR 230/69 kV GOIANINHA TR2 PE RBF FT TR 230/69 kV GOIANINHA TR2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
GOIANINHA TT 69/0 kV GOIANINHA TA2 PE DIT   061/2001 IPCA RCDM REA 2412/2010 14/08/2012 13/08/2042  R$287,431.46
GOIANINHA TT 69/0 kV GOIANINHA TA1 PE DIT   061/2001 IPCA RCDM REA 5931/2016 01/08/2018 01/08/2048  R$236,825.11
GOIANINHA TR 230/69 kV GOIANINHA TR4 PE RBF FT TR 230/69 kV GOIANINHA TR4 PE 061/2001 IPCA RBNI REA 5931/2016 15/04/2018 15/04/2052  R$ 1,432,908.35
GOIANINHA TR 230/69 kV GOIANINHA TR3 PE RBF FT TR 230/69 kV GOIANINHA TR3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
GOIANINHA TR 230/69 kV GOIANINHA TR2 PE RBF FT TR 230/69 kV GOIANINHA TR2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
GOIANINHA TR 230/69 kV GOIANINHA TR1 PE RBF FT TR 230/69 kV GOIANINHA TR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
GOIANINHA TR 230/69 kV GOIANINHA TR1 PE RBF FT TR 230/69 kV GOIANINHA TR1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
GOIANINHA TR 230/69 kV GOIANINHA TR1 PE RBF FT TR 230/69 kV GOIANINHA TR1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
GOIANINHA RTS 13,8 kV 5 Mvar GOIANINHA RT2 PE RBF FT TR 230/69 kV GOIANINHA TR2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$135,222.37
GOIANINHA RTS 13,8 kV 5 Mvar GOIANINHA RT1 PE RBF FT TR 230/69 kV GOIANINHA TR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$135,222.37
GOIANINHA RTB 230 kV 10 MVAr GOIANINHA RT1 PE RB FT RTB 230 kV 10 MVAr GOIANINHA RT1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$207,097.25
GOIANINHA MG 230 kV GOIANINHA MG1 PE RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$704,985.51
GOIANINHA MG 230 kV GOIANINHA MG1 PE RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RMEL REN 643/2014 30/09/2013 29/09/2030  R$26,967.83
GOIANINHA MG 230 kV GOIANINHA MG1 PE RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RBNI REA 5931/2016 15/04/2018 15/04/2050  R$69,019.10
GOIANINHA MG 230 kV GOIANINHA MG1 PE RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RBNI REA 5931/2016 15/04/2018 15/04/2049  R$18,232.96
GOIANINHA MG 230 kV GOIANINHA MG1 PE RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RMEL REN 643/2014 13/12/2015 12/12/2047  R$462,727.51
GOIANINHA MG 230 kV GOIANINHA MG1 PE RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RMEL REN 643/2014 28/09/2015 27/09/2045  R$6,970.88
GOIANINHA MG 230 kV GOIANINHA MG1 PE RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RBNI REA 5931/2016 15/04/2018 15/04/2039  R$46,708.36
GOIANINHA MG 230 kV GOIANINHA MG1 PE RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,080,370.56
GOIANINHA MG 230 kV GOIANINHA MG1 PE RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,128,987.77
GOIANINHA MG 230 kV GOIANINHA MG1 PE RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033  R$33,465.01
GOIANINHA MG 230 kV GOIANINHA MG1 PE RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RBNI REN 905/2020 11/03/2019 10/03/2050  R$40,825.97
GOIANINHA MC 69 kV TT 69/0 kV GOIANINHA TA2 PE  DIT   061/2001 IPCA RCDM REA 2412/2010 14/08/2012 13/08/2043  R$309,513.33
GOIANINHA MC 69 kV TT 69/0 kV GOIANINHA TA1 PE  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
GOIANINHA MC 69 kV TR 230/69 kV GOIANINHA TR4 PE RBF FT TR 230/69 kV GOIANINHA TR4 PE 061/2001 IPCA RBNI REA 5931/2016 15/04/2018 15/04/2040  R$ 1,198,124.82
GOIANINHA MC 69 kV TR 230/69 kV GOIANINHA TR3 PE  RBF FT TR 230/69 kV GOIANINHA TR3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
GOIANINHA MC 69 kV TR 230/69 kV GOIANINHA TR2 PE RBF FT TR 230/69 kV GOIANINHA TR2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
GOIANINHA MC 69 kV TR 230/69 kV GOIANINHA TR2 PE RBF FT TR 230/69 kV GOIANINHA TR2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
GOIANINHA MC 69 kV TR 230/69 kV GOIANINHA TR2 PE RBF FT TR 230/69 kV GOIANINHA TR2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$204,189.21
GOIANINHA MC 69 kV TR 230/69 kV GOIANINHA TR1 PE RBF FT TR 230/69 kV GOIANINHA TR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
GOIANINHA MC 69 kV BC 69 kV 21,3 Mvar GOIANINHA BC1 PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
GOIANINHA MC 69 kV BC 69 kV 21,3 Mvar GOIANINHA BC1 PE DIT   061/2001 IPCA RMEL REN 643/2014 30/06/2014 29/06/2046  R$42,647.51
GOIANINHA MC 69 kV BC 69 kV 21,3 Mvar GOIANINHA BC1 PE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
GOIANINHA MC 69 kV BC 69 kV 21,3 Mvar GOIANINHA BC1 PE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$235,271.08
GOIANINHA MC 230 kV TR 230/69 kV GOIANINHA TR4 PE RBF FT TR 230/69 kV GOIANINHA TR4 PE 061/2001 IPCA RBNI REA 5931/2016 15/04/2018 15/04/2041  R$667,357.30
GOIANINHA MC 230 kV TR 230/69 kV GOIANINHA TR3 PE  RBF FT TR 230/69 kV GOIANINHA TR3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
GOIANINHA MC 230 kV TR 230/69 kV GOIANINHA TR2 PE RBF FT TR 230/69 kV GOIANINHA TR2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
GOIANINHA MC 230 kV TR 230/69 kV GOIANINHA TR1 PE RBF FT TR 230/69 kV GOIANINHA TR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
GOIANINHA MC 230 kV RTB 230 kV 10 MVAr GOIANINHA RT1 PE  RB FT RTB 230 kV 10 MVAr GOIANINHA RT1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$151,491.77
GOIANINHA MC 230 kV RTB 230 kV 10 MVAr GOIANINHA RT1 PE  RB FT RTB 230 kV 10 MVAr GOIANINHA RT1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$447,043.25
GOIANINHA MC 13,8 kV TR 230/69 kV GOIANINHA TR2 PE RBF FT TR 230/69 kV GOIANINHA TR2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
GOIANINHA MC 13,8 kV TR 230/69 kV GOIANINHA TR1 PE RBF FT TR 230/69 kV GOIANINHA TR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
GOIANINHA MC 13,8 kV RTS 13,8 kV 5 Mvar GOIANINHA RT2 PE  RBF FT TR 230/69 kV GOIANINHA TR2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$40,324.83
GOIANINHA MC 13,8 kV RTS 13,8 kV 5 Mvar GOIANINHA RT1 PE  RBF FT TR 230/69 kV GOIANINHA TR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$40,324.83
GOIANINHA MC 13,8 kV CS 20/-9 MVAr GOIANINHA CS1 PE MC2 RBF FT CS 20/-9 MVAr GOIANINHA CS1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$65,134.54
GOIANINHA MC 13,8 kV CS 20/-9 MVAr GOIANINHA CS1 PE MC1 RBF FT CS 20/-9 MVAr GOIANINHA CS1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$65,134.54
GOIANINHA IB 69 kV MG 230 kV GOIANINHA MG1 PE IB3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$30,966.27
GOIANINHA IB 69 kV MG 230 kV GOIANINHA MG1 PE IB2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$30,966.27
GOIANINHA IB 69 kV MG 230 kV GOIANINHA MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
GOIANINHA IB 69 kV MG 230 kV GOIANINHA MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$134,104.45
GOIANINHA IB 230 kV MG 230 kV GOIANINHA MG1 PE IB1 RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,929.18
GOIANINHA IB 230 kV MG 230 kV GOIANINHA MG1 PE IB1 RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$368,658.63
GOIANINHA IB 230 kV MG 230 kV GOIANINHA MG1 PE IB1 RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$377,273.99
GOIANINHA IB 13,8 kV MG 230 kV GOIANINHA MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$26,945.03
GOIANINHA EL 69 kV GOIANINHADIST9 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
GOIANINHA EL 69 kV GOIANINHADIST9 DIT   061/2001 IPCA RMEL REN 643/2014 18/03/2015 17/03/2045  R$3,559.47
GOIANINHA EL 69 kV GOIANINHADIST9 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
GOIANINHA EL 69 kV GOIANINHADIST8 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
GOIANINHA EL 69 kV GOIANINHADIST8 DIT   061/2001 IPCA RMEL REN 643/2014 18/03/2015 17/03/2045  R$3,559.47
GOIANINHA EL 69 kV GOIANINHADIST8 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
GOIANINHA EL 69 kV GOIANINHADIST7 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
GOIANINHA EL 69 kV GOIANINHADIST7 DIT   061/2001 IPCA RMEL REN 643/2014 29/09/2015 28/09/2045  R$3,485.71
GOIANINHA EL 69 kV GOIANINHADIST7 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
GOIANINHA EL 69 kV GOIANINHADIST7 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
GOIANINHA EL 69 kV GOIANINHADIST6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
GOIANINHA EL 69 kV GOIANINHADIST6 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
GOIANINHA EL 69 kV GOIANINHADIST6 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
GOIANINHA EL 69 kV GOIANINHADIST5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
GOIANINHA EL 69 kV GOIANINHADIST5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
GOIANINHA EL 69 kV GOIANINHADIST5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
GOIANINHA EL 69 kV GOIANINHADIST4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
GOIANINHA EL 69 kV GOIANINHADIST4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
GOIANINHA EL 69 kV GOIANINHADIST4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
GOIANINHA EL 69 kV GOIANINHADIST4 DIT   061/2001 IPCA RMEL REN 443/2011 01/10/2015 30/09/2045  R$3,457.89
GOIANINHA EL 69 kV GOIANINHADIST3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
GOIANINHA EL 69 kV GOIANINHADIST3 DIT   061/2001 IPCA RMEL REN 643/2014 30/09/2015 29/09/2045  R$3,485.98
GOIANINHA EL 69 kV GOIANINHADIST3 DIT   061/2001 IPCA RMEL REN 443/2011 01/10/2015 30/09/2045  R$1,021.55
GOIANINHA EL 69 kV GOIANINHADIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
GOIANINHA EL 69 kV GOIANINHADIST2 DIT   061/2001 IPCA RMEL REN 643/2014 30/09/2015 29/09/2045  R$3,485.98
GOIANINHA EL 69 kV GOIANINHADIST10 DIT   061/2001 IPCA RCDM REN 905/2020 11/03/2019 10/03/2046  R$493,962.81
GOIANINHA EL 69 kV GOIANINHADIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
GOIANINHA EL 69 kV GOIANINHADIST1 DIT   061/2001 IPCA RMEL REN 643/2014 12/11/2015 11/11/2045  R$3,434.39
GOIANINHA EL 69 kV GOIANINHADIST1 DIT   061/2001 IPCA RMEL REN 643/2014 29/09/2015 28/09/2045  R$3,485.71
GOIANINHA EL 69 kV GOIANINHADIST1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
GOIANINHA EL 69 kV GOIANINHADIST1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
GOIANINHA EL 230 kV GOIANINHA LT 230 kV RECIFE II /GOIANINHA C-2 PE RB FT LT 230 kV RECIFE II /GOIANINHA C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
GOIANINHA EL 230 kV GOIANINHA LT 230 kV RECIFE II /GOIANINHA C-1 PE RB FT LT 230 kV RECIFE II /GOIANINHA C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
GOIANINHA EL 230 kV GOIANINHA LT 230 kV PAU FERRO /GOIANINHA C-1 PE  RB FT LT 230 kV PAU FERRO /GOIANINHA C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
GOIANINHA EL 230 kV GOIANINHA LT 230 kV GOIANINHA /JOAO PESSOA II C-2 PE/PB  RB FT LT 230 kV GOIANINHA /JOAO PESSOA II C-2 PE/PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
GOIANINHA EL 230 kV GOIANINHA LT 230 kV GOIANINHA /JOAO PESSOA II C-1 PE/PB  RB FT LT 230 kV GOIANINHA /JOAO PESSOA II C-1 PE/PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
GOIANINHA EL 230 kV GOIANINHA LT 230 kV GOIANINHA /JOAO PESSOA II C-1 PE/PB  RB FT LT 230 kV GOIANINHA /JOAO PESSOA II C-1 PE/PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
GOIANINHA EL 230 kV GOIANINHA LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB  RB FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
GOIANINHA EL 230 kV GOIANINHA LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB  RB FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
GOIANINHA EL 230 kV GOIANINHA LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB  RB FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$692,788.80
GOIANINHA EL 230 kV GOIANINHA LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB  RB FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB 061/2001 IPCA RMEL REN 443/2011 30/01/2016 29/01/2046  R$14,394.74
GOIANINHA EL 230 kV GOIANINHA LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB  RB FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB 061/2001 IPCA RMEL REN 443/2011 30/01/2016 29/01/2046  R$14,394.74
GOIANINHA EL 230 kV GOIANINHA LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB  RB FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB 061/2001 IPCA RMEL REN 443/2011 30/01/2016 29/01/2046  R$14,394.74
GOIANINHA CS 20/-9 MVAr GOIANINHA CS1 PE RBF FT CS 20/-9 MVAr GOIANINHA CS1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$827,609.80
GOIANINHA BC 69 kV 21,3 Mvar GOIANINHA BC1 PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$120,218.00
GOIANINHA BC 69 kV 21,3 Mvar GOIANINHA BC1 PE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$354,756.22
IBIAPINA II MG 230 kV IBIAPINA II MG1 CE RB FT MG 230 kV IBIAPINA II MG1 CE 010/2011 IPCA RBNI REN 905/2020 21/10/2021 20/10/2052  R$36,738.06
IBIAPINA II MC 69 kV TT 69/69 kV IBIAPINA II TA1 CE ICG   010/2011 IPCA RICG CC 010/2011 12/09/2016 13/10/2041  R$66,785.96
IBIAPINA II TT 69/69 kV IBIAPINA II TA1 CE ICG   010/2011 IPCA RICG CC 010/2011 12/09/2016 13/10/2041  R$179,403.89
IBIAPINA II TR 230/69 kV IBIAPINA II TR2 CE ICG   010/2011 IPCA RICG CC 010/2011 12/09/2016 13/10/2041  R$892,407.31
IBIAPINA II TR 230/69 kV IBIAPINA II TR1 CE ICG   010/2011 IPCA RICG CC 010/2011 12/09/2016 13/10/2041  R$892,407.31
IBIAPINA II MG 69 kV IBIAPINA II MG1 CE ICG   010/2011 IPCA RICG CC 010/2011 12/09/2016 13/10/2041  R$68,580.21
IBIAPINA II MG 230 kV IBIAPINA II MG1 CE RB FT MG 230 kV IBIAPINA II MG1 CE 010/2011 IPCA RBL CC 010/2011 12/09/2016 13/10/2041  R$861,644.23
IBIAPINA II MG 230 kV IBIAPINA II MG1 CE RB FT MG 230 kV IBIAPINA II MG1 CE 010/2011 IPCA RBNI REN 905/2020 21/10/2021 20/10/2052  R$36,738.06
IBIAPINA II MC 69 kV TR 230/69 kV IBIAPINA II TR2 CE ICG   010/2011 IPCA RICG CC 010/2011 12/09/2016 13/10/2041  R$158,244.78
IBIAPINA II IB 69 kV MG 69 kV IBIAPINA II MG1 CE IB1 ICG   010/2011 IPCA RICG CC 010/2011 12/09/2016 13/10/2041  R$108,488.85
IBIAPINA II IB 230 kV MG 230 kV IBIAPINA II MG1 CE IB1 RB FT MG 230 kV IBIAPINA II MG1 CE 010/2011 IPCA RBL CC 010/2011 12/09/2016 13/10/2041  R$304,317.03
IBIAPINA II MC 69 kV TR 230/69 kV IBIAPINA II TR1 CE ICG   010/2011 IPCA RICG CC 010/2011 12/09/2016 13/10/2041  R$158,244.78
IBIAPINA II MC 69 kV BC 69 kV 23 Mvar IBIAPINA II BC1 CE ICG   010/2011 IPCA RICG CC 010/2011 12/09/2016 13/10/2041  R$191,488.24
IBIAPINA II MC 230 kV TR 230/69 kV IBIAPINA II TR2 CE ICG   010/2011 IPCA RICG CC 010/2011 12/09/2016 13/10/2041  R$389,047.41
IBIAPINA II MC 230 kV TR 230/69 kV IBIAPINA II TR1 CE ICG   010/2011 IPCA RICG CC 010/2011 12/09/2016 13/10/2041  R$389,047.41
IBIAPINA II EL 69 kV IBIAPINA IIDIST1 DIT   010/2011 IPCA RCDM REN 905/2020 21/10/2021 20/10/2049  R$477,441.51
IBIAPINA II EL 69 kV IBIAPINA IIDIST2 DIT   010/2011 IPCA RCDM REN 905/2020 21/10/2021 20/10/2049  R$477,441.51
IBIAPINA II EL 230 kV IBIAPINA II LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE RB FT LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE 061/2001 IPCA RBNI REA 10142/2021 10/02/2021 10/02/2049  R$153,279.46
IBIAPINA II EL 230 kV IBIAPINA II LT 230 kV IBIAPINA II /SOBRAL II C-1 CE  RB FT LT 230 kV IBIAPINA II /SOBRAL II C-1 CE 061/2001 IPCA RBNI REA 10142/2021 10/02/2021 10/02/2050  R$153,279.46
IBIAPINA II BC 69 kV 23 Mvar IBIAPINA II BC1 CE ICG   010/2011 IPCA RICG CC 010/2011 12/09/2016 13/10/2041  R$280,545.14
IBICOARA TR 500/230 kV IBICOARA TRR1 BA RB FT TR 500/230 kV IBICOARA TRR1 BA 010/2007 IPCA RBL CC 010/2007 11/06/2007 11/06/2037  R$655,302.85
IBICOARA TR 500/230 kV IBICOARA TR3 BA RB FT TR 500/230 kV IBICOARA TR3 BA 010/2007 IPCA RBNI REA 5211/2015 10/06/2019 09/06/2053  R$ 4,162,028.51
IBICOARA TR 500/230 kV IBICOARA TR1 BA RB FT TR 500/230 kV IBICOARA TR1 BA 010/2007 IPCA RBL CC 010/2007 11/06/2007 11/06/2037  R$ 1,965,908.55
IBICOARA TR 230/138 kV IBICOARA TR3 BA RBF FT TR 230/138 kV IBICOARA TR3 BA 010/2007 IPCA RBL CC 010/2007 11/06/2007 11/06/2037  R$339,802.18
IBICOARA TR 230/138 kV IBICOARA TR2 BA RBF FT TR 230/138 kV IBICOARA TR2 BA 010/2007 IPCA RBL CC 010/2007 11/06/2007 11/06/2037  R$339,802.18
IBICOARA MG 500 kV IBICOARA MG4 BA RB FT MG 500 kV IBICOARA MG4 BA 061/2001 IPCA RMEL REN 643/2014 20/12/2013 19/12/2047  R$63,103.00
IBICOARA MG 500 kV IBICOARA MG4 BA RB FT MG 500 kV IBICOARA MG4 BA 061/2001 IPCA RMEL REN 443/2011 28/10/2016 27/10/2031  R$1,219.96
IBICOARA MG 500 kV IBICOARA MG2 BA RB FT MG 500 kV IBICOARA MG2 BA 010/2007 IPCA RBNI REA 5211/2015 10/06/2019 09/06/2048  R$136,155.47
IBICOARA MC 500 kV TR 500/230 kV IBICOARA TR1 BA RB FT TR 500/230 kV IBICOARA TR1 BA 010/2007 IPCA RMEL REN 443/2011 20/12/2015 19/12/2045  R$20,223.95
IBICOARA MG 500 kV IBICOARA MG4 BA RB FT MG 500 kV IBICOARA MG4 BA 061/2001 IPCA RBNI REA 7761/2019 30/09/2015 29/09/2030  R$37,102.58
IBICOARA MC 500 kV TR 500/230 kV IBICOARA TR1 BA RB FT TR 500/230 kV IBICOARA TR1 BA 010/2007 IPCA RBNI REA 5861/2016 25/05/2018 24/05/2046  R$32,448.57
IBICOARA MC 500 kV TR 500/230 kV IBICOARA TR3 BA RB FT TR 500/230 kV IBICOARA TR3 BA 010/2007 IPCA RBNI REA 5211/2015 10/06/2019 09/06/2051  R$ 2,149,831.11
IBICOARA MC 500 kV TR 500/230 kV IBICOARA TR1 BA RB FT TR 500/230 kV IBICOARA TR1 BA 010/2007 IPCA RBL CC 010/2007 11/06/2007 11/06/2037  R$ 1,015,561.91
IBICOARA MC 230 kV TR 230/138 kV IBICOARA TR3 BA RBF FT TR 230/138 kV IBICOARA TR3 BA 010/2007 IPCA RBL CC 010/2007 11/06/2007 11/06/2037  R$427,771.02
IBICOARA MC 230 kV TR 230/138 kV IBICOARA TR2 BA RBF FT TR 230/138 kV IBICOARA TR2 BA 010/2007 IPCA RBL CC 010/2007 11/06/2007 11/06/2037  R$427,771.02
IBICOARA MC 230 kV TR 500/230 kV IBICOARA TR3 BA RB FT TR 500/230 kV IBICOARA TR3 BA 010/2007 IPCA RBNI REA 5211/2015 10/06/2019 09/06/2050  R$ 1,294,767.62
IBICOARA MC 230 kV TR 500/230 kV IBICOARA TR1 BA RB FT TR 500/230 kV IBICOARA TR1 BA 010/2007 IPCA RBL CC 010/2007 11/06/2007 11/06/2037  R$427,771.02
IBICOARA MC 138 kV TR 230/138 kV IBICOARA TR3 BA RBF FT TR 230/138 kV IBICOARA TR3 BA 010/2007 IPCA RBL CC 010/2007 11/06/2007 11/06/2037  R$209,538.47
IBICOARA IB 500 kV MG 500 kV IBICOARA MG2 BA IB3 RB FT MG 500 kV IBICOARA MG2 BA 010/2007 IPCA RBL CC 010/2007 11/06/2007 11/06/2037  R$402,408.45
IBICOARA EL 230 kV IBICOARA LT 230 kV BRUMADO II /IBICOARA C-1 BA RB FT LT 230 kV BRUMADO II /IBICOARA C-1 BA 010/2007 IPCA RBL CC 010/2007 11/06/2007 11/06/2037  R$493,032.84
IBICOARA MC 138 kV TR 230/138 kV IBICOARA TR2 BA RBF FT TR 230/138 kV IBICOARA TR2 BA 010/2007 IPCA RBL CC 010/2007 11/06/2007 11/06/2037  R$209,538.47
IBICOARA EL 138 kV IBICOARADIST2 DIT   010/2007 IPCA RCDM REA 1523/2008 24/02/2011 23/02/2033  R$787,361.69
IBICOARA IB 230 kV MG 500 kV IBICOARA MG2 BA IB1 RB FT MG 500 kV IBICOARA MG2 BA 010/2007 IPCA RBL CC 010/2007 11/06/2007 11/06/2037  R$244,826.87
IBICOARA IB 138 kV MG 500 kV IBICOARA MG2 BA IB1 DIT   010/2007 IPCA RPEC CC 010/2007 11/06/2007 11/06/2037  R$113,073.76
IBICOARA EL 138 kV IBICOARADIST1 DIT   010/2007 IPCA RCDM REA 1523/2008 24/02/2011 23/02/2033  R$787,361.69
IBICOARA EL 138 kV IBICOARADIST1 DIT   010/2007 IPCA RMEL REN 643/2014 27/09/2014 26/09/2044  R$1,892.89
ICO TR 230/69 kV ICO TR1 CE RBF FT TR 230/69 kV ICO TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
ICO MG 230 kV ICO MG1 CE RB FT MG 230 kV ICO MG1 CE 061/2001 IPCA RMEL REN 443/2011 29/09/2016 28/09/2033  R$33,585.63
ICO TT 69/13,8 kV ICO TA1 CE DIT   061/2001 IPCA RCDM REA 3578/2012 18/02/2017 17/02/2047  R$232,303.39
ICO TR 230/69 kV ICO TR2 CE RBF FT TR 230/69 kV ICO TR2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
ICO TR 230/69 kV ICO TR1 CE RBF FT TR 230/69 kV ICO TR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
ICO TR 230/69 kV ICO TR1 CE RBF FT TR 230/69 kV ICO TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
ICO MG 230 kV ICO MG1 CE RB FT MG 230 kV ICO MG1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$501,071.09
ICO MG 230 kV ICO MG1 CE RB FT MG 230 kV ICO MG1 CE 061/2001 IPCA RBNI REA 1814/2009 20/01/2013 19/01/2041  R$48,331.76
ICO MG 230 kV ICO MG1 CE RB FT MG 230 kV ICO MG1 CE 061/2001 IPCA RMEL REN 643/2014 21/06/2013 20/06/2030  R$28,776.99
ICO MG 230 kV ICO MG1 CE RB FT MG 230 kV ICO MG1 CE 061/2001 IPCA RMEL REN 643/2014 05/02/2014 04/02/2031  R$27,443.40
ICO MG 230 kV ICO MG1 CE RB FT MG 230 kV ICO MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,478,631.17
ICO MG 230 kV ICO MG1 CE RB FT MG 230 kV ICO MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,513,186.03
ICO MG 230 kV ICO MG1 CE RB FT MG 230 kV ICO MG1 CE 061/2001 IPCA RBNI REA 8314/2019 08/06/2018 07/06/2033  R$8,227.43
ICO MG 230 kV ICO MG1 CE RB FT MG 230 kV ICO MG1 CE 061/2001 IPCA RBNI REA 7761/2019 31/08/2015 30/08/2030  R$25,714.75
ICO MC 230 kV TR 230/69 kV ICO TR1 CE RBF FT TR 230/69 kV ICO TR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
ICO IB 69 kV MG 230 kV ICO MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
ICO MC 69 kV TR 230/69 kV ICO TR2 CE RBF FT TR 230/69 kV ICO TR2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
ICO MC 69 kV TR 230/69 kV ICO TR1 CE RBF FT TR 230/69 kV ICO TR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
ICO MC 69 kV TR 230/69 kV ICO TR1 CE RBF FT TR 230/69 kV ICO TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
ICO MC 69 kV TR 230/69 kV ICO TR1 CE RBF FT TR 230/69 kV ICO TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$204,189.21
ICO MC 230 kV TR 230/69 kV ICO TR2 CE RBF FT TR 230/69 kV ICO TR2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
ICO EL 69 kV ICOS.M.DO OES.02J8 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
ICO MC 230 kV TR 230/69 kV ICO TR1 CE RBF FT TR 230/69 kV ICO TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
ICO MC 230 kV TR 230/69 kV ICO TR1 CE RBF FT TR 230/69 kV ICO TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$476,693.95
ICO EL 69 kV ICOIGUATU 02J6 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
ICO IB 69 kV MG 230 kV ICO MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$134,104.45
ICO IB 69 kV MG 230 kV ICO MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$137,238.41
ICO IB 230 kV MG 230 kV ICO MG1 CE IB1 RB FT MG 230 kV ICO MG1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,929.18
ICO EL 69 kV ICOS.M.DO OES.02J8 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ICO EL 69 kV ICOICO II 02J5 DIT   061/2001 IPCA RCDM REA 1814/2009 29/01/2013 28/01/2043  R$458,088.38
ICO EL 69 kV ICOS.M.DO OES.02J8 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
ICO EL 69 kV ICOS.M.DO OES.02J7 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ICO EL 69 kV ICOOROS 02J4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ICO EL 69 kV ICOOROS 02J4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
ICO EL 69 kV ICOOROS 02J4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
ICO EL 69 kV ICOIGUATU 02J6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ICO EL 69 kV ICOIGUATU 02J6 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
ICO EL 69 kV ICOCEDRO 02J9 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ICO EL 69 kV ICOCEDRO 02J9 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
ICO EL 69 kV ICOCEDRO 02J9 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
ICO EL 230 kV ICO LT 230 kV ICO /MILAGRES C-1 CE  RB FT LT 230 kV ICO /MILAGRES C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
ICO EL 230 kV ICO LT 230 kV ICO /MILAGRES C-1 CE  RB FT LT 230 kV ICO /MILAGRES C-1 CE 061/2001 IPCA RMEL REN 643/2014 20/07/2014 19/07/2044  R$21,635.61
ICO EL 230 kV ICO LT 230 kV ICO /MILAGRES C-1 CE  RB FT LT 230 kV ICO /MILAGRES C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
ICO EL 230 kV ICO LT 230 kV ICO /MILAGRES C-1 CE  RB FT LT 230 kV ICO /MILAGRES C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$692,788.80
ICO EL 230 kV ICO LT 230 kV BANABUIU /ICO C-1 CE  RB FT LT 230 kV BANABUIU /ICO C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
IGAPORA II TT 69/0 kV IGAPORA II TT1 BA ICG   020/2010 IPCA RICG CC 020/2010 02/06/2014 23/11/2040  R$56,766.43
IGAPORA II TR 230/69 kV IGAPORA II TR3 BA ICG   020/2010 IPCA RICGNI REA 4316/2013 04/07/2016 30/06/2032  R$ 1,750,374.98
IGAPORA II TR 230/69 kV IGAPORA II TR2 BA ICG   020/2010 IPCA RICG CC 020/2010 02/06/2014 23/11/2040  R$797,983.15
IGAPORA II TR 230/69 kV IGAPORA II TR1 BA ICG   020/2010 IPCA RICG CC 020/2010 02/06/2014 23/11/2040  R$797,983.15
IGAPORA II MG 69 kV IGAPORA II MG1 BA ICG   020/2010 IPCA RICG CC 020/2010 02/06/2014 23/11/2040  R$44,214.13
IGAPORA II MG 69 kV IGAPORA II MG1 BA ICG   020/2010 IPCA RICGNI REA 4316/2013 04/07/2016 30/06/2032  R$169,630.51
IGAPORA II MG 69 kV IGAPORA II MG1 BA ICG   020/2010 IPCA RICGNI REN 643/2014 08/07/2016 07/07/2049  R$75,882.29
IGAPORA II MG 230 kV IGAPORA II MG1 BA RB FT MG 230 kV IGAPORA II MG1 BA 020/2010 IPCA RBL CC 020/2010 26/06/2014 23/11/2040  R$456,737.48
IGAPORA II MG 230 kV IGAPORA II MG1 BA RB FT MG 230 kV IGAPORA II MG1 BA 020/2010 IPCA RBNI REA 7761/2019 31/10/2015 30/10/2030  R$30,138.01
IGAPORA II MC 69 kV TT 69/0 kV IGAPORA II TT1 BA  ICG   020/2010 IPCA RICG CC 020/2010 02/06/2014 23/11/2040  R$43,905.64
IGAPORA II MC 69 kV TR 230/69 kV IGAPORA II TR3 BA ICG   020/2010 IPCA RICGNI REA 4316/2013 04/07/2016 30/06/2032  R$413,325.83
IGAPORA II MC 69 kV TR 230/69 kV IGAPORA II TR2 BA  ICG   020/2010 IPCA RICG CC 020/2010 02/06/2014 23/11/2040  R$102,942.38
IGAPORA II MC 69 kV TR 230/69 kV IGAPORA II TR1 BA  ICG   020/2010 IPCA RICG CC 020/2010 02/06/2014 23/11/2040  R$102,942.38
IGAPORA II MC 69 kV BC 69 kV 21 Mvar IGAPORA II BC2 BA  ICG   020/2010 IPCA RICG CC 020/2010 02/06/2014 23/11/2040  R$125,004.19
IGAPORA II MC 69 kV BC 69 kV 21 Mvar IGAPORA II BC1 BA  ICG   020/2010 IPCA RICG CC 020/2010 02/06/2014 23/11/2040  R$125,004.19
IGAPORA II MC 230 kV TR 230/69 kV IGAPORA II TR3 BA ICG   020/2010 IPCA RICGNI REA 4316/2013 04/07/2016 30/06/2032  R$ 1,119,945.62
IGAPORA II MC 230 kV TR 230/69 kV IGAPORA II TR2 BA  ICG   020/2010 IPCA RICG CC 020/2010 02/06/2014 23/11/2040  R$253,014.20
IGAPORA II MC 230 kV TR 230/69 kV IGAPORA II TR1 BA  ICG   020/2010 IPCA RICG CC 020/2010 02/06/2014 23/11/2040  R$253,014.20
IGAPORA II MC 230 kV BC 230 kV 50 Mvar IGAPORA II BC1 BA RB FT BC 230 kV 50 Mvar IGAPORA II BC1 BA 020/2010 IPCA RBL CC 020/2010 26/06/2014 23/11/2040  R$242,823.56
IGAPORA II IB 69 kV MG 69 kV IGAPORA II MG1 BA IB1 ICG   020/2010 IPCA RICG CC 020/2010 02/06/2014 23/11/2040  R$70,194.47
IGAPORA II IB 230 kV MG 230 kV IGAPORA II MG1 BA IB1 RB FT MG 230 kV IGAPORA II MG1 BA 020/2010 IPCA RBL CC 020/2010 26/06/2014 23/11/2040  R$161,693.76
IGAPORA II EL 69 kV IGAPORA IIGUANAMBI DIT   020/2010 IPCA RCDM REN 443/2011 08/07/2016 07/07/2039  R$443,759.59
IGAPORA II EL 69 kV IGAPORA IICAETITE DIT   020/2010 IPCA RCDM REN 443/2011 08/07/2016 07/07/2039  R$443,759.59
IGAPORA II EL 230 kV IGAPORA II LT 230 kV IGAPORA II /IGAPORA III C-2 BA RB FT LT 230 kV IGAPORA II /IGAPORA III C-2 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 01/06/2042  R$592,169.06
IGAPORA II EL 230 kV IGAPORA II LT 230 kV IGAPORA II /IGAPORA III C-1 BA RB FT LT 230 kV IGAPORA II /IGAPORA III C-1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 01/06/2042  R$592,169.06
IGAPORA II EL 230 kV IGAPORA II LT 230 kV IGAPORA II /B.J.LAPA II C-1 BA RB FT LT 230 kV IGAPORA II /B.J.LAPA II C-1 BA 020/2010 IPCA RBL CC 020/2010 26/06/2014 23/11/2040  R$300,915.54
IGAPORA II BC 69 kV 21 Mvar IGAPORA II BC2 BA ICG   020/2010 IPCA RICG CC 020/2010 02/06/2014 23/11/2040  R$177,468.39
IGAPORA II BC 69 kV 21 Mvar IGAPORA II BC1 BA ICG   020/2010 IPCA RICG CC 020/2010 02/06/2014 23/11/2040  R$177,468.39
IGAPORA II BC 230 kV 50 Mvar IGAPORA II BC1 BA RB FT BC 230 kV 50 Mvar IGAPORA II BC1 BA 020/2010 IPCA RBL CC 020/2010 26/06/2014 23/11/2040  R$253,979.80
IGAPORA III TR 500/230 kV IGAPORA III TRR1 BA RB FT TR 500/230 kV IGAPORA III TRR1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 01/06/2042  R$ 1,822,572.30
IGAPORA III TR 500/230 kV IGAPORA III TR4 BA RB FT TR 500/230 kV IGAPORA III TR4 BA 019/2012 IPCA RBNI REA 5211/2015 12/03/2019 11/03/2054  R$ 5,929,893.99
IGAPORA III TR 500/230 kV IGAPORA III TR3 BA RB FT TR 500/230 kV IGAPORA III TR3 BA 019/2012 IPCA RBNI REA 4493/2014 07/08/2018 06/08/2053  R$ 5,929,893.99
IGAPORA III TR 500/230 kV IGAPORA III TR2 BA RB FT TR 500/230 kV IGAPORA III TR2 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 01/06/2042  R$ 5,467,714.89
IGAPORA III TR 500/230 kV IGAPORA III TR1 BA RB FT TR 500/230 kV IGAPORA III TR1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 01/06/2042  R$ 5,467,714.89
IGAPORA III RTB 500 kV 50 Mvar IGAPORA III RTBR1 BA RB FT RTB 500 kV 50 Mvar IGAPORA III RTBR1 BA 019/2012 IPCA RBNI REA 4493/2014 09/08/2018 08/08/2053  R$674,044.86
IGAPORA III MG 500 kV IGAPORA III MG1 BA RB FT MG 500 kV IGAPORA III MG1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 01/06/2042  R$ 2,827,575.92
IGAPORA III RTB 500 kV 150 Mvar IGAPORA III RTB1 BA RB FT RTB 500 kV 150 Mvar IGAPORA III RTB1 BA 019/2012 IPCA RBNI REA 4493/2014 09/08/2018 08/08/2053  R$ 2,211,433.23
IGAPORA III MG 500 kV IGAPORA III MG1 BA RB FT MG 500 kV IGAPORA III MG1 BA 019/2012 IPCA RBNI REA 7761/2019 28/07/2020 27/07/2035  R$25,954.16
IGAPORA III MC 500 kV TR 500/230 kV IGAPORA III TR4 BA RB FT TR 500/230 kV IGAPORA III TR4 BA 019/2012 IPCA RBNI REA 5211/2015 12/03/2019 11/03/2051  R$ 1,997,198.84
IGAPORA III MG 500 kV IGAPORA III MG1 BA RB FT MG 500 kV IGAPORA III MG1 BA 019/2012 IPCA RBNI REA 4493/2014 03/09/2018 02/09/2047  R$643,067.22
IGAPORA III MG 500 kV IGAPORA III MG1 BA RB FT MG 500 kV IGAPORA III MG1 BA 019/2012 IPCA RBNI REA 5211/2015 12/03/2019 11/03/2048  R$136,001.82
IGAPORA III MG 500 kV IGAPORA III MG1 BA RB FT MG 500 kV IGAPORA III MG1 BA 019/2012 IPCA RBNI REA 7761/2019 30/04/2019 29/04/2034  R$22,288.06
IGAPORA III MC 500 kV TR 500/230 kV IGAPORA III TR3 BA RB FT TR 500/230 kV IGAPORA III TR3 BA 019/2012 IPCA RBNI REA 4493/2014 07/08/2018 06/08/2050  R$ 1,997,198.84
IGAPORA III MC 500 kV TR 500/230 kV IGAPORA III TR3 BA RB FT TR 500/230 kV IGAPORA III TR3 BA 019/2012 IPCA RBNI REA 4493/2014 07/08/2018 06/08/2049  R$ 1,259,454.86
IGAPORA III MC 500 kV TR 500/230 kV IGAPORA III TR2 BA RB FT TR 500/230 kV IGAPORA III TR2 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 01/06/2042  R$ 1,144,216.82
IGAPORA III MC 500 kV TR 500/230 kV IGAPORA III TR1 BA RB FT TR 500/230 kV IGAPORA III TR1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 01/06/2042  R$ 1,144,216.82
IGAPORA III MC 500 kV RTB 500 kV 150 Mvar IGAPORA III RTB1 BA RB FT RTB 500 kV 150 Mvar IGAPORA III RTB1 BA 019/2012 IPCA RBNI REA 4493/2014 09/08/2018 08/08/2050  R$ 1,564,418.53
IGAPORA III MC 230 kV TR 500/230 kV IGAPORA III TR4 BA RB FT TR 500/230 kV IGAPORA III TR4 BA 019/2012 IPCA RBNI REA 5211/2015 12/03/2019 11/03/2050  R$ 1,260,522.86
IGAPORA III MC 230 kV TR 500/230 kV IGAPORA III TR2 BA  RB FT TR 500/230 kV IGAPORA III TR2 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 01/06/2042  R$420,441.20
IGAPORA III MC 230 kV TR 500/230 kV IGAPORA III TR1 BA  RB FT TR 500/230 kV IGAPORA III TR1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 01/06/2042  R$420,441.20
IGAPORA III IB 500 kV MG 500 kV IGAPORA III MG1 BA IB4 RB FT MG 500 kV IGAPORA III MG1 BA 019/2012 IPCA RBNI REA 4493/2014 03/09/2018 02/09/2050  R$ 1,912,176.89
IGAPORA III IB 500 kV MG 500 kV IGAPORA III MG1 BA IB3 RB FT MG 500 kV IGAPORA III MG1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 01/06/2042  R$ 1,220,926.18
IGAPORA III IB 500 kV MG 500 kV IGAPORA III MG1 BA IB2 RB FT MG 500 kV IGAPORA III MG1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 01/06/2042  R$ 1,220,926.18
IGAPORA III IB 500 kV MG 500 kV IGAPORA III MG1 BA IB1 RB FT MG 500 kV IGAPORA III MG1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 01/06/2042  R$ 1,220,926.18
IGAPORA III IB 230 kV MG 500 kV IGAPORA III MG1 BA IB1 RB FT MG 500 kV IGAPORA III MG1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 01/06/2042  R$366,017.65
IGAPORA III EL 230 kV IGAPORA III LT 230 kV IGAPORA III /PINDAI II C-1 BA RB FT LT 230 kV IGAPORA III /PINDAI II C-1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 01/06/2042  R$592,169.06
IGAPORA III EL 230 kV IGAPORA III LT 230 kV IGAPORA II /IGAPORA III C-2 BA RB FT LT 230 kV IGAPORA II /IGAPORA III C-2 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 01/06/2042  R$592,169.06
IGAPORA III EL 230 kV IGAPORA III LT 230 kV IGAPORA II /IGAPORA III C-1 BA RB FT LT 230 kV IGAPORA II /IGAPORA III C-1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 01/06/2042  R$592,169.06
IRECE TR 230/138 kV IRECE TRR1 BA RBF FT TR 230/138 kV IRECE TRR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$939,647.40
IRECE TR 230/138 kV IRECE TR8 BA RBF FT TR 230/138 kV IRECE TR8 BA 061/2001 IPCA RBNI REA 3965/2013 19/12/2019 19/12/2054  R$ 1,512,919.23
IRECE TT 69/13,8 kV IRECE TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
IRECE TR 69/69 kV IRECE TREG3 BA RBF FT TR 230/69 kV IRECE TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$179,108.49
IRECE TR 69/69 kV IRECE TREG2 BA RBF FT TR 230/69 kV IRECE TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$179,108.49
IRECE TR 230/69 kV IRECE TR6 BA RBF FT TR 230/69 kV IRECE TR6 BA 061/2001 IPCA RBNI REA 3965/2013 11/10/2019 11/10/2054  R$888,745.99
IRECE TR 230/69 kV IRECE TR3 BA RBF FT TR 230/69 kV IRECE TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,474.83
IRECE TR 230/69 kV IRECE TR2 BA RBF FT TR 230/69 kV IRECE TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,474.83
IRECE TR 230/69 kV IRECE TR2 BA RBF FT TR 230/69 kV IRECE TR2 BA 061/2001 IPCA RMEL REN 443/2011 20/08/2017 19/08/2051  R$28,905.31
IRECE TR 230/69 kV IRECE TR1 BA RBF FT TR 230/69 kV IRECE TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,584.08
IRECE TR 230/69 kV IRECE TR1 BA RBF FT TR 230/69 kV IRECE TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$665,685.27
IRECE TR 230/138 kV IRECE TRR1 BA RBF FT TR 230/138 kV IRECE TRR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$311,151.53
IRECE TR 230/138 kV IRECE TRR1 BA RBF FT TR 230/138 kV IRECE TRR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$918,189.77
IRECE TR 230/138 kV IRECE TR5 BA RBF FT TR 230/138 kV IRECE TR5 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$296,030.01
IRECE TR 230/13,8 kV IRECE TR7 BA RB FT CS 30/-15 MVAr IRECE CS1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,764.01
IRECE RTS 13,8 kV 0 Mvar IRECE RLCC BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,222.37
IRECE TR 230/138 kV IRECE TR4 BA RBF FT TR 230/138 kV IRECE TR4 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$296,030.01
IRECE TR 230/138 kV IRECE TR4 BA RBF FT TR 230/138 kV IRECE TR4 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$873,567.06
IRECE TR 230/138 kV IRECE TR4 BA RBF FT TR 230/138 kV IRECE TR4 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$893,981.88
IRECE RTL 230 kV 5 Mvar IRECE RTR1 BA RB FT RTL 230 kV 5 Mvar IRECE RTR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$85,137.79
IRECE TR 230/13,8 kV IRECE TR7 BA RB FT CS 30/-15 MVAr IRECE CS1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$678,020.00
IRECE TR 230/13,8 kV IRECE TR7 BA RB FT CS 30/-15 MVAr IRECE CS1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$693,864.98
IRECE RTL 230 kV 5 Mvar IRECE RTR1 BA RB FT RTL 230 kV 5 Mvar IRECE RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$251,236.60
IRECE RTL 230 kV 15 MVAr IRECE RT1 BA RB FT RTL 230 kV 15 MVAr IRECE RT1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$255,413.38
IRECE RTL 230 kV 15 MVAr IRECE RT1 BA RB FT RTL 230 kV 15 MVAr IRECE RT1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$753,709.79
IRECE RTB 13,8 kV 5 MVAr IRECE RT2 BA RBF FT RTB 13,8 kV 5 MVAr IRECE RT2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$135,222.37
IRECE RTB 13,8 kV 5 MVAr IRECE RT1 BA RBF FT RTB 13,8 kV 5 MVAr IRECE RT1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$399,033.22
ITABAIANA TR 230/69 kV ITABAIANA TR1 SE RBF FT TR 230/69 kV ITABAIANA TR1 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
IRECE RTB 13,8 kV 5 MVAr IRECE RT2 BA RBF FT RTB 13,8 kV 5 MVAr IRECE RT2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$399,033.22
IRECE RTB 13,8 kV 5 MVAr IRECE RT1 BA RBF FT RTB 13,8 kV 5 MVAr IRECE RT1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$135,222.37
ITABAIANA MG 230 kV ITABAIANA MG1 SE RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RBNI REA 2823/2011 22/06/2020 22/06/2054  R$ 1,175,214.33
IRECE MG 230 kV IRECE MG1 BA RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$687,142.63
IRECE MG 230 kV IRECE MG1 BA RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RBNI REA 3965/2013 19/12/2019 19/12/2053  R$117,622.06
IRECE MG 230 kV IRECE MG1 BA RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RBNI REA 3965/2013 19/12/2019 19/12/2053  R$92,638.27
IRECE MG 230 kV IRECE MG1 BA RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RMEL REN 643/2014 10/02/2014 09/02/2031  R$27,461.97
IRECE MG 230 kV IRECE MG1 BA RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RMEL REN 643/2014 04/12/2015 03/12/2032  R$35,765.41
IRECE MG 230 kV IRECE MG1 BA RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RMEL REN 643/2014 31/10/2015 30/10/2043  R$76,354.64
IRECE MG 230 kV IRECE MG1 BA RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RMEL REN 643/2014 28/02/2015 27/02/2043  R$51,070.18
IRECE MG 230 kV IRECE MG1 BA RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RBNI REA 2376/2010 23/08/2015 22/08/2043  R$133,045.06
IRECE MG 230 kV IRECE MG1 BA RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,027,717.26
IRECE MG 230 kV IRECE MG1 BA RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,075,103.99
IRECE MG 230 kV IRECE MG1 BA RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RMEL REN 443/2011 12/07/2016 11/07/2046  R$3,528.97
IRECE MC 69 kV TT 69/13,8 kV IRECE TA1 BA  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
IRECE MC 69 kV TR 230/69 kV IRECE TR6 BA RBF FT TR 230/69 kV IRECE TR6 BA 061/2001 IPCA RBNI REA 3965/2013 11/10/2019 11/10/2042  R$286,557.90
IRECE MC 69 kV TR 230/69 kV IRECE TR3 BA  RBF FT TR 230/69 kV IRECE TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
IRECE MC 69 kV TR 230/69 kV IRECE TR2 BA RBF FT TR 230/69 kV IRECE TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
IRECE MC 69 kV TR 230/69 kV IRECE TR2 BA RBF FT TR 230/69 kV IRECE TR2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
IRECE MC 69 kV TR 230/69 kV IRECE TR1 BA RBF FT TR 230/69 kV IRECE TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
IRECE MC 230 kV TR 230/69 kV IRECE TR6 BA RBF FT TR 230/69 kV IRECE TR6 BA 061/2001 IPCA RBNI REA 3965/2013 11/10/2019 11/10/2043  R$722,536.14
IRECE MC 230 kV TR 230/69 kV IRECE TR3 BA  RBF FT TR 230/69 kV IRECE TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
IRECE MC 230 kV TR 230/69 kV IRECE TR2 BA RBF FT TR 230/69 kV IRECE TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
IRECE MC 230 kV TR 230/69 kV IRECE TR1 BA RBF FT TR 230/69 kV IRECE TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
IRECE MC 230 kV TR 230/69 kV IRECE TR1 BA RBF FT TR 230/69 kV IRECE TR1 BA 061/2001 IPCA RMEL REN 443/2011 16/07/2017 15/07/2047  R$70,470.61
IRECE MC 230 kV TR 230/138 kV IRECE TR8 BA RBF FT TR 230/138 kV IRECE TR8 BA 061/2001 IPCA RBNI REA 3965/2013 19/12/2019 19/12/2043  R$722,536.14
IRECE MC 230 kV TR 230/138 kV IRECE TR5 BA  RBF FT TR 230/138 kV IRECE TR5 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
IRECE MC 230 kV TR 230/138 kV IRECE TR4 BA RBF FT TR 230/138 kV IRECE TR4 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
IRECE MC 230 kV TR 230/138 kV IRECE TR4 BA RBF FT TR 230/138 kV IRECE TR4 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$515,473.59
IRECE MC 230 kV TR 230/138 kV IRECE TR4 BA RBF FT TR 230/138 kV IRECE TR4 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$527,519.95
IRECE MC 230 kV TR 230/13,8 kV IRECE TR7 BA  RB FT CS 30/-15 MVAr IRECE CS1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
IRECE MC 230 kV RTL 230 kV 15 MVAr IRECE RT1 BA  RB FT RTL 230 kV 15 MVAr IRECE RT1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$99,071.31
IRECE MC 230 kV RTL 230 kV 15 MVAr IRECE RT1 BA  RB FT RTL 230 kV 15 MVAr IRECE RT1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$292,353.58
IRECE MC 230 kV RTL 230 kV 15 MVAr IRECE RT1 BA  RB FT RTL 230 kV 15 MVAr IRECE RT1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$299,185.73
IRECE MC 138 kV TR 230/138 kV IRECE TR8 BA RBF FT TR 230/138 kV IRECE TR8 BA 061/2001 IPCA RBNI REA 3965/2013 19/12/2019 19/12/2041  R$520,247.93
IRECE MC 138 kV TR 230/138 kV IRECE TR5 BA  RBF FT TR 230/138 kV IRECE TR5 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$121,202.15
IRECE MC 138 kV TR 230/138 kV IRECE TR4 BA  RBF FT TR 230/138 kV IRECE TR4 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$121,202.15
IRECE MC 13,8 kV TR 230/69 kV IRECE TR2 BA RBF FT TR 230/69 kV IRECE TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
IRECE MC 13,8 kV TR 230/69 kV IRECE TR2 BA RBF FT TR 230/69 kV IRECE TR2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$142,152.79
IRECE MC 13,8 kV TR 230/13,8 kV IRECE TR7 BA  RB FT CS 30/-15 MVAr IRECE CS1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
IRECE MC 13,8 kV RTB 13,8 kV 5 MVAr IRECE RT2 BA  RBF FT RTB 13,8 kV 5 MVAr IRECE RT2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,511.84
IRECE MC 13,8 kV RTB 13,8 kV 5 MVAr IRECE RT2 BA  RBF FT RTB 13,8 kV 5 MVAr IRECE RT2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,223.45
IRECE MC 13,8 kV RTB 13,8 kV 5 MVAr IRECE RT2 BA  RBF FT RTB 13,8 kV 5 MVAr IRECE RT2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$203,879.20
IRECE MC 13,8 kV RTB 13,8 kV 5 MVAr IRECE RT1 BA  RBF FT RTB 13,8 kV 5 MVAr IRECE RT1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,511.84
IRECE MC 13,8 kV RTB 13,8 kV 5 MVAr IRECE RT1 BA  RBF FT RTB 13,8 kV 5 MVAr IRECE RT1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,223.45
IRECE MC 13,8 kV RTB 13,8 kV 5 MVAr IRECE RT1 BA  RBF FT RTB 13,8 kV 5 MVAr IRECE RT1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$203,879.20
IRECE MC 13,8 kV CS 30/-15 MVAr IRECE CS1 BA  RB FT CS 30/-15 MVAr IRECE CS1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$65,134.54
IRECE MC 13,8 kV CS 30/-15 MVAr IRECE CS1 BA  RB FT CS 30/-15 MVAr IRECE CS1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$192,208.19
IRECE MC 13,8 kV CS 30/-15 MVAr IRECE CS1 BA  RB FT CS 30/-15 MVAr IRECE CS1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$196,700.00
IRECE IB 69 kV MG 230 kV IRECE MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
IRECE IB 69 kV MG 230 kV IRECE MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$134,104.45
IRECE IB 230 kV MG 230 kV IRECE MG1 BA IB1 RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
IRECE IB 230 kV MG 230 kV IRECE MG1 BA IB1 RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$423,550.65
IRECE IB 230 kV MG 230 kV IRECE MG1 BA IB1 RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$433,448.81
IRECE IB 138 kV MG 230 kV IRECE MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$93,640.20
IRECE EL 69 kV IRECEDIST4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
IRECE EL 69 kV IRECEDIST3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
IRECE EL 69 kV IRECEDIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
IRECE EL 69 kV IRECEDIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
IRECE EL 230 kV IRECE LT 230 kV OUROLANDIA II /IRECE C-1 BA  RB FT LT 230 kV OUROLANDIA II /IRECE C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
IRECE EL 230 kV IRECE LT 230 kV OUROLANDIA II /IRECE C-1 BA  RB FT LT 230 kV OUROLANDIA II /IRECE C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
IRECE EL 230 kV IRECE LT 230 kV OUROLANDIA II /IRECE C-1 BA  RB FT LT 230 kV OUROLANDIA II /IRECE C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$735,719.99
IRECE EL 230 kV IRECE LT 230 kV OUROLANDIA II /IRECE C-1 BA  RB FT LT 230 kV OUROLANDIA II /IRECE C-1 BA 061/2001 IPCA RMEL REN 443/2011 22/04/2017 21/04/2047  R$70,037.52
IRECE EL 230 kV IRECE LT 230 kV MORRO CHAPEU II /IRECE C-1 BA RB FT LT 230 kV MORRO CHAPEU II /IRECE C-1 BA 009/2011 IPCA RBL CC 009/2011 21/12/2017 13/10/2041  R$511,533.06
IRECE EL 230 kV IRECE LT 230 kV IRECE /BROT.MACAUBAS C-1 BA  RB FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
IRECE EL 230 kV IRECE LT 230 kV IRECE /BROT.MACAUBAS C-1 BA  RB FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
IRECE EL 230 kV IRECE LT 230 kV IRECE /BROT.MACAUBAS C-1 BA  RB FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$735,719.99
IRECE EL 230 kV IRECE LT 230 kV IRECE /BROT.MACAUBAS C-1 BA  RB FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA 061/2001 IPCA RMEL REN 443/2011 23/04/2017 22/04/2047  R$70,042.64
IRECE EL 138 kV IRECEBAIXIOS 03N2 DIT   061/2001 IPCA RCDM REA 2376/2010 23/08/2015 22/08/2045  R$989,380.62
IRECE EL 138 kV IRECEAGUAS BELAS DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$180,723.85
IRECE EL 138 kV IRECEAGUAS BELAS DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$533,305.40
IRECE CS 30/-15 MVAr IRECE CS1 BA RB FT CS 30/-15 MVAr IRECE CS1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$884,913.31
IRECE CS 30/-15 MVAr IRECE CS1 BA RB FT CS 30/-15 MVAr IRECE CS1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,611,326.85
IRECE CS 30/-15 MVAr IRECE CS1 BA RB FT CS 30/-15 MVAr IRECE CS1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,672,352.23
IRECE CR 230 kV 81 MVAr IRECE BC1 BA RB FT CR 230 kV 81 MVAr IRECE BC1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$312,319.70
ITABAIANA TT 69/13,8 kV ITABAIANA TA2 SE DIT   061/2001 IPCA RCDM REA 2837/2011 20/03/2016 19/03/2046  R$212,845.63
ITABAIANA TT 69/13,8 kV ITABAIANA TA1 SE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
ITABAIANA TT 69/13,8 kV ITABAIANA TA1 SE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$281,516.05
ITABAIANA TT 69/13,8 kV ITABAIANA TA1 SE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$288,094.94
ITABAIANA TR 230/69 kV ITABAIANA TR3 SE RBF FT TR 230/69 kV ITABAIANA TR3 SE 061/2001 IPCA RBNI REA 2823/2011 22/06/2020 22/06/2060  R$ 1,434,684.96
ITABAIANA TR 230/69 kV ITABAIANA TR2 SE RBF FT TR 230/69 kV ITABAIANA TR2 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
ITABAIANA TR 230/69 kV ITABAIANA TR2 SE RBF FT TR 230/69 kV ITABAIANA TR2 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
ITABAIANA TR 230/69 kV ITABAIANA TR1 SE RBF FT TR 230/69 kV ITABAIANA TR1 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
ITABAIANA MC 69 kV TR 230/69 kV ITABAIANA TR2 SE RBF FT TR 230/69 kV ITABAIANA TR2 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
ITABAIANA MC 69 kV TR 230/69 kV ITABAIANA TR1 SE RBF FT TR 230/69 kV ITABAIANA TR1 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
ITABAIANA MG 230 kV ITABAIANA MG1 SE RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$630,315.81
ITABAIANA MG 230 kV ITABAIANA MG1 SE RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RMEL REN 643/2014 30/04/2014 29/04/2042  R$83,842.75
ITABAIANA MG 230 kV ITABAIANA MG1 SE RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RMEL REN 643/2014 06/12/2015 05/12/2032  R$35,774.29
ITABAIANA MG 230 kV ITABAIANA MG1 SE RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2029  R$22,036.41
ITABAIANA MG 230 kV ITABAIANA MG1 SE RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RBNI REA 1814/2009 21/08/2015 20/08/2043  R$60,635.98
ITABAIANA MG 230 kV ITABAIANA MG1 SE RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,860,024.67
ITABAIANA MG 230 kV ITABAIANA MG1 SE RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RMEL REN 443/2011 15/09/2016 14/09/2033  R$33,529.33
ITABAIANA MG 230 kV ITABAIANA MG1 SE RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RMEL REN 443/2011 11/01/2016 10/01/2046  R$3,151.10
ITABAIANA MG 230 kV ITABAIANA MG1 SE RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RMEL REN 443/2011 11/01/2016 10/01/2046  R$3,151.08
ITABAIANA MG 230 kV ITABAIANA MG1 SE RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RBNI REN 905/2020 18/09/2017 17/09/2048  R$40,106.20
ITABAIANA MC 69 kV TR 230/69 kV ITABAIANA TR3 SE RBF FT TR 230/69 kV ITABAIANA TR3 SE 061/2001 IPCA RBNI REA 2823/2011 22/06/2020 22/06/2054  R$250,387.12
ITABAIANA IB 69 kV MG 230 kV ITABAIANA MG1 SE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
ITABAIANA EL 69 kV ITABAIANADIST8 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
ITABAIANA MC 69 kV TR 230/69 kV ITABAIANA TR1 SE RBF FT TR 230/69 kV ITABAIANA TR1 SE 061/2001 IPCA RMEL REN 643/2014 07/12/2014 06/12/2044  R$38,205.32
ITABAIANA MC 230 kV TR 230/69 kV ITABAIANA TR3 SE RBF FT TR 230/69 kV ITABAIANA TR3 SE 061/2001 IPCA RBNI REA 2823/2011 22/06/2020 22/06/2054  R$520,832.97
ITABAIANA MC 230 kV TR 230/69 kV ITABAIANA TR2 SE RBF FT TR 230/69 kV ITABAIANA TR2 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
ITABAIANA MC 230 kV TR 230/69 kV ITABAIANA TR2 SE RBF FT TR 230/69 kV ITABAIANA TR2 SE 061/2001 IPCA RMEL REN 443/2011 24/11/2017 23/11/2049  R$125,151.05
ITABAIANA MC 230 kV TR 230/69 kV ITABAIANA TR1 SE RBF FT TR 230/69 kV ITABAIANA TR1 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
ITABAIANA EL 69 kV ITABAIANADIST7 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ITABAIANA IB 230 kV MG 230 kV ITABAIANA MG1 SE IB1 RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,929.18
ITABAIANA EL 69 kV ITABAIANADIST9 DIT   061/2001 IPCA RCDM REN 905/2020 18/09/2017 17/09/2044  R$484,231.08
ITABAIANA EL 69 kV ITABAIANADIST8 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ITABAIANA EL 69 kV ITABAIANADIST8 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
ITABAIANA EL 69 kV ITABAIANADIST7 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
ITABAIANA EL 69 kV ITABAIANADIST6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ITABAIANA EL 69 kV ITABAIANADIST5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ITABAIANA EL 69 kV ITABAIANADIST4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ITABAIANA EL 69 kV ITABAIANADIST4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
ITABAIANA EL 69 kV ITABAIANADIST3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ITABAIANA EL 69 kV ITABAIANADIST4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
ITABAIANA EL 69 kV ITABAIANADIST3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
ITABAIANA EL 69 kV ITABAIANADIST3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
ITABAIANA EL 69 kV ITABAIANADIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ITABAIANA EL 69 kV ITABAIANADIST2 DIT   061/2001 IPCA RMEL REN 643/2014 22/01/2015 21/01/2045  R$12,780.43
ITABAIANA EL 69 kV ITABAIANADIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ITABAIANA EL 69 kV ITABAIANADIST1 DIT   061/2001 IPCA RMEL REN 643/2014 09/02/2014 08/02/2044  R$24,877.13
ITABAIANA EL 69 kV ITABAIANADIST2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
ITABAIANA EL 69 kV ITABAIANADIST2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
ITABAIANA EL 230 kV ITABAIANA LT 230 kV ITABAIANA /JARDIM C-2 SE  RB FT LT 230 kV ITABAIANA /JARDIM C-2 SE 061/2001 IPCA RBNI REA 5861/2016 10/06/2016 09/06/2044  R$28,900.49
ITABAIANA EL 230 kV ITABAIANA LT 230 kV ITABAIANA /JARDIM C-1 SE  RB FT LT 230 kV ITABAIANA /JARDIM C-1 SE 061/2001 IPCA RMEL REN 643/2014 21/04/2014 20/04/2044  R$20,352.13
ITABAIANA EL 230 kV ITABAIANA LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
ITABAIANA EL 230 kV ITABAIANA LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE 061/2001 IPCA RMEL REN 443/2011 20/08/2017 19/08/2045  R$16,635.06
ITABAIANA EL 230 kV ITABAIANA LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
ITABAIANA EL 230 kV ITABAIANA LT 230 kV ITABAIANA /JARDIM C-2 SE  RB FT LT 230 kV ITABAIANA /JARDIM C-2 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
ITABAIANINHA MG 230 kV ITABAIANINHA MG1 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBNI REA 2376/2010 22/03/2015 21/03/2043  R$59,264.75
ITABAIANA EL 230 kV ITABAIANA LT 230 kV ITABAIANA /JARDIM C-2 SE  RB FT LT 230 kV ITABAIANA /JARDIM C-2 SE 061/2001 IPCA RBNI REA 5861/2016 10/06/2016 09/06/2031  R$120,229.77
ITABAIANA EL 230 kV ITABAIANA LT 230 kV ITABAIANA /JARDIM C-1 SE  RB FT LT 230 kV ITABAIANA /JARDIM C-1 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
ITABAIANINHA MG 230 kV ITABAIANINHA MG1 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBNI REA 2837/2011 06/03/2015 05/03/2043  R$59,195.97
ITABAIANA EL 230 kV ITABAIANA LT 230 kV ITABAIANA /JARDIM C-1 SE  RB FT LT 230 kV ITABAIANA /JARDIM C-1 SE 061/2001 IPCA RBNI REA 5861/2016 10/06/2016 09/06/2044  R$28,900.49
ITABAIANA EL 230 kV ITABAIANA LT 230 kV ITABAIANA /JARDIM C-1 SE  RB FT LT 230 kV ITABAIANA /JARDIM C-1 SE 061/2001 IPCA RBNI REA 5861/2016 10/06/2016 09/06/2031  R$120,229.77
ITABAIANA EL 230 kV ITABAIANA LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE RB FT LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
ITABAIANA EL 230 kV ITABAIANA LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE RB FT LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE 061/2001 IPCA RBNI REA 5861/2016 10/06/2016 09/06/2044  R$28,900.49
ITABAIANA EL 230 kV ITABAIANA LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE RB FT LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE 061/2001 IPCA RBNI REA 5861/2016 10/06/2016 09/06/2031  R$120,229.77
ITABAIANINHA TT 69/13,8 kV ITABAIANINHA TA1 SE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
ITABAIANINHA TT 69/13,8 kV ITABAIANINHA TA1 SE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$281,516.05
ITABAIANINHA TT 69/13,8 kV ITABAIANINHA TA1 SE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$288,094.94
ITABAIANINHA TR 69/13,8 kV ITABAIANINHA TR5 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
ITABAIANINHA TR 69/13,8 kV ITABAIANINHA TR5 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$86,722.45
ITABAIANINHA TR 69/13,8 kV ITABAIANINHA TR5 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$88,749.11
ITABAIANINHA TR 230/69 kV ITABAIANINHA TR3 SE RBF FT TR 230/69 kV ITABAIANINHA TR3 SE 061/2001 IPCA RBNI REA 4271/2013 10/08/2015 09/08/2049  R$ 1,488,600.29
ITABAIANINHA TR 230/69 kV ITABAIANINHA TR2 SE RBF FT TR 230/69 kV ITABAIANINHA TR2 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,584.08
ITABAIANINHA TR 230/69 kV ITABAIANINHA TR1 SE RBF FT TR 230/69 kV ITABAIANINHA TR1 SE 061/2001 IPCA RBNI REA 4423/2013 12/09/2016 11/09/2050  R$ 1,623,293.61
ITABAIANINHA MG 230 kV ITABAIANINHA MG1 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBNI REA 4271/2013 10/08/2015 09/08/2043  R$208,039.58
ITABAIANINHA MG 230 kV ITABAIANINHA MG1 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$500,777.04
ITABAIANINHA MG 230 kV ITABAIANINHA MG1 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBNI REA 5212/2015 03/12/2017 02/12/2045  R$220,342.37
ITABAIANINHA MG 230 kV ITABAIANINHA MG1 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RMEL REN 643/2014 30/09/2013 29/09/2030  R$26,967.83
ITABAIANINHA MG 230 kV ITABAIANINHA MG1 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RMEL REN 643/2014 07/02/2014 06/02/2028  R$97,170.26
ITABAIANINHA MG 230 kV ITABAIANINHA MG1 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RMEL REN 643/2014 05/12/2015 04/12/2032  R$32,383.45
ITABAIANINHA MG 230 kV ITABAIANINHA MG1 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RMEL REN 643/2014 31/08/2015 30/08/2043  R$75,974.05
ITABAIANINHA MG 230 kV ITABAIANINHA MG1 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,477,763.43
ITABAIANINHA MG 230 kV ITABAIANINHA MG1 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,512,298.02
ITABAIANINHA MC 69 kV TR 69/13,8 kV ITABAIANINHA TR5 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
ITABAIANINHA MC 69 kV TR 69/13,8 kV ITABAIANINHA TR5 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
ITABAIANINHA MC 69 kV TR 69/13,8 kV ITABAIANINHA TR5 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$204,189.21
ITABAIANINHA MC 69 kV TR 230/69 kV ITABAIANINHA TR3 SE RBF FT TR 230/69 kV ITABAIANINHA TR3 SE 061/2001 IPCA RBNI REA 4271/2013 10/08/2015 09/08/2045  R$453,772.20
ITABAIANINHA MC 69 kV TR 230/69 kV ITABAIANINHA TR2 SE  RBF FT TR 230/69 kV ITABAIANINHA TR2 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
ITABAIANINHA MC 69 kV TR 230/69 kV ITABAIANINHA TR1 SE  RBF FT TR 230/69 kV ITABAIANINHA TR1 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
ITABAIANINHA MC 69 kV TR 230/69 kV ITABAIANINHA TR1 SE  RBF FT TR 230/69 kV ITABAIANINHA TR1 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$204,189.21
ITABAIANINHA MC 230 kV TR 230/69 kV ITABAIANINHA TR3 SE RBF FT TR 230/69 kV ITABAIANINHA TR3 SE 061/2001 IPCA RBNI REA 4271/2013 10/08/2015 09/08/2045  R$ 1,161,227.25
ITABAIANINHA MC 69 kV TR 230/69 kV ITABAIANINHA TR1 SE  RBF FT TR 230/69 kV ITABAIANINHA TR1 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
ITABAIANINHA MC 230 kV TR 230/69 kV ITABAIANINHA TR2 SE  RBF FT TR 230/69 kV ITABAIANINHA TR2 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
ITABAIANINHA MC 230 kV TR 230/69 kV ITABAIANINHA TR2 SE  RBF FT TR 230/69 kV ITABAIANINHA TR2 SE 061/2001 IPCA RMEL REN 643/2014 08/03/2014 07/03/2044  R$21,408.04
ITABAIANINHA EL 69 kV ITABAIANINHADIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ITABAIANINHA EL 69 kV ITABAIANINHADIST2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
ITABAIANINHA MC 230 kV TR 230/69 kV ITABAIANINHA TR1 SE  RBF FT TR 230/69 kV ITABAIANINHA TR1 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
ITABAIANINHA MC 230 kV TR 230/69 kV ITABAIANINHA TR1 SE  RBF FT TR 230/69 kV ITABAIANINHA TR1 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
ITABAIANINHA MC 230 kV TR 230/69 kV ITABAIANINHA TR1 SE  RBF FT TR 230/69 kV ITABAIANINHA TR1 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$476,693.95
ITABAIANINHA MC 230 kV BC 230 kV 0 Mvar ITABAIANINHA BC1 SE RB FT BC 230 kV 50 Mvar ITABAIANINHA BC1 SE 061/2001 IPCA RBNI REA 5212/2015 03/12/2017 02/12/2047  R$ 1,297,527.70
ITABAIANINHA IB 69 kV MG 230 kV ITABAIANINHA MG1 SE IB1 DIT   061/2001 IPCA RCDM REA 2460/2010 02/11/2012 01/11/2043  R$300,416.63
ITABAIANINHA IB 230 kV MG 230 kV ITABAIANINHA MG1 SE IB1 RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,929.18
ITABAIANINHA IB 230 kV MG 230 kV ITABAIANINHA MG1 SE IB1 RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBNI REA 5212/2015 03/12/2017 02/12/2050  R$109,252.38
ITABAIANINHA EL 69 kV ITABAIANINHAITAB. 04M4 DIT   061/2001 IPCA RCDM REA 2376/2010 22/03/2015 21/03/2045  R$483,134.83
ITABAIANINHA EL 69 kV ITABAIANINHADIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ITABAIANINHA EL 69 kV ITABAIANINHADIST2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
ITABAIANINHA EL 69 kV ITABAIANINHADIST1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
ITABAIANINHA EL 230 kV ITABAIANINHA LT 230 kV ITABAIANINHA /CATU C-1 SE/BA  RB FT LT 230 kV ITABAIANINHA /CATU C-1 SE/BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
ITABAIANINHA EL 69 kV ITABAIANINHADIST1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
ITABAIANINHA EL 69 kV ITABAIANINHAARAUA 04M2 DIT   061/2001 IPCA RCDM REA 2837/2011 06/03/2015 05/03/2045  R$508,327.41
ITABAIANINHA EL 230 kV ITABAIANINHA LT 230 kV ITABAIANINHA /CATU C-1 SE/BA  RB FT LT 230 kV ITABAIANINHA /CATU C-1 SE/BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$692,788.80
ITABAIANINHA EL 230 kV ITABAIANINHA LT 230 kV ITABAIANINHA /CATU C-1 SE/BA  RB FT LT 230 kV ITABAIANINHA /CATU C-1 SE/BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
ITABAIANINHA EL 230 kV ITABAIANINHA LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE  RB FT LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
ITABAIANINHA EL 230 kV ITABAIANINHA LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE  RB FT LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE 061/2001 IPCA RBNI REA 5861/2016 10/06/2016 09/06/2044  R$28,900.49
ITABAIANINHA EL 230 kV ITABAIANINHA LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE  RB FT LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE 061/2001 IPCA RBNI REA 5861/2016 10/06/2016 09/06/2031  R$120,229.77
ITABAIANINHA BC 230 kV 0 Mvar ITABAIANINHA BC1 SE RB FT BC 230 kV 50 Mvar ITABAIANINHA BC1 SE 061/2001 IPCA RBNI REA 5212/2015 03/12/2017 02/12/2040  R$438,241.84
ITABUNA III MG 230 kV ITABUNA III MG2 BA RB FT MG 230 kV ITABUNA III MG2 BA 061/2001 IPCA RBNI DSP 1270/2022 01/07/2022 30/06/2053  R$40,256.74
ITABUNA III EL 230 kV ITABUNA III LT 230 kV ITABUNA III /ITAPEBI C-1 BA RB FT LT 230 kV ITABUNA III /ITAPEBI C-1 BA 061/2001 IPCA RBNI DSP 1270/2022 01/07/2022 30/06/2051  R$203,728.71
ITABUNA III EL 230 kV ITABUNA III LT 230 kV FUNIL /ITABUNA III C-1 BA RB FT LT 230 kV FUNIL /ITABUNA III C-1 BA 061/2001 IPCA RBNI DSP 1270/2022 01/07/2022 30/06/2051  R$203,728.71
ITAPEBI MG 230 kV ITAPEBI MG1 BA RB FT MG 230 kV ITAPEBI MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$469,860.77
ITAPEBI MG 230 kV ITAPEBI MG1 BA RB FT MG 230 kV ITAPEBI MG1 BA 061/2001 IPCA RMEL REN 443/2011 27/04/2016 26/04/2031  R$4,829.72
ITAPEBI IB 230 kV MG 230 kV ITAPEBI MG1 BA IB1 RB FT MG 230 kV ITAPEBI MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
ITAPEBI EL 230 kV ITAPEBI LT 230 kV ITAPEBI /VERACEL C-1 BA  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
ITAPEBI EL 230 kV ITAPEBI LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA  RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
ITAPEBI EL 230 kV ITAPEBI LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA  RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
ITAPEBI EL 230 kV ITAPEBI LT 230 kV ITABUNA III /ITAPEBI C-1 BA  RB FT LT 230 kV ITABUNA III /ITAPEBI C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
ITAPEBI EL 230 kV ITAPEBI LT 230 kV ITABUNA III /ITAPEBI C-1 BA  RB FT LT 230 kV ITABUNA III /ITAPEBI C-1 BA 061/2001 IPCA RBNI REA 5861/2016 09/06/2016 08/06/2044  R$10,269.44
ITAPEBI EL 230 kV ITAPEBI LT 230 kV FUNIL /ITAPEBI C-1 BA  RB FT LT 230 kV FUNIL /ITAPEBI C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
ITAPEBI EL 230 kV ITAPEBI LT 230 kV FUNIL /ITAPEBI C-1 BA  RB FT LT 230 kV FUNIL /ITAPEBI C-1 BA 061/2001 IPCA RBNI REA 5861/2016 05/03/2014 04/03/2042  R$8,407.55
JABOATAO II TT 69/0 kV JABOATAO II TT1 PE DIT   017/2012 IPCA RPEC CC 017/2012 29/04/2018 01/06/2042  R$66,645.75
JABOATAO II TR 230/69 kV JABOATAO II TR2 PE RBF FT TR 230/69 kV JABOATAO II TR2 PE 017/2012 IPCA RBL CC 017/2012 29/04/2018 01/06/2042  R$ 1,686,146.62
JABOATAO II TR 230/69 kV JABOATAO II TR1 PE RBF FT TR 230/69 kV JABOATAO II TR1 PE 017/2012 IPCA RBL CC 017/2012 29/04/2018 01/06/2042  R$ 1,686,146.62
JABOATAO II MG 230 kV JABOATAO II MG1 PE RB FT MG 230 kV JABOATAO II MG1 PE 017/2012 IPCA RBL CC 017/2012 29/04/2018 01/06/2042  R$ 1,173,276.88
JABOATAO II MC 69 kV TT 69/0 kV JABOATAO II TT1 PE DIT   017/2012 IPCA RPEC CC 017/2012 29/04/2018 01/06/2042  R$69,305.81
JABOATAO II MC 69 kV TR 230/69 kV JABOATAO II TR2 PE RBF FT TR 230/69 kV JABOATAO II TR2 PE 017/2012 IPCA RBL CC 017/2012 29/04/2018 01/06/2042  R$220,740.38
JABOATAO II MC 69 kV TR 230/69 kV JABOATAO II TR1 PE RBF FT TR 230/69 kV JABOATAO II TR1 PE 017/2012 IPCA RBL CC 017/2012 29/04/2018 01/06/2042  R$220,740.38
JABOATAO II MC 230 kV TR 230/69 kV JABOATAO II TR2 PE RBF FT TR 230/69 kV JABOATAO II TR2 PE 017/2012 IPCA RBL CC 017/2012 29/04/2018 01/06/2042  R$541,369.28
JABOATAO II IB 69 kV MG 230 kV JABOATAO II MG1 PE IB1 DIT   017/2012 IPCA RPEC CC 017/2012 29/04/2018 01/06/2042  R$111,624.17
JABOATAO II IB 230 kV MG 230 kV JABOATAO II MG1 PE IB1 RB FT MG 230 kV JABOATAO II MG1 PE 017/2012 IPCA RBL CC 017/2012 29/04/2018 01/06/2042  R$471,267.47
JABOATAO II MC 230 kV TR 230/69 kV JABOATAO II TR1 PE RBF FT TR 230/69 kV JABOATAO II TR1 PE 017/2012 IPCA RBL CC 017/2012 29/04/2018 01/06/2042  R$541,369.28
JABOATAO II EL 69 kV JABOATAO IIDIST3 DIT   017/2012 IPCA RPEC CC 017/2012 29/04/2018 01/06/2042  R$191,406.59
JABOATAO II EL 69 kV JABOATAO IIDIST2 DIT   017/2012 IPCA RPEC CC 017/2012 29/04/2018 01/06/2042  R$191,406.59
JABOATAO II EL 69 kV JABOATAO IIDIST5 DIT   017/2012 IPCA RPEC CC 017/2012 29/04/2018 01/06/2042  R$191,406.59
JABOATAO II EL 69 kV JABOATAO IIDIST4 DIT   017/2012 IPCA RPEC CC 017/2012 29/04/2018 01/06/2042  R$191,406.59
JACARACANGA TR 230/69 kV JACARACANGA TR3 BA RBF FT TR 230/69 kV JACARACANGA TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
JACARACANGA TR 230/69 kV JACARACANGA TR1 BA RBF FT TR 230/69 kV JACARACANGA TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
JABOATAO II EL 69 kV JABOATAO IIDIST1 DIT   017/2012 IPCA RPEC CC 017/2012 29/04/2018 01/06/2042  R$191,406.59
JABOATAO II EL 230 kV JABOATAO II LT 230 kV RECIFE II /JABOATAO II C-1 PE RB FT LT 230 kV RECIFE II /JABOATAO II C-1 PE 061/2001 IPCA RBNI REA 10092/2021 11/03/2021 11/03/2049  R$153,279.46
JABOATAO II EL 230 kV JABOATAO II LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE  RB FT LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE 061/2001 IPCA RBNI REA 10092/2021 11/03/2021 11/03/2049  R$153,279.46
JACARACANGA TT 69/13,8 kV JACARACANGA TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
JACARACANGA TT 69/13,8 kV JACARACANGA TA2 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$281,516.05
JACARACANGA TT 69/13,8 kV JACARACANGA TA2 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$288,094.94
JACARACANGA TT 69/13,8 kV JACARACANGA TA1 BA DIT   061/2001 IPCA RCDM REA 3578/2012 05/02/2017 04/02/2047  R$232,108.77
JACARACANGA TR 69/13,8 kV JACARACANGA TR7 BA RB FT MG 230 kV JACARACANGA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
JACARACANGA TR 69/13,8 kV JACARACANGA TR7 BA RB FT MG 230 kV JACARACANGA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$86,722.45
JACARACANGA TR 69/13,8 kV JACARACANGA TR7 BA RB FT MG 230 kV JACARACANGA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$88,749.11
JACARACANGA TR 230/69 kV JACARACANGA TR1 BA RBF FT TR 230/69 kV JACARACANGA TR1 BA 061/2001 IPCA RMEL REN 443/2011 22/04/2017 21/04/2051  R$9,560.81
JACARACANGA TR 230/69 kV JACARACANGA TR2 BA RBF FT TR 230/69 kV JACARACANGA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
JACARACANGA TR 230/69 kV JACARACANGA TR2 BA RBF FT TR 230/69 kV JACARACANGA TR2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
JACARACANGA TR 230/69 kV JACARACANGA TR2 BA RBF FT TR 230/69 kV JACARACANGA TR2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
JACARACANGA TR 230/69 kV JACARACANGA TR2 BA RBF FT TR 230/69 kV JACARACANGA TR2 BA 061/2001 IPCA RMEL REN 443/2011 26/04/2017 25/04/2051  R$28,689.85
JACARACANGA TR 230/69 kV JACARACANGA TR1 BA RBF FT TR 230/69 kV JACARACANGA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
JACARACANGA IB 69 kV MG 230 kV JACARACANGA MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
JACARACANGA IB 69 kV MG 230 kV JACARACANGA MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$134,104.45
JACARACANGA MG 230 kV JACARACANGA MG1 BA RB FT MG 230 kV JACARACANGA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$605,549.19
JACARACANGA MG 230 kV JACARACANGA MG1 BA RB FT MG 230 kV JACARACANGA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,786,939.86
JACARACANGA MG 230 kV JACARACANGA MG1 BA RB FT MG 230 kV JACARACANGA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,828,699.75
JACARACANGA MC 69 kV TT 69/13,8 kV JACARACANGA TA2 BA  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
JACARACANGA MC 69 kV TT 69/13,8 kV JACARACANGA TA1 BA  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
JACARACANGA MC 69 kV TR 230/69 kV JACARACANGA TR3 BA RBF FT TR 230/69 kV JACARACANGA TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
JACARACANGA MC 69 kV TR 230/69 kV JACARACANGA TR2 BA  RBF FT TR 230/69 kV JACARACANGA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
JACARACANGA MC 69 kV TR 230/69 kV JACARACANGA TR1 BA  RBF FT TR 230/69 kV JACARACANGA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
JACARACANGA MC 69 kV BC 69 kV 27,1 Mvar JACARACANGA BC2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
JACARACANGA MC 69 kV BC 69 kV 27,1 Mvar JACARACANGA BC2 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
JACARACANGA MC 69 kV BC 69 kV 27,1 Mvar JACARACANGA BC2 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$235,271.08
JACARACANGA MC 230 kV TR 230/69 kV JACARACANGA TR3 BA RBF FT TR 230/69 kV JACARACANGA TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
JACARACANGA MC 230 kV TR 230/69 kV JACARACANGA TR2 BA  RBF FT TR 230/69 kV JACARACANGA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
JACARACANGA MC 230 kV TR 230/69 kV JACARACANGA TR1 BA  RBF FT TR 230/69 kV JACARACANGA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
JACARACANGA EL 69 kV JACARACANGADIST4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
JACARACANGA EL 69 kV JACARACANGADIST4 DIT   061/2001 IPCA RCDM REA 2040/2009 08/06/2014 07/06/2044  R$8,913.35
JACARACANGA IB 69 kV MG 230 kV JACARACANGA MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$137,238.41
JACARACANGA IB 230 kV MG 230 kV JACARACANGA MG1 BA IB1 RB FT MG 230 kV JACARACANGA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
JACARACANGA EL 69 kV JACARACANGADIST1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
JACARACANGA EL 69 kV JACARACANGADIST1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
JACARACANGA EL 69 kV JACARACANGADIST4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
JACARACANGA EL 69 kV JACARACANGADIST4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
JACARACANGA EL 69 kV JACARACANGADIST3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
JACARACANGA EL 69 kV JACARACANGADIST3 DIT   061/2001 IPCA RCDM REA 2040/2009 08/06/2014 07/06/2044  R$8,913.35
JACARACANGA EL 69 kV JACARACANGADIST3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
JACARACANGA EL 69 kV JACARACANGADIST3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
JACARACANGA EL 69 kV JACARACANGADIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
JACARACANGA EL 69 kV JACARACANGADIST2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
JACARACANGA EL 69 kV JACARACANGADIST2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
JACARACANGA EL 69 kV JACARACANGADIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
JACARACANGA EL 230 kV JACARACANGA LT 230 kV JACARACANGA /DOW QUIMICA C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
JACARACANGA EL 230 kV JACARACANGA LT 230 kV JACARACANGA /DOW QUIMICA C-2 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
JACARACANGA EL 230 kV JACARACANGA LT 230 kV JACARACANGA /DOW QUIMICA C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
JACARACANGA EL 230 kV JACARACANGA LT 230 kV JACARACANGA /DOW QUIMICA C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
JACARACANGA EL 230 kV JACARACANGA LT 230 kV JACARACANGA /DOW QUIMICA C-2 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$735,719.99
JACARACANGA EL 230 kV JACARACANGA LT 230 kV JACARACANGA /DOW QUIMICA C-2 BA DIT   061/2001 IPCA RCDM REA 5861/2016 08/02/2015 07/02/2030  R$116,553.57
JACARACANGA EL 230 kV JACARACANGA LT 230 kV JACARACANGA /DOW QUIMICA C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$735,719.99
JACARACANGA EL 230 kV JACARACANGA LT 230 kV JACARACANGA /DOW QUIMICA C-1 BA DIT   061/2001 IPCA RCDM REA 5861/2016 08/02/2015 07/02/2030  R$116,553.57
JACARACANGA EL 230 kV JACARACANGA LT 230 kV COTEGIPE /JACARACANGA C-1 BA RB FT LT 230 kV COTEGIPE /JACARACANGA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
JACARACANGA EL 230 kV JACARACANGA LT 230 kV COTEGIPE /JACARACANGA C-1 BA RB FT LT 230 kV COTEGIPE /JACARACANGA C-1 BA 061/2001 IPCA RMEL REN 443/2011 19/12/2015 18/12/2045  R$14,348.60
JACARACANGA EL 230 kV JACARACANGA LT 230 kV COTEGIPE /JACARACANGA C-1 BA RB FT LT 230 kV COTEGIPE /JACARACANGA C-1 BA 061/2001 IPCA RMEL REN 443/2011 19/12/2015 18/12/2045  R$14,348.60
JACARACANGA EL 230 kV JACARACANGA LT 230 kV CAMACARI IV /JACARACANGA C-2 BA  RB FT LT 230 kV CAMACARI IV /JACARACANGA C-2 BA 061/2001 IPCA RMEL REN 643/2014 15/11/2013 14/11/2041  R$77,320.20
JACARACANGA EL 230 kV JACARACANGA LT 230 kV CAMACARI IV /JACARACANGA C-1 BA  RB FT LT 230 kV CAMACARI IV /JACARACANGA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
JACARACANGA EL 230 kV JACARACANGA LT 230 kV CAMACARI IV /JACARACANGA C-2 BA  RB FT LT 230 kV CAMACARI IV /JACARACANGA C-2 BA 061/2001 IPCA RBNI REA 2891/2011 11/08/2014 10/08/2040  R$91,548.87
JACARACANGA EL 230 kV JACARACANGA LT 230 kV CAMACARI IV /JACARACANGA C-2 BA  RB FT LT 230 kV CAMACARI IV /JACARACANGA C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
JACARACANGA BC 69 kV 27,1 Mvar JACARACANGA BC2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$139,293.08
JACARACANGA EL 230 kV JACARACANGA LT 230 kV CAMACARI IV /JACARACANGA C-1 BA  RB FT LT 230 kV CAMACARI IV /JACARACANGA C-1 BA 061/2001 IPCA RBNI REA 2891/2011 01/09/2014 31/08/2040  R$91,720.19
JAGUARARI-SE MG 230 kV JAGUARARI-SE MG1 BA RB FT MG 230 kV JAGUARARI-SE MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$430,087.59
JAGUARARI-SE MG 230 kV JAGUARARI-SE MG1 BA RB FT MG 230 kV JAGUARARI-SE MG1 BA 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033  R$33,465.01
JAGUARARI-SE MC 230 kV04T2 M CARAIBA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
JAGUARARI-SE MC 230 kV04T1 M CARAIBA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
JAGUARARI-SE IB 230 kV MG 230 kV JAGUARARI-SE MG1 BA IB1 RB FT MG 230 kV JAGUARARI-SE MG1 BA 061/2001 IPCA RBNI REA 2173/2009 27/09/2012 26/09/2043  R$915,873.35
JAGUARARI-SE EL 230 kV JAGUARARI-SE LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA  RB FT LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA 061/2001 IPCA RBNI REA 2173/2009 27/09/2012 26/09/2042  R$475,331.54
JAGUARARI-SE EL 230 kV JAGUARARI-SE LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA  RB FT LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
JAGUARARI-SE EL 230 kV JAGUARARI-SE LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA  RB FT LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA 061/2001 IPCA RBNI REA 2173/2009 27/09/2012 26/09/2042  R$475,331.54
JAGUARARI-SE EL 230 kV JAGUARARI-SE LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA  RB FT LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
JARDIM TR 500/230 kV JARDIM TRR1 SE RB FT TR 500/230 kV JARDIM TRR1 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,027,322.87
JARDIM TR 500/230 kV JARDIM TR7 SE RB FT TR 500/230 kV JARDIM TR7 SE 061/2001 IPCA RMEL REN 643/2014 06/10/2013 05/10/2047  R$20,778.57
JARDIM TT 69/13,8 kV JARDIM TA2 SE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
JARDIM TT 69/13,8 kV JARDIM TA2 SE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$281,516.05
JARDIM TT 69/13,8 kV JARDIM TA2 SE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$288,094.94
JARDIM TT 69/13,8 kV JARDIM TA1 SE DIT   061/2001 IPCA RCDM REA 3578/2012 31/01/2016 30/01/2046  R$226,553.93
JARDIM TR 69/13,8 kV JARDIM TR5 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
JARDIM TR 69/13,8 kV JARDIM TR5 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$86,722.45
JARDIM TR 69/13,8 kV JARDIM TR5 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$88,749.11
JARDIM TR 500/230 kV JARDIM TRR1 SE RB FT TR 500/230 kV JARDIM TRR1 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$671,320.56
JARDIM TR 500/230 kV JARDIM TRR1 SE RB FT TR 500/230 kV JARDIM TRR1 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,981,027.26
JARDIM TR 500/230 kV JARDIM TR6 SE RB FT TR 500/230 kV JARDIM TR6 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 6,081,968.60
JARDIM TR 500/230 kV JARDIM TR8 SE RB FT TR 500/230 kV JARDIM TR8 SE 061/2001 IPCA RBNI REA 5225/2015 17/12/2017 16/12/2052  R$ 5,823,789.43
JARDIM TR 500/230 kV JARDIM TR7 SE RB FT TR 500/230 kV JARDIM TR7 SE 061/2001 IPCA RBNI REA 2181/2009 17/12/2012 16/12/2047  R$ 5,232,928.42
JARDIM TR 230/69 kV JARDIM TR4 SE RBF FT TR 230/69 kV JARDIM TR4 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
JARDIM TR 500/230 kV JARDIM TR6 SE RB FT TR 500/230 kV JARDIM TR6 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,013,961.67
JARDIM TR 500/230 kV JARDIM TR6 SE RB FT TR 500/230 kV JARDIM TR6 SE 061/2001 IPCA RMEL REN 643/2014 29/09/2013 28/09/2047  R$57,847.81
JARDIM TR 500/230 kV JARDIM TR6 SE RB FT TR 500/230 kV JARDIM TR6 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,943,081.78
JARDIM TR 230/69 kV JARDIM TR3 SE RBF FT TR 230/69 kV JARDIM TR3 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
JARDIM TR 230/69 kV JARDIM TR3 SE RBF FT TR 230/69 kV JARDIM TR3 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
JARDIM TR 230/69 kV JARDIM TR3 SE RBF FT TR 230/69 kV JARDIM TR3 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
JARDIM TR 230/69 kV JARDIM TR2 SE RBF FT TR 230/69 kV JARDIM TR2 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
JARDIM TR 230/69 kV JARDIM TR2 SE RBF FT TR 230/69 kV JARDIM TR2 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
JARDIM TR 230/69 kV JARDIM TR3 SE RBF FT TR 230/69 kV JARDIM TR3 SE 061/2001 IPCA RMEL REN 443/2011 18/06/2017 17/06/2051  R$95,101.24
JARDIM TR 230/69 kV JARDIM TR1 SE RBF FT TR 230/69 kV JARDIM TR1 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
JARDIM TR 230/69 kV JARDIM TR2 SE RBF FT TR 230/69 kV JARDIM TR2 SE 061/2001 IPCA RMEL REN 443/2011 26/11/2017 25/11/2051  R$29,087.31
JARDIM TR 230/69 kV JARDIM TR1 SE RBF FT TR 230/69 kV JARDIM TR1 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
JARDIM RTL 500 kV 99,1 Mvar JARDIM RT1 SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$724,896.22
JARDIM RTL 500 kV 99,1 Mvar JARDIM RT1 SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RMEL REN 643/2014 06/11/2013 05/11/2048  R$42,922.63
JARDIM RTL 500 kV 99,1 Mvar JARDIM RT1 SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,139,125.88
JARDIM RTL 500 kV 99,1 Mvar JARDIM RT1 SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,189,116.17
JARDIM RTL 500 kV 99,1 Mvar JARDIM RT1 SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RMEL REN 443/2011 30/03/2014 29/03/2044  R$17,463.14
JARDIM RTL 500 kV 99,1 Mvar JARDIM RT1 SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RMEL REN 443/2011 30/03/2014 29/03/2044  R$17,463.14
JARDIM RTL 500 kV 40 Mvar JARDIM RTR1 SE RB FT RTL 500 kV 40 Mvar JARDIM RTR1 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,524.66
JARDIM RTL 500 kV 99,1 Mvar JARDIM RT1 SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RMEL REN 443/2011 30/03/2014 29/03/2044  R$17,463.14
JARDIM RTL 500 kV 40 Mvar JARDIM RTR1 SE RB FT RTL 500 kV 40 Mvar JARDIM RTR1 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$780,719.35
JARDIM RTL 500 kV 40 Mvar JARDIM RTR1 SE RB FT RTL 500 kV 40 Mvar JARDIM RTR1 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$762,890.98
JARDIM MG 500 kV JARDIM MG1 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RMEL REN 643/2014 07/02/2014 06/02/2028  R$245,226.67
JARDIM MC 69 kV TR 230/69 kV JARDIM TR4 SE  RBF FT TR 230/69 kV JARDIM TR4 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
JARDIM MG 500 kV JARDIM MG1 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,395,320.10
JARDIM MG 500 kV JARDIM MG1 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBNI REA 5225/2015 17/12/2017 16/12/2045  R$220,542.02
JARDIM MC 69 kV TR 230/69 kV JARDIM TR2 SE  RBF FT TR 230/69 kV JARDIM TR2 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
JARDIM MG 500 kV JARDIM MG1 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RMEL REN 643/2014 03/12/2015 02/12/2032  R$31,689.68
JARDIM MG 500 kV JARDIM MG1 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2043  R$32,829.20
JARDIM MG 500 kV JARDIM MG1 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,117,507.10
JARDIM MG 500 kV JARDIM MG1 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,213,731.16
JARDIM MG 500 kV JARDIM MG1 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RMEL REN 443/2011 17/03/2016 16/03/2044  R$94,447.78
JARDIM MG 500 kV JARDIM MG1 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RMEL REN 443/2011 29/12/2016 28/12/2044  R$77,145.39
JARDIM MC 69 kV TT 69/13,8 kV JARDIM TA2 SE  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
JARDIM MC 69 kV TT 69/13,8 kV JARDIM TA1 SE  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
JARDIM MC 69 kV BC 69 kV 20,3 Mvar JARDIM BC3 SE  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
JARDIM MC 69 kV TR 230/69 kV JARDIM TR3 SE  RBF FT TR 230/69 kV JARDIM TR3 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
JARDIM MC 69 kV TR 230/69 kV JARDIM TR3 SE  RBF FT TR 230/69 kV JARDIM TR3 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
JARDIM MC 69 kV BC 69 kV 20,3 Mvar JARDIM BC1 SE  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
JARDIM MC 69 kV TR 230/69 kV JARDIM TR1 SE  RBF FT TR 230/69 kV JARDIM TR1 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
JARDIM MC 69 kV BC 69 kV 20,3 Mvar JARDIM BC1 SE  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$235,271.08
JARDIM MC 69 kV BC 69 kV 20,3 Mvar JARDIM BC3 SE  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
JARDIM MC 69 kV BC 69 kV 20,3 Mvar JARDIM BC3 SE  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$235,271.08
JARDIM MC 69 kV BC 69 kV 20,3 Mvar JARDIM BC2 SE  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
JARDIM MC 69 kV BC 69 kV 20,3 Mvar JARDIM BC2 SE  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
JARDIM MC 69 kV BC 69 kV 20,3 Mvar JARDIM BC2 SE  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$235,271.08
JARDIM MC 69 kV BC 69 kV 20,3 Mvar JARDIM BC1 SE  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
JARDIM MC 500 kV TR 500/230 kV JARDIM TR8 SE RB FT TR 500/230 kV JARDIM TR8 SE 061/2001 IPCA RBNI REA 5225/2015 17/12/2017 16/12/2048  R$ 2,161,441.15
JARDIM MC 230 kV TR 500/230 kV JARDIM TR7 SE  RB FT TR 500/230 kV JARDIM TR7 SE 061/2001 IPCA RBNI REA 2181/2009 17/12/2012 16/12/2042  R$ 1,201,653.68
JARDIM MC 500 kV TR 500/230 kV JARDIM TR7 SE  RB FT TR 500/230 kV JARDIM TR7 SE 061/2001 IPCA RBNI REA 2181/2009 17/12/2012 16/12/2043  R$ 1,851,410.17
JARDIM MC 500 kV TR 500/230 kV JARDIM TR6 SE  RB FT TR 500/230 kV JARDIM TR6 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
JARDIM MC 500 kV TR 500/230 kV JARDIM TR6 SE  RB FT TR 500/230 kV JARDIM TR6 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,319,175.21
JARDIM MC 500 kV TR 500/230 kV JARDIM TR6 SE  RB FT TR 500/230 kV JARDIM TR6 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,350,003.67
JARDIM MC 500 kV TR 500/230 kV JARDIM TR6 SE  RB FT TR 500/230 kV JARDIM TR6 SE 061/2001 IPCA RMEL REN 443/2011 20/11/2016 19/11/2039  R$16,132.43
JARDIM MC 500 kV RTL 500 kV 40 Mvar JARDIM RTR1 SE  RB FT RTL 500 kV 40 Mvar JARDIM RTR1 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$270,833.72
JARDIM MC 230 kV TR 500/230 kV JARDIM TR8 SE RB FT TR 500/230 kV JARDIM TR8 SE 061/2001 IPCA RBNI REA 5225/2015 17/12/2017 16/12/2047  R$ 1,355,496.42
JARDIM IB 500 kV MG 500 kV JARDIM MG1 SE IB2 RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
JARDIM MC 230 kV TR 500/230 kV JARDIM TR6 SE  RB FT TR 500/230 kV JARDIM TR6 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
JARDIM MC 230 kV TR 500/230 kV JARDIM TR6 SE  RB FT TR 500/230 kV JARDIM TR6 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$515,473.59
JARDIM MC 230 kV TR 500/230 kV JARDIM TR6 SE  RB FT TR 500/230 kV JARDIM TR6 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$527,519.95
JARDIM MC 230 kV TR 230/69 kV JARDIM TR4 SE  RBF FT TR 230/69 kV JARDIM TR4 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
JARDIM MC 230 kV TR 230/69 kV JARDIM TR3 SE  RBF FT TR 230/69 kV JARDIM TR3 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
JARDIM MC 230 kV TR 230/69 kV JARDIM TR3 SE  RBF FT TR 230/69 kV JARDIM TR3 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$515,473.59
JARDIM MC 230 kV TR 230/69 kV JARDIM TR3 SE  RBF FT TR 230/69 kV JARDIM TR3 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$527,519.95
JARDIM MC 230 kV TR 230/69 kV JARDIM TR2 SE  RBF FT TR 230/69 kV JARDIM TR2 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
JARDIM MC 230 kV TR 230/69 kV JARDIM TR1 SE  RBF FT TR 230/69 kV JARDIM TR1 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
JARDIM MC 230 kV TR 230/69 kV JARDIM TR1 SE  RBF FT TR 230/69 kV JARDIM TR1 SE 061/2001 IPCA RMEL REN 643/2014 09/03/2014 08/03/2044  R$64,229.19
JARDIM IB 69 kV MG 500 kV JARDIM MG1 SE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
JARDIM IB 500 kV MG 500 kV JARDIM MG1 SE IB2 RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RMEL REN 643/2014 23/02/2014 22/02/2044  R$75,746.41
JARDIM IB 500 kV MG 500 kV JARDIM MG1 SE IB2 RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RMEL REN 643/2014 13/04/2014 12/04/2044  R$50,693.72
JARDIM IB 500 kV MG 500 kV JARDIM MG1 SE IB2 RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,399,926.89
JARDIM IB 500 kV MG 500 kV JARDIM MG1 SE IB2 RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,432,642.48
JARDIM IB 500 kV MG 500 kV JARDIM MG1 SE IB1 RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
JARDIM IB 500 kV MG 500 kV JARDIM MG1 SE IB1 RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RMEL REN 643/2014 23/03/2014 22/03/2044  R$75,914.51
JARDIM IB 500 kV MG 500 kV JARDIM MG1 SE IB1 RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RMEL REN 643/2014 27/04/2014 26/04/2044  R$76,124.64
JARDIM IB 500 kV MG 500 kV JARDIM MG1 SE IB1 RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,432,642.48
JARDIM IB 230 kV MG 500 kV JARDIM MG1 SE IB1 RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
JARDIM IB 500 kV MG 500 kV JARDIM MG1 SE IB1 RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,399,926.89
JARDIM EL 69 kV JARDIMUPGN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
JARDIM EL 69 kV JARDIMTAICOCA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
JARDIM EL 69 kV JARDIMGRAGERO C-1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
JARDIM EL 69 kV JARDIMESTANCIA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
JARDIM EL 69 kV JARDIMTAICOCA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
JARDIM EL 69 kV JARDIMS.CRISTOVAO DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
JARDIM EL 69 kV JARDIMRIACHUELO C-2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
JARDIM EL 69 kV JARDIMRIACHUELO C-1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
JARDIM EL 69 kV JARDIMM.URUBU DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
JARDIM EL 69 kV JARDIMGRAGERO C-2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
JARDIM EL 69 kV JARDIMATALAIA C2 DIT   061/2001 IPCA RCDM REA 1814/2009 15/08/2012 14/08/2040  R$326,471.52
JARDIM EL 69 kV JARDIMATALAIA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
JARDIM EL 69 kV JARDIMATALAIA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
JARDIM EL 69 kV JARDIMATALAIA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
JARDIM EL 69 kV JARDIM02X3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
JARDIM EL 69 kV JARDIM02X3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
JARDIM EL 69 kV JARDIMARACAJU C-2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
JARDIM EL 69 kV JARDIMARACAJU C-1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
JARDIM EL 69 kV JARDIM02X3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
JARDIM EL 500 kV JARDIM LT 500 kV USINA XINGO /JARDIM C-1 AL/SE  RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RMEL REN 643/2014 03/11/2013 02/11/2043  R$34,513.31
JARDIM EL 500 kV JARDIM LT 500 kV USINA XINGO /JARDIM C-1 AL/SE  RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,494,659.50
JARDIM EL 69 kV JARDIM02X2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
JARDIM EL 500 kV JARDIM LT 500 kV USINA XINGO /JARDIM C-1 AL/SE  RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
JARDIM EL 500 kV JARDIM LT 500 kV USINA XINGO /JARDIM C-1 AL/SE  RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBNI REA 5861/2016 08/06/2016 07/06/2044  R$28,215.83
JARDIM EL 500 kV JARDIM LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA  RB FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,529,588.93
JARDIM EL 500 kV JARDIM LT 500 kV USINA XINGO /JARDIM C-1 AL/SE  RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,529,588.93
JARDIM EL 500 kV JARDIM LT 500 kV USINA XINGO /JARDIM C-1 AL/SE  RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBNI REA 5861/2016 08/06/2016 07/06/2031  R$107,427.70
JARDIM EL 500 kV JARDIM LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA  RB FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
JARDIM EL 500 kV JARDIM LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA  RB FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA 061/2001 IPCA RMEL REN 643/2014 03/03/2013 02/03/2043  R$16,912.50
JARDIM EL 500 kV JARDIM LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA  RB FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA 061/2001 IPCA RMEL REN 643/2014 13/04/2013 12/04/2043  R$16,970.10
JARDIM EL 500 kV JARDIM LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA  RB FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,494,659.50
JARDIM EL 230 kV JARDIM LT 230 kV N.S.SOCORRO /JARDIM C-2 SE  RB FT LT 230 kV N.S.SOCORRO /JARDIM C-2 SE 005/2008 IPCA RBL CC 005/2008 17/03/2008 17/03/2038  R$411,855.55
JARDIM EL 230 kV JARDIM LT 230 kV N.S.SOCORRO /JARDIM C-1 SE  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
JARDIM EL 230 kV JARDIM LT 230 kV N.S.SOCORRO /JARDIM C-1 SE  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
JARDIM EL 230 kV JARDIM LT 230 kV N.S.SOCORRO /JARDIM C-1 SE  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$735,719.99
JARDIM EL 230 kV JARDIM LT 230 kV ITABAIANA /JARDIM C-2 SE  RB FT LT 230 kV ITABAIANA /JARDIM C-2 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
JARDIM EL 230 kV JARDIM LT 230 kV ITABAIANA /JARDIM C-2 SE  RB FT LT 230 kV ITABAIANA /JARDIM C-2 SE 061/2001 IPCA RMEL REN 643/2014 02/02/2014 01/02/2044  R$64,050.88
JARDIM EL 230 kV JARDIM LT 230 kV ITABAIANA /JARDIM C-2 SE  RB FT LT 230 kV ITABAIANA /JARDIM C-2 SE 061/2001 IPCA RBNI REA 5861/2016 10/06/2016 09/06/2031  R$41,961.41
JARDIM EL 230 kV JARDIM LT 230 kV ITABAIANA /JARDIM C-1 SE  RB FT LT 230 kV ITABAIANA /JARDIM C-1 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
JARDIM EL 230 kV JARDIM LT 230 kV ITABAIANA /JARDIM C-1 SE  RB FT LT 230 kV ITABAIANA /JARDIM C-1 SE 061/2001 IPCA RMEL REN 643/2014 19/01/2014 18/01/2044  R$63,979.54
JARDIM EL 230 kV JARDIM LT 230 kV ITABAIANA /JARDIM C-1 SE  RB FT LT 230 kV ITABAIANA /JARDIM C-1 SE 061/2001 IPCA RBNI REA 5861/2016 10/06/2016 09/06/2031  R$41,961.41
JARDIM EL 230 kV JARDIMCIMESA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
JARDIM EL 230 kV JARDIMCIMESA DIT   061/2001 IPCA RMEL REN 443/2011 08/09/2013 07/09/2043  R$15,261.38
JARDIM EL 230 kV JARDIMCIMESA DIT   061/2001 IPCA RMEL REN 443/2011 08/09/2013 07/09/2043  R$15,261.38
JARDIM EL 230 kV JARDIMCIMESA DIT   061/2001 IPCA RMEL REN 443/2011 08/09/2013 07/09/2043  R$15,261.38
JARDIM BC 69 kV 20,3 Mvar JARDIM BC3 SE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$116,409.25
JARDIM BC 69 kV 20,3 Mvar JARDIM BC3 SE DIT   061/2001 IPCA RMEL REN 643/2014 01/11/2013 31/10/2033  R$100,842.10
JARDIM BC 69 kV 20,3 Mvar JARDIM BC2 SE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$116,409.25
JARDIM BC 69 kV 20,3 Mvar JARDIM BC2 SE DIT   061/2001 IPCA RMEL REN 643/2014 06/11/2013 05/11/2033  R$100,901.84
JARDIM BC 69 kV 20,3 Mvar JARDIM BC1 SE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$116,409.25
JARDIM BC 69 kV 20,3 Mvar JARDIM BC1 SE DIT   061/2001 IPCA RMEL REN 643/2014 25/10/2013 24/10/2033  R$100,758.45
JOAIRAM TT 69/0 kV JOAIRAM TA1 PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
JOAIRAM TR 230/69 kV JOAIRAM TR3 PE RBF FT TR 230/69 kV JOAIRAM TR3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$447,983.81
JOAIRAM TT 69/0 kV JOAIRAM TA2 PE DIT   061/2001 IPCA RCDM REA 2837/2011 27/04/2014 26/04/2044  R$203,128.92
JOAIRAM TR 230/69 kV JOAIRAM TR1 PE RBF FT TR 230/69 kV JOAIRAM TR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$447,983.81
JOAIRAM MG 230 kV JOAIRAM MG1 PE RB FT MG 230 kV JOAIRAM MG1 PE 061/2001 IPCA RMEL REN 643/2014 30/09/2013 29/09/2030  R$30,610.64
JOAIRAM TR 230/69 kV JOAIRAM TR2 PE RBF FT TR 230/69 kV JOAIRAM TR2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$447,983.81
JOAIRAM MG 230 kV JOAIRAM MG1 PE RB FT MG 230 kV JOAIRAM MG1 PE 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2046  R$2,460.29
JOAIRAM MG 230 kV JOAIRAM MG1 PE RB FT MG 230 kV JOAIRAM MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$620,390.62
JOAIRAM MG 230 kV JOAIRAM MG1 PE RB FT MG 230 kV JOAIRAM MG1 PE 061/2001 IPCA RBNI REA 1814/2009 30/09/2012 29/09/2040  R$47,850.30
JOAIRAM MG 230 kV JOAIRAM MG1 PE RB FT MG 230 kV JOAIRAM MG1 PE 061/2001 IPCA RMEL REN 443/2011 04/04/2016 03/04/2044  R$1,362.99
JOAIRAM MC 69 kV TT 69/0 kV JOAIRAM TA1 PE  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
JOAIRAM MC 69 kV TR 230/69 kV JOAIRAM TR1 PE  RBF FT TR 230/69 kV JOAIRAM TR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
JOAIRAM MC 230 kV TR 230/69 kV JOAIRAM TR3 PE RBF FT TR 230/69 kV JOAIRAM TR3 PE 061/2001 IPCA RMEL REN 443/2011 18/10/2017 17/10/2047  R$11,774.73
JOAIRAM MC 69 kV TR 230/69 kV JOAIRAM TR3 PE RBF FT TR 230/69 kV JOAIRAM TR3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
JOAIRAM MC 69 kV TR 230/69 kV JOAIRAM TR2 PE  RBF FT TR 230/69 kV JOAIRAM TR2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
JOAIRAM MC 230 kV TR 230/69 kV JOAIRAM TR1 PE  RBF FT TR 230/69 kV JOAIRAM TR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,757.03
JOAIRAM MC 230 kV TR 230/69 kV JOAIRAM TR3 PE RBF FT TR 230/69 kV JOAIRAM TR3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,757.03
JOAIRAM IB 69 kV MG 230 kV JOAIRAM MG1 PE IB2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
JOAIRAM MC 230 kV TR 230/69 kV JOAIRAM TR2 PE  RBF FT TR 230/69 kV JOAIRAM TR2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,757.03
JOAIRAM EL 69 kV JOAIRAMVARZEA C1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
JOAIRAM EL 230 kV JOAIRAM LT 230 kV BONGI /JOAIRAM C-1 PE  RB FT LT 230 kV BONGI /JOAIRAM C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
JOAIRAM IB 230 kV MG 230 kV JOAIRAM MG1 PE IB1 RB FT MG 230 kV JOAIRAM MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
JOAIRAM EL 69 kV JOAIRAMVARZEA C2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
JOAIRAM EL 69 kV JOAIRAMVARZEA C2 DIT   061/2001 IPCA RMEL REN 443/2011 17/05/2015 16/05/2038  R$7,280.80
JOAO CAMARA II MC 69 kV TR 230/69 kV JOAO CAMARA II TR1 RN  ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040  R$114,437.39
JOAIRAM EL 69 kV JOAIRAMTEJIPIO DIT   061/2001 IPCA RCDM REA 1814/2009 30/09/2012 29/09/2042  R$454,212.89
JOAIRAM EL 69 kV JOAIRAMJOBOTAO C2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
JOAIRAM EL 69 kV JOAIRAMJOBOTAO C1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
JOAIRAM EL 230 kV JOAIRAM LT 230 kV RECIFE II /JOAIRAM C-3 PE  RB FT LT 230 kV RECIFE II /JOAIRAM C-3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
JOAIRAM EL 230 kV JOAIRAM LT 230 kV RECIFE II /JOAIRAM C-2 PE  RB FT LT 230 kV RECIFE II /JOAIRAM C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
JOAIRAM EL 230 kV JOAIRAM LT 230 kV RECIFE II /JOAIRAM C-1 PE  RB FT LT 230 kV RECIFE II /JOAIRAM C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
JOAIRAM EL 230 kV JOAIRAM LT 230 kV BONGI /JOAIRAM C-3 PE  RB FT LT 230 kV BONGI /JOAIRAM C-3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
JOAIRAM EL 230 kV JOAIRAM LT 230 kV BONGI /JOAIRAM C-2 PE  RB FT LT 230 kV BONGI /JOAIRAM C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
JOAO CAMARA II MC 69 kV BC 69 kV 21 Mvar JOAO CAMARA II BC4 RN  ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040  R$138,962.72
JOAO CAMARA II TT 69/0 kV JOAO CAMARA II TT1 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040  R$63,105.23
JOAO CAMARA II TR 230/69 kV JOAO CAMARA II TR3 RN ICG   019/2010 IPCA RICGNI REA 4445/2013 29/10/2017 29/10/2052  R$ 1,914,763.79
JOAO CAMARA II TR 230/69 kV JOAO CAMARA II TR2 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040  R$585,943.90
JOAO CAMARA II TR 230/69 kV JOAO CAMARA II TR1 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040  R$585,943.90
JOAO CAMARA II MG 69 kV JOAO CAMARA II MG1 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040  R$315,972.51
JOAO CAMARA II MG 69 kV JOAO CAMARA II MG1 RN ICG   019/2010 IPCA RICGNI REA 4445/2013 29/10/2017 29/10/2046  R$37,904.64
JOAO CAMARA II MG 69 kV JOAO CAMARA II MG1 RN ICG   019/2010 IPCA RICGNI REN 443/2011 31/03/2015 30/03/2030  R$37,191.27
JOAO CAMARA II MG 230 kV JOAO CAMARA II MG1 RN RB FT MG 230 kV JOAO CAMARA II MG1 RN 019/2010 IPCA RBL CC 019/2010 17/02/2014 23/11/2040  R$534,937.70
JOAO CAMARA II MG 230 kV JOAO CAMARA II MG1 RN RB FT MG 230 kV JOAO CAMARA II MG1 RN 019/2010 IPCA RBNI REA 4445/2013 15/05/2020 15/05/2052  R$395,280.94
JOAO CAMARA II MG 230 kV JOAO CAMARA II MG1 RN RB FT MG 230 kV JOAO CAMARA II MG1 RN 019/2010 IPCA RBNI REN 443/2011 27/02/2014 26/02/2045  R$30,935.11
JOAO CAMARA II MG 230 kV JOAO CAMARA II MG1 RN RB FT MG 230 kV JOAO CAMARA II MG1 RN 019/2010 IPCA RMEL REN 643/2014 31/03/2015 30/03/2030  R$40,672.88
JOAO CAMARA II MG 230 kV JOAO CAMARA II MG1 RN RB FT MG 230 kV JOAO CAMARA II MG1 RN 019/2010 IPCA RBNI REA 8314/2019 31/08/2018 30/08/2033  R$9,896.63
JOAO CAMARA II MC 69 kV TT 69/0 kV JOAO CAMARA II TT1 RN  ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040  R$48,808.35
JOAO CAMARA II MC 69 kV TR 230/69 kV JOAO CAMARA II TR3 RN ICG   019/2010 IPCA RICGNI REA 4445/2013 29/10/2017 29/10/2040  R$413,497.80
JOAO CAMARA II MC 69 kV TR 230/69 kV JOAO CAMARA II TR2 RN  ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040  R$114,437.39
JOAO CAMARA II MC 69 kV BC 69 kV 21 Mvar JOAO CAMARA II BC3 RN  ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040  R$138,962.72
JOAO CAMARA II MC 69 kV BC 69 kV 21 Mvar JOAO CAMARA II BC2 RN  ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040  R$138,962.72
JOAO CAMARA II MC 69 kV BC 69 kV 21 Mvar JOAO CAMARA II BC1 RN  ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040  R$138,962.72
JOAO CAMARA II MC 230 kV TR 230/69 kV JOAO CAMARA II TR3 RN ICG   019/2010 IPCA RICGNI REA 4445/2013 29/10/2017 29/10/2041  R$ 1,120,395.90
JOAO CAMARA II MC 230 kV TR 230/69 kV JOAO CAMARA II TR2 RN  ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040  R$281,266.90
JOAO CAMARA II MC 230 kV TR 230/69 kV JOAO CAMARA II TR1 RN  ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040  R$281,266.90
JOAO CAMARA II MC 230 kV BC 230 kV 50 Mvar JOAO CAMARA II BC6 RN RB FT BC 230 kV 50,5 Mvar JOAO CAMARA II BC6 RN 019/2010 IPCA RBNI REA 4445/2013 16/11/2017 16/11/2043  R$ 1,156,214.23
JOAO CAMARA II MC 230 kV BC 230 kV 50 Mvar JOAO CAMARA II BC5 RN RB FT BC 230 kV 50,5 Mvar JOAO CAMARA II BC5 RN 019/2010 IPCA RBNI REA 4445/2013 26/11/2017 26/11/2043  R$ 1,156,223.13
JOAO CAMARA II IB 69 kV MG 69 kV JOAO CAMARA II MG1 RN IB1 ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040  R$78,032.70
JOAO CAMARA II IB 230 kV MG 230 kV JOAO CAMARA II MG1 RN IB1 RB FT MG 230 kV JOAO CAMARA II MG1 RN 019/2010 IPCA RBL CC 019/2010 17/02/2014 23/11/2040  R$192,399.16
JOAO CAMARA II BC 69 kV 21 Mvar JOAO CAMARA II BC4 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040  R$197,285.31
JOAO CAMARA II BC 230 kV 50 Mvar JOAO CAMARA II BC5 RN RB FT BC 230 kV 50,5 Mvar JOAO CAMARA II BC5 RN 019/2010 IPCA RBNI REA 4445/2013 26/11/2017 26/11/2037  R$377,681.57
JOAO CAMARA II EL 69 kV JOAO CAMARA II02P4 ICG   019/2010 IPCA RICGNI REN 443/2011 27/02/2014 26/02/2037  R$289,137.58
JOAO CAMARA II EL 69 kV JOAO CAMARA II02P3 ICG   019/2010 IPCA RICGNI REN 443/2011 27/02/2014 26/02/2037  R$289,137.58
JOAO CAMARA II EL 230 kV JOAO CAMARA II LT 230 kV CEARA MIRIM II /JOAO CAMARA II C-1 RN RB FT LT 230 kV CEARA MIRIM II /JOAO CAMARA II C-1 RN 019/2010 IPCA RBL CC 019/2010 17/02/2014 23/11/2040  R$358,058.93
JOAO CAMARA II EL 230 kV JOAO CAMARA IIUNI. DOS VENTOS DIT   061/2001 IPCA RCDM REA 6675/2017 01/07/2018 28/02/2038  R$126,644.50
JOAO CAMARA II BC 69 kV 21 Mvar JOAO CAMARA II BC3 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040  R$197,285.31
JOAO CAMARA II BC 69 kV 21 Mvar JOAO CAMARA II BC2 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040  R$197,285.31
JOAO CAMARA II BC 69 kV 21 Mvar JOAO CAMARA II BC1 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040  R$197,285.31
JOAO CAMARA II BC 230 kV 50 Mvar JOAO CAMARA II BC6 RN RB FT BC 230 kV 50,5 Mvar JOAO CAMARA II BC6 RN 019/2010 IPCA RBNI REA 4445/2013 16/11/2017 16/11/2037  R$377,677.73
JOAO CAMARA III MG 500 kV JOAO CAMARA III MG1 RN RB FT MG 500 kV JOAO CAMARA III MG1 RN 008/2011 IPCA RBNI REA 4443/2013 14/03/2016 13/03/2047  R$276,400.46
JOAO CAMARA III TR 500/138 kV JOAO CAMARA III TRR1 RN ICG   008/2011 IPCA RICG CC 008/2011 13/10/2014 13/10/2041  R$905,022.81
JOAO CAMARA III TR 500/138 kV JOAO CAMARA III TR2 RN ICG   008/2011 IPCA RICG CC 008/2011 13/10/2014 13/10/2041  R$ 2,715,069.69
JOAO CAMARA III TR 500/138 kV JOAO CAMARA III TR1 RN ICG   008/2011 IPCA RICG CC 008/2011 13/10/2014 13/10/2041  R$ 2,715,069.69
JOAO CAMARA III TR 500/138 kV JOAO CAMARA III ATR4 RN ICG   008/2011 IPCA RICGNI REA 4443/2013 14/03/2016 13/03/2031  R$ 4,725,067.36
JOAO CAMARA III TR 500/138 kV JOAO CAMARA III ATR3 RN ICG   008/2011 IPCA RICGNI REA 4443/2013 14/03/2016 13/03/2031  R$ 4,725,067.36
JOAO CAMARA III RTB 500 kV 0 Mvar JOAO CAMARA III RTBR1 RN RB FT RTB 500 kV 150 Mvar JOAO CAMARA III RTBR1 RN 008/2011 IPCA RBNI REA 4443/2013 14/03/2016 13/03/2052  R$745,231.78
JOAO CAMARA III RTB 500 kV 0 Mvar JOAO CAMARA III RTB1 RN RB FT RTB 500 kV 0 Mvar JOAO CAMARA III RTB1 RN 008/2011 IPCA RBNI REA 4443/2013 14/03/2016 13/03/2052  R$ 2,235,695.36
JOAO CAMARA III MG 500 kV JOAO CAMARA III MG1 RN RB FT MG 500 kV JOAO CAMARA III MG1 RN 008/2011 IPCA RBNI REA 4443/2013 14/03/2016 13/03/2047  R$276,400.46
JOAO CAMARA III MG 500 kV JOAO CAMARA III MG1 RN RB FT MG 500 kV JOAO CAMARA III MG1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041  R$717,217.83
JOAO CAMARA III MG 138 kV JOAO CAMARA III MG1 RN ICG   008/2011 IPCA RICGNI REA 4443/2013 14/03/2016 13/03/2031  R$35,238.60
JOAO CAMARA III MG 138 kV JOAO CAMARA III MG1 RN ICG   008/2011 IPCA RICGNI REA 4443/2013 14/03/2016 13/03/2031  R$35,238.60
JOAO CAMARA III MG 138 kV JOAO CAMARA III MG1 RN ICG   008/2011 IPCA RICG CC 008/2011 13/10/2014 13/10/2041  R$62,557.16
JOAO CAMARA III MC 500 kV TR 500/138 kV JOAO CAMARA III TR2 RN  ICG   008/2011 IPCA RICG CC 008/2011 13/10/2014 13/10/2041  R$693,743.36
JOAO CAMARA III MG 138 kV JOAO CAMARA III MG1 RN ICG   008/2011 IPCA RICGNI REA 4443/2013 14/05/2016 13/05/2031  R$34,960.74
JOAO CAMARA III IB 500 kV MG 500 kV JOAO CAMARA III MG1 RN IB4 RB FT MG 500 kV JOAO CAMARA III MG1 RN 008/2011 IPCA RBNI REA 4443/2013 14/03/2016 13/03/2047  R$ 1,299,395.22
JOAO CAMARA III MC 500 kV TR 500/138 kV JOAO CAMARA III TR1 RN  ICG   008/2011 IPCA RICG CC 008/2011 13/10/2014 13/10/2041  R$693,743.36
JOAO CAMARA III MC 500 kV TR 500/138 kV JOAO CAMARA III ATR4 RN  ICG   008/2011 IPCA RICGNI REA 4443/2013 14/03/2016 13/03/2031  R$ 1,445,921.26
JOAO CAMARA III MC 500 kV TR 500/138 kV JOAO CAMARA III ATR3 RN  ICG   008/2011 IPCA RICGNI REA 4443/2013 14/03/2016 13/03/2031  R$ 1,445,921.26
JOAO CAMARA III MC 500 kV RTB 500 kV 0 Mvar JOAO CAMARA III RTB1 RN RB FT RTB 500 kV 0 Mvar JOAO CAMARA III RTB1 RN 008/2011 IPCA RBNI REA 4443/2013 14/03/2016 13/03/2044  R$ 1,176,290.62
JOAO CAMARA III MC 138 kV TR 500/138 kV JOAO CAMARA III TR2 RN  ICG   008/2011 IPCA RICG CC 008/2011 13/10/2014 13/10/2041  R$192,814.95
JOAO CAMARA III MC 138 kV TR 500/138 kV JOAO CAMARA III TR1 RN  ICG   008/2011 IPCA RICG CC 008/2011 13/10/2014 13/10/2041  R$192,814.95
JOAO CAMARA III MC 138 kV TR 500/138 kV JOAO CAMARA III ATR4 RN  ICG   008/2011 IPCA RICGNI REA 4443/2013 14/03/2016 13/03/2031  R$420,959.30
JOAO CAMARA III MC 138 kV TR 500/138 kV JOAO CAMARA III ATR3 RN  ICG   008/2011 IPCA RICGNI REA 4443/2013 14/03/2016 13/03/2031  R$420,959.30
JOAO CAMARA III MC 138 kV BC 138 kV 50 Mvar JOAO CAMARA III BC1 RN  ICG   008/2011 IPCA RICG CC 008/2011 13/10/2014 13/10/2041  R$198,547.65
JOAO CAMARA III BC 138 kV 50 Mvar JOAO CAMARA III BC1 RN ICG   008/2011 IPCA RICG CC 008/2011 13/10/2014 13/10/2041  R$297,905.66
JOAO CAMARA III IB 500 kV MG 500 kV JOAO CAMARA III MG1 RN IB3 RB FT MG 500 kV JOAO CAMARA III MG1 RN 008/2011 IPCA RBNI REA 4443/2013 14/03/2016 13/03/2047  R$ 1,299,395.22
JOAO CAMARA III IB 500 kV MG 500 kV JOAO CAMARA III MG1 RN IB2 RB FT MG 500 kV JOAO CAMARA III MG1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041  R$613,007.12
JOAO CAMARA III IB 500 kV MG 500 kV JOAO CAMARA III MG1 RN IB1 RB FT MG 500 kV JOAO CAMARA III MG1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041  R$613,007.12
JOAO CAMARA III IB 138 kV MG 138 kV JOAO CAMARA III MG1 RN IB2 ICG   008/2011 IPCA RICGNI REA 4443/2013 14/05/2016 13/05/2031  R$227,737.34
JOAO CAMARA III IB 138 kV MG 138 kV JOAO CAMARA III MG1 RN IB1 ICG   008/2011 IPCA RICG CC 008/2011 13/10/2014 13/10/2041  R$144,649.22
JOAO CAMARA III EL 500 kV JOAO CAMARA III LT 500 kV JOAO CAMARA III /CEARA MIRIM II C-1 RN RB FT LT 500 kV JOAO CAMARA III /CEARA MIRIM II C-1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041  R$642,678.57
JOAO PESSOA II MG 230 kV JOAO PESSOA II MG2 PB RB FT MG 230 kV JOAO PESSOA II MG2 PB 061/2001 IPCA RBNI DSP 420/2023 01/07/2023 30/11/2053  R$20,103.70
JOAO PESSOA II MG 230 kV JOAO PESSOA II MG2 PB RB FT MG 230 kV JOAO PESSOA II MG2 PB 061/2001 IPCA RBNI DSP 420/2023 01/07/2023 30/11/2053  R$20,103.70
JOAO PESSOA II MG 230 kV JOAO PESSOA II MG2 PB RB FT MG 230 kV JOAO PESSOA II MG2 PB 061/2001 IPCA RBNI DSP 420/2023 01/07/2023 30/10/2053  R$20,103.70
JOAO PESSOA II MG 230 kV JOAO PESSOA II MG2 PB RB FT MG 230 kV JOAO PESSOA II MG2 PB 061/2001 IPCA RBNI DSP 420/2023 01/07/2023 30/10/2053  R$20,103.70
JOAO PESSOA II MG 230 kV JOAO PESSOA II MG2 PB RB FT MG 230 kV JOAO PESSOA II MG2 PB 061/2001 IPCA RBNI DSP 420/2023 01/07/2023 30/10/2053  R$20,103.70
JOAO PESSOA II MG 230 kV JOAO PESSOA II MG2 PB RB FT MG 230 kV JOAO PESSOA II MG2 PB 061/2001 IPCA RBNI DSP 420/2023 01/07/2023 30/10/2053  R$20,103.70
JOAO PESSOA II EL 230 kV JOAO PESSOA II LT 230 kV JOAO PESSOA II /SANTA RITA II C-2 PB RB FT LT 230 kV JOAO PESSOA II /SANTA RITA II C-2 PB 061/2001 IPCA RBNI DSP 420/2023 01/07/2023 30/10/2050  R$205,702.01
JOAO PESSOA II EL 230 kV JOAO PESSOA II LT 230 kV JOAO PESSOA II /SANTA RITA II C-1 PB RB FT LT 230 kV JOAO PESSOA II /SANTA RITA II C-1 PB 061/2001 IPCA RBNI DSP 420/2023 01/07/2023 30/10/2050  R$205,702.01
JOAO PESSOA II EL 230 kV JOAO PESSOA II LT 230 kV JOAO PESSOA II /MUSSURE II C-2 PB RB FT LT 230 kV JOAO PESSOA II /MUSSURE II C-2 PB 061/2001 IPCA RBNI DSP 420/2023 01/07/2023 30/11/2050  R$205,702.01
JOAO PESSOA II EL 230 kV JOAO PESSOA II LT 230 kV JOAO PESSOA II /MUSSURE II C-1 PB RB FT LT 230 kV JOAO PESSOA II /MUSSURE II C-1 PB 061/2001 IPCA RBNI DSP 420/2023 01/07/2023 30/10/2050  R$205,702.01
JOAO PESSOA II EL 230 kV JOAO PESSOA II LT 230 kV GOIANINHA /JOAO PESSOA II C-2 PE/PB RB FT LT 230 kV GOIANINHA /JOAO PESSOA II C-2 PE/PB 061/2001 IPCA RBNI DSP 420/2023 01/07/2023 30/10/2050  R$205,702.01
JOAO PESSOA II EL 230 kV JOAO PESSOA II LT 230 kV GOIANINHA /JOAO PESSOA II C-1 PE/PB RB FT LT 230 kV GOIANINHA /JOAO PESSOA II C-1 PE/PB 061/2001 IPCA RBNI DSP 420/2023 01/07/2023 30/10/2050  R$205,702.01
JUAZEIRO II TT 69/13,8 kV JUAZEIRO II TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
JUAZEIRO II TT 69/0 kV JUAZEIRO II TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
JUAZEIRO II TR 69/13,8 kV JUAZEIRO II TR6 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$88,749.11
JUAZEIRO II TR 230/69 kV JUAZEIRO II TR4 BA RBF FT TR 230/69 kV JUAZEIRO II TR4 BA 061/2001 IPCA RBNI REA 2823/2011 28/09/2015 27/09/2049  R$ 1,520,252.13
JUAZEIRO II TR 69/13,8 kV JUAZEIRO II TR6 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
JUAZEIRO II TR 69/13,8 kV JUAZEIRO II TR6 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$86,722.45
JUAZEIRO II TR 230/69 kV JUAZEIRO II TR3 BA RBF FT TR 230/69 kV JUAZEIRO II TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
JUAZEIRO II MC 69 kV TR 230/69 kV JUAZEIRO II TR2 BA RBF FT TR 230/69 kV JUAZEIRO II TR2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$204,189.21
JUAZEIRO II MC 230 kV TR 230/69 kV JUAZEIRO II TR3 BA RBF FT TR 230/69 kV JUAZEIRO II TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
JUAZEIRO II TR 230/69 kV JUAZEIRO II TR3 BA RBF FT TR 230/69 kV JUAZEIRO II TR3 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
JUAZEIRO II TR 230/69 kV JUAZEIRO II TR3 BA RBF FT TR 230/69 kV JUAZEIRO II TR3 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
JUAZEIRO II TR 230/69 kV JUAZEIRO II TR2 BA RBF FT TR 230/69 kV JUAZEIRO II TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
JUAZEIRO II TR 230/69 kV JUAZEIRO II TR1 BA RBF FT TR 230/69 kV JUAZEIRO II TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
JUAZEIRO II TR 230/69 kV JUAZEIRO II TR1 BA RBF FT TR 230/69 kV JUAZEIRO II TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
JUAZEIRO II TR 230/69 kV JUAZEIRO II TR1 BA RBF FT TR 230/69 kV JUAZEIRO II TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
JUAZEIRO II MG 230 kV JUAZEIRO II MG1 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBNI REA 2823/2011 28/09/2015 27/09/2045  R$ 1,639,135.73
JUAZEIRO II MG 230 kV JUAZEIRO II MG1 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$605,843.25
JUAZEIRO II MG 230 kV JUAZEIRO II MG1 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RMEL REN 643/2014 30/12/2013 29/12/2041  R$83,087.83
JUAZEIRO II MG 230 kV JUAZEIRO II MG1 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RMEL REN 643/2014 27/11/2015 26/11/2032  R$32,351.31
JUAZEIRO II MG 230 kV JUAZEIRO II MG1 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,787,807.60
JUAZEIRO II MG 230 kV JUAZEIRO II MG1 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,829,587.76
JUAZEIRO II MG 230 kV JUAZEIRO II MG1 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RMEL REN 443/2011 11/08/2016 10/08/2033  R$33,388.60
JUAZEIRO II MG 230 kV JUAZEIRO II MG1 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBNI REA 2376/2010 13/12/2017 12/12/2045  R$63,553.29
JUAZEIRO II MG 230 kV JUAZEIRO II MG1 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBNI REA 2376/2010 13/12/2017 12/12/2045  R$63,553.29
JUAZEIRO II MG 230 kV JUAZEIRO II MG1 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBNI REA 7761/2019 31/07/2015 30/07/2030  R$29,606.61
JUAZEIRO II MG 230 kV JUAZEIRO II MG1 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBNI REA 758/2006 20/12/2016 19/12/2047  R$44,564.89
JUAZEIRO II MC 69 kV TR 69/13,8 kV JUAZEIRO II TR6 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
JUAZEIRO II MC 69 kV TR 69/13,8 kV JUAZEIRO II TR6 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
JUAZEIRO II MC 69 kV TR 69/13,8 kV JUAZEIRO II TR6 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$204,189.21
JUAZEIRO II MC 69 kV TR 230/69 kV JUAZEIRO II TR4 BA RBF FT TR 230/69 kV JUAZEIRO II TR4 BA 061/2001 IPCA RBNI REA 2823/2011 28/09/2015 27/09/2045  R$484,836.45
JUAZEIRO II MC 69 kV TR 230/69 kV JUAZEIRO II TR3 BA RBF FT TR 230/69 kV JUAZEIRO II TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
JUAZEIRO II MC 69 kV TR 230/69 kV JUAZEIRO II TR2 BA RBF FT TR 230/69 kV JUAZEIRO II TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
JUAZEIRO II MC 69 kV TR 230/69 kV JUAZEIRO II TR2 BA RBF FT TR 230/69 kV JUAZEIRO II TR2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
JUAZEIRO II MC 230 kV TR 230/69 kV JUAZEIRO II TR2 BA RBF FT TR 230/69 kV JUAZEIRO II TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
JUAZEIRO II MC 69 kV TR 230/69 kV JUAZEIRO II TR1 BA RBF FT TR 230/69 kV JUAZEIRO II TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
JUAZEIRO II MC 230 kV TR 230/69 kV JUAZEIRO II TR4 BA RBF FT TR 230/69 kV JUAZEIRO II TR4 BA 061/2001 IPCA RBNI REA 2823/2011 28/09/2015 27/09/2045  R$ 1,376,262.97
JUAZEIRO II MC 230 kV TR 230/69 kV JUAZEIRO II TR2 BA RBF FT TR 230/69 kV JUAZEIRO II TR2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$515,473.59
JUAZEIRO II MC 13,8 kV TR 13,8/0,22 kV JUAZEIRO II TR5 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
JUAZEIRO II MC 13,8 kV TR 13,8/0,22 kV JUAZEIRO II TR4 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
JUAZEIRO II MC 230 kV TR 230/69 kV JUAZEIRO II TR2 BA RBF FT TR 230/69 kV JUAZEIRO II TR2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$527,519.95
JUAZEIRO II MC 230 kV TR 230/69 kV JUAZEIRO II TR1 BA RBF FT TR 230/69 kV JUAZEIRO II TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
JUAZEIRO II EL 230 kV JUAZEIRO II LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA 061/2001 IPCA RBNI REA 5861/2016 10/09/2015 09/09/2030  R$29,634.27
JUAZEIRO II EL 230 kV JUAZEIRO II LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA RB FT LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA 061/2001 IPCA RBNI REA 2173/2009 27/09/2012 26/09/2038  R$115,386.61
JUAZEIRO II IB 69 kV MG 230 kV JUAZEIRO II MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
JUAZEIRO II IB 230 kV MG 230 kV JUAZEIRO II MG1 BA IB1 RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
JUAZEIRO II EL 69 kV JUAZEIRO IITOURAO 02C6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
JUAZEIRO II EL 69 kV JUAZEIRO IISALITRE 02C8 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
JUAZEIRO II EL 69 kV JUAZEIRO IIPETROLINA 02C9 DIT   061/2001 IPCA RCDM REA 758/2006 20/12/2016 19/12/2044  R$608,183.36
JUAZEIRO II EL 69 kV JUAZEIRO IIPETROLINA 02C5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
JUAZEIRO II EL 69 kV JUAZEIRO IIPETROLINA 02C4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
JUAZEIRO II EL 69 kV JUAZEIRO IIJUNCO 02C7 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
JUAZEIRO II EL 69 kV JUAZEIRO IIJUNCO 02C7 DIT   061/2001 IPCA RCDM REA 1814/2009 21/12/2014 20/12/2044  R$15,412.06
JUAZEIRO II EL 69 kV JUAZEIRO IIJUNCO 02C7 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
JUAZEIRO II EL 69 kV JUAZEIRO IIJUNCO 02C7 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
JUAZEIRO II EL 69 kV JUAZEIRO IIJUAZEIRO I 02C3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
JUAZEIRO II EL 69 kV JUAZEIRO IIJUAZEIRO I 02C2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
JUAZEIRO II EL 69 kV JUAZEIRO IICARAIBA 02C1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
JUAZEIRO II EL 69 kV JUAZEIRO II02M2 DIT   061/2001 IPCA RCDM REA 2376/2010 13/12/2017 12/12/2047  R$515,067.47
JUAZEIRO II EL 69 kV JUAZEIRO II02M1 DIT   061/2001 IPCA RCDM REA 2376/2010 13/12/2017 12/12/2047  R$515,067.47
JUAZEIRO II EL 230 kV JUAZEIRO II LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
JUAZEIRO II EL 230 kV JUAZEIRO II LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA 061/2001 IPCA RBNI REA 5861/2016 10/09/2015 09/09/2043  R$35,850.06
JUAZEIRO II EL 230 kV JUAZEIRO II LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA 061/2001 IPCA RBNI REA 5861/2016 19/09/2017 18/09/2032  R$121,458.18
JUAZEIRO II EL 230 kV JUAZEIRO II LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
JUAZEIRO II EL 230 kV JUAZEIRO II LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA RB FT LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
JUAZEIRO II EL 230 kV JUAZEIRO II LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA 061/2001 IPCA RBNI REA 5861/2016 19/09/2017 18/09/2032  R$121,458.18
JUAZEIRO II EL 230 kV JUAZEIRO II LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA  RB FT LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
JUAZEIRO II EL 230 kV JUAZEIRO II LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA  RB FT LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA 061/2001 IPCA RBNI REA 5861/2016 09/06/2016 08/06/2044  R$28,898.45
JUAZEIRO II EL 230 kV JUAZEIRO II LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA  RB FT LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA 061/2001 IPCA RBNI REA 5861/2016 09/06/2016 08/06/2031  R$120,217.36
JUAZEIRO III EL 500 kV JUAZEIRO III LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RBNI REA 9689/2021 31/07/2019 30/07/2047  R$191,257.58
JUAZEIRO III EL 500 kV JUAZEIRO III LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA  RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBNI REA 9689/2021 31/07/2019 30/07/2047  R$191,257.58
LAGOA NOVA II TR 230/69 kV LAGOA NOVA II TR1 RN ICG   010/2011 IPCA RICG CC 010/2011 15/01/2016 13/10/2041  R$ 1,059,856.59
LAGOA DO CARRO EL 230 kV LAGOA DO CARRO LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE  RB FT LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE 061/2001 IPCA RBNI REA 9687/2021 22/10/2020 21/10/2048  R$153,279.46
LAGOA DO CARRO EL 230 kV LAGOA DO CARRO LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE RB FT LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE 061/2001 IPCA RBNI REA 9687/2021 22/10/2020 21/10/2048  R$153,279.46
LAGOA NOVA II TT 69/0 kV LAGOA NOVA II TA1 RN ICG   010/2011 IPCA RICG CC 010/2011 15/01/2016 13/10/2041  R$178,116.46
LAGOA NOVA II TR 230/69 kV LAGOA NOVA II TR3 RN ICG   010/2011 IPCA RICGNI REA 4876/2014 28/11/2016 27/11/2033  R$ 1,603,288.83
LAGOA NOVA II TR 230/69 kV LAGOA NOVA II TR2 RN ICG   010/2011 IPCA RICG CC 010/2011 15/01/2016 13/10/2041  R$ 1,059,856.59
LAGOA NOVA II MG 230 kV LAGOA NOVA II MG1 RN RB FT MG 230 kV LAGOA NOVA II MG1 RN 010/2011 IPCA RBL CC 010/2011 13/10/2011 13/10/2041  R$859,394.40
LAGOA NOVA II MG 69 kV LAGOA NOVA II MG1 RN ICG   010/2011 IPCA RICG CC 010/2011 15/01/2016 13/10/2041  R$68,088.07
LAGOA NOVA II MG 69 kV LAGOA NOVA II MG1 RN ICG   010/2011 IPCA RICGNI REA 4876/2014 28/11/2016 27/11/2033  R$15,183.06
LAGOA NOVA II MG 69 kV LAGOA NOVA II MG1 RN ICG   010/2011 IPCA RICGNI REN 905/2020 28/10/2022 27/10/2053  R$46,959.44
LAGOA NOVA II MG 230 kV LAGOA NOVA II MG1 RN RB FT MG 230 kV LAGOA NOVA II MG1 RN 010/2011 IPCA RBNI REA 4876/2014 28/11/2016 27/11/2048  R$59,463.14
LAGOA NOVA II MC 69 kV TT 69/0 kV LAGOA NOVA II TA1 RN  ICG   010/2011 IPCA RICG CC 010/2011 15/01/2016 13/10/2041  R$66,306.70
LAGOA NOVA II MC 69 kV TR 230/69 kV LAGOA NOVA II TR3 RN ICG   010/2011 IPCA RICGNI REA 4876/2014 28/11/2016 27/11/2033  R$220,699.48
LAGOA NOVA II MC 69 kV TR 230/69 kV LAGOA NOVA II TR2 RN  ICG   010/2011 IPCA RICG CC 010/2011 15/01/2016 13/10/2041  R$157,109.19
LAGOA NOVA II MC 69 kV TR 230/69 kV LAGOA NOVA II TR1 RN  ICG   010/2011 IPCA RICG CC 010/2011 15/01/2016 13/10/2041  R$157,109.19
LAGOA NOVA II MC 230 kV TR 230/69 kV LAGOA NOVA II TR3 RN ICG   010/2011 IPCA RICGNI REA 4876/2014 28/11/2016 27/11/2033  R$595,591.09
LAGOA NOVA II MC 230 kV TR 230/69 kV LAGOA NOVA II TR2 RN  ICG   010/2011 IPCA RICG CC 010/2011 15/01/2016 13/10/2041  R$386,255.54
LAGOA NOVA II MC 230 kV TR 230/69 kV LAGOA NOVA II TR1 RN  ICG   010/2011 IPCA RICG CC 010/2011 15/01/2016 13/10/2041  R$386,255.54
LAGOA NOVA II IB 69 kV MG 69 kV LAGOA NOVA II MG1 RN IB1 ICG   010/2011 IPCA RICG CC 010/2011 15/01/2016 13/10/2041  R$107,710.32
LAGOA NOVA II IB 230 kV MG 230 kV LAGOA NOVA II MG1 RN IB1 RB FT MG 230 kV LAGOA NOVA II MG1 RN 010/2011 IPCA RBL CC 010/2011 13/10/2011 13/10/2041  R$304,317.03
LAGOA NOVA II EL 69 kV LAGOA NOVA IIL.N. DO SERIDO DIT   010/2011 IPCA RCDM REN 905/2020 28/10/2022 27/10/2050  R$643,769.49
LAGOA NOVA II EL 230 kV LAGOA NOVA II LT 230 kV PARAISO /LAGOA NOVA II C-1 RN RB FT LT 230 kV PARAISO /LAGOA NOVA II C-1 RN 010/2011 IPCA RBL CC 010/2011 13/10/2011 13/10/2041  R$563,793.73
LT500 kV P. AFONSO IV /US. L.GONZAGA BA/PE LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,797,133.43
LT500 kV P. AFONSO IV /US. L.GONZAGA BA/PE LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBNI REA 5745/2016 10/01/2020 10/01/2049  R$ 1,396,111.76
LT500 kV P. AFONSO IV /US. L.GONZAGA BA/PE LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,303,234.49
LT500 kV P. AFONSO IV /USINA PA-IV BA LT 500 kV P. AFONSO IV /USINA PA-IV C-6 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$37,480.32
LT500 kV P. AFONSO IV /USINA PA-IV BA LT 500 kV P. AFONSO IV /USINA PA-IV C-6 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$110,602.22
LT500 kV P. AFONSO IV /USINA PA-IV BA LT 500 kV P. AFONSO IV /USINA PA-IV C-6 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$113,186.93
LT500 kV P. AFONSO IV /USINA PA-IV BA LT 500 kV P. AFONSO IV /USINA PA-IV C-5 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$37,480.32
LT500 kV P. AFONSO IV /USINA PA-IV BA LT 500 kV P. AFONSO IV /USINA PA-IV C-5 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$110,602.22
LT500 kV P. AFONSO IV /USINA PA-IV BA LT 500 kV P. AFONSO IV /USINA PA-IV C-5 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$113,186.93
LT500 kV P. AFONSO IV /USINA PA-IV BA LT 500 kV P. AFONSO IV /USINA PA-IV C-4 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$37,480.32
LT500 kV P. AFONSO IV /USINA PA-IV BA LT 500 kV P. AFONSO IV /USINA PA-IV C-4 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$110,602.22
LT500 kV P. AFONSO IV /USINA PA-IV BA LT 500 kV P. AFONSO IV /USINA PA-IV C-3 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$37,480.32
LT500 kV P. AFONSO IV /USINA PA-IV BA LT 500 kV P. AFONSO IV /USINA PA-IV C-3 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$110,602.22
LT500 kV P. AFONSO IV /USINA PA-IV BA LT 500 kV P. AFONSO IV /USINA PA-IV C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$37,480.32
LT500 kV P. AFONSO IV /USINA PA-IV BA LT 500 kV P. AFONSO IV /USINA PA-IV C-2 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$110,602.22
LT500 kV P. AFONSO IV /USINA PA-IV BA LT 500 kV P. AFONSO IV /USINA PA-IV C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$37,480.32
LT500 kV P. AFONSO IV /USINA PA-IV BA LT 500 kV P. AFONSO IV /USINA PA-IV C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$110,602.22
LT500 kV US. L.GONZAGA/U.SOBRADINHOPE/BA LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 15,184,335.96
LT500 kV US. L.GONZAGA/U.SOBRADINHOPE/BA LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 44,808,077.49
LT500 kV US. L.GONZAGA/U.SOBRADINHOPE/BA LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 45,855,219.61
LT 138 kV ACU II /SAN.MATOS II RN LT 138 kV ACU II /SAN.MATOS II C-1 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$672,445.76
LT 138 kV C.GRANDE II /PILOES PB LT 138 kV C.GRANDE II /PILOES C-1 PB DIT   061/2001 IPCA RCDM REA 1094/2007 09/11/2012 08/11/2052  R$ 2,015,791.66
LT 138 kV C.GRANDE II /PILOES PB LT 138 kV C.GRANDE II /PILOES C-1 PB DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$628,584.58
LT 138 kV C.GRANDE II /SANTA CRUZ II PB/RN LT 138 kV C.GRANDE II /SANTA CRUZ II C-1 PB/RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 1,257,169.15
LT 138 kV PARAISO /SANTA CRUZ II RN LT 138 kV PARAISO /SANTA CRUZ II C-1 RN DIT   061/2001 IPCA RCDM REA 2173/2009 30/03/2014 29/03/2052  R$295,460.53
LT 138 kV PARAISO /SANTA CRUZ II RN LT 138 kV PARAISO /SANTA CRUZ II C-1 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$29,007.13
LT 138 kV PARAISO /SANTA CRUZ II RN LT 138 kV PARAISO /SANTA CRUZ II C-1 RN DIT   061/2001 IPCA RCDM REA 1094/2007 30/03/2014 29/03/2054  R$61,327.24
LT 138 kV PILOES /PARAISO PB/RN LT 138 kV PILOES /PARAISO C-1 PB/RN DIT   061/2001 IPCA RCDM REA 2173/2009 30/03/2014 29/03/2052  R$298,365.19
LT 138 kV PILOES /PARAISO PB/RN LT 138 kV PILOES /PARAISO C-1 PB/RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$599,577.44
LT 138 kV PILOES /PARAISO PB/RN LT 138 kV PILOES /PARAISO C-1 PB/RN DIT   061/2001 IPCA RCDM REA 1094/2007 30/03/2014 29/03/2054  R$ 2,064,978.37
LT 138 kV USINA PA-II /ZEBU BA LT 138 kV USINA PA-II /ZEBU C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$97,613.09
LT 230 kV ACU III /ACU II RN LT 230 kV ACU III /ACU II C-3 RN RB FT LT 230 kV ACU III /ACU II C-3 RN 019/2010 IPCA RBL CC 019/2010 23/11/2010 23/11/2040  R$ 1,509,498.22
LT 230 kV ACU III /ACU II RN LT 230 kV ACU III /ACU II C-3 RN RB FT LT 230 kV ACU III /ACU II C-3 RN 019/2010 IPCA RBNI REA 4407/2013 23/12/2021 23/12/2058  R$266,453.47
LT 230 kV ACU III /ACU II RN LT 230 kV ACU III /ACU II C-3 RN RB FT LT 230 kV ACU III /ACU II C-3 RN 019/2010 IPCA RBNI DSP 1269/2022 01/07/2022 30/06/2056  R$39,805.24
LT 230 kV ACU III /ACU II RN LT 230 kV ACU III /ACU II C-1 RN RB FT LT 230 kV ACU III /ACU II C-1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$216,541.41
LT 230 kV ACU III /ACU II RN LT 230 kV ACU III /ACU II C-1 RN RB FT LT 230 kV ACU III /ACU II C-1 RN 061/2001 IPCA RBNI REA 4407/2013 05/02/2020 05/02/2057  R$458,186.11
LT 230 kV ACU III /ACU II RN LT 230 kV ACU III /ACU II C-1 RN RB FT LT 230 kV ACU III /ACU II C-1 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$639,000.89
LT 230 kV ACU III /ACU II RN LT 230 kV ACU III /ACU II C-1 RN RB FT LT 230 kV ACU III /ACU II C-1 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$653,934.02
LT 230 kV ACU III /ACU II RN LT 230 kV ACU III /ACU II C-1 RN RB FT LT 230 kV ACU III /ACU II C-1 RN 061/2001 IPCA RBNI DSP 1307/2022 01/07/2022 30/06/2056  R$46,205.98
LT 230 kV ALEX /MOSSORO II CE/RN LT 230 kV ALEX /MOSSORO II C-1 CE/RN RB FT LT 230 kV ALEX /MOSSORO II C-1 CE/RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,999,953.41
LT 230 kV ALEX /MOSSORO II CE/RN LT 230 kV ALEX /MOSSORO II C-1 CE/RN RB FT LT 230 kV ALEX /MOSSORO II C-1 CE/RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 5,116,799.80
LT 230 kV ALEX /MOSSORO II CE/RN LT 230 kV ALEX /MOSSORO II C-1 CE/RN RB FT LT 230 kV ALEX /MOSSORO II C-1 CE/RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,694,359.07
LT 230 kV ALEX /MOSSORO II CE/RN LT 230 kV ALEX /MOSSORO II C-1 CE/RN RB FT LT 230 kV ALEX /MOSSORO II C-1 CE/RN 061/2001 IPCA RBNI DSP 1183/2022 01/07/2022 30/06/2052  R$49,468.48
LT 230 kV ANGELIM /MESSIAS PE/AL LT 230 kV ANGELIM /MESSIAS C-3 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,557,129.58
LT 230 kV ANGELIM /MESSIAS PE/AL LT 230 kV ANGELIM /MESSIAS C-1 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-1 PE/AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,225,936.05
LT 230 kV ANGELIM /MESSIAS PE/AL LT 230 kV ANGELIM /MESSIAS C-1 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-1 PE/AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,617,664.79
LT 230 kV ANGELIM /MESSIAS PE/AL LT 230 kV ANGELIM /MESSIAS C-3 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,594,997.32
LT 230 kV ANGELIM /MESSIAS PE/AL LT 230 kV ANGELIM /MESSIAS C-3 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,702,380.08
LT 230 kV ANGELIM /MESSIAS PE/AL LT 230 kV ANGELIM /MESSIAS C-2 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,219,720.91
LT 230 kV ANGELIM /MESSIAS PE/AL LT 230 kV ANGELIM /MESSIAS C-2 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,599,324.29
LT 230 kV ANGELIM /MESSIAS PE/AL LT 230 kV ANGELIM /MESSIAS C-2 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL 061/2001 IPCA RBNI REA 7761/2019 06/12/2014 05/12/2051  R$ 1,405,810.64
LT 230 kV ANGELIM /RECIFE II PE LT 230 kV ANGELIM /RECIFE II C-1 PE RB FT LT 230 kV ANGELIM /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,667,848.16
LT 230 kV ANGELIM /RIBEIRAO PE LT 230 kV ANGELIM /RIBEIRAO C-2 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,786,852.29
LT 230 kV ANGELIM /RIBEIRAO PE LT 230 kV ANGELIM /RIBEIRAO C-2 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-2 PE 061/2001 IPCA RBNI REA 3817/2013 20/08/2019 20/08/2056  R$27,732.13
LT 230 kV ANGELIM /RIBEIRAO PE LT 230 kV ANGELIM /RIBEIRAO C-1 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-1 PE 061/2001 IPCA RBNI REA 2823/2011 21/01/2015 20/01/2051  R$ 5,796,316.95
LT 230 kV ANGELIM /RIBEIRAO PE LT 230 kV ANGELIM /RIBEIRAO C-1 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,277,621.90
LT 230 kV ANGELIM /RIBEIRAO PE LT 230 kV ANGELIM /RIBEIRAO C-1 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-1 PE 061/2001 IPCA RBNI REA 7761/2019 20/12/2014 19/12/2051  R$ 2,140,227.70
LT 230 kV ANGELIM /TACAIMBO PE LT 230 kV ANGELIM /TACAIMBO C-3 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,293,342.78
LT 230 kV ANGELIM /TACAIMBO PE LT 230 kV ANGELIM /TACAIMBO C-3 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-3 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,816,578.05
LT 230 kV ANGELIM /TACAIMBO PE LT 230 kV ANGELIM /TACAIMBO C-3 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-3 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,905,769.55
LT 230 kV ANGELIM /TACAIMBO PE LT 230 kV ANGELIM /TACAIMBO C-2 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,261,845.84
LT 230 kV ANGELIM /TACAIMBO PE LT 230 kV ANGELIM /TACAIMBO C-1 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,257,908.73
LT 230 kV ARAPIRACA III /PENEDO AL LT 230 kV ARAPIRACA III /PENEDO C-1 AL RB FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$692,948.64
LT 230 kV ARAPIRACA III /PENEDO AL LT 230 kV ARAPIRACA III /PENEDO C-1 AL RB FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,044,850.47
LT 230 kV AQUIRAZ II /FORTALEZA CE LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE 061/2001 IPCA RBNI REA 3631/2012 27/08/2021 27/08/2058  R$ 1,120,911.25
LT 230 kV AQUIRAZ II /FORTALEZA CE LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE 061/2001 IPCA RBNI REA 3631/2012 27/08/2021 27/08/2058  R$311,395.27
LT 230 kV AQUIRAZ II /FORTALEZA CE LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$196,855.83
LT 230 kV AQUIRAZ II /FORTALEZA CE LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE 061/2001 IPCA RBNI REA 2823/2011 02/10/2020 02/10/2060  R$ 1,792,180.49
LT 230 kV AQUIRAZ II /FORTALEZA CE LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$207,988.29
LT 230 kV AQUIRAZ II /FORTALEZA CE LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$613,761.16
LT 230 kV AQUIRAZ II /FORTALEZA CE LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,850.80
LT 230 kV AQUIRAZ II /FORTALEZA CE LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$592,698.84
LT 230 kV ARAPIRACA III /PENEDO AL LT 230 kV ARAPIRACA III /PENEDO C-1 AL RB FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,092,637.59
LT 230 kV ARAPIRACA III /PENEDO AL LT 230 kV ARAPIRACA III /PENEDO C-1 AL RB FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL 061/2001 IPCA RBNI REA 10134/2021 15/08/2016 14/08/2044  R$469,557.32
LT 230 kV B. ESPERANCA /TERESINA PI LT 230 kV B. ESPERANCA /TERESINA C-2 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,897,745.35
LT 230 kV B. ESPERANCA /TERESINA PI LT 230 kV B. ESPERANCA /TERESINA C-2 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 11,502,016.04
LT 230 kV B. ESPERANCA /TERESINA PI LT 230 kV B. ESPERANCA /TERESINA C-2 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 11,770,812.34
LT 230 kV B. ESPERANCA /TERESINA PI LT 230 kV B. ESPERANCA /TERESINA C-1 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,897,745.35
LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO BA LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA RB FT LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,412,703.20
LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO BA LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA RB FT LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 7,119,744.47
LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO BA LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA RB FT LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 7,286,129.30
LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO BA LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA RB FT LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA 061/2001 IPCA RBNI REA 10198/2021 19/06/2019 18/06/2047  R$1,209.05
LT 230 kV BANABUIU /ALEX CE LT 230 kV BANABUIU /ALEX C-1 CE RB FT LT 230 kV BANABUIU /ALEX C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,652,040.28
LT 230 kV BANABUIU /ALEX CE LT 230 kV BANABUIU /ALEX C-1 CE RB FT LT 230 kV BANABUIU /ALEX C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 7,826,014.04
LT 230 kV BANABUIU /ALEX CE LT 230 kV BANABUIU /ALEX C-1 CE RB FT LT 230 kV BANABUIU /ALEX C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 8,008,904.03
LT 230 kV BANABUIU /ALEX CE LT 230 kV BANABUIU /ALEX C-1 CE RB FT LT 230 kV BANABUIU /ALEX C-1 CE 061/2001 IPCA RBNI DSP 1183/2022 01/07/2022 30/06/2052  R$49,468.48
LT 230 kV BANABUIU /AQUIRAZ II CE LT 230 kV BANABUIU /AQUIRAZ II C-3 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-3 CE 061/2001 IPCA RBNI REA 3631/2012 06/11/2020 06/11/2057  R$ 1,120,911.25
LT 230 kV BANABUIU /AQUIRAZ II CE LT 230 kV BANABUIU /AQUIRAZ II C-3 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,291,429.41
LT 230 kV BANABUIU /AQUIRAZ II CE LT 230 kV BANABUIU /AQUIRAZ II C-3 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-3 CE 061/2001 IPCA RMEL REN 643/2014 19/04/2014 18/04/2051  R$29,437.99
LT 230 kV BANABUIU /AQUIRAZ II CE LT 230 kV BANABUIU /AQUIRAZ II C-2 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,533,810.10
LT 230 kV BANABUIU /AQUIRAZ II CE LT 230 kV BANABUIU /AQUIRAZ II C-2 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 7,477,123.77
LT 230 kV BANABUIU /AQUIRAZ II CE LT 230 kV BANABUIU /AQUIRAZ II C-1 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-1 CE 061/2001 IPCA RBNI REA 2823/2011 02/10/2020 02/10/2060  R$ 1,792,180.49
LT 230 kV BANABUIU /AQUIRAZ II CE LT 230 kV BANABUIU /AQUIRAZ II C-1 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,526,672.61
LT 230 kV BANABUIU /AQUIRAZ II CE LT 230 kV BANABUIU /AQUIRAZ II C-1 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-1 CE 061/2001 IPCA RMEL REN 643/2014 24/11/2014 23/11/2051  R$240,748.05
LT 230 kV BANABUIU /AQUIRAZ II CE LT 230 kV BANABUIU /AQUIRAZ II C-1 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 7,456,061.45
LT 230 kV BANABUIU /ICO CE LT 230 kV BANABUIU /ICO C-1 CE RB FT LT 230 kV BANABUIU /ICO C-1 CE 061/2001 IPCA RBNI REA 1312/2008 13/11/2012 12/11/2051  R$238,773.17
LT 230 kV BANABUIU /ICO CE LT 230 kV BANABUIU /ICO C-1 CE RB FT LT 230 kV BANABUIU /ICO C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,748,784.57
LT 230 kV BANABUIU /ICO CE LT 230 kV BANABUIU /ICO C-1 CE RB FT LT 230 kV BANABUIU /ICO C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,160,559.85
LT 230 kV BANABUIU /MOSSORO II CE/RN LT 230 kV BANABUIU /MOSSORO II C-2 CE/RN RB FT LT 230 kV BANABUIU /MOSSORO II C-2 CE/RN 061/2001 IPCA RBNI REA 2173/2009 06/06/2016 05/06/2053  R$ 5,622,155.35
LT 230 kV BANABUIU /RUSSAS II CE LT 230 kV BANABUIU /RUSSAS II C-1 CE RB FT LT 230 kV BANABUIU /RUSSAS II C-1 CE 061/2001 IPCA RBNI REA 2173/2009 10/09/2019 10/09/2059  R$ 3,349,267.02
LT 230 kV BANABUIU /RUSSAS II CE LT 230 kV BANABUIU /RUSSAS II C-1 CE RB FT LT 230 kV BANABUIU /RUSSAS II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,173,288.32
LT 230 kV BARREIRAS II /BARREIRAS BA LT 230 kV BARREIRAS II /BARREIRAS C-1 BA RB FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$275,598.16
LT 230 kV BARREIRAS II /BARREIRAS BA LT 230 kV BARREIRAS II /BARREIRAS C-1 BA RB FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$813,273.86
LT 230 kV BARREIRAS II /BARREIRAS BA LT 230 kV BARREIRAS II /BARREIRAS C-1 BA RB FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$832,279.66
LT 230 kV BARREIRAS II /BARREIRAS BA LT 230 kV BARREIRAS II /BARREIRAS C-1 BA RB FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA 061/2001 IPCA RBNI REA 9680/2021 19/11/2019 18/11/2047  R$53,751.35
LT 230 kV BOM NOME /MILAGRES PE/CE LT 230 kV BOM NOME /MILAGRES C-3 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-3 PE/CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,651,620.38
LT 230 kV BOM NOME /MILAGRES PE/CE LT 230 kV BOM NOME /MILAGRES C-3 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-3 PE/CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,873,834.07
LT 230 kV BOM NOME /MILAGRES PE/CE LT 230 kV BOM NOME /MILAGRES C-2 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-2 PE/CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,655,557.50
LT 230 kV BOM NOME /MILAGRES PE/CE LT 230 kV BOM NOME /MILAGRES C-1 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,647,683.26
LT 230 kV BONGI /ACONORTE PE LT 230 kV BONGI /ACONORTE C-1 PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$141,736.19
LT 230 kV BONGI /ACONORTE PE LT 230 kV BONGI /ACONORTE C-1 PE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$418,255.13
LT 230 kV BONGI /JOAIRAM PE LT 230 kV BONGI /JOAIRAM C-3 PE RB FT LT 230 kV BONGI /JOAIRAM C-3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,330.66
LT 230 kV BONGI /JOAIRAM PE LT 230 kV BONGI /JOAIRAM C-2 PE RB FT LT 230 kV BONGI /JOAIRAM C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$119,330.66
LT 230 kV BONGI /JOAIRAM PE LT 230 kV BONGI /JOAIRAM C-1 PE RB FT LT 230 kV BONGI /JOAIRAM C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$148,823.00
LT 230 kV BROT.MACAUBAS /B.JESUS LAPA BA LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA RB FT LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 5,923,616.07
LT 230 kV BROT.MACAUBAS /B.JESUS LAPA BA LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA RB FT LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA 061/2001 IPCA RBNI REA 4629/2014 27/09/2013 31/12/2042  R$743,623.78
LT 230 kV BROT.MACAUBAS /B.JESUS LAPA BA LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA RB FT LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 17,480,240.72
LT 230 kV BROT.MACAUBAS /B.JESUS LAPA BA LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA RB FT LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 17,888,745.11
LT 230 kV BRUMADO II /IBICOARA BA LT 230 kV BRUMADO II /IBICOARA C-1 BA RB FT LT 230 kV BRUMADO II /IBICOARA C-1 BA 010/2007 IPCA RBL CC 010/2007 11/06/2007 11/06/2037  R$ 4,525,487.44
LT 230 kV C.GRANDE III /C.GRANDE II PB LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB 061/2001 IPCA RBNI REA 10226/2021 27/01/2017 26/01/2050  R$66,126.73
LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,460,131.96
LT 230 kV C.GRANDE II /COTEMINAS PB LT 230 kV C.GRANDE II /COTEMINAS C-1 PB RB FT LT 230 kV C.GRANDE II /COTEMINAS C-1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$38,121.20
LT 230 kV C.GRANDE II /COTEMINAS PB LT 230 kV C.GRANDE II /COTEMINAS C-1 PB RB FT LT 230 kV C.GRANDE II /COTEMINAS C-1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$112,493.41
LT 230 kV C.GRANDE II /COTEMINAS PB LT 230 kV C.GRANDE II /COTEMINAS C-1 PB RB FT LT 230 kV C.GRANDE II /COTEMINAS C-1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$115,122.32
LT 230 kV C.GRANDE II /PARAISO PB/RN LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN RB FT LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,849,003.68
LT 230 kV C.GRANDE II /PARAISO PB/RN LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN RB FT LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,456,300.51
LT 230 kV C.GRANDE II /PARAISO PB/RN LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN RB FT LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,835,019.62
LT 230 kV C.GRANDE II /PARAISO PB/RN LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN RB FT LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,415,034.37
LT 230 kV C.GRANDE III /C.GRANDE II PB LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$77,730.55
LT 230 kV C.GRANDE III /C.GRANDE II PB LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$229,378.27
LT 230 kV C.GRANDE III /C.GRANDE II PB LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$234,738.72
LT 230 kV C.GRANDE III /C.GRANDE II PB LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB 061/2001 IPCA RBNI REA 10226/2021 27/01/2017 26/01/2050  R$66,126.73
LT 230 kV C.GRANDE III /C.GRANDE II PB LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$38,687.20
LT 230 kV C.GRANDE III /C.GRANDE II PB LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$114,163.65
LT 230 kV C.GRANDE III /C.GRANDE II PB LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$116,831.60
LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,308,763.06
LT 230 kV C.GRANDE III /C.GRANDE II PB LT 230 kV C.GRANDE III /C.GRANDE II C-1 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041  R$262,342.52
LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,409,456.68
LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN 061/2001 IPCA RBNI REA 3208/2011 06/01/2020 06/01/2060  R$ 1,416,515.34
LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN 061/2001 IPCA RBNI REA 10226/2021 27/01/2017 26/01/2050  R$66,126.73
LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,650,789.97
LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 7,822,324.45
LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 8,005,128.22
LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN 061/2001 IPCA RBNI REA 10141/2021 15/08/2016 15/08/2048  R$180,465.03
LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN 061/2001 IPCA RBNI REA 10226/2021 27/01/2017 26/01/2050  R$66,126.73
LT 230 kV CAMACARI II /BRAS.C.SODA BA LT 230 kV CAMACARI II /BRAS.C.SODA C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$170,083.43
LT 230 kV CAMACARI II /BRAS.C.SODA BA LT 230 kV CAMACARI II /BRAS.C.SODA C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$501,906.15
LT 230 kV CAMACARI II /BRAS.C.SODA BA LT 230 kV CAMACARI II /BRAS.C.SODA C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$513,635.45
LT 230 kV CAMACARI II /BRASKEM BA LT 230 kV CAMACARI II /BRASKEM C-2 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$418,255.13
LT 230 kV CAMACARI II /BRASKEM BA LT 230 kV CAMACARI II /BRASKEM C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$141,736.19
LT 230 kV CAMACARI II /BRASKEM BA LT 230 kV CAMACARI II /BRASKEM C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$141,736.19
LT 230 kV CAMACARI II /G.MANGABEIRA BA LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,300,517.71
LT 230 kV CAMACARI II /G.MANGABEIRA BA LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,837,750.86
LT 230 kV CAMACARI II /BRASKEM BA LT 230 kV CAMACARI II /BRASKEM C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$418,255.13
LT 230 kV CAMACARI II /BRASKEM BA LT 230 kV CAMACARI II /BRASKEM C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$428,029.54
LT 230 kV CAMACARI II /CARAIBAS BA LT 230 kV CAMACARI II /CARAIBAS C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$81,892.02
LT 230 kV CAMACARI II /CARAIBAS BA LT 230 kV CAMACARI II /CARAIBAS C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$241,658.52
LT 230 kV CAMACARI II /CARAIBAS BA LT 230 kV CAMACARI II /CARAIBAS C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$247,305.96
LT 230 kV CAMACARI II /COTEGIPE BA LT 230 kV CAMACARI II /COTEGIPE C-1 BA RB FT LT 230 kV CAMACARI II /COTEGIPE C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$508,872.31
LT 230 kV CAMACARI II /COTEGIPE BA LT 230 kV CAMACARI II /COTEGIPE C-1 BA RB FT LT 230 kV CAMACARI II /COTEGIPE C-1 BA 061/2001 IPCA RBNI REA 6258/2017 27/11/2020 27/11/2048  R$358,288.38
LT 230 kV CAMACARI II /COTEGIPE BA LT 230 kV CAMACARI II /COTEGIPE C-1 BA RB FT LT 230 kV CAMACARI II /COTEGIPE C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,501,652.09
LT 230 kV CAMACARI II /FEIRA DE SANTANA III BA LT 230 kV CAMACARI II /FEIRA DE SANTANA III C-2 BA RB FT LT 230 kV CAMACARI II /FEIRA DE SANTANA III C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$578,860.89
LT 230 kV CAMACARI II /FEIRA DE SANTANA III BA LT 230 kV CAMACARI II /FEIRA DE SANTANA III C-2 BA RB FT LT 230 kV CAMACARI II /FEIRA DE SANTANA III C-2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,708,184.27
LT 230 kV CAMACARI II /FEIRA DE SANTANA III BA LT 230 kV CAMACARI II /FEIRA DE SANTANA III C-2 BA RB FT LT 230 kV CAMACARI II /FEIRA DE SANTANA III C-2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,748,103.67
LT 230 kV CAMACARI II /FEIRA DE SANTANA III BA LT 230 kV CAMACARI II /FEIRA DE SANTANA III C-2 BA RB FT LT 230 kV CAMACARI II /FEIRA DE SANTANA III C-2 BA 061/2001 IPCA RBNI REA 2891/2011 26/09/2022 26/09/2056  R$34,286.53
LT 230 kV CAMACARI II /FEIRA DE SANTANA III BA LT 230 kV CAMACARI II /FEIRA DE SANTANA III C-2 BA RB FT LT 230 kV CAMACARI II /FEIRA DE SANTANA III C-2 BA 061/2001 IPCA RBNI DSP 337/2023 01/07/2023 25/09/2056  R$678,051.50
LT 230 kV CAMACARI II /G.MANGABEIRA BA LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,927,437.16
LT 230 kV CAMACARI II /MATATU BA LT 230 kV CAMACARI II /MATATU C-1 BA RB FT LT 230 kV CAMACARI II /MATATU C-1 BA 061/2001 IPCA RBNI REA 7761/2019 01/01/2021 31/12/2057  R$549,453.54
LT 230 kV CAMACARI II /PITUACU BA LT 230 kV CAMACARI II /PITUACU C-1 BA RB FT LT 230 kV CAMACARI II /PITUACU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$609,083.56
LT 230 kV CAMACARI II /MATATU BA LT 230 kV CAMACARI II /MATATU C-1 BA RB FT LT 230 kV CAMACARI II /MATATU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$925,222.38
LT 230 kV CAMACARI II /PITUACU BA LT 230 kV CAMACARI II /PITUACU C-1 BA RB FT LT 230 kV CAMACARI II /PITUACU C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,797,369.58
LT 230 kV CAMACARI II /PITUACU BA LT 230 kV CAMACARI II /PITUACU C-1 BA RB FT LT 230 kV CAMACARI II /PITUACU C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,839,373.20
LT 230 kV CAMACARI IV /COTEGIPE BA LT 230 kV CAMACARI IV /COTEGIPE C-1 BA RB FT LT 230 kV CAMACARI IV /COTEGIPE C-1 BA 061/2001 IPCA RBNI REA 2891/2011 02/06/2014 01/06/2051  R$846,814.85
LT 230 kV CAMACARI IV /COTEGIPE BA LT 230 kV CAMACARI IV /COTEGIPE C-1 BA RB FT LT 230 kV CAMACARI IV /COTEGIPE C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$498,045.24
LT 230 kV CAMACARI IV /JACARACANGA BA LT 230 kV CAMACARI IV /JACARACANGA C-2 BA RB FT LT 230 kV CAMACARI IV /JACARACANGA C-2 BA 061/2001 IPCA RBNI REA 2891/2011 11/08/2014 10/08/2054  R$ 1,322,947.85
LT 230 kV CAMACARI IV /JACARACANGA BA LT 230 kV CAMACARI IV /JACARACANGA C-2 BA RB FT LT 230 kV CAMACARI IV /JACARACANGA C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$328,159.31
LT 230 kV CAMACARI IV /JACARACANGA BA LT 230 kV CAMACARI IV /JACARACANGA C-2 BA RB FT LT 230 kV CAMACARI IV /JACARACANGA C-2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$968,378.71
LT 230 kV CAMACARI IV /JACARACANGA BA LT 230 kV CAMACARI IV /JACARACANGA C-1 BA RB FT LT 230 kV CAMACARI IV /JACARACANGA C-1 BA 061/2001 IPCA RBNI REA 2891/2011 01/09/2014 31/08/2054  R$ 1,324,418.77
LT 230 kV CAMACARI IV /JACARACANGA BA LT 230 kV CAMACARI IV /JACARACANGA C-1 BA RB FT LT 230 kV CAMACARI IV /JACARACANGA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$328,159.31
LT 230 kV CAMACARI IV /JACARACANGA BA LT 230 kV CAMACARI IV /JACARACANGA C-1 BA RB FT LT 230 kV CAMACARI IV /JACARACANGA C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$968,378.71
LT 230 kV CAMACARI IV /PITUACU BA LT 230 kV CAMACARI IV /PITUACU C-1 BA RB FT LT 230 kV CAMACARI IV /PITUACU C-1 BA 061/2001 IPCA RBNI REA 2891/2011 05/05/2014 04/05/2051  R$463,742.69
LT 230 kV CAMACARI IV /PITUACU BA LT 230 kV CAMACARI IV /PITUACU C-1 BA RB FT LT 230 kV CAMACARI IV /PITUACU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$609,083.56
LT 230 kV CAMACARI IV /PITUACU BA LT 230 kV CAMACARI IV /PITUACU C-1 BA RB FT LT 230 kV CAMACARI IV /PITUACU C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,797,369.58
LT 230 kV CAMACARI IV /PITUACU BA LT 230 kV CAMACARI IV /PITUACU C-1 BA RB FT LT 230 kV CAMACARI IV /PITUACU C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,839,373.20
LT 230 kV CAMPO FORMOSO /OUROLANDIA II BA LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA RB FT LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,699,562.72
LT 230 kV CAMPO FORMOSO /OUROLANDIA II BA LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA RB FT LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 5,132,514.32
LT 230 kV CAMPO FORMOSO /OUROLANDIA II BA LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA RB FT LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA 061/2001 IPCA RBNI REA 9690/2021 04/06/2019 03/06/2047  R$275,057.03
LT 230 kV CAMPO FORMOSO /OUROLANDIA II BA LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA RB FT LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,015,309.08
LT 230 kV CATU /CAMACARI IV BA LT 230 kV CATU /CAMACARI IV C-2 BA RB FT LT 230 kV CATU /CAMACARI IV C-2 BA 061/2001 IPCA RBNI REA 2891/2011 05/11/2014 04/11/2054  R$204,902.95
LT 230 kV CATU /CAMACARI IV BA LT 230 kV CATU /CAMACARI IV C-2 BA RB FT LT 230 kV CATU /CAMACARI IV C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$541,353.52
LT 230 kV CATU /CAMACARI IV BA LT 230 kV CATU /CAMACARI IV C-2 BA RB FT LT 230 kV CATU /CAMACARI IV C-2 BA 061/2001 IPCA RBNI REA 5931/2016 12/05/2022 12/05/2051  R$316,058.78
LT 230 kV CATU /CAMACARI IV BA LT 230 kV CATU /CAMACARI IV C-2 BA RB FT LT 230 kV CATU /CAMACARI IV C-2 BA 061/2001 IPCA RBNI REA 7761/2019 18/11/2017 17/11/2054  R$559,798.31
LT 230 kV CATU /CAMACARI IV BA LT 230 kV CATU /CAMACARI IV C-1 BA RB FT LT 230 kV CATU /CAMACARI IV C-1 BA 061/2001 IPCA RBNI REA 2891/2011 13/10/2014 12/10/2054  R$204,660.00
LT 230 kV CATU /CAMACARI IV BA LT 230 kV CATU /CAMACARI IV C-1 BA RB FT LT 230 kV CATU /CAMACARI IV C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$541,353.52
LT 230 kV CATU /CAMACARI IV BA LT 230 kV CATU /CAMACARI IV C-1 BA RB FT LT 230 kV CATU /CAMACARI IV C-1 BA 061/2001 IPCA RBNI REA 5931/2016 12/05/2022 12/05/2050  R$405,574.52
LT 230 kV CATU /G.MANGABEIRA BA LT 230 kV CATU /G.MANGABEIRA C-1 BA RB FT LT 230 kV CATU /G.MANGABEIRA C-1 BA 061/2001 IPCA RBNI REA 2173/2009 06/01/2023 06/01/2063  R$ 2,342,059.91
LT 230 kV CATU /G.MANGABEIRA BA LT 230 kV CATU /G.MANGABEIRA C-1 BA RB FT LT 230 kV CATU /G.MANGABEIRA C-1 BA 061/2001 IPCA RBNI REA 2891/2011 30/11/2015 29/11/2051  R$35,182.37
LT 230 kV CATU /G.MANGABEIRA BA LT 230 kV CATU /G.MANGABEIRA C-1 BA RB FT LT 230 kV CATU /G.MANGABEIRA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,519,726.98
LT 230 kV CAUIPE /FORTALEZA II CE LT 230 kV CAUIPE /FORTALEZA II C-2 CE RB FT LT 230 kV CAUIPE /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$901,195.07
LT 230 kV CAUIPE /FORTALEZA II CE LT 230 kV CAUIPE /FORTALEZA II C-1 CE RB FT LT 230 kV CAUIPE /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$944,701.04
LT 230 kV CAUIPE /MARACANAU CE LT 230 kV CAUIPE /MARACANAU C-1 CE RB FT LT 230 kV CAUIPE /MARACANAU C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$748,052.14
LT 230 kV CAUIPE /MARACANAU CE LT 230 kV CAUIPE /MARACANAU C-1 CE RB FT LT 230 kV CAUIPE /MARACANAU C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,207,457.62
LT 230 kV CAUIPE /MARACANAU CE LT 230 kV CAUIPE /MARACANAU C-1 CE RB FT LT 230 kV CAUIPE /MARACANAU C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,259,044.79
LT 230 kV CAUIPE /MARACANAU CE LT 230 kV CAUIPE /MARACANAU C-1 CE RB FT LT 230 kV CAUIPE /MARACANAU C-1 CE 061/2001 IPCA RBNI DSP 267/2023 01/07/2023 19/05/2057  R$38,888.87
LT 230 kV CAUIPE /SOBRAL II CE LT 230 kV CAUIPE /SOBRAL II C-1 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RBNI REA 2460/2010 21/11/2013 20/11/2051  R$80,840.78
LT 230 kV CAUIPE /SOBRAL II CE LT 230 kV CAUIPE /SOBRAL II C-1 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,492,222.35
LT 230 kV CAUIPE /SOBRAL II CE LT 230 kV CAUIPE /SOBRAL II C-1 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RMEL REN 643/2014 24/11/2014 23/11/2051  R$21,492.92
LT 230 kV CEARA MIRIM II /EXTREMOZ II RN LT 230 kV CEARA MIRIM II /EXTREMOZ II C-2 RN RB FT LT 230 kV CEARA MIRIM II /EXTREMOZ II C-2 RN 019/2010 IPCA RBL CC 019/2010 17/02/2014 23/11/2040  R$920,558.57
LT 230 kV CEARA MIRIM II /EXTREMOZ II RN LT 230 kV CEARA MIRIM II /EXTREMOZ II C-1 RN RB FT LT 230 kV CEARA MIRIM II /EXTREMOZ II C-1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041  R$908,303.85
LT 230 kV CEARA MIRIM II /JOAO CAMARA II RN LT 230 kV CEARA MIRIM II /JOAO CAMARA II C-1 RN RB FT LT 230 kV CEARA MIRIM II /JOAO CAMARA II C-1 RN 019/2010 IPCA RBL CC 019/2010 17/02/2014 23/11/2040  R$ 2,853,731.58
LT 230 kV CIC. DANTAS /CATU BA LT 230 kV CIC. DANTAS /CATU C-2 BA RB FT LT 230 kV CIC. DANTAS /CATU C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,962,707.77
LT 230 kV CIC. DANTAS /CATU BA LT 230 kV CIC. DANTAS /CATU C-2 BA RB FT LT 230 kV CIC. DANTAS /CATU C-2 BA 061/2001 IPCA RMEL REN 643/2014 24/11/2014 23/11/2051  R$15,554.09
LT 230 kV CIC. DANTAS /CATU BA LT 230 kV CIC. DANTAS /CATU C-2 BA RB FT LT 230 kV CIC. DANTAS /CATU C-2 BA 061/2001 IPCA RMEL REN 443/2011 24/09/2017 23/09/2074  R$58,273.39
LT 230 kV CIC. DANTAS /CATU BA LT 230 kV CIC. DANTAS /CATU C-1 BA RB FT LT 230 kV CIC. DANTAS /CATU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,950,896.42
LT 230 kV COTEGIPE /JACARACANGA BA LT 230 kV COTEGIPE /JACARACANGA C-1 BA RB FT LT 230 kV COTEGIPE /JACARACANGA C-1 BA 061/2001 IPCA RBNI REA 3208/2011 26/09/2021 26/09/2061  R$221,046.41
LT 230 kV CIC. DANTAS /CATU BA LT 230 kV CIC. DANTAS /CATU C-1 BA RB FT LT 230 kV CIC. DANTAS /CATU C-1 BA 061/2001 IPCA RMEL REN 643/2014 24/11/2014 23/11/2051  R$2,828.02
LT 230 kV CIC. DANTAS /CATU BA LT 230 kV CIC. DANTAS /CATU C-1 BA RB FT LT 230 kV CIC. DANTAS /CATU C-1 BA 061/2001 IPCA RMEL REN 443/2011 01/10/2017 30/09/2074  R$58,290.25
LT 230 kV DELM. GOUVEIA /FORTALEZA II CE LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$390,652.78
LT 230 kV COTEGIPE /JACARACANGA BA LT 230 kV COTEGIPE /JACARACANGA C-1 BA RB FT LT 230 kV COTEGIPE /JACARACANGA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$329,142.94
LT 230 kV COTEGIPE /JACARACANGA BA LT 230 kV COTEGIPE /JACARACANGA C-1 BA RB FT LT 230 kV COTEGIPE /JACARACANGA C-1 BA 061/2001 IPCA RMEL REN 643/2014 20/12/2015 19/12/2048  R$340,485.70
LT 230 kV COTEGIPE /MATATU BA LT 230 kV COTEGIPE /MATATU C-1 BA RB FT LT 230 kV COTEGIPE /MATATU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$649,624.23
LT 230 kV COTEGIPE /MATATU BA LT 230 kV COTEGIPE /MATATU C-1 BA RB FT LT 230 kV COTEGIPE /MATATU C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,917,002.67
LT 230 kV COTEMINAS /LAGOA DO CARRO PB/PE LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE RB FT LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,410,185.03
LT 230 kV COTEMINAS /LAGOA DO CARRO PB/PE LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE RB FT LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,161,372.64
LT 230 kV COTEMINAS /LAGOA DO CARRO PB/PE LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE RB FT LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,258,621.81
LT 230 kV COTEMINAS /LAGOA DO CARRO PB/PE LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE RB FT LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE 061/2001 IPCA RBNI REA 9687/2021 22/10/2020 21/10/2048  R$162,662.58
LT 230 kV DELM. GOUVEIA /FORTALEZA II CE LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$132,382.45
LT 230 kV DELM. GOUVEIA /FORTALEZA II CE LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$390,652.78
LT 230 kV DELM. GOUVEIA /FORTALEZA II CE LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$399,782.13
LT 230 kV DELM. GOUVEIA /FORTALEZA II CE LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$132,382.45
LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA BA LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA C-2 BA RB FT LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA C-2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,129,566.59
LT 230 kV DELM. GOUVEIA /FORTALEZA II CE LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$399,782.13
LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA BA LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA C-2 BA RB FT LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA C-2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,179,333.49
LT 230 kV EUNAPOLIS /TEIX. FREITAS II BA LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-2 BA RB FT LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-2 BA 018/2009 IPCA RBL CC 018/2009 03/08/2009 03/08/2039  R$ 9,116,294.90
LT 230 kV EUNAPOLIS /TEIX. FREITAS II BA LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-1 BA RB FT LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-1 BA 014/2008 IPCA RBL CC 014/2008 16/10/2008 16/10/2038  R$ 3,499,024.66
LT 230 kV EXTREMOZ II /NATAL III RN LT 230 kV EXTREMOZ II /NATAL III C-2 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-2 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,182,706.89
LT 230 kV EXTREMOZ II /NATAL III RN LT 230 kV EXTREMOZ II /NATAL III C-2 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-2 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,490,098.08
LT 230 kV EXTREMOZ II /NATAL III RN LT 230 kV EXTREMOZ II /NATAL III C-2 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-2 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,571,659.91
LT 230 kV EXTREMOZ II /NATAL III RN LT 230 kV EXTREMOZ II /NATAL III C-2 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-2 RN 061/2001 IPCA RBNI REA 3208/2011 06/01/2020 06/01/2060  R$ 1,416,515.34
LT 230 kV EXTREMOZ II /NATAL III RN LT 230 kV EXTREMOZ II /NATAL III C-2 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-2 RN 061/2001 IPCA RBNI DSP 1073/2022 01/07/2022 30/06/2058  R$20,656.79
LT 230 kV EXTREMOZ II /NATAL III RN LT 230 kV EXTREMOZ II /NATAL III C-1 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$31,092.22
LT 230 kV EXTREMOZ II /NATAL III RN LT 230 kV EXTREMOZ II /NATAL III C-1 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-1 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$91,751.31
LT 230 kV EXTREMOZ II /NATAL III RN LT 230 kV EXTREMOZ II /NATAL III C-1 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-1 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$93,895.49
LT 230 kV EXTREMOZ II /NATAL III RN LT 230 kV EXTREMOZ II /NATAL III C-1 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-1 RN 061/2001 IPCA RBNI REA 10141/2021 15/08/2016 15/08/2048  R$180,465.03
LT 230 kV EXTREMOZ II /NATAL III RN LT 230 kV EXTREMOZ II /NATAL III C-1 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-1 RN 061/2001 IPCA RBNI DSP 1073/2022 01/07/2022 30/06/2058  R$20,656.79
LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA BA LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA C-2 BA RB FT LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$721,656.82
LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA BA LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA C-2 BA RB FT LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA C-2 BA 061/2001 IPCA RBNI REA 2891/2011 26/09/2022 29/11/2051  R$42,744.47
LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA BA LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA C-2 BA RB FT LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA C-2 BA 061/2001 IPCA RBNI DSP 337/2023 01/07/2023 25/09/2056  R$678,051.50
LT 230 kV FORTALEZA /FORTALEZA II CE LT 230 kV FORTALEZA /FORTALEZA II C-2 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$7,677.38
LT 230 kV FLORESTA II /BOM NOME PE LT 230 kV FLORESTA II /BOM NOME C-1 PE RB FT LT 230 kV FLORESTA II /BOM NOME C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,810,180.13
LT 230 kV FLORESTA II /BOM NOME PE LT 230 kV FLORESTA II /BOM NOME C-1 PE RB FT LT 230 kV FLORESTA II /BOM NOME C-1 PE 061/2001 IPCA RBNI REA 10264/2021 05/04/2019 04/04/2047  R$5,151.47
LT 230 kV FORTALEZA /FORTALEZA II CE LT 230 kV FORTALEZA /FORTALEZA II C-3 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$7,677.38
LT 230 kV FORTALEZA /FORTALEZA II CE LT 230 kV FORTALEZA /FORTALEZA II C-1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$7,677.38
LT 230 kV FORTALEZA II /PICI II CE LT 230 kV FORTALEZA II /PICI II C-2 CE RB FT LT 230 kV FORTALEZA II /PICI II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$470,019.84
LT 230 kV FORTALEZA II /PICI II CE LT 230 kV FORTALEZA II /PICI II C-2 CE RB FT LT 230 kV FORTALEZA II /PICI II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,387,000.76
LT 230 kV FORTALEZA II /PICI II CE LT 230 kV FORTALEZA II /PICI II C-2 CE RB FT LT 230 kV FORTALEZA II /PICI II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,419,414.27
LT 230 kV FORTALEZA II /PICI II CE LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,387,000.76
LT 230 kV FORTALEZA II /PICI II CE LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$470,019.84
LT 230 kV FORTALEZA II /PICI II CE LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,419,414.27
LT 230 kV FUNIL /ITABUNA III BA LT 230 kV FUNIL /ITABUNA III C-1 BA RB FT LT 230 kV FUNIL /ITABUNA III C-1 BA 061/2001 IPCA RBNI DSP 1270/2022 01/07/2022 30/06/2056  R$352,212.00
LT 230 kV FUNIL /ITAPEBI BA LT 230 kV FUNIL /ITAPEBI C-1 BA RB FT LT 230 kV FUNIL /ITAPEBI C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,078,047.30
LT 230 kV FUNIL /ITABUNA III BA LT 230 kV FUNIL /ITABUNA III C-1 BA RB FT LT 230 kV FUNIL /ITABUNA III C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,058,127.31
LT 230 kV FUNIL /ITABUNA III BA LT 230 kV FUNIL /ITABUNA III C-1 BA RB FT LT 230 kV FUNIL /ITABUNA III C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,122,471.13
LT 230 kV FUNIL /ITABUNA III BA LT 230 kV FUNIL /ITABUNA III C-1 BA RB FT LT 230 kV FUNIL /ITABUNA III C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,195,441.70
LT 230 kV FUNIL /ITAPEBI BA LT 230 kV FUNIL /ITAPEBI C-1 BA RB FT LT 230 kV FUNIL /ITAPEBI C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 9,295,403.84
LT 230 kV FUNIL /ITAPEBI BA LT 230 kV FUNIL /ITAPEBI C-1 BA RB FT LT 230 kV FUNIL /ITAPEBI C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 9,083,135.56
LT 230 kV G.MANGABEIRA /SAPEACU BA LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$386,270.85
LT 230 kV G.MANGABEIRA /SAPEACU BA LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,139,862.44
LT 230 kV G.MANGABEIRA /SAPEACU BA LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$384,561.69
LT 230 kV G.MANGABEIRA /SAPEACU BA LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$508,872.31
LT 230 kV G.MANGABEIRA /SAPEACU BA LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,166,500.45
LT 230 kV G.MANGABEIRA /SAPEACU BA LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,134,818.80
LT 230 kV G.MANGABEIRA /SAPEACU BA LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,161,338.95
LT 230 kV G.MANGABEIRA /SAPEACU BA LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA 061/2001 IPCA RBNI REA 7977/2019 22/10/2021 22/10/2050  R$822,640.80
LT 230 kV GARANHUNS II /ANGELIM PE LT 230 kV GARANHUNS II /ANGELIM C-3 PE RB FT LT 230 kV GARANHUNS II /ANGELIM C-3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$314,969.32
LT 230 kV GARANHUNS II /ANGELIM PE LT 230 kV GARANHUNS II /ANGELIM C-3 PE RB FT LT 230 kV GARANHUNS II /ANGELIM C-3 PE 061/2001 IPCA RBNI REA 5654/2016 15/12/2017 14/12/2050  R$60,311.13
LT 230 kV GARANHUNS II /ANGELIM PE LT 230 kV GARANHUNS II /ANGELIM C-2 PE RB FT LT 230 kV GARANHUNS II /ANGELIM C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$233,067.69
LT 230 kV GARANHUNS II /ANGELIM PE LT 230 kV GARANHUNS II /ANGELIM C-2 PE RB FT LT 230 kV GARANHUNS II /ANGELIM C-2 PE 061/2001 IPCA RBNI REA 5824/2016 16/09/2019 16/09/2048  R$95,242.58
LT 230 kV GARANHUNS II /ANGELIM PE LT 230 kV GARANHUNS II /ANGELIM C-1 PE RB FT LT 230 kV GARANHUNS II /ANGELIM C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$233,067.69
LT 230 kV GARANHUNS II /ANGELIM PE LT 230 kV GARANHUNS II /ANGELIM C-1 PE RB FT LT 230 kV GARANHUNS II /ANGELIM C-1 PE 061/2001 IPCA RBNI REA 5824/2016 16/09/2019 16/09/2048  R$95,242.58
LT 230 kV GOIANINHA /C.GRANDE II PE/PB LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB RB FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,954,778.35
LT 230 kV GOIANINHA /C.GRANDE II PE/PB LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB RB FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBNI REA 5745/2016 21/10/2021 21/10/2050  R$ 1,112,300.09
LT 230 kV GOIANINHA /C.GRANDE II PE/PB LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB RB FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBNI DSP 386/2021 16/11/2021 15/11/2058  R$497,163.21
LT 230 kV GOIANINHA /JOAO PESSOA II PE/PB LT 230 kV GOIANINHA /JOAO PESSOA II C-2 PE/PB RB FT LT 230 kV GOIANINHA /JOAO PESSOA II C-2 PE/PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$722,034.19
LT 230 kV GOIANINHA /JOAO PESSOA II PE/PB LT 230 kV GOIANINHA /JOAO PESSOA II C-2 PE/PB RB FT LT 230 kV GOIANINHA /JOAO PESSOA II C-2 PE/PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,130,680.20
LT 230 kV GOIANINHA /JOAO PESSOA II PE/PB LT 230 kV GOIANINHA /JOAO PESSOA II C-2 PE/PB RB FT LT 230 kV GOIANINHA /JOAO PESSOA II C-2 PE/PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,180,473.12
LT 230 kV GOIANINHA /JOAO PESSOA II PE/PB LT 230 kV GOIANINHA /JOAO PESSOA II C-1 PE/PB RB FT LT 230 kV GOIANINHA /JOAO PESSOA II C-1 PE/PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,616,150.62
LT 230 kV GOIANINHA /JOAO PESSOA II PE/PB LT 230 kV GOIANINHA /JOAO PESSOA II C-2 PE/PB RB FT LT 230 kV GOIANINHA /JOAO PESSOA II C-2 PE/PB 061/2001 IPCA RBNI DSP 420/2023 01/07/2023 30/10/2056  R$6,559.05
LT 230 kV GOIANINHA /JOAO PESSOA II PE/PB LT 230 kV GOIANINHA /JOAO PESSOA II C-1 PE/PB RB FT LT 230 kV GOIANINHA /JOAO PESSOA II C-1 PE/PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$547,672.99
LT 230 kV GOIANINHA /JOAO PESSOA II PE/PB LT 230 kV GOIANINHA /JOAO PESSOA II C-1 PE/PB RB FT LT 230 kV GOIANINHA /JOAO PESSOA II C-1 PE/PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,653,919.24
LT 230 kV GOIANINHA /JOAO PESSOA II PE/PB LT 230 kV GOIANINHA /JOAO PESSOA II C-1 PE/PB RB FT LT 230 kV GOIANINHA /JOAO PESSOA II C-1 PE/PB 061/2001 IPCA RBNI DSP 420/2023 01/07/2023 30/10/2056  R$5,350.44
LT 230 kV IBIAPINA II /SOBRAL II CE LT 230 kV IBIAPINA II /SOBRAL II C-1 CE RB FT LT 230 kV IBIAPINA II /SOBRAL II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,800,155.44
LT 230 kV IBIAPINA II /SOBRAL II CE LT 230 kV IBIAPINA II /SOBRAL II C-1 CE RB FT LT 230 kV IBIAPINA II /SOBRAL II C-1 CE 061/2001 IPCA RBNI REA 10142/2021 10/02/2021 10/02/2054  R$101,229.69
LT 230 kV ICO /MILAGRES CE LT 230 kV ICO /MILAGRES C-1 CE RB FT LT 230 kV ICO /MILAGRES C-1 CE 061/2001 IPCA RBNI REA 1312/2008 13/11/2012 12/11/2052  R$77,842.48
LT 230 kV IGAPORA II /B.J.LAPA II BA LT 230 kV IGAPORA II /B.J.LAPA II C-1 BA RB FT LT 230 kV IGAPORA II /B.J.LAPA II C-1 BA 020/2010 IPCA RBL CC 020/2010 26/06/2014 23/11/2040  R$ 4,204,245.84
LT 230 kV IGAPORA II /B.J.LAPA II BA LT 230 kV IGAPORA II /B.J.LAPA II C-1 BA RB FT LT 230 kV IGAPORA II /B.J.LAPA II C-1 BA 020/2010 IPCA RBNI REA 3460/2012 02/06/2014 02/06/2054  R$133,358.27
LT 230 kV ICO /MILAGRES CE LT 230 kV ICO /MILAGRES C-1 CE RB FT LT 230 kV ICO /MILAGRES C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,748,784.57
LT 230 kV ICO /MILAGRES CE LT 230 kV ICO /MILAGRES C-1 CE RB FT LT 230 kV ICO /MILAGRES C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,160,559.85
LT 230 kV IGAPORA II /IGAPORA III BA LT 230 kV IGAPORA II /IGAPORA III C-2 BA RB FT LT 230 kV IGAPORA II /IGAPORA III C-2 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 01/06/2042  R$149,165.93
LT 230 kV IGAPORA II /IGAPORA III BA LT 230 kV IGAPORA II /IGAPORA III C-1 BA RB FT LT 230 kV IGAPORA II /IGAPORA III C-1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 01/06/2042  R$149,165.93
LT 230 kV IGAPORA III /PINDAI II BA LT 230 kV IGAPORA III /PINDAI II C-1 BA RB FT LT 230 kV IGAPORA III /PINDAI II C-1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 01/06/2042  R$ 3,430,800.21
LT 230 kV IRECE /BROT.MACAUBAS BA LT 230 kV IRECE /BROT.MACAUBAS C-1 BA RB FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,344,328.62
LT 230 kV IRECE /BROT.MACAUBAS BA LT 230 kV IRECE /BROT.MACAUBAS C-1 BA RB FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA 061/2001 IPCA RBNI REA 4629/2014 27/09/2013 31/12/2042  R$743,623.78
LT 230 kV ITABAIANA /JARDIM SE LT 230 kV ITABAIANA /JARDIM C-1 SE RB FT LT 230 kV ITABAIANA /JARDIM C-1 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$683,665.22
LT 230 kV ITABAIANA /JARDIM SE LT 230 kV ITABAIANA /JARDIM C-1 SE RB FT LT 230 kV ITABAIANA /JARDIM C-1 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,017,455.65
LT 230 kV IRECE /BROT.MACAUBAS BA LT 230 kV IRECE /BROT.MACAUBAS C-1 BA RB FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA 061/2001 IPCA RMEL REN 643/2014 03/06/2014 02/06/2039  R$556,014.74
LT 230 kV IRECE /BROT.MACAUBAS BA LT 230 kV IRECE /BROT.MACAUBAS C-1 BA RB FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 6,917,975.13
LT 230 kV IRECE /BROT.MACAUBAS BA LT 230 kV IRECE /BROT.MACAUBAS C-1 BA RB FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 7,079,644.71
LT 230 kV ITABAIANA /ITABAIANINHA SE LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE RB FT LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE 061/2001 IPCA RBNI REA 3817/2013 10/04/2017 09/04/2053  R$657,262.72
LT 230 kV ITABAIANA /ITABAIANINHA SE LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE RB FT LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,511,852.74
LT 230 kV ITABAIANA /JARDIM SE LT 230 kV ITABAIANA /JARDIM C-2 SE RB FT LT 230 kV ITABAIANA /JARDIM C-2 SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$683,665.22
LT 230 kV ITABAIANA /JARDIM SE LT 230 kV ITABAIANA /JARDIM C-2 SE RB FT LT 230 kV ITABAIANA /JARDIM C-2 SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,017,455.65
LT 230 kV ITABAIANINHA /CATU SE/BA LT 230 kV ITABAIANINHA /CATU C-1 SE/BA RB FT LT 230 kV ITABAIANINHA /CATU C-1 SE/BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,832,755.33
LT 230 kV ITABAIANINHA /CATU SE/BA LT 230 kV ITABAIANINHA /CATU C-1 SE/BA RB FT LT 230 kV ITABAIANINHA /CATU C-1 SE/BA 061/2001 IPCA RBNI REA 4407/2013 23/12/2021 23/12/2058  R$ 3,288,816.37
LT 230 kV ITABAIANINHA /CATU SE/BA LT 230 kV ITABAIANINHA /CATU C-1 SE/BA RB FT LT 230 kV ITABAIANINHA /CATU C-1 SE/BA 061/2001 IPCA RMEL REN 643/2014 28/07/2014 27/07/2047  R$183,526.90
LT 230 kV ITABUNA III /ITAPEBI BA LT 230 kV ITABUNA III /ITAPEBI C-1 BA RB FT LT 230 kV ITABUNA III /ITAPEBI C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 6,099,962.14
LT 230 kV ITABUNA III /ITAPEBI BA LT 230 kV ITABUNA III /ITAPEBI C-1 BA RB FT LT 230 kV ITABUNA III /ITAPEBI C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,019,919.98
LT 230 kV ITABUNA III /ITAPEBI BA LT 230 kV ITABUNA III /ITAPEBI C-1 BA RB FT LT 230 kV ITABUNA III /ITAPEBI C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,960,664.42
LT 230 kV ITAPEBI /EUNAPOLIS BA LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,155,009.44
LT 230 kV ITABUNA III /ITAPEBI BA LT 230 kV ITABUNA III /ITAPEBI C-1 BA RB FT LT 230 kV ITABUNA III /ITAPEBI C-1 BA 061/2001 IPCA RBNI DSP 1270/2022 01/07/2022 30/06/2056  R$352,212.00
LT 230 kV ITAPEBI /EUNAPOLIS BA LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,205,370.93
LT 230 kV ITAPEBI /EUNAPOLIS BA LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$730,278.76
LT 230 kV ITAPEBI /EUNAPOLIS BA LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$730,278.76
LT 230 kV ITAPEBI /EUNAPOLIS BA LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,155,009.44
LT 230 kV ITAPEBI /EUNAPOLIS BA LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,205,370.93
LT 230 kV JACARACANGA /ALCAN BA LT 230 kV JACARACANGA /ALCAN C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$44,150.78
LT 230 kV JACARACANGA /ALCAN BA LT 230 kV JACARACANGA /ALCAN C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$130,286.35
LT 230 kV JABOATAO II /PIRAPAMA II PE LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE RB FT LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$326,450.15
LT 230 kV JABOATAO II /PIRAPAMA II PE LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE RB FT LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$963,335.07
LT 230 kV JABOATAO II /PIRAPAMA II PE LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE RB FT LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE 061/2001 IPCA RBNI REA 10092/2021 11/03/2021 11/03/2056  R$290,442.54
LT 230 kV JACARACANGA /DOW QUIMICA BA LT 230 kV JACARACANGA /DOW QUIMICA C-2 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$543,731.67
LT 230 kV JACARACANGA /ALCAN BA LT 230 kV JACARACANGA /ALCAN C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$133,331.08
LT 230 kV JACARACANGA /DOW QUIMICA BA LT 230 kV JACARACANGA /DOW QUIMICA C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$184,257.05
LT 230 kV JACARACANGA /DOW QUIMICA BA LT 230 kV JACARACANGA /DOW QUIMICA C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$186,619.32
LT 230 kV JACARACANGA /DOW QUIMICA BA LT 230 kV JACARACANGA /DOW QUIMICA C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$550,702.59
LT 230 kV JAGUARARI-SE /SR.BONFIM II BA LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA RB FT LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA 061/2001 IPCA RBNI REA 2173/2009 27/09/2012 26/09/2051  R$84,021.21
LT 230 kV JAGUARARI-SE /SR.BONFIM II BA LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA RB FT LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,430,309.86
LT 230 kV JAGUARARI-SE /SR.BONFIM II BA LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA RB FT LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,220,759.83
LT 230 kV JOAO PESSOA II /MUSSURE II PB LT 230 kV JOAO PESSOA II /MUSSURE II C-2 PB RB FT LT 230 kV JOAO PESSOA II /MUSSURE II C-2 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$7,115.07
LT 230 kV JOAO PESSOA II /MUSSURE II PB LT 230 kV JOAO PESSOA II /MUSSURE II C-2 PB RB FT LT 230 kV JOAO PESSOA II /MUSSURE II C-2 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$20,996.14
LT 230 kV JOAO PESSOA II /MUSSURE II PB LT 230 kV JOAO PESSOA II /MUSSURE II C-2 PB RB FT LT 230 kV JOAO PESSOA II /MUSSURE II C-2 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$21,486.81
LT 230 kV JOAO PESSOA II /MUSSURE II PB LT 230 kV JOAO PESSOA II /MUSSURE II C-2 PB RB FT LT 230 kV JOAO PESSOA II /MUSSURE II C-2 PB 061/2001 IPCA RBNI DSP 420/2023 01/07/2023 30/11/2056  R$6,559.05
LT 230 kV JOAO PESSOA II /MUSSURE II PB LT 230 kV JOAO PESSOA II /MUSSURE II C-1 PB RB FT LT 230 kV JOAO PESSOA II /MUSSURE II C-1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$64,180.82
LT 230 kV JOAO PESSOA II /MUSSURE II PB LT 230 kV JOAO PESSOA II /MUSSURE II C-1 PB RB FT LT 230 kV JOAO PESSOA II /MUSSURE II C-1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$189,393.80
LT 230 kV JOAO PESSOA II /MUSSURE II PB LT 230 kV JOAO PESSOA II /MUSSURE II C-1 PB RB FT LT 230 kV JOAO PESSOA II /MUSSURE II C-1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$193,819.83
LT 230 kV JOAO PESSOA II /MUSSURE II PB LT 230 kV JOAO PESSOA II /MUSSURE II C-1 PB RB FT LT 230 kV JOAO PESSOA II /MUSSURE II C-1 PB 061/2001 IPCA RBNI DSP 420/2023 01/07/2023 30/10/2056  R$9,714.09
LT 230 kV JOAO PESSOA II /SANTA RITA II PB LT 230 kV JOAO PESSOA II /SANTA RITA II C-2 PB RB FT LT 230 kV JOAO PESSOA II /SANTA RITA II C-2 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$85,380.82
LT 230 kV JOAO PESSOA II /SANTA RITA II PB LT 230 kV JOAO PESSOA II /SANTA RITA II C-2 PB RB FT LT 230 kV JOAO PESSOA II /SANTA RITA II C-2 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$251,953.74
LT 230 kV JOAO PESSOA II /SANTA RITA II PB LT 230 kV JOAO PESSOA II /SANTA RITA II C-2 PB RB FT LT 230 kV JOAO PESSOA II /SANTA RITA II C-2 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$257,841.77
LT 230 kV JOAO PESSOA II /SANTA RITA II PB LT 230 kV JOAO PESSOA II /SANTA RITA II C-2 PB RB FT LT 230 kV JOAO PESSOA II /SANTA RITA II C-2 PB 061/2001 IPCA RBNI DSP 420/2023 01/07/2023 30/10/2056  R$5,350.44
LT 230 kV JOAO PESSOA II /SANTA RITA II PB LT 230 kV JOAO PESSOA II /SANTA RITA II C-1 PB RB FT LT 230 kV JOAO PESSOA II /SANTA RITA II C-1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$146,046.13
LT 230 kV JOAO PESSOA II /SANTA RITA II PB LT 230 kV JOAO PESSOA II /SANTA RITA II C-1 PB RB FT LT 230 kV JOAO PESSOA II /SANTA RITA II C-1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$430,973.50
LT 230 kV JOAO PESSOA II /SANTA RITA II PB LT 230 kV JOAO PESSOA II /SANTA RITA II C-1 PB RB FT LT 230 kV JOAO PESSOA II /SANTA RITA II C-1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$441,045.13
LT 230 kV JOAO PESSOA II /SANTA RITA II PB LT 230 kV JOAO PESSOA II /SANTA RITA II C-1 PB RB FT LT 230 kV JOAO PESSOA II /SANTA RITA II C-1 PB 061/2001 IPCA RBNI DSP 420/2023 01/07/2023 30/10/2056  R$9,714.09
LT 230 kV JUAZEIRO II /JAGUARARI-SE BA LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA RB FT LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,240,335.11
LT 230 kV JUAZEIRO II /JAGUARARI-SE BA LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA RB FT LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,660,155.56
LT 230 kV JUAZEIRO II /SR.BONFIM II BA LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA RB FT LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,308,923.92
LT 230 kV JUAZEIRO II /SR.BONFIM II BA LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA RB FT LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 6,813,497.95
LT 230 kV LAGOA DO CARRO /PAU FERRO PE LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE RB FT LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$531,531.28
LT 230 kV LAGOA DO CARRO /PAU FERRO PE LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE RB FT LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,568,517.38
LT 230 kV LAGOA DO CARRO /PAU FERRO PE LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE RB FT LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,605,172.84
LT 230 kV LAGOA DO CARRO /PAU FERRO PE LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE RB FT LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE 061/2001 IPCA RBNI REA 9687/2021 22/10/2020 21/10/2048  R$162,662.58
LT 230 kV MARACANAU /FORTALEZA II CE LT 230 kV MARACANAU /FORTALEZA II C-1 CE RB FT LT 230 kV MARACANAU /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$393,711.65
LT 230 kV MARACANAU /FORTALEZA II CE LT 230 kV MARACANAU /FORTALEZA II C-1 CE RB FT LT 230 kV MARACANAU /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,161,819.80
LT 230 kV MARACANAU /FORTALEZA II CE LT 230 kV MARACANAU /FORTALEZA II C-1 CE RB FT LT 230 kV MARACANAU /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,188,970.94
LT 230 kV MARACANAU /FORTALEZA II CE LT 230 kV MARACANAU /FORTALEZA II C-1 CE RB FT LT 230 kV MARACANAU /FORTALEZA II C-1 CE 061/2001 IPCA RBNI DSP 267/2023 01/07/2023 19/05/2057  R$38,888.87
LT 230 kV MESSIAS /MACEIO AL LT 230 kV MESSIAS /MACEIO C-2 AL RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$442,673.23
LT 230 kV MESSIAS /MACEIO AL LT 230 kV MESSIAS /MACEIO C-2 AL RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,306,302.53
LT 230 kV MESSIAS /MACEIO AL LT 230 kV MESSIAS /MACEIO C-2 AL RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,336,830.16
LT 230 kV MESSIAS /MACEIO AL LT 230 kV MESSIAS /MACEIO C-1 AL RB FT LT 230 kV MESSIAS /MACEIO C-1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$442,673.23
LT 230 kV MESSIAS /MACEIO AL LT 230 kV MESSIAS /MACEIO C-1 AL RB FT LT 230 kV MESSIAS /MACEIO C-1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,306,302.53
LT 230 kV MESSIAS /MACEIO AL LT 230 kV MESSIAS /MACEIO C-1 AL RB FT LT 230 kV MESSIAS /MACEIO C-1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,336,830.16
LT 230 kV MESSIAS /MACEIO II AL LT 230 kV MESSIAS /MACEIO II C-2 AL RB FT LT 230 kV MESSIAS /MACEIO II C-2 AL 005/2012 IPCA RBL CC 005/2012 01/03/2019 10/05/2042  R$914,849.30
LT 230 kV MESSIAS /MACEIO II AL LT 230 kV MESSIAS /MACEIO II C-1 AL RB FT LT 230 kV MESSIAS /MACEIO II C-1 AL 005/2012 IPCA RBL CC 005/2012 01/03/2019 10/05/2042  R$914,849.30
LT 230 kV MESSIAS /RIO LARGO II AL LT 230 kV MESSIAS /RIO LARGO II C-3 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-3 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$216,286.82
LT 230 kV MESSIAS /RIO LARGO II AL LT 230 kV MESSIAS /RIO LARGO II C-3 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-3 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$638,249.61
LT 230 kV MESSIAS /RIO LARGO II AL LT 230 kV MESSIAS /RIO LARGO II C-2 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-2 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$216,286.82
LT 230 kV MESSIAS /RIO LARGO II AL LT 230 kV MESSIAS /RIO LARGO II C-2 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-2 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$638,249.61
LT 230 kV MESSIAS /RIO LARGO II AL LT 230 kV MESSIAS /RIO LARGO II C-1 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$281,110.12
LT 230 kV MESSIAS /RIO LARGO II AL LT 230 kV MESSIAS /RIO LARGO II C-1 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$829,539.34
LT 230 kV MESSIAS /RIO LARGO II AL LT 230 kV MESSIAS /RIO LARGO II C-1 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$848,925.25
LT 230 kV MILAGRES /BANABUIU CE LT 230 kV MILAGRES /BANABUIU C-2 CE RB FT LT 230 kV MILAGRES /BANABUIU C-2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,497,569.14
LT 230 kV MILAGRES /BANABUIU CE LT 230 kV MILAGRES /BANABUIU C-2 CE RB FT LT 230 kV MILAGRES /BANABUIU C-2 CE 061/2001 IPCA RMEL REN 643/2014 19/04/2014 18/04/2051  R$3,679.74
LT 230 kV MILAGRES /BANABUIU CE LT 230 kV MILAGRES /BANABUIU C-2 CE RB FT LT 230 kV MILAGRES /BANABUIU C-2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 10,321,119.70
LT 230 kV MILAGRES /BANABUIU CE LT 230 kV MILAGRES /BANABUIU C-1 CE RB FT LT 230 kV MILAGRES /BANABUIU C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 4,446,973.11
LT 230 kV MILAGRES /BANABUIU CE LT 230 kV MILAGRES /BANABUIU C-1 CE RB FT LT 230 kV MILAGRES /BANABUIU C-1 CE 061/2001 IPCA RMEL REN 643/2014 19/04/2014 18/04/2051  R$3,679.74
LT 230 kV MILAGRES /COREMAS CE/PB LT 230 kV MILAGRES /COREMAS C-2 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-2 CE/PB 008/2005 IGPM RBL CC 008/2005 25/09/2009 04/03/2035  R$ 11,870,202.44
LT 230 kV MILAGRES /COREMAS CE/PB LT 230 kV MILAGRES /COREMAS C-1 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,350,458.56
LT 230 kV MILAGRES /COREMAS CE/PB LT 230 kV MILAGRES /COREMAS C-1 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 6,936,064.22
LT 230 kV MILAGRES /COREMAS CE/PB LT 230 kV MILAGRES /COREMAS C-1 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 7,098,156.53
LT 230 kV MILAGRES /TAUA II CE LT 230 kV MILAGRES /TAUA II C-1 CE RB FT LT 230 kV MILAGRES /TAUA II C-1 CE 007/2005 IGPM RBL CC 007/2005 28/12/2007 04/03/2035  R$ 8,717,079.27
LT 230 kV MORRO CHAPEU II /IRECE BA LT 230 kV MORRO CHAPEU II /IRECE C-1 BA RB FT LT 230 kV MORRO CHAPEU II /IRECE C-1 BA 009/2011 IPCA RBL CC 009/2011 21/12/2017 13/10/2041  R$ 2,378,035.26
LT 230 kV MOSSORO II /ACU II RN LT 230 kV MOSSORO II /ACU II C-2 RN RB FT LT 230 kV MOSSORO II /ACU II C-2 RN 019/2010 IPCA RBL CC 019/2010 23/11/2010 23/11/2040  R$ 2,058,406.66
LT 230 kV MOSSORO II /ACU II RN LT 230 kV MOSSORO II /ACU II C-2 RN RB FT LT 230 kV MOSSORO II /ACU II C-2 RN 019/2010 IPCA RBNI REA 4407/2013 27/05/2021 27/05/2058  R$325,196.17
LT 230 kV MOSSORO II /ACU III RN LT 230 kV MOSSORO II /ACU III C-2 RN RB FT LT 230 kV MOSSORO II /ACU III C-2 RN 019/2010 IPCA RBL CC 019/2010 23/11/2010 23/11/2040  R$548,908.44
LT 230 kV MOSSORO II /ACU III RN LT 230 kV MOSSORO II /ACU III C-2 RN RB FT LT 230 kV MOSSORO II /ACU III C-2 RN 019/2010 IPCA RBNI REA 4407/2013 13/12/2021 13/12/2058  R$96,892.16
LT 230 kV MOSSORO II /ACU III RN LT 230 kV MOSSORO II /ACU III C-2 RN RB FT LT 230 kV MOSSORO II /ACU III C-2 RN 019/2010 IPCA RBNI DSP 1269/2022 01/07/2022 30/06/2056  R$39,805.24
LT 230 kV MOSSORO II /ACU III RN LT 230 kV MOSSORO II /ACU III C-1 RN RB FT LT 230 kV MOSSORO II /ACU III C-1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,187,040.63
LT 230 kV MOSSORO II /ACU III RN LT 230 kV MOSSORO II /ACU III C-1 RN RB FT LT 230 kV MOSSORO II /ACU III C-1 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,502,886.70
LT 230 kV MOSSORO II /ACU III RN LT 230 kV MOSSORO II /ACU III C-1 RN RB FT LT 230 kV MOSSORO II /ACU III C-1 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,584,747.39
LT 230 kV MOSSORO II /ACU III RN LT 230 kV MOSSORO II /ACU III C-1 RN RB FT LT 230 kV MOSSORO II /ACU III C-1 RN 061/2001 IPCA RBNI DSP 1307/2022 01/07/2021 30/06/2056  R$46,205.98
LT 230 kV MOSSORO IV /MOSSORO II RN LT 230 kV MOSSORO IV /MOSSORO II C-1 RN RB FT LT 230 kV MOSSORO IV /MOSSORO II C-1 RN 018/2012 IPCA RBL CC 018/2012 28/10/2017 01/06/2042  R$ 1,812,140.11
LT 230 kV N.S.SOCORRO /FAFEN SE LT 230 kV N.S.SOCORRO /FAFEN C-1 SE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$295,283.74
LT 230 kV N.S.SOCORRO /FAFEN SE LT 230 kV N.S.SOCORRO /FAFEN C-1 SE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$871,364.85
LT 230 kV N.S.SOCORRO /FAFEN SE LT 230 kV N.S.SOCORRO /FAFEN C-1 SE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$891,728.21
LT 230 kV N.S.SOCORRO /JARDIM SE LT 230 kV N.S.SOCORRO /JARDIM C-2 SE RB FT LT 230 kV N.S.SOCORRO /JARDIM C-2 SE 005/2012 IPCA RBL CC 005/2012 17/02/2019 10/05/2042  R$127,053.54
LT 230 kV N.S.SOCORRO /JARDIM SE LT 230 kV N.S.SOCORRO /JARDIM C-1 SE RB FT LT 230 kV N.S.SOCORRO /JARDIM C-1 SE 005/2012 IPCA RBL CC 005/2012 17/02/2019 10/05/2042  R$127,053.54
LT 230 kV N.S.SOCORRO /JARDIM SE LT 230 kV N.S.SOCORRO /JARDIM C-1 SE RB FT LT 230 kV N.S.SOCORRO /JARDIM C-1 SE 005/2012 IPCA RBNI DSP 1080/2022 01/07/2022 30/06/2057  R$18,064.80
LT 230 kV N.S.SOCORRO /PENEDO SE/AL LT 230 kV N.S.SOCORRO /PENEDO C-1 SE/AL RB FT LT 230 kV N.S.SOCORRO /PENEDO C-1 SE/AL 005/2008 IPCA RBL CC 005/2008 17/03/2008 17/03/2038  R$ 3,645,557.73
LT 230 kV N.S.SOCORRO /PENEDO SE/AL LT 230 kV N.S.SOCORRO /PENEDO C-1 SE/AL RB FT LT 230 kV N.S.SOCORRO /PENEDO C-1 SE/AL 005/2008 IPCA RBNI DSP 1414/2022 01/07/2022 30/06/2057  R$89,312.14
LT 230 kV NATAL III /NATAL II RN LT 230 kV NATAL III /NATAL II C-2 RN RB FT LT 230 kV NATAL III /NATAL II C-2 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$233,191.66
LT 230 kV NATAL III /NATAL II RN LT 230 kV NATAL III /NATAL II C-2 RN RB FT LT 230 kV NATAL III /NATAL II C-2 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$688,134.81
LT 230 kV NATAL III /NATAL II RN LT 230 kV NATAL III /NATAL II C-2 RN RB FT LT 230 kV NATAL III /NATAL II C-2 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$704,216.17
LT 230 kV NATAL III /NATAL II RN LT 230 kV NATAL III /NATAL II C-2 RN RB FT LT 230 kV NATAL III /NATAL II C-2 RN 061/2001 IPCA RBNI DSP 1073/2022 01/07/2022 30/06/2058  R$20,656.79
LT 230 kV NATAL III /NATAL II RN LT 230 kV NATAL III /NATAL II C-1 RN RB FT LT 230 kV NATAL III /NATAL II C-1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$233,191.66
LT 230 kV NATAL III /NATAL II RN LT 230 kV NATAL III /NATAL II C-1 RN RB FT LT 230 kV NATAL III /NATAL II C-1 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$688,134.81
LT 230 kV NATAL III /NATAL II RN LT 230 kV NATAL III /NATAL II C-1 RN RB FT LT 230 kV NATAL III /NATAL II C-1 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$704,216.17
LT 230 kV NATAL III /NATAL II RN LT 230 kV NATAL III /NATAL II C-1 RN RB FT LT 230 kV NATAL III /NATAL II C-1 RN 061/2001 IPCA RBNI DSP 1073/2022 01/07/2022 30/06/2058  R$20,656.79
LT 230 kV OLINDINA /RL (CIC. DANTAS / CATU) BA LT 230 kV OLINDINA /RL (CIC. DANTAS / CATU) C-2 BA RB FT LT 230 kV OLINDINA /LT CIC. DANTAS/CATU C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$5,118.25
LT 230 kV OLINDINA /RL (CIC. DANTAS / CATU) BA LT 230 kV OLINDINA /RL (CIC. DANTAS / CATU) C-2 BA RB FT LT 230 kV OLINDINA /LT CIC. DANTAS/CATU C-2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$15,103.66
LT 230 kV OLINDINA /RL (CIC. DANTAS / CATU) BA LT 230 kV OLINDINA /RL (CIC. DANTAS / CATU) C-1 BA RB FT LT 230 kV OLINDINA /LT CIC. DANTAS/CATU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$5,118.25
LT 230 kV OLINDINA /RL (CIC. DANTAS / CATU) BA LT 230 kV OLINDINA /RL (CIC. DANTAS / CATU) C-1 BA RB FT LT 230 kV OLINDINA /LT CIC. DANTAS/CATU C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$15,103.66
LT 230 kV OUROLANDIA II /IRECE BA LT 230 kV OUROLANDIA II /IRECE C-1 BA RB FT LT 230 kV OUROLANDIA II /IRECE C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,476,418.69
LT 230 kV OUROLANDIA II /IRECE BA LT 230 kV OUROLANDIA II /IRECE C-1 BA RB FT LT 230 kV OUROLANDIA II /IRECE C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,356,824.26
LT 230 kV OUROLANDIA II /IRECE BA LT 230 kV OUROLANDIA II /IRECE C-1 BA RB FT LT 230 kV OUROLANDIA II /IRECE C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,458,641.04
LT 230 kV OUROLANDIA II /IRECE BA LT 230 kV OUROLANDIA II /IRECE C-1 BA RB FT LT 230 kV OUROLANDIA II /IRECE C-1 BA 061/2001 IPCA RBNI REA 9690/2021 04/06/2019 03/06/2047  R$275,057.03
LT 230 kV P. AFONSO IV /P.AFONSO III BA/AL LT 230 kV P. AFONSO IV /P.AFONSO III C-2 BA/AL RB FT LT 230 kV P. AFONSO IV /P.AFONSO III C-2 BA/AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$35,827.76
LT 230 kV P. AFONSO IV /P.AFONSO III BA/AL LT 230 kV P. AFONSO IV /P.AFONSO III C-2 BA/AL RB FT LT 230 kV P. AFONSO IV /P.AFONSO III C-2 BA/AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$105,725.60
LT 230 kV P. AFONSO IV /P.AFONSO III BA/AL LT 230 kV P. AFONSO IV /P.AFONSO III C-1 BA/AL RB FT LT 230 kV P. AFONSO IV /P.AFONSO III C-1 BA/AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$28,150.38
LT 230 kV P. AFONSO IV /P.AFONSO III BA/AL LT 230 kV P. AFONSO IV /P.AFONSO III C-1 BA/AL RB FT LT 230 kV P. AFONSO IV /P.AFONSO III C-1 BA/AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$83,070.12
LT 230 kV P.AFONSO III /BOM NOME AL/PE LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE RB FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,362,297.50
LT 230 kV P.AFONSO III /BOM NOME AL/PE LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE RB FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE 061/2001 IPCA RMEL REN 643/2014 24/11/2014 23/11/2051  R$353,291.33
LT 230 kV P.AFONSO III /BOM NOME AL/PE LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE RB FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 9,921,941.11
LT 230 kV P.AFONSO III /CIC. DANTAS AL/BA LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,633,930.95
LT 230 kV P.AFONSO III /CIC. DANTAS AL/BA LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA 061/2001 IPCA RMEL REN 643/2014 24/11/2014 23/11/2051  R$27,205.52
LT 230 kV P.AFONSO III /CIC. DANTAS AL/BA LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA 061/2001 IPCA RBNI REA 2173/2009 04/09/2017 03/09/2053  R$ 3,343,953.06
LT 230 kV P.AFONSO III /CIC. DANTAS AL/BA LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,641,805.18
LT 230 kV P.AFONSO III /CIC. DANTAS AL/BA LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA 061/2001 IPCA RMEL REN 643/2014 24/11/2014 23/11/2051  R$24,547.18
LT 230 kV P.AFONSO III /FLORESTA II AL/PE LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE RB FT LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,550,148.82
LT 230 kV P.AFONSO III /FLORESTA II AL/PE LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE RB FT LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE 061/2001 IPCA RBNI REA 10264/2021 05/04/2019 04/04/2047  R$5,151.47
LT 230 kV P.AFONSO III /GARANHUNS II AL/PE LT 230 kV P.AFONSO III /GARANHUNS II C-3 AL/PE RB FT LT 230 kV P.AFONSO III /GARANHUNS II C-3 AL/PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,188,366.00
LT 230 kV P.AFONSO III /GARANHUNS II AL/PE LT 230 kV P.AFONSO III /GARANHUNS II C-2 AL/PE RB FT LT 230 kV P.AFONSO III /GARANHUNS II C-2 AL/PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,188,366.00
LT 230 kV P.AFONSO III /GARANHUNS II AL/PE LT 230 kV P.AFONSO III /GARANHUNS II C-1 AL/PE RB FT LT 230 kV P.AFONSO III /GARANHUNS II C-1 AL/PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 4,035,544.43
LT 230 kV P.AFONSO III /GARANHUNS II AL/PE LT 230 kV P.AFONSO III /GARANHUNS II C-1 AL/PE RB FT LT 230 kV P.AFONSO III /GARANHUNS II C-1 AL/PE 061/2001 IPCA RBNI REA 5654/2016 15/12/2017 14/12/2050  R$ 1,097,315.60
LT 230 kV P.AFONSO III /ITABAIANA AL/SE LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE 061/2001 IPCA RBNI REA 2823/2011 13/08/2013 12/08/2046  R$183,841.90
LT 230 kV P.AFONSO III /ITABAIANA AL/SE LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,524,899.98
LT 230 kV P.AFONSO III /ITABAIANA AL/SE LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE 061/2001 IPCA RMEL REN 643/2014 24/11/2014 23/11/2051  R$10,803.03
LT 230 kV P.AFONSO III /ITABAIANA AL/SE LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 7,450,830.53
LT 230 kV P.AFONSO III /ITABAIANA AL/SE LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 7,624,952.67
LT 230 kV P.AFONSO III /ITABAIANA AL/SE LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE 061/2001 IPCA RBNI REA 2823/2011 13/08/2013 12/08/2046  R$183,841.90
LT 230 kV P.AFONSO III /ITABAIANA AL/SE LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,524,899.98
LT 230 kV P.AFONSO III /ITABAIANA AL/SE LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE 061/2001 IPCA RMEL REN 643/2014 24/11/2014 23/11/2051  R$10,803.03
LT 230 kV P.AFONSO III /ITABAIANA AL/SE LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 7,450,830.53
LT 230 kV P.AFONSO III /ITABAIANA AL/SE LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 7,624,952.67
LT 230 kV P.AFONSO III /SANTANA II AL LT 230 kV P.AFONSO III /SANTANA II C-1 AL RB FT LT 230 kV P.AFONSO III /SANTANA II C-1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,693,747.53
LT 230 kV P.AFONSO III /SANTANA II AL LT 230 kV P.AFONSO III /SANTANA II C-1 AL RB FT LT 230 kV P.AFONSO III /SANTANA II C-1 AL 061/2001 IPCA RBNI DSP 1019/2022 01/07/2022 30/06/2057  R$337,876.12
LT 230 kV P.AFONSO III /TACARUTU AL/PE LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE RB FT LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$860,269.56
LT 230 kV P.AFONSO III /TACARUTU AL/PE LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE RB FT LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE 061/2001 IPCA RBNI REA 7026/2018 01/07/2018 14/12/2044  R$85,258.42
LT 230 kV P.AFONSO III /USINA PA-I AL/BA LT 230 kV P.AFONSO III /USINA PA-I C-2 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$15,354.75
LT 230 kV P.AFONSO III /USINA PA-I AL/BA LT 230 kV P.AFONSO III /USINA PA-I C-1 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$15,354.75
LT 230 kV P.AFONSO III /USINA PA-II AL/BA LT 230 kV P.AFONSO III /USINA PA-II C-5 AL/BA RB FT LT 230 kV P.AFONSO III /USINA PA-II C-5 AL/BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$17,913.88
LT 230 kV P.AFONSO III /USINA PA-II AL/BA LT 230 kV P.AFONSO III /USINA PA-II C-4 AL/BA RB FT LT 230 kV P.AFONSO III /USINA PA-II C-4 AL/BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$17,913.88
LT 230 kV P.AFONSO III /USINA PA-II AL/BA LT 230 kV P.AFONSO III /USINA PA-II C-3 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$15,354.75
LT 230 kV P.AFONSO III /USINA PA-II AL/BA LT 230 kV P.AFONSO III /USINA PA-II C-2 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$15,354.75
LT 230 kV P.AFONSO III /USINA PA-II AL/BA LT 230 kV P.AFONSO III /USINA PA-II C-2 AL/BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$45,310.97
LT 230 kV P.AFONSO III /USINA PA-II AL/BA LT 230 kV P.AFONSO III /USINA PA-II C-2 AL/BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$46,369.87
LT 230 kV P.AFONSO III /USINA PA-II AL/BA LT 230 kV P.AFONSO III /USINA PA-II C-1 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$15,354.75
LT 230 kV P.AFONSO III /USINA PA-III AL/BA LT 230 kV P.AFONSO III /USINA PA-III C-4 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$15,354.75
LT 230 kV P.AFONSO III /USINA PA-III AL/BA LT 230 kV P.AFONSO III /USINA PA-III C-3 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$15,354.75
LT 230 kV P.AFONSO III /USINA PA-III AL/BA LT 230 kV P.AFONSO III /USINA PA-III C-2 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$15,354.75
LT 230 kV P.AFONSO III /USINA PA-III AL/BA LT 230 kV P.AFONSO III /USINA PA-III C-1 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$15,354.75
LT 230 kV P.AFONSO III /ZEBU AL LT 230 kV P.AFONSO III /ZEBU C-2 AL RB FT LT 230 kV P.AFONSO III /ZEBU C-2 AL/BA 017/2009 IPCA RBL CC 017/2009 03/08/2009 03/08/2039  R$211,220.06
LT 230 kV P.AFONSO III /ZEBU AL LT 230 kV P.AFONSO III /ZEBU C-1 AL RB FT LT 230 kV P.AFONSO III /ZEBU C-1 AL 017/2009 IPCA RBL CC 017/2009 03/08/2009 03/08/2039  R$211,220.06
LT 230 kV PARAISO /ACU II RN LT 230 kV PARAISO /ACU II C-2 RN RB FT LT 230 kV PARAISO /ACU II C-2 RN 012/2007 IPCA RBL CC 012/2007 14/06/2007 14/06/2037  R$ 5,739,321.02
LT 230 kV PARAISO /ACU II RN LT 230 kV PARAISO /ACU II C-1395 RN RB FT LT 230 kV PARAISO /ACU II C-3 RN 019/2010 IPCA RBL CC 019/2010 23/11/2010 23/11/2040  R$ 3,669,333.28
LT 230 kV PARAISO /LAGOA NOVA II RN LT 230 kV PARAISO /LAGOA NOVA II C-1 RN RB FT LT 230 kV PARAISO /LAGOA NOVA II C-1 RN 010/2011 IPCA RBL CC 010/2011 13/10/2011 13/10/2041  R$ 4,318,848.98
LT 230 kV PARAISO /NATAL II RN LT 230 kV PARAISO /NATAL II C-2 RN RB FT LT 230 kV PARAISO /NATAL II C-2 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,510,278.63
LT 230 kV PARAISO /NATAL II RN LT 230 kV PARAISO /NATAL II C-2 RN RB FT LT 230 kV PARAISO /NATAL II C-2 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,456,742.94
LT 230 kV PARAISO /NATAL II RN LT 230 kV PARAISO /NATAL II C-1 RN RB FT LT 230 kV PARAISO /NATAL II C-1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,494,740.79
LT 230 kV PARAISO /NATAL II RN LT 230 kV PARAISO /NATAL II C-1 RN RB FT LT 230 kV PARAISO /NATAL II C-1 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,410,891.67
LT 230 kV PARAISO /NATAL II RN LT 230 kV PARAISO /NATAL II C-1 RN RB FT LT 230 kV PARAISO /NATAL II C-1 RN 061/2001 IPCA RBNI REA 7761/2019 31/03/2017 30/03/2054  R$ 1,672,220.94
LT 230 kV PAU FERRO /C.GRANDE II PE/PB LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,956,214.81
LT 230 kV PAU FERRO /GOIANINHA PE LT 230 kV PAU FERRO /GOIANINHA C-1 PE RB FT LT 230 kV PAU FERRO /GOIANINHA C-1 PE 061/2001 IPCA RBNI REA 3677/2012 20/05/2019 20/05/2056  R$706,036.83
LT 230 kV PAU FERRO /GOIANINHA PE LT 230 kV PAU FERRO /GOIANINHA C-1 PE RB FT LT 230 kV PAU FERRO /GOIANINHA C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$688,995.39
LT 230 kV PAU FERRO /GOIANINHA PE LT 230 kV PAU FERRO /GOIANINHA C-1 PE RB FT LT 230 kV PAU FERRO /GOIANINHA C-1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,033,184.65
LT 230 kV PAU FERRO /GOIANINHA PE LT 230 kV PAU FERRO /GOIANINHA C-1 PE RB FT LT 230 kV PAU FERRO /GOIANINHA C-1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,080,699.15
LT 230 kV PAU FERRO /MIRUEIRA II PE LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE 061/2001 IPCA RBNI REA 3677/2012 20/05/2019 20/05/2056  R$337,843.62
LT 230 kV PAU FERRO /MIRUEIRA II PE LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE 061/2001 IPCA RBNI REA 3677/2012 20/05/2019 20/05/2056  R$ 1,466,598.27
LT 230 kV PAU FERRO /MIRUEIRA II PE LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$297,252.30
LT 230 kV PAU FERRO /MIRUEIRA II PE LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$877,173.95
LT 230 kV PAU FERRO /MIRUEIRA II PE LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$897,673.06
LT 230 kV PAU FERRO /MIRUEIRA II PE LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE 061/2001 IPCA RBNI REA 3677/2012 12/04/2016 11/04/2053  R$ 1,716,229.59
LT 230 kV PAU FERRO /SANTA RITA II PE/PB LT 230 kV PAU FERRO /SANTA RITA II C-1 PE/PB RB FT LT 230 kV PAU FERRO /SANTA RITA II C-1 PE/PB 017/2009 IPCA RBL CC 017/2009 21/08/2012 03/08/2039  R$ 7,651,698.96
LT 230 kV PICOS /TAUA II PI/CE LT 230 kV PICOS /TAUA II C-1 PI/CE RB FT LT 230 kV PICOS /TAUA II C-1 PI/CE 012/2007 IPCA RBL CC 012/2007 14/06/2007 14/06/2037  R$ 7,652,428.03
LT 230 kV PIRAPAMA II /SUAPE II PE LT 230 kV PIRAPAMA II /SUAPE II C-2 PE RB FT LT 230 kV PIRAPAMA II /SUAPE II C-2 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039  R$ 1,113,446.28
LT 230 kV PIRAPAMA II /SUAPE II PE LT 230 kV PIRAPAMA II /SUAPE II C-1 PE RB FT LT 230 kV PIRAPAMA II /SUAPE II C-1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039  R$ 1,113,446.28
LT 230 kV PIRIPIRI /IBIAPINA II PI/CE LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE RB FT LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,495,211.08
LT 230 kV PIRIPIRI /IBIAPINA II PI/CE LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE RB FT LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE 061/2001 IPCA RBNI REA 10142/2021 10/02/2021 10/02/2054  R$101,229.69
LT 230 kV PITUACU /NARANDIBA BA LT 230 kV PITUACU /NARANDIBA C-2 BA RB FT LT 230 kV PITUACU /NARANDIBA C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$72,717.12
LT 230 kV PITUACU /NARANDIBA BA LT 230 kV PITUACU /NARANDIBA C-2 BA RB FT LT 230 kV PITUACU /NARANDIBA C-2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$214,583.92
LT 230 kV PITUACU /NARANDIBA BA LT 230 kV PITUACU /NARANDIBA C-2 BA RB FT LT 230 kV PITUACU /NARANDIBA C-2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$219,598.64
LT 230 kV PITUACU /NARANDIBA BA LT 230 kV PITUACU /NARANDIBA C-1 BA RB FT LT 230 kV PITUACU /NARANDIBA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$72,717.12
LT 230 kV PITUACU /RL (COTEGIPE / MATATU) BA/PE LT 230 kV PITUACU /RL (COTEGIPE / MATATU) C-1 BA/PE RB FT LT 230 kV PITUACU /RL (COTEGIPE/MATATU) C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$51,182.51
LT 230 kV PITUACU /RL (COTEGIPE / MATATU) BA/PE LT 230 kV PITUACU /RL (COTEGIPE / MATATU) C-1 BA/PE RB FT LT 230 kV PITUACU /RL (COTEGIPE/MATATU) C-1 BA/PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$151,036.57
LT 230 kV QUIXERE /MOSSORO II CE/RN LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN RB FT LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$984,279.13
LT 230 kV QUIXERE /MOSSORO II CE/RN LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN RB FT LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,904,549.51
LT 230 kV QUIXERE /MOSSORO II CE/RN LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN RB FT LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN 061/2001 IPCA RBNI REA 6894/2018 01/07/2018 11/11/2044  R$3,653.95
LT 230 kV RECIFE II /GOIANINHA PE LT 230 kV RECIFE II /GOIANINHA C-2 PE RB FT LT 230 kV RECIFE II /GOIANINHA C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,109,402.21
LT 230 kV RECIFE II /GOIANINHA PE LT 230 kV RECIFE II /GOIANINHA C-1 PE RB FT LT 230 kV RECIFE II /GOIANINHA C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,109,402.21
LT 230 kV RECIFE II /JABOATAO II PE LT 230 kV RECIFE II /JABOATAO II C-1 PE RB FT LT 230 kV RECIFE II /JABOATAO II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$145,278.86
LT 230 kV RECIFE II /JABOATAO II PE LT 230 kV RECIFE II /JABOATAO II C-1 PE RB FT LT 230 kV RECIFE II /JABOATAO II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$428,709.33
LT 230 kV RECIFE II /JABOATAO II PE LT 230 kV RECIFE II /JABOATAO II C-1 PE RB FT LT 230 kV RECIFE II /JABOATAO II C-1 PE 061/2001 IPCA RBNI REA 10092/2021 11/03/2021 11/03/2056  R$290,442.54
LT 230 kV RECIFE II /JOAIRAM PE LT 230 kV RECIFE II /JOAIRAM C-3 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$137,976.07
LT 230 kV RECIFE II /JOAIRAM PE LT 230 kV RECIFE II /JOAIRAM C-2 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$137,976.07
LT 230 kV RECIFE II /JOAIRAM PE LT 230 kV RECIFE II /JOAIRAM C-1 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,807.97
LT 230 kV RECIFE II /MIRUEIRA PE LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$620,095.85
LT 230 kV RECIFE II /MIRUEIRA PE LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,829,866.19
LT 230 kV RECIFE II /MIRUEIRA PE LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,872,629.24
LT 230 kV RECIFE II /MIRUEIRA PE LT 230 kV RECIFE II /MIRUEIRA C-2 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$489,442.15
LT 230 kV RECIFE II /MIRUEIRA PE LT 230 kV RECIFE II /MIRUEIRA C-2 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,444,314.84
LT 230 kV RECIFE II /MIRUEIRA PE LT 230 kV RECIFE II /MIRUEIRA C-1 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$481,673.23
LT 230 kV RECIFE II /MIRUEIRA PE LT 230 kV RECIFE II /MIRUEIRA C-1 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-1 PE 061/2001 IPCA RMEL REN 643/2014 03/12/2015 02/12/2043  R$28,617.31
LT 230 kV RECIFE II /MIRUEIRA PE LT 230 kV RECIFE II /MIRUEIRA C-1 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,421,389.21
LT 230 kV RECIFE II /PAU FERRO PE LT 230 kV RECIFE II /PAU FERRO C-2 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$515,856.49
LT 230 kV RECIFE II /PAU FERRO PE LT 230 kV RECIFE II /PAU FERRO C-2 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,522,261.99
LT 230 kV RECIFE II /PAU FERRO PE LT 230 kV RECIFE II /PAU FERRO C-1 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$515,856.49
LT 230 kV RECIFE II /PAU FERRO PE LT 230 kV RECIFE II /PAU FERRO C-1 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,522,261.99
LT 230 kV RECIFE II /PIRAPAMA II PE LT 230 kV RECIFE II /PIRAPAMA II C-2 PE RB FT LT 230 kV RECIFE II /PIRAPAMA II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$471,729.01
LT 230 kV RECIFE II /PIRAPAMA II PE LT 230 kV RECIFE II /PIRAPAMA II C-2 PE RB FT LT 230 kV RECIFE II /PIRAPAMA II C-2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,392,044.40
LT 230 kV RIBEIRAO /RECIFE II PE LT 230 kV RIBEIRAO /RECIFE II C-2 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$880,995.87
LT 230 kV RIBEIRAO /RECIFE II PE LT 230 kV RIBEIRAO /RECIFE II C-2 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-2 PE 061/2001 IPCA RBNI REA 3817/2013 20/08/2019 20/08/2056  R$27,732.13
LT 230 kV RIBEIRAO /RECIFE II PE LT 230 kV RIBEIRAO /RECIFE II C-1 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE 061/2001 IPCA RBNI REA 2823/2011 01/02/2016 31/01/2052  R$ 2,911,656.81
LT 230 kV RIBEIRAO /RECIFE II PE LT 230 kV RIBEIRAO /RECIFE II C-1 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,114,203.97
LT 230 kV RIBEIRAO /RECIFE II PE LT 230 kV RIBEIRAO /RECIFE II C-1 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,287,950.04
LT 230 kV RIBEIRAO /RECIFE II PE LT 230 kV RIBEIRAO /RECIFE II C-1 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,364,787.77
LT 230 kV RIO LARGO II /ARAPIRACA III AL LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL RB FT LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,722,472.34
LT 230 kV RIO LARGO II /ARAPIRACA III AL LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL RB FT LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,082,914.02
LT 230 kV RIO LARGO II /ARAPIRACA III AL LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL RB FT LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 5,201,699.15
LT 230 kV RIO LARGO II /ARAPIRACA III AL LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL RB FT LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL 061/2001 IPCA RBNI REA 10134/2021 15/08/2016 14/08/2044  R$469,557.32
LT 230 kV RIO LARGO II /BRASKEM AL LT 230 kV RIO LARGO II /BRASKEM C-1 AL DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$502,376.07
LT 230 kV RIO LARGO II /BRASKEM AL LT 230 kV RIO LARGO II /BRASKEM C-1 AL DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,482,482.07
LT 230 kV RUSSAS II /BANABUIU CE LT 230 kV RUSSAS II /BANABUIU C-1 CE RB FT LT 230 kV RUSSAS II /BANABUIU C-1 CE 018/2012 IPCA RBL CC 018/2012 15/12/2020 01/06/2042  R$ 6,297,255.02
LT 230 kV RUSSAS II /QUIXERE CE LT 230 kV RUSSAS II /QUIXERE C-1 CE RB FT LT 230 kV RUSSAS II /QUIXERE C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$492,139.56
LT 230 kV RUSSAS II /QUIXERE CE LT 230 kV RUSSAS II /QUIXERE C-1 CE RB FT LT 230 kV RUSSAS II /QUIXERE C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,452,274.75
LT 230 kV RUSSAS II /QUIXERE CE LT 230 kV RUSSAS II /QUIXERE C-1 CE RB FT LT 230 kV RUSSAS II /QUIXERE C-1 CE 061/2001 IPCA RBNI REA 6894/2018 01/07/2018 11/11/2044  R$3,653.95
LT 230 kV S.JOAO PIAUI /ELISEU MARTIN PI LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI RB FT LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,403,637.23
LT 230 kV S.JOAO PIAUI /ELISEU MARTIN PI LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI RB FT LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI 061/2001 IPCA RMEL REN 643/2014 24/07/2014 23/07/2039  R$694,955.78
LT 230 kV S.JOAO PIAUI /ELISEU MARTIN PI LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI RB FT LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 10,043,932.19
LT 230 kV S.JOAO PIAUI /ELISEU MARTIN PI LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI RB FT LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 10,278,653.81
LT 230 kV S.JOAO PIAUI /PICOS PI LT 230 kV S.JOAO PIAUI /PICOS C-1 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,303,240.76
LT 230 kV S.JOAO PIAUI /PICOS PI LT 230 kV S.JOAO PIAUI /PICOS C-1 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 9,747,668.14
LT 230 kV S.JOAO PIAUI /PICOS PI LT 230 kV S.JOAO PIAUI /PICOS C-1 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 9,975,466.22
LT 230 kV SANTANA II /ANGELIM AL/PE LT 230 kV SANTANA II /ANGELIM C-1 AL/PE RB FT LT 230 kV SANTANA II /ANGELIM C-1 AL/PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,662,671.90
LT 230 kV SANTANA II /ANGELIM AL/PE LT 230 kV SANTANA II /ANGELIM C-1 AL/PE RB FT LT 230 kV SANTANA II /ANGELIM C-1 AL/PE 061/2001 IPCA RBNI DSP 1019/2022 01/07/2021 30/06/2057  R$337,876.12
LT 230 kV SAO LUIS II /SAO LUIS III MA LT 230 kV SAO LUIS II /SAO LUIS III C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS III C-2 MA 004/2010 IPCA RBL CC 004/2010 12/07/2010 12/07/2040  R$ 2,342,821.49
LT 230 kV SAPEACU /FUNIL BA LT 230 kV SAPEACU /FUNIL C-1 BA RB FT LT 230 kV SAPEACU /FUNIL C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,852,468.51
LT 230 kV SAPEACU /STO.A.JESUS BA LT 230 kV SAPEACU /STO.A.JESUS C-2 BA RB FT LT 230 kV SAPEACU /STO.A.JESUS C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$497,211.07
LT 230 kV SAPEACU /STO.A.JESUS BA LT 230 kV SAPEACU /STO.A.JESUS C-2 BA RB FT LT 230 kV SAPEACU /STO.A.JESUS C-2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,467,240.47
LT 230 kV SAPEACU /STO.A.JESUS BA LT 230 kV SAPEACU /STO.A.JESUS C-2 BA RB FT LT 230 kV SAPEACU /STO.A.JESUS C-2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,501,529.14
LT 230 kV SAPEACU /STO.A.JESUS BA LT 230 kV SAPEACU /STO.A.JESUS C-1 BA RB FT LT 230 kV SAPEACU /STO.A.JESUS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$497,211.07
LT 230 kV SOBRAL II /SOBRAL III CE LT 230 kV SOBRAL II /SOBRAL III C-2 CE RB FT LT 230 kV SOBRAL II /SOBRAL III C-2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$257,306.73
LT 230 kV SOBRAL II /SOBRAL III CE LT 230 kV SOBRAL II /SOBRAL III C-1 CE RB FT LT 230 kV SOBRAL II /SOBRAL III C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$257,306.73
LT 230 kV SOBRAL III /ACARAU II CE LT 230 kV SOBRAL III /ACARAU II C-1 CE RB FT LT 230 kV SOBRAL III /ACARAU II C-1 CE 021/2010 IPCA RBL CC 021/2010 08/04/2014 23/11/2040  R$ 3,970,090.17
LT 230 kV SR.BONFIM II /CAMPO FORMOSO BA LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA RB FT LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,036,733.26
LT 230 kV SR.BONFIM II /CAMPO FORMOSO BA LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA RB FT LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,059,338.54
LT 230 kV SR.BONFIM II /CAMPO FORMOSO BA LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA RB FT LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,130,833.74
LT 230 kV STO.A.JESUS /FUNIL BA LT 230 kV STO.A.JESUS /FUNIL C-2 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,015,895.91
LT 230 kV STO.A.JESUS /FUNIL BA LT 230 kV STO.A.JESUS /FUNIL C-2 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 8,899,730.50
LT 230 kV STO.A.JESUS /FUNIL BA LT 230 kV STO.A.JESUS /FUNIL C-2 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 9,107,712.70
LT 230 kV STO.A.JESUS /FUNIL BA LT 230 kV STO.A.JESUS /FUNIL C-1 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,526,453.76
LT 230 kV SUAPE II /SUAPE III PE LT 230 kV SUAPE II /SUAPE III C-2 PE RB FT LT 230 kV SUAPE II /SUAPE III C-2 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039  R$654,631.77
LT 230 kV SUAPE II /SUAPE III PE LT 230 kV SUAPE II /SUAPE III C-1 PE RB FT LT 230 kV SUAPE II /SUAPE III C-1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039  R$654,631.77
LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II BA LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA RB FT LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,908,282.18
LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II BA LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA RB FT LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,631,227.85
LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II BA LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA RB FT LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 5,762,826.80
LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II BA LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA RB FT LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA 061/2001 IPCA RBNI REA 10198/2021 05/06/2019 04/06/2047  R$1,209.05
LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II BA LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA RB FT LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA 061/2001 IPCA RBNI REA 9680/2021 19/11/2019 18/11/2047  R$53,751.35
LT 230 kV TACAIMBO /C.GRANDE II PE/PB LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,454,792.15
LT 230 kV TACAIMBO /C.GRANDE II PE/PB LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 7,243,946.47
LT 230 kV TACAIMBO /C.GRANDE II PE/PB LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 7,413,233.83
LT 230 kV TACAIMBO /C.GRANDE II PE/PB LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,454,792.15
LT 230 kV TACAIMBO /C.GRANDE II PE/PB LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 7,243,946.47
LT 230 kV TACAIMBO /C.GRANDE II PE/PB LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 7,413,233.83
LT 230 kV TACARUTU /BOM NOME PE LT 230 kV TACARUTU /BOM NOME C-1 PE RB FT LT 230 kV TACARUTU /BOM NOME C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,488,248.04
LT 230 kV TACARUTU /BOM NOME PE LT 230 kV TACARUTU /BOM NOME C-1 PE RB FT LT 230 kV TACARUTU /BOM NOME C-1 PE 061/2001 IPCA RBNI REA 7026/2018 01/07/2018 14/12/2044  R$85,258.42
LT 230 kV TERESINA /PIRIPIRI PI LT 230 kV TERESINA /PIRIPIRI C-1 PI RB FT LT 230 kV TERESINA /PIRIPIRI C-1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,045,359.63
LT 230 kV TERESINA II /TERESINA III PI LT 230 kV TERESINA II /TERESINA III C-2 PI RB FT LT 230 kV TERESINA II /TERESINA III C-2 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 09/12/2041  R$ 1,589,097.19
LT 230 kV TERESINA II /TERESINA III PI LT 230 kV TERESINA II /TERESINA III C-1 PI RB FT LT 230 kV TERESINA II /TERESINA III C-1 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 09/12/2041  R$ 1,589,097.19
LT 230 kV TERESINA II /TERESINA PI LT 230 kV TERESINA II /TERESINA C-2 PI RB FT LT 230 kV TERESINA II /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$432,418.25
LT 230 kV TERESINA II /TERESINA PI LT 230 kV TERESINA II /TERESINA C-2 PI RB FT LT 230 kV TERESINA II /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,276,040.70
LT 230 kV TERESINA II /TERESINA PI LT 230 kV TERESINA II /TERESINA C-2 PI RB FT LT 230 kV TERESINA II /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,305,861.13
LT 230 kV TERESINA II /TERESINA PI LT 230 kV TERESINA II /TERESINA C-1 PI RB FT LT 230 kV TERESINA II /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$432,418.25
LT 230 kV TERESINA II /TERESINA PI LT 230 kV TERESINA II /TERESINA C-1 PI RB FT LT 230 kV TERESINA II /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,276,040.70
LT 230 kV TERESINA II /TERESINA PI LT 230 kV TERESINA II /TERESINA C-1 PI RB FT LT 230 kV TERESINA II /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,305,861.13
LT 230 kV TOUROS /CEARA MIRIM II RN LT 230 kV TOUROS /CEARA MIRIM II C-1 RN RB FT LT 230 kV TOUROS /CEARA MIRIM II C-1 RN 018/2012 IPCA RBL CC 018/2012 12/05/2017 01/06/2042  R$ 3,396,358.15
LT 230 kV U. A. SALES /P.AFONSO III BA/AL LT 230 kV U. A. SALES /P.AFONSO III C-2 BA/AL DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$134,649.38
LT 230 kV U. A. SALES /P.AFONSO III BA/AL LT 230 kV U. A. SALES /P.AFONSO III C-2 BA/AL DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$397,342.37
LT 230 kV U. A. SALES /P.AFONSO III BA/AL LT 230 kV U. A. SALES /P.AFONSO III C-1 BA/AL DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$137,011.65
LT 230 kV U. A. SALES /P.AFONSO III BA/AL LT 230 kV U. A. SALES /P.AFONSO III C-1 BA/AL DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$404,313.29
LT 230 kV U.SOBRADINHO /JUAZEIRO II BA LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA 061/2001 IPCA RBNI REA 2891/2011 11/09/2017 10/09/2053  R$404,706.66
LT 230 kV U.SOBRADINHO /JUAZEIRO II BA LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$660,358.46
LT 230 kV U.SOBRADINHO /JUAZEIRO II BA LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,948,678.75
LT 230 kV U.SOBRADINHO /JUAZEIRO II BA LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA 061/2001 IPCA RBNI REA 2891/2011 11/09/2017 10/09/2053  R$404,706.66
LT 230 kV U.SOBRADINHO /JUAZEIRO II BA LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$660,358.46
LT 230 kV U.SOBRADINHO /JUAZEIRO II BA LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,948,678.75
LT 230 kV UB.ESPERANCA /B. ESPERANCA PI LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI RB FT LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$71,655.52
LT 230 kV UB.ESPERANCA /B. ESPERANCA PI LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI RB FT LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$211,451.20
LT 500 kV ANGELIM II /PAU FERRO PE LT 500 kV ANGELIM II /PAU FERRO C-1 PE RB FT LT 500 kV ANGELIM II /PAU FERRO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 7,831,847.52
LT 500 kV ANGELIM II /PAU FERRO PE LT 500 kV ANGELIM II /PAU FERRO C-1 PE RB FT LT 500 kV ANGELIM II /PAU FERRO C-1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 23,111,318.91
LT 500 kV ANGELIM II /RECIFE II PE LT 500 kV ANGELIM II /RECIFE II C-2 PE RB FT LT 500 kV ANGELIM II /RECIFE II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 8,202,424.52
LT 500 kV ANGELIM II /RECIFE II PE LT 500 kV ANGELIM II /RECIFE II C-2 PE RB FT LT 500 kV ANGELIM II /RECIFE II C-2 PE 061/2001 IPCA RBNI REA 5654/2016 29/11/2017 28/11/2050  R$978,017.79
LT 500 kV ANGELIM II /RECIFE II PE LT 500 kV ANGELIM II /RECIFE II C-2 PE RB FT LT 500 kV ANGELIM II /RECIFE II C-2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 24,204,869.71
LT 500 kV CAMACARI IV /CAMACARI II BA LT 500 kV CAMACARI IV /CAMACARI II C-1 BA RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$47,783.68
LT 500 kV CAMACARI IV /CAMACARI II BA LT 500 kV CAMACARI IV /CAMACARI II C-1 BA RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$141,006.81
LT 500 kV CAMACARI IV /CAMACARI II BA LT 500 kV CAMACARI IV /CAMACARI II C-1 BA RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$144,302.07
LT 500 kV CAMACARI IV /CAMACARI II BA LT 500 kV CAMACARI IV /CAMACARI II C-1 BA RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RBNI REA 10135/2021 15/08/2016 15/08/2050  R$15,456.00
LT 500 kV CEARA MIRIM II /C.GRANDE III RN/PB LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB RB FT LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041  R$ 13,742,719.36
LT 500 kV GARANHUNS II /ANGELIM II PE LT 500 kV GARANHUNS II /ANGELIM II C-1 PE RB FT LT 500 kV GARANHUNS II /ANGELIM II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$765,949.17
LT 500 kV GARANHUNS II /ANGELIM II PE LT 500 kV GARANHUNS II /ANGELIM II C-1 PE RB FT LT 500 kV GARANHUNS II /ANGELIM II C-1 PE 061/2001 IPCA RBNI REA 5654/2016 19/09/2017 18/09/2050  R$68,707.84
LT 500 kV GARANHUNS II /ANGELIM II PE LT 500 kV GARANHUNS II /ANGELIM II C-1 PE RB FT LT 500 kV GARANHUNS II /ANGELIM II C-1 PE 061/2001 IPCA RMEL REN 643/2014 30/11/2015 29/11/2048  R$113,999.73
LT 500 kV GARANHUNS II /ANGELIM II PE LT 500 kV GARANHUNS II /ANGELIM II C-1 PE RB FT LT 500 kV GARANHUNS II /ANGELIM II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,260,270.72
LT 500 kV JARDIM /CAMACARI IV SE/BA LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA RB FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 11,945,919.66
LT 500 kV JARDIM /CAMACARI IV SE/BA LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA RB FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 35,251,702.50
LT 500 kV JARDIM /CAMACARI IV SE/BA LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA RB FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 36,075,516.97
LT 500 kV JARDIM /CAMACARI IV SE/BA LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA RB FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA 061/2001 IPCA RBNI REA 10135/2021 15/08/2016 15/08/2050  R$15,456.00
LT 500 kV JOAO CAMARA III /CEARA MIRIM II RN LT 500 kV JOAO CAMARA III /CEARA MIRIM II C-1 RN RB FT LT 500 kV JOAO CAMARA III /CEARA MIRIM II C-1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041  R$ 4,376,740.95
LT 500 kV JUAZEIRO III /U.SOBRADINHO BA LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,018,171.23
LT 500 kV JUAZEIRO III /U.SOBRADINHO BA LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,955,503.97
LT 500 kV JUAZEIRO III /U.SOBRADINHO BA LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBNI REA 9689/2021 31/07/2019 30/07/2047  R$30,743.12
LT 500 kV L.GONZAGA /US. L.GONZAGA PE LT 500 kV L.GONZAGA /US. L.GONZAGA C-3 PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$37,480.32
LT 500 kV L.GONZAGA /US. L.GONZAGA PE LT 500 kV L.GONZAGA /US. L.GONZAGA C-3 PE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$110,602.22
LT 500 kV L.GONZAGA /US. L.GONZAGA PE LT 500 kV L.GONZAGA /US. L.GONZAGA C-2 PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$37,480.32
LT 500 kV L.GONZAGA /US. L.GONZAGA PE LT 500 kV L.GONZAGA /US. L.GONZAGA C-2 PE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$110,602.22
LT 500 kV L.GONZAGA /US. L.GONZAGA PE LT 500 kV L.GONZAGA /US. L.GONZAGA C-1 PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$37,480.32
LT 500 kV L.GONZAGA /US. L.GONZAGA PE LT 500 kV L.GONZAGA /US. L.GONZAGA C-1 PE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$110,602.22
LT 500 kV MESSIAS /SUAPE II AL/PE LT 500 kV MESSIAS /SUAPE II C-1 AL/PE RB FT LT 500 kV MESSIAS /SUAPE II C-1 AL/PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 7,658,372.54
LT 500 kV MESSIAS /SUAPE II AL/PE LT 500 kV MESSIAS /SUAPE II C-1 AL/PE RB FT LT 500 kV MESSIAS /SUAPE II C-1 AL/PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 22,599,404.48
LT 500 kV MESSIAS /SUAPE II AL/PE LT 500 kV MESSIAS /SUAPE II C-1 AL/PE RB FT LT 500 kV MESSIAS /SUAPE II C-1 AL/PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 23,127,541.14
LT 500 kV MESSIAS /SUAPE II AL/PE LT 500 kV MESSIAS /SUAPE II C-1 AL/PE RB FT LT 500 kV MESSIAS /SUAPE II C-1 AL/PE 061/2001 IPCA RBNI REA 10229/2021 21/05/2021 21/05/2055  R$753,271.48
LT 500 kV MILAGRES /QUIXADA CE LT 500 kV MILAGRES /QUIXADA C-1 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 12,877,854.54
LT 500 kV MILAGRES /QUIXADA CE LT 500 kV MILAGRES /QUIXADA C-1 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 38,001,787.23
LT 500 kV MILAGRES /QUIXADA CE LT 500 kV MILAGRES /QUIXADA C-1 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 38,889,869.80
LT 500 kV OLINDINA /CAMACARI II BA LT 500 kV OLINDINA /CAMACARI II C-2 BA RB FT LT 500 kV OLINDINA /CAMACARI II C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 7,058,794.15
LT 500 kV OLINDINA /CAMACARI II BA LT 500 kV OLINDINA /CAMACARI II C-2 BA RB FT LT 500 kV OLINDINA /CAMACARI II C-2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 20,830,084.12
LT 500 kV OLINDINA /CAMACARI II BA LT 500 kV OLINDINA /CAMACARI II C-1 BA RB FT LT 500 kV OLINDINA /CAMACARI II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 7,073,209.66
LT 500 kV OLINDINA /CAMACARI II BA LT 500 kV OLINDINA /CAMACARI II C-1 BA RB FT LT 500 kV OLINDINA /CAMACARI II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 20,872,623.44
LT 500 kV OLINDINA /US. L.GONZAGA BA/PE LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 11,945,651.64
LT 500 kV OLINDINA /US. L.GONZAGA BA/PE LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 35,250,911.59
LT 500 kV P. AFONSO IV /ANGELIM II BA/PE LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 10,643,450.68
LT 500 kV P. AFONSO IV /ANGELIM II BA/PE LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 31,408,193.56
LT 500 kV P. AFONSO IV /OLINDINA BA LT 500 kV P. AFONSO IV /OLINDINA C-1 BA RB FT LT 500 kV P. AFONSO IV /OLINDINA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 10,225,400.92
LT 500 kV P. AFONSO IV /OLINDINA BA LT 500 kV P. AFONSO IV /OLINDINA C-1 BA RB FT LT 500 kV P. AFONSO IV /OLINDINA C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 30,174,553.45
LT 500 kV P. AFONSO IV /USINA XINGO BA/AL LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL RB FT LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,585,181.25
LT 500 kV P. AFONSO IV /USINA XINGO BA/AL LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL RB FT LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 7,628,716.99
LT 500 kV P. AFONSO IV /USINA XINGO BA/AL LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL RB FT LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 7,806,996.25
LT 500 kV PAU FERRO /RECIFE II PE LT 500 kV PAU FERRO /RECIFE II C-1 PE RB FT LT 500 kV PAU FERRO /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$293,694.28
LT 500 kV PAU FERRO /RECIFE II PE LT 500 kV PAU FERRO /RECIFE II C-1 PE RB FT LT 500 kV PAU FERRO /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$866,674.46
LT 500 kV PECEM II /FORTALEZA II CE LT 500 kV PECEM II /FORTALEZA II C-1 CE RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,112,270.58
LT 500 kV PECEM II /FORTALEZA II CE LT 500 kV PECEM II /FORTALEZA II C-1 CE RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 6,233,185.56
LT 500 kV PECEM II /FORTALEZA II CE LT 500 kV PECEM II /FORTALEZA II C-1 CE RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 6,378,851.96
LT 500 kV QUIXADA /FORTALEZA II CE LT 500 kV QUIXADA /FORTALEZA II C-1 CE RB FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 6,559,056.51
LT 500 kV QUIXADA /FORTALEZA II CE LT 500 kV QUIXADA /FORTALEZA II C-1 CE RB FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE 061/2001 IPCA RMEL REN 643/2014 27/08/2015 26/08/2052  R$9,146.32
LT 500 kV QUIXADA /FORTALEZA II CE LT 500 kV QUIXADA /FORTALEZA II C-1 CE RB FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 19,355,387.90
LT 500 kV QUIXADA /FORTALEZA II CE LT 500 kV QUIXADA /FORTALEZA II C-1 CE RB FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 19,807,713.53
LT 500 kV S.JOAO PIAUI /B. ESPERANCA PI LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 11,220,071.03
LT 500 kV S.JOAO PIAUI /B. ESPERANCA PI LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 33,109,766.12
LT 500 kV SOBRAL III /PECEM II CE LT 500 kV SOBRAL III /PECEM II C-1 CE RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 8,017,026.96
LT 500 kV SOBRAL III /PECEM II CE LT 500 kV SOBRAL III /PECEM II C-1 CE RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 23,657,772.46
LT 500 kV SOBRAL III /PECEM II CE LT 500 kV SOBRAL III /PECEM II C-1 CE RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 24,210,642.65
LT 500 kV SUAPE II /RECIFE II PE LT 500 kV SUAPE II /RECIFE II C-1 PE RB FT LT 500 kV SUAPE II /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$798,725.97
LT 500 kV SUAPE II /RECIFE II PE LT 500 kV SUAPE II /RECIFE II C-1 PE RB FT LT 500 kV SUAPE II /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,356,993.11
LT 500 kV SUAPE II /RECIFE II PE LT 500 kV SUAPE II /RECIFE II C-1 PE RB FT LT 500 kV SUAPE II /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,412,074.84
LT 500 kV SUAPE II /RECIFE II PE LT 500 kV SUAPE II /RECIFE II C-1 PE RB FT LT 500 kV SUAPE II /RECIFE II C-1 PE 061/2001 IPCA RBNI REA 10229/2021 21/05/2021 21/05/2055  R$753,271.48
LT 500 kV TERESINA II /P.DUTRA PI/MA LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 9,980,337.27
LT 500 kV TERESINA II /P.DUTRA PI/MA LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 9,989,947.61
LT 500 kV TERESINA II /P.DUTRA PI/MA LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RMEL REN 643/2014 30/09/2015 29/09/2040  R$865,941.42
LT 500 kV TERESINA II /P.DUTRA PI/MA LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 29,479,744.65
LT 500 kV TERESINA II /P.DUTRA PI/MA LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 30,168,671.38
LT 500 kV TERESINA II /TIANGUA II PI/CE LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 11,369,031.29
LT 500 kV TERESINA II /TIANGUA II PI/CE LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBNI REA 9688/2021 19/09/2019 18/09/2047  R$511,116.78
LT 500 kV TIANGUA II /SOBRAL III CE LT 500 kV TIANGUA II /SOBRAL III C-1 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 4,689,845.54
LT 500 kV TIANGUA II /SOBRAL III CE LT 500 kV TIANGUA II /SOBRAL III C-1 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RBNI REA 9688/2021 03/10/2019 02/10/2047  R$507,791.95
LT 500 kV U.SOBRADINHO /S.JOAO PIAUI BA/PI LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 10,138,907.87
LT 500 kV U.SOBRADINHO /S.JOAO PIAUI BA/PI LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 29,919,317.56
LT 500 kV U.SOBRADINHO /SOBRADINHO BA LT 500 kV U.SOBRADINHO /SOBRADINHO C-3 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$37,480.32
LT 500 kV U.SOBRADINHO /SOBRADINHO BA LT 500 kV U.SOBRADINHO /SOBRADINHO C-3 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$110,602.22
LT 500 kV U.SOBRADINHO /SOBRADINHO BA LT 500 kV U.SOBRADINHO /SOBRADINHO C-3 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$113,186.93
LT 500 kV U.SOBRADINHO /SOBRADINHO BA LT 500 kV U.SOBRADINHO /SOBRADINHO C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$37,480.32
LT 500 kV U.SOBRADINHO /SOBRADINHO BA LT 500 kV U.SOBRADINHO /SOBRADINHO C-2 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$110,602.22
LT 500 kV U.SOBRADINHO /SOBRADINHO BA LT 500 kV U.SOBRADINHO /SOBRADINHO C-2 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$113,186.93
LT 500 kV U.SOBRADINHO /SOBRADINHO BA LT 500 kV U.SOBRADINHO /SOBRADINHO C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$37,480.32
LT 500 kV U.SOBRADINHO /SOBRADINHO BA LT 500 kV U.SOBRADINHO /SOBRADINHO C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$110,602.22
LT 500 kV U.SOBRADINHO /SOBRADINHO BA LT 500 kV U.SOBRADINHO /SOBRADINHO C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$113,186.93
LT 500 kV US. L.GONZAGA /GARANHUNS II PE LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE RB FT LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 11,170,092.13
LT 500 kV US. L.GONZAGA /GARANHUNS II PE LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE RB FT LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE 061/2001 IPCA RMEL REN 643/2014 30/11/2015 29/11/2048  R$ 1,971,864.82
LT 500 kV US. L.GONZAGA /GARANHUNS II PE LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE RB FT LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 32,962,281.33
LT 500 kV US. L.GONZAGA /JUAZEIRO III PE/BA LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 11,945,651.64
LT 500 kV US. L.GONZAGA /JUAZEIRO III PE/BA LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 35,250,911.59
LT 500 kV US. L.GONZAGA /JUAZEIRO III PE/BA LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RBNI REA 9689/2021 31/07/2019 30/07/2047  R$30,743.12
LT 500 kV US. L.GONZAGA /MILAGRES PE/CE LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 11,090,331.45
LT 500 kV US. L.GONZAGA /MILAGRES PE/CE LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 32,726,912.29
LT 500 kV US. L.GONZAGA /MILAGRES PE/CE LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 33,491,723.69
LT 500 kV USINA XINGO /JARDIM AL/SE LT 500 kV USINA XINGO /JARDIM C-1 AL/SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 7,678,661.03
LT 500 kV USINA XINGO /JARDIM AL/SE LT 500 kV USINA XINGO /JARDIM C-1 AL/SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 22,659,274.63
LT 500 kV USINA XINGO /JARDIM AL/SE LT 500 kV USINA XINGO /JARDIM C-1 AL/SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 23,188,810.42
LT 500 kV USINA XINGO /MESSIAS AL LT 500 kV USINA XINGO /MESSIAS C-1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 10,523,321.44
LT 500 kV USINA XINGO /MESSIAS AL LT 500 kV USINA XINGO /MESSIAS C-1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 31,053,699.27
LT 500 kV USINA XINGO /MESSIAS AL LT 500 kV USINA XINGO /MESSIAS C-1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 31,779,408.53
LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-6 AL DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$42,661.25
LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-6 AL DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$125,890.81
LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-6 AL DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$128,832.82
LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-5 AL DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$42,661.25
LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-5 AL DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$125,890.81
LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-5 AL DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$128,832.82
LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-4 AL DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$47,993.90
LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-4 AL DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$141,627.17
LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-4 AL DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$144,936.92
LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-3 AL DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$47,993.90
LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-3 AL DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$141,627.17
LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-3 AL DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$144,936.92
LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-2 AL DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$47,993.90
LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-2 AL DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$141,627.17
LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-2 AL DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$144,936.92
LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-1 AL DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$47,993.90
LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-1 AL DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$141,627.17
LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-1 AL DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$144,936.92
LT 69 kV ABAIXADORA /MOXOTO BA LT 69 kV ABAIXADORA /MOXOTO C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$73,950.49
LT 69 kV ABAIXADORA /MULUNGU BA LT 69 kV ABAIXADORA /MULUNGU C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$90,694.00
LT 69 kV ABAIXADORA /ZEBU BA/AL LT 69 kV ABAIXADORA /ZEBU C-1 BA/AL DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$75,345.79
LT 69 kV CAMACARI II /CAMACARI II BA LT 69 kV CAMACARI II /CAMACARI II C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$21,037.58
LT 69 kV CATU /COTEGIPE BA LT 69 kV CATU /COTEGIPE C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$457,024.20
LT 69 kV CATU /COTEGIPE BA LT 69 kV CATU /COTEGIPE C-2 BA DIT   061/2001 IPCA RMEL REN 643/2014 18/05/2015 17/05/2048  R$319,999.85
LT 69 kV CATU /COTEGIPE BA LT 69 kV CATU /COTEGIPE C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$457,024.20
LT 69 kV CATU /COTEGIPE BA LT 69 kV CATU /COTEGIPE C-1 BA DIT   061/2001 IPCA RMEL REN 643/2014 18/05/2015 17/05/2048  R$319,999.85
LT 69 kV MATATU /PITUACU BA LT 69 kV MATATU /PITUACU C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$83,334.19
LT 69 kV MATATU /PITUACU BA LT 69 kV MATATU /PITUACU C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$84,460.33
LT 69 kV MATATU /PITUACU BA LT 69 kV MATATU /PITUACU C-1 BA DIT   061/2001 IPCA RMEL REN 643/2014 18/05/2015 17/05/2048  R$334,309.05
LT 69 kV MATATU /PITUACU BA LT 69 kV MATATU /PITUACU C-1 BA DIT   061/2001 IPCA RMEL REN 643/2014 23/12/2015 22/12/2040  R$29,814.08
LT 69 kV PEDRA /JEQUIE BA LT 69 kV PEDRA /JEQUIE C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$262,198.68
LT 69 kV PEDRA /JEQUIE BA LT 69 kV PEDRA /JEQUIE C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$773,732.81
LT 69 kV PITUACU /COTEGIPE BA LT 69 kV PITUACU /COTEGIPE C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$226,072.14
LT 69 kV PITUACU /COTEGIPE BA LT 69 kV PITUACU /COTEGIPE C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$228,136.72
LT 69 kV ZEBU /MOXOTO BA LT 69 kV ZEBU /MOXOTO C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$100,461.05
LT 69 kV ZEBU /MOXOTO BA LT 69 kV ZEBU /MOXOTO C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$296,454.61
LT 69 kV ZEBU /MOXOTO BA LT 69 kV ZEBU /MOXOTO C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$303,382.61
MACEIO TT 69/0 kV MACEIO TA2 AL DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
MACEIO TR 230/69 kV MACEIO TR4 AL RBF FT TR 230/69 kV MACEIO TR4 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
MACEIO TR 230/69 kV MACEIO TR3 AL RBF FT TR 230/69 kV MACEIO TR3 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
MACEIO TR 230/69 kV MACEIO TR3 AL RBF FT TR 230/69 kV MACEIO TR3 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
MACEIO TR 230/69 kV MACEIO TR3 AL RBF FT TR 230/69 kV MACEIO TR3 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
MACEIO TR 230/69 kV MACEIO TR2 AL RBF FT TR 230/69 kV MACEIO TR2 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
MACEIO TR 230/69 kV MACEIO TR2 AL RBF FT TR 230/69 kV MACEIO TR2 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
MACEIO TR 230/69 kV MACEIO TR2 AL RBF FT TR 230/69 kV MACEIO TR2 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
MACEIO TR 230/69 kV MACEIO TR1 AL RBF FT TR 230/69 kV MACEIO TR1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
MACEIO TR 230/69 kV MACEIO TR1 AL RBF FT TR 230/69 kV MACEIO TR1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
MACEIO TR 230/69 kV MACEIO TR1 AL RBF FT TR 230/69 kV MACEIO TR1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
MACEIO MG 230 kV MACEIO MG1 AL RB FT MG 230 kV MACEIO MG1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$540,550.22
MACEIO MG 230 kV MACEIO MG1 AL RB FT MG 230 kV MACEIO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,595,131.72
MACEIO MG 230 kV MACEIO MG1 AL RB FT MG 230 kV MACEIO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,632,409.14
MACEIO MC 69 kV TR 230/69 kV MACEIO TR4 AL  RBF FT TR 230/69 kV MACEIO TR4 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$76,222.57
MACEIO MC 69 kV TR 230/69 kV MACEIO TR3 AL  RBF FT TR 230/69 kV MACEIO TR3 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$76,222.57
MACEIO MC 69 kV TR 230/69 kV MACEIO TR3 AL  RBF FT TR 230/69 kV MACEIO TR3 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$224,928.29
MACEIO MC 69 kV TR 230/69 kV MACEIO TR3 AL  RBF FT TR 230/69 kV MACEIO TR3 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$230,184.75
MACEIO MC 69 kV TR 230/69 kV MACEIO TR2 AL  RBF FT TR 230/69 kV MACEIO TR2 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$76,222.57
MACEIO MC 69 kV TR 230/69 kV MACEIO TR2 AL  RBF FT TR 230/69 kV MACEIO TR2 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$224,928.29
MACEIO MC 69 kV TR 230/69 kV MACEIO TR2 AL  RBF FT TR 230/69 kV MACEIO TR2 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$230,184.75
MACEIO MC 69 kV TR 230/69 kV MACEIO TR1 AL  RBF FT TR 230/69 kV MACEIO TR1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$76,222.57
MACEIO MC 230 kV TR 230/69 kV MACEIO TR4 AL  RBF FT TR 230/69 kV MACEIO TR4 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
MACEIO MC 230 kV TR 230/69 kV MACEIO TR3 AL  RBF FT TR 230/69 kV MACEIO TR3 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
MACEIO MC 230 kV TR 230/69 kV MACEIO TR3 AL  RBF FT TR 230/69 kV MACEIO TR3 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
MACEIO MC 230 kV TR 230/69 kV MACEIO TR3 AL  RBF FT TR 230/69 kV MACEIO TR3 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$476,693.95
MACEIO MC 230 kV TR 230/69 kV MACEIO TR2 AL  RBF FT TR 230/69 kV MACEIO TR2 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
MACEIO MC 230 kV TR 230/69 kV MACEIO TR2 AL  RBF FT TR 230/69 kV MACEIO TR2 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
MACEIO MC 230 kV TR 230/69 kV MACEIO TR2 AL  RBF FT TR 230/69 kV MACEIO TR2 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$476,693.95
MACEIO MC 230 kV TR 230/69 kV MACEIO TR1 AL  RBF FT TR 230/69 kV MACEIO TR1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
MACEIO IB 230 kV MG 230 kV MACEIO MG1 AL IB1 RB FT MG 230 kV MACEIO MG1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,929.18
MACEIO IB 230 kV MG 230 kV MACEIO MG1 AL IB1 RB FT MG 230 kV MACEIO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$368,658.63
MACEIO IB 230 kV MG 230 kV MACEIO MG1 AL IB1 RB FT MG 230 kV MACEIO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$377,273.99
MACEIO EL 230 kV MACEIO LT 230 kV MESSIAS /MACEIO C-2 AL  RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
MACEIO EL 230 kV MACEIO LT 230 kV MESSIAS /MACEIO C-2 AL  RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBNI REA 2040/2009 28/01/2013 27/01/2043  R$60,665.76
MACEIO EL 230 kV MACEIO LT 230 kV MESSIAS /MACEIO C-2 AL  RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
MACEIO EL 230 kV MACEIO LT 230 kV MESSIAS /MACEIO C-2 AL  RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$692,788.80
MACEIO EL 230 kV MACEIO LT 230 kV MESSIAS /MACEIO C-1 AL  RB FT LT 230 kV MESSIAS /MACEIO C-1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
MACEIO EL 230 kV MACEIO LT 230 kV MESSIAS /MACEIO C-1 AL  RB FT LT 230 kV MESSIAS /MACEIO C-1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
MACEIO EL 230 kV MACEIO LT 230 kV MESSIAS /MACEIO C-1 AL  RB FT LT 230 kV MESSIAS /MACEIO C-1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$692,788.80
MACEIO II TT 69/0 kV MACEIO II TT1 AL DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 10/05/2042  R$176,355.75
MACEIO II TR 230/69 kV MACEIO II TR2 AL RBF FT TR 230/69 kV MACEIO II TR2 AL 005/2012 IPCA RBL CC 005/2012 01/03/2019 10/05/2042  R$ 1,330,677.46
MACEIO II TR 230/69 kV MACEIO II TR1 AL RBF FT TR 230/69 kV MACEIO II TR1 AL 005/2012 IPCA RBL CC 005/2012 01/03/2019 10/05/2042  R$ 1,330,677.46
MACEIO II MG 230 kV MACEIO II MG1 AL RB FT MG 230 kV MACEIO II MG1 AL 005/2012 IPCA RBL CC 005/2012 01/03/2019 10/05/2042  R$ 1,082,247.25
MACEIO II MC 69 kV TT 69/0 kV MACEIO II TT1 AL DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 10/05/2042  R$65,713.98
MACEIO II MC 69 kV TR 230/69 kV MACEIO II TR2 AL RBF FT TR 230/69 kV MACEIO II TR2 AL 005/2012 IPCA RBL CC 005/2012 01/03/2019 10/05/2042  R$153,835.33
MACEIO II MC 69 kV TR 230/69 kV MACEIO II TR1 AL RBF FT TR 230/69 kV MACEIO II TR1 AL 005/2012 IPCA RBL CC 005/2012 01/03/2019 10/05/2042  R$153,835.33
MACEIO II MC 230 kV TR 230/69 kV MACEIO II TR2 AL RBF FT TR 230/69 kV MACEIO II TR2 AL 005/2012 IPCA RBL CC 005/2012 01/03/2019 10/05/2042  R$377,939.98
MACEIO II MC 230 kV TR 230/69 kV MACEIO II TR1 AL RBF FT TR 230/69 kV MACEIO II TR1 AL 005/2012 IPCA RBL CC 005/2012 01/03/2019 10/05/2042  R$377,939.98
MACEIO II IB 69 kV MG 230 kV MACEIO II MG1 AL IB1 DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 10/05/2042  R$106,911.02
MACEIO II IB 230 kV MG 230 kV MACEIO II MG1 AL IB1 RB FT MG 230 kV MACEIO II MG1 AL 005/2012 IPCA RBL CC 005/2012 01/03/2019 10/05/2042  R$329,863.21
MACEIO II EL 69 kV MACEIO IIDIST4 DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 10/05/2042  R$181,996.70
MACEIO II EL 69 kV MACEIO IIDIST3 DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 10/05/2042  R$181,996.70
MACEIO II EL 69 kV MACEIO IIDIST2 DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 10/05/2042  R$181,996.70
MACEIO II EL 69 kV MACEIO IIDIST1 DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 10/05/2042  R$181,996.70
MACEIO II EL 230 kV MACEIO II LT 230 kV MESSIAS /MACEIO II C-2 AL RB FT LT 230 kV MESSIAS /MACEIO II C-2 AL 005/2012 IPCA RBL CC 005/2012 01/03/2019 10/05/2042  R$579,013.66
MACEIO II EL 230 kV MACEIO II LT 230 kV MESSIAS /MACEIO II C-1 AL RB FT LT 230 kV MESSIAS /MACEIO II C-1 AL 005/2012 IPCA RBL CC 005/2012 01/03/2019 10/05/2042  R$579,013.66
MARACANAU MG 230 kV MARACANAU MG2 CE RB FT MG 230 kV MARACANAU MG2 CE 061/2001 IPCA RBNI DSP 267/2023 01/07/2023 19/05/2053  R$20,103.70
MARACANAU MG 230 kV MARACANAU MG2 CE RB FT MG 230 kV MARACANAU MG2 CE 061/2001 IPCA RBNI DSP 267/2023 01/07/2023 19/05/2053  R$20,103.70
MARACANAU EL 230 kV MARACANAU LT 230 kV MARACANAU /FORTALEZA II C-1 CE  RB FT LT 230 kV MARACANAU /FORTALEZA II C-1 CE 061/2001 IPCA RBNI DSP 267/2023 01/07/2023 19/05/2050  R$411,404.01
MARACANAU EL 230 kV MARACANAU LT 230 kV CAUIPE /MARACANAU C-1 CE  RB FT LT 230 kV CAUIPE /MARACANAU C-1 CE 061/2001 IPCA RBNI DSP 267/2023 01/07/2023 19/05/2050  R$411,404.01
MATATU TT 69/13,8 kV MATATU TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
MATATU TT 69/13,8 kV MATATU TA2 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$281,516.05
MATATU TT 69/13,8 kV MATATU TA2 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$288,094.94
MATATU TT 69/13,8 kV MATATU TA1 BA DIT   061/2001 IPCA RCDM REA 7806/2019 03/12/2021 03/12/2051  R$227,903.61
MATATU TR 230/69 kV MATATU TR4 BA RBF FT TR 230/69 kV MATATU TR4 BA 061/2001 IPCA RBNI REA 7806/2019 20/10/2021 20/10/2056  R$ 1,321,373.40
MATATU TR 230/69 kV MATATU TR3 BA RBF FT TR 230/69 kV MATATU TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
MATATU TR 230/69 kV MATATU TR2 BA RBF FT TR 230/69 kV MATATU TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
MATATU TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
MATATU TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
MATATU TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
MATATU TR 230/11,9 kV MATATU TRR1 BA RBF FT TR 230/11,9 kV MATATU TRR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,764.01
MATATU TR 230/11,9 kV MATATU TR5 BA RBF FT TR 230/11,9 kV MATATU TR5 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,764.01
MATATU TR 230/11,9 kV MATATU TR5 BA RBF FT TR 230/11,9 kV MATATU TR5 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$678,020.00
MATATU TR 230/11,9 kV MATATU TR5 BA RBF FT TR 230/11,9 kV MATATU TR5 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$693,864.98
MATATU TR 230/11,9 kV MATATU TR5 BA RBF FT TR 230/11,9 kV MATATU TR5 BA 061/2001 IPCA RMEL REN 443/2011 02/02/2016 01/02/2046  R$14,001.68
MATATU TR 230/11,9 kV MATATU TR4 BA RBF FT TR 230/11,9 kV MATATU TR4 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,764.01
MATATU TR 230/11,9 kV MATATU TR4 BA RBF FT TR 230/11,9 kV MATATU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$678,020.00
MATATU TR 230/11,9 kV MATATU TR4 BA RBF FT TR 230/11,9 kV MATATU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$693,864.98
MATATU RTS 13,8 kV 15 Mvar MATATU RTR1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$166,433.72
MATATU MG 230 kV MATATU MG1 BA RB FT MG 230 kV MATATU MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$699,316.03
MATATU MG 230 kV MATATU MG1 BA RB FT MG 230 kV MATATU MG1 BA 061/2001 IPCA RMEL REN 643/2014 20/12/2015 19/12/2043  R$20,562.39
MATATU MG 230 kV MATATU MG1 BA RB FT MG 230 kV MATATU MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,063,640.24
MATATU MG 230 kV MATATU MG1 BA RB FT MG 230 kV MATATU MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,111,866.47
MATATU MG 230 kV MATATU MG1 BA RB FT MG 230 kV MATATU MG1 BA 061/2001 IPCA RBNI REA 7806/2019 20/10/2021 20/10/2052  R$221,235.09
MATATU MG 230 kV MATATU MG1 BA RB FT MG 230 kV MATATU MG1 BA 061/2001 IPCA RBNI REA 7806/2019 20/10/2021 20/10/2052  R$40,677.45
MATATU MC 69 kV TR 230/69 kV MATATU TR4 BA RBF FT TR 230/69 kV MATATU TR4 BA 061/2001 IPCA RBNI REA 7806/2019 20/10/2021 20/10/2049  R$348,785.60
MATATU MC 69 kV TR 230/69 kV MATATU TR3 BA  RBF FT TR 230/69 kV MATATU TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
MATATU MC 69 kV TR 230/69 kV MATATU TR3 BA  RBF FT TR 230/69 kV MATATU TR3 BA 061/2001 IPCA RBNI REA 3578/2012 25/11/2019 24/11/2052  R$39,199.17
MATATU MC 69 kV TR 230/69 kV MATATU TR2 BA RBF FT TR 230/69 kV MATATU TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
MATATU MC 69 kV TR 230/69 kV MATATU TR2 BA RBF FT TR 230/69 kV MATATU TR2 BA 061/2001 IPCA RBNI REA 3578/2012 25/11/2019 24/11/2052  R$39,199.17
MATATU MC 69 kV TR 230/69 kV MATATU TR2 BA RBF FT TR 230/69 kV MATATU TR2 BA 061/2001 IPCA RBNI REA 2837/2011 25/11/2019 24/11/2049  R$26,150.96
MATATU MC 69 kV TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
MATATU MC 69 kV TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RBNI REA 3578/2012 25/11/2019 24/11/2052  R$39,199.17
MATATU MC 69 kV TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RBNI REA 2837/2011 02/02/2020 01/02/2050  R$52,487.46
MATATU MC 69 kV BC 69 kV 27,1 Mvar MATATU BC1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
MATATU MC 69 kV BC 69 kV 27,1 Mvar MATATU BC1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
MATATU MC 69 kV BC 69 kV 27,1 Mvar MATATU BC1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$235,271.08
MATATU MC 69 kV BC 69 kV 27,1 Mvar MATATU BC1 BA DIT   061/2001 IPCA RCDM REA 7761/2019 02/05/2019 01/05/2055  R$21,494.65
MATATU MC 4,16 kV TR 230/11,9 kV MATATU TR5 BA RBF FT TR 230/11,9 kV MATATU TR5 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
MATATU MC 4,16 kV TR 230/11,9 kV MATATU TR5 BA RBF FT TR 230/11,9 kV MATATU TR5 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$142,152.79
MATATU MC 4,16 kV TR 230/11,9 kV MATATU TR5 BA RBF FT TR 230/11,9 kV MATATU TR5 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$145,474.83
MATATU MC 4,16 kV TR 230/11,9 kV MATATU TR4 BA RBF FT TR 230/11,9 kV MATATU TR4 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
MATATU MC 4,16 kV TR 230/11,9 kV MATATU TR4 BA RBF FT TR 230/11,9 kV MATATU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$142,152.79
MATATU MC 4,16 kV CS 20/-10 Mvar MATATU CS2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$65,134.54
MATATU MC 4,16 kV CS 20/-10 Mvar MATATU CS2 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$192,208.19
MATATU MC 4,16 kV CS 20/-10 Mvar MATATU CS2 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$196,700.00
MATATU MC 4,16 kV CS 20/-10 Mvar MATATU CS1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$65,134.54
MATATU MC 4,16 kV CS 20/-10 Mvar MATATU CS1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$192,208.19
MATATU MC 230 kV TT 69/13,8 kV MATATU TA1 BA DIT   061/2001 IPCA RCDM REA 7806/2019 03/12/2021 03/12/2036  R$39,249.18
MATATU MC 230 kV TR 230/69 kV MATATU TR4 BA RBF FT TR 230/69 kV MATATU TR4 BA 061/2001 IPCA RBNI REA 7806/2019 20/10/2021 20/10/2049  R$894,145.06
MATATU MC 230 kV TR 230/69 kV MATATU TR3 BA  RBF FT TR 230/69 kV MATATU TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
MATATU MC 230 kV TR 230/69 kV MATATU TR3 BA  RBF FT TR 230/69 kV MATATU TR3 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
MATATU MC 230 kV TR 230/69 kV MATATU TR3 BA  RBF FT TR 230/69 kV MATATU TR3 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$476,693.95
MATATU MC 230 kV TR 230/69 kV MATATU TR2 BA RBF FT TR 230/69 kV MATATU TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
MATATU MC 230 kV TR 230/69 kV MATATU TR2 BA RBF FT TR 230/69 kV MATATU TR2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
MATATU MC 230 kV TR 230/69 kV MATATU TR2 BA RBF FT TR 230/69 kV MATATU TR2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$476,693.95
MATATU MC 230 kV TR 230/69 kV MATATU TR2 BA RBF FT TR 230/69 kV MATATU TR2 BA 061/2001 IPCA RMEL REN 443/2011 10/04/2016 09/04/2039  R$22,802.65
MATATU MC 230 kV TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
MATATU MC 230 kV TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
MATATU MC 230 kV TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$476,693.95
MATATU MC 230 kV TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RMEL REN 443/2011 27/11/2016 26/11/2046  R$16,728.97
MATATU MC 230 kV TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RMEL REN 443/2011 27/11/2016 26/11/2046  R$16,728.97
MATATU MC 230 kV TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RMEL REN 443/2011 27/11/2016 26/11/2046  R$16,728.97
MATATU MC 230 kV TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RMEL REN 443/2011 02/02/2016 01/02/2046  R$3,547.22
MATATU MC 230 kV TR 230/11,9 kV MATATU TR5 BA RBF FT TR 230/11,9 kV MATATU TR5 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
MATATU MC 230 kV TR 230/11,9 kV MATATU TR5 BA RBF FT TR 230/11,9 kV MATATU TR5 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
MATATU MC 230 kV TR 230/11,9 kV MATATU TR5 BA RBF FT TR 230/11,9 kV MATATU TR5 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$476,693.95
MATATU MC 230 kV TR 230/11,9 kV MATATU TR4 BA RBF FT TR 230/11,9 kV MATATU TR4 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
MATATU MC 230 kV TR 230/11,9 kV MATATU TR4 BA RBF FT TR 230/11,9 kV MATATU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
MATATU MC 230 kV TR 230/11,9 kV MATATU TR4 BA RBF FT TR 230/11,9 kV MATATU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$476,693.95
MATATU MC 230 kV TR 230/11,9 kV MATATU TR4 BA RBF FT TR 230/11,9 kV MATATU TR4 BA 061/2001 IPCA RMEL REN 443/2011 02/02/2016 01/02/2046  R$14,001.68
MATATU MC 11,9 kV TR 230/11,9 kV MATATU TR5 BA RBF FT TR 230/11,9 kV MATATU TR5 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$52,281.83
MATATU MC 11,9 kV TR 230/11,9 kV MATATU TR4 BA RBF FT TR 230/11,9 kV MATATU TR4 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$52,281.83
MATATU MC 11,9 kV TR 230/11,9 kV MATATU TR4 BA RBF FT TR 230/11,9 kV MATATU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$154,280.58
MATATU MC 11,9 kV TR 11,9/0,22 kV MATATU TR7 BA RB FT MG 230 kV MATATU MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$52,281.83
MATATU MC 11,9 kV TR 11,9/0,22 kV MATATU TR6 BA RB FT MG 230 kV MATATU MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$52,281.83
MATATU MC 11,9 kV TR 11,9/0,22 kV MATATU TR6 BA RB FT MG 230 kV MATATU MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$154,280.58
MATATU MC 11,9 kV CS 20/-10 Mvar MATATU CS2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$69,100.24
MATATU MC 11,9 kV CS 20/-10 Mvar MATATU CS1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$69,100.24
MATATU MC 11,9 kV CS 20/-10 Mvar MATATU CS1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$203,910.71
MATATU IB 69 kV MG 230 kV MATATU MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
MATATU IB 69 kV MG 230 kV MATATU MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$134,104.45
MATATU IB 69 kV MG 230 kV MATATU MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$137,238.41
MATATU IB 69 kV MG 230 kV MATATU MG1 BA IB1 DIT   061/2001 IPCA RCDM REA 7806/2019 03/12/2021 03/12/2053  R$55,509.28
MATATU IB 69 kV MG 230 kV MATATU MG1 BA IB1 DIT   061/2001 IPCA RCDM REA 7806/2019 03/12/2021 03/12/2052  R$51,065.35
MATATU IB 230 kV MG 230 kV MATATU MG1 BA IB1 RB FT MG 230 kV MATATU MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,929.18
MATATU IB 230 kV MG 230 kV MATATU MG1 BA IB1 RB FT MG 230 kV MATATU MG1 BA 061/2001 IPCA RBNI REA 7806/2019 20/10/2021 20/10/2051  R$729,492.96
MATATU IB 11,9 kV MG 230 kV MATATU MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$33,105.90
MATATU IB 11,9 kV MG 230 kV MATATU MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$97,693.54
MATATU EL 69 kV MATATUPITUACU 02J5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MATATU EL 69 kV MATATULAPINHA 02V7 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MATATU EL 69 kV MATATULAPINHA 02V7 DIT   061/2001 IPCA RCDM REA 2376/2010 05/04/2014 04/04/2044  R$8,867.72
MATATU EL 69 kV MATATULAPINHA 02V7 DIT   061/2001 IPCA RCDM REA 2376/2010 10/05/2014 09/05/2044  R$17,785.33
MATATU EL 69 kV MATATULAPINHA 02V7 DIT   061/2001 IPCA RCDM REA 2837/2011 31/12/2019 30/12/2052  R$46,103.57
MATATU EL 69 kV MATATUGRACA 02V6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MATATU EL 69 kV MATATUDIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MATATU EL 69 kV MATATUDIST2 DIT   061/2001 IPCA RCDM REA 2837/2011 01/06/2013 31/05/2045  R$36,675.27
MATATU EL 69 kV MATATUDIST2 DIT   061/2001 IPCA RCDM REA 5484/2015 11/04/2014 10/04/2044  R$29,796.84
MATATU EL 69 kV MATATUDIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MATATU EL 69 kV MATATUDIST1 DIT   061/2001 IPCA RMEL REN 443/2011 12/10/2015 11/10/2045  R$8,581.13
MATATU EL 69 kV MATATUCENTRAL 02V2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MATATU EL 69 kV MATATUCENTRAL 02V2 DIT   061/2001 IPCA RCDM REA 2837/2011 30/07/2019 29/07/2052  R$94,201.74
MATATU EL 69 kV MATATUCANDEAL 02V4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MATATU EL 69 kV MATATUCANDEAL 02V4 DIT   061/2001 IPCA RCDM REA 2376/2010 22/03/2014 21/03/2045  R$31,681.68
MATATU EL 69 kV MATATUCANDEAL 02V4 DIT   061/2001 IPCA RCDM REA 2376/2010 10/05/2014 09/05/2044  R$26,481.28
MATATU EL 69 kV MATATUCANDEAL 02V4 DIT   061/2001 IPCA RCDM REA 2837/2011 31/12/2019 30/12/2052  R$46,103.57
MATATU EL 69 kV MATATUAMARALINA 02V3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MATATU EL 69 kV MATATUAMARALINA 02V3 DIT   061/2001 IPCA RCDM REA 2376/2010 25/05/2014 24/05/2044  R$8,903.35
MATATU EL 69 kV MATATUAMARALINA 02V3 DIT   061/2001 IPCA RCDM REA 2376/2010 25/05/2014 24/05/2045  R$34,394.54
MATATU EL 69 kV MATATUAMARALINA 02V3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
MATATU EL 69 kV MATATUAMARALINA 02V3 DIT   061/2001 IPCA RCDM REA 2376/2010 25/05/2014 24/05/2045  R$32,033.27
MATATU EL 69 kV MATATUAMARALINA 02V3 DIT   061/2001 IPCA RCDM REA 2837/2011 30/01/2020 29/01/2053  R$46,169.44
MATATU EL 230 kV MATATU LT 230 kV COTEGIPE /MATATU C-1 BA RB FT LT 230 kV COTEGIPE /MATATU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
MATATU EL 230 kV MATATU LT 230 kV COTEGIPE /MATATU C-1 BA RB FT LT 230 kV COTEGIPE /MATATU C-1 BA 061/2001 IPCA RMEL REN 643/2014 10/11/2013 09/11/2041  R$39,757.59
MATATU EL 230 kV MATATU LT 230 kV CAMACARI II /MATATU C-1 BA RB FT LT 230 kV CAMACARI II /MATATU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
MATATU EL 230 kV MATATU LT 230 kV CAMACARI II /MATATU C-1 BA RB FT LT 230 kV CAMACARI II /MATATU C-1 BA 061/2001 IPCA RMEL REN 643/2014 02/02/2014 01/02/2042  R$40,047.55
MATATU EL 230 kV MATATU LT 230 kV CAMACARI II /MATATU C-1 BA RB FT LT 230 kV CAMACARI II /MATATU C-1 BA 061/2001 IPCA RMEL REN 443/2011 13/02/2015 12/02/2038  R$21,916.16
MATATU EL 11,9 kV MATATUDIST9 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$56,710.76
MATATU EL 11,9 kV MATATUDIST9 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$167,350.09
MATATU EL 11,9 kV MATATUDIST8 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$56,710.76
MATATU EL 11,9 kV MATATUDIST8 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$167,350.09
MATATU EL 11,9 kV MATATUDIST7 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$56,710.76
MATATU EL 11,9 kV MATATUDIST7 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$167,350.09
MATATU EL 11,9 kV MATATUDIST6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$56,710.76
MATATU EL 11,9 kV MATATUDIST6 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$167,350.09
MATATU EL 11,9 kV MATATUDIST5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$56,710.76
MATATU EL 11,9 kV MATATUDIST5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$167,350.09
MATATU EL 11,9 kV MATATUDIST4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$56,710.76
MATATU EL 11,9 kV MATATUDIST4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$167,350.09
MATATU EL 11,9 kV MATATUDIST3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$56,710.76
MATATU EL 11,9 kV MATATUDIST3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$167,350.09
MATATU EL 11,9 kV MATATUDIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$56,710.76
MATATU EL 11,9 kV MATATUDIST2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$167,350.09
MATATU EL 11,9 kV MATATUDIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$56,710.76
MATATU EL 11,9 kV MATATUDIST1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$167,350.09
MATATU EL 11,9 kV MATATUDIS12 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$56,710.76
MATATU EL 11,9 kV MATATUDIS12 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$167,350.09
MATATU EL 11,9 kV MATATUDIS11 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$56,710.76
MATATU EL 11,9 kV MATATUDIS11 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$167,350.09
MATATU EL 11,9 kV MATATUDIS10 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$56,710.76
MATATU EL 11,9 kV MATATUDIS10 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$167,350.09
MATATU CS 20/-10 Mvar MATATU CS2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$827,609.80
MATATU CS 20/-10 Mvar MATATU CS1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$827,609.80
MATATU BC 69 kV 27,1 Mvar MATATU BC1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$139,293.08
MESSIAS TR 69/13,8 kV MESSIAS TR3 AL RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
MESSIAS TR 69/13,8 kV MESSIAS TR3 AL RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$86,722.45
MESSIAS TR 69/13,8 kV MESSIAS TR3 AL RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$88,749.11
MESSIAS TR 500/230 kV MESSIAS TRR1 AL RB FT TR 500/230 kV MESSIAS TRR1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$671,320.56
MESSIAS TR 500/230 kV MESSIAS TRR1 AL RB FT TR 500/230 kV MESSIAS TRR1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,981,027.26
MESSIAS TR 500/230 kV MESSIAS TRR1 AL RB FT TR 500/230 kV MESSIAS TRR1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,027,322.87
MESSIAS TR 500/230 kV MESSIAS TR3 AL RB FT TR 500/230 kV MESSIAS TR3 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,013,961.67
MESSIAS TR 500/230 kV MESSIAS TR3 AL RB FT TR 500/230 kV MESSIAS TR3 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,943,081.78
MESSIAS TR 500/230 kV MESSIAS TR3 AL RB FT TR 500/230 kV MESSIAS TR3 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 6,081,968.60
MESSIAS TR 500/230 kV MESSIAS TR2 AL RB FT TR 500/230 kV MESSIAS TR2 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,013,961.67
MESSIAS TR 500/230 kV MESSIAS TR2 AL RB FT TR 500/230 kV MESSIAS TR2 AL 061/2001 IPCA RMEL REN 643/2014 15/09/2013 14/09/2047  R$77,054.07
MESSIAS TR 500/230 kV MESSIAS TR2 AL RB FT TR 500/230 kV MESSIAS TR2 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,943,081.78
MESSIAS TR 500/230 kV MESSIAS TR2 AL RB FT TR 500/230 kV MESSIAS TR2 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 6,081,968.60
MESSIAS RTL 500 kV 50 Mvar MESSIAS RTR1 AL RB FT RTL 500 kV 50 Mvar MESSIAS RTR1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$278,222.74
MESSIAS RTL 500 kV 50 Mvar MESSIAS RTR1 AL RB FT RTL 500 kV 50 Mvar MESSIAS RTR1 AL 061/2001 IPCA RMEL REN 643/2014 06/02/2014 05/02/2049  R$10,798.44
MESSIAS RTL 500 kV 50 Mvar MESSIAS RTR1 AL RB FT RTL 500 kV 50 Mvar MESSIAS RTR1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$821,018.86
MESSIAS RTL 500 kV 50 Mvar MESSIAS RTR1 AL RB FT RTL 500 kV 50 Mvar MESSIAS RTR1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$840,205.66
MESSIAS RTL 500 kV 50 Mvar MESSIAS RTR1 AL RB FT RTL 500 kV 50 Mvar MESSIAS RTR1 AL 061/2001 IPCA RMELP REA 14107/2023      R$625,968.07
MESSIAS RTL 500 kV 150 Mvar MESSIAS RT1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$834,668.23
MESSIAS RTL 500 kV 150 Mvar MESSIAS RT1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RMEL REN 643/2014 14/12/2013 13/12/2048  R$32,275.94
MESSIAS RTL 500 kV 150 Mvar MESSIAS RT1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,463,056.59
MESSIAS RTL 500 kV 150 Mvar MESSIAS RT1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,520,616.98
MESSIAS MG 500 kV MESSIAS MG1 AL RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,464,235.22
MESSIAS MG 500 kV MESSIAS MG1 AL RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RMEL REN 643/2014 22/05/2015 21/05/2043  R$50,334.42
MESSIAS MG 500 kV MESSIAS MG1 AL RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,320,871.54
MESSIAS MG 500 kV MESSIAS MG1 AL RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,421,848.12
MESSIAS MG 500 kV MESSIAS MG1 AL RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RMEL REN 443/2011 26/09/2016 25/09/2033  R$30,367.93
MESSIAS MC 500 kV TR 500/230 kV MESSIAS TR3 AL  RB FT TR 500/230 kV MESSIAS TR3 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
MESSIAS MC 500 kV TR 500/230 kV MESSIAS TR3 AL  RB FT TR 500/230 kV MESSIAS TR3 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,319,175.21
MESSIAS MC 500 kV TR 500/230 kV MESSIAS TR3 AL  RB FT TR 500/230 kV MESSIAS TR3 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,350,003.67
MESSIAS MC 500 kV TR 500/230 kV MESSIAS TR2 AL  RB FT TR 500/230 kV MESSIAS TR2 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
MESSIAS MC 500 kV TR 500/230 kV MESSIAS TR2 AL  RB FT TR 500/230 kV MESSIAS TR2 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,319,175.21
MESSIAS MC 500 kV TR 500/230 kV MESSIAS TR2 AL  RB FT TR 500/230 kV MESSIAS TR2 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,350,003.67
MESSIAS MC 500 kV RTL 500 kV 150 Mvar MESSIAS RT1 AL  RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$270,833.72
MESSIAS MC 230 kV TR 500/230 kV MESSIAS TR3 AL  RB FT TR 500/230 kV MESSIAS TR3 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,757.03
MESSIAS MC 230 kV TR 500/230 kV MESSIAS TR3 AL  RB FT TR 500/230 kV MESSIAS TR3 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$489,139.20
MESSIAS MC 230 kV TR 500/230 kV MESSIAS TR3 AL  RB FT TR 500/230 kV MESSIAS TR3 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$500,570.14
MESSIAS MC 230 kV TR 500/230 kV MESSIAS TR2 AL  RB FT TR 500/230 kV MESSIAS TR2 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,757.03
MESSIAS MC 230 kV TR 500/230 kV MESSIAS TR2 AL  RB FT TR 500/230 kV MESSIAS TR2 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$489,139.20
MESSIAS MC 230 kV TR 500/230 kV MESSIAS TR2 AL  RB FT TR 500/230 kV MESSIAS TR2 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$500,570.14
MESSIAS IB 500 kV MG 500 kV MESSIAS MG1 AL IB2 RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
MESSIAS IB 500 kV MG 500 kV MESSIAS MG1 AL IB2 RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,399,926.89
MESSIAS IB 500 kV MG 500 kV MESSIAS MG1 AL IB2 RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,432,642.48
MESSIAS IB 500 kV MG 500 kV MESSIAS MG1 AL IB1 RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
MESSIAS IB 500 kV MG 500 kV MESSIAS MG1 AL IB1 RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,399,926.89
MESSIAS IB 500 kV MG 500 kV MESSIAS MG1 AL IB1 RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,432,642.48
MESSIAS IB 230 kV MG 500 kV MESSIAS MG1 AL IB1 RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
MESSIAS IB 230 kV MG 500 kV MESSIAS MG1 AL IB1 RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$423,550.65
MESSIAS IB 230 kV MG 500 kV MESSIAS MG1 AL IB1 RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$433,448.81
MESSIAS EL 500 kV MESSIAS LT 500 kV USINA XINGO /MESSIAS C-1 AL  RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
MESSIAS EL 500 kV MESSIAS LT 500 kV USINA XINGO /MESSIAS C-1 AL  RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RMEL REN 643/2014 08/12/2013 07/12/2043  R$17,305.82
MESSIAS EL 500 kV MESSIAS LT 500 kV USINA XINGO /MESSIAS C-1 AL  RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,494,659.50
MESSIAS EL 500 kV MESSIAS LT 500 kV USINA XINGO /MESSIAS C-1 AL  RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,529,588.93
MESSIAS EL 500 kV MESSIAS LT 500 kV USINA XINGO /MESSIAS C-1 AL  RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBNI REA 5861/2016 08/05/2016 07/05/2044  R$28,154.27
MESSIAS EL 500 kV MESSIAS LT 500 kV MESSIAS /SUAPE II C-1 AL/PE  RB FT LT 500 kV MESSIAS /SUAPE II C-1 AL/PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
MESSIAS EL 500 kV MESSIAS LT 500 kV MESSIAS /SUAPE II C-1 AL/PE  RB FT LT 500 kV MESSIAS /SUAPE II C-1 AL/PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,494,659.50
MESSIAS EL 500 kV MESSIAS LT 500 kV MESSIAS /SUAPE II C-1 AL/PE  RB FT LT 500 kV MESSIAS /SUAPE II C-1 AL/PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,529,588.93
MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-3 AL  RB FT LT 230 kV MESSIAS /RIO LARGO II C-3 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-3 AL  RB FT LT 230 kV MESSIAS /RIO LARGO II C-3 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$694,952.04
MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-3 AL  RB FT LT 230 kV MESSIAS /RIO LARGO II C-3 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$711,192.72
MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-2 AL  RB FT LT 230 kV MESSIAS /RIO LARGO II C-2 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-2 AL  RB FT LT 230 kV MESSIAS /RIO LARGO II C-2 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$694,952.04
MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-2 AL  RB FT LT 230 kV MESSIAS /RIO LARGO II C-2 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$711,192.72
MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-1 AL  RB FT LT 230 kV MESSIAS /RIO LARGO II C-1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-1 AL  RB FT LT 230 kV MESSIAS /RIO LARGO II C-1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$694,952.04
MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-1 AL  RB FT LT 230 kV MESSIAS /RIO LARGO II C-1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$711,192.72
MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO II C-2 AL RB FT LT 230 kV MESSIAS /MACEIO II C-2 AL 005/2012 IPCA RBL CC 005/2012 01/03/2019 10/05/2042  R$579,013.66
MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO II C-1 AL RB FT LT 230 kV MESSIAS /MACEIO II C-1 AL 005/2012 IPCA RBL CC 005/2012 01/03/2019 10/05/2042  R$579,013.66
MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-2 AL  RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-2 AL  RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$694,952.04
MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-2 AL  RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$711,192.72
MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-2 AL  RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBNI REA 5861/2016 10/06/2016 09/06/2044  R$23,518.92
MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-2 AL  RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBNI REA 2040/2009 05/02/2018 04/02/2048  R$170,606.76
MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-1 AL  RB FT LT 230 kV MESSIAS /MACEIO C-1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-1 AL  RB FT LT 230 kV MESSIAS /MACEIO C-1 AL 061/2001 IPCA RBNI REA 2040/2009 09/11/2015 08/11/2046  R$193,013.94
MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-1 AL  RB FT LT 230 kV MESSIAS /MACEIO C-1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$694,952.04
MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-1 AL  RB FT LT 230 kV MESSIAS /MACEIO C-1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$711,192.72
MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-1 AL  RB FT LT 230 kV MESSIAS /MACEIO C-1 AL 061/2001 IPCA RBNI REA 5861/2016 10/06/2016 09/06/2044  R$23,518.92
MESSIAS EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-3 PE/AL  RB FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
MESSIAS EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-3 PE/AL  RB FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$694,952.04
MESSIAS EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-3 PE/AL  RB FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$711,192.72
MESSIAS EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-2 PE/AL  RB FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
MESSIAS EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-2 PE/AL  RB FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$694,952.04
MESSIAS EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-2 PE/AL  RB FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$711,192.72
MESSIAS EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-1 PE/AL  RB FT LT 230 kV ANGELIM /MESSIAS C-1 PE/AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
MESSIAS EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-1 PE/AL  RB FT LT 230 kV ANGELIM /MESSIAS C-1 PE/AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$694,952.04
MESSIAS EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-1 PE/AL  RB FT LT 230 kV ANGELIM /MESSIAS C-1 PE/AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$711,192.72
MILAGRES TT 69/13,8 kV MILAGRES TA2 CE DIT   061/2001 IPCA RCDM REA 2460/2010 22/06/2012 21/06/2042  R$286,328.89
MILAGRES TT 69/13,8 kV MILAGRES TA1 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
MILAGRES TR 69/13,8 kV MILAGRES TR8 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
MILAGRES TR 69/13,8 kV MILAGRES TR7 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
MILAGRES TR 69/13,8 kV MILAGRES TR6 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,982.05
MILAGRES TR 69/13,8 kV MILAGRES TR6 CE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$159,297.84
MILAGRES TR 69/13,8 kV MILAGRES TR6 CE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$163,020.55
MILAGRES TR 500/230 kV MILAGRES TR3 CE RB FT TR 500/230 kV MILAGRES TR3 CE 061/2001 IPCA RBNI REA 3929/2013 29/04/2016 28/04/2051  R$ 5,630,610.90
MILAGRES TR 500/230 kV MILAGRES TR2 CE RB FT TR 500/230 kV MILAGRES TR2 CE 061/2001 IPCA RBNI REA 2891/2011 09/02/2015 08/02/2050  R$ 5,486,616.83
MILAGRES TR 500/230 kV MILAGRES TR1 CE RB FT TR 500/230 kV MILAGRES TR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,013,961.67
MILAGRES TR 500/230 kV MILAGRES TR1 CE RB FT TR 500/230 kV MILAGRES TR1 CE 061/2001 IPCA RMEL REN 643/2014 25/08/2013 24/08/2047  R$52,693.42
MILAGRES TR 500/230 kV MILAGRES TR1 CE RB FT TR 500/230 kV MILAGRES TR1 CE 061/2001 IPCA RMEL REN 643/2014 15/12/2013 14/12/2043  R$55,838.97
MILAGRES TR 230/69 kV MILAGRES TR9 CE RBF FT TR 230/69 kV MILAGRES TR9 CE 061/2001 IPCA RBNI REA 2173/2009 15/08/2012 14/08/2046  R$ 1,392,205.99
MILAGRES TR 230/69 kV MILAGRES TR4 CE RBF FT TR 230/69 kV MILAGRES TR4 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
MILAGRES TR 230/69 kV MILAGRES TR4 CE RBF FT TR 230/69 kV MILAGRES TR4 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
MILAGRES TR 230/69 kV MILAGRES TR4 CE RBF FT TR 230/69 kV MILAGRES TR4 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
MILAGRES TR 230/69 kV MILAGRES TR3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
MILAGRES TR 230/69 kV MILAGRES TR3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
MILAGRES TR 230/69 kV MILAGRES TR3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
MILAGRES TR 13,8/13,8 kV MILAGRES TREG1 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$96,204.14
MILAGRES RTS 13,8 kV 5 Mvar MILAGRES RT4 CE RBF FT TR 230/69 kV MILAGRES TR4 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$135,222.37
MILAGRES RTS 13,8 kV 5 Mvar MILAGRES RT4 CE RBF FT TR 230/69 kV MILAGRES TR4 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$399,033.22
MILAGRES RTS 13,8 kV 5 Mvar MILAGRES RT4 CE RBF FT TR 230/69 kV MILAGRES TR4 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$408,358.42
MILAGRES RTS 13,8 kV 5 Mvar MILAGRES RT3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$135,222.37
MILAGRES RTS 13,8 kV 5 Mvar MILAGRES RT3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$399,033.22
MILAGRES RTS 13,8 kV 5 Mvar MILAGRES RT3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$408,358.42
MILAGRES RTS 13,8 kV 18,75 Mvar MILAGRES RT1 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$172,773.18
MILAGRES RTL 500 kV 60 Mvar MILAGRES RTR2 CE RB FT RTL 500 kV 60 Mvar MILAGRES RTR2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$294,317.25
MILAGRES RTL 500 kV 180 Mvar MILAGRES RT3 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$374,018.26
MILAGRES RTL 500 kV 180 Mvar MILAGRES RT3 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RMEL REN 643/2014 27/12/2013 26/12/2048  R$46,273.33
MILAGRES RTL 500 kV 120 Mvar MILAGRES RT1 CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$775,573.97
MILAGRES RTL 230 kV 10 MVAr MILAGRES RT3 CE RB FT LT 230 kV BOM NOME /MILAGRES C-3 PE/CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,656.08
MILAGRES RTL 230 kV 10 MVAr MILAGRES RT3 CE RB FT LT 230 kV BOM NOME /MILAGRES C-3 PE/CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$521,301.65
MILAGRES RTL 230 kV 10 MVAr MILAGRES RT3 CE RB FT LT 230 kV BOM NOME /MILAGRES C-3 PE/CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$533,484.21
MILAGRES RTL 230 kV 10 MVAr MILAGRES RT2 CE RB FT LT 230 kV BOM NOME /MILAGRES C-2 PE/CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,656.08
MILAGRES RTL 230 kV 10 MVAr MILAGRES RT1 CE RB FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,656.08
MILAGRES RTL 230 kV 10 MVAr MILAGRES RT1 CE RB FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$521,301.65
MILAGRES RTB 500 kV 99,1 MVAr MILAGRES RT2 CE RB FT RTB 500 kV 99,1 MVAr MILAGRES RT2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$338,612.51
MILAGRES RTB 500 kV 99,1 MVAr MILAGRES RT2 CE RB FT RTB 500 kV 99,1 MVAr MILAGRES RT2 CE 061/2001 IPCA RMEL REN 443/2011 26/11/2015 25/11/2045  R$19,011.78
MILAGRES RTB 500 kV 99,1 MVAr MILAGRES RT2 CE RB FT RTB 500 kV 99,1 MVAr MILAGRES RT2 CE 061/2001 IPCA RMEL REN 443/2011 26/11/2015 25/11/2045  R$19,011.78
MILAGRES RTB 500 kV 99,1 MVAr MILAGRES RT2 CE RB FT RTB 500 kV 99,1 MVAr MILAGRES RT2 CE 061/2001 IPCA RMEL REN 443/2011 26/11/2015 25/11/2045  R$19,011.78
MILAGRES RTB 500 kV 40 MVAr MILAGRES RTR1 CE RB FT RTB 500 kV 40 MVAr MILAGRES RTR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,524.66
MILAGRES RTB 230 kV 3,33 MVAr MILAGRES RTR1 CE RB FT RTB 230 kV 3,33 MVAr MILAGRES RTR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$58,820.58
MILAGRES RTB 230 kV 3,33 MVAr MILAGRES RTR1 CE RB FT RTB 230 kV 3,33 MVAr MILAGRES RTR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$173,576.06
MILAGRES RTB 230 kV 20 MVAr MILAGRES RT4 CE RB FT RTB 230 kV 20 MVAr MILAGRES RT4 CE 061/2001 IPCA RBNI REA 3929/2013 04/11/2015 03/11/2041  R$92,789.95
MILAGRES RTB 230 kV 20 MVAr MILAGRES RT4 CE RB FT RTB 230 kV 20 MVAr MILAGRES RT4 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$233,353.47
MILAGRES RTB 230 kV 20 MVAr MILAGRES RT4 CE RB FT RTB 230 kV 20 MVAr MILAGRES RT4 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$688,612.29
MILAGRES RTB 230 kV 20 MVAr MILAGRES RT4 CE RB FT RTB 230 kV 20 MVAr MILAGRES RT4 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$704,704.82
MILAGRES RTB 13,8 kV 5 MVAr MILAGRES RT3 CE RBF FT RTB 13,8 kV 5 MVAr MILAGRES RT3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$135,222.37
MILAGRES RTB 13,8 kV 5 MVAr MILAGRES RT1 CE RBF FT RTB 13,8 kV 5 MVAr MILAGRES RT1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$135,222.37
MILAGRES RTB 13,8 kV 5 MVAr MILAGRES RT1 CE RBF FT RTB 13,8 kV 5 MVAr MILAGRES RT1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$399,033.22
MILAGRES RTB 13,8 kV 10 Mvar MILAGRES RT2 CE RBF FT RTB 13,8 kV 10 Mvar MILAGRES RT2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$154,914.54
MILAGRES RTB 13,8 kV 10 Mvar MILAGRES RT2 CE RBF FT RTB 13,8 kV 10 Mvar MILAGRES RT2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$457,143.64
MILAGRES RTB 13,8 kV 10 Mvar MILAGRES RT2 CE RBF FT RTB 13,8 kV 10 Mvar MILAGRES RT2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$467,826.86
MILAGRES MG 500 kV MILAGRES MG1 CE RB FT MG 500 kV MILAGRES MG1 CE 061/2001 IPCA RBNI REA 2891/2011 15/12/2014 14/12/2043  R$772,232.61
MILAGRES MG 500 kV MILAGRES MG1 CE RB FT MG 500 kV MILAGRES MG1 CE 061/2001 IPCA RBNI REA 3929/2013 29/04/2016 28/04/2045  R$ 1,011,069.59
MILAGRES MG 500 kV MILAGRES MG1 CE RB FT MG 500 kV MILAGRES MG1 CE 061/2001 IPCA RMEL REN 643/2014 03/02/2014 02/02/2031  R$26,854.87
MILAGRES MG 230 kV MILAGRES MG1 CE RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RBNI REA 2173/2009 15/08/2012 14/08/2040  R$165,932.43
MILAGRES MG 230 kV MILAGRES MG1 CE RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RBNI REA 2460/2010 22/06/2012 21/06/2040  R$54,953.12
MILAGRES MG 230 kV MILAGRES MG1 CE RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RBNI REA 2891/2011 15/12/2014 14/12/2042  R$204,574.87
MILAGRES MG 230 kV MILAGRES MG1 CE RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,403,289.68
MILAGRES MG 230 kV MILAGRES MG1 CE RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RMEL REN 643/2014 28/10/2015 27/10/2032  R$32,230.69
MILAGRES MG 230 kV MILAGRES MG1 CE RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RMEL REN 643/2014 29/10/2015 28/10/2032  R$32,234.71
MILAGRES MG 230 kV MILAGRES MG1 CE RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RMEL REN 643/2014 29/10/2015 28/10/2032  R$35,605.55
MILAGRES MG 230 kV MILAGRES MG1 CE RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2029  R$190,455.72
MILAGRES MG 230 kV MILAGRES MG1 CE RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,141,024.85
MILAGRES MG 230 kV MILAGRES MG1 CE RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,237,798.51
MILAGRES MG 230 kV MILAGRES MG1 CE RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RMEL REN 443/2011 28/09/2016 27/09/2033  R$33,581.60
MILAGRES MC 69 kV TT 69/13,8 kV MILAGRES TA2 CE  DIT   061/2001 IPCA RCDM REA 2460/2010 22/06/2012 21/06/2043  R$308,370.28
MILAGRES MC 69 kV TT 69/13,8 kV MILAGRES TA1 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
MILAGRES MC 69 kV TR 69/13,8 kV MILAGRES TR6 CE TR7 e TR8 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
MILAGRES MC 69 kV TR 69/13,8 kV MILAGRES TR6 CE TR7 e TR8 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
MILAGRES MC 69 kV TR 230/69 kV MILAGRES TR9 CE RBF FT TR 230/69 kV MILAGRES TR9 CE 061/2001 IPCA RBNI REA 2173/2009 15/08/2012 14/08/2042  R$421,193.61
MILAGRES MC 69 kV TR 230/69 kV MILAGRES TR4 CE RBF FT TR 230/69 kV MILAGRES TR4 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
MILAGRES MC 69 kV TR 230/69 kV MILAGRES TR4 CE RBF FT TR 230/69 kV MILAGRES TR4 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
MILAGRES MC 69 kV TR 230/69 kV MILAGRES TR3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
MILAGRES MC 69 kV TR 230/69 kV MILAGRES TR3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
MILAGRES MC 69 kV BC 69 kV 20,3 Mvar MILAGRES BC1 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
MILAGRES MC 69 kV BC 69 kV 20,3 Mvar MILAGRES BC1 CE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
MILAGRES MC 69 kV BC 69 kV 20,3 Mvar MILAGRES BC1 CE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$235,271.08
MILAGRES MC 500 kV TR 500/230 kV MILAGRES TR3 CE  RB FT TR 500/230 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
MILAGRES MC 500 kV TR 500/230 kV MILAGRES TR2 CE RB FT TR 500/230 kV MILAGRES TR2 CE 061/2001 IPCA RBNI REA 2891/2011 09/02/2015 08/02/2046  R$ 1,952,365.87
MILAGRES MC 500 kV RTL 500 kV 180 Mvar MILAGRES RT3 CE  RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$270,833.72
MILAGRES MC 500 kV RTL 500 kV 120 Mvar MILAGRES RT1 CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$270,833.72
MILAGRES MC 500 kV RTB 500 kV 99,1 MVAr MILAGRES RT2 CE  RB FT RTB 500 kV 99,1 MVAr MILAGRES RT2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$418,557.22
MILAGRES MC 230 kV TR 500/230 kV MILAGRES TR3 CE RB FT TR 500/230 kV MILAGRES TR3 CE 061/2001 IPCA RBNI REA 3929/2013 29/04/2016 28/04/2047  R$ 1,125,933.97
MILAGRES MC 230 kV TR 500/230 kV MILAGRES TR2 CE RB FT TR 500/230 kV MILAGRES TR2 CE 061/2001 IPCA RBNI REA 2891/2011 09/02/2015 08/02/2045  R$ 1,150,171.54
MILAGRES MC 230 kV TR 500/230 kV MILAGRES TR1 CE RB FT TR 500/230 kV MILAGRES TR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
MILAGRES MC 230 kV TR 230/69 kV MILAGRES TR9 CE RBF FT TR 230/69 kV MILAGRES TR9 CE 061/2001 IPCA RBNI REA 2173/2009 15/08/2012 14/08/2042  R$ 1,080,755.77
MILAGRES MC 230 kV TR 230/69 kV MILAGRES TR4 CE RBF FT TR 230/69 kV MILAGRES TR4 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
MILAGRES MC 230 kV TR 230/69 kV MILAGRES TR4 CE RBF FT TR 230/69 kV MILAGRES TR4 CE 061/2001 IPCA RBNI REA 3578/2012 07/06/2016 06/06/2048  R$110,866.30
MILAGRES MC 230 kV TR 230/69 kV MILAGRES TR3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
MILAGRES MC 230 kV TR 230/69 kV MILAGRES TR3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBNI REA 3578/2012 12/04/2016 11/04/2049  R$111,945.49
MILAGRES MC 230 kV RTL 230 kV 10 MVAr MILAGRES RT3 CE  RB FT LT 230 kV BOM NOME /MILAGRES C-3 PE/CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$99,071.31
MILAGRES MC 230 kV RTL 230 kV 10 MVAr MILAGRES RT2 CE  RB FT LT 230 kV BOM NOME /MILAGRES C-2 PE/CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$99,071.31
MILAGRES MC 230 kV RTL 230 kV 10 MVAr MILAGRES RT1 CE  RB FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$99,071.31
MILAGRES MC 230 kV RTB 230 kV 20 MVAr MILAGRES RT4 CE RB FT RTB 230 kV 20 MVAr MILAGRES RT4 CE 061/2001 IPCA RBNI REA 3929/2013 04/11/2015 03/11/2046  R$99,357.60
MILAGRES MC 230 kV RTB 230 kV 20 MVAr MILAGRES RT4 CE RB FT RTB 230 kV 20 MVAr MILAGRES RT4 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$151,491.77
MILAGRES MC 230 kV RTB 230 kV 20 MVAr MILAGRES RT4 CE RB FT RTB 230 kV 20 MVAr MILAGRES RT4 CE 061/2001 IPCA RMEL REN 443/2011 27/10/2015 26/10/2045  R$16,233.52
MILAGRES MC 230 kV CE 58/-35 MvAr MILAGRES CE1 CE CE2 RB FT CE 58/-35 MvAr MILAGRES CE1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$163,065.57
MILAGRES MC 230 kV BC 230 kV 50,5 MVAr MILAGRES BC2 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$179,837.78
MILAGRES MC 230 kV BC 230 kV 50,5 MVAr MILAGRES BC2 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$530,690.67
MILAGRES MC 230 kV BC 230 kV 50,5 MVAr MILAGRES BC2 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$543,092.64
MILAGRES MC 230 kV BC 230 kV 50,5 MVAr MILAGRES BC1 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$179,837.78
MILAGRES MC 230 kV BC 230 kV 50,5 MVAr MILAGRES BC1 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$530,690.67
MILAGRES MC 230 kV BC 230 kV 50,5 MVAr MILAGRES BC1 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$543,092.64
MILAGRES MC 13,8 kV TR 69/13,8 kV MILAGRES TR7 CE TR8 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
MILAGRES MC 13,8 kV TR 69/13,8 kV MILAGRES TR7 CE TR8 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$142,152.79
MILAGRES MC 13,8 kV TR 69/13,8 kV MILAGRES TR7 CE TR8 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$145,474.83
MILAGRES MC 13,8 kV TR 69/13,8 kV MILAGRES TR6 CE  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
MILAGRES MC 13,8 kV TR 69/13,8 kV MILAGRES TR6 CE  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$142,152.79
MILAGRES MC 13,8 kV TR 230/69 kV MILAGRES TR4 CE RBF FT TR 230/69 kV MILAGRES TR4 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
MILAGRES MC 13,8 kV TR 230/69 kV MILAGRES TR3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
MILAGRES MC 13,8 kV TR 230/69 kV MILAGRES TR3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$142,152.79
MILAGRES MC 13,8 kV TR 13,8/13,8 kV MILAGRES TREG1 CE MC2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
MILAGRES MC 13,8 kV TR 13,8/13,8 kV MILAGRES TREG1 CE MC1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
MILAGRES MC 13,8 kV RTB 13,8 kV 5 MVAr MILAGRES RT3 CE RBF FT RTB 13,8 kV 5 MVAr MILAGRES RT3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,511.84
MILAGRES MC 13,8 kV RTB 13,8 kV 5 MVAr MILAGRES RT3 CE RBF FT RTB 13,8 kV 5 MVAr MILAGRES RT3 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,223.45
MILAGRES MC 13,8 kV RTB 13,8 kV 5 MVAr MILAGRES RT1 CE RBF FT RTB 13,8 kV 5 MVAr MILAGRES RT1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,511.84
MILAGRES MC 13,8 kV RTB 13,8 kV 5 MVAr MILAGRES RT1 CE RBF FT RTB 13,8 kV 5 MVAr MILAGRES RT1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,223.45
MILAGRES MC 13,8 kV RTB 13,8 kV 10 Mvar MILAGRES RT2 CE  RBF FT RTB 13,8 kV 10 Mvar MILAGRES RT2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,511.84
MILAGRES MC 13,8 kV RTB 13,8 kV 10 Mvar MILAGRES RT2 CE  RBF FT RTB 13,8 kV 10 Mvar MILAGRES RT2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,223.45
MILAGRES IB 69 kV MG 230 kV MILAGRES MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
MILAGRES IB 69 kV MG 230 kV MILAGRES MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$134,104.45
MILAGRES IB 69 kV MG 230 kV MILAGRES MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$137,238.41
MILAGRES IB 500 kV MG 500 kV MILAGRES MG1 CE IB3 RB FT MG 500 kV MILAGRES MG1 CE 061/2001 IPCA RBNI REA 3929/2013 29/04/2016 28/04/2047  R$ 1,912,748.05
MILAGRES IB 500 kV MG 500 kV MILAGRES MG1 CE IB1 RB FT MG 500 kV MILAGRES MG1 CE 061/2001 IPCA RBNI REA 2891/2011 15/12/2014 14/12/2045  R$ 1,852,324.84
MILAGRES IB 500 kV MG 500 kV MILAGRES MG1 CE IB1 RB FT MG 500 kV MILAGRES MG1 CE 061/2001 IPCA RMEL REN 443/2011 08/12/2015 07/12/2045  R$18,942.16
MILAGRES IB 500 kV MG 500 kV MILAGRES MG1 CE IB1 RB FT MG 500 kV MILAGRES MG1 CE 061/2001 IPCA RMEL REN 443/2011 08/12/2015 07/12/2045  R$18,942.16
MILAGRES IB 500 kV MG 500 kV MILAGRES MG1 CE IB1 RB FT MG 500 kV MILAGRES MG1 CE 061/2001 IPCA RMEL REN 443/2011 08/12/2015 07/12/2045  R$18,942.16
MILAGRES IB 230 kV MG 230 kV MILAGRES MG1 CE IB1 RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,929.18
MILAGRES IB 230 kV MG 230 kV MILAGRES MG1 CE IB1 RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$368,658.63
MILAGRES IB 13,8 kV MG 500 kV MILAGRES MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$33,105.90
MILAGRES IB 13,8 kV MG 500 kV MILAGRES MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$97,693.54
MILAGRES IB 13,8 kV MG 500 kV MILAGRES MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$99,976.59
MILAGRES EL 69 kV MILAGRESDIST8 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MILAGRES EL 69 kV MILAGRESDIST7 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MILAGRES EL 69 kV MILAGRESDIST7 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
MILAGRES EL 69 kV MILAGRESDIST7 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
MILAGRES EL 69 kV MILAGRESDIST6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MILAGRES EL 69 kV MILAGRESDIST6 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
MILAGRES EL 69 kV MILAGRESDIST6 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
MILAGRES EL 69 kV MILAGRESDIST5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MILAGRES EL 69 kV MILAGRESDIST5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
MILAGRES EL 69 kV MILAGRESDIST4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MILAGRES EL 69 kV MILAGRESDIST4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
MILAGRES EL 69 kV MILAGRESDIST3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MILAGRES EL 69 kV MILAGRESDIST3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
MILAGRES EL 69 kV MILAGRESDIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MILAGRES EL 69 kV MILAGRESDIST2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
MILAGRES EL 69 kV MILAGRESDIST2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
MILAGRES EL 69 kV MILAGRESDIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MILAGRES EL 500 kV MILAGRES LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
MILAGRES EL 500 kV MILAGRES LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RMEL REN 443/2011 08/03/2016 07/03/2046  R$19,001.88
MILAGRES EL 500 kV MILAGRES LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RMEL REN 443/2011 08/03/2016 07/03/2046  R$19,001.88
MILAGRES EL 500 kV MILAGRES LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RMEL REN 443/2011 08/03/2016 07/03/2046  R$19,001.88
MILAGRES EL 500 kV MILAGRES LT 500 kV MILAGRES /QUIXADA C-1 CE  RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RMEL REN 443/2011 18/12/2015 17/12/2045  R$18,345.28
MILAGRES EL 500 kV MILAGRES LT 500 kV MILAGRES /QUIXADA C-1 CE  RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RMEL REN 443/2011 18/12/2015 17/12/2045  R$18,345.28
MILAGRES EL 500 kV MILAGRES LT 500 kV MILAGRES /QUIXADA C-1 CE  RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RMEL REN 443/2011 18/12/2015 17/12/2045  R$18,345.28
MILAGRES EL 230 kV MILAGRES LT 230 kV MILAGRES /TAUA II C-1 CE  RB FT LT 230 kV MILAGRES /TAUA II C-1 CE 007/2005 IGPM RBL CC 007/2005 28/12/2007 04/03/2035  R$518,407.36
MILAGRES EL 230 kV MILAGRES LT 230 kV MILAGRES /COREMAS C-2 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-2 CE/PB 008/2005 IGPM RBL CC 008/2005 25/09/2009 04/03/2035  R$ 1,146,834.14
MILAGRES EL 230 kV MILAGRES LT 230 kV MILAGRES /COREMAS C-1 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
MILAGRES EL 230 kV MILAGRES LT 230 kV MILAGRES /COREMAS C-1 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
MILAGRES EL 230 kV MILAGRES LT 230 kV MILAGRES /COREMAS C-1 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB 061/2001 IPCA RBNI REA 5861/2016 02/02/2014 01/02/2042  R$36,799.05
MILAGRES EL 230 kV MILAGRES LT 230 kV MILAGRES /BANABUIU C-2 CE RB FT LT 230 kV MILAGRES /BANABUIU C-2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
MILAGRES EL 230 kV MILAGRES LT 230 kV MILAGRES /BANABUIU C-2 CE RB FT LT 230 kV MILAGRES /BANABUIU C-2 CE 061/2001 IPCA RMEL REN 643/2014 29/09/2013 28/09/2041  R$39,612.62
MILAGRES EL 230 kV MILAGRES LT 230 kV MILAGRES /BANABUIU C-2 CE RB FT LT 230 kV MILAGRES /BANABUIU C-2 CE 061/2001 IPCA RBNI REA 3578/2012 14/12/2015 13/12/2048  R$111,007.79
MILAGRES EL 230 kV MILAGRES LT 230 kV MILAGRES /BANABUIU C-1 CE RB FT LT 230 kV MILAGRES /BANABUIU C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
MILAGRES EL 230 kV MILAGRES LT 230 kV MILAGRES /BANABUIU C-1 CE RB FT LT 230 kV MILAGRES /BANABUIU C-1 CE 061/2001 IPCA RMEL REN 643/2014 26/11/2013 25/11/2041  R$39,812.82
MILAGRES EL 230 kV MILAGRES LT 230 kV MILAGRES /BANABUIU C-1 CE RB FT LT 230 kV MILAGRES /BANABUIU C-1 CE 061/2001 IPCA RBNI REA 3578/2012 01/02/2016 31/01/2049  R$111,390.68
MILAGRES EL 230 kV MILAGRES LT 230 kV ICO /MILAGRES C-1 CE  RB FT LT 230 kV ICO /MILAGRES C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
MILAGRES EL 230 kV MILAGRES LT 230 kV ICO /MILAGRES C-1 CE  RB FT LT 230 kV ICO /MILAGRES C-1 CE 061/2001 IPCA RMEL REN 443/2011 11/07/2015 10/07/2045  R$14,171.74
MILAGRES EL 230 kV MILAGRES LT 230 kV ICO /MILAGRES C-1 CE  RB FT LT 230 kV ICO /MILAGRES C-1 CE 061/2001 IPCA RBNI REA 3578/2012 07/06/2016 06/06/2048  R$173,729.22
MILAGRES EL 230 kV MILAGRES LT 230 kV BOM NOME /MILAGRES C-3 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-3 PE/CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
MILAGRES EL 230 kV MILAGRES LT 230 kV BOM NOME /MILAGRES C-3 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-3 PE/CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
MILAGRES EL 230 kV MILAGRES LT 230 kV BOM NOME /MILAGRES C-3 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-3 PE/CE 061/2001 IPCA RBNI REA 7761/2019 07/10/2021 06/10/2036  R$69,953.08
MILAGRES EL 230 kV MILAGRES LT 230 kV BOM NOME /MILAGRES C-2 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-2 PE/CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
MILAGRES EL 230 kV MILAGRES LT 230 kV BOM NOME /MILAGRES C-2 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-2 PE/CE 061/2001 IPCA RBNI REA 3578/2012 26/01/2016 25/01/2046  R$62,240.25
MILAGRES EL 230 kV MILAGRES LT 230 kV BOM NOME /MILAGRES C-2 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-2 PE/CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
MILAGRES EL 230 kV MILAGRES LT 230 kV BOM NOME /MILAGRES C-2 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-2 PE/CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$692,788.80
MILAGRES EL 230 kV MILAGRES LT 230 kV BOM NOME /MILAGRES C-2 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-2 PE/CE 061/2001 IPCA RMEL REN 443/2011 23/01/2016 22/01/2046  R$14,387.07
MILAGRES EL 230 kV MILAGRES LT 230 kV BOM NOME /MILAGRES C-1 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
MILAGRES EL 230 kV MILAGRES LT 230 kV BOM NOME /MILAGRES C-1 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE 061/2001 IPCA RBNI REA 7761/2019 07/10/2021 06/10/2036  R$70,386.73
MILAGRES EL 13,8 kV MILAGRESDIST5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
MILAGRES EL 13,8 kV MILAGRESDIST4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
MILAGRES EL 13,8 kV MILAGRESDIST3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
MILAGRES EL 13,8 kV MILAGRESDIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
MILAGRES EL 13,8 kV MILAGRESDIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
MILAGRES CE 58/-35 MvAr MILAGRES CE2 CE RB FT CE 58/-35 MvAr MILAGRES CE2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,592,963.72
MILAGRES CE 58/-35 MvAr MILAGRES CE2 CE RB FT CE 58/-35 MvAr MILAGRES CE2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,700,741.74
MILAGRES CE 58/-35 MvAr MILAGRES CE2 CE RB FT CE 58/-35 MvAr MILAGRES CE2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,810,595.70
MILAGRES CE 58/-35 MvAr MILAGRES CE1 CE RB FT CE 58/-35 MvAr MILAGRES CE1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,592,963.72
MILAGRES CE 58/-35 MvAr MILAGRES CE1 CE RB FT CE 58/-35 MvAr MILAGRES CE1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,700,741.74
MILAGRES CE 58/-35 MvAr MILAGRES CE1 CE RB FT CE 58/-35 MvAr MILAGRES CE1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,810,595.70
MILAGRES BC 69 kV 20,3 Mvar MILAGRES BC1 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$116,409.25
MILAGRES BC 230 kV 50,5 MVAr MILAGRES BC2 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,671.37
MILAGRES BC 230 kV 50,5 MVAr MILAGRES BC2 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$609,874.99
MILAGRES BC 230 kV 50,5 MVAr MILAGRES BC2 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$624,127.46
MILAGRES BC 230 kV 50,5 MVAr MILAGRES BC1 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,671.37
MILAGRES BC 230 kV 50,5 MVAr MILAGRES BC1 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$609,874.99
MILAGRES BC 230 kV 50,5 MVAr MILAGRES BC1 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$624,127.46
MIRUEIRA TT 69/13,8 kV MIRUEIRA TA2 PE DIT   061/2001 IPCA RCDM REA 3578/2012 14/06/2016 13/06/2046  R$228,575.23
MIRUEIRA TT 69/13,8 kV MIRUEIRA TA1 PE DIT   061/2001 IPCA RCDM REA 3578/2012 14/06/2016 13/06/2046  R$228,575.23
MIRUEIRA TR 69/13,8 kV MIRUEIRA TR5 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
MIRUEIRA TR 69/13,8 kV MIRUEIRA TR5 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$86,722.45
MIRUEIRA TR 69/13,8 kV MIRUEIRA TR5 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$88,749.11
MIRUEIRA TR 230/69 kV MIRUEIRA TR4 PE RBF FT TR 230/69 kV MIRUEIRA TR4 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
MIRUEIRA TR 230/69 kV MIRUEIRA TR3 PE RBF FT TR 230/69 kV MIRUEIRA TR3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
MIRUEIRA TR 230/69 kV MIRUEIRA TR3 PE RBF FT TR 230/69 kV MIRUEIRA TR3 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
MIRUEIRA TR 230/69 kV MIRUEIRA TR2 PE RBF FT TR 230/69 kV MIRUEIRA TR2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
MIRUEIRA TR 230/69 kV MIRUEIRA TR2 PE RBF FT TR 230/69 kV MIRUEIRA TR2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
MIRUEIRA TR 230/69 kV MIRUEIRA TR1 PE RBF FT TR 230/69 kV MIRUEIRA TR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
MIRUEIRA TR 230/69 kV MIRUEIRA TR1 PE RBF FT TR 230/69 kV MIRUEIRA TR1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
MIRUEIRA MG 230 kV MIRUEIRA MG1 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$685,977.71
MIRUEIRA MG 230 kV MIRUEIRA MG1 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RMEL REN 643/2014 30/07/2014 29/07/2042  R$84,410.51
MIRUEIRA MG 230 kV MIRUEIRA MG1 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,024,279.65
MIRUEIRA MG 230 kV MIRUEIRA MG1 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,071,586.05
MIRUEIRA MG 230 kV MIRUEIRA MG1 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033  R$33,465.01
MIRUEIRA MC 69 kV TR 69/13,8 kV MIRUEIRA TR5 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$60,565.23
MIRUEIRA MC 69 kV TR 69/13,8 kV MIRUEIRA TR5 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RMEL REN 643/2014 18/12/2013 17/12/2046  R$37,665.99
MIRUEIRA MC 69 kV TR 69/13,8 kV MIRUEIRA TR5 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$178,724.42
MIRUEIRA MC 69 kV TR 69/13,8 kV MIRUEIRA TR5 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$182,901.12
MIRUEIRA MC 69 kV TR 230/69 kV MIRUEIRA TR4 PE RBF FT TR 230/69 kV MIRUEIRA TR4 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
MIRUEIRA MC 69 kV TR 230/69 kV MIRUEIRA TR4 PE RBF FT TR 230/69 kV MIRUEIRA TR4 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
MIRUEIRA MC 69 kV TR 230/69 kV MIRUEIRA TR4 PE RBF FT TR 230/69 kV MIRUEIRA TR4 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$204,189.21
MIRUEIRA MC 69 kV TR 230/69 kV MIRUEIRA TR4 PE RBF FT TR 230/69 kV MIRUEIRA TR4 PE 061/2001 IPCA RMEL REN 443/2011 04/04/2016 03/04/2044  R$2,300.47
MIRUEIRA MC 69 kV TR 230/69 kV MIRUEIRA TR3 PE RBF FT TR 230/69 kV MIRUEIRA TR3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
MIRUEIRA MC 69 kV TR 230/69 kV MIRUEIRA TR2 PE RBF FT TR 230/69 kV MIRUEIRA TR2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
MIRUEIRA MC 69 kV TR 230/69 kV MIRUEIRA TR2 PE RBF FT TR 230/69 kV MIRUEIRA TR2 PE 061/2001 IPCA RMEL REN 643/2014 09/11/2015 08/11/2043  R$2,369.57
MIRUEIRA MC 69 kV TR 230/69 kV MIRUEIRA TR2 PE RBF FT TR 230/69 kV MIRUEIRA TR2 PE 061/2001 IPCA RMEL REN 643/2014 10/11/2015 09/11/2043  R$4,739.53
MIRUEIRA MC 69 kV TR 230/69 kV MIRUEIRA TR1 PE RBF FT TR 230/69 kV MIRUEIRA TR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
MIRUEIRA MC 69 kV TR 230/69 kV MIRUEIRA TR1 PE RBF FT TR 230/69 kV MIRUEIRA TR1 PE 061/2001 IPCA RMEL REN 643/2014 09/11/2015 08/11/2043  R$4,739.14
MIRUEIRA MC 69 kV TR 230/69 kV MIRUEIRA TR1 PE RBF FT TR 230/69 kV MIRUEIRA TR1 PE 061/2001 IPCA RMEL REN 643/2014 09/03/2014 08/03/2044  R$37,398.47
MIRUEIRA MC 69 kV BC 69 kV 20,3 Mvar MIRUEIRA BC2 PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
MIRUEIRA MC 69 kV BC 69 kV 20,3 Mvar MIRUEIRA BC2 PE DIT   061/2001 IPCA RMEL REN 643/2014 09/11/2015 08/11/2043  R$2,369.57
MIRUEIRA MC 69 kV BC 69 kV 20,3 Mvar MIRUEIRA BC2 PE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
MIRUEIRA MC 69 kV BC 69 kV 20,3 Mvar MIRUEIRA BC2 PE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$235,271.08
MIRUEIRA MC 69 kV BC 69 kV 20,3 Mvar MIRUEIRA BC1 PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
MIRUEIRA MC 69 kV BC 69 kV 20,3 Mvar MIRUEIRA BC1 PE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
MIRUEIRA MC 69 kV BC 69 kV 20,3 Mvar MIRUEIRA BC1 PE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$235,271.08
MIRUEIRA MC 230 kV TR 230/69 kV MIRUEIRA TR4 PE RBF FT TR 230/69 kV MIRUEIRA TR4 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
MIRUEIRA MC 230 kV TR 230/69 kV MIRUEIRA TR4 PE RBF FT TR 230/69 kV MIRUEIRA TR4 PE 061/2001 IPCA RMEL REN 443/2011 24/04/2016 23/04/2046  R$16,458.17
MIRUEIRA MC 230 kV TR 230/69 kV MIRUEIRA TR3 PE RBF FT TR 230/69 kV MIRUEIRA TR3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
MIRUEIRA MC 230 kV TR 230/69 kV MIRUEIRA TR3 PE RBF FT TR 230/69 kV MIRUEIRA TR3 PE 061/2001 IPCA RMEL REN 643/2014 10/11/2015 09/11/2043  R$4,739.53
MIRUEIRA MC 230 kV TR 230/69 kV MIRUEIRA TR2 PE RBF FT TR 230/69 kV MIRUEIRA TR2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
MIRUEIRA MC 230 kV TR 230/69 kV MIRUEIRA TR1 PE RBF FT TR 230/69 kV MIRUEIRA TR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
MIRUEIRA IB 69 kV MG 230 kV MIRUEIRA MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
MIRUEIRA IB 69 kV MG 230 kV MIRUEIRA MG1 PE IB1 DIT   061/2001 IPCA RMEL REN 643/2014 19/06/2015 18/06/2043  R$4,836.10
MIRUEIRA IB 230 kV MG 230 kV MIRUEIRA MG1 PE IB1 RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,929.18
MIRUEIRA IB 230 kV MG 230 kV MIRUEIRA MG1 PE IB1 RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$368,658.63
MIRUEIRA IB 230 kV MG 230 kV MIRUEIRA MG1 PE IB1 RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$377,273.99
MIRUEIRA EL 69 kV MIRUEIRADIST9 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MIRUEIRA EL 69 kV MIRUEIRADIST9 DIT   061/2001 IPCA RMEL REN 643/2014 09/07/2015 08/07/2043  R$4,814.22
MIRUEIRA EL 69 kV MIRUEIRADIST9 DIT   061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2043  R$2,410.08
MIRUEIRA EL 69 kV MIRUEIRADIST8 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MIRUEIRA EL 69 kV MIRUEIRADIST8 DIT   061/2001 IPCA RMEL REN 643/2014 01/07/2015 30/06/2043  R$4,811.06
MIRUEIRA EL 69 kV MIRUEIRADIST8 DIT   061/2001 IPCA RMEL REN 643/2014 10/07/2015 09/07/2043  R$4,814.63
MIRUEIRA EL 69 kV MIRUEIRADIST7 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MIRUEIRA EL 69 kV MIRUEIRADIST7 DIT   061/2001 IPCA RMEL REN 643/2014 06/07/2015 05/07/2045  R$4,443.49
MIRUEIRA EL 69 kV MIRUEIRADIST7 DIT   061/2001 IPCA RMEL REN 643/2014 08/07/2015 07/07/2045  R$4,444.18
MIRUEIRA EL 69 kV MIRUEIRADIST6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MIRUEIRA EL 69 kV MIRUEIRADIST6 DIT   061/2001 IPCA RMEL REN 643/2014 29/06/2015 28/06/2043  R$2,420.05
MIRUEIRA EL 69 kV MIRUEIRADIST6 DIT   061/2001 IPCA RMEL REN 643/2014 07/07/2015 06/07/2043  R$4,813.43
MIRUEIRA EL 69 kV MIRUEIRADIST5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MIRUEIRA EL 69 kV MIRUEIRADIST5 DIT   061/2001 IPCA RMEL REN 643/2014 23/06/2015 22/06/2043  R$4,837.70
MIRUEIRA EL 69 kV MIRUEIRADIST5 DIT   061/2001 IPCA RMEL REN 643/2014 03/07/2015 02/07/2043  R$4,811.85
MIRUEIRA EL 69 kV MIRUEIRADIST4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MIRUEIRA EL 69 kV MIRUEIRADIST4 DIT   061/2001 IPCA RMEL REN 643/2014 22/06/2015 21/06/2043  R$4,837.29
MIRUEIRA EL 69 kV MIRUEIRADIST4 DIT   061/2001 IPCA RMEL REN 643/2014 13/07/2015 12/07/2043  R$4,815.80
MIRUEIRA EL 69 kV MIRUEIRADIST3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MIRUEIRA EL 69 kV MIRUEIRADIST3 DIT   061/2001 IPCA RMEL REN 643/2014 17/06/2015 16/06/2043  R$4,835.30
MIRUEIRA EL 69 kV MIRUEIRADIST3 DIT   061/2001 IPCA RMEL REN 643/2014 18/06/2015 17/06/2043  R$4,835.71
MIRUEIRA EL 69 kV MIRUEIRADIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MIRUEIRA EL 69 kV MIRUEIRADIST2 DIT   061/2001 IPCA RMEL REN 643/2014 29/06/2015 28/06/2043  R$2,420.05
MIRUEIRA EL 69 kV MIRUEIRADIST2 DIT   061/2001 IPCA RMEL REN 643/2014 30/06/2015 29/06/2043  R$4,840.49
MIRUEIRA EL 69 kV MIRUEIRADIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MIRUEIRA EL 69 kV MIRUEIRADIST1 DIT   061/2001 IPCA RMEL REN 643/2014 26/06/2015 25/06/2043  R$4,838.89
MIRUEIRA EL 69 kV MIRUEIRADIST1 DIT   061/2001 IPCA RMEL REN 643/2014 02/07/2015 01/07/2043  R$4,811.45
MIRUEIRA EL 69 kV MIRUEIRADIST1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
MIRUEIRA EL 69 kV MIRUEIRADIST1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
MIRUEIRA EL 69 kV MIRUEIRADIS13 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MIRUEIRA EL 69 kV MIRUEIRADIS13 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
MIRUEIRA EL 69 kV MIRUEIRADIS13 DIT   061/2001 IPCA RMEL REN 443/2011 18/04/2016 17/04/2043  R$2,354.02
MIRUEIRA EL 69 kV MIRUEIRADIS12 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MIRUEIRA EL 69 kV MIRUEIRADIS12 DIT   061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2042  R$7,387.80
MIRUEIRA EL 69 kV MIRUEIRADIS12 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
MIRUEIRA EL 69 kV MIRUEIRADIS11 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MIRUEIRA EL 69 kV MIRUEIRADIS11 DIT   061/2001 IPCA RMEL REN 643/2014 28/07/2015 27/07/2042  R$9,801.13
MIRUEIRA EL 69 kV MIRUEIRADIS10 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MIRUEIRA EL 69 kV MIRUEIRADIS10 DIT   061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2043  R$9,640.35
MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RMEL REN 643/2014 26/01/2014 25/01/2042  R$40,023.39
MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV RECIFE II /MIRUEIRA C-2 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV RECIFE II /MIRUEIRA C-2 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-2 PE 061/2001 IPCA RMEL REN 643/2014 08/12/2013 07/12/2041  R$39,854.25
MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV RECIFE II /MIRUEIRA C-1 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV RECIFE II /MIRUEIRA C-1 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-1 PE 061/2001 IPCA RMEL REN 643/2014 10/11/2013 09/11/2041  R$39,757.59
MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE  RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE  RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE  RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$692,788.80
MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE  RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE  RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE 061/2001 IPCA RBNI REA 2040/2009 07/07/2014 06/07/2044  R$44,961.48
MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE  RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE 061/2001 IPCA RMEL REN 643/2014 02/02/2014 01/02/2042  R$40,939.15
MIRUEIRA BC 69 kV 20,3 Mvar MIRUEIRA BC2 PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$116,409.25
MIRUEIRA BC 69 kV 20,3 Mvar MIRUEIRA BC1 PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$116,409.25
MIRUEIRA II TT 69/0 kV MIRUEIRA II TT1 PE DIT   017/2012 IPCA RPEC CC 017/2012 15/08/2016 01/06/2042  R$66,645.75
MIRUEIRA II TR 230/69 kV MIRUEIRA II TR2 PE RBF FT TR 230/69 kV MIRUEIRA II TR2 PE 017/2012 IPCA RBL CC 017/2012 12/04/2016 01/06/2042  R$ 1,686,146.61
MIRUEIRA II TR 230/69 kV MIRUEIRA II TR1 PE RBF FT TR 230/69 kV MIRUEIRA II TR1 PE 017/2012 IPCA RBL CC 017/2012 12/04/2016 01/06/2042  R$ 1,686,146.61
MIRUEIRA II MG 230 kV MIRUEIRA II MG1 PE RB FT MG 230 kV MIRUEIRA II MG1 PE 017/2012 IPCA RBL CC 017/2012 12/04/2016 01/06/2042  R$ 1,405,991.11
MIRUEIRA II MC 69 kV TT 69/0 kV MIRUEIRA II TT1 PE DIT   017/2012 IPCA RPEC CC 017/2012 15/08/2016 01/06/2042  R$69,305.80
MIRUEIRA II MC 69 kV TR 230/69 kV MIRUEIRA II TR2 PE RBF FT TR 230/69 kV MIRUEIRA II TR2 PE 017/2012 IPCA RBL CC 017/2012 12/04/2016 01/06/2042  R$513,326.48
MIRUEIRA II MC 69 kV TR 230/69 kV MIRUEIRA II TR1 PE RBF FT TR 230/69 kV MIRUEIRA II TR1 PE 017/2012 IPCA RBL CC 017/2012 12/04/2016 01/06/2042  R$513,326.48
MIRUEIRA II MC 230 kV TR 230/69 kV MIRUEIRA II TR2 PE RBF FT TR 230/69 kV MIRUEIRA II TR2 PE 017/2012 IPCA RBL CC 017/2012 12/04/2016 01/06/2042  R$541,369.27
MIRUEIRA II MC 230 kV TR 230/69 kV MIRUEIRA II TR1 PE RBF FT TR 230/69 kV MIRUEIRA II TR1 PE 017/2012 IPCA RBL CC 017/2012 12/04/2016 01/06/2042  R$541,369.27
MIRUEIRA II IB 69 kV MG 230 kV MIRUEIRA II MG1 PE IB1 DIT   017/2012 IPCA RPEC CC 017/2012 15/08/2016 01/06/2042  R$111,624.17
MIRUEIRA II IB 230 kV MG 230 kV MIRUEIRA II MG1 PE IB1 RB FT MG 230 kV MIRUEIRA II MG1 PE 017/2012 IPCA RBL CC 017/2012 12/04/2016 01/06/2042  R$471,267.47
MIRUEIRA II EL 69 kV MIRUEIRA IIDIST4 DIT   017/2012 IPCA RPEC CC 017/2012 15/08/2016 01/06/2042  R$191,406.59
MIRUEIRA II EL 69 kV MIRUEIRA IIDIST3 DIT   017/2012 IPCA RPEC CC 017/2012 15/08/2016 01/06/2042  R$191,406.59
MIRUEIRA II EL 69 kV MIRUEIRA IIDIST2 DIT   017/2012 IPCA RPEC CC 017/2012 15/08/2016 01/06/2042  R$191,406.59
MIRUEIRA II EL 69 kV MIRUEIRA IIDIST1 DIT   017/2012 IPCA RPEC CC 017/2012 15/08/2016 01/06/2042  R$191,406.59
MIRUEIRA II EL 230 kV MIRUEIRA II LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE  RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE 061/2001 IPCA RBNI REA 10092/2021 11/03/2021 11/03/2049  R$153,279.46
MIRUEIRA II EL 230 kV MIRUEIRA II LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE 061/2001 IPCA RBNI REA 10092/2021 11/03/2021 11/03/2049  R$153,279.46
MORRO CHAPEU II TT 69/0 kV MORRO CHAPEU II TA1 BA ICG   009/2011 IPCA RICG CC 009/2011 06/08/2017 13/10/2041  R$212,107.05
MORRO CHAPEU II TR 230/69 kV MORRO CHAPEU II TR1 BA ICG   009/2011 IPCA RICG CC 009/2011 06/08/2017 13/10/2041  R$ 1,451,612.79
MORRO CHAPEU II RTB 230 kV 0 Mvar MORRO CHAPEU II RT1 BA RB FT RTB 230 kV 20 Mvar MORRO CHAPEU II RT1 BA 009/2011 IPCA RBL CC 009/2011 21/12/2017 13/10/2041  R$494,012.87
MORRO CHAPEU II MG 69 kV MORRO CHAPEU II MG1 BA ICG   009/2011 IPCA RICG CC 009/2011 06/08/2017 13/10/2041  R$81,081.56
MORRO CHAPEU II MG 230 kV MORRO CHAPEU II MG1 BA RB FT MG 230 kV MORRO CHAPEU II MG1 BA 009/2011 IPCA RBL CC 009/2011 21/12/2017 13/10/2041  R$753,172.38
MORRO CHAPEU II MC 69 kV TT 69/0 kV MORRO CHAPEU II TA1 BA  ICG   009/2011 IPCA RICG CC 009/2011 06/08/2017 13/10/2041  R$78,960.24
MORRO CHAPEU II MC 69 kV TR 230/69 kV MORRO CHAPEU II TR1 BA  ICG   009/2011 IPCA RICG CC 009/2011 06/08/2017 13/10/2041  R$187,090.89
MORRO CHAPEU II MC 230 kV TR 230/69 kV MORRO CHAPEU II TR1 BA  ICG   009/2011 IPCA RICG CC 009/2011 06/08/2017 13/10/2041  R$459,966.04
MORRO CHAPEU II MC 230 kV RTB 230 kV 0 Mvar MORRO CHAPEU II RT1 BA RB FT RTB 230 kV 20 Mvar MORRO CHAPEU II RT1 BA 009/2011 IPCA RBL CC 009/2011 21/12/2017 13/10/2041  R$338,713.27
MORRO CHAPEU II IB 69 kV MG 69 kV MORRO CHAPEU II MG1 BA IB1 ICG   009/2011 IPCA RICG CC 009/2011 06/08/2017 13/10/2041  R$128,265.06
MORRO CHAPEU II IB 230 kV MG 230 kV MORRO CHAPEU II MG1 BA IB1 RB FT MG 230 kV MORRO CHAPEU II MG1 BA 009/2011 IPCA RBL CC 009/2011 21/12/2017 13/10/2041  R$266,437.51
MORRO CHAPEU II EL 230 kV MORRO CHAPEU II LT 230 kV MORRO CHAPEU II /IRECE C-1 BA RB FT LT 230 kV MORRO CHAPEU II /IRECE C-1 BA 009/2011 IPCA RBL CC 009/2011 21/12/2017 13/10/2041  R$511,533.06
MOSSORO II TT 69/13,8 kV MOSSORO II TA1 RN DIT   061/2001 IPCA RCDM REA 3578/2012 10/07/2015 09/07/2045  R$223,484.54
MOSSORO II TR 69/3,3 kV MOSSORO II TR5 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$102,924.69
MOSSORO II TR 69/3,3 kV MOSSORO II TR5 RN DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$303,724.68
MOSSORO II TR 69/3,3 kV MOSSORO II TR5 RN DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$310,822.57
MOSSORO II TR 69/3,3 kV MOSSORO II TR5 RN DIT   061/2001 IPCA RMEL REN 443/2011 23/04/2015 22/04/2038  R$2,334.41
MOSSORO II TR 69/3,3 kV MOSSORO II TR5 RN DIT   061/2001 IPCA RMEL REN 443/2011 23/04/2015 22/04/2038  R$4,668.82
MOSSORO II TR 230/69 kV MOSSORO II TR6 RN RBF FT TR 230/69 kV MOSSORO II TR6 RN 061/2001 IPCA RBNI REA 3892/2013 12/05/2016 11/05/2050  R$ 1,540,430.43
MOSSORO II TR 230/69 kV MOSSORO II TR3 RN RBF FT TR 230/69 kV MOSSORO II TR3 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
MOSSORO II TR 230/69 kV MOSSORO II TR2 RN RBF FT TR 230/69 kV MOSSORO II TR2 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
MOSSORO II TR 230/69 kV MOSSORO II TR2 RN RBF FT TR 230/69 kV MOSSORO II TR2 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
MOSSORO II TR 230/69 kV MOSSORO II TR2 RN RBF FT TR 230/69 kV MOSSORO II TR2 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
MOSSORO II TR 230/69 kV MOSSORO II TR1 RN RBF FT TR 230/69 kV MOSSORO II TR1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
MOSSORO II TR 230/69 kV MOSSORO II TR1 RN RBF FT TR 230/69 kV MOSSORO II TR1 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
MOSSORO II TR 230/69 kV MOSSORO II TR1 RN RBF FT TR 230/69 kV MOSSORO II TR1 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
MOSSORO II RTB 230 kV 20 Mvar MOSSORO II RT1 RN RB FT RTB 230 kV 20 Mvar MOSSORO II RT1 RN 061/2001 IPCA RBNI REA 3620/2012 26/05/2014 25/05/2047  R$660,138.44
MOSSORO II RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$135,222.37
MOSSORO II RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$399,033.22
MOSSORO II RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$408,358.42
MOSSORO II RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN 061/2001 IPCA RMEL REN 443/2011 12/05/2016 11/05/2030  R$1,685.54
MOSSORO II RTB 13,8 kV 5 MVAr MOSSORO II RT2 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT2 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$135,222.37
MOSSORO II RTB 13,8 kV 5 MVAr MOSSORO II RT2 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT2 RN 061/2001 IPCA RMEL REN 443/2011 12/05/2016 11/05/2030  R$1,685.54
MOSSORO II RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$135,222.37
MOSSORO II RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$399,033.22
MOSSORO II RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$408,358.42
MOSSORO II RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN 061/2001 IPCA RMEL REN 443/2011 12/05/2016 11/05/2030  R$1,685.54
MOSSORO II MG 230 kV MOSSORO II MG1 RN RB FT MG 230 kV MOSSORO II MG1 RN 061/2001 IPCA RBNI REA 3892/2013 12/05/2016 11/05/2044  R$273,106.78
MOSSORO II MG 230 kV MOSSORO II MG1 RN RB FT MG 230 kV MOSSORO II MG1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$645,074.67
MOSSORO II MG 230 kV MOSSORO II MG1 RN RB FT MG 230 kV MOSSORO II MG1 RN 061/2001 IPCA RMEL REN 643/2014 30/08/2013 29/08/2030  R$26,852.65
MOSSORO II MG 230 kV MOSSORO II MG1 RN RB FT MG 230 kV MOSSORO II MG1 RN 061/2001 IPCA RBNI REA 2376/2010 23/10/2014 22/10/2042  R$58,619.93
MOSSORO II MG 230 kV MOSSORO II MG1 RN RB FT MG 230 kV MOSSORO II MG1 RN 061/2001 IPCA RBNI REA 1814/2009 23/10/2014 22/10/2042  R$58,619.93
MOSSORO II MG 230 kV MOSSORO II MG1 RN RB FT MG 230 kV MOSSORO II MG1 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,903,577.20
MOSSORO II MG 230 kV MOSSORO II MG1 RN RB FT MG 230 kV MOSSORO II MG1 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,948,062.83
MOSSORO II MG 230 kV MOSSORO II MG1 RN RB FT MG 230 kV MOSSORO II MG1 RN 061/2001 IPCA RMEL REN 443/2011 21/01/2016 20/01/2033  R$32,572.45
MOSSORO II MG 230 kV MOSSORO II MG1 RN RB FT MG 230 kV MOSSORO II MG1 RN 061/2001 IPCA RMEL REN 443/2011 29/12/2016 28/12/2044  R$79,006.23
MOSSORO II MC 69 kV TT 69/13,8 kV MOSSORO II TA1 RN  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
MOSSORO II MC 69 kV TR 69/3,3 kV MOSSORO II TR5 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
MOSSORO II MC 69 kV TR 69/3,3 kV MOSSORO II TR5 RN DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
MOSSORO II MC 69 kV TR 230/69 kV MOSSORO II TR6 RN RBF FT TR 230/69 kV MOSSORO II TR6 RN 061/2001 IPCA RBNI REA 3892/2013 12/05/2016 11/05/2046  R$462,021.46
MOSSORO II MC 69 kV TR 230/69 kV MOSSORO II TR3 RN  RBF FT TR 230/69 kV MOSSORO II TR3 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
MOSSORO II MC 69 kV TR 230/69 kV MOSSORO II TR2 RN RBF FT TR 230/69 kV MOSSORO II TR2 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
MOSSORO II MC 69 kV TR 230/69 kV MOSSORO II TR1 RN RBF FT TR 230/69 kV MOSSORO II TR1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
MOSSORO II MC 230 kV TR 230/69 kV MOSSORO II TR6 RN RBF FT TR 230/69 kV MOSSORO II TR6 RN 061/2001 IPCA RBNI REA 3892/2013 12/05/2016 11/05/2046  R$ 1,268,974.43
MOSSORO II MC 230 kV TR 230/69 kV MOSSORO II TR3 RN  RBF FT TR 230/69 kV MOSSORO II TR3 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
MOSSORO II MC 230 kV TR 230/69 kV MOSSORO II TR2 RN RBF FT TR 230/69 kV MOSSORO II TR2 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
MOSSORO II MC 230 kV TR 230/69 kV MOSSORO II TR2 RN RBF FT TR 230/69 kV MOSSORO II TR2 RN 061/2001 IPCA RMEL REN 443/2011 23/04/2017 22/04/2047  R$70,042.64
MOSSORO II MC 230 kV TR 230/69 kV MOSSORO II TR1 RN RBF FT TR 230/69 kV MOSSORO II TR1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
MOSSORO II MC 230 kV TR 230/69 kV MOSSORO II TR1 RN RBF FT TR 230/69 kV MOSSORO II TR1 RN 061/2001 IPCA RMEL REN 443/2011 23/01/2015 22/01/2038  R$14,581.35
MOSSORO II MC 230 kV RTB 230 kV 20 Mvar MOSSORO II RT1 RN  RB FT RTB 230 kV 20 Mvar MOSSORO II RT1 RN 061/2001 IPCA RBNI REA 3620/2012 26/05/2014 25/05/2045  R$ 1,194,042.55
MOSSORO II MC 13,8 kV TR 230/69 kV MOSSORO II TR2 RN  RBF FT TR 230/69 kV MOSSORO II TR2 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
MOSSORO II MC 13,8 kV TR 230/69 kV MOSSORO II TR1 RN  RBF FT TR 230/69 kV MOSSORO II TR1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
MOSSORO II MC 13,8 kV RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN  RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,511.84
MOSSORO II MC 13,8 kV RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN  RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,223.45
MOSSORO II MC 13,8 kV RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN  RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$203,879.20
MOSSORO II MC 13,8 kV RTB 13,8 kV 5 MVAr MOSSORO II RT2 RN  RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT2 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,511.84
MOSSORO II MC 13,8 kV RTB 13,8 kV 5 MVAr MOSSORO II RT2 RN  RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT2 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,223.45
MOSSORO II MC 13,8 kV RTB 13,8 kV 5 MVAr MOSSORO II RT2 RN  RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT2 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$203,879.20
MOSSORO II MC 13,8 kV RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN  RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,511.84
MOSSORO II MC 13,8 kV RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN  RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,223.45
MOSSORO II MC 13,8 kV RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN  RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$203,879.20
MOSSORO II MC 13,8 kV BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN  RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
MOSSORO II MC 13,8 kV BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN  RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
MOSSORO II MC 13,8 kV BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN  RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN 061/2001 IPCA RMEL REN 443/2011 12/05/2016 11/05/2030  R$1,685.54
MOSSORO II MC 13,8 kV BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN  RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
MOSSORO II MC 13,8 kV BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN  RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
MOSSORO II MC 13,8 kV BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN  RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN 061/2001 IPCA RMEL REN 443/2011 12/05/2016 11/05/2030  R$1,685.54
MOSSORO II MC 13,8 kV BC 13,8 kV 3,6 MVAr MOSSORO II BC2 RN  RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC2 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
MOSSORO II MC 13,8 kV BC 13,8 kV 3,6 MVAr MOSSORO II BC2 RN  RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC2 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
MOSSORO II MC 13,8 kV BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN  RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
MOSSORO II MC 13,8 kV BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN  RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
MOSSORO II MC 13,8 kV BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN  RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN 061/2001 IPCA RMEL REN 443/2011 12/05/2016 11/05/2030  R$3,371.07
MOSSORO II IB 69 kV MG 230 kV MOSSORO II MG1 RN IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
MOSSORO II IB 230 kV MG 230 kV MOSSORO II MG1 RN IB1 RB FT MG 230 kV MOSSORO II MG1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
MOSSORO II EL 69 kV MOSSORO IIROSADO-02J1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MOSSORO II EL 69 kV MOSSORO IIROSADO 02J8 DIT   061/2001 IPCA RCDM REA 1814/2009 23/10/2014 22/10/2044  R$478,330.52
MOSSORO II EL 69 kV MOSSORO IIMOSSOROIII-02J2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MOSSORO II EL 69 kV MOSSORO IIMOSSOROIII-02J2 DIT   061/2001 IPCA RMEL REN 443/2011 10/05/2016 09/05/2030  R$3,370.16
MOSSORO II EL 69 kV MOSSORO IIMOSSORO I-02J3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MOSSORO II EL 69 kV MOSSORO IIMOSSORO I-02J3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
MOSSORO II EL 69 kV MOSSORO IIMOSSORO I-02J3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
MOSSORO II EL 69 kV MOSSORO IIMOSSORO I-02J3 DIT   061/2001 IPCA RMEL REN 443/2011 10/05/2016 09/05/2030  R$3,370.16
MOSSORO II EL 69 kV MOSSORO IIMAISA-02J7 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MOSSORO II EL 69 kV MOSSORO IIMAISA-02J7 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
MOSSORO II EL 69 kV MOSSORO IIMAISA-02J7 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
MOSSORO II EL 69 kV MOSSORO IIGROSSOS-02J6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MOSSORO II EL 69 kV MOSSORO IIGROSSOS-02J6 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
MOSSORO II EL 69 kV MOSSORO IIGROSSOS-02J6 DIT   061/2001 IPCA RMEL REN 443/2011 10/05/2016 09/05/2030  R$3,370.16
MOSSORO II EL 69 kV MOSSORO IIC.AMARO-02J5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MOSSORO II EL 69 kV MOSSORO IIC.AMARO-02J5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
MOSSORO II EL 69 kV MOSSORO IIBARROCAS-02J4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MOSSORO II EL 69 kV MOSSORO IIBARROCAS-02J4 DIT   061/2001 IPCA RMEL REN 443/2011 10/05/2016 09/05/2030  R$3,479.04
MOSSORO II EL 69 kV MOSSORO IIBARAUNAS 02J9 DIT   061/2001 IPCA RCDM REA 2376/2010 23/10/2014 22/10/2044  R$478,330.52
MOSSORO II EL 230 kV MOSSORO II LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN  RB FT LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
MOSSORO II EL 230 kV MOSSORO II LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN  RB FT LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN 061/2001 IPCA RMEL REN 643/2014 30/04/2014 29/04/2042  R$40,347.85
MOSSORO II EL 230 kV MOSSORO II LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN  RB FT LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN 061/2001 IPCA RMEL REN 443/2011 07/05/2017 06/05/2047  R$70,113.96
MOSSORO II EL 230 kV MOSSORO II LT 230 kV MOSSORO IV /MOSSORO II C-1 RN RB FT LT 230 kV MOSSORO IV /MOSSORO II C-1 RN 018/2012 IPCA RBL CC 018/2012 28/10/2017 01/06/2042  R$558,840.27
MOSSORO II EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU III C-2 RN RB FT LT 230 kV MOSSORO II /ACU III C-2 RN 019/2010 IPCA RBL CC 019/2010 23/11/2010 23/11/2040  R$369,593.42
MOSSORO II EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU III C-1 RN  RB FT LT 230 kV MOSSORO II /ACU III C-1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
MOSSORO II EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU III C-1 RN  RB FT LT 230 kV MOSSORO II /ACU III C-1 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
MOSSORO II EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU III C-1 RN  RB FT LT 230 kV MOSSORO II /ACU III C-1 RN 061/2001 IPCA RMEL REN 443/2011 22/05/2016 21/05/2046  R$16,493.10
MOSSORO II EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU III C-1 RN  RB FT LT 230 kV MOSSORO II /ACU III C-1 RN 061/2001 IPCA RMEL REN 443/2011 22/05/2016 21/05/2046  R$16,493.10
MOSSORO II EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU III C-1 RN  RB FT LT 230 kV MOSSORO II /ACU III C-1 RN 061/2001 IPCA RMEL REN 443/2011 22/05/2016 21/05/2046  R$16,493.10
MOSSORO II EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU III C-1 RN  RB FT LT 230 kV MOSSORO II /ACU III C-1 RN 061/2001 IPCA RMEL REN 443/2011 22/05/2016 21/05/2046  R$16,493.10
MOSSORO II EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU III C-1 RN  RB FT LT 230 kV MOSSORO II /ACU III C-1 RN 061/2001 IPCA RBNI REA 5861/2016 10/06/2016 09/06/2044  R$28,900.49
MOSSORO II EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU III C-1 RN  RB FT LT 230 kV MOSSORO II /ACU III C-1 RN 061/2001 IPCA RBNI REA 5861/2016 10/06/2016 09/06/2031  R$120,229.77
MOSSORO II EL 230 kV MOSSORO II LT 230 kV BANABUIU /MOSSORO II C-2 CE/RN RB FT LT 230 kV BANABUIU /MOSSORO II C-2 CE/RN 061/2001 IPCA RBNI REA 2173/2009 06/06/2016 05/06/2046  R$ 1,435,157.12
MOSSORO II EL 230 kV MOSSORO II LT 230 kV ALEX /MOSSORO II C-1 CE/RN  RB FT LT 230 kV ALEX /MOSSORO II C-1 CE/RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
MOSSORO II EL 230 kV MOSSORO II LT 230 kV ALEX /MOSSORO II C-1 CE/RN  RB FT LT 230 kV ALEX /MOSSORO II C-1 CE/RN 061/2001 IPCA RMEL REN 643/2014 30/11/2014 29/11/2042  R$41,086.51
MOSSORO II EL 230 kV MOSSORO II LT 230 kV ALEX /MOSSORO II C-1 CE/RN  RB FT LT 230 kV ALEX /MOSSORO II C-1 CE/RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
MOSSORO II EL 230 kV MOSSORO II LT 230 kV ALEX /MOSSORO II C-1 CE/RN  RB FT LT 230 kV ALEX /MOSSORO II C-1 CE/RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$735,719.99
MOSSORO II EL 230 kV MOSSORO IIAREIA BRANCA DIT   061/2001 IPCA RCDM REA 6674/2017 01/07/2018 01/04/2038  R$129,276.95
MOSSORO II CE 20/-0 Mvar MOSSORO II CE1 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$573,454.18
MOSSORO II CE 20/-0 Mvar MOSSORO II CE1 RN DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,692,229.36
MOSSORO II CE 20/-0 Mvar MOSSORO II CE1 RN DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 1,731,775.91
MOSSORO II BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
MOSSORO II BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$94,657.45
MOSSORO II BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
MOSSORO II BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$94,657.45
MOSSORO II BC 13,8 kV 3,6 MVAr MOSSORO II BC2 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC2 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
MOSSORO II BC 13,8 kV 3,6 MVAr MOSSORO II BC2 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC2 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$94,657.45
MOSSORO II BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
MOSSORO II BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$94,657.45
MOSSORO IV TT 69/230 kV MOSSORO IV TT1 RN ICG   018/2012 IPCA RICG CC 018/2012 28/10/2017 01/06/2042  R$82,650.71
MOSSORO IV TR 230/69 kV MOSSORO IV TR1 RN ICG   018/2012 IPCA RICG CC 018/2012 28/10/2017 01/06/2042  R$ 1,295,223.01
MOSSORO IV MG 69 kV MOSSORO IV MG2 RN ICG   018/2012 IPCA RICG CC 018/2012 28/10/2017 01/06/2042  R$587,963.30
MOSSORO IV MG 230 kV MOSSORO IV MG1 RN RB FT MG 230 kV MOSSORO IV MG1 RN 018/2012 IPCA RBL CC 018/2012 28/10/2017 01/06/2042  R$932,205.93
MOSSORO IV MC 69 kV TT 69/230 kV MOSSORO IV TT1 RN ICG   018/2012 IPCA RICG CC 018/2012 28/10/2017 01/06/2042  R$85,949.15
MOSSORO IV MC 69 kV TR 230/69 kV MOSSORO IV TR1 RN  ICG   018/2012 IPCA RICG CC 018/2012 28/10/2017 01/06/2042  R$203,029.38
MOSSORO IV MC 230 kV TR 230/69 kV MOSSORO IV TR1 RN ICG   018/2012 IPCA RICG CC 018/2012 28/10/2017 01/06/2042  R$511,962.10
MOSSORO IV IB 69 kV MG 69 kV MOSSORO IV MG2 RN IB1 ICG   018/2012 IPCA RICG CC 018/2012 28/10/2017 01/06/2042  R$138,423.20
MOSSORO IV IB 230 kV MG 230 kV MOSSORO IV MG1 RN IB1 RB FT MG 230 kV MOSSORO IV MG1 RN 018/2012 IPCA RBL CC 018/2012 28/10/2017 01/06/2042  R$345,417.58
MOSSORO IV EL 230 kV MOSSORO IV LT 230 kV MOSSORO IV /MOSSORO II C-1 RN RB FT LT 230 kV MOSSORO IV /MOSSORO II C-1 RN 018/2012 IPCA RBL CC 018/2012 28/10/2017 01/06/2042  R$558,840.27
MOXOTO TR 69/13,8 kV MOXOTO TR2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
MOXOTO TR 69/13,8 kV MOXOTO TR2 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$86,722.45
MOXOTO TR 69/13,8 kV MOXOTO TR1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
MOXOTO TR 69/13,8 kV MOXOTO TR1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$86,722.45
MOXOTO MG 69 kV MOXOTO MG1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$246,186.96
MOXOTO MG 69 kV MOXOTO MG1 BA DIT   061/2001 IPCA RMEL REN 643/2014 28/02/2014 27/02/2031  R$16,800.17
MOXOTO MG 69 kV MOXOTO MG1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$726,483.16
MOXOTO MG 69 kV MOXOTO MG1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$743,460.70
MOXOTO MG 69 kV MOXOTO MG1 BA DIT   061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033  R$31,577.83
MOXOTO MC 69 kV TR 69/13,8 kV MOXOTO TR2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
MOXOTO MC 69 kV TR 69/13,8 kV MOXOTO TR1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$60,565.23
MOXOTO MC 13,8 kV TR 69/13,8 kV MOXOTO TR2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
MOXOTO MC 13,8 kV TR 69/13,8 kV MOXOTO TR2 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$142,152.79
MOXOTO MC 13,8 kV TR 69/13,8 kV MOXOTO TR2 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$145,474.83
MOXOTO MC 13,8 kV TR 69/13,8 kV MOXOTO TR1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
MOXOTO MC 13,8 kV TR 69/13,8 kV MOXOTO TR1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$142,152.79
MOXOTO MC 13,8 kV TR 69/13,8 kV MOXOTO TR1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$145,474.83
MOXOTO EL 69 kV MOXOTO LT 69 kV ZEBU /MOXOTO C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MOXOTO EL 69 kV MOXOTO LT 69 kV ABAIXADORA /MOXOTO C-1 BA  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MOXOTO EL 13,8 kV MOXOTODIST6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
MOXOTO EL 13,8 kV MOXOTODIST5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
MOXOTO EL 13,8 kV MOXOTODIST4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
MOXOTO EL 13,8 kV MOXOTODIST3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
MOXOTO EL 13,8 kV MOXOTODIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
MOXOTO EL 13,8 kV MOXOTODIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
MULUNGU TR 69/13,8 kV MULUNGU TR1-B BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
MULUNGU TR 69/13,8 kV MULUNGU TR1-B BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$86,722.45
MULUNGU TR 69/13,8 kV MULUNGU TR1-B BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$88,749.11
MULUNGU TR 69/13,8 kV MULUNGU TR1-A BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
MULUNGU MG 69 kV MULUNGU MG1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$225,479.05
MULUNGU MG 69 kV MULUNGU MG1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$665,375.34
MULUNGU MG 69 kV MULUNGU MG1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$680,924.83
MULUNGU MG 69 kV MULUNGU MG1 BA DIT   061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033  R$31,577.83
MULUNGU MC 13,8 kV TR 69/13,8 kV MULUNGU TR1-A BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
MULUNGU MC 13,8 kV TR 69/13,8 kV MULUNGU TR1-A BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$142,152.79
MULUNGU MC 13,8 kV TR 69/13,8 kV MULUNGU TR1-A BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$145,474.83
MULUNGU EL 69 kV MULUNGU LT 69 kV ABAIXADORA /MULUNGU C-1 BA  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$74,742.25
MULUNGU EL 69 kV MULUNGUDIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$74,742.25
MULUNGU EL 13,8 kV MULUNGUDIST5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
MULUNGU EL 13,8 kV MULUNGUDIST4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
MULUNGU EL 13,8 kV MULUNGUDIST3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
MULUNGU EL 13,8 kV MULUNGUDIST3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$158,986.22
MULUNGU EL 13,8 kV MULUNGUDIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
MULUNGU EL 13,8 kV MULUNGUDIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
MUSSURE II TT 69/13,8 kV MUSSURE II TA2 PB DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
MUSSURE II TT 69/13,8 kV MUSSURE II TA1 PB DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
MUSSURE II TR 69/13,8 kV MUSSURE II TR5 PB RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
MUSSURE II TR 69/13,8 kV MUSSURE II TR5 PB RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$86,722.45
MUSSURE II TR 69/13,8 kV MUSSURE II TR5 PB RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$88,749.11
MUSSURE II TR 230/69 kV MUSSURE II TR4 PB RBF FT TR 230/69 kV MUSSURE II TR4 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
MUSSURE II TR 230/69 kV MUSSURE II TR3 PB RBF FT TR 230/69 kV MUSSURE II TR3 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
MUSSURE II TR 230/69 kV MUSSURE II TR3 PB RBF FT TR 230/69 kV MUSSURE II TR3 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
MUSSURE II TR 230/69 kV MUSSURE II TR3 PB RBF FT TR 230/69 kV MUSSURE II TR3 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
MUSSURE II TR 230/69 kV MUSSURE II TR2 PB RBF FT TR 230/69 kV MUSSURE II TR2 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
MUSSURE II TR 230/69 kV MUSSURE II TR2 PB RBF FT TR 230/69 kV MUSSURE II TR2 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
MUSSURE II TR 230/69 kV MUSSURE II TR1 PB RBF FT TR 230/69 kV MUSSURE II TR1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
MUSSURE II TR 230/69 kV MUSSURE II TR1 PB RBF FT TR 230/69 kV MUSSURE II TR1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
MUSSURE II MG 230 kV MUSSURE II MG1 PB RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$615,933.57
MUSSURE II MG 230 kV MUSSURE II MG1 PB RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RMEL REN 643/2014 15/10/2015 14/10/2032  R$32,178.42
MUSSURE II MG 230 kV MUSSURE II MG1 PB RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RMEL REN 643/2014 30/09/2015 29/09/2043  R$76,161.22
MUSSURE II MG 230 kV MUSSURE II MG1 PB RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2029  R$72,893.79
MUSSURE II MG 230 kV MUSSURE II MG1 PB RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,817,583.54
MUSSURE II MG 230 kV MUSSURE II MG1 PB RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,860,059.55
MUSSURE II MG 230 kV MUSSURE II MG1 PB RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RBNI REA 758/2006 06/05/2012 05/05/2043  R$42,922.47
MUSSURE II MC 69 kV TT 69/13,8 kV MUSSURE II TA1 PB  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
MUSSURE II MC 69 kV TR 69/13,8 kV MUSSURE II TR5 PB RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$60,565.23
MUSSURE II MC 69 kV TR 69/13,8 kV MUSSURE II TR5 PB RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$178,724.42
MUSSURE II MC 69 kV TR 230/69 kV MUSSURE II TR4 PB  RBF FT TR 230/69 kV MUSSURE II TR4 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
MUSSURE II MC 69 kV TR 230/69 kV MUSSURE II TR3 PB RBF FT TR 230/69 kV MUSSURE II TR3 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
MUSSURE II MC 69 kV TR 230/69 kV MUSSURE II TR3 PB RBF FT TR 230/69 kV MUSSURE II TR3 PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
MUSSURE II MC 69 kV TR 230/69 kV MUSSURE II TR2 PB RBF FT TR 230/69 kV MUSSURE II TR2 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
MUSSURE II MC 69 kV TR 230/69 kV MUSSURE II TR1 PB RBF FT TR 230/69 kV MUSSURE II TR1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
MUSSURE II MC 69 kV BC 69 kV 21,3 Mvar MUSSURE II BC1 PB DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
MUSSURE II MC 69 kV BC 69 kV 21,3 Mvar MUSSURE II BC1 PB DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
MUSSURE II MC 69 kV BC 69 kV 21,3 Mvar MUSSURE II BC1 PB DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$235,271.08
MUSSURE II MC 69 kV BC 69 kV 21,2 Mvar MUSSURE II BC2 PB DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
MUSSURE II MC 69 kV BC 69 kV 21,2 Mvar MUSSURE II BC2 PB DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
MUSSURE II MC 69 kV BC 69 kV 21,2 Mvar MUSSURE II BC2 PB DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$235,271.08
MUSSURE II MC 230 kV TR 230/69 kV MUSSURE II TR4 PB  RBF FT TR 230/69 kV MUSSURE II TR4 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
MUSSURE II MC 230 kV TR 230/69 kV MUSSURE II TR4 PB  RBF FT TR 230/69 kV MUSSURE II TR4 PB 061/2001 IPCA RMEL REN 443/2011 06/07/2017 05/07/2047  R$22,727.40
MUSSURE II MC 230 kV TR 230/69 kV MUSSURE II TR3 PB RBF FT TR 230/69 kV MUSSURE II TR3 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
MUSSURE II MC 230 kV TR 230/69 kV MUSSURE II TR2 PB RBF FT TR 230/69 kV MUSSURE II TR2 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
MUSSURE II MC 230 kV TR 230/69 kV MUSSURE II TR1 PB RBF FT TR 230/69 kV MUSSURE II TR1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
MUSSURE II IB 69 kV MG 230 kV MUSSURE II MG1 PB IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
MUSSURE II IB 230 kV MG 230 kV MUSSURE II MG1 PB IB1 RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,929.18
MUSSURE II EL 69 kV MUSSURE IIVALENTINA 02J4 DIT   061/2001 IPCA RCDM REA 758/2006 06/05/2012 05/05/2040  R$583,774.92
MUSSURE II EL 69 kV MUSSURE IISANTA RITA-02J3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MUSSURE II EL 69 kV MUSSURE IIMUSSURE I-12J6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MUSSURE II EL 69 kV MUSSURE IIMUSSURE I-12J6 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
MUSSURE II EL 69 kV MUSSURE IIMUSSURE I-12J6 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
MUSSURE II EL 69 kV MUSSURE IIMANGABEIRA-02J8 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MUSSURE II EL 69 kV MUSSURE IIMANGABEIRA-02J8 DIT   061/2001 IPCA RCDM REA 2376/2010 26/03/2015 25/03/2045  R$13,218.56
MUSSURE II EL 69 kV MUSSURE IIMANGABEIRA-02J8 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
MUSSURE II EL 69 kV MUSSURE IIJ.PESSOA-02J1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MUSSURE II EL 69 kV MUSSURE IIILHA BISTO-02J7 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MUSSURE II EL 69 kV MUSSURE IIILHA BISTO-02J7 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
MUSSURE II EL 69 kV MUSSURE IIILHA BISTO-02J7 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
MUSSURE II EL 69 kV MUSSURE IICRISTO-02J2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
MUSSURE II EL 230 kV MUSSURE II LT 230 kV JOAO PESSOA II /MUSSURE II C-2 PB  RB FT LT 230 kV JOAO PESSOA II /MUSSURE II C-2 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
MUSSURE II EL 230 kV MUSSURE II LT 230 kV JOAO PESSOA II /MUSSURE II C-1 PB  RB FT LT 230 kV JOAO PESSOA II /MUSSURE II C-1 PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
MUSSURE II BC 69 kV 21,3 Mvar MUSSURE II BC1 PB DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$120,218.00
MUSSURE II BC 69 kV 21,3 Mvar MUSSURE II BC1 PB DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$354,756.22
MUSSURE II BC 69 kV 21,2 Mvar MUSSURE II BC2 PB DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$119,845.26
MUSSURE II BC 69 kV 21,2 Mvar MUSSURE II BC2 PB DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$353,656.29
MUSSURE II BC 69 kV 21,2 Mvar MUSSURE II BC2 PB DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$361,921.06
N.S.SOCORRO TT 69/0 kV N.S.SOCORRO TT1 SE DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 10/05/2042  R$176,355.71
N.S.SOCORRO TR 230/69 kV N.S.SOCORRO TR2 SE RBF FT TR 230/69 kV N.S.SOCORRO TR2 SE 005/2012 IPCA RBL CC 005/2012 17/02/2019 10/05/2042  R$ 1,510,193.64
N.S.SOCORRO TR 230/69 kV N.S.SOCORRO TR1 SE RBF FT TR 230/69 kV N.S.SOCORRO TR1 SE 005/2012 IPCA RBL CC 005/2012 17/02/2019 10/05/2042  R$ 1,510,193.64
N.S.SOCORRO MG 230 kV N.S.SOCORRO MG3 SE RB FT MG 230 kV N.S.SOCORRO MG3 SE 005/2008 IPCA RBNI DSP 1414/2022 01/07/2022 30/06/2053  R$20,673.51
N.S.SOCORRO MG 230 kV N.S.SOCORRO MG2 SE RB FT MG 230 kV N.S.SOCORRO MG2 SE 061/2001 IPCA RBNI DSP 1080/2022 01/07/2022 30/06/2053  R$20,128.37
N.S.SOCORRO MG 230 kV N.S.SOCORRO MG1 SE RB FT MG 230 kV N.S.SOCORRO MG1 SE 005/2012 IPCA RBL CC 005/2012 17/02/2019 10/05/2042  R$ 1,444,760.15
N.S.SOCORRO MG 230 kV N.S.SOCORRO MG1 SE RB FT MG 230 kV N.S.SOCORRO MG1 SE 005/2012 IPCA RBNI REN 905/2020 05/07/2020 04/07/2048  R$39,353.98
N.S.SOCORRO MC 69 kV TT 69/0 kV N.S.SOCORRO TT1 SE DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 10/05/2042  R$65,713.96
N.S.SOCORRO MC 69 kV TR 230/69 kV N.S.SOCORRO TR2 SE RBF FT TR 230/69 kV N.S.SOCORRO TR2 SE 005/2012 IPCA RBL CC 005/2012 17/02/2019 10/05/2042  R$195,026.83
N.S.SOCORRO MC 69 kV TR 230/69 kV N.S.SOCORRO TR1 SE RBF FT TR 230/69 kV N.S.SOCORRO TR1 SE 005/2012 IPCA RBL CC 005/2012 17/02/2019 10/05/2042  R$195,026.83
N.S.SOCORRO MC 230 kV TR 230/69 kV N.S.SOCORRO TR2 SE RBF FT TR 230/69 kV N.S.SOCORRO TR2 SE 005/2012 IPCA RBL CC 005/2012 17/02/2019 10/05/2042  R$479,138.54
N.S.SOCORRO MC 230 kV TR 230/69 kV N.S.SOCORRO TR1 SE RBF FT TR 230/69 kV N.S.SOCORRO TR1 SE 005/2012 IPCA RBL CC 005/2012 17/02/2019 10/05/2042  R$479,138.54
N.S.SOCORRO IB 69 kV MG 230 kV N.S.SOCORRO MG1 SE IB1 DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 10/05/2042  R$106,910.99
N.S.SOCORRO IB 230 kV MG 230 kV N.S.SOCORRO MG1 SE IB1 RB FT MG 230 kV N.S.SOCORRO MG1 SE 005/2012 IPCA RBL CC 005/2012 17/02/2019 10/05/2042  R$418,188.56
N.S.SOCORRO EL 69 kV N.S.SOCORRODIST6 DIT   005/2012 IPCA RCDM REN 905/2020 05/07/2020 04/07/2051  R$504,745.87
N.S.SOCORRO EL 69 kV N.S.SOCORRODIST5 DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 10/05/2042  R$181,996.65
N.S.SOCORRO EL 69 kV N.S.SOCORRODIST4 DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 10/05/2042  R$181,996.65
N.S.SOCORRO EL 69 kV N.S.SOCORRODIST3 DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 10/05/2042  R$181,996.65
N.S.SOCORRO EL 69 kV N.S.SOCORRODIST2 DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 10/05/2042  R$181,996.65
N.S.SOCORRO EL 69 kV N.S.SOCORRODIST1 DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 10/05/2042  R$181,996.65
N.S.SOCORRO EL 230 kV N.S.SOCORRO LT 230 kV N.S.SOCORRO /PENEDO C-1 SE/AL  RB FT LT 230 kV N.S.SOCORRO /PENEDO C-1 SE/AL 005/2008 IPCA RBNI DSP 1414/2022 01/07/2022 30/06/2051  R$210,029.93
N.S.SOCORRO EL 230 kV N.S.SOCORRO LT 230 kV N.S.SOCORRO /JARDIM C-2 SE RB FT LT 230 kV N.S.SOCORRO /JARDIM C-2 SE 005/2012 IPCA RBL CC 005/2012 17/02/2019 10/05/2042  R$672,025.46
N.S.SOCORRO EL 230 kV N.S.SOCORRO LT 230 kV N.S.SOCORRO /JARDIM C-1 SE  RB FT LT 230 kV N.S.SOCORRO /JARDIM C-1 SE 005/2012 IPCA RBL CC 005/2012 17/02/2019 10/05/2042  R$672,025.46
N.S.SOCORRO EL 230 kV N.S.SOCORRO LT 230 kV N.S.SOCORRO /FAFEN C-1 SE  RB FT EL 230 kV N.S.SOCORRO LT 230 kV N.S.SOCORRO /FAFEN C-1 SE 061/2001 IPCA RBNI DSP 1080/2022 01/07/2022 30/06/2051  R$203,728.71
NATAL II TT 69/13,8 kV NATAL II TA2 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
NATAL II TT 69/13,8 kV NATAL II TA2 RN DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$281,516.05
NATAL II TT 69/13,8 kV NATAL II TA2 RN DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$288,094.94
NATAL II TT 69/13,8 kV NATAL II TA1 RN DIT   061/2001 IPCA RCDM REA 3578/2012 13/11/2015 12/11/2045  R$225,371.09
NATAL II TR 69/3,3 kV NATAL II TR7 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$102,924.69
NATAL II TR 69/3,3 kV NATAL II TR7 RN DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$303,724.68
NATAL II TR 69/3,3 kV NATAL II TR7 RN DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$310,822.57
NATAL II TR 69/3,3 kV NATAL II TR6 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$102,924.69
NATAL II TR 69/3,3 kV NATAL II TR6 RN DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$303,724.68
NATAL II TR 69/3,3 kV NATAL II TR6 RN DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$310,822.57
NATAL II TR 69/13,8 kV NATAL II TR5 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
NATAL II TR 69/13,8 kV NATAL II TR5 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$86,722.45
NATAL II TR 69/13,8 kV NATAL II TR5 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$88,749.11
NATAL II TR 230/69 kV NATAL II TR8 RN RBF FT TR 230/69 kV NATAL II TR8 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
NATAL II TR 230/69 kV NATAL II TR4 RN RBF FT TR 230/69 kV NATAL II TR4 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
NATAL II TR 230/69 kV NATAL II TR4 RN RBF FT TR 230/69 kV NATAL II TR4 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
NATAL II TR 230/69 kV NATAL II TR4 RN RBF FT TR 230/69 kV NATAL II TR4 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
NATAL II TR 230/69 kV NATAL II TR3 RN RBF FT TR 230/69 kV NATAL II TR3 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
NATAL II TR 230/69 kV NATAL II TR3 RN RBF FT TR 230/69 kV NATAL II TR3 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
NATAL II TR 230/69 kV NATAL II TR3 RN RBF FT TR 230/69 kV NATAL II TR3 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
NATAL II TR 230/69 kV NATAL II TR2 RN RBF FT TR 230/69 kV NATAL II TR2 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
NATAL II TR 230/69 kV NATAL II TR2 RN RBF FT TR 230/69 kV NATAL II TR2 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
NATAL II TR 230/69 kV NATAL II TR1 RN RBF FT TR 230/69 kV NATAL II TR1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
NATAL II TR 230/69 kV NATAL II TR1 RN RBF FT TR 230/69 kV NATAL II TR1 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
NATAL II RTL 230 kV 9,9 MVAr NATAL II RT3 RN RB FT RTL 230 kV 9,9 MVAr NATAL II RT3 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,703.91
NATAL II RTL 230 kV 9,9 MVAr NATAL II RT3 RN RB FT RTL 230 kV 9,9 MVAr NATAL II RT3 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$515,540.91
NATAL II RTL 230 kV 9,9 MVAr NATAL II RT3 RN RB FT RTL 230 kV 9,9 MVAr NATAL II RT3 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$527,588.84
NATAL II RTL 230 kV 9,9 MVAr NATAL II RT2 RN RB FT RTL 230 kV 9,9 MVAr NATAL II RT2 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,703.91
NATAL II RTL 230 kV 9,9 MVAr NATAL II RT2 RN RB FT RTL 230 kV 9,9 MVAr NATAL II RT2 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$515,540.91
NATAL II RTB 230 kV 30 MVAr NATAL II RT1 RN RB FT RTB 230 kV 30 MVAr NATAL II RT1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$390,049.88
NATAL II MG 230 kV NATAL II MG1 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$745,637.47
NATAL II MG 230 kV NATAL II MG1 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RMEL REN 643/2014 30/09/2013 29/09/2030  R$26,967.83
NATAL II MG 230 kV NATAL II MG1 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RMEL REN 643/2014 30/04/2015 29/04/2043  R$51,329.93
NATAL II MG 230 kV NATAL II MG1 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2029  R$210,470.78
NATAL II MG 230 kV NATAL II MG1 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,200,332.09
NATAL II MG 230 kV NATAL II MG1 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,251,752.74
NATAL II MG 230 kV NATAL II MG1 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RMEL REN 443/2011 28/01/2016 27/01/2033  R$36,009.68
NATAL II MG 230 kV NATAL II MG1 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RMEL REN 443/2011 05/05/2016 04/05/2030  R$1,890.76
NATAL II MG 230 kV NATAL II MG1 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RMEL REN 443/2011 29/12/2016 28/12/2044  R$79,006.23
NATAL II MC 69 kV TT 69/13,8 kV NATAL II TA2 RN  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
NATAL II MC 69 kV TT 69/13,8 kV NATAL II TA2 RN  DIT   061/2001 IPCA RMEL REN 443/2011 05/05/2016 04/05/2030  R$1,890.76
NATAL II MC 69 kV TT 69/13,8 kV NATAL II TA1 RN  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
NATAL II MC 69 kV TR 69/3,3 kV NATAL II TR7 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$60,565.23
NATAL II MC 69 kV TR 69/3,3 kV NATAL II TR7 RN DIT   061/2001 IPCA RCDM REA 2376/2010 22/08/2013 21/08/2043  R$33,824.41
NATAL II MC 69 kV TR 69/3,3 kV NATAL II TR6 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$60,565.23
NATAL II MC 69 kV TR 69/3,3 kV NATAL II TR6 RN DIT   061/2001 IPCA RCDM REA 2376/2010 02/09/2013 01/09/2043  R$33,854.29
NATAL II MC 69 kV TR 230/69 kV NATAL II TR8 RN  RBF FT TR 230/69 kV NATAL II TR8 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
NATAL II MC 69 kV TR 230/69 kV NATAL II TR4 RN RBF FT TR 230/69 kV NATAL II TR4 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
NATAL II MC 69 kV TR 230/69 kV NATAL II TR4 RN RBF FT TR 230/69 kV NATAL II TR4 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
NATAL II MC 69 kV TR 230/69 kV NATAL II TR4 RN RBF FT TR 230/69 kV NATAL II TR4 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$204,189.21
NATAL II MC 69 kV TR 230/69 kV NATAL II TR3 RN RBF FT TR 230/69 kV NATAL II TR3 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
NATAL II MC 69 kV TR 230/69 kV NATAL II TR2 RN RBF FT TR 230/69 kV NATAL II TR2 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
NATAL II MC 69 kV TR 230/69 kV NATAL II TR1 RN RBF FT TR 230/69 kV NATAL II TR1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC4 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC4 RN DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC4 RN DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$235,271.08
NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC3 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC3 RN DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC3 RN DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$235,271.08
NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC2 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC2 RN DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC2 RN DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$235,271.08
NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC1 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC1 RN DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC1 RN DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$235,271.08
NATAL II MC 230 kV TR 230/69 kV NATAL II TR8 RN  RBF FT TR 230/69 kV NATAL II TR8 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$148,792.99
NATAL II MC 230 kV TR 230/69 kV NATAL II TR4 RN RBF FT TR 230/69 kV NATAL II TR4 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
NATAL II MC 230 kV TR 230/69 kV NATAL II TR4 RN RBF FT TR 230/69 kV NATAL II TR4 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
NATAL II MC 230 kV TR 230/69 kV NATAL II TR4 RN RBF FT TR 230/69 kV NATAL II TR4 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$476,693.95
NATAL II MC 230 kV TR 230/69 kV NATAL II TR3 RN RBF FT TR 230/69 kV NATAL II TR3 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
NATAL II MC 230 kV TR 230/69 kV NATAL II TR2 RN RBF FT TR 230/69 kV NATAL II TR2 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
NATAL II MC 230 kV TR 230/69 kV NATAL II TR1 RN RBF FT TR 230/69 kV NATAL II TR1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
NATAL II MC 230 kV RTL 230 kV 9,9 MVAr NATAL II RT3 RN RB FT RTL 230 kV 9,9 MVAr NATAL II RT3 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$99,071.31
NATAL II MC 230 kV RTL 230 kV 9,9 MVAr NATAL II RT3 RN RB FT RTL 230 kV 9,9 MVAr NATAL II RT3 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$292,353.58
NATAL II MC 230 kV RTL 230 kV 9,9 MVAr NATAL II RT2 RN RB FT RTL 230 kV 9,9 MVAr NATAL II RT2 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$99,071.31
NATAL II MC 230 kV RTL 230 kV 9,9 MVAr NATAL II RT2 RN RB FT RTL 230 kV 9,9 MVAr NATAL II RT2 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$292,353.58
NATAL II MC 230 kV RTB 230 kV 30 MVAr NATAL II RT1 RN  RB FT RTB 230 kV 30 MVAr NATAL II RT1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$151,491.77
NATAL II IB 69 kV MG 230 kV NATAL II MG1 RN IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
NATAL II IB 230 kV MG 230 kV NATAL II MG1 RN IB1 RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,929.18
NATAL II IB 230 kV MG 230 kV NATAL II MG1 RN IB1 RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$368,658.63
NATAL II IB 230 kV MG 230 kV NATAL II MG1 RN IB1 RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$377,273.99
NATAL II EL 69 kV NATAL IIRIBEIRA-02J3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
NATAL II EL 69 kV NATAL IIRIBEIRA-02J3 DIT   061/2001 IPCA RCDM REA 2040/2009 18/12/2013 17/12/2044  R$86,450.94
NATAL II EL 69 kV NATAL IIPARNAMIRIM-02J8 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
NATAL II EL 69 kV NATAL IIPARNAMIRIM-02J8 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
NATAL II EL 69 kV NATAL IIPARNAMIRIM-02J6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
NATAL II EL 69 kV NATAL IIPARNAMIRIM-02J6 DIT   061/2001 IPCA RCDM REA 2040/2009 21/03/2014 20/03/2045  R$87,079.15
NATAL II EL 69 kV NATAL IINEOPOLIS-02J9 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
NATAL II EL 69 kV NATAL IINEOPOLIS-02J9 DIT   061/2001 IPCA RCDM REA 2040/2009 21/03/2014 20/03/2045  R$87,079.15
NATAL II EL 69 kV NATAL IINEOPOLIS-02J9 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
NATAL II EL 69 kV NATAL IINEOPOLIS-02J9 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
NATAL II EL 69 kV NATAL IINATAL I-02J1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
NATAL II EL 69 kV NATAL IIIGAPO-02J7 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
NATAL II EL 69 kV NATAL IIIGAPO-02J5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
NATAL II EL 69 kV NATAL IIIGAPO-02J5 DIT   061/2001 IPCA RCDM REA 2040/2009 11/02/2014 10/02/2045  R$86,822.46
NATAL II EL 69 kV NATAL IIIGAPO-02J5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
NATAL II EL 69 kV NATAL IIIGAPO-02J5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
NATAL II EL 69 kV NATAL IIIGAPO-02J4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
NATAL II EL 69 kV NATAL IIIGAPO-02J4 DIT   061/2001 IPCA RCDM REA 2040/2009 27/01/2014 26/01/2045  R$86,721.12
NATAL II EL 69 kV NATAL IICENTRO-12J2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
NATAL II EL 69 kV NATAL IICENTRO-12J2 DIT   061/2001 IPCA RCDM REA 2040/2009 21/03/2014 20/03/2045  R$87,079.15
NATAL II EL 230 kV NATAL II LT 230 kV PARAISO /NATAL II C-2 RN  RB FT LT 230 kV PARAISO /NATAL II C-2 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
NATAL II EL 230 kV NATAL II LT 230 kV PARAISO /NATAL II C-2 RN  RB FT LT 230 kV PARAISO /NATAL II C-2 RN 061/2001 IPCA RMEL REN 443/2011 25/06/2017 24/06/2048  R$52,398.93
NATAL II EL 230 kV NATAL II LT 230 kV PARAISO /NATAL II C-1 RN RB FT LT 230 kV PARAISO /NATAL II C-1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
NATAL II EL 230 kV NATAL II LT 230 kV NATAL III /NATAL II C-2 RN  RB FT LT 230 kV NATAL III /NATAL II C-2 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
NATAL II EL 230 kV NATAL II LT 230 kV NATAL III /NATAL II C-1 RN  RB FT LT 230 kV NATAL III /NATAL II C-1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
NATAL II EL 230 kV NATAL II LT 230 kV NATAL III /NATAL II C-1 RN  RB FT LT 230 kV NATAL III /NATAL II C-1 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
NATAL II EL 230 kV NATAL II LT 230 kV NATAL III /NATAL II C-1 RN  RB FT LT 230 kV NATAL III /NATAL II C-1 RN 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$692,788.80
NATAL II EL 13,8 kV NATAL IIAUXIL1 RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
NATAL II CE 20/-0 Mvar NATAL II CE2 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$573,454.18
NATAL II CE 20/-0 Mvar NATAL II CE2 RN DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,692,229.36
NATAL II CE 20/-0 Mvar NATAL II CE2 RN DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 1,731,775.91
NATAL II CE 20/-0 Mvar NATAL II CE1 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$573,454.18
NATAL II CE 20/-0 Mvar NATAL II CE1 RN DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,692,229.36
NATAL II CE 20/-0 Mvar NATAL II CE1 RN DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 1,731,775.91
NATAL II BC 69 kV 21,3 Mvar NATAL II BC4 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$120,218.00
NATAL II BC 69 kV 21,3 Mvar NATAL II BC4 RN DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$354,756.22
NATAL II BC 69 kV 21,3 Mvar NATAL II BC3 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$120,218.00
NATAL II BC 69 kV 21,3 Mvar NATAL II BC2 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$120,218.00
NATAL II BC 69 kV 21,3 Mvar NATAL II BC1 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$120,218.00
NATAL III TT 69/0 kV NATAL III TT1 RN DIT   017/2009 IPCA RPEC CC 017/2009 03/08/2009 03/08/2039  R$76,571.19
NATAL III TR 230/69 kV NATAL III TR3 RN RBF FT TR 230/69 kV NATAL III TR3 RN 017/2009 IPCA RBNI REA 2823/2011 21/03/2018 21/03/2058  R$ 1,156,084.85
NATAL III TR 230/69 kV NATAL III TR2 RN RBF FT TR 230/69 kV NATAL III TR2 RN 017/2009 IPCA RBL CC 017/2009 03/08/2009 03/08/2039  R$ 2,270,093.20
NATAL III TR 230/69 kV NATAL III TR1 RN RBF FT TR 230/69 kV NATAL III TR1 RN 017/2009 IPCA RBL CC 017/2009 03/08/2009 03/08/2039  R$ 2,270,093.20
NATAL III MG 230 kV NATAL III MG2 RN RB FT MG 230 kV NATAL III MG2 RN 061/2001 IPCA RBNI DSP 1073/2022 01/07/2022 30/06/2053  R$80,513.45
NATAL III MG 230 kV NATAL III MG1 RN RB FT MG 230 kV NATAL III MG1 RN 017/2009 IPCA RBL CC 017/2009 03/08/2009 03/08/2039  R$ 1,467,872.93
NATAL III MG 230 kV NATAL III MG1 RN RB FT MG 230 kV NATAL III MG1 RN 017/2009 IPCA RBNI REA 2823/2011 21/03/2018 21/03/2052  R$144,808.21
NATAL III MG 230 kV NATAL III MG1 RN RB FT MG 230 kV NATAL III MG1 RN 017/2009 IPCA RMEL REN 643/2014 07/02/2014 06/02/2048  R$7,698.98
NATAL III MG 230 kV NATAL III MG1 RN RB FT MG 230 kV NATAL III MG1 RN 017/2009 IPCA RMEL REN 643/2014 28/02/2015 27/02/2030  R$65,912.29
NATAL III MG 230 kV NATAL III MG1 RN RB FT MG 230 kV NATAL III MG1 RN 017/2009 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033  R$30,655.69
NATAL III MC 69 kV TT 69/0 kV NATAL III TT1 RN DIT   017/2009 IPCA RPEC CC 017/2009 03/08/2009 03/08/2039  R$87,827.90
NATAL III MC 69 kV TR 230/69 kV NATAL III TR3 RN RBF FT TR 230/69 kV NATAL III TR3 RN 017/2009 IPCA RBNI REA 2823/2011 21/03/2018 21/03/2052  R$350,553.41
NATAL III MC 69 kV TR 230/69 kV NATAL III TR2 RN RBF FT TR 230/69 kV NATAL III TR2 RN 017/2009 IPCA RBL CC 017/2009 03/08/2009 03/08/2039  R$217,060.80
NATAL III MC 69 kV TR 230/69 kV NATAL III TR1 RN RBF FT TR 230/69 kV NATAL III TR1 RN 017/2009 IPCA RBL CC 017/2009 03/08/2009 03/08/2039  R$217,060.80
NATAL III MC 230 kV TR 230/69 kV NATAL III TR3 RN RBF FT TR 230/69 kV NATAL III TR3 RN 017/2009 IPCA RBNI REA 2823/2011 21/03/2018 21/03/2052  R$814,904.04
NATAL III MC 230 kV TR 230/69 kV NATAL III TR2 RN RBF FT TR 230/69 kV NATAL III TR2 RN 017/2009 IPCA RBL CC 017/2009 03/08/2009 03/08/2039  R$600,929.44
NATAL III MC 230 kV TR 230/69 kV NATAL III TR1 RN RBF FT TR 230/69 kV NATAL III TR1 RN 017/2009 IPCA RBL CC 017/2009 03/08/2009 03/08/2039  R$600,929.44
NATAL III IB 69 kV MG 230 kV NATAL III MG1 RN IB1 DIT   017/2009 IPCA RPEC CC 017/2009 03/08/2009 03/08/2039  R$116,128.34
NATAL III IB 230 kV MG 230 kV NATAL III MG1 RN IB1 RB FT MG 230 kV NATAL III MG1 RN 017/2009 IPCA RBL CC 017/2009 03/08/2009 03/08/2039  R$487,712.28
NATAL III EL 69 kV NATAL IIIDIST4 DIT   017/2009 IPCA RPEC CC 017/2009 03/08/2009 03/08/2039  R$174,900.19
NATAL III EL 69 kV NATAL IIIDIST3 DIT   017/2009 IPCA RPEC CC 017/2009 03/08/2009 03/08/2039  R$174,900.19
NATAL III EL 69 kV NATAL IIIDIST2 DIT   017/2009 IPCA RPEC CC 017/2009 03/08/2009 03/08/2039  R$174,900.19
NATAL III EL 69 kV NATAL IIIDIST1 DIT   017/2009 IPCA RPEC CC 017/2009 03/08/2009 03/08/2039  R$174,900.19
NATAL III EL 230 kV NATAL III LT 230 kV NATAL III /NATAL II C-2 RN RB FT LT 230 kV NATAL III /NATAL II C-2 RN 061/2001 IPCA RBNI DSP 1073/2022 01/07/2022 30/06/2051  R$203,728.71
NATAL III EL 230 kV NATAL III LT 230 kV NATAL III /NATAL II C-1 RN RB FT LT 230 kV NATAL III /NATAL II C-1 RN 061/2001 IPCA RBNI DSP 1073/2022 01/07/2022 30/06/2051  R$203,728.71
NATAL III EL 230 kV NATAL III LT 230 kV EXTREMOZ II /NATAL III C-2 RN  RB FT LT 230 kV EXTREMOZ II /NATAL III C-2 RN 061/2001 IPCA RBNI REA 3208/2011 06/01/2020 06/01/2049  R$ 675.66
NATAL III EL 230 kV NATAL III LT 230 kV EXTREMOZ II /NATAL III C-2 RN  RB FT LT 230 kV EXTREMOZ II /NATAL III C-2 RN 061/2001 IPCA RBNI DSP 1073/2022 01/07/2022 30/06/2051  R$203,728.71
NATAL III EL 230 kV NATAL III LT 230 kV EXTREMOZ II /NATAL III C-1 RN  RB FT LT 230 kV EXTREMOZ II /NATAL III C-1 RN 061/2001 IPCA RBNI DSP 1073/2022 01/07/2022 30/06/2051  R$203,728.71
OLINDINA TR 230/13,8 kV OLINDINA TR1 BA RBF FT TR 230/13,8 kV OLINDINA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,764.01
OLINDINA RTN 69 kV 0 Mvar OLINDINA RTN2 BA RB FT LT 500 kV P. AFONSO IV /OLINDINA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$14,881.75
OLINDINA RTN 69 kV 0 Mvar OLINDINA RTN1 BA RB FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$14,881.75
OLINDINA RTL 500 kV 50 Mvar OLINDINA RTR1 BA RB FT RTL 500 kV 50 Mvar OLINDINA RTR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$278,222.74
OLINDINA RTL 500 kV 50 Mvar OLINDINA RTR1 BA RB FT RTL 500 kV 50 Mvar OLINDINA RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$821,018.86
OLINDINA RTL 500 kV 150 MVAr OLINDINA RT2 BA RB FT LT 500 kV P. AFONSO IV /OLINDINA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$834,668.23
OLINDINA RTL 500 kV 150 MVAr OLINDINA RT2 BA RB FT LT 500 kV P. AFONSO IV /OLINDINA C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,463,056.59
OLINDINA RTL 500 kV 150 MVAr OLINDINA RT1 BA RB FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$834,668.23
OLINDINA RTL 500 kV 150 MVAr OLINDINA RT1 BA RB FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,463,056.59
OLINDINA RTL 500 kV 150 MVAr OLINDINA RT1 BA RB FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,520,616.98
OLINDINA MG 500 kV OLINDINA MG1 BA RB FT MG 500 kV OLINDINA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,450,833.82
OLINDINA MG 500 kV OLINDINA MG1 BA RB FT MG 500 kV OLINDINA MG1 BA 061/2001 IPCA RMEL REN 643/2014 11/07/2013 10/07/2030  R$26,102.06
OLINDINA MG 500 kV OLINDINA MG1 BA RB FT MG 500 kV OLINDINA MG1 BA 061/2001 IPCA RMEL REN 643/2014 13/09/2013 12/09/2030  R$28,498.04
OLINDINA MG 500 kV OLINDINA MG1 BA RB FT MG 500 kV OLINDINA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,281,324.81
OLINDINA MG 500 kV OLINDINA MG1 BA RB FT MG 500 kV OLINDINA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,381,377.21
OLINDINA MC 69 kV RTN 69 kV 0 Mvar OLINDINA RTN2 BA  RB FT LT 500 kV P. AFONSO IV /OLINDINA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$10,108.69
OLINDINA MC 69 kV RTN 69 kV 0 Mvar OLINDINA RTN1 BA  RB FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$10,108.69
OLINDINA MC 500 kV RTL 500 kV 150 MVAr OLINDINA RT2 BA  RB FT LT 500 kV P. AFONSO IV /OLINDINA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$270,833.72
OLINDINA MC 500 kV RTL 500 kV 150 MVAr OLINDINA RT1 BA  RB FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$270,833.72
OLINDINA MC 230 kV TR 230/13,8 kV OLINDINA TR1 BA  RBF FT TR 230/13,8 kV OLINDINA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$148,792.99
OLINDINA MC 13,8 kV TR 13,8/0,46 kV OLINDINA TR3 BA  RB FT MG 500 kV OLINDINA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
OLINDINA MC 13,8 kV TR 13,8/0,46 kV OLINDINA TR2 BA RB FT MG 500 kV OLINDINA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
OLINDINA IB 500 kV MG 500 kV OLINDINA MG1 BA IB3 RB FT MG 500 kV OLINDINA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
OLINDINA IB 500 kV MG 500 kV OLINDINA MG1 BA IB2 RB FT MG 500 kV OLINDINA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
OLINDINA IB 500 kV MG 500 kV OLINDINA MG1 BA IB1 RB FT MG 500 kV OLINDINA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
OLINDINA IB 500 kV MG 500 kV OLINDINA MG1 BA IB1 RB FT MG 500 kV OLINDINA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,399,926.89
OLINDINA EL 500 kV OLINDINA LT 500 kV P. AFONSO IV /OLINDINA C-1 BA RB FT LT 500 kV P. AFONSO IV /OLINDINA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
OLINDINA EL 500 kV OLINDINA LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
OLINDINA EL 500 kV OLINDINA LT 500 kV OLINDINA /CAMACARI II C-2 BA RB FT LT 500 kV OLINDINA /CAMACARI II C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
OLINDINA EL 500 kV OLINDINA LT 500 kV OLINDINA /CAMACARI II C-2 BA RB FT LT 500 kV OLINDINA /CAMACARI II C-2 BA 061/2001 IPCA RMEL REN 643/2014 02/02/2014 01/02/2044  R$20,003.83
OLINDINA EL 500 kV OLINDINA LT 500 kV OLINDINA /CAMACARI II C-1 BA RB FT LT 500 kV OLINDINA /CAMACARI II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
OLINDINA EL 230 kV OLINDINA LT 230 kV OLINDINA /RL (CIC. DANTAS / CATU) C-2 BA  RB FT LT 230 kV OLINDINA /LT CIC. DANTAS/CATU C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$221,285.77
OLINDINA EL 230 kV OLINDINA LT 230 kV OLINDINA /RL (CIC. DANTAS / CATU) C-1 BA  RB FT LT 230 kV OLINDINA /LT CIC. DANTAS/CATU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$221,285.77
OLINDINA EL 13,8 kV OLINDINAN.SOURE-01Y1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
OLINDINA EL 13,8 kV OLINDINAN.SOURE-01Y1 DIT   061/2001 IPCA RMEL REN 443/2011 12/01/2016 11/01/2046  R$5,018.38
OUROLANDIA II EL 230 kV OUROLANDIA II LT 230 kV OUROLANDIA II /IRECE C-1 BA  RB FT LT 230 kV OUROLANDIA II /IRECE C-1 BA 061/2001 IPCA RBNI REA 9690/2021 04/06/2019 03/06/2047  R$153,279.46
OUROLANDIA II EL 230 kV OUROLANDIA II LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA  RB FT LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA 061/2001 IPCA RBNI REA 9690/2021 04/06/2019 03/06/2047  R$153,279.46
P. AFONSO IV TR 500/230 kV P. AFONSO IV TRR1 BA RB FT TR 500/230 kV P. AFONSO IV TRR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$671,320.56
P. AFONSO IV TR 500/230 kV P. AFONSO IV TRR1 BA RB FT TR 500/230 kV P. AFONSO IV TRR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,981,027.26
P. AFONSO IV TR500/230kV P. AFONSO IV TR8 BA RB FT TR500/230kV P. AFONSO IV TR8 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,013,961.67
P. AFONSO IV TR500/230kV P. AFONSO IV TR8 BA RB FT TR500/230kV P. AFONSO IV TR8 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,943,081.78
P. AFONSO IV TR500/230kV P. AFONSO IV TR7 BA RB FT TR500/230kV P. AFONSO IV TR7 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,013,961.67
P. AFONSO IV TR500/230kV P. AFONSO IV TR7 BA RB FT TR500/230kV P. AFONSO IV TR7 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,943,081.78
P. AFONSO IV MG 500 kV P. AFONSO IV MG1 BA RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,704,179.79
P. AFONSO IV MG 500 kV P. AFONSO IV MG1 BA RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RMEL REN 443/2011 20/10/2016 19/10/2033  R$32,956.90
P. AFONSO IV MG 500 kV P. AFONSO IV MG1 BA RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBNI REA 6137/2016 27/05/2019 27/05/2051  R$204,818.12
P. AFONSO IV MC 500 kV TR500/230kV P. AFONSO IV TR8 BA RB FT TR500/230kV P. AFONSO IV TR8 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
P. AFONSO IV MC 500 kV TR500/230kV P. AFONSO IV TR8 BA RB FT TR500/230kV P. AFONSO IV TR8 BA 061/2001 IPCA RBNI REA 6137/2016 27/05/2019 27/05/2041  R$538,531.48
P. AFONSO IV MC 500 kV TR500/230kV P. AFONSO IV TR7 BA RB FT TR500/230kV P. AFONSO IV TR7 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
P. AFONSO IV MC 230 kV TR500/230kV P. AFONSO IV TR8 BA MC2 RB FT TR500/230kV P. AFONSO IV TR8 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
P. AFONSO IV MC 230 kV TR500/230kV P. AFONSO IV TR8 BA MC2 RB FT TR500/230kV P. AFONSO IV TR8 BA 061/2001 IPCA RBNI REA 2040/2009 25/01/2016 24/01/2046  R$104,558.83
P. AFONSO IV MC 230 kV TR500/230kV P. AFONSO IV TR8 BA MC2 RB FT TR500/230kV P. AFONSO IV TR8 BA 061/2001 IPCA RBNI REA 6137/2016 05/06/2019 05/06/2046  R$76,028.50
P. AFONSO IV MC 230 kV TR500/230kV P. AFONSO IV TR8 BA MC1 RB FT TR500/230kV P. AFONSO IV TR8 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
P. AFONSO IV MC 230 kV TR500/230kV P. AFONSO IV TR8 BA MC1 RB FT TR500/230kV P. AFONSO IV TR8 BA 061/2001 IPCA RBNI REA 2040/2009 25/01/2016 24/01/2046  R$95,938.28
P. AFONSO IV MC 230 kV TR500/230kV P. AFONSO IV TR7 BA MC2 RB FT TR500/230kV P. AFONSO IV TR7 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
P. AFONSO IV MC 230 kV TR500/230kV P. AFONSO IV TR7 BA MC2 RB FT TR500/230kV P. AFONSO IV TR7 BA 061/2001 IPCA RBNI REA 2040/2009 25/01/2016 24/01/2046  R$95,938.28
P. AFONSO IV MC 230 kV TR500/230kV P. AFONSO IV TR7 BA MC1 RB FT TR500/230kV P. AFONSO IV TR7 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
P. AFONSO IV MC 230 kV TR500/230kV P. AFONSO IV TR7 BA MC1 RB FT TR500/230kV P. AFONSO IV TR7 BA 061/2001 IPCA RBNI REA 2040/2009 30/04/2015 29/04/2045  R$102,403.50
P. AFONSO IV MC 230 kV TR500/230kV P. AFONSO IV TR7 BA MC1 RB FT TR500/230kV P. AFONSO IV TR7 BA 061/2001 IPCA RBNI REA 6137/2016 28/11/2019 28/11/2046  R$76,028.50
P. AFONSO IV MC 13,8 kV TR 18/13,8 kV P. AFONSO IV TR2 BA RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
P. AFONSO IV MC 13,8 kV TR 18/13,8 kV P. AFONSO IV TR1 BA RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
P. AFONSO IV IB 500 kV MG 500 kV P. AFONSO IV MG1 BA IB7 RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
P. AFONSO IV IB 500 kV MG 500 kV P. AFONSO IV MG1 BA IB7 RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RMEL REN 643/2014 15/02/2013 14/02/2043  R$16,890.03
P. AFONSO IV IB 500 kV MG 500 kV P. AFONSO IV MG1 BA IB6 RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
P. AFONSO IV IB 500 kV MG 500 kV P. AFONSO IV MG1 BA IB5 RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
P. AFONSO IV IB 500 kV MG 500 kV P. AFONSO IV MG1 BA IB5 RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RMEL REN 643/2014 03/11/2013 02/11/2043  R$17,256.65
P. AFONSO IV IB 500 kV MG 500 kV P. AFONSO IV MG1 BA IB4 RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
P. AFONSO IV IB 500 kV MG 500 kV P. AFONSO IV MG1 BA IB3 RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
P. AFONSO IV IB 500 kV MG 500 kV P. AFONSO IV MG1 BA IB3 RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,399,926.89
P. AFONSO IV IB 500 kV MG 500 kV P. AFONSO IV MG1 BA IB2 RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
P. AFONSO IV IB 500 kV MG 500 kV P. AFONSO IV MG1 BA IB2 RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RMEL REN 643/2014 07/02/2013 06/02/2043  R$16,878.80
P. AFONSO IV IB 500 kV MG 500 kV P. AFONSO IV MG1 BA IB1 RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBNI REA 5745/2016 13/03/2019 13/03/2050  R$ 1,420,825.86
P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL  RB FT LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL  RB FT LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL 061/2001 IPCA RBNI REA 5861/2016 06/09/2015 05/09/2043  R$27,667.74
P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL  RB FT LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL 061/2001 IPCA RBNI REA 5861/2016 06/09/2015 05/09/2030  R$104,364.40
P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-6 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-6 BA DIT   061/2001 IPCA RCDM REA 5861/2016 06/09/2015 05/09/2043  R$27,667.74
P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-6 BA DIT   061/2001 IPCA RCDM REA 5861/2016 06/09/2015 05/09/2030  R$104,364.40
P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-5 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-5 BA DIT   061/2001 IPCA RCDM REA 5861/2016 06/09/2015 05/09/2043  R$27,667.74
P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-5 BA DIT   061/2001 IPCA RCDM REA 5861/2016 06/09/2015 05/09/2030  R$104,364.40
P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-4 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-4 BA DIT   061/2001 IPCA RCDM REA 5861/2016 06/09/2015 05/09/2043  R$27,667.74
P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-4 BA DIT   061/2001 IPCA RCDM REA 5861/2016 06/09/2015 05/09/2030  R$104,364.40
P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-3 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-3 BA DIT   061/2001 IPCA RCDM REA 5861/2016 06/09/2015 05/09/2043  R$27,667.74
P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-3 BA DIT   061/2001 IPCA RCDM REA 5861/2016 06/09/2015 05/09/2030  R$104,364.40
P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-2 BA DIT   061/2001 IPCA RCDM REA 5861/2016 06/09/2015 05/09/2043  R$27,667.74
P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-2 BA DIT   061/2001 IPCA RCDM REA 5861/2016 06/09/2015 05/09/2030  R$104,364.40
P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-1 BA DIT   061/2001 IPCA RCDM REA 5861/2016 06/09/2015 05/09/2043  R$27,667.74
P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-1 BA DIT   061/2001 IPCA RCDM REA 5861/2016 06/09/2015 05/09/2030  R$104,364.40
P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBNI REA 5745/2016 10/01/2020 10/01/2049  R$ 1,383,197.45
P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /OLINDINA C-1 BA RB FT LT 500 kV P. AFONSO IV /OLINDINA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
P.AFONSO III MG 230 kV P.AFONSO III MG1 AL RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$867,592.52
P.AFONSO III MG 230 kV P.AFONSO III MG1 AL RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RMEL REN 643/2014 17/07/2013 16/07/2030  R$26,689.17
P.AFONSO III MG 230 kV P.AFONSO III MG1 AL RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RMEL REN 643/2014 17/11/2015 16/11/2032  R$35,689.93
P.AFONSO III MG 230 kV P.AFONSO III MG1 AL RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,560,214.23
P.AFONSO III MG 230 kV P.AFONSO III MG1 AL RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,620,045.15
P.AFONSO III MG 230 kV P.AFONSO III MG1 AL RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RMEL REN 443/2011 20/09/2016 19/09/2033  R$33,549.45
P.AFONSO III MG 230 kV P.AFONSO III MG1 AL RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBNI REA 6137/2016 28/11/2019 28/11/2051  R$207,879.81
P.AFONSO III MG 230 kV P.AFONSO III MG1 AL RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBNI REA 7761/2019 02/05/2019 01/05/2049  R$149,553.72
P.AFONSO III IB 230 kV MG 230 kV P.AFONSO III MG1 AL IB2 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
P.AFONSO III IB 230 kV MG 230 kV P.AFONSO III MG1 AL IB2 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBNI REA 2837/2011 09/02/2015 08/02/2045  R$43,855.76
P.AFONSO III IB 230 kV MG 230 kV P.AFONSO III MG1 AL IB2 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$423,550.65
P.AFONSO III IB 230 kV MG 230 kV P.AFONSO III MG1 AL IB2 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$433,448.81
P.AFONSO III IB 230 kV MG 230 kV P.AFONSO III MG1 AL IB1 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
P.AFONSO III IB 230 kV MG 230 kV P.AFONSO III MG1 AL IB1 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBNI REA 2837/2011 23/12/2014 22/12/2044  R$43,690.62
P.AFONSO III IB 230 kV MG 230 kV P.AFONSO III MG1 AL IB1 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$423,550.65
P.AFONSO III IB 230 kV MG 230 kV P.AFONSO III MG1 AL IB1 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$433,448.81
P.AFONSO III IB 230 kV MG 230 kV P.AFONSO III MG1 AL BARRA3 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBNI REA 6137/2016 28/11/2019 28/11/2049  R$ 1,000,841.19
P.AFONSO III IB 230 kV MG 230 kV P.AFONSO III MG1 AL BARRA2 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBNI REA 6137/2016 28/11/2019 28/11/2049  R$ 1,000,841.19
P.AFONSO III IB 230 kV MG 230 kV P.AFONSO III MG1 AL BARRA1 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBNI REA 6137/2016 28/11/2019 28/11/2049  R$ 1,000,841.19
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV U. A. SALES /P.AFONSO III C-2 BA/AL DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV U. A. SALES /P.AFONSO III C-2 BA/AL DIT   061/2001 IPCA RMEL REN 643/2014 17/01/2015 16/01/2043  R$41,252.17
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV U. A. SALES /P.AFONSO III C-2 BA/AL DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV U. A. SALES /P.AFONSO III C-1 BA/AL DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV U. A. SALES /P.AFONSO III C-1 BA/AL DIT   061/2001 IPCA RMEL REN 643/2014 29/09/2013 28/09/2041  R$77,004.83
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV U. A. SALES /P.AFONSO III C-1 BA/AL DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV U. A. SALES /P.AFONSO III C-1 BA/AL DIT   061/2001 IPCA RCDM REA 4347/2013 22/09/2020 21/09/2053  R$166,378.58
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV U. A. SALES /P.AFONSO III C-1 BA/AL DIT   061/2001 IPCA RCDM REA 4347/2013 31/12/2019 30/12/2049  R$50,285.85
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /ZEBU C-2 AL  RB FT LT 230 kV P.AFONSO III /ZEBU C-2 AL/BA 017/2009 IPCA RBL CC 017/2009 03/08/2009 03/08/2039  R$644,614.73
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /ZEBU C-1 AL  RB FT LT 230 kV P.AFONSO III /ZEBU C-1 AL 017/2009 IPCA RBL CC 017/2009 03/08/2009 03/08/2039  R$644,614.73
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-4 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-4 AL/BA DIT   061/2001 IPCA RCDM REA 6137/2016 03/01/2020 03/01/2046  R$76,028.50
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-3 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-3 AL/BA DIT   061/2001 IPCA RCDM REA 6137/2016 03/01/2020 03/01/2046  R$76,028.50
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-2 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-2 AL/BA DIT   061/2001 IPCA RCDM REA 6137/2016 03/01/2020 03/01/2046  R$76,028.50
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-1 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-1 AL/BA DIT   061/2001 IPCA RCDM REA 6137/2016 03/01/2020 03/01/2046  R$76,028.50
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-II C-5 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-II C-5 AL/BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-II C-5 AL/BA DIT   061/2001 IPCA RCDM REA 6137/2016 03/01/2020 03/01/2046  R$76,028.50
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-II C-4 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-II C-4 AL/BA DIT   061/2001 IPCA RCDM REA 6137/2016 03/01/2020 03/01/2046  R$76,028.50
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE RB FT LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE RB FT LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE 061/2001 IPCA RBNI REA 6137/2016 03/01/2020 03/01/2046  R$76,028.50
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /SANTANA II C-1 AL  RB FT LT 230 kV P.AFONSO III /SANTANA II C-1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /SANTANA II C-1 AL  RB FT LT 230 kV P.AFONSO III /SANTANA II C-1 AL 061/2001 IPCA RMEL REN 443/2011 11/09/2015 10/09/2045  R$14,239.86
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE 061/2001 IPCA RBNI REA 2823/2011 03/07/2020 03/07/2050  R$578,154.37
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE 061/2001 IPCA RBNI REA 4347/2013 16/03/2015 15/03/2045  R$37,452.42
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE 061/2001 IPCA RMEL REN 443/2011 06/09/2017 05/09/2047  R$47,157.04
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE 061/2001 IPCA RBNI REA 2823/2011 03/07/2020 03/07/2050  R$578,154.37
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE 061/2001 IPCA RBNI REA 6137/2016 25/11/2019 25/11/2046  R$76,028.50
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /GARANHUNS II C-3 AL/PE  RB FT LT 230 kV P.AFONSO III /GARANHUNS II C-3 AL/PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /GARANHUNS II C-2 AL/PE  RB FT LT 230 kV P.AFONSO III /GARANHUNS II C-2 AL/PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /GARANHUNS II C-1 AL/PE  RB FT LT 230 kV P.AFONSO III /GARANHUNS II C-1 AL/PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /GARANHUNS II C-1 AL/PE  RB FT LT 230 kV P.AFONSO III /GARANHUNS II C-1 AL/PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE  RB FT LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE  RB FT LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE 061/2001 IPCA RMEL REN 443/2011 25/01/2013 24/01/2043  R$14,979.35
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE  RB FT LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE 061/2001 IPCA RMEL REN 443/2011 25/01/2013 24/01/2043  R$14,979.35
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE  RB FT LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE 061/2001 IPCA RMEL REN 443/2011 25/01/2013 24/01/2043  R$14,979.35
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA 061/2001 IPCA RBNI REA 2837/2011 22/12/2014 21/12/2044  R$43,687.19
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA 061/2001 IPCA RMEL REN 643/2014 25/03/2015 24/03/2043  R$41,483.45
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA 061/2001 IPCA RBNI REA 2376/2010 23/02/2015 22/02/2045  R$43,903.93
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA 061/2001 IPCA RMEL REN 643/2014 22/02/2015 21/02/2043  R$41,376.45
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE RB FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE RB FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE 061/2001 IPCA RBNI REA 4347/2013 14/04/2015 13/04/2045  R$18,768.70
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE RB FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE 061/2001 IPCA RBNI REA 4347/2013 14/04/2015 13/04/2045  R$18,768.70
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE RB FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE RB FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE 061/2001 IPCA RBNI REA 6137/2016 03/01/2020 03/01/2046  R$76,028.50
P.AFONSO III EL 13,8 kV P.AFONSO IIIAUXIL2 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
P.AFONSO III EL 13,8 kV P.AFONSO IIIAUXIL1 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
PARAISO TR 230/138 kV PARAISO TR2 RN RBF FT TR 230/138 kV PARAISO TR2 RN 061/2001 IPCA RBNI REA 3402/2012 05/12/2014 04/12/2048  R$ 1,495,436.29
PARAISO TR 230/138 kV PARAISO TR1 RN RBF FT TR 230/138 kV PARAISO TR1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$399,926.80
PARAISO MG 230 kV PARAISO MG1 RN RB FT MG 230 kV PARAISO MG1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$536,820.88
PARAISO MG 230 kV PARAISO MG1 RN RB FT MG 230 kV PARAISO MG1 RN 061/2001 IPCA RMEL REN 643/2014 23/10/2015 22/10/2032  R$33,290.73
PARAISO MG 230 kV PARAISO MG1 RN RB FT MG 230 kV PARAISO MG1 RN 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2031  R$8,753.87
PARAISO MG 230 kV PARAISO MG1 RN RB FT MG 230 kV PARAISO MG1 RN 061/2001 IPCA RMEL REN 443/2011 28/09/2016 27/09/2033  R$34,123.26
PARAISO MC 230 kV TR 230/138 kV PARAISO TR2 RN RBF FT TR 230/138 kV PARAISO TR2 RN 061/2001 IPCA RBNI REA 3402/2012 05/12/2014 04/12/2044  R$ 1,197,924.28
PARAISO MC 230 kV TR 230/138 kV PARAISO TR1 RN RBF FT TR 230/138 kV PARAISO TR1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,757.03
PARAISO MC 138 kV TR 230/138 kV PARAISO TR2 RN RBF FT TR 230/138 kV PARAISO TR2 RN 061/2001 IPCA RBNI REA 3402/2012 05/12/2014 04/12/2044  R$926,237.87
PARAISO MC 138 kV TR 230/138 kV PARAISO TR1 RN RBF FT TR 230/138 kV PARAISO TR1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$121,202.15
PARAISO IB 230 kV MG 230 kV PARAISO MG1 RN IB1 RB FT MG 230 kV PARAISO MG1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
PARAISO IB 138 kV MG 230 kV PARAISO MG1 RN IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$93,640.20
PARAISO EL 230 kV PARAISO LT 230 kV PARAISO /NATAL II C-2 RN  RB FT LT 230 kV PARAISO /NATAL II C-2 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
PARAISO EL 230 kV PARAISO LT 230 kV PARAISO /NATAL II C-1 RN  RB FT LT 230 kV PARAISO /NATAL II C-1 RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
PARAISO EL 230 kV PARAISO LT 230 kV PARAISO /LAGOA NOVA II C-1 RN RB FT LT 230 kV PARAISO /LAGOA NOVA II C-1 RN 010/2011 IPCA RBL CC 010/2011 13/10/2011 13/10/2041  R$563,793.73
PARAISO EL 230 kV PARAISO LT 230 kV PARAISO /ACU II C-2 RN RB FT LT 230 kV PARAISO /ACU II C-2 RN 012/2007 IPCA RBL CC 012/2007 14/06/2007 14/06/2037  R$520,503.54
PARAISO EL 230 kV PARAISO LT 230 kV PARAISO /ACU II C-1395 RN RB FT LT 230 kV PARAISO /ACU II C-3 RN 019/2010 IPCA RBL CC 019/2010 23/11/2010 23/11/2040  R$361,775.51
PARAISO EL 230 kV PARAISO LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN  RB FT LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
PARAISO EL 230 kV PARAISO LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN  RB FT LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
PARAISO EL 138 kV PARAISO LT 138 kV PILOES /PARAISO C-1 PB/RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$180,723.85
PARAISO EL 138 kV PARAISO LT 138 kV PARAISO /SANTA CRUZ II C-1 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$180,723.85
PAU FERRO TT 69/0 kV PAU FERRO TA2 PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
PAU FERRO TT 69/0 kV PAU FERRO TA1 PE DIT   061/2001 IPCA RCDM REA 6108/2016 09/11/2018 09/11/2048  R$286,489.46
PAU FERRO TR 230/69 kV PAU FERRO TR3 PE RBF FT TR 230/69 kV PAU FERRO TR3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
PAU FERRO TR 230/69 kV PAU FERRO TR2 PE RBF FT TR 230/69 kV PAU FERRO TR2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
PAU FERRO TR 230/69 kV PAU FERRO TR1 PE RBF FT TR 230/69 kV PAU FERRO TR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
PAU FERRO TR 230/69 kV PAU FERRO TR04 PE RBF FT TR 230/69 kV PAU FERRO TR04 PE 061/2001 IPCA RBNI REA 6108/2016 09/11/2018 09/11/2052  R$ 1,285,040.48
PAU FERRO RTL 500 kV 33,33 Mvar PAU FERRO RTR1 PE RB FT RTL 500 kV 33,33 Mvar PAU FERRO RTR1 PE 061/2001 IPCA RBNI REA 10140/2021 28/03/2016 28/03/2052  R$76,503.48
PAU FERRO RTL 500 kV 100 Mvar PAU FERRO RT1 PE RB FT RTL 500 kV 100 Mvar PAU FERRO RT1 PE 061/2001 IPCA RBNI REA 10140/2021 28/03/2016 28/03/2052  R$229,510.45
PAU FERRO MG 230 kV PAU FERRO MG1 PE RB FT MG 230 kV PAU FERRO MG1 PE 061/2001 IPCA RBNI REA 3677/2012 28/06/2019 28/06/2052  R$118,102.83
PAU FERRO MG 230 kV PAU FERRO MG1 PE RB FT MG 230 kV PAU FERRO MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$610,300.30
PAU FERRO MG 230 kV PAU FERRO MG1 PE RB FT MG 230 kV PAU FERRO MG1 PE 061/2001 IPCA RBNI REA 1814/2009 23/10/2013 22/10/2041  R$57,050.91
PAU FERRO MG 230 kV PAU FERRO MG1 PE RB FT MG 230 kV PAU FERRO MG1 PE 061/2001 IPCA RBNI REA 1814/2009 23/10/2013 22/10/2041  R$57,050.91
PAU FERRO MG 230 kV PAU FERRO MG1 PE RB FT MG 230 kV PAU FERRO MG1 PE 061/2001 IPCA RBNI REA 6108/2016 09/11/2018 09/11/2050  R$62,513.66
PAU FERRO MG 230 kV PAU FERRO MG1 PE RB FT MG 230 kV PAU FERRO MG1 PE 061/2001 IPCA RBNI REA 6108/2016 09/11/2018 09/11/2049  R$16,535.46
PAU FERRO MG 230 kV PAU FERRO MG1 PE RB FT MG 230 kV PAU FERRO MG1 PE 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033  R$33,891.81
PAU FERRO MG 230 kV PAU FERRO MG1 PE RB FT MG 230 kV PAU FERRO MG1 PE 061/2001 IPCA RBNI REN 443/2011 08/11/2016 07/11/2044  R$205,050.60
PAU FERRO MG 230 kV PAU FERRO MG1 PE RB FT MG 230 kV PAU FERRO MG1 PE 061/2001 IPCA RMEL REN 443/2011 29/12/2016 28/12/2044  R$80,098.07
PAU FERRO MC 69 kV TT 69/0 kV PAU FERRO TA2 PE  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
PAU FERRO MC 69 kV TT 69/0 kV PAU FERRO TA1 PE  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
PAU FERRO MC 69 kV TR 230/69 kV PAU FERRO TR3 PE RBF FT TR 230/69 kV PAU FERRO TR3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
PAU FERRO MC 69 kV TR 230/69 kV PAU FERRO TR2 PE  RBF FT TR 230/69 kV PAU FERRO TR2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
PAU FERRO MC 69 kV TR 230/69 kV PAU FERRO TR1 PE  RBF FT TR 230/69 kV PAU FERRO TR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
PAU FERRO MC 69 kV TR 230/69 kV PAU FERRO TR1 PE  RBF FT TR 230/69 kV PAU FERRO TR1 PE 061/2001 IPCA RMEL REN 643/2014 06/04/2014 05/04/2044  R$13,335.11
PAU FERRO MC 69 kV TR 230/69 kV PAU FERRO TR04 PE RBF FT TR 230/69 kV PAU FERRO TR04 PE 061/2001 IPCA RBNI REA 6108/2016 09/11/2018 09/11/2041  R$266,017.64
PAU FERRO MC 500 kV RTL 500 kV 100 Mvar PAU FERRO RT1 PE  RB FT RTL 500 kV 100 Mvar PAU FERRO RT1 PE 061/2001 IPCA RBNI REA 10140/2021 28/03/2016 28/03/2042  R$82,673.47
PAU FERRO MC 230 kV TR 230/69 kV PAU FERRO TR3 PE RBF FT TR 230/69 kV PAU FERRO TR3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
PAU FERRO MC 230 kV TR 230/69 kV PAU FERRO TR2 PE  RBF FT TR 230/69 kV PAU FERRO TR2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
PAU FERRO MC 230 kV TR 230/69 kV PAU FERRO TR2 PE  RBF FT TR 230/69 kV PAU FERRO TR2 PE 061/2001 IPCA RMEL REN 443/2011 12/02/2017 11/02/2047  R$13,173.49
PAU FERRO MC 230 kV TR 230/69 kV PAU FERRO TR2 PE  RBF FT TR 230/69 kV PAU FERRO TR2 PE 061/2001 IPCA RMEL REN 443/2011 23/04/2017 22/04/2047  R$13,143.56
PAU FERRO MC 230 kV TR 230/69 kV PAU FERRO TR1 PE  RBF FT TR 230/69 kV PAU FERRO TR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
PAU FERRO MC 230 kV TR 230/69 kV PAU FERRO TR1 PE  RBF FT TR 230/69 kV PAU FERRO TR1 PE 061/2001 IPCA RMEL REN 443/2011 12/03/2017 11/03/2047  R$13,141.81
PAU FERRO MC 230 kV TR 230/69 kV PAU FERRO TR1 PE  RBF FT TR 230/69 kV PAU FERRO TR1 PE 061/2001 IPCA RMEL REN 443/2011 06/03/2017 05/03/2047  R$6,569.46
PAU FERRO MC 230 kV TR 230/69 kV PAU FERRO TR04 PE RBF FT TR 230/69 kV PAU FERRO TR04 PE 061/2001 IPCA RBNI REA 6108/2016 09/11/2018 09/11/2041  R$622,133.60
PAU FERRO IB 69 kV MG 230 kV PAU FERRO MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
PAU FERRO IB 230 kV MG 230 kV PAU FERRO MG1 PE IB1 RB FT MG 230 kV PAU FERRO MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,929.18
PAU FERRO EL 69 kV PAU FERROPAU FERRO-02N6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PAU FERRO EL 69 kV PAU FERROPAU FERRO-02N6 DIT   061/2001 IPCA RCDM REA 2376/2010 19/09/2014 18/09/2044  R$26,761.52
PAU FERRO EL 69 kV PAU FERROPAU FERRO-02N5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PAU FERRO EL 69 kV PAU FERROPAU FERRO-02N5 DIT   061/2001 IPCA RCDM REA 2376/2010 19/09/2014 18/09/2044  R$63,692.45
PAU FERRO EL 69 kV PAU FERROMONJOPE 02N4 DIT   061/2001 IPCA RCDM REA 1814/2009 23/10/2013 22/10/2043  R$466,640.04
PAU FERRO EL 69 kV PAU FERROMONJOPE 02N3 DIT   061/2001 IPCA RCDM REA 1814/2009 23/10/2013 22/10/2043  R$466,640.04
PAU FERRO EL 500 kV PAU FERRO LT 500 kV PAU FERRO /RECIFE II C-1 PE RB FT LT 500 kV PAU FERRO /RECIFE II C-1 PE 061/2001 IPCA RBNI REA 10140/2021 28/03/2016 28/03/2044  R$191,257.58
PAU FERRO EL 500 kV PAU FERRO LT 500 kV ANGELIM II /PAU FERRO C-1 PE RB FT LT 500 kV ANGELIM II /PAU FERRO C-1 PE 061/2001 IPCA RBNI REA 10140/2021 28/03/2016 28/03/2044  R$191,257.58
PAU FERRO EL 230 kV PAU FERRO LT 230 kV RECIFE II /PAU FERRO C-2 PE  RB FT LT 230 kV RECIFE II /PAU FERRO C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
PAU FERRO EL 230 kV PAU FERRO LT 230 kV RECIFE II /PAU FERRO C-2 PE  RB FT LT 230 kV RECIFE II /PAU FERRO C-2 PE 061/2001 IPCA RMEL REN 443/2011 08/03/2017 07/03/2047  R$1,774.95
PAU FERRO EL 230 kV PAU FERRO LT 230 kV RECIFE II /PAU FERRO C-2 PE  RB FT LT 230 kV RECIFE II /PAU FERRO C-2 PE 061/2001 IPCA RMEL REN 443/2011 06/03/2017 05/03/2047  R$6,586.84
PAU FERRO EL 230 kV PAU FERRO LT 230 kV RECIFE II /PAU FERRO C-1 PE  RB FT LT 230 kV RECIFE II /PAU FERRO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
PAU FERRO EL 230 kV PAU FERRO LT 230 kV RECIFE II /PAU FERRO C-1 PE  RB FT LT 230 kV RECIFE II /PAU FERRO C-1 PE 061/2001 IPCA RMEL REN 443/2011 15/03/2017 14/03/2047  R$6,582.92
PAU FERRO EL 230 kV PAU FERRO LT 230 kV PAU FERRO /SANTA RITA II C-1 PE/PB  RB FT LT 230 kV PAU FERRO /SANTA RITA II C-1 PE/PB 017/2009 IPCA RBL CC 017/2009 21/08/2012 03/08/2039  R$740,614.09
PAU FERRO EL 230 kV PAU FERRO LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE  RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE 061/2001 IPCA RBNI REA 3677/2012 20/05/2019 20/05/2044  R$746,199.05
PAU FERRO EL 230 kV PAU FERRO LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE  RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
PAU FERRO EL 230 kV PAU FERRO LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE  RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE 061/2001 IPCA RMEL REN 443/2011 09/04/2017 08/04/2047  R$6,568.43
PAU FERRO EL 230 kV PAU FERRO LT 230 kV PAU FERRO /GOIANINHA C-1 PE RB FT LT 230 kV PAU FERRO /GOIANINHA C-1 PE 061/2001 IPCA RBNI REA 3677/2012 20/05/2019 20/05/2044  R$746,199.05
PAU FERRO EL 230 kV PAU FERRO LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB  RB FT LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
PAU FERRO EL 230 kV PAU FERRO LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB  RB FT LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RMEL REN 643/2014 27/11/2014 26/11/2042  R$43,504.81
PAU FERRO EL 230 kV PAU FERRO LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB  RB FT LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RMEL REN 443/2011 22/03/2017 21/03/2047  R$1,771.21
PAU FERRO EL 230 kV PAU FERRO LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE  RB FT LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
PAU FERRO EL 230 kV PAU FERRO LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE  RB FT LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE 061/2001 IPCA RMEL REN 443/2011 02/05/2017 01/05/2047  R$1,765.91
PAU FERRO EL 230 kV PAU FERROFIAT 2 DIT   061/2001 IPCA RCDM REN 443/2011 08/11/2016 07/11/2046  R$ 1,443,870.05
PAU FERRO EL 230 kV PAU FERROFIAT 1 DIT   061/2001 IPCA RCDM REN 443/2011 08/11/2016 07/11/2046  R$ 1,443,870.05
PECEM II TR 500/230 kV PECEM II TRR1 CE RB FT TR 500/230 kV PECEM II TRR1 CE 004/2010 IPCA RBL CC 004/2010 12/07/2010 11/07/2040  R$ 2,029,768.37
PECEM II TR 500/230 kV PECEM II TR3 CE RB FT TR 500/230 kV PECEM II TR3 CE 004/2010 IPCA RBL CC 004/2010 12/07/2010 11/07/2040  R$ 6,089,308.30
PECEM II TR 500/230 kV PECEM II TR2 CE RB FT TR 500/230 kV PECEM II TR2 CE 004/2010 IPCA RBL CC 004/2010 12/07/2010 11/07/2040  R$ 6,089,308.30
PECEM II TR 500/230 kV PECEM II TR1 CE RB FT TR 500/230 kV PECEM II TR1 CE 004/2010 IPCA RBL CC 004/2010 12/07/2010 11/07/2040  R$ 6,089,308.30
PECEM II MG 500 kV PECEM II MG1 CE RB FT MG 500 kV PECEM II MG1 CE 004/2010 IPCA RBL CC 004/2010 12/07/2010 11/07/2040  R$ 2,249,442.74
PECEM II MC 500 kV TR 500/230 kV PECEM II TR3 CE  RB FT TR 500/230 kV PECEM II TR3 CE 004/2010 IPCA RBL CC 004/2010 12/07/2010 11/07/2040  R$ 1,228,796.05
PECEM II MC 500 kV TR 500/230 kV PECEM II TR2 CE  RB FT TR 500/230 kV PECEM II TR2 CE 004/2010 IPCA RBL CC 004/2010 12/07/2010 11/07/2040  R$ 1,228,796.05
PECEM II MC 500 kV TR 500/230 kV PECEM II TR1 CE  RB FT TR 500/230 kV PECEM II TR1 CE 004/2010 IPCA RBL CC 004/2010 12/07/2010 11/07/2040  R$ 1,228,796.05
PECEM II MC 230 kV TR 500/230 kV PECEM II TR3 CE  RB FT TR 500/230 kV PECEM II TR3 CE 004/2010 IPCA RBL CC 004/2010 12/07/2010 11/07/2040  R$635,756.01
PECEM II MC 230 kV TR 500/230 kV PECEM II TR2 CE  RB FT TR 500/230 kV PECEM II TR2 CE 004/2010 IPCA RBL CC 004/2010 12/07/2010 11/07/2040  R$635,756.01
PECEM II MC 230 kV TR 500/230 kV PECEM II TR1 CE  RB FT TR 500/230 kV PECEM II TR1 CE 004/2010 IPCA RBL CC 004/2010 12/07/2010 11/07/2040  R$635,756.01
PECEM II IB 500 kV MG 500 kV PECEM II MG1 CE IB4 RB FT MG 500 kV PECEM II MG1 CE 004/2010 IPCA RBL CC 004/2010 12/07/2010 11/07/2040  R$ 1,222,979.28
PECEM II IB 500 kV MG 500 kV PECEM II MG1 CE IB3 RB FT MG 500 kV PECEM II MG1 CE 004/2010 IPCA RBL CC 004/2010 12/07/2010 11/07/2040  R$ 1,222,979.28
PECEM II IB 500 kV MG 500 kV PECEM II MG1 CE IB2 RB FT MG 500 kV PECEM II MG1 CE 004/2010 IPCA RBL CC 004/2010 12/07/2010 11/07/2040  R$ 1,222,979.28
PECEM II IB 500 kV MG 500 kV PECEM II MG1 CE IB1 RB FT MG 500 kV PECEM II MG1 CE 004/2010 IPCA RBL CC 004/2010 12/07/2010 11/07/2040  R$ 1,222,979.28
PECEM II IB 230 kV MG 500 kV PECEM II MG1 CE IB1 RB FT MG 500 kV PECEM II MG1 CE 004/2010 IPCA RBL CC 004/2010 12/07/2010 11/07/2040  R$466,830.00
PECEM II EL 500 kV PECEM II LT 500 kV SOBRAL III /PECEM II C-1 CE  RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RBNI REA 10140/2021 31/12/2015 31/12/2043  R$191,257.58
PECEM II EL 500 kV PECEM II LT 500 kV PECEM II /FORTALEZA II C-1 CE  RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RBNI REA 10140/2021 31/12/2015 31/12/2043  R$191,257.58
PENEDO TT 69/13,8 kV PENEDO TA1 AL DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
PENEDO TT 69/13,8 kV PENEDO TA1 AL DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$281,516.05
PENEDO TT 69/13,8 kV PENEDO TA1 AL DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$288,094.94
PENEDO TT 69/0 kV PENEDO TA2 AL DIT   061/2001 IPCA RCDM REA 2460/2010 02/09/2012 01/09/2042  R$287,826.71
PENEDO TR 230/69 kV PENEDO TR3 AL RBF FT TR 230/69 kV PENEDO TR3 AL 005/2008 IPCA RBL CC 005/2008 17/03/2008 17/03/2038  R$662,809.83
PENEDO TR 230/69 kV PENEDO TR2 AL RBF FT TR 230/69 kV PENEDO TR2 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
PENEDO TR 230/69 kV PENEDO TR1 AL RBF FT TR 230/69 kV PENEDO TR1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
PENEDO TR 230/69 kV PENEDO TR1 AL RBF FT TR 230/69 kV PENEDO TR1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
PENEDO TR 230/69 kV PENEDO TR1 AL RBF FT TR 230/69 kV PENEDO TR1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
PENEDO RTL 230 kV 10 Mvar PENEDO RT1 AL RB FT RTL 230 kV 10 Mvar PENEDO RT1 AL 005/2008 IPCA RBL CC 005/2008 17/03/2008 17/03/2038  R$88,724.44
PENEDO MG 230 kV PENEDO MG1 AL RB FT MG 230 kV PENEDO MG1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$516,206.58
PENEDO MG 230 kV PENEDO MG1 AL RB FT MG 230 kV PENEDO MG1 AL 061/2001 IPCA RMEL REN 643/2014 31/05/2015 30/05/2043  R$51,461.93
PENEDO MG 230 kV PENEDO MG1 AL RB FT MG 230 kV PENEDO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,523,295.08
PENEDO MG 230 kV PENEDO MG1 AL RB FT MG 230 kV PENEDO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,558,893.71
PENEDO MG 230 kV PENEDO MG1 AL RB FT MG 230 kV PENEDO MG1 AL 061/2001 IPCA RMEL REN 443/2011 02/02/2016 01/02/2033  R$32,620.68
PENEDO MG 230 kV PENEDO MG1 AL RB FT MG 230 kV PENEDO MG1 AL 061/2001 IPCA RBNI REN 905/2020 30/04/2020 29/04/2051  R$48,969.09
PENEDO MC 69 kV TT 69/0 kV PENEDO TA2 AL  DIT   061/2001 IPCA RCDM REA 2460/2010 02/09/2012 01/09/2043  R$309,923.12
PENEDO MC 69 kV TR 230/69 kV PENEDO TR3 AL  RBF FT TR 230/69 kV PENEDO TR3 AL 005/2008 IPCA RBL CC 005/2008 17/03/2008 17/03/2038  R$96,588.79
PENEDO MC 69 kV TR 230/69 kV PENEDO TR2 AL  RBF FT TR 230/69 kV PENEDO TR2 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
PENEDO MC 69 kV TR 230/69 kV PENEDO TR1 AL  RBF FT TR 230/69 kV PENEDO TR1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
PENEDO MC 69 kV TR 230/69 kV PENEDO TR1 AL  RBF FT TR 230/69 kV PENEDO TR1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
PENEDO MC 69 kV TR 230/69 kV PENEDO TR1 AL  RBF FT TR 230/69 kV PENEDO TR1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$204,189.21
PENEDO MC 230 kV TR 230/69 kV PENEDO TR3 AL  RBF FT TR 230/69 kV PENEDO TR3 AL 005/2008 IPCA RBL CC 005/2008 17/03/2008 17/03/2038  R$374,256.29
PENEDO MC 230 kV TR 230/69 kV PENEDO TR2 AL  RBF FT TR 230/69 kV PENEDO TR2 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
PENEDO MC 230 kV TR 230/69 kV PENEDO TR2 AL  RBF FT TR 230/69 kV PENEDO TR2 AL 061/2001 IPCA RMEL REN 643/2014 18/08/2015 17/08/2045  R$28,582.04
PENEDO MC 230 kV TR 230/69 kV PENEDO TR2 AL  RBF FT TR 230/69 kV PENEDO TR2 AL 061/2001 IPCA RMEL REN 443/2011 28/10/2016 27/10/2046  R$1,015.79
PENEDO MC 230 kV TR 230/69 kV PENEDO TR1 AL  RBF FT TR 230/69 kV PENEDO TR1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
PENEDO MC 230 kV TR 230/69 kV PENEDO TR1 AL  RBF FT TR 230/69 kV PENEDO TR1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
PENEDO MC 230 kV TR 230/69 kV PENEDO TR1 AL  RBF FT TR 230/69 kV PENEDO TR1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$476,693.95
PENEDO MC 230 kV RTL 230 kV 10 Mvar PENEDO RT1 AL  RB FT RTL 230 kV 10 Mvar PENEDO RT1 AL 005/2008 IPCA RBL CC 005/2008 17/03/2008 17/03/2038  R$313,666.94
PENEDO MC 230 kV BC 230 kV 15 Mvar PENEDO BC2 AL RB FT BC 230 kV 15 Mvar PENEDO BC2 AL 061/2001 IPCA RBNI REA 2968/2011 24/11/2017 23/11/2047  R$ 1,296,801.20
PENEDO MC 230 kV BC 230 kV 15 Mvar PENEDO BC2 AL RB FT BC 230 kV 15 Mvar PENEDO BC2 AL 061/2001 IPCA RBNI REA 5861/2016 19/02/2018 18/02/2033  R$45,612.47
PENEDO MC 230 kV BC 230 kV 15 Mvar PENEDO BC1 AL RB FT BC 230 kV 15 Mvar PENEDO BC1 AL 061/2001 IPCA RBNI REA 2968/2011 23/11/2017 22/11/2047  R$ 1,296,720.47
PENEDO MC 230 kV BC 230 kV 15 Mvar PENEDO BC1 AL RB FT BC 230 kV 15 Mvar PENEDO BC1 AL 061/2001 IPCA RBNI REA 5861/2016 19/02/2018 18/02/2033  R$45,612.47
PENEDO IB 69 kV MG 230 kV PENEDO MG1 AL IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
PENEDO IB 69 kV MG 230 kV PENEDO MG1 AL IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$134,104.45
PENEDO IB 69 kV MG 230 kV PENEDO MG1 AL IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$137,238.41
PENEDO IB 230 kV MG 230 kV PENEDO MG1 AL IB1 RB FT MG 230 kV PENEDO MG1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,929.18
PENEDO IB 230 kV MG 230 kV PENEDO MG1 AL IB1 RB FT MG 230 kV PENEDO MG1 AL 061/2001 IPCA RMEL REN 643/2014 18/08/2015 17/08/2045  R$9,527.34
PENEDO IB 230 kV MG 230 kV PENEDO MG1 AL IB1 RB FT MG 230 kV PENEDO MG1 AL 061/2001 IPCA RMEL REN 443/2011 28/10/2016 27/10/2046  R$10,287.66
PENEDO EL 69 kV PENEDOPERIPERI 02J3 DIT   061/2001 IPCA RCDM REN 905/2020 30/04/2020 29/04/2048  R$583,547.45
PENEDO EL 69 kV PENEDOPERIPERI 02C8 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PENEDO EL 69 kV PENEDOPERIPERI 02C8 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
PENEDO EL 69 kV PENEDOPERIPERI 02C8 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
PENEDO EL 69 kV PENEDOMARITUBA 02C5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PENEDO EL 69 kV PENEDOMARITUBA 02C5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
PENEDO EL 69 kV PENEDOMARITUBA 02C5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
PENEDO EL 69 kV PENEDOMARITUBA 02C5 DIT   061/2001 IPCA RCDM REA 5484/2015 09/03/2022 08/03/2052  R$4,678.70
PENEDO EL 69 kV PENEDOMARITUBA 02C3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PENEDO EL 69 kV PENEDOMARITUBA 02C3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
PENEDO EL 69 kV PENEDOMARITUBA 02C3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
PENEDO EL 69 kV PENEDOCARAPICHO 02C2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PENEDO EL 69 kV PENEDOCARAPICHO 02C1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PENEDO EL 69 kV PENEDOCARAPICHO 02C1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
PENEDO EL 69 kV PENEDOCARAPICHO 02C1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
PENEDO EL 69 kV PENEDOBOA CICA 02C4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PENEDO EL 69 kV PENEDOBOA CICA 02C4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
PENEDO EL 69 kV PENEDOBOA CICA 02C4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
PENEDO EL 69 kV PENEDOARAPIRACA 02C7 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PENEDO EL 69 kV PENEDOARAPIRACA 02C7 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
PENEDO EL 69 kV PENEDOARAPIRACA 02C7 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
PENEDO EL 69 kV PENEDOARAPIRACA 02C6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PENEDO EL 69 kV PENEDOARAPIRACA 02C6 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
PENEDO EL 69 kV PENEDOARAPIRACA 02C6 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
PENEDO EL 230 kV PENEDO LT 230 kV N.S.SOCORRO /PENEDO C-1 SE/AL RB FT LT 230 kV N.S.SOCORRO /PENEDO C-1 SE/AL 005/2008 IPCA RBL CC 005/2008 17/03/2008 17/03/2038  R$368,924.70
PENEDO EL 230 kV PENEDO LT 230 kV ARAPIRACA III /PENEDO C-1 AL  RB FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
PENEDO EL 230 kV PENEDO LT 230 kV ARAPIRACA III /PENEDO C-1 AL  RB FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL 061/2001 IPCA RMEL REN 643/2014 18/08/2015 17/08/2045  R$9,197.39
PENEDO EL 230 kV PENEDO LT 230 kV ARAPIRACA III /PENEDO C-1 AL  RB FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL 061/2001 IPCA RMEL REN 643/2014 10/11/2013 09/11/2041  R$57,618.68
PENEDO EL 230 kV PENEDO LT 230 kV ARAPIRACA III /PENEDO C-1 AL  RB FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
PENEDO EL 230 kV PENEDO LT 230 kV ARAPIRACA III /PENEDO C-1 AL  RB FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$692,788.80
PENEDO EL 230 kV PENEDO LT 230 kV ARAPIRACA III /PENEDO C-1 AL  RB FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL 061/2001 IPCA RMEL REN 443/2011 28/10/2016 27/10/2046  R$2,174.20
PENEDO BC 230 kV 15 Mvar PENEDO BC2 AL RB FT BC 230 kV 15 Mvar PENEDO BC2 AL 061/2001 IPCA RBNI REA 2968/2011 24/11/2017 23/11/2041  R$368,303.84
PENEDO BC 230 kV 15 Mvar PENEDO BC1 AL RB FT BC 230 kV 15 Mvar PENEDO BC1 AL 061/2001 IPCA RBNI REA 2968/2011 23/11/2017 22/11/2041  R$368,276.20
PICI II TR 230/69 kV PICI II TR5 CE RBF FT TR 230/69 kV PICI II TR5 CE 061/2001 IPCA RBNI REA 6078/2016 21/10/2018 21/10/2052  R$ 1,424,804.83
PICI II TR 230/69 kV PICI II TR4 CE RBF FT TR 230/69 kV PICI II TR4 CE 061/2001 IPCA RBNI REA 2460/2010 17/02/2014 16/02/2048  R$ 1,466,953.44
PICI II TR 230/69 kV PICI II TR3 CE RBF FT TR 230/69 kV PICI II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
PICI II TR 230/69 kV PICI II TR2 CE RBF FT TR 230/69 kV PICI II TR2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
PICI II TR 230/69 kV PICI II TR2 CE RBF FT TR 230/69 kV PICI II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
PICI II TR 230/69 kV PICI II TR2 CE RBF FT TR 230/69 kV PICI II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
PICI II TR 230/69 kV PICI II TR1 CE RBF FT TR 230/69 kV PICI II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
PICI II TR 230/69 kV PICI II TR1 CE RBF FT TR 230/69 kV PICI II TR1 CE 061/2001 IPCA RBNI REA 6078/2016 21/05/2017 20/05/2048  R$138,706.75
PICI II MG 230 kV PICI II MG1 CE RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$515,618.47
PICI II MG 230 kV PICI II MG1 CE RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RMEL REN 643/2014 29/01/2014 28/01/2031  R$27,417.40
PICI II MG 230 kV PICI II MG1 CE RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RBNI REA 6078/2016 21/10/2018 21/10/2049  R$86,591.22
PICI II MG 230 kV PICI II MG1 CE RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RBNI REA 6078/2016 05/05/2021 05/05/2038  R$90,389.02
PICI II MG 230 kV PICI II MG1 CE RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RBNI REA 6078/2016 21/05/2017 20/05/2045  R$20,737.81
PICI II MG 230 kV PICI II MG1 CE RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,521,559.61
PICI II MG 230 kV PICI II MG1 CE RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,557,117.69
PICI II MG 230 kV PICI II MG1 CE RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RMEL REN 443/2011 13/01/2016 12/01/2033  R$32,540.27
PICI II MG 230 kV PICI II MG1 CE RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RBNI REA 8314/2019 10/08/2018 09/08/2033  R$12,519.00
PICI II MC 69 kV TR 230/69 kV PICI II TR4 CE RBF FT TR 230/69 kV PICI II TR4 CE 061/2001 IPCA RBNI REA 2460/2010 17/02/2014 16/02/2044  R$437,662.24
PICI II MC 69 kV TR 230/69 kV PICI II TR3 CE  RBF FT TR 230/69 kV PICI II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$60,565.23
PICI II MC 69 kV TR 230/69 kV PICI II TR3 CE  RBF FT TR 230/69 kV PICI II TR3 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$178,724.42
PICI II MC 69 kV TR 230/69 kV PICI II TR3 CE  RBF FT TR 230/69 kV PICI II TR3 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$182,901.12
PICI II MC 69 kV TR 230/69 kV PICI II TR2 CE RBF FT TR 230/69 kV PICI II TR2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$60,565.23
PICI II MC 69 kV TR 230/69 kV PICI II TR2 CE RBF FT TR 230/69 kV PICI II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$178,724.42
PICI II MC 69 kV TR 230/69 kV PICI II TR2 CE RBF FT TR 230/69 kV PICI II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$182,901.12
PICI II MC 69 kV TR 230/69 kV PICI II TR1 CE RBF FT TR 230/69 kV PICI II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
PICI II MC 69 kV TR 230/69 kV PICI II TR1 CE RBF FT TR 230/69 kV PICI II TR1 CE 061/2001 IPCA RBNI REA 6078/2016 21/05/2017 20/05/2047  R$246,690.51
PICI II MC 230 kV TR 230/69 kV PICI II TR5 CE RBF FT TR 230/69 kV PICI II TR5 CE 061/2001 IPCA RBNI REA 6078/2016 21/10/2018 21/10/2041  R$669,524.14
PICI II MC 230 kV TR 230/69 kV PICI II TR5 CE RBF FT TR 230/69 kV PICI II TR5 CE 061/2001 IPCA RBNI REA 6078/2016 21/10/2018 21/10/2041  R$286,235.53
PICI II MC 230 kV TR 230/69 kV PICI II TR4 CE RBF FT TR 230/69 kV PICI II TR4 CE 061/2001 IPCA RBNI REA 2460/2010 17/02/2014 16/02/2044  R$ 1,122,879.22
PICI II MC 230 kV TR 230/69 kV PICI II TR3 CE  RBF FT TR 230/69 kV PICI II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
PICI II MC 230 kV TR 230/69 kV PICI II TR3 CE  RBF FT TR 230/69 kV PICI II TR3 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
PICI II MC 230 kV TR 230/69 kV PICI II TR3 CE  RBF FT TR 230/69 kV PICI II TR3 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$476,693.95
PICI II MC 230 kV TR 230/69 kV PICI II TR2 CE RBF FT TR 230/69 kV PICI II TR2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
PICI II MC 230 kV TR 230/69 kV PICI II TR2 CE RBF FT TR 230/69 kV PICI II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
PICI II MC 230 kV TR 230/69 kV PICI II TR2 CE RBF FT TR 230/69 kV PICI II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$476,693.95
PICI II MC 230 kV TR 230/69 kV PICI II TR1 CE  RBF FT TR 230/69 kV PICI II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
PICI II IB 230 kV MG 230 kV PICI II MG1 CE IB1 RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,929.18
PICI II IB 230 kV MG 230 kV PICI II MG1 CE IB1 RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$368,658.63
PICI II IB 230 kV MG 230 kV PICI II MG1 CE IB1 RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$377,273.99
PICI II EL 230 kV PICI II LT 230 kV FORTALEZA II /PICI II C-2 CE RB FT LT 230 kV FORTALEZA II /PICI II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
PICI II EL 230 kV PICI II LT 230 kV FORTALEZA II /PICI II C-2 CE RB FT LT 230 kV FORTALEZA II /PICI II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
PICI II EL 230 kV PICI II LT 230 kV FORTALEZA II /PICI II C-2 CE RB FT LT 230 kV FORTALEZA II /PICI II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$692,788.80
PICI II EL 230 kV PICI II LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
PICI II EL 230 kV PICI II LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
PICI II EL 230 kV PICI II LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$692,788.80
PICI II EL 230 kV PICI II LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RMEL REN 443/2011 10/04/2016 09/04/2046  R$16,440.68
PICOS TT 69/13,8 kV PICOS TA1 PI DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
PICOS TT 69/13,8 kV PICOS TA1 PI DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$281,516.05
PICOS TR 69/69 kV PICOS TREG1 PI RBF FT TR 230/69 kV PICOS TR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$179,108.49
PICOS TR 230/69 kV PICOS TR4 PI RBF FT TR 230/69 kV PICOS TR4 PI 061/2001 IPCA RBNI REA 2173/2009 27/09/2012 26/09/2046  R$ 1,078,507.69
PICOS TR 230/69 kV PICOS TR3 PI RBF FT TR 230/69 kV PICOS TR3 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$266,604.65
PICOS TR 230/69 kV PICOS TR2 PI RBF FT TR 230/69 kV PICOS TR2 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,584.08
PICOS TR 230/69 kV PICOS TR2 PI RBF FT TR 230/69 kV PICOS TR2 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$665,685.27
PICOS TR 230/69 kV PICOS TR2 PI RBF FT TR 230/69 kV PICOS TR2 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$681,242.00
PICOS TR 230/69 kV PICOS TR1 PI RBF FT TR 230/69 kV PICOS TR1 PI 061/2001 IPCA RBNI REA 5166/2015 06/03/2018 05/03/2053  R$ 1,398,733.85
PICOS RTL 230 kV 15 Mvar PICOS RT2 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$222,456.15
PICOS RTB 230 kV 15 Mvar PICOS RT1 PI RB FT RTB 230 kV 15 Mvar PICOS RT1 PI 012/2007 IPCA RBL CC 012/2007 14/06/2007 14/06/2037  R$248,196.04
PICOS MG 230 kV PICOS MG1 PI RB FT MG 230 kV PICOS MG1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$520,957.68
PICOS MG 230 kV PICOS MG1 PI RB FT MG 230 kV PICOS MG1 PI 061/2001 IPCA RBNI REA 4602/2014 04/08/2017 03/08/2045  R$218,578.86
PICOS MG 230 kV PICOS MG1 PI RB FT MG 230 kV PICOS MG1 PI 061/2001 IPCA RBNI REA 4602/2014 04/08/2017 03/08/2045  R$218,578.86
PICOS MG 230 kV PICOS MG1 PI RB FT MG 230 kV PICOS MG1 PI 061/2001 IPCA RBNI REA 5166/2015 09/02/2018 08/02/2050  R$73,609.67
PICOS MG 230 kV PICOS MG1 PI RB FT MG 230 kV PICOS MG1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,537,315.31
PICOS MG 230 kV PICOS MG1 PI RB FT MG 230 kV PICOS MG1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,573,241.59
PICOS MG 230 kV PICOS MG1 PI RB FT MG 230 kV PICOS MG1 PI 061/2001 IPCA RMEL REN 443/2011 20/01/2016 19/01/2033  R$32,568.42
PICOS MC 69 kV TT 69/13,8 kV PICOS TA1 PI  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
PICOS MC 69 kV TR 230/69 kV PICOS TR4 PI RBF FT TR 230/69 kV PICOS TR4 PI 061/2001 IPCA RBNI REA 2173/2009 27/09/2012 26/09/2042  R$390,690.35
PICOS MC 69 kV TR 230/69 kV PICOS TR3 PI  RBF FT TR 230/69 kV PICOS TR3 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
PICOS MC 69 kV TR 230/69 kV PICOS TR2 PI RBF FT TR 230/69 kV PICOS TR2 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
PICOS MC 69 kV TR 230/69 kV PICOS TR1 PI  RBF FT TR 230/69 kV PICOS TR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
PICOS MC 69 kV TR 230/69 kV PICOS TR1 PI  RBF FT TR 230/69 kV PICOS TR1 PI 061/2001 IPCA RBNI REA 5166/2015 06/03/2018 05/03/2033  R$103,639.84
PICOS MC 69 kV TR 230/69 kV PICOS TR1 PI  RBF FT TR 230/69 kV PICOS TR1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
PICOS MC 69 kV TR 230/69 kV PICOS TR1 PI  RBF FT TR 230/69 kV PICOS TR1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$204,189.21
PICOS MC 230 kV TR 230/69 kV PICOS TR4 PI RBF FT TR 230/69 kV PICOS TR4 PI 061/2001 IPCA RBNI REA 2173/2009 27/09/2012 26/09/2042  R$ 1,084,043.08
PICOS MC 230 kV TR 230/69 kV PICOS TR3 PI  RBF FT TR 230/69 kV PICOS TR3 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
PICOS MC 230 kV TR 230/69 kV PICOS TR2 PI RBF FT TR 230/69 kV PICOS TR2 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
PICOS MC 230 kV TR 230/69 kV PICOS TR1 PI  RBF FT TR 230/69 kV PICOS TR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
PICOS MC 230 kV TR 230/69 kV PICOS TR1 PI  RBF FT TR 230/69 kV PICOS TR1 PI 061/2001 IPCA RBNI REA 5166/2015 06/03/2018 05/03/2036  R$297,932.19
PICOS MC 230 kV TR 230/69 kV PICOS TR1 PI  RBF FT TR 230/69 kV PICOS TR1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
PICOS MC 230 kV TR 230/69 kV PICOS TR1 PI  RBF FT TR 230/69 kV PICOS TR1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$476,693.95
PICOS MC 230 kV RTL 230 kV 15 Mvar PICOS RT2 PI  RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$99,071.31
PICOS MC 230 kV RTB 230 kV 15 Mvar PICOS RT1 PI  RB FT RTB 230 kV 15 Mvar PICOS RT1 PI 012/2007 IPCA RBL CC 012/2007 14/06/2007 14/06/2037  R$393,368.55
PICOS MC 230 kV BC 230 kV 17 Mvar PICOS BC2 PI RB FT BC 230 kV 15 Mvar PICOS BC2 PI 061/2001 IPCA RBNI REA 4602/2014 04/08/2017 03/08/2047  R$ 1,287,760.32
PICOS MC 230 kV BC 230 kV 17 Mvar PICOS BC1 PI RB FT BC 230 kV 15 Mvar PICOS BC1 PI 061/2001 IPCA RBNI REA 4602/2014 04/08/2017 03/08/2047  R$ 1,287,760.32
PICOS MC 230 kV BC 230 kV 15 Mvar PICOS BC3 PI RB FT BC 230 kV 15 Mvar PICOS BC3 PI 061/2001 IPCA RBNI REA 5166/2015 09/02/2018 08/02/2042  R$797,604.83
PICOS IB 69 kV MG 230 kV PICOS MG1 PI IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
PICOS IB 69 kV MG 230 kV PICOS MG1 PI IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$134,104.45
PICOS IB 69 kV MG 230 kV PICOS MG1 PI IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$137,238.41
PICOS IB 230 kV MG 230 kV PICOS MG1 PI IB1 RB FT MG 230 kV PICOS MG1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,929.18
PICOS IB 230 kV MG 230 kV PICOS MG1 PI IB1 RB FT MG 230 kV PICOS MG1 PI 061/2001 IPCA RBNI REA 5166/2015 09/02/2018 08/02/2051  R$91,691.93
PICOS EL 69 kV PICOSDIST4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PICOS EL 69 kV PICOSDIST3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PICOS EL 69 kV PICOSDIST3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
PICOS EL 69 kV PICOSDIST3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
PICOS EL 69 kV PICOSDIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PICOS EL 69 kV PICOSDIST2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
PICOS EL 69 kV PICOSDIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PICOS EL 69 kV PICOSDIST1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
PICOS EL 230 kV PICOS LT 230 kV S.JOAO PIAUI /PICOS C-1 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
PICOS EL 230 kV PICOS LT 230 kV S.JOAO PIAUI /PICOS C-1 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
PICOS EL 230 kV PICOS LT 230 kV S.JOAO PIAUI /PICOS C-1 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$692,788.80
PICOS EL 230 kV PICOS LT 230 kV S.JOAO PIAUI /PICOS C-1 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBNI REA 5861/2016 10/06/2016 09/06/2044  R$28,900.49
PICOS EL 230 kV PICOS LT 230 kV PICOS /TAUA II C-1 PI/CE RB FT LT 230 kV PICOS /TAUA II C-1 PI/CE 012/2007 IPCA RBL CC 012/2007 14/06/2007 14/06/2037  R$520,503.54
PICOS BC 230 kV 17 Mvar PICOS BC2 PI RB FT BC 230 kV 15 Mvar PICOS BC2 PI 061/2001 IPCA RBNI REA 4602/2014 04/08/2017 03/08/2041  R$365,207.59
PICOS BC 230 kV 17 Mvar PICOS BC1 PI RB FT BC 230 kV 15 Mvar PICOS BC1 PI 061/2001 IPCA RBNI REA 4602/2014 04/08/2017 03/08/2041  R$365,207.59
PICOS BC 230 kV 15 Mvar PICOS BC3 PI RB FT BC 230 kV 15 Mvar PICOS BC3 PI 061/2001 IPCA RBNI REA 5166/2015 09/02/2018 08/02/2038  R$435,896.60
PILOES MG 138 kV PILOES MG1 PB DIT   061/2001 IPCA RCDM REA 1094/2007 09/11/2012 08/11/2039  R$ 1,413,864.15
PILOES MG 138 kV PILOES MG1 PB DIT   061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033  R$32,534.20
PILOES MC 138 kV MG 138 kV PILOES MG1 PB DIT   061/2001 IPCA RCDM REA 1094/2007 09/11/2012 08/11/2042  R$875,478.98
PILOES IB 138 kV MG 138 kV PILOES MG1 PB IB1 DIT   061/2001 IPCA RCDM REA 1094/2007 09/11/2012 08/11/2043  R$729,146.83
PILOES EL 138 kV PILOES LT 138 kV PILOES /PARAISO C-1 PB/RN DIT   061/2001 IPCA RCDM REA 1094/2007 09/11/2012 08/11/2043  R$908,630.67
PILOES EL 138 kV PILOES LT 138 kV C.GRANDE II /PILOES C-1 PB DIT   061/2001 IPCA RCDM REA 1094/2007 09/11/2012 08/11/2043  R$908,630.67
PINDAI II TT 69/0 kV PINDAI II TT1 BA ICG   019/2012 IPCA RICG CC 019/2012 16/11/2015 01/06/2042  R$63,407.29
PINDAI II TR 230/69 kV PINDAI II TR2 BA ICG   019/2012 IPCA RICG CC 019/2012 16/11/2015 01/06/2042  R$ 1,203,147.87
PINDAI II TR 230/69 kV PINDAI II TR1 BA ICG   019/2012 IPCA RICG CC 019/2012 16/11/2015 01/06/2042  R$ 1,203,147.87
PINDAI II MG 69 kV PINDAI II MG1 BA ICG   019/2012 IPCA RICG CC 019/2012 16/11/2015 01/06/2042  R$187,440.56
PINDAI II MG 230 kV PINDAI II MG1 BA RB FT MG 230 kV PINDAI II MG1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 01/06/2042  R$997,568.30
PINDAI II MG 230 kV PINDAI II MG1 BA RB FT MG 230 kV PINDAI II MG1 BA 019/2012 IPCA RBNI REN 905/2020 12/01/2021 11/01/2049  R$39,401.32
PINDAI II MC 69 kV TT 69/0 kV PINDAI II TT1 BA  ICG   019/2012 IPCA RICG CC 019/2012 16/11/2015 01/06/2042  R$66,675.61
PINDAI II MC 69 kV TR 230/69 kV PINDAI II TR2 BA  ICG   019/2012 IPCA RICG CC 019/2012 16/11/2015 01/06/2042  R$157,499.77
PINDAI II MC 69 kV TR 230/69 kV PINDAI II TR1 BA  ICG   019/2012 IPCA RICG CC 019/2012 16/11/2015 01/06/2042  R$157,499.77
PINDAI II MC 230 kV TR 230/69 kV PINDAI II TR2 BA  ICG   019/2012 IPCA RICG CC 019/2012 16/11/2015 01/06/2042  R$395,257.66
PINDAI II MC 230 kV TR 230/69 kV PINDAI II TR1 BA  ICG   019/2012 IPCA RICG CC 019/2012 16/11/2015 01/06/2042  R$395,257.66
PINDAI II IB 69 kV MG 69 kV PINDAI II MG1 BA IB1 ICG   019/2012 IPCA RICG CC 019/2012 16/11/2015 01/06/2042  R$107,382.42
PINDAI II IB 230 kV MG 230 kV PINDAI II MG1 BA IB1 RB FT MG 230 kV PINDAI II MG1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 01/06/2042  R$366,017.65
PINDAI II EL 69 kV PINDAI IIDIST1 DIT   019/2012 IPCA RCDM REN 905/2020 12/01/2021 11/01/2053  R$504,049.55
PINDAI II EL 230 kV PINDAI II LT 230 kV IGAPORA III /PINDAI II C-1 BA RB FT LT 230 kV IGAPORA III /PINDAI II C-1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 01/06/2042  R$592,169.06
PIRAPAMA II TT 69/13,8 kV PIRAPAMA II TA2 PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
PIRAPAMA II TT 69/13,8 kV PIRAPAMA II TA2 PE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$281,516.05
PIRAPAMA II TT 69/13,8 kV PIRAPAMA II TA2 PE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$288,094.94
PIRAPAMA II TT 69/13,8 kV PIRAPAMA II TA1 PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
PIRAPAMA II TR 69/13,8 kV PIRAPAMA II TRX PE RB FT MG 230 kV PIRAPAMA II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
PIRAPAMA II TR 230/69 kV PIRAPAMA II TR4 PE RBF FT TR 230/69 kV PIRAPAMA II TR4 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
PIRAPAMA II TR 230/69 kV PIRAPAMA II TR3 PE RBF FT TR 230/69 kV PIRAPAMA II TR3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
PIRAPAMA II TR 230/69 kV PIRAPAMA II TR3 PE RBF FT TR 230/69 kV PIRAPAMA II TR3 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
PIRAPAMA II TR 230/69 kV PIRAPAMA II TR2 PE RBF FT TR 230/69 kV PIRAPAMA II TR2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
PIRAPAMA II TR 230/69 kV PIRAPAMA II TR2 PE RBF FT TR 230/69 kV PIRAPAMA II TR2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
PIRAPAMA II TR 230/69 kV PIRAPAMA II TR1 PE RBF FT TR 230/69 kV PIRAPAMA II TR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
PIRAPAMA II TR 230/69 kV PIRAPAMA II TR1 PE RBF FT TR 230/69 kV PIRAPAMA II TR1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
PIRAPAMA II MG 230 kV PIRAPAMA II MG1 PE RB FT MG 230 kV PIRAPAMA II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$636,114.21
PIRAPAMA II MG 230 kV PIRAPAMA II MG1 PE RB FT MG 230 kV PIRAPAMA II MG1 PE 061/2001 IPCA RMEL REN 643/2014 20/04/2015 19/04/2043  R$51,287.35
PIRAPAMA II MG 230 kV PIRAPAMA II MG1 PE RB FT MG 230 kV PIRAPAMA II MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,877,135.42
PIRAPAMA II MG 230 kV PIRAPAMA II MG1 PE RB FT MG 230 kV PIRAPAMA II MG1 PE 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033  R$33,465.01
PIRAPAMA II MC 69 kV TT 69/13,8 kV PIRAPAMA II TA2 PE  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
PIRAPAMA II MC 69 kV TT 69/13,8 kV PIRAPAMA II TA1 PE  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
PIRAPAMA II MC 69 kV TR 69/13,8 kV PIRAPAMA II TRX PE  RB FT MG 230 kV PIRAPAMA II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$60,565.23
PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR4 PE  RBF FT TR 230/69 kV PIRAPAMA II TR4 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR3 PE RBF FT TR 230/69 kV PIRAPAMA II TR3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR3 PE RBF FT TR 230/69 kV PIRAPAMA II TR3 PE 061/2001 IPCA RMEL REN 643/2014 05/08/2014 04/08/2044  R$37,838.84
PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR3 PE RBF FT TR 230/69 kV PIRAPAMA II TR3 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR2 PE RBF FT TR 230/69 kV PIRAPAMA II TR2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR2 PE RBF FT TR 230/69 kV PIRAPAMA II TR2 PE 061/2001 IPCA RMEL REN 643/2014 15/09/2015 14/09/2045  R$2,861.38
PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR2 PE RBF FT TR 230/69 kV PIRAPAMA II TR2 PE 061/2001 IPCA RMEL REN 643/2014 16/09/2015 15/09/2045  R$5,723.21
PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR2 PE RBF FT TR 230/69 kV PIRAPAMA II TR2 PE 061/2001 IPCA RMEL REN 443/2011 12/04/2016 11/04/2046  R$4,876.06
PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR1 PE RBF FT TR 230/69 kV PIRAPAMA II TR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR1 PE RBF FT TR 230/69 kV PIRAPAMA II TR1 PE 061/2001 IPCA RMEL REN 643/2014 03/08/2015 02/08/2045  R$2,867.29
PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR1 PE RBF FT TR 230/69 kV PIRAPAMA II TR1 PE 061/2001 IPCA RMEL REN 643/2014 17/09/2015 16/09/2045  R$5,723.66
PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR1 PE RBF FT TR 230/69 kV PIRAPAMA II TR1 PE 061/2001 IPCA RMEL REN 443/2011 12/04/2016 11/04/2046  R$1,953.34
PIRAPAMA II MC 69 kV BC 69 kV 20,3 Mvar PIRAPAMA II BC1 PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
PIRAPAMA II MC 69 kV BC 69 kV 20,3 Mvar PIRAPAMA II BC1 PE DIT   061/2001 IPCA RMEL REN 643/2014 29/07/2015 28/07/2045  R$2,872.50
PIRAPAMA II MC 69 kV BC 69 kV 20,3 Mvar PIRAPAMA II BC1 PE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
PIRAPAMA II MC 69 kV BC 69 kV 20,3 Mvar PIRAPAMA II BC1 PE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$235,271.08
PIRAPAMA II MC 69 kV BC 69 kV 20,3 Mvar PIRAPAMA II BC1 PE DIT   061/2001 IPCA RMEL REN 443/2011 12/04/2016 11/04/2046  R$2,739.17
PIRAPAMA II MC 69 kV BC 69 kV 20,3 Mvar PIRAPAMA II BC1 PE DIT   061/2001 IPCA RCDM REA 7761/2019 29/06/2018 28/06/2054  R$55,748.94
PIRAPAMA II MC 230 kV TR 230/69 kV PIRAPAMA II TR4 PE  RBF FT TR 230/69 kV PIRAPAMA II TR4 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
PIRAPAMA II MC 230 kV TR 230/69 kV PIRAPAMA II TR3 PE RBF FT TR 230/69 kV PIRAPAMA II TR3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
PIRAPAMA II MC 230 kV TR 230/69 kV PIRAPAMA II TR3 PE RBF FT TR 230/69 kV PIRAPAMA II TR3 PE 061/2001 IPCA RMEL REN 443/2011 05/05/2016 04/05/2046  R$16,471.87
PIRAPAMA II MC 230 kV TR 230/69 kV PIRAPAMA II TR3 PE RBF FT TR 230/69 kV PIRAPAMA II TR3 PE 061/2001 IPCA RMEL REN 443/2011 05/05/2016 04/05/2046  R$16,471.87
PIRAPAMA II MC 230 kV TR 230/69 kV PIRAPAMA II TR3 PE RBF FT TR 230/69 kV PIRAPAMA II TR3 PE 061/2001 IPCA RMEL REN 443/2011 05/05/2016 04/05/2046  R$16,471.87
PIRAPAMA II MC 230 kV TR 230/69 kV PIRAPAMA II TR2 PE RBF FT TR 230/69 kV PIRAPAMA II TR2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
PIRAPAMA II MC 230 kV TR 230/69 kV PIRAPAMA II TR2 PE RBF FT TR 230/69 kV PIRAPAMA II TR2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
PIRAPAMA II MC 230 kV TR 230/69 kV PIRAPAMA II TR2 PE RBF FT TR 230/69 kV PIRAPAMA II TR2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$476,693.95
PIRAPAMA II MC 230 kV TR 230/69 kV PIRAPAMA II TR1 PE RBF FT TR 230/69 kV PIRAPAMA II TR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
PIRAPAMA II MC 230 kV TR 230/69 kV PIRAPAMA II TR1 PE RBF FT TR 230/69 kV PIRAPAMA II TR1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
PIRAPAMA II MC 230 kV TR 230/69 kV PIRAPAMA II TR1 PE RBF FT TR 230/69 kV PIRAPAMA II TR1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$476,693.95
PIRAPAMA II IB 69 kV MG 230 kV PIRAPAMA II MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
PIRAPAMA II IB 230 kV MG 230 kV PIRAPAMA II MG1 PE IB1 RB FT MG 230 kV PIRAPAMA II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,929.18
PIRAPAMA II IB 230 kV MG 230 kV PIRAPAMA II MG1 PE IB1 RB FT MG 230 kV PIRAPAMA II MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$368,658.63
PIRAPAMA II EL 69 kV PIRAPAMA IIW MARTINS-02J3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PIRAPAMA II EL 69 kV PIRAPAMA IIW MARTINS-02J3 DIT   061/2001 IPCA RMEL REN 643/2014 12/08/2015 11/08/2045  R$2,869.28
PIRAPAMA II EL 69 kV PIRAPAMA IIW MARTINS-02J3 DIT   061/2001 IPCA RMEL REN 643/2014 23/09/2015 22/09/2045  R$5,726.31
PIRAPAMA II EL 69 kV PIRAPAMA IIW MARTINS-02J3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
PIRAPAMA II EL 69 kV PIRAPAMA IIW MARTINS-02J3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
PIRAPAMA II EL 69 kV PIRAPAMA IIW MARTINS-02J3 DIT   061/2001 IPCA RMEL REN 443/2011 12/04/2016 11/04/2046  R$2,739.17
PIRAPAMA II EL 69 kV PIRAPAMA IITERMOCABO-02P1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PIRAPAMA II EL 69 kV PIRAPAMA IITERMOCABO-02P1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
PIRAPAMA II EL 69 kV PIRAPAMA IITERMOCABO-02P1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
PIRAPAMA II EL 69 kV PIRAPAMA IISUAPE-02V3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PIRAPAMA II EL 69 kV PIRAPAMA IISUAPE-02V3 DIT   061/2001 IPCA RMEL REN 643/2014 07/08/2015 06/08/2045  R$5,736.36
PIRAPAMA II EL 69 kV PIRAPAMA IISUAPE-02V3 DIT   061/2001 IPCA RMEL REN 643/2014 12/08/2015 11/08/2045  R$5,738.60
PIRAPAMA II EL 69 kV PIRAPAMA IISUAPE-02J7 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PIRAPAMA II EL 69 kV PIRAPAMA IISUAPE-02J7 DIT   061/2001 IPCA RMEL REN 643/2014 12/08/2015 11/08/2045  R$2,869.28
PIRAPAMA II EL 69 kV PIRAPAMA IISUAPE-02J7 DIT   061/2001 IPCA RMEL REN 643/2014 18/09/2015 17/09/2045  R$5,724.11
PIRAPAMA II EL 69 kV PIRAPAMA IISUAPE-02J7 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
PIRAPAMA II EL 69 kV PIRAPAMA IISUAPE-02J7 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
PIRAPAMA II EL 69 kV PIRAPAMA IISUAPE-02J7 DIT   061/2001 IPCA RMEL REN 443/2011 12/04/2016 11/04/2046  R$2,739.17
PIRAPAMA II EL 69 kV PIRAPAMA IISIMISA-02J1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PIRAPAMA II EL 69 kV PIRAPAMA IISIMISA-02J1 DIT   061/2001 IPCA RMEL REN 643/2014 30/07/2015 29/07/2045  R$5,745.44
PIRAPAMA II EL 69 kV PIRAPAMA IISIMISA-02J1 DIT   061/2001 IPCA RMEL REN 643/2014 31/07/2015 30/07/2045  R$5,745.87
PIRAPAMA II EL 69 kV PIRAPAMA IISIMISA-02J1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
PIRAPAMA II EL 69 kV PIRAPAMA IISIMISA-02J1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
PIRAPAMA II EL 69 kV PIRAPAMA IISIMISA-02J1 DIT   061/2001 IPCA RMEL REN 443/2011 12/04/2016 11/04/2046  R$1,790.98
PIRAPAMA II EL 69 kV PIRAPAMA IIRHODIA-02J4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PIRAPAMA II EL 69 kV PIRAPAMA IIRHODIA-02J4 DIT   061/2001 IPCA RMEL REN 643/2014 12/08/2015 11/08/2045  R$5,738.60
PIRAPAMA II EL 69 kV PIRAPAMA IIRHODIA-02J4 DIT   061/2001 IPCA RMEL REN 643/2014 14/09/2015 13/09/2045  R$2,861.18
PIRAPAMA II EL 69 kV PIRAPAMA IIRHODIA-02J4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
PIRAPAMA II EL 69 kV PIRAPAMA IIRHODIA-02J4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
PIRAPAMA II EL 69 kV PIRAPAMA IIRHODIA-02J4 DIT   061/2001 IPCA RMEL REN 443/2011 30/09/2015 29/09/2038  R$7,109.89
PIRAPAMA II EL 69 kV PIRAPAMA IIRHODIA-02J4 DIT   061/2001 IPCA RMEL REN 443/2011 12/04/2016 11/04/2046  R$2,604.47
PIRAPAMA II EL 69 kV PIRAPAMA IIRECIFE-II-02V1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PIRAPAMA II EL 69 kV PIRAPAMA IIRECIFE-II-02V1 DIT   061/2001 IPCA RMEL REN 643/2014 13/08/2015 12/08/2045  R$5,739.05
PIRAPAMA II EL 69 kV PIRAPAMA IIRECIFE-II-02V1 DIT   061/2001 IPCA RMEL REN 643/2014 22/09/2015 21/09/2045  R$5,725.87
PIRAPAMA II EL 69 kV PIRAPAMA IIRECIFE-II-02V1 DIT   061/2001 IPCA RMEL REN 443/2011 12/04/2016 11/04/2046  R$4,769.44
PIRAPAMA II EL 69 kV PIRAPAMA IIPRAZERES-02V4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PIRAPAMA II EL 69 kV PIRAPAMA IIPRAZERES-02V4 DIT   061/2001 IPCA RMEL REN 643/2014 10/08/2015 09/08/2045  R$5,737.70
PIRAPAMA II EL 69 kV PIRAPAMA IIPRAZERES-02V4 DIT   061/2001 IPCA RMEL REN 643/2014 22/09/2015 21/09/2045  R$2,862.93
PIRAPAMA II EL 69 kV PIRAPAMA IIPRAZERES-02V4 DIT   061/2001 IPCA RMEL REN 643/2014 22/09/2015 21/09/2045  R$2,862.93
PIRAPAMA II EL 69 kV PIRAPAMA IIPRAZERES-02V4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
PIRAPAMA II EL 69 kV PIRAPAMA IIPRAZERES-02V4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
PIRAPAMA II EL 69 kV PIRAPAMA IIPRAZERES-02V4 DIT   061/2001 IPCA RMEL REN 443/2011 12/04/2016 11/04/2046  R$2,387.97
PIRAPAMA II EL 69 kV PIRAPAMA IIPONTEZINHA-02J9 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PIRAPAMA II EL 69 kV PIRAPAMA IIPONTEZINHA-02J9 DIT   061/2001 IPCA RCDM REA 1814/2009 29/03/2014 28/03/2044  R$19,932.75
PIRAPAMA II EL 69 kV PIRAPAMA IIPONTEZINHA-02J9 DIT   061/2001 IPCA RMEL REN 643/2014 13/08/2015 12/08/2045  R$5,739.05
PIRAPAMA II EL 69 kV PIRAPAMA IIPONTEZINHA-02J9 DIT   061/2001 IPCA RMEL REN 643/2014 24/09/2015 23/09/2045  R$5,726.75
PIRAPAMA II EL 69 kV PIRAPAMA IIPONTEZINHA-02J9 DIT   061/2001 IPCA RMEL REN 643/2014 29/03/2014 28/03/2044  R$37,457.57
PIRAPAMA II EL 69 kV PIRAPAMA IIPONTEZINHA-02J9 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
PIRAPAMA II EL 69 kV PIRAPAMA IIPONTEZINHA-02J9 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
PIRAPAMA II EL 69 kV PIRAPAMA IIPONTEZINHA-02J9 DIT   061/2001 IPCA RMEL REN 443/2011 12/04/2016 11/04/2046  R$2,387.97
PIRAPAMA II EL 69 kV PIRAPAMA IIPONTEZINHA-02J9 DIT   061/2001 IPCA RMEL REN 443/2011 12/04/2016 11/04/2046  R$2,387.97
PIRAPAMA II EL 69 kV PIRAPAMA IIPIEDADE-02J8 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PIRAPAMA II EL 69 kV PIRAPAMA IIPIEDADE-02J8 DIT   061/2001 IPCA RCDM REA 1814/2009 05/04/2014 04/04/2045  R$19,341.68
PIRAPAMA II EL 69 kV PIRAPAMA IIPIEDADE-02J8 DIT   061/2001 IPCA RMEL REN 643/2014 14/08/2015 13/08/2045  R$2,869.74
PIRAPAMA II EL 69 kV PIRAPAMA IIPIEDADE-02J8 DIT   061/2001 IPCA RMEL REN 643/2014 24/09/2015 23/09/2045  R$5,726.75
PIRAPAMA II EL 69 kV PIRAPAMA IIPIEDADE-02J8 DIT   061/2001 IPCA RMEL REN 643/2014 29/03/2014 28/03/2044  R$24,971.72
PIRAPAMA II EL 69 kV PIRAPAMA IIPIEDADE-02J8 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
PIRAPAMA II EL 69 kV PIRAPAMA IIPIEDADE-02J8 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
PIRAPAMA II EL 69 kV PIRAPAMA IIPIEDADE-02J8 DIT   061/2001 IPCA RMEL REN 443/2011 12/04/2016 11/04/2046  R$2,739.17
PIRAPAMA II EL 69 kV PIRAPAMA IIJUCARAL-02J5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PIRAPAMA II EL 69 kV PIRAPAMA IIJUCARAL-02J5 DIT   061/2001 IPCA RMEL REN 643/2014 03/08/2015 02/08/2045  R$2,867.29
PIRAPAMA II EL 69 kV PIRAPAMA IIJUCARAL-02J5 DIT   061/2001 IPCA RMEL REN 643/2014 14/08/2015 13/08/2045  R$2,869.74
PIRAPAMA II EL 69 kV PIRAPAMA IIJUCARAL-02J5 DIT   061/2001 IPCA RMEL REN 643/2014 17/09/2015 16/09/2045  R$2,861.82
PIRAPAMA II EL 69 kV PIRAPAMA IIJUCARAL-02J5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
PIRAPAMA II EL 69 kV PIRAPAMA IIJUCARAL-02J5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
PIRAPAMA II EL 69 kV PIRAPAMA IIJUCARAL-02J5 DIT   061/2001 IPCA RMEL REN 443/2011 12/04/2016 11/04/2046  R$2,739.17
PIRAPAMA II EL 69 kV PIRAPAMA IICABO-02J6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PIRAPAMA II EL 69 kV PIRAPAMA IICABO-02J6 DIT   061/2001 IPCA RMEL REN 643/2014 10/08/2015 09/08/2045  R$5,737.70
PIRAPAMA II EL 69 kV PIRAPAMA IICABO-02J6 DIT   061/2001 IPCA RMEL REN 643/2014 14/08/2015 13/08/2045  R$2,869.74
PIRAPAMA II EL 69 kV PIRAPAMA IICABO-02J6 DIT   061/2001 IPCA RMEL REN 643/2014 14/09/2015 13/09/2045  R$2,861.18
PIRAPAMA II EL 69 kV PIRAPAMA IICABO-02J6 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
PIRAPAMA II EL 69 kV PIRAPAMA IICABO-02J6 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
PIRAPAMA II EL 69 kV PIRAPAMA IICABO-02J6 DIT   061/2001 IPCA RMEL REN 443/2011 15/05/2015 14/05/2038  R$7,017.88
PIRAPAMA II EL 69 kV PIRAPAMA IICABO-02J6 DIT   061/2001 IPCA RMEL REN 443/2011 12/04/2016 11/04/2046  R$2,171.47
PIRAPAMA II EL 69 kV PIRAPAMA IIAMBEV-02V2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PIRAPAMA II EL 69 kV PIRAPAMA IIAMBEV-02V2 DIT   061/2001 IPCA RMEL REN 643/2014 04/08/2015 03/08/2045  R$5,735.04
PIRAPAMA II EL 69 kV PIRAPAMA IIAMBEV-02V2 DIT   061/2001 IPCA RMEL REN 643/2014 11/08/2015 10/08/2045  R$5,738.14
PIRAPAMA II EL 69 kV PIRAPAMA IIAMBEV-02V2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
PIRAPAMA II EL 69 kV PIRAPAMA IIAMBEV-02V2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
PIRAPAMA II EL 69 kV PIRAPAMA IIAMBEV-02V2 DIT   061/2001 IPCA RMEL REN 443/2011 12/04/2016 11/04/2046  R$6,501.43
PIRAPAMA II EL 230 kV PIRAPAMA II LT 230 kV RECIFE II /PIRAPAMA II C-2 PE RB FT LT 230 kV RECIFE II /PIRAPAMA II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
PIRAPAMA II EL 230 kV PIRAPAMA II LT 230 kV RECIFE II /PIRAPAMA II C-2 PE RB FT LT 230 kV RECIFE II /PIRAPAMA II C-2 PE 061/2001 IPCA RMEL REN 443/2011 18/11/2017 17/11/2049  R$125,100.59
PIRAPAMA II EL 230 kV PIRAPAMA II LT 230 kV PIRAPAMA II /SUAPE II C-2 PE RB FT LT 230 kV PIRAPAMA II /SUAPE II C-2 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039  R$397,469.34
PIRAPAMA II EL 230 kV PIRAPAMA II LT 230 kV PIRAPAMA II /SUAPE II C-1 PE RB FT LT 230 kV PIRAPAMA II /SUAPE II C-1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039  R$397,469.34
PIRAPAMA II EL 230 kV PIRAPAMA II LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE  RB FT LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
PIRAPAMA II EL 230 kV PIRAPAMA II LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE  RB FT LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE 061/2001 IPCA RMEL REN 443/2011 08/12/2017 07/12/2049  R$125,268.73
PIRAPAMA II EL 230 kV PIRAPAMA IILANXES DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
PIRAPAMA II BC 69 kV 20,3 Mvar PIRAPAMA II BC1 PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$116,409.25
PIRAPAMA II BC 69 kV 20,3 Mvar PIRAPAMA II BC1 PE DIT   061/2001 IPCA RCDM REA 5861/2016 09/06/2016 08/06/2044  R$23,010.09
PIRIPIRI TT 69/0 kV PIRIPIRI TA2 PI DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
PIRIPIRI TT 69/0 kV PIRIPIRI TA1 PI DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
PIRIPIRI TR 69/13,8 kV PIRIPIRI TR6C PI DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
PIRIPIRI TR 69/13,8 kV PIRIPIRI TR6B PI DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
PIRIPIRI TR 69/13,8 kV PIRIPIRI TR6A PI DIT   061/2001 IPCA RCDM REA 6233/2017 12/07/2019 12/07/2048  R$230,869.98
PIRIPIRI TR 230/69 kV PIRIPIRI TR3 PI RBF FT TR 230/69 kV PIRIPIRI TR3 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$266,604.65
PIRIPIRI TR 230/69 kV PIRIPIRI TR2 PI RBF FT TR 230/69 kV PIRIPIRI TR2 PI 061/2001 IPCA RBNI REA 2823/2011 24/09/2015 23/09/2049  R$ 1,313,627.24
PIRIPIRI TR 230/69 kV PIRIPIRI TR1 PI RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBNI REA 2823/2011 01/12/2015 30/11/2049  R$ 1,318,941.06
PIRIPIRI TR 230/138 kV PIRIPIRI TR7 PI RBF FT TR 230/138 kV PIRIPIRI TR7 PI 061/2001 IPCA RBNI REA 2823/2011 17/11/2014 16/11/2048  R$ 1,182,340.60
PIRIPIRI TR 230/138 kV PIRIPIRI TR5 PI RBF FT TR 230/138 kV PIRIPIRI TR5 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$296,030.01
PIRIPIRI TR 230/138 kV PIRIPIRI TR4 PI RBF FT TR 230/138 kV PIRIPIRI TR4 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$296,030.01
PIRIPIRI TR 230/138 kV PIRIPIRI TR4 PI RBF FT TR 230/138 kV PIRIPIRI TR4 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$873,567.06
PIRIPIRI TR 230/138 kV PIRIPIRI TR4 PI RBF FT TR 230/138 kV PIRIPIRI TR4 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$893,981.88
PIRIPIRI RTS 13,8 kV 0 Mvar PIRIPIRI RTS1 PI RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$135,222.37
PIRIPIRI RTL 230 kV 3,33 Mvar PIRIPIRI RTR1 PI RB FT RTL 230 kV 3,33 Mvar PIRIPIRI RTR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$58,820.58
PIRIPIRI RTL 230 kV 10 MVAr PIRIPIRI RT1 PI RB FT LT 230 kV TERESINA /PIRIPIRI C-1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,656.08
PIRIPIRI RTB 13,8 kV 5 Mvar PIRIPIRI RT1 PI RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$135,222.37
PIRIPIRI MG 230 kV PIRIPIRI MG1 PI RB FT MG 230 kV PIRIPIRI MG1 PI 061/2001 IPCA RBNI REA 2823/2011 17/11/2014 16/11/2042  R$204,167.68
PIRIPIRI MG 230 kV PIRIPIRI MG1 PI RB FT MG 230 kV PIRIPIRI MG1 PI 061/2001 IPCA RBNI REA 2823/2011 29/04/2016 28/04/2044  R$211,860.42
PIRIPIRI MG 230 kV PIRIPIRI MG1 PI RB FT MG 230 kV PIRIPIRI MG1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$710,100.38
PIRIPIRI MG 230 kV PIRIPIRI MG1 PI RB FT MG 230 kV PIRIPIRI MG1 PI 061/2001 IPCA RBNI REA 2040/2009 26/08/2013 25/08/2041  R$126,234.75
PIRIPIRI MG 230 kV PIRIPIRI MG1 PI RB FT MG 230 kV PIRIPIRI MG1 PI 061/2001 IPCA RMEL REN 643/2014 30/10/2013 29/10/2041  R$82,707.24
PIRIPIRI MG 230 kV PIRIPIRI MG1 PI RB FT MG 230 kV PIRIPIRI MG1 PI 061/2001 IPCA RBNI REA 1814/2009 29/05/2015 28/05/2043  R$59,557.05
PIRIPIRI MG 230 kV PIRIPIRI MG1 PI RB FT MG 230 kV PIRIPIRI MG1 PI 061/2001 IPCA RMEL REN 643/2014 08/10/2014 07/10/2044  R$59,137.12
PIRIPIRI MG 230 kV PIRIPIRI MG1 PI RB FT MG 230 kV PIRIPIRI MG1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,095,464.24
PIRIPIRI MG 230 kV PIRIPIRI MG1 PI RB FT MG 230 kV PIRIPIRI MG1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,144,434.18
PIRIPIRI MG 230 kV PIRIPIRI MG1 PI RB FT MG 230 kV PIRIPIRI MG1 PI 061/2001 IPCA RMEL REN 443/2011 26/01/2016 25/01/2033  R$32,592.54
PIRIPIRI MC 69 kV TT 69/0 kV PIRIPIRI TA2 PI  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
PIRIPIRI MC 69 kV TT 69/0 kV PIRIPIRI TA1 PI  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
PIRIPIRI MC 69 kV TR 69/13,8 kV PIRIPIRI TR6A PI TR6A/TR6C DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
PIRIPIRI MC 69 kV TR 230/69 kV PIRIPIRI TR3 PI RBF FT TR 230/69 kV PIRIPIRI TR3 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
PIRIPIRI MC 69 kV TR 230/69 kV PIRIPIRI TR2 PI  RBF FT TR 230/69 kV PIRIPIRI TR2 PI 061/2001 IPCA RBNI REA 2823/2011 24/09/2015 23/09/2045  R$311,430.94
PIRIPIRI MC 69 kV TR 230/69 kV PIRIPIRI TR2 PI  RBF FT TR 230/69 kV PIRIPIRI TR2 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
PIRIPIRI MC 69 kV TR 230/69 kV PIRIPIRI TR1 PI  RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBNI REA 2823/2011 01/12/2015 30/11/2045  R$312,833.12
PIRIPIRI MC 69 kV TR 230/69 kV PIRIPIRI TR1 PI  RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
PIRIPIRI MC 69 kV TR 230/69 kV PIRIPIRI TR1 PI  RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
PIRIPIRI MC 69 kV TR 230/69 kV PIRIPIRI TR1 PI  RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$204,189.21
PIRIPIRI MC 230 kV TR 230/69 kV PIRIPIRI TR3 PI RBF FT TR 230/69 kV PIRIPIRI TR3 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
PIRIPIRI MC 230 kV TR 230/69 kV PIRIPIRI TR3 PI RBF FT TR 230/69 kV PIRIPIRI TR3 PI 061/2001 IPCA RMEL REN 443/2011 16/03/2016 15/03/2049  R$118,329.55
PIRIPIRI MC 230 kV TR 230/69 kV PIRIPIRI TR2 PI  RBF FT TR 230/69 kV PIRIPIRI TR2 PI 061/2001 IPCA RBNI REA 2823/2011 24/09/2015 23/09/2043  R$225,776.71
PIRIPIRI MC 230 kV TR 230/69 kV PIRIPIRI TR2 PI  RBF FT TR 230/69 kV PIRIPIRI TR2 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
PIRIPIRI MC 230 kV TR 230/69 kV PIRIPIRI TR2 PI  RBF FT TR 230/69 kV PIRIPIRI TR2 PI 061/2001 IPCA RMEL REN 443/2011 01/09/2015 31/08/2038  R$7,445.43
PIRIPIRI MC 230 kV TR 230/69 kV PIRIPIRI TR2 PI  RBF FT TR 230/69 kV PIRIPIRI TR2 PI 061/2001 IPCA RMEL REN 443/2011 01/09/2015 31/08/2038  R$7,445.43
PIRIPIRI MC 230 kV TR 230/69 kV PIRIPIRI TR1 PI  RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBNI REA 2823/2011 01/12/2015 30/11/2045  R$793,962.41
PIRIPIRI MC 230 kV TR 230/69 kV PIRIPIRI TR1 PI  RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
PIRIPIRI MC 230 kV TR 230/69 kV PIRIPIRI TR1 PI  RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
PIRIPIRI MC 230 kV TR 230/69 kV PIRIPIRI TR1 PI  RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$476,693.95
PIRIPIRI MC 230 kV TR 230/138 kV PIRIPIRI TR7 PI RBF FT TR 230/138 kV PIRIPIRI TR7 PI 061/2001 IPCA RBNI REA 2823/2011 17/11/2014 16/11/2044  R$ 1,207,530.81
PIRIPIRI MC 230 kV TR 230/138 kV PIRIPIRI TR5 PI  RBF FT TR 230/138 kV PIRIPIRI TR5 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
PIRIPIRI MC 230 kV TR 230/138 kV PIRIPIRI TR4 PI RBF FT TR 230/138 kV PIRIPIRI TR4 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
PIRIPIRI MC 230 kV TR 230/138 kV PIRIPIRI TR4 PI RBF FT TR 230/138 kV PIRIPIRI TR4 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
PIRIPIRI MC 230 kV TR 230/138 kV PIRIPIRI TR4 PI RBF FT TR 230/138 kV PIRIPIRI TR4 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$476,693.95
PIRIPIRI MC 230 kV RTL 230 kV 10 MVAr PIRIPIRI RT1 PI  RB FT LT 230 kV TERESINA /PIRIPIRI C-1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$99,071.31
PIRIPIRI MC 230 kV BC 230 kV 30 Mvar PIRIPIRI BC2 PI RB FT BC 230 kV 30 Mvar PIRIPIRI BC2 PI 061/2001 IPCA RBNI REA 3208/2011 04/12/2017 03/12/2047  R$ 1,296,388.57
PIRIPIRI MC 230 kV BC 230 kV 30 Mvar PIRIPIRI BC1 PI RB FT BC 230 kV 30 Mvar PIRIPIRI BC1 PI 061/2001 IPCA RBNI REA 2823/2011 29/04/2016 28/04/2047  R$ 1,149,353.62
PIRIPIRI MC 138 kV TR 230/138 kV PIRIPIRI TR7 PI RBF FT TR 230/138 kV PIRIPIRI TR7 PI 061/2001 IPCA RBNI REA 2823/2011 17/11/2014 16/11/2044  R$963,515.13
PIRIPIRI MC 138 kV TR 230/138 kV PIRIPIRI TR5 PI  RBF FT TR 230/138 kV PIRIPIRI TR5 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$121,202.15
PIRIPIRI MC 138 kV TR 230/138 kV PIRIPIRI TR4 PI RBF FT TR 230/138 kV PIRIPIRI TR4 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$121,202.15
PIRIPIRI MC 138 kV TR 230/138 kV PIRIPIRI TR4 PI RBF FT TR 230/138 kV PIRIPIRI TR4 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$357,660.38
PIRIPIRI MC 138 kV TR 230/138 kV PIRIPIRI TR4 PI RBF FT TR 230/138 kV PIRIPIRI TR4 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$366,018.73
PIRIPIRI MC 13,8 kV RTB 13,8 kV 5 Mvar PIRIPIRI RT1 PI  RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,511.84
PIRIPIRI MC 13,8 kV RTB 13,8 kV 5 Mvar PIRIPIRI RT1 PI  RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,223.45
PIRIPIRI MC 13,8 kV RTB 13,8 kV 5 Mvar PIRIPIRI RT1 PI  RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$203,879.20
PIRIPIRI MC 13,8 kV BC 13,8 kV 3,6 MVAr PIRIPIRI BC3 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC3 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
PIRIPIRI MC 13,8 kV BC 13,8 kV 3,6 MVAr PIRIPIRI BC3 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC3 PI 061/2001 IPCA RMEL REN 443/2011 19/05/2016 18/05/2046  R$6,962.35
PIRIPIRI MC 13,8 kV BC 13,8 kV 3,6 MVAr PIRIPIRI BC2 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC2 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
PIRIPIRI MC 13,8 kV BC 13,8 kV 3,6 MVAr PIRIPIRI BC2 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC2 PI 061/2001 IPCA RMEL REN 443/2011 19/05/2016 18/05/2046  R$6,962.35
PIRIPIRI MC 13,8 kV BC 13,8 kV 3,6 MVAr PIRIPIRI BC1 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
PIRIPIRI MC 13,8 kV BC 13,8 kV 3,6 MVAr PIRIPIRI BC1 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC1 PI 061/2001 IPCA RMEL REN 443/2011 19/05/2016 18/05/2046  R$6,962.35
PIRIPIRI IB 69 kV MG 230 kV PIRIPIRI MG1 PI IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
PIRIPIRI IB 230 kV MG 230 kV PIRIPIRI MG1 PI IB1 RB FT MG 230 kV PIRIPIRI MG1 PI 061/2001 IPCA RBNI REA 2823/2011 13/03/2015 12/03/2046  R$336,431.10
PIRIPIRI IB 138 kV MG 230 kV PIRIPIRI MG1 PI IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$93,640.20
PIRIPIRI EL 69 kV PIRIPIRIPIRACURUCA-02J3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PIRIPIRI EL 69 kV PIRIPIRIPIRACURUCA-02J3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
PIRIPIRI EL 69 kV PIRIPIRIPIRACURUCA-02J3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
PIRIPIRI EL 69 kV PIRIPIRIPEDRO II-02J1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PIRIPIRI EL 69 kV PIRIPIRIPEDRO II-02J1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
PIRIPIRI EL 69 kV PIRIPIRIPEDRO II-02J1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
PIRIPIRI EL 69 kV PIRIPIRIESPERANTIN-02J5 DIT   061/2001 IPCA RCDM REA 1814/2009 29/05/2015 28/05/2045  R$485,312.79
PIRIPIRI EL 69 kV PIRIPIRIESPERANTIN-02J2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PIRIPIRI EL 69 kV PIRIPIRIESPERANTIN-02J2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
PIRIPIRI EL 69 kV PIRIPIRIC.MAIOR-02J4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PIRIPIRI EL 230 kV PIRIPIRI LT 230 kV TERESINA /PIRIPIRI C-1 PI RB FT LT 230 kV TERESINA /PIRIPIRI C-1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
PIRIPIRI EL 230 kV PIRIPIRI LT 230 kV TERESINA /PIRIPIRI C-1 PI RB FT LT 230 kV TERESINA /PIRIPIRI C-1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
PIRIPIRI EL 230 kV PIRIPIRI LT 230 kV TERESINA /PIRIPIRI C-1 PI RB FT LT 230 kV TERESINA /PIRIPIRI C-1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$692,788.80
PIRIPIRI EL 230 kV PIRIPIRI LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE  RB FT LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
PIRIPIRI EL 138 kV PIRIPIRITABULEIRO-03C1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$180,723.85
PIRIPIRI EL 138 kV PIRIPIRITABULEIRO-03C1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$533,305.40
PIRIPIRI EL 138 kV PIRIPIRITABULEIRO-03C1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$545,768.47
PIRIPIRI EL 138 kV PIRIPIRITABULEIRO-03C1 DIT   061/2001 IPCA RCDM REA 7761/2019 31/12/2019 30/12/2034  R$44,889.04
PIRIPIRI EL 138 kV PIRIPIRITABULEIRO 03C2 DIT   061/2001 IPCA RCDM REA 2040/2009 26/08/2013 25/08/2043  R$941,871.80
PIRIPIRI EL 13,8 kV PIRIPIRISETE CIDAD-01Y3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
PIRIPIRI EL 13,8 kV PIRIPIRISETE CIDAD-01Y3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$158,986.22
PIRIPIRI EL 13,8 kV PIRIPIRISETE CIDAD-01Y3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$162,701.65
PIRIPIRI EL 13,8 kV PIRIPIRIPIRIPIRI-01Y2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
PIRIPIRI EL 13,8 kV PIRIPIRIPIRIPIRI-01Y2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$158,986.22
PIRIPIRI EL 13,8 kV PIRIPIRIPIRIPIRI-01Y2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$162,701.65
PIRIPIRI EL 13,8 kV PIRIPIRIPIRACURUCA-01Y1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
PIRIPIRI EL 13,8 kV PIRIPIRIPIRACURUCA-01Y1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$158,986.22
PIRIPIRI EL 13,8 kV PIRIPIRIPIRACURUCA-01Y1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$162,701.65
PIRIPIRI BC 230 kV 30 Mvar PIRIPIRI BC2 PI RB FT BC 230 kV 30 Mvar PIRIPIRI BC2 PI 061/2001 IPCA RBNI REA 3208/2011 04/12/2017 03/12/2041  R$405,957.77
PIRIPIRI BC 230 kV 30 Mvar PIRIPIRI BC1 PI RB FT BC 230 kV 30 Mvar PIRIPIRI BC1 PI 061/2001 IPCA RBNI REA 2823/2011 29/04/2016 28/04/2040  R$387,860.73
PIRIPIRI BC 230 kV 30 Mvar PIRIPIRI BC1 PI RB FT BC 230 kV 30 Mvar PIRIPIRI BC1 PI 061/2001 IPCA RBNI REA 5861/2016 03/05/2017 02/05/2045  R$39,385.57
PIRIPIRI BC 13,8 kV 3,6 MVAr PIRIPIRI BC3 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC3 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
PIRIPIRI BC 13,8 kV 3,6 MVAr PIRIPIRI BC3 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC3 PI 061/2001 IPCA RMEL REN 643/2014 07/05/2014 06/05/2028  R$48,061.63
PIRIPIRI BC 13,8 kV 3,6 MVAr PIRIPIRI BC2 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC2 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
PIRIPIRI BC 13,8 kV 3,6 MVAr PIRIPIRI BC2 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC2 PI 061/2001 IPCA RMEL REN 643/2014 06/05/2014 05/05/2028  R$48,054.48
PIRIPIRI BC 13,8 kV 3,6 MVAr PIRIPIRI BC1 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
PIRIPIRI BC 13,8 kV 3,6 MVAr PIRIPIRI BC1 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC1 PI 061/2001 IPCA RMEL REN 643/2014 05/05/2014 04/05/2028  R$48,047.30
PITUACU TT 69/13,8 kV PITUACU TA2 BA DIT   061/2001 IPCA RCDM REA 2412/2010 12/08/2012 11/08/2042  R$287,389.85
PITUACU TT 69/13,8 kV PITUACU TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
PITUACU TT 69/13,8 kV PITUACU TA1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$281,516.05
PITUACU TR 69/13,8 kV PITUACU TR1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
PITUACU TR 69/13,8 kV PITUACU TR1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$86,722.45
PITUACU TR 69/13,8 kV PITUACU TR1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$88,749.11
PITUACU TR 230/69 kV PITUACU TR4 BA RBF FT TR 230/69 kV PITUACU TR4 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
PITUACU TR 230/69 kV PITUACU TR4 BA RBF FT TR 230/69 kV PITUACU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
PITUACU TR 230/69 kV PITUACU TR4 BA RBF FT TR 230/69 kV PITUACU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
PITUACU TR 230/69 kV PITUACU TR3 BA RBF FT TR 230/69 kV PITUACU TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
PITUACU TR 230/69 kV PITUACU TR3 BA RBF FT TR 230/69 kV PITUACU TR3 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
PITUACU TR 230/69 kV PITUACU TR3 BA RBF FT TR 230/69 kV PITUACU TR3 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
PITUACU TR 230/69 kV PITUACU TR2 BA RBF FT TR 230/69 kV PITUACU TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
PITUACU TR 230/69 kV PITUACU TR2 BA RBF FT TR 230/69 kV PITUACU TR2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
PITUACU TR 230/69 kV PITUACU TR2 BA RBF FT TR 230/69 kV PITUACU TR2 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
PITUACU TR 230/69 kV PITUACU TR1 BA RBF FT TR 230/69 kV PITUACU TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
PITUACU TR 230/69 kV PITUACU TR1 BA RBF FT TR 230/69 kV PITUACU TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
PITUACU TR 230/69 kV PITUACU TR1 BA RBF FT TR 230/69 kV PITUACU TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
PITUACU MG 230 kV PITUACU MG1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$645,910.48
PITUACU MG 230 kV PITUACU MG1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RMEL REN 643/2014 27/08/2013 26/08/2030  R$26,841.50
PITUACU MG 230 kV PITUACU MG1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RMEL REN 643/2014 30/04/2015 29/04/2043  R$51,329.93
PITUACU MG 230 kV PITUACU MG1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,906,043.62
PITUACU MG 230 kV PITUACU MG1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,950,586.90
PITUACU MG 230 kV PITUACU MG1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RMEL REN 443/2011 12/06/2016 11/06/2046  R$8,742.27
PITUACU MG 230 kV PITUACU MG1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RMEL REN 443/2011 12/06/2016 11/06/2046  R$8,742.27
PITUACU MG 230 kV PITUACU MG1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RMEL REN 443/2011 12/06/2016 11/06/2046  R$8,742.27
PITUACU MG 230 kV PITUACU MG1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033  R$33,465.01
PITUACU MG 230 kV PITUACU MG1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RBNI DSP 386/2021 17/02/2021 16/02/2036  R$680,181.34
PITUACU MC 69 kV TT 69/13,8 kV PITUACU TA2 BA DIT   061/2001 IPCA RCDM REA 2412/2010 12/08/2012 11/08/2043  R$309,470.19
PITUACU MC 69 kV TT 69/13,8 kV PITUACU TA1 BA  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
PITUACU MC 69 kV TR 230/69 kV PITUACU TR4 BA RBF FT TR 230/69 kV PITUACU TR4 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
PITUACU MC 69 kV TR 230/69 kV PITUACU TR4 BA RBF FT TR 230/69 kV PITUACU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
PITUACU MC 69 kV TR 230/69 kV PITUACU TR4 BA RBF FT TR 230/69 kV PITUACU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$204,189.21
PITUACU MC 69 kV TR 230/69 kV PITUACU TR3 BA RBF FT TR 230/69 kV PITUACU TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
PITUACU MC 69 kV TR 230/69 kV PITUACU TR3 BA RBF FT TR 230/69 kV PITUACU TR3 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
PITUACU MC 69 kV TR 230/69 kV PITUACU TR3 BA RBF FT TR 230/69 kV PITUACU TR3 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$204,189.21
PITUACU MC 69 kV TR 230/69 kV PITUACU TR2 BA RBF FT TR 230/69 kV PITUACU TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
PITUACU MC 69 kV TR 230/69 kV PITUACU TR1 BA RBF FT TR 230/69 kV PITUACU TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
PITUACU MC 69 kV TR 230/69 kV PITUACU TR1 BA RBF FT TR 230/69 kV PITUACU TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
PITUACU MC 69 kV BC 69 kV 21,2 Mvar PITUACU BC1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
PITUACU MC 69 kV BC 69 kV 21,2 Mvar PITUACU BC1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
PITUACU MC 69 kV BC 69 kV 21,2 Mvar PITUACU BC1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$235,271.08
PITUACU MC 230 kV TR 230/69 kV PITUACU TR4 BA RBF FT TR 230/69 kV PITUACU TR4 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
PITUACU MC 230 kV TR 230/69 kV PITUACU TR4 BA RBF FT TR 230/69 kV PITUACU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$515,473.59
PITUACU MC 230 kV TR 230/69 kV PITUACU TR4 BA RBF FT TR 230/69 kV PITUACU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$527,519.95
PITUACU MC 230 kV TR 230/69 kV PITUACU TR3 BA RBF FT TR 230/69 kV PITUACU TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
PITUACU MC 230 kV TR 230/69 kV PITUACU TR3 BA RBF FT TR 230/69 kV PITUACU TR3 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$515,473.59
PITUACU MC 230 kV TR 230/69 kV PITUACU TR3 BA RBF FT TR 230/69 kV PITUACU TR3 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$527,519.95
PITUACU MC 230 kV TR 230/69 kV PITUACU TR3 BA RBF FT TR 230/69 kV PITUACU TR3 BA 061/2001 IPCA RMEL REN 443/2011 03/04/2016 02/04/2046  R$16,431.95
PITUACU MC 230 kV TR 230/69 kV PITUACU TR2 BA RBF FT TR 230/69 kV PITUACU TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
PITUACU MC 230 kV TR 230/69 kV PITUACU TR2 BA RBF FT TR 230/69 kV PITUACU TR2 BA 061/2001 IPCA RMEL REN 643/2014 23/02/2014 22/02/2044  R$64,157.86
PITUACU MC 230 kV TR 230/69 kV PITUACU TR2 BA RBF FT TR 230/69 kV PITUACU TR2 BA 061/2001 IPCA RMEL REN 443/2011 03/04/2016 02/04/2046  R$16,431.95
PITUACU MC 230 kV TR 230/69 kV PITUACU TR1 BA RBF FT TR 230/69 kV PITUACU TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
PITUACU IB 69 kV MG 230 kV PITUACU MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
PITUACU IB 69 kV MG 230 kV PITUACU MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$134,104.45
PITUACU IB 69 kV MG 230 kV PITUACU MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$137,238.41
PITUACU IB 230 kV MG 230 kV PITUACU MG1 BA IB1 RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
PITUACU EL 69 kV PITUACUS.CRIST. 02J9 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PITUACU EL 69 kV PITUACUS.CRIST. 02J9 DIT   061/2001 IPCA RCDM REA 2376/2010 05/04/2014 04/04/2044  R$8,867.72
PITUACU EL 69 kV PITUACUS.CRIST. 02J9 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
PITUACU EL 69 kV PITUACUS.CRIST. 02J9 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
PITUACU EL 69 kV PITUACUS.CRIST. 02J9 DIT   061/2001 IPCA RCDM REA 2837/2011 12/10/2016 11/10/2046  R$37,028.79
PITUACU EL 69 kV PITUACUS.CRIST. 02J8 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PITUACU EL 69 kV PITUACUS.CRIST. 02J8 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
PITUACU EL 69 kV PITUACUS.CRIST. 02J8 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
PITUACU EL 69 kV PITUACUS.CRIST. 02J8 DIT   061/2001 IPCA RCDM REA 2837/2011 08/02/2017 07/02/2047  R$37,262.62
PITUACU EL 69 kV PITUACUS.CRIST. 02J8 DIT   061/2001 IPCA RCDM REA 2837/2011 08/02/2017 07/02/2047  R$37,296.98
PITUACU EL 69 kV PITUACUPITUBA 02J7 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PITUACU EL 69 kV PITUACUPITUBA 02J7 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
PITUACU EL 69 kV PITUACUPITUBA 02J7 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
PITUACU EL 69 kV PITUACUPITUBA 02J7 DIT   061/2001 IPCA RCDM REA 2837/2011 29/11/2017 28/11/2047  R$38,061.06
PITUACU EL 69 kV PITUACUPITUBA 02J6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PITUACU EL 69 kV PITUACUPITUBA 02J6 DIT   061/2001 IPCA RCDM REA 2837/2011 02/08/2015 01/08/2045  R$35,752.64
PITUACU EL 69 kV PITUACUPITUBA 02J6 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
PITUACU EL 69 kV PITUACUPITUBA 02J6 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
PITUACU EL 69 kV PITUACUPITUACU 02V1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PITUACU EL 69 kV PITUACUPITUACU 02V1 DIT   061/2001 IPCA RCDM REA 2376/2010 12/04/2014 11/04/2045  R$31,733.44
PITUACU EL 69 kV PITUACUPITUACU 02V1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
PITUACU EL 69 kV PITUACUPITUACU 02V1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
PITUACU EL 69 kV PITUACUPITUACU 02V1 DIT   061/2001 IPCA RCDM REA 2837/2011 20/03/2017 19/03/2047  R$37,371.26
PITUACU EL 69 kV PITUACUPITUACU 02V1 DIT   061/2001 IPCA RCDM REA 2837/2011 19/03/2017 18/03/2047  R$37,384.87
PITUACU EL 69 kV PITUACUMATATU 02J5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PITUACU EL 69 kV PITUACUMATATU 02J5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
PITUACU EL 69 kV PITUACUMATATU 02J5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
PITUACU EL 69 kV PITUACULFREIT/COTEGIPE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PITUACU EL 69 kV PITUACULFREIT/COTEGIPE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
PITUACU EL 69 kV PITUACULFREIT/COTEGIPE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
PITUACU EL 69 kV PITUACULFREIT/COTEGIPE DIT   061/2001 IPCA RCDM REA 2837/2011 23/10/2016 22/10/2046  R$36,969.31
PITUACU EL 69 kV PITUACUCAJAZ 02J4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PITUACU EL 69 kV PITUACUCAJAZ 02J4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
PITUACU EL 69 kV PITUACUCAJAZ 02J4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
PITUACU EL 69 kV PITUACUCAJAZ 02J3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PITUACU EL 69 kV PITUACUCAJAZ 02J3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
PITUACU EL 69 kV PITUACUCAJAZ 02J3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
PITUACU EL 69 kV PITUACUCAJAZ 02J3 DIT   061/2001 IPCA RCDM REA 2837/2011 29/11/2017 28/11/2047  R$38,061.06
PITUACU EL 69 kV PITUACUCAJAZ 02J3 DIT   061/2001 IPCA RCDM REA 2837/2011 29/11/2017 28/11/2047  R$22,619.48
PITUACU EL 69 kV PITUACUCAB 02J1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
PITUACU EL 69 kV PITUACUCAB 02J1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
PITUACU EL 230 kV PITUACU LT 230 kV PITUACU /RL (COTEGIPE / MATATU) C-1 BA/PE  RB FT LT 230 kV PITUACU /RL (COTEGIPE/MATATU) C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
PITUACU EL 230 kV PITUACU LT 230 kV PITUACU /RL (COTEGIPE / MATATU) C-1 BA/PE  RB FT LT 230 kV PITUACU /RL (COTEGIPE/MATATU) C-1 BA/PE 061/2001 IPCA RMEL REN 643/2014 02/02/2014 01/02/2044  R$64,050.88
PITUACU EL 230 kV PITUACU LT 230 kV PITUACU /RL (COTEGIPE / MATATU) C-1 BA/PE  RB FT LT 230 kV PITUACU /RL (COTEGIPE/MATATU) C-1 BA/PE 061/2001 IPCA RBNI REA 5861/2016 12/01/2018 11/01/2033  R$42,869.29
PITUACU EL 230 kV PITUACU LT 230 kV PITUACU /NARANDIBA C-2 BA  RB FT LT 230 kV PITUACU /NARANDIBA C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
PITUACU EL 230 kV PITUACU LT 230 kV PITUACU /NARANDIBA C-2 BA  RB FT LT 230 kV PITUACU /NARANDIBA C-2 BA 061/2001 IPCA RMEL REN 443/2011 17/10/2015 16/10/2045  R$15,073.52
PITUACU EL 230 kV PITUACU LT 230 kV PITUACU /NARANDIBA C-1 BA  RB FT LT 230 kV PITUACU /NARANDIBA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
PITUACU EL 230 kV PITUACU LT 230 kV CAMACARI IV /PITUACU C-1 BA  RB FT LT 230 kV CAMACARI IV /PITUACU C-1 BA 061/2001 IPCA RBNI REA 2891/2011 05/05/2014 04/05/2040  R$90,749.42
PITUACU EL 230 kV PITUACU LT 230 kV CAMACARI IV /PITUACU C-1 BA  RB FT LT 230 kV CAMACARI IV /PITUACU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
PITUACU EL 230 kV PITUACU LT 230 kV CAMACARI IV /PITUACU C-1 BA  RB FT LT 230 kV CAMACARI IV /PITUACU C-1 BA 061/2001 IPCA RBNI REA 2040/2009 16/05/2014 15/05/2045  R$229,472.36
PITUACU EL 230 kV PITUACU LT 230 kV CAMACARI IV /PITUACU C-1 BA  RB FT LT 230 kV CAMACARI IV /PITUACU C-1 BA 061/2001 IPCA RMEL REN 643/2014 19/01/2014 18/01/2044  R$63,979.54
PITUACU EL 230 kV PITUACU LT 230 kV CAMACARI II /PITUACU C-1 BA  RB FT LT 230 kV CAMACARI II /PITUACU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
PITUACU EL 230 kV PITUACU LT 230 kV CAMACARI II /PITUACU C-1 BA  RB FT LT 230 kV CAMACARI II /PITUACU C-1 BA 061/2001 IPCA RBNI REA 2040/2009 09/06/2014 08/06/2044  R$44,861.00
PITUACU EL 230 kV PITUACU LT 230 kV CAMACARI II /PITUACU C-1 BA  RB FT LT 230 kV CAMACARI II /PITUACU C-1 BA 061/2001 IPCA RBNI REA 2040/2009 30/11/2017 29/11/2047  R$47,120.93
PITUACU EL 230 kV PITUACU LT 230 kV CAMACARI II /PITUACU C-1 BA  RB FT LT 230 kV CAMACARI II /PITUACU C-1 BA 061/2001 IPCA RBNI REA 5861/2016 12/01/2018 11/01/2033  R$122,819.32
PITUACU BC 69 kV 21,2 Mvar PITUACU BC1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$119,845.26
PITUACU BC 69 kV 21,2 Mvar PITUACU BC1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$353,656.29
PITUACU BC 69 kV 21,2 Mvar PITUACU BC1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$361,921.06
POCOES II TR 230/138 kV POCOES II TR2 BA RBF FT TR 230/138 kV POCOES II TR2 BA 005/2012 IPCA RBL CC 005/2012 28/10/2019 10/05/2042  R$ 1,527,110.44
POCOES II TR 230/138 kV POCOES II TR1 BA RBF FT TR 230/138 kV POCOES II TR1 BA 005/2012 IPCA RBL CC 005/2012 28/10/2019 10/05/2042  R$ 1,527,110.44
POCOES II MG 230 kV POCOES II MG1 BA RB FT MG 230 kV POCOES II MG1 BA 005/2012 IPCA RBL CC 005/2012 28/10/2019 10/05/2042  R$ 1,377,925.52
POCOES II MC 230 kV TR 230/138 kV POCOES II TR2 BA RBF FT TR 230/138 kV POCOES II TR2 BA 005/2012 IPCA RBL CC 005/2012 28/10/2019 10/05/2042  R$472,048.71
POCOES II MC 230 kV TR 230/138 kV POCOES II TR1 BA RBF FT TR 230/138 kV POCOES II TR1 BA 005/2012 IPCA RBL CC 005/2012 28/10/2019 10/05/2042  R$472,048.71
POCOES II MC 138 kV TR 230/138 kV POCOES II TR2 BA RBF FT TR 230/138 kV POCOES II TR2 BA 005/2012 IPCA RBL CC 005/2012 28/10/2019 10/05/2042  R$357,320.00
POCOES II MC 138 kV TR 230/138 kV POCOES II TR1 BA RBF FT TR 230/138 kV POCOES II TR1 BA 005/2012 IPCA RBL CC 005/2012 28/10/2019 10/05/2042  R$357,320.00
POCOES II IB 230 kV MG 230 kV POCOES II MG1 BA IB1 RB FT MG 230 kV POCOES II MG1 BA 005/2012 IPCA RBL CC 005/2012 28/10/2019 10/05/2042  R$412,000.61
POCOES II IB 138 kV MG 230 kV POCOES II MG1 BA IB1 DIT   005/2012 IPCA RPEC CC 005/2012 28/10/2019 10/05/2042  R$243,371.42
POCOES II EL 138 kV POCOES IIDIST3 DIT   005/2012 IPCA RPEC CC 005/2012 28/10/2019 10/05/2042  R$418,500.54
POCOES II EL 138 kV POCOES IIDIST2 DIT   005/2012 IPCA RPEC CC 005/2012 28/10/2019 10/05/2042  R$418,500.54
POCOES II EL 138 kV POCOES IIDIST1 DIT   005/2012 IPCA RPEC CC 005/2012 28/10/2019 10/05/2042  R$418,500.54
POLO TT 69/69 kV POLO TT1 BA DIT   014/2010 IPCA RPEC CC 014/2010 11/04/2016 06/10/2040  R$31,504.09
POLO TT 69/0 kV POLO TT2 BA DIT   014/2010 IPCA RCDM REA 5686/2016 06/09/2018 06/09/2048  R$264,435.49
POLO TR 230/69 kV POLO TR3 BA RBF FT TR 230/69 kV POLO TR3 BA 014/2010 IPCA RBNI REA 5686/2016 06/09/2018 06/09/2052  R$ 1,489,914.19
POLO TR 230/69 kV POLO TR2 BA RBF FT TR 230/69 kV POLO TR2 BA 014/2010 IPCA RBNI REA 5686/2016 06/09/2018 06/09/2052  R$ 1,489,914.19
POLO TR 230/69 kV POLO TR1 BA RBF FT TR 230/69 kV POLO TR1 BA 014/2010 IPCA RBL CC 014/2010 11/04/2016 06/10/2040  R$637,277.86
POLO MG 230 kV POLO MG2 BA RB FT MG 230 kV POLO MG2 BA 014/2010 IPCA RBL CC 014/2010 11/04/2016 06/10/2040  R$544,578.02
POLO MG 230 kV POLO MG2 BA RB FT MG 230 kV POLO MG2 BA 014/2010 IPCA RBNI REA 5686/2016 06/09/2018 06/09/2050  R$264,673.35
POLO MG 230 kV POLO MG2 BA RB FT MG 230 kV POLO MG2 BA 014/2010 IPCA RBNI REA 5686/2016 06/09/2018 06/09/2049  R$76,239.75
POLO MG 230 kV POLO MG2 BA RB FT MG 230 kV POLO MG2 BA 014/2010 IPCA RBNI REA 5686/2016 06/09/2018 06/09/2049  R$38,119.87
POLO MC 69 kV TT 69/69 kV POLO TT1 BA  DIT   014/2010 IPCA RPEC CC 014/2010 11/04/2016 06/10/2040  R$34,058.42
POLO MC 69 kV TT 69/0 kV POLO TT2 BA DIT   014/2010 IPCA RCDM REA 5686/2016 06/09/2018 06/09/2038  R$279,205.63
POLO MC 69 kV TR 230/69 kV POLO TR3 BA RBF FT TR 230/69 kV POLO TR3 BA 014/2010 IPCA RBNI REA 5686/2016 06/09/2018 06/09/2040  R$416,232.37
POLO MC 69 kV TR 230/69 kV POLO TR2 BA RBF FT TR 230/69 kV POLO TR2 BA 014/2010 IPCA RBNI REA 5686/2016 06/09/2018 06/09/2040  R$416,232.37
POLO MC 69 kV TR 230/69 kV POLO TR1 BA RBF FT TR 230/69 kV POLO TR1 BA 014/2010 IPCA RBL CC 014/2010 11/04/2016 06/10/2040  R$97,713.14
POLO MC 230 kV TR 230/69 kV POLO TR3 BA RBF FT TR 230/69 kV POLO TR3 BA 014/2010 IPCA RBNI REA 5686/2016 06/09/2018 06/09/2041  R$ 1,127,693.32
POLO MC 230 kV TR 230/69 kV POLO TR2 BA RBF FT TR 230/69 kV POLO TR2 BA 014/2010 IPCA RBNI REA 5686/2016 06/09/2018 06/09/2041  R$ 1,127,693.32
POLO MC 230 kV TR 230/69 kV POLO TR1 BA RBF FT TR 230/69 kV POLO TR1 BA 014/2010 IPCA RBL CC 014/2010 11/04/2016 06/10/2040  R$245,723.62
POLO IB 69 kV MG 230 kV POLO MG2 BA IB1 DIT   014/2010 IPCA RPEC CC 014/2010 11/04/2016 06/10/2040  R$51,155.50
POLO EL 69 kV POLODIST5 DIT   014/2010 IPCA RPEC CC 014/2010 11/04/2016 06/10/2040  R$88,572.35
POLO EL 69 kV POLODIST4 DIT   014/2010 IPCA RPEC CC 014/2010 11/04/2016 06/10/2040  R$88,572.35
POLO EL 69 kV POLODIST3 DIT   014/2010 IPCA RPEC CC 014/2010 11/04/2016 06/10/2040  R$88,572.35
POLO EL 69 kV POLODIST2 DIT   014/2010 IPCA RPEC CC 014/2010 11/04/2016 06/10/2040  R$88,572.35
POLO EL 69 kV POLODIST1 DIT   014/2010 IPCA RPEC CC 014/2010 11/04/2016 06/10/2040  R$88,572.35
QUIXADA RTL 500 kV 60 Mvar QUIXADA RTR1 CE RB FT RTL 500 kV 60 Mvar QUIXADA RTR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$294,317.25
QUIXADA RTL 500 kV 180 Mvar QUIXADA RT1 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$882,951.75
QUIXADA RTL 500 kV 180 Mvar QUIXADA RT1 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RMEL REN 643/2014 25/10/2013 24/10/2048  R$46,221.86
QUIXADA MG 500 kV QUIXADA MG1 CE RB FT MG 500 kV QUIXADA MG1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$764,831.94
QUIXADA MG 500 kV QUIXADA MG1 CE RB FT MG 500 kV QUIXADA MG1 CE 061/2001 IPCA RMEL REN 443/2011 03/10/2016 02/10/2033  R$31,728.92
QUIXADA MC 500 kV RTL 500 kV 180 Mvar QUIXADA RT1 CE  RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$270,833.72
QUIXADA MC 500 kV RTL 500 kV 180 Mvar QUIXADA RT1 CE  RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RMEL REN 443/2011 28/02/2016 27/02/2046  R$55,339.23
QUIXADA IB 500 kV MG 500 kV QUIXADA MG1 CE IB2 RB FT MG 500 kV QUIXADA MG1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
QUIXADA IB 500 kV MG 500 kV QUIXADA MG1 CE IB1 RB FT MG 500 kV QUIXADA MG1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
QUIXADA IB 500 kV MG 500 kV QUIXADA MG1 CE IB1 RB FT MG 500 kV QUIXADA MG1 CE 061/2001 IPCA RMEL REN 643/2014 03/10/2013 02/10/2043  R$17,213.11
QUIXADA IB 500 kV MG 500 kV QUIXADA MG1 CE IB1 RB FT MG 500 kV QUIXADA MG1 CE 061/2001 IPCA RMEL REN 443/2011 29/01/2016 28/01/2046  R$18,404.26
QUIXADA IB 500 kV MG 500 kV QUIXADA MG1 CE IB1 RB FT MG 500 kV QUIXADA MG1 CE 061/2001 IPCA RMEL REN 443/2011 29/01/2016 28/01/2046  R$18,404.26
QUIXADA IB 500 kV MG 500 kV QUIXADA MG1 CE IB1 RB FT MG 500 kV QUIXADA MG1 CE 061/2001 IPCA RMEL REN 443/2011 29/01/2016 28/01/2046  R$18,404.26
QUIXADA IB 500 kV MG 500 kV QUIXADA MG1 CE IB1 RB FT MG 500 kV QUIXADA MG1 CE 061/2001 IPCA RMEL REN 443/2011 29/01/2016 28/01/2046  R$18,404.26
QUIXADA IB 500 kV MG 500 kV QUIXADA MG1 CE IB1 RB FT MG 500 kV QUIXADA MG1 CE 061/2001 IPCA RMEL REN 443/2011 29/01/2016 28/01/2046  R$18,404.26
QUIXADA EL 500 kV QUIXADA LT 500 kV QUIXADA /FORTALEZA II C-1 CE  RB FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
QUIXADA EL 500 kV QUIXADA LT 500 kV QUIXADA /FORTALEZA II C-1 CE  RB FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE 061/2001 IPCA RMEL REN 443/2011 28/02/2016 27/02/2046  R$57,090.97
QUIXADA EL 500 kV QUIXADA LT 500 kV MILAGRES /QUIXADA C-1 CE  RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
QUIXADA EL 500 kV QUIXADA LT 500 kV MILAGRES /QUIXADA C-1 CE  RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RMEL REN 443/2011 28/02/2016 27/02/2046  R$57,090.97
QUIXADA EL 500 kV QUIXADA LT 500 kV MILAGRES /QUIXADA C-1 CE  RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RBNI REA 5484/2015 14/02/2020 13/02/2053  R$244,063.83
QUIXERE MG 230 kV QUIXERE MGA1 CE RB FT MG 230 kV QUIXERE MGA1 CE 061/2001 IPCA RBNI REA 6894/2018 01/07/2018 11/11/2033  R$48,131.91
QUIXERE IB 230 kV MG 230 kV QUIXERE MGA1 CE IB1 RB FT MG 230 kV QUIXERE MGA1 CE 061/2001 IPCA RBNI REA 6894/2018 01/07/2018 11/11/2039  R$76,763.06
QUIXERE EL 230 kV QUIXERE LT 230 kV RUSSAS II /QUIXERE C-1 CE  RB FT LT 230 kV RUSSAS II /QUIXERE C-1 CE 061/2001 IPCA RBNI REA 6894/2018 01/07/2018 11/11/2038  R$126,644.50
QUIXERE EL 230 kV QUIXERE LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN  RB FT LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN 061/2001 IPCA RBNI REA 6894/2018 01/07/2018 11/11/2038  R$126,644.50
RECIFE II TR 69/13,8 kV RECIFE II TR2 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
RECIFE II TR 69/13,8 kV RECIFE II TR2 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$86,722.45
RECIFE II TR 69/13,8 kV RECIFE II TR2 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$88,749.11
RECIFE II TR 69/13,8 kV RECIFE II TR1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
RECIFE II TR 69/13,8 kV RECIFE II TR1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$86,722.45
RECIFE II TR 69/13,8 kV RECIFE II TR1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$88,749.11
RECIFE II TR 500/230 kV RECIFE II TRR1 PE RB FT TR 500/230 kV RECIFE II TRR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$671,320.56
RECIFE II TR 500/230 kV RECIFE II TRR1 PE RB FT TR 500/230 kV RECIFE II TRR1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,981,027.26
RECIFE II TR 500/230 kV RECIFE II TR4C PE RB FT TR 500/230 kV RECIFE II TR4C PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$671,320.56
RECIFE II TR 500/230 kV RECIFE II TR4 PE RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,013,961.67
RECIFE II TR 500/230 kV RECIFE II TR4 PE RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RMEL REN 643/2014 22/09/2013 21/09/2047  R$19,273.07
RECIFE II TR 500/230 kV RECIFE II TR4 PE RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,943,081.78
RECIFE II TR 500/230 kV RECIFE II TR4 PE RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 6,081,968.60
RECIFE II TR 500/230 kV RECIFE II TR3 PE RB FT TR 500/230 kV RECIFE II TR3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,013,961.67
RECIFE II TR 500/230 kV RECIFE II TR3 PE RB FT TR 500/230 kV RECIFE II TR3 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,943,081.78
RECIFE II TR 500/230 kV RECIFE II TR3 PE RB FT TR 500/230 kV RECIFE II TR3 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 6,081,968.60
RECIFE II TR 500/230 kV RECIFE II TR2 PE RB FT TR 500/230 kV RECIFE II TR2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,013,961.67
RECIFE II TR 500/230 kV RECIFE II TR2 PE RB FT TR 500/230 kV RECIFE II TR2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,943,081.78
RECIFE II TR 500/230 kV RECIFE II TR1 PE RB FT TR 500/230 kV RECIFE II TR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,013,961.67
RECIFE II TR 500/230 kV RECIFE II TR1 PE RB FT TR 500/230 kV RECIFE II TR1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,943,081.78
RECIFE II TR 230/13,8 kV RECIFE II TRR1 PE RB FT TR 230/13,8 kV RECIFE II TRR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$255,705.30
RECIFE II TR 230/13,8 kV RECIFE II TRR1 PE RB FT TR 230/13,8 kV RECIFE II TRR1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$754,571.21
RECIFE II TR 230/13,8 kV RECIFE II TRR1 PE RB FT TR 230/13,8 kV RECIFE II TRR1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$772,205.15
RECIFE II TR 230/13,8 kV RECIFE II TR5 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$767,115.89
RECIFE II TR 230/13,8 kV RECIFE II TR5 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,263,713.62
RECIFE II TR 230/13,8 kV RECIFE II TR5 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,316,615.46
RECIFE II RTL 500 kV 33,3 Mvar RECIFE II RTR1 PE RB FT RTL 500 kV 33,3 Mvar RECIFE II RTR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$242,341.83
RECIFE II RTL 500 kV 33,3 Mvar RECIFE II RTR1 PE RB FT RTL 500 kV 33,3 Mvar RECIFE II RTR1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$715,136.41
RECIFE II RTL 500 kV 100 MVAr RECIFE II RT2 PE RB FT RTL 500 kV 100 MVAr RECIFE II RT2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$727,290.45
RECIFE II RTL 500 kV 100 MVAr RECIFE II RT2 PE RB FT RTL 500 kV 100 MVAr RECIFE II RT2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,146,191.10
RECIFE II RTL 500 kV 100 Mvar RECIFE II RT1 PE RB FT RTL 500 kV 100 Mvar RECIFE II RT1 PE 061/2001 IPCA RMEL REA 11954/2022 02/06/2022 02/06/2058  R$ 2,294,301.06
RECIFE II MG 500 kV RECIFE II MG1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,475,580.71
RECIFE II MG 500 kV RECIFE II MG1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBNI REA 2376/2010 01/05/2012 30/04/2040  R$48,847.43
RECIFE II MG 500 kV RECIFE II MG1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RMEL REN 643/2014 30/09/2013 29/09/2030  R$26,396.63
RECIFE II MG 500 kV RECIFE II MG1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RMEL REN 643/2014 07/06/2013 06/06/2030  R$56,224.75
RECIFE II MG 500 kV RECIFE II MG1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2029  R$84,070.59
RECIFE II MG 500 kV RECIFE II MG1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RMEL REN 643/2014 30/03/2014 29/03/2044  R$58,248.22
RECIFE II MG 500 kV RECIFE II MG1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 7,305,292.28
RECIFE II MG 500 kV RECIFE II MG1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 7,476,013.27
RECIFE II MC 69 kV TR 69/13,8 kV RECIFE II TR2 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$60,565.23
RECIFE II MC 69 kV TR 69/13,8 kV RECIFE II TR1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$60,565.23
RECIFE II MC 500 kV TR 500/230 kV RECIFE II TR4 PE  RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
RECIFE II MC 500 kV TR 500/230 kV RECIFE II TR4 PE  RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,319,175.21
RECIFE II MC 500 kV TR 500/230 kV RECIFE II TR4 PE  RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,350,003.67
RECIFE II MC 500 kV TR 500/230 kV RECIFE II TR4 PE  RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RMEL REN 443/2011 05/11/2015 04/11/2045  R$18,284.88
RECIFE II MC 500 kV TR 500/230 kV RECIFE II TR4 PE  RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RMEL REN 443/2011 05/11/2015 04/11/2045  R$36,569.75
RECIFE II MC 500 kV TR 500/230 kV RECIFE II TR3 PE RB FT TR 500/230 kV RECIFE II TR3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
RECIFE II MC 500 kV TR 500/230 kV RECIFE II TR3 PE RB FT TR 500/230 kV RECIFE II TR3 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,319,175.21
RECIFE II MC 500 kV TR 500/230 kV RECIFE II TR2 PE RB FT TR 500/230 kV RECIFE II TR2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
RECIFE II MC 500 kV TR 500/230 kV RECIFE II TR1 PE RB FT TR 500/230 kV RECIFE II TR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
RECIFE II MC 500 kV RTL 500 kV 100 MVAr RECIFE II RT2 PE  RB FT RTL 500 kV 100 MVAr RECIFE II RT2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$270,833.72
RECIFE II MC 500 kV RTL 500 kV 100 Mvar RECIFE II RT1 PE  RB FT RTL 500 kV 100 Mvar RECIFE II RT1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$270,833.72
RECIFE II MC 230 kV TR 500/230 kV RECIFE II TR4 PE  RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
RECIFE II MC 230 kV TR 500/230 kV RECIFE II TR4 PE  RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$515,473.59
RECIFE II MC 230 kV TR 500/230 kV RECIFE II TR4 PE  RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$527,519.95
RECIFE II MC 230 kV TR 500/230 kV RECIFE II TR4 PE  RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RBNI REA 6137/2016 15/07/2020 15/07/2046  R$96,774.49
RECIFE II MC 230 kV TR 500/230 kV RECIFE II TR3 PE RB FT TR 500/230 kV RECIFE II TR3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$210,996.61
RECIFE II MC 230 kV TR 500/230 kV RECIFE II TR3 PE RB FT TR 500/230 kV RECIFE II TR3 PE 061/2001 IPCA RBNI REA 6137/2016 06/08/2020 06/08/2051  R$335,817.01
RECIFE II MC 230 kV TR 500/230 kV RECIFE II TR2 PE RB FT TR 500/230 kV RECIFE II TR2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$210,996.61
RECIFE II MC 230 kV TR 500/230 kV RECIFE II TR2 PE RB FT TR 500/230 kV RECIFE II TR2 PE 061/2001 IPCA RBNI REA 6137/2016 16/06/2020 16/06/2051  R$335,817.01
RECIFE II MC 230 kV TR 500/230 kV RECIFE II TR1 PE RB FT TR 500/230 kV RECIFE II TR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$210,996.61
RECIFE II MC 230 kV TR 500/230 kV RECIFE II TR1 PE RB FT TR 500/230 kV RECIFE II TR1 PE 061/2001 IPCA RMEL REN 643/2014 23/02/2014 22/02/2044  R$64,157.86
RECIFE II MC 230 kV TR 500/230 kV RECIFE II TR1 PE RB FT TR 500/230 kV RECIFE II TR1 PE 061/2001 IPCA RMEL REN 643/2014 23/02/2014 22/02/2044  R$64,157.86
RECIFE II MC 230 kV TR 500/230 kV RECIFE II TR1 PE RB FT TR 500/230 kV RECIFE II TR1 PE 061/2001 IPCA RBNI REA 6137/2016 16/06/2020 16/06/2051  R$211,028.12
RECIFE II MC 230 kV TR 230/13,8 kV RECIFE II TR5 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
RECIFE II MC 230 kV TR 230/13,8 kV RECIFE II TR5 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$515,473.59
RECIFE II MC 230 kV TR 230/13,8 kV RECIFE II TR5 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBNI REA 6137/2016 31/07/2020 31/07/2046  R$96,774.49
RECIFE II MC 230 kV BC 230 kV 50,5 MVAr RECIFE II BC2 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$194,878.24
RECIFE II MC 230 kV BC 230 kV 50,5 MVAr RECIFE II BC2 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC2 PE 061/2001 IPCA RMEL REN 443/2011 28/07/2016 27/07/2044  R$16,134.60
RECIFE II MC 230 kV BC 230 kV 50,5 MVAr RECIFE II BC2 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC2 PE 061/2001 IPCA RBNI REA 6137/2016 16/06/2020 16/06/2047  R$84,039.71
RECIFE II MC 230 kV BC 230 kV 50,5 MVAr RECIFE II BC1 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$194,878.24
RECIFE II MC 230 kV BC 230 kV 50,5 MVAr RECIFE II BC1 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$575,074.17
RECIFE II MC 230 kV BC 230 kV 50,5 MVAr RECIFE II BC1 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$588,513.36
RECIFE II MC 230 kV BC 230 kV 50,5 MVAr RECIFE II BC1 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC1 PE 061/2001 IPCA RMEL REN 443/2011 01/07/2016 30/06/2044  R$16,099.76
RECIFE II MC 230 kV BC 230 kV 50,5 MVAr RECIFE II BC1 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC1 PE 061/2001 IPCA RBNI REA 6137/2016 16/06/2020 16/06/2047  R$84,039.71
RECIFE II MC 13,8 kV CS 150/-105 MVAr RECIFE II CS2 PE  RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$65,134.54
RECIFE II MC 13,8 kV CS 150/-105 MVAr RECIFE II CS1 PE  RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$65,134.54
RECIFE II MC 13,8 kV CS 150/-105 MVAr RECIFE II CS1 PE  RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$192,208.19
RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB4 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB4 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RMEL REN 443/2011 07/08/2015 06/08/2045  R$18,158.45
RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB4 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RMEL REN 443/2011 07/08/2015 06/08/2045  R$18,158.45
RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB4 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RMEL REN 443/2011 07/08/2015 06/08/2045  R$18,158.45
RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB3 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB3 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RMEL REN 443/2011 30/09/2015 29/09/2045  R$18,234.30
RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB3 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RMEL REN 443/2011 30/09/2015 29/09/2045  R$18,234.30
RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB2 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB2 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RMEL REN 443/2011 25/09/2015 24/09/2045  R$18,227.28
RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB2 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RMEL REN 443/2011 25/09/2015 24/09/2045  R$18,227.28
RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB1 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB1 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,399,926.89
RECIFE II IB 230 kV MG 500 kV RECIFE II MG1 PE IB2 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
RECIFE II IB 230 kV MG 500 kV RECIFE II MG1 PE IB2 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$423,550.65
RECIFE II IB 230 kV MG 500 kV RECIFE II MG1 PE IB2 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$433,448.81
RECIFE II IB 230 kV MG 500 kV RECIFE II MG1 PE IB1 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
RECIFE II EL 69 kV RECIFE II LT 69 kV JABOATAO /RECIFE II C-1 RJ/PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$74,742.25
RECIFE II EL 69 kV RECIFE II LT 69 kV JABOATAO /RECIFE II C-1 RJ/PE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$220,559.95
RECIFE II EL 500 kV RECIFE II LT 500 kV SUAPE II /RECIFE II C-1 PE RB FT LT 500 kV SUAPE II /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
RECIFE II EL 500 kV RECIFE II LT 500 kV SUAPE II /RECIFE II C-1 PE RB FT LT 500 kV SUAPE II /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,494,659.50
RECIFE II EL 500 kV RECIFE II LT 500 kV SUAPE II /RECIFE II C-1 PE RB FT LT 500 kV SUAPE II /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,529,588.93
RECIFE II EL 500 kV RECIFE II LT 500 kV SUAPE II /RECIFE II C-1 PE RB FT LT 500 kV SUAPE II /RECIFE II C-1 PE 061/2001 IPCA RMEL REN 443/2011 21/08/2015 20/08/2045  R$18,178.11
RECIFE II EL 500 kV RECIFE II LT 500 kV SUAPE II /RECIFE II C-1 PE RB FT LT 500 kV SUAPE II /RECIFE II C-1 PE 061/2001 IPCA RMEL REN 443/2011 21/08/2015 20/08/2045  R$18,178.11
RECIFE II EL 500 kV RECIFE II LT 500 kV PAU FERRO /RECIFE II C-1 PE  RB FT LT 500 kV PAU FERRO /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
RECIFE II EL 500 kV RECIFE II LT 500 kV PAU FERRO /RECIFE II C-1 PE  RB FT LT 500 kV PAU FERRO /RECIFE II C-1 PE 061/2001 IPCA RBNI REA 5861/2016 08/06/2016 07/06/2044  R$28,215.83
RECIFE II EL 500 kV RECIFE II LT 500 kV PAU FERRO /RECIFE II C-1 PE  RB FT LT 500 kV PAU FERRO /RECIFE II C-1 PE 061/2001 IPCA RBNI REA 5861/2016 08/06/2016 07/06/2031  R$107,427.70
RECIFE II EL 500 kV RECIFE II LT 500 kV ANGELIM II /RECIFE II C-2 PE  RB FT LT 500 kV ANGELIM II /RECIFE II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
RECIFE II EL 230 kV RECIFE II LT 230 kV RIBEIRAO /RECIFE II C-2 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
RECIFE II EL 230 kV RECIFE II LT 230 kV RIBEIRAO /RECIFE II C-2 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-2 PE 061/2001 IPCA RBNI REA 6137/2016 12/08/2020 12/08/2050  R$187,080.98
RECIFE II EL 230 kV RECIFE II LT 230 kV RIBEIRAO /RECIFE II C-2 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-2 PE 061/2001 IPCA RBNI REA 7761/2019 02/05/2019 01/05/2034  R$13,552.20
RECIFE II EL 230 kV RECIFE II LT 230 kV RIBEIRAO /RECIFE II C-1 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
RECIFE II EL 230 kV RECIFE II LT 230 kV RIBEIRAO /RECIFE II C-1 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE 061/2001 IPCA RMEL REN 643/2014 30/03/2014 29/03/2042  R$40,240.85
RECIFE II EL 230 kV RECIFE II LT 230 kV RIBEIRAO /RECIFE II C-1 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE 061/2001 IPCA RBNI REA 6137/2016 03/01/2021 03/01/2051  R$108,304.10
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /PIRAPAMA II C-2 PE RB FT LT 230 kV RECIFE II /PIRAPAMA II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /PIRAPAMA II C-2 PE RB FT LT 230 kV RECIFE II /PIRAPAMA II C-2 PE 061/2001 IPCA RBNI REA 6137/2016 26/07/2021 26/07/2051  R$187,080.98
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /PAU FERRO C-2 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /PAU FERRO C-2 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-2 PE 061/2001 IPCA RBNI REA 2040/2009 29/04/2015 28/04/2045  R$102,395.51
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /PAU FERRO C-2 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-2 PE 061/2001 IPCA RBNI REA 6137/2016 26/04/2021 26/04/2051  R$187,080.98
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /PAU FERRO C-1 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /PAU FERRO C-1 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-1 PE 061/2001 IPCA RBNI REA 2040/2009 29/04/2015 28/04/2045  R$102,395.51
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /PAU FERRO C-1 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-1 PE 061/2001 IPCA RBNI REA 6137/2016 07/03/2021 07/03/2051  R$187,080.98
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RMEL REN 643/2014 30/03/2014 29/03/2042  R$40,240.85
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RMEL REN 443/2011 08/11/2015 07/11/2045  R$14,303.57
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RMEL REN 443/2011 08/11/2015 07/11/2045  R$14,303.57
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RMEL REN 443/2011 08/11/2015 07/11/2045  R$14,303.57
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RBNI REA 5861/2016 31/05/2014 30/05/2029  R$4,139.84
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RBNI REA 6137/2016 07/06/2021 07/06/2051  R$187,080.98
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-2 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-2 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-2 PE 061/2001 IPCA RMEL REN 643/2014 28/02/2014 27/02/2042  R$40,137.29
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-2 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-2 PE 061/2001 IPCA RBNI REA 5861/2016 31/05/2014 30/05/2029  R$4,139.84
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-2 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-2 PE 061/2001 IPCA RBNI REA 6137/2016 20/01/2021 20/01/2051  R$187,080.98
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-1 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-1 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-1 PE 061/2001 IPCA RMEL REN 643/2014 08/12/2013 07/12/2041  R$39,854.25
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-1 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-1 PE 061/2001 IPCA RBNI REA 6137/2016 07/06/2021 07/06/2051  R$187,080.98
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-1 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-1 PE 061/2001 IPCA RBNI REA 5861/2016 09/05/2017 08/05/2032  R$ 394.55
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JOAIRAM C-3 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JOAIRAM C-3 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-3 PE 061/2001 IPCA RBNI REA 6137/2016 05/04/2021 05/04/2051  R$187,080.98
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JOAIRAM C-2 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JOAIRAM C-2 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-2 PE 061/2001 IPCA RBNI REA 6137/2016 21/12/2020 21/12/2050  R$187,080.98
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JOAIRAM C-1 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JOAIRAM C-1 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JOAIRAM C-1 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$735,719.99
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JOAIRAM C-1 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-1 PE 061/2001 IPCA RMEL REN 443/2011 23/01/2016 22/01/2046  R$14,387.07
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JOAIRAM C-1 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-1 PE 061/2001 IPCA RMEL REN 443/2011 23/01/2016 22/01/2046  R$14,387.07
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JOAIRAM C-1 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-1 PE 061/2001 IPCA RBNI REA 6137/2016 31/07/2020 31/07/2050  R$100,387.65
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JABOATAO II C-1 PE RB FT LT 230 kV RECIFE II /JABOATAO II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JABOATAO II C-1 PE RB FT LT 230 kV RECIFE II /JABOATAO II C-1 PE 061/2001 IPCA RBNI REA 6137/2016 24/07/2020 24/07/2050  R$187,080.98
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /GOIANINHA C-2 PE RB FT LT 230 kV RECIFE II /GOIANINHA C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /GOIANINHA C-2 PE RB FT LT 230 kV RECIFE II /GOIANINHA C-2 PE 061/2001 IPCA RBNI REA 6137/2016 28/06/2021 28/06/2051  R$187,080.98
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /GOIANINHA C-2 PE RB FT LT 230 kV RECIFE II /GOIANINHA C-2 PE 061/2001 IPCA RBNI REA 7761/2019 02/05/2019 01/05/2034  R$13,552.20
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /GOIANINHA C-1 PE RB FT LT 230 kV RECIFE II /GOIANINHA C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /GOIANINHA C-1 PE RB FT LT 230 kV RECIFE II /GOIANINHA C-1 PE 061/2001 IPCA RMEL REN 443/2011 23/01/2016 22/01/2046  R$14,387.07
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /GOIANINHA C-1 PE RB FT LT 230 kV RECIFE II /GOIANINHA C-1 PE 061/2001 IPCA RBNI REA 6137/2016 17/05/2021 17/05/2051  R$187,080.98
RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /GOIANINHA C-1 PE RB FT LT 230 kV RECIFE II /GOIANINHA C-1 PE 061/2001 IPCA RBNI REA 7761/2019 02/05/2019 01/05/2034  R$13,552.20
RECIFE II EL 230 kV RECIFE II LT 230 kV ANGELIM /RECIFE II C-1 PE RB FT LT 230 kV ANGELIM /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
RECIFE II EL 230 kV RECIFE II LT 230 kV ANGELIM /RECIFE II C-1 PE RB FT LT 230 kV ANGELIM /RECIFE II C-1 PE 061/2001 IPCA RBNI REA 6137/2016 20/01/2021 20/01/2051  R$187,080.98
RECIFE II EL 230 kV RECIFE II LT 230 kV ANGELIM /RECIFE II C-1 PE RB FT LT 230 kV ANGELIM /RECIFE II C-1 PE 061/2001 IPCA RBNI REA 7761/2019 02/05/2019 01/05/2034  R$13,552.20
RECIFE II CS 150/-105 MVAr RECIFE II CS2 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,744,465.94
RECIFE II CS 150/-105 MVAr RECIFE II CS2 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,147,815.84
RECIFE II CS 150/-105 MVAr RECIFE II CS2 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 5,268,117.69
RECIFE II CS 150/-105 MVAr RECIFE II CS2 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RMEL REN 443/2011 11/11/2016 10/11/2041  R$293,909.20
RECIFE II CS 150/-105 MVAr RECIFE II CS1 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,744,465.94
RECIFE II CS 150/-105 MVAr RECIFE II CS1 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,147,815.84
RECIFE II CS 150/-105 MVAr RECIFE II CS1 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 5,268,117.69
RECIFE II CS 150/-105 MVAr RECIFE II CS1 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RMEL REN 443/2011 05/03/2016 04/03/2041  R$296,855.42
RECIFE II BC 230 kV 50,5 MVAr RECIFE II BC2 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,671.37
RECIFE II BC 230 kV 50,5 MVAr RECIFE II BC2 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$609,874.99
RECIFE II BC 230 kV 50,5 MVAr RECIFE II BC2 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$624,127.46
RECIFE II BC 230 kV 50,5 MVAr RECIFE II BC1 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,671.37
RECIFE II BC 230 kV 50,5 MVAr RECIFE II BC1 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$609,874.99
RECIFE II BC 230 kV 50,5 MVAr RECIFE II BC1 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$624,127.46
RIBEIRAO TT 69/13,8 kV RIBEIRAO TA1 PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
RIBEIRAO TT 69/13,8 kV RIBEIRAO TA1 PE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$281,516.05
RIBEIRAO TT 69/13,8 kV RIBEIRAO TA1 PE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$288,094.94
RIBEIRAO TT 69/0 kV RIBEIRAO TA2 PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
RIBEIRAO TR 230/69 kV RIBEIRAO TR4 PE RBF FT TR 230/69 kV RIBEIRAO TR4 PE 061/2001 IPCA RBNI REA 3965/2013 14/11/2016 13/11/2050  R$ 1,557,494.02
RIBEIRAO TR 230/69 kV RIBEIRAO TR3 PE RBF FT TR 230/69 kV RIBEIRAO TR3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
RIBEIRAO TR 230/69 kV RIBEIRAO TR3 PE RBF FT TR 230/69 kV RIBEIRAO TR3 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
RIBEIRAO TR 230/69 kV RIBEIRAO TR3 PE RBF FT TR 230/69 kV RIBEIRAO TR3 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
RIBEIRAO TR 230/69 kV RIBEIRAO TR2 PE RBF FT TR 230/69 kV RIBEIRAO TR2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
RIBEIRAO TR 230/69 kV RIBEIRAO TR2 PE RBF FT TR 230/69 kV RIBEIRAO TR2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
RIBEIRAO TR 230/69 kV RIBEIRAO TR2 PE RBF FT TR 230/69 kV RIBEIRAO TR2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
RIBEIRAO TR 230/69 kV RIBEIRAO TR1 PE RBF FT TR 230/69 kV RIBEIRAO TR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
RIBEIRAO MG 230 kV RIBEIRAO MG1 PE RB FT MG 230 kV RIBEIRAO MG1 PE 061/2001 IPCA RBNI REA 3817/2013 20/08/2019 20/08/2050  R$119,286.88
RIBEIRAO MG 230 kV RIBEIRAO MG1 PE RB FT MG 230 kV RIBEIRAO MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$571,115.23
RIBEIRAO MG 230 kV RIBEIRAO MG1 PE RB FT MG 230 kV RIBEIRAO MG1 PE 061/2001 IPCA RBNI REA 3965/2013 14/11/2016 13/11/2044  R$276,611.18
RIBEIRAO MG 230 kV RIBEIRAO MG1 PE RB FT MG 230 kV RIBEIRAO MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,685,327.28
RIBEIRAO MG 230 kV RIBEIRAO MG1 PE RB FT MG 230 kV RIBEIRAO MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,724,712.53
RIBEIRAO MC 69 kV TR 230/69 kV RIBEIRAO TR4 PE  RBF FT TR 230/69 kV RIBEIRAO TR4 PE 061/2001 IPCA RBNI REA 3965/2013 14/11/2016 13/11/2046  R$467,580.73
RIBEIRAO MC 69 kV TR 230/69 kV RIBEIRAO TR3 PE RBF FT TR 230/69 kV RIBEIRAO TR3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
RIBEIRAO MC 69 kV TR 230/69 kV RIBEIRAO TR3 PE RBF FT TR 230/69 kV RIBEIRAO TR3 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
RIBEIRAO MC 69 kV TR 230/69 kV RIBEIRAO TR2 PE RBF FT TR 230/69 kV RIBEIRAO TR2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
RIBEIRAO MC 69 kV TR 230/69 kV RIBEIRAO TR2 PE RBF FT TR 230/69 kV RIBEIRAO TR2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
RIBEIRAO MC 69 kV TR 230/69 kV RIBEIRAO TR2 PE RBF FT TR 230/69 kV RIBEIRAO TR2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$204,189.21
RIBEIRAO MC 69 kV TR 230/69 kV RIBEIRAO TR1 PE  RBF FT TR 230/69 kV RIBEIRAO TR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
RIBEIRAO MC 230 kV TR 230/69 kV RIBEIRAO TR4 PE  RBF FT TR 230/69 kV RIBEIRAO TR4 PE 061/2001 IPCA RBNI REA 3965/2013 14/11/2016 13/11/2046  R$ 1,208,381.25
RIBEIRAO MC 230 kV TR 230/69 kV RIBEIRAO TR3 PE RBF FT TR 230/69 kV RIBEIRAO TR3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
RIBEIRAO MC 230 kV TR 230/69 kV RIBEIRAO TR3 PE RBF FT TR 230/69 kV RIBEIRAO TR3 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
RIBEIRAO MC 230 kV TR 230/69 kV RIBEIRAO TR3 PE RBF FT TR 230/69 kV RIBEIRAO TR3 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$476,693.95
RIBEIRAO MC 230 kV TR 230/69 kV RIBEIRAO TR2 PE RBF FT TR 230/69 kV RIBEIRAO TR2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
RIBEIRAO MC 230 kV TR 230/69 kV RIBEIRAO TR2 PE RBF FT TR 230/69 kV RIBEIRAO TR2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
RIBEIRAO MC 230 kV TR 230/69 kV RIBEIRAO TR2 PE RBF FT TR 230/69 kV RIBEIRAO TR2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$476,693.95
RIBEIRAO MC 230 kV TR 230/69 kV RIBEIRAO TR1 PE  RBF FT TR 230/69 kV RIBEIRAO TR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
RIBEIRAO IB 69 kV MG 230 kV RIBEIRAO MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
RIBEIRAO IB 69 kV MG 230 kV RIBEIRAO MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$134,104.45
RIBEIRAO IB 69 kV MG 230 kV RIBEIRAO MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$137,238.41
RIBEIRAO IB 230 kV MG 230 kV RIBEIRAO MG1 PE IB1 RB FT MG 230 kV RIBEIRAO MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,929.18
RIBEIRAO IB 230 kV MG 230 kV RIBEIRAO MG1 PE IB1 RB FT MG 230 kV RIBEIRAO MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$368,658.63
RIBEIRAO IB 230 kV MG 230 kV RIBEIRAO MG1 PE IB1 RB FT MG 230 kV RIBEIRAO MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$377,273.99
RIBEIRAO EL 69 kV RIBEIRAODIST9 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
RIBEIRAO EL 69 kV RIBEIRAODIST9 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
RIBEIRAO EL 69 kV RIBEIRAODIST9 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
RIBEIRAO EL 69 kV RIBEIRAODIST8 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
RIBEIRAO EL 69 kV RIBEIRAODIST8 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
RIBEIRAO EL 69 kV RIBEIRAODIST8 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
RIBEIRAO EL 69 kV RIBEIRAODIST7 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
RIBEIRAO EL 69 kV RIBEIRAODIST7 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
RIBEIRAO EL 69 kV RIBEIRAODIST7 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
RIBEIRAO EL 69 kV RIBEIRAODIST6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
RIBEIRAO EL 69 kV RIBEIRAODIST6 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
RIBEIRAO EL 69 kV RIBEIRAODIST6 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
RIBEIRAO EL 69 kV RIBEIRAODIST5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
RIBEIRAO EL 69 kV RIBEIRAODIST5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
RIBEIRAO EL 69 kV RIBEIRAODIST5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
RIBEIRAO EL 69 kV RIBEIRAODIST4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
RIBEIRAO EL 69 kV RIBEIRAODIST4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
RIBEIRAO EL 69 kV RIBEIRAODIST4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
RIBEIRAO EL 69 kV RIBEIRAODIST3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
RIBEIRAO EL 69 kV RIBEIRAODIST3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
RIBEIRAO EL 69 kV RIBEIRAODIST3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
RIBEIRAO EL 69 kV RIBEIRAODIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
RIBEIRAO EL 69 kV RIBEIRAODIST2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
RIBEIRAO EL 69 kV RIBEIRAODIST2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
RIBEIRAO EL 69 kV RIBEIRAODIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
RIBEIRAO EL 69 kV RIBEIRAODIST1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
RIBEIRAO EL 69 kV RIBEIRAODIST1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
RIBEIRAO EL 69 kV RIBEIRAODIS10 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
RIBEIRAO EL 230 kV RIBEIRAO LT 230 kV RIBEIRAO /RECIFE II C-2 PE  RB FT LT 230 kV RIBEIRAO /RECIFE II C-2 PE 061/2001 IPCA RBNI REA 3817/2013 20/08/2019 20/08/2044  R$740,253.79
RIBEIRAO EL 230 kV RIBEIRAO LT 230 kV RIBEIRAO /RECIFE II C-1 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
RIBEIRAO EL 230 kV RIBEIRAO LT 230 kV RIBEIRAO /RECIFE II C-1 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE 061/2001 IPCA RMEL REN 643/2014 30/11/2014 29/11/2042  R$41,086.51
RIBEIRAO EL 230 kV RIBEIRAO LT 230 kV RIBEIRAO /RECIFE II C-1 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
RIBEIRAO EL 230 kV RIBEIRAO LT 230 kV RIBEIRAO /RECIFE II C-1 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$692,788.80
RIBEIRAO EL 230 kV RIBEIRAO LT 230 kV ANGELIM /RIBEIRAO C-2 PE  RB FT LT 230 kV ANGELIM /RIBEIRAO C-1 PE 061/2001 IPCA RBNI REA 3817/2013 20/08/2019 20/08/2044  R$740,253.79
RIBEIRAO EL 230 kV RIBEIRAO LT 230 kV ANGELIM /RIBEIRAO C-1 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
RIBEIRAO EL 230 kV RIBEIRAO LT 230 kV ANGELIM /RIBEIRAO C-1 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
RIBEIRAO EL 230 kV RIBEIRAO LT 230 kV ANGELIM /RIBEIRAO C-1 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$692,788.80
RIO LARGO II TT 69/13,8 kV RIO LARGO II TA2 AL DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
RIO LARGO II TT 69/13,8 kV RIO LARGO II TA2 AL DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$281,516.05
RIO LARGO II TT 69/13,8 kV RIO LARGO II TA2 AL DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$288,094.94
RIO LARGO II TT 69/13,8 kV RIO LARGO II TA1 AL DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
RIO LARGO II TT 69/13,8 kV RIO LARGO II TA1 AL DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$281,516.05
RIO LARGO II TT 69/13,8 kV RIO LARGO II TA1 AL DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$288,094.94
RIO LARGO II TR 69/13,8 kV RIO LARGO II TR4 AL RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
RIO LARGO II TR 69/13,8 kV RIO LARGO II TR4 AL RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$86,722.45
RIO LARGO II TR 69/13,8 kV RIO LARGO II TR4 AL RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$88,749.11
RIO LARGO II TR 230/69 kV RIO LARGO II TR5 AL RBF FT TR 230/69 kV RIO LARGO II TR5 AL 061/2001 IPCA RBNI REA 2823/2011 17/02/2014 16/02/2048  R$ 1,467,229.75
RIO LARGO II TR 230/69 kV RIO LARGO II TR3 AL RBF FT TR 230/69 kV RIO LARGO II TR3 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
RIO LARGO II TR 230/69 kV RIO LARGO II TR3 AL RBF FT TR 230/69 kV RIO LARGO II TR3 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
RIO LARGO II TR 230/69 kV RIO LARGO II TR3 AL RBF FT TR 230/69 kV RIO LARGO II TR3 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
RIO LARGO II TR 230/69 kV RIO LARGO II TR1 AL RBF FT TR 230/69 kV RIO LARGO II TR1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
RIO LARGO II TR 230/69 kV RIO LARGO II TR1 AL RBF FT TR 230/69 kV RIO LARGO II TR1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
RIO LARGO II TR 230/69 kV RIO LARGO II TR1 AL RBF FT TR 230/69 kV RIO LARGO II TR1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
RIO LARGO II MG 230 kV RIO LARGO II MG1 AL RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RBNI REA 2823/2011 17/02/2014 16/02/2044  R$ 1,075,345.97
RIO LARGO II MG 230 kV RIO LARGO II MG1 AL RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$600,798.09
RIO LARGO II MG 230 kV RIO LARGO II MG1 AL RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RMEL REN 643/2014 30/09/2013 29/09/2030  R$26,967.83
RIO LARGO II MG 230 kV RIO LARGO II MG1 AL RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RMEL REN 643/2014 09/08/2013 08/08/2030  R$28,973.99
RIO LARGO II MG 230 kV RIO LARGO II MG1 AL RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,772,919.63
RIO LARGO II MG 230 kV RIO LARGO II MG1 AL RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,814,351.87
RIO LARGO II MC 69 kV TR 69/13,8 kV RIO LARGO II TR4 AL  RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
RIO LARGO II MC 69 kV TR 69/13,8 kV RIO LARGO II TR4 AL  RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
RIO LARGO II MC 69 kV TR 69/13,8 kV RIO LARGO II TR4 AL  RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$204,189.21
RIO LARGO II MC 69 kV TR 230/69 kV RIO LARGO II TR5 AL  RBF FT TR 230/69 kV RIO LARGO II TR5 AL 061/2001 IPCA RBNI REA 2823/2011 17/02/2014 16/02/2045  R$463,701.60
RIO LARGO II MC 69 kV TR 230/69 kV RIO LARGO II TR3 AL  RBF FT TR 230/69 kV RIO LARGO II TR3 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
RIO LARGO II MC 69 kV TR 230/69 kV RIO LARGO II TR1 AL  RBF FT TR 230/69 kV RIO LARGO II TR1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
RIO LARGO II MC 69 kV TR 230/69 kV RIO LARGO II TR1 AL  RBF FT TR 230/69 kV RIO LARGO II TR1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
RIO LARGO II MC 69 kV BC 69 kV 27,1 Mvar RIO LARGO II BC2 AL  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
RIO LARGO II MC 69 kV BC 69 kV 27,1 Mvar RIO LARGO II BC2 AL  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
RIO LARGO II MC 69 kV BC 69 kV 27,1 Mvar RIO LARGO II BC2 AL  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$235,271.08
RIO LARGO II MC 69 kV BC 69 kV 21,3 Mvar RIO LARGO II BC4 AL  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
RIO LARGO II MC 69 kV BC 69 kV 21,3 Mvar RIO LARGO II BC4 AL  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
RIO LARGO II MC 69 kV BC 69 kV 21,3 Mvar RIO LARGO II BC4 AL  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$235,271.08
RIO LARGO II MC 69 kV BC 69 kV 21,3 Mvar RIO LARGO II BC3 AL  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
RIO LARGO II MC 69 kV BC 69 kV 21,3 Mvar RIO LARGO II BC3 AL  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
RIO LARGO II MC 69 kV BC 69 kV 21,3 Mvar RIO LARGO II BC3 AL  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$235,271.08
RIO LARGO II MC 69 kV BC 69 kV 21,3 Mvar RIO LARGO II BC1 AL  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
RIO LARGO II MC 69 kV BC 69 kV 21,3 Mvar RIO LARGO II BC1 AL  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
RIO LARGO II MC 69 kV BC 69 kV 21,3 Mvar RIO LARGO II BC1 AL  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$235,271.08
RIO LARGO II MC 230 kV TR 230/69 kV RIO LARGO II TR5 AL  RBF FT TR 230/69 kV RIO LARGO II TR5 AL 061/2001 IPCA RBNI REA 2823/2011 17/02/2014 16/02/2044  R$ 1,189,665.45
RIO LARGO II MC 230 kV TR 230/69 kV RIO LARGO II TR3 AL  RBF FT TR 230/69 kV RIO LARGO II TR3 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
RIO LARGO II MC 230 kV TR 230/69 kV RIO LARGO II TR3 AL  RBF FT TR 230/69 kV RIO LARGO II TR3 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
RIO LARGO II MC 230 kV TR 230/69 kV RIO LARGO II TR1 AL  RBF FT TR 230/69 kV RIO LARGO II TR1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
RIO LARGO II MC 230 kV TR 230/69 kV RIO LARGO II TR1 AL  RBF FT TR 230/69 kV RIO LARGO II TR1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
RIO LARGO II IB 69 kV MG 230 kV RIO LARGO II MG1 AL IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
RIO LARGO II IB 69 kV MG 230 kV RIO LARGO II MG1 AL IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$134,104.45
RIO LARGO II IB 230 kV MG 230 kV RIO LARGO II MG1 AL IB1 RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,929.18
RIO LARGO II EL 69 kV RIO LARGO IITAB.MARTINS 2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
RIO LARGO II EL 69 kV RIO LARGO IITAB.MARTINS 2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
RIO LARGO II EL 69 kV RIO LARGO IITAB.MARTINS 1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
RIO LARGO II EL 69 kV RIO LARGO IITAB.MARTINS 1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
RIO LARGO II EL 69 kV RIO LARGO IIS.L.QUITUNDE 1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
RIO LARGO II EL 69 kV RIO LARGO IIS.L.QUITUNDE 1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
RIO LARGO II EL 69 kV RIO LARGO IIRIO LARGO I DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
RIO LARGO II EL 69 kV RIO LARGO IIRIO LARGO I DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
RIO LARGO II EL 69 kV RIO LARGO IIR.LARGO I 02L8 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
RIO LARGO II EL 69 kV RIO LARGO IIR.LARGO I 02L8 DIT   061/2001 IPCA RCDM REA 1814/2009 30/09/2012 29/09/2043  R$308,478.14
RIO LARGO II EL 230 kV RIO LARGO II LT 230 kV RIO LARGO II /BRASKEM C-1 AL  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
RIO LARGO II EL 230 kV RIO LARGO II LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL  RB FT LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
RIO LARGO II EL 230 kV RIO LARGO II LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL  RB FT LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
RIO LARGO II EL 230 kV RIO LARGO II LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL  RB FT LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$692,788.80
RIO LARGO II EL 230 kV RIO LARGO II LT 230 kV MESSIAS /RIO LARGO II C-3 AL  RB FT LT 230 kV MESSIAS /RIO LARGO II C-3 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
RIO LARGO II EL 230 kV RIO LARGO II LT 230 kV MESSIAS /RIO LARGO II C-2 AL  RB FT LT 230 kV MESSIAS /RIO LARGO II C-2 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
RIO LARGO II EL 230 kV RIO LARGO II LT 230 kV MESSIAS /RIO LARGO II C-1 AL  RB FT LT 230 kV MESSIAS /RIO LARGO II C-1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
RIO LARGO II BC 69 kV 27,1 Mvar RIO LARGO II BC2 AL DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$139,293.08
RIO LARGO II BC 69 kV 21,3 Mvar RIO LARGO II BC4 AL DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$120,218.00
RIO LARGO II BC 69 kV 21,3 Mvar RIO LARGO II BC3 AL DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$120,218.00
RIO LARGO II BC 69 kV 21,3 Mvar RIO LARGO II BC1 AL DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$120,218.00
RUSSAS II TT 69/13,8 kV RUSSAS II TA2 CE DIT   061/2001 IPCA RCDM REA 2412/2010 20/06/2012 19/06/2042  R$286,287.28
RUSSAS II TT 69/13,8 kV RUSSAS II TA1 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
RUSSAS II TR 230/69 kV RUSSAS II TR4 CE RBF FT TR 230/69 kV RUSSAS II TR4 CE 061/2001 IPCA RBNI REA 2823/2011 29/09/2014 28/09/2048  R$ 1,487,428.74
RUSSAS II TR 230/69 kV RUSSAS II TR3 CE RBF FT TR 230/69 kV RUSSAS II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
RUSSAS II TR 230/69 kV RUSSAS II TR1 CE RBF FT TR 230/69 kV RUSSAS II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
RUSSAS II TR 230/69 kV RUSSAS II TR1 CE RBF FT TR 230/69 kV RUSSAS II TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
RUSSAS II TR 230/69 kV RUSSAS II TR1 CE RBF FT TR 230/69 kV RUSSAS II TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
RUSSAS II MG 230 kV RUSSAS II MG1 CE RB FT MG 230 kV RUSSAS II MG1 CE 061/2001 IPCA RBNI REA 2823/2011 29/09/2014 28/09/2042  R$203,455.12
RUSSAS II MG 230 kV RUSSAS II MG1 CE RB FT MG 230 kV RUSSAS II MG1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$545,889.43
RUSSAS II MG 230 kV RUSSAS II MG1 CE RB FT MG 230 kV RUSSAS II MG1 CE 061/2001 IPCA RMEL REN 643/2014 31/01/2014 30/01/2031  R$27,424.83
RUSSAS II MG 230 kV RUSSAS II MG1 CE RB FT MG 230 kV RUSSAS II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,610,887.43
RUSSAS II MG 230 kV RUSSAS II MG1 CE RB FT MG 230 kV RUSSAS II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,648,533.05
RUSSAS II MG 230 kV RUSSAS II MG1 CE RB FT MG 230 kV RUSSAS II MG1 CE 061/2001 IPCA RMEL REN 443/2011 17/05/2016 16/05/2046  R$14,513.39
RUSSAS II MG 230 kV RUSSAS II MG1 CE RB FT MG 230 kV RUSSAS II MG1 CE 061/2001 IPCA RBNI REA 7761/2019 31/07/2015 30/07/2030  R$29,447.44
RUSSAS II MC 69 kV TT 69/13,8 kV RUSSAS II TA2 CE DIT   061/2001 IPCA RCDM REA 2412/2010 20/06/2012 19/06/2043  R$308,327.14
RUSSAS II MC 69 kV TT 69/13,8 kV RUSSAS II TA1 CE  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
RUSSAS II MC 69 kV TR 230/69 kV RUSSAS II TR4 CE RBF FT TR 230/69 kV RUSSAS II TR4 CE 061/2001 IPCA RBNI REA 2823/2011 29/09/2014 28/09/2045  R$470,764.48
RUSSAS II MC 69 kV TR 230/69 kV RUSSAS II TR3 CE  RBF FT TR 230/69 kV RUSSAS II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
RUSSAS II MC 69 kV TR 230/69 kV RUSSAS II TR1 CE RBF FT TR 230/69 kV RUSSAS II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
RUSSAS II MC 230 kV TR 230/69 kV RUSSAS II TR4 CE RBF FT TR 230/69 kV RUSSAS II TR4 CE 061/2001 IPCA RBNI REA 2823/2011 29/09/2014 28/09/2044  R$ 1,324,318.11
RUSSAS II MC 230 kV TR 230/69 kV RUSSAS II TR3 CE  RBF FT TR 230/69 kV RUSSAS II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
RUSSAS II MC 230 kV TR 230/69 kV RUSSAS II TR1 CE RBF FT TR 230/69 kV RUSSAS II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
RUSSAS II MC 230 kV TR 230/69 kV RUSSAS II TR1 CE RBF FT TR 230/69 kV RUSSAS II TR1 CE 061/2001 IPCA RMEL REN 443/2011 09/07/2017 08/07/2047  R$70,434.94
RUSSAS II IB 69 kV MG 230 kV RUSSAS II MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
RUSSAS II IB 230 kV MG 230 kV RUSSAS II MG1 CE IB1 RB FT MG 230 kV RUSSAS II MG1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
RUSSAS II EL 69 kV RUSSAS IIDIST5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
RUSSAS II EL 69 kV RUSSAS IIDIST4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
RUSSAS II EL 69 kV RUSSAS IIDIST4 DIT   061/2001 IPCA RMEL REN 643/2014 09/02/2014 08/02/2044  R$37,315.69
RUSSAS II EL 69 kV RUSSAS IIDIST3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
RUSSAS II EL 69 kV RUSSAS IIDIST3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
RUSSAS II EL 69 kV RUSSAS IIDIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
RUSSAS II EL 69 kV RUSSAS IIDIST2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
RUSSAS II EL 69 kV RUSSAS IIDIST2 DIT   061/2001 IPCA RMEL REN 443/2011 24/04/2016 23/04/2046  R$8,709.91
RUSSAS II EL 69 kV RUSSAS IIDIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
RUSSAS II EL 230 kV RUSSAS II LT 230 kV RUSSAS II /QUIXERE C-1 CE  RB FT LT 230 kV RUSSAS II /QUIXERE C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
RUSSAS II EL 230 kV RUSSAS II LT 230 kV RUSSAS II /QUIXERE C-1 CE  RB FT LT 230 kV RUSSAS II /QUIXERE C-1 CE 061/2001 IPCA RMEL REN 443/2011 01/05/2016 30/04/2046  R$14,495.82
RUSSAS II EL 230 kV RUSSAS II LT 230 kV RUSSAS II /QUIXERE C-1 CE  RB FT LT 230 kV RUSSAS II /QUIXERE C-1 CE 061/2001 IPCA RMEL REN 443/2011 23/07/2017 22/07/2047  R$70,506.27
RUSSAS II EL 230 kV RUSSAS II LT 230 kV RUSSAS II /BANABUIU C-1 CE  RB FT LT 230 kV RUSSAS II /BANABUIU C-1 CE 018/2012 IPCA RBL CC 018/2012 15/12/2020 01/06/2042  R$558,840.27
RUSSAS II EL 230 kV RUSSAS II LT 230 kV BANABUIU /RUSSAS II C-1 CE RB FT LT 230 kV BANABUIU /RUSSAS II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
RUSSAS II EL 230 kV RUSSAS II LT 230 kV BANABUIU /RUSSAS II C-1 CE RB FT LT 230 kV BANABUIU /RUSSAS II C-1 CE 061/2001 IPCA RMEL REN 443/2011 16/07/2017 15/07/2047  R$46,980.42
S.JOAO PIAUI TT 69/13,8 kV S.JOAO PIAUI TA1 PI DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
S.JOAO PIAUI TT 69/13,8 kV S.JOAO PIAUI TA1 PI DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$281,516.05
S.JOAO PIAUI TR 69/13,8 kV S.JOAO PIAUI TR5 PI RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
S.JOAO PIAUI TR 69/13,8 kV S.JOAO PIAUI TR5 PI RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$86,722.45
S.JOAO PIAUI TR 500/230 kV S.JOAO PIAUI TRR1 PI RB FT TR 500/230 kV S.JOAO PIAUI TRR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$523,092.75
S.JOAO PIAUI TR 500/230 kV S.JOAO PIAUI TRR1 PI RB FT TR 500/230 kV S.JOAO PIAUI TRR1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,543,615.76
S.JOAO PIAUI TR 500/230 kV S.JOAO PIAUI TR1 PI RB FT TR 500/230 kV S.JOAO PIAUI TR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,569,278.24
S.JOAO PIAUI TR 500/230 kV S.JOAO PIAUI TR1 PI RB FT TR 500/230 kV S.JOAO PIAUI TR1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,630,847.29
S.JOAO PIAUI TR 230/69 kV S.JOAO PIAUI TR8 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR8 PI 061/2001 IPCA RBNI REA 2460/2010 23/12/2013 22/12/2047  R$ 1,115,637.52
S.JOAO PIAUI TR 230/69 kV S.JOAO PIAUI TR4 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR4 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$199,497.82
S.JOAO PIAUI TR 230/69 kV S.JOAO PIAUI TR4 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR4 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$588,706.28
S.JOAO PIAUI TR 230/69 kV S.JOAO PIAUI TR4 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR4 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$602,464.05
S.JOAO PIAUI TR 230/69 kV S.JOAO PIAUI TR3 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR3 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$199,497.82
S.JOAO PIAUI TR 230/69 kV S.JOAO PIAUI TR3 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR3 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$588,706.28
S.JOAO PIAUI TR 230/69 kV S.JOAO PIAUI TR3 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR3 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$602,464.05
S.JOAO PIAUI RTN 69 kV 0 Mvar S.JOAO PIAUI RTN2 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$14,881.75
S.JOAO PIAUI RTN 69 kV 0 Mvar S.JOAO PIAUI RTN1 PI RB FT RTL 500 kV 100 MVAr S.JOAO PIAUI RT1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$14,881.75
S.JOAO PIAUI RTL 500 kV 100 MVAr S.JOAO PIAUI RT2 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$727,290.45
S.JOAO PIAUI RTL 500 kV 100 MVAr S.JOAO PIAUI RT2 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,146,191.10
S.JOAO PIAUI RTL 500 kV 100 MVAr S.JOAO PIAUI RT2 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,196,346.50
S.JOAO PIAUI RTL 500 kV 100 MVAr S.JOAO PIAUI RT2 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RMEL REA 9918/2021 26/05/2021 26/05/2057  R$552,027.57
S.JOAO PIAUI RTL 500 kV 100 MVAr S.JOAO PIAUI RT2 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RMEL REA 9918/2021 26/05/2021 26/05/2057  R$552,027.57
S.JOAO PIAUI RTL 500 kV 100 MVAr S.JOAO PIAUI RT1 PI RB FT RTL 500 kV 100 MVAr S.JOAO PIAUI RT1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$727,290.45
S.JOAO PIAUI RTL 500 kV 100 MVAr S.JOAO PIAUI RT1 PI RB FT RTL 500 kV 100 MVAr S.JOAO PIAUI RT1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,146,191.10
S.JOAO PIAUI MG 500 kV S.JOAO PIAUI MG1 PI RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBNI REA 2460/2010 23/12/2013 22/12/2043  R$172,284.38
S.JOAO PIAUI MG 500 kV S.JOAO PIAUI MG1 PI RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,348,413.79
S.JOAO PIAUI MG 500 kV S.JOAO PIAUI MG1 PI RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RMEL REN 643/2014 16/12/2014 15/12/2031  R$30,304.41
S.JOAO PIAUI MG 500 kV S.JOAO PIAUI MG1 PI RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,979,089.36
S.JOAO PIAUI MG 500 kV S.JOAO PIAUI MG1 PI RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,072,078.67
S.JOAO PIAUI MG 500 kV S.JOAO PIAUI MG1 PI RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBNI REN 905/2020 23/10/2017 22/10/2048  R$40,175.48
S.JOAO PIAUI MG 500 kV S.JOAO PIAUI MG1 PI RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBNI REA 7761/2019 28/07/2020 27/07/2035  R$35,541.61
S.JOAO PIAUI MC 69 kV TT 69/13,8 kV S.JOAO PIAUI TA1 PI  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
S.JOAO PIAUI MC 69 kV TR 230/69 kV S.JOAO PIAUI TR8 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR8 PI 061/2001 IPCA RBNI REA 2460/2010 23/12/2013 22/12/2043  R$435,988.46
S.JOAO PIAUI MC 69 kV TR 230/69 kV S.JOAO PIAUI TR4 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR4 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
S.JOAO PIAUI MC 69 kV TR 230/69 kV S.JOAO PIAUI TR3 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR3 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
S.JOAO PIAUI MC 69 kV RTN 69 kV 0 Mvar S.JOAO PIAUI RTN2 PI  RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$10,108.69
S.JOAO PIAUI MC 69 kV RTN 69 kV 0 Mvar S.JOAO PIAUI RTN1 PI  RB FT RTL 500 kV 100 MVAr S.JOAO PIAUI RT1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$10,108.69
S.JOAO PIAUI MC 500 kV TR 500/230 kV S.JOAO PIAUI TR1 PI RB FT TR 500/230 kV S.JOAO PIAUI TR1 PI 061/2001 IPCA RBNI REA 3208/2011 16/11/2016 15/11/2047  R$896,150.31
S.JOAO PIAUI MC 500 kV TR 500/230 kV S.JOAO PIAUI TR1 PI RB FT TR 500/230 kV S.JOAO PIAUI TR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
S.JOAO PIAUI MC 500 kV RTL 500 kV 100 MVAr S.JOAO PIAUI RT2 PI  RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$270,833.72
S.JOAO PIAUI MC 500 kV RTL 500 kV 100 MVAr S.JOAO PIAUI RT1 PI RB FT RTL 500 kV 100 MVAr S.JOAO PIAUI RT1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$270,833.72
S.JOAO PIAUI MC 230 kV TR 500/230 kV S.JOAO PIAUI TR1 PI MC2 RB FT TR 500/230 kV S.JOAO PIAUI TR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
S.JOAO PIAUI MC 230 kV TR 500/230 kV S.JOAO PIAUI TR1 PI MC1 RB FT TR 500/230 kV S.JOAO PIAUI TR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
S.JOAO PIAUI MC 230 kV TR 230/69 kV S.JOAO PIAUI TR8 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR8 PI 061/2001 IPCA RBNI REA 2460/2010 23/12/2013 22/12/2043  R$ 1,232,910.88
S.JOAO PIAUI MC 230 kV TR 230/69 kV S.JOAO PIAUI TR4 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR4 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
S.JOAO PIAUI MC 230 kV TR 230/69 kV S.JOAO PIAUI TR4 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR4 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$515,473.59
S.JOAO PIAUI MC 230 kV TR 230/69 kV S.JOAO PIAUI TR3 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR3 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
S.JOAO PIAUI MC 13,8 kV TR 69/13,8 kV S.JOAO PIAUI TR5 PI RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
S.JOAO PIAUI MC 13,8 kV TR 500/230 kV S.JOAO PIAUI TR1 PI RB FT TR 500/230 kV S.JOAO PIAUI TR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
S.JOAO PIAUI IB 69 kV MG 500 kV S.JOAO PIAUI MG1 PI IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
S.JOAO PIAUI IB 69 kV MG 500 kV S.JOAO PIAUI MG1 PI IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$134,104.45
S.JOAO PIAUI IB 500 kV MG 500 kV S.JOAO PIAUI MG1 PI IB2 RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBNI REA 3208/2011 03/11/2016 02/11/2047  R$949,306.19
S.JOAO PIAUI IB 500 kV MG 500 kV S.JOAO PIAUI MG1 PI IB2 RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
S.JOAO PIAUI IB 500 kV MG 500 kV S.JOAO PIAUI MG1 PI IB1 RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
S.JOAO PIAUI IB 230 kV MG 500 kV S.JOAO PIAUI MG1 PI IB1 RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
S.JOAO PIAUI IB 230 kV MG 500 kV S.JOAO PIAUI MG1 PI IB1 RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$423,550.65
S.JOAO PIAUI IB 230 kV MG 500 kV S.JOAO PIAUI MG1 PI IB1 RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$433,448.81
S.JOAO PIAUI EL 69 kV S.JOAO PIAUIS.MENDES-02J1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
S.JOAO PIAUI EL 69 kV S.JOAO PIAUIDIST1 DIT   061/2001 IPCA RCDM REN 905/2020 23/10/2017 22/10/2044  R$485,167.79
S.JOAO PIAUI EL 69 kV S.JOAO PIAUIC.BURITI-02J2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
S.JOAO PIAUI EL 500 kV S.JOAO PIAUI LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
S.JOAO PIAUI EL 500 kV S.JOAO PIAUI LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI  RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
S.JOAO PIAUI EL 230 kV S.JOAO PIAUI LT 230 kV S.JOAO PIAUI /PICOS C-1 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
S.JOAO PIAUI EL 230 kV S.JOAO PIAUI LT 230 kV S.JOAO PIAUI /PICOS C-1 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
S.JOAO PIAUI EL 230 kV S.JOAO PIAUI LT 230 kV S.JOAO PIAUI /PICOS C-1 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$735,719.99
S.JOAO PIAUI EL 230 kV S.JOAO PIAUI LT 230 kV S.JOAO PIAUI /PICOS C-1 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBNI REA 5861/2016 10/06/2016 09/06/2044  R$28,900.49
S.JOAO PIAUI EL 230 kV S.JOAO PIAUI LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI  RB FT LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
S.JOAO PIAUI CR 500 kV 484 MVAr S.JOAO PIAUI BC2 PI RB FT CR 500 kV 484 MVAr S.JOAO PIAUI BC2 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,575,996.83
S.JOAO PIAUI CR 500 kV 436 MVAr S.JOAO PIAUI BC1 PI RB FT CR 500 kV 436 MVAr S.JOAO PIAUI BC1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,448,711.70
SAN.MATOS II TT 69/0 kV SAN.MATOS II TA1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2049  R$191,825.09
SAN.MATOS II TR 138/69 kV SAN.MATOS II TR2 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2053  R$822,608.14
SAN.MATOS II TR 138/69 kV SAN.MATOS II TR1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2053  R$822,608.14
SAN.MATOS II RTB 13,8 kV 5 Mvar SAN.MATOS II RT1 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,222.37
SAN.MATOS II RTB 13,8 kV 5 Mvar SAN.MATOS II RT1 RN DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$399,033.22
SAN.MATOS II MG 138 kV SAN.MATOS II MG1 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$350,841.50
SAN.MATOS II MG 138 kV SAN.MATOS II MG1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2044  R$ 1,020,029.85
SAN.MATOS II MG 138 kV SAN.MATOS II MG1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2050  R$258,048.16
SAN.MATOS II MG 138 kV SAN.MATOS II MG1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2050  R$93,950.03
SAN.MATOS II MG 138 kV SAN.MATOS II MG1 RN DIT   061/2001 IPCA RMEL REN 643/2014 31/07/2015 30/07/2043  R$55,443.06
SAN.MATOS II MG 138 kV SAN.MATOS II MG1 RN DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,035,312.51
SAN.MATOS II MC 69 kV TR 138/69 kV SAN.MATOS II TR2 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2042  R$330,409.03
SAN.MATOS II MC 69 kV TR 138/69 kV SAN.MATOS II TR1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2042  R$267,945.24
SAN.MATOS II MC 138 kV TR 138/69 kV SAN.MATOS II TR2 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2040  R$491,148.18
SAN.MATOS II MC 138 kV TR 138/69 kV SAN.MATOS II TR1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2040  R$491,148.18
SAN.MATOS II MC 13,8 kV RTB 13,8 kV 5 Mvar SAN.MATOS II RT1 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$67,511.84
SAN.MATOS II MC 13,8 kV BC 13,8 kV 1,8 Mvar SAN.MATOS II BC2 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
SAN.MATOS II MC 13,8 kV BC 13,8 kV 1,8 Mvar SAN.MATOS II BC1 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
SAN.MATOS II IB 69 kV MG 138 kV SAN.MATOS II MG1 RN IB1 DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2047  R$287,645.19
SAN.MATOS II IB 138 kV MG 138 kV SAN.MATOS II MG1 RN IB1 DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2041  R$375,396.24
SAN.MATOS II EL 69 kV SAN.MATOS IIMIGUEL ANGICOS DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$74,742.25
SAN.MATOS II EL 69 kV SAN.MATOS IIMIGUEL ANGICOS DIT   061/2001 IPCA RMEL REN 443/2011 17/03/2016 16/03/2046  R$8,684.81
SAN.MATOS II EL 69 kV SAN.MATOS IIMIGUEL ANGICOS DIT   061/2001 IPCA RMEL REN 443/2011 17/03/2016 16/03/2046  R$8,684.81
SAN.MATOS II EL 69 kV SAN.MATOS IIMIGUEL ANGICOS DIT   061/2001 IPCA RMEL REN 443/2011 17/03/2016 16/03/2039  R$7,222.60
SAN.MATOS II EL 69 kV SAN.MATOS IIMIGUEL ANGICOS DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2043  R$310,273.02
SAN.MATOS II EL 69 kV SAN.MATOS IIJUCURUTU DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$74,742.25
SAN.MATOS II EL 69 kV SAN.MATOS IIJUCURUTU DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2043  R$310,273.02
SAN.MATOS II EL 138 kV SAN.MATOS II LT 138 kV SAN.MATOS II /CUR.NOVOS II C-1 RN  DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2041  R$718,528.30
SAN.MATOS II EL 138 kV SAN.MATOS II LT 138 kV ACU II /SAN.MATOS II C-1 RN  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$125,631.06
SAN.MATOS II EL 138 kV SAN.MATOS II LT 138 kV ACU II /SAN.MATOS II C-1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2041  R$718,528.30
SAN.MATOS II BC 13,8 kV 1,8 Mvar SAN.MATOS II BC2 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
SAN.MATOS II BC 13,8 kV 1,8 Mvar SAN.MATOS II BC2 RN DIT   061/2001 IPCA RMEL REN 643/2014 10/01/2014 09/01/2028  R$9,589.60
SAN.MATOS II BC 13,8 kV 1,8 Mvar SAN.MATOS II BC1 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
SAN.MATOS II BC 13,8 kV 1,8 Mvar SAN.MATOS II BC1 RN DIT   061/2001 IPCA RMEL REN 643/2014 08/01/2014 07/01/2028  R$6,170.92
SANTA CRUZ II TT 69/13,8 kV SANTA CRUZ II TA1 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
SANTA CRUZ II TR 69/13,8 kV SANTA CRUZ II TR2C RN DIT   061/2001 IPCA RCDM REA 4576/2014 20/09/2019 20/09/2054  R$152,101.06
SANTA CRUZ II TR 138/69 kV SANTA CRUZ II TR3 RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2053  R$822,608.14
SANTA CRUZ II TR 138/69 kV SANTA CRUZ II TR2 RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2053  R$822,608.14
SANTA CRUZ II TR 138/69 kV SANTA CRUZ II TR1 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$210,884.22
SANTA CRUZ II RTB 138 kV 10 Mvar SANTA CRUZ II RT1 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$154,914.54
SANTA CRUZ II MG 138 kV SANTA CRUZ II MG1 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$390,209.94
SANTA CRUZ II MG 138 kV SANTA CRUZ II MG1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2050  R$ 1,019,323.22
SANTA CRUZ II MG 138 kV SANTA CRUZ II MG1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2050  R$344,064.21
SANTA CRUZ II MG 138 kV SANTA CRUZ II MG1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2050  R$150,320.03
SANTA CRUZ II MG 138 kV SANTA CRUZ II MG1 RN DIT   061/2001 IPCA RMEL REN 643/2014 30/09/2013 29/09/2030  R$26,885.52
SANTA CRUZ II MG 138 kV SANTA CRUZ II MG1 RN DIT   061/2001 IPCA RMEL REN 643/2014 21/05/2013 20/05/2030  R$15,988.46
SANTA CRUZ II MG 138 kV SANTA CRUZ II MG1 RN DIT   061/2001 IPCA RCDM REA 758/2006 13/11/2014 12/11/2045  R$43,650.90
SANTA CRUZ II MG 138 kV SANTA CRUZ II MG1 RN DIT   061/2001 IPCA RCDM REA 758/2006 24/08/2012 23/08/2043  R$42,667.85
SANTA CRUZ II MC 69 kV TR 69/13,8 kV SANTA CRUZ II TR2B RN DIT   061/2001 IPCA RCDM REA 4576/2014 20/09/2019 20/09/2042  R$105,087.19
SANTA CRUZ II MC 69 kV TR 138/69 kV SANTA CRUZ II TR3 RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2042  R$217,061.21
SANTA CRUZ II MC 69 kV TR 138/69 kV SANTA CRUZ II TR2 RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2042  R$267,945.24
SANTA CRUZ II MC 69 kV TR 138/69 kV SANTA CRUZ II TR1 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
SANTA CRUZ II MC 69 kV TR 138/69 kV SANTA CRUZ II TR1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 20/09/2019 20/09/2042  R$267,945.24
SANTA CRUZ II MC 138 kV TR 138/69 kV SANTA CRUZ II TR3 RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2040  R$491,148.18
SANTA CRUZ II MC 138 kV TR 138/69 kV SANTA CRUZ II TR2 RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2040  R$491,148.18
SANTA CRUZ II MC 138 kV TR 138/69 kV SANTA CRUZ II TR1 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$110,998.23
SANTA CRUZ II MC 138 kV TR 138/69 kV SANTA CRUZ II TR1 RN DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$327,549.21
SANTA CRUZ II MC 138 kV TR 138/69 kV SANTA CRUZ II TR1 RN DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$335,203.87
SANTA CRUZ II MC 138 kV TR 138/69 kV SANTA CRUZ II TR1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 20/09/2019 20/09/2040  R$491,148.18
SANTA CRUZ II MC 138 kV RTB 138 kV 10 Mvar SANTA CRUZ II RT1 RN DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$110,277.53
SANTA CRUZ II MC 138 kV RTB 138 kV 10 Mvar SANTA CRUZ II RT1 RN DIT   061/2001 IPCA RCDM REA 1814/2009 10/12/2012 09/12/2045  R$74,480.00
SANTA CRUZ II MC 13,8 kV TR 69/13,8 kV SANTA CRUZ II TR2B RN DIT   061/2001 IPCA RCDM REA 4576/2014 20/09/2019 20/09/2039  R$79,948.59
SANTA CRUZ II IB 69 kV MG 138 kV SANTA CRUZ II MG1 RN IB1 DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2047  R$172,813.68
SANTA CRUZ II IB 138 kV MG 138 kV SANTA CRUZ II MG1 RN IB1 DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2041  R$375,396.24
SANTA CRUZ II EL 69 kV SANTA CRUZ IITANGARA 02N1 DIT   061/2001 IPCA RCDM REA 758/2006 13/11/2014 12/11/2042  R$594,600.20
SANTA CRUZ II EL 69 kV SANTA CRUZ IITANGARA 02J1 DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2043  R$310,273.02
SANTA CRUZ II EL 69 kV SANTA CRUZ IICUITE DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2043  R$310,273.02
SANTA CRUZ II EL 138 kV SANTA CRUZ II LT 138 kV PARAISO /SANTA CRUZ II C-1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2041  R$718,528.30
SANTA CRUZ II EL 138 kV SANTA CRUZ II LT 138 kV CUR.NOVOS II /SANTA CRUZ II C-1 RN  DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2041  R$718,528.30
SANTA CRUZ II EL 138 kV SANTA CRUZ II LT 138 kV C.GRANDE II /SANTA CRUZ II C-1 PB/RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2041  R$718,528.30
SANTA CRUZ II EL 13,8 kV SANTA CRUZ IIDIST3 DIT   061/2001 IPCA RCDM REA 758/2006 24/08/2012 23/08/2040  R$579,990.94
SANTA RITA II TT 69/0 kV SANTA RITA II TT2 PB DIT   017/2009 IPCA RCDM REA 4347/2013 08/05/2017 07/05/2047  R$187,764.26
SANTA RITA II TT 69/0 kV SANTA RITA II TT1 PB DIT   017/2009 IPCA RPEC CC 017/2009 03/08/2009 03/08/2039  R$76,571.61
SANTA RITA II TR 230/69 kV SANTA RITA II TR3 PB RBF FT TR 230/69 kV SANTA RITA II TR3 PB 017/2009 IPCA RBNI REA 3892/2013 22/02/2016 22/02/2051  R$ 1,150,518.95
SANTA RITA II TR 230/69 kV SANTA RITA II TR2 PB RBF FT TR 230/69 kV SANTA RITA II TR2 PB 017/2009 IPCA RBL CC 017/2009 21/08/2012 03/08/2039  R$ 1,676,477.60
SANTA RITA II TR 230/69 kV SANTA RITA II TR1 PB RBF FT TR 230/69 kV SANTA RITA II TR1 PB 017/2009 IPCA RBL CC 017/2009 21/08/2012 03/08/2039  R$ 1,676,477.60
SANTA RITA II MG 230 kV SANTA RITA II MG1 PB RB FT MG 230 kV SANTA RITA II MG1 PB 017/2009 IPCA RBL CC 017/2009 21/08/2012 03/08/2039  R$ 1,081,578.19
SANTA RITA II MG 230 kV SANTA RITA II MG1 PB RB FT MG 230 kV SANTA RITA II MG1 PB 017/2009 IPCA RBNI REA 3892/2013 22/02/2016 22/02/2050  R$141,847.72
SANTA RITA II MG 230 kV SANTA RITA II MG1 PB RB FT MG 230 kV SANTA RITA II MG1 PB 017/2009 IPCA RMEL REN 643/2014 28/02/2015 27/02/2030  R$65,182.51
SANTA RITA II MG 230 kV SANTA RITA II MG1 PB RB FT MG 230 kV SANTA RITA II MG1 PB 017/2009 IPCA RBNI REA 4347/2013 08/05/2017 07/05/2049  R$107,811.78
SANTA RITA II MC 69 kV TT 69/0 kV SANTA RITA II TT1 PB DIT   017/2009 IPCA RPEC CC 017/2009 03/08/2009 03/08/2039  R$87,828.38
SANTA RITA II MC 69 kV TR 230/69 kV SANTA RITA II TR3 PB RBF FT TR 230/69 kV SANTA RITA II TR3 PB 017/2009 IPCA RBNI REA 3892/2013 22/02/2016 22/02/2039  R$330,976.68
SANTA RITA II MC 69 kV TR 230/69 kV SANTA RITA II TR2 PB RBF FT TR 230/69 kV SANTA RITA II TR2 PB 017/2009 IPCA RBL CC 017/2009 21/08/2012 03/08/2039  R$160,300.72
SANTA RITA II MC 69 kV TR 230/69 kV SANTA RITA II TR1 PB RBF FT TR 230/69 kV SANTA RITA II TR1 PB 017/2009 IPCA RBL CC 017/2009 21/08/2012 03/08/2039  R$160,300.72
SANTA RITA II MC 69 kV BC 69 kV 21 Mvar SANTA RITA II BC2 PB DIT   017/2009 IPCA RPEC CC 017/2009 03/08/2009 03/08/2039  R$161,174.31
SANTA RITA II MC 69 kV BC 69 kV 21 Mvar SANTA RITA II BC1 PB DIT   017/2009 IPCA RPEC CC 017/2009 03/08/2009 03/08/2039  R$161,174.31
SANTA RITA II MC 230 kV TR 230/69 kV SANTA RITA II TR3 PB RBF FT TR 230/69 kV SANTA RITA II TR3 PB 017/2009 IPCA RBNI REA 3892/2013 22/02/2016 22/02/2040  R$838,655.08
SANTA RITA II MC 230 kV TR 230/69 kV SANTA RITA II TR2 PB RBF FT TR 230/69 kV SANTA RITA II TR2 PB 017/2009 IPCA RBL CC 017/2009 21/08/2012 03/08/2039  R$443,790.04
SANTA RITA II MC 230 kV TR 230/69 kV SANTA RITA II TR1 PB RBF FT TR 230/69 kV SANTA RITA II TR1 PB 017/2009 IPCA RBL CC 017/2009 21/08/2012 03/08/2039  R$443,790.04
SANTA RITA II IB 69 kV MG 230 kV SANTA RITA II MG1 PB IB1 DIT   017/2009 IPCA RPEC CC 017/2009 03/08/2009 03/08/2039  R$116,128.96
SANTA RITA II IB 230 kV MG 230 kV SANTA RITA II MG1 PB IB1 RB FT MG 230 kV SANTA RITA II MG1 PB 017/2009 IPCA RBL CC 017/2009 21/08/2012 03/08/2039  R$360,178.48
SANTA RITA II EL 69 kV SANTA RITA IIDIST4 DIT   017/2009 IPCA RPEC CC 017/2009 03/08/2009 03/08/2039  R$174,898.85
SANTA RITA II EL 69 kV SANTA RITA IIDIST3 DIT   017/2009 IPCA RPEC CC 017/2009 03/08/2009 03/08/2039  R$174,898.85
SANTA RITA II EL 69 kV SANTA RITA IIDIST2 DIT   017/2009 IPCA RPEC CC 017/2009 03/08/2009 03/08/2039  R$174,898.85
SANTA RITA II EL 69 kV SANTA RITA IIDIST1 DIT   017/2009 IPCA RPEC CC 017/2009 03/08/2009 03/08/2039  R$174,898.85
SANTA RITA II EL 230 kV SANTA RITA II LT 230 kV PAU FERRO /SANTA RITA II C-1 PE/PB  RB FT LT 230 kV PAU FERRO /SANTA RITA II C-1 PE/PB 017/2009 IPCA RBL CC 017/2009 21/08/2012 03/08/2039  R$733,008.24
SANTA RITA II EL 230 kV SANTA RITA II LT 230 kV JOAO PESSOA II /SANTA RITA II C-2 PB  RB FT LT 230 kV JOAO PESSOA II /SANTA RITA II C-2 PB 061/2001 IPCA RBNI REA 10199/2021 17/05/2021 17/05/2049  R$153,279.46
SANTA RITA II EL 230 kV SANTA RITA II LT 230 kV JOAO PESSOA II /SANTA RITA II C-1 PB  RB FT LT 230 kV JOAO PESSOA II /SANTA RITA II C-1 PB 061/2001 IPCA RBNI REA 10199/2021 17/05/2021 17/05/2049  R$153,279.46
SANTA RITA II BC 69 kV 21 Mvar SANTA RITA II BC2 PB DIT   017/2009 IPCA RPEC CC 017/2009 03/08/2009 03/08/2039  R$296,874.21
SANTA RITA II BC 69 kV 21 Mvar SANTA RITA II BC1 PB DIT   017/2009 IPCA RPEC CC 017/2009 03/08/2009 03/08/2039  R$296,874.21
SANTANA II MG 230 kV SANTANA II MG2 AL RB FT MG 230 kV SANTANA II MG2 AL 061/2001 IPCA RBNI DSP 1019/2022 01/07/2022 30/06/2053  R$40,256.74
SANTANA II EL 230 kV SANTANA II LT 230 kV SANTANA II /ANGELIM C-1 AL/PE  RB FT LT 230 kV SANTANA II /ANGELIM C-1 AL/PE 061/2001 IPCA RBNI DSP 1019/2022 01/07/2022 30/06/2051  R$204,753.60
SANTANA II EL 230 kV SANTANA II LT 230 kV P.AFONSO III /SANTANA II C-1 AL  RB FT LT 230 kV P.AFONSO III /SANTANA II C-1 AL 061/2001 IPCA RBNI DSP 1019/2022 01/07/2022 30/06/2051  R$204,753.60
SAO LUIS II EL 230 kV SAO LUIS II LT 230 kV SAO LUIS II /SAO LUIS III C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS III C-2 MA 004/2010 IPCA RBL CC 004/2010 12/07/2010 12/07/2040  R$566,933.31
SAO LUIS III EL 230 kV SAO LUIS III LT 230 kV SAO LUIS II /SAO LUIS III C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS III C-2 MA 004/2010 IPCA RBL CC 004/2010 12/07/2010 12/07/2040  R$566,933.31
SAPEACU MG 500 kV SAPEACU MG5 BA RB FT MG 500 kV SAPEACU MG5 BA 061/2001 IPCA RMEL REN 643/2014 20/12/2013 19/12/2047  R$41,035.54
SAPEACU EL 230 kV SAPEACU LT 230 kV SAPEACU /STO.A.JESUS C-2 BA  RB FT LT 230 kV SAPEACU /STO.A.JESUS C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
SAPEACU EL 230 kV SAPEACU LT 230 kV SAPEACU /STO.A.JESUS C-1 BA  RB FT LT 230 kV SAPEACU /STO.A.JESUS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
SAPEACU EL 230 kV SAPEACU LT 230 kV SAPEACU /FUNIL C-1 BA  RB FT LT 230 kV SAPEACU /FUNIL C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
SAPEACU EL 230 kV SAPEACU LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA  RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
SAPEACU EL 230 kV SAPEACU LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA  RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
SAPEACU EL 230 kV SAPEACU LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA  RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
SOBRAL II TT 69/13,8 kV SOBRAL II TA2 CE DIT   061/2001 IPCA RCDM REA 2412/2010 27/06/2012 26/06/2042  R$286,432.91
SOBRAL II TT 69/13,8 kV SOBRAL II TA1 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
SOBRAL II TT 69/13,8 kV SOBRAL II TA1 CE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$281,516.05
SOBRAL II TR 230/69 kV SOBRAL II TR4 CE RBF FT TR 230/69 kV SOBRAL II TR4 CE 061/2001 IPCA RBNI REA 2460/2010 31/03/2014 30/03/2048  R$ 1,464,878.36
SOBRAL II TR 230/69 kV SOBRAL II TR3 CE RBF FT TR 230/69 kV SOBRAL II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
SOBRAL II TR 230/69 kV SOBRAL II TR2 CE RBF FT TR 230/69 kV SOBRAL II TR2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
SOBRAL II TR 230/69 kV SOBRAL II TR2 CE RBF FT TR 230/69 kV SOBRAL II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
SOBRAL II TR 230/69 kV SOBRAL II TR2 CE RBF FT TR 230/69 kV SOBRAL II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
SOBRAL II TR 230/69 kV SOBRAL II TR1 CE RBF FT TR 230/69 kV SOBRAL II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
SOBRAL II TR 230/69 kV SOBRAL II TR1 CE RBF FT TR 230/69 kV SOBRAL II TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
SOBRAL II TR 230/69 kV SOBRAL II TR1 CE RBF FT TR 230/69 kV SOBRAL II TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
SOBRAL II RTL 230 kV 3,33 Mvar SOBRAL II RTR1 CE RB FT RTL 230 kV 3,33 Mvar SOBRAL II RTR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$58,820.58
SOBRAL II RTL 230 kV 10 Mvar SOBRAL II RT2 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,656.08
SOBRAL II RTL 230 kV 10 MVAr SOBRAL II RT1 CE RB FT LT 230 kV IBIAPINA II /SOBRAL II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,656.08
SOBRAL II MG 230 kV SOBRAL II MG1 CE RB FT MG 230 kV SOBRAL II MG1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$625,647.27
SOBRAL II MG 230 kV SOBRAL II MG1 CE RB FT MG 230 kV SOBRAL II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,846,248.09
SOBRAL II MG 230 kV SOBRAL II MG1 CE RB FT MG 230 kV SOBRAL II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,889,393.98
SOBRAL II MC 69 kV TT 69/13,8 kV SOBRAL II TA2 CE DIT   061/2001 IPCA RCDM REA 2412/2010 27/06/2012 26/06/2043  R$308,478.10
SOBRAL II MC 69 kV TT 69/13,8 kV SOBRAL II TA1 CE  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
SOBRAL II MC 69 kV TR 230/69 kV SOBRAL II TR4 CE RBF FT TR 230/69 kV SOBRAL II TR4 CE 061/2001 IPCA RBNI REA 2460/2010 31/03/2014 30/03/2044  R$438,917.56
SOBRAL II MC 69 kV TR 230/69 kV SOBRAL II TR3 CE  RBF FT TR 230/69 kV SOBRAL II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
SOBRAL II MC 69 kV TR 230/69 kV SOBRAL II TR2 CE RBF FT TR 230/69 kV SOBRAL II TR2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
SOBRAL II MC 69 kV TR 230/69 kV SOBRAL II TR2 CE RBF FT TR 230/69 kV SOBRAL II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
SOBRAL II MC 69 kV TR 230/69 kV SOBRAL II TR2 CE RBF FT TR 230/69 kV SOBRAL II TR2 CE 061/2001 IPCA RMEL REN 443/2011 26/11/2017 25/11/2045  R$7,255.53
SOBRAL II MC 69 kV TR 230/69 kV SOBRAL II TR2 CE RBF FT TR 230/69 kV SOBRAL II TR2 CE 061/2001 IPCA RMEL REN 443/2011 26/11/2017 25/11/2045  R$7,255.53
SOBRAL II MC 69 kV TR 230/69 kV SOBRAL II TR2 CE RBF FT TR 230/69 kV SOBRAL II TR2 CE 061/2001 IPCA RMEL REN 443/2011 26/11/2017 25/11/2045  R$7,255.53
SOBRAL II MC 69 kV TR 230/69 kV SOBRAL II TR1 CE RBF FT TR 230/69 kV SOBRAL II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
SOBRAL II MC 69 kV BC 69 kV 24,4 Mvar SOBRAL II BC2 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
SOBRAL II MC 69 kV BC 69 kV 24,4 Mvar SOBRAL II BC2 CE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
SOBRAL II MC 69 kV BC 69 kV 24,4 Mvar SOBRAL II BC2 CE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$235,271.08
SOBRAL II MC 69 kV BC 69 kV 24,4 Mvar SOBRAL II BC1 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
SOBRAL II MC 69 kV BC 69 kV 24,4 Mvar SOBRAL II BC1 CE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
SOBRAL II MC 69 kV BC 69 kV 24,4 Mvar SOBRAL II BC1 CE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$235,271.08
SOBRAL II MC 230 kV TR 230/69 kV SOBRAL II TR4 CE RBF FT TR 230/69 kV SOBRAL II TR4 CE 061/2001 IPCA RBNI REA 2460/2010 31/03/2014 30/03/2044  R$ 1,126,090.08
SOBRAL II MC 230 kV TR 230/69 kV SOBRAL II TR3 CE  RBF FT TR 230/69 kV SOBRAL II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
SOBRAL II MC 230 kV TR 230/69 kV SOBRAL II TR2 CE RBF FT TR 230/69 kV SOBRAL II TR2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
SOBRAL II MC 230 kV TR 230/69 kV SOBRAL II TR1 CE RBF FT TR 230/69 kV SOBRAL II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
SOBRAL II MC 230 kV TR 230/69 kV SOBRAL II TR1 CE RBF FT TR 230/69 kV SOBRAL II TR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
SOBRAL II MC 230 kV RTL 230 kV 10 Mvar SOBRAL II RT2 CE  RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$99,071.31
SOBRAL II MC 230 kV RTL 230 kV 10 MVAr SOBRAL II RT1 CE  RB FT LT 230 kV IBIAPINA II /SOBRAL II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$99,071.31
SOBRAL II MC 13,8 kV TR 230/69 kV SOBRAL II TR2 CE  RBF FT TR 230/69 kV SOBRAL II TR2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
SOBRAL II MC 13,8 kV TR 230/69 kV SOBRAL II TR1 CE  RBF FT TR 230/69 kV SOBRAL II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
SOBRAL II MC 13,8 kV BC 13,8 kV 3,6 MVAr SOBRAL II BC5 CE  RBF FT BC 13,8 kV 3,6 MVAr SOBRAL II BC5 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
SOBRAL II MC 13,8 kV BC 13,8 kV 3,6 MVAr SOBRAL II BC4 CE  RBF FT BC 13,8 kV 3,6 MVAr SOBRAL II BC4 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
SOBRAL II MC 13,8 kV BC 13,8 kV 3,6 MVAr SOBRAL II BC3 CE  RBF FT BC 13,8 kV 3,6 MVAr SOBRAL II BC3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
SOBRAL II IB 69 kV MG 230 kV SOBRAL II MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
SOBRAL II IB 230 kV MG 230 kV SOBRAL II MG1 CE IB1 RB FT MG 230 kV SOBRAL II MG1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,929.18
SOBRAL II EL 69 kV SOBRAL IIDIST8 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
SOBRAL II EL 69 kV SOBRAL IIDIST7 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
SOBRAL II EL 69 kV SOBRAL IIDIST7 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
SOBRAL II EL 69 kV SOBRAL IIDIST7 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
SOBRAL II EL 69 kV SOBRAL IIDIST6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
SOBRAL II EL 69 kV SOBRAL IIDIST5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
SOBRAL II EL 69 kV SOBRAL IIDIST5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
SOBRAL II EL 69 kV SOBRAL IIDIST5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
SOBRAL II EL 69 kV SOBRAL IIDIST4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
SOBRAL II EL 69 kV SOBRAL IIDIST4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
SOBRAL II EL 69 kV SOBRAL IIDIST4 DIT   061/2001 IPCA RMEL REN 443/2011 07/08/2016 06/08/2039  R$4,878.64
SOBRAL II EL 69 kV SOBRAL IIDIST3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
SOBRAL II EL 69 kV SOBRAL IIDIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
SOBRAL II EL 69 kV SOBRAL IIDIST2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
SOBRAL II EL 69 kV SOBRAL IIDIST2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
SOBRAL II EL 69 kV SOBRAL IIDIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
SOBRAL II EL 69 kV SOBRAL IIDIST1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
SOBRAL II EL 69 kV SOBRAL IIDIST1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
SOBRAL II EL 230 kV SOBRAL II LT 230 kV SOBRAL II /SOBRAL III C-2 CE  RB FT LT 230 kV SOBRAL II /SOBRAL III C-2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
SOBRAL II EL 230 kV SOBRAL II LT 230 kV SOBRAL II /SOBRAL III C-1 CE  RB FT LT 230 kV SOBRAL II /SOBRAL III C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
SOBRAL II EL 230 kV SOBRAL II LT 230 kV IBIAPINA II /SOBRAL II C-1 CE  RB FT LT 230 kV IBIAPINA II /SOBRAL II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
SOBRAL II EL 230 kV SOBRAL II LT 230 kV CAUIPE /SOBRAL II C-1 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RBNI REA 2460/2010 21/11/2013 20/11/2044  R$783,917.74
SOBRAL II EL 230 kV SOBRAL II LT 230 kV CAUIPE /SOBRAL II C-1 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
SOBRAL II EL 230 kV SOBRAL II LT 230 kV CAUIPE /SOBRAL II C-1 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RMEL REN 643/2014 16/03/2014 15/03/2042  R$48,094.29
SOBRAL II BC 69 kV 24,4 Mvar SOBRAL II BC2 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,980.29
SOBRAL II BC 69 kV 24,4 Mvar SOBRAL II BC1 CE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$130,980.29
SOBRAL II BC 13,8 kV 3,6 MVAr SOBRAL II BC5 CE RBF FT BC 13,8 kV 3,6 MVAr SOBRAL II BC5 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
SOBRAL II BC 13,8 kV 3,6 MVAr SOBRAL II BC5 CE RBF FT BC 13,8 kV 3,6 MVAr SOBRAL II BC5 CE 061/2001 IPCA RMEL REN 643/2014 03/10/2014 02/10/2028  R$53,290.73
SOBRAL II BC 13,8 kV 3,6 MVAr SOBRAL II BC4 CE RBF FT BC 13,8 kV 3,6 MVAr SOBRAL II BC4 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
SOBRAL II BC 13,8 kV 3,6 MVAr SOBRAL II BC3 CE RBF FT BC 13,8 kV 3,6 MVAr SOBRAL II BC3 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
SOBRAL II BC 13,8 kV 3,6 MVAr SOBRAL II BC3 CE RBF FT BC 13,8 kV 3,6 MVAr SOBRAL II BC3 CE 061/2001 IPCA RMEL REN 643/2014 03/10/2014 02/10/2028  R$106,581.41
SOBRAL III TR 500/230 kV SOBRAL III TR2 CE RB FT TR 500/230 kV SOBRAL III TR2 CE 061/2001 IPCA RBNI REA 2181/2009 21/09/2012 20/09/2047  R$ 5,204,776.77
SOBRAL III TR 500/230 kV SOBRAL III TR1 CE RB FT TR 500/230 kV SOBRAL III TR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,013,961.67
SOBRAL III RTL 500 kV 60 Mvar SOBRAL III RTR1 CE RB FT RTL 500 kV 60 Mvar SOBRAL III RTR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$294,317.25
SOBRAL III RTL 500 kV 60 Mvar SOBRAL III RTR1 CE RB FT RTL 500 kV 60 Mvar SOBRAL III RTR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$868,512.81
SOBRAL III RTL 500 kV 60 Mvar SOBRAL III RTR1 CE RB FT RTL 500 kV 60 Mvar SOBRAL III RTR1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$888,809.51
SOBRAL III RTL 500 kV 148 MVAr SOBRAL III RT2 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$831,113.46
SOBRAL III RTL 500 kV 148 MVAr SOBRAL III RT2 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RMEL REN 643/2014 26/01/2014 25/01/2049  R$32,370.99
SOBRAL III RTL 500 kV 148 MVAr SOBRAL III RT2 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,452,566.68
SOBRAL III RTL 500 kV 148 MVAr SOBRAL III RT2 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,509,881.92
SOBRAL III RTL 500 kV 148 MVAr SOBRAL III RT1 CE RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$831,113.46
SOBRAL III RTL 500 kV 148 MVAr SOBRAL III RT1 CE RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RMEL REN 643/2014 27/01/2014 26/01/2049  R$43,164.26
SOBRAL III RTL 500 kV 148 MVAr SOBRAL III RT1 CE RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,452,566.68
SOBRAL III RTL 500 kV 148 MVAr SOBRAL III RT1 CE RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,509,881.92
SOBRAL III MG 500 kV SOBRAL III MG1 CE RB FT MG 500 kV SOBRAL III MG1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,158,400.28
SOBRAL III MG 500 kV SOBRAL III MG1 CE RB FT MG 500 kV SOBRAL III MG1 CE 061/2001 IPCA RMEL REN 643/2014 30/01/2014 29/01/2031  R$26,840.31
SOBRAL III MG 500 kV SOBRAL III MG1 CE RB FT MG 500 kV SOBRAL III MG1 CE 061/2001 IPCA RMEL REN 643/2014 01/08/2014 31/07/2031  R$29,765.27
SOBRAL III MG 500 kV SOBRAL III MG1 CE RB FT MG 500 kV SOBRAL III MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,418,370.74
SOBRAL III MG 500 kV SOBRAL III MG1 CE RB FT MG 500 kV SOBRAL III MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,498,256.33
SOBRAL III MC 500 kV TR 500/230 kV SOBRAL III TR2 CE RB FT TR 500/230 kV SOBRAL III TR2 CE 061/2001 IPCA RBNI REA 2181/2009 21/09/2012 20/09/2043  R$ 1,840,207.18
SOBRAL III MC 500 kV TR 500/230 kV SOBRAL III TR1 CE  RB FT TR 500/230 kV SOBRAL III TR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
SOBRAL III MC 500 kV RTL 500 kV 148 MVAr SOBRAL III RT2 CE  RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$270,833.72
SOBRAL III MC 500 kV RTL 500 kV 148 MVAr SOBRAL III RT2 CE  RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RMEL REN 443/2011 18/02/2016 17/02/2046  R$55,297.10
SOBRAL III MC 500 kV RTL 500 kV 148 MVAr SOBRAL III RT1 CE  RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$270,833.72
SOBRAL III MC 500 kV RTL 500 kV 148 MVAr SOBRAL III RT1 CE  RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RMEL REN 443/2011 18/02/2016 17/02/2046  R$55,297.10
SOBRAL III MC 230 kV TR 500/230 kV SOBRAL III TR2 CE RB FT TR 500/230 kV SOBRAL III TR2 CE 061/2001 IPCA RBNI REA 2181/2009 21/09/2012 20/09/2042  R$ 1,133,526.79
SOBRAL III MC 230 kV TR 500/230 kV SOBRAL III TR1 CE  RB FT TR 500/230 kV SOBRAL III TR1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,757.03
SOBRAL III IB 500 kV MG 500 kV SOBRAL III MG1 CE IB1 RB FT MG 500 kV SOBRAL III MG1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
SOBRAL III IB 500 kV MG 500 kV SOBRAL III MG1 CE IB1 RB FT MG 500 kV SOBRAL III MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,399,926.89
SOBRAL III IB 500 kV MG 500 kV SOBRAL III MG1 CE IB1 RB FT MG 500 kV SOBRAL III MG1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,432,642.48
SOBRAL III IB 500 kV MG 500 kV SOBRAL III MG1 CE IB1 RB FT MG 500 kV SOBRAL III MG1 CE 061/2001 IPCA RMEL REN 443/2011 18/02/2016 17/02/2046  R$55,297.10
SOBRAL III IB 230 kV MG 500 kV SOBRAL III MG1 CE IB1 RB FT MG 500 kV SOBRAL III MG1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
SOBRAL III EL 500 kV SOBRAL III LT 500 kV TIANGUA II /SOBRAL III C-1 CE  RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
SOBRAL III EL 500 kV SOBRAL III LT 500 kV TIANGUA II /SOBRAL III C-1 CE  RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RMEL REN 643/2014 05/03/2013 04/03/2043  R$16,915.32
SOBRAL III EL 500 kV SOBRAL III LT 500 kV TIANGUA II /SOBRAL III C-1 CE  RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,494,659.50
SOBRAL III EL 500 kV SOBRAL III LT 500 kV TIANGUA II /SOBRAL III C-1 CE  RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,529,588.93
SOBRAL III EL 500 kV SOBRAL III LT 500 kV TIANGUA II /SOBRAL III C-1 CE  RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RMEL REN 443/2011 18/02/2016 17/02/2046  R$36,864.73
SOBRAL III EL 500 kV SOBRAL III LT 500 kV SOBRAL III /PECEM II C-1 CE  RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
SOBRAL III EL 500 kV SOBRAL III LT 500 kV SOBRAL III /PECEM II C-1 CE  RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,494,659.50
SOBRAL III EL 500 kV SOBRAL III LT 500 kV SOBRAL III /PECEM II C-1 CE  RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,529,588.93
SOBRAL III EL 500 kV SOBRAL III LT 500 kV SOBRAL III /PECEM II C-1 CE  RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RMEL REN 443/2011 18/02/2016 17/02/2046  R$55,297.10
SOBRAL III EL 230 kV SOBRAL III LT 230 kV SOBRAL III /ACARAU II C-1 CE RB FT LT 230 kV SOBRAL III /ACARAU II C-1 CE 021/2010 IPCA RBL CC 021/2010 08/04/2014 23/11/2040  R$489,113.45
SOBRAL III EL 230 kV SOBRAL III LT 230 kV SOBRAL II /SOBRAL III C-2 CE  RB FT LT 230 kV SOBRAL II /SOBRAL III C-2 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
SOBRAL III EL 230 kV SOBRAL III LT 230 kV SOBRAL II /SOBRAL III C-1 CE  RB FT LT 230 kV SOBRAL II /SOBRAL III C-1 CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
SR.BONFIM II TT 69/13,8 kV SR.BONFIM II TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
SR.BONFIM II TT 69/0 kV SR.BONFIM II TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
SR.BONFIM II TR 230/69 kV SR.BONFIM II TR3 BA RBF FT TR 230/69 kV SR.BONFIM II TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
SR.BONFIM II TR 230/69 kV SR.BONFIM II TR1 BA RBF FT TR 230/69 kV SR.BONFIM II TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
SR.BONFIM II TR 230/138 kV SR.BONFIM II TR6 BA RBF FT TR 230/138 kV SR.BONFIM II TR6 BA 061/2001 IPCA RBNI REA 3208/2011 23/11/2015 22/11/2049  R$ 1,527,596.71
SR.BONFIM II TR 230/138 kV SR.BONFIM II TR4 BA RBF FT TR 230/138 kV SR.BONFIM II TR4 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$399,926.80
SR.BONFIM II TR 230/138 kV SR.BONFIM II TR3 BA RBF FT TR 230/138 kV SR.BONFIM II TR3 BA 061/2001 IPCA RBNI REA 6059/2016 29/07/2018 29/07/2052  R$ 1,579,851.45
SR.BONFIM II RTS 69 kV 40 MVAr SR.BONFIM II RT2 BA RBF FT TR 230/69 kV SR.BONFIM II TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$194,298.88
SR.BONFIM II RTS 69 kV 40 MVAr SR.BONFIM II RT1 BA RBF FT TR 230/69 kV SR.BONFIM II TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$194,298.88
SR.BONFIM II MG 230 kV SR.BONFIM II MG1 BA RB FT MG 230 kV SR.BONFIM II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$664,142.88
SR.BONFIM II MG 230 kV SR.BONFIM II MG1 BA RB FT MG 230 kV SR.BONFIM II MG1 BA 061/2001 IPCA RBNI REA 2837/2011 15/12/2015 14/12/2043  R$134,094.26
SR.BONFIM II MG 230 kV SR.BONFIM II MG1 BA RB FT MG 230 kV SR.BONFIM II MG1 BA 061/2001 IPCA RBNI REA 6059/2016 29/07/2018 29/07/2049  R$38,597.30
SR.BONFIM II MC 69 kV TR 230/69 kV SR.BONFIM II TR3 BA  RBF FT TR 230/69 kV SR.BONFIM II TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
SR.BONFIM II MC 69 kV TR 230/69 kV SR.BONFIM II TR1 BA RBF FT TR 230/69 kV SR.BONFIM II TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
SR.BONFIM II MC 230 kV TR 230/69 kV SR.BONFIM II TR3 BA  RBF FT TR 230/69 kV SR.BONFIM II TR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
SR.BONFIM II MC 230 kV TR 230/69 kV SR.BONFIM II TR1 BA RBF FT TR 230/69 kV SR.BONFIM II TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
SR.BONFIM II MC 230 kV TR 230/138 kV SR.BONFIM II TR6 BA RBF FT TR 230/138 kV SR.BONFIM II TR6 BA 061/2001 IPCA RBNI REA 3208/2011 23/11/2015 22/11/2046  R$ 1,330,160.29
SR.BONFIM II MC 230 kV TR 230/138 kV SR.BONFIM II TR4 BA  RBF FT TR 230/138 kV SR.BONFIM II TR4 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
SR.BONFIM II MC 230 kV TR 230/138 kV SR.BONFIM II TR3 BA  RBF FT TR 230/69 kV SR.BONFIM II TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
SR.BONFIM II MC 230 kV TR 230/138 kV SR.BONFIM II TR3 BA  RBF FT TR 230/69 kV SR.BONFIM II TR2 BA 061/2001 IPCA RBNI REA 6059/2016 29/07/2018 29/07/2042  R$676,979.42
SR.BONFIM II MC 138 kV TR 230/138 kV SR.BONFIM II TR6 BA RBF FT TR 230/138 kV SR.BONFIM II TR6 BA 061/2001 IPCA RBNI REA 3208/2011 23/11/2015 22/11/2045  R$948,094.46
SR.BONFIM II MC 138 kV TR 230/138 kV SR.BONFIM II TR4 BA  RBF FT TR 230/138 kV SR.BONFIM II TR4 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$121,202.15
SR.BONFIM II MC 138 kV TR 230/138 kV SR.BONFIM II TR3 BA RBF FT TR 230/138 kV SR.BONFIM II TR3 BA 061/2001 IPCA RBNI REA 6059/2016 29/07/2018 29/07/2039  R$ 1,567,439.79
SR.BONFIM II IB 69 kV MG 230 kV SR.BONFIM II MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
SR.BONFIM II IB 230 kV MG 230 kV SR.BONFIM II MG1 BA IB1 RB FT MG 230 kV SR.BONFIM II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
SR.BONFIM II IB 138 kV MG 230 kV SR.BONFIM II MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$93,640.20
SR.BONFIM II EL 69 kV SR.BONFIM IIJACOB-PEDRINHAS DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
SR.BONFIM II EL 69 kV SR.BONFIM IIJACOBINA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
SR.BONFIM II EL 69 kV SR.BONFIM IIITIUBA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
SR.BONFIM II EL 69 kV SR.BONFIM IICIA CIMENT BRA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
SR.BONFIM II EL 69 kV SR.BONFIM IIBONFIM DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
SR.BONFIM II EL 230 kV SR.BONFIM II LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA  RB FT LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
SR.BONFIM II EL 230 kV SR.BONFIM II LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA  RB FT LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA 061/2001 IPCA RMEL REN 443/2011 23/08/2015 22/08/2045  R$14,218.98
SR.BONFIM II EL 230 kV SR.BONFIM II LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA  RB FT LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
SR.BONFIM II EL 230 kV SR.BONFIM II LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA  RB FT LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA 061/2001 IPCA RBNI REA 5861/2016 09/06/2016 08/06/2044  R$28,898.45
SR.BONFIM II EL 230 kV SR.BONFIM II LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA  RB FT LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA 061/2001 IPCA RBNI REA 5861/2016 09/06/2016 08/06/2031  R$120,217.36
SR.BONFIM II EL 230 kV SR.BONFIM II LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA RB FT LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA 061/2001 IPCA RBNI REA 2173/2009 27/09/2012 26/09/2038  R$115,386.61
SR.BONFIM II EL 230 kV SR.BONFIM II LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA RB FT LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
SR.BONFIM II EL 138 kV SR.BONFIM IIQUEIMADAII-03S2 DIT   061/2001 IPCA RCDM REA 2837/2011 15/12/2015 14/12/2045  R$996,830.41
SR.BONFIM II EL 138 kV SR.BONFIM IIJACOBINA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$180,723.85
STO.A.JESUS TT 69/13,8 kV STO.A.JESUS TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
STO.A.JESUS TT 69/13,8 kV STO.A.JESUS TA1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$281,516.05
STO.A.JESUS TT 69/13,8 kV STO.A.JESUS TA1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$288,094.94
STO.A.JESUS TR 69/13,8 kV STO.A.JESUS TR5 BA RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
STO.A.JESUS TR 69/13,8 kV STO.A.JESUS TR5 BA RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$86,722.45
STO.A.JESUS TR 69/13,8 kV STO.A.JESUS TR5 BA RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$88,749.11
STO.A.JESUS TR 230/69 kV STO.A.JESUS TR3 BA RBF FT TR 230/69 kV STO.A.JESUS TR3 BA 061/2001 IPCA RBNI REA 3208/2011 09/11/2015 08/11/2049  R$ 1,517,662.69
STO.A.JESUS TR 230/69 kV STO.A.JESUS TR2 BA RBF FT TR 230/69 kV STO.A.JESUS TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
STO.A.JESUS TR 230/69 kV STO.A.JESUS TR1 BA RBF FT TR 230/69 kV STO.A.JESUS TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
STO.A.JESUS TR 230/69 kV STO.A.JESUS TR1 BA RBF FT TR 230/69 kV STO.A.JESUS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
STO.A.JESUS TR 230/69 kV STO.A.JESUS TR1 BA RBF FT TR 230/69 kV STO.A.JESUS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
STO.A.JESUS MG 230 kV STO.A.JESUS MG1 BA RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$570,821.18
STO.A.JESUS MG 230 kV STO.A.JESUS MG1 BA RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RMEL REN 643/2014 07/02/2014 06/02/2048  R$6,646.50
STO.A.JESUS MG 230 kV STO.A.JESUS MG1 BA RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,684,459.54
STO.A.JESUS MG 230 kV STO.A.JESUS MG1 BA RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,723,824.51
STO.A.JESUS MG 230 kV STO.A.JESUS MG1 BA RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBNI REA 7761/2019 28/07/2020 27/07/2035  R$61,104.35
STO.A.JESUS MC 69 kV TT 69/13,8 kV STO.A.JESUS TA1 BA  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
STO.A.JESUS MC 69 kV TR 69/13,8 kV STO.A.JESUS TR5 BA RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
STO.A.JESUS MC 69 kV TR 69/13,8 kV STO.A.JESUS TR5 BA RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
STO.A.JESUS MC 69 kV TR 69/13,8 kV STO.A.JESUS TR5 BA RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$204,189.21
STO.A.JESUS MC 69 kV TR 230/69 kV STO.A.JESUS TR3 BA RBF FT TR 230/69 kV STO.A.JESUS TR3 BA 061/2001 IPCA RBNI REA 3208/2011 09/11/2015 08/11/2045  R$456,492.06
STO.A.JESUS MC 69 kV TR 230/69 kV STO.A.JESUS TR2 BA  RBF FT TR 230/69 kV STO.A.JESUS TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
STO.A.JESUS MC 69 kV TR 230/69 kV STO.A.JESUS TR1 BA RBF FT TR 230/69 kV STO.A.JESUS TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
STO.A.JESUS MC 69 kV TR 230/69 kV STO.A.JESUS TR1 BA RBF FT TR 230/69 kV STO.A.JESUS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
STO.A.JESUS MC 69 kV TR 230/69 kV STO.A.JESUS TR1 BA RBF FT TR 230/69 kV STO.A.JESUS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$204,189.21
STO.A.JESUS MC 230 kV TR 230/69 kV STO.A.JESUS TR3 BA RBF FT TR 230/69 kV STO.A.JESUS TR3 BA 061/2001 IPCA RBNI REA 3208/2011 09/11/2015 08/11/2045  R$ 1,171,042.14
STO.A.JESUS MC 230 kV TR 230/69 kV STO.A.JESUS TR2 BA  RBF FT TR 230/69 kV STO.A.JESUS TR2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
STO.A.JESUS MC 230 kV TR 230/69 kV STO.A.JESUS TR1 BA RBF FT TR 230/69 kV STO.A.JESUS TR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,850.76
STO.A.JESUS MC 230 kV TR 230/69 kV STO.A.JESUS TR1 BA RBF FT TR 230/69 kV STO.A.JESUS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$465,808.25
STO.A.JESUS MC 230 kV TR 230/69 kV STO.A.JESUS TR1 BA RBF FT TR 230/69 kV STO.A.JESUS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$476,693.95
STO.A.JESUS IB 69 kV MG 230 kV STO.A.JESUS MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
STO.A.JESUS IB 69 kV MG 230 kV STO.A.JESUS MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$134,104.45
STO.A.JESUS IB 69 kV MG 230 kV STO.A.JESUS MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$137,238.41
STO.A.JESUS IB 230 kV MG 230 kV STO.A.JESUS MG1 BA IB1 RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,929.18
STO.A.JESUS IB 230 kV MG 230 kV STO.A.JESUS MG1 BA IB1 RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$368,658.63
STO.A.JESUS IB 230 kV MG 230 kV STO.A.JESUS MG1 BA IB1 RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$377,273.99
STO.A.JESUS EL 69 kV STO.A.JESUSDIST6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
STO.A.JESUS EL 69 kV STO.A.JESUSDIST6 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
STO.A.JESUS EL 69 kV STO.A.JESUSDIST6 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
STO.A.JESUS EL 69 kV STO.A.JESUSDIST5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
STO.A.JESUS EL 69 kV STO.A.JESUSDIST5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
STO.A.JESUS EL 69 kV STO.A.JESUSDIST5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
STO.A.JESUS EL 69 kV STO.A.JESUSDIST4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
STO.A.JESUS EL 69 kV STO.A.JESUSDIST4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
STO.A.JESUS EL 69 kV STO.A.JESUSDIST4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
STO.A.JESUS EL 69 kV STO.A.JESUSDIST3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
STO.A.JESUS EL 69 kV STO.A.JESUSDIST3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
STO.A.JESUS EL 69 kV STO.A.JESUSDIST3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
STO.A.JESUS EL 69 kV STO.A.JESUSDIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
STO.A.JESUS EL 69 kV STO.A.JESUSDIST2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
STO.A.JESUS EL 69 kV STO.A.JESUSDIST2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
STO.A.JESUS EL 69 kV STO.A.JESUSDIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
STO.A.JESUS EL 69 kV STO.A.JESUSDIST1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
STO.A.JESUS EL 69 kV STO.A.JESUSDIST1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
STO.A.JESUS EL 230 kV STO.A.JESUS LT 230 kV STO.A.JESUS /FUNIL C-2 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
STO.A.JESUS EL 230 kV STO.A.JESUS LT 230 kV STO.A.JESUS /FUNIL C-1 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
STO.A.JESUS EL 230 kV STO.A.JESUS LT 230 kV STO.A.JESUS /FUNIL C-1 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
STO.A.JESUS EL 230 kV STO.A.JESUS LT 230 kV STO.A.JESUS /FUNIL C-1 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$692,788.80
STO.A.JESUS EL 230 kV STO.A.JESUS LT 230 kV STO.A.JESUS /FUNIL C-1 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA 061/2001 IPCA RBNI REA 5861/2016 10/06/2016 09/06/2044  R$28,900.49
STO.A.JESUS EL 230 kV STO.A.JESUS LT 230 kV STO.A.JESUS /FUNIL C-1 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA 061/2001 IPCA RBNI REA 5861/2016 10/06/2016 09/06/2031  R$120,229.77
STO.A.JESUS EL 230 kV STO.A.JESUS LT 230 kV SAPEACU /STO.A.JESUS C-2 BA RB FT LT 230 kV SAPEACU /STO.A.JESUS C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
STO.A.JESUS EL 230 kV STO.A.JESUS LT 230 kV SAPEACU /STO.A.JESUS C-1 BA  RB FT LT 230 kV SAPEACU /STO.A.JESUS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
STO.A.JESUS EL 230 kV STO.A.JESUS LT 230 kV SAPEACU /STO.A.JESUS C-1 BA  RB FT LT 230 kV SAPEACU /STO.A.JESUS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
STO.A.JESUS EL 230 kV STO.A.JESUS LT 230 kV SAPEACU /STO.A.JESUS C-1 BA  RB FT LT 230 kV SAPEACU /STO.A.JESUS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$692,788.80
SUAPE II TR 500/230 kV SUAPE II TRR1 PE RB FT TR 500/230 kV SUAPE II TRR1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039  R$682,108.85
SUAPE II TR 500/230 kV SUAPE II TR2 PE RB FT TR 500/230 kV SUAPE II TR2 PE 006/2009 IPCA RBNI REA 3237/2011 23/02/2015 23/02/2055  R$ 5,485,466.91
SUAPE II TR 500/230 kV SUAPE II TR1 PE RB FT TR 500/230 kV SUAPE II TR1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039  R$ 2,046,326.55
SUAPE II RTL 500 kV 33,33 Mvar SUAPE II RTR1 PE RB FT RTL 500 kV 33,33 Mvar SUAPE II RTR1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039  R$251,749.32
SUAPE II RTL 500 kV 100 Mvar SUAPE II RT1 PE RB FT RTL 500 kV 100 Mvar SUAPE II RT1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039  R$755,250.00
SUAPE II MG 500 kV SUAPE II MG1 PE RB FT MG 500 kV SUAPE II MG1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039  R$ 2,581,973.81
SUAPE II MG 500 kV SUAPE II MG1 PE RB FT MG 500 kV SUAPE II MG1 PE 006/2009 IPCA RBNI REA 3237/2011 23/02/2015 23/02/2049  R$51,601.27
SUAPE II MG 500 kV SUAPE II MG1 PE RB FT MG 500 kV SUAPE II MG1 PE 006/2009 IPCA RMEL REN 643/2014 27/03/2015 26/03/2030  R$50,661.48
SUAPE II MG 500 kV SUAPE II MG1 PE RB FT MG 500 kV SUAPE II MG1 PE 006/2009 IPCA RBNI REN 443/2011 07/07/2015 06/07/2046  R$120,090.47
SUAPE II MG 500 kV SUAPE II MG1 PE RB FT MG 500 kV SUAPE II MG1 PE 006/2009 IPCA RBNI REN 443/2011 07/07/2015 06/07/2046  R$120,090.47
SUAPE II MC 500 kV TR 500/230 kV SUAPE II TR2 PE  RB FT TR 500/230 kV SUAPE II TR2 PE 006/2009 IPCA RBNI REA 3237/2011 23/02/2015 23/02/2048  R$ 1,235,470.87
SUAPE II MC 500 kV TR 500/230 kV SUAPE II TR1 PE  RB FT TR 500/230 kV SUAPE II TR1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039  R$655,835.81
SUAPE II MC 500 kV RTL 500 kV 100 Mvar SUAPE II RT1 PE RB FT RTL 500 kV 100 Mvar SUAPE II RT1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039  R$582,362.58
SUAPE II MC 230 kV TR 500/230 kV SUAPE II TR2 PE  RB FT TR 500/230 kV SUAPE II TR2 PE 006/2009 IPCA RBNI REA 3237/2011 23/02/2015 23/02/2049  R$470,453.54
SUAPE II MC 230 kV TR 500/230 kV SUAPE II TR1 PE  RB FT TR 500/230 kV SUAPE II TR1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039  R$274,838.06
SUAPE II IB 500 kV MG 500 kV SUAPE II MG1 PE IB2 RB FT MG 500 kV SUAPE II MG1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039  R$252,694.63
SUAPE II IB 500 kV MG 500 kV SUAPE II MG1 PE IB1 RB FT MG 500 kV SUAPE II MG1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039  R$252,694.63
SUAPE II IB 230 kV MG 500 kV SUAPE II MG1 PE IB1 RB FT MG 500 kV SUAPE II MG1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039  R$151,970.45
SUAPE II EL 500 kV SUAPE II LT 500 kV SUAPE II /RECIFE II C-1 PE  RB FT LT 500 kV SUAPE II /RECIFE II C-1 PE 061/2001 IPCA RBNI REA 10229/2021 21/05/2021 21/05/2049  R$191,257.58
SUAPE II EL 500 kV SUAPE II LT 500 kV MESSIAS /SUAPE II C-1 AL/PE  RB FT LT 500 kV MESSIAS /SUAPE II C-1 AL/PE 061/2001 IPCA RBNI REA 10229/2021 21/05/2021 21/05/2049  R$190,918.78
SUAPE II EL 230 kV SUAPE II LT 230 kV SUAPE II /SUAPE III C-2 PE RB FT LT 230 kV SUAPE II /SUAPE III C-2 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039  R$316,708.67
SUAPE II EL 230 kV SUAPE II LT 230 kV SUAPE II /SUAPE III C-2 PE RB FT LT 230 kV SUAPE II /SUAPE III C-2 PE 006/2009 IPCA RBNI REA 5861/2016 10/12/2018 09/12/2033  R$53,864.97
SUAPE II EL 230 kV SUAPE II LT 230 kV SUAPE II /SUAPE III C-1 PE RB FT LT 230 kV SUAPE II /SUAPE III C-1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039  R$316,708.67
SUAPE II EL 230 kV SUAPE II LT 230 kV SUAPE II /SUAPE III C-1 PE RB FT LT 230 kV SUAPE II /SUAPE III C-1 PE 006/2009 IPCA RBNI REA 5861/2016 10/12/2018 09/12/2033  R$53,864.97
SUAPE II EL 230 kV SUAPE II LT 230 kV SUAPE II /RNEST PETROBRAS C-2 PE  DIT   006/2009 IPCA RCDM REN 443/2011 07/07/2015 06/07/2043  R$830,332.68
SUAPE II EL 230 kV SUAPE II LT 230 kV SUAPE II /RNEST PETROBRAS C-1 PE  DIT   006/2009 IPCA RCDM REN 443/2011 07/07/2015 06/07/2043  R$830,332.68
SUAPE II EL 230 kV SUAPE II LT 230 kV PIRAPAMA II /SUAPE II C-2 PE RB FT LT 230 kV PIRAPAMA II /SUAPE II C-2 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039  R$316,708.67
SUAPE II EL 230 kV SUAPE II LT 230 kV PIRAPAMA II /SUAPE II C-1 PE RB FT LT 230 kV PIRAPAMA II /SUAPE II C-1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039  R$316,708.67
SUAPE III TT 69/0 kV SUAPE III TA2 PE DIT   006/2009 IPCA RCDM REA 4347/2013 30/10/2017 29/10/2047  R$497,032.44
SUAPE III TT 69/0 kV SUAPE III TA1 PE DIT   006/2009 IPCA RPEC CC 006/2009 28/01/2009 28/01/2039  R$70,058.93
SUAPE III TR 230/69 kV SUAPE III TR3 PE RBF FT TR 230/69 kV SUAPE III TR3 PE 006/2009 IPCA RBNI REA 3237/2011 18/05/2015 18/05/2055  R$ 1,050,276.62
SUAPE III TR 230/69 kV SUAPE III TR2 PE RBF FT TR 230/69 kV SUAPE III TR2 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039  R$395,582.79
SUAPE III TR 230/69 kV SUAPE III TR1 PE RBF FT TR 230/69 kV SUAPE III TR1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039  R$395,582.79
SUAPE III MG 230 kV SUAPE III MG1 PE RB FT MG 230 kV SUAPE III MG1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039  R$ 1,584,614.99
SUAPE III MG 230 kV SUAPE III MG1 PE RB FT MG 230 kV SUAPE III MG1 PE 006/2009 IPCA RBNI REA 3237/2011 18/05/2015 18/05/2047  R$51,619.17
SUAPE III MG 230 kV SUAPE III MG1 PE RB FT MG 230 kV SUAPE III MG1 PE 006/2009 IPCA RBNI REA 3237/2011 18/05/2015 18/05/2047  R$13,613.29
SUAPE III MG 230 kV SUAPE III MG1 PE RB FT MG 230 kV SUAPE III MG1 PE 006/2009 IPCA RBNI REA 4347/2013 30/10/2017 29/10/2049  R$150,670.63
SUAPE III MC 69 kV TR 230/69 kV SUAPE III TR3 PE RBF FT TR 230/69 kV SUAPE III TR3 PE 006/2009 IPCA RBNI REA 3237/2011 18/05/2015 18/05/2049  R$193,680.64
SUAPE III MC 69 kV TR 230/69 kV SUAPE III TR2 PE RBF FT TR 230/69 kV SUAPE III TR2 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039  R$50,229.66
SUAPE III MC 69 kV TR 230/69 kV SUAPE III TR1 PE RBF FT TR 230/69 kV SUAPE III TR1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039  R$50,229.66
SUAPE III MC 230 kV TR 230/69 kV SUAPE III TR3 PE RBF FT TR 230/69 kV SUAPE III TR3 PE 006/2009 IPCA RBNI REA 3237/2011 18/05/2015 18/05/2049  R$470,677.89
SUAPE III MC 230 kV TR 230/69 kV SUAPE III TR2 PE RBF FT TR 230/69 kV SUAPE III TR2 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039  R$274,838.06
SUAPE III MC 230 kV TR 230/69 kV SUAPE III TR1 PE RBF FT TR 230/69 kV SUAPE III TR1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039  R$274,838.06
SUAPE III IB 69 kV MG 230 kV SUAPE III MG1 PE IB1 DIT   006/2009 IPCA RPEC CC 006/2009 28/01/2009 28/01/2039  R$11,574.13
SUAPE III IB 230 kV MG 230 kV SUAPE III MG1 PE IB1 RB FT MG 230 kV SUAPE III MG1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039  R$151,970.45
SUAPE III EL 69 kV SUAPE IIIDIST4 DIT   006/2009 IPCA RPEC CC 006/2009 28/01/2009 28/01/2039  R$24,329.82
SUAPE III EL 69 kV SUAPE IIIDIST3 DIT   006/2009 IPCA RPEC CC 006/2009 28/01/2009 28/01/2039  R$24,329.82
SUAPE III EL 69 kV SUAPE IIIDIST2 DIT   006/2009 IPCA RPEC CC 006/2009 28/01/2009 28/01/2039  R$24,329.82
SUAPE III EL 69 kV SUAPE IIIDIST1 DIT   006/2009 IPCA RPEC CC 006/2009 28/01/2009 28/01/2039  R$24,329.82
SUAPE III EL 230 kV SUAPE III LT 230 kV SUAPE II /SUAPE III C-2 PE RB FT LT 230 kV SUAPE II /SUAPE III C-2 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039  R$316,708.67
SUAPE III EL 230 kV SUAPE III LT 230 kV SUAPE II /SUAPE III C-1 PE RB FT LT 230 kV SUAPE II /SUAPE III C-1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039  R$316,708.67
TABOCAS BREJO VELHO MG 230 kV TABOCAS BREJO VELHO MG1 BA RB FT MG 230 kV TABOCAS BREJO VELHO MG1 BA 061/2001 IPCA RBNI REA 10198/2021 05/06/2019 04/06/2037  R$53,136.94
TABOCAS BREJO VELHO MG 230 kV TABOCAS BREJO VELHO MG1 BA RB FT MG 230 kV TABOCAS BREJO VELHO MG1 BA 061/2001 IPCA RBNI REA 10198/2021 05/06/2019 04/06/2050  R$56,608.73
TABOCAS BREJO VELHO IB 230 kV MG 230 kV TABOCAS BREJO VELHO MG1 BA IB1 RB FT MG 230 kV TABOCAS BREJO VELHO MG1 BA 061/2001 IPCA RBNI REA 10198/2021 05/06/2019 04/06/2048  R$108,297.35
TABOCAS BREJO VELHO EL 230 kV TABOCAS BREJO VELHO LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA  RB FT LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA 061/2001 IPCA RBNI REA 10198/2021 05/06/2019 04/06/2047  R$153,279.46
TABOCAS BREJO VELHO EL 230 kV TABOCAS BREJO VELHO LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA  RB FT LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA 061/2001 IPCA RBNI REA 10198/2021 19/06/2019 18/06/2047  R$153,279.46
TACAIMBO TT 69/13,8 kV TACAIMBO TA2 PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
TACAIMBO TT 69/13,8 kV TACAIMBO TA1 PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
TACAIMBO TT 69/13,8 kV TACAIMBO TA1 PE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$281,516.05
TACAIMBO TR 69/13,8 kV TACAIMBO TR5 PE RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
TACAIMBO TR 69/13,8 kV TACAIMBO TR5 PE RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$86,722.45
TACAIMBO TR 69/13,8 kV TACAIMBO TR5 PE RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$88,749.11
TACAIMBO TR 230/69 kV TACAIMBO TR4 PE RBF FT TR 230/69 kV TACAIMBO TR4 PE 061/2001 IPCA RBNI REA 5655/2016 14/10/2018 14/10/2052  R$ 1,659,929.61
TACAIMBO TR 230/69 kV TACAIMBO TR3 PE RBF FT TR 230/69 kV TACAIMBO TR3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
TACAIMBO TR 230/69 kV TACAIMBO TR2 PE RBF FT TR 230/69 kV TACAIMBO TR2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
TACAIMBO TR 230/69 kV TACAIMBO TR2 PE RBF FT TR 230/69 kV TACAIMBO TR2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
TACAIMBO TR 230/69 kV TACAIMBO TR2 PE RBF FT TR 230/69 kV TACAIMBO TR2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
TACAIMBO TR 230/69 kV TACAIMBO TR1 PE RBF FT TR 230/69 kV TACAIMBO TR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
TACAIMBO TR 230/69 kV TACAIMBO TR1 PE RBF FT TR 230/69 kV TACAIMBO TR1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
TACAIMBO TR 230/69 kV TACAIMBO TR1 PE RBF FT TR 230/69 kV TACAIMBO TR1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
TACAIMBO MG 230 kV TACAIMBO MG1 PE RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$610,594.35
TACAIMBO MG 230 kV TACAIMBO MG1 PE RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RMEL REN 643/2014 30/10/2013 29/10/2041  R$82,707.24
TACAIMBO MG 230 kV TACAIMBO MG1 PE RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RBNI REA 1814/2009 13/04/2015 12/04/2043  R$59,359.32
TACAIMBO MG 230 kV TACAIMBO MG1 PE RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RBNI REA 5655/2016 14/10/2018 14/10/2050  R$71,956.99
TACAIMBO MG 230 kV TACAIMBO MG1 PE RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RBNI REA 5655/2016 14/10/2018 14/10/2049  R$18,927.68
TACAIMBO MG 230 kV TACAIMBO MG1 PE RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,801,827.83
TACAIMBO MG 230 kV TACAIMBO MG1 PE RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,843,935.64
TACAIMBO MC 69 kV TT 69/13,8 kV TACAIMBO TA2 PE  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
TACAIMBO MC 69 kV TR 69/13,8 kV TACAIMBO TR5 PE RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
TACAIMBO MC 69 kV TR 230/69 kV TACAIMBO TR4 PE RBF FT TR 230/69 kV TACAIMBO TR4 PE 061/2001 IPCA RBNI REA 5655/2016 14/10/2018 14/10/2041  R$327,774.91
TACAIMBO MC 69 kV TR 230/69 kV TACAIMBO TR3 PE RBF FT TR 230/69 kV TACAIMBO TR3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
TACAIMBO MC 69 kV TR 230/69 kV TACAIMBO TR2 PE RBF FT TR 230/69 kV TACAIMBO TR2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
TACAIMBO MC 69 kV TR 230/69 kV TACAIMBO TR2 PE RBF FT TR 230/69 kV TACAIMBO TR2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
TACAIMBO MC 69 kV TR 230/69 kV TACAIMBO TR1 PE RBF FT TR 230/69 kV TACAIMBO TR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
TACAIMBO MC 230 kV TR 230/69 kV TACAIMBO TR4 PE RBF FT TR 230/69 kV TACAIMBO TR4 PE 061/2001 IPCA RBNI REA 5655/2016 14/10/2018 14/10/2042  R$769,470.99
TACAIMBO MC 230 kV TR 230/69 kV TACAIMBO TR3 PE RBF FT TR 230/69 kV TACAIMBO TR3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
TACAIMBO MC 230 kV TR 230/69 kV TACAIMBO TR2 PE RBF FT TR 230/69 kV TACAIMBO TR2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
TACAIMBO MC 230 kV TR 230/69 kV TACAIMBO TR2 PE RBF FT TR 230/69 kV TACAIMBO TR2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$515,473.59
TACAIMBO MC 230 kV TR 230/69 kV TACAIMBO TR1 PE RBF FT TR 230/69 kV TACAIMBO TR1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
TACAIMBO IB 69 kV MG 230 kV TACAIMBO MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
TACAIMBO IB 69 kV MG 230 kV TACAIMBO MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$134,104.45
TACAIMBO IB 69 kV MG 230 kV TACAIMBO MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$137,238.41
TACAIMBO IB 230 kV MG 230 kV TACAIMBO MG1 PE IB1 RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
TACAIMBO EL 69 kV TACAIMBOSAO CAETANO DIT   061/2001 IPCA RCDM REA 1814/2009 13/04/2015 12/04/2045  R$483,839.47
TACAIMBO EL 69 kV TACAIMBODIST4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
TACAIMBO EL 69 kV TACAIMBODIST4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
TACAIMBO EL 69 kV TACAIMBODIST4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
TACAIMBO EL 69 kV TACAIMBODIST3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
TACAIMBO EL 69 kV TACAIMBODIST3 DIT   061/2001 IPCA RMEL REN 643/2014 29/11/2013 28/11/2046  R$37,612.86
TACAIMBO EL 69 kV TACAIMBODIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
TACAIMBO EL 69 kV TACAIMBODIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
TACAIMBO EL 69 kV TACAIMBOBELO JARDIM C2 DIT   061/2001 IPCA RCDM REA 1814/2009 13/04/2015 12/04/2045  R$483,839.47
TACAIMBO EL 230 kV TACAIMBO LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
TACAIMBO EL 230 kV TACAIMBO LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
TACAIMBO EL 230 kV TACAIMBO LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$735,719.99
TACAIMBO EL 230 kV TACAIMBO LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
TACAIMBO EL 230 kV TACAIMBO LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
TACAIMBO EL 230 kV TACAIMBO LT 230 kV ANGELIM /TACAIMBO C-3 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-3 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
TACAIMBO EL 230 kV TACAIMBO LT 230 kV ANGELIM /TACAIMBO C-3 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-3 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
TACAIMBO EL 230 kV TACAIMBO LT 230 kV ANGELIM /TACAIMBO C-3 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-3 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$735,719.99
TACAIMBO EL 230 kV TACAIMBO LT 230 kV ANGELIM /TACAIMBO C-3 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-3 PE 061/2001 IPCA RMEL REN 443/2011 14/04/2016 13/04/2046  R$14,477.14
TACAIMBO EL 230 kV TACAIMBO LT 230 kV ANGELIM /TACAIMBO C-2 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
TACAIMBO EL 230 kV TACAIMBO LT 230 kV ANGELIM /TACAIMBO C-2 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
TACAIMBO EL 230 kV TACAIMBO LT 230 kV ANGELIM /TACAIMBO C-2 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$735,719.99
TACAIMBO EL 230 kV TACAIMBO LT 230 kV ANGELIM /TACAIMBO C-1 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
TACAIMBO EL 230 kV TACAIMBO LT 230 kV ANGELIM /TACAIMBO C-1 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
TACAIMBO EL 230 kV TACAIMBO LT 230 kV ANGELIM /TACAIMBO C-1 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$735,719.99
TACARUTU MG 230 kV TACARUTU MG1 PE RB FT MG 230 kV TACARUTU MG1 PE 061/2001 IPCA RBNI REA 7026/2018 01/07/2018 14/12/2033  R$48,131.91
TACARUTU IB 230 kV MG 230 kV TACARUTU MG1 PE IB1 RB FT MG 230 kV TACARUTU MG1 PE 061/2001 IPCA RBNI REA 7026/2018 01/07/2018 14/12/2039  R$76,763.06
TACARUTU EL 230 kV TACARUTU LT 230 kV TACARUTU /BOM NOME C-1 PE  RB FT LT 230 kV TACARUTU /BOM NOME C-1 PE 061/2001 IPCA RBNI REA 7026/2018 01/07/2018 14/12/2038  R$126,644.50
TACARUTU EL 230 kV TACARUTU LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE  RB FT LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE 061/2001 IPCA RBNI REA 7026/2018 01/07/2018 14/12/2038  R$126,644.50
TAUA II TT 69/0 kV TAUA II TT1 CE DIT   007/2005 IGPM RPEC CC 007/2005 04/03/2005 04/03/2035  R$138,947.09
TAUA II TR 230/69 kV TAUA II TR2 CE RBF FT TR 230/69 kV TAUA II TR2 CE 007/2005 IGPM RBNI REA 2823/2011 02/03/2015 02/03/2055  R$ 1,634,401.19
TAUA II TR 230/69 kV TAUA II TR1 CE RBF FT TR 230/69 kV TAUA II TR1 CE 007/2005 IGPM RBL CC 007/2005 28/12/2007 04/03/2035  R$778,427.25
TAUA II RTL 230 kV 15 Mvar TAUA II RT2 CE RB FT LT 230 kV MILAGRES /TAUA II C-1 CE 007/2005 IGPM RBNI REA 1179/2008 30/05/2010 30/05/2044  R$ 1,045,337.13
TAUA II RTB 230 kV 15 Mvar TAUA II RT1 CE RB FT RTB 230 kV 15 Mvar TAUA II RT1 CE 012/2007 IPCA RBL CC 012/2007 14/06/2007 14/06/2037  R$248,196.04
TAUA II MG 230 kV TAUA II MG1 CE RB FT MG 230 kV TAUA II MG1 CE 007/2005 IGPM RBL CC 007/2005 28/12/2007 04/03/2035  R$606,895.75
TAUA II MG 230 kV TAUA II MG1 CE RB FT MG 230 kV TAUA II MG1 CE 007/2005 IGPM RBNI REA 1179/2008 30/05/2010 30/05/2043  R$297,043.83
TAUA II MG 230 kV TAUA II MG1 CE RB FT MG 230 kV TAUA II MG1 CE 007/2005 IGPM RBNI REA 2823/2011 02/03/2015 02/03/2047  R$169,855.15
TAUA II MG 230 kV TAUA II MG1 CE RB FT MG 230 kV TAUA II MG1 CE 007/2005 IGPM RBNI REA 3402/2012 15/12/2016 15/12/2049  R$171,190.56
TAUA II MG 230 kV TAUA II MG1 CE RB FT MG 230 kV TAUA II MG1 CE 007/2005 IGPM RBNI REA 2376/2010 31/01/2013 31/01/2046  R$14,141.71
TAUA II MG 230 kV TAUA II MG1 CE RB FT MG 230 kV TAUA II MG1 CE 007/2005 IGPM RMEL REN 643/2014 25/06/2014 24/06/2046  R$17,280.20
TAUA II MG 230 kV TAUA II MG1 CE RB FT MG 230 kV TAUA II MG1 CE 007/2005 IGPM RMEL REN 643/2014 06/02/2014 05/04/2046  R$9,160.38
TAUA II MC 69 kV TR 230/69 kV TAUA II TR2 CE RBF FT TR 230/69 kV TAUA II TR2 CE 007/2005 IGPM RBNI REA 2823/2011 02/03/2015 02/03/2049  R$409,069.29
TAUA II MC 69 kV TR 230/69 kV TAUA II TR1 CE  RBF FT TR 230/69 kV TAUA II TR1 CE 007/2005 IGPM RBL CC 007/2005 28/12/2007 04/03/2035  R$110,770.80
TAUA II MC 230 kV TR 230/69 kV TAUA II TR2 CE RBF FT TR 230/69 kV TAUA II TR2 CE 007/2005 IGPM RBNI REA 2823/2011 02/03/2015 02/03/2049  R$ 1,103,599.31
TAUA II MC 230 kV TR 230/69 kV TAUA II TR1 CE  RBF FT TR 230/69 kV TAUA II TR1 CE 007/2005 IGPM RBL CC 007/2005 28/12/2007 04/03/2035  R$486,691.93
TAUA II MC 230 kV RTB 230 kV 15 Mvar TAUA II RT1 CE RB FT RTB 230 kV 15 Mvar TAUA II RT1 CE 012/2007 IPCA RBL CC 012/2007 14/06/2007 14/06/2037  R$393,368.55
TAUA II MC 230 kV CE 90/-45 Mvar TAUA II CE1 CE  RB FT CE 90/-45 Mvar TAUA II CE1 CE 007/2005 IGPM RBNI REA 3402/2012 15/12/2016 15/12/2049  R$ 1,117,134.97
TAUA II IB 69 kV MG 230 kV TAUA II MG1 CE IB1 DIT   007/2005 IGPM RPEC CC 007/2005 04/03/2005 04/03/2035  R$59,052.51
TAUA II IB 230 kV MG 230 kV TAUA II MG1 CE IB1 RB FT MG 230 kV TAUA II MG1 CE 007/2005 IGPM RBNI REA 1179/2008 30/05/2010 30/05/2043  R$718,529.63
TAUA II EL 69 kV TAUA IIDIST5 DIT   007/2005 IGPM RCDM REA 758/2006 27/11/2009 27/11/2040  R$399,676.25
TAUA II EL 69 kV TAUA IIDIST4 DIT   007/2005 IGPM RCDM REA 758/2006 09/03/2008 09/03/2038  R$454,311.79
TAUA II EL 69 kV TAUA IIDIST3 DIT   007/2005 IGPM RCDM REA 758/2006 28/02/2008 28/02/2038  R$454,384.36
TAUA II EL 69 kV TAUA IIDIST2 DIT   007/2005 IGPM RCDM REA 758/2006 27/02/2008 27/02/2038  R$454,391.62
TAUA II EL 69 kV TAUA IIDIST1 DIT   007/2005 IGPM RCDM REA 758/2006 27/02/2008 27/02/2038  R$454,391.62
TAUA II EL 230 kV TAUA II LT 230 kV PICOS /TAUA II C-1 PI/CE RB FT LT 230 kV PICOS /TAUA II C-1 PI/CE 012/2007 IPCA RBL CC 012/2007 14/06/2007 14/06/2037  R$520,503.54
TAUA II EL 230 kV TAUA II LT 230 kV MILAGRES /TAUA II C-1 CE  RB FT LT 230 kV MILAGRES /TAUA II C-1 CE 007/2005 IGPM RBL CC 007/2005 28/12/2007 04/03/2035  R$583,703.84
TAUA II CE 90/-45 Mvar TAUA II CE1 CE RB FT CE 90/-45 Mvar TAUA II CE1 CE 007/2005 IGPM RBNI REA 3402/2012 15/12/2016 15/12/2046  R$ 9,726,947.48
TEIX. FREITAS II TR 230/138 kV TEIX. FREITAS II TRR1 BA RBF FT TR 230/138 kV TEIX. FREITAS II TRR1 BA 014/2008 IPCA RBL CC 014/2008 16/10/2008 16/10/2038  R$118,045.79
TEIX. FREITAS II TR 230/138 kV TEIX. FREITAS II TR2 BA RBF FT TR 230/138 kV TEIX. FREITAS II TR2 BA 014/2008 IPCA RBNI REA 2823/2011 19/06/2019 19/06/2059  R$ 1,981,923.31
TEIX. FREITAS II TR 230/138 kV TEIX. FREITAS II TR1 BA RBF FT TR 230/138 kV TEIX. FREITAS II TR1 BA 014/2008 IPCA RBL CC 014/2008 16/10/2008 16/10/2038  R$354,135.55
TEIX. FREITAS II MG 230 kV TEIX. FREITAS II MG1 BA RB FT MG 230 kV TEIX. FREITAS II MG1 BA 014/2008 IPCA RBL CC 014/2008 16/10/2008 16/10/2038  R$997,089.36
TEIX. FREITAS II MG 230 kV TEIX. FREITAS II MG1 BA RB FT MG 230 kV TEIX. FREITAS II MG1 BA 014/2008 IPCA RBNI REA 2823/2011 19/06/2019 19/06/2051  R$101,152.82
TEIX. FREITAS II MC 230 kV TR 230/138 kV TEIX. FREITAS II TR2 BA RBF FT TR 230/138 kV TEIX. FREITAS II TR2 BA 014/2008 IPCA RBNI REA 2823/2011 19/06/2019 19/06/2053  R$559,016.04
TEIX. FREITAS II MC 230 kV TR 230/138 kV TEIX. FREITAS II TR1 BA RBF FT TR 230/138 kV TEIX. FREITAS II TR1 BA 014/2008 IPCA RBL CC 014/2008 16/10/2008 16/10/2038  R$248,029.59
TEIX. FREITAS II MC 138 kV TR 230/138 kV TEIX. FREITAS II TR2 BA RBF FT TR 230/138 kV TEIX. FREITAS II TR2 BA 014/2008 IPCA RBNI REA 2823/2011 19/06/2019 19/06/2053  R$444,223.87
TEIX. FREITAS II MC 138 kV TR 230/138 kV TEIX. FREITAS II TR1 BA RBF FT TR 230/138 kV TEIX. FREITAS II TR1 BA 014/2008 IPCA RBL CC 014/2008 16/10/2008 16/10/2038  R$89,820.38
TEIX. FREITAS II MC 138 kV BC 138 kV 10 Mvar TEIX. FREITAS II BC1 BA DIT   014/2008 IPCA RPEC CC 014/2008 16/10/2008 16/10/2038  R$92,240.48
TEIX. FREITAS II IB 230 kV MG 230 kV TEIX. FREITAS II MG1 BA IB1 RB FT MG 230 kV TEIX. FREITAS II MG1 BA 014/2008 IPCA RBL CC 014/2008 16/10/2008 16/10/2038  R$139,980.45
TEIX. FREITAS II IB 230 kV MG 230 kV TEIX. FREITAS II MG1 BA IB1 DIT   014/2008 IPCA RPEC CC 014/2008 16/10/2008 16/10/2038  R$59,901.54
TEIX. FREITAS II EL 230 kV TEIX. FREITAS II LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-2 BA RB FT LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-2 BA 018/2009 IPCA RBL CC 018/2009 03/08/2009 03/08/2039  R$785,688.22
TEIX. FREITAS II EL 230 kV TEIX. FREITAS II LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-1 BA RB FT LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-1 BA 014/2008 IPCA RBL CC 014/2008 16/10/2008 16/10/2038  R$287,267.00
TEIX. FREITAS II EL 138 kV TEIX. FREITAS IIDIST2 DIT   014/2008 IPCA RPEC CC 014/2008 16/10/2008 16/10/2038  R$119,212.12
TEIX. FREITAS II EL 138 kV TEIX. FREITAS IIDIST1 DIT   014/2008 IPCA RPEC CC 014/2008 16/10/2008 16/10/2038  R$119,212.12
TEIX. FREITAS II BC 138 kV 10 Mvar TEIX. FREITAS II BC1 BA DIT   014/2008 IPCA RPEC CC 014/2008 16/10/2008 16/10/2038  R$76,165.60
TERESINA TT 69/13,8 kV TERESINA TA2 PI DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
TERESINA TT 69/13,8 kV TERESINA TA2 PI DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$281,516.05
TERESINA TT 69/13,8 kV TERESINA TA2 PI DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$288,094.94
TERESINA TT 69/13,8 kV TERESINA TA1 PI DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
TERESINA TT 69/13,8 kV TERESINA TA1 PI DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$281,516.05
TERESINA TR 230/69 kV TERESINA TR6 PI RBF FT TR 230/69 kV TERESINA TR6 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
TERESINA TR 230/69 kV TERESINA TR5 PI RBF FT TR 230/69 kV TERESINA TR5 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
TERESINA TR 230/69 kV TERESINA TR5 PI RBF FT TR 230/69 kV TERESINA TR5 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
TERESINA TR 230/69 kV TERESINA TR4 PI RBF FT TR 230/69 kV TERESINA TR4 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
TERESINA TR 230/69 kV TERESINA TR4 PI RBF FT TR 230/69 kV TERESINA TR4 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
TERESINA TR 230/69 kV TERESINA TR4 PI RBF FT TR 230/69 kV TERESINA TR4 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,150,710.31
TERESINA TR 230/69 kV TERESINA TR3 PI RBF FT TR 230/69 kV TERESINA TR3 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$381,042.16
TERESINA TR 230/69 kV TERESINA TR3 PI RBF FT TR 230/69 kV TERESINA TR3 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,124,432.88
TERESINA TR 230/69 kV TERESINA TR1 PI RBF FT TR 230/69 kV TERESINA TR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$199,696.02
TERESINA TR 230/13,8 kV TERESINA TR2 PI RBF FT TR 230/13,8 kV TERESINA TR2 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$199,696.02
TERESINA RTL 230 kV 3,33 Mvar TERESINA RTR1 PI RB FT RTL 230 kV 3,33 Mvar TERESINA RTR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$58,820.58
TERESINA RTL 230 kV 10 MVAr TERESINA RT2 PI RB FT RTL 230 kV 10 MVAr TERESINA RT2 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,656.08
TERESINA RTL 230 kV 10 MVAr TERESINA RT2 PI RB FT RTL 230 kV 10 MVAr TERESINA RT2 PI 061/2001 IPCA RMEL REN 443/2011 31/08/2017 30/08/2052  R$9,604.35
TERESINA RTL 230 kV 10 MVAr TERESINA RT1 PI RB FT RTL 230 kV 10 MVAr TERESINA RT1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,656.08
TERESINA RTL 230 kV 10 MVAr TERESINA RT1 PI RB FT RTL 230 kV 10 MVAr TERESINA RT1 PI 061/2001 IPCA RMEL REN 443/2011 30/08/2017 29/08/2052  R$9,603.74
TERESINA RTL 230 kV 10 MVAr TERESINA RT1 PI RB FT RTL 230 kV 10 MVAr TERESINA RT1 PI 061/2001 IPCA RMEL REN 443/2011 30/08/2017 29/08/2052  R$9,603.74
TERESINA RTB 13,8 kV 5 Mvar TERESINA RT2 PI DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,222.37
TERESINA RTB 13,8 kV 5 Mvar TERESINA RT1 PI DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,222.37
TERESINA MG 230 kV TERESINA MG1 PI RB FT MG 230 kV TERESINA MG1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$829,228.04
TERESINA MG 230 kV TERESINA MG1 PI RB FT MG 230 kV TERESINA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,447,002.90
TERESINA MG 230 kV TERESINA MG1 PI RB FT MG 230 kV TERESINA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,504,188.12
TERESINA MC 69 kV TT 69/13,8 kV TERESINA TA2 PI  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
TERESINA MC 69 kV TT 69/13,8 kV TERESINA TA1 PI  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
TERESINA MC 69 kV TR 230/69 kV TERESINA TR6 PI  RBF FT TR 230/69 kV TERESINA TR6 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
TERESINA MC 69 kV TR 230/69 kV TERESINA TR5 PI RBF FT TR 230/69 kV TERESINA TR5 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
TERESINA MC 69 kV TR 230/69 kV TERESINA TR5 PI RBF FT TR 230/69 kV TERESINA TR5 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
TERESINA MC 69 kV TR 230/69 kV TERESINA TR5 PI RBF FT TR 230/69 kV TERESINA TR5 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$204,189.21
TERESINA MC 69 kV TR 230/69 kV TERESINA TR4 PI RBF FT TR 230/69 kV TERESINA TR4 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
TERESINA MC 69 kV TR 230/69 kV TERESINA TR4 PI RBF FT TR 230/69 kV TERESINA TR4 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$199,526.38
TERESINA MC 69 kV TR 230/69 kV TERESINA TR3 PI RBF FT TR 230/69 kV TERESINA TR3 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
TERESINA MC 69 kV TR 230/69 kV TERESINA TR1 PI  RBF FT TR 230/69 kV TERESINA TR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
TERESINA MC 69 kV BC 69 kV 21,3 Mvar TERESINA BC4 PI DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
TERESINA MC 69 kV BC 69 kV 21,3 Mvar TERESINA BC4 PI DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
TERESINA MC 69 kV BC 69 kV 21,3 Mvar TERESINA BC4 PI DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$235,271.08
TERESINA MC 69 kV BC 69 kV 21,3 Mvar TERESINA BC3 PI DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
TERESINA MC 69 kV BC 69 kV 21,3 Mvar TERESINA BC3 PI DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$229,898.47
TERESINA MC 69 kV BC 69 kV 21,3 Mvar TERESINA BC3 PI DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$235,271.08
TERESINA MC 230 kV TR 230/69 kV TERESINA TR6 PI  RBF FT TR 230/69 kV TERESINA TR6 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
TERESINA MC 230 kV TR 230/69 kV TERESINA TR5 PI RBF FT TR 230/69 kV TERESINA TR5 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
TERESINA MC 230 kV TR 230/69 kV TERESINA TR5 PI RBF FT TR 230/69 kV TERESINA TR5 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$515,473.59
TERESINA MC 230 kV TR 230/69 kV TERESINA TR5 PI RBF FT TR 230/69 kV TERESINA TR5 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$527,519.95
TERESINA MC 230 kV TR 230/69 kV TERESINA TR4 PI RBF FT TR 230/69 kV TERESINA TR4 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
TERESINA MC 230 kV TR 230/69 kV TERESINA TR3 PI RBF FT TR 230/69 kV TERESINA TR3 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
TERESINA MC 230 kV TR 230/69 kV TERESINA TR3 PI RBF FT TR 230/69 kV TERESINA TR3 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$515,473.59
TERESINA MC 230 kV TR 230/13,8 kV TERESINA TR2 PI TR1 RBF FT TR 230/13,8 kV TERESINA TR2 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
TERESINA MC 230 kV RTL 230 kV 10 MVAr TERESINA RT2 PI  RB FT RTL 230 kV 10 MVAr TERESINA RT2 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$99,071.31
TERESINA MC 230 kV RTL 230 kV 10 MVAr TERESINA RT2 PI  RB FT RTL 230 kV 10 MVAr TERESINA RT2 PI 061/2001 IPCA RMEL REN 443/2011 01/12/2017 30/11/2049  R$125,312.78
TERESINA MC 230 kV RTL 230 kV 10 MVAr TERESINA RT1 PI  RB FT RTL 230 kV 10 MVAr TERESINA RT1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$99,071.31
TERESINA MC 230 kV RTL 230 kV 10 MVAr TERESINA RT1 PI  RB FT RTL 230 kV 10 MVAr TERESINA RT1 PI 061/2001 IPCA RMEL REN 443/2011 04/08/2017 03/08/2049  R$124,209.43
TERESINA MC 230 kV BC 230 kV 50,5 MVAr TERESINA BC2 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC2 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$166,000.61
TERESINA MC 230 kV BC 230 kV 50,5 MVAr TERESINA BC2 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC2 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$489,857.99
TERESINA MC 230 kV BC 230 kV 50,5 MVAr TERESINA BC2 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC2 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$501,305.72
TERESINA MC 230 kV BC 230 kV 50,5 MVAr TERESINA BC2 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC2 PI 061/2001 IPCA RBNI REA 5861/2016 03/05/2017 02/05/2045  R$11,527.17
TERESINA MC 230 kV BC 230 kV 50,5 MVAr TERESINA BC2 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC2 PI 061/2001 IPCA RMEL REN 443/2011 29/03/2017 28/03/2049  R$123,133.30
TERESINA MC 230 kV BC 230 kV 50,5 MVAr TERESINA BC2 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC2 PI 061/2001 IPCA RBNI DSP 386/2021 17/02/2021 16/02/2036  R$20,646.82
TERESINA MC 230 kV BC 230 kV 50,5 MVAr TERESINA BC1 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$166,000.61
TERESINA MC 230 kV BC 230 kV 50,5 MVAr TERESINA BC1 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$489,857.99
TERESINA MC 230 kV BC 230 kV 50,5 MVAr TERESINA BC1 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$501,305.72
TERESINA MC 230 kV BC 230 kV 50,5 MVAr TERESINA BC1 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC1 PI 061/2001 IPCA RMEL REN 443/2011 23/11/2016 22/11/2049  R$115,907.60
TERESINA MC 230 kV BC 230 kV 50,5 MVAr TERESINA BC1 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC1 PI 061/2001 IPCA RBNI REA 5861/2016 03/05/2017 02/05/2045  R$11,527.17
TERESINA MC 230 kV BC 230 kV 50,5 MVAr TERESINA BC1 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC1 PI 061/2001 IPCA RBNI DSP 386/2021 17/02/2021 16/02/2036  R$20,646.82
TERESINA MC 13,8 kV TR 230/69 kV TERESINA TR1 PI  RBF FT TR 230/69 kV TERESINA TR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$52,281.83
TERESINA MC 13,8 kV TR 230/69 kV TERESINA TR1 PI  RBF FT TR 230/69 kV TERESINA TR1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$154,280.58
TERESINA MC 13,8 kV TR 230/69 kV TERESINA TR1 PI  RBF FT TR 230/69 kV TERESINA TR1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$157,886.04
TERESINA MC 13,8 kV TR 230/13,8 kV TERESINA TR2 PI RBF FT TR 230/13,8 kV TERESINA TR2 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$52,281.83
TERESINA MC 13,8 kV RTB 13,8 kV 5 Mvar TERESINA RT2 PI  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$72,828.97
TERESINA MC 13,8 kV RTB 13,8 kV 5 Mvar TERESINA RT1 PI  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$72,828.97
TERESINA MC 13,8 kV BC 13,8 kV 3,6 Mvar TERESINA BC9 PI DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
TERESINA MC 13,8 kV BC 13,8 kV 3,6 Mvar TERESINA BC8 PI DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
TERESINA MC 13,8 kV BC 13,8 kV 3,6 Mvar TERESINA BC7 PI DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
TERESINA MC 13,8 kV BC 13,8 kV 3,6 Mvar TERESINA BC6 PI DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
TERESINA MC 13,8 kV BC 13,8 kV 3,6 Mvar TERESINA BC5 PI DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$77,906.84
TERESINA IB 69 kV MG 230 kV TERESINA MG1 PI IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
TERESINA IB 230 kV MG 230 kV TERESINA MG1 PI IB2 RB FT MG 230 kV TERESINA MG1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
TERESINA IB 13,8 kV MG 230 kV TERESINA MG1 PI IB2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$33,105.90
TERESINA IB 13,8 kV MG 230 kV TERESINA MG1 PI IB2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$97,693.54
TERESINA IB 13,8 kV MG 230 kV TERESINA MG1 PI IB2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$99,976.59
TERESINA EL 69 kV TERESINADIST9 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
TERESINA EL 69 kV TERESINADIST9 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
TERESINA EL 69 kV TERESINADIST9 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
TERESINA EL 69 kV TERESINADIST8 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
TERESINA EL 69 kV TERESINADIST8 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
TERESINA EL 69 kV TERESINADIST8 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
TERESINA EL 69 kV TERESINADIST7 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
TERESINA EL 69 kV TERESINADIST7 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
TERESINA EL 69 kV TERESINADIST7 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
TERESINA EL 69 kV TERESINADIST6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
TERESINA EL 69 kV TERESINADIST6 DIT   061/2001 IPCA RCDM REA 758/2006 13/03/2022 12/03/2052  R$26,260.42
TERESINA EL 69 kV TERESINADIST5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
TERESINA EL 69 kV TERESINADIST5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
TERESINA EL 69 kV TERESINADIST5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
TERESINA EL 69 kV TERESINADIST4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
TERESINA EL 69 kV TERESINADIST4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
TERESINA EL 69 kV TERESINADIST4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
TERESINA EL 69 kV TERESINADIST4 DIT   061/2001 IPCA RCDM REA 758/2006 13/03/2022 12/03/2052  R$11,864.90
TERESINA EL 69 kV TERESINADIST3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
TERESINA EL 69 kV TERESINADIST3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
TERESINA EL 69 kV TERESINADIST3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
TERESINA EL 69 kV TERESINADIST3 DIT   061/2001 IPCA RMEL REN 443/2011 31/01/2016 30/01/2039  R$7,191.92
TERESINA EL 69 kV TERESINADIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
TERESINA EL 69 kV TERESINADIST2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
TERESINA EL 69 kV TERESINADIST2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
TERESINA EL 69 kV TERESINADIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
TERESINA EL 69 kV TERESINADIST1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
TERESINA EL 69 kV TERESINADIS12 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
TERESINA EL 69 kV TERESINADIS11 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
TERESINA EL 69 kV TERESINADIS10 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
TERESINA EL 69 kV TERESINADIS10 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$233,260.90
TERESINA EL 69 kV TERESINADIS10 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$238,712.09
TERESINA EL 230 kV TERESINA LT 230 kV TERESINA II /TERESINA C-2 PI  RB FT LT 230 kV TERESINA II /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
TERESINA EL 230 kV TERESINA LT 230 kV TERESINA II /TERESINA C-2 PI  RB FT LT 230 kV TERESINA II /TERESINA C-2 PI 061/2001 IPCA RMEL REN 643/2014 25/06/2014 24/06/2042  R$40,541.14
TERESINA EL 230 kV TERESINA LT 230 kV TERESINA II /TERESINA C-1 PI  RB FT LT 230 kV TERESINA II /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
TERESINA EL 230 kV TERESINA LT 230 kV TERESINA II /TERESINA C-1 PI  RB FT LT 230 kV TERESINA II /TERESINA C-1 PI 061/2001 IPCA RMEL REN 643/2014 16/03/2014 15/03/2042  R$40,192.52
TERESINA EL 230 kV TERESINA LT 230 kV TERESINA /PIRIPIRI C-1 PI RB FT LT 230 kV TERESINA /PIRIPIRI C-1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
TERESINA EL 230 kV TERESINA LT 230 kV TERESINA /PIRIPIRI C-1 PI RB FT LT 230 kV TERESINA /PIRIPIRI C-1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
TERESINA EL 230 kV TERESINA LT 230 kV TERESINA /PIRIPIRI C-1 PI RB FT LT 230 kV TERESINA /PIRIPIRI C-1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$735,719.99
TERESINA EL 230 kV TERESINA LT 230 kV COELHO NETO /TERESINA C-1 MA/PI RB FT LT 230 kV COELHO NETO /TERESINA C-1 MA/PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
TERESINA EL 230 kV TERESINA LT 230 kV COELHO NETO /TERESINA C-1 MA/PI RB FT LT 230 kV COELHO NETO /TERESINA C-1 MA/PI 061/2001 IPCA RMEL REN 643/2014 02/11/2014 01/11/2042  R$40,989.85
TERESINA EL 230 kV TERESINA LT 230 kV COELHO NETO /TERESINA C-1 MA/PI RB FT LT 230 kV COELHO NETO /TERESINA C-1 MA/PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
TERESINA EL 230 kV TERESINA LT 230 kV COELHO NETO /TERESINA C-1 MA/PI RB FT LT 230 kV COELHO NETO /TERESINA C-1 MA/PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$735,719.99
TERESINA EL 230 kV TERESINA LT 230 kV B. ESPERANCA /TERESINA C-2 PI  RB FT LT 230 kV B. ESPERANCA /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
TERESINA EL 230 kV TERESINA LT 230 kV B. ESPERANCA /TERESINA C-2 PI  RB FT LT 230 kV B. ESPERANCA /TERESINA C-2 PI 061/2001 IPCA RBNI REA 5861/2016 10/06/2016 09/06/2044  R$28,900.49
TERESINA EL 230 kV TERESINA LT 230 kV B. ESPERANCA /TERESINA C-1 PI  RB FT LT 230 kV B. ESPERANCA /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
TERESINA EL 230 kV TERESINA LT 230 kV B. ESPERANCA /TERESINA C-1 PI  RB FT LT 230 kV B. ESPERANCA /TERESINA C-1 PI 061/2001 IPCA RMEL REN 643/2014 31/12/2014 30/12/2042  R$41,193.51
TERESINA EL 230 kV TERESINA LT 230 kV B. ESPERANCA /TERESINA C-1 PI  RB FT LT 230 kV B. ESPERANCA /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$718,919.21
TERESINA EL 230 kV TERESINA LT 230 kV B. ESPERANCA /TERESINA C-1 PI  RB FT LT 230 kV B. ESPERANCA /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$735,719.99
TERESINA EL 13,8 kV TERESINADIST7 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$56,710.76
TERESINA EL 13,8 kV TERESINADIST7 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$167,350.09
TERESINA EL 13,8 kV TERESINADIST7 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$171,260.97
TERESINA EL 13,8 kV TERESINADIST6 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$56,710.76
TERESINA EL 13,8 kV TERESINADIST6 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$167,350.09
TERESINA EL 13,8 kV TERESINADIST6 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$171,260.97
TERESINA EL 13,8 kV TERESINADIST5 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$56,710.76
TERESINA EL 13,8 kV TERESINADIST5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$167,350.09
TERESINA EL 13,8 kV TERESINADIST5 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$171,260.97
TERESINA EL 13,8 kV TERESINADIST4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$56,710.76
TERESINA EL 13,8 kV TERESINADIST4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$167,350.09
TERESINA EL 13,8 kV TERESINADIST4 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$171,260.97
TERESINA EL 13,8 kV TERESINADIST3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$56,710.76
TERESINA EL 13,8 kV TERESINADIST3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$167,350.09
TERESINA EL 13,8 kV TERESINADIST3 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$171,260.97
TERESINA EL 13,8 kV TERESINADIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$56,710.76
TERESINA EL 13,8 kV TERESINADIST2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$167,350.09
TERESINA EL 13,8 kV TERESINADIST2 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$171,260.97
TERESINA EL 13,8 kV TERESINADIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$56,710.76
TERESINA EL 13,8 kV TERESINADIST1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$167,350.09
TERESINA EL 13,8 kV TERESINADIST1 DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$171,260.97
TERESINA BC 69 kV 21,3 Mvar TERESINA BC4 PI DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$120,218.00
TERESINA BC 69 kV 21,3 Mvar TERESINA BC4 PI DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$354,756.22
TERESINA BC 69 kV 21,3 Mvar TERESINA BC4 PI DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$363,046.69
TERESINA BC 69 kV 21,3 Mvar TERESINA BC3 PI DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$120,218.00
TERESINA BC 69 kV 21,3 Mvar TERESINA BC3 PI DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$354,756.22
TERESINA BC 230 kV 50,5 MVAr TERESINA BC2 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC2 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,671.37
TERESINA BC 230 kV 50,5 MVAr TERESINA BC2 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC2 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$609,874.99
TERESINA BC 230 kV 50,5 MVAr TERESINA BC2 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC2 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$624,127.46
TERESINA BC 230 kV 50,5 MVAr TERESINA BC1 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,671.37
TERESINA BC 230 kV 50,5 MVAr TERESINA BC1 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$609,874.99
TERESINA BC 230 kV 50,5 MVAr TERESINA BC1 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$624,127.46
TERESINA BC 13,8 kV 3,6 Mvar TERESINA BC9 PI DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
TERESINA BC 13,8 kV 3,6 Mvar TERESINA BC9 PI DIT   061/2001 IPCA RMEL REN 643/2014 30/04/2014 29/04/2028  R$10,547.52
TERESINA BC 13,8 kV 3,6 Mvar TERESINA BC8 PI DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
TERESINA BC 13,8 kV 3,6 Mvar TERESINA BC8 PI DIT   061/2001 IPCA RMEL REN 643/2014 28/04/2014 27/04/2028  R$10,544.37
TERESINA BC 13,8 kV 3,6 Mvar TERESINA BC7 PI DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
TERESINA BC 13,8 kV 3,6 Mvar TERESINA BC7 PI DIT   061/2001 IPCA RMEL REN 643/2014 27/04/2014 26/04/2028  R$10,542.79
TERESINA BC 13,8 kV 3,6 Mvar TERESINA BC6 PI DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
TERESINA BC 13,8 kV 3,6 Mvar TERESINA BC6 PI DIT   061/2001 IPCA RMEL REN 643/2014 26/04/2014 25/04/2028  R$10,541.21
TERESINA BC 13,8 kV 3,6 Mvar TERESINA BC5 PI DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$32,077.04
TERESINA BC 13,8 kV 3,6 Mvar TERESINA BC5 PI DIT   061/2001 IPCA RMEL REN 643/2014 23/04/2014 22/04/2028  R$10,536.49
TERESINA II TR 500/230 kV TERESINA II TRR1 PI RB FT TR 500/230 kV TERESINA II TRR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$523,092.75
TERESINA II TR 500/230 kV TERESINA II TRR1 PI RB FT TR 500/230 kV TERESINA II TRR1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,543,615.76
TERESINA II TR 500/230 kV TERESINA II TRR1 PI RB FT TR 500/230 kV TERESINA II TRR1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,579,689.28
TERESINA II TR 500/230 kV TERESINA II TR4 PI RB FT TR 500/230 kV TERESINA II TR4 PI 061/2001 IPCA RBNI REA 8328/2019 12/04/2022 12/04/2056  R$ 3,196,897.33
TERESINA II TR 500/230 kV TERESINA II TR3 PI RB FT TR 500/230 kV TERESINA II TR3 PI 061/2001 IPCA RBNI REA 2823/2011 01/06/2015 31/05/2050  R$ 4,451,297.67
TERESINA II TR 500/230 kV TERESINA II TR2 PI RB FT TR 500/230 kV TERESINA II TR2 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,569,278.24
TERESINA II TR 500/230 kV TERESINA II TR1 PI RB FT TR 500/230 kV TERESINA II TR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,569,278.24
TERESINA II TR 500/230 kV TERESINA II TR1 PI RB FT TR 500/230 kV TERESINA II TR1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,630,847.29
TERESINA II TR 500/230 kV TERESINA II TR1 PI RB FT TR 500/230 kV TERESINA II TR1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,739,067.85
TERESINA II TR 230/13,8 kV TERESINA II TRR2 PI RB FT TR 230/13,8 kV TERESINA II TRR2 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$207,861.14
TERESINA II TR 230/13,8 kV TERESINA II TRR2 PI RB FT TR 230/13,8 kV TERESINA II TRR2 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$613,385.94
TERESINA II TR 230/13,8 kV TERESINA II TRR2 PI RB FT TR 230/13,8 kV TERESINA II TRR2 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$627,720.46
TERESINA II TR 230/13,8 kV TERESINA II TR3 PI RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$623,583.43
TERESINA II TR 230/13,8 kV TERESINA II TR3 PI RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,840,157.83
TERESINA II TR 230/13,8 kV TERESINA II TR3 PI RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,883,161.38
TERESINA II RTS 13,8 kV 5 MVAr TERESINA II RT1 PI RB FT TR 230/13,8 kV TERESINA II TRR2 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$135,222.37
TERESINA II RTS 13,8 kV 5 MVAr TERESINA II RT1 PI RB FT TR 230/13,8 kV TERESINA II TRR2 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$399,033.22
TERESINA II RTS 13,8 kV 5 MVAr TERESINA II RT1 PI RB FT TR 230/13,8 kV TERESINA II TRR2 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$408,358.42
TERESINA II RTL 500 kV 60 Mvar TERESINA II RTR1 PI RB FT RTL 500 kV 60 Mvar TERESINA II RTR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$294,317.25
TERESINA II RTL 500 kV 60 Mvar TERESINA II RTR1 PI RB FT RTL 500 kV 60 Mvar TERESINA II RTR1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$868,512.81
TERESINA II RTL 500 kV 60 Mvar TERESINA II RTR1 PI RB FT RTL 500 kV 60 Mvar TERESINA II RTR1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$888,809.51
TERESINA II RTL 500 kV 150 Mvar TERESINA II RT4 PI RB FT RTL 500 kV 150 Mvar TERESINA II RT4 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$834,668.23
TERESINA II RTL 500 kV 150 Mvar TERESINA II RT4 PI RB FT RTL 500 kV 150 Mvar TERESINA II RT4 PI 061/2001 IPCA RMEL REN 643/2014 18/12/2013 17/12/2048  R$43,046.39
TERESINA II RTL 500 kV 150 Mvar TERESINA II RT4 PI RB FT RTL 500 kV 150 Mvar TERESINA II RT4 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,463,056.59
TERESINA II RTL 500 kV 150 Mvar TERESINA II RT4 PI RB FT RTL 500 kV 150 Mvar TERESINA II RT4 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,520,616.98
TERESINA II RTL 500 kV 150 Mvar TERESINA II RT3 PI RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$834,668.23
TERESINA II RTL 500 kV 150 Mvar TERESINA II RT3 PI RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RMEL REN 643/2014 19/12/2013 18/12/2048  R$43,049.33
TERESINA II RTL 500 kV 150 Mvar TERESINA II RT3 PI RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,463,056.59
TERESINA II RTL 500 kV 150 Mvar TERESINA II RT3 PI RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,520,616.98
TERESINA II RTL 500 kV 100 MVAr TERESINA II RT2 PI RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$727,290.45
TERESINA II RTL 500 kV 100 Mvar TERESINA II RT1 PI RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$727,290.45
TERESINA II RTL 500 kV 100 Mvar TERESINA II RT1 PI RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RMEL REN 643/2014 11/01/2014 10/01/2049  R$43,117.11
TERESINA II RTL 500 kV 100 Mvar TERESINA II RT1 PI RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,146,191.10
TERESINA II RTL 500 kV 100 Mvar TERESINA II RT1 PI RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,196,346.50
TERESINA II RTL 500 kV 100 Mvar TERESINA II RT1 PI RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RMEL REN 443/2011 12/04/2015 11/04/2045  R$150,056.62
TERESINA II RTB 500 kV 40 Mvar TERESINA II RTR1 PI RB FT RTB 500 kV 40 Mvar TERESINA II RTR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,524.66
TERESINA II RTB 500 kV 40 Mvar TERESINA II RTR1 PI RB FT RTB 500 kV 40 Mvar TERESINA II RTR1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$762,890.98
TERESINA II RTB 500 kV 40 Mvar TERESINA II RTR1 PI RB FT RTB 500 kV 40 Mvar TERESINA II RTR1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$780,719.35
TERESINA II RTB 500 kV 100 Mvar TERESINA II RT5 PI RB FT RTB 500 kV 100 Mvar TERESINA II RT5 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$727,290.45
TERESINA II RTB 500 kV 100 Mvar TERESINA II RT5 PI RB FT RTB 500 kV 100 Mvar TERESINA II RT5 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,146,191.10
TERESINA II RTB 500 kV 100 Mvar TERESINA II RT5 PI RB FT RTB 500 kV 100 Mvar TERESINA II RT5 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,196,346.50
TERESINA II RTB 500 kV 100 Mvar TERESINA II RT5 PI RB FT RTB 500 kV 100 Mvar TERESINA II RT5 PI 061/2001 IPCA RMEL REN 443/2011 01/07/2015 30/06/2045  R$18,106.47
TERESINA II RTB 500 kV 100 Mvar TERESINA II RT5 PI RB FT RTB 500 kV 100 Mvar TERESINA II RT5 PI 061/2001 IPCA RMEL REN 443/2011 18/05/2013 17/05/2043  R$34,038.53
TERESINA II MG 500 kV TERESINA II MG1 PI RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBNI REA 2823/2011 17/04/2015 16/04/2045  R$ 1,629,649.28
TERESINA II MG 500 kV TERESINA II MG1 PI RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,000,523.76
TERESINA II MG 500 kV TERESINA II MG1 PI RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RMEL REN 643/2014 30/11/2013 29/11/2030  R$28,805.01
TERESINA II MG 500 kV TERESINA II MG1 PI RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,903,427.31
TERESINA II MG 500 kV TERESINA II MG1 PI RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 6,041,387.42
TERESINA II MG 500 kV TERESINA II MG1 PI RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBNI REA 8328/2019 12/04/2022 12/04/2053  R$748,881.98
TERESINA II MG 500 kV TERESINA II MG1 PI RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBNI REA 8328/2019 12/04/2022 12/04/2053  R$190,985.33
TERESINA II MG 500 kV TERESINA II MG1 PI RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBNI REA 7761/2019 28/07/2020 27/07/2035  R$21,127.74
TERESINA II MC 500 kV TR 500/230 kV TERESINA II TR4 PI  RB FT TR 500/230 kV TERESINA II TR4 PI 061/2001 IPCA RBNI REA 8328/2019 12/04/2022 12/04/2051  R$ 1,602,160.65
TERESINA II MC 500 kV TR 500/230 kV TERESINA II TR3 PI  RB FT TR 500/230 kV TERESINA II TR3 PI 061/2001 IPCA RBNI REA 2823/2011 01/06/2015 31/05/2046  R$ 1,441,061.60
TERESINA II MC 500 kV TR 500/230 kV TERESINA II TR2 PI  RB FT TR 500/230 kV TERESINA II TR2 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
TERESINA II MC 500 kV TR 500/230 kV TERESINA II TR1 PI  RB FT TR 500/230 kV TERESINA II TR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
TERESINA II MC 500 kV TR 500/230 kV TERESINA II TR1 PI  RB FT TR 500/230 kV TERESINA II TR1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,319,175.21
TERESINA II MC 500 kV TR 500/230 kV TERESINA II TR1 PI  RB FT TR 500/230 kV TERESINA II TR1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,350,003.67
TERESINA II MC 500 kV TR 500/230 kV TERESINA II TR1 PI  RB FT TR 500/230 kV TERESINA II TR1 PI 061/2001 IPCA RMEL REN 443/2011 29/11/2015 28/11/2045  R$54,955.76
TERESINA II MC 500 kV RTL 500 kV 150 Mvar TERESINA II RT4 PI RB FT RTL 500 kV 150 Mvar TERESINA II RT4 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$270,833.72
TERESINA II MC 500 kV RTL 500 kV 150 Mvar TERESINA II RT4 PI RB FT RTL 500 kV 150 Mvar TERESINA II RT4 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$799,214.31
TERESINA II MC 500 kV RTL 500 kV 150 Mvar TERESINA II RT4 PI RB FT RTL 500 kV 150 Mvar TERESINA II RT4 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$817,891.54
TERESINA II MC 500 kV RTL 500 kV 150 Mvar TERESINA II RT3 PI  RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$270,833.72
TERESINA II MC 500 kV RTL 500 kV 100 MVAr TERESINA II RT2 PI  RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$270,833.72
TERESINA II MC 500 kV RTL 500 kV 100 Mvar TERESINA II RT1 PI  RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$270,833.72
TERESINA II MC 500 kV RTL 500 kV 100 Mvar TERESINA II RT1 PI  RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RMEL REN 643/2014 18/05/2013 17/05/2043  R$51,057.79
TERESINA II MC 500 kV RTB 500 kV 100 Mvar TERESINA II RT5 PI RB FT RTB 500 kV 100 Mvar TERESINA II RT5 PI 061/2001 IPCA RBNI REA 2823/2011 21/07/2015 20/07/2046  R$ 1,795,560.77
TERESINA II MC 230 kV TR 500/230 kV TERESINA II TR4 PI  RB FT TR 500/230 kV TERESINA II TR4 PI 061/2001 IPCA RBNI REA 8328/2019 12/04/2022 12/04/2050  R$986,401.07
TERESINA II MC 230 kV TR 500/230 kV TERESINA II TR3 PI  RB FT TR 500/230 kV TERESINA II TR3 PI 061/2001 IPCA RBNI REA 2823/2011 01/06/2015 31/05/2045  R$ 1,279,650.15
TERESINA II MC 230 kV TR 500/230 kV TERESINA II TR2 PI  RB FT TR 500/230 kV TERESINA II TR2 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,757.03
TERESINA II MC 230 kV TR 500/230 kV TERESINA II TR2 PI  RB FT TR 500/230 kV TERESINA II TR2 PI 061/2001 IPCA RMEL REN 643/2014 06/09/2015 05/09/2045  R$1,312.63
TERESINA II MC 230 kV TR 500/230 kV TERESINA II TR1 PI  RB FT TR 500/230 kV TERESINA II TR1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,757.03
TERESINA II MC 230 kV TR 500/230 kV TERESINA II TR1 PI  RB FT TR 500/230 kV TERESINA II TR1 PI 061/2001 IPCA RMEL REN 643/2014 16/02/2014 15/02/2044  R$64,122.21
TERESINA II MC 230 kV TR 500/230 kV TERESINA II TR1 PI  RB FT TR 500/230 kV TERESINA II TR1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$489,139.20
TERESINA II MC 230 kV TR 500/230 kV TERESINA II TR1 PI  RB FT TR 500/230 kV TERESINA II TR1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$500,570.14
TERESINA II MC 230 kV TR 230/13,8 kV TERESINA II TR3 PI  RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$165,757.03
TERESINA II MC 230 kV TR 230/13,8 kV TERESINA II TR3 PI  RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$489,139.20
TERESINA II MC 230 kV TR 230/13,8 kV TERESINA II TR3 PI  RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$500,570.14
TERESINA II MC 13,8 kV RTS 13,8 kV 5 MVAr TERESINA II RT1 PI  RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$40,324.83
TERESINA II MC 13,8 kV RTS 13,8 kV 5 MVAr TERESINA II RT1 PI  RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$118,996.20
TERESINA II MC 13,8 kV RTS 13,8 kV 5 MVAr TERESINA II RT1 PI  RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$121,777.08
TERESINA II MC 13,8 kV CS 150/-105 MVAr TERESINA II CS1 PI  RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$65,134.54
TERESINA II MC 13,8 kV CS 150/-105 MVAr TERESINA II CS1 PI  RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$192,208.19
TERESINA II MC 13,8 kV CS 150/-105 MVAr TERESINA II CS1 PI  RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$196,700.00
TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB4 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBNI REA 2823/2011 29/09/2014 28/09/2045  R$ 1,808,825.51
TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB3 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB3 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RMEL REN 643/2014 26/08/2013 25/08/2043  R$34,319.47
TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB3 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RMEL REN 443/2011 22/11/2015 21/11/2045  R$18,308.75
TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB3 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RMEL REN 443/2011 22/11/2015 21/11/2045  R$36,617.51
TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB3 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RMEL REN 443/2011 26/08/2013 25/08/2043  R$17,159.72
TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB2 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB2 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,399,926.89
TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB2 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,432,642.48
TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB2 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RMEL REN 443/2011 16/08/2015 15/08/2045  R$18,171.10
TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB2 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RMEL REN 443/2011 18/05/2013 17/05/2043  R$17,019.26
TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB2 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RMEL REN 443/2011 20/09/2015 19/09/2045  R$54,660.78
TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB1 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB1 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,399,926.89
TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB1 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,432,642.48
TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB1 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RMEL REN 443/2011 13/12/2015 12/12/2045  R$55,014.76
TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB1 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RMEL REN 443/2011 22/08/2015 21/08/2045  R$54,538.57
TERESINA II IB 230 kV MG 500 kV TERESINA II MG1 PI IB1 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
TERESINA II IB 230 kV MG 500 kV TERESINA II MG1 PI IB1 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$423,550.65
TERESINA II IB 230 kV MG 500 kV TERESINA II MG1 PI IB1 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$433,448.81
TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE  RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE  RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,494,659.50
TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE  RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,529,588.93
TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE  RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RMEL REN 443/2011 15/11/2015 14/11/2045  R$54,896.76
TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE  RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBNI REA 5861/2016 08/06/2016 07/06/2044  R$28,215.83
TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE  RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBNI REA 5861/2016 08/06/2016 07/06/2031  R$107,427.70
TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA  RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA  RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 061/2001 IPCA RMEL REN 443/2011 19/10/2015 18/10/2045  R$56,486.62
TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA  RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 061/2001 IPCA RBNI REA 5861/2016 08/06/2016 07/06/2044  R$28,215.83
TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA  RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 061/2001 IPCA RBNI REA 5861/2016 08/06/2016 07/06/2031  R$107,427.70
TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,494,659.50
TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,529,588.93
TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RMEL REN 443/2011 18/02/2016 17/02/2046  R$55,297.10
TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA III C-2 PI RB FT LT 230 kV TERESINA II /TERESINA III C-2 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 09/12/2041  R$666,611.29
TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA III C-1 PI RB FT LT 230 kV TERESINA II /TERESINA III C-1 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 09/12/2041  R$666,611.29
TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA C-2 PI RB FT LT 230 kV TERESINA II /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA C-2 PI RB FT LT 230 kV TERESINA II /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$694,952.04
TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA C-2 PI RB FT LT 230 kV TERESINA II /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$711,192.72
TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA C-2 PI RB FT LT 230 kV TERESINA II /TERESINA C-2 PI 061/2001 IPCA RBNI REA 5861/2016 10/06/2016 09/06/2044  R$28,900.49
TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA C-2 PI RB FT LT 230 kV TERESINA II /TERESINA C-2 PI 061/2001 IPCA RBNI REA 5861/2016 10/06/2016 09/06/2031  R$120,229.77
TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA C-1 PI RB FT LT 230 kV TERESINA II /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,501.85
TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA C-1 PI RB FT LT 230 kV TERESINA II /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$694,952.04
TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA C-1 PI RB FT LT 230 kV TERESINA II /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$711,192.72
TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA C-1 PI RB FT LT 230 kV TERESINA II /TERESINA C-1 PI 061/2001 IPCA RBNI REA 5861/2016 10/06/2016 09/06/2044  R$28,900.49
TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA C-1 PI RB FT LT 230 kV TERESINA II /TERESINA C-1 PI 061/2001 IPCA RBNI REA 5861/2016 10/06/2016 09/06/2031  R$120,229.77
TERESINA II CS 150/-105 MVAr TERESINA II CS1 PI RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,744,465.94
TERESINA II CS 150/-105 MVAr TERESINA II CS1 PI RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,147,815.84
TERESINA II CS 150/-105 MVAr TERESINA II CS1 PI RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 5,268,117.69
TERESINA III TT 69/0 kV TERESINA III TT1 PI DIT   017/2011 IPCA RPEC CC 017/2011 05/06/2018 09/12/2041  R$214,285.26
TERESINA III TR 230/69 kV TERESINA III TR3 PI RBF FT TR 230/69 kV TERESINA III TR3 PI 017/2011 IPCA RBNI REA 5166/2015 05/10/2018 04/10/2053  R$ 2,414,951.09
TERESINA III TR 230/69 kV TERESINA III TR2 PI RBF FT TR 230/69 kV TERESINA III TR2 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 09/12/2041  R$ 1,673,117.98
TERESINA III TR 230/69 kV TERESINA III TR1 PI RBF FT TR 230/69 kV TERESINA III TR1 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 09/12/2041  R$ 1,673,117.98
TERESINA III MG 230 kV TERESINA III MG1 PI RB FT MG 230 kV TERESINA III MG1 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 09/12/2041  R$ 1,469,912.40
TERESINA III MG 230 kV TERESINA III MG1 PI RB FT MG 230 kV TERESINA III MG1 PI 017/2011 IPCA RBNI REA 5166/2015 05/10/2018 04/10/2047  R$136,001.82
TERESINA III MG 230 kV TERESINA III MG1 PI RB FT MG 230 kV TERESINA III MG1 PI 017/2011 IPCA RBNI REA 5166/2015 05/10/2018 04/10/2046  R$39,353.98
TERESINA III MC 69 kV TT 69/0 kV TERESINA III TT1 PI DIT   017/2011 IPCA RPEC CC 017/2011 05/06/2018 09/12/2041  R$79,787.82
TERESINA III MC 69 kV TR 230/69 kV TERESINA III TR3 PI RBF FT TR 230/69 kV TERESINA III TR3 PI 017/2011 IPCA RBNI REA 5166/2015 05/10/2018 04/10/2049  R$498,111.59
TERESINA III MC 69 kV TR 230/69 kV TERESINA III TR2 PI RBF FT TR 230/69 kV TERESINA III TR2 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 09/12/2041  R$193,133.73
TERESINA III MC 69 kV TR 230/69 kV TERESINA III TR1 PI RBF FT TR 230/69 kV TERESINA III TR1 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 09/12/2041  R$193,133.73
TERESINA III MC 230 kV TR 230/69 kV TERESINA III TR3 PI RBF FT TR 230/69 kV TERESINA III TR3 PI 017/2011 IPCA RBNI REA 5166/2015 05/10/2018 04/10/2049  R$ 1,293,319.04
TERESINA III MC 230 kV TR 230/69 kV TERESINA III TR2 PI RBF FT TR 230/69 kV TERESINA III TR2 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 09/12/2041  R$474,693.09
TERESINA III MC 230 kV TR 230/69 kV TERESINA III TR1 PI RBF FT TR 230/69 kV TERESINA III TR1 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 09/12/2041  R$474,693.09
TERESINA III IB 69 kV MG 230 kV TERESINA III MG1 PI IB1 DIT   017/2011 IPCA RPEC CC 017/2011 05/06/2018 09/12/2041  R$129,635.78
TERESINA III IB 230 kV MG 230 kV TERESINA III MG1 PI IB1 RB FT MG 230 kV TERESINA III MG1 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 09/12/2041  R$359,705.48
TERESINA III EL 69 kV TERESINA IIIDIST3 DIT   017/2011 IPCA RPEC CC 017/2011 05/06/2018 09/12/2041  R$221,296.74
TERESINA III EL 69 kV TERESINA IIIDIST2 DIT   017/2011 IPCA RPEC CC 017/2011 05/06/2018 09/12/2041  R$221,296.74
TERESINA III EL 69 kV TERESINA IIIDIST1 DIT   017/2011 IPCA RPEC CC 017/2011 05/06/2018 09/12/2041  R$221,296.74
TERESINA III EL 230 kV TERESINA III LT 230 kV TERESINA II /TERESINA III C-2 PI RB FT LT 230 kV TERESINA II /TERESINA III C-2 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 09/12/2041  R$666,611.29
TERESINA III EL 230 kV TERESINA III LT 230 kV TERESINA II /TERESINA III C-1 PI RB FT LT 230 kV TERESINA II /TERESINA III C-1 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 09/12/2041  R$666,611.29
TIANGUA II EL 500 kV TIANGUA II LT 500 kV TIANGUA II /SOBRAL III C-1 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RBNI REA 9688/2021 03/10/2019 02/10/2047  R$191,257.58
TIANGUA II EL 500 kV TIANGUA II LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBNI REA 9688/2021 19/09/2019 18/09/2047  R$191,257.58
TOUROS TT 69/0 kV TOUROS TT1 RN ICG   018/2012 IPCA RICG CC 018/2012 12/05/2017 01/06/2042  R$82,650.71
TOUROS TR 230/69 kV TOUROS TR1 RN ICG   018/2012 IPCA RICG CC 018/2012 12/05/2017 01/06/2042  R$ 1,550,948.76
TOUROS MG 69 kV TOUROS MG2 RN ICG   018/2012 IPCA RICG CC 018/2012 12/05/2017 01/06/2042  R$587,963.31
TOUROS MG 230 kV TOUROS MG1 RN RB FT MG 230 kV TOUROS MG1 RN 018/2012 IPCA RBL CC 018/2012 12/05/2017 01/06/2042  R$932,205.93
TOUROS MC 69 kV TT 69/0 kV TOUROS TT1 RN ICG   018/2012 IPCA RICG CC 018/2012 12/05/2017 01/06/2042  R$85,949.15
TOUROS MC 69 kV TR 230/69 kV TOUROS TR1 RN ICG   018/2012 IPCA RICG CC 018/2012 12/05/2017 01/06/2042  R$203,029.38
TOUROS MC 230 kV TR 230/69 kV TOUROS TR1 RN ICG   018/2012 IPCA RICG CC 018/2012 12/05/2017 01/06/2042  R$511,962.10
TOUROS IB 69 kV MG 69 kV TOUROS MG2 RN IB1 ICG   018/2012 IPCA RICG CC 018/2012 12/05/2017 01/06/2042  R$138,423.20
TOUROS IB 230 kV MG 230 kV TOUROS MG1 RN IB1 RB FT MG 230 kV TOUROS MG1 RN 018/2012 IPCA RBL CC 018/2012 12/05/2017 01/06/2042  R$345,417.58
TOUROS EL 230 kV TOUROS LT 230 kV TOUROS /CEARA MIRIM II C-1 RN RB FT LT 230 kV TOUROS /CEARA MIRIM II C-1 RN 018/2012 IPCA RBL CC 018/2012 12/05/2017 01/06/2042  R$558,840.27
U.SOBRADINHO TR 500/230 kV U.SOBRADINHO TRR1 BA RB FT TR 500/230 kV U.SOBRADINHO TRR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$523,092.75
U.SOBRADINHO TR 500/230 kV U.SOBRADINHO TRR1 BA RB FT TR 500/230 kV U.SOBRADINHO TRR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,543,615.76
U.SOBRADINHO TR 500/230 kV U.SOBRADINHO TR4 BA RB FT TR 500/230 kV U.SOBRADINHO TR4 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,569,278.24
U.SOBRADINHO TR 500/230 kV U.SOBRADINHO TR4 BA RB FT TR 500/230 kV U.SOBRADINHO TR4 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,630,847.29
U.SOBRADINHO TR 500/230 kV U.SOBRADINHO TR3 BA RB FT TR 500/230 kV U.SOBRADINHO TR3 BA 061/2001 IPCA RBNI REA 2823/2011 15/12/2014 14/12/2049  R$ 5,876,754.27
U.SOBRADINHO TR500/230kV U.SOBRADINHO TR5 BA RB FT TR500/230kV U.SOBRADINHO TR5 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,569,278.24
U.SOBRADINHO TR500/230kV U.SOBRADINHO TR5 BA RB FT TR500/230kV U.SOBRADINHO TR5 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,630,847.29
U.SOBRADINHO TR500/230kV U.SOBRADINHO TR5 BA RB FT TR500/230kV U.SOBRADINHO TR5 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,739,067.85
U.SOBRADINHO RTN 69 kV 0 Mvar U.SOBRADINHO RTN5 BA RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$14,881.75
U.SOBRADINHO RTN 69 kV 0 Mvar U.SOBRADINHO RTN4 BA RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$14,881.75
U.SOBRADINHO RTN 69 kV 0 Mvar U.SOBRADINHO RTN3 BA RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$14,881.75
U.SOBRADINHO RTL 500 kV 50 Mvar U.SOBRADINHO RTR3 BA RB FT RTL 500 kV 50 Mvar U.SOBRADINHO RTR3 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$278,222.74
U.SOBRADINHO RTL 500 kV 50 Mvar U.SOBRADINHO RTR3 BA RB FT RTL 500 kV 50 Mvar U.SOBRADINHO RTR3 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$821,018.86
U.SOBRADINHO RTL 500 kV 33,3 Mvar U.SOBRADINHO RTR1 BA RB FT RTL 500 kV 33,3 Mvar U.SOBRADINHO RTR1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$242,341.83
U.SOBRADINHO RTL 500 kV 33,3 Mvar U.SOBRADINHO RTR1 BA RB FT RTL 500 kV 33,3 Mvar U.SOBRADINHO RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$715,136.41
U.SOBRADINHO RTL 500 kV 33 Mvar U.SOBRADINHO RT6 BA RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$727,290.45
U.SOBRADINHO RTL 500 kV 33 Mvar U.SOBRADINHO RT6 BA RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,146,191.10
U.SOBRADINHO RTL 500 kV 33 Mvar U.SOBRADINHO RT6 BA RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,196,346.50
U.SOBRADINHO RTL 500 kV 33 Mvar U.SOBRADINHO RT6 BA RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RMEL REA 11954/2022 02/06/2022 02/06/2058  R$ 2,294,301.06
U.SOBRADINHO RTL 500 kV 150 Mvar U.SOBRADINHO RT3 BA RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$834,668.23
U.SOBRADINHO RTL 500 kV 150 Mvar U.SOBRADINHO RT3 BA RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,463,056.59
U.SOBRADINHO RTL 500 kV 100 Mvar U.SOBRADINHO RT5 BA RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$727,290.45
U.SOBRADINHO RTL 500 kV 100 Mvar U.SOBRADINHO RT5 BA RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,146,191.10
U.SOBRADINHO RTL 500 kV 100 Mvar U.SOBRADINHO RT4 BA RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$727,290.45
U.SOBRADINHO RTL 500 kV 100 Mvar U.SOBRADINHO RT4 BA RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,146,191.10
U.SOBRADINHO MG 500 kV U.SOBRADINHO MG1 BA RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RBNI REA 2823/2011 15/12/2014 14/12/2042  R$199,756.49
U.SOBRADINHO MG 500 kV U.SOBRADINHO MG1 BA RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,981,462.94
U.SOBRADINHO MG 500 kV U.SOBRADINHO MG1 BA RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RBNI REN 443/2011 03/02/2013 31/12/2042  R$19,740.56
U.SOBRADINHO MG 500 kV U.SOBRADINHO MG1 BA RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2029  R$57,960.79
U.SOBRADINHO MG 500 kV U.SOBRADINHO MG1 BA RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,847,179.97
U.SOBRADINHO MG 500 kV U.SOBRADINHO MG1 BA RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 5,983,825.62
U.SOBRADINHO MC 69 kV RTN 69 kV 0 Mvar U.SOBRADINHO RTN5 BA  RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$10,108.69
U.SOBRADINHO MC 69 kV RTN 69 kV 0 Mvar U.SOBRADINHO RTN4 BA  RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$10,108.69
U.SOBRADINHO MC 69 kV RTN 69 kV 0 Mvar U.SOBRADINHO RTN3 BA  RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$10,108.69
U.SOBRADINHO MC 500 kV TR 500/230 kV U.SOBRADINHO TR4 BA  RB FT TR 500/230 kV U.SOBRADINHO TR4 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
U.SOBRADINHO MC 500 kV TR 500/230 kV U.SOBRADINHO TR3 BA RB FT TR 500/230 kV U.SOBRADINHO TR3 BA 061/2001 IPCA RBNI REA 2823/2011 15/12/2014 14/12/2045  R$ 2,015,321.80
U.SOBRADINHO MC 500 kV TR 13,8/500 kV U.SOBRADINHO TR3 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
U.SOBRADINHO MC 500 kV TR 13,8/500 kV U.SOBRADINHO TR2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
U.SOBRADINHO MC 500 kV TR 13,8/500 kV U.SOBRADINHO TR1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
U.SOBRADINHO MC 500 kV TR500/230kV U.SOBRADINHO TR5 BA RB FT TR500/230kV U.SOBRADINHO TR5 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
U.SOBRADINHO MC 500 kV TR500/230kV U.SOBRADINHO TR5 BA RB FT TR500/230kV U.SOBRADINHO TR5 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,319,175.21
U.SOBRADINHO MC 500 kV TR500/230kV U.SOBRADINHO TR5 BA RB FT TR500/230kV U.SOBRADINHO TR5 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,350,003.67
U.SOBRADINHO MC 500 kV TR500/230kV U.SOBRADINHO TR5 BA RB FT TR500/230kV U.SOBRADINHO TR5 BA 061/2001 IPCA RMEL REN 443/2011 15/12/2016 14/12/2046  R$56,565.52
U.SOBRADINHO MC 500 kV RTL 500 kV 33 Mvar U.SOBRADINHO RT6 BA  RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$270,833.72
U.SOBRADINHO MC 500 kV RTL 500 kV 150 Mvar U.SOBRADINHO RT3 BA  RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$270,833.72
U.SOBRADINHO MC 500 kV RTL 500 kV 100 Mvar U.SOBRADINHO RT5 BA  RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$270,833.72
U.SOBRADINHO MC 500 kV RTL 500 kV 100 Mvar U.SOBRADINHO RT4 BA  RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$270,833.72
U.SOBRADINHO MC 230 kV TR 500/230 kV U.SOBRADINHO TR4 BA MC2 RB FT TR 500/230 kV U.SOBRADINHO TR4 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$156,832.97
U.SOBRADINHO MC 230 kV TR 500/230 kV U.SOBRADINHO TR4 BA MC1 RB FT TR 500/230 kV U.SOBRADINHO TR4 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$156,832.97
U.SOBRADINHO MC 230 kV TR 500/230 kV U.SOBRADINHO TR3 BA RB FT TR 500/230 kV U.SOBRADINHO TR3 BA 061/2001 IPCA RBNI REA 2823/2011 15/12/2014 14/12/2044  R$ 1,341,964.09
U.SOBRADINHO MC 230 kV TR500/230kV U.SOBRADINHO TR5 BA RB FT TR500/230kV U.SOBRADINHO TR5 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,681.10
U.SOBRADINHO MC 230 kV TR500/230kV U.SOBRADINHO TR5 BA RB FT TR500/230kV U.SOBRADINHO TR5 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$515,473.59
U.SOBRADINHO MC 230 kV TR500/230kV U.SOBRADINHO TR5 BA RB FT TR500/230kV U.SOBRADINHO TR5 BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$527,519.95
U.SOBRADINHO MC 230 kV TR500/230kV U.SOBRADINHO TR5 BA RB FT TR500/230kV U.SOBRADINHO TR5 BA 061/2001 IPCA RMEL REN 443/2011 27/11/2017 26/11/2047  R$71,153.34
U.SOBRADINHO MC 13,8 kV TR 500/230 kV U.SOBRADINHO TR4 BA  RB FT TR 500/230 kV U.SOBRADINHO TR4 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
U.SOBRADINHO IB 500 kV MG 500 kV U.SOBRADINHO MG1 BA IB5 RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RBNI REA 2823/2011 15/12/2014 14/12/2045  R$ 1,482,460.33
U.SOBRADINHO IB 500 kV MG 500 kV U.SOBRADINHO MG1 BA IB4 RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
U.SOBRADINHO IB 500 kV MG 500 kV U.SOBRADINHO MG1 BA IB3 RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
U.SOBRADINHO IB 500 kV MG 500 kV U.SOBRADINHO MG1 BA IB2 RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
U.SOBRADINHO IB 500 kV MG 500 kV U.SOBRADINHO MG1 BA IB2 RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RMEL REN 443/2011 05/03/2016 04/03/2046  R$18,454.85
U.SOBRADINHO IB 500 kV MG 500 kV U.SOBRADINHO MG1 BA IB1 RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
U.SOBRADINHO IB 230 kV MG 500 kV U.SOBRADINHO MG1 BA IB1 RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
U.SOBRADINHO EL 500 kV U.SOBRADINHO LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA  RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
U.SOBRADINHO EL 500 kV U.SOBRADINHO LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA  RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBNI REA 5861/2016 09/06/2016 08/06/2031  R$41,068.33
U.SOBRADINHO EL 500 kV U.SOBRADINHO LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
U.SOBRADINHO EL 500 kV U.SOBRADINHO LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA  RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
U.SOBRADINHO EL 230 kV U.SOBRADINHO LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA 061/2001 IPCA RBNI REA 2823/2011 10/08/2015 09/08/2045  R$573,811.75
U.SOBRADINHO EL 230 kV U.SOBRADINHO LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
U.SOBRADINHO EL 230 kV U.SOBRADINHO LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA 061/2001 IPCA RMEL REN 443/2011 12/02/2017 11/02/2047  R$69,685.98
U.SOBRADINHO EL 230 kV U.SOBRADINHO LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA 061/2001 IPCA RBNI REA 5861/2016 19/09/2017 18/09/2032  R$42,388.74
U.SOBRADINHO EL 230 kV U.SOBRADINHO LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$243,623.73
U.SOBRADINHO EL 230 kV U.SOBRADINHO LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA 061/2001 IPCA RBNI REA 5861/2016 19/09/2017 18/09/2032  R$42,388.74
U.SOBRADINHO EL 230 kV U.SOBRADINHOSET.GAME. FIC DIT   061/2001 IPCA RCDM REN 443/2011 03/02/2013 31/12/2042  R$84,192.27
U.SOBRADINHO EL 230 kV U.SOBRADINHOS.PED.LAGO FIC DIT   061/2001 IPCA RCDM REN 443/2011 03/02/2013 31/12/2042  R$84,192.27
U.SOBRADINHO EL 230 kV U.SOBRADINHOPED. BRANCA FIC DIT   061/2001 IPCA RCDM REN 443/2011 03/02/2013 31/12/2042  R$84,192.27
UB.ESPERANCA TT 69/69 kV UB.ESPERANCA TA1 PI DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
UB.ESPERANCA TR 69/13,8 kV UB.ESPERANCA TR7 PI DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
UB.ESPERANCA TR 230/69 kV UB.ESPERANCA TR6 PI RBF FT TR 230/69 kV UB.ESPERANCA TR6 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$199,696.02
UB.ESPERANCA TR 230/69 kV UB.ESPERANCA TR6 PI RBF FT TR 230/69 kV UB.ESPERANCA TR6 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$589,291.15
UB.ESPERANCA TR 230/69 kV UB.ESPERANCA TR5 PI RBF FT TR 230/69 kV UB.ESPERANCA TR5 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$321,498.18
UB.ESPERANCA TR230/69 kV UB.ESPERANCA TR8 PI RBF FT TR230/69 kV UB.ESPERANCA TR8 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,584.08
UB.ESPERANCA TR230/69 kV UB.ESPERANCA TR8 PI RBF FT TR230/69 kV UB.ESPERANCA TR8 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$665,685.27
UB.ESPERANCA TR230/69 kV UB.ESPERANCA TR8 PI RBF FT TR230/69 kV UB.ESPERANCA TR8 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$681,242.00
UB.ESPERANCA MG 230 kV UB.ESPERANCA MG1 PI RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$619,888.46
UB.ESPERANCA MG 230 kV UB.ESPERANCA MG1 PI RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2029  R$110,184.71
UB.ESPERANCA MG 230 kV UB.ESPERANCA MG1 PI RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,829,254.18
UB.ESPERANCA MG 230 kV UB.ESPERANCA MG1 PI RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,872,002.93
UB.ESPERANCA MG 230 kV UB.ESPERANCA MG1 PI RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBNI REA 7761/2019 28/07/2020 27/07/2035  R$120,986.19
UB.ESPERANCA MG 230 kV UB.ESPERANCA MG1 PI RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBNI REA 758/2006 14/02/2012 13/02/2043  R$42,719.23
UB.ESPERANCA MC 69 kV TT 69/69 kV UB.ESPERANCA TA1 PI  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$28,278.12
UB.ESPERANCA MC 69 kV TR 69/13,8 kV UB.ESPERANCA TR7 PI  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$60,565.23
UB.ESPERANCA MC 69 kV TR 230/69 kV UB.ESPERANCA TR6 PI  RBF FT TR 230/69 kV UB.ESPERANCA TR6 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$60,565.23
UB.ESPERANCA MC 69 kV TR 230/69 kV UB.ESPERANCA TR5 PI  RBF FT TR 230/69 kV UB.ESPERANCA TR5 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$60,565.23
UB.ESPERANCA MC 69 kV TR230/69 kV UB.ESPERANCA TR8 PI  RBF FT TR230/69 kV UB.ESPERANCA TR8 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$60,565.23
UB.ESPERANCA MC 230 kV TR 230/69 kV UB.ESPERANCA TR6 PI  RBF FT TR 230/69 kV UB.ESPERANCA TR6 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$112,343.78
UB.ESPERANCA MC 230 kV TR 230/69 kV UB.ESPERANCA TR5 PI RBF FT TR 230/69 kV UB.ESPERANCA TR5 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$156,832.97
UB.ESPERANCA MC 230 kV TR 13,8/230 kV UB.ESPERANCA TR4 PI  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$156,832.97
UB.ESPERANCA MC 230 kV TR 13,8/230 kV UB.ESPERANCA TR3 PI DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$156,832.97
UB.ESPERANCA MC 230 kV TR 13,8/230 kV UB.ESPERANCA TR3 PI DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$462,804.81
UB.ESPERANCA MC 230 kV TR 13,8/230 kV UB.ESPERANCA TR2 PI DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$156,832.97
UB.ESPERANCA MC 230 kV TR 13,8/230 kV UB.ESPERANCA TR2 PI DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$462,804.81
UB.ESPERANCA MC 230 kV TR 13,8/230 kV UB.ESPERANCA TR2 PI DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$473,620.33
UB.ESPERANCA MC 230 kV TR 13,8/230 kV UB.ESPERANCA TR1 PI DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$156,832.97
UB.ESPERANCA MC 230 kV TR 13,8/230 kV UB.ESPERANCA TR1 PI DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$462,804.81
UB.ESPERANCA MC 230 kV TR 13,8/230 kV UB.ESPERANCA TR1 PI DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$473,620.33
UB.ESPERANCA MC 230 kV TR230/69 kV UB.ESPERANCA TR8 PI  RBF FT TR230/69 kV UB.ESPERANCA TR8 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$112,343.78
UB.ESPERANCA MC 13,8 kV TR 69/13,8 kV UB.ESPERANCA TR7 PI  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
UB.ESPERANCA MC 13,8 kV TR 69/13,8 kV UB.ESPERANCA TR7 PI  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$142,152.79
UB.ESPERANCA MC 13,8 kV TR 69/13,8 kV UB.ESPERANCA TR7 PI  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$145,474.83
UB.ESPERANCA MC 13,8 kV TR 230/69 kV UB.ESPERANCA TR5 PI  RBF FT TR 230/69 kV UB.ESPERANCA TR5 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$48,172.02
UB.ESPERANCA IB 230 kV MG 230 kV UB.ESPERANCA MG1 PI IB3 RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
UB.ESPERANCA IB 230 kV MG 230 kV UB.ESPERANCA MG1 PI IB3 RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$423,550.65
UB.ESPERANCA IB 230 kV MG 230 kV UB.ESPERANCA MG1 PI IB2 RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
UB.ESPERANCA IB 230 kV MG 230 kV UB.ESPERANCA MG1 PI IB2 RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RMEL REN 643/2014 23/03/2014 22/03/2044  R$64,300.53
UB.ESPERANCA IB 230 kV MG 230 kV UB.ESPERANCA MG1 PI IB2 RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$423,550.65
UB.ESPERANCA IB 230 kV MG 230 kV UB.ESPERANCA MG1 PI IB2 RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$433,448.81
UB.ESPERANCA IB 230 kV MG 230 kV UB.ESPERANCA MG1 PI IB1 RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,530.71
UB.ESPERANCA IB 230 kV MG 230 kV UB.ESPERANCA MG1 PI IB1 RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$423,550.65
UB.ESPERANCA IB 230 kV MG 230 kV UB.ESPERANCA MG1 PI IB1 RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$433,448.81
UB.ESPERANCA EL 69 kV UB.ESPERANCAS.J.PATOS-02J3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$74,742.25
UB.ESPERANCA EL 69 kV UB.ESPERANCAPARAIBANO-02J3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$74,742.25
UB.ESPERANCA EL 69 kV UB.ESPERANCAPARAIBANO-02J3 DIT   061/2001 IPCA RMEL REN 443/2011 17/01/2017 16/01/2049  R$43,909.88
UB.ESPERANCA EL 69 kV UB.ESPERANCAFLORIANO-02J4 DIT   061/2001 IPCA RCDM REA 758/2006 14/02/2012 13/02/2040  R$580,754.48
UB.ESPERANCA EL 69 kV UB.ESPERANCABERTOLINEA-02J2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$74,742.25
UB.ESPERANCA EL 230 kV UB.ESPERANCA LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI  RB FT LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$229,407.64
UB.ESPERANCA EL 230 kV UB.ESPERANCA LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI  RB FT LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$676,968.39
UB.ESPERANCA EL 13,8 kV UB.ESPERANCAS.J.PATOS-01Y2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
UB.ESPERANCA EL 13,8 kV UB.ESPERANCAS.J.PATOS-01Y2 DIT   061/2001 IPCA RCDM REA 1814/2009 07/01/2015 06/01/2048  R$20,650.97
UB.ESPERANCA EL 13,8 kV UB.ESPERANCAGUADALUPE-01Y1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
UB.ESPERANCA EL 13,8 kV UB.ESPERANCAGUADALUPE-01Y1 DIT   061/2001 IPCA RCDM REA 1814/2009 07/01/2015 06/01/2048  R$20,650.97
UB.ESPERANCA EL 13,8 kV UB.ESPERANCABOA ESPER.-01Y3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
UB.ESPERANCA EL 13,8 kV UB.ESPERANCABOA ESPER.-01Y3 DIT   061/2001 IPCA RCDM REA 1814/2009 07/01/2015 06/01/2048  R$20,650.97
US. FUNIL MG 115 kV US. FUNIL MG1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$295,370.10
US. FUNIL MG 115 kV US. FUNIL MG1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$871,619.69
US. FUNIL MG 115 kV US. FUNIL MG1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$891,989.01
US. FUNIL MC 115 kV TR 115/6,6 kV US. FUNIL TR3 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$115,908.76
US. FUNIL MC 115 kV TR 115/6,6 kV US. FUNIL TR3 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$342,039.89
US. FUNIL MC 115 kV TR 115/6,6 kV US. FUNIL TR2 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$115,908.76
US. FUNIL MC 115 kV TR 115/6,6 kV US. FUNIL TR2 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$342,039.89
US. FUNIL MC 115 kV TR 115/6,6 kV US. FUNIL TR1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$115,908.76
US. FUNIL MC 115 kV TR 115/6,6 kV US. FUNIL TR1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$342,039.89
US. L.GONZAGA RTN 69 kV 0 Mvar US. L.GONZAGA RTN2 PE RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$14,881.75
US. L.GONZAGA RTN 69 kV 0 Mvar US. L.GONZAGA RTN1 PE RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$14,881.75
US. L.GONZAGA RTL 500 kV 40 Mvar US. L.GONZAGA RTR2 PE RB FT RTL 500 kV 40 Mvar US. L.GONZAGA RTR2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,524.66
US. L.GONZAGA RTL 500 kV 100 MVAr US. L.GONZAGA RT4 PE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$339,410.59
US. L.GONZAGA RTL 500 kV 100 MVAr US. L.GONZAGA RT3 PE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$339,410.59
US. L.GONZAGA RTB 500 kV 50 Mvar US. L.GONZAGA RTR1 PE RB FT RTB 500 kV 50 Mvar US. L.GONZAGA RTR1 PE 061/2001 IPCA RMEL REA 11954/2022 21/10/2022 21/10/2058  R$806,718.24
US. L.GONZAGA RTB 500 kV 150 Mvar US. L.GONZAGA RT2 PE RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RMEL REA 11954/2022 06/01/2023 06/01/2059  R$ 2,420,154.72
US. L.GONZAGA RTB 500 kV 150 Mvar US. L.GONZAGA RT1 PE RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RMEL REA 11954/2022 06/01/2023 06/01/2059  R$ 2,420,154.72
US. L.GONZAGA MG 500 kV US. L.GONZAGA MG1 PE RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,028,017.15
US. L.GONZAGA MG 500 kV US. L.GONZAGA MG1 PE RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RMEL REN 643/2014 20/12/2015 19/12/2029  R$100,833.85
US. L.GONZAGA MG 500 kV US. L.GONZAGA MG1 PE RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,984,558.69
US. L.GONZAGA MG 500 kV US. L.GONZAGA MG1 PE RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RMEL REN 443/2011 15/11/2016 14/11/2033  R$16,529.62
US. L.GONZAGA MC 69 kV RTN 69 kV 0 Mvar US. L.GONZAGA RTN2 PE  RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$10,108.69
US. L.GONZAGA MC 69 kV RTN 69 kV 0 Mvar US. L.GONZAGA RTN1 PE  RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$10,108.69
US. L.GONZAGA MC 500 kV TR 16/500 kV US. L.GONZAGA TR3 PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
US. L.GONZAGA MC 500 kV TR 16/500 kV US. L.GONZAGA TR3 PE DIT   061/2001 IPCA RMEL REN 643/2014 25/10/2013 24/10/2043  R$51,732.03
US. L.GONZAGA MC 500 kV TR 16/500 kV US. L.GONZAGA TR3 PE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,319,175.21
US. L.GONZAGA MC 500 kV TR 16/500 kV US. L.GONZAGA TR2 PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
US. L.GONZAGA MC 500 kV TR 16/500 kV US. L.GONZAGA TR2 PE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,319,175.21
US. L.GONZAGA MC 500 kV TR 16/500 kV US. L.GONZAGA TR1 PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
US. L.GONZAGA MC 500 kV TR 16/500 kV US. L.GONZAGA TR1 PE DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,319,175.21
US. L.GONZAGA MC 500 kV RTL 500 kV 100 MVAr US. L.GONZAGA RT4 PE  RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$270,833.72
US. L.GONZAGA MC 500 kV RTL 500 kV 100 MVAr US. L.GONZAGA RT4 PE  RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RMEL REN 643/2014 11/07/2013 10/07/2043  R$51,285.34
US. L.GONZAGA MC 500 kV RTL 500 kV 100 MVAr US. L.GONZAGA RT3 PE  RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$270,833.72
US. L.GONZAGA MC 500 kV RTL 500 kV 100 MVAr US. L.GONZAGA RT3 PE  RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RMEL REN 643/2014 14/06/2013 13/06/2043  R$51,171.57
US. L.GONZAGA MC 500 kV RTB 500 kV 150 Mvar US. L.GONZAGA RT2 PE  RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$270,833.72
US. L.GONZAGA MC 500 kV RTB 500 kV 150 Mvar US. L.GONZAGA RT1 PE  RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$270,833.72
US. L.GONZAGA MC 500 kV RTB 500 kV 150 Mvar US. L.GONZAGA RT1 PE  RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RMEL REN 643/2014 13/09/2013 12/09/2043  R$51,555.04
US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB6 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB6 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RMEL REN 643/2014 28/02/2014 27/02/2044  R$75,776.41
US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB5 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB5 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RMEL REN 643/2014 29/11/2013 28/11/2043  R$17,293.18
US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB5 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RMEL REN 643/2014 29/11/2013 28/11/2043  R$34,586.35
US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB5 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RMEL REN 643/2014 29/11/2013 28/11/2043  R$51,879.53
US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB5 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,399,926.89
US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB5 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,432,642.48
US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB4 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBNI REA 5745/2016 13/03/2019 13/03/2050  R$ 1,420,825.86
US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB3 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB3 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RMEL REN 643/2014 08/11/2013 07/11/2043  R$17,263.68
US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB3 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RMEL REN 643/2014 08/11/2013 07/11/2043  R$17,263.68
US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB3 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RMEL REN 643/2014 22/11/2013 21/11/2043  R$51,850.02
US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB3 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,399,926.89
US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB3 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,432,642.48
US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB2 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB2 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,399,926.89
US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB2 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,432,642.48
US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB1 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB1 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RMEL REN 643/2014 31/10/2013 30/10/2043  R$34,504.88
US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB1 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RMEL REN 643/2014 31/10/2013 30/10/2043  R$17,252.42
US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB1 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,399,926.89
US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB1 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,432,642.48
US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA  RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA  RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RMEL REN 643/2014 15/02/2014 14/02/2044  R$75,698.36
US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA  RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,494,659.50
US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RMEL REN 643/2014 21/02/2014 20/02/2044  R$27,008.77
US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RMEL REN 643/2014 21/02/2014 20/02/2044  R$49,838.75
US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RMEL REN 643/2014 13/12/2013 12/12/2043  R$51,938.53
US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,494,659.50
US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE  RB FT LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE  RB FT LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,494,659.50
US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBNI REA 5745/2016 10/01/2020 10/01/2049  R$ 1,383,197.45
US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,494,659.50
USINA XINGO MG 500 kV USINA XINGO MG1 AL RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,133,282.59
USINA XINGO MG 500 kV USINA XINGO MG1 AL RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RMEL REN 643/2014 08/07/2013 07/07/2030  R$26,091.15
USINA XINGO MG 500 kV USINA XINGO MG1 AL RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RMEL REN 643/2014 20/12/2015 19/12/2029  R$50,422.83
USINA XINGO MG 500 kV USINA XINGO MG1 AL RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RMEL REN 643/2014 07/02/2014 06/02/2028  R$21,270.88
USINA XINGO MG 500 kV USINA XINGO MG1 AL RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 6,295,190.77
USINA XINGO MG 500 kV USINA XINGO MG1 AL RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 6,442,306.19
USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR6 AL  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR6 AL  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,319,175.21
USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR6 AL  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 1,350,003.67
USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR6 AL  DIT   061/2001 IPCA RCDM REA 5861/2016 22/08/2014 21/08/2042  R$35,497.97
USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR5 AL  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR5 AL  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,319,175.21
USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR5 AL  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 1,350,003.67
USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR5 AL  DIT   061/2001 IPCA RCDM REA 5484/2015 22/08/2014 21/08/2042  R$35,497.97
USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR4 AL  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR4 AL  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,319,175.21
USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR4 AL  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 1,350,003.67
USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR4 AL  DIT   061/2001 IPCA RCDM REA 5484/2015 22/08/2014 21/08/2042  R$35,497.97
USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR3 AL  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR3 AL  DIT   061/2001 IPCA RMEL REN 643/2014 08/03/2013 07/03/2043  R$50,758.58
USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR3 AL  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,319,175.21
USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR3 AL  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 1,350,003.67
USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR3 AL  DIT   061/2001 IPCA RCDM REA 5484/2015 22/08/2014 21/08/2042  R$35,497.97
USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR2 AL  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR2 AL  DIT   061/2001 IPCA RMEL REN 643/2014 14/03/2013 13/03/2043  R$33,855.91
USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR2 AL  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,319,175.21
USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR2 AL  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 1,350,003.67
USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR2 AL  DIT   061/2001 IPCA RCDM REA 5484/2015 22/08/2014 21/08/2042  R$35,497.97
USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR1 AL  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$447,035.46
USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR1 AL  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,319,175.21
USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR1 AL  DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 1,350,003.67
USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR1 AL  DIT   061/2001 IPCA RCDM REA 5484/2015 22/08/2014 21/08/2042  R$35,497.97
USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB6 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB6 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,399,926.89
USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB6 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,432,642.48
USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB5 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB5 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,399,926.89
USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB5 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,432,642.48
USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB4 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB4 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RMEL REN 643/2014 14/05/2014 13/05/2044  R$76,226.70
USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB4 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,399,926.89
USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB4 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,432,642.48
USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB3 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB3 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RMEL REN 643/2014 24/05/2013 23/05/2043  R$51,083.08
USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB3 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,399,926.89
USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB3 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,432,642.48
USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB2 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB2 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RMEL REN 643/2014 09/05/2014 08/05/2044  R$76,196.68
USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB2 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,399,926.89
USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB2 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,432,642.48
USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB1 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$474,400.19
USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB1 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RMEL REN 643/2014 25/05/2013 24/05/2043  R$34,058.18
USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB1 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RMEL REN 643/2014 07/05/2014 06/05/2044  R$69,205.50
USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB1 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,399,926.89
USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB1 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,432,642.48
USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB1 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RMEL REN 443/2011 07/05/2014 06/05/2044  R$55,182.24
USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB1 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RMEL REN 443/2011 07/05/2014 06/05/2044  R$55,182.24
USINA XINGO EL 500 kV USINA XINGO LT 500 kV USINA XINGO /MESSIAS C-1 AL  RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
USINA XINGO EL 500 kV USINA XINGO LT 500 kV USINA XINGO /MESSIAS C-1 AL  RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,494,659.50
USINA XINGO EL 500 kV USINA XINGO LT 500 kV USINA XINGO /MESSIAS C-1 AL  RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,529,588.93
USINA XINGO EL 500 kV USINA XINGO LT 500 kV USINA XINGO /MESSIAS C-1 AL  RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBNI REA 5861/2016 08/05/2016 07/05/2044  R$22,959.81
USINA XINGO EL 500 kV USINA XINGO LT 500 kV USINA XINGO /JARDIM C-1 AL/SE  RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
USINA XINGO EL 500 kV USINA XINGO LT 500 kV USINA XINGO /JARDIM C-1 AL/SE  RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,494,659.50
USINA XINGO EL 500 kV USINA XINGO LT 500 kV USINA XINGO /JARDIM C-1 AL/SE  RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,529,588.93
USINA XINGO EL 500 kV USINA XINGO LT 500 kV USINA XINGO /JARDIM C-1 AL/SE  RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBNI REA 5861/2016 08/05/2016 07/05/2044  R$22,959.81
USINA XINGO EL 500 kV USINA XINGO LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL  RB FT LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL 061/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$506,502.69
USINA XINGO EL 500 kV USINA XINGO LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL  RB FT LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,494,659.50
USINA XINGO EL 500 kV USINA XINGO LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL  RB FT LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL 061/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,529,588.93
USINA XINGO EL 500 kV USINA XINGO LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL  RB FT LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL 061/2001 IPCA RBNI REA 4809/2014 22/08/2014 21/08/2042  R$21,805.20
ZEBU TT 69/13,8 kV ZEBU TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$95,398.74
ZEBU TT 69/0 kV ZEBU TT2 AL DIT   017/2009 IPCA RCDM REA 5677/2016 04/09/2021 04/09/2051  R$266,405.47
ZEBU TT 69/0 kV ZEBU TT1 AL DIT   017/2009 IPCA RPEC CC 017/2009 03/08/2009 03/08/2039  R$76,571.19
ZEBU TR 69/13,8 kV ZEBU TR3 AL DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$29,388.07
ZEBU TR 69/13,8 kV ZEBU TR3 AL DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$86,722.45
ZEBU TR 230/69 kV ZEBU TR3 AL RBF FT TR 230/69 kV ZEBU TR3 AL 017/2009 IPCA RBNI REA 5677/2016 27/09/2021 27/09/2055  R$ 1,351,794.85
ZEBU TR 230/69 kV ZEBU TR2 AL RBF FT TR 230/69 kV ZEBU TR2 BA 017/2009 IPCA RBL CC 017/2009 03/08/2009 03/08/2039  R$ 1,181,584.46
ZEBU TR 230/69 kV ZEBU TR1 AL RBF FT TR 230/69 kV ZEBU TR1 BA 017/2009 IPCA RBL CC 017/2009 03/08/2009 03/08/2039  R$ 1,181,584.46
ZEBU TR 138/69 kV ZEBU TR6 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$93,039.27
ZEBU TR 138/69 kV ZEBU TR1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$93,039.27
ZEBU TR 138/69 kV ZEBU TR1 BA DIT   061/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$274,553.38
ZEBU MG 230 kV ZEBU MG1 BA RB FT MG 230 kV ZEBU MG1 BA 017/2009 IPCA RBL CC 017/2009 03/08/2009 03/08/2039  R$942,032.16
ZEBU MG 230 kV ZEBU MG1 BA RB FT MG 230 kV ZEBU MG1 BA 017/2009 IPCA RBNI REA 5677/2016 01/10/2021 01/10/2053  R$57,815.98
ZEBU MG 230 kV ZEBU MG1 BA RB FT MG 230 kV ZEBU MG1 BA 017/2009 IPCA RBNI REA 5677/2016 01/10/2021 01/10/2052  R$15,319.47
ZEBU MG 230 kV ZEBU MG1 BA RB FT MG 230 kV ZEBU MG1 BA 017/2009 IPCA RBNI REA 5677/2016 01/10/2021 01/10/2052  R$15,319.47
ZEBU MG 230 kV ZEBU MG1 BA RB FT MG 230 kV ZEBU MG1 BA 017/2009 IPCA RBNI REA 7761/2019 31/07/2015 30/07/2030  R$11,173.96
ZEBU MG 138 kV ZEBU MG1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$391,077.24
ZEBU MG 138 kV ZEBU MG1 BA DIT   061/2001 IPCA RMEL REN 643/2014 27/11/2015 26/11/2032  R$18,052.53
ZEBU MC 69 kV TT 69/0 kV ZEBU TT2 AL DIT   017/2009 IPCA RCDM REA 5677/2016 04/09/2021 04/09/2041  R$104,410.17
ZEBU MC 69 kV TT 69/0 kV ZEBU TT1 AL DIT   017/2009 IPCA RPEC CC 017/2009 03/08/2009 03/08/2039  R$87,827.90
ZEBU MC 69 kV TR 69/13,8 kV ZEBU TR3 AL  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
ZEBU MC 69 kV TR 230/69 kV ZEBU TR3 AL RBF FT TR 230/69 kV ZEBU TR3 AL 017/2009 IPCA RBNI REA 5677/2016 27/09/2021 27/09/2043  R$243,534.43
ZEBU MC 69 kV TR 230/69 kV ZEBU TR2 AL RBF FT TR 230/69 kV ZEBU TR2 BA 017/2009 IPCA RBL CC 017/2009 03/08/2009 03/08/2039  R$139,522.33
ZEBU MC 69 kV TR 230/69 kV ZEBU TR1 AL RBF FT TR 230/69 kV ZEBU TR1 BA 017/2009 IPCA RBL CC 017/2009 03/08/2009 03/08/2039  R$139,522.33
ZEBU MC 69 kV TR 138/69 kV ZEBU TR1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$67,614.50
ZEBU MC 230 kV TR 230/69 kV ZEBU TR3 AL RBF FT TR 230/69 kV ZEBU TR3 AL 017/2009 IPCA RBNI REA 5677/2016 27/09/2021 27/09/2044  R$591,289.94
ZEBU MC 230 kV TR 230/69 kV ZEBU TR2 AL RBF FT TR 230/69 kV ZEBU TR2 BA 017/2009 IPCA RBL CC 017/2009 03/08/2009 03/08/2039  R$386,265.40
ZEBU MC 230 kV TR 230/69 kV ZEBU TR1 AL RBF FT TR 230/69 kV ZEBU TR1 BA 017/2009 IPCA RBL CC 017/2009 03/08/2009 03/08/2039  R$386,265.40
ZEBU IB 69 kV MG 230 kV ZEBU MG1 BA IB1 DIT   017/2009 IPCA RPEC CC 017/2009 03/08/2009 03/08/2039  R$116,128.34
ZEBU IB 69 kV MG 138 kV ZEBU MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,444.64
ZEBU IB 230 kV MG 230 kV ZEBU MG1 BA IB1 RB FT MG 230 kV ZEBU MG1 BA 017/2009 IPCA RBL CC 017/2009 03/08/2009 03/08/2039  R$313,491.68
ZEBU EL 69 kV ZEBU LT 69 kV ZEBU /XINGO C-1 AL  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ZEBU EL 69 kV ZEBU LT 69 kV ZEBU /XINGO C-1 AL  DIT   061/2001 IPCA RMEL REN 443/2011 11/11/2015 10/11/2038  R$7,137.90
ZEBU EL 69 kV ZEBU LT 69 kV ZEBU /MOXOTO C-1 BA  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ZEBU EL 69 kV ZEBU LT 69 kV ZEBU /ITAPARICA C-1 BA/PE DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ZEBU EL 69 kV ZEBU LT 69 kV ABAIXADORA /ZEBU C-1 BA/AL  DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$79,046.28
ZEBU EL 69 kV ZEBUD. GOUVEIA C2 DIT   017/2009 IPCA RPEC CC 017/2009 03/08/2009 03/08/2039  R$174,900.19
ZEBU EL 69 kV ZEBUD. GOUVEIA C1 DIT   017/2009 IPCA RPEC CC 017/2009 03/08/2009 03/08/2039  R$174,900.19
ZEBU EL 69 kV ZEBUBARRO VERMELHO DIT   017/2009 IPCA RPEC CC 017/2009 03/08/2009 03/08/2039  R$174,900.19
ZEBU EL 69 kV ZEBUADUTORA DIT   017/2009 IPCA RPEC CC 017/2009 03/08/2009 03/08/2039  R$174,900.19
ZEBU EL 230 kV ZEBU LT 230 kV P.AFONSO III /ZEBU C-2 AL  RB FT LT 230 kV P.AFONSO III /ZEBU C-2 AL/BA 017/2009 IPCA RBL CC 017/2009 03/08/2009 03/08/2039  R$637,994.77
ZEBU EL 230 kV ZEBU LT 230 kV P.AFONSO III /ZEBU C-1 AL  RB FT LT 230 kV P.AFONSO III /ZEBU C-1 AL 017/2009 IPCA RBL CC 017/2009 03/08/2009 03/08/2039  R$637,994.77
ZEBU EL 138 kV ZEBU LT 138 kV USINA PA-II /ZEBU C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$125,631.06
ZEBU EL 13,8 kV ZEBUDIST4 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
ZEBU EL 13,8 kV ZEBUDIST3 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
ZEBU EL 13,8 kV ZEBUDIST2 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
ZEBU EL 13,8 kV ZEBUDIST1 DIT   061/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,876.45
CAMACARI II MG 500 kV CAMACARI II MG1 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBNIA REA 6137/2016      R$137,879.08
CAMACARI II IB 230 kV MG 500 kV CAMACARI II MG1 BA IB4 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBNIA REA 6137/2016      R$930,774.50
CAMACARI II IB 230 kV MG 500 kV CAMACARI II MG1 BA IB3 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBNIA REA 6137/2016      R$930,774.50
CAMACARI II IB 230 kV MG 500 kV CAMACARI II MG1 BA IB2 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBNIA REA 6137/2016      R$102,584.34
CAMACARI II IB 230 kV MG 500 kV CAMACARI II MG1 BA IB1 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBNIA REA 6137/2016      R$102,584.34
LT 230 kV PIRIPIRI /IBIAPINA II PI/CE LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE RB FT LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE 061/2001 IPCA RBNIA REA 5987/2016      R$734,001.62
AQUIRAZ II TT 69/0 kV AQUIRAZ II TT2 CE RB FT MG 230 kV AQUIRAZ II MG1 CE 004/2010 IPCA RBNIA REA 4877/2014      R$260,819.73
AQUIRAZ II TR 230/69 kV AQUIRAZ II TR4 CE RBF FT TR 230/69 kV AQUIRAZ II TR4 CE 004/2010 IPCA RBNIA REA 4877/2014      R$ 1,573,425.57
AQUIRAZ II MG 230 kV AQUIRAZ II MG1 CE RB FT MG 230 kV AQUIRAZ II MG1 CE 004/2010 IPCA RBNIA REA 4877/2014      R$58,014.02
AQUIRAZ II MG 230 kV AQUIRAZ II MG1 CE RB FT MG 230 kV AQUIRAZ II MG1 CE 004/2010 IPCA RBNIA REA 4877/2014      R$30,637.11
AQUIRAZ II MC 69 kV TT 69/0 kV AQUIRAZ II TT2 CE  RB FT MG 230 kV AQUIRAZ II MG1 CE 004/2010 IPCA RBNIA REA 4877/2014      R$96,301.34
AQUIRAZ II MC 69 kV TR 230/69 kV AQUIRAZ II TR4 CE  RBF FT TR 230/69 kV AQUIRAZ II TR4 CE 004/2010 IPCA RBNIA REA 4877/2014      R$220,561.53
AQUIRAZ II MC 230 kV TR 230/69 kV AQUIRAZ II TR4 CE  RBF FT TR 230/69 kV AQUIRAZ II TR4 CE 004/2010 IPCA RBNIA REA 4877/2014      R$535,079.00
RECIFE II MG 500 kV RECIFE II MG1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBNIA REA 6137/2016      R$208,730.79
RECIFE II MC 230 kV MG 500 kV RECIFE II MG1 PE IB6 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBNIA REA 6137/2016      R$939,840.80
RECIFE II MC 230 kV MG 500 kV RECIFE II MG1 PE IB5 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBNIA REA 6137/2016      R$939,840.80
RECIFE II IB 230 kV MG 500 kV RECIFE II MG1 PE IB2 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBNIA REA 6137/2016      R$103,991.33
RECIFE II IB 230 kV MG 500 kV RECIFE II MG1 PE IB1 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBNIA REA 6137/2016      R$463,303.63
MORRO CHAPEU II MG 230 kV MORRO CHAPEU II MG1 BA RB FT MG 230 kV MORRO CHAPEU II MG1 BA 009/2011 IPCA RBNIA REA 8159/2019      R$132,750.87
ELETRONORTE ABUNA TR 230/138 kV ABUNA TR1 RO RBF FT TR 230/138 kV ABUNA TR1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$324,502.71
ABUNA RTN 69 kV 0 Mvar ABUNA RN2 RO RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$16,313.10
ABUNA TR 230/138 kV ABUNA TR2 RO RBF FT TR 230/138 kV ABUNA TR2 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$324,502.71
ABUNA RTL 230 kV 30 Mvar ABUNA RT5 RO RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-2 RO/AC 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039  R$712,339.08
ABUNA RTL 230 kV 0 Mvar ABUNA RLR RO RB FT RTL 230 kV 30 Mvar ABUNA RLR RO 058/2001 IPCA RBNI REA 5679/2016 18/12/2017 17/12/2052  R$780,156.44
ABUNA MG 230 kV ABUNA MG1 RO RB FT MG 230 kV ABUNA MG1 RO 058/2001 IPCA RBNI REA 3216/2011 12/01/2014 11/01/2042  R$164,895.90
ABUNA RTL 230 kV 30 Mvar ABUNA RT3 RO RB FT LT 230 kV ABUNA /PORTO VELHO C-2 RO 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039  R$712,339.08
ABUNA RTL 230 kV 30 Mvar ABUNA RT2 RO RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$272,633.98
ABUNA RTL 230 kV 30 Mvar ABUNA RT1 RO RB FT LT 230 kV ABUNA /PORTO VELHO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$272,633.98
ABUNA MG 230 kV ABUNA MG1 RO RB FT MG 230 kV ABUNA MG1 RO 058/2001 IPCA RBNI REA 3216/2011 12/01/2014 11/01/2042  R$75,409.64
ABUNA RTB 230 kV 30 Mvar ABUNA RT4 RO RB FT RTB 230 kV 30 Mvar ABUNA RT4 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$272,633.98
ABUNA MG 230 kV ABUNA MG1 RO RB FT MG 230 kV ABUNA MG1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$510,427.13
ABUNA MG 230 kV ABUNA MG1 RO RB FT MG 230 kV ABUNA MG1 RO 058/2001 IPCA RBNI REA 5679/2016 18/12/2017 17/12/2047  R$227,786.42
ABUNA MG 230 kV ABUNA MG1 RO RB FT MG 230 kV ABUNA MG1 RO 058/2001 IPCA RMEL REN 443/2011 01/09/2016 31/08/2033  R$61,587.95
ABUNA MC 69 kV RTN 69 kV 0 Mvar ABUNA RN2 RO  RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$11,080.96
ABUNA MC 230 kV TR 230/138 kV ABUNA TR2 RO  RBF FT TR 230/138 kV ABUNA TR2 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$173,033.12
ABUNA MC 230 kV TR 230/138 kV ABUNA TR1 RO  RBF FT TR 230/138 kV ABUNA TR1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$173,033.12
ABUNA MC 230 kV RTL 230 kV 30 Mvar ABUNA RT5 RO  RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-2 RO/AC 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039  R$234,359.04
ABUNA MC 230 kV RTL 230 kV 30 Mvar ABUNA RT2 RO  RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$108,600.16
ABUNA MC 230 kV RTL 230 kV 30 Mvar ABUNA RT3 RO  RB FT LT 230 kV ABUNA /PORTO VELHO C-2 RO 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039  R$234,359.04
ABUNA IB 230 kV MG 230 kV ABUNA MG1 RO IB1 RB FT MG 230 kV ABUNA MG1 RO 058/2001 IPCA RBNI REA 3216/2011 12/01/2014 11/01/2043  R$701,452.57
ABUNA MC 230 kV RTL 230 kV 30 Mvar ABUNA RT1 RO  RB FT LT 230 kV ABUNA /PORTO VELHO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$108,600.16
ABUNA MC 230 kV RTB 230 kV 30 Mvar ABUNA RT4 RO  RB FT RTB 230 kV 30 Mvar ABUNA RT4 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$148,256.42
ABUNA MC 138 kV TR 230/138 kV ABUNA TR2 RO  RBF FT TR 230/138 kV ABUNA TR2 RO 058/2001 IPCA RBNI REA 3216/2011 12/01/2014 11/01/2045  R$648,012.54
ABUNA MC 138 kV TR 230/138 kV ABUNA TR1 RO  RBF FT TR 230/138 kV ABUNA TR1 RO 058/2001 IPCA RBNI REA 3216/2011 12/01/2014 11/01/2045  R$647,943.20
ABUNA MC 138 kV TR 230/138 kV ABUNA TR1 RO  RBF FT TR 230/138 kV ABUNA TR1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$121,674.23
ABUNA EL 230 kV ABUNA LT 230 kV ABUNA /RIO BRANCO 1 C-2 RO/AC  RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-2 RO/AC 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039  R$715,201.15
ABUNA IB 138 kV MG 230 kV ABUNA MG1 RO IB1 DIT   058/2001 IPCA RCDM REA 3216/2011 12/01/2014 11/01/2045  R$551,790.98
ABUNA EL 230 kV ABUNA LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC  RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$242,569.43
ABUNA EL 230 kV ABUNA LT 230 kV ABUNA /PORTO VELHO C-2 RO  RB FT LT 230 kV ABUNA /PORTO VELHO C-2 RO 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039  R$715,201.15
ABUNA EL 230 kV ABUNA LT 230 kV ABUNA /PORTO VELHO C-1 RO  RB FT LT 230 kV ABUNA /PORTO VELHO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$242,569.43
ALTAMIRA TR 230/69 kV ALTAMIRA TF2 PA RBF FT TR 230/69 kV ALTAMIRA TF2 PA 058/2001 IPCA RBNI REA 4512/2014 07/04/2014 06/04/2038  R$8,770.17
ALTAMIRA TR 230/69 kV ALTAMIRA TF1 PA RBF FT TR 230/69 kV ALTAMIRA TF1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$325,243.33
ALTAMIRA TR 230/69 kV ALTAMIRA TR3 PA RBF FT TR 230/69 kV ALTAMIRA TR3 PA 058/2001 IPCA RBNI REA 4857/2014 19/12/2016 18/12/2050  R$ 1,267,068.69
ALTAMIRA TR 230/69 kV ALTAMIRA TF2 PA RBF FT TR 230/69 kV ALTAMIRA TF2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$325,243.33
ALTAMIRA RTL 230 kV 30 Mvar ALTAMIRA RT1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$427,565.57
ALTAMIRA RTL 230 kV 30 Mvar ALTAMIRA RT1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBNI REA 4857/2014 19/12/2016 18/12/2041  R$26,132.93
ALTAMIRA TR 230/69 kV ALTAMIRA TF1 PA RBF FT TR 230/69 kV ALTAMIRA TF1 PA 058/2001 IPCA RBNI REA 4512/2014 07/04/2014 06/04/2038  R$8,770.17
ALTAMIRA TR 230/69 kV ALTAMIRA TF1 PA RBF FT TR 230/69 kV ALTAMIRA TF1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$773,810.52
ALTAMIRA TR 230/69 kV ALTAMIRA TF1 PA RBF FT TR 230/69 kV ALTAMIRA TF1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$637,855.98
ALTAMIRA MG 230 kV ALTAMIRA MG1 PA RB FT MG 230 kV ALTAMIRA MG1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,292,544.95
ALTAMIRA MC 69 kV TR 230/69 kV ALTAMIRA TR3 PA RBF FT TR 230/69 kV ALTAMIRA TR3 PA 058/2001 IPCA RBNI REA 4857/2014 19/12/2016 18/12/2046  R$422,925.11
ALTAMIRA RTL 230 kV 30 Mvar ALTAMIRA RT1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,017,252.94
ALTAMIRA RTL 230 kV 30 Mvar ALTAMIRA RT1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$838,526.82
ALTAMIRA RTB 230 kV 30 Mvar ALTAMIRA RT2 PA RB FT RTB 230 kV 30 Mvar ALTAMIRA RT2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$272,633.98
ALTAMIRA MG 230 kV ALTAMIRA MG1 PA RB FT MG 230 kV ALTAMIRA MG1 PA 058/2001 IPCA RBNI REA 3361/2012 21/06/2016 20/06/2043  R$50,865.76
ALTAMIRA MG 230 kV ALTAMIRA MG1 PA RB FT MG 230 kV ALTAMIRA MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$543,274.64
ALTAMIRA MG 230 kV ALTAMIRA MG1 PA RB FT MG 230 kV ALTAMIRA MG1 PA 058/2001 IPCA RBNI REA 4857/2014 19/12/2016 18/12/2043  R$612,887.58
ALTAMIRA MG 230 kV ALTAMIRA MG1 PA RB FT MG 230 kV ALTAMIRA MG1 PA 058/2001 IPCA RBNI REA 4857/2014 19/12/2016 18/12/2045  R$203,058.63
ALTAMIRA MG 230 kV ALTAMIRA MG1 PA RB FT MG 230 kV ALTAMIRA MG1 PA 058/2001 IPCA RBNI REA 4857/2014 19/12/2016 18/12/2043  R$115,004.79
ALTAMIRA MC 69 kV TR 230/69 kV ALTAMIRA TF2 PA RBF FT TR 230/69 kV ALTAMIRA TF2 PA 058/2001 IPCA RBNI REA 3361/2012 21/06/2016 20/06/2046  R$323,329.05
ALTAMIRA MG 230 kV ALTAMIRA MG1 PA RB FT MG 230 kV ALTAMIRA MG1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,065,451.44
ALTAMIRA MG 230 kV ALTAMIRA MG1 PA RB FT MG 230 kV ALTAMIRA MG1 PA 058/2001 IPCA RBNI REN 443/2011 01/10/2018 30/09/2049  R$42,462.96
ALTAMIRA MC 69 kV TR 230/69 kV ALTAMIRA TF2 PA RBF FT TR 230/69 kV ALTAMIRA TF2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$66,390.50
ALTAMIRA MC 230 kV TR 230/69 kV ALTAMIRA TF1 PA RBF FT TR 230/69 kV ALTAMIRA TF1 PA 058/2001 IPCA RBNI REA 3361/2012 11/07/2016 10/07/2045  R$ 1,224,351.47
ALTAMIRA MC 230 kV RTL 230 kV 30 Mvar ALTAMIRA RT1 PA  RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$108,600.16
ALTAMIRA MC 69 kV TR 230/69 kV ALTAMIRA TF1 PA RBF FT TR 230/69 kV ALTAMIRA TF1 PA 058/2001 IPCA RBNI REA 3361/2012 11/07/2016 10/07/2045  R$420,667.73
ALTAMIRA MC 230 kV TR 230/69 kV ALTAMIRA TR3 PA RBF FT TR 230/69 kV ALTAMIRA TR3 PA 058/2001 IPCA RBNI REA 4857/2014 19/12/2016 18/12/2046  R$997,719.22
ALTAMIRA MC 230 kV TR 230/69 kV ALTAMIRA TF2 PA RBF FT TR 230/69 kV ALTAMIRA TF2 PA 058/2001 IPCA RBNI REA 3361/2012 21/06/2016 20/06/2047  R$706,749.75
ALTAMIRA MC 230 kV TR 230/69 kV ALTAMIRA TF2 PA RBF FT TR 230/69 kV ALTAMIRA TF2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$163,104.17
ALTAMIRA MC 230 kV RTB 230 kV 30 Mvar ALTAMIRA RT2 PA RB FT RTB 230 kV 30 Mvar ALTAMIRA RT2 PA 058/2001 IPCA RBNI REA 3361/2012 21/06/2016 20/06/2047  R$448,282.41
ALTAMIRA MC 230 kV TR 230/69 kV ALTAMIRA TF1 PA RBF FT TR 230/69 kV ALTAMIRA TF1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$163,104.17
ALTAMIRA MC 230 kV TR 230/69 kV ALTAMIRA TF1 PA RBF FT TR 230/69 kV ALTAMIRA TF1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$388,053.21
ALTAMIRA MC 230 kV TR 230/69 kV ALTAMIRA TF1 PA RBF FT TR 230/69 kV ALTAMIRA TF1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$319,874.26
ALTAMIRA EL 69 kV ALTAMIRADIST1 DIT   058/2001 IPCA RCDM REA 3361/2012 21/06/2016 20/06/2046  R$417,881.64
ALTAMIRA EL 69 kV ALTAMIRADIST1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$194,928.32
ALTAMIRA MC 230 kV RTB 230 kV 30 Mvar ALTAMIRA RT2 PA RB FT RTB 230 kV 30 Mvar ALTAMIRA RT2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$148,256.42
ALTAMIRA IB 69 kV MG 230 kV ALTAMIRA MG1 PA IB1 DIT   058/2001 IPCA RCDM REA 3361/2012 21/06/2016 20/06/2048  R$308,335.30
ALTAMIRA IB 230 kV MG 230 kV ALTAMIRA MG1 PA IB1 RB FT MG 230 kV ALTAMIRA MG1 PA 058/2001 IPCA RBNI REA 3361/2012 21/06/2016 20/06/2049  R$779,352.85
ALTAMIRA EL 69 kV ALTAMIRADIST1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$160,548.83
ALTAMIRA EL 69 kV ALTAMIRADIST1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$81,931.09
ALTAMIRA EL 69 kV ALTAMIRACELPA C2 DIT   058/2001 IPCA RCDM REN 443/2011 01/10/2018 30/09/2046  R$370,778.06
ALTAMIRA EL 230 kV ALTAMIRA LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA  RB FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$577,114.91
ALTAMIRA EL 230 kV ALTAMIRA LT 230 kV TUCURUI /ALTAMIRA C-1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBNI REA 3361/2012 21/06/2016 20/06/2048  R$566,742.40
ALTAMIRA EL 230 kV ALTAMIRA LT 230 kV TUCURUI /ALTAMIRA C-1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$242,569.43
ALTAMIRA EL 230 kV ALTAMIRA LT 230 kV TUCURUI /ALTAMIRA C-1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$577,114.91
ALTAMIRA EL 230 kV ALTAMIRA LT 230 kV TUCURUI /ALTAMIRA C-1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$475,718.78
ALUMAR EL 230 kV ALUMAR LT 230 kV SAO LUIS II /ALUMAR C-2 MA DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$251,472.48
ALTAMIRA EL 230 kV ALTAMIRA LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA  RB FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA 058/2001 IPCA RBNI REA 3361/2012 21/06/2016 20/06/2045  R$573,679.64
ALTAMIRA EL 230 kV ALTAMIRA LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA  RB FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$242,569.43
ALUMAR EL 230 kV ALUMAR LT 230 kV SAO LUIS II /ALUMAR C-1 MA DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$251,472.48
ALTAMIRA EL 230 kV ALTAMIRA LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA  RB FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$475,718.78
ARARAQUARA 2 MC 500 kV CV 600/600 kV ARARAQUARA 2 CC2 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 01/04/2013 26/02/2039  R$689,439.82
ARARAQUARA 2 MC 500 kV CV 600/600 kV ARARAQUARA 2 CC1 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 01/04/2013 26/02/2039  R$689,439.82
ARARAQUARA 2 MC 500 kV BF 500 kV 0 Mvar ARARAQUARA 2 GF4 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 01/04/2013 26/02/2039  R$612,201.93
ARARAQUARA 2 MC 500 kV BF 500 kV 0 Mvar ARARAQUARA 2 GF3 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 01/04/2013 26/02/2039  R$612,201.93
ARARAQUARA 2 MC 500 kV BF 500 kV 0 Mvar ARARAQUARA 2 GF2 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 01/04/2013 26/02/2039  R$612,201.93
ARARAQUARA 2 MC 500 kV BF 500 kV 0 Mvar ARARAQUARA 2 GF1 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 01/04/2013 26/02/2039  R$612,201.93
ARARAQUARA 2 IB 500 kV MG 500 kV ARARAQUARA 2 MG2 SP IB9 RB FT MG 500 kV ARARAQUARA 2 MG2 SP 012/2009 IPCA RBL CC 012/2009 01/04/2013 26/02/2039  R$265,642.31
ARARAQUARA 2 IB 500 kV MG 500 kV ARARAQUARA 2 MG2 SP IB8 RB FT MG 500 kV ARARAQUARA 2 MG2 SP 012/2009 IPCA RBL CC 012/2009 01/04/2013 26/02/2039  R$265,642.31
ARARAQUARA 2 IB 500 kV MG 500 kV ARARAQUARA 2 MG2 SP IB7 RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 01/04/2013 26/02/2039  R$265,642.31
ARARAQUARA 2 IB 500 kV MG 500 kV ARARAQUARA 2 MG2 SP IB6 RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 01/04/2013 26/02/2039  R$265,642.31
ARARAQUARA 2 CV 600/600 kV ARARAQUARA 2 CC2 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 01/04/2013 26/02/2039  R$ 54,708,056.40
ARARAQUARA 2 CV 600/600 kV ARARAQUARA 2 CC1 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 01/04/2013 26/02/2039  R$ 54,708,056.40
ARARAQUARA 2 BF 500 kV 0 Mvar ARARAQUARA 2 GF2 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 01/04/2013 26/02/2039  R$ 8,618,743.04
ARARAQUARA 2 BF 500 kV 0 Mvar ARARAQUARA 2 GF4 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 01/04/2013 26/02/2039  R$ 8,618,743.04
ARARAQUARA 2 BF 500 kV 0 Mvar ARARAQUARA 2 GF3 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 01/04/2013 26/02/2039  R$ 8,618,743.04
ARARAQUARA 2 BF 500 kV 0 Mvar ARARAQUARA 2 GF1 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 01/04/2013 26/02/2039  R$ 8,618,743.04
ARIQUEMES MG 230 kV ARIQUEMES MG1 RO RB FT MG 230 kV ARIQUEMES MG1 RO 058/2001 IPCA RBNI REA 7814/2019 13/05/2021 13/05/2052  R$127,742.01
ARIQUEMES MC 69 kV TR 230/69 kV ARIQUEMES TR2 RO  RBF FT TR 230/69 kV ARIQUEMES TR2 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$66,390.50
ARIQUEMES TR 230/69 kV ARIQUEMES TR3 RO RBF FT TR 230/69 kV ARIQUEMES TR3 RO 058/2001 IPCA RBNI REA 5678/2016 05/03/2018 04/03/2052  R$ 1,249,653.74
ARIQUEMES TR 230/69 kV ARIQUEMES TR2 RO RBF FT TR 230/69 kV ARIQUEMES TR2 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$325,243.33
ARIQUEMES TR 230/69 kV ARIQUEMES TR1 RO RBF FT TR 230/69 kV ARIQUEMES TR1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$325,243.33
ARIQUEMES RTN 230 kV 0,1 Mvar ARIQUEMES RN1 RO RB FT RTL 230 kV 20 Mvar ARIQUEMES RT1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$16,313.10
ARIQUEMES RTL 230 kV 20 Mvar ARIQUEMES RT1 RO RB FT RTL 230 kV 20 Mvar ARIQUEMES RT1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$255,797.82
ARIQUEMES RTL 230 kV 0 Mvar ARIQUEMES RT3 RO RB FT RTL 230 kV 20 Mvar ARIQUEMES RT3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039  R$689,609.76
ARIQUEMES RTB 230 kV 20,00 Mvar ARIQUEMES RB1 RO RB FT RTB 230 kV 20 Mvar ARIQUEMES RB1 RO 058/2001 IPCA RBNI REA 7814/2019 13/05/2021 13/05/2056  R$510,736.68
ARIQUEMES MG 230 kV ARIQUEMES MG1 RO RB FT MG 230 kV ARIQUEMES MG1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$494,283.21
ARIQUEMES MG 230 kV ARIQUEMES MG1 RO RB FT MG 230 kV ARIQUEMES MG1 RO 058/2001 IPCA RBNI REA 5678/2016 05/03/2018 04/03/2041  R$45,460.61
ARIQUEMES MG 230 kV ARIQUEMES MG1 RO RB FT MG 230 kV ARIQUEMES MG1 RO 058/2001 IPCA RBNI REA 5678/2016 05/03/2018 04/03/2049  R$77,608.58
ARIQUEMES MG 230 kV ARIQUEMES MG1 RO RB FT MG 230 kV ARIQUEMES MG1 RO 058/2001 IPCA RBNI REA 5678/2016 05/03/2018 04/03/2049  R$20,036.51
ARIQUEMES MG 230 kV ARIQUEMES MG1 RO RB FT MG 230 kV ARIQUEMES MG1 RO 058/2001 IPCA RBNI REA 5678/2016 05/03/2018 04/03/2049  R$20,036.51
ARIQUEMES MG 230 kV ARIQUEMES MG1 RO RB FT MG 230 kV ARIQUEMES MG1 RO 058/2001 IPCA RMEL REN 443/2011 01/09/2016 31/08/2033  R$24,469.02
ARIQUEMES MC 69 kV TR 230/69 kV ARIQUEMES TR1 RO RBF FT TR 230/69 kV ARIQUEMES TR1 RO 058/2001 IPCA RBNI REA 3470/2012 08/04/2015 07/04/2055  R$7,607.46
ARIQUEMES MC 69 kV TR 230/69 kV ARIQUEMES TR3 RO RBF FT TR 230/69 kV ARIQUEMES TR3 RO 058/2001 IPCA RBNI REA 5678/2016 05/03/2018 04/03/2041  R$332,744.69
ARIQUEMES MC 69 kV TR 230/69 kV ARIQUEMES TR2 RO  RBF FT TR 230/69 kV ARIQUEMES TR2 RO 058/2001 IPCA RBNI REA 3470/2012 08/04/2015 07/04/2055  R$7,607.46
ARIQUEMES MC 69 kV TR 230/69 kV ARIQUEMES TR1 RO RBF FT TR 230/69 kV ARIQUEMES TR1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$66,390.50
ARIQUEMES MC 230 kV RTL 230 kV 0 Mvar ARIQUEMES RT3 RO RB FT RTL 230 kV 20 Mvar ARIQUEMES RT3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039  R$228,828.44
ARIQUEMES MC 230 kV TR 230/69 kV ARIQUEMES TR3 RO RBF FT TR 230/69 kV ARIQUEMES TR3 RO 058/2001 IPCA RBNI REA 5678/2016 05/03/2018 04/03/2041  R$743,977.46
ARIQUEMES MC 230 kV TR 230/69 kV ARIQUEMES TR2 RO  RBF FT TR 230/69 kV ARIQUEMES TR2 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
ARIQUEMES MC 230 kV TR 230/69 kV ARIQUEMES TR1 RO RBF FT TR 230/69 kV ARIQUEMES TR1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
ARIQUEMES MC 230 kV RTN 230 kV 0,1 Mvar ARIQUEMES RN1 RO  RB FT RTL 230 kV 20 Mvar ARIQUEMES RT1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$11,080.96
ARIQUEMES MC 230 kV RTB 230 kV 20,00 Mvar ARIQUEMES RB1 RO RB FT RTB 230 kV 20 Mvar ARIQUEMES RB1 RO 058/2001 IPCA RBNI REA 7814/2019 13/05/2021 13/05/2045  R$ 1,020,509.06
ARIQUEMES MC 230 kV RTL 230 kV 20 Mvar ARIQUEMES RT1 RO  RB FT RTL 230 kV 20 Mvar ARIQUEMES RT1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$108,600.16
ARIQUEMES IB 230 kV MG 230 kV ARIQUEMES MG1 RO IB1 RB FT MG 230 kV ARIQUEMES MG1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
ARIQUEMES EL 69 kV ARIQUEMESDIST1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$81,931.09
ARIQUEMES EL 230 kV ARIQUEMES LT 230 kV SAMUEL /ARIQUEMES C-1 RO  RB FT LT 230 kV SAMUEL /ARIQUEMES C-1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
ARIQUEMES EL 230 kV ARIQUEMES LT 230 kV SAMUEL /ARIQUEMES C-3 RO RB FT LT 230 kV SAMUEL /ARIQUEMES C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039  R$698,323.25
ARIQUEMES EL 230 kV ARIQUEMES LT 230 kV ARIQUEMES /JI-PARANA C-3 RO RB FT LT 230 kV ARIQUEMES /JI-PARANA C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039  R$698,323.25
ARIQUEMES EL 230 kV ARIQUEMES LT 230 kV ARIQUEMES /JARU C-1 RO  RB FT LT 230 kV ARIQUEMES /JARU C-1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
BACABEIRA MG 500 kV BACABEIRA MG2 MA RB FT MG 500 kV BACABEIRA MG2 MA 058/2001 IPCA RBNI DSP 554/2023 01/07/2023 08/09/2036  R$69,620.43
BACABEIRA MG 500 kV BACABEIRA MG2 MA RB FT MG 500 kV BACABEIRA MG2 MA 058/2001 IPCA RBNI DSP 554/2023 01/07/2023 25/09/2050  R$75,234.86
BACABEIRA MG 500 kV BACABEIRA MG2 MA RB FT MG 500 kV BACABEIRA MG2 MA 058/2001 IPCA RBNI DSP 554/2023 01/07/2023 08/09/2050  R$75,234.86
BACABEIRA MG 500 kV BACABEIRA MG2 MA RB FT MG 500 kV BACABEIRA MG2 MA 058/2001 IPCA RBNI DSP 554/2023 01/07/2023 08/09/2050  R$75,234.86
BACABEIRA MG 500 kV BACABEIRA MG2 MA RB FT MG 500 kV BACABEIRA MG2 MA 058/2001 IPCA RBNI DSP 554/2023 01/07/2023 25/09/2050  R$75,234.86
BACABEIRA MG 500 kV BACABEIRA MG2 MA RB FT MG 500 kV BACABEIRA MG2 MA 058/2001 IPCA RBNI DSP 554/2023 01/07/2023 19/05/2036  R$9,404.97
BACABEIRA EL 500 kV BACABEIRA LT 500 kV SAO LUIS II /BACABEIRA C-2 MA  RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RBNI DSP 554/2023 01/07/2023 08/09/2048  R$261,359.78
BACABEIRA EL 500 kV BACABEIRA LT 500 kV SAO LUIS II /BACABEIRA C-1 MA  RB FT LT 500 kV SAO LUIS II /BACABEIRA C-1 MA 058/2001 IPCA RBNI DSP 554/2023 01/07/2023 25/09/2048  R$261,359.78
BACABEIRA EL 500 kV BACABEIRA LT 500 kV BACABEIRA /MIRANDA II C-2 MA  RB FT LT 500 kV BACABEIRA /MIRANDA II C-2 MA 058/2001 IPCA RBNI DSP 554/2023 01/07/2023 08/09/2048  R$261,359.78
BACABEIRA EL 500 kV BACABEIRA LT 500 kV BACABEIRA /MIRANDA II C-1 MA  RB FT LT 500 kV BACABEIRA /MIRANDA II C-1 MA 058/2001 IPCA RBNI DSP 554/2023 01/07/2023 25/09/2048  R$261,359.78
BALSAS TT 69/0 kV BALSAS TT1 MA DIT   001/2009 IPCA RPEC CC 001/2009 28/01/2009 28/01/2039  R$115,215.88
BALSAS MG 230 kV BALSAS MG1 MA RB FT MG 230 kV BALSAS MG1 MA 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039  R$986,978.38
BALSAS MG 230 kV BALSAS MG1 MA RB FT MG 230 kV BALSAS MG1 MA 001/2009 IPCA RBNI REA 4745/2014 23/06/2016 23/06/2047  R$155,139.63
BALSAS TR 230/69 kV BALSAS TR2 MA RBF FT TR 230/69 kV BALSAS TR2 MA 001/2009 IPCA RBNI REA 4745/2014 23/06/2016 23/06/2050  R$ 2,050,549.95
BALSAS TR 230/69 kV BALSAS TR1 MA RBF FT TR 230/69 kV BALSAS TR1 MA 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039  R$388,170.25
BALSAS MG 230 kV BALSAS MG1 MA RB FT MG 230 kV BALSAS MG1 MA 001/2009 IPCA RBNI REN 443/2011 16/08/2017 15/08/2048  R$36,309.90
BALSAS MC 69 kV TR 230/69 kV BALSAS TR1 MA RBF FT TR 230/69 kV BALSAS TR1 MA 001/2009 IPCA RBNI REA 4745/2014 15/07/2016 15/07/2047  R$36,505.08
BALSAS MG 230 kV BALSAS MG1 MA RB FT MG 230 kV BALSAS MG1 MA 001/2009 IPCA RBNI REA 4745/2014 23/06/2016 23/06/2047  R$44,467.15
BALSAS MC 230 kV TR 230/69 kV BALSAS TR2 MA RBF FT TR 230/69 kV BALSAS TR2 MA 001/2009 IPCA RBNI REA 4745/2014 23/06/2016 23/06/2039  R$933,737.87
BALSAS MC 69 kV TT 69/0 kV BALSAS TT1 MA DIT   001/2009 IPCA RPEC CC 001/2009 28/01/2009 28/01/2039  R$28,804.47
BALSAS MC 69 kV TR 230/69 kV BALSAS TR2 MA RBF FT TR 230/69 kV BALSAS TR2 MA 001/2009 IPCA RBNI REA 4745/2014 23/06/2016 23/06/2039  R$432,305.75
BALSAS MC 69 kV TR 230/69 kV BALSAS TR1 MA RBF FT TR 230/69 kV BALSAS TR1 MA 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039  R$49,288.45
BALSAS MC 230 kV TR 230/69 kV BALSAS TR1 MA  RBF FT TR 230/69 kV BALSAS TR1 MA 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039  R$269,688.06
BALSAS MC 13,8 kV TR 230/69 kV BALSAS TR2 MA  RBF FT TR 230/69 kV BALSAS TR2 MA 001/2009 IPCA RBNI REA 4745/2014 23/06/2016 23/06/2046  R$70,600.47
BALSAS IB 69 kV MG 230 kV BALSAS MG1 MA IB1 DIT   001/2009 IPCA RPEC CC 001/2009 28/01/2009 28/01/2039  R$23,792.65
BALSAS IB 230 kV MG 230 kV BALSAS MG1 MA IB1 RB FT MG 230 kV BALSAS MG1 MA 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039  R$149,122.79
BALSAS EL 69 kV BALSASSE BALSAS III DIT   001/2009 IPCA RCDM REN 443/2011 16/08/2017 15/08/2045  R$304,129.18
BALSAS EL 69 kV BALSASDIST4 DIT   001/2009 IPCA RPEC CC 001/2009 28/01/2009 28/01/2039  R$50,014.18
BALSAS EL 69 kV BALSASDIST3 DIT   001/2009 IPCA RPEC CC 001/2009 28/01/2009 28/01/2039  R$50,014.18
BALSAS EL 69 kV BALSASDIST2 DIT   001/2009 IPCA RPEC CC 001/2009 28/01/2009 28/01/2039  R$50,014.18
BALSAS EL 69 kV BALSASDIST1 DIT   001/2009 IPCA RPEC CC 001/2009 28/01/2009 28/01/2039  R$50,014.18
BALSAS EL 230 kV BALSAS LT 230 kV RIB.GONCALVES /BALSAS C-1 PI/MA RB FT LT 230 kV RIB.GONCALVES /BALSAS C-1 PI/MA 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039  R$310,774.09
BARRA PEIXE TR 230/138 kV BARRA PEIXE TRR1 MT RBF FT TR 230/138 kV BARRA PEIXE TRR1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$156,606.84
BARRA PEIXE TR 230/138 kV BARRA PEIXE TRR1 MT RBF FT TR 230/138 kV BARRA PEIXE TRR1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$307,131.93
BARRA PEIXE TR 230/138 kV BARRA PEIXE TR5 MT RBF FT TR 230/138 kV BARRA PEIXE TR5 MT 058/2001 IPCA RBNI REA 5687/2016 13/08/2018 13/08/2052  R$ 1,562,307.42
BARRA PEIXE TR 230/138 kV BARRA PEIXE TRR1 MT RBF FT TR 230/138 kV BARRA PEIXE TRR1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$372,594.95
BARRA PEIXE TR 230/138 kV BARRA PEIXE TR4 MT RBF FT TR 230/138 kV BARRA PEIXE TR4 MT 058/2001 IPCA RBNI REA 5687/2016 13/08/2018 13/08/2052  R$ 1,562,307.42
BARRA PEIXE TR 230/138 kV BARRA PEIXE TR1 MT RBF FT TR 230/138 kV BARRA PEIXE TR1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$921,296.88
BARRA PEIXE MG 230 kV BARRA PEIXE MG1 MT RB FT MG 230 kV BARRA PEIXE MG1 MT 058/2001 IPCA RBNI REA 2384/2010 24/10/2012 23/10/2039  R$ 1,168,785.06
BARRA PEIXE TR 230/138 kV BARRA PEIXE TR3 MT RBF FT TR 230/138 kV BARRA PEIXE TR3 MT 058/2001 IPCA RBNI REA 2384/2010 28/11/2012 27/11/2046  R$ 1,028,685.60
BARRA PEIXE TR 230/138 kV BARRA PEIXE TR2 MT RBF FT TR 230/138 kV BARRA PEIXE TR2 MT 058/2001 IPCA RBNI REA 2384/2010 24/10/2012 23/10/2046  R$ 1,026,295.22
BARRA PEIXE TR 230/138 kV BARRA PEIXE TR1 MT RBF FT TR 230/138 kV BARRA PEIXE TR1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$469,770.10
BARRA PEIXE TR 230/138 kV BARRA PEIXE TR1 MT RBF FT TR 230/138 kV BARRA PEIXE TR1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,117,664.85
BARRA PEIXE MG 230 kV BARRA PEIXE MG1 MT RB FT MG 230 kV BARRA PEIXE MG1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$646,615.82
BARRA PEIXE RTL 230 kV 20 MVAr BARRA PEIXE RT3 MT RB FT RTL 230 kV 20 MVAr BARRA PEIXE RT3 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$341,233.25
BARRA PEIXE RTL 230 kV 20 MVAr BARRA PEIXE RT1 MT RB FT RTL 230 kV 20 MVAr BARRA PEIXE RT1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$341,233.25
BARRA PEIXE RTL 230 kV 20 MVAr BARRA PEIXE RT1 MT RB FT RTL 230 kV 20 MVAr BARRA PEIXE RT1 MT 058/2001 IPCA RMEL REN 443/2011 05/06/2017 04/06/2031  R$88,342.99
BARRA PEIXE RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT RB FT RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$341,233.25
BARRA PEIXE RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT RB FT RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$811,853.32
BARRA PEIXE RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT RB FT RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$669,214.86
BARRA PEIXE MG 230 kV BARRA PEIXE MG1 MT RB FT MG 230 kV BARRA PEIXE MG1 MT 058/2001 IPCA RBNI REA 5687/2016 13/08/2018 13/08/2050  R$132,697.69
BARRA PEIXE MG 230 kV BARRA PEIXE MG1 MT RB FT MG 230 kV BARRA PEIXE MG1 MT 058/2001 IPCA RBNI REA 5687/2016 13/08/2018 13/08/2049  R$82,860.77
BARRA PEIXE MG 230 kV BARRA PEIXE MG1 MT RB FT MG 230 kV BARRA PEIXE MG1 MT 058/2001 IPCA RBNI REA 5687/2016 13/08/2018 13/08/2051  R$94,677.65
BARRA PEIXE MC 230 kV TR 230/138 kV BARRA PEIXE TR1 MT RBF FT TR 230/138 kV BARRA PEIXE TR1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$432,295.55
BARRA PEIXE MG 230 kV BARRA PEIXE MG1 MT RB FT MG 230 kV BARRA PEIXE MG1 MT 058/2001 IPCA RBNI REA 5687/2016 13/08/2018 13/08/2042  R$70,543.48
BARRA PEIXE MC 230 kV RTL 230 kV 20 MVAr BARRA PEIXE RT3 MT  RB FT RTL 230 kV 20 MVAr BARRA PEIXE RT3 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$108,600.16
BARRA PEIXE MG 230 kV BARRA PEIXE MG1 MT RB FT MG 230 kV BARRA PEIXE MG1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,538,411.62
BARRA PEIXE MC 230 kV TR 230/138 kV BARRA PEIXE TR5 MT RBF FT TR 230/138 kV BARRA PEIXE TR5 MT 058/2001 IPCA RBNI REA 5687/2016 13/08/2018 13/08/2042  R$696,209.82
BARRA PEIXE MC 230 kV TR 230/138 kV BARRA PEIXE TR4 MT RBF FT TR 230/138 kV BARRA PEIXE TR4 MT 058/2001 IPCA RBNI REA 5687/2016 13/08/2018 13/08/2042  R$696,209.82
BARRA PEIXE MC 230 kV TR 230/138 kV BARRA PEIXE TR3 MT RBF FT TR 230/138 kV BARRA PEIXE TR3 MT 058/2001 IPCA RBNI REA 2384/2010 28/11/2012 27/11/2042  R$904,691.56
BARRA PEIXE MC 230 kV TR 230/138 kV BARRA PEIXE TR2 MT  RBF FT TR 230/138 kV BARRA PEIXE TR2 MT 058/2001 IPCA RBNI REA 2384/2010 24/10/2012 23/10/2042  R$901,939.62
BARRA PEIXE MC 230 kV TR 230/138 kV BARRA PEIXE TR1 MT RBF FT TR 230/138 kV BARRA PEIXE TR1 MT 058/2001 IPCA RBNI REA 2384/2010 28/11/2012 27/11/2040  R$183,055.43
BARRA PEIXE MC 230 kV TR 230/138 kV BARRA PEIXE TR1 MT RBF FT TR 230/138 kV BARRA PEIXE TR1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
BARRA PEIXE MC 138 kV TR 230/138 kV BARRA PEIXE TR5 MT RBF FT TR 230/138 kV BARRA PEIXE TR5 MT 058/2001 IPCA RBNI REA 5687/2016 13/08/2018 13/08/2039  R$567,132.32
BARRA PEIXE MC 138 kV TR 230/138 kV BARRA PEIXE TR3 MT RBF FT TR 230/138 kV BARRA PEIXE TR3 MT 058/2001 IPCA RBNI REA 2384/2010 28/11/2012 27/11/2042  R$674,185.26
BARRA PEIXE MC 230 kV RTL 230 kV 20 MVAr BARRA PEIXE RT1 MT RB FT RTL 230 kV 20 MVAr BARRA PEIXE RT1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$108,600.16
BARRA PEIXE MC 230 kV RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT RB FT RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,729.23
BARRA PEIXE MC 230 kV RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT RB FT RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$415,711.27
BARRA PEIXE MC 230 kV RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT RB FT RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$342,672.93
BARRA PEIXE MC 138 kV TR 230/138 kV BARRA PEIXE TR2 MT RBF FT TR 230/138 kV BARRA PEIXE TR2 MT 058/2001 IPCA RBNI REA 2384/2010 24/10/2012 23/10/2044  R$671,849.74
BARRA PEIXE MC 138 kV TR 230/138 kV BARRA PEIXE TR4 MT RBF FT TR 230/138 kV BARRA PEIXE TR4 MT 058/2001 IPCA RBNI REA 5687/2016 13/08/2018 13/08/2039  R$567,132.32
BARRA PEIXE IB 230 kV MG 230 kV BARRA PEIXE MG1 MT IB1 RB FT MG 230 kV BARRA PEIXE MG1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
BARRA PEIXE IB 138 kV MG 230 kV BARRA PEIXE MG1 MT IB1 DIT   058/2001 IPCA RCDM REA 2384/2010 24/10/2012 23/10/2043  R$545,769.85
BARRA PEIXE EL 230 kV BARRA PEIXE LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
BARRA PEIXE EL 230 kV BARRA PEIXE LT 230 kV RIO VERDE FUR /BARRA PEIXE C-1 GO/MT  RB FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-1 GO/MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$506,280.43
BARRA PEIXE EL 230 kV BARRA PEIXE LT 230 kV RIO VERDE FUR /BARRA PEIXE C-1 GO/MT  RB FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-1 GO/MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
BARRA PEIXE EL 230 kV BARRA PEIXE LT 230 kV RIO VERDE FUR /BARRA PEIXE C-1 GO/MT  RB FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-1 GO/MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$614,190.55
BARRA PEIXE EL 138 kV BARRA PEIXEDIST1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$471,329.12
BARRA PEIXE BC 230 kV 35 Mvar BARRA PEIXE BC2 MT RB FT BC 230 kV 35 Mvar BARRA PEIXE BC2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,278.24
BARRA PEIXE EL 230 kV BARRA PEIXE LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
BARRA PEIXE EL 230 kV BARRA PEIXE LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$614,190.55
BARRA PEIXE EL 230 kV BARRA PEIXE LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$506,280.43
BARRA PEIXE EL 230 kV BARRA PEIXE LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT  RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
BARRA PEIXE EL 138 kV BARRA PEIXEDIST2 DIT   058/2001 IPCA RCDM REA 2384/2010 28/11/2012 27/11/2043  R$721,207.77
BARRA PEIXE EL 138 kV BARRA PEIXEDIST1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$198,106.19
BARRA PEIXE EL 13,8 kV BARRA PEIXEDIST1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$59,058.38
BARRA PEIXE EL 13,8 kV BARRA PEIXEDIST1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$140,510.18
BARRA PEIXE BC 230 kV 37 Mvar BARRA PEIXE BC3 MT RB FT BC 230 kV 37 Mvar BARRA PEIXE BC3 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$196,624.33
BARRA PEIXE BC 230 kV 120 Mvar BARRA PEIXE BC1 MT RB FT BC 230 kV 120 Mvar BARRA PEIXE BC1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$309,816.51
BOA VISTA TR 230/69 kV BOA VISTA TR3 RR DIT   058/2001 IPCA RCDM DSP 3687/2017 05/07/2015 17/06/2050  R$ 1,516,539.43
BOA VISTA TR 230/69 kV BOA VISTA TR2 RR DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2056  R$302,362.96
BOA VISTA TT 13,8/0 kV BOA VISTA TT2 RR DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2051  R$10,888.05
BOA VISTA TT 13,8/0 kV BOA VISTA TT1 RR DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2051  R$10,888.05
BOA VISTA TR 230/69 kV BOA VISTA TR1 RR DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2056  R$302,362.96
BOA VISTA RTL 230 kV 25 Mvar BOA VISTA RTLR1 RR DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2057  R$122,825.27
BOA VISTA MG 230 kV BOA VISTA MG2 RR DIT   058/2001 IPCA RCDM DSP 3687/2017 05/07/2015 05/07/2047  R$18,672.58
BOA VISTA RTL 230 kV 25 Mvar BOA VISTA RTL1 RR DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2057  R$122,825.27
BOA VISTA MG 230 kV BOA VISTA MG2 RR DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2051  R$24,391.60
BOA VISTA MG 230 kV BOA VISTA MG2 RR DIT   058/2001 IPCA RCDM REA 3587/2012 01/06/2016 31/05/2044  R$467,812.92
BOA VISTA MG 230 kV BOA VISTA MG2 RR DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2052  R$36,185.00
BOA VISTA MG 230 kV BOA VISTA MG2 RR DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2045  R$245,249.12
BOA VISTA MG 230 kV BOA VISTA MG2 RR DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2052  R$83,773.37
BOA VISTA MC 230 kV TR 230/69 kV BOA VISTA TR2 RR  DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2049  R$195,713.35
BOA VISTA MC 230 kV RTL 230 kV 25 Mvar BOA VISTA RTL1 RR  DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2048  R$105,557.12
BOA VISTA MG 230 kV BOA VISTA MG2 RR DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2051  R$26,763.05
BOA VISTA MG 230 kV BOA VISTA MG2 RR DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2052  R$6,103.09
BOA VISTA MC 69 kV TR 230/69 kV BOA VISTA TR3 RR  DIT   058/2001 IPCA RCDM DSP 3687/2017 05/07/2015 17/06/2038  R$255,865.09
BOA VISTA MC 69 kV TR 230/69 kV BOA VISTA TR2 RR  DIT   058/2001 IPCA RCDM REA 3587/2012 01/06/2016 31/05/2044  R$90,864.58
BOA VISTA MC 69 kV TR 230/69 kV BOA VISTA TR2 RR  DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2049  R$72,844.61
BOA VISTA MC 69 kV TR 230/69 kV BOA VISTA TR1 RR  DIT   058/2001 IPCA RCDM REA 3587/2012 01/06/2016 31/05/2044  R$90,917.18
BOA VISTA MC 69 kV TR 230/69 kV BOA VISTA TR1 RR  DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2049  R$75,079.97
BOA VISTA MC 230 kV TR 230/69 kV BOA VISTA TR3 RR  DIT   058/2001 IPCA RCDM DSP 3687/2017 05/07/2015 17/06/2039  R$622,478.88
BOA VISTA MC 230 kV TR 230/69 kV BOA VISTA TR2 RR  DIT   058/2001 IPCA RCDM REA 3587/2012 01/06/2016 31/05/2046  R$639,954.26
BOA VISTA MC 230 kV TR 230/69 kV BOA VISTA TR1 RR  DIT   058/2001 IPCA RCDM REA 3587/2012 01/06/2016 31/05/2046  R$639,927.36
BOA VISTA MC 230 kV TR 230/69 kV BOA VISTA TR1 RR  DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2049  R$202,949.66
BOA VISTA MC 230 kV RTL 230 kV 25 Mvar BOA VISTA RTLR1 RR  DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2048  R$105,557.12
BOA VISTA MC 13,8 kV TT 13,8/0 kV BOA VISTA TT2 RR  DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2048  R$55,331.09
BOA VISTA MC 13,8 kV TT 13,8/0 kV BOA VISTA TT1 RR  DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2048  R$55,331.09
BOA VISTA MC 13,8 kV BC 13,8 kV 3,6 Mvar BOA VISTA BC6 RR  DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2048  R$57,593.53
BOA VISTA MC 13,8 kV BC 13,8 kV 3,6 Mvar BOA VISTA BC1 RR  DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2048  R$57,593.53
BOA VISTA MC 13,8 kV BC 13,8 kV 3,6 Mvar BOA VISTA BC9 RR  DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2048  R$57,593.53
BOA VISTA IB 69 kV MG 230 kV BOA VISTA MG2 RR IB1 DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2051  R$56,401.03
BOA VISTA MC 13,8 kV BC 13,8 kV 3,6 Mvar BOA VISTA BC4 RR  DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2022 06/06/2048  R$57,593.53
BOA VISTA IB 230 kV MG 230 kV BOA VISTA MG2 RR IB1 DIT   058/2001 IPCA RCDM REA 3587/2012 01/06/2016 31/05/2048  R$827,019.94
BOA VISTA EL 69 kV BOA VISTADIST3 DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2049  R$76,561.80
BOA VISTA EL 69 kV BOA VISTADIST2 DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2049  R$76,561.80
BOA VISTA EL 69 kV BOA VISTADIST1 DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2049  R$76,561.80
BOA VISTA EL 230 kV BOA VISTA LT 230 kV BOA VISTA /S. E. Uiaren VEN C-1 RR  RB   058/2001 IPCA RBNI PRT 631/2022 06/04/2023 06/06/2050  R$215,595.93
BOA VISTA BC 13,8 kV 3,6 Mvar BOA VISTA BC8 RR DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2036  R$11,187.08
BOA VISTA BC 13,8 kV 3,6 Mvar BOA VISTA BC4 RR DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2036  R$11,187.08
BOA VISTA EL 13,8 kV BOA VISTADIST1 DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2048  R$57,593.53
BOA VISTA BC 13,8 kV 3,6 Mvar BOA VISTA BC9 RR DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2036  R$11,187.08
BOA VISTA BC 13,8 kV 3,6 Mvar BOA VISTA BC3 RR DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2036  R$11,187.08
BOA VISTA BC 13,8 kV 3,6 Mvar BOA VISTA BC7 RR DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2036  R$11,187.08
BOA VISTA BC 13,8 kV 3,6 Mvar BOA VISTA BC6 RR DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2036  R$11,187.08
BOA VISTA BC 13,8 kV 3,6 Mvar BOA VISTA BC5 RR DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2036  R$11,187.08
BOA VISTA BC 13,8 kV 3,6 Mvar BOA VISTA BC10 RR DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2036  R$11,187.08
BOA VISTA BC 13,8 kV 3,6 Mvar BOA VISTA BC1 RR DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2036  R$11,187.08
BOA VISTA BC 13,8 kV 3,6 Mvar BOA VISTA BC2 RR DIT   058/2001 IPCA RCDM PRT 631/2022 06/04/2023 06/06/2036  R$11,187.08
C. MAGALHAES TR 138/13,8 kV C. MAGALHAES TR1 MT DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$202,046.07
C. MAGALHAES RTB 138 kV 5 Mvar C. MAGALHAES RT1 MT DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$148,228.30
C. MAGALHAES TR 138/13,8 kV C. MAGALHAES TR1 MT DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$84,922.78
C. MAGALHAES RTB 138 kV 5 Mvar C. MAGALHAES RT1 MT DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$352,660.93
C. MAGALHAES RTB 138 kV 5 Mvar C. MAGALHAES RT2 MT DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$148,228.30
C. MAGALHAES RTB 138 kV 5 Mvar C. MAGALHAES RT2 MT DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$352,660.93
C. MAGALHAES RTB 138 kV 5 Mvar C. MAGALHAES RT2 MT DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$290,462.15
C. MAGALHAES MG 138 kV C. MAGALHAES MG1 MT DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$366,521.44
C. MAGALHAES MC 138 kV TR 138/13,8 kV C. MAGALHAES TR1 MT  DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$121,674.23
C. MAGALHAES MC 138 kV RTB 138 kV 5 Mvar C. MAGALHAES RT2 MT DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$120,884.22
C. MAGALHAES MC 13,8 kV TR 138/13,8 kV C. MAGALHAES TR1 MT  DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$52,805.29
C. MAGALHAES EL 138 kV C. MAGALHAES LT 138 kV PARQUE EMAS /C. MAGALHAES C-1 GO/MT  DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$137,714.48
C. MAGALHAES MC 138 kV RTB 138 kV 5 Mvar C. MAGALHAES RT1 MT DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$120,884.22
C. MAGALHAES EL 138 kV C. MAGALHAES LT 138 kV C. MAGALHAES /RONDONOPOLIS C-1 MT DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$137,714.48
C. MAGALHAES EL 13,8 kV C. MAGALHAESDIST2 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$59,058.38
C. MAGALHAES EL 13,8 kV C. MAGALHAESDIST1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$59,058.38
CARAJAS MG 230 kV CARAJAS MG1 PA RB FT MG 230 kV CARAJAS MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$471,454.18
CARAJAS MC 230 kV BC 230 kV 30 MVAr CARAJAS BC1 PA  RB FT BC 230 kV 30 MVAr CARAJAS BC1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,037.95
CARAJAS IB 230 kV MG 230 kV CARAJAS MG1 PA IB1 RB FT MG 230 kV CARAJAS MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
CARAJAS EL 230 kV CARAJAS LT 230 kV CARAJAS /MARABA C-1 PA RB FT LT 230 kV CARAJAS /MARABA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
CARAJAS EL 230 kV CARAJAS LT 230 kV CARAJAS /INTEGRADORA C-2 PA  RB FT LT 230 kV CARAJAS /INTEGRADORA C-2 PA 058/2001 IPCA RBNI REA 4658/2014 02/09/2013 31/12/2042  R$309,087.78
CARAJAS EL 230 kV CARAJAS LT 230 kV CARAJAS /INTEGRADORA C-1 PA  DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
CARAJAS BC 230 kV 30 MVAr CARAJAS BC1 PA RB FT BC 230 kV 30 MVAr CARAJAS BC1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,448.19
CARAJAS EL 230 kV CARAJASCONS1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
CASTANHAL MG 230 kV CASTANHAL MG2 PA RB FT MG 230 kV CASTANHAL MG2 PA 058/2001 IPCA RBNI REA 2152/2009 19/11/2012 18/11/2033  R$603,261.52
CASTANHAL EL 230 kV CASTANHAL LT 230 kV UTINGA /CASTANHAL C-1 PA  RB FT LT 230 kV UTINGA /CASTANHAL C-1 PA 058/2001 IPCA RBNI REA 2152/2009 19/11/2012 18/11/2042  R$ 1,000,521.86
CASTANHAL EL 230 kV CASTANHAL LT 230 kV CASTANHAL /SANTA MARIA C-2 PA RB FT LT 230 kV CASTANHAL /SANTA MARIA C-2 PA 058/2001 IPCA RBNI REA 2152/2009 19/11/2012 18/11/2042  R$ 1,000,460.44
COELHO NETO RTL 230 kV 5 MVAr COELHO NETO RT2 MA RB FT RTL 230 kV 5 MVAr COELHO NETO RT2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$46,061.10
COELHO NETO RTL 230 kV 5 MVAr COELHO NETO RT2 MA RB FT RTL 230 kV 5 MVAr COELHO NETO RT2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$109,587.38
COELHO NETO TR 230/69 kV COELHO NETO TF2 MA RBF FT TR 230/69 kV COELHO NETO TF2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$339,729.29
COELHO NETO TR 230/69 kV COELHO NETO TF2 MA RBF FT TR 230/69 kV COELHO NETO TF2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$808,275.14
COELHO NETO TR 230/69 kV COELHO NETO TF2 MA RBF FT TR 230/69 kV COELHO NETO TF2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$666,265.35
COELHO NETO TR 230/69 kV COELHO NETO TF1 MA RBF FT TR 230/69 kV COELHO NETO TF1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$339,729.29
COELHO NETO TR 230/69 kV COELHO NETO TF1 MA RBF FT TR 230/69 kV COELHO NETO TF1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$808,275.14
COELHO NETO TR 230/69 kV COELHO NETO TF1 MA RBF FT TR 230/69 kV COELHO NETO TF1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$666,265.35
COELHO NETO RTL 230 kV 5 MVAr COELHO NETO RT2 MA RB FT RTL 230 kV 5 MVAr COELHO NETO RT2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$90,333.44
COELHO NETO RTL 230 kV 20 MVAr COELHO NETO RT1 MA RB FT RTL 230 kV 20 MVAr COELHO NETO RT1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$255,797.82
COELHO NETO MG 230 kV COELHO NETO MG1 MA RB FT MG 230 kV COELHO NETO MG1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$493,253.50
COELHO NETO MG 230 kV COELHO NETO MG1 MA RB FT MG 230 kV COELHO NETO MG1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,173,535.95
COELHO NETO MG 230 kV COELHO NETO MG1 MA RB FT MG 230 kV COELHO NETO MG1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$967,351.71
COELHO NETO MC 230 kV TR 230/69 kV COELHO NETO TF2 MA  RBF FT TR 230/69 kV COELHO NETO TF2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$173,033.12
COELHO NETO MC 230 kV TR 230/69 kV COELHO NETO TF1 MA RBF FT TR 230/69 kV COELHO NETO TF1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$173,033.12
COELHO NETO MC 230 kV TR 230/69 kV COELHO NETO TF1 MA RBF FT TR 230/69 kV COELHO NETO TF1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$411,675.93
COELHO NETO MC 230 kV TR 230/69 kV COELHO NETO TF1 MA RBF FT TR 230/69 kV COELHO NETO TF1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$339,346.58
COELHO NETO MC 230 kV RTL 230 kV 5 MVAr COELHO NETO RT2 MA  RB FT RTL 230 kV 5 MVAr COELHO NETO RT2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$108,600.16
COELHO NETO MC 230 kV RTL 230 kV 20 MVAr COELHO NETO RT1 MA  RB FT RTL 230 kV 20 MVAr COELHO NETO RT1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$108,600.16
COELHO NETO IB 230 kV MG 230 kV COELHO NETO MG1 MA IB1 RB FT MG 230 kV COELHO NETO MG1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$136,945.09
COELHO NETO EL 230 kV COELHO NETO LT 230 kV PERITORO /COELHO NETO C-1 MA  RB FT LT 230 kV PERITORO /COELHO NETO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$251,472.48
COELHO NETO EL 230 kV COELHO NETO LT 230 kV COELHO NETO /TERESINA C-1 MA/PI RB FT LT 230 kV COELHO NETO /TERESINA C-1 MA/PI 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$251,472.48
COLETORA PORTO VELHO TR 500/230 kV COLETORA PORTO VELHO TF13 RO RB FT TR 500/230 kV COLETORA PORTO VELHO TF13 RO 058/2001 IPCA RBNI DSP 553/2023 01/07/2023 13/06/2057  R$739,181.86
COLETORA PORTO VELHO MG 500 kV COLETORA PORTO VELHO MG4 RO RB FT MG 500 kV COLETORA PORTO VELHO MG4 RO 058/2001 IPCA RBNI DSP 553/2023 01/07/2023 13/06/2053  R$78,281.07
COLETORA PORTO VELHO MG 500 kV COLETORA PORTO VELHO MG1 RO RB FT MG 500 kV COLETORA PORTO VELHO MG1 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039  R$ 4,996,743.70
COLETORA PORTO VELHO MG 500 kV COLETORA PORTO VELHO MG4 RO RB FT MG 500 kV COLETORA PORTO VELHO MG4 RO 058/2001 IPCA RBNI DSP 553/2023 01/07/2023 13/06/2053  R$20,913.59
COLETORA PORTO VELHO MC 500 kV TR 500/230 kV COLETORA PORTO VELHO TF13 RO  RB FT TR 500/230 kV COLETORA PORTO VELHO TF13 RO 058/2001 IPCA RBNI DSP 553/2023 01/07/2023 13/06/2051  R$308,073.58
COLETORA PORTO VELHO MC 500 kV CV 600/600 kV COLETORA PORTO VELHO CC2 RO RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 01/04/2013 26/02/2039  R$689,439.82
COLETORA PORTO VELHO MC 500 kV CV 600/600 kV COLETORA PORTO VELHO CC1 RO RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 01/04/2013 26/02/2039  R$689,439.82
COLETORA PORTO VELHO MC 500 kV CV 500/230 kV COLETORA PORTO VELHO BTB2 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB2 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039  R$799,596.43
COLETORA PORTO VELHO MC 500 kV CV 500/230 kV COLETORA PORTO VELHO BTB1 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB1 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039  R$799,596.43
COLETORA PORTO VELHO MC 500 kV BF 500 kV 0 Mvar COLETORA PORTO VELHO FH51 RO RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 01/04/2013 26/02/2039  R$612,201.93
COLETORA PORTO VELHO MC 500 kV BF 500 kV 0 Mvar COLETORA PORTO VELHO FH41 RO RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 01/04/2013 26/02/2039  R$612,201.93
COLETORA PORTO VELHO MC 230 kV TR 500/230 kV COLETORA PORTO VELHO TF13 RO  RB FT TR 500/230 kV COLETORA PORTO VELHO TF13 RO 058/2001 IPCA RBNI DSP 553/2023 01/07/2023 13/06/2049  R$177,178.94
COLETORA PORTO VELHO MC 230 kV CV 500/230 kV COLETORA PORTO VELHO BTB2 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB2 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039  R$335,083.15
COLETORA PORTO VELHO MC 230 kV CV 500/230 kV COLETORA PORTO VELHO BTB1 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB1 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039  R$335,083.15
COLETORA PORTO VELHO MC 230 kV BF 230 kV 0 Mvar COLETORA PORTO VELHO FH74 RO  RB FT CV 500/230 kV COLETORA PORTO VELHO BTB2 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039  R$291,873.54
COLETORA PORTO VELHO MC 230 kV BF 230 kV 0 Mvar COLETORA PORTO VELHO FH73 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB2 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039  R$291,873.54
COLETORA PORTO VELHO MC 230 kV BF 230 kV 0 Mvar COLETORA PORTO VELHO FH72 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB1 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039  R$291,873.54
COLETORA PORTO VELHO MC 230 kV BF 230 kV 0 Mvar COLETORA PORTO VELHO FH71 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB1 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039  R$291,873.54
COLETORA PORTO VELHO IB 500 kV MG 500 kV COLETORA PORTO VELHO MG2 RO IB3 RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 01/04/2013 26/02/2039  R$265,642.31
COLETORA PORTO VELHO IB 500 kV MG 500 kV COLETORA PORTO VELHO MG2 RO IB2 RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 01/04/2013 26/02/2039  R$265,642.31
COLETORA PORTO VELHO IB 500 kV MG 500 kV COLETORA PORTO VELHO MG1 RO IB1 RB FT MG 500 kV COLETORA PORTO VELHO MG1 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039  R$308,085.84
COLETORA PORTO VELHO IB 230 kV MG 500 kV COLETORA PORTO VELHO MG1 RO IB1 RB FT MG 500 kV COLETORA PORTO VELHO MG1 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039  R$185,282.70
COLETORA PORTO VELHO EL 230 kV COLETORA PORTO VELHO LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-2 RO RB FT LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-2 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039  R$386,131.90
COLETORA PORTO VELHO EL 230 kV COLETORA PORTO VELHO LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-1 RO RB FT LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-1 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039  R$386,131.90
COLETORA PORTO VELHO CV 600/600 kV COLETORA PORTO VELHO CC2 RO RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 01/04/2013 26/02/2039  R$ 58,439,954.56
COLETORA PORTO VELHO CV 600/600 kV COLETORA PORTO VELHO CC1 RO RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 01/04/2013 26/02/2039  R$ 58,439,954.56
COLETORA PORTO VELHO CV 500/230 kV COLETORA PORTO VELHO BTB2 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB2 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039  R$ 32,742,703.05
COLETORA PORTO VELHO CV 500/230 kV COLETORA PORTO VELHO BTB1 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB1 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039  R$ 32,742,703.05
COLETORA PORTO VELHO BF 500 kV 0 Mvar COLETORA PORTO VELHO FH54 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB1 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039  R$ 2,902,315.25
COLETORA PORTO VELHO BF 500 kV 0 Mvar COLETORA PORTO VELHO FH51 RO RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 01/04/2013 26/02/2039  R$ 18,509,722.43
COLETORA PORTO VELHO BF 500 kV 0 Mvar COLETORA PORTO VELHO FH44 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB2 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039  R$ 5,804,630.50
COLETORA PORTO VELHO BF 500 kV 0 Mvar COLETORA PORTO VELHO FH41 RO RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 01/04/2013 26/02/2039  R$ 18,509,722.43
COLETORA PORTO VELHO BF 230 kV 0 Mvar COLETORA PORTO VELHO FH74 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB2 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039  R$ 2,176,737.68
COLETORA PORTO VELHO BF 230 kV 0 Mvar COLETORA PORTO VELHO FH73 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB2 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039  R$ 2,176,737.68
COLETORA PORTO VELHO BF 230 kV 0 Mvar COLETORA PORTO VELHO FH72 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB1 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039  R$ 2,176,737.68
COLETORA PORTO VELHO BF 230 kV 0 Mvar COLETORA PORTO VELHO FH71 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB1 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039  R$ 2,176,737.68
COLINAS RTL 500 kV 45,45 MVAr COLINAS RTR1 TO RB FT RTL 500 kV 45,45 MVAr COLINAS RTR1 TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$295,750.25
COLINAS RTL 500 kV 45,45 MVAr COLINAS RTR1 TO RB FT RTL 500 kV 45,45 MVAr COLINAS RTR1 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$703,641.34
COLINAS RTL 500 kV 45,45 MVAr COLINAS RTR1 TO RB FT RTL 500 kV 45,45 MVAr COLINAS RTR1 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$580,015.17
COLINAS RTL 500 kV 136 MVAr COLINAS RT2 TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$886,504.62
COLINAS RTL 500 kV 136 MVAr COLINAS RT2 TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,109,148.84
COLINAS RTL 500 kV 136 MVAr COLINAS RT2 TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,738,582.23
COLINAS RTL 500 kV 136 MVAr COLINAS RT1 TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$886,504.62
COLINAS RTL 500 kV 136 MVAr COLINAS RT1 TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,109,148.84
COLINAS RTL 500 kV 136 MVAr COLINAS RT1 TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,738,582.23
COLINAS RTB 500 kV 45,45 Mvar COLINAS RTR1 TO RB FT RTB 500 kV 45,45 Mvar COLINAS RTR1 TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$295,750.25
COLINAS RTB 500 kV 45,45 Mvar COLINAS RTR1 TO RB FT RTB 500 kV 45,45 Mvar COLINAS RTR1 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$703,641.34
COLINAS RTB 500 kV 45,45 Mvar COLINAS RTR1 TO RB FT RTB 500 kV 45,45 Mvar COLINAS RTR1 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$580,015.17
COLINAS RTB 500 kV 165 Mvar COLINAS RT4 TO RB FT RTB 500 kV 165 Mvar COLINAS RT4 TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$942,616.43
COLINAS RTB 500 kV 165 Mvar COLINAS RT4 TO RB FT RTB 500 kV 165 Mvar COLINAS RT4 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,242,648.60
COLINAS RTB 500 kV 165 Mvar COLINAS RT4 TO RB FT RTB 500 kV 165 Mvar COLINAS RT4 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,848,626.76
COLINAS MG 500 kV COLINAS MG2 TO RB FT MG 500 kV COLINAS MG2 TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,069,174.94
COLINAS MG 500 kV COLINAS MG2 TO RB FT MG 500 kV COLINAS MG2 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,543,753.34
COLINAS MG 500 kV COLINAS MG2 TO RB FT MG 500 kV COLINAS MG2 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,096,828.94
COLINAS MC 500 kV RTL 500 kV 136 MVAr COLINAS RT2 TO  RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$296,882.99
COLINAS MC 500 kV RTL 500 kV 136 MVAr COLINAS RT1 TO  RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$296,882.99
COLINAS MC 500 kV RTB 500 kV 165 Mvar COLINAS RT4 TO  RB FT RTB 500 kV 165 Mvar COLINAS RT4 TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$419,755.70
COLINAS IB 500 kV MG 500 kV COLINAS MG2 TO IB1 RB FT MG 500 kV COLINAS MG2 TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$520,028.84
COLINAS IB 500 kV MG 500 kV COLINAS MG2 TO IB1 RB FT MG 500 kV COLINAS MG2 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,237,239.15
COLINAS IB 500 kV MG 500 kV COLINAS MG2 TO IB1 RB FT MG 500 kV COLINAS MG2 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,019,862.59
COLINAS EL 500 kV COLINAS LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
COLINAS EL 500 kV COLINAS LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,320,962.73
COLINAS EL 500 kV COLINAS LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,088,876.36
COLINAS EL 500 kV COLINAS LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBNI REA 5861/2016 05/06/2019 04/06/2034  R$14,457.98
COLINAS EL 500 kV COLINAS LT 500 kV COLINAS /MIRACEMA C-1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
COLINAS EL 500 kV COLINAS LT 500 kV COLINAS /MIRACEMA C-1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,320,962.73
COLINAS EL 500 kV COLINAS LT 500 kV COLINAS /MIRACEMA C-1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,088,876.36
COLINAS EL 500 kV COLINAS LT 500 kV COLINAS /MIRACEMA C-1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBNI REA 5861/2016 03/06/2019 02/06/2034  R$14,457.98
COLINAS CR 500 kV 161 MVAr COLINAS BC2 TO RB FT CR 500 kV 161 MVAr COLINAS BC2 TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$648,445.03
COLINAS CR 500 kV 161 MVAr COLINAS BC2 TO RB FT CR 500 kV 161 MVAr COLINAS BC2 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,542,763.62
COLINAS CR 500 kV 161 MVAr COLINAS BC2 TO RB FT CR 500 kV 161 MVAr COLINAS BC2 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,271,707.98
COLINAS CR 500 kV 161 MVAr COLINAS BC1 TO RB FT CR 500 kV 161 MVAr COLINAS BC1 TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$648,445.03
COLINAS CR 500 kV 161 MVAr COLINAS BC1 TO RB FT CR 500 kV 161 MVAr COLINAS BC1 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,542,763.62
COLINAS CR 500 kV 161 MVAr COLINAS BC1 TO RB FT CR 500 kV 161 MVAr COLINAS BC1 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,271,707.98
COXIPO MC 230 kV TR 230/138 kV COXIPO TR5 MT  RBF FT TR 230/138 kV COXIPO TR5 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
COXIPO MC 230 kV TR 230/138 kV COXIPO TR3 MT RBF FT TR 230/138 kV COXIPO TR3 MT 058/2001 IPCA RBNI REA 5569/2015 01/10/2018 01/10/2042  R$740,372.85
COXIPO TR 230/138 kV COXIPO TRR2 MT RBF FT TR 230/138 kV COXIPO TRR2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$214,854.83
COXIPO TR 230/138 kV COXIPO TRR2 MT RBF FT TR 230/138 kV COXIPO TRR2 MT 058/2001 IPCA RBNI REA 8161/2019 13/09/2019 13/09/2044  R$105,542.17
COXIPO TR 230/138 kV COXIPO TRR1 MT RBF FT TR 230/138 kV COXIPO TRR1 MT 058/2001 IPCA RBNI REA 5569/2015 22/07/2019 22/07/2053  R$ 1,800,439.77
COXIPO TR 230/138 kV COXIPO TR5 MT RBF FT TR 230/138 kV COXIPO TR5 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$644,589.72
COXIPO TR 230/138 kV COXIPO TR4 MT RBF FT TR 230/138 kV COXIPO TR4 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$644,589.72
COXIPO TR 230/138 kV COXIPO TR3 MT RBF FT TR 230/138 kV COXIPO TR3 MT 058/2001 IPCA RBNI REA 5569/2015 01/10/2018 01/10/2052  R$ 1,763,120.11
COXIPO TR 230/138 kV COXIPO TR3 MT RBF FT TR 230/138 kV COXIPO TR3 MT 058/2001 IPCA RBNI REA 5569/2015 01/03/2019 01/03/2053  R$30,932.80
COXIPO TR 230/138 kV COXIPO TR2 MT RBF FT TR 230/138 kV COXIPO TR2 MT 058/2001 IPCA RBNI REA 5569/2015 28/05/2018 28/05/2052  R$ 1,791,816.63
COXIPO TR 230/138 kV COXIPO TR1 MT RBF FT TR 230/138 kV COXIPO TR1 MT 058/2001 IPCA RBNI REA 5569/2015 11/12/2017 10/12/2050  R$ 1,794,767.15
COXIPO TR 230/138 kV COXIPO TR1 MT RBF FT TR 230/138 kV COXIPO TR1 MT 058/2001 IPCA RBNI REA 5569/2015 01/10/2018 01/10/2052  R$28,762.38
COXIPO TR 230/12,3 kV COXIPO TF1 MT RB FT CE 70/-50 MvAr COXIPO CE1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$353,141.20
COXIPO TR 230/12,3 kV COXIPO TF1 MT RB FT CE 70/-50 MvAr COXIPO CE1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$840,184.39
COXIPO TR 230/12,3 kV COXIPO TF1 MT RB FT CE 70/-50 MvAr COXIPO CE1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$692,568.31
COXIPO RTL 230 kV 30 Mvar COXIPO RT2 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$341,233.25
COXIPO RTL 230 kV 30 MVAr COXIPO RT1 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$427,565.57
COXIPO RTL 230 kV 30 MVAr COXIPO RT1 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,017,252.94
COXIPO RTL 230 kV 30 MVAr COXIPO RT1 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$838,526.82
COXIPO RTL 138 kV 5 Mvar COXIPO RT2 MT DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$148,228.30
COXIPO RTL 138 kV 5 Mvar COXIPO RT2 MT DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$352,660.93
COXIPO RTL 138 kV 5 Mvar COXIPO RT2 MT DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$290,462.15
COXIPO RTL 138 kV 5 Mvar COXIPO RT1 MT DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$148,228.30
COXIPO RTL 138 kV 5 Mvar COXIPO RT1 MT DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$352,660.93
COXIPO RTL 138 kV 5 Mvar COXIPO RT1 MT DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$290,462.15
COXIPO MG 230 kV COXIPO MG1 MT RB FT MG 230 kV COXIPO MG1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$957,300.35
COXIPO MG 230 kV COXIPO MG1 MT RB FT MG 230 kV COXIPO MG1 MT 058/2001 IPCA RBNI REA 5569/2015 11/12/2017 10/12/2045  R$211,441.11
COXIPO MG 230 kV COXIPO MG1 MT RB FT MG 230 kV COXIPO MG1 MT 058/2001 IPCA RBNI REA 5569/2015 11/12/2017 10/12/2045  R$133,151.59
COXIPO MG 230 kV COXIPO MG1 MT RB FT MG 230 kV COXIPO MG1 MT 058/2001 IPCA RBNI REA 8348/2019 15/02/2022 15/02/2053  R$323,309.96
COXIPO MG 230 kV COXIPO MG1 MT RB FT MG 230 kV COXIPO MG1 MT 058/2001 IPCA RBNI DSP 1422/2021 26/01/2022 25/01/2052  R$11,224.17
COXIPO MG 230 kV COXIPO MG1 MT RB FT MG 230 kV COXIPO MG1 MT 058/2001 IPCA RBNI DSP 1422/2021 25/01/2022 24/01/2052  R$11,223.79
COXIPO MG 230 kV COXIPO MG1 MT RB FT MG 230 kV COXIPO MG1 MT 058/2001 IPCA RBNI DSP 1422/2021 27/01/2022 26/01/2050  R$126,682.07
COXIPO MC 138 kV TR 230/138 kV COXIPO TR2 MT  RBF FT TR 230/138 kV COXIPO TR2 MT 058/2001 IPCA RBNI REA 5569/2015 28/05/2018 28/05/2040  R$573,067.95
COXIPO MC 230 kV TR 230/138 kV COXIPO TR4 MT RBF FT TR 230/138 kV COXIPO TR4 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
COXIPO MC 138 kV TR 230/138 kV COXIPO TR1 MT RBF FT TR 230/138 kV COXIPO TR1 MT 058/2001 IPCA RBNI REA 5569/2015 11/12/2017 10/12/2047  R$918,652.47
COXIPO MC 230 kV TR 230/138 kV COXIPO TR3 MT RBF FT TR 230/138 kV COXIPO TR3 MT 058/2001 IPCA RBNI REA 5569/2015 01/03/2019 01/03/2042  R$31,280.23
COXIPO MC 230 kV TR 230/138 kV COXIPO TR2 MT  RBF FT TR 230/138 kV COXIPO TR2 MT 058/2001 IPCA RBNI REA 5569/2015 28/05/2018 28/05/2041  R$770,235.33
COXIPO MC 230 kV TR 230/138 kV COXIPO TR1 MT RBF FT TR 230/138 kV COXIPO TR1 MT 058/2001 IPCA RBNI REA 5569/2015 11/12/2017 10/12/2047  R$ 1,147,680.29
COXIPO MC 230 kV TR 230/138 kV COXIPO TR1 MT RBF FT TR 230/138 kV COXIPO TR1 MT 058/2001 IPCA RBNI REA 5569/2015 01/10/2018 01/10/2042  R$31,164.23
COXIPO MC 230 kV TR 230/12,3 kV COXIPO TF1 MT RB FT CE 70/-50 MvAr COXIPO CE1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
COXIPO MC 230 kV TR 230/12,3 kV COXIPO TF1 MT RB FT CE 70/-50 MvAr COXIPO CE1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$432,295.55
COXIPO MC 138 kV TR 230/138 kV COXIPO TR5 MT  RBF FT TR 230/138 kV COXIPO TR5 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,205.57
COXIPO MC 138 kV TR 230/138 kV COXIPO TR4 MT RBF FT TR 230/138 kV COXIPO TR4 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$143,205.57
COXIPO MC 138 kV TR 230/138 kV COXIPO TR4 MT RBF FT TR 230/138 kV COXIPO TR4 MT 058/2001 IPCA RBNI REA 5569/2015 09/04/2018 09/04/2051  R$42,967.72
COXIPO MC 138 kV TR 230/138 kV COXIPO TR3 MT RBF FT TR 230/138 kV COXIPO TR3 MT 058/2001 IPCA RBNI REA 5569/2015 01/10/2018 01/10/2040  R$618,199.54
COXIPO MC 138 kV TR 230/138 kV COXIPO TR3 MT RBF FT TR 230/138 kV COXIPO TR3 MT 058/2001 IPCA RBNI REA 5569/2015 01/03/2019 01/03/2041  R$29,518.23
COXIPO MC 138 kV TR 230/138 kV COXIPO TR1 MT RBF FT TR 230/138 kV COXIPO TR1 MT 058/2001 IPCA RBNI REA 5569/2015 01/10/2018 01/10/2040  R$29,344.36
COXIPO MC 138 kV RTL 138 kV 5 Mvar COXIPO RT2 MT  DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$81,636.81
COXIPO MC 138 kV RTL 138 kV 5 Mvar COXIPO RT1 MT  DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$81,636.81
COXIPO MC 138 kV BC 138 kV 35,00 Mvar COXIPO BCD3 MT DIT   058/2001 IPCA RCDM REA 8348/2019 15/02/2022 15/02/2050  R$788,923.79
COXIPO MC 138 kV BC 138 kV 35,00 Mvar COXIPO BCD2 MT DIT   058/2001 IPCA RCDM REA 8348/2019 15/02/2022 15/02/2050  R$788,923.79
COXIPO MC 138 kV BC 138 kV 35,00 Mvar COXIPO BCD1 MT DIT   058/2001 IPCA RCDM REA 8348/2019 15/02/2022 15/02/2050  R$788,923.79
COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC9 MT  RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC9 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$85,400.06
COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC9 MT  RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC9 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$203,181.60
COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC8 MT  RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC8 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$85,400.06
COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC8 MT  RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC8 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$203,181.60
COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC7 MT  RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC7 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$85,400.06
COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC7 MT  RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC7 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$203,181.60
COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC6 MT  RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC6 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$85,400.06
COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC5 MT  RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC5 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$85,400.06
COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC4 MT  RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC4 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$85,400.06
COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC3 MT  RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC3 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$85,400.06
COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC2 MT  RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$85,400.06
COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC1 MT  RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$85,400.06
COXIPO IB 230 kV MG 230 kV COXIPO MG1 MT IB1 RB FT MG 230 kV COXIPO MG1 MT 058/2001 IPCA RBNI REA 5569/2015 22/11/2017 21/11/2048  R$421,337.50
COXIPO IB 138 kV MG 230 kV COXIPO MG1 MT IB1 DIT   058/2001 IPCA RCDM REA 5569/2015 07/02/2018 07/02/2039  R$339,897.18
COXIPO IB 138 kV MG 230 kV COXIPO MG1 MT IB1 DIT   058/2001 IPCA RCDM REA 5569/2015 07/02/2018 07/02/2058  R$61,555.25
COXIPO EL 230 kV COXIPO LT 230 kV VARZEA GRANDE /COXIPO C-2 MT  RB FT LT 230 kV VARZEA GRANDE /COXIPO C-2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
COXIPO EL 230 kV COXIPO LT 230 kV VARZEA GRANDE /COXIPO C-2 MT  RB FT LT 230 kV VARZEA GRANDE /COXIPO C-2 MT 058/2001 IPCA RBNI REA 4967/2014 21/06/2016 20/06/2044  R$141,098.90
COXIPO EL 230 kV COXIPO LT 230 kV VARZEA GRANDE /COXIPO C-1 MT  RB FT LT 230 kV VARZEA GRANDE /COXIPO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
COXIPO EL 230 kV COXIPO LT 230 kV RONDONOPOLIS /COXIPO C-2 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
COXIPO EL 230 kV COXIPO LT 230 kV RONDONOPOLIS /COXIPO C-2 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$614,190.55
COXIPO EL 230 kV COXIPO LT 230 kV RONDONOPOLIS /COXIPO C-1 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
COXIPO EL 230 kV COXIPO LT 230 kV COXIPO /NOBRES C-1 MT  RB FT LT 230 kV COXIPO /NOBRES C-1 MT 058/2001 IPCA RBNI REA 2384/2010 20/12/2012 19/12/2037  R$91,664.72
COXIPO EL 230 kV COXIPO LT 230 kV COXIPO /NOBRES C-1 MT  RB FT LT 230 kV COXIPO /NOBRES C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
COXIPO EL 230 kV COXIPO LT 230 kV COXIPO /NOBRES C-1 MT  RB FT LT 230 kV COXIPO /NOBRES C-1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$614,190.55
COXIPO EL 230 kV COXIPO LT 230 kV COXIPO /NOBRES C-1 MT  RB FT LT 230 kV COXIPO /NOBRES C-1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$506,280.43
COXIPO EL 138 kV COXIPODIST6 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$209,149.49
COXIPO EL 138 kV COXIPODIST5 DIT   058/2001 IPCA RCDM REA 5569/2015 06/02/2018 06/02/2048  R$43,067.66
COXIPO EL 138 kV COXIPODIST4 DIT   058/2001 IPCA RCDM REA 5569/2015 06/02/2018 06/02/2049  R$81,317.04
COXIPO EL 138 kV COXIPODIST6 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$497,603.06
COXIPO EL 138 kV COXIPODIST6 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$409,840.85
COXIPO EL 138 kV COXIPODIST5 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$209,149.49
COXIPO EL 138 kV COXIPODIST4 DIT   058/2001 IPCA RMEL REN 443/2011 26/11/2017 25/11/2047  R$11,640.05
COXIPO EL 138 kV COXIPODIST5 DIT   058/2001 IPCA RCDM REA 8161/2019 13/09/2019 13/09/2034  R$41,877.66
COXIPO EL 138 kV COXIPODIST4 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$209,149.49
COXIPO EL 138 kV COXIPODIST3 DIT   058/2001 IPCA RCDM REA 8161/2019 13/09/2019 13/09/2034  R$41,877.66
COXIPO EL 138 kV COXIPODIST4 DIT   058/2001 IPCA RCDM REA 5569/2015 06/02/2018 06/02/2048  R$43,067.66
COXIPO EL 138 kV COXIPODIST4 DIT   058/2001 IPCA RMEL REN 443/2011 26/11/2017 25/11/2047  R$11,640.05
COXIPO EL 138 kV COXIPODIST4 DIT   058/2001 IPCA RMEL REN 443/2011 26/11/2017 25/11/2047  R$11,640.05
COXIPO EL 138 kV COXIPODIST2 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$209,149.49
COXIPO EL 138 kV COXIPODIST4 DIT   058/2001 IPCA RCDM REA 8161/2019 13/09/2019 13/09/2034  R$41,877.66
COXIPO EL 138 kV COXIPODIST3 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$209,149.49
COXIPO EL 138 kV COXIPODIST3 DIT   058/2001 IPCA RCDM REA 5569/2015 06/02/2018 06/02/2049  R$81,317.04
COXIPO EL 138 kV COXIPODIST3 DIT   058/2001 IPCA RCDM REA 5569/2015 06/02/2018 06/02/2048  R$43,067.66
COXIPO EL 138 kV COXIPODIST2 DIT   058/2001 IPCA RCDM REA 5569/2015 06/02/2018 06/02/2049  R$81,317.04
COXIPO EL 138 kV COXIPODIST2 DIT   058/2001 IPCA RCDM REA 5569/2015 06/02/2018 06/02/2048  R$43,067.66
COXIPO EL 138 kV COXIPODIST2 DIT   058/2001 IPCA RCDM REA 8161/2019 13/09/2019 13/09/2034  R$41,877.66
COXIPO EL 138 kV COXIPODIST1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$209,149.49
COXIPO CE 70/-50 MvAr COXIPO CE1 MT RB FT CE 70/-50 MvAr COXIPO CE1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,160,714.69
COXIPO CE 70/-50 MvAr COXIPO CE1 MT RB FT CE 70/-50 MvAr COXIPO CE1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,237,518.98
COXIPO EL 138 kV COXIPODIST1 DIT   058/2001 IPCA RCDM REA 5569/2015 06/02/2018 06/02/2049  R$81,317.04
COXIPO EL 138 kV COXIPODIST1 DIT   058/2001 IPCA RCDM REA 8161/2019 13/09/2019 13/09/2034  R$41,877.66
COXIPO EL 13,8 kV COXIPODIST8 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$59,058.38
COXIPO EL 13,8 kV COXIPODIST7 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$59,058.38
COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC9 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC9 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$62,586.18
COXIPO CE 70/-50 MvAr COXIPO CE1 MT RB FT CE 70/-50 MvAr COXIPO CE1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,140,716.46
COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC9 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC9 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$148,903.41
COXIPO BC 138 kV 35,00 Mvar COXIPO BCD3 MT DIT   058/2001 IPCA RCDM REA 8348/2019 15/02/2022 15/02/2044  R$310,586.48
COXIPO BC 138 kV 35,00 Mvar COXIPO BCD2 MT DIT   058/2001 IPCA RCDM REA 8348/2019 15/02/2022 15/02/2044  R$310,586.48
COXIPO BC 138 kV 35,00 Mvar COXIPO BCD1 MT DIT   058/2001 IPCA RCDM REA 8348/2019 15/02/2022 15/02/2044  R$310,586.48
COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC9 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC9 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$122,741.85
COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC8 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC8 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$62,586.18
COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC6 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC6 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$62,586.18
COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC5 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC5 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$62,586.18
COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC8 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC8 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$148,903.41
COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC8 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC8 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$122,741.85
COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC7 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC7 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$62,586.18
COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC7 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC7 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$148,903.41
COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC7 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC7 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$122,741.85
COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC5 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC5 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$122,741.85
COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC6 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC6 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$148,903.41
COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC6 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC6 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$122,741.85
COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC4 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC4 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$62,586.18
COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC5 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC5 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$148,903.41
COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC4 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC4 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$148,903.41
COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC4 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC4 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$122,741.85
COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC2 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC2 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$122,741.85
COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC3 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC3 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$62,586.18
COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC3 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC3 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$148,903.41
COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC3 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC3 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$122,741.85
COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC2 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$62,586.18
COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC2 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC2 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$148,903.41
COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC1 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$62,586.18
COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC1 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$148,903.41
COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC1 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$122,741.85
CVRD EL 230 kV CVRD LT 230 kV CVRD /SAO LUIS II C-1 PA/MA DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$251,472.48
CVRD EL 230 kV CVRD LT 230 kV CVRD /SAO LUIS II C-1 PA/MA DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$598,296.81
CVRD EL 230 kV CVRD LT 230 kV CVRD /SAO LUIS II C-1 PA/MA DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$492,775.25
GUAMA TR 230/69 kV GUAMA TRR1 PA RBF FT TR 230/69 kV GUAMA TRR1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$238,402.24
GUAMA TR 230/69 kV GUAMA TRR1 PA RBF FT TR 230/69 kV GUAMA TRR1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$567,200.44
GUAMA TR 230/69 kV GUAMA TR3 PA RBF FT TR 230/69 kV GUAMA TR3 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$715,206.72
GUAMA TR 230/69 kV GUAMA TR2 PA RBF FT TR 230/69 kV GUAMA TR2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$715,206.72
GUAMA TR 230/69 kV GUAMA TR2 PA RBF FT TR 230/69 kV GUAMA TR2 PA 058/2001 IPCA RMEL REA 2837/2011 03/03/2013 02/03/2048  R$44,600.15
GUAMA TR 230/69 kV GUAMA TR2 PA RBF FT TR 230/69 kV GUAMA TR2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,701,601.31
GUAMA TR 230/69 kV GUAMA TR2 PA RBF FT TR 230/69 kV GUAMA TR2 PA 058/2001 IPCA RMEL REN 443/2011 13/11/2016 12/11/2030  R$69,785.22
GUAMA TR 230/69 kV GUAMA TR1 PA RBF FT TR 230/69 kV GUAMA TR1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$715,206.72
GUAMA TR 230/69 kV GUAMA TR1 PA RBF FT TR 230/69 kV GUAMA TR1 PA 058/2001 IPCA RMEL REA 2837/2011 03/03/2013 02/03/2047  R$56,026.17
GUAMA TR 230/69 kV GUAMA TR1 PA RBF FT TR 230/69 kV GUAMA TR1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,701,601.31
GUAMA MG 230 kV GUAMA MG1 PA RB FT MG 230 kV GUAMA MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$652,271.21
GUAMA MG 230 kV GUAMA MG1 PA RB FT MG 230 kV GUAMA MG1 PA 058/2001 IPCA RMEL REN 643/2014 31/10/2014 30/10/2044  R$16,336.74
GUAMA MG 230 kV GUAMA MG1 PA RB FT MG 230 kV GUAMA MG1 PA 058/2001 IPCA RMEL REN 643/2014 18/12/2014 17/12/2044  R$16,399.59
GUAMA MC 69 kV TR 230/69 kV GUAMA TR3 PA RBF FT TR 230/69 kV GUAMA TR3 PA 058/2001 IPCA RBNI REA 539/2006 03/02/2014 02/02/2043  R$79,693.13
GUAMA MC 69 kV TR 230/69 kV GUAMA TR2 PA  RBF FT TR 230/69 kV GUAMA TR2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$66,390.50
GUAMA MC 69 kV TR 230/69 kV GUAMA TR1 PA  RBF FT TR 230/69 kV GUAMA TR1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$66,390.50
GUAMA MC 230 kV TR 230/69 kV GUAMA TR3 PA RBF FT TR 230/69 kV GUAMA TR3 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,482.24
GUAMA MC 230 kV TR 230/69 kV GUAMA TR2 PA  RBF FT TR 230/69 kV GUAMA TR2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,482.24
GUAMA MC 230 kV TR 230/69 kV GUAMA TR1 PA  RBF FT TR 230/69 kV GUAMA TR1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,482.24
GUAMA MC 230 kV BC 230 kV 55 Mvar GUAMA BC2 PA  RB FT BC 230 kV 55 Mvar GUAMA BC2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$213,621.98
GUAMA MC 230 kV BC 230 kV 55 Mvar GUAMA BC1 PA  RB FT BC 230 kV 55 Mvar GUAMA BC1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$213,621.98
GUAMA IB 230 kV MG 230 kV GUAMA MG1 PA IB1 RB FT MG 230 kV GUAMA MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
GUAMA EL 230 kV GUAMA LT 230 kV VILA DO CONDE /GUAMA C-2 PA RB FT LT 230 kV VILA DO CONDE /GUAMA C-2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$267,055.89
GUAMA EL 230 kV GUAMA LT 230 kV VILA DO CONDE /GUAMA C-1 PA RB FT LT 230 kV VILA DO CONDE /GUAMA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$267,055.89
GUAMA EL 230 kV GUAMA LT 230 kV VILA DO CONDE /GUAMA C-1 PA RB FT LT 230 kV VILA DO CONDE /GUAMA C-1 PA 058/2001 IPCA RMEL REN 643/2014 27/07/2014 26/07/2044  R$48,633.14
GUAMA EL 230 kV GUAMA LT 230 kV GUAMA /MARITUBA C-2 PA  RB FT LT 230 kV GUAMA /UTINGA C-2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$267,055.89
GUAMA EL 230 kV GUAMA LT 230 kV GUAMA /MARITUBA C-2 PA  RB FT LT 230 kV GUAMA /UTINGA C-2 PA 058/2001 IPCA RMEL REN 643/2014 14/10/2015 13/10/2045  R$50,377.11
GUAMA EL 230 kV GUAMA LT 230 kV GUAMA /MARITUBA C-1 PA  RB FT LT 230 kV GUAMA /MARITUBA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$267,055.89
GUAMA EL 230 kV GUAMA LT 230 kV GUAMA /MARITUBA C-1 PA  RB FT LT 230 kV GUAMA /MARITUBA C-1 PA 058/2001 IPCA RMEL REN 643/2014 14/09/2014 13/09/2044  R$48,825.60
GUAMA BC 230 kV 55 Mvar GUAMA BC2 PA RB FT BC 230 kV 55 Mvar GUAMA BC2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$234,761.43
GUAMA BC 230 kV 55 Mvar GUAMA BC1 PA RB FT BC 230 kV 55 Mvar GUAMA BC1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$234,761.43
IMPERATRIZ CS 100/-70 Mvar IMPERATRIZ CS3 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS3 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,652,892.11
IMPERATRIZ CS 100/-70 Mvar IMPERATRIZ CS3 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS3 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,011,097.73
IMPERATRIZ TT 69/0 kV IMPERATRIZ TT1 MA DIT   058/2001 IPCA RCDM REN 443/2011 28/11/2019 27/11/2049  R$282,702.52
IMPERATRIZ TR 500/230 kV IMPERATRIZ TRR1 MA RB FT TR 500/230 kV IMPERATRIZ TRR1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$735,889.36
IMPERATRIZ TR 500/230 kV IMPERATRIZ TRR1 MA RB FT TR 500/230 kV IMPERATRIZ TRR1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,750,808.91
IMPERATRIZ TR 500/230 kV IMPERATRIZ TR2 MA RB FT TR 500/230 kV IMPERATRIZ TR2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,005,356.45
IMPERATRIZ TR 500/230 kV IMPERATRIZ TR2 MA RB FT TR 500/230 kV IMPERATRIZ TR2 MA 058/2001 IPCA RMEL REN 443/2011 18/02/2017 17/02/2031  R$25,685.69
IMPERATRIZ TR 500/230 kV IMPERATRIZ TR1 MA RB FT TR 500/230 kV IMPERATRIZ TR1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,207,668.08
IMPERATRIZ TR 500/230 kV IMPERATRIZ TR1 MA RB FT TR 500/230 kV IMPERATRIZ TR1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,252,426.74
IMPERATRIZ TR 500/230 kV IMPERATRIZ TR1 MA RB FT TR 500/230 kV IMPERATRIZ TR1 MA 058/2001 IPCA RMEL REN 443/2011 04/05/2017 03/05/2031  R$25,757.21
IMPERATRIZ TR 230/69 kV IMPERATRIZ TF5 MA RBF FT TR 230/69 kV IMPERATRIZ TF5 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$417,691.47
IMPERATRIZ TR 230/69 kV IMPERATRIZ TF4 MA RBF FT TR 230/69 kV IMPERATRIZ TF4 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$417,691.47
IMPERATRIZ TR 230/69 kV IMPERATRIZ TF4 MA RBF FT TR 230/69 kV IMPERATRIZ TF4 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$993,760.73
IMPERATRIZ TR 230/69 kV IMPERATRIZ TF4 MA RBF FT TR 230/69 kV IMPERATRIZ TF4 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$819,162.08
IMPERATRIZ TR 230/69 kV IMPERATRIZ TF3 MA RBF FT TR 230/69 kV IMPERATRIZ TF3 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$417,691.47
IMPERATRIZ TR 230/13,8 kV IMPERATRIZ TF2 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS3 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$748,861.82
IMPERATRIZ TR 230/13,8 kV IMPERATRIZ TF2 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS3 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,781,672.66
IMPERATRIZ TR 230/13,8 kV IMPERATRIZ TF2 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS3 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,468,641.93
IMPERATRIZ TR 230/13,8 kV IMPERATRIZ TF2 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS3 MA 058/2001 IPCA RMEL REN 443/2011 19/01/2017 18/01/2031  R$20,162.80
IMPERATRIZ TR 230/13,8 kV IMPERATRIZ TF1 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$748,861.82
IMPERATRIZ TR 230/13,8 kV IMPERATRIZ TF1 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,781,672.66
IMPERATRIZ TR 230/13,8 kV IMPERATRIZ TF1 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,468,641.93
IMPERATRIZ RTN 69 kV 0 Mvar IMPERATRIZ RN4 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$16,313.10
IMPERATRIZ RTN 69 kV 0 Mvar IMPERATRIZ RN2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$16,313.10
IMPERATRIZ RTN 69 kV 0 Mvar IMPERATRIZ RN12 MA RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$16,313.10
IMPERATRIZ RTL 500 kV 45,45 Mvar IMPERATRIZ RTR6 MA RB FT RTL 500 kV 45,45 Mvar IMPERATRIZ RTR6 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$295,750.25
IMPERATRIZ RTL 500 kV 45,45 Mvar IMPERATRIZ RTR6 MA RB FT RTL 500 kV 45,45 Mvar IMPERATRIZ RTR6 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$703,641.34
IMPERATRIZ RTL 500 kV 45,45 Mvar IMPERATRIZ RTR6 MA RB FT RTL 500 kV 45,45 Mvar IMPERATRIZ RTR6 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$580,015.17
IMPERATRIZ RTL 500 kV 45,3 Mvar IMPERATRIZ RTR5 MA RB FT RTL 500 kV 45,3 Mvar IMPERATRIZ RTR5 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$295,430.36
IMPERATRIZ RTL 500 kV 45,3 Mvar IMPERATRIZ RTR5 MA RB FT RTL 500 kV 45,3 Mvar IMPERATRIZ RTR5 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$702,880.27
IMPERATRIZ RTL 500 kV 45,3 Mvar IMPERATRIZ RTR5 MA RB FT RTL 500 kV 45,3 Mvar IMPERATRIZ RTR5 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$579,387.82
IMPERATRIZ RTL 500 kV 33,3 Mvar IMPERATRIZ RTR4 MA RB FT RTL 500 kV 33,3 Mvar IMPERATRIZ RTR4 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,650.70
IMPERATRIZ RTL 500 kV 33,3 Mvar IMPERATRIZ RTR4 MA RB FT RTL 500 kV 33,3 Mvar IMPERATRIZ RTR4 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$632,029.26
IMPERATRIZ RTL 500 kV 33,3 Mvar IMPERATRIZ RTR4 MA RB FT RTL 500 kV 33,3 Mvar IMPERATRIZ RTR4 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$520,984.97
IMPERATRIZ RTL 500 kV 150 Mvar IMPERATRIZ RT2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$914,948.10
IMPERATRIZ RTL 500 kV 150 Mvar IMPERATRIZ RT2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,176,820.84
IMPERATRIZ RTL 500 kV 150 Mvar IMPERATRIZ RT2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,794,364.60
IMPERATRIZ RTL 500 kV 150 Mvar IMPERATRIZ RT2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RMEL REN 443/2011 02/09/2017 01/09/2031  R$17,090.91
IMPERATRIZ RTL 500 kV 150 Mvar IMPERATRIZ RT1 MA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$914,948.10
IMPERATRIZ RTL 500 kV 150 Mvar IMPERATRIZ RT1 MA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,176,820.84
IMPERATRIZ RTL 500 kV 150 Mvar IMPERATRIZ RT1 MA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,794,364.60
IMPERATRIZ RTL 500 kV 150 Mvar IMPERATRIZ RT1 MA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RMEL REN 443/2011 20/01/2017 19/01/2031  R$16,832.00
IMPERATRIZ RTL 500 kV 136 Mvar IMPERATRIZ RT4 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$886,504.62
IMPERATRIZ RTL 500 kV 136 Mvar IMPERATRIZ RT4 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,109,148.84
IMPERATRIZ RTL 500 kV 136 Mvar IMPERATRIZ RT4 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,738,582.23
IMPERATRIZ RTL 500 kV 136 Mvar IMPERATRIZ RT12 MA RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$886,504.62
IMPERATRIZ RTL 500 kV 136 Mvar IMPERATRIZ RT12 MA RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,109,148.84
IMPERATRIZ RTL 500 kV 136 Mvar IMPERATRIZ RT12 MA RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,738,582.23
IMPERATRIZ RTL 500 kV 136 Mvar IMPERATRIZ RT12 MA RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RMEL REN 443/2011 04/06/2017 03/06/2031  R$16,994.43
IMPERATRIZ RTL 500 kV 100 Mvar IMPERATRIZ RT3 MA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$797,242.53
IMPERATRIZ RTL 500 kV 100 Mvar IMPERATRIZ RT3 MA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,896,778.80
IMPERATRIZ RTL 500 kV 100 Mvar IMPERATRIZ RT3 MA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,563,524.51
IMPERATRIZ RTB 500 kV 54,4 Mvar IMPERATRIZ RTR14 MA RB FT RTB 500 kV 54,4 Mvar IMPERATRIZ RTR14 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$313,144.05
IMPERATRIZ RTB 500 kV 45,3 Mvar IMPERATRIZ RTR6 MA RB FT RTB 500 kV 45,3 Mvar IMPERATRIZ RTR6 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$295,430.36
IMPERATRIZ RTB 500 kV 165 Mvar IMPERATRIZ RT14 MA RB FT RTB 500 kV 165 Mvar IMPERATRIZ RT14 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$942,616.43
IMPERATRIZ RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA RB FT RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$942,616.43
IMPERATRIZ RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA RB FT RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,242,648.60
IMPERATRIZ RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA RB FT RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,848,626.76
IMPERATRIZ RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA RB FT RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA 058/2001 IPCA RMEL REN 443/2011 20/01/2017 19/01/2031  R$16,832.00
IMPERATRIZ RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA RB FT RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$886,504.62
IMPERATRIZ RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA RB FT RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,109,148.84
IMPERATRIZ RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA RB FT RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,738,582.23
IMPERATRIZ MG 500 kV IMPERATRIZ MG2 MA RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,712,233.03
IMPERATRIZ MG 500 kV IMPERATRIZ MG2 MA RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBNI REA 2040/2009 29/06/2017 28/06/2045  R$55,916.91
IMPERATRIZ MG 500 kV IMPERATRIZ MG2 MA RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBNI REN 443/2011 27/10/2017 26/10/2045  R$56,380.86
IMPERATRIZ MC 69 kV TR 230/69 kV IMPERATRIZ TF5 MA RBF FT TR 230/69 kV IMPERATRIZ TF5 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$74,117.78
IMPERATRIZ MC 69 kV TR 230/69 kV IMPERATRIZ TF4 MA RBF FT TR 230/69 kV IMPERATRIZ TF4 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$74,117.78
IMPERATRIZ MC 69 kV TR 230/69 kV IMPERATRIZ TF3 MA RBF FT TR 230/69 kV IMPERATRIZ TF3 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$74,117.78
IMPERATRIZ MC 69 kV TR 230/69 kV IMPERATRIZ TF3 MA RBF FT TR 230/69 kV IMPERATRIZ TF3 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$176,339.10
IMPERATRIZ MC 69 kV TR 230/69 kV IMPERATRIZ TF3 MA RBF FT TR 230/69 kV IMPERATRIZ TF3 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$145,357.23
IMPERATRIZ MC 69 kV RTN 69 kV 0 Mvar IMPERATRIZ RN4 MA  RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$11,080.96
IMPERATRIZ MC 69 kV RTN 69 kV 0 Mvar IMPERATRIZ RN2 MA  RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$11,080.96
IMPERATRIZ MC 69 kV RTN 69 kV 0 Mvar IMPERATRIZ RN12 MA  RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$11,080.96
IMPERATRIZ MC 500 kV TR 500/230 kV IMPERATRIZ TR2 MA RB FT TR 500/230 kV IMPERATRIZ TR2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$490,032.13
IMPERATRIZ MC 500 kV TR 500/230 kV IMPERATRIZ TR1 MA RB FT TR 500/230 kV IMPERATRIZ TR1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$490,032.13
IMPERATRIZ MC 500 kV RTL 500 kV 150 Mvar IMPERATRIZ RT2 MA  RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$296,882.99
IMPERATRIZ MC 500 kV RTL 500 kV 150 Mvar IMPERATRIZ RT1 MA  RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$296,882.99
IMPERATRIZ MC 500 kV RTL 500 kV 136 Mvar IMPERATRIZ RT4 MA  RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$296,882.99
IMPERATRIZ MC 500 kV RTL 500 kV 136 Mvar IMPERATRIZ RT12 MA  RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$296,882.99
IMPERATRIZ MC 500 kV RTL 500 kV 100 Mvar IMPERATRIZ RT3 MA  RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$296,882.99
IMPERATRIZ MC 500 kV RTB 500 kV 165 Mvar IMPERATRIZ RT14 MA  RB FT RTB 500 kV 165 Mvar IMPERATRIZ RT14 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$296,882.99
IMPERATRIZ MC 500 kV RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA  RB FT RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$458,814.80
IMPERATRIZ MC 500 kV RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA  RB FT RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,091,600.28
IMPERATRIZ MC 500 kV RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA  RB FT RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$899,811.72
IMPERATRIZ MC 500 kV RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA  RB FT RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$458,814.80
IMPERATRIZ MC 500 kV RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA  RB FT RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,091,600.28
IMPERATRIZ MC 230 kV TR 500/230 kV IMPERATRIZ TR2 MA RB FT TR 500/230 kV IMPERATRIZ TR2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,482.24
IMPERATRIZ MC 230 kV TR 500/230 kV IMPERATRIZ TR1 MA RB FT TR 500/230 kV IMPERATRIZ TR1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,482.24
IMPERATRIZ MC 230 kV TR 230/69 kV IMPERATRIZ TF5 MA RBF FT TR 230/69 kV IMPERATRIZ TF5 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,482.24
IMPERATRIZ MC 230 kV TR 230/69 kV IMPERATRIZ TF4 MA RBF FT TR 230/69 kV IMPERATRIZ TF4 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,482.24
IMPERATRIZ MC 230 kV TR 230/69 kV IMPERATRIZ TF3 MA RBF FT TR 230/69 kV IMPERATRIZ TF3 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,482.24
IMPERATRIZ MC 230 kV TR 230/69 kV IMPERATRIZ TF3 MA RBF FT TR 230/69 kV IMPERATRIZ TF3 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$455,569.58
IMPERATRIZ MC 230 kV TR 230/69 kV IMPERATRIZ TF3 MA RBF FT TR 230/69 kV IMPERATRIZ TF3 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$375,528.35
IMPERATRIZ MC 230 kV TR 230/13,8 kV IMPERATRIZ TF2 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS3 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,482.24
IMPERATRIZ MC 230 kV TR 230/13,8 kV IMPERATRIZ TF2 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS3 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$455,569.58
IMPERATRIZ MC 230 kV TR 230/13,8 kV IMPERATRIZ TF1 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,482.24
IMPERATRIZ MC 13,8 kV CS 100/-70 Mvar IMPERATRIZ CS3 MA  RB FT CS 100/-70 Mvar IMPERATRIZ CS3 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$71,399.30
IMPERATRIZ MC 13,8 kV CS 100/-70 Mvar IMPERATRIZ CS2 MA  RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$71,399.30
IMPERATRIZ MC 13,8 kV CS 100/-70 Mvar IMPERATRIZ CS1 MA  RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$71,399.30
IMPERATRIZ IB 69 kV MG 500 kV IMPERATRIZ MG2 MA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$49,815.59
IMPERATRIZ IB 500 kV MG 500 kV IMPERATRIZ MG2 MA IB5 RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$520,028.84
IMPERATRIZ IB 500 kV MG 500 kV IMPERATRIZ MG2 MA IB5 RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,237,239.15
IMPERATRIZ IB 500 kV MG 500 kV IMPERATRIZ MG2 MA IB5 RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,019,862.59
IMPERATRIZ IB 500 kV MG 500 kV IMPERATRIZ MG2 MA IB4 RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$520,028.84
IMPERATRIZ IB 500 kV MG 500 kV IMPERATRIZ MG2 MA IB4 RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,237,239.15
IMPERATRIZ IB 500 kV MG 500 kV IMPERATRIZ MG2 MA IB4 RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,019,862.59
IMPERATRIZ IB 500 kV MG 500 kV IMPERATRIZ MG2 MA IB3 RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$520,028.84
IMPERATRIZ IB 500 kV MG 500 kV IMPERATRIZ MG2 MA IB2 RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$520,028.84
IMPERATRIZ IB 500 kV MG 500 kV IMPERATRIZ MG1 MA IB1 RB FT MG 500 kV IMPERATRIZ MG1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$520,028.84
IMPERATRIZ IB 230 kV MG 500 kV IMPERATRIZ MG2 MA IB1 RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
IMPERATRIZ EL 69 kV IMPERATRIZSANTA RITA DIT   058/2001 IPCA RCDM REA 2040/2009 29/06/2017 28/06/2047  R$411,950.27
IMPERATRIZ EL 69 kV IMPERATRIZIMPERATRIZ DIT   058/2001 IPCA RCDM REN 443/2011 27/10/2017 26/10/2048  R$412,230.52
IMPERATRIZ EL 69 kV IMPERATRIZDIST6 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
IMPERATRIZ EL 69 kV IMPERATRIZDIST5 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
IMPERATRIZ EL 69 kV IMPERATRIZDIST4 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
IMPERATRIZ EL 69 kV IMPERATRIZDIST4 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$206,153.28
IMPERATRIZ EL 69 kV IMPERATRIZDIST4 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$169,794.04
IMPERATRIZ EL 69 kV IMPERATRIZDIST3 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
IMPERATRIZ EL 69 kV IMPERATRIZDIST2 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
IMPERATRIZ EL 69 kV IMPERATRIZDIST2 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$206,153.28
IMPERATRIZ EL 69 kV IMPERATRIZDIST2 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$169,794.04
IMPERATRIZ EL 69 kV IMPERATRIZDIST1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,320,962.73
IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBNI REA 8314/2019 24/08/2021 23/08/2036  R$76,560.91
IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$13,875.15
IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,320,962.73
IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$13,878.52
IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$13,878.52
IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,320,962.73
IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,088,876.36
IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$13,858.30
IMPERATRIZ EL 230 kV IMPERATRIZ LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA RB FT LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$267,055.89
IMPERATRIZ EL 230 kV IMPERATRIZ LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA RB FT LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$635,372.46
IMPERATRIZ EL 230 kV IMPERATRIZ LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA RB FT LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$523,740.78
IMPERATRIZ EL 13,8 kV IMPERATRIZDIST1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$59,058.38
IMPERATRIZ CS 100/-70 Mvar IMPERATRIZ CS3 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS3 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,535,361.40
IMPERATRIZ CS 100/-70 Mvar IMPERATRIZ CS1 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RMEL REA 5229/2015 09/01/2018 08/01/2048  R$258,866.06
IMPERATRIZ CR 500 kV 451 Mvar IMPERATRIZ BC2 MA RB FT CR 500 kV 451 Mvar IMPERATRIZ BC2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,630,903.61
IMPERATRIZ CS 100/-70 Mvar IMPERATRIZ CS2 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,535,361.40
IMPERATRIZ CS 100/-70 Mvar IMPERATRIZ CS2 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,652,892.11
IMPERATRIZ CS 100/-70 Mvar IMPERATRIZ CS2 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,011,097.73
IMPERATRIZ CS 100/-70 Mvar IMPERATRIZ CS1 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,535,361.40
IMPERATRIZ CR 500 kV 390 Mvar IMPERATRIZ BC1 MA RB FT CR 500 kV 390 Mvar IMPERATRIZ BC1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,435,684.31
IMPERATRIZ CS 100/-70 Mvar IMPERATRIZ CS1 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,652,892.11
IMPERATRIZ CS 100/-70 Mvar IMPERATRIZ CS1 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,011,097.73
IMPERATRIZ CR 500 kV 161 Mvar IMPERATRIZ BC4 MA RB FT CR 500 kV 161 Mvar IMPERATRIZ BC4 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$648,445.03
IMPERATRIZ CR 500 kV 451 Mvar IMPERATRIZ BC2 MA RB FT CR 500 kV 451 Mvar IMPERATRIZ BC2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,880,203.65
IMPERATRIZ CR 500 kV 451 Mvar IMPERATRIZ BC2 MA RB FT CR 500 kV 451 Mvar IMPERATRIZ BC2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,198,471.80
IMPERATRIZ CR 500 kV 390 Mvar IMPERATRIZ BC1 MA RB FT CR 500 kV 390 Mvar IMPERATRIZ BC1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,444,065.95
IMPERATRIZ CR 500 kV 161 Mvar IMPERATRIZ BC4 MA RB FT CR 500 kV 161 Mvar IMPERATRIZ BC4 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,542,763.62
IMPERATRIZ CR 500 kV 390 Mvar IMPERATRIZ BC1 MA RB FT CR 500 kV 390 Mvar IMPERATRIZ BC1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,832,052.23
IMPERATRIZ CR 500 kV 161 Mvar IMPERATRIZ BC4 MA RB FT CR 500 kV 161 Mvar IMPERATRIZ BC4 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,271,707.98
IMPERATRIZ CR 500 kV 107 Mvar IMPERATRIZ BC3 MA RB FT CR 500 kV 107 Mvar IMPERATRIZ BC3 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$441,127.09
IMPERATRIZ CR 500 kV 107 Mvar IMPERATRIZ BC3 MA RB FT CR 500 kV 107 Mvar IMPERATRIZ BC3 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,049,518.14
IMPERATRIZ CR 500 kV 107 Mvar IMPERATRIZ BC3 MA RB FT CR 500 kV 107 Mvar IMPERATRIZ BC3 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$865,123.20
INTEGRADORA MG 230 kV INTEGRADORA MG1 PA RB FT MG 230 kV INTEGRADORA MG1 PA 058/2001 IPCA RBNI REA 4658/2014 02/09/2013 31/12/2042  R$663,585.49
INTEGRADORA IB 230 kV MG 230 kV INTEGRADORA MG1 PA IB1 RB FT MG 230 kV INTEGRADORA MG1 PA 058/2001 IPCA RBNI REA 4658/2014 02/09/2013 31/12/2042  R$189,381.71
INTEGRADORA EL 230 kV INTEGRADORA LT 230 kV INTEGRADORA /SERRA DO SOSSEGO C-1 PA  DIT   058/2001 IPCA RCDM REA 4658/2014 02/09/2013 31/12/2042  R$309,087.78
INTEGRADORA EL 230 kV INTEGRADORA LT 230 kV INTEGRADORA /ONCA PUMA C-2 PA  RB FT LT 230 kV INTEGRADORA /ONCA PUMA C-2 PA 058/2001 IPCA RBNI REA 4658/2014 02/09/2013 31/12/2042  R$309,087.78
INTEGRADORA EL 230 kV INTEGRADORA LT 230 kV INTEGRADORA /ONCA PUMA C-1 PA  RB FT LT 230 kV INTEGRADORA /ONCA PUMA C-1 PA 058/2001 IPCA RBNI REA 4658/2014 02/09/2013 31/12/2042  R$309,087.78
INTEGRADORA EL 230 kV INTEGRADORA LT 230 kV CARAJAS /INTEGRADORA C-3 PA  RB FT LT 230 kV CARAJAS /INTEGRADORA C-3 PA 058/2001 IPCA RBNI REA 4658/2014 02/09/2013 31/12/2042  R$309,087.78
INTEGRADORA EL 230 kV INTEGRADORA LT 230 kV CARAJAS /INTEGRADORA C-2 PA  RB FT LT 230 kV CARAJAS /INTEGRADORA C-2 PA 058/2001 IPCA RBNI REA 4658/2014 02/09/2013 31/12/2042  R$309,087.78
JARU TR 230/69 kV JARU TR3 RO RBF FT TR 230/69 kV JARU TR3 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$199,799.03
JARU MC 69 kV TR 230/69 kV JARU TR1 RO RBF FT TR 230/69 kV JARU TR1 RO 058/2001 IPCA RBNI REA 3216/2011 11/06/2018 11/06/2052  R$41,015.93
JARU MC 230 kV TR 230/69 kV JARU TR3 RO RBF FT TR 230/69 kV JARU TR3 RO 058/2001 IPCA RBNI REA 4225/2013 01/12/2016 30/11/2046  R$994,088.33
JARU TR 230/69 kV JARU TR3 RO RBF FT TR 230/69 kV JARU TR3 RO 058/2001 IPCA RBNI REA 4225/2013 01/12/2016 30/11/2050  R$966,740.30
JARU TR 230/69 kV JARU TR2 RO RBF FT TR 230/69 kV JARU TR2 RO 058/2001 IPCA RBNI REA 3216/2011 14/09/2015 13/09/2040  R$148,840.31
JARU TR 230/69 kV JARU TR2 RO RBF FT TR 230/69 kV JARU TR2 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$199,799.03
JARU TR 230/69 kV JARU TR1 RO RBF FT TR 230/69 kV JARU TR1 RO 058/2001 IPCA RBNI REA 3216/2011 11/06/2018 11/06/2058  R$71,091.15
JARU TR 230/69 kV JARU TR1 RO RBF FT TR 230/69 kV JARU TR1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$199,799.03
JARU MG 230 kV JARU MG1 RO RB FT MG 230 kV JARU MG1 RO 058/2001 IPCA RBNI REA 3216/2011 14/09/2015 13/09/2041  R$ 2,213,392.79
JARU MG 230 kV JARU MG1 RO RB FT MG 230 kV JARU MG1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$445,154.17
JARU MG 230 kV JARU MG1 RO RB FT MG 230 kV JARU MG1 RO 058/2001 IPCA RBNI REA 4225/2013 01/12/2016 30/11/2045  R$202,265.68
JARU MG 230 kV JARU MG1 RO RB FT MG 230 kV JARU MG1 RO 058/2001 IPCA RBNI REA 4225/2013 01/12/2016 30/11/2045  R$56,927.96
JARU MC 69 kV TR 230/69 kV JARU TR3 RO RBF FT TR 230/69 kV JARU TR3 RO 058/2001 IPCA RBNI REA 4225/2013 01/12/2016 30/11/2046  R$382,785.07
JARU MC 69 kV TR 230/69 kV JARU TR2 RO RBF FT TR 230/69 kV JARU TR2 RO 058/2001 IPCA RBNI REA 3216/2011 14/09/2015 13/09/2045  R$372,552.57
JARU MC 69 kV TR 230/69 kV JARU TR1 RO RBF FT TR 230/69 kV JARU TR1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$66,390.50
JARU IB 230 kV MG 230 kV JARU MG1 RO IB1 RB FT MG 230 kV JARU MG1 RO 058/2001 IPCA RBNI REA 3216/2011 14/09/2015 13/09/2046  R$771,999.20
JARU MC 230 kV TR 230/69 kV JARU TR2 RO RBF FT TR 230/69 kV JARU TR2 RO 058/2001 IPCA RBNI REA 3216/2011 14/09/2015 13/09/2045  R$964,765.54
JARU MC 230 kV TR 230/69 kV JARU TR1 RO RBF FT TR 230/69 kV JARU TR1 RO 058/2001 IPCA RBNI REA 3216/2011 11/06/2018 11/06/2052  R$114,566.06
JARU MC 230 kV TR 230/69 kV JARU TR1 RO RBF FT TR 230/69 kV JARU TR1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$163,104.17
JARU EL 230 kV JARU LT 230 kV JARU /JI-PARANA C-1 RO RB FT LT 230 kV JARU /JI-PARANA C-1 RO 058/2001 IPCA RBNI REA 3216/2011 14/09/2015 13/09/2045  R$ 1,075,942.83
JARU EL 230 kV JARU LT 230 kV ARIQUEMES /JARU C-1 RO RB FT LT 230 kV ARIQUEMES /JARU C-1 RO 058/2001 IPCA RBNI REA 3216/2011 14/09/2015 13/09/2044  R$ 1,077,106.50
JAURU TR 230/138 kV JAURU TRR1 MT RBF FT TR 230/138 kV JAURU TRR1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$307,224.09
JAURU TR 230/138 kV JAURU TR2 MT RBF FT TR 230/138 kV JAURU TR2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$921,672.28
JAURU TR 230/138 kV JAURU TR1 MT RBF FT TR 230/138 kV JAURU TR1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$921,672.28
JAURU RTN 69 kV 0 Mvar JAURU RN4 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$16,313.10
JAURU RTN 69 kV 0 Mvar JAURU RN3 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$16,313.10
JAURU RTB 230 kV 100,00 Mvar JAURU RT1 MT RB FT RTB 230 kV 100 Mvar JAURU RT1 MT 058/2001 IPCA RBNI REA 8348/2019 14/01/2022 14/01/2058  R$863,036.06
JAURU RTL 230 kV 30 Mvar JAURU RT4 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$272,633.98
JAURU RTL 230 kV 30 Mvar JAURU RT3 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$272,633.98
JAURU RTL 230 kV 0 Mvar JAURU RT7 MT RB FT LT 230 kV VILHENA /JAURU C-3 RO/MT 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039  R$758,002.86
JAURU RTB 230 kV 33,30 Mvar JAURU RTR MT RB FT RTB 230 kV 33,3 Mvar JAURU RTR MT 058/2001 IPCA RBNI REA 8348/2019 30/12/2021 30/12/2057  R$287,678.69
JAURU MG 230 kV JAURU MG1 MT RB FT MG 230 kV JAURU MG1 MT 058/2001 IPCA RBNI REA 8348/2019 30/12/2021 30/12/2052  R$172,515.85
JAURU MC 69 kV RTN 69 kV 0 Mvar JAURU RN3 MT  RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$11,080.96
JAURU MG 230 kV JAURU MG1 MT RB FT MG 230 kV JAURU MG1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$588,453.27
JAURU MC 69 kV RTN 69 kV 0 Mvar JAURU RN4 MT  RB FT LT 230 kV JAURU /VARZEA GRANDE C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$11,080.96
JAURU MC 230 kV RTL 230 kV 30 Mvar JAURU RT4 MT  RB FT LT 230 kV JAURU /VARZEA GRANDE C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$108,600.16
JAURU IB 230 kV MG 230 kV JAURU MG1 MT IB1 RB FT MG 230 kV JAURU MG1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
JAURU MC 230 kV TR 230/138 kV JAURU TRR1 MT  RBF FT TR 230/138 kV JAURU TRR1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
JAURU MC 230 kV TR 230/138 kV JAURU TR2 MT  RBF FT TR 230/138 kV JAURU TR2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
JAURU MC 230 kV TR 230/138 kV JAURU TR1 MT  RBF FT TR 230/138 kV JAURU TR1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
JAURU EL 230 kV JAURU LT 230 kV VILHENA /JAURU C-3 RO/MT  RB FT LT 230 kV VILHENA /JAURU C-3 RO/MT 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039  R$704,855.94
JAURU MC 230 kV RTL 230 kV 30 Mvar JAURU RT3 MT  RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$108,600.16
JAURU MC 230 kV RTL 230 kV 0 Mvar JAURU RT7 MT RB FT LT 230 kV VILHENA /JAURU C-3 RO/MT 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039  R$231,106.27
JAURU MC 230 kV RTB 230 kV 100,00 Mvar JAURU RT1 MT RB FT RTB 230 kV 100 Mvar JAURU RT1 MT 058/2001 IPCA RBNI REA 8348/2019 14/01/2022 14/01/2051  R$934,381.65
JAURU MC 138 kV TR 230/138 kV JAURU TR2 MT  RBF FT TR 230/138 kV JAURU TR2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$121,674.23
JAURU MC 138 kV TR 230/138 kV JAURU TR1 MT  RBF FT TR 230/138 kV JAURU TR1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$121,674.23
JAURU EL 230 kV JAURU LT 230 kV JAURU /VARZEA GRANDE C-2 MT  RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
JAURU EL 230 kV JAURU LT 230 kV JAURU /VARZEA GRANDE C-2 MT  RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBNI REA 5861/2016 07/06/2019 06/06/2034  R$15,005.42
JAURU EL 230 kV JAURU LT 230 kV JAURU /VARZEA GRANDE C-1 MT  RB FT LT 230 kV JAURU /VARZEA GRANDE C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
JAURU EL 230 kV JAURU LT 230 kV JAURU /VARZEA GRANDE C-1 MT  RB FT LT 230 kV JAURU /VARZEA GRANDE C-1 MT 058/2001 IPCA RBNI REA 5861/2016 07/06/2019 06/06/2034  R$15,005.42
JI-PARANA TR 230/69 kV JI-PARANA TR3 RO RBF FT TR 230/69 kV JI-PARANA TR3 RO 058/2001 IPCA RBNI REA 2533/2010 25/08/2014 24/08/2039  R$ 1,231,856.73
JI-PARANA TR 230/69 kV JI-PARANA TR3 RO RBF FT TR 230/69 kV JI-PARANA TR3 RO 058/2001 IPCA RBNI REA 2533/2010 25/08/2014 24/08/2037  R$1,593.02
JI-PARANA TR 230/69 kV JI-PARANA TR2 RO RBF FT TR 230/69 kV JI-PARANA TR2 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$325,243.33
JI-PARANA RTL 230 kV 20 Mvar JI-PARANA RT1 RO RB FT RTL 230 kV 20 Mvar JI-PARANA RT1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$255,797.82
JI-PARANA TR 230/69 kV JI-PARANA TR1 RO RBF FT TR 230/69 kV JI-PARANA TR1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$325,243.33
JI-PARANA TR 230/138 kV JI-PARANA TR2 RO RBF FT TR 230/138 kV JI-PARANA TR2 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$438,392.47
JI-PARANA TR 230/138 kV JI-PARANA TR1 RO RBF FT TR 230/138 kV JI-PARANA TR1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$438,392.47
JI-PARANA RTN 230 kV 0,1 Mvar JI-PARANA RN1 RO RB FT RTL 230 kV 20 Mvar JI-PARANA RT1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$16,313.10
JI-PARANA RTL 230 kV 20 Mvar JI-PARANA RT3 RO RB FT RTL 230 kV 20 Mvar JI-PARANA RT3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039  R$689,609.76
JI-PARANA RTL 230 kV 20 Mvar JI-PARANA RLR RO RB FT RTL 230 kV 20 Mvar JI-PARANA RLR RO 058/2001 IPCA RBNI REA 7814/2019 13/05/2021 13/05/2057  R$493,188.32
JI-PARANA RTB 230 kV 20 Mvar JI-PARANA RT1 RO RB FT RTB 230 kV 20 Mvar JI-PARANA RT1 RO 058/2001 IPCA RBNI REA 2533/2010 06/06/2014 05/06/2049  R$613,339.68
JI-PARANA MG 230 kV JI-PARANA MG1 RO RB FT MG 230 kV JI-PARANA MG1 RO 058/2001 IPCA RBNI REA 2533/2010 06/06/2014 05/06/2041  R$190,763.72
JI-PARANA MG 230 kV JI-PARANA MG1 RO RB FT MG 230 kV JI-PARANA MG1 RO 058/2001 IPCA RBNI REA 2533/2010 13/08/2019 13/08/2051  R$126,636.35
JI-PARANA MG 230 kV JI-PARANA MG1 RO RB FT MG 230 kV JI-PARANA MG1 RO 058/2001 IPCA RBNI REA 2533/2010 03/11/2015 02/11/2043  R$419,887.11
JI-PARANA MG 230 kV JI-PARANA MG1 RO RB FT MG 230 kV JI-PARANA MG1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$707,650.68
JI-PARANA MG 230 kV JI-PARANA MG1 RO RB FT MG 230 kV JI-PARANA MG1 RO 058/2001 IPCA RBNI REA 7814/2019 13/05/2021 13/05/2053  R$3,498.10
JI-PARANA MC 69 kV TR 230/69 kV JI-PARANA TR3 RO RBF FT TR 230/69 kV JI-PARANA TR3 RO 058/2001 IPCA RBNI REA 2533/2010 25/08/2014 24/08/2044  R$371,086.88
JI-PARANA MC 69 kV TR 230/69 kV JI-PARANA TR2 RO RBF FT TR 230/69 kV JI-PARANA TR2 RO 058/2001 IPCA RBNI REA 2533/2010 03/11/2015 02/11/2045  R$382,301.91
JI-PARANA MC 69 kV TR 230/69 kV JI-PARANA TR1 RO RBF FT TR 230/69 kV JI-PARANA TR1 RO 058/2001 IPCA RBNI REA 2533/2010 07/06/2019 07/06/2053  R$227,280.08
JI-PARANA MC 230 kV TR 230/69 kV JI-PARANA TR3 RO RBF FT TR 230/69 kV JI-PARANA TR3 RO 058/2001 IPCA RBNI REA 2533/2010 25/08/2014 24/08/2045  R$930,165.56
JI-PARANA MC 230 kV TR 230/69 kV JI-PARANA TR2 RO  RBF FT TR 230/69 kV JI-PARANA TR2 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
JI-PARANA MC 230 kV TR 230/69 kV JI-PARANA TR1 RO  RBF FT TR 230/69 kV JI-PARANA TR1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
JI-PARANA MC 230 kV TR 230/138 kV JI-PARANA TR2 RO  RBF FT TR 230/138 kV JI-PARANA TR2 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
JI-PARANA MC 230 kV TR 230/138 kV JI-PARANA TR1 RO  RBF FT TR 230/138 kV JI-PARANA TR1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
JI-PARANA MC 230 kV RTN 230 kV 0,1 Mvar JI-PARANA RN1 RO  RB FT RTL 230 kV 20 Mvar JI-PARANA RT1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$11,080.96
JI-PARANA MC 230 kV RTL 230 kV 20 Mvar JI-PARANA RT3 RO  RB FT RTL 230 kV 20 Mvar JI-PARANA RT3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039  R$228,828.44
JI-PARANA MC 230 kV RTL 230 kV 20 Mvar JI-PARANA RT1 RO  RB FT RTL 230 kV 20 Mvar JI-PARANA RT1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$108,600.16
JI-PARANA MC 230 kV RTB 230 kV 20 Mvar JI-PARANA RT1 RO  RB FT RTB 230 kV 20 Mvar JI-PARANA RT1 RO 058/2001 IPCA RBNI REA 2533/2010 06/06/2014 05/06/2044  R$895,101.57
JI-PARANA MC 230 kV BC 230 kV 18,5 Mvar JI-PARANA BC3 RO  RB FT BC 230 kV 18,5 Mvar JI-PARANA BC3 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,037.95
JI-PARANA MC 230 kV BC 230 kV 18,5 Mvar JI-PARANA BC2 RO  RB FT BC 230 kV 18,5 Mvar JI-PARANA BC2 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,037.95
JI-PARANA MC 230 kV BC 230 kV 18,5 Mvar JI-PARANA BC1 RO  RB FT BC 230 kV 18,5 Mvar JI-PARANA BC1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,037.95
JI-PARANA MC 138 kV TR 230/138 kV JI-PARANA TR2 RO  RBF FT TR 230/138 kV JI-PARANA TR2 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$132,859.59
JI-PARANA MC 138 kV TR 230/138 kV JI-PARANA TR1 RO  RBF FT TR 230/138 kV JI-PARANA TR1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$132,859.59
JI-PARANA IB 69 kV MG 230 kV JI-PARANA MG1 RO IB1 DIT   058/2001 IPCA RCDM REA 2533/2010 03/11/2015 02/11/2046  R$304,812.83
JI-PARANA IB 230 kV MG 230 kV JI-PARANA MG1 RO IB1 RB FT MG 230 kV JI-PARANA MG1 RO 058/2001 IPCA RBNI REA 2533/2010 25/08/2014 24/08/2042  R$10,251.32
JI-PARANA IB 230 kV MG 230 kV JI-PARANA MG1 RO IB1 RB FT MG 230 kV JI-PARANA MG1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
JI-PARANA IB 138 kV MG 230 kV JI-PARANA MG1 RO IB1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$102,646.68
JI-PARANA EL 69 kV JI-PARANADIST2 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
JI-PARANA EL 69 kV JI-PARANADIST1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
JI-PARANA EL 230 kV JI-PARANA LT 230 kV JI-PARANA /PIMENTA BUENO C-3 RO  RB FT LT 230 kV JI-PARANA /PIMENTA BUENO C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039  R$698,323.25
JI-PARANA EL 230 kV JI-PARANA LT 230 kV JI-PARANA /PIMENTA BUENO C-1 RO RB FT LT 230 kV JI-PARANA /PIMENTA BUENO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
JI-PARANA EL 230 kV JI-PARANA LT 230 kV JARU /JI-PARANA C-1 RO  RB FT LT 230 kV JARU /JI-PARANA C-1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
JI-PARANA EL 230 kV JI-PARANA LT 230 kV ARIQUEMES /JI-PARANA C-3 RO RB FT LT 230 kV ARIQUEMES /JI-PARANA C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039  R$698,323.25
JI-PARANA EL 138 kV JI-PARANAROLIM MOURA C1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$198,106.19
JI-PARANA BC 230 kV 18,5 Mvar JI-PARANA BC3 RO RB FT BC 230 kV 18,5 Mvar JI-PARANA BC3 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$129,940.17
JI-PARANA BC 230 kV 18,5 Mvar JI-PARANA BC2 RO RB FT BC 230 kV 18,5 Mvar JI-PARANA BC2 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$129,940.17
JI-PARANA BC 230 kV 18,5 Mvar JI-PARANA BC1 RO RB FT BC 230 kV 18,5 Mvar JI-PARANA BC1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$129,940.17
JORGE TEIXEIRA EL 230 kV JORGE TEIXEIRA LT 230 kV JORGE TEIXEIRA /LECHUGA C-2 AM  RB FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-2 AM 009/2010 IPCA RBL CC 009/2010 17/03/2014 12/07/2040  R$803,300.22
JORGE TEIXEIRA EL 230 kV JORGE TEIXEIRA LT 230 kV JORGE TEIXEIRA /LECHUGA C-3 AM  RB FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-3 AM 014/2012 IPCA RBL CC 014/2012 01/07/2016 07/05/2042  R$727,662.15
JORGE TEIXEIRA EL 230 kV JORGE TEIXEIRA LT 230 kV JORGE TEIXEIRA /LECHUGA C-1 AM  RB FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-1 AM 009/2010 IPCA RBL CC 009/2010 17/03/2014 12/07/2040  R$803,300.22
LECHUGA TR 230/138 kV LECHUGA TR3 AM RBF FT TR 230/138 kV LECHUGA TR3 AM 014/2012 IPCA RBL CC 014/2012 01/04/2015 07/05/2042  R$ 1,597,450.34
LECHUGA TR 230/138 kV LECHUGA TR2 AM RBF FT TR 230/138 kV LECHUGA TR2 AM 014/2012 IPCA RBL CC 014/2012 01/04/2015 07/05/2042  R$ 1,597,450.34
LECHUGA TR 230/138 kV LECHUGA TR1 AM RBF FT TR 230/138 kV LECHUGA TR1 AM 014/2012 IPCA RBL CC 014/2012 01/04/2015 07/05/2042  R$ 1,597,450.34
LECHUGA MG 230 kV LECHUGA MG2 AM RB FT MG 230 kV LECHUGA MG2 AM 014/2012 IPCA RBL CC 014/2012 01/04/2015 07/05/2042  R$897,925.71
LECHUGA MC 230 kV TR 230/138 kV LECHUGA TR3 AM RBF FT TR 230/138 kV LECHUGA TR3 AM 014/2012 IPCA RBL CC 014/2012 01/04/2015 07/05/2042  R$415,885.34
LECHUGA MC 230 kV TR 230/138 kV LECHUGA TR2 AM RBF FT TR 230/138 kV LECHUGA TR2 AM 014/2012 IPCA RBL CC 014/2012 01/04/2015 07/05/2042  R$415,885.34
LECHUGA MC 230 kV TR 230/138 kV LECHUGA TR1 AM RBF FT TR 230/138 kV LECHUGA TR1 AM 014/2012 IPCA RBL CC 014/2012 01/04/2015 07/05/2042  R$415,885.34
LECHUGA MC 138 kV TR 230/138 kV LECHUGA TR3 AM RBF FT TR 230/138 kV LECHUGA TR3 AM 014/2012 IPCA RBL CC 014/2012 01/04/2015 07/05/2042  R$310,330.97
LECHUGA MC 138 kV TR 230/138 kV LECHUGA TR2 AM RBF FT TR 230/138 kV LECHUGA TR2 AM 014/2012 IPCA RBL CC 014/2012 01/04/2015 07/05/2042  R$310,330.97
LECHUGA MC 138 kV TR 230/138 kV LECHUGA TR1 AM RBF FT TR 230/138 kV LECHUGA TR1 AM 014/2012 IPCA RBL CC 014/2012 01/04/2015 07/05/2042  R$310,330.97
LECHUGA IB 138 kV MG 230 kV LECHUGA MG2 AM IB1 DIT   014/2012 IPCA RPEC CC 014/2012 01/04/2015 07/05/2042  R$269,705.62
LECHUGA EL 230 kV LECHUGA LT 230 kV JORGE TEIXEIRA /LECHUGA C-3 AM  RB FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-3 AM 014/2012 IPCA RBL CC 014/2012 01/07/2016 07/05/2042  R$727,662.15
LECHUGA EL 138 kV LECHUGADIST2 DIT   014/2012 IPCA RPEC CC 014/2012 01/04/2015 07/05/2042  R$469,665.48
LECHUGA EL 230 kV LECHUGA LT 230 kV JORGE TEIXEIRA /LECHUGA C-2 AM  RB FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-2 AM 009/2010 IPCA RBL CC 009/2010 17/03/2014 12/07/2040  R$803,300.22
LECHUGA EL 230 kV LECHUGA LT 230 kV JORGE TEIXEIRA /LECHUGA C-1 AM  RB FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-1 AM 009/2010 IPCA RBL CC 009/2010 17/03/2014 12/07/2040  R$803,300.22
LECHUGA EL 138 kV LECHUGADIST3 DIT   014/2012 IPCA RPEC CC 014/2012 01/04/2015 07/05/2042  R$469,665.48
LECHUGA EL 138 kV LECHUGADIST1 DIT   014/2012 IPCA RPEC CC 014/2012 01/04/2015 07/05/2042  R$469,665.48
LT 138 kV C. MAGALHAES /RONDONOPOLIS MT LT 138 kV C. MAGALHAES /RONDONOPOLIS C-1 MT DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 2,645,319.67
LT 138 kV PRATA /COXIPO MT LT 138 kV PRATA /COXIPO C-1 MT DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 1,824,081.66
LT 138 kV PRATA /COXIPO MT LT 138 kV PRATA /COXIPO C-1 MT DIT   058/2001 IPCA RCDM DSP 555/2023 01/07/2023 26/01/2056  R$6,831.29
LT 138 kV RONDONOPOLIS /PRATA MT LT 138 kV RONDONOPOLIS /PRATA C-1 MT DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$969,851.47
LT 138 kV RONDONOPOLIS /PRATA MT LT 138 kV RONDONOPOLIS /PRATA C-1 MT DIT   058/2001 IPCA RCDM DSP 555/2023 01/07/2023 26/01/2056  R$6,831.29
LT 230 kV ABUNA /PORTO VELHO RO LT 230 kV ABUNA /PORTO VELHO C-2 RO RB FT LT 230 kV ABUNA /PORTO VELHO C-2 RO 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039  R$ 15,645,288.80
LT 230 kV ABUNA /PORTO VELHO RO LT 230 kV ABUNA /PORTO VELHO C-1 RO RB FT LT 230 kV ABUNA /PORTO VELHO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 4,056,847.66
LT 230 kV ABUNA /RIO BRANCO 1 RO/AC LT 230 kV ABUNA /RIO BRANCO 1 C-2 RO/AC RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-2 RO/AC 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039  R$ 24,642,202.89
LT 230 kV ABUNA /RIO BRANCO 1 RO/AC LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 6,527,640.52
LT 230 kV ALTAMIRA /TRANSAMAZONIC PA LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA RB FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 4,034,189.73
LT 230 kV ALTAMIRA /TRANSAMAZONIC PA LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA RB FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA 058/2001 IPCA RBNI REA 4660/2014 21/06/2016 20/06/2044  R$8,561.47
LT 230 kV ALTAMIRA /TRANSAMAZONIC PA LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA RB FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 9,598,039.77
LT 230 kV ALTAMIRA /TRANSAMAZONIC PA LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA RB FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 7,911,713.49
LT 230 kV ARIQUEMES /JARU RO LT 230 kV ARIQUEMES /JARU C-1 RO RB FT LT 230 kV ARIQUEMES /JARU C-1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,735,518.29
LT 230 kV ARIQUEMES /JI-PARANA RO LT 230 kV ARIQUEMES /JI-PARANA C-3 RO RB FT LT 230 kV ARIQUEMES /JI-PARANA C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039  R$ 13,407,196.04
LT 230 kV BARRA PEIXE /RONDONOPOLIS MT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 4,678,106.41
LT 230 kV BARRA PEIXE /RONDONOPOLIS MT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 11,130,029.65
LT 230 kV BARRA PEIXE /RONDONOPOLIS MT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 9,174,540.61
LT 230 kV BARRA PEIXE /RONDONOPOLIS MT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 4,559,637.82
LT 230 kV BARRA PEIXE /RONDONOPOLIS MT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 10,848,172.26
LT 230 kV BARRA PEIXE /RONDONOPOLIS MT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 8,942,204.12
LT 230 kV BOA VISTA /S. E. Uiaren VEN RR LT 230 kV BOA VISTA /S. E. Uiaren VEN C-1 RR RB   058/2001 IPCA RBNI PRT 631/2022 06/04/2023 06/06/2056  R$ 4,604,823.84
LT 230 kV CARAJAS /INTEGRADORA PA LT 230 kV CARAJAS /INTEGRADORA C-3 PA RB FT LT 230 kV CARAJAS /INTEGRADORA C-3 PA 058/2001 IPCA RBNI REA 4658/2014 02/09/2013 31/12/2042  R$ 2,130,172.24
LT 230 kV CARAJAS /INTEGRADORA PA LT 230 kV CARAJAS /INTEGRADORA C-2 PA RB FT LT 230 kV CARAJAS /INTEGRADORA C-2 PA 058/2001 IPCA RBNI REA 4658/2014 02/09/2013 31/12/2042  R$ 2,130,172.24
LT 230 kV CARAJAS /MARABA PA LT 230 kV CARAJAS /MARABA C-1 PA RB FT LT 230 kV CARAJAS /MARABA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,161,320.12
LT 230 kV CASTANHAL /SANTA MARIA PA LT 230 kV CASTANHAL /SANTA MARIA C-2 PA RB FT LT 230 kV CASTANHAL /SANTA MARIA C-2 PA 058/2001 IPCA RBNI REA 2152/2009 19/11/2012 18/11/2047  R$42,073.04
LT 230 kV CASTANHAL /SANTA MARIA PA LT 230 kV CASTANHAL /SANTA MARIA C-2 PA RB FT LT 230 kV CASTANHAL /SANTA MARIA C-2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$670,679.46
LT 230 kV CASTANHAL /SANTA MARIA PA LT 230 kV CASTANHAL /SANTA MARIA C-2 PA RB FT LT 230 kV CASTANHAL /SANTA MARIA C-2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,595,663.20
LT 230 kV CASTANHAL /SANTA MARIA PA LT 230 kV CASTANHAL /SANTA MARIA C-2 PA RB FT LT 230 kV CASTANHAL /SANTA MARIA C-2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,315,313.37
LT 230 kV CAXIAS II /COELHO NETO MA LT 230 kV CAXIAS II /COELHO NETO C-1 MA RB FT LT 230 kV CAXIAS II /COELHO NETO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,026,152.36
LT 230 kV COELHO NETO /TERESINA MA/PI LT 230 kV COELHO NETO /TERESINA C-1 MA/PI RB FT LT 230 kV COELHO NETO /TERESINA C-1 MA/PI 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,783,688.02
LT 230 kV COLETORA PORTO VELHO /PORTO VELHO RO LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-2 RO RB FT LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-2 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039  R$556,873.95
LT 230 kV COLETORA PORTO VELHO /PORTO VELHO RO LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-1 RO RB FT LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-1 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039  R$556,873.95
LT 230 kV COXIPO /NOBRES MT LT 230 kV COXIPO /NOBRES C-1 MT RB FT LT 230 kV COXIPO /NOBRES C-1 MT 058/2001 IPCA RBNI REA 2384/2010 20/12/2012 19/12/2049  R$67,031.11
LT 230 kV COXIPO /NOBRES MT LT 230 kV COXIPO /NOBRES C-1 MT RB FT LT 230 kV COXIPO /NOBRES C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,425,692.80
LT 230 kV COXIPO /NOBRES MT LT 230 kV COXIPO /NOBRES C-1 MT RB FT LT 230 kV COXIPO /NOBRES C-1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,771,145.50
LT 230 kV COXIPO /NOBRES MT LT 230 kV COXIPO /NOBRES C-1 MT RB FT LT 230 kV COXIPO /NOBRES C-1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,757,184.88
LT 230 kV GUAMA /MARITUBA PA LT 230 kV GUAMA /MARITUBA C-2 PA RB FT LT 230 kV GUAMA /MARITUBA C-2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$244,498.72
LT 230 kV GUAMA /MARITUBA PA LT 230 kV GUAMA /MARITUBA C-2 PA RB FT LT 230 kV GUAMA /MARITUBA C-2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$581,705.02
LT 230 kV GUAMA /MARITUBA PA LT 230 kV GUAMA /MARITUBA C-2 PA RB FT LT 230 kV GUAMA /MARITUBA C-2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$479,502.44
LT 230 kV GUAMA /MARITUBA PA LT 230 kV GUAMA /MARITUBA C-1 PA RB FT LT 230 kV GUAMA /MARITUBA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$244,498.72
LT 230 kV GUAMA /MARITUBA PA LT 230 kV GUAMA /MARITUBA C-1 PA RB FT LT 230 kV GUAMA /MARITUBA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$581,705.02
LT 230 kV GUAMA /MARITUBA PA LT 230 kV GUAMA /MARITUBA C-1 PA RB FT LT 230 kV GUAMA /MARITUBA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$479,502.44
LT 230 kV GUAMA /UTINGA PA LT 230 kV GUAMA /UTINGA C-2 PA RB FT LT 230 kV GUAMA /UTINGA C-2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$356,911.92
LT 230 kV GUAMA /UTINGA PA LT 230 kV GUAMA /UTINGA C-2 PA RB FT LT 230 kV GUAMA /UTINGA C-2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$849,155.61
LT 230 kV GUAMA /UTINGA PA LT 230 kV GUAMA /UTINGA C-2 PA RB FT LT 230 kV GUAMA /UTINGA C-2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$699,963.33
LT 230 kV IMPERATRIZ /PORTO FRANCO MA LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA RB FT LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,376,492.73
LT 230 kV IMPERATRIZ /PORTO FRANCO MA LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA RB FT LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,654,089.97
LT 230 kV IMPERATRIZ /PORTO FRANCO MA LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA RB FT LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,660,695.41
LT 230 kV JARU /JI-PARANA RO LT 230 kV JARU /JI-PARANA C-1 RO RB FT LT 230 kV JARU /JI-PARANA C-1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,804,297.08
LT 230 kV JAURU /VARZEA GRANDE MT LT 230 kV JAURU /VARZEA GRANDE C-2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 5,700,712.04
LT 230 kV JAURU /VARZEA GRANDE MT LT 230 kV JAURU /VARZEA GRANDE C-2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBNI REA 4967/2014 08/07/2016 07/07/2052  R$288,770.48
LT 230 kV JAURU /VARZEA GRANDE MT LT 230 kV JAURU /VARZEA GRANDE C-2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBNI REA 4530/2014 03/10/2014 02/10/2042  R$422,999.70
LT 230 kV JAURU /VARZEA GRANDE MT LT 230 kV JAURU /VARZEA GRANDE C-1 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 5,820,260.15
LT 230 kV JI-PARANA /PIMENTA BUENO RO LT 230 kV JI-PARANA /PIMENTA BUENO C-3 RO RB FT LT 230 kV JI-PARANA /PIMENTA BUENO C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039  R$ 9,669,433.54
LT 230 kV JI-PARANA /PIMENTA BUENO RO LT 230 kV JI-PARANA /PIMENTA BUENO C-1 RO RB FT LT 230 kV JI-PARANA /PIMENTA BUENO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,542,003.48
LT 230 kV JORGE TEIXEIRA /LECHUGA AM LT 230 kV JORGE TEIXEIRA /LECHUGA C-3 AM RB FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-3 AM 014/2012 IPCA RBL CC 014/2012 01/07/2016 07/05/2042  R$ 3,056,528.85
LT 230 kV JORGE TEIXEIRA /LECHUGA AM LT 230 kV JORGE TEIXEIRA /LECHUGA C-2 AM RB FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-2 AM 009/2010 IPCA RBL CC 009/2010 17/03/2014 12/07/2040  R$ 2,225,050.41
LT 230 kV JORGE TEIXEIRA /LECHUGA AM LT 230 kV JORGE TEIXEIRA /LECHUGA C-1 AM RB FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-1 AM 009/2010 IPCA RBL CC 009/2010 17/03/2014 12/07/2040  R$ 2,225,050.41
LT 230 kV MARITUBA /UTINGA PA LT 230 kV MARITUBA /UTINGA C-2 PA RB FT LT 230 kV MARITUBA /UTINGA C-2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$112,413.20
LT 230 kV MARITUBA /UTINGA PA LT 230 kV MARITUBA /UTINGA C-2 PA RB FT LT 230 kV MARITUBA /UTINGA C-2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$267,450.58
LT 230 kV MARITUBA /UTINGA PA LT 230 kV MARITUBA /UTINGA C-2 PA RB FT LT 230 kV MARITUBA /UTINGA C-2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$220,460.89
LT 230 kV MARITUBA /UTINGA PA LT 230 kV MARITUBA /UTINGA C-1 PA RB FT LT 230 kV MARITUBA /UTINGA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$112,413.20
LT 230 kV MARITUBA /UTINGA PA LT 230 kV MARITUBA /UTINGA C-1 PA RB FT LT 230 kV MARITUBA /UTINGA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$267,450.58
LT 230 kV MARITUBA /UTINGA PA LT 230 kV MARITUBA /UTINGA C-1 PA RB FT LT 230 kV MARITUBA /UTINGA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$220,460.89
LT 230 kV MIRANDA II /PERITORO MA LT 230 kV MIRANDA II /PERITORO C-1 MA RB FT LT 230 kV MIRANDA II /PERITORO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,050,002.81
LT 230 kV NOBRES /NOVA MUTUM MT LT 230 kV NOBRES /NOVA MUTUM C-1 MT RB FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,256,513.62
LT 230 kV NOBRES /NOVA MUTUM MT LT 230 kV NOBRES /NOVA MUTUM C-1 MT RB FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,368,638.78
LT 230 kV NOBRES /NOVA MUTUM MT LT 230 kV NOBRES /NOVA MUTUM C-1 MT RB FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,425,396.52
LT 230 kV NOVA MUTUM /SORRISO MT LT 230 kV NOVA MUTUM /SORRISO C-1 MT RB FT LT 230 kV NOVA MUTUM /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,128,951.65
LT 230 kV NOVA MUTUM /SORRISO MT LT 230 kV NOVA MUTUM /SORRISO C-1 MT RB FT LT 230 kV NOVA MUTUM /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 7,444,320.77
LT 230 kV NOVA MUTUM /SORRISO MT LT 230 kV NOVA MUTUM /SORRISO C-1 MT RB FT LT 230 kV NOVA MUTUM /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 6,136,391.85
LT 230 kV P.DUTRA /PERITORO MA LT 230 kV P.DUTRA /PERITORO C-1 MA RB FT LT 230 kV P.DUTRA /PERITORO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,276,582.06
LT 230 kV PERITORO /CAXIAS II MA LT 230 kV PERITORO /CAXIAS II C-1 MA RB FT LT 230 kV PERITORO /CAXIAS II C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,785,959.49
LT 230 kV PIMENTA BUENO /VILHENA RO LT 230 kV PIMENTA BUENO /VILHENA C-3 RO RB FT LT 230 kV PIMENTA BUENO /VILHENA C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039  R$ 13,082,172.37
LT 230 kV PIMENTA BUENO /VILHENA RO LT 230 kV PIMENTA BUENO /VILHENA C-1 RO RB FT LT 230 kV PIMENTA BUENO /VILHENA C-1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,459,110.00
LT 230 kV RIB.GONCALVES /BALSAS PI/MA LT 230 kV RIB.GONCALVES /BALSAS C-1 PI/MA RB FT LT 230 kV RIB.GONCALVES /BALSAS C-1 PI/MA 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039  R$ 2,557,803.44
LT 230 kV RONDONOPOLIS /COXIPO MT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 4,050,373.97
LT 230 kV RONDONOPOLIS /COXIPO MT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 9,636,544.88
LT 230 kV RONDONOPOLIS /COXIPO MT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 7,943,453.44
LT 230 kV RONDONOPOLIS /COXIPO MT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 4,050,373.97
LT 230 kV RONDONOPOLIS /COXIPO MT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 9,636,544.88
LT 230 kV SAMUEL /ARIQUEMES RO LT 230 kV SAMUEL /ARIQUEMES C-3 RO RB FT LT 230 kV SAMUEL /ARIQUEMES C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039  R$ 12,513,382.16
LT 230 kV SAMUEL /ARIQUEMES RO LT 230 kV SAMUEL /ARIQUEMES C-1 RO RB FT LT 230 kV SAMUEL /ARIQUEMES C-1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,269,862.37
LT 230 kV SAMUEL /PORTO VELHO RO LT 230 kV SAMUEL /PORTO VELHO C-3 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039  R$ 3,412,741.25
LT 230 kV SAMUEL /PORTO VELHO RO LT 230 kV SAMUEL /PORTO VELHO C-2 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-2 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$698,324.45
LT 230 kV SAMUEL /PORTO VELHO RO LT 230 kV SAMUEL /PORTO VELHO C-1 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$698,324.45
LT 230 kV SAO LUIS II /MIRANDA II MA LT 230 kV SAO LUIS II /MIRANDA II C-1 MA RB FT LT 230 kV SAO LUIS II /MIRANDA II C-1 MA 058/2001 IPCA RBNI REA 3216/2011 26/05/2014 25/05/2048  R$19,869.30
LT 230 kV SAO LUIS II /MIRANDA II MA LT 230 kV SAO LUIS II /MIRANDA II C-1 MA RB FT LT 230 kV SAO LUIS II /MIRANDA II C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,277,229.43
LT 230 kV SAO LUIS II /SAO LUIS I MA LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$451,000.62
LT 230 kV SAO LUIS II /SAO LUIS I MA LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,073,008.99
LT 230 kV SAO LUIS II /SAO LUIS I MA LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$884,486.82
LT 230 kV SAO LUIS II /SAO LUIS I MA LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$441,505.87
LT 230 kV SAO LUIS II /SAO LUIS I MA LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,050,419.33
LT 230 kV SAO LUIS II /SAO LUIS I MA LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$865,866.05
LT 230 kV SAO LUIS II /SAO LUIS III MA LT 230 kV SAO LUIS II /SAO LUIS III C-1 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS III C-1 MA 007/2008 IPCA RBL CC 007/2008 17/03/2008 17/03/2038  R$ 1,779,399.57
LT 230 kV SINOP /SORRISO II MT LT 230 kV SINOP /SORRISO II C-1 MT RB FT LT 230 kV SINOP /SORRISO II C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$9,179.21
LT 230 kV SINOP /SORRISO II MT LT 230 kV SINOP /SORRISO II C-1 MT RB FT LT 230 kV SINOP /SORRISO II C-1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$21,838.94
LT 230 kV SINOP /SORRISO II MT LT 230 kV SINOP /SORRISO II C-1 MT RB FT LT 230 kV SINOP /SORRISO II C-1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$18,001.95
LT 230 kV SORRISO II /SORRISO MT LT 230 kV SORRISO II /SORRISO C-1 MT RB FT LT 230 kV SORRISO II /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$9,055.03
LT 230 kV SORRISO II /SORRISO MT LT 230 kV SORRISO II /SORRISO C-1 MT RB FT LT 230 kV SORRISO II /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$21,543.48
LT 230 kV SORRISO II /SORRISO MT LT 230 kV SORRISO II /SORRISO C-1 MT RB FT LT 230 kV SORRISO II /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$17,758.40
LT 230 kV TRANSAMAZONIC /RUROPOLIS PA LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,087,304.23
LT 230 kV TRANSAMAZONIC /RUROPOLIS PA LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBNI REA 4660/2014 21/06/2016 20/06/2045  R$7,255.91
LT 230 kV TRANSAMAZONIC /RUROPOLIS PA LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 7,345,234.29
LT 230 kV TRANSAMAZONIC /RUROPOLIS PA LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 6,054,714.35
LT 230 kV TUCURUI /ALTAMIRA PA LT 230 kV TUCURUI /ALTAMIRA C-1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBNI REA 3216/2011 02/07/2015 01/07/2052  R$63,960.25
LT 230 kV TUCURUI /ALTAMIRA PA LT 230 kV TUCURUI /ALTAMIRA C-1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 7,028,920.15
LT 230 kV TUCURUI /ALTAMIRA PA LT 230 kV TUCURUI /ALTAMIRA C-1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 16,723,024.85
LT 230 kV TUCURUI /ALTAMIRA PA LT 230 kV TUCURUI /ALTAMIRA C-1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 13,784,875.28
LT 230 kV UTINGA /CASTANHAL PA LT 230 kV UTINGA /CASTANHAL C-1 PA RB FT LT 230 kV UTINGA /CASTANHAL C-1 PA 058/2001 IPCA RBNI REA 2152/2009 19/11/2012 18/11/2047  R$112,194.78
LT 230 kV UTINGA /CASTANHAL PA LT 230 kV UTINGA /CASTANHAL C-1 PA RB FT LT 230 kV UTINGA /CASTANHAL C-1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,341,560.14
LT 230 kV UTINGA /CASTANHAL PA LT 230 kV UTINGA /CASTANHAL C-1 PA RB FT LT 230 kV UTINGA /CASTANHAL C-1 PA 058/2001 IPCA RBNI REA 6029/2016 12/07/2019 12/07/2047  R$794,453.23
LT 230 kV UTINGA /CASTANHAL PA LT 230 kV UTINGA /CASTANHAL C-1 PA RB FT LT 230 kV UTINGA /CASTANHAL C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,191,805.15
LT 230 kV UTINGA /CASTANHAL PA LT 230 kV UTINGA /CASTANHAL C-1 PA RB FT LT 230 kV UTINGA /CASTANHAL C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,631,021.38
LT 230 kV UTINGA /MIRAMAR PA LT 230 kV UTINGA /MIRAMAR C-2 PA RB FT LT 230 kV UTINGA /MIRAMAR C-2 PA 058/2001 IPCA RBNI REA 3362/2012 19/04/2016 18/04/2052  R$21,182.77
LT 230 kV UTINGA /MIRAMAR PA LT 230 kV UTINGA /MIRAMAR C-2 PA RB FT LT 230 kV UTINGA /MIRAMAR C-2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$175,960.79
LT 230 kV UTINGA /MIRAMAR PA LT 230 kV UTINGA /MIRAMAR C-2 PA RB FT LT 230 kV UTINGA /MIRAMAR C-2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$418,641.35
LT 230 kV UTINGA /MIRAMAR PA LT 230 kV UTINGA /MIRAMAR C-2 PA RB FT LT 230 kV UTINGA /MIRAMAR C-2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$345,088.21
LT 230 kV UTINGA /MIRAMAR PA LT 230 kV UTINGA /MIRAMAR C-1 PA RB FT LT 230 kV UTINGA /MIRAMAR C-1 PA 058/2001 IPCA RBNI REA 3362/2012 19/04/2016 18/04/2052  R$21,182.77
LT 230 kV UTINGA /MIRAMAR PA LT 230 kV UTINGA /MIRAMAR C-1 PA RB FT LT 230 kV UTINGA /MIRAMAR C-1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$175,960.79
LT 230 kV UTINGA /MIRAMAR PA LT 230 kV UTINGA /MIRAMAR C-1 PA RB FT LT 230 kV UTINGA /MIRAMAR C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$418,641.35
LT 230 kV UTINGA /MIRAMAR PA LT 230 kV UTINGA /MIRAMAR C-1 PA RB FT LT 230 kV UTINGA /MIRAMAR C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$345,088.21
LT 230 kV VARZEA GRANDE /COXIPO MT LT 230 kV VARZEA GRANDE /COXIPO C-2 MT RB FT LT 230 kV VARZEA GRANDE /COXIPO C-2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$510,969.11
LT 230 kV VARZEA GRANDE /COXIPO MT LT 230 kV VARZEA GRANDE /COXIPO C-2 MT RB FT LT 230 kV VARZEA GRANDE /COXIPO C-2 MT 058/2001 IPCA RBNI REA 4967/2014 21/06/2016 20/06/2052  R$288,496.40
LT 230 kV VARZEA GRANDE /COXIPO MT LT 230 kV VARZEA GRANDE /COXIPO C-1 MT RB FT LT 230 kV VARZEA GRANDE /COXIPO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$391,421.00
LT 230 kV VILA DO CONDE /GUAMA PA LT 230 kV VILA DO CONDE /GUAMA C-2 PA RB FT LT 230 kV VILA DO CONDE /GUAMA C-2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$835,093.85
LT 230 kV VILA DO CONDE /GUAMA PA LT 230 kV VILA DO CONDE /GUAMA C-2 PA RB FT LT 230 kV VILA DO CONDE /GUAMA C-2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,986,833.67
LT 230 kV VILA DO CONDE /GUAMA PA LT 230 kV VILA DO CONDE /GUAMA C-1 PA RB FT LT 230 kV VILA DO CONDE /GUAMA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$835,093.85
LT 230 kV VILA DO CONDE /GUAMA PA LT 230 kV VILA DO CONDE /GUAMA C-1 PA RB FT LT 230 kV VILA DO CONDE /GUAMA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,986,833.67
LT 230 kV VILHENA /JAURU RO/MT LT 230 kV VILHENA /JAURU C-3 RO/MT RB FT LT 230 kV VILHENA /JAURU C-3 RO/MT 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039  R$ 27,364,624.89
LT 230 kV XINGU /RL (TUCURUI / ALTAMIRA) PA LT 230 kV XINGU /RL (TUCURUI / ALTAMIRA) C-1 PA RB FT LT 230 kV XINGU /RL (ALTAMIRA / TUCURUI) C-1 PA 058/2001 IPCA RBNI REA 4472/2014 01/10/2014 31/12/2042  R$23,319.65
LT 500 kV BACABEIRA /MIRANDA II MA LT 500 kV BACABEIRA /MIRANDA II C-2 MA RB FT LT 500 kV BACABEIRA /MIRANDA II C-2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,610,863.48
LT 500 kV BACABEIRA /MIRANDA II MA LT 500 kV BACABEIRA /MIRANDA II C-2 MA RB FT LT 500 kV BACABEIRA /MIRANDA II C-2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 8,590,872.92
LT 500 kV BACABEIRA /MIRANDA II MA LT 500 kV BACABEIRA /MIRANDA II C-2 MA RB FT LT 500 kV BACABEIRA /MIRANDA II C-2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 7,081,500.67
LT 500 kV BACABEIRA /MIRANDA II MA LT 500 kV BACABEIRA /MIRANDA II C-2 MA RB FT LT 500 kV BACABEIRA /MIRANDA II C-2 MA 058/2001 IPCA RBNI DSP 554/2023 01/07/2023 08/09/2054  R$65,314.71
LT 500 kV BACABEIRA /MIRANDA II MA LT 500 kV BACABEIRA /MIRANDA II C-1 MA RB FT LT 500 kV BACABEIRA /MIRANDA II C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,608,127.46
LT 500 kV BACABEIRA /MIRANDA II MA LT 500 kV BACABEIRA /MIRANDA II C-1 MA RB FT LT 500 kV BACABEIRA /MIRANDA II C-1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 8,584,363.45
LT 500 kV BACABEIRA /MIRANDA II MA LT 500 kV BACABEIRA /MIRANDA II C-1 MA RB FT LT 500 kV BACABEIRA /MIRANDA II C-1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 7,076,134.88
LT 500 kV BACABEIRA /MIRANDA II MA LT 500 kV BACABEIRA /MIRANDA II C-1 MA RB FT LT 500 kV BACABEIRA /MIRANDA II C-1 MA 058/2001 IPCA RBNI DSP 554/2023 01/07/2023 25/09/2055  R$66,795.74
LT 500 kV COLINAS /MIRACEMA TO LT 500 kV COLINAS /MIRACEMA C-1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 9,164,117.02
LT 500 kV COLINAS /MIRACEMA TO LT 500 kV COLINAS /MIRACEMA C-1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 21,803,029.97
LT 500 kV COLINAS /MIRACEMA TO LT 500 kV COLINAS /MIRACEMA C-1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 17,972,349.60
LT 500 kV IMPERATRIZ /COLINAS MA/TO LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 18,045,377.92
LT 500 kV IMPERATRIZ /COLINAS MA/TO LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 42,933,095.98
LT 500 kV IMPERATRIZ /COLINAS MA/TO LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 35,389,971.54
LT 500 kV IMPERATRIZ /MARABA MA/PA LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 9,589,718.04
LT 500 kV IMPERATRIZ /MARABA MA/PA LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 22,815,608.90
LT 500 kV IMPERATRIZ /MARABA MA/PA LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 18,807,023.61
LT 500 kV IMPERATRIZ /MARABA MA/PA LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 9,602,359.66
LT 500 kV IMPERATRIZ /MARABA MA/PA LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 22,845,685.50
LT 500 kV IMPERATRIZ /P.DUTRA MA LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 20,297,692.23
LT 500 kV IMPERATRIZ /P.DUTRA MA LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 48,291,743.88
LT 500 kV IMPERATRIZ /P.DUTRA MA LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 39,807,132.53
LT 500 kV IMPERATRIZ /P.DUTRA MA LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 20,297,692.23
LT 500 kV IMPERATRIZ /P.DUTRA MA LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 48,291,743.88
LT 500 kV IMPERATRIZ /P.DUTRA MA LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 39,807,132.53
LT 500 kV MARABA /TUCURUI PA LT 500 kV MARABA /TUCURUI C-2 PA RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 11,693,493.39
LT 500 kV MARABA /TUCURUI PA LT 500 kV MARABA /TUCURUI C-2 PA RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 27,820,856.73
LT 500 kV MARABA /TUCURUI PA LT 500 kV MARABA /TUCURUI C-2 PA RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 22,932,875.10
LT 500 kV MARABA /TUCURUI PA LT 500 kV MARABA /TUCURUI C-1 PA RB FT LT 500 kV MARABA /TUCURUI C-1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 11,693,493.39
LT 500 kV MARABA /TUCURUI PA LT 500 kV MARABA /TUCURUI C-1 PA RB FT LT 500 kV MARABA /TUCURUI C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 27,820,856.73
LT 500 kV MARABA /TUCURUI PA LT 500 kV MARABA /TUCURUI C-1 PA RB FT LT 500 kV MARABA /TUCURUI C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 22,932,875.10
LT 500 kV MIRANDA II /P.DUTRA MA LT 500 kV MIRANDA II /P.DUTRA C-2 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 10,360,856.53
LT 500 kV MIRANDA II /P.DUTRA MA LT 500 kV MIRANDA II /P.DUTRA C-2 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 24,650,281.62
LT 500 kV MIRANDA II /P.DUTRA MA LT 500 kV MIRANDA II /P.DUTRA C-2 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 20,319,353.75
LT 500 kV MIRANDA II /SANTO A. DOS LOPES MA LT 500 kV MIRANDA II /SANTO A. DOS LOPES C-1 MA RB FT LT 500 kV MIRANDA II /SANTO A. DOS LOPES C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 7,479,621.89
LT 500 kV MIRANDA II /SANTO A. DOS LOPES MA LT 500 kV MIRANDA II /SANTO A. DOS LOPES C-1 MA RB FT LT 500 kV MIRANDA II /SANTO A. DOS LOPES C-1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 17,795,322.77
LT 500 kV MIRANDA II /SANTO A. DOS LOPES MA LT 500 kV MIRANDA II /SANTO A. DOS LOPES C-1 MA RB FT LT 500 kV MIRANDA II /SANTO A. DOS LOPES C-1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 14,668,775.97
LT 500 kV MIRANDA II /SANTO A. DOS LOPES MA LT 500 kV MIRANDA II /SANTO A. DOS LOPES C-1 MA RB FT LT 500 kV MIRANDA II /SANTO A. DOS LOPES C-1 MA 058/2001 IPCA RBNI DSP 275/2023 01/07/2023 27/04/2051  R$15,439.00
LT 500 kV P.DUTRA /B. ESPERANCA MA/PI LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 10,786,457.55
LT 500 kV P.DUTRA /B. ESPERANCA MA/PI LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 25,662,860.55
LT 500 kV P.DUTRA /B. ESPERANCA MA/PI LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 21,154,027.76
LT 500 kV SANTO A. DOS LOPES /P.DUTRA MA LT 500 kV SANTO A. DOS LOPES /P.DUTRA C-1 MA RB FT LT 500 kV SANTO A. DOS LOPES /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,800,117.61
LT 500 kV SANTO A. DOS LOPES /P.DUTRA MA LT 500 kV SANTO A. DOS LOPES /P.DUTRA C-1 MA RB FT LT 500 kV SANTO A. DOS LOPES /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 6,661,967.31
LT 500 kV SANTO A. DOS LOPES /P.DUTRA MA LT 500 kV SANTO A. DOS LOPES /P.DUTRA C-1 MA RB FT LT 500 kV SANTO A. DOS LOPES /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 5,491,493.88
LT 500 kV SANTO A. DOS LOPES /P.DUTRA MA LT 500 kV SANTO A. DOS LOPES /P.DUTRA C-1 MA RB FT LT 500 kV SANTO A. DOS LOPES /P.DUTRA C-1 MA 058/2001 IPCA RBNI DSP 275/2023 01/07/2023 27/04/2050  R$14,159.90
LT 500 kV SANTO A. DOS LOPES /P.DUTRA MA LT 500 kV SANTO A. DOS LOPES /P.DUTRA C-1 MA RB FT LT 500 kV SANTO A. DOS LOPES /P.DUTRA C-1 MA 058/2001 IPCA RBNI DSP 275/2023 01/07/2023 27/04/2030  R$38,809.91
LT 500 kV SAO LUIS II /BACABEIRA MA LT 500 kV SAO LUIS II /BACABEIRA C-2 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,950,393.41
LT 500 kV SAO LUIS II /BACABEIRA MA LT 500 kV SAO LUIS II /BACABEIRA C-2 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,640,325.52
LT 500 kV SAO LUIS II /BACABEIRA MA LT 500 kV SAO LUIS II /BACABEIRA C-2 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,825,044.16
LT 500 kV SAO LUIS II /BACABEIRA MA LT 500 kV SAO LUIS II /BACABEIRA C-2 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RBNI DSP 554/2023 01/07/2023 08/09/2054  R$65,314.71
LT 500 kV SAO LUIS II /BACABEIRA MA LT 500 kV SAO LUIS II /BACABEIRA C-1 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,948,915.56
LT 500 kV SAO LUIS II /BACABEIRA MA LT 500 kV SAO LUIS II /BACABEIRA C-1 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,636,809.46
LT 500 kV SAO LUIS II /BACABEIRA MA LT 500 kV SAO LUIS II /BACABEIRA C-1 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,822,145.85
LT 500 kV SAO LUIS II /BACABEIRA MA LT 500 kV SAO LUIS II /BACABEIRA C-1 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-1 MA 058/2001 IPCA RBNI DSP 554/2023 01/07/2023 25/09/2055  R$66,795.74
LT 500 kV TUCURUI /VILA DO CONDE PA LT 500 kV TUCURUI /VILA DO CONDE C-1 PA RB FT LT 500 kV TUCURUI /VILA DO CONDE C-1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 17,207,344.23
LT 500 kV TUCURUI /VILA DO CONDE PA LT 500 kV TUCURUI /VILA DO CONDE C-1 PA RB FT LT 500 kV TUCURUI /VILA DO CONDE C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 40,939,267.91
LT 500 kV TUCURUI /VILA DO CONDE PA LT 500 kV TUCURUI /VILA DO CONDE C-1 PA RB FT LT 500 kV TUCURUI /VILA DO CONDE C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 33,746,448.82
LT 69 kV TUCURUI /TUCURUI VILA PA LT 69 kV TUCURUI /TUCURUI VILA C-1 PA DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$38,109.89
LT 69 kV TUCURUI /TUCURUI VILA PA LT 69 kV TUCURUI /TUCURUI VILA C-1 PA DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$90,670.07
LT 69 kV TUCURUI /TUCURUI VILA PA LT 69 kV TUCURUI /TUCURUI VILA C-1 PA DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$74,678.60
LUCAS RIO VERDE TR 230/138 kV LUCAS RIO VERDE TRR1 MT RBF FT TR 230/138 kV LUCAS RIO VERDE TRR1 MT 004/2011 IPCA RBL CC 004/2011 28/06/2013 28/06/2041  R$373,065.24
LUCAS RIO VERDE TR 230/138 kV LUCAS RIO VERDE TR2 MT RBF FT TR 230/138 kV LUCAS RIO VERDE TR2 MT 004/2011 IPCA RBNI REA 9241/2020 14/07/2022 14/07/2055  R$ 2,186,448.72
LUCAS RIO VERDE TR 230/138 kV LUCAS RIO VERDE TR1 MT RBF FT TR 230/138 kV LUCAS RIO VERDE TR1 MT 004/2011 IPCA RBL CC 004/2011 28/06/2013 28/06/2041  R$ 1,119,193.94
LUCAS RIO VERDE MG 230 kV LUCAS RIO VERDE MG2 MT RB FT MG 230 kV LUCAS RIO VERDE MG2 MT 004/2011 IPCA RBL CC 004/2011 28/06/2013 28/06/2041  R$758,332.97
LUCAS RIO VERDE MG 230 kV LUCAS RIO VERDE MG2 MT RB FT MG 230 kV LUCAS RIO VERDE MG2 MT 004/2011 IPCA RBNI REA 9241/2020 14/07/2022 14/07/2053  R$126,668.59
LUCAS RIO VERDE MG 230 kV LUCAS RIO VERDE MG2 MT RB FT MG 230 kV LUCAS RIO VERDE MG2 MT 004/2011 IPCA RBNI REA 9241/2020 14/07/2022 14/07/2053  R$80,975.09
LUCAS RIO VERDE MC 230 kV TR 230/138 kV LUCAS RIO VERDE TR2 MT RBF FT TR 230/138 kV LUCAS RIO VERDE TR2 MT 004/2011 IPCA RBNI REA 9241/2020 14/07/2022 14/07/2050  R$ 1,289,076.64
LUCAS RIO VERDE MC 230 kV TR 230/138 kV LUCAS RIO VERDE TR1 MT RBF FT TR 230/138 kV LUCAS RIO VERDE TR1 MT 004/2011 IPCA RBL CC 004/2011 28/06/2013 28/06/2041  R$350,470.32
LUCAS RIO VERDE MC 138 kV TR 230/138 kV LUCAS RIO VERDE TR2 MT RBF FT TR 230/138 kV LUCAS RIO VERDE TR2 MT 004/2011 IPCA RBNI REA 9241/2020 14/07/2022 14/07/2051  R$ 1,405,702.68
LUCAS RIO VERDE MC 138 kV TR 230/138 kV LUCAS RIO VERDE TR1 MT RBF FT TR 230/138 kV LUCAS RIO VERDE TR1 MT 004/2011 IPCA RBL CC 004/2011 28/06/2013 28/06/2041  R$265,473.00
LUCAS RIO VERDE IB 230 kV MG 230 kV LUCAS RIO VERDE MG2 MT IB1 RB FT MG 230 kV LUCAS RIO VERDE MG2 MT 004/2011 IPCA RBL CC 004/2011 28/06/2013 28/06/2041  R$264,996.11
LUCAS RIO VERDE IB 138 kV MG 230 kV LUCAS RIO VERDE MG2 MT IB1 DIT   004/2011 IPCA RPEC CC 004/2011 28/06/2011 28/06/2041  R$186,165.67
LUCAS RIO VERDE EL 138 kV LUCAS RIO VERDEDIST2 DIT   004/2011 IPCA RPEC CC 004/2011 28/06/2011 28/06/2041  R$360,938.66
LUCAS RIO VERDE EL 138 kV LUCAS RIO VERDEDIST1 DIT   004/2011 IPCA RPEC CC 004/2011 28/06/2011 28/06/2041  R$360,938.66
MARABA TR 500/230 kV MARABA TRR2 PA RB FT TR 500/230 kV MARABA TRR2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$668,452.15
MARABA TR 500/230 kV MARABA TRR2 PA RB FT TR 500/230 kV MARABA TRR2 PA 058/2001 IPCA RMEL REN 443/2011 03/07/2016 02/07/2030  R$49,544.07
MARABA TR 500/230 kV MARABA TRR1 PA RB FT TR 500/230 kV MARABA TRR1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$573,404.74
MARABA TR 500/230 kV MARABA TRR1 PA RB FT TR 500/230 kV MARABA TRR1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,364,229.71
MARABA TR 500/230 kV MARABA TR2 PA RB FT TR 500/230 kV MARABA TR2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,005,356.45
MARABA TR 500/230 kV MARABA TR1 PA RB FT TR 500/230 kV MARABA TR1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,720,214.21
MARABA TR 500/230 kV MARABA TR1 PA RB FT TR 500/230 kV MARABA TR1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,092,689.12
MARABA TR 230/69 kV MARABA TR3 PA RBF FT TR 230/69 kV MARABA TR3 PA 058/2001 IPCA RBNI REA 2533/2010 28/01/2013 27/01/2047  R$920,563.74
MARABA TR 230/69 kV MARABA TF3 PA RBF FT TR 230/69 kV MARABA TF3 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$217,048.06
MARABA TR 230/69 kV MARABA TF3 PA RBF FT TR 230/69 kV MARABA TF3 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$516,395.12
MARABA TR 230/69 kV MARABA TF2 PA RBF FT TR 230/69 kV MARABA TF2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$217,048.06
MARABA TR 230/69 kV MARABA TF2 PA RBF FT TR 230/69 kV MARABA TF2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$516,395.12
MARABA TR 230/13,8 kV MARABA TRR1 PA RB FT TR 230/13,8 kV MARABA TRR1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$502,751.73
MARABA TR 230/13,8 kV MARABA TF1 PA RB FT CS 150/-90 MVAr MARABA CS1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$502,751.73
MARABA TR 230/13,8 kV MARABA TF1 PA RB FT CS 150/-90 MVAr MARABA CS1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,196,133.90
MARABA TR 230/13,8 kV MARABA TF1 PA RB FT CS 150/-90 MVAr MARABA CS1 PA 058/2001 IPCA RMEL REN 443/2011 16/12/2016 15/12/2030  R$33,567.51
MARABA RTL 500 kV 45,45 Mvar MARABA RTR2 PA RB FT RTL 500 kV 45,45 Mvar MARABA RTR2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$295,750.25
MARABA RTL 500 kV 45,45 Mvar MARABA RTR2 PA RB FT RTL 500 kV 45,45 Mvar MARABA RTR2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$703,641.34
MARABA RTL 500 kV 45,45 Mvar MARABA RTR2 PA RB FT RTL 500 kV 45,45 Mvar MARABA RTR2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$580,015.17
MARABA RTL 500 kV 45,45 Mvar MARABA RTR1 PA RB FT RTL 500 kV 45,45 Mvar MARABA RTR1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$295,750.25
MARABA RTL 500 kV 45,45 Mvar MARABA RTR1 PA RB FT RTL 500 kV 45,45 Mvar MARABA RTR1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$703,641.34
MARABA RTL 500 kV 45,45 Mvar MARABA RTR1 PA RB FT RTL 500 kV 45,45 Mvar MARABA RTR1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$580,015.17
MARABA RTL 500 kV 150 Mvar MARABA RT4 PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$401,809.73
MARABA RTL 500 kV 150 Mvar MARABA RT4 PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$955,975.31
MARABA RTL 500 kV 150 Mvar MARABA RT4 PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$788,015.36
MARABA RTL 500 kV 136 MVAr MARABA RT3 PA RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$401,809.73
MARABA RTL 500 kV 136 MVAr MARABA RT3 PA RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$955,975.31
MARABA RTL 500 kV 136 MVAr MARABA RT3 PA RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$788,015.36
MARABA RTL 500 kV 136 MVAr MARABA RT2 PA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$401,809.73
MARABA RTL 500 kV 136 MVAr MARABA RT2 PA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$955,975.31
MARABA RTL 500 kV 136 MVAr MARABA RT2 PA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$788,015.36
MARABA RTL 500 kV 136 MVAr MARABA RT1 PA RB FT LT 500 kV MARABA /TUCURUI C-1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$401,809.73
MARABA RTL 500 kV 136 MVAr MARABA RT1 PA RB FT LT 500 kV MARABA /TUCURUI C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$955,975.31
MARABA RTL 500 kV 136 MVAr MARABA RT1 PA RB FT LT 500 kV MARABA /TUCURUI C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$788,015.36
MARABA RTB 500 kV 55 Mvar MARABA RTR3 PA RB FT RTB 500 kV 55 Mvar MARABA RTR3 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$314,205.48
MARABA RTB 500 kV 55 Mvar MARABA RTR1 PA RB FT RTB 500 kV 55 Mvar MARABA RTR1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$314,205.48
MARABA RTB 500 kV 165 Mvar MARABA RT8 PA RB FT RTB 500 kV 165 Mvar MARABA RT8 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$420,513.66
MARABA RTB 500 kV 165 Mvar MARABA RT6 PA RB FT RTB 500 kV 165 Mvar MARABA RT6 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$420,513.66
MARABA RTB 500 kV 165 Mvar MARABA RT10 PA RB FT RTB 500 kV 165 Mvar MARABA RT10 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$420,513.66
MARABA MG 500 kV MARABA MG1 PA RB FT MG 500 kV MARABA MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,181,370.14
MARABA MC 69 kV TR 230/69 kV MARABA TR3 PA  RBF FT TR 230/69 kV MARABA TR3 PA 058/2001 IPCA RBNI REA 2533/2010 28/01/2013 27/01/2042  R$356,882.55
MARABA MC 69 kV TR 230/69 kV MARABA TF3 PA RBF FT TR 230/69 kV MARABA TF3 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$74,117.78
MARABA MC 69 kV TR 230/69 kV MARABA TF2 PA RBF FT TR 230/69 kV MARABA TF2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$74,117.78
MARABA MC 500 kV TR 500/230 kV MARABA TR2 PA  RB FT TR 500/230 kV MARABA TR2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$490,032.13
MARABA MC 500 kV TR 500/230 kV MARABA TR1 PA RB FT TR 500/230 kV MARABA TR1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$490,032.13
MARABA MC 500 kV RTL 500 kV 150 Mvar MARABA RT4 PA  RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$296,882.99
MARABA MC 500 kV RTL 500 kV 136 MVAr MARABA RT3 PA  RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$296,882.99
MARABA MC 500 kV RTL 500 kV 136 MVAr MARABA RT2 PA  RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$296,882.99
MARABA MC 500 kV RTL 500 kV 136 MVAr MARABA RT2 PA  RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RMEL REA 2837/2011 30/12/2013 29/12/2036  R$37,208.16
MARABA MC 500 kV RTL 500 kV 136 MVAr MARABA RT1 PA  RB FT LT 500 kV MARABA /TUCURUI C-1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$296,882.99
MARABA MC 500 kV RTB 500 kV 165 Mvar MARABA RT8 PA  RB FT RTB 500 kV 165 Mvar MARABA RT8 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$458,814.80
MARABA MC 500 kV RTB 500 kV 165 Mvar MARABA RT6 PA RB FT RTB 500 kV 165 Mvar MARABA RT6 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$419,755.70
MARABA MC 500 kV RTB 500 kV 165 Mvar MARABA RT10 PA  RB FT RTB 500 kV 165 Mvar MARABA RT10 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$458,814.80
MARABA MC 230 kV TR 500/230 kV MARABA TR2 PA  RB FT TR 500/230 kV MARABA TR2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,482.24
MARABA MC 230 kV TR 500/230 kV MARABA TR1 PA RB FT TR 500/230 kV MARABA TR1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,482.24
MARABA MC 230 kV TR 500/230 kV MARABA TR1 PA RB FT TR 500/230 kV MARABA TR1 PA 058/2001 IPCA RMEL REA 2837/2011 30/12/2013 29/12/2036  R$37,208.16
MARABA MC 230 kV TR 230/69 kV MARABA TR3 PA RBF FT TR 230/69 kV MARABA TR3 PA 058/2001 IPCA RBNI REA 2533/2010 28/01/2013 27/01/2042  R$939,910.70
MARABA MC 230 kV TR 230/69 kV MARABA TF3 PA RBF FT TR 230/69 kV MARABA TF3 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,482.24
MARABA MC 230 kV TR 230/69 kV MARABA TF2 PA RBF FT TR 230/69 kV MARABA TF2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,482.24
MARABA MC 230 kV TR 230/13,8 kV MARABA TF1 PA  RB FT CS 150/-90 MVAr MARABA CS1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,482.24
MARABA MC 13,8 kV CS 150/-90 MVAr MARABA CS1 PA RB FT CS 150/-90 MVAr MARABA CS1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$71,399.30
MARABA IB 69 kV MG 500 kV MARABA MG1 PA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$49,815.59
MARABA IB 500 kV MG 500 kV MARABA MG1 PA IB7 RB FT MG 500 kV MARABA MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$520,028.84
MARABA EL 69 kV MARABADIST3 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
MARABA EL 69 kV MARABADIST3 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$206,153.28
MARABA EL 69 kV MARABADIST2 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
MARABA EL 69 kV MARABADIST1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
MARABA EL 500 kV MARABA LT 500 kV MARABA /TUCURUI C-2 PA RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
MARABA EL 500 kV MARABA LT 500 kV MARABA /TUCURUI C-2 PA RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,320,962.73
MARABA EL 500 kV MARABA LT 500 kV MARABA /TUCURUI C-1 PA RB FT LT 500 kV MARABA /TUCURUI C-1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
MARABA EL 500 kV MARABA LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
MARABA EL 500 kV MARABA LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,320,962.73
MARABA EL 500 kV MARABA LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
MARABA EL 500 kV MARABA LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RMEL REA 2837/2011 30/12/2013 29/12/2036  R$37,208.16
MARABA EL 230 kV MARABADIST2 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$267,055.89
MARABA EL 230 kV MARABADIST2 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$635,372.46
MARABA EL 230 kV MARABADIST2 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$523,311.87
MARABA EL 230 kV MARABADIST1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$267,055.89
MARABA EL 230 kV MARABADIST1 DIT   058/2001 IPCA RMEL REA 2837/2011 30/12/2013 29/12/2036  R$35,785.12
MARABA EL 230 kV MARABADIST1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$635,372.46
MARABA EL 230 kV MARABADIST1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$523,311.87
MARABA EL 13,8 kV MARABADIST3 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$59,058.38
MARABA CS 150/-90 MVAr MARABA CS1 PA RB FT CS 150/-90 MVAr MARABA CS1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,818,029.19
MARABA CS 150/-90 MVAr MARABA CS1 PA RB FT CS 150/-90 MVAr MARABA CS1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,325,407.97
MARABA CS 150/-90 MVAr MARABA CS1 PA RB FT CS 150/-90 MVAr MARABA CS1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,565,456.01
MARABA CR 500 kV 348 MVAr MARABA BC1 PA RB FT CR 500 kV 348 MVAr MARABA BC1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,309,286.45
MARABA CR 500 kV 348 MVAr MARABA BC1 PA RB FT CR 500 kV 348 MVAr MARABA BC1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,115,020.42
MARABA CR 500 kV 348 MVAr MARABA BC1 PA RB FT CR 500 kV 348 MVAr MARABA BC1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,567,727.33
MARABA CR 500 kV 283 MVAr MARABA BC2 PA RB FT CR 500 kV 283 MVAr MARABA BC2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,090,832.27
MARABA CR 500 kV 283 MVAr MARABA BC2 PA RB FT CR 500 kV 283 MVAr MARABA BC2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,595,279.90
MARABA CR 500 kV 283 MVAr MARABA BC2 PA RB FT CR 500 kV 283 MVAr MARABA BC2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,139,302.55
MIRACEMA TR 500/138 kV MIRACEMA TRR1 TO RBF FT TR 500/138 kV MIRACEMA TRR1 TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$432,424.89
MIRACEMA TR 500/138 kV MIRACEMA TR2 TO RBF FT TR 500/138 kV MIRACEMA TR2 TO 058/2001 IPCA RBNI REA 2911/2011 08/10/2013 07/10/2047  R$ 3,639,357.85
MIRACEMA TR 500/138 kV MIRACEMA TF1 TO RBF FT TR 500/138 kV MIRACEMA TF1 TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,297,274.66
MIRACEMA RTN 69 kV 0 Mvar MIRACEMA RN2 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$16,313.10
MIRACEMA RTN 69 kV 0 Mvar MIRACEMA RN1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$16,313.10
MIRACEMA RTL 500 kV 45,5 Mvar MIRACEMA RTR2 TO RB FT RTL 500 kV 45,5 Mvar MIRACEMA RTR2 TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$295,856.64
MIRACEMA RTL 500 kV 45,5 Mvar MIRACEMA RTR2 TO RB FT RTL 500 kV 45,5 Mvar MIRACEMA RTR2 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$703,894.47
MIRACEMA RTL 500 kV 45,5 Mvar MIRACEMA RTR2 TO RB FT RTL 500 kV 45,5 Mvar MIRACEMA RTR2 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$580,223.83
MIRACEMA RTL 500 kV 45,45 MVAr MIRACEMA RTR1 TO RB FT RTL 500 kV 45,45 MVAr MIRACEMA RTR1 TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$295,750.25
MIRACEMA RTL 500 kV 45,45 MVAr MIRACEMA RTR1 TO RB FT RTL 500 kV 45,45 MVAr MIRACEMA RTR1 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$703,641.34
MIRACEMA RTL 500 kV 45,45 MVAr MIRACEMA RTR1 TO RB FT RTL 500 kV 45,45 MVAr MIRACEMA RTR1 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$580,015.17
MIRACEMA RTL 500 kV 136 Mvar MIRACEMA RT2 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$886,504.62
MIRACEMA RTL 500 kV 136 Mvar MIRACEMA RT2 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,109,148.84
MIRACEMA RTL 500 kV 136 Mvar MIRACEMA RT2 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,738,582.23
MIRACEMA RTL 500 kV 136 MVAr MIRACEMA RT1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$886,504.62
MIRACEMA RTL 500 kV 136 MVAr MIRACEMA RT1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,109,148.84
MIRACEMA RTL 500 kV 136 MVAr MIRACEMA RT1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,738,582.23
MIRACEMA RTB 500 kV 136 MVAr MIRACEMA RT3 TO RB FT RTB 500 kV 136 MVAr MIRACEMA RT3 TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$886,504.62
MIRACEMA RTB 500 kV 136 MVAr MIRACEMA RT3 TO RB FT RTB 500 kV 136 MVAr MIRACEMA RT3 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,109,148.84
MIRACEMA RTB 500 kV 136 MVAr MIRACEMA RT3 TO RB FT RTB 500 kV 136 MVAr MIRACEMA RT3 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,738,582.23
MIRACEMA MG 500 kV MIRACEMA MG1 TO RB FT MG 500 kV MIRACEMA MG1 TO 058/2001 IPCA RBNI REA 2911/2011 08/10/2013 07/10/2040  R$838,577.79
MIRACEMA MG 500 kV MIRACEMA MG1 TO RB FT MG 500 kV MIRACEMA MG1 TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$589,578.45
MIRACEMA MG 500 kV MIRACEMA MG1 TO RB FT MG 500 kV MIRACEMA MG1 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,402,709.78
MIRACEMA MG 500 kV MIRACEMA MG1 TO RB FT MG 500 kV MIRACEMA MG1 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,156,260.87
MIRACEMA MG 500 kV MIRACEMA MG1 TO RB FT MG 500 kV MIRACEMA MG1 TO 058/2001 IPCA RBNI REA 6502/2017 18/10/2019 18/10/2050  R$21,369.35
MIRACEMA MC 69 kV RTN 69 kV 0 Mvar MIRACEMA RN2 TO  RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$11,080.96
MIRACEMA MC 69 kV RTN 69 kV 0 Mvar MIRACEMA RN1 TO  RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$11,080.96
MIRACEMA MC 500 kV TR 500/138 kV MIRACEMA TR2 TO RBF FT TR 500/138 kV MIRACEMA TR2 TO 058/2001 IPCA RBNI REA 2911/2011 08/10/2013 07/10/2044  R$ 1,570,018.99
MIRACEMA MC 500 kV TR 500/138 kV MIRACEMA TF1 TO  RBF FT TR 500/138 kV MIRACEMA TF1 TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$490,032.13
MIRACEMA MC 500 kV RTB 500 kV 136 MVAr MIRACEMA RT3 TO RB FT RTB 500 kV 136 MVAr MIRACEMA RT3 TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$419,755.70
MIRACEMA MC 500 kV RTB 500 kV 136 MVAr MIRACEMA RT3 TO RB FT RTB 500 kV 136 MVAr MIRACEMA RT3 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$998,671.90
MIRACEMA MC 500 kV RTB 500 kV 136 MVAr MIRACEMA RT3 TO RB FT RTB 500 kV 136 MVAr MIRACEMA RT3 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$823,210.38
MIRACEMA MC 500 kV RTB 500 kV 136 MVAr MIRACEMA RT3 TO RB FT RTB 500 kV 136 MVAr MIRACEMA RT3 TO 058/2001 IPCA RBNI REA 5861/2016 03/06/2019 02/06/2034  R$185,068.92
MIRACEMA MC 500 kV RTB 500 kV 136 MVAr MIRACEMA RT3 TO RB FT RTB 500 kV 136 MVAr MIRACEMA RT3 TO 058/2001 IPCA RBNI REA 6502/2017 09/07/2019 09/07/2047  R$216,364.98
MIRACEMA MC 500 kV CR 500 kV 161 MVAr MIRACEMA BC1 TO RB FT CR 500 kV 161 MVAr MIRACEMA BC1 TO 058/2001 IPCA RBNI REA 6502/2017 14/10/2019 14/10/2051  R$369,668.73
MIRACEMA MC 138 kV TR 500/138 kV MIRACEMA TR2 TO RBF FT TR 500/138 kV MIRACEMA TR2 TO 058/2001 IPCA RBNI REA 2911/2011 08/10/2013 07/10/2043  R$767,059.07
MIRACEMA MC 138 kV TR 500/138 kV MIRACEMA TF1 TO RBF FT TR 500/138 kV MIRACEMA TF1 TO 058/2001 IPCA RBNI REA 2911/2011 27/11/2013 26/11/2041  R$64,488.18
MIRACEMA MC 138 kV TR 500/138 kV MIRACEMA TF1 TO RBF FT TR 500/138 kV MIRACEMA TF1 TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$132,859.59
MIRACEMA IB 500 kV MG 500 kV MIRACEMA MG1 TO IB5 RB FT MG 500 kV MIRACEMA MG1 TO 058/2001 IPCA RBNI REA 2911/2011 08/10/2013 07/10/2044  R$ 1,468,994.75
MIRACEMA IB 500 kV MG 500 kV MIRACEMA MG1 TO IB1 RB FT MG 500 kV MIRACEMA MG1 TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$520,028.84
MIRACEMA IB 500 kV MG 500 kV MIRACEMA MG1 TO IB1 RB FT MG 500 kV MIRACEMA MG1 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,237,239.15
MIRACEMA IB 500 kV MG 500 kV MIRACEMA MG1 TO IB1 RB FT MG 500 kV MIRACEMA MG1 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,019,862.59
MIRACEMA EL 500 kV MIRACEMA LT 500 kV GURUPI /MIRACEMA C-1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
MIRACEMA EL 500 kV MIRACEMA LT 500 kV GURUPI /MIRACEMA C-1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,320,962.73
MIRACEMA EL 500 kV MIRACEMA LT 500 kV GURUPI /MIRACEMA C-1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,088,876.36
MIRACEMA EL 500 kV MIRACEMA LT 500 kV GURUPI /MIRACEMA C-1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 058/2001 IPCA RBNI REA 6502/2017 17/05/2019 17/05/2047  R$197,690.20
MIRACEMA EL 500 kV MIRACEMA LT 500 kV COLINAS /MIRACEMA C-1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
MIRACEMA EL 500 kV MIRACEMA LT 500 kV COLINAS /MIRACEMA C-1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,320,962.73
MIRACEMA EL 500 kV MIRACEMA LT 500 kV COLINAS /MIRACEMA C-1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,088,876.36
MIRACEMA CR 500 kV 161 MVAr MIRACEMA BC1 TO RB FT CR 500 kV 161 MVAr MIRACEMA BC1 TO 058/2001 IPCA RBNI REA 6502/2017 14/10/2019 14/10/2039  R$ 14,369,304.66
MIRACEMA CR 500 kV 161 MVAr MIRACEMA BC1 TO RB FT CR 500 kV 161 MVAr MIRACEMA BC1 TO 058/2001 IPCA RBNI REA 6502/2017 28/11/2019 28/11/2039  R$72,434.78
MIRAMAR TR 230/69 kV MIRAMAR TR3 PA RBF FT TR 230/69 kV MIRAMAR TR3 PA 012/2011 IPCA RBL CC 012/2011 25/04/2016 09/12/2041  R$818,380.73
MIRAMAR TR 230/69 kV MIRAMAR TR2 PA RBF FT TR 230/69 kV MIRAMAR TR2 PA 012/2011 IPCA RBL CC 012/2011 25/04/2016 09/12/2041  R$537,873.98
MIRAMAR TR 230/69 kV MIRAMAR TR1 PA RBF FT TR 230/69 kV MIRAMAR TR1 PA 012/2011 IPCA RBL CC 012/2011 25/04/2016 09/12/2041  R$537,873.98
MIRAMAR MG 230 kV MIRAMAR MG2 PA RB FT MG 230 kV MIRAMAR MG2 PA 058/2001 IPCA RBNI REA 3362/2012 19/04/2016 18/04/2047  R$529,199.92
MIRAMAR MG 230 kV MIRAMAR MG1 PA RB FT MG 230 kV MIRAMAR MG1 PA 012/2011 IPCA RBL CC 012/2011 25/04/2016 09/12/2041  R$398,113.77
MIRAMAR MC 69 kV TR 230/69 kV MIRAMAR TR3 PA RBF FT TR 230/69 kV MIRAMAR TR3 PA 012/2011 IPCA RBL CC 012/2011 25/04/2016 09/12/2041  R$116,725.54
MIRAMAR MC 69 kV TR 230/69 kV MIRAMAR TR2 PA RBF FT TR 230/69 kV MIRAMAR TR2 PA 012/2011 IPCA RBL CC 012/2011 25/04/2016 09/12/2041  R$76,716.90
MIRAMAR MC 69 kV TR 230/69 kV MIRAMAR TR1 PA RBF FT TR 230/69 kV MIRAMAR TR1 PA 012/2011 IPCA RBL CC 012/2011 25/04/2016 09/12/2041  R$76,716.90
MIRAMAR MC 230 kV TR 230/69 kV MIRAMAR TR3 PA RBF FT TR 230/69 kV MIRAMAR TR3 PA 012/2011 IPCA RBL CC 012/2011 25/04/2016 09/12/2041  R$286,994.56
MIRAMAR MC 230 kV TR 230/69 kV MIRAMAR TR2 PA RBF FT TR 230/69 kV MIRAMAR TR2 PA 012/2011 IPCA RBL CC 012/2011 25/04/2016 09/12/2041  R$188,624.81
MIRAMAR MC 230 kV TR 230/69 kV MIRAMAR TR1 PA RBF FT TR 230/69 kV MIRAMAR TR1 PA 012/2011 IPCA RBL CC 012/2011 25/04/2016 09/12/2041  R$188,624.81
MIRAMAR IB 69 kV MG 230 kV MIRAMAR MG1 PA IB1 DIT   012/2011 IPCA RPEC CC 012/2011 25/04/2016 09/12/2041  R$184,348.77
MIRAMAR IB 230 kV MG 230 kV MIRAMAR MG1 PA IB1 RB FT MG 230 kV MIRAMAR MG1 PA 012/2011 IPCA RBL CC 012/2011 25/04/2016 09/12/2041  R$142,917.99
MIRAMAR EL 69 kV MIRAMARDIST7 DIT   012/2011 IPCA RPEC CC 012/2011 25/04/2016 09/12/2041  R$314,038.13
MIRAMAR EL 69 kV MIRAMARDIST6 DIT   012/2011 IPCA RPEC CC 012/2011 25/04/2016 09/12/2041  R$314,038.13
MIRAMAR EL 69 kV MIRAMARDIST5 DIT   012/2011 IPCA RPEC CC 012/2011 25/04/2016 09/12/2041  R$314,038.13
MIRAMAR EL 69 kV MIRAMARDIST4 DIT   012/2011 IPCA RPEC CC 012/2011 25/04/2016 09/12/2041  R$314,038.13
MIRAMAR EL 69 kV MIRAMARDIST3 DIT   012/2011 IPCA RPEC CC 012/2011 25/04/2016 09/12/2041  R$314,038.13
MIRAMAR EL 69 kV MIRAMARDIST2 DIT   012/2011 IPCA RPEC CC 012/2011 25/04/2016 09/12/2041  R$314,038.13
MIRAMAR EL 69 kV MIRAMARDIST1 DIT   012/2011 IPCA RPEC CC 012/2011 25/04/2016 09/12/2041  R$268,448.36
MIRAMAR EL 230 kV MIRAMAR LT 230 kV UTINGA /MIRAMAR C-2 PA RB FT LT 230 kV UTINGA /MIRAMAR C-2 PA 058/2001 IPCA RBNI REA 3362/2012 19/04/2016 18/04/2046  R$ 1,059,762.28
MIRAMAR EL 230 kV MIRAMAR LT 230 kV UTINGA /MIRAMAR C-1 PA RB FT LT 230 kV UTINGA /MIRAMAR C-1 PA 058/2001 IPCA RBNI REA 3362/2012 19/04/2016 18/04/2046  R$ 1,058,520.18
MIRANDA II TR 500/230 kV MIRANDA II TRR1 MA RB FT TR 500/230 kV MIRANDA II TRR1 MA 002/2009 IPCA RBL CC 002/2009 08/12/2010 28/01/2039  R$984,807.84
MIRANDA II TR 500/230 kV MIRANDA II TR2 MA RB FT TR 500/230 kV MIRANDA II TR2 MA 002/2009 IPCA RBNI REA 6219/2017 10/03/2019 10/03/2054  R$ 5,795,788.78
MIRANDA II TR 500/230 kV MIRANDA II TR1 MA RB FT TR 500/230 kV MIRANDA II TR1 MA 002/2009 IPCA RBL CC 002/2009 08/12/2010 28/01/2039  R$ 2,954,423.53
MIRANDA II TR 500/230 kV MIRANDA II TR1 MA RB FT TR 500/230 kV MIRANDA II TR1 MA 002/2009 IPCA RMEL REN 443/2011 19/09/2017 18/09/2047  R$41,781.42
MIRANDA II TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$417,691.47
MIRANDA II TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$993,760.73
MIRANDA II TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$819,162.08
MIRANDA II TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RMEL REN 443/2011 25/06/2017 24/06/2040  R$18,270.25
MIRANDA II TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$417,691.47
MIRANDA II TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$993,760.73
MIRANDA II TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$819,162.08
MIRANDA II TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RMEL REN 443/2011 19/03/2017 18/03/2031  R$51,433.49
MIRANDA II TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RMEL REN 443/2011 29/10/2017 28/10/2040  R$20,424.18
MIRANDA II TR 230/138 kV MIRANDA II TR3 MA RBF FT TR 230/138 kV MIRANDA II TR3 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$438,392.47
MIRANDA II TR 230/138 kV MIRANDA II TR2 MA RBF FT TR 230/138 kV MIRANDA II TR2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$438,392.47
MIRANDA II TR 230/138 kV MIRANDA II TR1 MA RBF FT TR 230/138 kV MIRANDA II TR1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$438,392.47
MIRANDA II TR 230/138 kV MIRANDA II TR1 MA RBF FT TR 230/138 kV MIRANDA II TR1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,043,012.01
MIRANDA II TR 230/138 kV MIRANDA II TR1 MA RBF FT TR 230/138 kV MIRANDA II TR1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$859,760.16
MIRANDA II RTB 500 kV 45,33 Mvar MIRANDA II RTR1 MA RB FT RTB 500 kV 45,33 Mvar MIRANDA II RTR1 MA 002/2009 IPCA RBL CC 002/2009 08/12/2010 28/01/2039  R$467,550.66
MIRANDA II RTB 500 kV 136 Mvar MIRANDA II RT1 MA RB FT RTB 500 kV 136 Mvar MIRANDA II RT1 MA 002/2009 IPCA RBL CC 002/2009 08/12/2010 28/01/2039  R$ 1,402,648.65
MIRANDA II RTB 230 kV 10 MVAr MIRANDA II RT2 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$227,016.23
MIRANDA II RTB 230 kV 10 MVAr MIRANDA II RT2 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$540,111.13
MIRANDA II RTB 230 kV 10 MVAr MIRANDA II RT2 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$445,216.38
MIRANDA II RTB 230 kV 10 MVAr MIRANDA II RT1 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$227,016.23
MIRANDA II RTB 230 kV 10 MVAr MIRANDA II RT1 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$540,111.13
MIRANDA II RTB 230 kV 10 MVAr MIRANDA II RT1 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$445,216.38
MIRANDA II RTB 230 kV 10 MVAr MIRANDA II RT1 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT1 MA 058/2001 IPCA RMEL REN 443/2011 06/04/2017 05/04/2047  R$ 251.12
MIRANDA II MG 500 kV MIRANDA II MG1 MA RB FT MG 500 kV MIRANDA II MG1 MA 002/2009 IPCA RBL CC 002/2009 08/12/2010 28/01/2039  R$ 3,774,941.91
MIRANDA II MG 500 kV MIRANDA II MG1 MA RB FT MG 500 kV MIRANDA II MG1 MA 002/2009 IPCA RBNI REA 6219/2017 10/03/2019 10/03/2051  R$107,375.19
MIRANDA II MG 230 kV MIRANDA II MG1 MA RB FT MG 230 kV MIRANDA II MG1 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2045  R$226,006.54
MIRANDA II MG 230 kV MIRANDA II MG1 MA RB FT MG 230 kV MIRANDA II MG1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$800,058.18
MIRANDA II MG 230 kV MIRANDA II MG1 MA RB FT MG 230 kV MIRANDA II MG1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,903,477.71
MIRANDA II MG 230 kV MIRANDA II MG1 MA RB FT MG 230 kV MIRANDA II MG1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,569,046.45
MIRANDA II MG 230 kV MIRANDA II MG1 MA RB FT MG 230 kV MIRANDA II MG1 MA 058/2001 IPCA RBNI REN 443/2011 29/06/2017 28/06/2045  R$125,072.62
MIRANDA II MG 230 kV MIRANDA II MG1 MA RB FT MG 230 kV MIRANDA II MG1 MA 058/2001 IPCA RBNI REN 443/2011 27/10/2017 26/10/2048  R$96,454.87
MIRANDA II MC 69 kV TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2043  R$80,732.30
MIRANDA II MC 69 kV TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$74,117.78
MIRANDA II MC 69 kV TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$176,339.10
MIRANDA II MC 69 kV TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$145,357.23
MIRANDA II MC 69 kV TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2043  R$80,732.30
MIRANDA II MC 69 kV TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$74,117.78
MIRANDA II MC 69 kV TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$176,339.10
MIRANDA II MC 69 kV TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$145,357.23
MIRANDA II MC 500 kV TR 500/230 kV MIRANDA II TR2 MA RB FT TR 500/230 kV MIRANDA II TR2 MA 002/2009 IPCA RBNI REA 6219/2017 10/03/2019 10/11/2038  R$ 1,512,881.20
MIRANDA II MC 500 kV TR 500/230 kV MIRANDA II TR1 MA RB FT TR 500/230 kV MIRANDA II TR1 MA 002/2009 IPCA RBL CC 002/2009 08/12/2010 28/01/2039  R$ 1,075,640.19
MIRANDA II MC 500 kV RTB 500 kV 136 Mvar MIRANDA II RT1 MA  RB FT RTB 500 kV 136 Mvar MIRANDA II RT1 MA 002/2009 IPCA RBL CC 002/2009 08/12/2010 28/01/2039  R$955,136.30
MIRANDA II MC 230 kV TR 500/230 kV MIRANDA II TR2 MA RB FT TR 500/230 kV MIRANDA II TR2 MA 002/2009 IPCA RBNI REA 6219/2017 10/03/2019 10/03/2045  R$983,832.00
MIRANDA II MC 230 kV TR 500/230 kV MIRANDA II TR1 MA RB FT TR 500/230 kV MIRANDA II TR1 MA 002/2009 IPCA RBL CC 002/2009 08/12/2010 28/01/2039  R$450,763.52
MIRANDA II MC 230 kV TR 500/230 kV MIRANDA II TR1 MA RB FT TR 500/230 kV MIRANDA II TR1 MA 002/2009 IPCA RBNI REA 2533/2010 16/11/2015 16/11/2049  R$154,071.02
MIRANDA II MC 230 kV TR 500/230 kV MIRANDA II TR1 MA RB FT TR 500/230 kV MIRANDA II TR1 MA 002/2009 IPCA RBNI REA 6219/2017 01/04/2019 01/04/2043  R$61,085.99
MIRANDA II MC 230 kV TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2043  R$204,911.68
MIRANDA II MC 230 kV TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
MIRANDA II MC 230 kV TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$432,295.55
MIRANDA II MC 230 kV TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$356,343.44
MIRANDA II MC 230 kV TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2043  R$204,971.99
MIRANDA II MC 230 kV TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
MIRANDA II MC 230 kV TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$432,295.55
MIRANDA II MC 230 kV TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$356,343.44
MIRANDA II MC 230 kV TR 230/138 kV MIRANDA II TR3 MA RBF FT TR 230/138 kV MIRANDA II TR3 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2046  R$151,853.11
MIRANDA II MC 230 kV TR 230/138 kV MIRANDA II TR3 MA RBF FT TR 230/138 kV MIRANDA II TR3 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
MIRANDA II MC 230 kV TR 230/138 kV MIRANDA II TR2 MA RBF FT TR 230/138 kV MIRANDA II TR2 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2043  R$204,867.97
MIRANDA II MC 230 kV TR 230/138 kV MIRANDA II TR2 MA RBF FT TR 230/138 kV MIRANDA II TR2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
MIRANDA II MC 230 kV TR 230/138 kV MIRANDA II TR1 MA RBF FT TR 230/138 kV MIRANDA II TR1 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2043  R$205,302.75
MIRANDA II MC 230 kV TR 230/138 kV MIRANDA II TR1 MA RBF FT TR 230/138 kV MIRANDA II TR1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
MIRANDA II MC 230 kV RTB 230 kV 10 MVAr MIRANDA II RT2 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT2 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2044  R$351,223.81
MIRANDA II MC 230 kV RTB 230 kV 10 MVAr MIRANDA II RT2 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$148,256.42
MIRANDA II MC 230 kV RTB 230 kV 10 MVAr MIRANDA II RT1 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT1 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2043  R$351,488.26
MIRANDA II MC 230 kV RTB 230 kV 10 MVAr MIRANDA II RT1 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$148,256.42
MIRANDA II MC 230 kV BC 230 kV 20 Mvar MIRANDA II BC2 MA RB FT BC 230 kV 20 Mvar MIRANDA II BC2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$189,550.87
MIRANDA II MC 230 kV BC 230 kV 20 Mvar MIRANDA II BC1 MA RB FT BC 230 kV 20 Mvar MIRANDA II BC1 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2045  R$292,817.31
MIRANDA II MC 230 kV BC 230 kV 20 Mvar MIRANDA II BC1 MA RB FT BC 230 kV 20 Mvar MIRANDA II BC1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$189,550.87
MIRANDA II MC 138 kV TR 230/138 kV MIRANDA II TR3 MA RBF FT TR 230/138 kV MIRANDA II TR3 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$132,859.59
MIRANDA II MC 138 kV TR 230/138 kV MIRANDA II TR2 MA RBF FT TR 230/138 kV MIRANDA II TR2 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2043  R$105,102.91
MIRANDA II MC 138 kV TR 230/138 kV MIRANDA II TR2 MA RBF FT TR 230/138 kV MIRANDA II TR2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$132,859.59
MIRANDA II MC 138 kV TR 230/138 kV MIRANDA II TR1 MA RBF FT TR 230/138 kV MIRANDA II TR1 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2043  R$105,102.91
MIRANDA II MC 138 kV TR 230/138 kV MIRANDA II TR1 MA RBF FT TR 230/138 kV MIRANDA II TR1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$132,859.59
MIRANDA II MC 138 kV TR 230/138 kV MIRANDA II TR1 MA RBF FT TR 230/138 kV MIRANDA II TR1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$316,096.10
MIRANDA II MC 138 kV TR 230/138 kV MIRANDA II TR1 MA RBF FT TR 230/138 kV MIRANDA II TR1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$260,559.64
MIRANDA II IB 69 kV MG 230 kV MIRANDA II MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$49,815.59
MIRANDA II IB 69 kV MG 230 kV MIRANDA II MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$118,519.96
MIRANDA II IB 69 kV MG 230 kV MIRANDA II MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$97,616.61
MIRANDA II IB 500 kV MG 500 kV MIRANDA II MG1 MA IB3 RB FT MG 500 kV MIRANDA II MG1 MA 002/2009 IPCA RBL CC 002/2009 08/12/2010 28/01/2039  R$414,445.95
MIRANDA II IB 500 kV MG 500 kV MIRANDA II MG1 MA IB2 RB FT MG 500 kV MIRANDA II MG1 MA 002/2009 IPCA RBL CC 002/2009 08/12/2010 28/01/2039  R$414,445.95
MIRANDA II IB 500 kV MG 500 kV MIRANDA II MG1 MA IB1 RB FT MG 500 kV MIRANDA II MG1 MA 002/2009 IPCA RBL CC 002/2009 08/12/2010 28/01/2039  R$414,445.95
MIRANDA II IB 230 kV MG 230 kV MIRANDA II MG1 MA IB1 RB FT MG 230 kV MIRANDA II MG1 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2044  R$266,998.66
MIRANDA II IB 230 kV MG 230 kV MIRANDA II MG1 MA IB1 RB FT MG 230 kV MIRANDA II MG1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
MIRANDA II IB 230 kV MG 230 kV MIRANDA II MG1 MA IB1 RB FT MG 230 kV MIRANDA II MG1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$374,329.15
MIRANDA II IB 230 kV MG 230 kV MIRANDA II MG1 MA IB1 RB FT MG 230 kV MIRANDA II MG1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$308,561.44
MIRANDA II IB 138 kV MG 230 kV MIRANDA II MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$102,646.68
MIRANDA II EL 69 kV MIRANDA IIDIST4 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
MIRANDA II EL 69 kV MIRANDA IIDIST3 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
MIRANDA II EL 69 kV MIRANDA IIDIST3 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$206,153.28
MIRANDA II EL 69 kV MIRANDA IIDIST3 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$169,794.04
MIRANDA II EL 69 kV MIRANDA IIDIST2 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
MIRANDA II EL 69 kV MIRANDA IIDIST2 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$206,153.28
MIRANDA II EL 69 kV MIRANDA IIDIST2 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$169,794.04
MIRANDA II EL 69 kV MIRANDA IIDIST1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
MIRANDA II EL 69 kV MIRANDA IIDIST1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$206,153.28
MIRANDA II EL 69 kV MIRANDA IIDIST1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$169,794.04
MIRANDA II EL 230 kV MIRANDA II LT 230 kV SAO LUIS II /MIRANDA II C-1 MA RB FT LT 230 kV SAO LUIS II /MIRANDA II C-1 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2043  R$360,799.48
MIRANDA II EL 230 kV MIRANDA II LT 230 kV SAO LUIS II /MIRANDA II C-1 MA RB FT LT 230 kV SAO LUIS II /MIRANDA II C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
MIRANDA II EL 230 kV MIRANDA II LT 230 kV MIRANDA II /PERITORO C-1 MA RB FT LT 230 kV MIRANDA II /PERITORO C-1 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2043  R$360,793.99
MIRANDA II EL 230 kV MIRANDA II LT 230 kV MIRANDA II /PERITORO C-1 MA RB FT LT 230 kV MIRANDA II /PERITORO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
MIRANDA II EL 138 kV MIRANDA IITRES MARIAS DIT   058/2001 IPCA RCDM REN 443/2011 29/06/2017 28/06/2048  R$801,547.51
MIRANDA II EL 138 kV MIRANDA IISANTA INES C2 DIT   058/2001 IPCA RCDM REN 443/2011 27/10/2017 26/10/2045  R$720,549.91
MIRANDA II EL 138 kV MIRANDA IIDIST5 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$198,106.19
MIRANDA II EL 138 kV MIRANDA IIDIST4 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$198,106.19
MIRANDA II EL 138 kV MIRANDA IIDIST4 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$471,329.12
MIRANDA II EL 138 kV MIRANDA IIDIST4 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$388,200.84
MIRANDA II EL 138 kV MIRANDA IIDIST3 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$198,106.19
MIRANDA II EL 138 kV MIRANDA IIDIST3 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$471,329.12
MIRANDA II EL 138 kV MIRANDA IIDIST3 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$388,200.84
MIRANDA II EL 13,8 kV MIRANDA IIDIST6 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$59,058.38
MIRANDA II EL 13,8 kV MIRANDA IIDIST6 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$140,510.18
MIRANDA II EL 13,8 kV MIRANDA IIDIST6 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$115,728.41
MIRANDA II EL 13,8 kV MIRANDA IIDIST5 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$59,058.38
MIRANDA II EL 13,8 kV MIRANDA IIDIST5 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$140,510.18
MIRANDA II EL 13,8 kV MIRANDA IIDIST5 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$115,728.41
MIRANDA II BC 230 kV 20 Mvar MIRANDA II BC2 MA RB FT BC 230 kV 20 Mvar MIRANDA II BC2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$137,440.45
MIRANDA II BC 230 kV 20 Mvar MIRANDA II BC1 MA RB FT BC 230 kV 20 Mvar MIRANDA II BC1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$137,440.45
NOBRES TR 230/138 kV NOBRES TR2 MT RBF FT TR 230/138 kV NOBRES TR2 MT 013/2011 IPCA RBL CC 013/2011 08/10/2013 09/12/2041  R$555,140.45
NOBRES TR 230/138 kV NOBRES TR1 MT RBF FT TR 230/138 kV NOBRES TR1 MT 013/2011 IPCA RBL CC 013/2011 08/10/2013 09/12/2041  R$555,140.45
NOBRES MG 230 kV NOBRES MG2 MT RB FT MG 230 kV NOBRES MG2 MT 013/2011 IPCA RBL CC 013/2011 08/10/2013 09/12/2041  R$489,698.92
NOBRES MG 230 kV NOBRES MG1 MT RB FT MG 230 kV NOBRES MG1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$449,654.86
NOBRES MC 230 kV TR 230/138 kV NOBRES TR2 MT RBF FT TR 230/138 kV NOBRES TR2 MT 013/2011 IPCA RBL CC 013/2011 08/10/2013 09/12/2041  R$225,839.93
NOBRES MC 230 kV TR 230/138 kV NOBRES TR1 MT RBF FT TR 230/138 kV NOBRES TR1 MT 013/2011 IPCA RBL CC 013/2011 08/10/2013 09/12/2041  R$225,839.93
NOBRES MC 138 kV TR 230/138 kV NOBRES TR2 MT RBF FT TR 230/138 kV NOBRES TR2 MT 013/2011 IPCA RBL CC 013/2011 08/10/2013 09/12/2041  R$173,555.05
NOBRES MC 138 kV TR 230/138 kV NOBRES TR1 MT RBF FT TR 230/138 kV NOBRES TR1 MT 013/2011 IPCA RBL CC 013/2011 08/10/2013 09/12/2041  R$173,555.05
NOBRES IB 230 kV MG 230 kV NOBRES MG1 MT IB1 RB FT MG 230 kV NOBRES MG1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
NOBRES IB 138 kV MG 230 kV NOBRES MG2 MT IB1 DIT   013/2011 IPCA RPEC CC 013/2011 09/12/2011 09/12/2041  R$138,863.56
NOBRES EL 230 kV NOBRES LT 230 kV NOBRES /NOVA MUTUM C-1 MT RB FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
NOBRES EL 230 kV NOBRES LT 230 kV NOBRES /NOVA MUTUM C-1 MT RB FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$614,190.55
NOBRES EL 230 kV NOBRES LT 230 kV NOBRES /NOVA MUTUM C-1 MT RB FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$506,280.43
NOBRES EL 230 kV NOBRES LT 230 kV COXIPO /NOBRES C-1 MT  RB FT LT 230 kV COXIPO /NOBRES C-1 MT 058/2001 IPCA RBNI REA 2384/2010 20/12/2012 19/12/2038  R$99,991.19
NOBRES EL 230 kV NOBRES LT 230 kV COXIPO /NOBRES C-1 MT  RB FT LT 230 kV COXIPO /NOBRES C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
NOBRES EL 230 kV NOBRES LT 230 kV COXIPO /NOBRES C-1 MT  RB FT LT 230 kV COXIPO /NOBRES C-1 MT 058/2001 IPCA RBNI REA 2376/2010 09/05/2014 08/05/2038  R$41,006.45
NOBRES EL 138 kV NOBRESDIST1 DIT   013/2011 IPCA RPEC CC 013/2011 09/12/2011 09/12/2041  R$268,601.79
NOVA MUTUM TR 230/69 kV NOVA MUTUM TF3 MT RBF FT TR 230/69 kV NOVA MUTUM TF3 MT 058/2001 IPCA RBNI REA 4347/2013 20/01/2017 19/01/2051  R$137,475.12
NOVA MUTUM TR 230/69 kV NOVA MUTUM TF2 MT RBF FT TR 230/69 kV NOVA MUTUM TF2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$199,799.03
NOVA MUTUM TR 230/69 kV NOVA MUTUM TF1 MT RBF FT TR 230/69 kV NOVA MUTUM TF1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$199,799.03
NOVA MUTUM TR 230/69 kV NOVA MUTUM TF1 MT RBF FT TR 230/69 kV NOVA MUTUM TF1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$475,356.67
NOVA MUTUM TR 230/69 kV NOVA MUTUM TF1 MT RBF FT TR 230/69 kV NOVA MUTUM TF1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$391,838.94
NOVA MUTUM RTL 230 kV 20 MVAr NOVA MUTUM RT1 MT RB FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$341,233.25
NOVA MUTUM RTL 230 kV 20 MVAr NOVA MUTUM RT1 MT RB FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$811,853.32
NOVA MUTUM RTL 230 kV 20 MVAr NOVA MUTUM RT1 MT RB FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$669,214.86
NOVA MUTUM MG 230 kV NOVA MUTUM MG1 MT RB FT MG 230 kV NOVA MUTUM MG1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$543,274.64
NOVA MUTUM MG 230 kV NOVA MUTUM MG1 MT RB FT MG 230 kV NOVA MUTUM MG1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,292,544.95
NOVA MUTUM MG 230 kV NOVA MUTUM MG1 MT RB FT MG 230 kV NOVA MUTUM MG1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,065,451.44
NOVA MUTUM MG 230 kV NOVA MUTUM MG1 MT RB FT MG 230 kV NOVA MUTUM MG1 MT 058/2001 IPCA RBNI REA 4347/2013 20/01/2017 19/01/2046  R$264,125.94
NOVA MUTUM MC 69 kV TR 230/69 kV NOVA MUTUM TF3 MT  RBF FT TR 230/69 kV NOVA MUTUM TF3 MT 058/2001 IPCA RBNI REA 4347/2013 20/01/2017 19/01/2046  R$375,661.78
NOVA MUTUM MC 69 kV TR 230/69 kV NOVA MUTUM TF2 MT RBF FT TR 230/69 kV NOVA MUTUM TF2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$66,390.50
NOVA MUTUM MC 69 kV TR 230/69 kV NOVA MUTUM TF1 MT RBF FT TR 230/69 kV NOVA MUTUM TF1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$66,390.50
NOVA MUTUM MC 230 kV TR 230/69 kV NOVA MUTUM TF3 MT  RBF FT TR 230/69 kV NOVA MUTUM TF3 MT 058/2001 IPCA RBNI REA 4347/2013 20/01/2017 19/01/2047  R$ 1,020,101.93
NOVA MUTUM MC 230 kV TR 230/69 kV NOVA MUTUM TF2 MT RBF FT TR 230/69 kV NOVA MUTUM TF2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
NOVA MUTUM MC 230 kV TR 230/69 kV NOVA MUTUM TF1 MT RBF FT TR 230/69 kV NOVA MUTUM TF1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
NOVA MUTUM MC 230 kV TR 230/69 kV NOVA MUTUM TF1 MT RBF FT TR 230/69 kV NOVA MUTUM TF1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$432,295.55
NOVA MUTUM MC 230 kV TR 230/69 kV NOVA MUTUM TF1 MT RBF FT TR 230/69 kV NOVA MUTUM TF1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$356,343.44
NOVA MUTUM MC 230 kV RTL 230 kV 20 MVAr NOVA MUTUM RT1 MT  RB FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$108,600.16
NOVA MUTUM IB 230 kV MG 230 kV NOVA MUTUM MG1 MT IB1 RB FT MG 230 kV NOVA MUTUM MG1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
NOVA MUTUM EL 230 kV NOVA MUTUM LT 230 kV NOVA MUTUM /SORRISO C-1 MT  RB FT LT 230 kV NOVA MUTUM /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
NOVA MUTUM EL 230 kV NOVA MUTUM LT 230 kV NOBRES /NOVA MUTUM C-1 MT  RB FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
NOVA MUTUM EL 13,8 kV NOVA MUTUMDIST1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$59,058.38
NOVA MUTUM PARANA TR 230/69 kV NOVA MUTUM PARANA TRR1 RO RBF FT TR 230/69 kV NOVA MUTUM PARANA TRR1 RO 058/2001 IPCA RBNI REA 4661/2014 01/07/2022 12/06/2048  R$77,823.77
NOVA MUTUM PARANA MG 230 kV NOVA MUTUM PARANA MG1 RO RB FT MG 230 kV NOVA MUTUM PARANA MG1 RO 058/2001 IPCA RBNI REA 4661/2014 01/07/2022 12/06/2048  R$45,558.23
NOVA MUTUM PARANA MC 69 kV TR 230/69 kV NOVA MUTUM PARANA TR1 RO  RBF FT TR 230/69 kV NOVA MUTUM PARANA TR1 RO 058/2001 IPCA RBNI REA 4661/2014 01/07/2022 12/06/2048  R$29,662.39
NOVA MUTUM PARANA MC 230 kV TR 230/69 kV NOVA MUTUM PARANA TR1 RO  RBF FT TR 230/69 kV NOVA MUTUM PARANA TR1 RO 058/2001 IPCA RBNI REA 4661/2014 01/07/2022 12/06/2048  R$81,693.03
P.DUTRA TT 69/0 kV P.DUTRA TT1 MA DIT   058/2001 IPCA RCDM REN 443/2011 30/11/2019 29/11/2049  R$220,311.10
P.DUTRA TR 500/230 kV P.DUTRA TRR1 MA RB FT TR 500/230 kV P.DUTRA TRR1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$573,404.74
P.DUTRA TR 500/230 kV P.DUTRA TRR1 MA RB FT TR 500/230 kV P.DUTRA TRR1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,364,229.71
P.DUTRA TR 500/230 kV P.DUTRA TRR1 MA RB FT TR 500/230 kV P.DUTRA TRR1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,124,541.55
P.DUTRA TR 500/230 kV P.DUTRA TR1 MA RB FT TR 500/230 kV P.DUTRA TR1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,720,214.21
P.DUTRA TR 500/230 kV P.DUTRA TR1 MA RB FT TR 500/230 kV P.DUTRA TR1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,092,689.12
P.DUTRA TR 500/230 kV P.DUTRA TR1 MA RB FT TR 500/230 kV P.DUTRA TR1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,373,624.67
P.DUTRA TR 500/230 kV P.DUTRA TR1 MA RB FT TR 500/230 kV P.DUTRA TR1 MA 058/2001 IPCA RMEL REN 443/2011 14/05/2017 13/05/2031  R$29,620.82
P.DUTRA TR 230/69 kV P.DUTRA TF6 MA RBF FT TR 230/69 kV P.DUTRA TF6 MA 058/2001 IPCA RBNI REA 8348/2019 28/12/2021 28/12/2055  R$ 1,330,343.96
P.DUTRA TR 230/69 kV P.DUTRA TF5 MA RBF FT TR 230/69 kV P.DUTRA TF5 MA 058/2001 IPCA RBNI REA 2533/2010 03/09/2012 02/09/2046  R$ 1,031,572.08
P.DUTRA TR 230/69 kV P.DUTRA TF4 MA RBF FT TR 230/69 kV P.DUTRA TF4 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$292,247.16
P.DUTRA TR 230/69 kV P.DUTRA TF1 MA RBF FT TR 230/69 kV P.DUTRA TF1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$292,247.16
P.DUTRA TR 230/69 kV P.DUTRA TF1 MA RBF FT TR 230/69 kV P.DUTRA TF1 MA 058/2001 IPCA RMEL REN 443/2011 19/02/2017 18/02/2031  R$23,013.71
P.DUTRA TR 230/13,8 kV P.DUTRA TRR3 MA RB FT TR 230/13,8 kV P.DUTRA TRR3 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$249,624.39
P.DUTRA TR 230/13,8 kV P.DUTRA TF3 MA RB FT CS 100/-70 MVAr P.DUTRA CS1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$748,861.82
P.DUTRA TR 230/13,8 kV P.DUTRA TF3 MA RB FT CS 100/-70 MVAr P.DUTRA CS1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,781,672.66
P.DUTRA TR 230/13,8 kV P.DUTRA TF3 MA RB FT CS 100/-70 MVAr P.DUTRA CS1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,468,641.93
P.DUTRA TR 230/13,8 kV P.DUTRA TF3 MA RB FT CS 100/-70 MVAr P.DUTRA CS1 MA 058/2001 IPCA RMEL REN 443/2011 15/02/2017 14/02/2031  R$24,762.24
P.DUTRA RTL 500 kV 50 Mvar P.DUTRA RTR1 MA RB FT RTL 500 kV 50 Mvar P.DUTRA RTR1 MA 058/2001 IPCA RMEL REA 9918/2021 04/05/2023 04/05/2059  R$665,043.77
P.DUTRA RTL 500 kV 45,3 Mvar P.DUTRA RTR1 MA RB FT RTL 500 kV 45,3 Mvar P.DUTRA RTR1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$295,430.36
P.DUTRA RTL 500 kV 45,3 Mvar P.DUTRA RTR1 MA RB FT RTL 500 kV 45,3 Mvar P.DUTRA RTR1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$702,880.27
P.DUTRA RTL 500 kV 45,3 Mvar P.DUTRA RTR1 MA RB FT RTL 500 kV 45,3 Mvar P.DUTRA RTR1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$579,387.82
P.DUTRA RTL 500 kV 150 MVAr P.DUTRA RT8 MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$914,948.10
P.DUTRA RTL 500 kV 150 MVAr P.DUTRA RT8 MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,176,820.84
P.DUTRA RTL 500 kV 150 MVAr P.DUTRA RT8 MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,794,364.60
P.DUTRA RTL 500 kV 150 MVAr P.DUTRA RT8 MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 058/2001 IPCA RMEL REN 443/2011 26/11/2017 25/11/2040  R$28,385.43
P.DUTRA RTL 500 kV 150 MVAr P.DUTRA RT4 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$914,948.10
P.DUTRA RTL 500 kV 150 MVAr P.DUTRA RT4 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RMEL REA 2837/2011 24/03/2013 23/03/2043  R$18,907.96
P.DUTRA RTL 500 kV 150 MVAr P.DUTRA RT4 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,176,820.84
P.DUTRA RTL 500 kV 150 MVAr P.DUTRA RT4 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,794,364.60
P.DUTRA RTL 500 kV 150 MVAr P.DUTRA RT4 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RMEL REN 443/2011 13/02/2017 12/02/2031  R$23,219.47
P.DUTRA RTL 500 kV 150 MVAr P.DUTRA RT11 MA RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$914,948.10
P.DUTRA RTL 500 kV 150 MVAr P.DUTRA RT11 MA RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 058/2001 IPCA RMEL REN 443/2011 19/11/2017 18/11/2047  R$20,144.94
P.DUTRA RTL 500 kV 136 MVAr P.DUTRA RT7 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$886,504.62
P.DUTRA RTL 500 kV 136 MVAr P.DUTRA RT7 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,109,148.84
P.DUTRA RTL 500 kV 136 MVAr P.DUTRA RT7 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,738,582.23
P.DUTRA RTL 500 kV 136 MVAr P.DUTRA RT7 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RMEL REN 443/2011 10/04/2017 09/04/2031  R$23,298.88
P.DUTRA RTL 500 kV 136 MVAr P.DUTRA RT3 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$886,504.62
P.DUTRA RTL 500 kV 136 MVAr P.DUTRA RT3 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,109,148.84
P.DUTRA RTL 500 kV 136 MVAr P.DUTRA RT3 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,738,582.23
P.DUTRA RTL 500 kV 136 MVAr P.DUTRA RT3 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA 058/2001 IPCA RMEL REN 443/2011 08/10/2017 07/10/2051  R$21,363.56
P.DUTRA RTL 500 kV 136 Mvar P.DUTRA RT2 MA RB FT LT 500 kV SANTO A. DOS LOPES /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$886,504.62
P.DUTRA RTL 500 kV 136 Mvar P.DUTRA RT2 MA RB FT LT 500 kV SANTO A. DOS LOPES /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,109,148.84
P.DUTRA RTL 500 kV 136 Mvar P.DUTRA RT2 MA RB FT LT 500 kV SANTO A. DOS LOPES /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,738,582.23
P.DUTRA RTL 500 kV 100 MVAr P.DUTRA RT6 MA RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$797,242.53
P.DUTRA RTL 500 kV 100 MVAr P.DUTRA RT6 MA RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,896,778.80
P.DUTRA RTL 500 kV 100 MVAr P.DUTRA RT6 MA RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,563,524.51
P.DUTRA RTL 500 kV 100 MVAr P.DUTRA RT5 MA RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$797,242.53
P.DUTRA RTL 500 kV 100 MVAr P.DUTRA RT5 MA RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,896,778.80
P.DUTRA RTL 500 kV 100 MVAr P.DUTRA RT5 MA RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,563,524.51
P.DUTRA RTB 500 kV 54,4 MVAr P.DUTRA RTR1 MA RB FT RTB 500 kV 54,4 MVAr P.DUTRA RTR1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$313,144.05
P.DUTRA RTB 500 kV 54,4 MVAr P.DUTRA RTR1 MA RB FT RTB 500 kV 54,4 MVAr P.DUTRA RTR1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$745,024.21
P.DUTRA RTB 500 kV 54,4 MVAr P.DUTRA RTR1 MA RB FT RTB 500 kV 54,4 MVAr P.DUTRA RTR1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$614,127.28
P.DUTRA RTB 500 kV 33,3 Mvar P.DUTRA RTR1 MA RB FT RTB 500 kV 33,3 Mvar P.DUTRA RTR1 MA 058/2001 IPCA RMEL REA 9918/2021 07/05/2023 07/05/2059  R$630,972.50
P.DUTRA RTB 500 kV 163 MVAr P.DUTRA RT9 MA RB FT RTB 500 kV 163 MVAr P.DUTRA RT9 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$939,076.17
P.DUTRA RTB 500 kV 163 MVAr P.DUTRA RT9 MA RB FT RTB 500 kV 163 MVAr P.DUTRA RT9 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,234,225.70
P.DUTRA RTB 500 kV 163 MVAr P.DUTRA RT9 MA RB FT RTB 500 kV 163 MVAr P.DUTRA RT9 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,841,683.72
P.DUTRA RTB 500 kV 163 MVAr P.DUTRA RT9 MA RB FT RTB 500 kV 163 MVAr P.DUTRA RT9 MA 058/2001 IPCA RMEL REN 443/2011 06/02/2017 05/02/2031  R$23,198.18
P.DUTRA RTB 500 kV 150 MVAr P.DUTRA RT1 MA RB FT RTB 500 kV 150 MVAr P.DUTRA RT1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$914,948.10
P.DUTRA RTB 500 kV 150 MVAr P.DUTRA RT1 MA RB FT RTB 500 kV 150 MVAr P.DUTRA RT1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,176,820.84
P.DUTRA RTB 500 kV 150 MVAr P.DUTRA RT1 MA RB FT RTB 500 kV 150 MVAr P.DUTRA RT1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,794,364.60
P.DUTRA MG 500 kV P.DUTRA MG1 MA RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,516,479.47
P.DUTRA MG 500 kV P.DUTRA MG1 MA RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBNI REN 443/2011 29/06/2017 28/06/2045  R$55,879.94
P.DUTRA MG 500 kV P.DUTRA MG1 MA RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBNI REN 443/2011 29/06/2017 28/06/2045  R$55,879.94
P.DUTRA MG 500 kV P.DUTRA MG1 MA RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBNI REA 8348/2019 28/12/2021 28/12/2052  R$163,456.46
P.DUTRA MG 500 kV P.DUTRA MG1 MA RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBNI REA 8348/2019 28/12/2021 28/12/2052  R$45,794.77
P.DUTRA MC 69 kV TR 230/69 kV P.DUTRA TF6 MA RBF FT TR 230/69 kV P.DUTRA TF6 MA 058/2001 IPCA RBNI REA 8348/2019 28/12/2021 28/12/2048  R$352,053.90
P.DUTRA MC 69 kV TR 230/69 kV P.DUTRA TF5 MA RBF FT TR 230/69 kV P.DUTRA TF5 MA 058/2001 IPCA RBNI REA 2533/2010 03/09/2012 02/09/2044  R$338,544.67
P.DUTRA MC 69 kV TR 230/69 kV P.DUTRA TF4 MA  RBF FT TR 230/69 kV P.DUTRA TF4 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$74,117.78
P.DUTRA MC 69 kV TR 230/69 kV P.DUTRA TF1 MA  RBF FT TR 230/69 kV P.DUTRA TF1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$74,117.78
P.DUTRA MC 500 kV TR 500/230 kV P.DUTRA TR1 MA RB FT TR 500/230 kV P.DUTRA TR1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$490,032.13
P.DUTRA MC 500 kV RTL 500 kV 150 MVAr P.DUTRA RT8 MA  RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$296,882.99
P.DUTRA MC 500 kV RTL 500 kV 150 MVAr P.DUTRA RT4 MA  RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$296,882.99
P.DUTRA MC 500 kV RTL 500 kV 150 MVAr P.DUTRA RT11 MA  RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$296,882.99
P.DUTRA MC 500 kV RTL 500 kV 136 MVAr P.DUTRA RT7 MA  RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$296,882.99
P.DUTRA MC 500 kV RTL 500 kV 136 MVAr P.DUTRA RT3 MA  RB FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$296,882.99
P.DUTRA MC 500 kV RTL 500 kV 136 Mvar P.DUTRA RT2 MA  RB FT LT 500 kV SANTO A. DOS LOPES /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$296,882.99
P.DUTRA MC 500 kV RTL 500 kV 100 MVAr P.DUTRA RT6 MA  RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$296,882.99
P.DUTRA MC 500 kV RTL 500 kV 100 MVAr P.DUTRA RT5 MA  RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$296,882.99
P.DUTRA MC 500 kV RTB 500 kV 163 MVAr P.DUTRA RT9 MA RB FT RTB 500 kV 163 MVAr P.DUTRA RT9 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$458,814.80
P.DUTRA MC 500 kV RTB 500 kV 163 MVAr P.DUTRA RT9 MA RB FT RTB 500 kV 163 MVAr P.DUTRA RT9 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,091,600.28
P.DUTRA MC 500 kV RTB 500 kV 163 MVAr P.DUTRA RT9 MA RB FT RTB 500 kV 163 MVAr P.DUTRA RT9 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$899,811.72
P.DUTRA MC 500 kV RTB 500 kV 150 MVAr P.DUTRA RT1 MA  RB FT RTB 500 kV 150 MVAr P.DUTRA RT1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$458,814.80
P.DUTRA MC 500 kV RTB 500 kV 150 MVAr P.DUTRA RT1 MA  RB FT RTB 500 kV 150 MVAr P.DUTRA RT1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,091,600.28
P.DUTRA MC 500 kV RTB 500 kV 150 MVAr P.DUTRA RT1 MA  RB FT RTB 500 kV 150 MVAr P.DUTRA RT1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$899,811.72
P.DUTRA MC 230 kV TR 500/230 kV P.DUTRA TR1 MA RB FT TR 500/230 kV P.DUTRA TR1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,482.24
P.DUTRA MC 230 kV TR 230/69 kV P.DUTRA TF6 MA RBF FT TR 230/69 kV P.DUTRA TF6 MA 058/2001 IPCA RBNI REA 8348/2019 28/12/2021 28/12/2049  R$930,321.69
P.DUTRA MC 230 kV TR 230/69 kV P.DUTRA TF5 MA RBF FT TR 230/69 kV P.DUTRA TF5 MA 058/2001 IPCA RBNI REA 2533/2010 03/09/2012 02/09/2041  R$901,166.22
P.DUTRA MC 230 kV TR 230/69 kV P.DUTRA TF4 MA RBF FT TR 230/69 kV P.DUTRA TF4 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,482.24
P.DUTRA MC 230 kV TR 230/69 kV P.DUTRA TF1 MA  RBF FT TR 230/69 kV P.DUTRA TF1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,482.24
P.DUTRA MC 230 kV TR 230/13,8 kV P.DUTRA TF3 MA  RB FT CS 100/-70 MVAr P.DUTRA CS1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,482.24
P.DUTRA MC 13,8 kV CS 100/-70 MVAr P.DUTRA CS2 MA RB FT CS 100/-70 MVAr P.DUTRA CS2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$71,399.30
P.DUTRA MC 13,8 kV CS 100/-70 MVAr P.DUTRA CS1 MA RB FT CS 100/-70 MVAr P.DUTRA CS1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$71,399.30
P.DUTRA IB 69 kV MG 500 kV P.DUTRA MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$49,815.59
P.DUTRA IB 69 kV MG 500 kV P.DUTRA MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$118,519.96
P.DUTRA IB 69 kV MG 500 kV P.DUTRA MG1 MA IB1 DIT   058/2001 IPCA RCDM REA 8348/2019 28/12/2021 28/12/2036  R$43,595.85
P.DUTRA IB 500 kV MG 500 kV P.DUTRA MG1 MA IB4 RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$520,028.84
P.DUTRA IB 500 kV MG 500 kV P.DUTRA MG1 MA IB4 RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,237,239.15
P.DUTRA IB 500 kV MG 500 kV P.DUTRA MG1 MA IB3 RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$520,028.84
P.DUTRA IB 500 kV MG 500 kV P.DUTRA MG1 MA IB3 RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,237,239.15
P.DUTRA IB 500 kV MG 500 kV P.DUTRA MG1 MA IB2 RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$520,028.84
P.DUTRA IB 500 kV MG 500 kV P.DUTRA MG1 MA IB2 RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,237,239.15
P.DUTRA IB 500 kV MG 500 kV P.DUTRA MG1 MA IB1 RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$520,028.84
P.DUTRA IB 500 kV MG 500 kV P.DUTRA MG1 MA IB1 RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,237,239.15
P.DUTRA IB 230 kV MG 500 kV P.DUTRA MG1 MA IB1 RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
P.DUTRA IB 230 kV MG 500 kV P.DUTRA MG1 MA IB1 RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBNI REA 8348/2019 28/12/2021 28/12/2036  R$129,049.67
P.DUTRA EL 69 kV P.DUTRADIST2 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
P.DUTRA EL 69 kV P.DUTRADIST1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
P.DUTRA EL 69 kV P.DUTRACEMAR DIT   058/2001 IPCA RCDM REN 443/2011 29/06/2017 28/06/2046  R$412,042.59
P.DUTRA EL 69 kV P.DUTRABARRA CORDA DIT   058/2001 IPCA RCDM REN 443/2011 29/06/2017 28/06/2046  R$412,042.59
P.DUTRA EL 500 kV P.DUTRA LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA  RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
P.DUTRA EL 500 kV P.DUTRA LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA  RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 058/2001 IPCA RBNI REA 5861/2016 03/06/2019 02/06/2034  R$13,847.08
P.DUTRA EL 500 kV P.DUTRA LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
P.DUTRA EL 500 kV P.DUTRA LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,320,962.73
P.DUTRA EL 500 kV P.DUTRA LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,088,876.36
P.DUTRA EL 500 kV P.DUTRA LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 058/2001 IPCA RBNI REA 5861/2016 03/06/2019 02/06/2034  R$13,847.08
P.DUTRA EL 500 kV P.DUTRA LT 500 kV SANTO A. DOS LOPES /P.DUTRA C-1 MA  RB FT LT 500 kV SANTO A. DOS LOPES /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
P.DUTRA EL 500 kV P.DUTRA LT 500 kV SANTO A. DOS LOPES /P.DUTRA C-1 MA  RB FT LT 500 kV SANTO A. DOS LOPES /P.DUTRA C-1 MA 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$13,886.38
P.DUTRA EL 500 kV P.DUTRA LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI  RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
P.DUTRA EL 500 kV P.DUTRA LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI  RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$13,851.57
P.DUTRA EL 500 kV P.DUTRA LT 500 kV MIRANDA II /P.DUTRA C-2 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
P.DUTRA EL 500 kV P.DUTRA LT 500 kV MIRANDA II /P.DUTRA C-2 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,320,962.73
P.DUTRA EL 500 kV P.DUTRA LT 500 kV MIRANDA II /P.DUTRA C-2 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$13,847.08
P.DUTRA EL 500 kV P.DUTRA LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
P.DUTRA EL 500 kV P.DUTRA LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,320,962.73
P.DUTRA EL 500 kV P.DUTRA LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$13,850.46
P.DUTRA EL 500 kV P.DUTRA LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
P.DUTRA EL 230 kV P.DUTRA LT 230 kV P.DUTRA /PERITORO C-1 MA  RB FT LT 230 kV P.DUTRA /PERITORO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$267,055.89
P.DUTRA EL 230 kV P.DUTRA LT 230 kV P.DUTRA /PERITORO C-1 MA  RB FT LT 230 kV P.DUTRA /PERITORO C-1 MA 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$13,848.19
P.DUTRA EL 13,8 kV P.DUTRADIST2 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$59,058.38
P.DUTRA CS 100/-70 MVAr P.DUTRA CS2 MA RB FT CS 100/-70 MVAr P.DUTRA CS2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,535,361.40
P.DUTRA CS 100/-70 MVAr P.DUTRA CS2 MA RB FT CS 100/-70 MVAr P.DUTRA CS2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,652,892.11
P.DUTRA CS 100/-70 MVAr P.DUTRA CS2 MA RB FT CS 100/-70 MVAr P.DUTRA CS2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,011,097.73
P.DUTRA CS 100/-70 MVAr P.DUTRA CS1 MA RB FT CS 100/-70 MVAr P.DUTRA CS1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,535,361.40
P.DUTRA CS 100/-70 MVAr P.DUTRA CS1 MA RB FT CS 100/-70 MVAr P.DUTRA CS1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,652,892.11
P.DUTRA CS 100/-70 MVAr P.DUTRA CS1 MA RB FT CS 100/-70 MVAr P.DUTRA CS1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,011,097.73
P.DUTRA CR 500 kV 454 MVAr P.DUTRA BC2 MA RB FT CR 500 kV 454 MVAr P.DUTRA BC2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,630,903.61
P.DUTRA CR 500 kV 454 MVAr P.DUTRA BC2 MA RB FT CR 500 kV 454 MVAr P.DUTRA BC2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,880,203.65
P.DUTRA CR 500 kV 454 MVAr P.DUTRA BC2 MA RB FT CR 500 kV 454 MVAr P.DUTRA BC2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,198,471.80
P.DUTRA CR 500 kV 390 MVAr P.DUTRA BC1 MA RB FT CR 500 kV 390 MVAr P.DUTRA BC1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,444,065.95
P.DUTRA CR 500 kV 390 MVAr P.DUTRA BC1 MA RB FT CR 500 kV 390 MVAr P.DUTRA BC1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,435,684.31
P.DUTRA CR 500 kV 390 MVAr P.DUTRA BC1 MA RB FT CR 500 kV 390 MVAr P.DUTRA BC1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,832,052.23
PERITORO TT 69/0 kV PERITORO TT1 MA DIT   058/2001 IPCA RCDM REN 443/2011 09/05/2014 08/05/2044  R$138,518.67
PERITORO TR 230/69 kV PERITORO TR3 MA RBF FT TR 230/69 kV PERITORO TR3 MA 058/2001 IPCA RBNI REA 2533/2010 03/09/2012 02/09/2046  R$ 1,362,296.66
PERITORO TR 230/69 kV PERITORO TF2 MA RBF FT TR 230/69 kV PERITORO TF2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$417,691.47
PERITORO TR 230/69 kV PERITORO TF1 MA RBF FT TR 230/69 kV PERITORO TF1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$417,691.47
PERITORO TR 230/69 kV PERITORO TF1 MA RBF FT TR 230/69 kV PERITORO TF1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$993,760.73
PERITORO TR 230/69 kV PERITORO TF1 MA RBF FT TR 230/69 kV PERITORO TF1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$819,162.08
PERITORO MG 230 kV PERITORO MG1 MA RB FT MG 230 kV PERITORO MG1 MA 058/2001 IPCA RBNI REA 2533/2010 03/09/2012 02/09/2039  R$206,211.85
PERITORO MG 230 kV PERITORO MG1 MA RB FT MG 230 kV PERITORO MG1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$647,570.20
PERITORO MG 230 kV PERITORO MG1 MA RB FT MG 230 kV PERITORO MG1 MA 058/2001 IPCA RBNI REN 443/2011 08/08/2019 07/08/2050  R$36,632.28
PERITORO MC 69 kV TR 230/69 kV PERITORO TR3 MA RBF FT TR 230/69 kV PERITORO TR3 MA 058/2001 IPCA RBNI REA 2533/2010 03/09/2012 02/09/2042  R$339,002.75
PERITORO MC 69 kV TR 230/69 kV PERITORO TF2 MA  RBF FT TR 230/69 kV PERITORO TF2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$74,117.78
PERITORO MC 69 kV TR 230/69 kV PERITORO TF2 MA  RBF FT TR 230/69 kV PERITORO TF2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$176,339.10
PERITORO MC 69 kV TR 230/69 kV PERITORO TF2 MA  RBF FT TR 230/69 kV PERITORO TF2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$145,357.23
PERITORO MC 69 kV TR 230/69 kV PERITORO TF1 MA RBF FT TR 230/69 kV PERITORO TF1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$74,117.78
PERITORO MC 69 kV TR 230/69 kV PERITORO TF1 MA RBF FT TR 230/69 kV PERITORO TF1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$176,339.10
PERITORO MC 69 kV TR 230/69 kV PERITORO TF1 MA RBF FT TR 230/69 kV PERITORO TF1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$145,357.23
PERITORO MC 230 kV TR 230/69 kV PERITORO TR3 MA RBF FT TR 230/69 kV PERITORO TR3 MA 058/2001 IPCA RBNI REA 2533/2010 03/09/2012 02/09/2042  R$892,819.23
PERITORO MC 230 kV TR 230/69 kV PERITORO TF2 MA  RBF FT TR 230/69 kV PERITORO TF2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,482.24
PERITORO MC 230 kV TR 230/69 kV PERITORO TF2 MA  RBF FT TR 230/69 kV PERITORO TF2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$455,569.58
PERITORO MC 230 kV TR 230/69 kV PERITORO TF2 MA  RBF FT TR 230/69 kV PERITORO TF2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$375,528.35
PERITORO MC 230 kV TR 230/69 kV PERITORO TF1 MA RBF FT TR 230/69 kV PERITORO TF1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,482.24
PERITORO MC 230 kV TR 230/69 kV PERITORO TF1 MA RBF FT TR 230/69 kV PERITORO TF1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$455,569.58
PERITORO MC 230 kV TR 230/69 kV PERITORO TF1 MA RBF FT TR 230/69 kV PERITORO TF1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$375,528.35
PERITORO MC 230 kV BC 230 kV 20 Mvar PERITORO BC1 MA  RB FT BC 230 kV 20 Mvar PERITORO BC1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$213,621.98
PERITORO IB 69 kV MG 230 kV PERITORO MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$49,815.59
PERITORO IB 230 kV MG 230 kV PERITORO MG1 MA IB1 RB FT MG 230 kV PERITORO MG1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
PERITORO EL 69 kV PERITORODIST9 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
PERITORO EL 69 kV PERITORODIST8 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
PERITORO EL 69 kV PERITORODIST7 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
PERITORO EL 69 kV PERITORODIST6 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
PERITORO EL 69 kV PERITORODIST6 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$206,153.28
PERITORO EL 69 kV PERITORODIST6 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$169,794.04
PERITORO EL 69 kV PERITORODIST5 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
PERITORO EL 69 kV PERITORODIST5 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$206,153.28
PERITORO EL 69 kV PERITORODIST5 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$169,794.04
PERITORO EL 69 kV PERITORODIST4 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
PERITORO EL 69 kV PERITORODIST3 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
PERITORO EL 69 kV PERITORODIST2 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
PERITORO EL 69 kV PERITORODIST10 DIT   058/2001 IPCA RCDM REN 443/2011 08/08/2019 07/08/2047  R$408,326.30
PERITORO EL 69 kV PERITORODIST1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
PERITORO EL 230 kV PERITORO LT 230 kV PERITORO /COELHO NETO C-1 MA RB FT LT 230 kV PERITORO /COELHO NETO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$267,055.89
PERITORO EL 230 kV PERITORO LT 230 kV P.DUTRA /PERITORO C-1 MA  RB FT LT 230 kV P.DUTRA /PERITORO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$267,055.89
PERITORO EL 230 kV PERITORO LT 230 kV MIRANDA II /PERITORO C-1 MA RB FT LT 230 kV MIRANDA II /PERITORO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$267,055.89
PERITORO EL 13,8 kV PERITORODIST6 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$59,058.38
PERITORO EL 13,8 kV PERITORODIST5 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$59,058.38
PERITORO BC 230 kV 20 Mvar PERITORO BC1 MA RB FT BC 230 kV 20 Mvar PERITORO BC1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$137,440.45
PIMENTA BUENO TR 230/138 kV PIMENTA BUENO TR2 RO RBF FT TR 230/138 kV PIMENTA BUENO TR2 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$324,502.71
PIMENTA BUENO TR 230/138 kV PIMENTA BUENO TR1 RO RBF FT TR 230/138 kV PIMENTA BUENO TR1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$324,502.71
PIMENTA BUENO RTN 230 kV 0,1 Mvar PIMENTA BUENO RN1 RO RB FT LT 230 kV JI-PARANA /PIMENTA BUENO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$16,313.10
PIMENTA BUENO RTL 230 kV 20 Mvar PIMENTA BUENO RT1 RO RB FT LT 230 kV JI-PARANA /PIMENTA BUENO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$255,797.82
PIMENTA BUENO RTL 230 kV 0 Mvar PIMENTA BUENO RT4 RO RB FT LT 230 kV JI-PARANA /PIMENTA BUENO C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039  R$689,609.76
PIMENTA BUENO RTB 230 kV 20 Mvar PIMENTA BUENO RT2 RO RB FT RTB 230 kV 20 Mvar PIMENTA BUENO RT2 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$255,797.82
PIMENTA BUENO MG 230 kV PIMENTA BUENO MG1 RO RB FT MG 230 kV PIMENTA BUENO MG1 RO 058/2001 IPCA RBNI REA 2533/2010 20/12/2012 19/12/2040  R$549,096.54
PIMENTA BUENO MG 230 kV PIMENTA BUENO MG1 RO RB FT MG 230 kV PIMENTA BUENO MG1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$610,252.58
PIMENTA BUENO MC 230 kV TR 230/138 kV PIMENTA BUENO TR2 RO  RBF FT TR 230/138 kV PIMENTA BUENO TR2 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
PIMENTA BUENO MC 230 kV TR 230/138 kV PIMENTA BUENO TR1 RO RBF FT TR 230/138 kV PIMENTA BUENO TR1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
PIMENTA BUENO MC 230 kV RTN 230 kV 0,1 Mvar PIMENTA BUENO RN1 RO  RB FT LT 230 kV JI-PARANA /PIMENTA BUENO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$11,080.96
PIMENTA BUENO MC 230 kV RTL 230 kV 0 Mvar PIMENTA BUENO RT4 RO RB FT LT 230 kV JI-PARANA /PIMENTA BUENO C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039  R$228,828.44
PIMENTA BUENO MC 230 kV RTB 230 kV 20 Mvar PIMENTA BUENO RT2 RO  RB FT RTB 230 kV 20 Mvar PIMENTA BUENO RT2 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,729.23
PIMENTA BUENO MC 230 kV BC 230 kV 18 Mvar PIMENTA BUENO BC3 RO  RB FT BC 230 kV 18 Mvar PIMENTA BUENO BC3 RO 058/2001 IPCA RBNI REA 2533/2010 20/12/2012 19/12/2043  R$785,702.82
PIMENTA BUENO MC 230 kV BC 230 kV 18 Mvar PIMENTA BUENO BC2 RO  RB FT BC 230 kV 18 Mvar PIMENTA BUENO BC2 RO 058/2001 IPCA RBNI REA 2533/2010 20/12/2012 19/12/2043  R$785,702.82
PIMENTA BUENO MC 230 kV BC 230 kV 18 Mvar PIMENTA BUENO BC1 RO MC2 RB FT BC 230 kV 18 Mvar PIMENTA BUENO BC1 RO 058/2001 IPCA RBNI REA 2533/2010 20/12/2012 19/12/2042  R$221,242.09
PIMENTA BUENO MC 230 kV BC 230 kV 18 Mvar PIMENTA BUENO BC1 RO MC1 RB FT BC 230 kV 18 Mvar PIMENTA BUENO BC1 RO 058/2001 IPCA RBNI REA 2533/2010 20/12/2012 19/12/2043  R$785,690.72
PIMENTA BUENO MC 138 kV TR 230/138 kV PIMENTA BUENO TR2 RO  RBF FT TR 230/138 kV PIMENTA BUENO TR2 RO 058/2001 IPCA RBNI REA 3470/2012 08/04/2015 07/04/2045  R$44,155.85
PIMENTA BUENO MC 138 kV TR 230/138 kV PIMENTA BUENO TR2 RO  RBF FT TR 230/138 kV PIMENTA BUENO TR2 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$121,674.23
PIMENTA BUENO MC 138 kV TR 230/138 kV PIMENTA BUENO TR1 RO  RBF FT TR 230/138 kV PIMENTA BUENO TR1 RO 058/2001 IPCA RBNI REA 3470/2012 08/04/2015 07/04/2045  R$44,155.85
PIMENTA BUENO MC 138 kV TR 230/138 kV PIMENTA BUENO TR1 RO  RBF FT TR 230/138 kV PIMENTA BUENO TR1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$121,674.23
PIMENTA BUENO IB 230 kV MG 230 kV PIMENTA BUENO MG1 RO IB1 RB FT MG 230 kV PIMENTA BUENO MG1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
PIMENTA BUENO EL 230 kV PIMENTA BUENO LT 230 kV PIMENTA BUENO /VILHENA C-3 RO  RB FT LT 230 kV PIMENTA BUENO /VILHENA C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039  R$698,323.25
PIMENTA BUENO EL 230 kV PIMENTA BUENO LT 230 kV PIMENTA BUENO /VILHENA C-1 RO RB FT LT 230 kV PIMENTA BUENO /VILHENA C-1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
PIMENTA BUENO EL 230 kV PIMENTA BUENO LT 230 kV JI-PARANA /PIMENTA BUENO C-3 RO  RB FT LT 230 kV JI-PARANA /PIMENTA BUENO C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039  R$698,323.25
PIMENTA BUENO EL 230 kV PIMENTA BUENO LT 230 kV JI-PARANA /PIMENTA BUENO C-1 RO RB FT LT 230 kV JI-PARANA /PIMENTA BUENO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
PIMENTA BUENO BC 230 kV 18 Mvar PIMENTA BUENO BC3 RO RB FT BC 230 kV 18 Mvar PIMENTA BUENO BC3 RO 058/2001 IPCA RBNI REA 2533/2010 20/12/2012 19/12/2032  R$295,037.67
PIMENTA BUENO BC 230 kV 18 Mvar PIMENTA BUENO BC2 RO RB FT BC 230 kV 18 Mvar PIMENTA BUENO BC2 RO 058/2001 IPCA RBNI REA 2533/2010 20/12/2012 19/12/2032  R$295,037.67
PIMENTA BUENO BC 230 kV 18 Mvar PIMENTA BUENO BC1 RO RB FT BC 230 kV 18 Mvar PIMENTA BUENO BC1 RO 058/2001 IPCA RBNI REA 2533/2010 20/12/2012 19/12/2032  R$294,663.32
PORTO FRANCO TT 69/0 kV PORTO FRANCO TA3 MA RB FT MG 230 kV PORTO FRANCO MG1 MA 058/2001 IPCA RBNI REA 4492/2014 21/06/2016 20/06/2046  R$150,874.64
PORTO FRANCO TR 230/69 kV PORTO FRANCO TF3 MA RBF FT TR 230/69 kV PORTO FRANCO TF3 MA 058/2001 IPCA RBNI REA 4492/2014 21/06/2016 20/06/2050  R$955,382.46
PORTO FRANCO TR 230/69 kV PORTO FRANCO TF2 MA RBF FT TR 230/69 kV PORTO FRANCO TF2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$217,048.06
PORTO FRANCO TR 230/69 kV PORTO FRANCO TF2 MA RBF FT TR 230/69 kV PORTO FRANCO TF2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$516,395.12
PORTO FRANCO TR 230/69 kV PORTO FRANCO TF2 MA RBF FT TR 230/69 kV PORTO FRANCO TF2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$425,667.15
PORTO FRANCO TR 230/69 kV PORTO FRANCO TF1 MA RBF FT TR 230/69 kV PORTO FRANCO TF1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$217,048.06
PORTO FRANCO TR 230/138 kV PORTO FRANCO TR3 MA RBF FT TR 230/138 kV PORTO FRANCO TR3 MA 058/2001 IPCA RBNI REA 3361/2012 16/07/2015 15/07/2049  R$ 1,364,211.79
PORTO FRANCO TR 230/138 kV PORTO FRANCO TR2 MA RBF FT TR 230/138 kV PORTO FRANCO TR2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$438,392.47
PORTO FRANCO TR 230/138 kV PORTO FRANCO TR1 MA RBF FT TR 230/138 kV PORTO FRANCO TR1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$438,392.47
PORTO FRANCO TR 230/138 kV PORTO FRANCO TR1 MA RBF FT TR 230/138 kV PORTO FRANCO TR1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,043,012.01
PORTO FRANCO TR 230/138 kV PORTO FRANCO TR1 MA RBF FT TR 230/138 kV PORTO FRANCO TR1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$859,760.16
PORTO FRANCO MG 230 kV PORTO FRANCO MG1 MA RB FT MG 230 kV PORTO FRANCO MG1 MA 058/2001 IPCA RBNI REA 3361/2012 16/07/2015 15/07/2042  R$189,444.76
PORTO FRANCO MG 230 kV PORTO FRANCO MG1 MA RB FT MG 230 kV PORTO FRANCO MG1 MA 058/2001 IPCA RBNI REA 3361/2012 16/07/2015 15/07/2041  R$119,666.02
PORTO FRANCO MG 230 kV PORTO FRANCO MG1 MA RB FT MG 230 kV PORTO FRANCO MG1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$660,227.70
PORTO FRANCO MG 230 kV PORTO FRANCO MG1 MA RB FT MG 230 kV PORTO FRANCO MG1 MA 058/2001 IPCA RBNI REA 4492/2014 21/06/2016 20/06/2044  R$337,088.38
PORTO FRANCO MG 230 kV PORTO FRANCO MG1 MA RB FT MG 230 kV PORTO FRANCO MG1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,570,796.65
PORTO FRANCO MG 230 kV PORTO FRANCO MG1 MA RB FT MG 230 kV PORTO FRANCO MG1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,294,815.74
PORTO FRANCO MG 230 kV PORTO FRANCO MG1 MA RB FT MG 230 kV PORTO FRANCO MG1 MA 058/2001 IPCA RBNI REN 443/2011 16/08/2017 15/08/2048  R$42,841.24
PORTO FRANCO MC 69 kV TT 69/0 kV PORTO FRANCO TA3 MA RB FT MG 230 kV PORTO FRANCO MG1 MA 058/2001 IPCA RBNI REA 4492/2014 21/06/2016 20/06/2047  R$255,776.17
PORTO FRANCO MC 69 kV TR 230/69 kV PORTO FRANCO TF3 MA RBF FT TR 230/69 kV PORTO FRANCO TF3 MA 058/2001 IPCA RBNI REA 4492/2014 21/06/2016 20/06/2046  R$678,126.78
PORTO FRANCO MC 69 kV TR 230/69 kV PORTO FRANCO TF2 MA RBF FT TR 230/69 kV PORTO FRANCO TF2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$74,117.78
PORTO FRANCO MC 69 kV TR 230/69 kV PORTO FRANCO TF2 MA RBF FT TR 230/69 kV PORTO FRANCO TF2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$176,339.10
PORTO FRANCO MC 69 kV TR 230/69 kV PORTO FRANCO TF1 MA  RBF FT TR 230/69 kV PORTO FRANCO TF1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$74,117.78
PORTO FRANCO MC 230 kV TR 230/69 kV PORTO FRANCO TF3 MA RBF FT TR 230/69 kV PORTO FRANCO TF3 MA 058/2001 IPCA RBNI REA 4492/2014 21/06/2016 20/06/2046  R$ 1,465,494.86
PORTO FRANCO MC 230 kV TR 230/69 kV PORTO FRANCO TF2 MA RBF FT TR 230/69 kV PORTO FRANCO TF2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
PORTO FRANCO MC 230 kV TR 230/69 kV PORTO FRANCO TF2 MA RBF FT TR 230/69 kV PORTO FRANCO TF2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$432,295.55
PORTO FRANCO MC 230 kV TR 230/69 kV PORTO FRANCO TF2 MA RBF FT TR 230/69 kV PORTO FRANCO TF2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$356,343.44
PORTO FRANCO MC 230 kV TR 230/69 kV PORTO FRANCO TF1 MA  RBF FT TR 230/69 kV PORTO FRANCO TF1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
PORTO FRANCO MC 230 kV TR 230/138 kV PORTO FRANCO TR3 MA RBF FT TR 230/138 kV PORTO FRANCO TR3 MA 058/2001 IPCA RBNI REA 3361/2012 16/07/2015 15/07/2045  R$923,706.25
PORTO FRANCO MC 230 kV TR 230/138 kV PORTO FRANCO TR2 MA RBF FT TR 230/138 kV PORTO FRANCO TR2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
PORTO FRANCO MC 230 kV TR 230/138 kV PORTO FRANCO TR1 MA RBF FT TR 230/138 kV PORTO FRANCO TR1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
PORTO FRANCO MC 230 kV TR 230/138 kV PORTO FRANCO TR1 MA RBF FT TR 230/138 kV PORTO FRANCO TR1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$432,295.55
PORTO FRANCO MC 230 kV TR 230/138 kV PORTO FRANCO TR1 MA RBF FT TR 230/138 kV PORTO FRANCO TR1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$356,343.44
PORTO FRANCO MC 138 kV TR 230/138 kV PORTO FRANCO TR3 MA RBF FT TR 230/138 kV PORTO FRANCO TR3 MA 058/2001 IPCA RBNI REA 3361/2012 16/07/2015 15/07/2046  R$760,871.35
PORTO FRANCO MC 138 kV TR 230/138 kV PORTO FRANCO TR2 MA RBF FT TR 230/138 kV PORTO FRANCO TR2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$132,859.59
PORTO FRANCO MC 138 kV TR 230/138 kV PORTO FRANCO TR1 MA RBF FT TR 230/138 kV PORTO FRANCO TR1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$132,859.59
PORTO FRANCO MC 138 kV TR 230/138 kV PORTO FRANCO TR1 MA RBF FT TR 230/138 kV PORTO FRANCO TR1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$316,096.10
PORTO FRANCO MC 138 kV TR 230/138 kV PORTO FRANCO TR1 MA RBF FT TR 230/138 kV PORTO FRANCO TR1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$260,559.64
PORTO FRANCO MC 13,8 kV TR 230/138 kV PORTO FRANCO TR3 MA RBF FT TR 230/138 kV PORTO FRANCO TR3 MA 058/2001 IPCA RBNI REA 3361/2012 16/07/2015 15/07/2044  R$31,407.18
PORTO FRANCO IB 69 kV MG 230 kV PORTO FRANCO MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$49,815.59
PORTO FRANCO IB 69 kV MG 230 kV PORTO FRANCO MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$118,519.96
PORTO FRANCO IB 69 kV MG 230 kV PORTO FRANCO MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$97,616.61
PORTO FRANCO IB 230 kV MG 230 kV PORTO FRANCO MG1 MA IB1 RB FT MG 230 kV PORTO FRANCO MG1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
PORTO FRANCO IB 230 kV MG 230 kV PORTO FRANCO MG1 MA IB1 RB FT MG 230 kV PORTO FRANCO MG1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$374,329.15
PORTO FRANCO IB 230 kV MG 230 kV PORTO FRANCO MG1 MA IB1 RB FT MG 230 kV PORTO FRANCO MG1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$308,561.44
PORTO FRANCO IB 138 kV MG 230 kV PORTO FRANCO MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$102,646.68
PORTO FRANCO EL 69 kV PORTO FRANCOSE SITIO NOVO DIT   058/2001 IPCA RCDM REN 443/2011 16/08/2017 15/08/2045  R$360,061.09
PORTO FRANCO EL 69 kV PORTO FRANCODIST2 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
PORTO FRANCO EL 69 kV PORTO FRANCODIST2 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$206,153.28
PORTO FRANCO EL 69 kV PORTO FRANCODIST2 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$169,794.04
PORTO FRANCO EL 69 kV PORTO FRANCODIST1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
PORTO FRANCO EL 69 kV PORTO FRANCODIST1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$206,153.28
PORTO FRANCO EL 69 kV PORTO FRANCODIST1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$169,794.04
PORTO FRANCO EL 230 kV PORTO FRANCO LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA RB FT LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
PORTO FRANCO EL 230 kV PORTO FRANCO LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA RB FT LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$614,190.55
PORTO FRANCO EL 230 kV PORTO FRANCO LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA RB FT LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$506,280.43
PORTO FRANCO EL 138 kV PORTO FRANCODIST2 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$198,106.19
PORTO FRANCO EL 138 kV PORTO FRANCODIST2 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$471,329.12
PORTO FRANCO EL 138 kV PORTO FRANCODIST2 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$388,200.84
PORTO FRANCO EL 138 kV PORTO FRANCODIST1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$198,106.19
PORTO FRANCO EL 138 kV PORTO FRANCODIST1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$471,329.12
PORTO FRANCO EL 138 kV PORTO FRANCODIST1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$388,200.84
PORTO VELHO TR 230/69 kV PORTO VELHO TR4 RO RBF FT TR 230/69 kV PORTO VELHO TR4 RO 058/2001 IPCA RBNI REA 2533/2010 25/06/2012 24/06/2046  R$ 1,411,326.45
PORTO VELHO TR 230/69 kV PORTO VELHO TR3 RO RBF FT TR 230/69 kV PORTO VELHO TR3 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$417,691.47
PORTO VELHO TR 230/69 kV PORTO VELHO TR2 RO RBF FT TR 230/69 kV PORTO VELHO TR2 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$417,691.47
PORTO VELHO TR 230/69 kV PORTO VELHO TR1 RO RBF FT TR 230/69 kV PORTO VELHO TR1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$417,691.47
PORTO VELHO TR 230/69 kV PORTO VELHO TR1 RO RBF FT TR 230/69 kV PORTO VELHO TR1 RO 058/2001 IPCA RBNI REA 5861/2016 19/06/2019 18/06/2054  R$264,035.16
PORTO VELHO MG 230 kV PORTO VELHO MG1 RO RB FT MG 230 kV PORTO VELHO MG1 RO 058/2001 IPCA RBNI REA 2533/2010 25/06/2012 24/06/2038  R$231,704.28
PORTO VELHO MG 230 kV PORTO VELHO MG1 RO RB FT MG 230 kV PORTO VELHO MG1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$587,010.88
PORTO VELHO MG 230 kV PORTO VELHO MG1 RO RB FT MG 230 kV PORTO VELHO MG1 RO 058/2001 IPCA RMEL REN 443/2011 01/09/2016 31/08/2033  R$232,502.69
PORTO VELHO MG 230 kV PORTO VELHO MG1 RO RB FT MG 230 kV PORTO VELHO MG1 RO 058/2001 IPCA RBNI REA 5861/2016 19/03/2021 18/03/2036  R$ 1,554,309.07
PORTO VELHO MC 69 kV TR 230/69 kV PORTO VELHO TR4 RO RBF FT TR 230/69 kV PORTO VELHO TR4 RO 058/2001 IPCA RBNI REA 2533/2010 25/06/2012 24/06/2043  R$350,812.47
PORTO VELHO MC 69 kV TR 230/69 kV PORTO VELHO TR3 RO  RBF FT TR 230/69 kV PORTO VELHO TR3 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$78,835.78
PORTO VELHO MC 69 kV TR 230/69 kV PORTO VELHO TR2 RO  RBF FT TR 230/69 kV PORTO VELHO TR2 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$78,835.78
PORTO VELHO MC 69 kV TR 230/69 kV PORTO VELHO TR1 RO  RBF FT TR 230/69 kV PORTO VELHO TR1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$78,835.78
PORTO VELHO MC 230 kV TR 230/69 kV PORTO VELHO TR4 RO RBF FT TR 230/69 kV PORTO VELHO TR4 RO 058/2001 IPCA RBNI REA 2533/2010 25/06/2012 24/06/2042  R$889,464.86
PORTO VELHO MC 230 kV TR 230/69 kV PORTO VELHO TR3 RO  RBF FT TR 230/69 kV PORTO VELHO TR3 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
PORTO VELHO MC 230 kV TR 230/69 kV PORTO VELHO TR2 RO  RBF FT TR 230/69 kV PORTO VELHO TR2 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
PORTO VELHO MC 230 kV TR 230/69 kV PORTO VELHO TR1 RO  RBF FT TR 230/69 kV PORTO VELHO TR1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
PORTO VELHO IB 230 kV MG 230 kV PORTO VELHO MG1 RO IB1 RB FT MG 230 kV PORTO VELHO MG1 RO 058/2001 IPCA RBNI REA 2533/2010 25/06/2012 24/06/2042  R$9,633.23
PORTO VELHO IB 230 kV MG 230 kV PORTO VELHO MG1 RO IB1 RB FT MG 230 kV PORTO VELHO MG1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV SAMUEL /PORTO VELHO C-3 RO  RB FT LT 230 kV SAMUEL /PORTO VELHO C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039  R$698,323.25
PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV SAMUEL /PORTO VELHO C-2 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-2 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV SAMUEL /PORTO VELHO C-2 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-2 RO 058/2001 IPCA RBNI REA 5833/2016 20/10/2017 19/10/2047  R$174,421.91
PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV SAMUEL /PORTO VELHO C-2 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-2 RO 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$14,799.56
PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV SAMUEL /PORTO VELHO C-1 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV SAMUEL /PORTO VELHO C-1 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-1 RO 058/2001 IPCA RBNI REA 5833/2016 20/10/2017 19/10/2047  R$174,421.91
PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV SAMUEL /PORTO VELHO C-1 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-1 RO 058/2001 IPCA RBNI REA 5861/2016 07/06/2019 06/06/2034  R$14,799.56
PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-2 RO RB FT LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-2 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039  R$386,131.90
PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-2 RO RB FT LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-2 RO 010/2009 IPCA RBNI REA 5861/2016 17/06/2019 16/06/2034  R$14,793.56
PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-1 RO RB FT LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-1 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039  R$386,131.90
PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-1 RO RB FT LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-1 RO 010/2009 IPCA RBNI REA 5861/2016 07/06/2019 06/06/2034  R$14,793.56
PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV ABUNA /PORTO VELHO C-2 RO  RB FT LT 230 kV ABUNA /PORTO VELHO C-2 RO 022/2009 IPCA RBNI REA 5861/2016 07/06/2019 06/06/2034  R$14,793.56
PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV ABUNA /PORTO VELHO C-2 RO  RB FT LT 230 kV ABUNA /PORTO VELHO C-2 RO 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039  R$715,201.15
PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV ABUNA /PORTO VELHO C-1 RO  RB FT LT 230 kV ABUNA /PORTO VELHO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV ABUNA /PORTO VELHO C-1 RO  RB FT LT 230 kV ABUNA /PORTO VELHO C-1 RO 058/2001 IPCA RBNI REA 5861/2016 17/06/2019 16/06/2034  R$14,799.56
PRATA MG 138 kV PRATA MG1 MT DIT   058/2001 IPCA RCDM DSP 555/2023 01/07/2023 26/01/2052  R$13,569.12
PRATA MG 138 kV PRATA MG1 MT DIT   058/2001 IPCA RCDM DSP 555/2023 01/07/2023 26/01/2052  R$13,569.12
PRATA EL 138 kV PRATA LT 138 kV RONDONOPOLIS /PRATA C-1 MT  DIT   058/2001 IPCA RCDM DSP 555/2023 01/07/2023 26/01/2048  R$151,880.08
PRATA EL 138 kV PRATA LT 138 kV PRATA /COXIPO C-1 MT  DIT   058/2001 IPCA RCDM DSP 555/2023 01/07/2023 26/01/2048  R$151,880.08
RIB.GONCALVES TT 69/0 kV RIB.GONCALVES TT1 PI DIT   001/2009 IPCA RPEC CC 001/2009 28/01/2009 28/01/2039  R$115,215.88
RIB.GONCALVES TR 500/230 kV RIB.GONCALVES TRR1 PI RB FT TR 500/230 kV RIB.GONCALVES TRR1 PI 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039  R$589,202.33
RIB.GONCALVES TR 500/230 kV RIB.GONCALVES TR1 PI RB FT TR 500/230 kV RIB.GONCALVES TR1 PI 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039  R$ 1,767,607.00
RIB.GONCALVES TR 500/230 kV RIB.GONCALVES AT2 PI RB FT TR 500/230 kV RIB.GONCALVES AT2 PI 001/2009 IPCA RBNI REA 4745/2014 13/07/2016 13/07/2050  R$ 4,751,525.13
RIB.GONCALVES TR 230/69 kV RIB.GONCALVES TR2 PI RBF FT TR 230/69 kV RIB.GONCALVES TR2 PI 001/2009 IPCA RBNI REA 8542/2020 28/12/2021 28/12/2056  R$925,650.38
RIB.GONCALVES TR 230/69 kV RIB.GONCALVES TR1 PI RBF FT TR 230/69 kV RIB.GONCALVES TR1 PI 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039  R$266,437.48
RIB.GONCALVES MG 500 kV RIB.GONCALVES MG3 PI RB FT MG 500 kV RIB.GONCALVES MG3 PI 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039  R$ 2,927,305.85
RIB.GONCALVES MG 500 kV RIB.GONCALVES MG3 PI RB FT MG 500 kV RIB.GONCALVES MG3 PI 001/2009 IPCA RBNI REA 4745/2014 13/07/2016 13/07/2047  R$584,329.38
RIB.GONCALVES MG 500 kV RIB.GONCALVES MG3 PI RB FT MG 500 kV RIB.GONCALVES MG3 PI 001/2009 IPCA RBNI REA 4745/2014 13/07/2016 13/07/2047  R$155,154.63
RIB.GONCALVES MG 500 kV RIB.GONCALVES MG3 PI RB FT MG 500 kV RIB.GONCALVES MG3 PI 001/2009 IPCA RBNI REA 8542/2020 22/12/2021 22/12/2052  R$183,636.40
RIB.GONCALVES MG 500 kV RIB.GONCALVES MG3 PI RB FT MG 500 kV RIB.GONCALVES MG3 PI 001/2009 IPCA RBNI DSP 4029/2021 18/04/2022 17/04/2037  R$51,482.47
RIB.GONCALVES MC 69 kV TT 69/0 kV RIB.GONCALVES TT1 PI  DIT   001/2009 IPCA RPEC CC 001/2009 28/01/2009 28/01/2039  R$28,804.47
RIB.GONCALVES MC 69 kV TR 230/69 kV RIB.GONCALVES TR2 PI RBF FT TR 230/69 kV RIB.GONCALVES TR2 PI 001/2009 IPCA RBNI REA 8542/2020 28/12/2021 28/12/2049  R$326,106.44
RIB.GONCALVES MC 69 kV TR 230/69 kV RIB.GONCALVES TR1 PI  RBF FT TR 230/69 kV RIB.GONCALVES TR1 PI 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039  R$49,288.45
RIB.GONCALVES MC 500 kV TR 500/230 kV RIB.GONCALVES TR1 PI  RB FT TR 500/230 kV RIB.GONCALVES TR1 PI 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039  R$643,546.57
RIB.GONCALVES MC 500 kV TR 500/230 kV RIB.GONCALVES AT2 PI RB FT TR 500/230 kV RIB.GONCALVES AT2 PI 001/2009 IPCA RBNI REA 4745/2014 13/07/2016 13/07/2044  R$ 1,715,054.14
RIB.GONCALVES MC 230 kV TR 500/230 kV RIB.GONCALVES TR1 PI RB FT TR 500/230 kV RIB.GONCALVES TR1 PI 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039  R$269,688.06
RIB.GONCALVES MC 230 kV TR 500/230 kV RIB.GONCALVES TR1 PI RB FT TR 500/230 kV RIB.GONCALVES TR1 PI 001/2009 IPCA RBNI REA 4745/2014 30/08/2016 30/08/2046  R$62,079.07
RIB.GONCALVES MC 230 kV TR 500/230 kV RIB.GONCALVES AT2 PI RB FT TR 500/230 kV RIB.GONCALVES AT2 PI 001/2009 IPCA RBNI REA 4745/2014 13/07/2016 13/07/2040  R$916,452.38
RIB.GONCALVES MC 230 kV TR 230/69 kV RIB.GONCALVES TR2 PI RBF FT TR 230/69 kV RIB.GONCALVES TR2 PI 001/2009 IPCA RBNI REA 8542/2020 28/12/2021 28/12/2049  R$869,145.06
RIB.GONCALVES MC 230 kV TR 230/69 kV RIB.GONCALVES TR1 PI  RBF FT TR 230/69 kV RIB.GONCALVES TR1 PI 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039  R$269,688.06
RIB.GONCALVES IB 69 kV MG 500 kV RIB.GONCALVES MG3 PI IB1 DIT   001/2009 IPCA RPEC CC 001/2009 28/01/2009 28/01/2039  R$23,792.65
RIB.GONCALVES IB 500 kV MG 500 kV RIB.GONCALVES MG3 PI IB2 RB FT MG 500 kV RIB.GONCALVES MG3 PI 001/2009 IPCA RBNI REA 4745/2014 13/07/2016 13/07/2046  R$ 1,579,037.54
RIB.GONCALVES IB 500 kV MG 500 kV RIB.GONCALVES MG3 PI IB1 RB FT MG 500 kV RIB.GONCALVES MG3 PI 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039  R$247,959.56
RIB.GONCALVES IB 230 kV MG 500 kV RIB.GONCALVES MG3 PI IB1 RB FT MG 500 kV RIB.GONCALVES MG3 PI 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039  R$149,122.79
RIB.GONCALVES EL 69 kV RIB.GONCALVESDIST1 DIT   001/2009 IPCA RPEC CC 001/2009 28/01/2009 28/01/2039  R$50,014.18
RIB.GONCALVES EL 230 kV RIB.GONCALVES LT 230 kV RIB.GONCALVES /BALSAS C-1 PI/MA RB FT LT 230 kV RIB.GONCALVES /BALSAS C-1 PI/MA 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039  R$310,774.09
RIO BRANCO 1 TR 230/69 kV RIO BRANCO 1 TR4 AC RBF FT TR 230/69 kV RIO BRANCO 1 TR4 AC 058/2001 IPCA RBNI REA 5746/2016 24/04/2018 24/04/2052  R$ 1,675,820.77
RIO BRANCO 1 TR 230/69 kV RIO BRANCO 1 TR3 AC RBF FT TR 230/69 kV RIO BRANCO 1 TR3 AC 058/2001 IPCA RBNI REA 2533/2010 05/10/2012 04/10/2046  R$ 1,420,541.55
RIO BRANCO 1 TR 230/69 kV RIO BRANCO 1 TR2 AC RBF FT TR 230/69 kV RIO BRANCO 1 TR2 AC 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$417,691.47
RIO BRANCO 1 TR 230/69 kV RIO BRANCO 1 TR1 AC RBF FT TR 230/69 kV RIO BRANCO 1 TR1 AC 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$417,691.47
RIO BRANCO 1 TR 230/138 kV RIO BRANCO 1 TR2 AC RBF FT TR 230/138 kV RIO BRANCO 1 TR2 AC 058/2001 IPCA RBNI REA 2911/2011 02/09/2013 01/09/2046  R$ 1,072,057.20
RIO BRANCO 1 TR 230/138 kV RIO BRANCO 1 TR1 AC RBF FT TR 230/138 kV RIO BRANCO 1 TR1 AC 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$324,502.71
RIO BRANCO 1 RTS 230 kV 0 Mvar RIO BRANCO 1 RLC5 AC RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC5 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2053  R$60,028.42
RIO BRANCO 1 RTS 230 kV 0 Mvar RIO BRANCO 1 RLC4 AC RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC4 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2053  R$60,028.42
RIO BRANCO 1 RTS 230 kV 0 Mvar RIO BRANCO 1 RLC3 AC RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC3 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2053  R$60,028.42
RIO BRANCO 1 RTS 230 kV 0 Mvar RIO BRANCO 1 RLC2 AC RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC2 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2053  R$60,028.42
RIO BRANCO 1 RTS 230 kV 0 Mvar RIO BRANCO 1 RLC1 AC RB FT BC 230 kV 18 Mvar RIO BRANCO 1 BC1 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2053  R$60,028.42
RIO BRANCO 1 RTN 69 kV 0 Mvar RIO BRANCO 1 RN1 AC RB FT RTL 230 kV 30 Mvar RIO BRANCO 1 RT1 AC 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$16,313.10
RIO BRANCO 1 RTL 230 kV 30 Mvar RIO BRANCO 1 RT3 AC RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-2 RO/AC 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039  R$712,339.08
RIO BRANCO 1 RTL 230 kV 30 Mvar RIO BRANCO 1 RT1 AC RB FT RTL 230 kV 30 Mvar RIO BRANCO 1 RT1 AC 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$272,633.98
RIO BRANCO 1 RTB 230 kV 20 Mvar RIO BRANCO 1 RT2 AC RB FT RTB 230 kV 20 Mvar RIO BRANCO 1 RT2 AC 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$255,797.82
RIO BRANCO 1 RTB 230 kV 0 Mvar RIO BRANCO 1 RT4 AC RB FT RTB 230 kV 0 Mvar RIO BRANCO 1 RT4 AC 058/2001 IPCA RBNI REA 4857/2014 12/09/2016 11/09/2051  R$642,909.75
RIO BRANCO 1 MG 230 kV RIO BRANCO 1 MG1 AC RB FT MG 230 kV RIO BRANCO 1 MG1 AC 058/2001 IPCA RBNI REA 2533/2010 05/10/2012 04/10/2039  R$233,350.25
RIO BRANCO 1 MG 230 kV RIO BRANCO 1 MG1 AC RB FT MG 230 kV RIO BRANCO 1 MG1 AC 058/2001 IPCA RBNI REA 2911/2011 09/09/2013 08/09/2041  R$ 1,035,461.67
RIO BRANCO 1 MG 230 kV RIO BRANCO 1 MG1 AC RB FT MG 230 kV RIO BRANCO 1 MG1 AC 058/2001 IPCA RBNI REA 2911/2011 09/09/2013 08/09/2041  R$282,958.76
RIO BRANCO 1 MG 230 kV RIO BRANCO 1 MG1 AC RB FT MG 230 kV RIO BRANCO 1 MG1 AC 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$642,252.74
RIO BRANCO 1 MG 230 kV RIO BRANCO 1 MG1 AC RB FT MG 230 kV RIO BRANCO 1 MG1 AC 058/2001 IPCA RBNI REA 4857/2014 12/09/2016 11/09/2042  R$204,310.17
RIO BRANCO 1 MG 230 kV RIO BRANCO 1 MG1 AC RB FT MG 230 kV RIO BRANCO 1 MG1 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2049  R$312,265.55
RIO BRANCO 1 MG 230 kV RIO BRANCO 1 MG1 AC RB FT MG 230 kV RIO BRANCO 1 MG1 AC 058/2001 IPCA RBNI REA 5746/2016 24/04/2018 24/04/2049  R$77,587.30
RIO BRANCO 1 MG 230 kV RIO BRANCO 1 MG1 AC RB FT MG 230 kV RIO BRANCO 1 MG1 AC 058/2001 IPCA RBNI REA 5746/2016 24/04/2018 24/04/2049  R$20,031.00
RIO BRANCO 1 MC 69 kV TR 230/69 kV RIO BRANCO 1 TR4 AC  RBF FT TR 230/69 kV RIO BRANCO 1 TR4 AC 058/2001 IPCA RBNI REA 5746/2016 24/04/2018 24/04/2040  R$317,528.22
RIO BRANCO 1 MC 69 kV TR 230/69 kV RIO BRANCO 1 TR3 AC  RBF FT TR 230/69 kV RIO BRANCO 1 TR3 AC 058/2001 IPCA RBNI REA 2533/2010 05/10/2012 04/10/2042  R$358,000.55
RIO BRANCO 1 MC 69 kV TR 230/69 kV RIO BRANCO 1 TR2 AC  RBF FT TR 230/69 kV RIO BRANCO 1 TR2 AC 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$74,117.78
RIO BRANCO 1 MC 69 kV TR 230/69 kV RIO BRANCO 1 TR1 AC  RBF FT TR 230/69 kV RIO BRANCO 1 TR1 AC 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$74,117.78
RIO BRANCO 1 MC 69 kV RTN 69 kV 0 Mvar RIO BRANCO 1 RN1 AC  RB FT RTL 230 kV 30 Mvar RIO BRANCO 1 RT1 AC 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$11,080.96
RIO BRANCO 1 MC 230 kV TR 230/69 kV RIO BRANCO 1 TR4 AC  RBF FT TR 230/69 kV RIO BRANCO 1 TR4 AC 058/2001 IPCA RBNI REA 5746/2016 24/04/2018 24/04/2041  R$701,311.58
RIO BRANCO 1 MC 230 kV TR 230/69 kV RIO BRANCO 1 TR3 AC  RBF FT TR 230/69 kV RIO BRANCO 1 TR3 AC 058/2001 IPCA RBNI REA 2533/2010 05/10/2012 04/10/2042  R$861,705.10
RIO BRANCO 1 MC 230 kV TR 230/69 kV RIO BRANCO 1 TR2 AC  RBF FT TR 230/69 kV RIO BRANCO 1 TR2 AC 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$173,033.12
RIO BRANCO 1 MC 230 kV TR 230/69 kV RIO BRANCO 1 TR1 AC  RBF FT TR 230/69 kV RIO BRANCO 1 TR1 AC 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$173,033.12
RIO BRANCO 1 MC 230 kV TR 230/138 kV RIO BRANCO 1 TR2 AC  RBF FT TR 230/138 kV RIO BRANCO 1 TR2 AC 058/2001 IPCA RBNI REA 2911/2011 02/09/2013 01/09/2042  R$892,506.56
RIO BRANCO 1 MC 230 kV TR 230/138 kV RIO BRANCO 1 TR1 AC  RBF FT TR 230/138 kV RIO BRANCO 1 TR1 AC 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$173,033.12
RIO BRANCO 1 MC 230 kV RTL 230 kV 30 Mvar RIO BRANCO 1 RT3 AC RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-2 RO/AC 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039  R$234,359.04
RIO BRANCO 1 MC 230 kV RTL 230 kV 30 Mvar RIO BRANCO 1 RT1 AC  RB FT RTL 230 kV 30 Mvar RIO BRANCO 1 RT1 AC 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$108,600.16
RIO BRANCO 1 MC 230 kV RTB 230 kV 20 Mvar RIO BRANCO 1 RT2 AC  RB FT RTB 230 kV 20 Mvar RIO BRANCO 1 RT2 AC 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$166,062.52
RIO BRANCO 1 MC 230 kV RTB 230 kV 0 Mvar RIO BRANCO 1 RT4 AC  RB FT RTB 230 kV 0 Mvar RIO BRANCO 1 RT4 AC 058/2001 IPCA RBNI REA 4857/2014 12/09/2016 11/09/2045  R$910,031.16
RIO BRANCO 1 MC 230 kV CE 55/-20 Mvar RIO BRANCO 1 CE1 AC  RB FT CE 55/-20 Mvar RIO BRANCO 1 CE1 AC 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039  R$531,504.67
RIO BRANCO 1 MC 230 kV BC 230 kV 18 Mvar RIO BRANCO 1 BC1 AC  RB FT BC 230 kV 18 Mvar RIO BRANCO 1 BC1 AC 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039  R$530,366.80
RIO BRANCO 1 MC 230 kV BC 230 kV 0 Mvar RIO BRANCO 1 BC5 AC  RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC5 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2041  R$642,049.03
RIO BRANCO 1 MC 230 kV BC 230 kV 0 Mvar RIO BRANCO 1 BC4 AC  RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC4 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2041  R$642,049.03
RIO BRANCO 1 MC 230 kV BC 230 kV 0 Mvar RIO BRANCO 1 BC3 AC  RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC3 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2041  R$642,049.03
RIO BRANCO 1 MC 230 kV BC 230 kV 0 Mvar RIO BRANCO 1 BC2 AC  RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC2 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2041  R$642,049.03
RIO BRANCO 1 MC 138 kV TR 230/138 kV RIO BRANCO 1 TR2 AC  RBF FT TR 230/138 kV RIO BRANCO 1 TR2 AC 058/2001 IPCA RBNI REA 2911/2011 02/09/2013 01/09/2042  R$752,644.37
RIO BRANCO 1 MC 138 kV TR 230/138 kV RIO BRANCO 1 TR1 AC  RBF FT TR 230/138 kV RIO BRANCO 1 TR1 AC 058/2001 IPCA RBNI REA 2911/2011 09/09/2013 08/09/2045  R$749,172.34
RIO BRANCO 1 IB 230 kV MG 230 kV RIO BRANCO 1 MG1 AC IB1 RB FT MG 230 kV RIO BRANCO 1 MG1 AC 058/2001 IPCA RBNI REA 2533/2010 05/10/2012 04/10/2042  R$9,709.73
RIO BRANCO 1 IB 230 kV MG 230 kV RIO BRANCO 1 MG1 AC IB1 RB FT MG 230 kV RIO BRANCO 1 MG1 AC 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$136,945.09
RIO BRANCO 1 IB 138 kV MG 230 kV RIO BRANCO 1 MG1 AC IB1 DIT   058/2001 IPCA RCDM REA 2911/2011 09/09/2013 08/09/2043  R$586,330.72
RIO BRANCO 1 EL 230 kV RIO BRANCO 1 LT 230 kV ABUNA /RIO BRANCO 1 C-2 RO/AC  RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-2 RO/AC 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039  R$715,201.15
RIO BRANCO 1 EL 230 kV RIO BRANCO 1 LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC  RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$251,472.48
RIO BRANCO 1 EL 138 kV RIO BRANCO 1DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$198,106.19
RIO BRANCO 1 CE 55/-20 Mvar RIO BRANCO 1 CE1 AC RB FT CE 55/-20 Mvar RIO BRANCO 1 CE1 AC 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039  R$ 6,017,994.58
RIO BRANCO 1 BC 230 kV 18 Mvar RIO BRANCO 1 BC1 AC RB FT BC 230 kV 18 Mvar RIO BRANCO 1 BC1 AC 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039  R$293,423.95
RIO BRANCO 1 BC 230 kV 0 Mvar RIO BRANCO 1 BC5 AC RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC5 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2038  R$616,818.05
RIO BRANCO 1 BC 230 kV 0 Mvar RIO BRANCO 1 BC4 AC RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC4 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2038  R$616,818.05
RIO BRANCO 1 BC 230 kV 0 Mvar RIO BRANCO 1 BC3 AC RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC3 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2038  R$616,818.05
RIO BRANCO 1 BC 230 kV 0 Mvar RIO BRANCO 1 BC2 AC RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC2 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2038  R$616,818.05
RONDONOPOLIS TT 13,8/13,8 kV RONDONOPOLIS TT1 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$104,574.36
RONDONOPOLIS TR 230/138 kV RONDONOPOLIS TR4 MT RBF FT TR 230/138 kV RONDONOPOLIS TR4 MT 058/2001 IPCA RBNI REA 4514/2014 03/02/2016 02/02/2050  R$ 1,456,638.62
RONDONOPOLIS TR 230/138 kV RONDONOPOLIS TR3 MT RBF FT TR 230/138 kV RONDONOPOLIS TR3 MT 058/2001 IPCA RBNI REA 3216/2011 23/11/2015 22/11/2049  R$ 1,448,531.00
RONDONOPOLIS TR 230/138 kV RONDONOPOLIS TR2 MT RBF FT TR 230/138 kV RONDONOPOLIS TR2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$438,392.47
RONDONOPOLIS TR 230/138 kV RONDONOPOLIS TR2 MT RBF FT TR 230/138 kV RONDONOPOLIS TR2 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,043,012.01
RONDONOPOLIS TR 230/138 kV RONDONOPOLIS TR2 MT RBF FT TR 230/138 kV RONDONOPOLIS TR2 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$859,760.16
RONDONOPOLIS TR 230/138 kV RONDONOPOLIS TR2 MT RBF FT TR 230/138 kV RONDONOPOLIS TR2 MT 058/2001 IPCA RMEL REN 443/2011 09/06/2017 08/06/2031  R$52,535.34
RONDONOPOLIS TR 230/138 kV RONDONOPOLIS TR1 MT RBF FT TR 230/138 kV RONDONOPOLIS TR1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$644,589.72
RONDONOPOLIS TR 230/138 kV RONDONOPOLIS TR1 MT RBF FT TR 230/138 kV RONDONOPOLIS TR1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,533,591.18
RONDONOPOLIS RTL 230 kV 30 MVAr RONDONOPOLIS RT2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$427,565.57
RONDONOPOLIS RTL 230 kV 30 MVAr RONDONOPOLIS RT2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,017,252.94
RONDONOPOLIS RTL 230 kV 30 MVAr RONDONOPOLIS RT2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$838,526.82
RONDONOPOLIS RTL 230 kV 30 MVAr RONDONOPOLIS RT1 MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$427,565.57
RONDONOPOLIS RTL 230 kV 30 MVAr RONDONOPOLIS RT1 MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,017,252.94
RONDONOPOLIS RTL 230 kV 30 MVAr RONDONOPOLIS RT1 MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$838,526.82
RONDONOPOLIS RTL 230 kV 20 MVAr RONDONOPOLIS RT4 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$341,233.25
RONDONOPOLIS RTL 230 kV 20 MVAr RONDONOPOLIS RT4 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$811,853.32
RONDONOPOLIS RTL 230 kV 20 MVAr RONDONOPOLIS RT4 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$669,214.86
RONDONOPOLIS RTL 230 kV 20 MVAr RONDONOPOLIS RT4 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RMEL REN 443/2011 13/06/2017 12/06/2031  R$42,929.19
RONDONOPOLIS RTB 230 kV 30 MVAr RONDONOPOLIS RT3 MT RB FT RTB 230 kV 30 MVAr RONDONOPOLIS RT3 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$427,565.57
RONDONOPOLIS RTB 230 kV 30 MVAr RONDONOPOLIS RT3 MT RB FT RTB 230 kV 30 MVAr RONDONOPOLIS RT3 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,017,252.94
RONDONOPOLIS RTB 230 kV 30 MVAr RONDONOPOLIS RT3 MT RB FT RTB 230 kV 30 MVAr RONDONOPOLIS RT3 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$838,526.82
RONDONOPOLIS MG 230 kV RONDONOPOLIS MG1 MT RB FT MG 230 kV RONDONOPOLIS MG1 MT 058/2001 IPCA RBNI REA 3216/2011 23/11/2015 22/11/2043  R$200,709.48
RONDONOPOLIS MG 230 kV RONDONOPOLIS MG1 MT RB FT MG 230 kV RONDONOPOLIS MG1 MT 058/2001 IPCA RBNI REA 3216/2011 23/11/2015 22/11/2043  R$126,393.54
RONDONOPOLIS MG 230 kV RONDONOPOLIS MG1 MT RB FT MG 230 kV RONDONOPOLIS MG1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$634,606.86
RONDONOPOLIS MG 230 kV RONDONOPOLIS MG1 MT RB FT MG 230 kV RONDONOPOLIS MG1 MT 058/2001 IPCA RBNI REA 4514/2014 03/02/2016 02/02/2043  R$329,855.41
RONDONOPOLIS MC 230 kV TR 230/138 kV RONDONOPOLIS TR4 MT RBF FT TR 230/138 kV RONDONOPOLIS TR4 MT 058/2001 IPCA RBNI REA 4514/2014 03/02/2016 02/02/2045  R$ 1,039,135.10
RONDONOPOLIS MC 230 kV TR 230/138 kV RONDONOPOLIS TR3 MT RBF FT TR 230/138 kV RONDONOPOLIS TR3 MT 058/2001 IPCA RBNI REA 3216/2011 23/11/2015 22/11/2045  R$ 1,033,030.58
RONDONOPOLIS MC 230 kV TR 230/138 kV RONDONOPOLIS TR2 MT RBF FT TR 230/138 kV RONDONOPOLIS TR2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,482.24
RONDONOPOLIS MC 230 kV TR 230/138 kV RONDONOPOLIS TR2 MT RBF FT TR 230/138 kV RONDONOPOLIS TR2 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$455,569.58
RONDONOPOLIS MC 230 kV TR 230/138 kV RONDONOPOLIS TR2 MT RBF FT TR 230/138 kV RONDONOPOLIS TR2 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$375,528.35
RONDONOPOLIS MC 230 kV TR 230/138 kV RONDONOPOLIS TR1 MT RBF FT TR 230/138 kV RONDONOPOLIS TR1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,482.24
RONDONOPOLIS MC 230 kV RTL 230 kV 30 MVAr RONDONOPOLIS RT2 MT  RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$108,600.16
RONDONOPOLIS MC 230 kV RTL 230 kV 30 MVAr RONDONOPOLIS RT1 MT  RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$108,600.16
RONDONOPOLIS MC 230 kV RTL 230 kV 20 MVAr RONDONOPOLIS RT4 MT  RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$108,600.16
RONDONOPOLIS MC 230 kV RTB 230 kV 30 MVAr RONDONOPOLIS RT3 MT RB FT RTB 230 kV 30 MVAr RONDONOPOLIS RT3 MT 058/2001 IPCA RBNI REA 4514/2014 29/10/2015 28/10/2044  R$993,902.12
RONDONOPOLIS MC 230 kV BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT  RB FT BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$198,453.92
RONDONOPOLIS MC 230 kV BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT  RB FT BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$472,156.44
RONDONOPOLIS MC 230 kV BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT  RB FT BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$389,200.98
RONDONOPOLIS MC 138 kV TR 230/138 kV RONDONOPOLIS TR4 MT RBF FT TR 230/138 kV RONDONOPOLIS TR4 MT 058/2001 IPCA RBNI REA 4514/2014 03/02/2016 02/02/2047  R$763,861.01
RONDONOPOLIS MC 138 kV TR 230/138 kV RONDONOPOLIS TR3 MT RBF FT TR 230/138 kV RONDONOPOLIS TR3 MT 058/2001 IPCA RBNI REA 3216/2011 23/11/2015 22/11/2045  R$812,956.18
RONDONOPOLIS MC 13,8 kV TT 13,8/13,8 kV RONDONOPOLIS TT1 MT  RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$30,997.96
RONDONOPOLIS MC 13,8 kV TR 230/138 kV RONDONOPOLIS TR1 MT  RBF FT TR 230/138 kV RONDONOPOLIS TR1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$52,805.29
RONDONOPOLIS MC 13,8 kV BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC3 MT  RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC3 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$85,400.06
RONDONOPOLIS MC 13,8 kV BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC2 MT  RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$85,400.06
RONDONOPOLIS MC 13,8 kV BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC1 MT  RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$85,400.06
RONDONOPOLIS IB 230 kV MG 230 kV RONDONOPOLIS MG1 MT IB1 RB FT MG 230 kV RONDONOPOLIS MG1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
RONDONOPOLIS IB 230 kV MG 230 kV RONDONOPOLIS MG1 MT IB1 RB FT MG 230 kV RONDONOPOLIS MG1 MT 058/2001 IPCA RBNI REA 4514/2014 03/02/2016 02/02/2044  R$70,501.45
RONDONOPOLIS EL 230 kV RONDONOPOLIS LT 230 kV RONDONOPOLIS /COXIPO C-2 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$267,055.89
RONDONOPOLIS EL 230 kV RONDONOPOLIS LT 230 kV RONDONOPOLIS /COXIPO C-2 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$635,372.46
RONDONOPOLIS EL 230 kV RONDONOPOLIS LT 230 kV RONDONOPOLIS /COXIPO C-1 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$267,055.89
RONDONOPOLIS EL 230 kV RONDONOPOLIS LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$267,055.89
RONDONOPOLIS EL 230 kV RONDONOPOLIS LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$267,055.89
RONDONOPOLIS EL 230 kV RONDONOPOLIS LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$635,372.46
RONDONOPOLIS EL 230 kV RONDONOPOLIS LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$523,740.78
RONDONOPOLIS EL 230 kV RONDONOPOLIS LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$267,055.89
RONDONOPOLIS EL 138 kV RONDONOPOLISDIST1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$59,058.38
RONDONOPOLIS BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT RB FT BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,448.19
RONDONOPOLIS BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT RB FT BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$419,800.96
RONDONOPOLIS BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT RB FT BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$346,044.09
RONDONOPOLIS BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC3 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC3 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$62,586.18
RONDONOPOLIS BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC3 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC3 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$148,903.41
RONDONOPOLIS BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC3 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC3 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$122,741.85
RONDONOPOLIS BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC2 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$62,586.18
RONDONOPOLIS BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC2 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC2 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$148,903.41
RONDONOPOLIS BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC2 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC2 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$122,741.85
RONDONOPOLIS BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC1 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$62,586.18
RONDONOPOLIS BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC1 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$148,903.41
RONDONOPOLIS BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC1 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$122,741.85
RUROPOLIS TR 230/138 kV RUROPOLIS TR3 PA RBF FT TR 230/138 kV RUROPOLIS TR3 PA 058/2001 IPCA RBNI REA 3361/2012 13/07/2015 12/07/2049  R$ 1,417,760.56
RUROPOLIS TR 230/138 kV RUROPOLIS TR2 PA RBF FT TR 230/138 kV RUROPOLIS TR2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$438,392.47
RUROPOLIS TR 230/138 kV RUROPOLIS TR2 PA RBF FT TR 230/138 kV RUROPOLIS TR2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,043,012.01
RUROPOLIS TR 230/138 kV RUROPOLIS TR2 PA RBF FT TR 230/138 kV RUROPOLIS TR2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$859,760.16
RUROPOLIS TR 230/138 kV RUROPOLIS TR1 PA RBF FT TR 230/138 kV RUROPOLIS TR1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$438,392.47
RUROPOLIS TR 230/138 kV RUROPOLIS TR1 PA RBF FT TR 230/138 kV RUROPOLIS TR1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,043,012.01
RUROPOLIS TR 230/138 kV RUROPOLIS TR1 PA RBF FT TR 230/138 kV RUROPOLIS TR1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$859,760.16
RUROPOLIS RTL 230 kV 30 MVAr RUROPOLIS RT2 PA RB FT RTL 230 kV 30 MVAr RUROPOLIS RT2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$427,565.57
RUROPOLIS RTL 230 kV 30 MVAr RUROPOLIS RT2 PA RB FT RTL 230 kV 30 MVAr RUROPOLIS RT2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,017,252.94
RUROPOLIS RTL 230 kV 30 MVAr RUROPOLIS RT2 PA RB FT RTL 230 kV 30 MVAr RUROPOLIS RT2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$838,526.82
RUROPOLIS RTL 230 kV 30 MVAr RUROPOLIS RT1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$427,565.57
RUROPOLIS RTL 230 kV 30 MVAr RUROPOLIS RT1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBNI REA 4512/2014 17/03/2014 16/03/2045  R$14,202.68
RUROPOLIS RTL 230 kV 30 MVAr RUROPOLIS RT1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,017,252.94
RUROPOLIS RTL 230 kV 30 MVAr RUROPOLIS RT1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$838,526.82
RUROPOLIS RTL 230 kV 30 MVAr RUROPOLIS RT1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RMEL REN 443/2011 28/10/2016 27/10/2030  R$24,169.50
RUROPOLIS MG 230 kV RUROPOLIS MG1 PA RB FT MG 230 kV RUROPOLIS MG1 PA 058/2001 IPCA RBNI REA 3361/2012 13/07/2015 12/07/2044  R$49,181.54
RUROPOLIS MG 230 kV RUROPOLIS MG1 PA RB FT MG 230 kV RUROPOLIS MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$608,088.73
RUROPOLIS MG 230 kV RUROPOLIS MG1 PA RB FT MG 230 kV RUROPOLIS MG1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,446,748.96
RUROPOLIS MG 230 kV RUROPOLIS MG1 PA RB FT MG 230 kV RUROPOLIS MG1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,192,562.60
RUROPOLIS MG 230 kV RUROPOLIS MG1 PA RB FT MG 230 kV RUROPOLIS MG1 PA 058/2001 IPCA RBNI REN 443/2011 22/10/2015 21/10/2046  R$88,995.43
RUROPOLIS MG 230 kV RUROPOLIS MG1 PA RB FT MG 230 kV RUROPOLIS MG1 PA 058/2001 IPCA RBNI REN 443/2011 22/05/2017 21/05/2048  R$92,622.89
RUROPOLIS MC 230 kV TR 230/138 kV RUROPOLIS TR3 PA RBF FT TR 230/138 kV RUROPOLIS TR3 PA 058/2001 IPCA RBNI REA 3361/2012 13/07/2015 12/07/2044  R$973,718.30
RUROPOLIS MC 230 kV TR 230/138 kV RUROPOLIS TR2 PA RBF FT TR 230/138 kV RUROPOLIS TR2 PA 058/2001 IPCA RBNI REA 3361/2012 07/04/2016 06/04/2045  R$802,452.64
RUROPOLIS MC 230 kV TR 230/138 kV RUROPOLIS TR2 PA RBF FT TR 230/138 kV RUROPOLIS TR2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$163,104.17
RUROPOLIS MC 230 kV TR 230/138 kV RUROPOLIS TR2 PA RBF FT TR 230/138 kV RUROPOLIS TR2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$388,053.21
RUROPOLIS MC 230 kV TR 230/138 kV RUROPOLIS TR2 PA RBF FT TR 230/138 kV RUROPOLIS TR2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$319,874.26
RUROPOLIS MC 230 kV TR 230/138 kV RUROPOLIS TR1 PA RBF FT TR 230/138 kV RUROPOLIS TR1 PA 058/2001 IPCA RBNI REA 3361/2012 24/10/2016 23/10/2045  R$813,196.38
RUROPOLIS MC 230 kV TR 230/138 kV RUROPOLIS TR1 PA RBF FT TR 230/138 kV RUROPOLIS TR1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$163,104.17
RUROPOLIS MC 230 kV TR 230/138 kV RUROPOLIS TR1 PA RBF FT TR 230/138 kV RUROPOLIS TR1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$388,053.21
RUROPOLIS MC 230 kV TR 230/138 kV RUROPOLIS TR1 PA RBF FT TR 230/138 kV RUROPOLIS TR1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$319,874.26
RUROPOLIS MC 230 kV RTL 230 kV 30 MVAr RUROPOLIS RT2 PA  RB FT RTL 230 kV 30 MVAr RUROPOLIS RT2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$108,600.16
RUROPOLIS MC 230 kV RTL 230 kV 30 MVAr RUROPOLIS RT2 PA  RB FT RTL 230 kV 30 MVAr RUROPOLIS RT2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$258,378.70
RUROPOLIS MC 230 kV RTL 230 kV 30 MVAr RUROPOLIS RT2 PA  RB FT RTL 230 kV 30 MVAr RUROPOLIS RT2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$212,982.89
RUROPOLIS MC 230 kV RTL 230 kV 30 MVAr RUROPOLIS RT1 PA  RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$108,600.16
RUROPOLIS MC 230 kV RTL 230 kV 30 MVAr RUROPOLIS RT1 PA  RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$258,378.70
RUROPOLIS MC 230 kV RTL 230 kV 30 MVAr RUROPOLIS RT1 PA  RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$212,982.89
RUROPOLIS MC 138 kV TR 230/138 kV RUROPOLIS TR3 PA RBF FT TR 230/138 kV RUROPOLIS TR3 PA 058/2001 IPCA RBNI REA 3361/2012 13/07/2015 12/07/2044  R$796,239.52
RUROPOLIS MC 138 kV TR 230/138 kV RUROPOLIS TR2 PA RBF FT TR 230/138 kV RUROPOLIS TR2 PA 058/2001 IPCA RBNI REA 3361/2012 07/04/2016 06/04/2045  R$638,242.07
RUROPOLIS MC 138 kV TR 230/138 kV RUROPOLIS TR2 PA RBF FT TR 230/138 kV RUROPOLIS TR2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$121,674.23
RUROPOLIS MC 138 kV TR 230/138 kV RUROPOLIS TR2 PA RBF FT TR 230/138 kV RUROPOLIS TR2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$289,484.19
RUROPOLIS MC 138 kV TR 230/138 kV RUROPOLIS TR2 PA RBF FT TR 230/138 kV RUROPOLIS TR2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$238,623.30
RUROPOLIS MC 138 kV TR 230/138 kV RUROPOLIS TR1 PA RBF FT TR 230/138 kV RUROPOLIS TR1 PA 058/2001 IPCA RBNI REA 3361/2012 24/10/2016 23/10/2045  R$647,117.50
RUROPOLIS MC 138 kV TR 230/138 kV RUROPOLIS TR1 PA RBF FT TR 230/138 kV RUROPOLIS TR1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$121,674.23
RUROPOLIS MC 138 kV TR 230/138 kV RUROPOLIS TR1 PA RBF FT TR 230/138 kV RUROPOLIS TR1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$289,484.19
RUROPOLIS MC 138 kV TR 230/138 kV RUROPOLIS TR1 PA RBF FT TR 230/138 kV RUROPOLIS TR1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$238,623.30
RUROPOLIS MC 13,8 kV TR 230/138 kV RUROPOLIS TR3 PA  RBF FT TR 230/138 kV RUROPOLIS TR3 PA 058/2001 IPCA RBNI REA 3361/2012 13/07/2015 12/07/2038  R$36,563.47
RUROPOLIS MC 13,8 kV BC 13,8 kV 3,6 Mvar RUROPOLIS BC1 PA  DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$85,400.06
RUROPOLIS IB 230 kV MG 230 kV RUROPOLIS MG1 PA IB1 RB FT MG 230 kV RUROPOLIS MG1 PA 058/2001 IPCA RBNI REA 3361/2012 13/07/2015 12/07/2045  R$780,267.98
RUROPOLIS IB 138 kV MG 230 kV RUROPOLIS MG1 PA IB1 DIT   058/2001 IPCA RCDM REA 3361/2012 22/10/2015 21/10/2044  R$594,893.74
RUROPOLIS IB 13,8 kV MG 230 kV RUROPOLIS MG1 PA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$36,290.08
RUROPOLIS IB 13,8 kV MG 230 kV RUROPOLIS MG1 PA IB1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$86,340.42
RUROPOLIS IB 13,8 kV MG 230 kV RUROPOLIS MG1 PA IB1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$71,112.57
RUROPOLIS EL 230 kV RUROPOLIS LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA  RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBNI REA 3361/2012 21/06/2016 20/06/2045  R$747,070.79
RUROPOLIS EL 230 kV RUROPOLIS LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA  RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$242,569.43
RUROPOLIS EL 230 kV RUROPOLIS LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA  RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$577,114.91
RUROPOLIS EL 230 kV RUROPOLIS LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA  RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$475,718.78
RUROPOLIS EL 138 kV RUROPOLISDIST4 DIT   058/2001 IPCA RCDM REN 443/2011 22/05/2017 21/05/2044  R$898,903.16
RUROPOLIS EL 138 kV RUROPOLISDIST3 DIT   058/2001 IPCA RCDM REN 443/2011 22/10/2015 21/10/2042  R$859,469.10
RUROPOLIS EL 138 kV RUROPOLISDIST2 DIT   058/2001 IPCA RCDM REA 3361/2012 22/10/2015 21/10/2044  R$710,058.29
RUROPOLIS EL 138 kV RUROPOLISDIST2 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$137,714.48
RUROPOLIS EL 138 kV RUROPOLISDIST2 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$327,646.72
RUROPOLIS EL 138 kV RUROPOLISDIST2 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$269,859.70
RUROPOLIS EL 138 kV RUROPOLISDIST1 DIT   058/2001 IPCA RCDM REA 3361/2012 22/05/2017 21/05/2046  R$738,396.42
RUROPOLIS EL 138 kV RUROPOLISDIST1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$137,714.48
RUROPOLIS EL 138 kV RUROPOLISDIST1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$327,646.72
RUROPOLIS EL 138 kV RUROPOLISDIST1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$269,859.70
RUROPOLIS EL 13,8 kV RUROPOLISDIST2 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$59,058.38
RUROPOLIS EL 13,8 kV RUROPOLISDIST2 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$140,510.18
RUROPOLIS EL 13,8 kV RUROPOLISDIST2 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$115,728.41
RUROPOLIS EL 13,8 kV RUROPOLISDIST1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$59,058.38
RUROPOLIS EL 13,8 kV RUROPOLISDIST1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$140,510.18
RUROPOLIS EL 13,8 kV RUROPOLISDIST1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$115,728.41
RUROPOLIS BC 13,8 kV 3,6 Mvar RUROPOLIS BC1 PA DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$35,162.27
SAMUEL MG 230 kV SAMUEL MG1 RO RB FT MG 230 kV SAMUEL MG1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$471,454.18
SAMUEL MG 230 kV SAMUEL MG1 RO RB FT MG 230 kV SAMUEL MG1 RO 058/2001 IPCA RMEL REN 443/2011 01/09/2016 31/08/2033  R$56,858.94
SAMUEL IB 230 kV MG 230 kV SAMUEL MG1 RO IB1 RB FT MG 230 kV SAMUEL MG1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
SAMUEL EL 230 kV SAMUEL LT 230 kV SAMUEL /PORTO VELHO C-3 RO  RB FT LT 230 kV SAMUEL /PORTO VELHO C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039  R$698,323.25
SAMUEL EL 230 kV SAMUEL LT 230 kV SAMUEL /PORTO VELHO C-3 RO  RB FT LT 230 kV SAMUEL /PORTO VELHO C-3 RO 021/2009 IPCA RBNI REA 8314/2019 26/08/2021 25/08/2036  R$27,948.27
SAMUEL EL 230 kV SAMUEL LT 230 kV SAMUEL /PORTO VELHO C-2 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-2 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
SAMUEL EL 230 kV SAMUEL LT 230 kV SAMUEL /PORTO VELHO C-2 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-2 RO 058/2001 IPCA RBNI REA 5833/2016 20/10/2017 19/10/2047  R$174,421.91
SAMUEL EL 230 kV SAMUEL LT 230 kV SAMUEL /PORTO VELHO C-2 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-2 RO 058/2001 IPCA RBNI REA 5861/2016 19/06/2019 18/06/2034  R$14,799.56
SAMUEL EL 230 kV SAMUEL LT 230 kV SAMUEL /PORTO VELHO C-1 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
SAMUEL EL 230 kV SAMUEL LT 230 kV SAMUEL /PORTO VELHO C-1 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-1 RO 058/2001 IPCA RBNI REA 5833/2016 20/10/2017 19/10/2047  R$174,421.91
SAMUEL EL 230 kV SAMUEL LT 230 kV SAMUEL /PORTO VELHO C-1 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-1 RO 058/2001 IPCA RBNI REA 5861/2016 19/06/2019 18/06/2034  R$14,799.56
SAMUEL EL 230 kV SAMUEL LT 230 kV SAMUEL /ARIQUEMES C-3 RO  RB FT LT 230 kV SAMUEL /ARIQUEMES C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039  R$698,323.25
SAMUEL EL 230 kV SAMUEL LT 230 kV SAMUEL /ARIQUEMES C-3 RO  RB FT LT 230 kV SAMUEL /ARIQUEMES C-3 RO 021/2009 IPCA RBNI REA 8314/2019 26/08/2021 25/08/2036  R$27,948.27
SAMUEL EL 230 kV SAMUEL LT 230 kV SAMUEL /ARIQUEMES C-1 RO  RB FT LT 230 kV SAMUEL /ARIQUEMES C-1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
SAMUEL EL 230 kV SAMUEL LT 230 kV SAMUEL /ARIQUEMES C-1 RO  RB FT LT 230 kV SAMUEL /ARIQUEMES C-1 RO 058/2001 IPCA RBNI REA 5861/2016 19/06/2019 18/06/2034  R$14,799.56
SANTA MARIA TR 230/69 kV SANTA MARIA TF2 PA RBF FT TR 230/69 kV SANTA MARIA TF2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$491,071.69
SANTA MARIA TR 230/69 kV SANTA MARIA TF1 PA RBF FT TR 230/69 kV SANTA MARIA TF1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$491,071.69
SANTA MARIA TR 230/69 kV SANTA MARIA TF1 PA RBF FT TR 230/69 kV SANTA MARIA TF1 PA 058/2001 IPCA RMEL REN 443/2011 20/06/2017 19/06/2040  R$21,070.43
SANTA MARIA TR 230/138 kV SANTA MARIA TRR1 PA RBF FT TR 230/138 kV SANTA MARIA TRR1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$438,392.47
SANTA MARIA TR 230/138 kV SANTA MARIA TRR1 PA RBF FT TR 230/138 kV SANTA MARIA TRR1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,043,012.01
SANTA MARIA TR 230/138 kV SANTA MARIA TRR1 PA RBF FT TR 230/138 kV SANTA MARIA TRR1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$859,760.16
SANTA MARIA TR 230/138 kV SANTA MARIA TR3 PA RBF FT TR 230/138 kV SANTA MARIA TR3 PA 058/2001 IPCA RBNI REA 2911/2011 31/08/2016 30/08/2050  R$ 1,453,396.54
SANTA MARIA TR 230/138 kV SANTA MARIA TR1 PA RBF FT TR 230/138 kV SANTA MARIA TR1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$438,392.47
SANTA MARIA TR 230/138 kV SANTA MARIA TR1 PA RBF FT TR 230/138 kV SANTA MARIA TR1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,043,012.01
SANTA MARIA TR 230/138 kV SANTA MARIA TR1 PA RBF FT TR 230/138 kV SANTA MARIA TR1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$859,760.16
SANTA MARIA MG 230 kV SANTA MARIA MG1 PA RB FT MG 230 kV SANTA MARIA MG1 PA 058/2001 IPCA RBNI REA 2911/2011 31/08/2016 30/08/2045  R$582,363.61
SANTA MARIA MG 230 kV SANTA MARIA MG1 PA RB FT MG 230 kV SANTA MARIA MG1 PA 058/2001 IPCA RBNI REA 2911/2011 31/08/2016 30/08/2044  R$306,483.78
SANTA MARIA MG 230 kV SANTA MARIA MG1 PA RB FT MG 230 kV SANTA MARIA MG1 PA 058/2001 IPCA RBNI REA 2911/2011 29/04/2014 28/04/2039  R$517,987.90
SANTA MARIA MG 230 kV SANTA MARIA MG1 PA RB FT MG 230 kV SANTA MARIA MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$627,551.20
SANTA MARIA MG 230 kV SANTA MARIA MG1 PA RB FT MG 230 kV SANTA MARIA MG1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,493,053.56
SANTA MARIA MG 230 kV SANTA MARIA MG1 PA RB FT MG 230 kV SANTA MARIA MG1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,230,731.72
SANTA MARIA MC 230 kV TR 230/69 kV SANTA MARIA TF2 PA RBF FT TR 230/69 kV SANTA MARIA TF2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
SANTA MARIA MC 230 kV TR 230/69 kV SANTA MARIA TF1 PA RBF FT TR 230/69 kV SANTA MARIA TF1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
SANTA MARIA MC 230 kV TR 230/69 kV SANTA MARIA TF1 PA RBF FT TR 230/69 kV SANTA MARIA TF1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$432,295.55
SANTA MARIA MC 230 kV TR 230/69 kV SANTA MARIA TF1 PA RBF FT TR 230/69 kV SANTA MARIA TF1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$356,343.44
SANTA MARIA MC 230 kV TR 230/138 kV SANTA MARIA TRR1 PA RBF FT TR 230/138 kV SANTA MARIA TRR1 PA 058/2001 IPCA RBNI REA 2911/2011 26/09/2016 25/09/2044  R$110,077.89
SANTA MARIA MC 230 kV TR 230/138 kV SANTA MARIA TRR1 PA RBF FT TR 230/138 kV SANTA MARIA TRR1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
SANTA MARIA MC 230 kV TR 230/138 kV SANTA MARIA TR3 PA RBF FT TR 230/138 kV SANTA MARIA TR3 PA 058/2001 IPCA RBNI REA 2911/2011 31/08/2016 30/08/2045  R$ 1,000,506.05
SANTA MARIA MC 230 kV TR 230/138 kV SANTA MARIA TR1 PA RBF FT TR 230/138 kV SANTA MARIA TR1 PA 058/2001 IPCA RBNI REA 2911/2011 12/12/2016 11/12/2044  R$109,861.41
SANTA MARIA MC 230 kV TR 230/138 kV SANTA MARIA TR1 PA RBF FT TR 230/138 kV SANTA MARIA TR1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
SANTA MARIA MC 230 kV TR 230/138 kV SANTA MARIA TR1 PA RBF FT TR 230/138 kV SANTA MARIA TR1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$432,295.55
SANTA MARIA MC 230 kV TR 230/138 kV SANTA MARIA TR1 PA RBF FT TR 230/138 kV SANTA MARIA TR1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$356,343.44
SANTA MARIA MC 230 kV BC 230 kV 55 Mvar SANTA MARIA BC2 PA  RB FT BC 230 kV 55 Mvar SANTA MARIA BC2 PA 058/2001 IPCA RBNI REA 2911/2011 29/04/2014 28/04/2044  R$998,051.01
SANTA MARIA MC 230 kV BC 230 kV 55 Mvar SANTA MARIA BC1 PA  RB FT BC 230 kV 55 Mvar SANTA MARIA BC1 PA 058/2001 IPCA RBNI REA 2911/2011 29/04/2014 28/04/2044  R$997,250.00
SANTA MARIA MC 138 kV TR 230/138 kV SANTA MARIA TRR1 PA RBF FT TR 230/138 kV SANTA MARIA TRR1 PA 058/2001 IPCA RBNI REA 539/2006 26/09/2016 25/09/2046  R$149,264.09
SANTA MARIA MC 138 kV TR 230/138 kV SANTA MARIA TRR1 PA RBF FT TR 230/138 kV SANTA MARIA TRR1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$121,674.23
SANTA MARIA MC 138 kV TR 230/138 kV SANTA MARIA TR3 PA RBF FT TR 230/138 kV SANTA MARIA TR3 PA 058/2001 IPCA RBNI REA 2911/2011 31/08/2016 30/08/2045  R$818,700.85
SANTA MARIA MC 138 kV TR 230/138 kV SANTA MARIA TR1 PA RBF FT TR 230/138 kV SANTA MARIA TR1 PA 058/2001 IPCA RBNI REA 2911/2011 12/12/2016 11/12/2045  R$775,651.57
SANTA MARIA IB 230 kV MG 230 kV SANTA MARIA MG1 PA IB1 RB FT MG 230 kV SANTA MARIA MG1 PA 058/2001 IPCA RBNI REA 2911/2011 16/12/2013 15/12/2044  R$177,991.39
SANTA MARIA IB 230 kV MG 230 kV SANTA MARIA MG1 PA IB1 RB FT MG 230 kV SANTA MARIA MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
SANTA MARIA IB 138 kV MG 230 kV SANTA MARIA MG1 PA IB1 DIT   058/2001 IPCA RCDM REA 2911/2011 31/08/2016 30/08/2048  R$621,250.64
SANTA MARIA EL 69 kV SANTA MARIATMSR-LI4-02 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$81,931.09
SANTA MARIA EL 69 kV SANTA MARIATMSR-LI4-01 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$81,931.09
SANTA MARIA EL 69 kV SANTA MARIATMSR-LI4-01 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$194,928.32
SANTA MARIA EL 69 kV SANTA MARIATMSR-LI4-01 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$160,548.83
SANTA MARIA EL 230 kV SANTA MARIA LT 230 kV CASTANHAL /SANTA MARIA C-2 PA  RB FT LT 230 kV CASTANHAL /SANTA MARIA C-2 PA 058/2001 IPCA RBNI REA 2152/2009 19/11/2012 18/11/2040  R$1,355.42
SANTA MARIA EL 230 kV SANTA MARIA LT 230 kV CASTANHAL /SANTA MARIA C-2 PA  RB FT LT 230 kV CASTANHAL /SANTA MARIA C-2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
SANTA MARIA EL 230 kV SANTA MARIA LT 230 kV CASTANHAL /SANTA MARIA C-2 PA  RB FT LT 230 kV CASTANHAL /SANTA MARIA C-2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$614,190.55
SANTA MARIA EL 230 kV SANTA MARIA LT 230 kV CASTANHAL /SANTA MARIA C-2 PA  RB FT LT 230 kV CASTANHAL /SANTA MARIA C-2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$506,280.43
SANTA MARIA EL 138 kV SANTA MARIAMRSR-LI5-01 DIT   058/2001 IPCA RCDM REA 2911/2011 21/06/2017 20/06/2045  R$31,930.58
SANTA MARIA EL 138 kV SANTA MARIAMRSR-LI5-01 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$137,714.48
SANTA MARIA EL 138 kV SANTA MARIAMRSR-LI5-01 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$327,646.72
SANTA MARIA EL 138 kV SANTA MARIAMRSR-LI5-01 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$269,859.70
SANTA MARIA EL 138 kV SANTA MARIADIST2 DIT   058/2001 IPCA RCDM REA 2911/2011 21/06/2017 20/06/2046  R$831,702.18
SANTA MARIA BC 230 kV 55 Mvar SANTA MARIA BC2 PA RB FT BC 230 kV 55 Mvar SANTA MARIA BC2 PA 058/2001 IPCA RBNI REA 2911/2011 29/04/2014 28/04/2034  R$366,582.04
SANTA MARIA BC 230 kV 55 Mvar SANTA MARIA BC1 PA RB FT BC 230 kV 55 Mvar SANTA MARIA BC1 PA 058/2001 IPCA RBNI REA 2911/2011 29/04/2014 28/04/2034  R$366,582.04
SANTO A. DOS LOPES MG 500 kV SANTO A. DOS LOPES MG1 MA RB FT MG 500 kV SANTO A. DOS LOPES MG1 MA 058/2001 IPCA RBNI DSP 275/2023 01/07/2023 27/04/2032  R$69,634.07
SANTO A. DOS LOPES MG 500 kV SANTO A. DOS LOPES MG1 MA RB FT MG 500 kV SANTO A. DOS LOPES MG1 MA 058/2001 IPCA RBNI DSP 275/2023 01/07/2023 27/04/2046  R$75,249.62
SANTO A. DOS LOPES IB 500 kV MG 500 kV SANTO A. DOS LOPES MG1 MA IB1 RB FT MG 500 kV SANTO A. DOS LOPES MG1 MA 058/2001 IPCA RBNI DSP 275/2023 01/07/2023 27/04/2047  R$280,502.55
SANTO A. DOS LOPES EL 500 kV SANTO A. DOS LOPES LT 500 kV SANTO A. DOS LOPES /P.DUTRA C-1 MA  RB FT LT 500 kV SANTO A. DOS LOPES /P.DUTRA C-1 MA 058/2001 IPCA RBNI DSP 275/2023 01/07/2023 27/04/2044  R$258,796.03
SANTO A. DOS LOPES EL 500 kV SANTO A. DOS LOPES LT 500 kV MIRANDA II /SANTO A. DOS LOPES C-1 MA  RB FT LT 500 kV MIRANDA II /SANTO A. DOS LOPES C-1 MA 058/2001 IPCA RBNI DSP 275/2023 01/07/2023 27/04/2044  R$258,796.03
SAO LUIS I TR 69/13,8 kV SAO LUIS I TR1 MA DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$138,295.59
SAO LUIS I TR 230/69 kV SAO LUIS I TF4 MA RBF FT TR 230/69 kV SAO LUIS I TF4 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$417,691.47
SAO LUIS I TR 230/69 kV SAO LUIS I TF4 MA RBF FT TR 230/69 kV SAO LUIS I TF4 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$993,760.73
SAO LUIS I TR 230/69 kV SAO LUIS I TF4 MA RBF FT TR 230/69 kV SAO LUIS I TF4 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$819,162.08
SAO LUIS I TR 230/69 kV SAO LUIS I TF4 MA RBF FT TR 230/69 kV SAO LUIS I TF4 MA 058/2001 IPCA RMEL REN 443/2011 18/06/2017 17/06/2040  R$20,183.52
SAO LUIS I TR 230/69 kV SAO LUIS I TF4 MA RBF FT TR 230/69 kV SAO LUIS I TF4 MA 058/2001 IPCA RMEL REN 443/2011 18/06/2017 17/06/2040  R$6,407.18
SAO LUIS I TR 230/69 kV SAO LUIS I TF3 MA RBF FT TR 230/69 kV SAO LUIS I TF3 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$417,691.47
SAO LUIS I TR 230/69 kV SAO LUIS I TF3 MA RBF FT TR 230/69 kV SAO LUIS I TF3 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$993,760.73
SAO LUIS I TR 230/69 kV SAO LUIS I TF3 MA RBF FT TR 230/69 kV SAO LUIS I TF3 MA 058/2001 IPCA RMEL REN 443/2011 11/06/2017 10/06/2031  R$27,677.14
SAO LUIS I TR 230/69 kV SAO LUIS I TF3 MA RBF FT TR 230/69 kV SAO LUIS I TF3 MA 058/2001 IPCA RMEL REN 443/2011 23/04/2017 22/04/2040  R$20,082.17
SAO LUIS I TR 230/69 kV SAO LUIS I TF2 MA RBF FT TR 230/69 kV SAO LUIS I TF2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$417,691.47
SAO LUIS I TR 230/69 kV SAO LUIS I TF2 MA RBF FT TR 230/69 kV SAO LUIS I TF2 MA 058/2001 IPCA RMEL REN 443/2011 29/05/2017 28/05/2031  R$27,567.18
SAO LUIS I TR 230/69 kV SAO LUIS I TF2 MA RBF FT TR 230/69 kV SAO LUIS I TF2 MA 058/2001 IPCA RMEL REN 443/2011 30/07/2017 29/07/2040  R$20,513.09
SAO LUIS I TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$417,691.47
SAO LUIS I TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$993,760.73
SAO LUIS I TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$819,162.08
SAO LUIS I TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RMEL REN 443/2011 07/05/2017 06/05/2031  R$27,488.81
SAO LUIS I TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RMEL REN 443/2011 23/07/2017 22/07/2040  R$20,246.84
SAO LUIS I TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RMEL REN 443/2011 23/07/2017 22/07/2040  R$6,427.28
SAO LUIS I MG 230 kV SAO LUIS I MG1 MA RB FT MG 230 kV SAO LUIS I MG1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$707,303.82
SAO LUIS I MG 230 kV SAO LUIS I MG1 MA RB FT MG 230 kV SAO LUIS I MG1 MA 058/2001 IPCA RBNI REN 443/2011 29/06/2017 28/06/2045  R$55,924.49
SAO LUIS I MC 69 kV TR 69/13,8 kV SAO LUIS I TR1 MA  DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$74,117.78
SAO LUIS I MC 69 kV TR 230/69 kV SAO LUIS I TF4 MA RBF FT TR 230/69 kV SAO LUIS I TF4 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$74,117.78
SAO LUIS I MC 69 kV TR 230/69 kV SAO LUIS I TF3 MA  RBF FT TR 230/69 kV SAO LUIS I TF3 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$74,117.78
SAO LUIS I MC 69 kV TR 230/69 kV SAO LUIS I TF2 MA  RBF FT TR 230/69 kV SAO LUIS I TF2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$74,117.78
SAO LUIS I MC 69 kV TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$74,117.78
SAO LUIS I MC 69 kV TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$176,339.10
SAO LUIS I MC 69 kV TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$145,357.23
SAO LUIS I MC 230 kV TR 230/69 kV SAO LUIS I TF4 MA RBF FT TR 230/69 kV SAO LUIS I TF4 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,482.24
SAO LUIS I MC 230 kV TR 230/69 kV SAO LUIS I TF3 MA  RBF FT TR 230/69 kV SAO LUIS I TF3 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,482.24
SAO LUIS I MC 230 kV TR 230/69 kV SAO LUIS I TF2 MA  RBF FT TR 230/69 kV SAO LUIS I TF2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,482.24
SAO LUIS I MC 230 kV TR 230/69 kV SAO LUIS I TF2 MA  RBF FT TR 230/69 kV SAO LUIS I TF2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$455,569.58
SAO LUIS I MC 230 kV TR 230/69 kV SAO LUIS I TF2 MA  RBF FT TR 230/69 kV SAO LUIS I TF2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$375,528.35
SAO LUIS I MC 230 kV TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,482.24
SAO LUIS I MC 230 kV TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$455,569.58
SAO LUIS I MC 230 kV TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$375,528.35
SAO LUIS I MC 13,8 kV TR 69/13,8 kV SAO LUIS I TR1 MA  DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$57,310.39
SAO LUIS I IB 69 kV MG 230 kV SAO LUIS I MG1 MA IB3 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$49,815.59
SAO LUIS I IB 69 kV MG 230 kV SAO LUIS I MG1 MA IB2 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$49,815.59
SAO LUIS I IB 69 kV MG 230 kV SAO LUIS I MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$49,815.59
SAO LUIS I IB 230 kV MG 230 kV SAO LUIS I MG1 MA IB1 RB FT MG 230 kV SAO LUIS I MG1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
SAO LUIS I IB 13,8 kV MG 230 kV SAO LUIS I MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$36,290.08
SAO LUIS I EL 69 kV SAO LUIS IMARACANA 2 DIT   007/2008 IPCA RCDM REN 443/2011 29/06/2017 28/06/2040  R$346,035.78
SAO LUIS I EL 69 kV SAO LUIS IDIST8 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
SAO LUIS I EL 69 kV SAO LUIS IDIST7 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
SAO LUIS I EL 69 kV SAO LUIS IDIST6 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
SAO LUIS I EL 69 kV SAO LUIS IDIST6 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$206,153.28
SAO LUIS I EL 69 kV SAO LUIS IDIST6 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$169,794.04
SAO LUIS I EL 69 kV SAO LUIS IDIST5 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
SAO LUIS I EL 69 kV SAO LUIS IDIST4 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
SAO LUIS I EL 69 kV SAO LUIS IDIST3 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
SAO LUIS I EL 69 kV SAO LUIS IDIST2 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
SAO LUIS I EL 69 kV SAO LUIS IDIST2 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$206,153.28
SAO LUIS I EL 69 kV SAO LUIS IDIST2 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$169,794.04
SAO LUIS I EL 69 kV SAO LUIS IDIST1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
SAO LUIS I EL 230 kV SAO LUIS I LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$267,055.89
SAO LUIS I EL 230 kV SAO LUIS I LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$635,372.46
SAO LUIS I EL 230 kV SAO LUIS I LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA 058/2001 IPCA RMEL REN 443/2011 17/09/2017 16/09/2040  R$20,348.18
SAO LUIS I EL 230 kV SAO LUIS I LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$267,055.89
SAO LUIS I EL 230 kV SAO LUIS I LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA 058/2001 IPCA RMEL REN 443/2011 24/09/2017 23/09/2040  R$20,360.84
SAO LUIS I EL 13,8 kV SAO LUIS IDIST8 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$62,165.30
SAO LUIS I EL 13,8 kV SAO LUIS IDIST7 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$62,165.30
SAO LUIS I EL 13,8 kV SAO LUIS IDIST6 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$62,165.30
SAO LUIS I EL 13,8 kV SAO LUIS IDIST5 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$62,165.30
SAO LUIS I EL 13,8 kV SAO LUIS IDIST4 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$62,165.30
SAO LUIS I EL 13,8 kV SAO LUIS IDIST3 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$62,165.30
SAO LUIS I EL 13,8 kV SAO LUIS IDIST2 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$62,165.30
SAO LUIS I EL 13,8 kV SAO LUIS IDIST1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$62,165.30
SAO LUIS II TR 500/230 kV SAO LUIS II TRR1 MA RB FT TR 500/230 kV SAO LUIS II TRR1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$735,889.36
SAO LUIS II TR 500/230 kV SAO LUIS II TRR1 MA RB FT TR 500/230 kV SAO LUIS II TRR1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,750,808.91
SAO LUIS II TR 500/230 kV SAO LUIS II TRR1 MA RB FT TR 500/230 kV SAO LUIS II TRR1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,443,200.78
SAO LUIS II TR 500/230 kV SAO LUIS II TR4 MA RB FT TR 500/230 kV SAO LUIS II TR4 MA 058/2001 IPCA RBNI REA 3216/2011 26/05/2014 25/05/2048  R$ 4,884,412.54
SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,207,668.08
SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,252,426.74
SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,329,602.34
SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RMEL REN 443/2011 29/12/2017 28/12/2051  R$32,097.31
SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RMEL REN 443/2011 29/12/2017 28/12/2051  R$26,287.12
SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RMEL REN 443/2011 29/12/2017 28/12/2051  R$26,287.12
SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RMEL REN 443/2011 29/12/2017 28/12/2051  R$26,287.12
SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RMEL REN 443/2011 29/12/2017 28/12/2051  R$26,287.12
SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RMEL REN 443/2011 29/12/2017 28/12/2051  R$125,907.95
SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RMEL REN 443/2011 29/12/2017 28/12/2051  R$125,907.95
SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RMEL REN 443/2011 29/12/2017 28/12/2047  R$117,794.37
SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RMEL REN 443/2011 29/12/2017 28/12/2040  R$42,702.30
SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RMEL REN 443/2011 29/12/2017 28/12/2047  R$11,535.96
SAO LUIS II TR 500/230 kV SAO LUIS II TR2 MA RB FT TR 500/230 kV SAO LUIS II TR2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,207,668.08
SAO LUIS II TR 500/230 kV SAO LUIS II TR2 MA RB FT TR 500/230 kV SAO LUIS II TR2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,252,426.74
SAO LUIS II TR 500/230 kV SAO LUIS II TR2 MA RB FT TR 500/230 kV SAO LUIS II TR2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,329,602.34
SAO LUIS II TR 500/230 kV SAO LUIS II TR2 MA RB FT TR 500/230 kV SAO LUIS II TR2 MA 058/2001 IPCA RMEL REN 443/2011 27/07/2017 26/07/2047  R$82,458.01
SAO LUIS II TR 500/230 kV SAO LUIS II TR2 MA RB FT TR 500/230 kV SAO LUIS II TR2 MA 058/2001 IPCA RMEL REN 443/2011 27/07/2017 26/07/2051  R$33,337.38
SAO LUIS II TR 500/230 kV SAO LUIS II TR2 MA RB FT TR 500/230 kV SAO LUIS II TR2 MA 058/2001 IPCA RMEL REN 443/2011 20/10/2017 19/10/2042  R$6,246.25
SAO LUIS II TR 500/230 kV SAO LUIS II TR2 MA RB FT TR 500/230 kV SAO LUIS II TR2 MA 058/2001 IPCA RMEL REN 443/2011 07/07/2017 06/07/2040  R$20,217.89
SAO LUIS II TR 500/230 kV SAO LUIS II TR1 MA RB FT TR 500/230 kV SAO LUIS II TR1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,207,668.08
SAO LUIS II TR 500/230 kV SAO LUIS II TR1 MA RB FT TR 500/230 kV SAO LUIS II TR1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,252,426.74
SAO LUIS II TR 500/230 kV SAO LUIS II TR1 MA RB FT TR 500/230 kV SAO LUIS II TR1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,329,602.34
SAO LUIS II TR 500/230 kV SAO LUIS II TR1 MA RB FT TR 500/230 kV SAO LUIS II TR1 MA 058/2001 IPCA RMEL REN 443/2011 06/07/2017 05/07/2040  R$20,216.08
SAO LUIS II RTN 69 kV 0 Mvar SAO LUIS II RN2 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$16,313.10
SAO LUIS II RTN 69 kV 0 Mvar SAO LUIS II RN1 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$16,313.10
SAO LUIS II RTL 500 kV 33,3 MVAr SAO LUIS II RTR1 MA RB FT RTL 500 kV 33,3 MVAr SAO LUIS II RTR1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,650.70
SAO LUIS II RTL 500 kV 33,3 MVAr SAO LUIS II RTR1 MA RB FT RTL 500 kV 33,3 MVAr SAO LUIS II RTR1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$632,029.26
SAO LUIS II RTL 500 kV 33,3 MVAr SAO LUIS II RTR1 MA RB FT RTL 500 kV 33,3 MVAr SAO LUIS II RTR1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$520,984.97
SAO LUIS II RTL 500 kV 100 MVAr SAO LUIS II RT2 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$797,242.53
SAO LUIS II RTL 500 kV 100 MVAr SAO LUIS II RT2 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,896,778.80
SAO LUIS II RTL 500 kV 100 MVAr SAO LUIS II RT2 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,563,524.51
SAO LUIS II RTL 500 kV 100 Mvar SAO LUIS II RT1 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$797,242.53
SAO LUIS II RTL 500 kV 100 Mvar SAO LUIS II RT1 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,896,778.80
SAO LUIS II RTL 500 kV 100 Mvar SAO LUIS II RT1 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,563,524.51
SAO LUIS II RTB 500 kV 45,33 Mvar SAO LUIS II RT4 MA RB FT RTB 500 kV 45,33 Mvar SAO LUIS II RT4 MA 058/2001 IPCA RBNI REA 7814/2019 16/08/2021 16/08/2057  R$ 1,964,621.84
SAO LUIS II RTB 500 kV 45,3 MVAr SAO LUIS II RTR1 MA RB FT RTB 500 kV 45,3 MVAr SAO LUIS II RTR1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$295,750.25
SAO LUIS II RTB 500 kV 45,3 MVAr SAO LUIS II RTR1 MA RB FT RTB 500 kV 45,3 MVAr SAO LUIS II RTR1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$703,641.34
SAO LUIS II RTB 500 kV 45,3 MVAr SAO LUIS II RTR1 MA RB FT RTB 500 kV 45,3 MVAr SAO LUIS II RTR1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$580,015.17
SAO LUIS II RTB 500 kV 136 MVAr SAO LUIS II RT3 MA RB FT RTB 500 kV 136 MVAr SAO LUIS II RT3 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$887,250.75
SAO LUIS II RTB 500 kV 136 MVAr SAO LUIS II RT3 MA RB FT RTB 500 kV 136 MVAr SAO LUIS II RT3 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,110,924.02
SAO LUIS II RTB 500 kV 136 MVAr SAO LUIS II RT3 MA RB FT RTB 500 kV 136 MVAr SAO LUIS II RT3 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,740,045.51
SAO LUIS II RTB 500 kV 136 MVAr SAO LUIS II RT3 MA RB FT RTB 500 kV 136 MVAr SAO LUIS II RT3 MA 058/2001 IPCA RMEL REN 443/2011 26/04/2017 25/04/2031  R$41,480.98
SAO LUIS II RTB 500 kV 136 MVAr SAO LUIS II RT3 MA RB FT RTB 500 kV 136 MVAr SAO LUIS II RT3 MA 058/2001 IPCA RMEL REN 443/2011 09/06/2017 08/06/2040  R$27,958.93
SAO LUIS II MG 500 kV SAO LUIS II MG1 MA RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBNI REA 2270/2010 16/12/2013 15/12/2040  R$ 1,303,599.75
SAO LUIS II MG 500 kV SAO LUIS II MG1 MA RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBNI REA 3216/2011 26/05/2014 25/05/2042  R$671,494.75
SAO LUIS II MG 500 kV SAO LUIS II MG1 MA RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,993,026.35
SAO LUIS II MG 500 kV SAO LUIS II MG1 MA RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBNI REA 7814/2019 16/08/2021 16/08/2052  R$452,692.17
SAO LUIS II MC 69 kV RTN 69 kV 0 Mvar SAO LUIS II RN2 MA  RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$11,080.96
SAO LUIS II MC 69 kV RTN 69 kV 0 Mvar SAO LUIS II RN1 MA  RB FT LT 500 kV SAO LUIS II /BACABEIRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$11,080.96
SAO LUIS II MC 500 kV TR 500/230 kV SAO LUIS II TR4 MA RB FT TR 500/230 kV SAO LUIS II TR4 MA 058/2001 IPCA RBNI REA 3216/2011 26/05/2014 25/05/2045  R$ 1,616,690.58
SAO LUIS II MC 500 kV TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$490,032.13
SAO LUIS II MC 500 kV TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,165,871.75
SAO LUIS II MC 500 kV TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$961,034.07
SAO LUIS II MC 500 kV TR 500/230 kV SAO LUIS II TR2 MA RB FT TR 500/230 kV SAO LUIS II TR2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$490,032.13
SAO LUIS II MC 500 kV TR 500/230 kV SAO LUIS II TR2 MA RB FT TR 500/230 kV SAO LUIS II TR2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,165,871.75
SAO LUIS II MC 500 kV TR 500/230 kV SAO LUIS II TR1 MA  RB FT TR 500/230 kV SAO LUIS II TR1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$490,032.13
SAO LUIS II MC 500 kV RTB 500 kV 45,33 Mvar SAO LUIS II RT4 MA RB FT RTB 500 kV 45,33 Mvar SAO LUIS II RT4 MA 058/2001 IPCA RBNI REA 7814/2019 16/08/2021 16/08/2050  R$ 1,659,030.64
SAO LUIS II MC 500 kV RTB 500 kV 136 MVAr SAO LUIS II RT3 MA  RB FT RTB 500 kV 136 MVAr SAO LUIS II RT3 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$419,755.70
SAO LUIS II MC 500 kV RTB 500 kV 136 MVAr SAO LUIS II RT3 MA  RB FT RTB 500 kV 136 MVAr SAO LUIS II RT3 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$998,671.90
SAO LUIS II MC 230 kV TR 500/230 kV SAO LUIS II TR4 MA RB FT TR 500/230 kV SAO LUIS II TR4 MA 058/2001 IPCA RBNI REA 3216/2011 26/05/2014 25/05/2045  R$ 1,043,654.75
SAO LUIS II MC 230 kV TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,482.24
SAO LUIS II MC 230 kV TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$455,569.58
SAO LUIS II MC 230 kV TR 500/230 kV SAO LUIS II TR2 MA RB FT TR 500/230 kV SAO LUIS II TR2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,482.24
SAO LUIS II MC 230 kV TR 500/230 kV SAO LUIS II TR1 MA  RB FT TR 500/230 kV SAO LUIS II TR1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,482.24
SAO LUIS II MC 230 kV CE 150/-100 Mvar SAO LUIS II CE2 MA RB FT CE 150/-100 Mvar SAO LUIS II CE2 MA 058/2001 IPCA RBNI REA 2270/2010 16/12/2013 15/12/2044  R$926,991.40
SAO LUIS II MC 230 kV CE 150/-100 MvAr SAO LUIS II CE1 MA  RB FT CE 150/-100 MvAr SAO LUIS II CE1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$178,749.50
SAO LUIS II MC 230 kV BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA RB FT BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$197,134.90
SAO LUIS II MC 230 kV BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA RB FT BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$469,018.25
SAO LUIS II MC 230 kV BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA RB FT BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$386,614.16
SAO LUIS II MC 230 kV BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$197,134.90
SAO LUIS II MC 230 kV BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$469,018.25
SAO LUIS II MC 230 kV BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$386,614.16
SAO LUIS II MC 230 kV BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$197,134.90
SAO LUIS II MC 230 kV BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$469,018.25
SAO LUIS II MC 230 kV BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$386,614.16
SAO LUIS II MC 230 kV BC 230 kV 50,8 MVAr SAO LUIS II BC1 MA RB FT BC 230 kV 50,8 MVAr SAO LUIS II BC1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$197,134.90
SAO LUIS II IB 500 kV MG 500 kV SAO LUIS II MG1 MA IB4 RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBNI REA 3216/2011 26/05/2014 25/05/2045  R$ 1,334,599.57
SAO LUIS II IB 500 kV MG 500 kV SAO LUIS II MG1 MA IB4 RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBNI REA 7814/2019 16/08/2021 16/08/2051  R$219,606.00
SAO LUIS II IB 500 kV MG 500 kV SAO LUIS II MG1 MA IB3 RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$520,028.84
SAO LUIS II IB 500 kV MG 500 kV SAO LUIS II MG1 MA IB3 RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,237,239.15
SAO LUIS II IB 500 kV MG 500 kV SAO LUIS II MG1 MA IB3 RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,019,862.59
SAO LUIS II IB 500 kV MG 500 kV SAO LUIS II MG1 MA IB2 RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$520,028.84
SAO LUIS II IB 500 kV MG 500 kV SAO LUIS II MG1 MA IB2 RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,237,239.15
SAO LUIS II IB 500 kV MG 500 kV SAO LUIS II MG1 MA IB1 RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$520,028.84
SAO LUIS II IB 500 kV MG 500 kV SAO LUIS II MG1 MA IB1 RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,237,239.15
SAO LUIS II IB 230 kV MG 500 kV SAO LUIS II MG1 MA IB2 RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
SAO LUIS II IB 230 kV MG 500 kV SAO LUIS II MG1 MA IB1 RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
SAO LUIS II EL 500 kV SAO LUIS II LT 500 kV SAO LUIS II /BACABEIRA C-2 MA  RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
SAO LUIS II EL 500 kV SAO LUIS II LT 500 kV SAO LUIS II /BACABEIRA C-2 MA  RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,320,962.73
SAO LUIS II EL 500 kV SAO LUIS II LT 500 kV SAO LUIS II /BACABEIRA C-2 MA  RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RMEL REN 443/2011 05/02/2017 04/02/2040  R$27,647.85
SAO LUIS II EL 500 kV SAO LUIS II LT 500 kV SAO LUIS II /BACABEIRA C-1 MA  RB FT LT 500 kV SAO LUIS II /BACABEIRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
SAO LUIS II EL 230 kV SAO LUIS II LT 230 kV SAO LUIS II /SAO LUIS III C-1 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS III C-1 MA 007/2008 IPCA RBL CC 007/2008 17/03/2008 17/03/2038  R$322,970.00
SAO LUIS II EL 230 kV SAO LUIS II LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$267,055.89
SAO LUIS II EL 230 kV SAO LUIS II LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$635,372.46
SAO LUIS II EL 230 kV SAO LUIS II LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA 058/2001 IPCA RMEL REN 443/2011 03/12/2017 02/12/2040  R$6,829.18
SAO LUIS II EL 230 kV SAO LUIS II LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$267,055.89
SAO LUIS II EL 230 kV SAO LUIS II LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA 058/2001 IPCA RMEL REN 443/2011 06/08/2017 05/08/2040  R$20,272.18
SAO LUIS II EL 230 kV SAO LUIS II LT 230 kV SAO LUIS II /MIRANDA II C-1 MA RB FT LT 230 kV SAO LUIS II /MIRANDA II C-1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$267,055.89
SAO LUIS II CE 150/-100 Mvar SAO LUIS II CE2 MA RB FT CE 150/-100 Mvar SAO LUIS II CE2 MA 058/2001 IPCA RBNI REA 2270/2010 16/12/2013 15/12/2043  R$ 9,205,155.52
SAO LUIS II CE 150/-100 MvAr SAO LUIS II CE1 MA RB FT CE 150/-100 MvAr SAO LUIS II CE1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,724,546.71
SAO LUIS II BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA RB FT BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$244,880.13
SAO LUIS II BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA RB FT BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$582,612.47
SAO LUIS II BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA RB FT BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$480,250.45
SAO LUIS II BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,632.07
SAO LUIS II BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$560,609.71
SAO LUIS II BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$462,113.47
SAO LUIS II BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$235,632.07
SAO LUIS II BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$560,609.71
SAO LUIS II BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$462,113.47
SAO LUIS II BC 230 kV 50,8 MVAr SAO LUIS II BC1 MA RB FT BC 230 kV 50,8 MVAr SAO LUIS II BC1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$227,119.21
SAO LUIS II BC 230 kV 50,8 MVAr SAO LUIS II BC1 MA RB FT BC 230 kV 50,8 MVAr SAO LUIS II BC1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$540,356.16
SAO LUIS II BC 230 kV 50,8 MVAr SAO LUIS II BC1 MA RB FT BC 230 kV 50,8 MVAr SAO LUIS II BC1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$445,418.35
SAO LUIS III TT 69/0 kV SAO LUIS III TT1 MA DIT   007/2008 IPCA RCDM REA 1581/2008 03/09/2010 03/09/2041  R$332,080.98
SAO LUIS III TR 230/69 kV SAO LUIS III TR3 MA RBF FT TR 230/69 kV SAO LUIS III TR3 MA 007/2008 IPCA RBNI REA 8348/2019 27/09/2021 27/09/2055  R$ 1,283,991.56
SAO LUIS III TR 230/69 kV SAO LUIS III TR2 MA RBF FT TR 230/69 kV SAO LUIS III TR2 MA 007/2008 IPCA RBNI REA 2911/2011 01/06/2013 01/06/2053  R$ 1,673,377.68
SAO LUIS III TR 230/69 kV SAO LUIS III TR2 MA RBF FT TR 230/69 kV SAO LUIS III TR2 MA 007/2008 IPCA RMEL REN 443/2011 22/10/2017 21/10/2047  R$ 100.19
SAO LUIS III TR 230/69 kV SAO LUIS III TR1 MA RBF FT TR 230/69 kV SAO LUIS III TR1 MA 007/2008 IPCA RBL CC 007/2008 17/03/2008 17/03/2038  R$647,763.57
SAO LUIS III MG 230 kV SAO LUIS III MG1 MA RB FT MG 230 kV SAO LUIS III MG1 MA 007/2008 IPCA RBNI REA 1581/2008 03/09/2010 03/09/2038  R$91,010.68
SAO LUIS III MG 230 kV SAO LUIS III MG1 MA RB FT MG 230 kV SAO LUIS III MG1 MA 007/2008 IPCA RBL CC 007/2008 17/03/2008 17/03/2038  R$850,360.22
SAO LUIS III MG 230 kV SAO LUIS III MG1 MA RB FT MG 230 kV SAO LUIS III MG1 MA 007/2008 IPCA RBNI REA 2911/2011 01/06/2013 01/06/2045  R$207,005.46
SAO LUIS III MG 230 kV SAO LUIS III MG1 MA RB FT MG 230 kV SAO LUIS III MG1 MA 007/2008 IPCA RBNI REN 443/2011 29/06/2017 28/06/2048  R$40,929.54
SAO LUIS III MG 230 kV SAO LUIS III MG1 MA RB FT MG 230 kV SAO LUIS III MG1 MA 007/2008 IPCA RBNI REN 443/2011 29/06/2017 28/06/2048  R$40,929.54
SAO LUIS III MG 230 kV SAO LUIS III MG1 MA RB FT MG 230 kV SAO LUIS III MG1 MA 007/2008 IPCA RBNI REA 8348/2019 27/09/2021 27/09/2052  R$132,543.80
SAO LUIS III MG 230 kV SAO LUIS III MG1 MA RB FT MG 230 kV SAO LUIS III MG1 MA 007/2008 IPCA RBNI REA 8348/2019 27/09/2021 27/09/2052  R$37,134.13
SAO LUIS III MC 69 kV TT 69/0 kV SAO LUIS III TT1 MA  DIT   007/2008 IPCA RCDM REA 1581/2008 03/09/2010 02/09/2030  R$139,039.07
SAO LUIS III MC 69 kV TR 230/69 kV SAO LUIS III TR3 MA RBF FT TR 230/69 kV SAO LUIS III TR3 MA 007/2008 IPCA RBNI REA 8348/2019 27/09/2021 27/09/2048  R$284,407.39
SAO LUIS III MC 69 kV TR 230/69 kV SAO LUIS III TR2 MA RBF FT TR 230/69 kV SAO LUIS III TR2 MA 007/2008 IPCA RBNI REA 2911/2011 01/06/2013 01/06/2047  R$345,708.45
SAO LUIS III MC 69 kV TR 230/69 kV SAO LUIS III TR1 MA RBF FT TR 230/69 kV SAO LUIS III TR1 MA 007/2008 IPCA RBL CC 007/2008 17/03/2008 17/03/2038  R$75,801.51
SAO LUIS III MC 69 kV TR 230/69 kV SAO LUIS III TR1 MA RBF FT TR 230/69 kV SAO LUIS III TR1 MA 007/2008 IPCA RBNI DSP 1422/2021 27/12/2021 26/12/2051  R$14,458.78
SAO LUIS III MC 69 kV TR 230/69 kV SAO LUIS III TR1 MA RBF FT TR 230/69 kV SAO LUIS III TR1 MA 007/2008 IPCA RBNI DSP 1422/2021 27/12/2021 26/12/2051  R$14,458.78
SAO LUIS III MC 69 kV TR 230/69 kV SAO LUIS III TR1 MA RBF FT TR 230/69 kV SAO LUIS III TR1 MA 007/2008 IPCA RBNI DSP 1422/2021 27/12/2021 26/12/2051  R$14,458.78
SAO LUIS III MC 230 kV TR 230/69 kV SAO LUIS III TR3 MA RBF FT TR 230/69 kV SAO LUIS III TR3 MA 007/2008 IPCA RBNI REA 8348/2019 27/09/2021 27/09/2049  R$752,069.58
SAO LUIS III MC 230 kV TR 230/69 kV SAO LUIS III TR2 MA RBF FT TR 230/69 kV SAO LUIS III TR2 MA 007/2008 IPCA RBNI REA 2911/2011 01/06/2013 01/06/2047  R$837,365.95
SAO LUIS III MC 230 kV TR 230/69 kV SAO LUIS III TR1 MA RBF FT TR 230/69 kV SAO LUIS III TR1 MA 007/2008 IPCA RBL CC 007/2008 17/03/2008 17/03/2038  R$282,386.72
SAO LUIS III MC 13,8 kV TR 230/69 kV SAO LUIS III TR2 MA  RBF FT TR 230/69 kV SAO LUIS III TR2 MA 007/2008 IPCA RBNI REA 2911/2011 01/06/2013 01/06/2048  R$1,711.92
SAO LUIS III IB 69 kV MG 230 kV SAO LUIS III MG1 MA IB1 DIT   007/2008 IPCA RPEC CC 007/2008 10/08/2010 17/03/2038  R$37,182.59
SAO LUIS III IB 230 kV MG 230 kV SAO LUIS III MG1 MA IB1 RB FT MG 230 kV SAO LUIS III MG1 MA 007/2008 IPCA RBL CC 007/2008 17/03/2008 17/03/2038  R$160,994.56
SAO LUIS III EL 69 kV SAO LUIS IIIOLHOS DAGUA DIT   007/2008 IPCA RCDM REN 443/2011 29/06/2017 28/06/2040  R$346,035.78
SAO LUIS III EL 69 kV SAO LUIS IIIDIST3 DIT   007/2008 IPCA RCDM REA 1581/2008 03/09/2010 03/09/2041  R$373,099.05
SAO LUIS III EL 69 kV SAO LUIS IIIDIST2 DIT   007/2008 IPCA RCDM REA 1581/2008 03/09/2010 03/09/2041  R$373,099.05
SAO LUIS III EL 69 kV SAO LUIS IIIDIST1 DIT   007/2008 IPCA RCDM REA 1581/2008 03/09/2010 03/09/2041  R$373,099.05
SAO LUIS III EL 69 kV SAO LUIS IIIARACARY DIT   007/2008 IPCA RCDM REN 443/2011 29/06/2017 28/06/2040  R$346,035.78
SAO LUIS III EL 230 kV SAO LUIS III LT 230 kV SAO LUIS II /SAO LUIS III C-1 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS III C-1 MA 007/2008 IPCA RBL CC 007/2008 17/03/2008 17/03/2038  R$322,970.00
SINOP TR 230/138 kV SINOP TR3 MT RBF FT TR 230/138 kV SINOP TR3 MT 058/2001 IPCA RBNI REA 3102/2011 16/09/2013 15/09/2047  R$ 1,380,292.14
SINOP TR 230/138 kV SINOP TR2 MT RBF FT TR 230/138 kV SINOP TR2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$438,392.47
SINOP TR 230/138 kV SINOP TR1 MT RBF FT TR 230/138 kV SINOP TR1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$438,392.47
SINOP RTL 230 kV 22,14 Mvar SINOP RT1 MT RB FT LT 230 kV SINOP /SORRISO II C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$362,877.52
SINOP RTL 230 kV 20 MVAr SINOP RT2 MT RB FT LT 230 kV SINOP /SORRISO II C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$341,233.25
SINOP RTL 230 kV 20 MVAr SINOP RT2 MT RB FT LT 230 kV SINOP /SORRISO II C-1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$811,853.32
SINOP RTL 230 kV 20 MVAr SINOP RT2 MT RB FT LT 230 kV SINOP /SORRISO II C-1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$669,214.86
SINOP MG 230 kV SINOP MG1 MT RB FT MG 230 kV SINOP MG1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$593,846.06
SINOP MG 230 kV SINOP MG1 MT RB FT MG 230 kV SINOP MG1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,412,863.18
SINOP MG 230 kV SINOP MG1 MT RB FT MG 230 kV SINOP MG1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,164,630.38
SINOP MG 230 kV SINOP MG1 MT RB FT MG 230 kV SINOP MG1 MT 058/2001 IPCA RBNI REA 7814/2019 08/09/2020 08/09/2052  R$ 72.09
SINOP MC 230 kV TR 230/138 kV SINOP TR3 MT RBF FT TR 230/138 kV SINOP TR3 MT 058/2001 IPCA RBNI REA 3102/2011 16/09/2013 15/09/2042  R$933,817.65
SINOP MC 230 kV TR 230/138 kV SINOP TR2 MT RBF FT TR 230/138 kV SINOP TR2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
SINOP MC 230 kV TR 230/138 kV SINOP TR2 MT RBF FT TR 230/138 kV SINOP TR2 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$432,295.55
SINOP MC 230 kV TR 230/138 kV SINOP TR2 MT RBF FT TR 230/138 kV SINOP TR2 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$356,343.44
SINOP MC 230 kV TR 230/138 kV SINOP TR1 MT  RBF FT TR 230/138 kV SINOP TR1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
SINOP MC 230 kV RTL 230 kV 22,14 Mvar SINOP RT1 MT  RB FT LT 230 kV SINOP /SORRISO II C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$108,600.16
SINOP MC 230 kV RTL 230 kV 20 MVAr SINOP RT2 MT  RB FT LT 230 kV SINOP /SORRISO II C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$108,600.16
SINOP MC 230 kV CE 55/-20 Mvar SINOP CE1 MT RB FT CE 55/-20 Mvar SINOP CE1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$185,014.51
SINOP MC 230 kV BC 230 kV 30 MVAr SINOP BC1 MT  RB FT BC 230 kV 30 MVAr SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,037.95
SINOP MC 138 kV TR 230/138 kV SINOP TR3 MT RBF FT TR 230/138 kV SINOP TR3 MT 058/2001 IPCA RBNI REA 3102/2011 16/09/2013 15/09/2043  R$723,011.60
SINOP MC 138 kV TR 230/138 kV SINOP TR2 MT RBF FT TR 230/138 kV SINOP TR2 MT 058/2001 IPCA RBNI REA 3102/2011 16/09/2013 15/09/2047  R$74,967.35
SINOP MC 138 kV TR 230/138 kV SINOP TR2 MT RBF FT TR 230/138 kV SINOP TR2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$121,674.23
SINOP MC 138 kV TR 230/138 kV SINOP TR1 MT RBF FT TR 230/138 kV SINOP TR1 MT 058/2001 IPCA RBNI REA 3102/2011 16/09/2013 15/09/2047  R$74,967.35
SINOP MC 138 kV TR 230/138 kV SINOP TR1 MT RBF FT TR 230/138 kV SINOP TR1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$121,674.23
SINOP MC 13,8 kV TR 230/138 kV SINOP TR1 MT TERC RBF FT TR 230/138 kV SINOP TR1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$59,058.38
SINOP MC 13,8 kV TR 230/138 kV SINOP TR1 MT TERC RBF FT TR 230/138 kV SINOP TR1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$140,510.18
SINOP MC 13,8 kV TR 230/138 kV SINOP TR1 MT TERC RBF FT TR 230/138 kV SINOP TR1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$115,823.26
SINOP MC 13,8 kV BC 13,8 kV 3,6 Mvar SINOP BC8 MT  RBF FT BC 13,8 kV 3,6 Mvar SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$72,058.70
SINOP MC 13,8 kV BC 13,8 kV 3,6 Mvar SINOP BC7 MT  RBF FT BC 13,8 kV 3,6 Mvar SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$72,058.70
SINOP MC 13,8 kV BC 13,8 kV 3,6 Mvar SINOP BC6 MT  RBF FT BC 13,8 kV 3,6 Mvar SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$72,058.70
SINOP MC 13,8 kV BC 13,8 kV 3,6 Mvar SINOP BC5 MT  RBF FT BC 13,8 kV 3,6 Mvar SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$85,400.06
SINOP MC 13,8 kV BC 13,8 kV 3,6 Mvar SINOP BC4 MT  RBF FT BC 13,8 kV 3,6 Mvar SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$72,058.70
SINOP MC 13,8 kV BC 13,8 kV 3,6 Mvar SINOP BC3 MT  RBF FT BC 13,8 kV 3,6 Mvar SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$72,058.70
SINOP MC 13,8 kV BC 13,8 kV 3,6 Mvar SINOP BC2 MT  RBF FT BC 13,8 kV 3,6 Mvar SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$72,058.70
SINOP MC 13,8 kV BC 13,8 kV 3,6 Mvar SINOP BC1 MT  RBF FT BC 13,8 kV 3,6 Mvar SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$85,400.06
SINOP IB 230 kV MG 230 kV SINOP MG1 MT IB1 RB FT MG 230 kV SINOP MG1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
SINOP IB 138 kV MG 230 kV SINOP MG1 MT IB1 DIT   058/2001 IPCA RCDM REA 3102/2011 16/09/2013 15/09/2044  R$551,878.57
SINOP EL 230 kV SINOP LT 230 kV SINOP /SORRISO II C-1 MT  RB FT LT 230 kV SINOP /SORRISO II C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
SINOP EL 230 kV SINOP LT 230 kV SINOP /SORRISO II C-1 MT  RB FT LT 230 kV SINOP /SORRISO II C-1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$614,190.55
SINOP EL 230 kV SINOP LT 230 kV SINOP /SORRISO II C-1 MT  RB FT LT 230 kV SINOP /SORRISO II C-1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$506,280.43
SINOP EL 230 kV SINOP LT 230 kV SINOP /SORRISO II C-1 MT  RB FT LT 230 kV SINOP /SORRISO II C-1 MT 058/2001 IPCA RBNI REA 7814/2019 08/09/2020 08/09/2051  R$136,412.57
SINOP EL 138 kV SINOPDIST1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$137,714.48
SINOP EL 138 kV SINOPDIST1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$327,646.72
SINOP EL 138 kV SINOPDIST1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$269,859.70
SINOP CE 55/-20 Mvar SINOP CE1 MT RB FT CE 55/-20 Mvar SINOP CE1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,814,041.97
SINOP BC 230 kV 30 MVAr SINOP BC1 MT RB FT BC 230 kV 30 MVAr SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$176,448.19
SINOP BC 13,8 kV 3,6 Mvar SINOP BC8 MT RBF FT BC 13,8 kV 3,6 Mvar SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$35,162.27
SINOP BC 13,8 kV 3,6 Mvar SINOP BC7 MT RBF FT BC 13,8 kV 3,6 Mvar SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$35,162.27
SINOP BC 13,8 kV 3,6 Mvar SINOP BC6 MT RBF FT BC 13,8 kV 3,6 Mvar SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$35,162.27
SINOP BC 13,8 kV 3,6 Mvar SINOP BC5 MT RBF FT BC 13,8 kV 3,6 Mvar SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$35,162.27
SINOP BC 13,8 kV 3,6 Mvar SINOP BC4 MT RBF FT BC 13,8 kV 3,6 Mvar SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$35,162.27
SINOP BC 13,8 kV 3,6 Mvar SINOP BC3 MT RBF FT BC 13,8 kV 3,6 Mvar SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$35,162.27
SINOP BC 13,8 kV 3,6 Mvar SINOP BC2 MT RBF FT BC 13,8 kV 3,6 Mvar SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$35,162.27
SINOP BC 13,8 kV 3,6 Mvar SINOP BC1 MT RBF FT BC 13,8 kV 3,6 Mvar SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$35,162.27
SORRISO TR 230/69 kV SORRISO TF3 MT RBF FT TR 230/69 kV SORRISO TF3 MT 058/2001 IPCA RBNI REA 5713/2016 18/12/2017 17/12/2051  R$ 1,040,479.21
SORRISO TR 230/69 kV SORRISO TF2 MT RBF FT TR 230/69 kV SORRISO TF2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$199,799.03
SORRISO TR 230/69 kV SORRISO TF1 MT RBF FT TR 230/69 kV SORRISO TF1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$199,799.03
SORRISO TR 230/69 kV SORRISO TF1 MT RBF FT TR 230/69 kV SORRISO TF1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$475,356.67
SORRISO TR 230/69 kV SORRISO TF1 MT RBF FT TR 230/69 kV SORRISO TF1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$391,838.94
SORRISO MG 230 kV SORRISO MG1 MT RB FT MG 230 kV SORRISO MG1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$548,667.44
SORRISO MG 230 kV SORRISO MG1 MT RB FT MG 230 kV SORRISO MG1 MT 058/2001 IPCA RBNI REA 5713/2016 18/12/2017 17/12/2044  R$273,228.16
SORRISO MG 230 kV SORRISO MG1 MT RB FT MG 230 kV SORRISO MG1 MT 058/2001 IPCA RBNI REA 5713/2016 18/12/2017 17/12/2042  R$517,097.45
SORRISO MG 230 kV SORRISO MG1 MT RB FT MG 230 kV SORRISO MG1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,305,375.36
SORRISO MG 230 kV SORRISO MG1 MT RB FT MG 230 kV SORRISO MG1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,076,027.61
SORRISO MC 69 kV TR 230/69 kV SORRISO TF3 MT RBF FT TR 230/69 kV SORRISO TF3 MT 058/2001 IPCA RBNI REA 5713/2016 18/12/2017 17/12/2047  R$439,379.33
SORRISO MC 69 kV TR 230/69 kV SORRISO TF2 MT  RBF FT TR 230/69 kV SORRISO TF2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$74,117.78
SORRISO MC 69 kV TR 230/69 kV SORRISO TF1 MT  RBF FT TR 230/69 kV SORRISO TF1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$74,117.78
SORRISO MC 230 kV TR 230/69 kV SORRISO TF3 MT RBF FT TR 230/69 kV SORRISO TF3 MT 058/2001 IPCA RBNI REA 5713/2016 18/12/2017 17/12/2046  R$ 1,045,487.08
SORRISO MC 230 kV TR 230/69 kV SORRISO TF2 MT  RBF FT TR 230/69 kV SORRISO TF2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
SORRISO MC 230 kV TR 230/69 kV SORRISO TF1 MT  RBF FT TR 230/69 kV SORRISO TF1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
SORRISO MC 230 kV TR 230/69 kV SORRISO TF1 MT  RBF FT TR 230/69 kV SORRISO TF1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$432,295.55
SORRISO MC 230 kV TR 230/69 kV SORRISO TF1 MT  RBF FT TR 230/69 kV SORRISO TF1 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$356,343.44
SORRISO MC 13,8 kV BC 13,8 kV 3,6 MVAr SORRISO BC2 MT  RBF FT BC 13,8 kV 3,6 MVAr SORRISO BC2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$85,400.06
SORRISO MC 13,8 kV BC 13,8 kV 3,6 MVAr SORRISO BC1 MT  RBF FT BC 13,8 kV 3,6 MVAr SORRISO BC1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$85,400.06
SORRISO IB 69 kV MG 230 kV SORRISO MG1 MT IB1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$49,815.59
SORRISO IB 230 kV MG 230 kV SORRISO MG1 MT IB1 RB FT MG 230 kV SORRISO MG1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
SORRISO EL 69 kV SORRISODIST1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
SORRISO EL 69 kV SORRISODIST1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$206,153.28
SORRISO EL 69 kV SORRISODIST1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$169,794.04
SORRISO EL 230 kV SORRISO LT 230 kV SORRISO II /SORRISO C-1 MT  RB FT LT 230 kV SORRISO II /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
SORRISO EL 230 kV SORRISO LT 230 kV NOVA MUTUM /SORRISO C-1 MT  RB FT LT 230 kV NOVA MUTUM /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
SORRISO EL 13,8 kV SORRISODIST2 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$59,058.38
SORRISO BC 13,8 kV 3,6 MVAr SORRISO BC2 MT RBF FT BC 13,8 kV 3,6 MVAr SORRISO BC2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$35,162.27
SORRISO BC 13,8 kV 3,6 MVAr SORRISO BC1 MT RBF FT BC 13,8 kV 3,6 MVAr SORRISO BC1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$35,162.27
SUB S.LUIS MC 13,8 kV CS 33/-31 MVAr SUB S.LUIS CS2 MA RB FT CS 33/-31 MVAr SUB S.LUIS CS2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$71,399.30
SUB S.LUIS MC 13,8 kV CS 33/-31 MVAr SUB S.LUIS CS1 MA RB FT CS 33/-31 MVAr SUB S.LUIS CS1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$71,399.30
SUB S.LUIS CS 33/-31 MVAr SUB S.LUIS CS2 MA RB FT CS 33/-31 MVAr SUB S.LUIS CS2 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,079,952.20
SUB S.LUIS CS 33/-31 MVAr SUB S.LUIS CS2 MA RB FT CS 33/-31 MVAr SUB S.LUIS CS2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,569,394.32
SUB S.LUIS CS 33/-31 MVAr SUB S.LUIS CS2 MA RB FT CS 33/-31 MVAr SUB S.LUIS CS2 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,117,964.94
SUB S.LUIS CS 33/-31 MVAr SUB S.LUIS CS1 MA RB FT CS 33/-31 MVAr SUB S.LUIS CS1 MA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,079,952.20
SUB S.LUIS CS 33/-31 MVAr SUB S.LUIS CS1 MA RB FT CS 33/-31 MVAr SUB S.LUIS CS1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,569,394.32
SUB S.LUIS CS 33/-31 MVAr SUB S.LUIS CS1 MA RB FT CS 33/-31 MVAr SUB S.LUIS CS1 MA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,117,964.94
TRANSAMAZONIC TT 34/34 kV TRANSAMAZONIC TA2 PA DIT   058/2001 IPCA RCDM REA 4660/2014 29/08/2016 28/08/2046  R$220,275.53
TRANSAMAZONIC TR 230/34,5 kV TRANSAMAZONIC TF2 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$199,799.03
TRANSAMAZONIC TR 230/34,5 kV TRANSAMAZONIC TF2 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF2 PA 058/2001 IPCA RBNI REA 4660/2014 21/06/2016 20/06/2041  R$158,803.24
TRANSAMAZONIC TR 230/34,5 kV TRANSAMAZONIC TF1 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$199,799.03
TRANSAMAZONIC TR 230/34,5 kV TRANSAMAZONIC TF1 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF1 PA 058/2001 IPCA RBNI REA 4660/2014 18/11/2016 17/11/2041  R$160,673.32
TRANSAMAZONIC TR 230/34,5 kV TRANSAMAZONIC TF1 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$475,356.67
TRANSAMAZONIC TR 230/34,5 kV TRANSAMAZONIC TF1 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$391,838.94
TRANSAMAZONIC RTL 230 kV 30 Mvar TRANSAMAZONIC RT1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$427,565.57
TRANSAMAZONIC RTL 230 kV 30 Mvar TRANSAMAZONIC RT1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,017,252.94
TRANSAMAZONIC RTL 230 kV 30 Mvar TRANSAMAZONIC RT1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$838,526.82
TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$478,014.31
TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBNI REA 4660/2014 29/08/2016 28/08/2047  R$ 3,136,464.74
TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBNI REA 4660/2014 29/08/2016 28/08/2047  R$626,247.99
TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBNI REA 4660/2014 29/08/2016 28/08/2044  R$320,482.37
TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBNI REA 4660/2014 29/08/2016 28/08/2047  R$167,320.83
TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBNI REA 4660/2014 29/08/2016 28/08/2047  R$280,060.88
TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBNI REA 4660/2014 29/08/2016 28/08/2047  R$280,060.88
TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBNI REA 4660/2014 29/08/2016 28/08/2047  R$31,065.34
TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBNI REA 4660/2014 29/08/2016 28/08/2047  R$31,065.34
TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBNI REA 4660/2014 29/08/2016 28/08/2047  R$244,620.19
TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,137,279.26
TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$937,465.14
TRANSAMAZONIC MC 34,5 kV TR 230/34,5 kV TRANSAMAZONIC TF2 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$66,390.50
TRANSAMAZONIC MC 34,5 kV TR 230/34,5 kV TRANSAMAZONIC TF2 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF2 PA 058/2001 IPCA RBNI REA 4660/2014 21/06/2016 20/06/2042  R$333,101.66
TRANSAMAZONIC MC 34,5 kV TR 230/34,5 kV TRANSAMAZONIC TF1 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$66,390.50
TRANSAMAZONIC MC 34,5 kV TR 230/34,5 kV TRANSAMAZONIC TF1 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF1 PA 058/2001 IPCA RBNI REA 4660/2014 18/11/2016 17/11/2045  R$331,633.13
TRANSAMAZONIC MC 34,5 kV TR 230/34,5 kV TRANSAMAZONIC TF1 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$157,954.57
TRANSAMAZONIC MC 34,5 kV TR 230/34,5 kV TRANSAMAZONIC TF1 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$130,202.76
TRANSAMAZONIC MC 34 kV TT 34/34 kV TRANSAMAZONIC TA2 PA DIT   058/2001 IPCA RCDM REA 4660/2014 29/08/2016 28/08/2044  R$267,657.76
TRANSAMAZONIC MC 230 kV TR 230/34,5 kV TRANSAMAZONIC TF2 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$163,104.17
TRANSAMAZONIC MC 230 kV TR 230/34,5 kV TRANSAMAZONIC TF2 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF2 PA 058/2001 IPCA RBNI REA 4660/2014 21/06/2016 20/06/2046  R$ 1,546,286.35
TRANSAMAZONIC MC 230 kV TR 230/34,5 kV TRANSAMAZONIC TF1 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$242,569.43
TRANSAMAZONIC MC 230 kV TR 230/34,5 kV TRANSAMAZONIC TF1 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF1 PA 058/2001 IPCA RBNI REA 4660/2014 18/11/2016 17/11/2045  R$ 1,181,720.26
TRANSAMAZONIC MC 230 kV RTL 230 kV 30 Mvar TRANSAMAZONIC RT1 PA  RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$108,600.16
TRANSAMAZONIC MC 230 kV RTL 230 kV 30 Mvar TRANSAMAZONIC RT1 PA  RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBNI REA 4660/2014 21/06/2016 20/06/2047  R$25,141.78
TRANSAMAZONIC IB 34 kV MG 230 kV TRANSAMAZONIC MG1 PA IB1 DIT   058/2001 IPCA RCDM REA 4660/2014 29/08/2016 28/08/2047  R$274,551.13
TRANSAMAZONIC IB 230 kV MG 230 kV TRANSAMAZONIC MG1 PA IB1 RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBNI REA 4660/2014 29/08/2016 28/08/2051  R$873,320.46
TRANSAMAZONIC EL 34,5 kV TRANSAMAZONICDIST1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$81,931.09
TRANSAMAZONIC EL 34,5 kV TRANSAMAZONICDIST1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$194,928.32
TRANSAMAZONIC EL 34,5 kV TRANSAMAZONICDIST1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$160,548.83
TRANSAMAZONIC EL 34 kV TRANSAMAZONICCELPA DIT   058/2001 IPCA RCDM REA 4660/2014 29/08/2016 28/08/2046  R$371,990.77
TRANSAMAZONIC EL 230 kV TRANSAMAZONIC LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBNI REA 4660/2014 21/06/2016 20/06/2045  R$ 1,482,413.74
TRANSAMAZONIC EL 230 kV TRANSAMAZONIC LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA RB FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA 058/2001 IPCA RBNI REA 4660/2014 21/06/2016 20/06/2044  R$ 1,488,135.33
TUCURUI TR 500/230 kV TUCURUI TRR1 PA RB FT TR 500/230 kV TUCURUI TRR1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$668,452.15
TUCURUI TR 500/230 kV TUCURUI TRR1 PA RB FT TR 500/230 kV TUCURUI TRR1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,590,364.05
TUCURUI TR 500/230 kV TUCURUI TRR1 PA RB FT TR 500/230 kV TUCURUI TRR1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,310,945.25
TUCURUI TR 500/230 kV TUCURUI TR2 PA RB FT TR 500/230 kV TUCURUI TR2 PA 058/2001 IPCA RBNI REA 3216/2011 09/02/2015 08/02/2049  R$ 5,214,139.36
TUCURUI TR 500/230 kV TUCURUI TR1 PA RB FT TR 500/230 kV TUCURUI TR1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,005,356.45
TUCURUI TR 500/230 kV TUCURUI TR1 PA RB FT TR 500/230 kV TUCURUI TR1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,771,092.14
TUCURUI TR 500/230 kV TUCURUI TR1 PA RB FT TR 500/230 kV TUCURUI TR1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,932,835.76
TUCURUI TR 230/69 kV TUCURUI TR2 PA RBF FT TR 230/69 kV TUCURUI TR2 PA 058/2001 IPCA RBNI REA 8542/2020 18/04/2022 18/04/2057  R$ 1,413,176.93
TUCURUI TR 230/69 kV TUCURUI TF1 PA RBF FT TR 230/69 kV TUCURUI TF1 PA 058/2001 IPCA RBNI REA 3216/2011 09/02/2015 08/02/2049  R$ 1,403,607.89
TUCURUI TR 230/138 kV TUCURUI TR2 PA RBF FT TR 230/138 kV TUCURUI TR2 PA 012/2011 IPCA RBL CC 012/2011 26/12/2014 09/12/2041  R$480,274.89
TUCURUI TR 230/138 kV TUCURUI TR1 PA RBF FT TR 230/138 kV TUCURUI TR1 PA 012/2011 IPCA RBL CC 012/2011 26/12/2014 09/12/2041  R$480,274.89
TUCURUI RTB 500 kV 50 Mvar TUCURUI RT1 PA RB FT RTB 500 kV 50 Mvar TUCURUI RT1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$596,023.54
TUCURUI MG 500 kV TUCURUI MG1 PA RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBNI REA 3216/2011 22/02/2016 21/02/2045  R$ 12,710,637.03
TUCURUI MG 500 kV TUCURUI MG1 PA RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,723,416.73
TUCURUI MG 500 kV TUCURUI MG1 PA RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBNI REA 4745/2014 22/02/2016 21/02/2045  R$644,207.90
TUCURUI MG 500 kV TUCURUI MG1 PA RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBNI REA 4745/2014 22/02/2016 21/02/2045  R$741,390.22
TUCURUI MG 500 kV TUCURUI MG1 PA RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBNI REA 4745/2014 22/02/2016 21/02/2041  R$4,336.44
TUCURUI MG 500 kV TUCURUI MG1 PA RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBNI REA 8542/2020 18/04/2022 18/04/2057  R$212,422.27
TUCURUI MG 230 kV TUCURUI MG1 PA RB FT MG 230 kV TUCURUI MG1 PA 012/2011 IPCA RBL CC 012/2011 26/12/2014 09/12/2041  R$361,382.51
TUCURUI MC 69 kV TR 500/69 kV TUCURUI TF1 PA  RBF FT TR 500/69 kV TUCURUI TF1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$74,117.78
TUCURUI MC 69 kV TR 230/69 kV TUCURUI TR2 PA RBF FT TR 230/69 kV TUCURUI TR2 PA 058/2001 IPCA RBNI REA 8542/2020 18/04/2022 18/04/2049  R$667,161.82
TUCURUI MC 69 kV TR 230/69 kV TUCURUI TF1 PA RBF FT TR 230/69 kV TUCURUI TF1 PA 058/2001 IPCA RBNI REA 3216/2011 09/02/2015 08/02/2046  R$420,166.22
TUCURUI MC 500 kV TR 500/230 kV TUCURUI TR2 PA RB FT TR 500/230 kV TUCURUI TR1 PA 058/2001 IPCA RBNI REA 3216/2011 09/02/2015 08/02/2046  R$942,400.40
TUCURUI MC 500 kV TR 500/230 kV TUCURUI TR2 PA RB FT TR 500/230 kV TUCURUI TR1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$490,032.13
TUCURUI MC 500 kV TR 500/230 kV TUCURUI TR2 PA RB FT TR 500/230 kV TUCURUI TR1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,165,871.75
TUCURUI MC 500 kV TR 500/230 kV TUCURUI TR2 PA RB FT TR 500/230 kV TUCURUI TR1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$961,034.07
TUCURUI MC 500 kV TR 500/230 kV TUCURUI TR1 PA RB FT TR 500/230 kV TUCURUI TR2 PA 058/2001 IPCA RBNI REA 3216/2011 22/02/2016 21/02/2046  R$ 1,356,546.37
TUCURUI MC 500 kV RTB 500 kV 50 Mvar TUCURUI RT1 PA MC2 RB FT RTB 500 kV 50 Mvar TUCURUI RT1 PA 058/2001 IPCA RBNI REA 4745/2014 22/02/2016 21/02/2048  R$ 1,188,266.84
TUCURUI MC 500 kV RTB 500 kV 50 Mvar TUCURUI RT1 PA MC1 RB FT RTB 500 kV 50 Mvar TUCURUI RT1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$296,882.99
TUCURUI MC 230 kV TR 500/230 kV TUCURUI TR2 PA RB FT TR 500/230 kV TUCURUI TR2 PA 058/2001 IPCA RBNI REA 3216/2011 09/02/2015 08/02/2046  R$ 2,270,252.86
TUCURUI MC 230 kV TR 500/230 kV TUCURUI TR1 PA RB FT TR 500/230 kV TUCURUI TR1 PA 058/2001 IPCA RBNI REA 3216/2011 22/02/2016 21/02/2047  R$ 2,870,004.49
TUCURUI MC 230 kV TR 500/230 kV TUCURUI TR1 PA RB FT TR 500/230 kV TUCURUI TR1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$173,033.12
TUCURUI MC 230 kV TR 500/230 kV TUCURUI TR1 PA RB FT TR 500/230 kV TUCURUI TR1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$411,675.93
TUCURUI MC 230 kV TR 500/230 kV TUCURUI TR1 PA RB FT TR 500/230 kV TUCURUI TR1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$339,346.58
TUCURUI MC 230 kV TR 230/69 kV TUCURUI TR2 PA RBF FT TR 230/69 kV TUCURUI TR2 PA 058/2001 IPCA RBNI REA 8542/2020 18/04/2022 18/04/2050  R$ 1,012,224.70
TUCURUI MC 230 kV TR 230/69 kV TUCURUI TF1 PA RBF FT TR 230/69 kV TUCURUI TF1 PA 058/2001 IPCA RBNI REA 3216/2011 09/02/2015 08/02/2046  R$987,604.86
TUCURUI MC 230 kV TR 230/138 kV TUCURUI TR2 PA RBF FT TR 230/138 kV TUCURUI TR2 PA 012/2011 IPCA RBL CC 012/2011 26/12/2014 09/12/2041  R$188,624.81
TUCURUI MC 230 kV TR 230/138 kV TUCURUI TR1 PA RBF FT TR 230/138 kV TUCURUI TR1 PA 012/2011 IPCA RBL CC 012/2011 26/12/2014 09/12/2041  R$188,624.81
TUCURUI MC 138 kV TR 230/138 kV TUCURUI TR2 PA RBF FT TR 230/138 kV TUCURUI TR2 PA 012/2011 IPCA RBL CC 012/2011 26/12/2014 09/12/2041  R$142,529.71
TUCURUI MC 138 kV TR 230/138 kV TUCURUI TR1 PA RBF FT TR 230/138 kV TUCURUI TR1 PA 012/2011 IPCA RBL CC 012/2011 26/12/2014 09/12/2041  R$142,529.71
TUCURUI IB 69 kV MG 500 kV TUCURUI MG1 PA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$49,815.59
TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB9 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$520,028.84
TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB7 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$520,028.84
TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB6 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBNI REA 3216/2011 22/02/2016 21/02/2046  R$194,427.03
TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB6 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$520,028.84
TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB6 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,237,239.15
TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB6 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,019,862.59
TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB5 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$520,028.84
TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB5 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,237,239.15
TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB5 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,019,862.59
TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB4 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBNI REA 3216/2011 22/02/2016 21/02/2046  R$194,427.03
TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB4 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$520,028.84
TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB4 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,237,239.15
TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB4 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,019,862.59
TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB3 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$520,028.84
TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB3 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,237,239.15
TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB2 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$520,028.84
TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB1 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$520,028.84
TUCURUI IB 230 kV MG 500 kV TUCURUI MG1 PA IB1 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBNI REA 3216/2011 09/02/2015 08/02/2046  R$784,398.67
TUCURUI IB 138 kV MG 230 kV TUCURUI MG1 PA IB1 DIT   012/2011 IPCA RPEC CC 012/2011 26/12/2014 09/12/2041  R$374,080.74
TUCURUI IB 13,8 kV MG 500 kV TUCURUI MG1 PA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$36,290.08
TUCURUI EL 69 kV TUCURUI LT 69 kV US. TUCURUI /TUCURUI C-2 PA DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
TUCURUI EL 69 kV TUCURUI LT 69 kV US. TUCURUI /TUCURUI C-1 PA DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
TUCURUI EL 69 kV TUCURUIDIST1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,649.09
TUCURUI EL 69 kV TUCURUIDIST1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$206,153.28
TUCURUI EL 69 kV TUCURUIDIST1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$169,794.04
TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /VILA DO CONDE C-1 PA RB FT LT 500 kV TUCURUI /VILA DO CONDE C-1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /VILA DO CONDE C-1 PA RB FT LT 500 kV TUCURUI /VILA DO CONDE C-1 PA 058/2001 IPCA RBNI REA 8314/2019 20/08/2021 19/08/2036  R$156,601.44
TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-9 PA  DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-8 PA  DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-7 PA  DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-6 PA  DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-5 PA  DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-4 PA DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-4 PA DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,320,962.73
TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-3 PA DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-3 PA DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,320,962.73
TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-2 PA DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-2 PA DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,320,962.73
TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-11 PA DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-11 PA DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,320,962.73
TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-11 PA DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 1,087,984.64
TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-10 PA DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-10 PA DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,320,962.73
TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-10 PA DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 1,087,984.64
TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-1 PA DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
TUCURUI EL 500 kV TUCURUI LT 500 kV MARABA /TUCURUI C-2 PA  RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
TUCURUI EL 500 kV TUCURUI LT 500 kV MARABA /TUCURUI C-2 PA  RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,320,962.73
TUCURUI EL 500 kV TUCURUI LT 500 kV MARABA /TUCURUI C-2 PA  RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$14,415.91
TUCURUI EL 500 kV TUCURUI LT 500 kV MARABA /TUCURUI C-1 PA RB FT LT 500 kV MARABA /TUCURUI C-1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
TUCURUI EL 500 kV TUCURUI LT 500 kV MARABA /TUCURUI C-1 PA RB FT LT 500 kV MARABA /TUCURUI C-1 PA 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034  R$14,415.91
TUCURUI EL 230 kV TUCURUI LT 230 kV TUCURUI /ALTAMIRA C-1 PA  RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBNI REA 3216/2011 02/07/2015 01/07/2045  R$ 1,112,472.09
TUCURUI EL 230 kV TUCURUI LT 230 kV TUCURUI /ALTAMIRA C-1 PA  RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$242,569.43
TUCURUI EL 230 kV TUCURUI LT 230 kV TUCURUI /ALTAMIRA C-1 PA  RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$577,114.91
TUCURUI EL 230 kV TUCURUI LT 230 kV TUCURUI /ALTAMIRA C-1 PA  RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$475,718.78
TUCURUI EL 230 kV TUCURUIDIST1 DIT   058/2001 IPCA RCDM REA 3216/2011 24/05/2015 23/05/2045  R$ 1,109,319.67
TUCURUI EL 230 kV TUCURUIDIST1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$242,569.43
TUCURUI EL 230 kV TUCURUIDIST1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$577,114.91
TUCURUI EL 138 kV TUCURUIDIST1 DIT   012/2011 IPCA RPEC CC 012/2011 26/12/2014 09/12/2041  R$711,341.96
TUCURUI EL 13,8 kV TUCURUIDIST8 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$62,165.30
TUCURUI EL 13,8 kV TUCURUIDIST7 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$62,165.30
TUCURUI EL 13,8 kV TUCURUIDIST6 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$62,165.30
TUCURUI EL 13,8 kV TUCURUIDIST5 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$62,165.30
TUCURUI EL 13,8 kV TUCURUIDIST4 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$62,165.30
TUCURUI EL 13,8 kV TUCURUIDIST3 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$62,165.30
TUCURUI EL 13,8 kV TUCURUIDIST2 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$62,165.30
TUCURUI EL 13,8 kV TUCURUIDIST1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$62,165.30
TUCURUI VILA TR 69/34,5 kV TUCURUI VILA TR3 PA DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$162,655.08
TUCURUI VILA TR 69/34,5 kV TUCURUI VILA TR3 PA DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$386,984.75
TUCURUI VILA TR 69/34,5 kV TUCURUI VILA TR3 PA DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$318,732.28
TUCURUI VILA TR 69/13,8 kV TUCURUI VILA TR2 PA DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$66,255.36
TUCURUI VILA TR 69/13,8 kV TUCURUI VILA TR1 PA DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$112,824.17
TUCURUI VILA MG 69 kV TUCURUI VILA MG1 PA DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$275,822.68
TUCURUI VILA MG 69 kV TUCURUI VILA MG1 PA DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$656,230.17
TUCURUI VILA MG 69 kV TUCURUI VILA MG1 PA DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$540,490.91
TUCURUI VILA MC 69 kV TR 69/34,5 kV TUCURUI VILA TR3 PA  DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$66,390.50
TUCURUI VILA MC 69 kV TR 69/34,5 kV TUCURUI VILA TR3 PA  DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$157,954.57
TUCURUI VILA MC 69 kV TR 69/34,5 kV TUCURUI VILA TR3 PA  DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$130,096.13
TUCURUI VILA MC 69 kV TR 69/13,8 kV TUCURUI VILA TR2 PA  DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$66,390.50
TUCURUI VILA MC 69 kV TR 69/13,8 kV TUCURUI VILA TR2 PA  DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$157,954.57
TUCURUI VILA MC 69 kV TR 69/13,8 kV TUCURUI VILA TR2 PA  DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$130,096.13
TUCURUI VILA MC 69 kV TR 69/13,8 kV TUCURUI VILA TR1 PA  DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$66,390.50
TUCURUI VILA MC 69 kV TR 69/13,8 kV TUCURUI VILA TR1 PA  DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$157,954.57
TUCURUI VILA MC 69 kV TR 69/13,8 kV TUCURUI VILA TR1 PA  DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$130,096.13
TUCURUI VILA MC 13,8 kV TR 69/13,8 kV TUCURUI VILA TR2 PA  DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$52,805.29
TUCURUI VILA MC 13,8 kV TR 69/13,8 kV TUCURUI VILA TR2 PA  DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$125,632.99
TUCURUI VILA MC 13,8 kV TR 69/13,8 kV TUCURUI VILA TR2 PA  DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$103,475.11
TUCURUI VILA MC 13,8 kV TR 69/13,8 kV TUCURUI VILA TR1 PA  DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$52,805.29
TUCURUI VILA MC 13,8 kV TR 69/13,8 kV TUCURUI VILA TR1 PA  DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$125,632.99
TUCURUI VILA MC 13,8 kV TR 69/13,8 kV TUCURUI VILA TR1 PA  DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$103,475.11
TUCURUI VILA MC 13,8 kV TR 13,8/0,22 kV TUCURUI VILA TR1 PA  DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$52,805.29
TUCURUI VILA MC 13,8 kV TR 13,8/0,22 kV TUCURUI VILA TR1 PA  DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$125,632.99
TUCURUI VILA MC 13,8 kV TR 13,8/0,22 kV TUCURUI VILA TR1 PA  DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$103,475.11
TUCURUI VILA MC 13,8 kV BC 13,8 kV 3 Mvar TUCURUI VILA BC1 PA  DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$85,400.06
TUCURUI VILA MC 13,8 kV BC 13,8 kV 3 Mvar TUCURUI VILA BC1 PA  DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$203,181.60
TUCURUI VILA MC 13,8 kV BC 13,8 kV 3 Mvar TUCURUI VILA BC1 PA  DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$167,346.48
TUCURUI VILA EL 69 kV TUCURUI VILADIST2 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$81,931.09
TUCURUI VILA EL 69 kV TUCURUI VILADIST2 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$194,928.32
TUCURUI VILA EL 69 kV TUCURUI VILADIST2 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$160,548.83
TUCURUI VILA EL 34,5 kV TUCURUI VILADIST1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$81,931.09
TUCURUI VILA EL 34,5 kV TUCURUI VILADIST1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$194,928.32
TUCURUI VILA EL 34,5 kV TUCURUI VILADIST1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$160,548.83
TUCURUI VILA EL 13,8 kV TUCURUI VILADIST3 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$59,058.38
TUCURUI VILA EL 13,8 kV TUCURUI VILADIST3 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$140,510.18
TUCURUI VILA EL 13,8 kV TUCURUI VILADIST3 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$115,728.41
TUCURUI VILA EL 13,8 kV TUCURUI VILADIST2 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$59,058.38
TUCURUI VILA EL 13,8 kV TUCURUI VILADIST2 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$140,510.18
TUCURUI VILA EL 13,8 kV TUCURUI VILADIST2 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$115,728.41
TUCURUI VILA EL 13,8 kV TUCURUI VILADIST1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$59,058.38
TUCURUI VILA EL 13,8 kV TUCURUI VILADIST1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$140,510.18
TUCURUI VILA EL 13,8 kV TUCURUI VILADIST1 DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$115,728.41
TUCURUI VILA BC 13,8 kV 3 Mvar TUCURUI VILA BC1 PA DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$35,162.27
TUCURUI VILA BC 13,8 kV 3 Mvar TUCURUI VILA BC1 PA DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$83,657.15
TUCURUI VILA BC 13,8 kV 3 Mvar TUCURUI VILA BC1 PA DIT   058/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$68,902.55
UTINGA TR 230/69 kV UTINGA TF4 PA RBF FT TR 230/69 kV UTINGA TF4 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$715,206.72
UTINGA TR 230/69 kV UTINGA TF3 PA RBF FT TR 230/69 kV UTINGA TF3 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$715,206.72
UTINGA TR 230/69 kV UTINGA TF3 PA RBF FT TR 230/69 kV UTINGA TF3 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,701,601.31
UTINGA TR 230/69 kV UTINGA TF3 PA RBF FT TR 230/69 kV UTINGA TF3 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,402,638.70
UTINGA TR 230/69 kV UTINGA TF3 PA RBF FT TR 230/69 kV UTINGA TF3 PA 058/2001 IPCA RMEL REN 443/2011 20/11/2016 19/11/2030  R$38,651.55
UTINGA TR 230/69 kV UTINGA TF2 PA RBF FT TR 230/69 kV UTINGA TF2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$715,206.72
UTINGA TR 230/69 kV UTINGA TF2 PA RBF FT TR 230/69 kV UTINGA TF2 PA 058/2001 IPCA RMEL REA 2837/2011 24/02/2013 23/02/2048  R$61,697.12
UTINGA TR 230/69 kV UTINGA TF2 PA RBF FT TR 230/69 kV UTINGA TF2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,701,601.31
UTINGA TR 230/69 kV UTINGA TF2 PA RBF FT TR 230/69 kV UTINGA TF2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,402,638.70
UTINGA TR 230/69 kV UTINGA TF1 PA RBF FT TR 230/69 kV UTINGA TF1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$715,206.72
UTINGA TR 230/69 kV UTINGA TF1 PA RBF FT TR 230/69 kV UTINGA TF1 PA 058/2001 IPCA RMEL REA 2837/2011 24/02/2013 23/02/2047  R$56,260.82
UTINGA TR 230/69 kV UTINGA TF1 PA RBF FT TR 230/69 kV UTINGA TF1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,701,601.31
UTINGA TR 230/69 kV UTINGA TF1 PA RBF FT TR 230/69 kV UTINGA TF1 PA 058/2001 IPCA RMEL REN 443/2011 18/12/2016 17/12/2030  R$38,678.93
UTINGA TR 230/69 kV UTINGA TF1 PA RBF FT TR 230/69 kV UTINGA TF1 PA 058/2001 IPCA RMEL REN 443/2011 26/06/2017 25/06/2040  R$21,015.78
UTINGA MG 230 kV UTINGA MG1 PA RB FT MG 230 kV UTINGA MG1 PA 058/2001 IPCA RBNI REA 3362/2012 24/04/2015 23/04/2046  R$68,020.57
UTINGA MG 230 kV UTINGA MG1 PA RB FT MG 230 kV UTINGA MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$696,007.46
UTINGA MC 69 kV TR 230/69 kV UTINGA TF4 PA RBF FT TR 230/69 kV UTINGA TF4 PA 058/2001 IPCA RBNI REA 539/2006 21/02/2014 20/02/2043  R$90,272.44
UTINGA MC 69 kV TR 230/69 kV UTINGA TF3 PA  RBF FT TR 230/69 kV UTINGA TF3 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$66,390.50
UTINGA MC 69 kV TR 230/69 kV UTINGA TF3 PA  RBF FT TR 230/69 kV UTINGA TF3 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$157,954.57
UTINGA MC 69 kV TR 230/69 kV UTINGA TF3 PA  RBF FT TR 230/69 kV UTINGA TF3 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$130,202.76
UTINGA MC 69 kV TR 230/69 kV UTINGA TF2 PA  RBF FT TR 230/69 kV UTINGA TF2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$66,390.50
UTINGA MC 69 kV TR 230/69 kV UTINGA TF1 PA  RBF FT TR 230/69 kV UTINGA TF1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$66,390.50
UTINGA MC 230 kV TR 230/69 kV UTINGA TF4 PA RBF FT TR 230/69 kV UTINGA TF4 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,482.24
UTINGA MC 230 kV TR 230/69 kV UTINGA TF3 PA RBF FT TR 230/69 kV UTINGA TF3 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,482.24
UTINGA MC 230 kV TR 230/69 kV UTINGA TF3 PA RBF FT TR 230/69 kV UTINGA TF3 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$455,569.58
UTINGA MC 230 kV TR 230/69 kV UTINGA TF3 PA RBF FT TR 230/69 kV UTINGA TF3 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$375,528.35
UTINGA MC 230 kV TR 230/69 kV UTINGA TF2 PA  RBF FT TR 230/69 kV UTINGA TF2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,482.24
UTINGA MC 230 kV TR 230/69 kV UTINGA TF1 PA  RBF FT TR 230/69 kV UTINGA TF1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$191,482.24
UTINGA MC 230 kV BC 230 kV 55 Mvar UTINGA BC4 PA  RB FT BC 230 kV 55 Mvar UTINGA BC4 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$213,621.98
UTINGA MC 230 kV BC 230 kV 55 Mvar UTINGA BC3 PA  RB FT BC 230 kV 55 Mvar UTINGA BC3 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$213,621.98
UTINGA MC 230 kV BC 230 kV 55 MVAr UTINGA BC2 PA  RB FT BC 230 kV 55 MVAr UTINGA BC2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$213,621.98
UTINGA MC 230 kV BC 230 kV 55 MVAr UTINGA BC1 PA  RB FT BC 230 kV 55 MVAr UTINGA BC1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$213,621.98
UTINGA IB 230 kV MG 230 kV UTINGA MG1 PA IB1 RB FT MG 230 kV UTINGA MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
UTINGA EL 230 kV UTINGA LT 230 kV UTINGA /MIRAMAR C-2 PA RB FT LT 230 kV UTINGA /MIRAMAR C-2 PA 058/2001 IPCA RBNI REA 3362/2012 19/04/2016 18/04/2045  R$ 1,134,345.49
UTINGA EL 230 kV UTINGA LT 230 kV UTINGA /MIRAMAR C-1 PA  RB FT LT 230 kV UTINGA /MIRAMAR C-1 PA 058/2001 IPCA RBNI REA 2152/2009 19/11/2012 18/11/2040  R$1,355.42
UTINGA EL 230 kV UTINGA LT 230 kV UTINGA /MIRAMAR C-1 PA  RB FT LT 230 kV UTINGA /MIRAMAR C-1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$267,055.89
UTINGA EL 230 kV UTINGA LT 230 kV UTINGA /MIRAMAR C-1 PA  RB FT LT 230 kV UTINGA /MIRAMAR C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$635,372.46
UTINGA EL 230 kV UTINGA LT 230 kV UTINGA /MIRAMAR C-1 PA  RB FT LT 230 kV UTINGA /MIRAMAR C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$523,740.78
UTINGA EL 230 kV UTINGA LT 230 kV UTINGA /CASTANHAL C-1 PA  RB FT LT 230 kV UTINGA /CASTANHAL C-1 PA 058/2001 IPCA RBNI REA 3362/2012 24/04/2015 23/04/2046  R$ 1,008,944.41
UTINGA EL 230 kV UTINGA LT 230 kV MARITUBA /UTINGA C-2 PA  RB FT LT 230 kV GUAMA /UTINGA C-2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$267,055.89
UTINGA EL 230 kV UTINGA LT 230 kV MARITUBA /UTINGA C-1 PA  RB FT LT 230 kV MARITUBA /UTINGA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$267,055.89
UTINGA EL 230 kV UTINGA LT 230 kV MARITUBA /UTINGA C-1 PA  RB FT LT 230 kV MARITUBA /UTINGA C-1 PA 058/2001 IPCA RMEL REN 443/2011 25/09/2017 24/09/2040  R$21,187.12
UTINGA BC 230 kV 55 Mvar UTINGA BC4 PA RB FT BC 230 kV 55 Mvar UTINGA BC4 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$234,761.43
UTINGA BC 230 kV 55 Mvar UTINGA BC3 PA RB FT BC 230 kV 55 Mvar UTINGA BC3 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$234,761.43
UTINGA BC 230 kV 55 MVAr UTINGA BC2 PA RB FT BC 230 kV 55 MVAr UTINGA BC2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$234,761.43
UTINGA BC 230 kV 55 MVAr UTINGA BC1 PA RB FT BC 230 kV 55 MVAr UTINGA BC1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$234,761.43
VARZEA GRANDE RTN 69 kV 0 Mvar VARZEA GRANDE RTN1 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$16,313.10
VARZEA GRANDE RTL 230 kV 30 Mvar VARZEA GRANDE RT2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$427,565.57
VARZEA GRANDE RTL 230 kV 30 Mvar VARZEA GRANDE RT2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBNI REA 4967/2014 08/07/2016 07/07/2050  R$65,687.52
VARZEA GRANDE RTL 230 kV 30 Mvar VARZEA GRANDE RT2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBNI REA 4967/2014 08/07/2016 07/07/2051  R$80,487.55
VARZEA GRANDE RTL 230 kV 30 Mvar VARZEA GRANDE RT2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,017,252.94
VARZEA GRANDE RTL 230 kV 30 Mvar VARZEA GRANDE RT2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$838,526.82
VARZEA GRANDE RTL 230 kV 30 Mvar VARZEA GRANDE RT1 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$427,565.57
VARZEA GRANDE MG 230 kV VARZEA GRANDE MG2 MT RB FT MG 230 kV VARZEA GRANDE MG2 MT 058/2001 IPCA RBNI REA 4967/2014 08/07/2016 07/07/2045  R$145,611.89
VARZEA GRANDE MG 230 kV VARZEA GRANDE MG2 MT RB FT MG 230 kV VARZEA GRANDE MG2 MT 058/2001 IPCA RBNI REA 4967/2014 08/07/2016 07/07/2045  R$25,153.40
VARZEA GRANDE MG 230 kV VARZEA GRANDE MG2 MT RB FT MG 230 kV VARZEA GRANDE MG2 MT 058/2001 IPCA RBNI REA 4967/2014 08/07/2016 07/07/2045  R$25,153.40
VARZEA GRANDE MG 230 kV VARZEA GRANDE MG2 MT RB FT MG 230 kV VARZEA GRANDE MG2 MT 058/2001 IPCA RBNI REA 4967/2014 08/07/2016 07/07/2045  R$610,465.47
VARZEA GRANDE MC 230 kV RTL 230 kV 30 Mvar VARZEA GRANDE RT2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$108,600.16
VARZEA GRANDE MC 230 kV RTL 230 kV 30 Mvar VARZEA GRANDE RT2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBNI REA 4967/2014 08/07/2016 07/07/2044  R$3,951.53
VARZEA GRANDE MC 230 kV RTL 230 kV 30 Mvar VARZEA GRANDE RT2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBNI REA 4967/2014 08/07/2016 07/07/2044  R$327,672.40
VARZEA GRANDE MC 230 kV RTL 230 kV 30 Mvar VARZEA GRANDE RT1 MT  RB FT LT 230 kV JAURU /VARZEA GRANDE C-1 MT 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$108,600.16
VARZEA GRANDE EL 230 kV VARZEA GRANDE LT 230 kV VARZEA GRANDE /COXIPO C-2 MT  RB FT LT 230 kV VARZEA GRANDE /COXIPO C-2 MT 058/2001 IPCA RBNI REA 4967/2014 21/06/2016 20/06/2048  R$ 1,105,039.52
VARZEA GRANDE EL 230 kV VARZEA GRANDE LT 230 kV JAURU /VARZEA GRANDE C-2 MT  RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBNI REA 4967/2014 08/07/2016 07/07/2048  R$ 1,106,454.89
VILA DO CONDE TR 500/230 kV VILA DO CONDE TRR1 PA RB FT TR 500/230 kV VILA DO CONDE TRR1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$788,197.72
VILA DO CONDE TR 500/230 kV VILA DO CONDE TRR1 PA RB FT TR 500/230 kV VILA DO CONDE TRR1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,875,259.62
VILA DO CONDE TR 500/230 kV VILA DO CONDE TR4 PA RB FT TR 500/230 kV VILA DO CONDE TR4 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,364,593.17
VILA DO CONDE TR 500/230 kV VILA DO CONDE TR3 PA RB FT TR 500/230 kV VILA DO CONDE TR3 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,364,593.17
VILA DO CONDE TR 500/230 kV VILA DO CONDE TR3 PA RB FT TR 500/230 kV VILA DO CONDE TR3 PA 058/2001 IPCA RMEL REN 443/2011 15/06/2016 14/06/2030  R$38,054.26
VILA DO CONDE TR 500/230 kV VILA DO CONDE TR2 PA RB FT TR 500/230 kV VILA DO CONDE TR2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,364,593.17
VILA DO CONDE TR 500/230 kV VILA DO CONDE TR2 PA RB FT TR 500/230 kV VILA DO CONDE TR2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,625,778.86
VILA DO CONDE TR 500/230 kV VILA DO CONDE TR2 PA RB FT TR 500/230 kV VILA DO CONDE TR2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,637,358.41
VILA DO CONDE TR 500/230 kV VILA DO CONDE TR2 PA RB FT TR 500/230 kV VILA DO CONDE TR2 PA 058/2001 IPCA RMEL REN 443/2011 07/04/2017 06/04/2047  R$14,784.04
VILA DO CONDE TR 500/230 kV VILA DO CONDE TR2 PA RB FT TR 500/230 kV VILA DO CONDE TR2 PA 058/2001 IPCA RMEL REN 443/2011 07/04/2017 06/04/2047  R$14,784.04
VILA DO CONDE TR 500/230 kV VILA DO CONDE TR2 PA RB FT TR 500/230 kV VILA DO CONDE TR2 PA 058/2001 IPCA RMEL REN 443/2011 07/04/2017 06/04/2047  R$14,784.04
VILA DO CONDE TR 500/230 kV VILA DO CONDE TR1 PA RB FT TR 500/230 kV VILA DO CONDE TR1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,364,593.17
VILA DO CONDE TR 500/230 kV VILA DO CONDE TR1 PA RB FT TR 500/230 kV VILA DO CONDE TR1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,625,778.86
VILA DO CONDE TR 230/69 kV VILA DO CONDE TR8 PA RBF FT TR 230/69 kV VILA DO CONDE TR8 PA 058/2001 IPCA RBNI REA 4058/2013 01/12/2015 30/11/2049  R$ 2,029,272.68
VILA DO CONDE TR 230/69 kV VILA DO CONDE TR7 PA RBF FT TR 230/69 kV VILA DO CONDE TR7 PA 058/2001 IPCA RBNI REA 4058/2013 01/12/2015 30/11/2049  R$ 2,029,272.68
VILA DO CONDE TR 230/69 kV VILA DO CONDE TF3 PA RBF FT TR 230/69 kV VILA DO CONDE TF3 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$217,048.06
VILA DO CONDE TR 230/69 kV VILA DO CONDE TF3 PA RBF FT TR 230/69 kV VILA DO CONDE TF3 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$516,395.12
VILA DO CONDE TR 230/13,8 kV VILA DO CONDE TF2 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$502,751.73
VILA DO CONDE TR 230/13,8 kV VILA DO CONDE TF2 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,196,133.90
VILA DO CONDE TR 230/13,8 kV VILA DO CONDE TF2 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS2 PA 058/2001 IPCA RMEL REN 443/2011 22/05/2016 21/05/2030  R$24,543.32
VILA DO CONDE TR 230/13,8 kV VILA DO CONDE TF1 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$502,751.73
VILA DO CONDE TR 230/13,8 kV VILA DO CONDE TF1 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,196,133.90
VILA DO CONDE TR 230/13,8 kV VILA DO CONDE TF1 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS1 PA 058/2001 IPCA RMEL REN 443/2011 03/02/2017 02/02/2031  R$24,689.61
VILA DO CONDE RTL 500 kV 163 MVAr VILA DO CONDE RT1 PA RB FT LT 500 kV TUCURUI /VILA DO CONDE C-1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$939,076.17
VILA DO CONDE RTL 500 kV 163 MVAr VILA DO CONDE RT1 PA RB FT LT 500 kV TUCURUI /VILA DO CONDE C-1 PA 058/2001 IPCA RMEL REA 2837/2011 13/07/2013 12/07/2036  R$38,049.06
VILA DO CONDE RTL 500 kV 163 MVAr VILA DO CONDE RT1 PA RB FT LT 500 kV TUCURUI /VILA DO CONDE C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,234,225.70
VILA DO CONDE RTL 500 kV 163 MVAr VILA DO CONDE RT1 PA RB FT LT 500 kV TUCURUI /VILA DO CONDE C-1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,841,683.72
VILA DO CONDE RTB 500 kV 54,42 MVAr VILA DO CONDE RTR1 PA RB FT RTB 500 kV 54,42 MVAr VILA DO CONDE RTR1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$313,179.62
VILA DO CONDE RTB 500 kV 54,42 MVAr VILA DO CONDE RTR1 PA RB FT RTB 500 kV 54,42 MVAr VILA DO CONDE RTR1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$745,108.84
VILA DO CONDE RTB 500 kV 54,42 MVAr VILA DO CONDE RTR1 PA RB FT RTB 500 kV 54,42 MVAr VILA DO CONDE RTR1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$614,197.04
VILA DO CONDE RTB 500 kV 165 Mvar VILA DO CONDE RT4 PA RB FT RTB 500 kV 165 Mvar VILA DO CONDE RT4 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$942,616.43
VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,399,199.76
VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBNI REA 4058/2013 11/03/2016 10/03/2045  R$ 1,321,258.19
VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RMEL REN 443/2011 17/07/2017 16/07/2047  R$14,895.74
VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RMEL REN 443/2011 17/07/2017 16/07/2047  R$14,895.74
VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RMEL REN 443/2011 17/07/2017 16/07/2047  R$14,895.74
VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RMEL REN 443/2011 06/04/2017 05/04/2047  R$14,782.93
VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RMEL REN 443/2011 06/04/2017 05/04/2047  R$14,782.93
VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RMEL REN 443/2011 06/04/2017 05/04/2047  R$14,782.93
VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RMEL REN 443/2011 06/04/2017 05/04/2047  R$14,782.93
VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RMEL REN 443/2011 06/04/2017 05/04/2047  R$14,782.93
VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RMEL REN 443/2011 06/04/2017 05/04/2047  R$14,782.93
VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RMEL REN 443/2011 22/12/2017 21/12/2050  R$88,420.96
VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBNI REN 443/2011 03/10/2018 02/10/2049  R$42,466.92
VILA DO CONDE MC 69 kV TR 230/69 kV VILA DO CONDE TR8 PA RBF FT TR 230/69 kV VILA DO CONDE TR8 PA 058/2001 IPCA RBNI REA 4058/2013 01/12/2015 30/11/2044  R$436,382.04
VILA DO CONDE MC 69 kV TR 230/69 kV VILA DO CONDE TR7 PA RBF FT TR 230/69 kV VILA DO CONDE TR7 PA 058/2001 IPCA RBNI REA 4058/2013 01/12/2015 30/11/2046  R$434,669.81
VILA DO CONDE MC 69 kV TR 230/69 kV VILA DO CONDE TF3 PA  RBF FT TR 230/69 kV VILA DO CONDE TF3 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$66,390.50
VILA DO CONDE MC 500 kV TR 500/230 kV VILA DO CONDE TR4 PA RB FT TR 500/230 kV VILA DO CONDE TR4 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$490,032.13
VILA DO CONDE MC 500 kV TR 500/230 kV VILA DO CONDE TR3 PA  RB FT TR 500/230 kV VILA DO CONDE TR3 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$490,032.13
VILA DO CONDE MC 500 kV TR 500/230 kV VILA DO CONDE TR2 PA  RB FT TR 500/230 kV VILA DO CONDE TR2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$490,032.13
VILA DO CONDE MC 500 kV TR 500/230 kV VILA DO CONDE TR2 PA  RB FT TR 500/230 kV VILA DO CONDE TR2 PA 058/2001 IPCA RMEL REA 2837/2011 13/07/2013 12/07/2036  R$38,049.06
VILA DO CONDE MC 500 kV TR 500/230 kV VILA DO CONDE TR1 PA  RB FT TR 500/230 kV VILA DO CONDE TR1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$490,032.13
VILA DO CONDE MC 500 kV TR 500/230 kV VILA DO CONDE TR1 PA  RB FT TR 500/230 kV VILA DO CONDE TR1 PA 058/2001 IPCA RMEL REA 2837/2011 13/07/2013 12/07/2036  R$38,049.06
VILA DO CONDE MC 500 kV RTB 500 kV 165 Mvar VILA DO CONDE RT4 PA  RB FT RTB 500 kV 165 Mvar VILA DO CONDE RT4 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$458,814.80
VILA DO CONDE MC 230 kV TR 500/230 kV VILA DO CONDE TR4 PA RB FT TR 500/230 kV VILA DO CONDE TR4 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$171,917.44
VILA DO CONDE MC 230 kV TR 500/230 kV VILA DO CONDE TR3 PA  RB FT TR 500/230 kV VILA DO CONDE TR3 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$171,917.44
VILA DO CONDE MC 230 kV TR 500/230 kV VILA DO CONDE TR2 PA  RB FT TR 500/230 kV VILA DO CONDE TR2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$171,917.44
VILA DO CONDE MC 230 kV TR 500/230 kV VILA DO CONDE TR1 PA  RB FT TR 500/230 kV VILA DO CONDE TR1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$171,917.44
VILA DO CONDE MC 230 kV TR 230/69 kV VILA DO CONDE TR8 PA  RBF FT TR 230/69 kV VILA DO CONDE TF6 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$171,917.44
VILA DO CONDE MC 230 kV TR 230/69 kV VILA DO CONDE TR8 PA  RBF FT TR 230/69 kV VILA DO CONDE TF6 PA 058/2001 IPCA RBNI REA 4058/2013 01/12/2015 30/11/2044  R$697,414.61
VILA DO CONDE MC 230 kV TR 230/69 kV VILA DO CONDE TR7 PA RBF FT TR 230/69 kV VILA DO CONDE TR7 PA 058/2001 IPCA RBNI REA 4058/2013 01/12/2015 30/11/2045  R$945,572.56
VILA DO CONDE MC 230 kV TR 230/69 kV VILA DO CONDE TF3 PA RBF FT TR 230/69 kV VILA DO CONDE TF3 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$171,917.44
VILA DO CONDE MC 230 kV TR 230/13,8 kV VILA DO CONDE TF2 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$171,917.44
VILA DO CONDE MC 230 kV TR 230/13,8 kV VILA DO CONDE TF1 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$171,917.44
VILA DO CONDE MC 230 kV BC 230 kV 111 MVAr VILA DO CONDE BC4 PA  RB FT BC 230 kV 111 MVAr VILA DO CONDE BC4 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$198,453.92
VILA DO CONDE MC 230 kV BC 230 kV 111 MVAr VILA DO CONDE BC3 PA  RB FT BC 230 kV 111 MVAr VILA DO CONDE BC3 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$198,453.92
VILA DO CONDE MC 230 kV BC 230 kV 111 MVAr VILA DO CONDE BC2 PA  RB FT BC 230 kV 111 MVAr VILA DO CONDE BC2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$198,453.92
VILA DO CONDE MC 230 kV BC 230 kV 111 MVAr VILA DO CONDE BC1 PA  RB FT BC 230 kV 111 MVAr VILA DO CONDE BC1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$198,453.92
VILA DO CONDE MC 230 kVDESMONTAGEM EQP RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBNI REA 4058/2013 11/03/2016 10/03/2045  R$460,215.13
VILA DO CONDE MC 13,8 kV TR 230/69 kV VILA DO CONDE TR8 PA  RBF FT TR 230/69 kV VILA DO CONDE TR8 PA 058/2001 IPCA RBNI REA 4058/2013 01/12/2015 30/11/2038  R$820,060.90
VILA DO CONDE MC 13,8 kV TR 230/69 kV VILA DO CONDE TR7 PA  RBF FT TR 230/69 kV VILA DO CONDE TR7 PA 058/2001 IPCA RBNI REA 4058/2013 01/12/2015 30/11/2038  R$278,023.86
VILA DO CONDE MC 13,8 kV CS 150/-90 MVAr VILA DO CONDE CS2 PA  RB FT CS 150/-90 MVAr VILA DO CONDE CS2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$71,399.30
VILA DO CONDE MC 13,8 kV CS 150/-90 MVAr VILA DO CONDE CS1 PA  RB FT CS 150/-90 MVAr VILA DO CONDE CS1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$71,399.30
VILA DO CONDE IB 69 kV MG 500 kV VILA DO CONDE MG1 PA IB1 DIT   058/2001 IPCA RCDM REA 4058/2013 11/03/2016 10/03/2047  R$327,682.33
VILA DO CONDE IB 500 kV MG 500 kV VILA DO CONDE MG1 PA IB4 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$520,028.84
VILA DO CONDE IB 500 kV MG 500 kV VILA DO CONDE MG1 PA IB3 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$520,028.84
VILA DO CONDE IB 500 kV MG 500 kV VILA DO CONDE MG1 PA IB3 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,237,239.15
VILA DO CONDE IB 500 kV MG 500 kV VILA DO CONDE MG1 PA IB3 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,019,862.59
VILA DO CONDE IB 500 kV MG 500 kV VILA DO CONDE MG1 PA IB2 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$520,028.84
VILA DO CONDE IB 500 kV MG 500 kV VILA DO CONDE MG1 PA IB1 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$520,028.84
VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB9 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB9 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$374,329.15
VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB9 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$308,561.44
VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB8 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB8 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$374,329.15
VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB8 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$308,561.44
VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB7 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB6 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB6 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBNI REA 4058/2013 11/03/2016 10/03/2046  R$ 1,532,635.48
VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB5 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB4 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB3 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB2 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB14 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBNI REA 4058/2013 11/03/2016 10/03/2046  R$ 1,017,562.70
VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB11 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB11 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$374,329.15
VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB11 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$308,561.44
VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB10 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB10 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$374,329.15
VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB10 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$308,561.44
VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB1 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
VILA DO CONDE IB 13,8 kV MG 500 kV VILA DO CONDE MG1 PA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$29,536.65
VILA DO CONDE EL 69 kV VILA DO CONDECELPA C3 DIT   058/2001 IPCA RCDM REN 443/2011 03/10/2018 02/10/2046  R$370,815.62
VILA DO CONDE EL 69 kV VILA DO CONDECELPA C2 DIT   058/2001 IPCA RCDM REA 4058/2013 21/06/2017 20/06/2047  R$452,204.62
VILA DO CONDE EL 69 kV VILA DO CONDECELPA C1 DIT   058/2001 IPCA RCDM REA 4058/2013 21/06/2017 20/06/2047  R$451,476.34
VILA DO CONDE EL 500 kV VILA DO CONDE LT 500 kV TUCURUI /VILA DO CONDE C-1 PA RB FT LT 500 kV TUCURUI /VILA DO CONDE C-1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$555,219.02
VILA DO CONDE EL 230 kV VILA DO CONDE LT 230 kV VILA DO CONDE /GUAMA C-2 PA RB FT LT 230 kV VILA DO CONDE /GUAMA C-2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$251,472.48
VILA DO CONDE EL 230 kV VILA DO CONDE LT 230 kV VILA DO CONDE /GUAMA C-2 PA RB FT LT 230 kV VILA DO CONDE /GUAMA C-2 PA 058/2001 IPCA RMEL REN 443/2011 06/03/2017 05/03/2040  R$20,804.90
VILA DO CONDE EL 230 kV VILA DO CONDE LT 230 kV VILA DO CONDE /GUAMA C-1 PA RB FT LT 230 kV VILA DO CONDE /GUAMA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$251,472.48
VILA DO CONDE EL 230 kV VILA DO CONDE LT 230 kV ALBRAS /VILA DO CONDE C-2 PA DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$251,472.48
VILA DO CONDE EL 230 kV VILA DO CONDE LT 230 kV ALBRAS /VILA DO CONDE C-1 PA DIT   058/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$251,472.48
VILA DO CONDE CS 150/-90 MVAr VILA DO CONDE CS2 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,818,029.19
VILA DO CONDE CS 150/-90 MVAr VILA DO CONDE CS2 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,325,407.97
VILA DO CONDE CS 150/-90 MVAr VILA DO CONDE CS2 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,565,456.01
VILA DO CONDE CS 150/-90 MVAr VILA DO CONDE CS1 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,818,029.19
VILA DO CONDE CS 150/-90 MVAr VILA DO CONDE CS1 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,325,407.97
VILA DO CONDE CS 150/-90 MVAr VILA DO CONDE CS1 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,565,456.01
VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC4 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC4 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$302,316.23
VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC4 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC4 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$719,262.94
VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC4 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC4 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$592,892.14
VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC4 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC4 PA 058/2001 IPCA RMEL REN 443/2011 05/10/2017 04/10/2040  R$21,205.94
VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC3 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC3 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$302,316.23
VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC3 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC3 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$719,262.94
VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC3 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC3 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$592,892.14
VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC2 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC2 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$302,316.23
VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC2 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$719,262.94
VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC2 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC2 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$592,892.14
VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC2 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC2 PA 058/2001 IPCA RMEL REN 443/2011 30/08/2017 29/08/2040  R$21,138.18
VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC2 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC2 PA 058/2001 IPCA RMEL REN 443/2011 07/06/2017 06/06/2047  R$14,851.49
VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC2 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC2 PA 058/2001 IPCA RMEL REN 443/2011 07/06/2017 06/06/2047  R$14,851.49
VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC2 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC2 PA 058/2001 IPCA RMEL REN 443/2011 07/06/2017 06/06/2047  R$14,851.49
VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC1 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC1 PA 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$302,316.23
VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC1 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$719,262.94
VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC1 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC1 PA 058/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$592,892.14
VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC1 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC1 PA 058/2001 IPCA RMEL REN 443/2011 18/08/2017 17/08/2040  R$21,115.59
VILHENA TR 230/69 kV VILHENA TR2 RO RBF FT TR 230/69 kV VILHENA TR2 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$325,243.33
VILHENA TR 230/69 kV VILHENA TR1 RO RBF FT TR 230/69 kV VILHENA TR1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$325,243.33
VILHENA RTN 230 kV 0,1 Mvar VILHENA RN2 RO RB FT LT 230 kV PIMENTA BUENO /VILHENA C-1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$16,313.10
VILHENA RTL 230 kV 20 Mvar VILHENA RT2 RO RB FT LT 230 kV PIMENTA BUENO /VILHENA C-1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$255,797.82
VILHENA RTL 230 kV 0 Mvar VILHENA RT7 RO RB FT LT 230 kV PIMENTA BUENO /VILHENA C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039  R$689,609.76
VILHENA RTL 230 kV 0 Mvar VILHENA RT6 RO RB FT LT 230 kV VILHENA /JAURU C-3 RO/MT 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039  R$695,528.72
VILHENA RTB 230 kV 20 Mvar VILHENA RT1 RO RB FT RTB 230 kV 20 Mvar VILHENA RT1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$255,797.82
VILHENA MG 230 kV VILHENA MG3 RO RB FT MG 230 kV VILHENA MG3 RO 021/2009 IPCA RBNI REA 6171/2017 30/01/2019 30/01/2050  R$185,587.02
VILHENA MG 230 kV VILHENA MG3 RO RB FT MG 230 kV VILHENA MG3 RO 021/2009 IPCA RBNI REA 6171/2017 30/01/2019 30/01/2042  R$99,211.03
VILHENA MG 230 kV VILHENA MG1 RO RB FT MG 230 kV VILHENA MG1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$581,480.47
VILHENA MC 69 kV TR 230/69 kV VILHENA TR2 RO RBF FT TR 230/69 kV VILHENA TR2 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$66,390.50
VILHENA MC 69 kV TR 230/69 kV VILHENA TR1 RO RBF FT TR 230/69 kV VILHENA TR1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$66,390.50
VILHENA MC 230 kV TR 230/69 kV VILHENA TR2 RO RBF FT TR 230/69 kV VILHENA TR2 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
VILHENA MC 230 kV TR 230/69 kV VILHENA TR1 RO RBF FT TR 230/69 kV VILHENA TR1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,699.84
VILHENA MC 230 kV RTN 230 kV 0,1 Mvar VILHENA RN2 RO  RB FT LT 230 kV PIMENTA BUENO /VILHENA C-1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$11,080.96
VILHENA MC 230 kV RTL 230 kV 20 Mvar VILHENA RT2 RO  RB FT LT 230 kV PIMENTA BUENO /VILHENA C-1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$108,600.16
VILHENA MC 230 kV RTL 230 kV 0 Mvar VILHENA RT7 RO RB FT LT 230 kV PIMENTA BUENO /VILHENA C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039  R$228,828.44
VILHENA MC 230 kV RTL 230 kV 0 Mvar VILHENA RT6 RO RB FT LT 230 kV VILHENA /JAURU C-3 RO/MT 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039  R$228,828.44
VILHENA MC 230 kV RTB 230 kV 20 Mvar VILHENA RT1 RO  RB FT RTB 230 kV 20 Mvar VILHENA RT1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$174,729.23
VILHENA MC 230 kV CR 230 kV 0 Mvar VILHENA BC6 RO RB FT LT 230 kV VILHENA /JAURU C-3 RO/MT 021/2009 IPCA RBNI REA 6171/2017 30/01/2019 30/01/2041  R$736,278.45
VILHENA MC 230 kV CE 100/-50 Mvar VILHENA CE1 RO  RB FT CE 100/-50 Mvar VILHENA CE1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$185,014.51
VILHENA MC 230 kV BC 230 kV 18,5 Mvar VILHENA BC3 RO  RB FT BC 230 kV 18,5 Mvar VILHENA BC3 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,966.85
VILHENA MC 230 kV BC 230 kV 18,5 Mvar VILHENA BC2 RO  RB FT BC 230 kV 18,5 Mvar VILHENA BC2 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$181,966.85
VILHENA MC 230 kV BC 230 kV 18,5 Mvar VILHENA BC1 RO  RB FT BC 230 kV 18,5 Mvar VILHENA BC1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$197,134.90
VILHENA IB 230 kV MG 230 kV VILHENA MG1 RO IB1 RB FT MG 230 kV VILHENA MG1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$157,335.75
VILHENA IB 230 kV MG 230 kV VILHENA MG1 RO IB1 RB FT MG 230 kV VILHENA MG1 RO 058/2001 IPCA RBNI REA 6171/2017 26/11/2018 26/11/2051  R$146,333.51
VILHENA EL 230 kV VILHENA LT 230 kV VILHENA /JAURU C-3 RO/MT RB FT LT 230 kV VILHENA /JAURU C-3 RO/MT 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039  R$698,323.25
VILHENA EL 230 kV VILHENA LT 230 kV VILHENA /JAURU C-3 RO/MT RB FT LT 230 kV VILHENA /JAURU C-3 RO/MT 021/2009 IPCA RBNI REA 6171/2017 30/01/2019 30/01/2052  R$243,604.89
VILHENA EL 230 kV VILHENA LT 230 kV PIMENTA BUENO /VILHENA C-3 RO RB FT LT 230 kV PIMENTA BUENO /VILHENA C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039  R$698,323.25
VILHENA EL 230 kV VILHENA LT 230 kV PIMENTA BUENO /VILHENA C-1 RO RB FT LT 230 kV PIMENTA BUENO /VILHENA C-1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,152.84
VILHENA CR 230 kV 0 Mvar VILHENA BC6 RO RB FT LT 230 kV VILHENA /JAURU C-3 RO/MT 021/2009 IPCA RBNI REA 6171/2017 30/01/2019 30/01/2039  R$ 4,410,099.31
VILHENA CE 100/-50 Mvar VILHENA CE1 RO RB FT CE 100/-50 Mvar VILHENA CE1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,809,707.09
VILHENA BC 230 kV 18,5 Mvar VILHENA BC3 RO RB FT BC 230 kV 18,5 Mvar VILHENA BC3 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$129,940.17
GUAMA TR 230/69 kV GUAMA TRR1 PA RBF FT TR 230/69 kV GUAMA TRR1 PA 058/2001 IPCA RMELP REA 9918/2021      R$ 1,092,915.14
MARABA RTL 500 kV 136 MVAr MARABA RT3 PA RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RMELP REA 9918/2021      R$ 1,978,732.25
RONDONOPOLIS BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT RB FT BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RMELP REA 9918/2021      R$382,096.65
UTINGA TR 230/69 kV UTINGA TF1 PA RBF FT TR 230/69 kV UTINGA TF1 PA 058/2001 IPCA RMELP REA 9918/2021      R$ 3,270,206.54
VILA DO CONDE RTB 500 kV 54,42 MVAr VILA DO CONDE RTR1 PA RB FT RTB 500 kV 54,42 MVAr VILA DO CONDE RTR1 PA 058/2001 IPCA RMELP REA 9918/2021      R$676,371.36
VILA DO CONDE RTL 500 kV 163 MVAr VILA DO CONDE RT1 PA RB FT LT 500 kV TUCURUI /VILA DO CONDE C-1 PA 058/2001 IPCA RMELP REA 9918/2021      R$ 2,029,114.05
VILHENA BC 230 kV 18,5 Mvar VILHENA BC2 RO RB FT BC 230 kV 18,5 Mvar VILHENA BC2 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$129,940.17
VILHENA BC 230 kV 18,5 Mvar VILHENA BC1 RO RB FT BC 230 kV 18,5 Mvar VILHENA BC1 RO 058/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$129,940.17
IMPERATRIZ RTL 500 kV 100 Mvar IMPERATRIZ RT3 MA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RMELP REA 9918/2021      R$ 1,832,060.72
IMPERATRIZ RTL 500 kV 33,3 Mvar IMPERATRIZ RTR4 MA RB FT RTL 500 kV 33,3 Mvar IMPERATRIZ RTR4 MA 058/2001 IPCA RMELP REA 9918/2021      R$610,686.91
VILA DO CONDE TR 500/230 kV VILA DO CONDE TRR1 PA RB FT TR 500/230 kV VILA DO CONDE TRR1 PA 058/2001 IPCA RMELP CC 058/2001      R$ 2,635,039.86
RIO BRANCO 1 RTB 230 kV 20 Mvar RIO BRANCO 1 RT2 AC RB FT RTB 230 kV 20 Mvar RIO BRANCO 1 RT2 AC 058/2001 IPCA RMELP CC 058/2001      R$492,552.57
P.DUTRA RTL 500 kV 136 MVAr P.DUTRA RT7 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RMELP REA 9918/2021      R$ 1,901,732.69
GUAMA TR 230/69 kV GUAMA TR2 PA RBF FT TR 230/69 kV GUAMA TR2 PA 058/2001 IPCA RMELP REA 9918/2021      R$ 3,278,745.43
MIRANDA II RTB 230 kV 10 MVAr MIRANDA II RT2 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT2 MA 058/2001 IPCA RBNIA REA 9901/2021      R$ 1,271,225.43
MIRANDA II MC 230 kV RTB 230 kV 10 MVAr MIRANDA II RT2 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT2 MA 058/2001 IPCA RBNIA REA 9901/2021      R$ 4,436,024.76
IMPERATRIZ CR 500 kV 451 Mvar IMPERATRIZ BC2 MA RB FT CR 500 kV 451 Mvar IMPERATRIZ BC2 MA 058/2001 IPCA RMELP REA 9918/2021      R$ 13,740,800.42
IMPERATRIZ RTL 500 kV 45,3 Mvar IMPERATRIZ RTR5 MA RB FT RTL 500 kV 45,3 Mvar IMPERATRIZ RTR5 MA 058/2001 IPCA RMELP REA 9918/2021      R$646,131.31
IMPERATRIZ RTL 500 kV 150 Mvar IMPERATRIZ RT1 MA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RMELP REA 9918/2021      R$ 1,938,393.93
GUAMA TR 230/69 kV GUAMA TRR1 PA RBF FT TR 230/69 kV GUAMA TRR1 PA 058/2001 IPCA RMELP REA 9918/2021      R$ 1,092,915.14
MIRANDA II MG 230 kV MIRANDA II MG1 MA RB FT MG 230 kV MIRANDA II MG1 MA 058/2001 IPCA RBNIA REA 9901/2021      R$141,197.59
MIRANDA II MG 230 kV MIRANDA II MG1 MA RB FT MG 230 kV MIRANDA II MG1 MA 058/2001 IPCA RBNIA REA 9901/2021      R$40,673.47
MIRANDA II MG 230 kV MIRANDA II MG1 MA RB FT MG 230 kV MIRANDA II MG1 MA 058/2001 IPCA RBNIA REA 9901/2021      R$73,126.67
MIRANDA II TR 230/69 kV MIRANDA II TR3 MA RBF FT TR 230/69 kV MIRANDA II TR3 MA 058/2001 IPCA RBNIA REA 9901/2021      R$ 1,566,173.54
MIRANDA II MC 69 kV TR 230/69 kV MIRANDA II TR3 MA  RBF FT TR 230/69 kV MIRANDA II TR3 MA 058/2001 IPCA RBNIA REA 9901/2021      R$414,876.45
MIRANDA II MC 230 kV TR 230/69 kV MIRANDA II TR3 MA  RBF FT TR 230/69 kV MIRANDA II TR3 MA 058/2001 IPCA RBNIA REA 9901/2021      R$ 1,090,771.48
UTINGA TR 230/69 kV UTINGA TF2 PA RBF FT TR 230/69 kV UTINGA TF2 PA 058/2001 IPCA RMELP REA 9918/2021      R$ 3,303,860.58
MARABA RTL 500 kV 45,45 Mvar MARABA RTR2 PA RB FT RTL 500 kV 45,45 Mvar MARABA RTR2 PA 058/2001 IPCA RMELP REA 9918/2021      R$666,309.55
MARABA CR 500 kV 283 MVAr MARABA BC2 PA RB FT CR 500 kV 283 MVAr MARABA BC2 PA 058/2001 IPCA RMELP REA 9918/2021      R$ 11,269,841.45
VILHENA MG 230 kV VILHENA MG1 RO RB FT MG 230 kV VILHENA MG1 RO 058/2001 IPCA RBNIA REA 10197/2021      R$150,191.96
VILHENA MG 230 kV VILHENA MG1 RO RB FT MG 230 kV VILHENA MG1 RO 058/2001 IPCA RBNIA REA 10197/2021      R$151,051.56
VILHENA RTB 230 kV 60 Mvar VILHENA RT8 RO RB FT RTB 230 kV 60 Mvar VILHENA RT8 RO 058/2001 IPCA RBNIA REA 10197/2021      R$ 1,002,512.78
VILHENA MC 230 kV RTB 230 kV 60 Mvar VILHENA RT8 RO  RB FT RTB 230 kV 60 Mvar VILHENA RT8 RO 058/2001 IPCA RBNIA REA 10197/2021      R$ 1,074,135.23
FURNAS  ADRIANOPOLIS MC 500 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBNI DSP 1423/2021 21/07/2021 20/07/2051  R$112,643.25
ADRIANOPOLIS TR 500/345 kV ADRIANOPOLIS TRR1 RJ RB FT TR 500/345 kV ADRIANOPOLIS TRR1 RJ 062/2001 IPCA RMEL REA 8707/2020 09/10/2020 09/10/2055  R$ 1,243,106.47
ADRIANOPOLIS TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,511,686.56
ADRIANOPOLIS TR 500/345 kV ADRIANOPOLIS TR53 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR53 RJ 062/2001 IPCA RMEL REA 8707/2020 19/12/2020 19/12/2055  R$ 3,729,319.43
ADRIANOPOLIS TR 500/345 kV ADRIANOPOLIS TR51 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR51 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,511,686.56
ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TRR2 RJ RBF FT TR 345/138 kV ADRIANOPOLIS TRR2 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$240,533.81
ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TRR1 RJ RBF FT TR 345/138 kV ADRIANOPOLIS TRR1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$240,533.81
ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TR2B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2B RJ 062/2001 IPCA RMEL REA 8707/2020 10/05/2022 10/05/2056  R$ 2,671,302.93
ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TR2A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RMEL REN 643/2014 17/10/2015 16/10/2048  R$ 1,902,333.47
ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TR2A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,390,304.14
ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TR2A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RMEL REA 8707/2020 17/05/2021 17/05/2055  R$890,434.32
ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TR1B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1B RJ 062/2001 IPCA RMEL REN 643/2014 21/11/2015 20/11/2048  R$ 1,906,532.99
ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TR1B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1B RJ 062/2001 IPCA RMEL REA 8707/2020 11/12/2020 11/12/2054  R$890,434.32
ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TR1A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1A RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$721,601.44
ADRIANOPOLIS RTL 500 kV 136 MVAr ADRIANOPOLIS RT6 RJ RB FT RTL 500 kV 136 MVAr ADRIANOPOLIS RT6 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$591,699.53
ADRIANOPOLIS RTL 500 kV 136 MVAr ADRIANOPOLIS RT5 RJ RB FT RTL 500 kV 136 MVAr ADRIANOPOLIS RT5 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$591,699.53
ADRIANOPOLIS RTB 13,8 kV 50 MVAr ADRIANOPOLIS RT4 RJ RB FT RTB 13,8 kV 50 MVAr ADRIANOPOLIS RT4 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$146,796.84
ADRIANOPOLIS RTB 13,8 kV 50 MVAr ADRIANOPOLIS RT3 RJ RB FT RTB 13,8 kV 50 MVAr ADRIANOPOLIS RT3 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$146,796.84
ADRIANOPOLIS MG 500 kV ADRIANOPOLIS MG1 RJ RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,214,138.04
ADRIANOPOLIS MG 500 kV ADRIANOPOLIS MG1 RJ RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032  R$ 406.14
ADRIANOPOLIS MG 500 kV ADRIANOPOLIS MG1 RJ RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RMEL REN 443/2011 05/10/2015 04/10/2028  R$9,075.68
ADRIANOPOLIS MG 500 kV ADRIANOPOLIS MG1 RJ RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RMEL REN 443/2011 14/03/2016 13/03/2029  R$9,815.77
ADRIANOPOLIS MC 500 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBNI DSP 1423/2021 20/07/2021 19/07/2051  R$112,639.43
ADRIANOPOLIS MC 500 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$327,073.06
ADRIANOPOLIS MC 500 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBNI DSP 1423/2021 21/07/2021 20/07/2054  R$214,452.69
ADRIANOPOLIS MC 500 kV TR 500/345 kV ADRIANOPOLIS TR53 RJ  RB FT TR 500/345 kV ADRIANOPOLIS TR53 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$327,073.06
ADRIANOPOLIS MC 500 kV TR 500/345 kV ADRIANOPOLIS TR51 RJ  RB FT TR 500/345 kV ADRIANOPOLIS TR51 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$327,073.06
ADRIANOPOLIS MC 500 kV RTL 500 kV 136 MVAr ADRIANOPOLIS RT6 RJ RB FT RTL 500 kV 136 MVAr ADRIANOPOLIS RT6 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$198,155.23
ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBNI REA 3578/2012 20/04/2020 19/04/2050  R$22,473.31
ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR53 RJ  RB FT TR 500/345 kV ADRIANOPOLIS TR53 RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2053  R$155,749.70
ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBNI REA 3578/2012 20/04/2020 19/04/2050  R$22,473.31
ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR51 RJ  RB FT TR 500/345 kV ADRIANOPOLIS TR51 RJ 062/2001 IPCA RBNI REA 3578/2012 22/04/2019 21/04/2049  R$19,929.29
ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBNI REA 3578/2012 20/04/2020 19/04/2050  R$22,473.31
ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBNI REA 3578/2012 20/04/2020 19/04/2050  R$22,473.31
ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBNI REA 3578/2012 20/04/2020 19/04/2050  R$54,105.04
ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBNI REA 3578/2012 20/04/2020 19/04/2051  R$27,823.57
ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBNI REA 3578/2012 20/04/2020 19/04/2053  R$122,457.28
ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR53 RJ  RB FT TR 500/345 kV ADRIANOPOLIS TR53 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR51 RJ  RB FT TR 500/345 kV ADRIANOPOLIS TR51 RJ 062/2001 IPCA RBNI REA 3578/2012 31/05/2019 30/05/2049  R$22,283.52
ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR53 RJ  RB FT TR 500/345 kV ADRIANOPOLIS TR53 RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2050  R$75,928.74
ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR51 RJ  RB FT TR 500/345 kV ADRIANOPOLIS TR51 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2B RJ  RBF FT TR 345/138 kV ADRIANOPOLIS TR2B RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2050  R$75,928.74
ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ  RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2B RJ  RBF FT TR 345/138 kV ADRIANOPOLIS TR2B RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2B RJ  RBF FT TR 345/138 kV ADRIANOPOLIS TR2B RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2053  R$155,749.70
ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ  RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2053  R$155,749.70
ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ  RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2050  R$56,167.84
ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ  RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2042  R$81,340.49
ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1B RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ  RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2050  R$56,167.84
ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ  RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2050  R$56,167.84
ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ  RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2050  R$56,167.84
ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ  RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2050  R$56,167.84
ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1B RJ 062/2001 IPCA RBNI REA 3578/2012 21/11/2015 20/11/2043  R$35,291.60
ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1B RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2050  R$56,167.84
ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1B RJ 062/2001 IPCA RBNI REA 3578/2012 21/11/2015 20/11/2045  R$210,368.10
ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1B RJ 062/2001 IPCA RBNI REA 3578/2012 21/11/2015 20/11/2043  R$35,291.60
ADRIANOPOLIS MC 345 kV BC 345 kV 160 MVAr ADRIANOPOLIS BC11 RJ  RB FT BC 345 kV 160 MVAr ADRIANOPOLIS BC11 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$213,278.01
ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1B RJ 062/2001 IPCA RBNI REA 3578/2012 21/11/2015 20/11/2043  R$35,291.60
ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1B RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2050  R$56,167.84
ADRIANOPOLIS MC 345 kV BC 345 kV 160 MVAr ADRIANOPOLIS BC10 RJ  RB FT BC 345 kV 160 MVAr ADRIANOPOLIS BC10 RJ 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2042  R$73,132.09
ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1A RJ  RBF FT TR 345/138 kV ADRIANOPOLIS TR1A RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1A RJ  RBF FT TR 345/138 kV ADRIANOPOLIS TR1A RJ 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2042  R$81,340.49
ADRIANOPOLIS MC 345 kV BC 345 kV 160 MVAr ADRIANOPOLIS BC10 RJ  RB FT BC 345 kV 160 MVAr ADRIANOPOLIS BC10 RJ 062/2001 IPCA RMEL REN 643/2014 19/01/2015 18/01/2045  R$204,918.07
ADRIANOPOLIS MC 345 kV BC 345 kV 160 MVAr ADRIANOPOLIS BC11 RJ  RB FT BC 345 kV 160 MVAr ADRIANOPOLIS BC11 RJ 062/2001 IPCA RMEL REN 643/2014 12/01/2015 11/01/2045  R$204,805.62
ADRIANOPOLIS MC 345 kV BC 345 kV 160 MVAr ADRIANOPOLIS BC10 RJ  RB FT BC 345 kV 160 MVAr ADRIANOPOLIS BC10 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$213,278.01
ADRIANOPOLIS MC 138 kV TR 345/138 kV ADRIANOPOLIS TR2B RJ  RBF FT TR 345/138 kV ADRIANOPOLIS TR2B RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$88,677.44
ADRIANOPOLIS MC 13,8 kV RTB 13,8 kV 50 MVAr ADRIANOPOLIS RT3 RJ  RB FT RTB 13,8 kV 50 MVAr ADRIANOPOLIS RT3 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,394.97
ADRIANOPOLIS MC 13,8 kV BC 13,8 kV 50 Mvar ADRIANOPOLIS BC6 RJ  RBF FT BC 13,8 kV 50 Mvar ADRIANOPOLIS BC6 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$57,000.46
ADRIANOPOLIS MC 138 kV TR 345/138 kV ADRIANOPOLIS TR2B RJ  RBF FT TR 345/138 kV ADRIANOPOLIS TR2B RJ 062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2040  R$35,668.40
ADRIANOPOLIS MC 138 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ  RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$88,677.44
ADRIANOPOLIS MC 138 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ  RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2040  R$35,668.40
ADRIANOPOLIS MC 138 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ  RBF FT TR 345/138 kV ADRIANOPOLIS TR1B RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$88,677.44
ADRIANOPOLIS MC 138 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ  RBF FT TR 345/138 kV ADRIANOPOLIS TR1B RJ 062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2040  R$35,668.40
ADRIANOPOLIS MC 138 kV TR 345/138 kV ADRIANOPOLIS TR1A RJ  RBF FT TR 345/138 kV ADRIANOPOLIS TR1A RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$88,677.44
ADRIANOPOLIS MC 138 kV TR 345/138 kV ADRIANOPOLIS TR1A RJ  RBF FT TR 345/138 kV ADRIANOPOLIS TR1A RJ 062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2040  R$35,668.40
ADRIANOPOLIS MC 13,8 kV RTB 13,8 kV 50 MVAr ADRIANOPOLIS RT4 RJ  RB FT RTB 13,8 kV 50 MVAr ADRIANOPOLIS RT4 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,394.97
ADRIANOPOLIS MC 13,8 kV BC 13,8 kV 50 Mvar ADRIANOPOLIS BC5 RJ  RBF FT BC 13,8 kV 50 Mvar ADRIANOPOLIS BC5 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$57,000.46
ADRIANOPOLIS MC 13,8 kV BC 13,8 kV 10 Mvar ADRIANOPOLIS BC9 RJ  RB FT BC 13,8 kV 10 Mvar ADRIANOPOLIS BC9 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$57,000.46
ADRIANOPOLIS MC 13,8 kV BC 13,8 kV 10 Mvar ADRIANOPOLIS BC8 RJ  RB FT BC 13,8 kV 10 Mvar ADRIANOPOLIS BC8 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$57,000.46
ADRIANOPOLIS MC 13,8 kV BC 13,8 kV 10 Mvar ADRIANOPOLIS BC7 RJ  RB FT BC 13,8 kV 10 Mvar ADRIANOPOLIS BC7 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$57,000.46
ADRIANOPOLIS IB 500 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB3 RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$347,094.43
ADRIANOPOLIS IB 500 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB2 RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$347,094.43
ADRIANOPOLIS IB 500 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB2 RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RBNI DSP 1423/2021 28/02/2022 27/02/2055  R$292,832.39
ADRIANOPOLIS EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ  RB FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ 062/2001 IPCA RBNI DSP 1423/2021 07/06/2021 06/06/2054  R$291,516.75
ADRIANOPOLIS EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ 062/2001 IPCA RMEL REN 643/2014 02/05/2016 01/05/2038  R$48,565.59
ADRIANOPOLIS IB 500 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB2 RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RBNI DSP 1423/2021 28/02/2022 27/02/2052  R$122,180.73
ADRIANOPOLIS IB 500 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB2 RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RBNI DSP 1423/2021 28/02/2022 27/02/2052  R$122,180.73
ADRIANOPOLIS IB 345 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB3 RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
ADRIANOPOLIS IB 345 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB3 RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RBNI REA 3578/2012 03/05/2017 02/05/2049  R$203,408.89
ADRIANOPOLIS IB 345 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB2 RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
ADRIANOPOLIS IB 345 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB1 RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
ADRIANOPOLIS IB 138 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$70,192.63
ADRIANOPOLIS IB 138 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB1 DIT   062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2040  R$71,336.76
ADRIANOPOLIS EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-2 RJ  RB FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-2 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
ADRIANOPOLIS EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ  RB FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
ADRIANOPOLIS EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ  RB FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ 062/2001 IPCA RBNI DSP 1423/2021 07/06/2021 06/06/2051  R$121,589.96
ADRIANOPOLIS EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ  RB FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ 062/2001 IPCA RBNI DSP 1423/2021 07/06/2021 06/06/2051  R$121,589.96
ADRIANOPOLIS EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /B. FLUMINENSE C-1 RJ  RB FT LT 500 kV ADRIANOPOLIS /B. FLUMINENSE C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
ADRIANOPOLIS EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
ADRIANOPOLIS EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /B. FLUMINENSE C-1 RJ  RB FT LT 500 kV ADRIANOPOLIS /B. FLUMINENSE C-1 RJ 062/2001 IPCA RBNI DSP 1423/2021 24/06/2021 23/06/2051  R$102,435.61
ADRIANOPOLIS EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
ADRIANOPOLIS EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /B. FLUMINENSE C-1 RJ  RB FT LT 500 kV ADRIANOPOLIS /B. FLUMINENSE C-1 RJ 062/2001 IPCA RBNI DSP 1423/2021 23/06/2021 22/06/2051  R$137,951.25
ADRIANOPOLIS EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /B. FLUMINENSE C-1 RJ  RB FT LT 500 kV ADRIANOPOLIS /B. FLUMINENSE C-1 RJ 062/2001 IPCA RBNI DSP 1423/2021 24/06/2021 23/06/2054  R$279,856.71
ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ  RB FT LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ  RB FT LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,372,890.86
ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ  RB FT LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,245,071.61
ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /NOVA IGUACU C-1 RJ  RB FT LT 345 kV ADRIANOPOLIS /NOVA IGUACU C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2042  R$32,689.82
ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2042  R$47,376.56
ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /NOVA IGUACU C-1 RJ  RB FT LT 345 kV ADRIANOPOLIS /NOVA IGUACU C-1 RJ 062/2001 IPCA RBNI REA 3578/2012 30/04/2019 29/04/2052  R$119,720.80
ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2042  R$76,324.15
ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ 062/2001 IPCA RBNI REA 3578/2012 24/06/2016 23/06/2046  R$224,785.22
ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RBNI REA 3578/2012 06/05/2015 05/05/2045  R$184,911.37
ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RBNI REA 3578/2012 06/05/2015 05/05/2042  R$65,407.36
ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RBNI REA 3578/2012 06/05/2015 05/05/2042  R$47,396.63
ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RBNI REA 3578/2012 22/04/2019 21/04/2049  R$20,139.46
ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RBNI REA 3578/2012 31/05/2019 30/05/2049  R$22,283.52
ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2045  R$184,834.39
ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2042  R$32,689.82
ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RBNI REA 3578/2012 14/02/2016 13/02/2044  R$33,368.47
ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /COMPERJ C-1 RJ  RB FT LT 345 kV ADRIANOPOLIS /COMPERJ C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /COMPERJ C-1 RJ  RB FT LT 345 kV ADRIANOPOLIS /COMPERJ C-1 RJ 062/2001 IPCA RBNI REA 3578/2012 03/05/2017 02/05/2049  R$193,479.87
ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RBNI REA 3578/2012 17/04/2020 16/04/2050  R$22,469.85
ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-3 RJ DIT   062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2030  R$32,226.64
ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 23/05/2014 22/05/2038  R$36,769.60
ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV IMBARIE /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV IMBARIE /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 08/08/2014 07/08/2038  R$37,004.84
ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV IMBARIE /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2030  R$32,226.64
ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-3 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-3 RJ DIT   062/2001 IPCA RMEL REN 643/2014 17/05/2014 16/05/2038  R$36,748.35
ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 25/04/2014 24/04/2038  R$36,681.82
ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2030  R$32,226.64
ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /MAGE C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 30/03/2014 29/03/2038  R$36,600.58
ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /MAGE C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2030  R$32,226.64
ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2030  R$32,226.64
ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /MAGE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /MAGE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /MAGE C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 24/03/2014 23/03/2038  R$36,579.20
ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /CEPEL C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /CEPEL C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2030  R$32,226.64
ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /MAGE C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2030  R$32,226.64
ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /CEPEL C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /CEPEL C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2030  R$32,226.64
ADRIANOPOLIS BC 345 kV 160 MVAr ADRIANOPOLIS BC11 RJ RB FT BC 345 kV 160 MVAr ADRIANOPOLIS BC11 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$236,910.45
ADRIANOPOLIS BC 345 kV 160 MVAr ADRIANOPOLIS BC11 RJ RB FT BC 345 kV 160 MVAr ADRIANOPOLIS BC11 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,227,346.45
ADRIANOPOLIS BC 13,8 kV 50 Mvar ADRIANOPOLIS BC6 RJ RBF FT BC 13,8 kV 50 Mvar ADRIANOPOLIS BC6 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$137,408.32
ADRIANOPOLIS BC 13,8 kV 50 Mvar ADRIANOPOLIS BC5 RJ RBF FT BC 13,8 kV 50 Mvar ADRIANOPOLIS BC5 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$137,408.32
ADRIANOPOLIS BC 345 kV 160 MVAr ADRIANOPOLIS BC10 RJ RB FT BC 345 kV 160 MVAr ADRIANOPOLIS BC10 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$236,910.45
ADRIANOPOLIS BC 13,8 kV 10 Mvar ADRIANOPOLIS BC9 RJ RB FT BC 13,8 kV 10 Mvar ADRIANOPOLIS BC9 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$44,138.98
ADRIANOPOLIS BC 13,8 kV 10 Mvar ADRIANOPOLIS BC8 RJ RB FT BC 13,8 kV 10 Mvar ADRIANOPOLIS BC8 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$44,138.98
ADRIANOPOLIS BC 13,8 kV 10 Mvar ADRIANOPOLIS BC7 RJ RB FT BC 13,8 kV 10 Mvar ADRIANOPOLIS BC7 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$44,138.98
AGUA VERMELHA TR 500/440 kV AGUA VERMELHA TR8 SP RB FT TR 500/440 kV AGUA VERMELHA TR8 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,656,027.78
AGUA VERMELHA TR 500/440 kV AGUA VERMELHA TRR1 SP RB FT TR 500/440 kV AGUA VERMELHA TRR1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$552,009.26
AGUA VERMELHA MC 500 kV TR 500/440 kV AGUA VERMELHA TR8 SP  RB FT TR 500/440 kV AGUA VERMELHA TR8 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$327,073.06
AGUA VERMELHA MC 500 kV TR 500/440 kV AGUA VERMELHA TR8 SP  RB FT TR 500/440 kV AGUA VERMELHA TR8 SP 062/2001 IPCA RMEL REN 643/2014 08/05/2015 07/05/2045  R$1,643.28
AGUA VERMELHA MG 500 kV AGUA VERMELHA MG2 SP RB FT MG 500 kV AGUA VERMELHA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$864,945.62
AGUA VERMELHA MC 500 kV TR 500/440 kV AGUA VERMELHA TR8 SP  RB FT TR 500/440 kV AGUA VERMELHA TR8 SP 062/2001 IPCA RBNI REA 7761/2019 03/04/2022 02/04/2037  R$304,697.12
AGUA VERMELHA MC 500 kV TR 500/440 kV AGUA VERMELHA TR8 SP  RB FT TR 500/440 kV AGUA VERMELHA TR8 SP 062/2001 IPCA RBNI REA 7761/2019 03/04/2022 02/04/2037  R$19,448.75
AGUA VERMELHA MC 440 kV TR 500/440 kV AGUA VERMELHA TR8 SP  RB FT TR 500/440 kV AGUA VERMELHA TR8 SP 062/2001 IPCA RMEL REN 643/2014 08/05/2015 07/05/2045  R$1,643.28
AGUA VERMELHA MC 440 kV TR 500/440 kV AGUA VERMELHA TR8 SP  RB FT TR 500/440 kV AGUA VERMELHA TR8 SP 062/2001 IPCA RBNI REA 7761/2019 03/04/2022 02/04/2037  R$304,697.12
AGUA VERMELHA MC 440 kV TR 500/440 kV AGUA VERMELHA TR8 SP  RB FT TR 500/440 kV AGUA VERMELHA TR8 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$327,073.06
AGUA VERMELHA MC 440 kV TR 500/440 kV AGUA VERMELHA TR8 SP  RB FT TR 500/440 kV AGUA VERMELHA TR8 SP 062/2001 IPCA RBNI REA 7761/2019 03/04/2022 02/04/2037  R$19,448.75
AGUA VERMELHA IB 500 kV MG 500 kV AGUA VERMELHA MG2 SP IB5 RB FT MG 500 kV AGUA VERMELHA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$347,094.43
AGUA VERMELHA IB 500 kV MG 500 kV AGUA VERMELHA MG2 SP IB5 RB FT MG 500 kV AGUA VERMELHA MG2 SP 062/2001 IPCA RMEL REN 643/2014 08/05/2015 07/05/2030  R$16,660.97
AGUA VERMELHA IB 440 kV MG 500 kV AGUA VERMELHA MG1 SP IB5 RB FT MG 500 kV AGUA VERMELHA MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$347,094.43
AGUA VERMELHA IB 440 kV MG 500 kV AGUA VERMELHA MG1 SP IB5 RB FT MG 500 kV AGUA VERMELHA MG1 SP 062/2001 IPCA RMEL REN 643/2014 08/05/2015 07/05/2030  R$16,660.97
AGUAS LINDAS MG 230 kV AGUAS LINDAS MG2 GO RB FT MG 230 kV AGUAS LINDAS MG2 GO 062/2001 IPCA RBNI REA 2367/2010 26/11/2013 25/11/2036  R$679,388.55
AGUAS LINDAS MG 230 kV AGUAS LINDAS MG2 GO RB FT MG 230 kV AGUAS LINDAS MG2 GO 062/2001 IPCA RBNI REA 5861/2016 28/11/2017 27/11/2045  R$ 0.01
AGUAS LINDAS EL 230 kV AGUAS LINDAS LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO  RB FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO 062/2001 IPCA RBNI REA 2367/2010 24/11/2013 23/11/2040  R$ 1,090,292.40
AGUAS LINDAS EL 230 kV AGUAS LINDAS LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF  RB FT LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBNI REA 2367/2010 24/11/2013 23/11/2040  R$ 1,090,292.40
ANGRA FUR TR 500/138 kV ANGRA FUR TR58 RJ RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 5,736,391.63
ANGRA FUR MG 500 kV ANGRA FUR MG1 RJ RB FT MG 500 kV ANGRA FUR MG1 RJ 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032  R$1,218.42
ANGRA FUR TR 500/138 kV ANGRA FUR TRR1 RJ RBF FT TR 500/138 kV ANGRA FUR TRR1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$406,611.97
ANGRA FUR TR 500/138 kV ANGRA FUR TRR1 RJ RBF FT TR 500/138 kV ANGRA FUR TRR1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,106,508.00
ANGRA FUR TR 500/138 kV ANGRA FUR TRR1 RJ RBF FT TR 500/138 kV ANGRA FUR TRR1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,910,387.33
ANGRA FUR TR 500/138 kV ANGRA FUR TR58 RJ RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,220,949.00
ANGRA FUR TR 500/138 kV ANGRA FUR TR58 RJ RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 6,325,290.52
ANGRA FUR MG 500 kV ANGRA FUR MG1 RJ RB FT MG 500 kV ANGRA FUR MG1 RJ 062/2001 IPCA RMEL REN 443/2011 21/03/2016 20/03/2029  R$8,829.70
ANGRA FUR TR 138/138 kV ANGRA FUR TRD2 RJ RBF FT TR 138/138 kV ANGRA FUR TRD2 RJ 062/2001 IPCA RBNI REA 4089/2013 27/07/2018 27/07/2053  R$ 2,395,130.34
ANGRA FUR TR 138/138 kV ANGRA FUR TRD1 RJ RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$343,987.40
ANGRA FUR TR 138/13,8 kV ANGRA FUR TR1D RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$22,900.97
ANGRA FUR TR 138/13,8 kV ANGRA FUR TR1C RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$22,900.97
ANGRA FUR TR 138/13,8 kV ANGRA FUR TR1C RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$115,800.51
ANGRA FUR TR 138/13,8 kV ANGRA FUR TR1B RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$22,900.97
ANGRA FUR TR 138/13,8 kV ANGRA FUR TR1A RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$22,900.97
ANGRA FUR RTL 500 kV 136 MVAr ANGRA FUR RT1 RJ RB FT RTL 500 kV 136 MVAr ANGRA FUR RT1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$591,699.53
ANGRA FUR MG 500 kV ANGRA FUR MG1 RJ RB FT MG 500 kV ANGRA FUR MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,491,158.69
ANGRA FUR MG 500 kV ANGRA FUR MG1 RJ RB FT MG 500 kV ANGRA FUR MG1 RJ 062/2001 IPCA RBNI REA 4089/2013 27/07/2018 27/07/2049  R$94,285.88
ANGRA FUR MG 500 kV ANGRA FUR MG1 RJ RB FT MG 500 kV ANGRA FUR MG1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 7,725,148.20
ANGRA FUR MG 500 kV ANGRA FUR MG1 RJ RB FT MG 500 kV ANGRA FUR MG1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 7,005,919.38
ANGRA FUR MG 500 kV ANGRA FUR MG1 RJ RB FT MG 500 kV ANGRA FUR MG1 RJ 062/2001 IPCA RMEL REN 443/2011 21/03/2016 20/03/2029  R$20,538.27
ANGRA FUR MG 500 kV ANGRA FUR MG1 RJ RB FT MG 500 kV ANGRA FUR MG1 RJ 062/2001 IPCA RBNI REA 8314/2019 11/02/2021 10/02/2036  R$35,270.00
ANGRA FUR MG 500 kV ANGRA FUR MG1 RJ RB FT MG 500 kV ANGRA FUR MG1 RJ 062/2001 IPCA RBNI REA 8314/2019 11/02/2021 10/02/2036  R$35,270.00
ANGRA FUR MG 500 kV ANGRA FUR MG1 RJ RB FT MG 500 kV ANGRA FUR MG1 RJ 062/2001 IPCA RBNI REA 8314/2019 11/02/2021 10/02/2036  R$35,270.00
ANGRA FUR MC 500 kV TR 500/25 kV ANGRA FUR TRG2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$335,097.51
ANGRA FUR MC 500 kV TR 500/25 kV ANGRA FUR TRG2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,694,445.99
ANGRA FUR MC 500 kV TR 500/138 kV ANGRA FUR TR58 RJ RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,694,445.99
ANGRA FUR MC 500 kV TR 500/25 kV ANGRA FUR TRG2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 1,536,689.22
ANGRA FUR MC 500 kV TR 500/25 kV ANGRA FUR TRG2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 02/12/2016 01/12/2045  R$59,044.27
ANGRA FUR MC 500 kV TR 500/138 kV ANGRA FUR TR58 RJ RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,536,689.22
ANGRA FUR MC 500 kV TR 500/19 kV ANGRA FUR TRG1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$335,097.51
ANGRA FUR MC 500 kV TR 500/138 kV ANGRA FUR TR58 RJ RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$327,073.06
ANGRA FUR MC 138 kV TR 138/4,16 kV ANGRA FUR T1A2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$97,927.93
ANGRA FUR MC 138 kV TR 138/138 kV ANGRA FUR TRD2 RJ MC2 RBF FT TR 138/138 kV ANGRA FUR TRD2 RJ 062/2001 IPCA RBNI REA 4089/2013 27/07/2018 27/07/2039  R$349,320.74
ANGRA FUR MC 500 kV TR 500/138 kV ANGRA FUR TR58 RJ RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBNI REA 7761/2019 27/03/2022 26/03/2037  R$365,577.42
ANGRA FUR MC 500 kV RTL 500 kV 136 MVAr ANGRA FUR RT1 RJ  RB FT RTL 500 kV 136 MVAr ANGRA FUR RT1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$198,155.23
ANGRA FUR MC 138 kV TR 500/138 kV ANGRA FUR TR58 RJ RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$95,582.88
ANGRA FUR MC 138 kV TR 500/138 kV ANGRA FUR TR58 RJ RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$495,179.99
ANGRA FUR MC 138 kV TR 500/138 kV ANGRA FUR TR58 RJ RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$449,077.61
ANGRA FUR MC 138 kV TR 500/138 kV ANGRA FUR TR58 RJ RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBNI REA 7761/2019 27/03/2022 26/03/2037  R$365,577.42
ANGRA FUR MC 138 kV TR 138/138 kV ANGRA FUR TRD2 RJ MC1 RBF FT TR 138/138 kV ANGRA FUR TRD2 RJ 062/2001 IPCA RBNI REA 4089/2013 27/07/2018 27/07/2039  R$349,320.74
ANGRA FUR MC 138 kV TR 138/4,16 kV ANGRA FUR T1A2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 02/07/2016 01/07/2038  R$14,449.40
ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1D RJ  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$90,853.06
ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1D RJ  DIT   062/2001 IPCA RMEL REN 643/2014 04/06/2016 03/06/2038  R$14,410.59
ANGRA FUR MC 138 kV TR 138/138 kV ANGRA FUR TRD1 RJ MC2 RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$41,223.70
ANGRA FUR MC 138 kV TR 138/138 kV ANGRA FUR TRD1 RJ MC1 RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$44,816.48
ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1C RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$90,853.06
ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1C RJ DIT   062/2001 IPCA RMEL REN 443/2011 26/01/2017 25/01/2040  R$4,889.97
ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1C RJ DIT   062/2001 IPCA RMEL REN 443/2011 26/01/2017 25/01/2040  R$4,889.97
ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1C RJ DIT   062/2001 IPCA RMEL REN 443/2011 26/01/2017 25/01/2040  R$4,889.97
ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1B RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$90,853.06
ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1B RJ DIT   062/2001 IPCA RMEL REN 643/2014 02/06/2016 01/06/2038  R$14,407.81
ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1A RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$90,853.06
ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1A RJ DIT   062/2001 IPCA RMEL REN 443/2011 10/01/2017 09/01/2040  R$4,882.77
ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1A RJ DIT   062/2001 IPCA RMEL REN 443/2011 10/01/2017 09/01/2040  R$4,882.77
ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1A RJ DIT   062/2001 IPCA RMEL REN 443/2011 10/01/2017 09/01/2040  R$4,882.77
ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR T2A3 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$97,927.93
ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR T2A3 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$495,179.99
ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR T2A3 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$449,077.61
ANGRA FUR MC 138 kV BC 138 kV 25 Mvar ANGRA FUR BC1A RJ  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$89,119.95
ANGRA FUR MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1D RJ  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$21,288.16
ANGRA FUR MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1C RJ  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$14,986.67
ANGRA FUR MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1C RJ  DIT   062/2001 IPCA RMEL REN 443/2011 18/01/2017 17/01/2041  R$ 186.76
ANGRA FUR MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1B RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$39,190.43
ANGRA FUR MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1C RJ  DIT   062/2001 IPCA RMEL REN 443/2011 10/01/2017 09/01/2041  R$ 186.62
ANGRA FUR MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1A RJ DIT   062/2001 IPCA RMEL REN 443/2011 10/01/2017 09/01/2041  R$ 186.62
ANGRA FUR MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1C RJ  DIT   062/2001 IPCA RMEL REN 443/2011 18/01/2017 17/01/2041  R$ 186.76
ANGRA FUR IB 138 kV MG 500 kV ANGRA FUR MG1 RJ IB4 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$78,514.10
ANGRA FUR MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1B RJ DIT   062/2001 IPCA RMEL REN 643/2014 02/02/2016 01/02/2045  R$6,759.83
ANGRA FUR MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1A RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$39,190.43
ANGRA FUR IB 138 kV MG 500 kV ANGRA FUR MG1 RJ IB4 DIT   062/2001 IPCA RMEL REN 643/2014 31/05/2016 30/05/2038  R$14,413.79
ANGRA FUR MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1A RJ DIT   062/2001 IPCA RMEL REN 443/2011 10/01/2017 09/01/2041  R$ 186.62
ANGRA FUR MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1A RJ DIT   062/2001 IPCA RMEL REN 443/2011 10/01/2017 09/01/2041  R$ 186.62
ANGRA FUR MC 13,8 kV BC 13,8 kV 5 Mvar ANGRA FUR BC2 RJ  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$61,625.22
ANGRA FUR MC 13,8 kV BC 13,8 kV 3 Mvar ANGRA FUR BC1 RJ  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$61,625.22
ANGRA FUR IB 500 kV MG 500 kV ANGRA FUR MG1 RJ IB1 RB FT MG 500 kV ANGRA FUR MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$347,094.43
ANGRA FUR IB 138 kV MG 500 kV ANGRA FUR MG1 RJ IB2 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$70,192.63
ANGRA FUR IB 138 kV MG 500 kV ANGRA FUR MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$78,514.10
ANGRA FUR IB 138 kV MG 500 kV ANGRA FUR MG1 RJ IB3 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$78,514.10
ANGRA FUR IB 138 kV MG 500 kV ANGRA FUR MG1 RJ IB3 DIT   062/2001 IPCA RMEL REN 643/2014 14/07/2016 13/07/2038  R$14,457.15
ANGRA FUR EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ  RB FT LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
ANGRA FUR EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ  RB FT LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ 062/2001 IPCA RBNI REA 5861/2016 10/02/2021 09/02/2036  R$12,522.11
ANGRA FUR EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ  RB FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ 062/2001 IPCA RMEL REN 643/2014 02/12/2016 01/12/2047  R$326,901.52
ANGRA FUR EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ  RB FT LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,919,850.95
ANGRA FUR EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ  RB FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ 062/2001 IPCA RMEL REN 443/2011 23/04/2017 22/04/2040  R$16,621.90
ANGRA FUR EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ  RB FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
ANGRA FUR EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ  RB FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ 062/2001 IPCA RMEL REN 443/2011 23/04/2017 22/04/2040  R$16,621.90
ANGRA FUR EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ  RB FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ 062/2001 IPCA RMEL REN 443/2011 23/04/2017 22/04/2040  R$16,621.90
ANGRA FUR EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ  RB FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ 062/2001 IPCA RBNI REA 5861/2016 10/02/2021 09/02/2036  R$12,522.11
ANGRA FUR EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP RB FT LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
ANGRA FUR EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP RB FT LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RBNI REA 4347/2013 06/07/2015 05/07/2040  R$10,262.35
ANGRA FUR EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /SANTA CRUZ C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$655,870.82
ANGRA FUR EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /JACUACANGA C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
ANGRA FUR EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP RB FT LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RBNI REA 5861/2016 10/02/2021 09/02/2036  R$12,522.11
ANGRA FUR EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /SANTA CRUZ C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
ANGRA FUR EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /SANTA CRUZ C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$723,202.62
ANGRA FUR EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /ANGRA AMPLA C-1 RJ  DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$655,870.82
ANGRA FUR EL 13,8 kV ANGRA FURDIST9 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$42,510.35
ANGRA FUR EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /JACUACANGA C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$723,202.62
ANGRA FUR EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /JACUACANGA C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$655,870.82
ANGRA FUR EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /ANGRA AMPLA C-1 RJ  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
ANGRA FUR EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /ANGRA AMPLA C-1 RJ  DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$723,202.62
ANGRA FUR EL 13,8 kV ANGRA FURDIST9 DIT   062/2001 IPCA RMEL REN 643/2014 27/09/2016 26/09/2045  R$6,886.35
ANGRA FUR EL 138 kV ANGRA FURMAMBUCABA-AMPLA DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
ANGRA FUR EL 13,8 kV ANGRA FURDIST8 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$42,510.35
ANGRA FUR EL 13,8 kV ANGRA FURDIST7 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$42,510.35
ANGRA FUR EL 13,8 kV ANGRA FURDIST6 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$42,510.35
ANGRA FUR EL 13,8 kV ANGRA FURDIST6 DIT   062/2001 IPCA RMEL REN 643/2014 12/07/2016 11/07/2045  R$6,845.43
ANGRA FUR EL 13,8 kV ANGRA FURDIST7 DIT   062/2001 IPCA RMEL REN 443/2011 15/12/2016 14/12/2040  R$ 609.10
ANGRA FUR EL 13,8 kV ANGRA FURDIST5 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$42,510.35
ANGRA FUR EL 13,8 kV ANGRA FURDIST5 DIT   062/2001 IPCA RMEL REN 443/2011 15/12/2016 14/12/2040  R$ 609.10
ANGRA FUR EL 13,8 kV ANGRA FURDIST4 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$42,510.35
ANGRA FUR EL 13,8 kV ANGRA FURDIST3 DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$214,956.80
ANGRA FUR EL 13,8 kV ANGRA FURDIST3 DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$194,943.84
ANGRA FUR EL 13,8 kV ANGRA FURDIST3 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$42,510.35
ANGRA FUR EL 13,8 kV ANGRA FURDIST3 DIT   062/2001 IPCA RMEL REN 443/2011 15/12/2016 14/12/2040  R$ 609.10
ANGRA FUR EL 13,8 kV ANGRA FURDIST2 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$42,510.35
ANGRA FUR EL 13,8 kV ANGRA FURDIST2 DIT   062/2001 IPCA RMEL REN 643/2014 14/06/2016 13/06/2045  R$6,830.53
ANGRA FUR EL 13,8 kV ANGRA FURDIST11 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$42,510.35
ANGRA FUR EL 13,8 kV ANGRA FURDIST11 DIT   062/2001 IPCA RMEL REN 643/2014 28/09/2016 27/09/2045  R$6,886.88
ANGRA FUR EL 13,8 kV ANGRA FURDIST12 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$42,510.35
ANGRA FUR EL 13,8 kV ANGRA FURDIST12 DIT   062/2001 IPCA RMEL REN 643/2014 11/10/2016 10/10/2045  R$6,893.79
ANGRA FUR EL 13,8 kV ANGRA FURDIST10 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$42,510.35
ANGRA FUR EL 13,8 kV ANGRA FURDIST10 DIT   062/2001 IPCA RMEL REN 643/2014 04/10/2016 03/10/2045  R$6,890.07
ANGRA FUR EL 13,8 kV ANGRA FURDIST1 DIT   062/2001 IPCA RMEL REN 443/2011 10/01/2017 09/01/2041  R$ 186.62
ANGRA FUR EL 13,8 kV ANGRA FURDIST1 DIT   062/2001 IPCA RMEL REN 443/2011 10/01/2017 09/01/2041  R$ 186.62
ANGRA FUR EL 13,8 kV ANGRA FURDIST1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$42,510.35
ANGRA FUR EL 13,8 kV ANGRA FURDIST1 DIT   062/2001 IPCA RMEL REN 443/2011 10/01/2017 09/01/2041  R$ 186.62
ANGRA FUR BC 138 kV 25 Mvar ANGRA FUR BC1A RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$104,029.47
ANGRA FUR BC 138 kV 25 Mvar ANGRA FUR BC1A RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$526,032.88
ANGRA FUR EL 13,8 kV ANGRA FURDIST1 DIT   062/2001 IPCA RMEL REN 443/2011 15/12/2016 14/12/2040  R$ 609.10
ANGRA FUR BC 13,8 kV 5 Mvar ANGRA FUR BC2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$24,044.93
ANGRA FUR BC 13,8 kV 5 Mvar ANGRA FUR BC2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$121,585.01
ANGRA FUR BC 13,8 kV 5 Mvar ANGRA FUR BC2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$110,265.17
ANGRA FUR BC 13,8 kV 3 Mvar ANGRA FUR BC1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$24,044.93
ARARAQUARA FURNAS RTL 500 kV 73,4 Mvar ARARAQUARA FURNAS RTPC SP RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$472,201.85
ARARAQUARA FURNAS RTL 500 kV 73,4 Mvar ARARAQUARA FURNAS RTCA SP RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$472,201.85
ARARAQUARA FURNAS RTL 500 kV 73,4 Mvar ARARAQUARA FURNAS RMR2 SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$472,201.85
ARARAQUARA FURNAS RTL 500 kV 73,4 Mvar ARARAQUARA FURNAS RMR1 SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$472,201.85
ARARAQUARA FURNAS RTL 500 kV 73,4 Mvar ARARAQUARA FURNAS RMR1 SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,446,305.19
ARARAQUARA FURNAS RTL 500 kV 73,4 Mvar ARARAQUARA FURNAS RMR1 SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,218,548.63
ARARAQUARA FURNAS MG 500 kV ARARAQUARA FURNAS MG1 SP RB FT MG 500 kV ARARAQUARA FURNAS MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$713,623.25
ARARAQUARA FURNAS MG 500 kV ARARAQUARA FURNAS MG1 SP RB FT MG 500 kV ARARAQUARA FURNAS MG1 SP 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032  R$ 812.28
ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP  RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
ARARAQUARA FURNAS MG 500 kV ARARAQUARA FURNAS MG1 SP RB FT MG 500 kV ARARAQUARA FURNAS MG1 SP 062/2001 IPCA RMEL REN 443/2011 13/07/2017 12/07/2031  R$9,750.26
ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG  RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 07/11/2016 06/11/2039  R$16,421.25
ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP  RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP  RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG  RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG  RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 07/11/2016 06/11/2039  R$16,421.25
ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG  RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 07/11/2016 06/11/2039  R$16,421.25
ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG  RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 07/11/2016 06/11/2039  R$16,421.25
ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG  RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 07/11/2016 06/11/2039  R$16,421.25
ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG  RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 07/11/2016 06/11/2039  R$16,421.25
ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP  RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RMEL REN 443/2011 16/10/2016 15/10/2039  R$16,397.77
ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP  RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RMEL REN 443/2011 16/10/2016 15/10/2039  R$16,397.77
ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP  RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RMEL REN 443/2011 16/10/2016 15/10/2039  R$16,397.77
ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP  RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RMEL REN 443/2011 16/10/2016 15/10/2039  R$16,397.77
ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP  RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RMEL REN 443/2011 16/10/2016 15/10/2039  R$16,397.77
ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP  RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RMEL REN 443/2011 16/10/2016 15/10/2039  R$16,397.77
ATIBAIA 2 EL 345 kV ATIBAIA 2 LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBNI REA 4420/2013 10/09/2013 31/12/2042  R$869,671.83
ATIBAIA 2 EL 345 kV ATIBAIA 2 LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP RB FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 4420/2013 10/09/2013 31/12/2042  R$869,671.83
B.DESPACHO 3 RTL 500 kV 33,33 Mvar B.DESPACHO 3 RTR3 MG RB FT RTL 500 kV 33,33 Mvar B.DESPACHO 3 RTR3 MG 003/2009 IPCA RBL CC 003/2009 28/01/2009 28/01/2039  R$228,074.13
B.DESPACHO 3 RTL 500 kV 100 Mvar B.DESPACHO 3 RT21 MG RB FT RTL 500 kV 100 Mvar B.DESPACHO 3 RT21 MG 003/2009 IPCA RBL CC 003/2009 28/01/2009 28/01/2039  R$684,224.24
B.DESPACHO 3 MC 500 kV RTL 500 kV 100 Mvar B.DESPACHO 3 RT21 MG RB FT RTL 500 kV 100 Mvar B.DESPACHO 3 RT21 MG 003/2009 IPCA RBL CC 003/2009 28/01/2009 28/01/2039  R$527,595.62
B.DESPACHO 3 EL 500 kV B.DESPACHO 3 LT 500 kV B.DESPACHO 3 /OURO PRETO 2 C-1 MG RB FT LT 500 kV B.DESPACHO 3 /OURO PRETO 2 C-1 MG 003/2009 IPCA RBL CC 003/2009 28/01/2009 28/01/2039  R$629,753.71
BANDEIRANTES TR 345/230 kV BANDEIRANTES TRR1 GO RB FT TR 345/230 kV BANDEIRANTES TRR1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,303,639.49
BANDEIRANTES TR 345/230 kV BANDEIRANTES TR5 GO RB FT TR 345/230 kV BANDEIRANTES TR5 GO 062/2001 IPCA RBNI REA 4326/2013 01/06/2016 31/05/2048  R$ 3,424,547.09
BANDEIRANTES TR 345/230 kV BANDEIRANTES TRR1 GO RB FT TR 345/230 kV BANDEIRANTES TRR1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$251,637.03
BANDEIRANTES TR 345/230 kV BANDEIRANTES TR4 GO RB FT TR 345/230 kV BANDEIRANTES TR4 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$754,911.09
BANDEIRANTES TR 345/230 kV BANDEIRANTES TR3 GO RB FT TR 345/230 kV BANDEIRANTES TR3 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$513,572.40
BANDEIRANTES TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$754,911.09
BANDEIRANTES TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,910,918.47
BANDEIRANTES TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,546,803.09
BANDEIRANTES TR 345/230 kV BANDEIRANTES TR1 GO RB FT TR 345/230 kV BANDEIRANTES TR1 GO 062/2001 IPCA RMEL REA 8707/2020 18/08/2020 18/08/2054  R$ 2,706,652.26
BANDEIRANTES RTB 13,8 kV 25 MVAr BANDEIRANTES RT3 GO RB FT RTB 13,8 kV 25 MVAr BANDEIRANTES RT3 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$132,389.09
BANDEIRANTES TR 10,5/345 kV BANDEIRANTES TRR1 GO RB FT TR 10,5/345 kV BANDEIRANTES TRR1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$145,037.82
BANDEIRANTES TR 10,5/345 kV BANDEIRANTES TRR1 GO RB FT TR 10,5/345 kV BANDEIRANTES TRR1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$751,387.94
BANDEIRANTES TR 10,5/345 kV BANDEIRANTES TRR1 GO RB FT TR 10,5/345 kV BANDEIRANTES TRR1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$681,432.01
BANDEIRANTES TR 10,5/345 kV BANDEIRANTES TR7 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE2 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$438,212.83
BANDEIRANTES TR 10,5/345 kV BANDEIRANTES TR7 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE2 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,270,220.54
BANDEIRANTES TR 10,5/345 kV BANDEIRANTES TR7 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE2 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,058,857.86
BANDEIRANTES TR 10,5/345 kV BANDEIRANTES TR6 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$438,212.83
BANDEIRANTES TR 10,5/345 kV BANDEIRANTES TR6 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,270,220.54
BANDEIRANTES TR 10,5/345 kV BANDEIRANTES TR6 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,058,857.86
BANDEIRANTES RTL 345 kV 60 MVAr BANDEIRANTES RT2 GO RB FT RTL 345 kV 60 MVAr BANDEIRANTES RT2 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$391,216.93
BANDEIRANTES RTL 345 kV 60 MVAr BANDEIRANTES RT1 GO RB FT RTL 345 kV 60 MVAr BANDEIRANTES RT1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$391,216.93
BANDEIRANTES RTL 345 kV 60 MVAr BANDEIRANTES RT1 GO RB FT RTL 345 kV 60 MVAr BANDEIRANTES RT1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,026,751.94
BANDEIRANTES RTB 13,8 kV 25 MVAr BANDEIRANTES RT3 GO RB FT RTB 13,8 kV 25 MVAr BANDEIRANTES RT3 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$685,859.49
BANDEIRANTES RTB 13,8 kV 25 MVAr BANDEIRANTES RT4 GO RB FT RTB 13,8 kV 25 MVAr BANDEIRANTES RT4 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$132,389.09
BANDEIRANTES RTB 13,8 kV 25 MVAr BANDEIRANTES RT4 GO RB FT RTB 13,8 kV 25 MVAr BANDEIRANTES RT4 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$685,859.49
BANDEIRANTES MG 345 kV BANDEIRANTES MG1 GO RB FT MG 345 kV BANDEIRANTES MG1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,006,097.27
BANDEIRANTES MG 345 kV BANDEIRANTES MG1 GO RB FT MG 345 kV BANDEIRANTES MG1 GO 062/2001 IPCA RBNI REA 3468/2012 31/08/2012 30/08/2050  R$939,881.60
BANDEIRANTES MG 345 kV BANDEIRANTES MG1 GO RB FT MG 345 kV BANDEIRANTES MG1 GO 062/2001 IPCA RBNI REA 4326/2013 01/06/2016 31/05/2045  R$636,397.16
BANDEIRANTES MG 345 kV BANDEIRANTES MG1 GO RB FT MG 345 kV BANDEIRANTES MG1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,212,222.24
BANDEIRANTES MG 345 kV BANDEIRANTES MG1 GO RB FT MG 345 kV BANDEIRANTES MG1 GO 062/2001 IPCA RMEL REN 443/2011 25/08/2017 24/08/2031  R$9,770.45
BANDEIRANTES MC 345 kV TR 345/230 kV BANDEIRANTES TR5 GO RB FT TR 345/230 kV BANDEIRANTES TR5 GO 062/2001 IPCA RBNI REA 4326/2013 01/06/2016 31/05/2046  R$ 1,480,716.29
BANDEIRANTES MC 345 kV TR 345/230 kV BANDEIRANTES TR4 GO  RB FT TR 345/230 kV BANDEIRANTES TR4 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
BANDEIRANTES MC 345 kV TR 345/230 kV BANDEIRANTES TR3 GO  RB FT TR 345/230 kV BANDEIRANTES TR3 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
BANDEIRANTES MC 345 kV TR 345/230 kV BANDEIRANTES TR3 GO  RB FT TR 345/230 kV BANDEIRANTES TR3 GO 062/2001 IPCA RMEL REN 643/2014 08/06/2015 07/06/2036  R$34,053.86
BANDEIRANTES MC 345 kV TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RMEL REN 643/2014 26/08/2015 25/08/2045  R$186,367.12
BANDEIRANTES MC 345 kV TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,168,504.07
BANDEIRANTES MC 345 kV TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
BANDEIRANTES MC 345 kV TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,059,713.69
BANDEIRANTES MC 345 kV TR 345/230 kV BANDEIRANTES TR1 GO  RB FT TR 345/230 kV BANDEIRANTES TR1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
BANDEIRANTES MC 345 kV TR 345/230 kV BANDEIRANTES TR1 GO  RB FT TR 345/230 kV BANDEIRANTES TR1 GO 062/2001 IPCA RBNI REA 5861/2016 22/04/2019 21/04/2034  R$102,691.33
BANDEIRANTES MC 345 kV TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RMEL REN 643/2014 26/08/2015 25/08/2036  R$34,294.10
BANDEIRANTES MC 345 kV TR 10,5/345 kV BANDEIRANTES TR6 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,059,713.69
BANDEIRANTES MC 345 kV RTL 345 kV 60 MVAr BANDEIRANTES RT2 GO  RB FT RTL 345 kV 60 MVAr BANDEIRANTES RT2 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$126,860.75
BANDEIRANTES MC 345 kV TR 10,5/345 kV BANDEIRANTES TR7 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE2 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
BANDEIRANTES MC 345 kV TR 10,5/345 kV BANDEIRANTES TR7 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE2 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,168,504.07
BANDEIRANTES MC 345 kV TR 10,5/345 kV BANDEIRANTES TR6 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
BANDEIRANTES MC 345 kV TR 10,5/345 kV BANDEIRANTES TR6 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE1 GO 062/2001 IPCA RMEL REN 643/2014 05/08/2015 04/08/2045  R$186,071.54
BANDEIRANTES MC 345 kV TR 10,5/345 kV BANDEIRANTES TR6 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,168,504.07
BANDEIRANTES MC 345 kV RTL 345 kV 60 MVAr BANDEIRANTES RT1 GO  RB FT RTL 345 kV 60 MVAr BANDEIRANTES RT1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$126,860.75
BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR4 GO RB FT TR 345/230 kV BANDEIRANTES TR4 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$127,805.26
BANDEIRANTES MC 345 kV RTL 345 kV 60 MVAr BANDEIRANTES RT2 GO  RB FT RTL 345 kV 60 MVAr BANDEIRANTES RT2 GO 062/2001 IPCA RMEL REN 643/2014 24/03/2013 23/03/2041  R$209,113.72
BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR3 GO  RB FT TR 345/230 kV BANDEIRANTES TR3 GO 062/2001 IPCA RMEL REN 643/2014 08/06/2015 07/06/2036  R$23,218.91
BANDEIRANTES MC 345 kV RTL 345 kV 60 MVAr BANDEIRANTES RT1 GO  RB FT RTL 345 kV 60 MVAr BANDEIRANTES RT1 GO 062/2001 IPCA RMEL REN 643/2014 17/03/2013 16/03/2041  R$208,985.67
BANDEIRANTES MC 345 kV BC 345 kV 91,5 MVAr BANDEIRANTES BC1 GO  RB FT BC 345 kV 91,5 MVAr BANDEIRANTES BC1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$213,278.01
BANDEIRANTES MC 345 kV BC 345 kV 91,5 MVAr BANDEIRANTES BC1 GO  RB FT BC 345 kV 91,5 MVAr BANDEIRANTES BC1 GO 062/2001 IPCA RMEL REN 643/2014 06/04/2013 05/04/2041  R$154,856.52
BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR5 GO RB FT TR 345/230 kV BANDEIRANTES TR5 GO 062/2001 IPCA RBNI REA 4326/2013 01/06/2016 31/05/2046  R$ 1,078,661.70
BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR4 GO RB FT TR 345/230 kV BANDEIRANTES TR4 GO 062/2001 IPCA RBNI REA 2230/2009 06/04/2015 05/04/2042  R$73,682.09
BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$662,112.32
BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR3 GO  RB FT TR 345/230 kV BANDEIRANTES TR3 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$127,805.26
BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RBNI REA 2230/2009 06/04/2015 05/04/2042  R$161,672.82
BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$127,805.26
BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RMEL REN 643/2014 26/08/2015 25/08/2036  R$23,382.71
BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR1 GO  RB FT TR 345/230 kV BANDEIRANTES TR1 GO 062/2001 IPCA RBNI REA 2230/2009 15/04/2019 15/04/2052  R$69,281.93
BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR1 GO  RB FT TR 345/230 kV BANDEIRANTES TR1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$127,805.26
BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR1 GO  RB FT TR 345/230 kV BANDEIRANTES TR1 GO 062/2001 IPCA RBNI REA 5861/2016 22/04/2019 21/04/2034  R$96,533.53
BANDEIRANTES IB 345 kV MG 345 kV BANDEIRANTES MG1 GO IB1 RB FT MG 345 kV BANDEIRANTES MG1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
BANDEIRANTES IB 345 kV MG 345 kV BANDEIRANTES MG1 GO IB1 RB FT MG 345 kV BANDEIRANTES MG1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,036,883.85
BANDEIRANTES IB 345 kV MG 345 kV BANDEIRANTES MG1 GO IB1 RB FT MG 345 kV BANDEIRANTES MG1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$940,347.61
BANDEIRANTES IB 230 kV MG 345 kV BANDEIRANTES MG1 GO IB1 RB FT MG 345 kV BANDEIRANTES MG1 GO 062/2001 IPCA RBNI REA 2230/2009 15/04/2019 15/04/2052  R$69,281.93
BANDEIRANTES IB 230 kV MG 345 kV BANDEIRANTES MG1 GO IB1 RB FT MG 345 kV BANDEIRANTES MG1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$105,014.11
BANDEIRANTES IB 230 kV MG 345 kV BANDEIRANTES MG1 GO IB1 RB FT MG 345 kV BANDEIRANTES MG1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$544,039.71
BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RMEL REN 443/2011 25/05/2014 24/05/2034  R$10,965.73
BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RMEL REN 443/2011 25/05/2014 24/05/2034  R$10,965.73
BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RMEL REN 443/2011 25/05/2014 24/05/2034  R$10,965.73
BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBNI REA 4347/2013 03/05/2017 02/05/2046  R$81,840.73
BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBNI REA 4347/2013 03/05/2017 02/05/2049  R$154,695.03
BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RMEL REN 443/2011 05/05/2014 04/05/2034  R$10,940.95
BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RMEL REN 443/2011 05/05/2014 04/05/2034  R$10,940.95
BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RMEL REN 443/2011 05/05/2014 04/05/2034  R$10,940.95
BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBNI REA 4347/2013 03/05/2017 02/05/2049  R$154,695.03
BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBNI REA 4347/2013 03/05/2017 02/05/2046  R$81,840.73
BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-2 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-2 GO 062/2001 IPCA RBNI REA 2230/2009 15/04/2019 15/04/2052  R$69,281.93
BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-2 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-2 GO 062/2001 IPCA RBNI REA 2230/2009 15/04/2019 15/04/2039  R$6,761.28
BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-2 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-2 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$178,247.06
BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-2 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-2 GO 062/2001 IPCA RMEL REN 443/2011 14/11/2014 13/11/2035  R$7,599.85
BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-2 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-2 GO 062/2001 IPCA RMEL REN 443/2011 14/11/2014 13/11/2035  R$7,599.85
BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-2 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-2 GO 062/2001 IPCA RMEL REN 443/2011 14/11/2014 13/11/2035  R$7,599.85
BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-1 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-1 GO 062/2001 IPCA RBNI REA 2230/2009 06/04/2015 05/04/2042  R$167,826.59
BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-1 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-1 GO 062/2001 IPCA RBNI REA 2230/2009 06/04/2015 05/04/2032  R$23,710.27
BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-1 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$178,247.06
BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-1 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$923,432.89
BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-1 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-1 GO 062/2001 IPCA RMEL REN 443/2011 12/11/2014 11/11/2035  R$7,598.19
BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-1 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-1 GO 062/2001 IPCA RMEL REN 443/2011 12/11/2014 11/11/2035  R$7,598.19
BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-1 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-1 GO 062/2001 IPCA RMEL REN 443/2011 12/11/2014 11/11/2035  R$7,598.19
BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO  RB FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO 062/2001 IPCA RBNI REA 2230/2009 15/04/2019 15/04/2052  R$69,281.93
BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO  RB FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$178,247.06
BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO  RB FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO 062/2001 IPCA RMEL REN 443/2011 20/11/2014 19/11/2035  R$7,604.80
BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO  RB FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO 062/2001 IPCA RMEL REN 443/2011 20/11/2014 19/11/2035  R$7,604.80
BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO  RB FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO 062/2001 IPCA RMEL REN 443/2011 20/11/2014 19/11/2035  R$7,604.80
BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO  RB FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO 062/2001 IPCA RBNI REA 2230/2009 15/04/2019 15/04/2052  R$69,281.93
BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO  RB FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$178,247.06
BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO  RB FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$923,432.89
BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO  RB FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO 062/2001 IPCA RMEL REN 443/2011 19/11/2014 18/11/2035  R$7,603.98
BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO  RB FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO 062/2001 IPCA RMEL REN 443/2011 19/11/2014 18/11/2035  R$7,603.98
BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO  RB FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO 062/2001 IPCA RMEL REN 443/2011 19/11/2014 18/11/2035  R$7,603.98
BANDEIRANTES CE 100/-50 MvAr BANDEIRANTES CE2 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE2 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,590,954.59
BANDEIRANTES CE 100/-50 MvAr BANDEIRANTES CE2 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE2 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 8,242,154.25
BANDEIRANTES CE 100/-50 MvAr BANDEIRANTES CE2 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE2 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 7,474,791.00
BANDEIRANTES CE 100/-50 MvAr BANDEIRANTES CE1 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,590,954.59
BANDEIRANTES CE 100/-50 MvAr BANDEIRANTES CE1 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 8,242,154.25
BANDEIRANTES CE 100/-50 MvAr BANDEIRANTES CE1 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 7,474,791.00
BANDEIRANTES BC 345 kV 91,5 MVAr BANDEIRANTES BC1 GO RB FT BC 345 kV 91,5 MVAr BANDEIRANTES BC1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$199,032.89
BARREIRO 1 TR 345/138 kV BARREIRO 1 TR3 MG RBF FT TR 345/138 kV BARREIRO 1 TR3 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$589,615.33
BARREIRO 1 TR 345/138 kV BARREIRO 1 TRR1 MG RBF FT TR 345/138 kV BARREIRO 1 TRR1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$196,538.44
BARREIRO 1 TR 345/138 kV BARREIRO 1 TR4 MG RBF FT TR 345/138 kV BARREIRO 1 TR4 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$589,615.33
BARREIRO 1 MC 345 kV TR 345/138 kV BARREIRO 1 TR4 MG RBF FT TR 345/138 kV BARREIRO 1 TR4 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,265.74
BARREIRO 1 MC 345 kV TR 345/138 kV BARREIRO 1 TR3 MG RBF FT TR 345/138 kV BARREIRO 1 TR3 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,265.74
BARREIRO 1 MC 138 kV TR 345/138 kV BARREIRO 1 TR3 MG RBF FT TR 345/138 kV BARREIRO 1 TR3 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$88,677.44
BARREIRO 1 MC 138 kV TR 345/138 kV BARREIRO 1 TR4 MG  RBF FT TR 345/138 kV BARREIRO 1 TR4 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$88,677.44
BARREIRO 1 EL 345 kV BARREIRO 1 LT 345 kV BARREIRO 1 /PIMENTA C-1 MG RB FT LT 345 kV BARREIRO 1 /PIMENTA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
BARRO ALTO TR 230/69 kV BARRO ALTO TRR1 GO RBF FT TR 230/69 kV BARRO ALTO TRR1 GO 062/2001 IPCA RMEL REA 11449/2022 02/05/2022 02/09/2056  R$814,224.04
BARRO ALTO TR 230/13,8 kV BARRO ALTO TRC1 GO RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$750,514.49
BARRO ALTO TR 230/13,8 kV BARRO ALTO TRC1 GO RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$680,639.89
BARRO ALTO TR 230/69 kV BARRO ALTO TR3 GO RBF FT TR 230/69 kV BARRO ALTO TR3 GO 062/2001 IPCA RBNI REA 4276/2013 22/11/2016 21/11/2048  R$ 1,361,008.95
BARRO ALTO TR 230/69 kV BARRO ALTO TR2 GO RBF FT TR 230/69 kV BARRO ALTO TR2 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$301,673.94
BARRO ALTO TR 230/69 kV BARRO ALTO TR1 GO RBF FT TR 230/69 kV BARRO ALTO TR1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$301,673.94
BARRO ALTO TR 230/69 kV BARRO ALTO TR1 GO RBF FT TR 230/69 kV BARRO ALTO TR1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,562,862.45
BARRO ALTO TR 230/13,8 kV BARRO ALTO TRC1 GO RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$144,869.22
BARRO ALTO RTB 230 kV 15 Mvar BARRO ALTO RT1 GO RB FT RTB 230 kV 15 Mvar BARRO ALTO RT1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$162,759.83
BARRO ALTO RTB 230 kV 15 Mvar BARRO ALTO RT1 GO RB FT RTB 230 kV 15 Mvar BARRO ALTO RT1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$843,199.18
BARRO ALTO MG 230 kV BARRO ALTO MG1 GO RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RBNI REA 5861/2016 28/11/2017 27/11/2045  R$34,931.97
BARRO ALTO MG 230 kV BARRO ALTO MG1 GO RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RBNI REA 7761/2019 31/05/2019 30/05/2036  R$28,323.64
BARRO ALTO MG 230 kV BARRO ALTO MG1 GO RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$435,575.05
BARRO ALTO MG 230 kV BARRO ALTO MG1 GO RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RBNI REA 4276/2013 22/11/2016 21/11/2045  R$234,323.19
BARRO ALTO MG 230 kV BARRO ALTO MG1 GO RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,256,555.16
BARRO ALTO MG 230 kV BARRO ALTO MG1 GO RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,046,464.76
BARRO ALTO MG 230 kV BARRO ALTO MG1 GO RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RMEL REN 443/2011 08/12/2017 07/12/2032  R$15,598.56
BARRO ALTO MG 230 kV BARRO ALTO MG1 GO RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RMEL REN 443/2011 08/12/2017 07/12/2032  R$14,076.03
BARRO ALTO MC 69 kV TR 230/69 kV BARRO ALTO TR1 GO  RBF FT TR 230/69 kV BARRO ALTO TR1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$52,619.12
BARRO ALTO MC 69 kV TR 230/69 kV BARRO ALTO TR1 GO  RBF FT TR 230/69 kV BARRO ALTO TR1 GO 062/2001 IPCA RMEL REN 643/2014 18/10/2015 17/10/2043  R$51,667.24
BARRO ALTO MC 69 kV TR 230/69 kV BARRO ALTO TR3 GO  RBF FT TR 230/69 kV BARRO ALTO TR3 GO 062/2001 IPCA RBNI REA 4276/2013 22/11/2016 21/11/2046  R$488,929.94
BARRO ALTO MC 69 kV TR 230/69 kV BARRO ALTO TR2 GO  RBF FT TR 230/69 kV BARRO ALTO TR2 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$52,619.12
BARRO ALTO MC 230 kV TR 230/69 kV BARRO ALTO TR3 GO  RBF FT TR 230/69 kV BARRO ALTO TR3 GO 062/2001 IPCA RBNI REA 4276/2013 22/11/2016 21/11/2046  R$ 1,083,910.52
BARRO ALTO MC 230 kV TR 230/13,8 kV BARRO ALTO TRC1 GO  RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$121,275.97
BARRO ALTO MC 69 kV TR 230/69 kV BARRO ALTO TR1 GO  RBF FT TR 230/69 kV BARRO ALTO TR1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$272,600.45
BARRO ALTO MC 230 kV TR 230/13,8 kV BARRO ALTO TRC1 GO  RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RMEL REN 643/2014 02/11/2014 01/11/2041  R$122,068.74
BARRO ALTO MC 230 kV TR 230/69 kV BARRO ALTO TR2 GO  RBF FT TR 230/69 kV BARRO ALTO TR2 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$121,275.97
BARRO ALTO MC 230 kV TR 230/69 kV BARRO ALTO TR1 GO  RBF FT TR 230/69 kV BARRO ALTO TR1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$121,275.97
BARRO ALTO MC 230 kV TR 230/69 kV BARRO ALTO TR1 GO  RBF FT TR 230/69 kV BARRO ALTO TR1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$628,286.49
BARRO ALTO MC 230 kV TR 230/69 kV BARRO ALTO TR1 GO  RBF FT TR 230/69 kV BARRO ALTO TR1 GO 062/2001 IPCA RMEL REN 643/2014 31/01/2016 30/01/2044  R$126,199.33
BARRO ALTO MC 230 kV TR 230/13,8 kV BARRO ALTO TRC1 GO  RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$628,286.49
BARRO ALTO MC 230 kV RTB 230 kV 15 Mvar BARRO ALTO RT1 GO  RB FT RTB 230 kV 15 Mvar BARRO ALTO RT1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$116,623.42
BARRO ALTO MC 230 kV BC 230 kV 27,7 Mvar BARRO ALTO BC2 GO  RB FT BC 230 kV 27,7 Mvar BARRO ALTO BC2 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,395.86
BARRO ALTO MC 230 kV RTB 230 kV 15 Mvar BARRO ALTO RT1 GO  RB FT RTB 230 kV 15 Mvar BARRO ALTO RT1 GO 062/2001 IPCA RMEL REN 643/2014 06/12/2015 05/12/2043  R$118,138.18
BARRO ALTO MC 230 kV RTB 230 kV 15 Mvar BARRO ALTO RT1 GO  RB FT RTB 230 kV 15 Mvar BARRO ALTO RT1 GO 062/2001 IPCA RMEL REN 643/2014 27/06/2016 26/06/2047  R$165,867.55
BARRO ALTO MC 230 kV BC 230 kV 27 Mvar BARRO ALTO BC1 GO  RB FT BC 230 kV 27 Mvar BARRO ALTO BC1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$124,395.86
BARRO ALTO MC 13,8 kV CE 33/-22 Mvar BARRO ALTO CE1 GO  RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$47,655.63
BARRO ALTO MC 13,8 kV CE 33/-22 Mvar BARRO ALTO CE1 GO  RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$223,900.70
BARRO ALTO IB 230 kV MG 230 kV BARRO ALTO MG1 GO IB1 RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RMEL REN 643/2014 01/11/2015 31/10/2043  R$32,174.01
BARRO ALTO MC 13,8 kV CE 33/-22 Mvar BARRO ALTO CE1 GO  RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$246,886.38
BARRO ALTO IB 230 kV MG 230 kV BARRO ALTO MG1 GO IB1 RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RMEL REN 643/2014 22/11/2015 21/11/2043  R$32,217.42
BARRO ALTO IB 69 kV MG 230 kV BARRO ALTO MG1 GO IB1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$34,065.28
BARRO ALTO IB 69 kV MG 230 kV BARRO ALTO MG1 GO IB1 DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$172,253.66
BARRO ALTO IB 69 kV MG 230 kV BARRO ALTO MG1 GO IB1 DIT   062/2001 IPCA RMEL REN 643/2014 24/05/2015 23/05/2042  R$12,711.85
BARRO ALTO IB 69 kV MG 230 kV BARRO ALTO MG1 GO IB1 DIT   062/2001 IPCA RMEL REN 643/2014 31/05/2015 30/05/2042  R$12,719.32
BARRO ALTO IB 230 kV MG 230 kV BARRO ALTO MG1 GO IB1 RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$105,014.11
BARRO ALTO EL 69 kV BARRO ALTODIST3 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$62,479.35
BARRO ALTO EL 69 kV BARRO ALTODIST3 DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$315,931.55
BARRO ALTO IB 230 kV MG 230 kV BARRO ALTO MG1 GO IB1 RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$544,039.71
BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV ITAPACI /BARRO ALTO C-1 GO  RB FT LT 230 kV ITAPACI /BARRO ALTO C-1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$172,304.70
BARRO ALTO EL 69 kV BARRO ALTODIST3 DIT   062/2001 IPCA RMEL REN 643/2014 04/10/2015 03/10/2043  R$50,788.29
BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV ITAPACI /BARRO ALTO C-1 GO  RB FT LT 230 kV ITAPACI /BARRO ALTO C-1 GO 062/2001 IPCA RBNI REA 3218/2011 01/02/2015 31/01/2040  R$42,792.46
BARRO ALTO EL 69 kV BARRO ALTODIST2 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$62,479.35
BARRO ALTO EL 69 kV BARRO ALTODIST2 DIT   062/2001 IPCA RMEL REN 643/2014 11/10/2015 10/10/2043  R$50,817.46
BARRO ALTO EL 69 kV BARRO ALTODIST2 DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$315,931.55
BARRO ALTO EL 69 kV BARRO ALTODIST1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$62,479.35
BARRO ALTO EL 69 kV BARRO ALTODIST1 DIT   062/2001 IPCA RMEL REN 643/2014 20/09/2015 19/09/2042  R$34,217.77
BARRO ALTO EL 69 kV BARRO ALTODIST1 DIT   062/2001 IPCA RMEL REN 643/2014 20/09/2015 19/09/2042  R$16,530.33
BARRO ALTO EL 69 kV BARRO ALTODIST1 DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$315,931.55
BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV ITAPACI /BARRO ALTO C-1 GO  RB FT LT 230 kV ITAPACI /BARRO ALTO C-1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$892,647.68
BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /NIQUELANDIA C-2 GO  RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-2 GO 028/2009 IPCA RBL CC 028/2009 01/07/2016 19/11/2039  R$672,494.09
BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO  RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$892,647.68
BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV ITAPACI /BARRO ALTO C-1 GO  RB FT LT 230 kV ITAPACI /BARRO ALTO C-1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$809,540.16
BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV ITAPACI /BARRO ALTO C-1 GO  RB FT LT 230 kV ITAPACI /BARRO ALTO C-1 GO 062/2001 IPCA RMEL REN 643/2014 29/05/2016 28/05/2044  R$43,899.23
BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO  RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO 062/2001 IPCA RMEL REN 643/2014 03/07/2016 02/07/2044  R$91,050.20
BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO  RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$172,304.70
BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO  RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO 062/2001 IPCA RBNI REA 3578/2012 06/05/2016 05/05/2044  R$40,068.51
BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO  RB FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO 062/2001 IPCA RBNI REA 2367/2010 24/11/2013 23/11/2037  R$27,628.27
BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO  RB FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$172,304.70
BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO  RB FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO 062/2001 IPCA RMEL REN 643/2014 17/04/2016 16/04/2044  R$30,201.61
BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO  RB FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO 062/2001 IPCA RMEL REN 643/2014 16/06/2016 15/06/2044  R$60,643.11
BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO  RB FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$892,647.68
BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO  RB FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO 062/2001 IPCA RMEL REN 643/2014 21/04/2016 20/04/2044  R$43,784.36
BARRO ALTO CE 33/-22 Mvar BARRO ALTO CE1 GO RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$672,192.31
BARRO BRANCO IB 345 kV MG 345 kV BARRO BRANCO MG1 MG  RB FT MG 345 kV BARRO BRANCO MG1 MG 062/2001 IPCA RBNI REA 8920/2020 01/09/2017 31/08/2049  R$160,676.72
BARRO ALTO CE 33/-22 Mvar BARRO ALTO CE1 GO RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,482,382.69
BARRO ALTO CE 33/-22 Mvar BARRO ALTO CE1 GO RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,158,164.96
BARRO ALTO BC 230 kV 27,7 Mvar BARRO ALTO BC2 GO RB FT BC 230 kV 27,7 Mvar BARRO ALTO BC2 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$112,648.86
BARRO ALTO BC 230 kV 27 Mvar BARRO ALTO BC1 GO RB FT BC 230 kV 27 Mvar BARRO ALTO BC1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$111,005.32
BARRO BRANCO MG 345 kV BARRO BRANCO MG1 MG RB FT MG 345 kV BARRO BRANCO MG1 MG 062/2001 IPCA RBNI REA 8920/2020 01/09/2017 30/04/2037  R$52,902.88
BARRO BRANCO MG 345 kV BARRO BRANCO MG1 MG RB FT MG 345 kV BARRO BRANCO MG1 MG 062/2001 IPCA RBNI REA 8920/2020 01/09/2017 31/08/2048  R$105,984.24
BARRO BRANCO EL 345 kV BARRO BRANCO LT 345 kV PADRE FIALHO /BARRO BRANCO C-1 MG  RB FT LT 345 kV PADRE FIALHO /BARRO BRANCO C-1 MG 062/2001 IPCA RBNI REA 8920/2020 01/09/2017 31/08/2045  R$147,937.24
BARRO BRANCO EL 345 kV BARRO BRANCO LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG  RB FT LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG 062/2001 IPCA RBNI REA 8920/2020 01/09/2017 31/08/2045  R$147,937.24
BATEIAS RTL 500 kV 165 Mvar BATEIAS RT4 PR RB FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR 034/2001 IGPM RBL CC 034/2001 21/03/2003 09/05/2031  R$ 3,436,058.42
BATEIAS RTL 500 kV 165 Mvar BATEIAS RT3 PR RB FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR 034/2001 IGPM RBL CC 034/2001 21/03/2003 09/05/2031  R$ 3,436,058.42
BATEIAS IB 500 kV MG 500 kV BATEIAS MG5 PR IB7 RB FT MG 500 kV BATEIAS MG5 PR 034/2001 IGPM RBL CC 034/2001 21/03/2003 09/05/2031  R$ 2,713,265.28
BATEIAS EL 500 kV BATEIAS LT 500 kV IBIUNA /BATEIAS C-2 SP/PR  RB FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR 034/2001 IGPM RBL CC 034/2001 21/03/2003 09/05/2031  R$ 2,713,265.28
BATEIAS EL 500 kV BATEIAS LT 500 kV IBIUNA /BATEIAS C-2 SP/PR  RB FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR 034/2001 IGPM RBNI REA 8314/2019 11/02/2021 10/02/2036  R$32,736.89
BATEIAS EL 500 kV BATEIAS LT 500 kV IBIUNA /BATEIAS C-2 SP/PR  RB FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR 034/2001 IGPM RBNI REA 5861/2016 10/02/2021 09/02/2036  R$15,454.63
BATEIAS EL 500 kV BATEIAS LT 500 kV IBIUNA /BATEIAS C-1 SP/PR  RB FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR 034/2001 IGPM RBL CC 034/2001 21/03/2003 09/05/2031  R$ 2,713,265.28
BATEIAS EL 500 kV BATEIAS LT 500 kV IBIUNA /BATEIAS C-1 SP/PR  RB FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR 034/2001 IGPM RMEL REN 443/2011 31/12/2017 30/12/2032  R$2,497.30
BATEIAS EL 500 kV BATEIAS LT 500 kV IBIUNA /BATEIAS C-2 SP/PR  RB FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR 034/2001 IGPM RBNI REA 8314/2019 10/02/2021 09/02/2036  R$26,585.73
BATEIAS EL 500 kV BATEIAS LT 500 kV IBIUNA /BATEIAS C-1 SP/PR  RB FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR 034/2001 IGPM RBNI REA 5861/2016 10/02/2021 09/02/2036  R$15,454.63
BATEIAS EL 500 kV BATEIAS LT 500 kV IBIUNA /BATEIAS C-1 SP/PR  RB FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR 034/2001 IGPM RBNI REA 8314/2019 10/02/2021 09/02/2036  R$26,585.73
BATEIAS EL 500 kV BATEIAS LT 500 kV IBIUNA /BATEIAS C-1 SP/PR  RB FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR 034/2001 IGPM RBNI REA 8314/2019 11/02/2021 10/02/2036  R$32,736.89
BRAS. GERAL TR 230/34,5 kV BRAS. GERAL TRR1 DF RBF FT TR 230/34,5 kV BRAS. GERAL TRR1 DF 062/2001 IPCA RBNI REA 3231/2011 10/12/2013 09/12/2044  R$ 1,090,275.32
BRAS. GERAL TR 230/34,5 kV BRAS. GERAL TR5 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR5 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$217,084.40
BRAS. GERAL TR 230/34,5 kV BRAS. GERAL TR4 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR4 DF 062/2001 IPCA RBNI REA 2367/2010 29/11/2012 28/11/2041  R$ 1,214,738.78
BRAS. GERAL TR 230/34,5 kV BRAS. GERAL TR2 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR2 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$217,084.40
BRAS. GERAL TR 230/34,5 kV BRAS. GERAL TR1 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR1 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$217,084.40
BRAS. GERAL MG 230 kV BRAS. GERAL MG1 DF RB FT MG 230 kV BRAS. GERAL MG1 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$439,788.48
BRAS. GERAL MG 230 kV BRAS. GERAL MG1 DF RB FT MG 230 kV BRAS. GERAL MG1 DF 062/2001 IPCA RBNI REA 5012/2015 06/05/2021 06/05/2047  R$577,868.42
BRAS. GERAL MG 230 kV BRAS. GERAL MG1 DF RB FT MG 230 kV BRAS. GERAL MG1 DF 062/2001 IPCA RBNI REA 3893/2013 30/07/2014 29/07/2040  R$228,078.76
BRAS. GERAL MG 230 kV BRAS. GERAL MG1 DF RB FT MG 230 kV BRAS. GERAL MG1 DF 062/2001 IPCA RBNI REN 643/2014 29/06/2013 28/06/2036  R$216,803.94
BRAS. GERAL MG 230 kV BRAS. GERAL MG1 DF RB FT MG 230 kV BRAS. GERAL MG1 DF 062/2001 IPCA RBNI REA 5012/2015 06/05/2021 06/05/2052  R$416,439.90
BRAS. GERAL MG 230 kV BRAS. GERAL MG1 DF RB FT MG 230 kV BRAS. GERAL MG1 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,278,383.39
BRAS. GERAL MG 230 kV BRAS. GERAL MG1 DF RB FT MG 230 kV BRAS. GERAL MG1 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,066,260.72
BRAS. GERAL MG 230 kV BRAS. GERAL MG1 DF RB FT MG 230 kV BRAS. GERAL MG1 DF 062/2001 IPCA RBNI REA 7761/2019 27/10/2021 26/10/2036  R$35,872.08
BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TRR1 DF RBF FT TR 230/34,5 kV BRAS. GERAL TRR1 DF 062/2001 IPCA RBNI REA 3893/2013 30/07/2014 29/07/2033  R$41,631.60
BRAS. GERAL MG 230 kV BRAS. GERAL MG1 DF RB FT MG 230 kV BRAS. GERAL MG1 DF 062/2001 IPCA RBNI REA 7761/2019 20/09/2021 19/09/2036  R$35,807.13
BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR5 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR5 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$288,914.49
BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR5 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR5 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$262,015.90
BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR5 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR5 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$55,768.17
BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR5 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR5 DF 062/2001 IPCA RBNI REA 5012/2015 27/01/2020 27/01/2043  R$206,917.30
BRAS. GERAL MC 230 kV TR 230/34,5 kV BRAS. GERAL TR5 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR5 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$114,746.69
BRAS. GERAL MC 230 kV TR 230/34,5 kV BRAS. GERAL TR5 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR5 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$594,460.66
BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR5 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR5 DF 062/2001 IPCA RBNI REA 4068/2013 07/12/2017 06/12/2047  R$39,047.40
BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR4 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR4 DF 062/2001 IPCA RBNI REA 5012/2015 21/02/2020 21/02/2043  R$320,343.47
BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR3D DF DISPONIVEL RBF FT TR 230/34,5 kV BRAS. GERAL TR3D DF 062/2001 IPCA RBNI REA 5012/2015 21/02/2020 21/02/2043  R$320,343.47
BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR2 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR2 DF 062/2001 IPCA RBNI REA 5012/2015 11/09/2020 11/09/2043  R$320,343.47
BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR1 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR1 DF 062/2001 IPCA RBNI REA 5012/2015 01/10/2020 01/10/2043  R$320,343.47
BRAS. GERAL MC 230 kV TR 230/34,5 kV BRAS. GERAL TRR1 DF RBF FT TR 230/34,5 kV BRAS. GERAL TRR1 DF 062/2001 IPCA RBNI REA 3893/2013 30/07/2014 29/07/2042  R$950,342.72
BRAS. GERAL MC 230 kV TR 230/34,5 kV BRAS. GERAL TR4 DF  RBF FT TR 230/34,5 kV BRAS. GERAL TR4 DF 062/2001 IPCA RBNI REA 2367/2010 29/11/2012 28/11/2031  R$20,402.86
BRAS. GERAL MC 230 kV TR 230/34,5 kV BRAS. GERAL TR4 DF  RBF FT TR 230/34,5 kV BRAS. GERAL TR4 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$114,746.69
BRAS. GERAL MC 230 kV TR 230/34,5 kV BRAS. GERAL TR5 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR5 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$539,115.02
BRAS. GERAL MC 13,8 kV CS 20/-10 MVAr BRAS. GERAL CS1 DF  RBF FT CS 20/-10 MVAr BRAS. GERAL CS1 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$47,655.63
BRAS. GERAL IB 34,50 kV MG 230 kV BRAS. GERAL MG1 DF IB4 DIT   062/2001 IPCA RCDM REA 5012/2015 23/12/2020 23/12/2052  R$181,563.27
BRAS. GERAL MC 230 kV TR 230/34,5 kV BRAS. GERAL TR2 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR2 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$114,746.69
BRAS. GERAL MC 230 kV TR 230/34,5 kV BRAS. GERAL TR1 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR1 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$114,746.69
BRAS. GERAL IB 34,5 kV MG 230 kV BRAS. GERAL MG1 DF IB1 DIT   062/2001 IPCA RCDM REA 5012/2015 23/12/2020 23/12/2049  R$335,765.58
BRAS. GERAL IB 230 kV MG 230 kV BRAS. GERAL MG1 DF IB2 RB FT MG 230 kV BRAS. GERAL MG1 DF 062/2001 IPCA RBNI REA 2367/2010 06/03/2013 05/03/2040  R$699,225.78
BRAS. GERAL IB 34,50 kV MG 230 kV BRAS. GERAL MG1 DF IB3 DIT   062/2001 IPCA RCDM REA 5012/2015 23/12/2020 23/12/2052  R$181,563.27
BRAS. GERAL IB 34,50 kV MG 230 kV BRAS. GERAL MG1 DF IB2 DIT   062/2001 IPCA RCDM REA 5012/2015 23/12/2020 23/12/2049  R$335,765.58
BRAS. GERAL EL 34,5 kV BRAS. GERALDIST9 DIT   062/2001 IPCA RCDM REA 5012/2015 19/03/2020 19/03/2044  R$391,705.88
BRAS. GERAL EL 34,5 kV BRAS. GERALDIST8 DIT   062/2001 IPCA RCDM REA 5012/2015 19/03/2020 19/03/2044  R$391,705.88
BRAS. GERAL EL 34,5 kV BRAS. GERALDIST4 DIT   062/2001 IPCA RCDM REA 5012/2015 03/09/2020 03/09/2044  R$391,705.88
BRAS. GERAL EL 34,5 kV BRAS. GERALDIST3 DIT   062/2001 IPCA RCDM REA 5012/2015 28/08/2020 28/08/2044  R$391,705.88
BRAS. GERAL EL 34,5 kV BRAS. GERALDIST7 DIT   062/2001 IPCA RCDM REA 5012/2015 03/09/2020 03/09/2044  R$391,705.88
BRAS. GERAL EL 34,5 kV BRAS. GERALDIST6 DIT   062/2001 IPCA RCDM REA 5012/2015 28/08/2020 28/08/2044  R$391,705.88
BRAS. GERAL EL 34,5 kV BRAS. GERALDIST5 DIT   062/2001 IPCA RCDM REA 5012/2015 19/03/2020 19/03/2044  R$391,705.88
BRAS. GERAL EL 34,5 kV BRAS. GERALDIST10 DIT   062/2001 IPCA RCDM REA 5012/2015 19/03/2020 19/03/2044  R$391,705.88
BRAS. GERAL EL 34,5 kV BRAS. GERALDIST2 DIT   062/2001 IPCA RCDM REA 5012/2015 16/12/2020 16/12/2044  R$391,705.88
BRAS. GERAL EL 230 kV BRAS. GERAL LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF RB FT LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$167,845.88
BRAS. GERAL EL 34,5 kV BRAS. GERALDIST1 DIT   062/2001 IPCA RCDM REA 5012/2015 18/12/2020 18/12/2044  R$391,705.88
BRAS. GERAL EL 230 kV BRAS. GERALLT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF RB FT LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$167,845.88
BRAS. SUL TR 345/230 kV BRAS. SUL TRR2 DF RB FT TR 345/230 kV BRAS. SUL TRR2 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$251,637.03
BRAS. SUL TR 345/230 kV BRAS. SUL TR9 DF RB FT TR 345/230 kV BRAS. SUL TR9 DF 062/2001 IPCA RBNI REA 2367/2010 12/09/2012 11/09/2041  R$ 2,822,875.34
BRAS. GERAL CS 20/-10 MVAr BRAS. GERAL CS2 DF RBF FT CS 20/-10 MVAr BRAS. GERAL CS2 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$605,519.90
BRAS. GERAL CS 20/-10 MVAr BRAS. GERAL CS1 DF RBF FT CS 20/-10 MVAr BRAS. GERAL CS1 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$605,519.90
BRAS. SUL TR 345/230 kV BRAS. SUL TR6 DF RB FT TR 345/230 kV BRAS. SUL TR6 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$754,911.09
BRAS. SUL TR 345/230 kV BRAS. SUL TRR2 DF RB FT TR 345/230 kV BRAS. SUL TRR2 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,303,639.49
BRAS. SUL TR 345/230 kV BRAS. SUL TR6 DF RB FT TR 345/230 kV BRAS. SUL TR6 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,910,918.47
BRAS. SUL TR 345/230 kV BRAS. SUL TR6 DF RB FT TR 345/230 kV BRAS. SUL TR6 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,546,803.09
BRAS. SUL TR 345/230 kV BRAS. SUL TR3 DF RB FT TR 345/230 kV BRAS. SUL TR3 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$754,911.09
BRAS. SUL TR 345/230 kV BRAS. SUL TR3 DF RB FT TR 345/230 kV BRAS. SUL TR3 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,910,918.47
BRAS. SUL TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,770,193.05
BRAS. SUL TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$589,615.33
BRAS. SUL TR 345/230 kV BRAS. SUL TR10 DF RB FT TR 345/230 kV BRAS. SUL TR10 DF 062/2001 IPCA RBNI REA 3814/2012 02/09/2014 01/09/2044  R$ 3,261,340.97
BRAS. SUL TR 345/138 kV BRAS. SUL TRR2 DF RBF FT TR 345/138 kV BRAS. SUL TRR2 DF 062/2001 IPCA RBNI REA 3814/2012 30/09/2015 29/09/2046  R$958,498.41
BRAS. SUL TR 345/138 kV BRAS. SUL TRR1 DF RBF FT TR 345/138 kV BRAS. SUL TRR1 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$196,538.44
BRAS. SUL TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBNI REA 2367/2010 27/09/2012 26/09/2032  R$235,597.96
BRAS. SUL TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$589,615.33
BRAS. SUL TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,054,581.52
BRAS. SUL TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,054,581.52
BRAS. SUL TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,770,193.05
BRAS. SUL TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$589,615.33
BRAS. SUL TR 345/138 kV BRAS. SUL TR4 DF RBF FT TR 345/138 kV BRAS. SUL TR4 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$589,615.33
BRAS. SUL TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,054,581.52
BRAS. SUL TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,770,193.05
BRAS. SUL TR 13,8/345 kV BRAS. SUL TR1 DF RB FT CS 60/-30 MVAr BRAS. SUL CS1 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$254,086.82
BRAS. SUL TR 345/138 kV BRAS. SUL TR4 DF RBF FT TR 345/138 kV BRAS. SUL TR4 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,054,581.52
BRAS. SUL TR 345/138 kV BRAS. SUL TR4 DF RBF FT TR 345/138 kV BRAS. SUL TR4 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,770,193.05
BRAS. SUL TR 345/138 kV BRAS. SUL TR2 DF RBF FT TR 345/138 kV BRAS. SUL TR2 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$589,615.33
BRAS. SUL TR 345/138 kV BRAS. SUL TR2 DF RBF FT TR 345/138 kV BRAS. SUL TR2 DF 062/2001 IPCA RBNI REA 8707/2020 29/07/2022 29/07/2057  R$ 1,567,329.50
BRAS. SUL TR 345/138 kV BRAS. SUL TR1 DF RBF FT TR 345/138 kV BRAS. SUL TR1 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$589,615.33
BRAS. SUL TR 13,8/345 kV BRAS. SUL TR1 DF RB FT CS 60/-30 MVAr BRAS. SUL CS1 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,316,330.93
BRAS. SUL RTB 13,8 kV 25 Mvar BRAS. SUL RT2 DF RBF FT RTB 13,8 kV 25 Mvar BRAS. SUL RT2 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$132,389.09
BRAS. SUL RTB 13,8 kV 25 Mvar BRAS. SUL RT2 DF RBF FT RTB 13,8 kV 25 Mvar BRAS. SUL RT2 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$685,859.49
BRAS. SUL TR 13,8/345 kV BRAS. SUL TR1 DF RB FT CS 60/-30 MVAr BRAS. SUL CS1 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,193,777.53
BRAS. SUL RTL 345 kV 60 Mvar BRAS. SUL RT3 DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$391,216.93
BRAS. SUL RTL 345 kV 60 Mvar BRAS. SUL RT3 DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,026,751.94
BRAS. SUL RTL 345 kV 60 Mvar BRAS. SUL RT3 DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,838,056.73
BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBNI REA 2367/2010 12/09/2012 11/09/2031  R$6,172.56
BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 5,814,553.44
BRAS. SUL RTB 13,8 kV 25 Mvar BRAS. SUL RT1 DF RBF FT RTB 13,8 kV 25 Mvar BRAS. SUL RT1 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$132,389.09
BRAS. SUL RTB 13,8 kV 25 Mvar BRAS. SUL RT1 DF RBF FT RTB 13,8 kV 25 Mvar BRAS. SUL RT1 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$685,859.49
BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032  R$4,194.74
BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBNI REA 3814/2012 02/09/2014 01/09/2039  R$694,601.80
BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,237,585.17
BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 6,411,476.44
BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RMEL REN 443/2011 25/04/2017 24/04/2031  R$132,892.42
BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RMEL REN 443/2011 25/04/2017 24/04/2031  R$107,990.50
BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RMEL REN 443/2011 25/04/2017 24/04/2031  R$92,958.41
BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RMEL REN 443/2011 01/12/2017 30/11/2032  R$11,944.89
BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBNI REA 4347/2013 22/03/2019 21/03/2034  R$11,467.14
BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBNI REA 5861/2016 28/07/2021 27/07/2036  R$598,093.65
BRAS. SUL MC 345 kV TR 345/230 kV BRAS. SUL TR9 DF RB FT TR 345/230 kV BRAS. SUL TR9 DF 062/2001 IPCA RBNI REA 2367/2010 12/09/2012 11/09/2039  R$ 1,893,760.59
BRAS. SUL MC 345 kV TR 345/230 kV BRAS. SUL TR6 DF  RB FT TR 345/230 kV BRAS. SUL TR6 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
BRAS. SUL MC 345 kV TR 345/230 kV BRAS. SUL TR6 DF  RB FT TR 345/230 kV BRAS. SUL TR6 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,168,504.07
BRAS. SUL MC 345 kV TR 345/230 kV BRAS. SUL TR6 DF  RB FT TR 345/230 kV BRAS. SUL TR6 DF 062/2001 IPCA RBNI REA 4068/2013 04/01/2018 03/01/2048  R$88,487.05
BRAS. SUL MC 345 kV TR 345/230 kV BRAS. SUL TR6 DF  RB FT TR 345/230 kV BRAS. SUL TR6 DF 062/2001 IPCA RBNI REA 7761/2019 31/05/2019 30/05/2034  R$103,055.89
BRAS. SUL MC 345 kV TR 345/230 kV BRAS. SUL TR3 DF  RB FT TR 345/230 kV BRAS. SUL TR3 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
BRAS. SUL MC 345 kV TR 345/230 kV BRAS. SUL TR10 DF RB FT TR 345/230 kV BRAS. SUL TR10 DF 062/2001 IPCA RBNI REA 3814/2012 02/09/2014 01/09/2042  R$ 1,510,718.90
BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR8B DF  RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBNI REA 2367/2010 27/09/2012 26/09/2040  R$679,696.60
BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR8B DF  RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR4 DF RBF FT TR 345/138 kV BRAS. SUL TR4 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR4 DF RBF FT TR 345/138 kV BRAS. SUL TR4 DF 062/2001 IPCA RBNI REA 7761/2019 04/04/2021 03/04/2036  R$35,285.50
BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR8B DF  RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,168,504.07
BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR8B DF  RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,059,713.69
BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,168,504.07
BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,059,713.69
BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBNI REA 4068/2013 19/12/2018 18/12/2048  R$48,659.12
BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBNI REA 7761/2019 04/04/2021 03/04/2036  R$90,800.92
BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,168,504.07
BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,059,713.69
BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBNI REA 4068/2013 09/11/2018 08/11/2048  R$48,551.86
BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBNI REA 7761/2019 31/05/2019 30/05/2034  R$103,055.89
BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR2 DF  RBF FT TR 345/138 kV BRAS. SUL TR2 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR2 DF  RBF FT TR 345/138 kV BRAS. SUL TR2 DF 062/2001 IPCA RBNI REA 7761/2019 31/05/2019 30/05/2034  R$100,928.54
BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR1 DF  RBF FT TR 345/138 kV BRAS. SUL TR1 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR1 DF  RBF FT TR 345/138 kV BRAS. SUL TR1 DF 062/2001 IPCA RBNI REA 7761/2019 18/02/2017 17/02/2032  R$96,396.52
BRAS. SUL MC 230 kV TR 345/230 kV BRAS. SUL TR3 DF  RB FT TR 345/230 kV BRAS. SUL TR3 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$127,805.26
BRAS. SUL MC 230 kV TR 345/230 kV BRAS. SUL TR10 DF RB FT TR 345/230 kV BRAS. SUL TR10 DF 062/2001 IPCA RBNI REA 3814/2012 02/09/2014 01/09/2043  R$689,427.50
BRAS. SUL MC 230 kV TR 345/230 kV BRAS. SUL TR9 DF RB FT TR 345/230 kV BRAS. SUL TR9 DF 062/2001 IPCA RBNI REA 2367/2010 12/09/2012 11/09/2038  R$194,880.72
BRAS. SUL MC 230 kV TR 345/230 kV BRAS. SUL TR9 DF RB FT TR 345/230 kV BRAS. SUL TR9 DF 062/2001 IPCA RBNI REA 4068/2013 08/01/2018 07/01/2048  R$68,703.05
BRAS. SUL MC 230 kV TR 345/230 kV BRAS. SUL TR6 DF  RB FT TR 345/230 kV BRAS. SUL TR6 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$127,805.26
BRAS. SUL MC 230 kV TR 345/230 kV BRAS. SUL TR6 DF  RB FT TR 345/230 kV BRAS. SUL TR6 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$662,112.32
BRAS. SUL MC 230 kV TR 345/230 kV BRAS. SUL TR6 DF  RB FT TR 345/230 kV BRAS. SUL TR6 DF 062/2001 IPCA RBNI REA 4068/2013 04/01/2018 03/01/2048  R$68,683.24
BRAS. SUL MC 230 kV TR 345/230 kV BRAS. SUL TR6 DF  RB FT TR 345/230 kV BRAS. SUL TR6 DF 062/2001 IPCA RBNI REA 7761/2019 31/05/2019 30/05/2034  R$96,876.24
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBNI REA 2367/2010 27/09/2012 26/09/2045  R$619,589.86
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$95,582.88
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$495,179.99
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$449,077.61
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBNI REA 4068/2013 19/12/2018 18/12/2048  R$11,308.43
BRAS. SUL IB 345 kV MG 345 kV BRAS. SUL MG1 DF IB1 RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBNI REA 4068/2013 01/03/2018 29/02/2048  R$37,210.73
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$95,582.88
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$495,179.99
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$449,077.61
BRAS. SUL IB 345 kV MG 345 kV BRAS. SUL MG1 DF IB1 RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBNI REA 4068/2013 30/08/2015 29/08/2046  R$512,391.50
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBNI REA 4068/2013 19/12/2018 18/12/2048  R$11,308.43
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBNI REA 4068/2013 19/12/2018 18/12/2048  R$11,308.43
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBNI REA 4068/2013 19/12/2018 18/12/2048  R$11,308.43
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBNI REA 4068/2013 19/12/2018 18/12/2048  R$11,308.43
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBNI REA 4068/2013 19/12/2018 18/12/2048  R$30,123.70
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBNI REA 7761/2019 04/04/2021 03/04/2036  R$90,800.92
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$95,582.88
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$495,179.99
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBNI REA 4068/2013 09/11/2018 08/11/2048  R$30,057.30
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBNI REA 7761/2019 31/05/2019 30/05/2034  R$128,514.64
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR4 DF RBF FT TR 345/138 kV BRAS. SUL TR4 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$95,582.88
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR4 DF RBF FT TR 345/138 kV BRAS. SUL TR4 DF 062/2001 IPCA RBNI REA 4068/2013 24/10/2018 23/10/2048  R$11,043.19
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR4 DF RBF FT TR 345/138 kV BRAS. SUL TR4 DF 062/2001 IPCA RBNI REA 4068/2013 24/10/2018 23/10/2048  R$11,043.19
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR4 DF RBF FT TR 345/138 kV BRAS. SUL TR4 DF 062/2001 IPCA RBNI REA 4068/2013 24/10/2018 23/10/2048  R$11,043.19
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR4 DF RBF FT TR 345/138 kV BRAS. SUL TR4 DF 062/2001 IPCA RBNI REA 4068/2013 24/10/2018 23/10/2048  R$11,043.19
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR4 DF RBF FT TR 345/138 kV BRAS. SUL TR4 DF 062/2001 IPCA RBNI REA 4068/2013 24/10/2018 23/10/2048  R$11,043.19
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR4 DF RBF FT TR 345/138 kV BRAS. SUL TR4 DF 062/2001 IPCA RBNI REA 7761/2019 04/04/2021 03/04/2036  R$35,285.50
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR2 DF  RBF FT TR 345/138 kV BRAS. SUL TR2 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$95,582.88
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR2 DF  RBF FT TR 345/138 kV BRAS. SUL TR2 DF 062/2001 IPCA RBNI REA 4068/2013 17/03/2017 16/03/2046  R$52,141.09
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR2 DF  RBF FT TR 345/138 kV BRAS. SUL TR2 DF 062/2001 IPCA RMEL REN 443/2011 05/04/2017 04/04/2046  R$24,735.98
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR2 DF  RBF FT TR 345/138 kV BRAS. SUL TR2 DF 062/2001 IPCA RMEL REN 443/2011 05/04/2017 04/04/2046  R$24,735.98
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR2 DF  RBF FT TR 345/138 kV BRAS. SUL TR2 DF 062/2001 IPCA RMEL REN 443/2011 05/04/2017 04/04/2046  R$24,735.98
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR2 DF  RBF FT TR 345/138 kV BRAS. SUL TR2 DF 062/2001 IPCA RMEL REN 443/2011 05/04/2017 04/04/2046  R$24,735.98
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR2 DF  RBF FT TR 345/138 kV BRAS. SUL TR2 DF 062/2001 IPCA RMEL REN 443/2011 05/04/2017 04/04/2046  R$24,735.98
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR2 DF  RBF FT TR 345/138 kV BRAS. SUL TR2 DF 062/2001 IPCA RBNI REA 7761/2019 31/05/2019 30/05/2034  R$95,860.73
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR1 DF  RBF FT TR 345/138 kV BRAS. SUL TR1 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$95,582.88
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR1 DF  RBF FT TR 345/138 kV BRAS. SUL TR1 DF 062/2001 IPCA RBNI REA 4068/2013 17/03/2017 16/03/2046  R$26,423.92
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR1 DF  RBF FT TR 345/138 kV BRAS. SUL TR1 DF 062/2001 IPCA RBNI REA 4068/2013 17/03/2017 16/03/2046  R$26,423.92
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR1 DF  RBF FT TR 345/138 kV BRAS. SUL TR1 DF 062/2001 IPCA RMEL REN 443/2011 21/02/2017 20/02/2046  R$24,676.97
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR1 DF  RBF FT TR 345/138 kV BRAS. SUL TR1 DF 062/2001 IPCA RMEL REN 443/2011 21/02/2017 20/02/2046  R$24,676.97
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR1 DF  RBF FT TR 345/138 kV BRAS. SUL TR1 DF 062/2001 IPCA RMEL REN 443/2011 21/02/2017 20/02/2046  R$24,676.97
BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR1 DF  RBF FT TR 345/138 kV BRAS. SUL TR1 DF 062/2001 IPCA RBNI REA 7761/2019 18/02/2017 17/02/2032  R$91,556.27
BRAS. SUL MC 13,8 kV RTB 13,8 kV 25 Mvar BRAS. SUL RT2 DF  RBF FT RTB 13,8 kV 25 Mvar BRAS. SUL RT2 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,394.97
BRAS. SUL MC 13,8 kV RTB 13,8 kV 25 Mvar BRAS. SUL RT1 DF  RBF FT RTB 13,8 kV 25 Mvar BRAS. SUL RT1 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,394.97
BRAS. SUL MC 13,8 kV BC 13,8 kV 15 Mvar BRAS. SUL BC4 DF  RBF FT BC 13,8 kV 15 Mvar BRAS. SUL BC4 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$57,000.46
BRAS. SUL MC 13,8 kV BC 13,8 kV 15 Mvar BRAS. SUL BC3 DF  RBF FT BC 13,8 kV 15 Mvar BRAS. SUL BC3 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$57,000.46
BRAS. SUL MC 13,8 kV BC 13,8 kV 15 Mvar BRAS. SUL BC2 DF  RBF FT BC 13,8 kV 15 Mvar BRAS. SUL BC2 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$57,000.46
BRAS. SUL MC 13,8 kV BC 13,8 kV 15 Mvar BRAS. SUL BC1 DF  RBF FT BC 13,8 kV 15 Mvar BRAS. SUL BC1 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$57,000.46
BRAS. SUL IB 345 kV MG 345 kV BRAS. SUL MG1 DF IB1 RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,036,883.85
BRAS. SUL IB 345 kV MG 345 kV BRAS. SUL MG1 DF IB1 RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$940,347.61
BRAS. SUL IB 230 kV MG 345 kV BRAS. SUL MG1 DF IB1 RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$105,014.11
BRAS. SUL IB 230 kV MG 345 kV BRAS. SUL MG1 DF IB1 RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBNI REA 5484/2015 22/04/2019 21/04/2049  R$92,377.63
BRAS. SUL EL 345 kV BRAS. SUL LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
BRAS. SUL EL 345 kV BRAS. SUL LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RMEL REN 643/2014 17/09/2015 16/09/2036  R$62,311.32
BRAS. SUL IB 138 kV MG 345 kV BRAS. SUL MG1 DF IB1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$78,514.10
BRAS. SUL IB 138 kV MG 345 kV BRAS. SUL MG1 DF IB1 DIT   062/2001 IPCA RCDM REA 4068/2013 21/11/2017 20/11/2047  R$27,052.34
BRAS. SUL IB 138 kV MG 345 kV BRAS. SUL MG1 DF IB1 DIT   062/2001 IPCA RCDM REA 4068/2013 21/11/2017 20/11/2047  R$27,052.34
BRAS. SUL EL 345 kV BRAS. SUL LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,372,890.86
BRAS. SUL EL 345 kV BRAS. SUL LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,245,071.61
BRAS. SUL EL 230 kV BRAS. SUL LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF RB FT LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$178,247.06
BRAS. SUL EL 230 kV BRAS. SUL LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF RB FT LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF 062/2001 IPCA RBNI REA 3814/2012 22/04/2014 21/04/2042  R$ 1,038,778.81
BRAS. SUL EL 345 kV BRAS. SUL LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBNI REA 4347/2013 22/03/2019 21/03/2034  R$11,467.14
BRAS. SUL EL 345 kV BRAS. SUL LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
BRAS. SUL EL 345 kV BRAS. SUL LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF 062/2001 IPCA RBNI REA 4347/2013 22/03/2019 21/03/2034  R$11,467.14
BRAS. SUL EL 345 kV BRAS. SUL LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
BRAS. SUL EL 345 kV BRAS. SUL LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF 062/2001 IPCA RBNI REA 4347/2013 22/03/2019 21/03/2034  R$11,467.14
BRAS. SUL EL 230 kV BRAS. SUL LT 230 kV BRAS. SUL /PIRINEUS C-1 DF/GO  RB FT LT 230 kV BRAS. SUL /PIRINEUS C-1 DF/GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$178,247.06
BRAS. SUL EL 230 kV BRAS. SUL LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF RB FT LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF 062/2001 IPCA RBNI REA 4068/2013 06/04/2015 05/04/2045  R$64,085.40
BRAS. SUL EL 230 kV BRAS. SUL LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF RB FT LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$178,247.06
BRAS. SUL EL 230 kV BRAS. SUL LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF RB FT LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF 062/2001 IPCA RBNI REA 4068/2013 07/11/2018 06/11/2032  R$ 267.10
BRAS. SUL EL 230 kV BRAS. SUL LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF  RB FT LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$178,247.06
BRAS. SUL EL 138 kV BRAS. SULDIST9 DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$723,202.62
BRAS. SUL EL 230 kV BRAS. SUL LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF RB FT LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF 062/2001 IPCA RBNI REA 4068/2013 07/11/2018 06/11/2048  R$91,598.28
BRAS. SUL EL 230 kV BRAS. SUL LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF  RB FT LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBNI REA 2367/2010 24/11/2013 23/11/2043  R$114,162.10
BRAS. SUL EL 138 kV BRAS. SULDIST9 DIT   062/2001 IPCA RCDM REA 4068/2013 24/10/2018 23/10/2048  R$32,138.32
BRAS. SUL EL 230 kV BRAS. SUL LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF  RB FT LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBNI REA 4068/2013 07/11/2018 06/11/2048  R$91,598.28
BRAS. SUL EL 138 kV BRAS. SULDIST9 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
BRAS. SUL EL 138 kV BRAS. SULDIST9 DIT   062/2001 IPCA RCDM REA 7761/2019 07/04/2021 06/04/2036  R$132,537.66
BRAS. SUL EL 138 kV BRAS. SULDIST7 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
BRAS. SUL EL 138 kV BRAS. SULDIST7 DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$723,202.62
BRAS. SUL EL 138 kV BRAS. SULDIST7 DIT   062/2001 IPCA RCDM REA 4068/2013 17/03/2017 16/03/2046  R$49,732.81
BRAS. SUL EL 138 kV BRAS. SULDIST6 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
BRAS. SUL EL 138 kV BRAS. SULDIST7 DIT   062/2001 IPCA RCDM REA 7761/2019 04/04/2021 03/04/2036  R$167,176.08
BRAS. SUL EL 138 kV BRAS. SULDIST6 DIT   062/2001 IPCA RCDM REA 4068/2013 22/12/2016 21/12/2045  R$49,475.68
BRAS. SUL EL 138 kV BRAS. SULDIST6 DIT   062/2001 IPCA RCDM REA 7761/2019 04/04/2021 03/04/2036  R$143,298.84
BRAS. SUL EL 138 kV BRAS. SULDIST5 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
BRAS. SUL EL 138 kV BRAS. SULDIST5 DIT   062/2001 IPCA RMEL REN 443/2011 24/05/2017 23/05/2046  R$34,526.47
BRAS. SUL EL 138 kV BRAS. SULDIST5 DIT   062/2001 IPCA RMEL REN 443/2011 24/05/2017 23/05/2046  R$23,823.27
BRAS. SUL EL 138 kV BRAS. SULDIST5 DIT   062/2001 IPCA RMEL REN 443/2011 24/05/2017 23/05/2046  R$23,823.27
BRAS. SUL EL 138 kV BRAS. SULDIST5 DIT   062/2001 IPCA RCDM REA 4068/2013 24/05/2017 23/05/2046  R$25,628.24
BRAS. SUL EL 138 kV BRAS. SULDIST5 DIT   062/2001 IPCA RCDM REA 4068/2013 24/05/2017 23/05/2046  R$25,628.24
BRAS. SUL EL 138 kV BRAS. SULDIST5 DIT   062/2001 IPCA RCDM REA 7761/2019 04/04/2021 03/04/2036  R$47,838.35
BRAS. SUL EL 138 kV BRAS. SULDIST4 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
BRAS. SUL EL 138 kV BRAS. SULDIST4 DIT   062/2001 IPCA RMEL REN 443/2011 10/04/2017 09/04/2046  R$34,427.84
BRAS. SUL EL 138 kV BRAS. SULDIST4 DIT   062/2001 IPCA RMEL REN 443/2011 10/04/2017 09/04/2046  R$23,755.21
BRAS. SUL EL 138 kV BRAS. SULDIST4 DIT   062/2001 IPCA RMEL REN 443/2011 10/04/2017 09/04/2046  R$23,755.21
BRAS. SUL EL 138 kV BRAS. SULDIST4 DIT   062/2001 IPCA RCDM REA 4068/2013 25/04/2017 24/04/2046  R$25,583.77
BRAS. SUL EL 138 kV BRAS. SULDIST4 DIT   062/2001 IPCA RCDM REA 4068/2013 25/04/2017 24/04/2046  R$25,583.77
BRAS. SUL EL 138 kV BRAS. SULDIST4 DIT   062/2001 IPCA RCDM REA 7761/2019 04/04/2021 03/04/2036  R$49,506.07
BRAS. SUL EL 138 kV BRAS. SULDIST3 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
BRAS. SUL EL 138 kV BRAS. SULDIST3 DIT   062/2001 IPCA RMEL REN 443/2011 26/07/2017 25/07/2046  R$34,658.06
BRAS. SUL EL 138 kV BRAS. SULDIST3 DIT   062/2001 IPCA RMEL REN 443/2011 26/07/2017 25/07/2046  R$23,914.05
BRAS. SUL EL 138 kV BRAS. SULDIST3 DIT   062/2001 IPCA RMEL REN 443/2011 26/07/2017 25/07/2046  R$23,914.05
BRAS. SUL EL 138 kV BRAS. SULDIST3 DIT   062/2001 IPCA RCDM REA 4068/2013 07/08/2017 06/08/2046  R$25,737.33
BRAS. SUL EL 138 kV BRAS. SULDIST3 DIT   062/2001 IPCA RCDM REA 4068/2013 07/08/2017 06/08/2046  R$25,737.33
BRAS. SUL EL 138 kV BRAS. SULDIST3 DIT   062/2001 IPCA RCDM REA 7761/2019 04/04/2021 03/04/2036  R$13,881.54
BRAS. SUL EL 138 kV BRAS. SULDIST2 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
BRAS. SUL EL 138 kV BRAS. SULDIST2 DIT   062/2001 IPCA RMEL REN 443/2011 03/05/2017 02/05/2046  R$34,472.35
BRAS. SUL EL 138 kV BRAS. SULDIST2 DIT   062/2001 IPCA RMEL REN 443/2011 03/05/2017 02/05/2046  R$23,785.93
BRAS. SUL EL 138 kV BRAS. SULDIST2 DIT   062/2001 IPCA RMEL REN 443/2011 03/05/2017 02/05/2046  R$23,785.93
BRAS. SUL EL 138 kV BRAS. SULDIST2 DIT   062/2001 IPCA RCDM REA 4068/2013 03/05/2017 02/05/2046  R$25,588.07
BRAS. SUL EL 138 kV BRAS. SULDIST2 DIT   062/2001 IPCA RCDM REA 4068/2013 03/05/2017 02/05/2046  R$25,588.07
BRAS. SUL EL 138 kV BRAS. SULDIST2 DIT   062/2001 IPCA RCDM REA 4068/2013 03/05/2017 02/05/2046  R$49,860.11
BRAS. SUL EL 138 kV BRAS. SULDIST2 DIT   062/2001 IPCA RCDM REA 7761/2019 04/04/2021 03/04/2036  R$42,601.79
BRAS. SUL EL 138 kV BRAS. SULDIST1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
BRAS. SUL EL 138 kV BRAS. SULDIST1 DIT   062/2001 IPCA RCDM REA 4068/2013 21/08/2017 20/08/2046  R$50,202.72
BRAS. SUL EL 138 kV BRAS. SULDIST1 DIT   062/2001 IPCA RCDM REA 7761/2019 04/04/2021 03/04/2036  R$42,179.36
BRAS. SUL CS 60/-30 MVAr BRAS. SUL CS1 DF RB FT CS 60/-30 MVAr BRAS. SUL CS1 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$773,224.13
BRAS. SUL BC 13,8 kV 15 Mvar BRAS. SUL BC4 DF RBF FT BC 13,8 kV 15 Mvar BRAS. SUL BC4 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,636.29
BRAS. SUL BC 13,8 kV 15 Mvar BRAS. SUL BC3 DF RBF FT BC 13,8 kV 15 Mvar BRAS. SUL BC3 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,636.29
BRAS. SUL BC 13,8 kV 15 Mvar BRAS. SUL BC2 DF RBF FT BC 13,8 kV 15 Mvar BRAS. SUL BC2 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,636.29
BRAS. SUL BC 13,8 kV 15 Mvar BRAS. SUL BC1 DF RBF FT BC 13,8 kV 15 Mvar BRAS. SUL BC1 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$67,636.29
C. DOURADA TR 230/138 kV C. DOURADA TRR2 GO RBF FT TR 230/138 kV C. DOURADA TRR2 GO 062/2001 IPCA RMEL REA 7846/2019 30/09/2022 30/09/2055  R$754,025.40
C. DOURADA TR 230/138 kV C. DOURADA TR2 GO RBF FT TR 230/138 kV C. DOURADA TR2 GO 062/2001 IPCA RMEL REA 7846/2019 10/10/2022 10/10/2055  R$ 2,262,076.17
C. DOURADA MC 230 kV TR 230/138 kV C. DOURADA TR2 GO  RBF FT TR 230/138 kV C. DOURADA TR2 GO 062/2001 IPCA RMEL REA 7846/2019 10/10/2022 10/10/2052  R$325,410.13
C. DOURADA MC 230 kV TR 230/138 kV C. DOURADA TR2 GO  RBF FT TR 230/138 kV C. DOURADA TR2 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$121,275.97
C. DOURADA MC 138 kV TR 230/138 kV C. DOURADA TR2 GO  RBF FT TR 230/138 kV C. DOURADA TR2 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$88,677.44
C. DOURADA MC 138 kV TR 230/138 kV C. DOURADA TR2 GO  RBF FT TR 230/138 kV C. DOURADA TR2 GO 062/2001 IPCA RMEL REA 7846/2019 10/10/2022 10/10/2049  R$213,972.41
C. DOURADA EL 230 kV C. DOURADA LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO  RB FT LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO 062/2001 IPCA RMEL REN 643/2014 22/01/2016 21/01/2047  R$153,274.02
C. DOURADA EL 230 kV C. DOURADA LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO  RB FT LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO 062/2001 IPCA RMEL REN 443/2011 30/01/2016 29/01/2038  R$23,686.56
C. DOURADA EL 230 kV C. DOURADA LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO  RB FT LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$172,304.70
C. DOURADA EL 230 kV C. DOURADA LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO  RB FT LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$172,304.70
C. DOURADA EL 230 kV C. DOURADA LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO  RB FT LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO 062/2001 IPCA RMEL REN 443/2011 30/01/2016 29/01/2038  R$23,686.56
C. DOURADA EL 230 kV C. DOURADA LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO  RB FT LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO 062/2001 IPCA RMEL REN 643/2014 30/01/2016 29/01/2047  R$153,364.52
C. PAULISTA TR 500/138 kV C. PAULISTA TRR1 SP RBF FT TR 500/138 kV C. PAULISTA TRR1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$336,721.90
C. PAULISTA TR 500/138 kV C. PAULISTA TRR1 SP RBF FT TR 500/138 kV C. PAULISTA TRR1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,744,433.10
C. PAULISTA TR 500/138 kV C. PAULISTA TRR1 SP RBF FT TR 500/138 kV C. PAULISTA TRR1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,582,022.42
C. PAULISTA TR 500/138 kV C. PAULISTA TR59 SP RBF FT TR 500/138 kV C. PAULISTA TR59 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,011,947.98
C. PAULISTA TR 500/138 kV C. PAULISTA TR59 SP RBF FT TR 500/138 kV C. PAULISTA TR59 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,242,532.65
C. PAULISTA TR 500/138 kV C. PAULISTA TR57 SP RBF FT TR 500/138 kV C. PAULISTA TR57 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,011,947.98
C. PAULISTA TR 500/138 kV C. PAULISTA TR59 SP RBF FT TR 500/138 kV C. PAULISTA TR59 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,754,440.97
C. PAULISTA TR 500/138 kV C. PAULISTA TR57 SP RBF FT TR 500/138 kV C. PAULISTA TR57 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,242,532.65
C. PAULISTA TR 500/138 kV C. PAULISTA TR57 SP RBF FT TR 500/138 kV C. PAULISTA TR57 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,754,440.97
C. PAULISTA TR 500/138 kV C. PAULISTA TR57 SP RBF FT TR 500/138 kV C. PAULISTA TR57 SP 062/2001 IPCA RMEL REN 643/2014 20/02/2016 19/02/2045  R$6,769.39
C. PAULISTA MG 500 kV C. PAULISTA MG1 SP RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,481,056.87
C. PAULISTA RTL 500 kV 136 MVAr C. PAULISTA RT2 SP RB FT RTL 500 kV 136 MVAr C. PAULISTA RT2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$591,699.53
C. PAULISTA RTB 500 kV 136 Mvar C. PAULISTA RT1 SP RB FT RTB 500 kV 136 Mvar C. PAULISTA RT1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$591,699.53
C. PAULISTA MG 500 kV C. PAULISTA MG1 SP RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032  R$ 812.28
C. PAULISTA MG 500 kV C. PAULISTA MG1 SP RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RMEL REN 443/2011 21/03/2016 20/03/2029  R$32,246.83
C. PAULISTA MG 500 kV C. PAULISTA MG1 SP RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RMEL REN 443/2011 21/03/2016 20/03/2029  R$9,825.92
C. PAULISTA MG 500 kV C. PAULISTA MG1 SP RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RBNI REA 4347/2013 24/11/2017 23/11/2032  R$9,416.07
C. PAULISTA MG 500 kV C. PAULISTA MG1 SP RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 11/02/2021 10/02/2036  R$11,160.14
C. PAULISTA MG 500 kV C. PAULISTA MG1 SP RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 11/02/2021 10/02/2036  R$11,160.14
C. PAULISTA MG 500 kV C. PAULISTA MG1 SP RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 11/02/2021 10/02/2036  R$11,160.14
C. PAULISTA MG 500 kV C. PAULISTA MG1 SP RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 11/02/2021 10/02/2036  R$11,160.14
C. PAULISTA MG 500 kV C. PAULISTA MG1 SP RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 11/02/2021 10/02/2036  R$11,160.14
C. PAULISTA MG 500 kV C. PAULISTA MG1 SP RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 11/02/2021 10/02/2036  R$11,160.14
C. PAULISTA MG 500 kV C. PAULISTA MG1 SP RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 11/02/2021 10/02/2036  R$11,160.14
C. PAULISTA MC 500 kV TR 500/138 kV C. PAULISTA TR57 SP  RBF FT TR 500/138 kV C. PAULISTA TR57 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$327,073.06
C. PAULISTA MG 500 kV C. PAULISTA MG1 SP RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 11/02/2021 10/02/2036  R$11,160.14
C. PAULISTA MC 500 kV TR 500/138 kV C. PAULISTA TR57 SP  RBF FT TR 500/138 kV C. PAULISTA TR57 SP 062/2001 IPCA RMEL REN 643/2014 09/05/2015 08/05/2036  R$47,165.76
C. PAULISTA MC 500 kV TR 500/138 kV C. PAULISTA TR59 SP  RBF FT TR 500/138 kV C. PAULISTA TR59 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$327,073.06
C. PAULISTA MC 500 kV TR 500/138 kV C. PAULISTA TR59 SP  RBF FT TR 500/138 kV C. PAULISTA TR59 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,694,445.99
C. PAULISTA MC 500 kV RTB 500 kV 136 Mvar C. PAULISTA RT1 SP  RB FT RTB 500 kV 136 Mvar C. PAULISTA RT1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$280,166.90
C. PAULISTA MC 138 kV TR 500/138 kV C. PAULISTA TR59 SP  RBF FT TR 500/138 kV C. PAULISTA TR59 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$95,582.88
C. PAULISTA MC 500 kV RTL 500 kV 136 MVAr C. PAULISTA RT2 SP  RB FT RTL 500 kV 136 MVAr C. PAULISTA RT2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$198,155.23
C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP  RB FT LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RBNI REA 5861/2016 10/02/2021 09/02/2036  R$12,522.11
C. PAULISTA MC 138 kV TR 500/138 kV C. PAULISTA TR57 SP  RBF FT TR 500/138 kV C. PAULISTA TR57 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$95,582.88
C. PAULISTA IB 500 kV MG 500 kV C. PAULISTA MG1 SP IB3 RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$347,094.43
C. PAULISTA IB 500 kV MG 500 kV C. PAULISTA MG1 SP IB2 RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$347,094.43
C. PAULISTA IB 500 kV MG 500 kV C. PAULISTA MG1 SP IB1 RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$347,094.43
C. PAULISTA IB 138 kV MG 500 kV C. PAULISTA MG1 SP IB1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$78,514.10
C. PAULISTA IB 138 kV MG 500 kV C. PAULISTA MG1 SP IB1 DIT   062/2001 IPCA RMEL REN 643/2014 08/11/2015 07/11/2043  R$23,665.22
C. PAULISTA IB 138 kV MG 500 kV C. PAULISTA MG1 SP IB1 DIT   062/2001 IPCA RMEL REN 443/2011 22/11/2015 21/11/2045  R$23,142.80
C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP  RB FT LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP  RB FT LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RMEL REN 443/2011 15/12/2016 14/12/2039  R$49,406.93
C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TAUBATE C-1 SP RB FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP 062/2001 IPCA RBNI REA 4347/2013 25/04/2017 24/04/2032  R$9,224.76
C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ  RB FT LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBNI REA 2040/2009 30/09/2012 29/09/2026  R$18,485.34
C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 643/2014 06/11/2015 05/11/2037  R$47,888.72
C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,919,850.95
C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBNI REA 5861/2016 10/02/2021 09/02/2036  R$12,522.11
C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TAUBATE C-1 SP RB FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TAUBATE C-1 SP RB FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP 062/2001 IPCA RMEL REN 443/2011 28/03/2017 27/03/2046  R$69,590.37
C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TAUBATE C-1 SP RB FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP 062/2001 IPCA RMEL REN 443/2011 28/03/2017 27/03/2040  R$49,780.55
C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TAUBATE C-1 SP RB FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP 062/2001 IPCA RBNI REA 5861/2016 10/02/2021 09/02/2036  R$12,522.11
C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP  RB FT LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,919,850.95
C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ  RB FT LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ 062/2001 IPCA RBNI REA 5861/2016 10/02/2021 09/02/2036  R$12,522.11
C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV B. FLUMINENSE /C. PAULISTA C-1 RJ/SP  RB FT LT 500 kV B. FLUMINENSE /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG RB FT LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG RB FT LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG 062/2001 IPCA RMEL REN 643/2014 01/11/2015 31/10/2037  R$47,891.97
C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG RB FT LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG 062/2001 IPCA RBNI REA 5861/2016 10/02/2021 09/02/2036  R$12,522.11
C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP  RB FT LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP  RB FT LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP 062/2001 IPCA RMEL REN 643/2014 17/11/2015 16/11/2037  R$47,941.61
C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV B. FLUMINENSE /C. PAULISTA C-1 RJ/SP  RB FT LT 500 kV B. FLUMINENSE /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RBNI REA 5861/2016 10/02/2021 09/02/2036  R$12,522.11
C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP  RB FT LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP 062/2001 IPCA RBNI REA 5861/2016 10/02/2021 09/02/2036  R$12,522.11
C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP RB FT LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP RB FT LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RMEL REN 643/2014 15/01/2016 14/01/2038  R$48,168.62
C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP RB FT LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RBNI REA 5861/2016 10/02/2021 09/02/2036  R$12,522.11
C. PAULISTA EL 138 kV C. PAULISTA LT 138 kV C. PAULISTA /VOLTA REDONDA C-2 SP/RJ  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
C. PAULISTA EL 138 kV C. PAULISTA LT 138 kV C. PAULISTA /VOLTA REDONDA C-2 SP/RJ  DIT   062/2001 IPCA RMEL REN 643/2014 05/12/2015 04/12/2043  R$22,532.31
C. PAULISTA EL 138 kV C. PAULISTA LT 138 kV C. PAULISTA /VOLTA REDONDA C-1 SP/RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
C. PAULISTA EL 138 kV C. PAULISTA LT 138 kV C. PAULISTA /VOLTA REDONDA C-2 SP/RJ  DIT   062/2001 IPCA RMEL REN 643/2014 29/11/2015 28/11/2043  R$22,529.62
CAMPINAS TR 500/345 kV CAMPINAS TRR1 SP RB FT TR 500/345 kV CAMPINAS TRR1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$504,189.36
CAMPINAS TR 500/345 kV CAMPINAS TR54 SP RB FT TR 500/345 kV CAMPINAS TR54 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,511,686.56
CAMPINAS TR 345/138 kV CAMPINAS TRR1 SP RBF FT TR 345/138 kV CAMPINAS TRR1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$196,538.44
CAMPINAS TR 345/138 kV CAMPINAS TR5 SP RBF FT TR 345/138 kV CAMPINAS TR5 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$589,615.33
CAMPINAS TR 500/345 kV CAMPINAS TR51 SP RB FT TR 500/345 kV CAMPINAS TR51 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,511,686.56
CAMPINAS TR 345/138 kV CAMPINAS TR3 SP RBF FT TR 345/138 kV CAMPINAS TR3 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,054,581.52
CAMPINAS TR 345/138 kV CAMPINAS TRR1 SP RBF FT TR 345/138 kV CAMPINAS TRR1 SP 062/2001 IPCA RBNI REA 8707/2020 27/07/2021 27/07/2056  R$519,998.73
CAMPINAS TR 345/138 kV CAMPINAS TR3 SP RBF FT TR 345/138 kV CAMPINAS TR3 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,770,193.05
CAMPINAS TR 345/138 kV CAMPINAS TR4 SP RBF FT TR 345/138 kV CAMPINAS TR4 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$589,615.33
CAMPINAS TR 345/138 kV CAMPINAS TR3 SP RBF FT TR 345/138 kV CAMPINAS TR3 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$589,615.33
CAMPINAS MC 500 kV TR 500/345 kV CAMPINAS TR51 SP  RB FT TR 500/345 kV CAMPINAS TR51 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$327,073.06
CAMPINAS MC 345 kV TR 500/345 kV CAMPINAS TR54 SP  RB FT TR 500/345 kV CAMPINAS TR54 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
CAMPINAS TR 345/138 kV CAMPINAS TR2 SP RBF FT TR 345/138 kV CAMPINAS TR2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$589,615.33
CAMPINAS TR 345/138 kV CAMPINAS TR1 SP RBF FT TR 345/138 kV CAMPINAS TR1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$589,615.33
CAMPINAS RTL 500 kV 136 MVAr CAMPINAS RTC2 SP RB FT RTL 500 kV 136 MVAr CAMPINAS RTC2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$591,699.53
CAMPINAS RTB 500 kV 45,3 MVAr CAMPINAS RTR1 SP RB FT RTB 500 kV 45,3 MVAr CAMPINAS RTR1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$197,185.67
CAMPINAS RTB 13,8 kV 50 MVAr CAMPINAS RT5 SP RB FT RTB 13,8 kV 50 MVAr CAMPINAS RT5 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$146,796.84
CAMPINAS RTB 13,8 kV 50 MVAr CAMPINAS RT4 SP RB FT RTB 13,8 kV 50 MVAr CAMPINAS RT4 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$146,796.84
CAMPINAS RTB 13,8 kV 50 MVAr CAMPINAS RT4 SP RB FT RTB 13,8 kV 50 MVAr CAMPINAS RT4 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$760,500.80
CAMPINAS RTB 13,8 kV 25 MVAr CAMPINAS RT2 SP RBF FT RTB 13,8 kV 25 MVAr CAMPINAS RT2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$132,389.09
CAMPINAS RTB 13,8 kV 25 MVAr CAMPINAS RT1 SP RBF FT RTB 13,8 kV 25 MVAr CAMPINAS RT1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$132,389.09
CAMPINAS MG 500 kV CAMPINAS MG1 SP RB FT MG 500 kV CAMPINAS MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,466,822.18
CAMPINAS MG 500 kV CAMPINAS MG1 SP RB FT MG 500 kV CAMPINAS MG1 SP 062/2001 IPCA RBNI REA 5012/2015 20/08/2018 20/08/2050  R$466,704.38
CAMPINAS MG 500 kV CAMPINAS MG1 SP RB FT MG 500 kV CAMPINAS MG1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 7,599,069.61
CAMPINAS MG 500 kV CAMPINAS MG1 SP RB FT MG 500 kV CAMPINAS MG1 SP 062/2001 IPCA RBNI REA 4347/2013 31/10/2017 30/10/2045  R$21,746.04
CAMPINAS MG 500 kV CAMPINAS MG1 SP RB FT MG 500 kV CAMPINAS MG1 SP 062/2001 IPCA RBNI REA 4347/2013 31/10/2017 30/10/2032  R$9,394.35
CAMPINAS MG 500 kV CAMPINAS MG1 SP RB FT MG 500 kV CAMPINAS MG1 SP 062/2001 IPCA RBNI REA 5484/2015 18/12/2018 17/12/2032  R$15,939.96
CAMPINAS MC 500 kV TR 500/345 kV CAMPINAS TR54 SP  RB FT TR 500/345 kV CAMPINAS TR54 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$327,073.06
CAMPINAS MC 345 kV TR 500/345 kV CAMPINAS TR51 SP  RB FT TR 500/345 kV CAMPINAS TR51 SP 062/2001 IPCA RMEL REN 643/2014 06/07/2015 05/07/2045  R$247,150.84
CAMPINAS MC 500 kV TR 500/345 kV CAMPINAS TR51 SP  RB FT TR 500/345 kV CAMPINAS TR51 SP 062/2001 IPCA RMEL REN 643/2014 08/07/2015 07/07/2036  R$47,408.81
CAMPINAS MC 500 kV RTL 500 kV 136 MVAr CAMPINAS RTC2 SP RB FT RTL 500 kV 136 MVAr CAMPINAS RTC2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$198,155.23
CAMPINAS MC 345 kV TR 500/345 kV CAMPINAS TR51 SP  RB FT TR 500/345 kV CAMPINAS TR51 SP 062/2001 IPCA RMEL REN 643/2014 08/07/2015 07/07/2036  R$33,436.28
CAMPINAS MC 345 kV TR 500/345 kV CAMPINAS TR51 SP  RB FT TR 500/345 kV CAMPINAS TR51 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR3 SP RBF FT TR 345/138 kV CAMPINAS TR3 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,168,504.07
CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR3 SP RBF FT TR 345/138 kV CAMPINAS TR3 SP 062/2001 IPCA RMEL REN 643/2014 20/03/2016 19/03/2038  R$34,149.93
CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR5 SP  RBF FT TR 345/138 kV CAMPINAS TR5 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR4 SP  RBF FT TR 345/138 kV CAMPINAS TR4 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR3 SP RBF FT TR 345/138 kV CAMPINAS TR3 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR2 SP RBF FT TR 345/138 kV CAMPINAS TR2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR3 SP RBF FT TR 345/138 kV CAMPINAS TR3 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,059,713.69
CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR2 SP RBF FT TR 345/138 kV CAMPINAS TR2 SP 062/2001 IPCA RMEL REN 643/2014 07/08/2015 06/08/2045  R$247,680.23
CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR1 SP RBF FT TR 345/138 kV CAMPINAS TR1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR1 SP RBF FT TR 345/138 kV CAMPINAS TR1 SP 062/2001 IPCA RMEL REN 643/2014 14/09/2015 13/09/2045  R$248,318.89
CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR2 SP RBF FT TR 345/138 kV CAMPINAS TR2 SP 062/2001 IPCA RMEL REN 643/2014 07/08/2015 06/08/2036  R$33,521.01
CAMPINAS MC 345 kV BC 345 kV 100 Mvar CAMPINAS BC1 SP RB FT BC 345 kV 100 Mvar CAMPINAS BC1 SP 062/2001 IPCA RBNI REA 5012/2015 20/08/2018 20/08/2045  R$ 1,235,260.51
CAMPINAS MC 138 kV TR 345/138 kV CAMPINAS TR5 SP  RBF FT TR 345/138 kV CAMPINAS TR5 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$81,211.75
CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR1 SP RBF FT TR 345/138 kV CAMPINAS TR1 SP 062/2001 IPCA RMEL REN 643/2014 14/09/2015 13/09/2036  R$33,632.45
CAMPINAS MC 345 kV BC 345 kV 100 Mvar CAMPINAS BC2 SP RB FT BC 345 kV 100 Mvar CAMPINAS BC2 SP 062/2001 IPCA RBNI REA 5012/2015 20/08/2018 20/08/2045  R$ 1,235,414.08
CAMPINAS MC 138 kV TR 345/138 kV CAMPINAS TR4 SP  RBF FT TR 345/138 kV CAMPINAS TR4 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$81,211.75
CAMPINAS MC 13,8 kV RTB 13,8 kV 50 MVAr CAMPINAS RT5 SP  RB FT RTB 13,8 kV 50 MVAr CAMPINAS RT5 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,394.97
CAMPINAS MC 13,8 kV RTB 13,8 kV 25 MVAr CAMPINAS RT2 SP  RBF FT RTB 13,8 kV 25 MVAr CAMPINAS RT2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,394.97
CAMPINAS MC 13,8 kV RTB 13,8 kV 50 MVAr CAMPINAS RT4 SP  RB FT RTB 13,8 kV 50 MVAr CAMPINAS RT4 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,394.97
CAMPINAS MC 13,8 kV RTB 13,8 kV 25 MVAr CAMPINAS RT1 SP  RBF FT RTB 13,8 kV 25 MVAr CAMPINAS RT1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,394.97
CAMPINAS IB 345 kV MG 500 kV CAMPINAS MG1 SP IB1 RB FT MG 500 kV CAMPINAS MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
CAMPINAS IB 345 kV MG 500 kV CAMPINAS MG1 SP IB1 RB FT MG 500 kV CAMPINAS MG1 SP 062/2001 IPCA RMEL REN 643/2014 02/12/2014 01/12/2044  R$216,338.15
CAMPINAS EL 500 kV CAMPINAS LT 500 kV ITATIBA /CAMPINAS C-1 SP  RB FT LT 500 kV ITATIBA /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBNI REA 2040/2009 20/04/2013 19/04/2039  R$444,097.42
CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
CAMPINAS EL 500 kV CAMPINAS LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP  RB FT LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
CAMPINAS EL 500 kV CAMPINAS LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP  RB FT LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP 062/2001 IPCA RMEL REN 643/2014 09/05/2014 08/05/2030  R$79,423.68
CAMPINAS EL 500 kV CAMPINAS LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP  RB FT LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP 062/2001 IPCA RMEL REN 643/2014 17/11/2015 16/11/2037  R$47,941.61
CAMPINAS EL 500 kV CAMPINAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP  RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
CAMPINAS EL 500 kV CAMPINAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP  RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RMEL REN 643/2014 25/10/2015 24/10/2037  R$47,858.19
CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RMEL REN 643/2014 26/02/2014 25/02/2030  R$19,941.46
CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 643/2014 01/06/2014 31/05/2030  R$56,633.59
CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 643/2014 11/01/2016 10/01/2038  R$33,958.69
CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 5484/2015 22/03/2015 21/03/2045  R$190,951.99
CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 5484/2015 20/08/2018 19/08/2048  R$48,334.68
CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RMEL REN 643/2014 30/11/2014 29/11/2048  R$302,056.24
CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 5484/2015 20/08/2018 19/08/2048  R$19,662.07
CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 5484/2015 20/08/2018 19/08/2048  R$19,662.07
CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 5484/2015 20/08/2018 19/08/2048  R$28,495.76
CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 5484/2015 20/08/2018 19/08/2048  R$19,662.07
CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 5484/2015 20/08/2018 19/08/2048  R$19,662.07
CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 5484/2015 20/08/2018 19/08/2038  R$29,612.08
CAMPINAS EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-4 SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$94,172.97
CAMPINAS EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-3 SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$94,172.97
CAMPINAS EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-3 SP DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$476,192.75
CAMPINAS EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-2 SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$94,172.97
CAMPINAS EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-2 SP DIT   062/2001 IPCA RMEL REN 443/2011 07/08/2015 06/08/2036  R$4,688.89
CAMPINAS EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-2 SP DIT   062/2001 IPCA RMEL REN 443/2011 07/08/2015 06/08/2036  R$4,688.89
CAMPINAS EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-2 SP DIT   062/2001 IPCA RMEL REN 443/2011 07/08/2015 06/08/2036  R$4,688.89
CAMPINAS EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-1 SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$94,172.97
CAMPINAS EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-1 SP DIT   062/2001 IPCA RMEL REN 643/2014 14/09/2015 13/09/2036  R$33,632.45
CAMPINAS BC 345 kV 100 Mvar CAMPINAS BC2 SP RB FT BC 345 kV 100 Mvar CAMPINAS BC2 SP 062/2001 IPCA RBNI REA 5012/2015 20/08/2018 20/08/2038  R$ 1,188,718.76
CAMPINAS BC 345 kV 100 Mvar CAMPINAS BC1 SP RB FT BC 345 kV 100 Mvar CAMPINAS BC1 SP 062/2001 IPCA RBNI REA 5012/2015 20/08/2018 20/08/2038  R$ 1,188,718.76
CAMPOS TR 345/138 kV CAMPOS TRR2 RJ RBF FT TR 345/138 kV CAMPOS TRR2 RJ 062/2001 IPCA RBNI REA 4481/2013 09/11/2017 08/11/2052  R$986,806.25
CAMPOS TR 345/138 kV CAMPOS TRR1 RJ RBF FT TR 345/138 kV CAMPOS TRR1 RJ 062/2001 IPCA RBNI REA 4188/2013 26/05/2017 25/05/2051  R$965,192.57
CAMPOS TR 345/138 kV CAMPOS TR4 RJ RBF FT TR 345/138 kV CAMPOS TR4 RJ 062/2001 IPCA RBNI REA 4481/2013 09/11/2017 08/11/2051  R$ 3,220,907.36
CAMPOS RTL 345 kV 60 MVAr CAMPOS RT5 RJ RB FT RTL 345 kV 60 MVAr CAMPOS RT5 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,838,056.73
CAMPOS TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RBNI REA 6787/2017 02/10/2020 02/10/2055  R$ 3,587,590.94
CAMPOS TR 345/138 kV CAMPOS TR2 RJ RBF FT TR 345/138 kV CAMPOS TR2 RJ 062/2001 IPCA RBNI REA 6787/2017 05/11/2018 05/11/2053  R$ 3,233,607.73
CAMPOS TR 345/138 kV CAMPOS TR1 RJ RBF FT TR 345/138 kV CAMPOS TR1 RJ 062/2001 IPCA RMEL REA 7185/2018 08/08/2022 08/08/2057  R$ 3,720,195.80
CAMPOS RTL 345 kV 60 MVAr CAMPOS RT6 RJ RB FT RTL 345 kV 60 MVAr CAMPOS RT6 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$391,216.93
CAMPOS RTL 345 kV 60 MVAr CAMPOS RT6 RJ RB FT RTL 345 kV 60 MVAr CAMPOS RT6 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,026,751.94
CAMPOS RTL 345 kV 60 MVAr CAMPOS RT5 RJ RB FT RTL 345 kV 60 MVAr CAMPOS RT5 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$391,216.93
CAMPOS RTL 345 kV 60 MVAr CAMPOS RT5 RJ RB FT RTL 345 kV 60 MVAr CAMPOS RT5 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,026,751.94
CAMPOS RTB 13,8 kV 25 Mvar CAMPOS RT4 RJ RBF FT RTB 13,8 kV 25 Mvar CAMPOS RT4 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$132,389.09
CAMPOS RTB 13,8 kV 25 Mvar CAMPOS RT4 RJ RBF FT RTB 13,8 kV 25 Mvar CAMPOS RT4 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$685,859.49
CAMPOS RTB 13,8 kV 25 Mvar CAMPOS RT3 RJ RBF FT RTB 13,8 kV 25 Mvar CAMPOS RT3 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$132,389.09
CAMPOS RTB 13,8 kV 25 Mvar CAMPOS RT2 RJ RBF FT RTB 13,8 kV 25 Mvar CAMPOS RT2 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$132,389.09
CAMPOS RTB 13,8 kV 25 Mvar CAMPOS RT2 RJ RBF FT RTB 13,8 kV 25 Mvar CAMPOS RT2 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$685,859.49
CAMPOS RTB 13,8 kV 25 Mvar CAMPOS RT1 RJ RBF FT RTB 13,8 kV 25 Mvar CAMPOS RT1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$132,389.09
CAMPOS RTB 13,8 kV 25 Mvar CAMPOS RT1 RJ RBF FT RTB 13,8 kV 25 Mvar CAMPOS RT1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$685,859.49
CAMPOS MG 345 kV CAMPOS MG1 RJ RB FT MG 345 kV CAMPOS MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,007,053.62
CAMPOS MG 345 kV CAMPOS MG1 RJ RB FT MG 345 kV CAMPOS MG1 RJ 062/2001 IPCA RBNI REA 4481/2013 09/11/2017 08/11/2047  R$669,172.78
CAMPOS MG 345 kV CAMPOS MG1 RJ RB FT MG 345 kV CAMPOS MG1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,217,176.76
CAMPOS MG 345 kV CAMPOS MG1 RJ RB FT MG 345 kV CAMPOS MG1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,731,445.77
CAMPOS MG 345 kV CAMPOS MG1 RJ RB FT MG 345 kV CAMPOS MG1 RJ 062/2001 IPCA RBNI REA 6787/2017 05/11/2018 05/11/2050  R$18,786.33
CAMPOS MG 345 kV CAMPOS MG1 RJ RB FT MG 345 kV CAMPOS MG1 RJ 062/2001 IPCA RBNI REA 6787/2017 02/10/2020 02/10/2052  R$196,212.90
CAMPOS MG 345 kV CAMPOS MG1 RJ RB FT MG 345 kV CAMPOS MG1 RJ 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032  R$3,774.34
CAMPOS MG 345 kV CAMPOS MG1 RJ RB FT MG 345 kV CAMPOS MG1 RJ 062/2001 IPCA RBNI REA 5861/2016 21/12/2017 20/12/2045  R$ 0.01
CAMPOS MC 345 kV TR 345/138 kV CAMPOS TR4 RJ  RBF FT TR 345/138 kV CAMPOS TR4 RJ 062/2001 IPCA RBNI REA 4481/2013 09/11/2017 08/11/2049  R$ 1,641,228.39
CAMPOS MC 345 kV TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$198,107.74
CAMPOS MC 345 kV TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RMEL REN 643/2014 01/09/2015 31/08/2045  R$212,112.69
CAMPOS MC 345 kV TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RMEL REN 643/2014 20/10/2016 19/10/2039  R$34,707.86
CAMPOS MC 345 kV TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RBNI REA 6787/2017 02/10/2020 02/10/2044  R$436,411.48
CAMPOS MC 345 kV TR 345/138 kV CAMPOS TR2 RJ  RBF FT TR 345/138 kV CAMPOS TR2 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$198,107.74
CAMPOS MC 345 kV TR 345/138 kV CAMPOS TR2 RJ  RBF FT TR 345/138 kV CAMPOS TR2 RJ 062/2001 IPCA RMEL REN 643/2014 29/01/2015 28/01/2039  R$51,805.36
CAMPOS MC 345 kV CE 100/-60 MvAr CAMPOS CE1 RJ  RB FT CE 100/-60 MvAr CAMPOS CE1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$216,525.71
CAMPOS MC 345 kV BC 345 kV 60 Mvar CAMPOS BC9 RJ  RB FT BC 345 kV 60 Mvar CAMPOS BC9 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$196,552.56
CAMPOS MC 345 kV TR 345/138 kV CAMPOS TR2 RJ  RBF FT TR 345/138 kV CAMPOS TR2 RJ 062/2001 IPCA RBNI REA 6787/2017 05/11/2018 05/11/2042  R$368,343.84
CAMPOS MC 345 kV TR 345/138 kV CAMPOS TR1 RJ RBF FT TR 345/138 kV CAMPOS TR1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$198,107.74
CAMPOS MC 345 kV TR 345/138 kV CAMPOS TR1 RJ RBF FT TR 345/138 kV CAMPOS TR1 RJ 062/2001 IPCA RMEL REN 643/2014 08/12/2015 07/12/2046  R$213,419.09
CAMPOS MC 345 kV TR 345/138 kV CAMPOS TR1 RJ RBF FT TR 345/138 kV CAMPOS TR1 RJ 062/2001 IPCA RMEL REA 7185/2018 08/08/2022 08/08/2043  R$206,071.70
CAMPOS MC 345 kV RTL 345 kV 60 MVAr CAMPOS RT6 RJ  RB FT RTL 345 kV 60 MVAr CAMPOS RT6 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$126,860.75
CAMPOS MC 345 kV RTL 345 kV 60 MVAr CAMPOS RT5 RJ  RB FT RTL 345 kV 60 MVAr CAMPOS RT5 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$126,860.75
CAMPOS MC 345 kV BC 345 kV 60 Mvar CAMPOS BC10 RJ  RB FT BC 345 kV 60 Mvar CAMPOS BC10 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$196,552.56
CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$88,677.44
CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR4 RJ  RBF FT TR 345/138 kV CAMPOS TR4 RJ 062/2001 IPCA RBNI REA 4481/2013 09/11/2017 08/11/2053  R$ 1,927,971.80
CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RMEL REN 443/2011 03/11/2016 02/11/2039  R$4,858.21
CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$459,405.39
CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$416,633.71
CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RBNI REA 6787/2017 02/10/2020 02/10/2038  R$243,705.73
CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RMEL REN 443/2011 03/11/2016 02/11/2039  R$4,858.21
CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RMEL REN 443/2011 03/11/2016 02/11/2039  R$4,858.21
CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES  RB FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES 062/2001 IPCA RMEL REN 643/2014 16/09/2015 15/09/2045  R$190,121.34
CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR2 RJ  RBF FT TR 345/138 kV CAMPOS TR2 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$88,677.44
CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR2 RJ  RBF FT TR 345/138 kV CAMPOS TR2 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$459,405.39
CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR2 RJ  RBF FT TR 345/138 kV CAMPOS TR2 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$416,633.71
CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR2 RJ  RBF FT TR 345/138 kV CAMPOS TR2 RJ 062/2001 IPCA RBNI REA 6787/2017 05/11/2018 05/11/2036  R$247,129.01
CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR2 RJ  RBF FT TR 345/138 kV CAMPOS TR2 RJ 062/2001 IPCA RMEL REN 443/2011 24/01/2014 23/01/2034  R$4,452.17
CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR2 RJ  RBF FT TR 345/138 kV CAMPOS TR2 RJ 062/2001 IPCA RMEL REN 443/2011 24/01/2014 23/01/2034  R$4,452.17
CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR2 RJ  RBF FT TR 345/138 kV CAMPOS TR2 RJ 062/2001 IPCA RMEL REN 443/2011 24/01/2014 23/01/2034  R$4,452.17
CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR1 RJ RBF FT TR 345/138 kV CAMPOS TR1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$88,677.44
CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR1 RJ RBF FT TR 345/138 kV CAMPOS TR1 RJ 062/2001 IPCA RMEL REN 643/2014 26/09/2015 25/09/2036  R$28,261.21
CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR1 RJ RBF FT TR 345/138 kV CAMPOS TR1 RJ 062/2001 IPCA RMEL REA 7185/2018 08/08/2022 08/08/2041  R$117,359.87
CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR1 RJ RBF FT TR 345/138 kV CAMPOS TR1 RJ 062/2001 IPCA RBNI REA 1814/2009 02/01/2019 01/01/2049  R$29,524.64
CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR1 RJ RBF FT TR 345/138 kV CAMPOS TR1 RJ 062/2001 IPCA RBNI REA 4347/2013 29/05/2019 28/05/2053  R$77,903.66
CAMPOS MC 138 kV BC 138 kV 25 MVAr CAMPOS BC2-A RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$89,119.95
CAMPOS MC 138 kV BC 138 kV 25 MVAr CAMPOS BC2-A RJ DIT   062/2001 IPCA RCDM REA 1814/2009 24/03/2016 23/03/2044  R$31,196.29
CAMPOS MC 138 kV BC 138 kV 25 Mvar CAMPOS BC1-A RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$89,119.95
CAMPOS MC 138 kV BC 138 kV 25 Mvar CAMPOS BC1-A RJ DIT   062/2001 IPCA RCDM REA 1814/2009 16/03/2016 15/03/2044  R$31,176.37
CAMPOS MC 13,8 kV RTB 13,8 kV 25 Mvar CAMPOS RT4 RJ  RBF FT RTB 13,8 kV 25 Mvar CAMPOS RT4 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,394.97
CAMPOS MC 13,8 kV RTB 13,8 kV 25 Mvar CAMPOS RT3 RJ  RBF FT RTB 13,8 kV 25 Mvar CAMPOS RT3 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,394.97
CAMPOS MC 13,8 kV RTB 13,8 kV 25 Mvar CAMPOS RT2 RJ  RBF FT RTB 13,8 kV 25 Mvar CAMPOS RT2 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,394.97
CAMPOS MC 13,8 kV RTB 13,8 kV 25 Mvar CAMPOS RT1 RJ  RBF FT RTB 13,8 kV 25 Mvar CAMPOS RT1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,394.97
CAMPOS MC 13,8 kV BC 13,8 kV 10 Mvar CAMPOS BC8 RJ  RBF FT BC 13,8 kV 10 Mvar CAMPOS BC8 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$57,000.46
CAMPOS MC 13,8 kV BC 13,8 kV 10 Mvar CAMPOS BC7 RJ  RBF FT BC 13,8 kV 10 Mvar CAMPOS BC7 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$57,000.46
CAMPOS MC 13,8 kV BC 13,8 kV 10 Mvar CAMPOS BC6 RJ  RBF FT BC 13,8 kV 10 Mvar CAMPOS BC6 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$57,000.46
CAMPOS MC 13,8 kV BC 13,8 kV 10 Mvar CAMPOS BC5 RJ  RBF FT BC 13,8 kV 10 Mvar CAMPOS BC5 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$57,000.46
CAMPOS MC 13,8 kV BC 13,8 kV 10 Mvar CAMPOS BC4 RJ  RBF FT BC 13,8 kV 10 Mvar CAMPOS BC4 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$57,000.46
CAMPOS MC 13,8 kV BC 13,8 kV 10 Mvar CAMPOS BC3 RJ  RBF FT BC 13,8 kV 10 Mvar CAMPOS BC3 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$57,000.46
CAMPOS IB 138 kV MG 345 kV CAMPOS MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$70,192.63
CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-3 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-3 RJ 006/2005 IGPM RBL CC 006/2005 02/06/2010 04/03/2035  R$ 2,899,009.81
CAMPOS IB 138 kV MG 345 kV CAMPOS MG1 RJ IB1 DIT   062/2001 IPCA RCDM REA 1814/2009 02/01/2019 01/01/2049  R$67,754.31
CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES  RB FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES  RB FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES 062/2001 IPCA RBNI REA 2040/2009 06/04/2015 05/04/2036  R$30,328.56
CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES  RB FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES 062/2001 IPCA RMEL REN 643/2014 16/09/2014 15/09/2043  R$185,420.75
CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES  RB FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES  RB FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES 062/2001 IPCA RBNI REA 2040/2009 06/04/2015 05/04/2036  R$30,328.56
CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-3 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-3 RJ 006/2005 IGPM RBNI REA 2376/2010 30/11/2012 30/11/2039  R$94,616.01
CAMPOS EL 138 kV CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 13/05/2016 12/05/2038  R$14,388.75
CAMPOS EL 138 kV CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-1 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 22/03/2017 21/03/2049  R$131,586.31
CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ  RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ  RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ 062/2001 IPCA RBNI REA 2040/2009 06/04/2015 05/04/2036  R$30,328.56
CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ  RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,272,974.20
CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ  RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,154,457.41
CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ  RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ  RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ 062/2001 IPCA RBNI REA 2040/2009 06/04/2015 05/04/2036  R$30,328.56
CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ  RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ 062/2001 IPCA RMEL REN 643/2014 25/11/2015 24/11/2046  R$191,005.75
CAMPOS EL 138 kV CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
CAMPOS EL 138 kV CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 02/11/2015 01/11/2037  R$14,167.43
CAMPOS EL 138 kV CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-2 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 03/04/2016 02/04/2047  R$128,800.52
CAMPOS EL 138 kV CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-2 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 03/04/2016 02/04/2044  R$48,489.44
CAMPOS EL 138 kV CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
CAMPOS EL 138 kV CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-1 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 10/11/2016 09/11/2045  R$49,197.17
CAMPOS EL 138 kV CAMPOS LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
CAMPOS EL 138 kV CAMPOS LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 29/09/2015 28/09/2036  R$14,134.90
CAMPOS EL 138 kV CAMPOS LT 138 kV CAMPOS /IRIRI C-2 RJ  DIT   062/2001 IPCA RMEL REN 643/2014 10/03/2015 09/03/2036  R$13,886.11
CAMPOS EL 138 kV CAMPOS LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 02/01/2019 01/01/2049  R$77,111.63
CAMPOS EL 138 kV CAMPOS LT 138 kV CAMPOS /IRIRI C-2 RJ  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
CAMPOS EL 138 kV CAMPOSDIST2 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$94,172.97
CAMPOS EL 138 kV CAMPOS LT 138 kV CAMPOS /IRIRI C-2 RJ  DIT   062/2001 IPCA RCDM REA 1814/2009 02/01/2019 01/01/2049  R$77,111.63
CAMPOS BC 345 kV 60 Mvar CAMPOS BC9 RJ RB FT BC 345 kV 60 Mvar CAMPOS BC9 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,430.30
CAMPOS BC 345 kV 60 Mvar CAMPOS BC10 RJ RB FT BC 345 kV 60 Mvar CAMPOS BC10 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,430.30
CAMPOS EL 138 kV CAMPOSDIST1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$94,172.97
CAMPOS CE 100/-60 MvAr CAMPOS CE1 RJ RB FT CE 100/-60 MvAr CAMPOS CE1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,092,326.48
CAMPOS BC 138 kV 25 MVAr CAMPOS BC2-B RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$104,029.47
CAMPOS BC 138 kV 25 MVAr CAMPOS BC2-A RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$104,029.47
CAMPOS BC 138 kV 25 Mvar CAMPOS BC1-A RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$104,029.47
CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC8 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC8 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$44,138.98
CAMPOS BC 138 kV 25 MVAr CAMPOS BC1-B RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$104,029.47
CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC8 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC8 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$228,667.94
CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC7 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC7 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$44,138.98
CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC7 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC7 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$228,667.94
CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC6 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC6 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$44,138.98
CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC6 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC6 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$228,667.94
CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC5 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC5 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$44,138.98
CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC5 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC5 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$228,667.94
CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC4 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC4 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$44,138.98
CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC4 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC4 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$228,667.94
CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC3 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC3 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$44,138.98
CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC3 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC3 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$228,667.94
CORUMBA MG 345 kV CORUMBA MG1 GO RB FT MG 345 kV CORUMBA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$482,864.12
CORUMBA MG 345 kV CORUMBA MG1 GO RB FT MG 345 kV CORUMBA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,501,542.55
CORUMBA MG 345 kV CORUMBA MG1 GO RB FT MG 345 kV CORUMBA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,268,643.27
CORUMBA MG 345 kV CORUMBA MG1 GO RB FT MG 345 kV CORUMBA MG1 GO 062/2001 IPCA RMEL REN 443/2011 25/08/2017 24/08/2031  R$14,160.21
CORUMBA MG 345 kV CORUMBA MG1 GO RB FT MG 345 kV CORUMBA MG1 GO 062/2001 IPCA RMEL REN 443/2011 25/08/2017 24/08/2031  R$14,160.21
CORUMBA IB 345 kV MG 345 kV CORUMBA MG1 GO IB1 RB FT MG 345 kV CORUMBA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
CORUMBA IB 345 kV MG 345 kV CORUMBA MG1 GO IB1 RB FT MG 345 kV CORUMBA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,036,883.85
CORUMBA IB 345 kV MG 345 kV CORUMBA MG1 GO IB1 RB FT MG 345 kV CORUMBA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$940,347.61
CORUMBA EL 345 kV CORUMBA LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG  RB FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
CORUMBA EL 345 kV CORUMBA LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG  RB FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,372,890.86
CORUMBA EL 345 kV CORUMBA LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG  RB FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,245,071.61
CORUMBA EL 345 kV CORUMBA LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG  RB FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBNI REA 5861/2016 09/02/2021 08/02/2036  R$223,161.19
CORUMBA EL 345 kV CORUMBALT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
CORUMBA EL 345 kV CORUMBALT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RMEL REN 643/2014 17/09/2015 16/09/2030  R$57,543.81
CORUMBA EL 345 kV CORUMBALT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,372,890.86
CORUMBA EL 345 kV CORUMBALT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,245,071.61
CORUMBA EL 345 kV CORUMBALT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBNI REA 4347/2013 09/04/2018 08/04/2033  R$17,821.09
ESTREITO MG 345 kV ESTREITO MG1 MG RB FT MG 345 kV ESTREITO MG1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$569,733.24
ESTREITO IB 345 kV MG 345 kV ESTREITO MG1 MG IB1 RB FT MG 345 kV ESTREITO MG1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
ESTREITO EL 345 kV ESTREITO LT 345 kV ESTREITO /M. MORAES C-1 MG  RB FT LT 345 kV ESTREITO /M. MORAES C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
ESTREITO EL 345 kV ESTREITO LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP  RB FT LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
ESTREITO EL 345 kV ESTREITO LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP  RB FT LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
ESTREITO EL 345 kV ESTREITO LT 345 kV ESTREITO /FURNAS C-1 MG  RB FT LT 345 kV ESTREITO /FURNAS C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
F.IGUACU 50HZ MG 500 kV F.IGUACU 50HZ MG1 PR DIT   062/2001 IPCA RMEL REN 443/2011 06/11/2016 05/11/2040  R$ 683.96
F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR8 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$335,097.51
F.IGUACU 50HZ MG 500 kV F.IGUACU 50HZ MG1 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 1,206,713.80
F.IGUACU 50HZ MG 500 kV F.IGUACU 50HZ MG1 PR DIT   062/2001 IPCA RMEL REN 443/2011 06/11/2016 05/11/2040  R$ 683.96
F.IGUACU 50HZ MG 500 kV F.IGUACU 50HZ MG1 PR DIT   062/2001 IPCA RMEL REN 443/2011 06/11/2016 05/11/2040  R$ 683.96
F.IGUACU 50HZ EL 500 kV F.IGUACU 50HZ LT 500 kV MARGEM DIREITA /F.IGUACU 50HZ C-2 RS/PR  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$379,674.11
F.IGUACU 50HZ EL 500 kV F.IGUACU 50HZ LT 500 kV MARGEM DIREITA /F.IGUACU 50HZ C-1 RS/PR  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$379,674.11
F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR8 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,694,445.99
F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR8 PR DIT   062/2001 IPCA RMEL REN 443/2011 02/12/2016 01/12/2040  R$13,670.68
F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR8 PR DIT   062/2001 IPCA RMEL REN 443/2011 02/12/2016 01/12/2040  R$13,670.68
F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR8 PR DIT   062/2001 IPCA RMEL REN 443/2011 02/12/2016 01/12/2040  R$13,670.68
F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR7 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$335,097.51
F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR6 PR  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$335,097.51
F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR6 PR  DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,694,445.99
F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR5 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$335,097.51
F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR5 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,694,445.99
F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR4 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$335,097.51
F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR3 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$335,097.51
F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR3 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,694,445.99
F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR2 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$335,097.51
F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR1 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$335,097.51
F.IGUACU 50HZ MC 500 kV BC 500 kV 349 MVAr F.IGUACU 50HZ BC2 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$341,413.07
F.IGUACU 50HZ MC 500 kV BC 500 kV 349 MVAr F.IGUACU 50HZ BC2 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,726,381.10
F.IGUACU 50HZ MC 500 kV BC 500 kV 349 MVAr F.IGUACU 50HZ BC1 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$341,413.07
F.IGUACU 50HZ MC 500 kV BC 500 kV 349 MVAr F.IGUACU 50HZ BC1 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,726,381.10
F.IGUACU 50HZ MC 500 kV BC 500 kV 280,3 MVAr F.IGUACU 50HZ BC5 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$341,413.07
F.IGUACU 50HZ MC 500 kV BC 500 kV 280,3 MVAr F.IGUACU 50HZ BC5 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,726,381.10
F.IGUACU 50HZ MC 500 kV BC 500 kV 280,3 MVAr F.IGUACU 50HZ BC4 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$341,413.07
F.IGUACU 50HZ MC 500 kV BC 500 kV 280,3 MVAr F.IGUACU 50HZ BC4 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,726,381.10
F.IGUACU 50HZ MC 500 kV BC 500 kV 280,3 MVAr F.IGUACU 50HZ BC3 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$341,413.07
F.IGUACU 50HZ MC 500 kV BC 500 kV 280,3 MVAr F.IGUACU 50HZ BC3 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,726,381.10
F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB9 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$355,610.09
F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB8 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$355,610.09
F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB7 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$355,610.09
F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB6 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$355,610.09
F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB5 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$355,610.09
F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB4 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$355,610.09
F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB3 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$355,610.09
F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB2 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$355,610.09
F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB2 DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,798,169.41
F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB11 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$355,610.09
F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB10 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$355,610.09
F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$355,610.09
F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB1 DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,798,169.41
F.IGUACU 50HZ EL 500 kV F.IGUACU 50HZ LT 500 kV ITAIPU 50HZ /F.IGUACU 50HZ C-2 RS/PR  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$379,674.11
F.IGUACU 50HZ EL 500 kV F.IGUACU 50HZ LT 500 kV ITAIPU 50HZ /F.IGUACU 50HZ C-2 RS/PR  DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,919,850.95
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV8 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 10,495,027.95
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV8 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 53,068,904.87
F.IGUACU 50HZ EL 500 kV F.IGUACU 50HZ LT 500 kV ITAIPU 50HZ /F.IGUACU 50HZ C-1 RS/PR  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$379,674.11
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CVR4 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 3,498,342.65
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CVR3 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 3,498,342.65
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CVR2 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 3,498,342.65
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CVR1 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 3,498,342.65
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV8 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 48,128,069.44
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV8 PR DIT   062/2001 IPCA RMEL REA 11324/2022 14/04/2022 14/04/2057  R$ 1,529,587.90
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV7 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 10,495,027.95
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV7 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 53,068,904.87
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV7 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 48,128,069.44
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV6 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 10,495,027.95
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV6 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 53,068,904.87
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV6 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 48,128,069.44
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV6 PR DIT   062/2001 IPCA RMEL REA 11324/2022 14/04/2022 14/04/2057  R$ 2,194,238.14
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV5 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 10,495,027.95
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV5 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 53,068,904.87
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV5 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 48,128,069.44
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV5 PR DIT   062/2001 IPCA RMEL REN 443/2011 25/08/2017 24/08/2036  R$2,074.40
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV5 PR DIT   062/2001 IPCA RMEL REN 443/2011 25/08/2017 24/08/2036  R$2,074.40
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV5 PR DIT   062/2001 IPCA RMEL REN 443/2011 25/08/2017 24/08/2036  R$2,074.40
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV5 PR DIT   062/2001 IPCA RMEL REN 443/2011 25/08/2017 24/08/2036  R$2,074.40
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV4 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 10,495,027.95
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV4 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 53,068,904.87
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV1 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 53,068,904.87
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV1 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 48,128,069.44
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV4 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 48,128,069.44
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV4 PR DIT   062/2001 IPCA RMEL REA 11324/2022 14/04/2022 14/04/2057  R$ 2,225,400.63
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV3 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 10,495,027.95
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV3 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 53,068,904.87
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV3 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 48,128,069.44
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV3 PR DIT   062/2001 IPCA RMEL REA 11324/2022 14/04/2022 14/04/2057  R$ 1,510,516.51
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV2 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 10,495,027.95
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV2 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 53,068,904.87
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV2 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 48,128,069.44
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV2 PR DIT   062/2001 IPCA RMEL REN 443/2011 06/07/2017 05/07/2036  R$ 460.43
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV2 PR DIT   062/2001 IPCA RMEL REN 443/2011 06/07/2017 05/07/2036  R$ 460.43
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV2 PR DIT   062/2001 IPCA RMEL REN 443/2011 06/07/2017 05/07/2036  R$ 460.43
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV2 PR DIT   062/2001 IPCA RMEL REN 443/2011 06/07/2017 05/07/2036  R$ 460.43
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV1 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 10,495,027.95
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV1 PR DIT   062/2001 IPCA RMEL REN 443/2011 16/05/2017 15/05/2036  R$2,626.71
F.IGUACU 50HZ BF 500 kV 349 Mvar F.IGUACU 50HZ 1-ZRA PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$312,279.57
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV1 PR DIT   062/2001 IPCA RMEL REN 443/2011 16/05/2017 15/05/2036  R$2,183.76
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV1 PR DIT   062/2001 IPCA RMEL REN 443/2011 16/05/2017 15/05/2036  R$2,183.76
F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV1 PR DIT   062/2001 IPCA RMEL REN 443/2011 16/05/2017 15/05/2036  R$2,183.76
F.IGUACU 50HZ BF 500 kV 280,3 Mvar F.IGUACU 50HZ 5-ZRE PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$296,267.42
F.IGUACU 50HZ BF 500 kV 349 Mvar F.IGUACU 50HZ 2-ZRB PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$312,279.57
F.IGUACU 50HZ BF 500 kV 280,3 Mvar F.IGUACU 50HZ 4-ZRD PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$296,267.42
F.IGUACU 50HZ BF 500 kV 280,3 Mvar F.IGUACU 50HZ 3-ZRC PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$296,267.42
F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TRR5 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$799,768.06
F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TRR5 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 4,044,087.87
F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TRR5 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 3,667,574.11
F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR4 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 2,399,304.19
F.IGUACU 60HZ RTL 750 kV 330 Mvar F.IGUACU 60HZ RT2 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 3,864,641.83
F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR5 PR DIT   062/2001 IPCA RCDM REA 5012/2015 02/05/2019 02/05/2054  R$ 12,238,466.71
F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR4 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 12,132,263.60
F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR4 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 11,002,722.34
F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR3 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 2,399,304.19
F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR3 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 12,132,263.60
F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR3 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 11,002,722.34
F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR2 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 2,399,304.19
F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR2 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 12,132,263.60
F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR2 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 11,002,722.34
F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR2 PR DIT   062/2001 IPCA RMEL REN 643/2014 20/03/2016 19/03/2038  R$7,456.21
F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR1 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 2,399,304.19
F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR1 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 12,132,263.60
F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR1 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 11,002,722.34
F.IGUACU 60HZ RTL 750 kV 330 Mvar F.IGUACU 60HZ RT3 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$842,741.55
F.IGUACU 60HZ RTL 750 kV 330 Mvar F.IGUACU 60HZ RT3 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 4,261,386.58
F.IGUACU 60HZ RTL 750 kV 330 Mvar F.IGUACU 60HZ RT3 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 3,864,641.83
F.IGUACU 60HZ RTL 750 kV 330 Mvar F.IGUACU 60HZ RT2 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$842,741.55
F.IGUACU 60HZ RTL 750 kV 330 Mvar F.IGUACU 60HZ RT2 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 4,261,386.58
F.IGUACU 60HZ RTL 750 kV 330 Mvar F.IGUACU 60HZ RT1 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 4,261,386.58
F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 2,110,851.61
F.IGUACU 60HZ RTL 750 kV 330 Mvar F.IGUACU 60HZ RT1 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$842,741.55
F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 10,673,681.25
F.IGUACU 60HZ RTL 750 kV 330 Mvar F.IGUACU 60HZ RT1 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 3,864,641.83
F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 9,679,937.31
F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RCDM REA 5012/2015 22/04/2019 22/04/2051  R$557,337.75
F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RCDM REA 8314/2019 09/07/2019 08/07/2034  R$36,788.51
F.IGUACU 60HZ MG 500 kV F.IGUACU 60HZ MG1 PR RB FT MG 500 kV F.IGUACU 60HZ MG1 PR 062/2001 IPCA RBNI REA 2069/2009 05/06/2012 04/06/2033  R$975,222.39
F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032  R$1,758.01
F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RMEL REN 443/2011 16/11/2015 15/11/2028  R$9,030.00
F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RMEL REN 443/2011 16/11/2015 15/11/2028  R$9,030.02
F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RMEL REN 443/2011 16/11/2015 15/11/2028  R$9,030.00
F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RMEL REN 443/2011 16/11/2015 15/11/2028  R$9,030.00
F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RMEL REN 443/2011 16/11/2015 15/11/2028  R$9,030.00
F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RCDM REA 8314/2019 09/07/2019 08/07/2034  R$20,891.89
F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RCDM REA 8314/2019 09/07/2019 08/07/2034  R$20,891.89
F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RCDM REA 8314/2019 09/07/2019 08/07/2034  R$20,891.89
F.IGUACU 60HZ MG 500 kV F.IGUACU 60HZ MG1 PR RB FT MG 500 kV F.IGUACU 60HZ MG1 PR 062/2001 IPCA RBNI REA 5012/2015 22/04/2019 22/04/2051  R$549,536.37
F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 2,667,513.08
F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR3 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 2,667,513.08
F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$527,533.48
F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR2 PR DIT   062/2001 IPCA RCDM REA 5484/2015 10/02/2021 09/02/2036  R$53,592.71
F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 2,419,161.56
F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR DIT   062/2001 IPCA RCDM REA 5484/2015 22/04/2019 21/04/2034  R$99,798.47
F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR3 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$527,533.48
F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR1 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$527,533.48
F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR3 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 2,419,161.56
F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR3 PR DIT   062/2001 IPCA RCDM REA 5484/2015 10/02/2021 09/02/2036  R$65,128.87
F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR2 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$527,533.48
F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR2 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 2,667,513.08
F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR1 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 2,667,513.08
F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR1 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 2,419,161.56
F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR5 PR DIT   062/2001 IPCA RCDM REA 5012/2015 02/05/2019 02/05/2048  R$ 3,176,953.23
F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR5 PR DIT   062/2001 IPCA RCDM REA 5012/2015 02/05/2019 02/05/2048  R$ 2,241,869.69
F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR1 PR DIT   062/2001 IPCA RCDM REA 5484/2015 10/02/2021 09/02/2036  R$70,089.86
F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR  DIT   062/2001 IPCA RCDM REA 2069/2009 15/06/2012 14/06/2038  R$ 1,528,557.86
F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$335,097.51
F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR  DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 1,536,689.22
F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR3 PR  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$335,097.51
F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR  DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,694,445.99
F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR3 PR  DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,694,445.99
F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR  DIT   062/2001 IPCA RCDM REA 5484/2015 22/04/2019 21/04/2034  R$100,349.86
F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR3 PR  DIT   062/2001 IPCA RCDM REA 5484/2015 10/02/2021 09/02/2036  R$65,128.87
F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR2 PR  DIT   062/2001 IPCA RCDM REA 2069/2009 27/02/2012 26/02/2038  R$ 1,515,094.48
F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR2 PR  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$335,097.51
F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR2 PR  DIT   062/2001 IPCA RCDM REA 5484/2015 10/02/2021 09/02/2036  R$53,592.71
F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR1 PR  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$335,097.51
F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR2 PR  DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,694,445.99
F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR1 PR  DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,694,445.99
F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR1 PR  DIT   062/2001 IPCA RCDM REA 5484/2015 10/02/2021 09/02/2036  R$70,089.86
F.IGUACU 60HZ IB 750 kV MG 750 kV F.IGUACU 60HZ MG1 PR IB5 DIT   062/2001 IPCA RCDM REA 5012/2015 22/04/2019 22/04/2050  R$ 2,768,373.77
F.IGUACU 60HZ IB 750 kV MG 750 kV F.IGUACU 60HZ MG1 PR IB4 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$633,989.66
F.IGUACU 60HZ IB 750 kV MG 750 kV F.IGUACU 60HZ MG1 PR IB3 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$633,989.66
F.IGUACU 60HZ IB 750 kV MG 750 kV F.IGUACU 60HZ MG1 PR IB2 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$633,989.66
F.IGUACU 60HZ IB 750 kV MG 750 kV F.IGUACU 60HZ MG1 PR IB1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$633,989.66
F.IGUACU 60HZ IB 500 kV MG 500 kV F.IGUACU 60HZ MG1 PR IB7 RB FT MG 500 kV F.IGUACU 60HZ MG1 PR 062/2001 IPCA RBNI REA 5012/2015 22/04/2019 22/04/2050  R$ 1,529,060.38
F.IGUACU 60HZ IB 500 kV MG 500 kV F.IGUACU 60HZ MG1 PR IB5 RB FT MG 500 kV F.IGUACU 60HZ MG1 PR 062/2001 IPCA RBNI REA 2069/2009 05/06/2012 04/06/2039  R$754,263.15
F.IGUACU 60HZ IB 500 kV MG 500 kV F.IGUACU 60HZ MG1 PR IB4 RB FT MG 500 kV F.IGUACU 60HZ MG1 PR 062/2001 IPCA RBNI REA 2069/2009 15/06/2012 14/06/2039  R$ 1,318,303.85
F.IGUACU 60HZ IB 500 kV MG 500 kV F.IGUACU 60HZ MG1 PR IB3 RB FT MG 500 kV F.IGUACU 60HZ MG1 PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$347,094.43
F.IGUACU 60HZ IB 500 kV MG 500 kV F.IGUACU 60HZ MG1 PR IB2 RB FT MG 500 kV F.IGUACU 60HZ MG1 PR 062/2001 IPCA RBNI REA 2069/2009 27/02/2012 26/02/2038  R$ 1,261,362.39
F.IGUACU 60HZ IB 500 kV MG 500 kV F.IGUACU 60HZ MG1 PR IB1 RB FT MG 500 kV F.IGUACU 60HZ MG1 PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$347,094.43
F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$598,970.24
F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 3,028,738.44
F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 2,746,756.02
F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR DIT   062/2001 IPCA RCDM REA 5861/2016 09/07/2019 08/07/2034  R$11,160.19
F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$598,970.24
F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 3,028,738.44
F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 2,746,756.02
F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR DIT   062/2001 IPCA RCDM REA 5861/2016 09/07/2019 08/07/2034  R$11,160.19
F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$598,970.24
F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 3,028,738.44
F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 2,746,756.02
F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR DIT   062/2001 IPCA RCDM REA 5861/2016 09/07/2019 08/07/2034  R$11,160.19
F.IGUACU 60HZ EL 500 kV F.IGUACU 60HZEL4 RB FT EL 500 kV F.IGUACU 60HZEL4 062/2001 IPCA RBNI REA 2069/2009 15/06/2012 14/06/2038  R$ 1,090,669.08
F.IGUACU 60HZ EL 500 kV F.IGUACU 60HZEL3 RB FT EL 500 kV F.IGUACU 60HZEL3 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
F.IGUACU 60HZ EL 500 kV F.IGUACU 60HZEL5 RB FT EL 500 kV F.IGUACU 60HZEL5 062/2001 IPCA RBNI REA 2069/2009 05/06/2012 04/06/2040  R$427,137.72
F.IGUACU 60HZ EL 500 kV F.IGUACU 60HZEL2 RB FT EL 500 kV F.IGUACU 60HZEL2 062/2001 IPCA RBNI REA 2069/2009 27/02/2012 26/02/2038  R$ 1,006,150.97
F.IGUACU 60HZ EL 500 kV F.IGUACU 60HZEL1 RB FT EL 500 kV F.IGUACU 60HZEL1 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
FERNAO DIAS MG 500 kV FERNAO DIAS MG5 SP RB FT MG 500 kV FERNAO DIAS MG5 SP 062/2001 IPCA RBNI DSP 199/2023 01/07/2023 25/01/2052  R$77,778.30
FERNAO DIAS IB 500 kV MG 500 kV FERNAO DIAS MG5 SP IB7 RB FT MG 500 kV FERNAO DIAS MG5 SP 062/2001 IPCA RBNI DSP 199/2023 01/07/2023 25/01/2053  R$289,928.54
FERNAO DIAS EL 500 kV FERNAO DIAS LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP  RB FT LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP 062/2001 IPCA RBNI DSP 199/2023 01/07/2023 25/01/2050  R$267,492.59
FERNAO DIAS EL 500 kV FERNAO DIAS LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP  RB FT LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP 062/2001 IPCA RBNI DSP 199/2023 01/07/2023 25/01/2050  R$267,492.59
FUNIL MG 138 kV FUNIL MG1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$221,409.25
FUNIL MG 138 kV FUNIL MG1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,119,572.66
FUNIL MG 138 kV FUNIL MG1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 21/03/2016 20/03/2029  R$2,532.03
FUNIL IB 138 kV MG 138 kV FUNIL MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$78,514.10
FUNIL IB 138 kV MG 138 kV FUNIL MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$397,012.48
FURNAS IB 345 kV MG 345 kV FURNAS MG1 MG IB1 RB FT MG 345 kV FURNAS MG1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
FUNIL IB 138 kV MG 138 kV FUNIL MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$360,049.72
FUNIL EL 138 kV FUNIL LT 138 kV SAUDADE /FUNIL C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
FUNIL EL 138 kV FUNIL LT 138 kV SAUDADE /FUNIL C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$723,202.62
FUNIL EL 138 kV FUNIL LT 138 kV SAUDADE /FUNIL C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$655,870.82
FUNIL EL 138 kV FUNIL LT 138 kV SAUDADE /FUNIL C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
FUNIL EL 138 kV FUNIL LT 138 kV SAUDADE /FUNIL C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$723,202.62
FUNIL EL 138 kV FUNIL LT 138 kV SAUDADE /FUNIL C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$655,870.82
FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /POCOS CALDAS C-1 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
FURNAS MG 345 kV FURNAS MG1 MG RB FT MG 345 kV FURNAS MG1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,090,947.96
FURNAS MG 345 kV FURNAS MG1 MG RB FT MG 345 kV FURNAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032  R$6,219.75
FURNAS MG 345 kV FURNAS MG1 MG RB FT MG 345 kV FURNAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 05/07/2016 04/07/2029  R$8,714.10
FURNAS MG 345 kV FURNAS MG1 MG RB FT MG 345 kV FURNAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 05/07/2016 04/07/2029  R$8,714.10
FURNAS MG 345 kV FURNAS MG1 MG RB FT MG 345 kV FURNAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 05/07/2016 04/07/2029  R$20,269.45
FURNAS MG 345 kV FURNAS MG1 MG RB FT MG 345 kV FURNAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 05/07/2016 04/07/2029  R$8,714.10
FURNAS MG 345 kV FURNAS MG1 MG RB FT MG 345 kV FURNAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 05/07/2016 04/07/2029  R$40,055.07
FURNAS MC 345 kV TR 15/345 kV FURNAS TRG8 MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$231,086.04
FURNAS MC 345 kV TR 15/345 kV FURNAS TRG7 MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$231,086.04
FURNAS MC 345 kV TR 15/345 kV FURNAS TRG6 MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$231,086.04
FURNAS MC 345 kV TR 15/345 kV FURNAS TRG5 MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$231,086.04
FURNAS MC 345 kV TR 15/345 kV FURNAS TRG5 MG DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,168,504.07
FURNAS MC 345 kV TR 15/345 kV FURNAS TRG4 MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$231,086.04
FURNAS MC 345 kV TR 15/345 kV FURNAS TRG3 MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$231,086.04
FURNAS MC 345 kV TR 15/345 kV FURNAS TRG3 MG DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,168,504.07
FURNAS MC 345 kV TR 15/345 kV FURNAS TRG2 MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$231,086.04
FURNAS MC 345 kV TR 15/345 kV FURNAS TRG2 MG DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,168,504.07
FURNAS MC 345 kV TR 15/345 kV FURNAS TRG1 MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$231,086.04
FURNAS IB 345 kV MG 345 kV FURNAS MG1 MG IB2 RB FT MG 345 kV FURNAS MG1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
FURNAS IB 345 kV MG 345 kV FURNAS MG1 MG IB2 RB FT MG 345 kV FURNAS MG1 MG 062/2001 IPCA RBNI REA 1814/2009 06/04/2015 05/04/2044  R$232,528.20
FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /PIMENTA C-1 MG  RB FT LT 345 kV FURNAS /PIMENTA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /POCOS CALDAS C-2 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-2 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /POCOS CALDAS C-2 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-2 MG 062/2001 IPCA RBNI REA 1814/2009 30/09/2012 29/09/2038  R$423,155.70
FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /PIMENTA C-1 MG  RB FT LT 345 kV FURNAS /PIMENTA C-1 MG 062/2001 IPCA RBNI REA 1814/2009 06/04/2015 05/04/2045  R$201,884.28
FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /POCOS CALDAS C-1 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-1 MG 062/2001 IPCA RBNI REA 1814/2009 02/12/2012 01/12/2038  R$425,605.46
FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /PIMENTA C-1 MG  RB FT LT 345 kV FURNAS /PIMENTA C-1 MG 062/2001 IPCA RBNI REA 1814/2009 24/11/2014 23/11/2041  R$75,446.26
FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /M. MORAES C-1 MG  RB FT LT 345 kV FURNAS /M. MORAES C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RBNI REA 1814/2009 30/01/2012 29/01/2037  R$344,563.93
FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RBNI REA 1814/2009 08/07/2012 07/07/2038  R$419,815.42
FURNAS EL 345 kV FURNAS LT 345 kV ESTREITO /FURNAS C-1 MG  RB FT LT 345 kV ESTREITO /FURNAS C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
GRAJAU EL 500 kV GRAJAU LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ  RB FT LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
GRAJAU EL 500 kV GRAJAU LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ 062/2001 IPCA RMEL REN 443/2011 07/09/2015 06/09/2036  R$15,884.34
GRAJAU TR 500/138 kV GRAJAU TRR2 RJ RBF FT TR 500/138 kV GRAJAU TRR2 RJ 062/2001 IPCA RBNI REA 3178/2011 14/11/2013 13/11/2043  R$ 1,682,166.63
GRAJAU TR 500/138 kV GRAJAU TRR1 RJ RBF FT TR 500/138 kV GRAJAU TRR1 RJ 062/2001 IPCA RMEL REA 5457/2015 29/04/2016 28/04/2049  R$ 1,836,156.42
GRAJAU TR 500/138 kV GRAJAU TR58 RJ RBF FT TR 500/138 kV GRAJAU TR58 RJ 062/2001 IPCA RMEL REA 5457/2015 02/11/2015 01/11/2048  R$ 5,455,338.18
GRAJAU TR 500/138 kV GRAJAU TR56 RJ RBF FT TR 500/138 kV GRAJAU TR56 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$934,167.37
GRAJAU TR 500/138 kV GRAJAU TR56 RJ RBF FT TR 500/138 kV GRAJAU TR56 RJ 062/2001 IPCA RMEL REA 5457/2015 13/10/2015 12/10/2048  R$ 1,816,624.31
GRAJAU TR 500/138 kV GRAJAU TR56 RJ RBF FT TR 500/138 kV GRAJAU TR56 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,839,579.70
GRAJAU TR 500/138 kV GRAJAU TR54 RJ RBF FT TR 500/138 kV GRAJAU TR54 RJ 062/2001 IPCA RMEL REA 5457/2015 20/12/2015 19/12/2048  R$ 5,470,159.90
GRAJAU TR 500/138 kV GRAJAU TR52 RJ RBF FT TR 500/138 kV GRAJAU TR52 RJ 062/2001 IPCA RMEL REA 5457/2015 15/09/2015 14/09/2047  R$ 5,441,678.48
GRAJAU MG 500 kV GRAJAU MG1 RJ RB FT MG 500 kV GRAJAU MG1 RJ 062/2001 IPCA RBNI REA 3178/2011 14/11/2013 13/11/2037  R$370,894.62
GRAJAU MG 500 kV GRAJAU MG1 RJ RB FT MG 500 kV GRAJAU MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,162,240.92
GRAJAU MG 500 kV GRAJAU MG1 RJ RB FT MG 500 kV GRAJAU MG1 RJ 062/2001 IPCA RBNI REA 4552/2014 26/02/2018 26/02/2055  R$961,498.82
GRAJAU MG 500 kV GRAJAU MG1 RJ RB FT MG 500 kV GRAJAU MG1 RJ 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2045  R$3,285.43
GRAJAU MC 500 kV TR 500/138 kV GRAJAU TR58 RJ  RBF FT TR 500/138 kV GRAJAU TR58 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$327,073.06
GRAJAU MC 500 kV TR 500/138 kV GRAJAU TR58 RJ  RBF FT TR 500/138 kV GRAJAU TR58 RJ 062/2001 IPCA RBNI REA 4347/2013 09/04/2018 08/04/2033  R$19,951.88
GRAJAU MC 500 kV TR 500/138 kV GRAJAU TR56 RJ  RBF FT TR 500/138 kV GRAJAU TR56 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$327,073.06
GRAJAU MC 500 kV TR 500/138 kV GRAJAU TR56 RJ  RBF FT TR 500/138 kV GRAJAU TR56 RJ 062/2001 IPCA RBNI REA 4347/2013 09/04/2018 08/04/2033  R$19,951.88
GRAJAU MC 500 kV TR 500/138 kV GRAJAU TR54 RJ  RBF FT TR 500/138 kV GRAJAU TR54 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$327,073.06
GRAJAU MC 500 kV TR 500/138 kV GRAJAU TR54 RJ  RBF FT TR 500/138 kV GRAJAU TR54 RJ 062/2001 IPCA RBNI REA 4347/2013 09/04/2018 08/04/2033  R$17,821.09
GRAJAU MC 500 kV TR 500/138 kV GRAJAU TR52 RJ  RBF FT TR 500/138 kV GRAJAU TR52 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$327,073.06
GRAJAU MC 500 kV TR 500/138 kV GRAJAU TR52 RJ  RBF FT TR 500/138 kV GRAJAU TR52 RJ 062/2001 IPCA RBNI REA 4347/2013 09/04/2018 08/04/2033  R$19,951.88
GRAJAU MC 138 kV TR 500/138 kV GRAJAU TR58 RJ RBF FT TR 500/138 kV GRAJAU TR58 RJ 062/2001 IPCA RBNI REA 4552/2014 26/02/2018 26/02/2040  R$ 1,017,241.67
GRAJAU MC 138 kV TR 500/138 kV GRAJAU TR56 RJ RBF FT TR 500/138 kV GRAJAU TR56 RJ 062/2001 IPCA RBNI REA 4552/2014 26/02/2018 26/02/2040  R$ 1,017,241.67
GRAJAU MC 138 kV TR 500/138 kV GRAJAU TR54 RJ RBF FT TR 500/138 kV GRAJAU TR54 RJ 062/2001 IPCA RBNI REA 4552/2014 26/02/2018 26/02/2040  R$ 1,017,241.67
GRAJAU MC 138 kV TR 500/138 kV GRAJAU TR52 RJ RBF FT TR 500/138 kV GRAJAU TR52 RJ 062/2001 IPCA RBNI REA 4552/2014 26/02/2018 26/02/2040  R$ 1,017,241.67
GRAJAU MC 13,8 kV CS 200/-150 MVAr GRAJAU CS2 RJ  RBF FT CS 200/-150 MVAr GRAJAU CS2 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$47,655.63
GRAJAU MC 13,8 kV CS 200/-150 MVAr GRAJAU CS1 RJ  RBF FT CS 200/-150 MVAr GRAJAU CS1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$47,655.63
GRAJAU IB 500 kV MG 500 kV GRAJAU MG1 RJ IB1 RB FT MG 500 kV GRAJAU MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$347,094.43
GRAJAU IB 138 kV MG 500 kV GRAJAU MG1 RJ IB2 DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2041  R$723,126.02
GRAJAU IB 138 kV MG 500 kV GRAJAU MG1 RJ IB1 DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2041  R$723,126.02
GRAJAU EL 500 kV GRAJAU LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ 062/2001 IPCA RMEL REN 443/2011 07/09/2015 06/09/2036  R$15,884.34
GRAJAU EL 500 kV GRAJAU LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ  RB FT LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ 062/2001 IPCA RBNI REA 4347/2013 09/04/2018 08/04/2033  R$9,539.21
GRAJAU EL 500 kV GRAJAU LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
GRAJAU EL 500 kV GRAJAU LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ 062/2001 IPCA RBNI REA 4347/2013 09/04/2018 08/04/2033  R$17,821.09
GRAJAU EL 500 kV GRAJAU LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ 062/2001 IPCA RMEL REN 443/2011 07/09/2015 06/09/2036  R$15,884.34
GRAJAU EL 138 kV GRAJAU LT 138 kV TERMINAL SUL /GRAJAU C-4 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040  R$ 1,206,054.91
GRAJAU EL 138 kV GRAJAU LT 138 kV TERMINAL SUL /GRAJAU C-3 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040  R$ 1,206,054.91
GRAJAU EL 138 kV GRAJAU LT 138 kV TERMINAL SUL /GRAJAU C-2 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040  R$ 1,206,054.91
GRAJAU EL 138 kV GRAJAU LT 138 kV TERMINAL SUL /GRAJAU C-1 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040  R$ 1,206,054.91
GRAJAU EL 138 kV GRAJAU LT 138 kV GRAJAU /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040  R$ 1,010,443.12
GRAJAU EL 138 kV GRAJAU LT 138 kV FREI CANECA /GRAJAU C-6 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040  R$ 1,206,054.91
GRAJAU EL 138 kV GRAJAU LT 138 kV FREI CANECA /GRAJAU C-5 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040  R$ 1,206,054.91
GRAJAU EL 138 kV GRAJAU LT 138 kV FREI CANECA /GRAJAU C-4 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040  R$ 1,206,054.91
GRAJAU EL 138 kV GRAJAU LT 138 kV FREI CANECA /GRAJAU C-3 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040  R$ 1,206,054.91
GRAJAU EL 138 kV GRAJAU LT 138 kV FREI CANECA /GRAJAU C-2 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040  R$ 1,206,054.91
GRAJAU EL 138 kV GRAJAU LT 138 kV CASCADURA /GRAJAU C-2 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040  R$ 1,010,443.12
GRAJAU EL 138 kV GRAJAU LT 138 kV CASCADURA /GRAJAU C-1 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040  R$ 1,010,443.12
GRAJAU EL 138 kV GRAJAU LT 138 kV FREI CANECA /GRAJAU C-1 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040  R$ 1,206,054.91
GRAJAU EL 138 kV GRAJAU LT 138 kV CASCADURA /GRAJAU C-5 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040  R$ 1,010,443.12
GRAJAU EL 138 kV GRAJAU LT 138 kV CASCADURA /GRAJAU C-4 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2046  R$ 1,010,443.12
GRAJAU EL 138 kV GRAJAU LT 138 kV CASCADURA /GRAJAU C-3 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040  R$ 1,010,443.12
GRAJAU CS 200/-150 MVAr GRAJAU CS2 RJ RBF FT CS 200/-150 MVAr GRAJAU CS2 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,569,819.21
GRAJAU CS 200/-150 MVAr GRAJAU CS2 RJ RBF FT CS 200/-150 MVAr GRAJAU CS2 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 8,132,659.57
GRAJAU CS 200/-150 MVAr GRAJAU CS1 RJ RBF FT CS 200/-150 MVAr GRAJAU CS1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,569,819.21
GRAJAU CS 200/-150 MVAr GRAJAU CS1 RJ RBF FT CS 200/-150 MVAr GRAJAU CS1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 8,132,659.57
GUARULHOS MG 345 kV GUARULHOS MG1 SP RB FT MG 345 kV GUARULHOS MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$743,471.48
GUARULHOS MG 345 kV GUARULHOS MG1 SP RB FT MG 345 kV GUARULHOS MG1 SP 062/2001 IPCA RBNI REA 4347/2013 18/01/2016 17/01/2042  R$5,264.09
GUARULHOS MG 345 kV GUARULHOS MG1 SP RB FT MG 345 kV GUARULHOS MG1 SP 062/2001 IPCA RBNI REA 4347/2013 18/01/2016 17/01/2042  R$6,316.91
GUARULHOS MG 345 kV GUARULHOS MG1 SP RB FT MG 345 kV GUARULHOS MG1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,851,654.04
GUARULHOS MG 345 kV GUARULHOS MG1 SP RB FT MG 345 kV GUARULHOS MG1 SP 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032  R$ 812.28
GUARULHOS MG 345 kV GUARULHOS MG1 SP RB FT MG 345 kV GUARULHOS MG1 SP 062/2001 IPCA RBNI REA 5861/2016 21/12/2017 20/12/2034  R$46,142.61
GUARULHOS MC 345 kV BC 345 kV 150 Mvar GUARULHOS BC2 SP  RB FT BC 345 kV 150 Mvar GUARULHOS BC2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$196,552.56
GUARULHOS MC 345 kV BC 345 kV 100 Mvar GUARULHOS BC1 SP  RB FT BC 345 kV 100 Mvar GUARULHOS BC1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$196,552.56
GUARULHOS IB 345 kV MG 345 kV GUARULHOS MG1 SP IB1 RB FT MG 345 kV GUARULHOS MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
GUARULHOS EL 345 kV GUARULHOS LT 345 kV NORTE /GUARULHOS C-2 SP RB FT LT 345 kV NORTE /GUARULHOS C-2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
GUARULHOS EL 345 kV GUARULHOS LT 345 kV NORTE /GUARULHOS C-2 SP RB FT LT 345 kV NORTE /GUARULHOS C-2 SP 062/2001 IPCA RBNI REA 4347/2013 18/01/2016 17/01/2042  R$5,264.09
GUARULHOS EL 345 kV GUARULHOS LT 345 kV NORTE /GUARULHOS C-2 SP RB FT LT 345 kV NORTE /GUARULHOS C-2 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,372,890.86
GUARULHOS EL 345 kV GUARULHOS LT 345 kV NORTE /GUARULHOS C-1 SP RB FT LT 345 kV NORTE /GUARULHOS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
GUARULHOS EL 345 kV GUARULHOS LT 345 kV NORTE /GUARULHOS C-1 SP RB FT LT 345 kV NORTE /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 4347/2013 18/01/2016 17/01/2042  R$5,264.09
GUARULHOS EL 345 kV GUARULHOS LT 345 kV NORTE /GUARULHOS C-1 SP RB FT LT 345 kV NORTE /GUARULHOS C-1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,372,890.86
GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2040  R$6,666.03
GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RBNI REA 4347/2013 18/01/2016 17/01/2042  R$6,316.91
GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RBNI REA 5484/2015 02/10/2017 01/10/2047  R$99,311.51
GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2048  R$80,126.30
GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBNI REA 4347/2013 18/01/2016 17/01/2042  R$6,316.91
GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBNI REA 5484/2015 02/10/2017 01/10/2047  R$99,311.51
GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /NORDESTE C-1 SP RB FT LT 345 kV GUARULHOS /NORDESTE C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /NORDESTE C-1 SP RB FT LT 345 kV GUARULHOS /NORDESTE C-1 SP 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2048  R$80,126.30
GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /NORDESTE C-1 SP RB FT LT 345 kV GUARULHOS /NORDESTE C-1 SP 062/2001 IPCA RBNI REA 4347/2013 18/01/2016 17/01/2042  R$6,316.91
GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /NORDESTE C-1 SP RB FT LT 345 kV GUARULHOS /NORDESTE C-1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,372,890.86
GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /NORDESTE C-1 SP RB FT LT 345 kV GUARULHOS /NORDESTE C-1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,245,071.61
GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /IBIUNA C-2 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /IBIUNA C-2 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-2 SP 062/2001 IPCA RBNI REA 4347/2013 18/01/2016 17/01/2042  R$5,264.09
GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /IBIUNA C-2 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-2 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,372,890.86
GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /IBIUNA C-1 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /IBIUNA C-1 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-1 SP 062/2001 IPCA RBNI REA 4347/2013 18/01/2016 17/01/2042  R$5,264.09
GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /IBIUNA C-1 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,372,890.86
GUARULHOS EL 345 kV GUARULHOS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
GUARULHOS EL 345 kV GUARULHOS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2048  R$80,126.30
GUARULHOS EL 345 kV GUARULHOS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 4347/2013 18/01/2016 17/01/2042  R$5,264.09
GUARULHOS EL 345 kV GUARULHOS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 5484/2015 04/11/2015 03/11/2033  R$42,471.60
GUARULHOS EL 345 kV GUARULHOS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 5484/2015 27/11/2018 26/11/2048  R$53,100.19
GUARULHOS BC 345 kV 150 Mvar GUARULHOS BC2 SP RB FT BC 345 kV 150 Mvar GUARULHOS BC2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$232,536.06
GUARULHOS BC 345 kV 100 Mvar GUARULHOS BC1 SP RB FT BC 345 kV 100 Mvar GUARULHOS BC1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$205,053.82
GURUPI RTN 69 kV 0,5 Mvar GURUPI RTNSM1 TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$10,888.22
GURUPI RTN 69 kV 0,5 Mvar GURUPI RTNMI1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$10,888.22
GURUPI RTL 500 kV 136 MVAr GURUPI RSM1 TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$591,699.53
GURUPI RTL 500 kV 136 MVAr GURUPI RSM1 TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,065,379.02
GURUPI RTL 500 kV 136 MVAr GURUPI RSM1 TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,779,985.28
GURUPI RTL 500 kV 136 MVAr GURUPI RMI1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$591,699.53
GURUPI RTL 500 kV 136 MVAr GURUPI RMI1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,065,379.02
GURUPI RTL 500 kV 136 MVAr GURUPI RMI1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,779,985.28
GURUPI MG 500 kV GURUPI MG2 TO RB FT MG 500 kV GURUPI MG2 TO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$559,588.55
GURUPI MG 500 kV GURUPI MG2 TO RB FT MG 500 kV GURUPI MG2 TO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,629,118.06
GURUPI MG 500 kV GURUPI MG2 TO RB FT MG 500 kV GURUPI MG2 TO 062/2001 IPCA RMEL REN 443/2011 25/04/2017 24/04/2031  R$157,558.50
GURUPI MG 500 kV GURUPI MG2 TO RB FT MG 500 kV GURUPI MG2 TO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,899,023.75
GURUPI MG 500 kV GURUPI MG2 TO RB FT MG 500 kV GURUPI MG2 TO 062/2001 IPCA RMEL REN 443/2011 25/04/2017 24/04/2031  R$155,378.63
GURUPI MG 500 kV GURUPI MG2 TO RB FT MG 500 kV GURUPI MG2 TO 062/2001 IPCA RBNI REA 6370/2017 11/11/2020 11/11/2051  R$38,070.39
GURUPI MG 500 kV GURUPI MG2 TO RB FT MG 500 kV GURUPI MG2 TO 062/2001 IPCA RBNI REA 6370/2017 18/11/2020 18/11/2051  R$38,070.39
GURUPI MG 500 kV GURUPI MG2 TO RB FT MG 500 kV GURUPI MG2 TO 062/2001 IPCA RBNI REA 5861/2016 13/09/2017 12/09/2033  R$46,407.16
GURUPI MC 69 kV RTN 69 kV 0,5 Mvar GURUPI RTNSM1 TO  RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$7,396.01
GURUPI MC 69 kV RTN 69 kV 0,5 Mvar GURUPI RTNMI1 TO  RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$7,396.01
GURUPI MC 500 kV RTL 500 kV 136 MVAr GURUPI RSM1 TO  RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$198,155.23
GURUPI MC 500 kV RTL 500 kV 136 MVAr GURUPI RMI1 TO  RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$198,155.23
GURUPI MC 500 kV CR 500 kV 361,5 Mvar GURUPI BC3 TO RB FT CR 500 kV 361,5 Mvar GURUPI BC3 TO 062/2001 IPCA RBNI REA 6370/2017 11/11/2020 11/11/2050  R$396,489.15
GURUPI MC 500 kV CR 500 kV 161 MVAr GURUPI BC1 TO RB FT CR 500 kV 161 MVAr GURUPI BC1 TO 062/2001 IPCA RBNI REA 6370/2017 17/11/2020 17/11/2050  R$396,489.15
GURUPI IB 500 kV MG 500 kV GURUPI MG2 TO IB2 RB FT MG 500 kV GURUPI MG2 TO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$347,094.43
GURUPI EL 500 kV GURUPI LT 500 kV S.DA MESA /GURUPI C-1 GO/TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
GURUPI EL 500 kV GURUPI LT 500 kV S.DA MESA /GURUPI C-1 GO/TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,919,850.95
GURUPI EL 500 kV GURUPI LT 500 kV S.DA MESA /GURUPI C-1 GO/TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,741,108.47
GURUPI EL 500 kV GURUPI LT 500 kV GURUPI /MIRACEMA C-1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
GURUPI EL 500 kV GURUPI LT 500 kV GURUPI /MIRACEMA C-1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,919,850.95
GURUPI EL 500 kV GURUPI LT 500 kV GURUPI /MIRACEMA C-1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,741,108.47
GURUPI CR 500 kV 361,5 Mvar GURUPI BC3 TO RB FT CR 500 kV 361,5 Mvar GURUPI BC3 TO 062/2001 IPCA RBNI REA 6370/2017 11/11/2020 11/11/2040  R$ 15,331,968.81
GURUPI CR 500 kV 161 MVAr GURUPI BC1 TO RB FT CR 500 kV 161 MVAr GURUPI BC1 TO 062/2001 IPCA RBNI REA 6370/2017 17/11/2020 17/11/2040  R$ 12,176,455.00
IBIUNA TR 500/345 kV IBIUNA ATR3 SP RB FT TR 500/345 kV IBIUNA ATR3 SP 034/2001 IGPM RBNI REA 3744/2012 09/12/2015 09/12/2050  R$ 6,752,733.60
IBIUNA TR 500/345 kV IBIUNA ATR1 SP RB FT TR 500/345 kV IBIUNA ATR1 SP 034/2001 IGPM RBL CC 034/2001 21/03/2003 09/05/2031  R$ 6,703,213.01
IBIUNA TR 345/20 kV IBIUNA TRW2 SP RB FT CS 330/-220 MVAr IBIUNA CS4 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$502,324.10
IBIUNA TR 500/345 kV IBIUNA ATR2 SP RB FT TR 500/345 kV IBIUNA ATR2 SP 034/2001 IGPM RBL CC 034/2001 21/03/2003 09/05/2031  R$ 6,703,213.01
IBIUNA TR 345/20 kV IBIUNA TRV2 SP RB FT CS 330/-220 MVAr IBIUNA CS3 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,602,357.59
IBIUNA MC 345 kV TR 345/122 kV IBIUNA TR7 SP DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,068,587.41
IBIUNA TR 345/20 kV IBIUNA TRW2 SP RB FT CS 330/-220 MVAr IBIUNA CS4 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,602,357.59
IBIUNA TR 345/20 kV IBIUNA TRW2 SP RB FT CS 330/-220 MVAr IBIUNA CS4 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,360,072.19
IBIUNA TR 345/20 kV IBIUNA TRV2 SP RB FT CS 330/-220 MVAr IBIUNA CS3 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$502,324.10
IBIUNA MC 345 kV TR 345/122 kV IBIUNA TR6 SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$211,326.29
IBIUNA TR 345/20 kV IBIUNA TRV2 SP RB FT CS 330/-220 MVAr IBIUNA CS3 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,360,072.19
IBIUNA TR 345/20 kV IBIUNA TRU2 SP RB FT CS 330/-220 MVAr IBIUNA CS2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$502,324.10
IBIUNA TR 345/20 kV IBIUNA TRU2 SP RB FT CS 330/-220 MVAr IBIUNA CS2 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,602,357.59
IBIUNA TR 345/20 kV IBIUNA TRU2 SP RB FT CS 330/-220 MVAr IBIUNA CS2 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,360,072.19
IBIUNA TR 345/20 kV IBIUNA TRT2 SP RB FT CS 330/-220 MVAr IBIUNA CS1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$502,324.10
IBIUNA TR 345/20 kV IBIUNA TRT2 SP RB FT CS 330/-220 MVAr IBIUNA CS1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,602,357.59
IBIUNA TR 345/20 kV IBIUNA TRT2 SP RB FT CS 330/-220 MVAr IBIUNA CS1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,360,072.19
IBIUNA TR 345/20 kV IBIUNA TR2RES SP RB FT TR 345/20 kV IBIUNA TR2RES SP 062/2001 IPCA RBNI REA 7831/2019 20/08/2021 20/08/2056  R$ 4,032,821.27
IBIUNA RTL 500 kV 105 Mvar IBIUNA RTINBC2 SP RB FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR 034/2001 IGPM RBL CC 034/2001 21/03/2003 09/05/2031  R$ 2,705,702.42
IBIUNA RTL 500 kV 105 Mvar IBIUNA RTINBC1 SP RB FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR 034/2001 IGPM RBL CC 034/2001 21/03/2003 09/05/2031  R$ 2,705,702.42
IBIUNA RTB 500 kV 60 Mvar IBIUNA RTR1 SP RB FT RTB 500 kV 60 Mvar IBIUNA RTR1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$215,336.93
IBIUNA RTB 500 kV 180 Mvar IBIUNA RT3 SP RB FT RTB 500 kV 180 Mvar IBIUNA RT3 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$646,010.79
IBIUNA MG 500 kV IBIUNA MG2 SP RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,923,077.88
IBIUNA MG 500 kV IBIUNA MG2 SP RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RMEL REN 443/2011 20/06/2016 19/06/2029  R$11,972.67
IBIUNA MG 500 kV IBIUNA MG2 SP RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBNI REA 7831/2019 13/08/2021 13/08/2051  R$36,208.14
IBIUNA MG 500 kV IBIUNA MG2 SP RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBNI REA 8314/2019 11/02/2021 10/02/2036  R$22,081.46
IBIUNA MG 500 kV IBIUNA MG1 SP RB FT MG 500 kV IBIUNA MG1 SP 034/2001 IGPM RBL CC 034/2001 21/03/2003 09/05/2031  R$ 12,310,531.90
IBIUNA MG 500 kV IBIUNA MG1 SP RB FT MG 500 kV IBIUNA MG1 SP 034/2001 IGPM RMEL REN 443/2011 20/06/2016 19/06/2031  R$6,673.07
IBIUNA MG 500 kV IBIUNA MG1 SP RB FT MG 500 kV IBIUNA MG1 SP 034/2001 IGPM RMEL REN 443/2011 20/06/2016 19/06/2031  R$6,673.07
IBIUNA MG 500 kV IBIUNA MG1 SP RB FT MG 500 kV IBIUNA MG1 SP 034/2001 IGPM RMEL REN 443/2011 20/06/2016 19/06/2031  R$6,673.07
IBIUNA MG 500 kV IBIUNA MG1 SP RB FT MG 500 kV IBIUNA MG1 SP 034/2001 IGPM RBNI REA 8314/2019 11/02/2021 10/02/2036  R$23,117.52
IBIUNA MG 500 kV IBIUNA MG1 SP RB FT MG 500 kV IBIUNA MG1 SP 034/2001 IGPM RBNI REA 8314/2019 11/02/2021 10/02/2036  R$23,117.52
IBIUNA MG 500 kV IBIUNA MG1 SP RB FT MG 500 kV IBIUNA MG1 SP 034/2001 IGPM RBNI REA 8314/2019 10/02/2021 09/02/2036  R$40,314.27
IBIUNA MC 500 kV TR 500/345 kV IBIUNA ATR3 SP RB FT TR 500/345 kV IBIUNA ATR3 SP 034/2001 IGPM RBNI REA 3744/2012 09/12/2015 09/12/2043  R$ 2,310,902.85
IBIUNA MC 500 kV TR 500/345 kV IBIUNA ATR2 SP  RB FT TR 500/345 kV IBIUNA ATR2 SP 034/2001 IGPM RBL CC 034/2001 21/03/2003 09/05/2031  R$ 2,447,484.84
IBIUNA MC 500 kV TR 500/345 kV IBIUNA ATR1 SP  RB FT TR 500/345 kV IBIUNA ATR1 SP 034/2001 IGPM RBL CC 034/2001 21/03/2003 09/05/2031  R$ 2,447,484.84
IBIUNA MC 500 kV RTB 500 kV 180 Mvar IBIUNA RT3 SP RB FT RTB 500 kV 180 Mvar IBIUNA RT3 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$306,236.98
IBIUNA MC 345 kV TR 500/345 kV IBIUNA ATR3 SP RB FT TR 500/345 kV IBIUNA ATR3 SP 034/2001 IGPM RBNI REA 3744/2012 09/12/2015 09/12/2042  R$ 1,586,316.07
IBIUNA MC 345 kV TR 500/345 kV IBIUNA ATR2 SP  RB FT TR 500/345 kV IBIUNA ATR2 SP 034/2001 IGPM RBL CC 034/2001 21/03/2003 09/05/2031  R$ 1,333,583.93
IBIUNA MC 345 kV TR 500/345 kV IBIUNA ATR1 SP  RB FT TR 500/345 kV IBIUNA ATR1 SP 034/2001 IGPM RBL CC 034/2001 21/03/2003 09/05/2031  R$ 1,333,583.93
IBIUNA MC 345 kV TR 345/20 kV IBIUNA TRW2 SP RB FT CS 330/-220 MVAr IBIUNA CS4 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,265.74
IBIUNA MC 345 kV TR 345/20 kV IBIUNA TRV2 SP RB FT CS 330/-220 MVAr IBIUNA CS3 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,265.74
IBIUNA MC 345 kV TR 345/20 kV IBIUNA TRU2 SP RB FT CS 330/-220 MVAr IBIUNA CS2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,265.74
IBIUNA MC 345 kV TR 345/20 kV IBIUNA TRT2 SP RB FT CS 330/-220 MVAr IBIUNA CS1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,265.74
IBIUNA MC 345 kV TR 345/122 kV IBIUNA TR8 SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$211,326.29
IBIUNA MC 345 kV TR 345/122 kV IBIUNA TR7 SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$211,326.29
IBIUNA MC 345 kV TR 345/122 kV IBIUNA TR5 SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$211,326.29
IBIUNA MC 345 kV TR 345/122 kV IBIUNA TR4 SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$211,326.29
IBIUNA MC 345 kV TR 345/122 kV IBIUNA TR3 SP  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$211,326.29
IBIUNA MC 345 kV TR 345/122 kV IBIUNA TR2 SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$211,326.29
IBIUNA MC 345 kV TR 345/122 kV IBIUNA TR1 SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$211,326.29
IBIUNA MC 345 kV BF 345 kV 59 Mvar IBIUNA ZRJ SP  RB FT BF 345 kV 59 Mvar IBIUNA ZRJ SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$213,278.01
IBIUNA CV 600/600 kV IBIUNA CVR3 SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 3,498,342.65
IBIUNA CV 600/600 kV IBIUNA CV5 SP DIT   062/2001 IPCA RMEL REA 11324/2022 14/04/2022 14/04/2057  R$ 2,302,780.38
IBIUNA MC 345 kV BF 345 kV 59 Mvar IBIUNA ZRI SP  RB FT BF 345 kV 59 Mvar IBIUNA ZRI SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$213,278.01
IBIUNA MC 345 kV BF 345 kV 296,3 Mvar IBIUNA ZRL SP  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$218,510.60
IBIUNA MC 345 kV BF 345 kV 296 Mvar IBIUNA ZRN SP  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$218,510.60
IBIUNA MC 345 kV BF 345 kV 294 Mvar IBIUNA ZRG SP  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$218,510.60
IBIUNA MC 345 kV BF 345 kV 294 Mvar IBIUNA ZRD SP  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$218,510.60
IBIUNA MC 345 kV BF 345 kV 294 Mvar IBIUNA ZRD SP  DIT   062/2001 IPCA RMEL REN 643/2014 05/02/2016 04/02/2047  R$242,867.36
IBIUNA MC 345 kV BF 345 kV 279,8 Mvar IBIUNA ZRC SP  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$218,510.60
IBIUNA MC 345 kV BF 345 kV 237 Mvar IBIUNA ZRH SP  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$218,510.60
IBIUNA MC 345 kV BF 345 kV 237 Mvar IBIUNA ZRF SP  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$218,510.60
IBIUNA MC 345 kV BF 345 kV 237 Mvar IBIUNA ZRB SP  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$218,510.60
IBIUNA MC 345 kV BF 345 kV 237 Mvar IBIUNA ZRA SP  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$218,510.60
IBIUNA MC 345 kV BF 345 kV 237 Mvar IBIUNA ZRA SP  DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,104,915.40
IBIUNA MC 345 kV BF 345 kV 220,8 Mvar IBIUNA ZRM SP  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$218,510.60
IBIUNA MC 345 kV BF 345 kV 220,8 Mvar IBIUNA ZRK SP  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$218,510.60
IBIUNA MC 345 kV BF 345 kV 220,8 Mvar IBIUNA ZRE SP  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$218,510.60
IBIUNA MC 20 kV CS 330/-220 MVAr IBIUNA CS4 SP  RB FT CS 330/-220 MVAr IBIUNA CS4 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$47,655.63
IBIUNA MC 20 kV CS 330/-220 MVAr IBIUNA CS3 SP  RB FT CS 330/-220 MVAr IBIUNA CS3 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$47,655.63
IBIUNA MC 20 kV CS 330/-220 MVAr IBIUNA CS2 SP  RB FT CS 330/-220 MVAr IBIUNA CS2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$47,655.63
IBIUNA MC 20 kV CS 330/-220 MVAr IBIUNA CS1 SP  RB FT CS 330/-220 MVAr IBIUNA CS1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$47,655.63
IBIUNA MC 13,8 kV TR 500/345 kV IBIUNA ATR3 SP  RB FT TR 500/345 kV IBIUNA ATR3 SP 034/2001 IGPM RBNI REA 3744/2012 09/12/2015 09/12/2035  R$127,951.77
IBIUNA IB 500 kV MG 500 kV IBIUNA MG2 SP IB4 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$347,094.43
IBIUNA IB 500 kV MG 500 kV IBIUNA MG2 SP IB3 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$347,094.43
IBIUNA IB 500 kV MG 500 kV IBIUNA MG2 SP IB2 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$347,094.43
IBIUNA IB 500 kV MG 500 kV IBIUNA MG2 SP IB1 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$347,094.43
IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB9 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB8 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB7 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB6 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB5 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB4 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB3 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB3 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,036,883.85
IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB20 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB2 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB2 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,036,883.85
IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB19 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB18 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB17 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB16 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB15 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB14 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB13 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB12 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB11 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB10 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB1 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
IBIUNA EL 500 kV IBIUNA LT 500 kV IBIUNA /ITATIBA C-1 SP  RB FT LT 500 kV IBIUNA /ITATIBA C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
IBIUNA EL 500 kV IBIUNA LT 500 kV IBIUNA /BATEIAS C-2 SP/PR  RB FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR 034/2001 IGPM RBL CC 034/2001 21/03/2003 09/05/2031  R$ 2,713,265.28
IBIUNA EL 500 kV IBIUNA LT 500 kV IBIUNA /BATEIAS C-2 SP/PR  RB FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR 034/2001 IGPM RBNI REA 5484/2015 09/03/2018 08/03/2042  R$108,215.13
IBIUNA EL 500 kV IBIUNA LT 500 kV IBIUNA /BATEIAS C-2 SP/PR  RB FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR 034/2001 IGPM RBNI REA 5861/2016 10/02/2021 09/02/2036  R$15,454.63
IBIUNA EL 500 kV IBIUNA LT 500 kV IBIUNA /BATEIAS C-1 SP/PR  RB FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR 034/2001 IGPM RBL CC 034/2001 21/03/2003 09/05/2031  R$ 2,713,265.28
IBIUNA EL 500 kV IBIUNA LT 500 kV IBIUNA /BATEIAS C-1 SP/PR  RB FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR 034/2001 IGPM RBNI REA 5484/2015 09/03/2018 08/03/2042  R$126,250.99
IBIUNA EL 500 kV IBIUNA LT 500 kV IBIUNA /BATEIAS C-1 SP/PR  RB FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR 034/2001 IGPM RBNI REA 5861/2016 10/02/2021 09/02/2036  R$15,454.63
IBIUNA EL 345 kV IBIUNA LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
IBIUNA EL 345 kV IBIUNA LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
IBIUNA EL 345 kV IBIUNA LT 345 kV IBIUNA /INTERLAGOS C-2 SP  RB FT LT 345 kV IBIUNA /INTERLAGOS C-2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
IBIUNA EL 345 kV IBIUNA LT 345 kV IBIUNA /INTERLAGOS C-1 SP  RB FT LT 345 kV IBIUNA /INTERLAGOS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
IBIUNA EL 345 kV IBIUNA LT 345 kV GUARULHOS /IBIUNA C-2 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
IBIUNA EL 345 kV IBIUNA LT 345 kV GUARULHOS /IBIUNA C-2 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-2 SP 062/2001 IPCA RMEL REN 643/2014 06/03/2016 05/03/2038  R$34,103.17
IBIUNA EL 345 kV IBIUNA LT 345 kV GUARULHOS /IBIUNA C-1 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
IBIUNA CV 600/600 kV IBIUNA CVR4 SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 3,498,342.65
IBIUNA CV 600/600 kV IBIUNA CV4 SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 10,495,027.95
IBIUNA CV 600/600 kV IBIUNA CVR2 SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 3,498,342.65
IBIUNA CV 600/600 kV IBIUNA CVR1 SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 3,498,342.65
IBIUNA CV 600/600 kV IBIUNA CV8 SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 10,495,027.95
IBIUNA CV 600/600 kV IBIUNA CV7 SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 10,495,027.95
IBIUNA CV 600/600 kV IBIUNA CV6 SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 10,495,027.95
IBIUNA CV 600/600 kV IBIUNA CV5D SP DIT   062/2001 IPCA RMEL REN 443/2011 25/05/2017 24/05/2047  R$2,798.35
IBIUNA CV 600/600 kV IBIUNA CV5 SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 10,495,027.95
IBIUNA CV 600/600 kV IBIUNA CV5 SP DIT   062/2001 IPCA RMEL REN 443/2011 25/05/2017 24/05/2047  R$2,798.35
IBIUNA CV 600/600 kV IBIUNA CV2 SP DIT   062/2001 IPCA RMEL REA 11324/2022 14/04/2022 14/04/2057  R$ 1,340,379.88
IBIUNA CV 600/600 kV IBIUNA CV2 SP DIT   062/2001 IPCA RMEL REA 11324/2022 14/04/2022 14/04/2057  R$ 1,200,992.21
IBIUNA CV 600/600 kV IBIUNA CV3 SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 10,495,027.95
IBIUNA CV 600/600 kV IBIUNA CV2 SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 10,495,027.95
IBIUNA CV 600/600 kV IBIUNA CV1 SP DIT   062/2001 IPCA RMEL REA 11324/2022 14/04/2022 14/04/2057  R$ 2,230,114.51
IBIUNA CV 600/600 kV IBIUNA CV1 SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 10,495,027.95
IBIUNA CV 600/600 kV IBIUNA CV1 SP DIT   062/2001 IPCA RMEL REA 7831/2019 28/10/2021 28/10/2056  R$ 5,625,918.89
IBIUNA CS 330/-220 MVAr IBIUNA CS4 SP RB FT CS 330/-220 MVAr IBIUNA CS4 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 11,064,907.85
IBIUNA CS 330/-220 MVAr IBIUNA CS2 SP RB FT CS 330/-220 MVAr IBIUNA CS2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,135,820.97
IBIUNA CS 330/-220 MVAr IBIUNA CS4 SP RB FT CS 330/-220 MVAr IBIUNA CS4 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,135,820.97
IBIUNA CS 330/-220 MVAr IBIUNA CS2 SP RB FT CS 330/-220 MVAr IBIUNA CS2 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 11,064,907.85
IBIUNA CS 330/-220 MVAr IBIUNA CS3 SP RB FT CS 330/-220 MVAr IBIUNA CS3 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,135,820.97
IBIUNA CS 330/-220 MVAr IBIUNA CS3 SP RB FT CS 330/-220 MVAr IBIUNA CS3 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 11,064,907.85
IBIUNA CS 330/-220 MVAr IBIUNA CS1 SP RB FT CS 330/-220 MVAr IBIUNA CS1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,135,820.97
IBIUNA CS 330/-220 MVAr IBIUNA CS1 SP RB FT CS 330/-220 MVAr IBIUNA CS1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 11,064,907.85
IBIUNA CR 500 kV 382 MVAr IBIUNA BC2B SP RB FT CR 500 kV 382 MVAr IBIUNA BC2A SP 034/2001 IGPM RBL CC 034/2001 21/03/2003 09/05/2031  R$ 11,729,452.32
IBIUNA CR 500 kV 382 MVAr IBIUNA BC1A SP RB FT CR 500 kV 382 MVAr IBIUNA BC1A SP 034/2001 IGPM RBL CC 034/2001 21/03/2003 09/05/2031  R$ 11,729,452.32
IBIUNA BF 345 kV 59 Mvar IBIUNA ZRJ SP RB FT BF 345 kV 59 Mvar IBIUNA ZRJ SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$169,291.12
IBIUNA CR 500 kV 382 MVAr IBIUNA BC2A SP RB FT CR 500 kV 382 MVAr IBIUNA BC2A SP 034/2001 IGPM RBL CC 034/2001 21/03/2003 09/05/2031  R$ 11,729,452.32
IBIUNA CR 500 kV 382 MVAr IBIUNA BC1B SP RB FT CR 500 kV 382 MVAr IBIUNA BC1A SP 034/2001 IGPM RBL CC 034/2001 21/03/2003 09/05/2031  R$ 11,729,452.32
IBIUNA BF 345 kV 59 Mvar IBIUNA ZRI SP RB FT BF 345 kV 59 Mvar IBIUNA ZRI SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$169,291.12
IBIUNA BF 345 kV 294 Mvar IBIUNA ZRD SP RB FT BF 345 kV 294 Mvar IBIUNA ZRD SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$278,147.92
IBIUNA BF 345 kV 279,8 Mvar IBIUNA ZRC SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$281,534.31
IBIUNA BF 345 kV 296,3 Mvar IBIUNA ZRL SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$285,513.18
IBIUNA BF 345 kV 296 Mvar IBIUNA ZRN SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$285,513.18
IBIUNA BF 345 kV 294 Mvar IBIUNA ZRG SP RB FT BF 345 kV 294 Mvar IBIUNA ZRG SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$278,147.92
IBIUNA BF 345 kV 237 Mvar IBIUNA ZRF SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$270,005.83
IBIUNA BF 345 kV 237 Mvar IBIUNA ZRB SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$270,005.83
IBIUNA BF 345 kV 237 Mvar IBIUNA ZRH SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$270,005.83
IBIUNA BF 345 kV 237 Mvar IBIUNA ZRA SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$270,005.83
IBIUNA BF 345 kV 220,8 Mvar IBIUNA ZRM SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$265,089.10
IBIUNA BF 345 kV 220,8 Mvar IBIUNA ZRK SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$265,089.10
IBIUNA BF 345 kV 220,8 Mvar IBIUNA ZRE SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$265,089.10
IMBARIE MG 138 kV IMBARIE MG1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$257,739.27
IMBARIE IB 138 kV MG 138 kV IMBARIE MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$70,192.63
IMBARIE IB 138 kV MG 138 kV IMBARIE MG1 RJ IB1 DIT   062/2001 IPCA RMEL REN 443/2011 26/04/2017 25/04/2049  R$119,118.49
IMBARIE IB 138 kV MG 138 kV IMBARIE MG1 RJ IB1 DIT   062/2001 IPCA RMEL REN 443/2011 26/04/2017 25/04/2046  R$28,619.23
IMBARIE IB 138 kV MG 138 kV IMBARIE MG1 RJ IB1 DIT   062/2001 IPCA RMEL REN 443/2011 26/04/2017 25/04/2046  R$28,619.23
IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 02/04/2017 01/04/2040  R$4,910.05
IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 02/04/2017 01/04/2040  R$4,910.05
IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 02/04/2017 01/04/2040  R$4,910.05
IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 02/04/2017 01/04/2049  R$113,570.58
IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 02/04/2017 01/04/2046  R$27,720.03
IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 02/04/2017 01/04/2046  R$27,720.03
IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 02/04/2017 01/04/2046  R$40,173.96
IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 12/03/2017 11/03/2040  R$4,903.86
IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 12/03/2017 11/03/2040  R$4,903.86
IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 12/03/2017 11/03/2040  R$4,903.86
IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 12/03/2017 11/03/2049  R$113,445.95
IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 12/03/2017 11/03/2046  R$27,688.07
IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 12/03/2017 11/03/2046  R$27,688.07
IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 12/03/2017 11/03/2046  R$40,127.66
IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 08/08/2014 07/08/2038  R$55,507.26
IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 19/12/2016 18/12/2046  R$222,340.86
IMBARIE EL 138 kV IMBARIEDIST3 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
IMBARIE EL 138 kV IMBARIEDIST3 DIT   062/2001 IPCA RMEL REN 443/2011 23/04/2017 22/04/2046  R$27,763.76
IMBARIE EL 138 kV IMBARIEDIST3 DIT   062/2001 IPCA RMEL REN 443/2011 23/04/2017 22/04/2046  R$27,763.76
IMBARIE EL 138 kV IMBARIEDIST3 DIT   062/2001 IPCA RMEL REN 443/2011 23/04/2017 22/04/2046  R$27,763.76
IMBARIE EL 138 kV IMBARIEDIST3 DIT   062/2001 IPCA RMEL REN 443/2011 23/04/2017 22/04/2049  R$113,735.45
IMBARIE EL 138 kV IMBARIEDIST2 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
IMBARIE EL 138 kV IMBARIEDIST2 DIT   062/2001 IPCA RMEL REN 643/2014 21/11/2016 20/11/2047  R$246,032.09
IMBARIE EL 138 kV IMBARIEDIST1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
IMBARIE EL 138 kV IMBARIEDIST1 DIT   062/2001 IPCA RMEL REN 643/2014 31/01/2016 30/01/2046  R$137,668.09
IMBARIE EL 138 kV IMBARIEDIST1 DIT   062/2001 IPCA RMEL REN 643/2014 24/01/2016 23/01/2044  R$66,037.87
IMBARIE EL 138 kV IMBARIEDIST1 DIT   062/2001 IPCA RMEL REN 443/2011 28/01/2017 27/01/2040  R$4,890.88
IMBARIE EL 138 kV IMBARIEDIST1 DIT   062/2001 IPCA RMEL REN 443/2011 28/01/2017 27/01/2040  R$4,890.88
IMBARIE EL 138 kV IMBARIEDIST1 DIT   062/2001 IPCA RMEL REN 443/2011 28/01/2017 27/01/2040  R$4,890.88
IRIRI MG 138 kV IRIRI MG1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$248,656.76
IRIRI MG 138 kV IRIRI MG1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032  R$4,685.77
IRIRI IB 138 kV MG 138 kV IRIRI MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$78,514.10
IRIRI EL 138 kV IRIRI LT 138 kV IRIRI /ROCHA LEAO C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$139,341.27
IRIRI EL 138 kV IRIRI LT 138 kV CAMPOS /IRIRI C-2 RJ  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$139,341.27
IRIRI EL 138 kV IRIRIDIST3 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$139,341.27
IRIRI EL 138 kV IRIRIDIST2 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$139,341.27
IRIRI EL 138 kV IRIRIDIST1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$139,341.27
ITABERA RTL 750 kV 329 Mvar ITABERA RIV3 SP RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$821,925.66
ITABERA RTL 750 kV 329 Mvar ITABERA RIV2 SP RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,861,658.00
ITABERA RTL 750 kV 329 Mvar ITABERA RIV3 SP RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,258,096.43
ITABERA RTL 750 kV 329 Mvar ITABERA RIV3 SP RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,861,658.00
ITABERA RTL 750 kV 329 Mvar ITABERA RIV2 SP RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$821,925.66
ITABERA RTL 750 kV 329 Mvar ITABERA RIV2 SP RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,258,096.43
ITABERA RTL 750 kV 329 Mvar ITABERA RIV1 SP RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$821,925.66
ITABERA RTB 765 kV 330 Mvar ITABERA RT2 SP RB FT RTB 765 kV 330 Mvar ITABERA RT2 SP 062/2001 IPCA RBNI REA 5822/2016 01/08/2019 01/08/2055  R$ 4,258,164.61
ITABERA RTL 750 kV 329 Mvar ITABERA RIV1 SP RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,258,096.43
ITABERA RTL 750 kV 329 Mvar ITABERA RIV1 SP RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,861,658.00
ITABERA RTB 750 kV 329 Mvar ITABERA RT1 SP RB FT RTB 750 kV 329 Mvar ITABERA RT1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$821,925.66
ITABERA RTB 750 kV 329 Mvar ITABERA RT1 SP RB FT RTB 750 kV 329 Mvar ITABERA RT1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,258,096.43
ITABERA RTB 750 kV 329 Mvar ITABERA RT1 SP RB FT RTB 750 kV 329 Mvar ITABERA RT1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,861,658.00
ITABERA RTB 750 kV 110 Mvar ITABERA RTR 2 SP RB FT RTB 750 kV 110 Mvar ITABERA RTR 2 SP 062/2001 IPCA RBNI REA 5822/2016 01/08/2019 01/08/2055  R$ 1,419,388.21
ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$997,976.89
ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBNI REA 5822/2016 01/08/2019 01/08/2050  R$198,716.44
ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,170,153.52
ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RMEL REN 443/2011 20/06/2016 19/06/2029  R$23,226.38
ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RMEL REN 443/2011 20/06/2016 19/06/2029  R$11,613.20
ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RMEL REN 443/2011 20/06/2016 19/06/2029  R$11,613.20
ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RMEL REN 443/2011 20/06/2016 19/06/2029  R$8,753.88
ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RMEL REN 443/2011 20/06/2016 19/06/2029  R$8,753.88
ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RMEL REN 443/2011 20/06/2016 19/06/2029  R$8,753.88
ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RMEL REN 443/2011 20/06/2016 19/06/2029  R$8,753.88
ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RMEL REN 443/2011 20/06/2016 19/06/2029  R$11,628.69
ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 09/07/2019 08/07/2034  R$13,151.99
ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 09/07/2019 08/07/2034  R$13,151.99
ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RMEL REN 443/2011 20/06/2016 19/06/2029  R$11,597.69
ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 09/07/2019 08/07/2034  R$13,151.99
ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 09/07/2019 08/07/2034  R$13,151.99
ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 09/07/2019 08/07/2034  R$13,151.99
ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 09/07/2019 08/07/2034  R$13,151.99
ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 09/07/2019 08/07/2034  R$24,242.36
ITABERA MC 750 kV RTB 750 kV 329 Mvar ITABERA RT1 SP  RB FT RTB 750 kV 329 Mvar ITABERA RT1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$507,441.28
ITABERA IB 750 kV MG 750 kV ITABERA MG1 SP IB4 RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$618,807.76
ITABERA MC 765 kV RTB 765 kV 330 Mvar ITABERA RT2 SP RB FT RTB 765 kV 330 Mvar ITABERA RT2 SP 062/2001 IPCA RBNI REA 5822/2016 01/08/2019 01/08/2048  R$ 2,717,347.03
ITABERA IB 750 kV MG 750 kV ITABERA MG1 SP IB3 RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$618,807.76
ITABERA IB 750 kV MG 750 kV ITABERA MG1 SP IB2 RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$618,807.76
ITABERA IB 750 kV MG 750 kV ITABERA MG1 SP IB1 RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$618,807.76
ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-3 SP  RB FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$584,626.93
ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-3 SP  RB FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBNI REA 5861/2016 07/12/2017 06/12/2037  R$12,908.91
ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR  RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$584,626.93
ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-3 SP  RB FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBNI REA 5861/2016 09/07/2019 08/07/2034  R$11,160.19
ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-2 SP  RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$584,626.93
ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-2 SP  RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBNI REA 5861/2016 09/07/2019 08/07/2034  R$11,160.19
ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-1 SP  RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$584,626.93
ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-1 SP  RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,028,738.44
ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-1 SP  RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,746,756.02
ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-1 SP  RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBNI REA 5861/2016 09/07/2019 08/07/2034  R$11,160.19
ITABERA CR 750 kV 621 Mvar ITABERA BC1B SP RB FT CR 750 kV 621 Mvar ITABERA BC1B SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,442,663.44
ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR  RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBNI REA 5861/2016 18/04/2018 17/04/2038  R$13,043.30
ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR  RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBNI REA 5861/2016 09/07/2019 08/07/2034  R$11,160.19
ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-2 SP/PR  RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$584,626.93
ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-2 SP/PR  RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,028,738.44
ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-2 SP/PR  RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBNI REA 5861/2016 09/07/2019 08/07/2034  R$11,160.19
ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-1 SP/PR  RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$584,626.93
ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-1 SP/PR  RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,028,738.44
ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-1 SP/PR  RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,746,756.02
ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-1 SP/PR  RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBNI REA 5861/2016 09/07/2019 08/07/2034  R$11,160.19
ITABERA CR 750 kV 621 Mvar ITABERA BC3B SP RB FT CR 750 kV 621 Mvar ITABERA BC3B SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,442,663.44
ITABERA CR 750 kV 621 Mvar ITABERA BC3A SP RB FT CR 750 kV 621 Mvar ITABERA BC3A SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,442,663.44
ITABERA CR 750 kV 621 Mvar ITABERA BC2B SP RB FT CR 750 kV 621 Mvar ITABERA BC2B SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,442,663.44
ITABERA CR 750 kV 621 Mvar ITABERA BC2A SP RB FT CR 750 kV 621 Mvar ITABERA BC2A SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,442,663.44
ITABERA CR 750 kV 621 Mvar ITABERA BC1A SP RB FT CR 750 kV 621 Mvar ITABERA BC1A SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,442,663.44
ITAPETI EL 345 kV ITAPETI LT 345 kV ITAPETI /TIJUCO PRETO C-4 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-4 SP 007/2006 IPCA RBL CC 007/2006 27/04/2006 27/04/2036  R$ 2,279,105.81
ITAPETI EL 345 kV ITAPETI LT 345 kV ITAPETI /TIJUCO PRETO C-3 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-3 SP 007/2006 IPCA RBL CC 007/2006 27/04/2006 27/04/2036  R$ 2,279,105.81
ITAPETI EL 345 kV ITAPETI LT 345 kV ITAPETI /NORDESTE C-1 SP RB FT LT 345 kV ITAPETI /NORDESTE C-1 SP 007/2006 IPCA RBL CC 007/2006 27/04/2006 27/04/2036  R$ 2,279,105.81
ITATIBA EL 500 kV ITATIBA LT 500 kV ITATIBA /CAMPINAS C-1 SP  RB FT LT 500 kV ITATIBA /CAMPINAS C-1 SP 062/2001 IPCA RBNI REA 6605/2017 01/07/2018 17/06/2041  R$265,005.77
ITATIBA EL 500 kV ITATIBA LT 500 kV IBIUNA /ITATIBA C-1 SP  RB FT LT 500 kV IBIUNA /ITATIBA C-1 SP 062/2001 IPCA RBNI REA 6605/2017 01/07/2018 17/06/2041  R$265,005.77
ITUMBIARA TR 500/345 kV ITUMBIARA TRR1 MG RB FT TR 500/345 kV ITUMBIARA TRR1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$504,189.36
ITUMBIARA TR 500/345 kV ITUMBIARA TRR1 MG RB FT TR 500/345 kV ITUMBIARA TRR1 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,612,020.79
ITUMBIARA TR 500/345 kV ITUMBIARA TR53 MG RB FT TR 500/345 kV ITUMBIARA TR53 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,511,686.56
ITUMBIARA TR 500/345 kV ITUMBIARA TR53 MG RB FT TR 500/345 kV ITUMBIARA TR53 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 7,831,495.58
ITUMBIARA TR 500/345 kV ITUMBIARA TR50 MG RB FT TR 500/345 kV ITUMBIARA TR50 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,511,686.56
ITUMBIARA TR 500/345 kV ITUMBIARA TR50 MG RB FT TR 500/345 kV ITUMBIARA TR50 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 7,831,495.58
ITUMBIARA TR 345/230 kV ITUMBIARA TRR4 MG RB FT TR 345/230 kV ITUMBIARA TRR4 MG 062/2001 IPCA RBNI REA 4326/2013 28/12/2016 27/12/2049  R$ 1,620,088.18
ITUMBIARA TR 345/230 kV ITUMBIARA TR2 MG RB FT TR 345/230 kV ITUMBIARA TR2 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$486,805.40
ITUMBIARA TR 500/345 kV ITUMBIARA TR49 MG RB FT TR 500/345 kV ITUMBIARA TR49 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,511,686.56
ITUMBIARA TR 500/345 kV ITUMBIARA TR49 MG RB FT TR 500/345 kV ITUMBIARA TR49 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 7,831,495.58
ITUMBIARA TR 500/345 kV ITUMBIARA TR49 MG RB FT TR 500/345 kV ITUMBIARA TR49 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 7,102,365.58
ITUMBIARA RTL 500 kV 111 Mvar ITUMBIARA RTEBIM MG RB FT LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,861,482.69
ITUMBIARA TR 345/230 kV ITUMBIARA TR2 MG RB FT TR 345/230 kV ITUMBIARA TR2 MG 062/2001 IPCA RMEL REN 643/2014 26/07/2015 25/07/2044  R$4,132.73
ITUMBIARA TR345/230kV ITUMBIARATR3 MG RB FT TR345/230kV ITUMBIARATR3 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$486,805.40
ITUMBIARA TR345/230kV ITUMBIARATR3 MG RB FT TR345/230kV ITUMBIARATR3 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,521,960.85
ITUMBIARA TR345/230kV ITUMBIARATR3 MG RB FT TR345/230kV ITUMBIARATR3 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,287,160.58
ITUMBIARA TR345/230kV ITUMBIARATR1 MG RB FT TR345/230kV ITUMBIARATR1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$486,805.40
ITUMBIARA TR345/230kV ITUMBIARATR1 MG RB FT TR345/230kV ITUMBIARATR1 MG 062/2001 IPCA RMEL REN 643/2014 10/08/2015 09/08/2044  R$4,137.67
ITUMBIARA RTL 500 kV 111 Mvar ITUMBIARA RTEBIM MG RB FT LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,595,072.16
ITUMBIARA RTL 345 kV 96 Mvar ITUMBIARA RTCL MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,223,134.76
ITUMBIARA RTL 345 kV 96 Mvar ITUMBIARA RTCL MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2044  R$5,524.18
ITUMBIARA RTL 500 kV 111 Mvar ITUMBIARA RTEBIM MG RB FT LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG 062/2001 IPCA RMEL REN 443/2011 15/10/2014 14/10/2035  R$47,280.91
ITUMBIARA RTL 500 kV 111 Mvar ITUMBIARA RTEBIM MG RB FT LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG 062/2001 IPCA RMEL REA 9185/2020 26/10/2020 26/10/2054  R$668,025.65
ITUMBIARA RTL 345 kV 96 Mvar ITUMBIARA RTCL MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$473,177.97
ITUMBIARA RTL 345 kV 96 Mvar ITUMBIARA RTCL MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,451,362.13
ITUMBIARA RTL 345 kV 96 Mvar ITUMBIARA RTCL MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RMEL REN 443/2011 06/05/2014 05/05/2034  R$32,826.57
ITUMBIARA RTL 345 kV 96 Mvar ITUMBIARA RTCL MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RMEL REA 9185/2020 26/10/2020 26/10/2054  R$481,828.82
ITUMBIARA MG 500 kV ITUMBIARA MG1 MG RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,023,670.72
ITUMBIARA MG 500 kV ITUMBIARA MG1 MG RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBNI REA 4326/2013 28/12/2016 27/12/2042  R$135,602.35
ITUMBIARA MG 500 kV ITUMBIARA MG1 MG RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 10,483,898.41
ITUMBIARA MG 500 kV ITUMBIARA MG1 MG RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBNI REA 5861/2016 13/09/2017 12/09/2033  R$46,407.16
ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG3 MG DIT   062/2001 IPCA RMEL REN 643/2014 15/10/2015 14/10/2037  R$48,817.66
ITUMBIARA MG 500 kV ITUMBIARA MG1 MG RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 9,507,823.69
ITUMBIARA MG 500 kV ITUMBIARA MG1 MG RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032  R$ 812.28
ITUMBIARA MG 500 kV ITUMBIARA MG1 MG RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RMEL REN 443/2011 25/08/2017 24/08/2031  R$12,008.16
ITUMBIARA MC 345 kV TR345/230kV ITUMBIARATR1 MG  RB FT TR345/230kV ITUMBIARATR1 MG 062/2001 IPCA RBNI REA 4068/2013 04/02/2016 03/02/2044  R$41,909.15
ITUMBIARA MG 500 kV ITUMBIARA MG1 MG RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBNI REA 8314/2019 11/02/2021 10/02/2036  R$41,445.07
ITUMBIARA MG 500 kV ITUMBIARA MG1 MG RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBNI REA 8314/2019 11/02/2021 10/02/2036  R$41,445.07
ITUMBIARA MC 500 kV TR 500/345 kV ITUMBIARA TR53 MG RB FT TR 500/345 kV ITUMBIARA TR53 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$327,073.06
ITUMBIARA MC 500 kV TR 500/345 kV ITUMBIARA TR53 MG RB FT TR 500/345 kV ITUMBIARA TR53 MG 062/2001 IPCA RMEL REN 443/2011 03/10/2014 02/10/2035  R$47,218.95
ITUMBIARA MC 500 kV TR 500/345 kV ITUMBIARA TR53 MG RB FT TR 500/345 kV ITUMBIARA TR53 MG 062/2001 IPCA RBNI REA 5861/2016 13/03/2021 12/03/2036  R$101,915.50
ITUMBIARA MC 500 kV TR 500/345 kV ITUMBIARA TR50 MG RB FT TR 500/345 kV ITUMBIARA TR50 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$327,073.06
ITUMBIARA MC 500 kV TR 500/345 kV ITUMBIARA TR50 MG RB FT TR 500/345 kV ITUMBIARA TR50 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,694,445.99
ITUMBIARA MC 500 kV TR 500/345 kV ITUMBIARA TR50 MG RB FT TR 500/345 kV ITUMBIARA TR50 MG 062/2001 IPCA RMEL REN 443/2011 07/12/2014 06/12/2035  R$47,507.00
ITUMBIARA MC 500 kV TR 500/345 kV ITUMBIARA TR50 MG RB FT TR 500/345 kV ITUMBIARA TR50 MG 062/2001 IPCA RBNI REA 5861/2016 07/05/2021 06/05/2036  R$117,368.79
ITUMBIARA MC 500 kV TR 500/345 kV ITUMBIARA TR49 MG  RB FT TR 500/345 kV ITUMBIARA TR49 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$327,073.06
ITUMBIARA MC 500 kV TR 500/345 kV ITUMBIARA TR49 MG  RB FT TR 500/345 kV ITUMBIARA TR49 MG 062/2001 IPCA RBNI REA 5861/2016 10/04/2021 09/04/2036  R$110,780.38
ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG6 MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$335,097.51
ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG6 MG DIT   062/2001 IPCA RMEL REN 643/2014 05/03/2015 04/03/2036  R$47,882.56
ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG5 MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$335,097.51
ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG5 MG DIT   062/2001 IPCA RMEL REN 643/2014 28/04/2015 27/04/2036  R$48,130.18
ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG4 MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$335,097.51
ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG4 MG DIT   062/2001 IPCA RMEL REN 643/2014 23/04/2015 22/04/2036  R$48,104.97
ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG3 MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$335,097.51
ITUMBIARA MC 345 kV TR345/230kV ITUMBIARATR1 MG  RB FT TR345/230kV ITUMBIARATR1 MG 062/2001 IPCA RBNI REA 5861/2016 19/12/2020 18/12/2035  R$152,179.00
ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG2 MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$335,097.51
ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG2 MG DIT   062/2001 IPCA RMEL REN 643/2014 18/01/2015 17/01/2036  R$47,697.78
ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG1 MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$335,097.51
ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG1 MG DIT   062/2001 IPCA RMEL REN 643/2014 31/03/2015 30/03/2036  R$48,014.15
ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR53 MG RB FT TR 500/345 kV ITUMBIARA TR53 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR53 MG RB FT TR 500/345 kV ITUMBIARA TR53 MG 062/2001 IPCA RBNI REA 4068/2013 24/06/2016 23/06/2044  R$85,533.66
ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR53 MG RB FT TR 500/345 kV ITUMBIARA TR53 MG 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2044  R$7,285.58
ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR53 MG RB FT TR 500/345 kV ITUMBIARA TR53 MG 062/2001 IPCA RMEL REN 443/2011 03/10/2014 02/10/2035  R$33,302.40
ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR53 MG RB FT TR 500/345 kV ITUMBIARA TR53 MG 062/2001 IPCA RBNI REA 5861/2016 13/03/2021 12/03/2036  R$101,915.50
ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR50 MG RB FT TR 500/345 kV ITUMBIARA TR50 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR50 MG RB FT TR 500/345 kV ITUMBIARA TR50 MG 062/2001 IPCA RBNI REA 1814/2009 22/01/2012 21/01/2039  R$197,780.20
ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR50 MG RB FT TR 500/345 kV ITUMBIARA TR50 MG 062/2001 IPCA RBNI REA 4068/2013 24/06/2016 23/06/2044  R$85,533.66
ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR50 MG RB FT TR 500/345 kV ITUMBIARA TR50 MG 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2044  R$7,285.58
ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR50 MG RB FT TR 500/345 kV ITUMBIARA TR50 MG 062/2001 IPCA RMEL REN 443/2011 07/12/2014 06/12/2035  R$33,505.53
ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR50 MG RB FT TR 500/345 kV ITUMBIARA TR50 MG 062/2001 IPCA RBNI REA 5861/2016 07/05/2021 06/05/2036  R$117,368.79
ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR49 MG  RB FT TR 500/345 kV ITUMBIARA TR49 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR49 MG  RB FT TR 500/345 kV ITUMBIARA TR49 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,168,504.07
ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR49 MG  RB FT TR 500/345 kV ITUMBIARA TR49 MG 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2044  R$7,285.58
ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR49 MG  RB FT TR 500/345 kV ITUMBIARA TR49 MG 062/2001 IPCA RBNI REA 5861/2016 10/04/2021 09/04/2036  R$110,780.38
ITUMBIARA MC 345 kV TR 345/230 kV ITUMBIARA TR2 MG  RB FT TR 345/230 kV ITUMBIARA TR2 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
ITUMBIARA MC 345 kV TR 345/230 kV ITUMBIARA TR2 MG  RB FT TR 345/230 kV ITUMBIARA TR2 MG 062/2001 IPCA RBNI REA 1814/2009 15/04/2012 14/04/2039  R$199,319.49
ITUMBIARA MC 345 kV TR 345/230 kV ITUMBIARA TR2 MG  RB FT TR 345/230 kV ITUMBIARA TR2 MG 062/2001 IPCA RMEL REN 643/2014 26/07/2015 25/07/2036  R$34,204.31
ITUMBIARA MC 345 kV TR 345/230 kV ITUMBIARA TR2 MG  RB FT TR 345/230 kV ITUMBIARA TR2 MG 062/2001 IPCA RBNI REA 4068/2013 24/06/2016 23/06/2044  R$297,114.08
ITUMBIARA MC 345 kV TR 345/230 kV ITUMBIARA TR2 MG  RB FT TR 345/230 kV ITUMBIARA TR2 MG 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2044  R$5,524.18
ITUMBIARA MC 345 kV TR 345/230 kV ITUMBIARA TR2 MG  RB FT TR 345/230 kV ITUMBIARA TR2 MG 062/2001 IPCA RBNI REA 5861/2016 30/11/2020 29/11/2035  R$118,514.29
ITUMBIARA MC 345 kV TR345/230kV ITUMBIARATR3 MG RB FT TR345/230kV ITUMBIARATR3 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
ITUMBIARA MC 345 kV TR345/230kV ITUMBIARATR3 MG RB FT TR345/230kV ITUMBIARATR3 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,168,504.07
ITUMBIARA MC 345 kV TR345/230kV ITUMBIARATR3 MG RB FT TR345/230kV ITUMBIARATR3 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,059,713.69
ITUMBIARA MC 345 kV TR345/230kV ITUMBIARATR3 MG RB FT TR345/230kV ITUMBIARATR3 MG 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2044  R$5,524.18
ITUMBIARA MC 345 kV TR345/230kV ITUMBIARATR3 MG RB FT TR345/230kV ITUMBIARATR3 MG 062/2001 IPCA RBNI REA 5861/2016 23/07/2021 22/07/2036  R$117,143.71
ITUMBIARA MC 345 kV TR345/230kV ITUMBIARATR1 MG  RB FT TR345/230kV ITUMBIARATR1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
ITUMBIARA MC 345 kV TR345/230kV ITUMBIARATR1 MG  RB FT TR345/230kV ITUMBIARATR1 MG 062/2001 IPCA RBNI REA 1814/2009 12/02/2012 11/02/2039  R$198,165.67
ITUMBIARA MC 345 kV TR345/230kV ITUMBIARATR1 MG  RB FT TR345/230kV ITUMBIARATR1 MG 062/2001 IPCA RBNI REA 4068/2013 30/01/2016 29/01/2044  R$41,908.08
ITUMBIARA MC 345 kV TR345/230kV ITUMBIARATR1 MG  RB FT TR345/230kV ITUMBIARATR1 MG 062/2001 IPCA RBNI REA 4068/2013 31/01/2016 30/01/2044  R$41,911.46
ITUMBIARA MC 345 kV TR345/230kV ITUMBIARATR1 MG  RB FT TR345/230kV ITUMBIARATR1 MG 062/2001 IPCA RBNI REA 4068/2013 04/02/2016 03/02/2044  R$41,909.15
ITUMBIARA MC 345 kV TR345/230kV ITUMBIARATR1 MG  RB FT TR345/230kV ITUMBIARATR1 MG 062/2001 IPCA RBNI REA 4068/2013 04/02/2016 03/02/2044  R$41,909.15
ITUMBIARA MC 345 kV TR345/230kV ITUMBIARATR1 MG  RB FT TR345/230kV ITUMBIARATR1 MG 062/2001 IPCA RBNI REA 4068/2013 04/02/2016 03/02/2044  R$84,711.12
ITUMBIARA MC 345 kV TR345/230kV ITUMBIARATR1 MG  RB FT TR345/230kV ITUMBIARATR1 MG 062/2001 IPCA RMEL REN 643/2014 10/08/2015 09/08/2036  R$34,238.07
ITUMBIARA MC 345 kV TR345/230kV ITUMBIARATR1 MG  RB FT TR345/230kV ITUMBIARATR1 MG 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2044  R$5,524.18
ITUMBIARA MC 230 kV TR 345/230 kV ITUMBIARA TR2 MG RB FT TR 345/230 kV ITUMBIARA TR2 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$127,805.26
ITUMBIARA MC 230 kV TR 345/230 kV ITUMBIARA TR2 MG RB FT TR 345/230 kV ITUMBIARA TR2 MG 062/2001 IPCA RBNI REA 1814/2009 15/04/2012 14/04/2039  R$139,310.64
ITUMBIARA MC 230 kV TR 345/230 kV ITUMBIARA TR2 MG RB FT TR 345/230 kV ITUMBIARA TR2 MG 062/2001 IPCA RBNI REA 5861/2016 30/11/2020 29/11/2035  R$118,514.29
ITUMBIARA MC 230 kV TR345/230kV ITUMBIARATR3 MG RB FT TR345/230kV ITUMBIARATR3 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$127,805.26
ITUMBIARA MC 230 kV TR 345/230 kV ITUMBIARA TR2 MG RB FT TR 345/230 kV ITUMBIARA TR2 MG 062/2001 IPCA RMEL REN 643/2014 26/07/2015 25/07/2036  R$23,321.50
ITUMBIARA MC 230 kV TR345/230kV ITUMBIARATR3 MG RB FT TR345/230kV ITUMBIARATR3 MG 062/2001 IPCA RBNI REA 5861/2016 23/07/2021 22/07/2036  R$117,143.71
ITUMBIARA MC 230 kV TR345/230kV ITUMBIARATR1 MG RB FT TR345/230kV ITUMBIARATR1 MG 062/2001 IPCA RBNI REA 5861/2016 19/12/2020 18/12/2035  R$152,179.00
ITUMBIARA MC 230 kV TR345/230kV ITUMBIARATR3 MG RB FT TR345/230kV ITUMBIARATR3 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$662,112.32
ITUMBIARA MC 230 kV TR345/230kV ITUMBIARATR1 MG RB FT TR345/230kV ITUMBIARATR1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$127,805.26
ITUMBIARA MC 230 kV TR345/230kV ITUMBIARATR1 MG RB FT TR345/230kV ITUMBIARATR1 MG 062/2001 IPCA RBNI REA 1814/2009 12/02/2012 11/02/2039  R$138,504.22
ITUMBIARA MC 230 kV TR345/230kV ITUMBIARATR1 MG RB FT TR345/230kV ITUMBIARATR1 MG 062/2001 IPCA RMEL REN 643/2014 10/08/2015 09/08/2036  R$23,344.51
ITUMBIARA IB 345 kV MG 500 kV ITUMBIARA MG1 MG IB1 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBNI REA 4068/2013 24/06/2016 23/06/2044  R$39,808.66
ITUMBIARA IB 230 kV MG 500 kV ITUMBIARA MG1 MG IB1 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$493,388.38
ITUMBIARA IB 500 kV MG 500 kV ITUMBIARA MG1 MG IB3 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$347,094.43
ITUMBIARA IB 500 kV MG 500 kV ITUMBIARA MG1 MG IB2 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$347,094.43
ITUMBIARA IB 345 kV MG 500 kV ITUMBIARA MG1 MG IB2 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
ITUMBIARA IB 345 kV MG 500 kV ITUMBIARA MG1 MG IB2 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,036,883.85
ITUMBIARA IB 345 kV MG 500 kV ITUMBIARA MG1 MG IB2 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$940,347.61
ITUMBIARA IB 345 kV MG 500 kV ITUMBIARA MG1 MG IB1 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
ITUMBIARA IB 345 kV MG 500 kV ITUMBIARA MG1 MG IB1 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBNI REA 1814/2009 23/03/2012 22/03/2039  R$186,600.68
ITUMBIARA IB 345 kV MG 500 kV ITUMBIARA MG1 MG IB1 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBNI REA 4068/2013 22/11/2015 21/11/2043  R$39,234.23
ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG  RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBNI REA 4068/2013 04/05/2016 03/05/2044  R$57,941.45
ITUMBIARA IB 230 kV MG 500 kV ITUMBIARA MG1 MG IB1 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$105,014.11
ITUMBIARA IB 230 kV MG 500 kV ITUMBIARA MG1 MG IB1 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBNI REA 1814/2009 04/04/2012 03/04/2039  R$142,897.64
ITUMBIARA IB 230 kV MG 500 kV ITUMBIARA MG1 MG IB1 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$544,039.71
ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG  RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBNI REA 4068/2013 04/05/2016 03/05/2044  R$39,979.59
ITUMBIARA EL 500 kV ITUMBIARA LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG RB FT LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
ITUMBIARA EL 500 kV ITUMBIARA LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG RB FT LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG 062/2001 IPCA RMEL REN 443/2011 15/09/2014 14/09/2034  R$47,148.37
ITUMBIARA EL 500 kV ITUMBIARA LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG RB FT LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG 062/2001 IPCA RBNI REA 4347/2013 09/04/2018 08/04/2033  R$17,821.09
ITUMBIARA EL 500 kV ITUMBIARA LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG RB FT LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG 062/2001 IPCA RBNI REA 5861/2016 10/02/2021 09/02/2036  R$12,522.11
ITUMBIARA EL 500 kV ITUMBIARA LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG  RB FT LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
ITUMBIARA EL 500 kV ITUMBIARA LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG  RB FT LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG 062/2001 IPCA RMEL REN 443/2011 15/10/2014 14/10/2035  R$47,280.91
ITUMBIARA EL 500 kV ITUMBIARA LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG  RB FT LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG 062/2001 IPCA RBNI REA 4347/2013 09/04/2018 08/04/2033  R$17,821.09
ITUMBIARA EL 500 kV ITUMBIARA LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG  RB FT LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG 062/2001 IPCA RBNI REA 8314/2019 09/07/2019 08/07/2034  R$12,522.11
ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG  RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG  RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBNI REA 2040/2009 30/04/2012 29/04/2034  R$89,334.07
ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG  RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBNI REA 1814/2009 31/05/2012 30/05/2039  R$176,689.30
ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG  RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBNI REA 4068/2013 04/05/2016 03/05/2044  R$39,979.59
ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG  RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBNI REA 4068/2013 04/05/2016 03/05/2044  R$39,979.59
ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG  RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBNI REA 4068/2013 04/05/2016 03/05/2044  R$39,979.59
ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RBNI REA 4068/2013 23/11/2015 22/11/2043  R$39,549.30
ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2044  R$5,524.18
ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG  RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2044  R$5,524.18
ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG  RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RMEL REN 443/2011 06/05/2014 05/05/2034  R$32,826.57
ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RBNI REA 1814/2009 05/03/2012 04/03/2039  R$175,283.87
ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RBNI REA 4068/2013 22/11/2015 21/11/2043  R$39,546.08
ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RBNI REA 4068/2013 24/11/2015 23/11/2043  R$39,552.53
ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RMEL REN 443/2011 25/05/2014 24/05/2034  R$10,965.73
ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RBNI REA 4068/2013 23/11/2015 22/11/2043  R$57,317.83
ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RBNI REA 4068/2013 28/11/2015 27/11/2043  R$39,565.41
ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RMEL REN 443/2011 25/05/2014 24/05/2034  R$10,965.73
ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RMEL REN 443/2011 25/05/2014 24/05/2034  R$10,965.73
ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO 062/2001 IPCA RBNI REA 4068/2013 05/12/2015 04/12/2043  R$39,573.36
ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO 062/2001 IPCA RBNI REA 4068/2013 07/12/2015 06/12/2043  R$39,579.79
ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO 062/2001 IPCA RBNI REA 4068/2013 08/12/2015 07/12/2043  R$57,366.66
ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO 062/2001 IPCA RBNI REA 4068/2013 06/12/2015 05/12/2043  R$39,576.58
ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO 062/2001 IPCA RBNI REA 4068/2013 09/12/2015 08/12/2043  R$39,586.21
ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2044  R$5,524.18
ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO 062/2001 IPCA RMEL REN 443/2011 05/05/2014 04/05/2034  R$32,822.84
ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG  RB FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG  RB FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,372,890.86
ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG  RB FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,245,071.61
ITUMBIARA EL 230 kV ITUMBIARA LT 230 kV PARANAIBA /ITUMBIARA C-1 GO/MG RB FT LT 230 kV PARANAIBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$923,432.89
ITUMBIARA EL 230 kV ITUMBIARA LT 230 kV PARANAIBA /ITUMBIARA C-1 GO/MG RB FT LT 230 kV PARANAIBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$837,459.19
ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG  RB FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2044  R$5,524.18
ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG  RB FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBNI REA 5861/2016 21/01/2021 20/01/2036  R$200,794.45
ITUMBIARA EL 230 kV ITUMBIARA LT 230 kV PARANAIBA /ITUMBIARA C-1 GO/MG RB FT LT 230 kV PARANAIBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$178,247.06
ITUMBIARA EL 230 kV ITUMBIARA LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$178,247.06
ITUMBIARA EL 230 kV ITUMBIARA LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$178,247.06
ITUMBIARA EL 230 kV ITUMBIARA LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO 062/2001 IPCA RBNI REA 1814/2009 14/05/2012 13/05/2039  R$124,158.02
ITUMBIARA EL 230 kV ITUMBIARA LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$923,432.89
ITUTINGA MG 345 kV ITUTINGA MG1 MG RB FT MG 345 kV ITUTINGA MG1 MG 062/2001 IPCA RBNI REA 5952/2016 01/08/2019 01/08/2051  R$191,529.51
ITUTINGA MG 345 kV ITUTINGA MG1 MG RB FT MG 345 kV ITUTINGA MG1 MG 062/2001 IPCA RBNI REA 5952/2016 01/08/2019 01/08/2045  R$16,172.91
ITUMBIARA EL 230 kV ITUMBIARA LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO 062/2001 IPCA RMEL REN 643/2014 31/01/2015 30/01/2036  R$22,956.94
ITUMBIARA EL 230 kV ITUMBIARA LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO  RB FT LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$178,247.06
ITUMBIARA EL 230 kV ITUMBIARA LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO  RB FT LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO 062/2001 IPCA RBNI REA 1814/2009 10/07/2012 09/07/2039  R$124,793.54
ITUMBIARA EL 230 kV ITUMBIARA LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO  RB FT LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO 062/2001 IPCA RMEL REN 643/2014 30/01/2016 29/01/2038  R$23,686.56
ITUMBIARA CR 230 kV 33,9 Mvar ITUMBIARA BC1 MG RB FT CR 230 kV 33,9 Mvar ITUMBIARA BC1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$145,902.19
ITUMBIARA CR 230 kV 183 Mvar ITUMBIARA BC2 MG RB FT CR 230 kV 183 Mvar ITUMBIARA BC2 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$407,400.85
ITUTINGA RTB 345 kV 60 Mvar ITUTINGA RT1 MG RB FT RTB 345 kV 60 Mvar ITUTINGA RT1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$391,216.93
ITUTINGA RTB 345 kV 33 Mvar ITUTINGA RB2R MG RB FT RTB 345 kV 100 Mvar ITUTINGA RB2 MG 062/2001 IPCA RBNI REA 5952/2016 01/08/2019 01/08/2054  R$815,534.39
ITUTINGA RTB 345 kV 20 MVAr ITUTINGA RTR1 MG RB FT RTB 345 kV 20 MVAr ITUTINGA RTR1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$130,405.64
ITUTINGA RTB 345 kV 100 Mvar ITUTINGA RB2 MG RB FT RTB 345 kV 100 Mvar ITUTINGA RB2 MG 062/2001 IPCA RBNI REA 5952/2016 01/08/2019 01/08/2054  R$ 2,446,603.12
ITUTINGA MG 345 kV ITUTINGA MG1 MG RB FT MG 345 kV ITUTINGA MG1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$613,167.80
ITUTINGA MG 345 kV ITUTINGA MG1 MG RB FT MG 345 kV ITUTINGA MG1 MG 062/2001 IPCA RMEL REN 443/2011 05/07/2016 04/07/2029  R$9,301.91
ITUTINGA MG 345 kV ITUTINGA MG1 MG RB FT MG 345 kV ITUTINGA MG1 MG 062/2001 IPCA RBNI REA 5952/2016 01/08/2019 01/08/2045  R$72,051.37
ITUTINGA MC 345 kV RTB 345 kV 60 Mvar ITUTINGA RT1 MG  RB FT RTB 345 kV 60 Mvar ITUTINGA RT1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$180,542.06
ITUTINGA MC 345 kV RTB 345 kV 100 Mvar ITUTINGA RB2 MG RB FT RTB 345 kV 100 Mvar ITUTINGA RB2 MG 062/2001 IPCA RBNI REA 5952/2016 01/08/2019 01/08/2045  R$ 1,057,073.31
ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RMEL REN 443/2011 20/02/2017 19/02/2040  R$11,672.15
ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RMEL REN 443/2011 20/02/2017 19/02/2040  R$11,672.15
ITUTINGA IB 345 kV MG 345 kV ITUTINGA MG1 MG IB1 RB FT MG 345 kV ITUTINGA MG1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
ITUTINGA IB 345 kV MG 345 kV ITUTINGA MG1 MG IB1 RB FT MG 345 kV ITUTINGA MG1 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,036,883.85
ITUTINGA IB 345 kV MG 345 kV ITUTINGA MG1 MG IB1 RB FT MG 345 kV ITUTINGA MG1 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$940,347.61
ITUTINGA IB 345 kV MG 345 kV ITUTINGA MG1 MG IB1 RB FT MG 345 kV ITUTINGA MG1 MG 062/2001 IPCA RMEL REN 443/2011 23/02/2017 22/02/2046  R$37,049.17
ITUTINGA IB 345 kV MG 345 kV ITUTINGA MG1 MG IB1 RB FT MG 345 kV ITUTINGA MG1 MG 062/2001 IPCA RMEL REN 443/2011 24/02/2017 23/02/2046  R$37,051.98
ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RMEL REN 443/2011 20/02/2017 19/02/2046  R$37,384.88
ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RMEL REN 443/2011 20/02/2017 19/02/2046  R$37,384.88
ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RMEL REN 443/2011 20/02/2017 19/02/2046  R$37,384.88
ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RMEL REN 443/2011 20/02/2017 19/02/2046  R$37,384.88
ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RMEL REN 443/2011 20/02/2017 19/02/2040  R$11,672.15
ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RMEL REN 443/2011 09/04/2017 08/04/2046  R$37,488.39
ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RMEL REN 443/2011 09/04/2017 08/04/2046  R$37,488.39
ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RMEL REN 443/2011 20/02/2017 19/02/2046  R$54,180.99
ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RMEL REN 443/2011 26/03/2017 25/03/2046  R$37,465.01
ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RMEL REN 443/2011 26/03/2017 25/03/2046  R$37,465.01
ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RMEL REN 443/2011 26/03/2017 25/03/2040  R$11,700.87
ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RMEL REN 443/2011 26/03/2017 25/03/2040  R$11,700.87
ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RMEL REN 443/2011 26/03/2017 25/03/2040  R$11,700.87
ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RMEL REN 443/2011 27/04/2017 26/04/2046  R$37,539.04
ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RMEL REN 443/2011 26/03/2017 25/03/2046  R$37,465.01
ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RMEL REN 443/2011 26/03/2017 25/03/2046  R$54,297.11
ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RMEL REN 443/2011 09/04/2017 08/04/2040  R$11,708.15
ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RMEL REN 443/2011 09/04/2017 08/04/2040  R$11,708.15
ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RMEL REN 443/2011 09/04/2017 08/04/2040  R$11,708.15
ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RMEL REN 443/2011 09/04/2017 08/04/2046  R$37,488.39
ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RMEL REN 443/2011 09/04/2017 08/04/2046  R$37,488.39
ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RMEL REN 443/2011 29/04/2017 28/04/2046  R$54,412.55
ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RMEL REN 443/2011 12/03/2017 11/03/2040  R$11,685.95
ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RMEL REN 443/2011 12/03/2017 11/03/2040  R$11,685.95
ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RMEL REN 443/2011 12/03/2017 11/03/2040  R$11,685.95
ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RMEL REN 443/2011 12/03/2017 11/03/2046  R$37,425.50
ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RMEL REN 443/2011 12/03/2017 11/03/2046  R$37,425.50
ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RMEL REN 443/2011 12/03/2017 11/03/2046  R$37,425.50
ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RMEL REN 443/2011 12/03/2017 11/03/2046  R$37,425.50
ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RMEL REN 443/2011 12/03/2017 11/03/2046  R$54,239.86
IVAIPORA TR 750/500 kV IVAIPORA TRR1 PR RB FT TR 750/500 kV IVAIPORA TRR1 PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$780,616.32
IVAIPORA TR 750/500 kV IVAIPORA TRR1 PR RB FT TR 750/500 kV IVAIPORA TRR1 PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,044,087.87
IVAIPORA TR 750/500 kV IVAIPORA TR2 PR RB FT TR 750/500 kV IVAIPORA TR2 PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,341,848.97
IVAIPORA TR 750/500 kV IVAIPORA TR2 PR RB FT TR 750/500 kV IVAIPORA TR2 PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 11,002,722.34
IVAIPORA TR 750/500 kV IVAIPORA TR3 PR RB FT TR 750/500 kV IVAIPORA TR3 PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,341,848.97
IVAIPORA TR 750/500 kV IVAIPORA TR1 PR RB FT TR 750/500 kV IVAIPORA TR1 PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,341,848.97
IVAIPORA TR 750/500 kV IVAIPORA TR2 PR RB FT TR 750/500 kV IVAIPORA TR2 PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 12,132,263.60
IVAIPORA TR 750/500 kV IVAIPORA TR1 PR RB FT TR 750/500 kV IVAIPORA TR1 PR 062/2001 IPCA RMEL REN 443/2011 07/03/2017 06/03/2040  R$2,550.32
IVAIPORA TR 750/500 kV IVAIPORA TR1 PR RB FT TR 750/500 kV IVAIPORA TR1 PR 062/2001 IPCA RMEL REN 443/2011 07/03/2017 06/03/2040  R$2,550.32
IVAIPORA TR 750/500 kV IVAIPORA TR1 PR RB FT TR 750/500 kV IVAIPORA TR1 PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 12,132,263.60
IVAIPORA TR 750/500 kV IVAIPORA TR1 PR RB FT TR 750/500 kV IVAIPORA TR1 PR 062/2001 IPCA RMEL REN 443/2011 07/03/2017 06/03/2040  R$2,550.32
IVAIPORA RTL 750 kV 329 Mvar IVAIPORA RIA3 PR RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$821,925.66
IVAIPORA RTL 750 kV 329 Mvar IVAIPORA RIA3 PR RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,258,096.43
IVAIPORA TR 500/69 kV IVAIPORA TREGR1 PR RB FT TR 750/500 kV IVAIPORA TRR1 PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$584,612.08
IVAIPORA TR 500/69 kV IVAIPORA TREG3 PR RB FT TR 750/500 kV IVAIPORA TR3 PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,753,836.25
IVAIPORA TR 500/69 kV IVAIPORA TREG2 PR RB FT TR 750/500 kV IVAIPORA TR2 PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,753,836.25
IVAIPORA TR 500/69 kV IVAIPORA TREG1 PR RB FT TR 750/500 kV IVAIPORA TR1 PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,753,836.25
IVAIPORA RTL 750 kV 329 Mvar IVAIPORA RIA1 PR RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,258,096.43
IVAIPORA RTL 750 kV 329 Mvar IVAIPORA RIA3 PR RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,861,658.00
IVAIPORA RTL 750 kV 329 Mvar IVAIPORA RIA2 PR RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$821,925.66
IVAIPORA RTL 750 kV 329 Mvar IVAIPORA RIA2 PR RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,258,096.43
IVAIPORA RTL 750 kV 329 Mvar IVAIPORA RIA2 PR RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,861,658.00
IVAIPORA RTL 750 kV 329 Mvar IVAIPORA RIA2 PR RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RMEL REA 11449/2022 04/05/2022 04/05/2058  R$ 1,172,825.35
IVAIPORA RTL 750 kV 329 Mvar IVAIPORA RIA1 PR RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$821,925.66
IVAIPORA RTL 750 kV 150 Mvar IVAIPORA RFI2 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$303,079.04
IVAIPORA RTL 750 kV 329 Mvar IVAIPORA RIA1 PR RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,861,658.00
IVAIPORA RTL 750 kV 150 Mvar IVAIPORA RFI2 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 1,389,858.98
IVAIPORA RTL 750 kV 150 Mvar IVAIPORA RFI3 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$303,079.04
IVAIPORA RTL 750 kV 150 Mvar IVAIPORA RFI3 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,532,542.13
IVAIPORA RTL 750 kV 150 Mvar IVAIPORA RFI3 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 1,389,858.98
IVAIPORA RTL 750 kV 150 Mvar IVAIPORA RFI1 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$303,079.04
IVAIPORA RTL 750 kV 150 Mvar IVAIPORA RFI2 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,532,542.13
IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RMEL REN 443/2011 16/11/2015 15/11/2028  R$9,030.00
IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RMEL REN 443/2011 16/11/2015 15/11/2028  R$9,030.00
IVAIPORA RTL 750 kV 150 Mvar IVAIPORA RFI1 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,532,542.13
IVAIPORA RTL 750 kV 150 Mvar IVAIPORA RFI1 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 1,389,858.98
IVAIPORA RTB 750 kV 329 Mvar IVAIPORA RT7 PR RB FT RTB 750 kV 329 Mvar IVAIPORA RT7 PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$821,925.66
IVAIPORA RTB 750 kV 329 Mvar IVAIPORA RT7 PR RB FT RTB 750 kV 329 Mvar IVAIPORA RT7 PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,258,096.43
IVAIPORA RTB 750 kV 329 Mvar IVAIPORA RT7 PR RB FT RTB 750 kV 329 Mvar IVAIPORA RT7 PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,861,658.00
IVAIPORA RTB 69 kV 60 Mvar IVAIPORA RTR1 PR RB FT RTB 69 kV 60 Mvar IVAIPORA RTR1 PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$150,586.58
IVAIPORA RTB 69 kV 180 Mvar IVAIPORA RT3B PR RB FT RTB 69 kV 180 Mvar IVAIPORA RT3B PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$173,422.33
IVAIPORA RTB 69 kV 180 Mvar IVAIPORA RT3A PR RB FT RTB 69 kV 180 Mvar IVAIPORA RT3A PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$173,422.33
IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT2C PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT2C PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$173,422.33
IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT2C PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT2C PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$898,437.73
IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT2C PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT2C PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$814,791.14
IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT2B PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT2B PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$173,422.33
IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT2B PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT2B PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$898,437.73
IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT2B PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT2B PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$814,791.14
IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT2A PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT2A PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$173,422.33
IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT2A PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT2A PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$898,437.73
IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT2A PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT2A PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$814,791.14
IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT1C PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1C PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$173,422.33
IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT1C PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1C PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$898,437.73
IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT1C PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1C PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$814,791.14
IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT1B PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1B PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$173,422.33
IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT1B PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1B PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$898,437.73
IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT1B PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1B PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$814,791.14
IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT1A PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1A PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$173,422.33
IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT1A PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1A PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$898,437.73
IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT1A PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1A PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$814,791.14
IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,267,676.48
IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 6,567,368.55
IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 5,955,931.64
IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032  R$ 812.28
IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RMEL REN 443/2011 16/11/2015 15/11/2028  R$9,030.00
IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RMEL REN 443/2011 16/11/2015 15/11/2028  R$9,030.00
IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RMEL REN 443/2011 16/11/2015 15/11/2028  R$35,279.88
IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBNI REA 8314/2019 09/07/2019 08/07/2034  R$12,931.24
IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBNI REA 8314/2019 09/07/2019 08/07/2034  R$12,931.24
IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBNI REA 8314/2019 09/07/2019 08/07/2034  R$12,931.24
IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBNI REA 8314/2019 09/07/2019 08/07/2034  R$12,931.24
IVAIPORA MC 750 kV TR 750/500 kV IVAIPORA TR2 PR  RB FT TR 750/500 kV IVAIPORA TR2 PR 062/2001 IPCA RBNI REA 5484/2015 24/12/2018 23/12/2033  R$98,717.38
IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBNI REA 8314/2019 09/07/2019 08/07/2034  R$12,931.24
IVAIPORA MC 750 kV RTB 750 kV 329 Mvar IVAIPORA RT7 PR  RB FT RTB 750 kV 329 Mvar IVAIPORA RT7 PR 062/2001 IPCA RBNI REA 5484/2015 16/05/2019 15/05/2034  R$131,190.98
IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBNI REA 8314/2019 09/07/2019 08/07/2034  R$12,931.24
IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBNI REA 8314/2019 09/07/2019 08/07/2034  R$22,667.98
IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBNI REA 8360/2019 13/04/2021 12/04/2051  R$22,026.24
IVAIPORA MC 750 kV TR 750/500 kV IVAIPORA TR3 PR  RB FT TR 750/500 kV IVAIPORA TR3 PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$514,900.84
IVAIPORA MC 750 kV TR 750/500 kV IVAIPORA TR3 PR  RB FT TR 750/500 kV IVAIPORA TR3 PR 062/2001 IPCA RMEL REN 643/2014 02/12/2016 01/12/2045  R$71,000.46
IVAIPORA MC 750 kV TR 750/500 kV IVAIPORA TR3 PR  RB FT TR 750/500 kV IVAIPORA TR3 PR 062/2001 IPCA RMEL REN 643/2014 09/12/2016 08/12/2045  R$71,008.99
IVAIPORA MC 750 kV TR 750/500 kV IVAIPORA TR2 PR  RB FT TR 750/500 kV IVAIPORA TR2 PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$514,900.84
IVAIPORA MC 750 kV TR 750/500 kV IVAIPORA TR2 PR  RB FT TR 750/500 kV IVAIPORA TR2 PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,667,513.08
IVAIPORA MC 750 kV TR 750/500 kV IVAIPORA TR2 PR  RB FT TR 750/500 kV IVAIPORA TR2 PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,419,161.56
IVAIPORA MC 69 kV RTB 69 kV 180 Mvar IVAIPORA RT3B PR RB FT RTB 69 kV 180 Mvar IVAIPORA RT3B PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,394.97
IVAIPORA MC 750 kV TR 750/500 kV IVAIPORA TR1 PR  RB FT TR 750/500 kV IVAIPORA TR1 PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$514,900.84
IVAIPORA MC 750 kV TR 750/500 kV IVAIPORA TR1 PR  RB FT TR 750/500 kV IVAIPORA TR1 PR 062/2001 IPCA RBNI REA 5484/2015 24/12/2018 23/12/2033  R$98,717.38
IVAIPORA MC 750 kV RTB 750 kV 329 Mvar IVAIPORA RT7 PR  RB FT RTB 750 kV 329 Mvar IVAIPORA RT7 PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$507,441.28
IVAIPORA MC 69 kV RTB 69 kV 180 Mvar IVAIPORA RT3A PR RB FT RTB 69 kV 180 Mvar IVAIPORA RT3A PR 062/2001 IPCA RBNI REA 1266/2008 09/02/2012 08/02/2037  R$39,917.88
IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT2B PR  RB FT RTB 69 kV 180 MVAr IVAIPORA RT2B PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,394.97
IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT2A PR  RB FT RTB 69 kV 180 MVAr IVAIPORA RT2A PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,394.97
IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT2C PR  RB FT RTB 69 kV 180 MVAr IVAIPORA RT2C PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,394.97
IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1C PR  RB FT RTB 69 kV 180 MVAr IVAIPORA RT1C PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,394.97
IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1C PR  RB FT RTB 69 kV 180 MVAr IVAIPORA RT1C PR 062/2001 IPCA RMEL REN 443/2011 22/01/2017 21/01/2040  R$2,543.32
IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1C PR  RB FT RTB 69 kV 180 MVAr IVAIPORA RT1C PR 062/2001 IPCA RMEL REN 443/2011 22/01/2017 21/01/2040  R$2,543.32
IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1B PR  RB FT RTB 69 kV 180 MVAr IVAIPORA RT1B PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,394.97
IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1B PR  RB FT RTB 69 kV 180 MVAr IVAIPORA RT1B PR 062/2001 IPCA RMEL REN 443/2011 21/01/2017 20/01/2040  R$2,543.09
IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1C PR  RB FT RTB 69 kV 180 MVAr IVAIPORA RT1C PR 062/2001 IPCA RMEL REN 443/2011 22/01/2017 21/01/2040  R$2,543.32
IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1B PR  RB FT RTB 69 kV 180 MVAr IVAIPORA RT1B PR 062/2001 IPCA RMEL REN 443/2011 21/01/2017 20/01/2040  R$2,543.09
IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1A PR  RB FT RTB 69 kV 180 MVAr IVAIPORA RT1A PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,394.97
IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1A PR  RB FT RTB 69 kV 180 MVAr IVAIPORA RT1A PR 062/2001 IPCA RMEL REN 443/2011 20/01/2017 19/01/2040  R$2,542.86
IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1B PR  RB FT RTB 69 kV 180 MVAr IVAIPORA RT1B PR 062/2001 IPCA RMEL REN 443/2011 21/01/2017 20/01/2040  R$2,543.09
IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1A PR  RB FT RTB 69 kV 180 MVAr IVAIPORA RT1A PR 062/2001 IPCA RMEL REN 443/2011 20/01/2017 19/01/2040  R$2,542.86
IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1A PR  RB FT RTB 69 kV 180 MVAr IVAIPORA RT1A PR 062/2001 IPCA RMEL REN 443/2011 20/01/2017 19/01/2040  R$2,542.86
IVAIPORA MC 500 kV TR 750/500 kV IVAIPORA TR3 PR  RB FT TR 750/500 kV IVAIPORA TR3 PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$327,073.06
IVAIPORA IB 750 kV MG 750 kV IVAIPORA MG1 PR IB6 RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$618,807.76
IVAIPORA IB 750 kV MG 750 kV IVAIPORA MG1 PR IB5 RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$618,807.76
IVAIPORA IB 750 kV MG 750 kV IVAIPORA MG1 PR IB3 RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$618,807.76
IVAIPORA IB 750 kV MG 750 kV IVAIPORA MG1 PR IB2 RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$618,807.76
IVAIPORA IB 750 kV MG 750 kV IVAIPORA MG1 PR IB4 RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$618,807.76
IVAIPORA IB 750 kV MG 750 kV IVAIPORA MG1 PR IB1 RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RMEL REN 643/2014 21/12/2016 20/12/2045  R$62,187.98
IVAIPORA IB 750 kV MG 750 kV IVAIPORA MG1 PR IB1 RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$618,807.76
IVAIPORA EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR  RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$584,626.93
IVAIPORA EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR  RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RMEL REN 643/2014 28/11/2016 27/11/2045  R$64,743.05
IVAIPORA EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR  RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBNI REA 5861/2016 16/04/2018 15/04/2038  R$13,041.28
IVAIPORA EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR  RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBNI REA 5861/2016 09/07/2019 08/07/2034  R$11,160.19
IVAIPORA EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-2 SP/PR  RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$584,626.93
IVAIPORA EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-2 SP/PR  RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RMEL REN 643/2014 24/11/2016 23/11/2047  R$311,278.60
IVAIPORA EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-2 SP/PR  RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBNI REA 5861/2016 09/07/2019 08/07/2034  R$11,160.19
IVAIPORA EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-1 SP/PR  RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$584,626.93
IVAIPORA EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-1 SP/PR  RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,028,738.44
IVAIPORA EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-1 SP/PR  RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,746,756.02
IVAIPORA EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-1 SP/PR  RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBNI REA 5861/2016 09/07/2019 08/07/2034  R$11,160.19
IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$598,970.24
IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 3,028,738.44
IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 2,746,756.02
IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR DIT   062/2001 IPCA RCDM REA 5861/2016 09/07/2019 08/07/2034  R$11,160.19
IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$598,970.24
IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 3,028,738.44
IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 2,746,756.02
IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR DIT   062/2001 IPCA RCDM REA 5861/2016 09/07/2019 08/07/2034  R$11,160.19
IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$598,970.24
IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 3,028,738.44
IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 2,746,756.02
IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR DIT   062/2001 IPCA RCDM REA 5861/2016 09/07/2019 08/07/2034  R$11,160.19
IVAIPORA CR 750 kV 528 Mvar IVAIPORA BC5A PR RB FT CR 750 kV 528 Mvar IVAIPORA BC5A PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,276,400.18
IVAIPORA CR 750 kV 528 Mvar IVAIPORA BC5B PR RB FT CR 750 kV 528 Mvar IVAIPORA BC5A PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,276,400.18
IVAIPORA CR 750 kV 528 Mvar IVAIPORA BC1B PR RB FT CR 750 kV 528 Mvar IVAIPORA BC1A PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,276,400.18
IVAIPORA CR 750 kV 508 Mvar IVAIPORA BC6B PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 1,269,840.39
IVAIPORA CR 750 kV 528 Mvar IVAIPORA BC3B PR RB FT CR 750 kV 528 Mvar IVAIPORA BC3A PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,276,400.18
IVAIPORA CR 750 kV 528 Mvar IVAIPORA BC3A PR RB FT CR 750 kV 528 Mvar IVAIPORA BC3A PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,276,400.18
IVAIPORA CR 750 kV 508 Mvar IVAIPORA BC6A PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 1,269,840.39
IVAIPORA CR 750 kV 528 Mvar IVAIPORA BC1A PR RB FT CR 750 kV 528 Mvar IVAIPORA BC1A PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,276,400.18
IVAIPORA CR 750 kV 508 Mvar IVAIPORA BC2B PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 1,269,840.39
IVAIPORA CR 750 kV 508 Mvar IVAIPORA BC4B PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 1,269,840.39
IVAIPORA CR 750 kV 508 Mvar IVAIPORA BC4A PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 1,269,840.39
IVAIPORA CR 750 kV 508 Mvar IVAIPORA BC2A PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 1,269,840.39
JACAREPAGUA TR 345/138 kV JACAREPAGUA TR2B RJ RBF FT TR 345/138 kV JACAREPAGUA TR2B RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$721,601.44
JACAREPAGUA TR 345/138 kV JACAREPAGUA TR2B RJ RBF FT TR 345/138 kV JACAREPAGUA TR2B RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,738,353.32
JACAREPAGUA TR 345/138 kV JACAREPAGUA TRR2 RJ RBF FT TR 345/138 kV JACAREPAGUA TRR2 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$240,533.81
JACAREPAGUA TR 345/138 kV JACAREPAGUA TRR1 RJ RBF FT TR 345/138 kV JACAREPAGUA TRR1 RJ 062/2001 IPCA RMEL REA 5457/2015 08/04/2016 07/04/2049  R$ 1,005,847.11
JACAREPAGUA TR 345/138 kV JACAREPAGUA TR3A RJ RBF FT TR 345/138 kV JACAREPAGUA TR3A RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$363,983.58
JACAREPAGUA TR 345/138 kV JACAREPAGUA TR1A RJ RBF FT TR 345/138 kV JACAREPAGUA TR1A RJ 062/2001 IPCA RMEL REA 5457/2015 27/03/2016 26/03/2049  R$ 3,016,103.80
JACAREPAGUA RTB 13,8 kV 30 MVAr JACAREPAGUA RT1 RJ RBF FT RTB 13,8 kV 30 MVAr JACAREPAGUA RT1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$136,178.82
JACAREPAGUA TR 345/138 kV JACAREPAGUA TR2B RJ RBF FT TR 345/138 kV JACAREPAGUA TR2B RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,390,304.14
JACAREPAGUA TR 345/138 kV JACAREPAGUA TR2A RJ RBF FT TR 345/138 kV JACAREPAGUA TR2A RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$721,601.44
JACAREPAGUA TR 345/138 kV JACAREPAGUA TR1B RJ RBF FT TR 345/138 kV JACAREPAGUA TR1B RJ 062/2001 IPCA RMEL REA 5457/2015 06/12/2015 05/12/2048  R$ 2,997,777.24
JACAREPAGUA MG 345 kV JACAREPAGUA MG1 RJ RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$900,745.11
JACAREPAGUA RTB 13,8 kV 30 MVAr JACAREPAGUA RT3 RJ RBF FT RTB 13,8 kV 30 MVAr JACAREPAGUA RT3 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$136,178.82
JACAREPAGUA RTB 13,8 kV 30 Mvar JACAREPAGUA RT2 RJ RBF FT RTB 13,8 kV 30 Mvar JACAREPAGUA RT2 RJ 062/2001 IPCA RMEL REA 11449/2022 04/05/2022 04/05/2058  R$888,165.26
JACAREPAGUA MG 345 kV JACAREPAGUA MG1 RJ RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RBNI REN 443/2011 13/12/2016 12/12/2044  R$110,216.82
JACAREPAGUA MG 345 kV JACAREPAGUA MG1 RJ RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RMEL REN 443/2011 05/10/2015 04/10/2028  R$9,075.68
JACAREPAGUA MG 345 kV JACAREPAGUA MG1 RJ RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RBNI REA 5710/2016 18/09/2019 18/09/2052  R$23,098.17
JACAREPAGUA MG 345 kV JACAREPAGUA MG1 RJ RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,666,431.20
JACAREPAGUA MG 345 kV JACAREPAGUA MG1 RJ RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,231,975.87
JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR2B RJ RBF FT TR 345/138 kV JACAREPAGUA TR2B RJ 062/2001 IPCA RMEL REN 443/2011 15/07/2014 14/07/2034  R$32,373.68
JACAREPAGUA MG 345 kV JACAREPAGUA MG1 RJ RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2045  R$110,664.94
JACAREPAGUA MG 345 kV JACAREPAGUA MG1 RJ RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032  R$202,647.48
JACAREPAGUA MG 345 kV JACAREPAGUA MG1 RJ RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032  R$ 406.14
JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR2A RJ RBF FT TR 345/138 kV JACAREPAGUA TR2A RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
JACAREPAGUA MG 345 kV JACAREPAGUA MG1 RJ RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RMEL REN 443/2011 05/10/2015 04/10/2028  R$9,075.68
JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR3A RJ  RBF FT TR 345/138 kV JACAREPAGUA TR3A RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR3A RJ  RBF FT TR 345/138 kV JACAREPAGUA TR3A RJ 062/2001 IPCA RBNI REA 3578/2012 20/07/2015 19/07/2040  R$31,163.81
JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR2B RJ RBF FT TR 345/138 kV JACAREPAGUA TR2B RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR2B RJ RBF FT TR 345/138 kV JACAREPAGUA TR2B RJ 062/2001 IPCA RMEL REN 643/2014 22/03/2015 21/03/2042  R$113,776.58
JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR2B RJ RBF FT TR 345/138 kV JACAREPAGUA TR2B RJ 062/2001 IPCA RBNI REA 3578/2012 20/07/2015 19/07/2040  R$25,912.85
JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR2A RJ RBF FT TR 345/138 kV JACAREPAGUA TR2A RJ 062/2001 IPCA RBNI REA 3578/2012 20/07/2015 19/07/2040  R$25,912.85
JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR1B RJ  RBF FT TR 345/138 kV JACAREPAGUA TR1B RJ 062/2001 IPCA RBNI REA 3578/2012 20/07/2015 19/07/2040  R$25,912.85
JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR1B RJ  RBF FT TR 345/138 kV JACAREPAGUA TR1B RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,059,713.69
JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR1B RJ  RBF FT TR 345/138 kV JACAREPAGUA TR1B RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR1A RJ  RBF FT TR 345/138 kV JACAREPAGUA TR1A RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR1B RJ  RBF FT TR 345/138 kV JACAREPAGUA TR1B RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,168,504.07
JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR1A RJ  RBF FT TR 345/138 kV JACAREPAGUA TR1A RJ 062/2001 IPCA RBNI REA 3578/2012 20/07/2015 19/07/2040  R$25,912.85
JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR1A RJ  RBF FT TR 345/138 kV JACAREPAGUA TR1A RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,168,504.07
JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR1A RJ  RBF FT TR 345/138 kV JACAREPAGUA TR1A RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,059,713.69
JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR3A RJ  RBF FT TR 345/138 kV JACAREPAGUA TR3A RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$95,582.88
JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR2B RJ RBF FT TR 345/138 kV JACAREPAGUA TR2B RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$449,077.61
JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR2A RJ RBF FT TR 345/138 kV JACAREPAGUA TR2A RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$495,179.99
JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR2B RJ RBF FT TR 345/138 kV JACAREPAGUA TR2B RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$95,582.88
JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR2B RJ RBF FT TR 345/138 kV JACAREPAGUA TR2B RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$495,179.99
JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR2A RJ RBF FT TR 345/138 kV JACAREPAGUA TR2A RJ 062/2001 IPCA RMEL REN 443/2011 06/12/2015 05/12/2037  R$11,285.65
JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR2A RJ RBF FT TR 345/138 kV JACAREPAGUA TR2A RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$95,582.88
JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR2A RJ RBF FT TR 345/138 kV JACAREPAGUA TR2A RJ 062/2001 IPCA RMEL REN 443/2011 06/12/2015 05/12/2037  R$11,285.65
JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR2A RJ RBF FT TR 345/138 kV JACAREPAGUA TR2A RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$449,077.61
JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR2A RJ RBF FT TR 345/138 kV JACAREPAGUA TR2A RJ 062/2001 IPCA RMEL REN 443/2011 06/12/2015 05/12/2037  R$11,285.65
JACAREPAGUA MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1B RJ  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$89,119.95
JACAREPAGUA MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1B RJ  DIT   062/2001 IPCA RMEL REN 643/2014 12/04/2015 11/04/2042  R$38,327.62
JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR1B RJ RBF FT TR 345/138 kV JACAREPAGUA TR1B RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$95,582.88
JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR1B RJ RBF FT TR 345/138 kV JACAREPAGUA TR1B RJ 062/2001 IPCA RBNI REA 5710/2016 09/10/2018 09/10/2049  R$237,711.99
JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR1A RJ RBF FT TR 345/138 kV JACAREPAGUA TR1A RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$95,582.88
JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR1A RJ RBF FT TR 345/138 kV JACAREPAGUA TR1A RJ 062/2001 IPCA RBNI REA 5710/2016 16/08/2019 16/08/2050  R$237,711.99
JACAREPAGUA MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ  DIT   062/2001 IPCA RCDM REA 5710/2016 18/01/2019 18/01/2051  R$166,023.04
JACAREPAGUA MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1B RJ  DIT   062/2001 IPCA RCDM REA 5710/2016 24/01/2019 24/01/2051  R$166,023.04
JACAREPAGUA MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1B RJ  DIT   062/2001 IPCA RMEL REN 643/2014 10/04/2015 09/04/2042  R$26,441.59
JACAREPAGUA MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ  DIT   062/2001 IPCA RMEL REN 643/2014 09/04/2015 08/04/2042  R$26,439.34
JACAREPAGUA MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$100,162.74
JACAREPAGUA MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ  DIT   062/2001 IPCA RMEL REN 643/2014 08/02/2015 07/02/2042  R$26,321.99
JACAREPAGUA MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ  DIT   062/2001 IPCA RMEL REN 643/2014 07/12/2014 06/12/2041  R$26,196.38
JACAREPAGUA MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ  DIT   062/2001 IPCA RMEL REN 643/2014 21/12/2014 20/12/2041  R$26,228.07
JACAREPAGUA MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ  DIT   062/2001 IPCA RMEL REN 443/2011 08/02/2015 07/02/2042  R$38,147.80
JACAREPAGUA MC 13,8 kV TR 345/138 kV JACAREPAGUA TR3A RJ  RBF FT TR 345/138 kV JACAREPAGUA TR3A RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$35,245.01
JACAREPAGUA MC 13,8 kV TR 345/138 kV JACAREPAGUA TR1B RJ  RBF FT TR 345/138 kV JACAREPAGUA TR1B RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$35,245.01
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV VILA VALQUEIR /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
JACAREPAGUA MC 13,8 kV TR 345/138 kV JACAREPAGUA TR2A RJ  RBF FT TR 345/138 kV JACAREPAGUA TR2A RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$35,245.01
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
JACAREPAGUA MC 13,8 kV TR 345/138 kV JACAREPAGUA TR1A RJ  RBF FT TR 345/138 kV JACAREPAGUA TR1A RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$35,245.01
JACAREPAGUA MC 13,8 kV RTB 13,8 kV 30 MVAr JACAREPAGUA RT3 RJ  RBF FT RTB 13,8 kV 30 MVAr JACAREPAGUA RT3 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,394.97
JACAREPAGUA MC 13,8 kV RTB 13,8 kV 30 Mvar JACAREPAGUA RT2 RJ  RBF FT RTB 13,8 kV 30 Mvar JACAREPAGUA RT2 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,394.97
JACAREPAGUA MC 13,8 kV RTB 13,8 kV 30 MVAr JACAREPAGUA RT1 RJ  RBF FT RTB 13,8 kV 30 MVAr JACAREPAGUA RT1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,394.97
JACAREPAGUA IB 345 kV MG 345 kV JACAREPAGUA MG1 RJ IB1 RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
JACAREPAGUA IB 345 kV MG 345 kV JACAREPAGUA MG1 RJ IB1 RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RBNI REA 3578/2012 20/07/2015 19/07/2040  R$31,163.81
JACAREPAGUA IB 345 kV MG 345 kV JACAREPAGUA MG1 RJ IB1 RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,036,883.85
JACAREPAGUA IB 345 kV MG 345 kV JACAREPAGUA MG1 RJ IB1 RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$940,347.61
JACAREPAGUA IB 138 kV MG 345 kV JACAREPAGUA MG1 RJ IB4 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$78,514.10
JACAREPAGUA IB 138 kV MG 345 kV JACAREPAGUA MG1 RJ IB3 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$78,514.10
JACAREPAGUA IB 138 kV MG 345 kV JACAREPAGUA MG1 RJ IB3 DIT   062/2001 IPCA RCDM REA 3578/2012 10/09/2015 09/09/2042  R$99,618.96
JACAREPAGUA IB 138 kV MG 345 kV JACAREPAGUA MG1 RJ IB2 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$78,514.10
JACAREPAGUA IB 138 kV MG 345 kV JACAREPAGUA MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$78,514.10
JACAREPAGUA EL 345 kV JACAREPAGUA LT 345 kV NOVA IGUACU /JACAREPAGUA C-1 RJ  RB FT LT 345 kV NOVA IGUACU /JACAREPAGUA C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
JACAREPAGUA EL 345 kV JACAREPAGUA LT 345 kV NOVA IGUACU /JACAREPAGUA C-1 RJ  RB FT LT 345 kV NOVA IGUACU /JACAREPAGUA C-1 RJ 062/2001 IPCA RBNI REA 3578/2012 20/07/2015 19/07/2040  R$25,552.85
JACAREPAGUA EL 345 kV JACAREPAGUA LT 345 kV NOVA IGUACU /JACAREPAGUA C-1 RJ  RB FT LT 345 kV NOVA IGUACU /JACAREPAGUA C-1 RJ 062/2001 IPCA RMEL REN 643/2014 12/07/2015 11/07/2036  R$33,450.06
JACAREPAGUA EL 345 kV JACAREPAGUA LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
JACAREPAGUA EL 345 kV JACAREPAGUA LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ 062/2001 IPCA RBNI REA 3578/2012 20/07/2015 19/07/2040  R$25,552.85
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ZONA OESTE /JACAREPAGUA C-1 RJ  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV VILA VALQUEIR /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV VILA VALQUEIR /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RCDM REA 5710/2016 23/10/2019 23/10/2050  R$176,617.92
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV VILA VALQUEIR /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 10/11/2014 09/11/2035  R$4,578.84
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ARI FRANCO C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV VILA VALQUEIR /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RCDM REA 5710/2016 11/01/2019 11/01/2050  R$254,455.37
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ARI FRANCO C-1 RJ DIT   062/2001 IPCA RCDM REA 2837/2011 10/09/2015 09/09/2042  R$131,304.25
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RCDM REA 5710/2016 16/05/2019 16/05/2049  R$224,554.82
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 25/01/2015 24/01/2042  R$51,842.24
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 22/02/2015 21/02/2042  R$37,644.85
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 03/12/2014 02/12/2035  R$4,587.99
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 03/12/2014 02/12/2035  R$4,587.99
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 03/12/2014 02/12/2035  R$4,587.99
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RCDM REA 5710/2016 23/10/2019 23/10/2049  R$224,554.82
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 01/03/2015 28/02/2042  R$51,980.94
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 26/07/2015 25/07/2042  R$38,072.17
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 06/11/2014 05/11/2035  R$4,576.86
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 06/11/2014 05/11/2035  R$4,576.86
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 06/11/2014 05/11/2035  R$4,576.86
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ZONA INDUSTR. C-1 RJ  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ZONA INDUSTR. C-1 RJ  DIT   062/2001 IPCA RMEL REN 443/2011 02/12/2014 01/12/2035  R$4,589.75
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ZONA INDUSTR. C-1 RJ  DIT   062/2001 IPCA RMEL REN 443/2011 02/12/2014 01/12/2035  R$4,589.75
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ZONA INDUSTR. C-1 RJ  DIT   062/2001 IPCA RCDM REA 1814/2009 08/03/2021 07/03/2054  R$100,046.93
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /PALMARES C-1 RJ  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /PALMARES C-1 RJ  DIT   062/2001 IPCA RMEL REN 443/2011 11/02/2015 10/02/2036  R$4,617.86
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /PALMARES C-1 RJ  DIT   062/2001 IPCA RMEL REN 443/2011 11/02/2015 10/02/2036  R$4,617.86
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /PALMARES C-1 RJ  DIT   062/2001 IPCA RMEL REN 443/2011 11/02/2015 10/02/2036  R$4,617.86
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /PALMARES C-1 RJ  DIT   062/2001 IPCA RCDM REA 1814/2009 08/03/2021 07/03/2054  R$100,046.93
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /MATO ALTO C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /MATO ALTO C-1 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 10/09/2015 09/09/2045  R$134,362.03
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /COSMOS C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /COSMOS C-1 RJ DIT   062/2001 IPCA RCDM REA 2837/2011 10/09/2015 09/09/2044  R$326,434.28
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /COSMOS C-1 RJ DIT   062/2001 IPCA RCDM REA 2837/2011 10/09/2015 09/09/2032  R$21,232.43
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /COSMOS C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 30/11/2014 29/11/2035  R$10,935.13
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /COSMOS C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 30/11/2014 29/11/2035  R$10,935.13
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /COSMOS C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 30/11/2014 29/11/2035  R$10,935.13
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ARI FRANCO C-1 RJ DIT   062/2001 IPCA RCDM REA 2837/2011 10/09/2015 09/09/2032  R$21,232.43
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ARI FRANCO C-1 RJ DIT   062/2001 IPCA RCDM REA 5710/2016 04/09/2019 04/09/2049  R$96,609.87
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ARI FRANCO C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$723,202.62
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 19/11/2014 18/11/2035  R$4,583.31
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 19/11/2014 18/11/2035  R$4,583.31
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ARI FRANCO C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$655,870.82
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RCDM REA 5710/2016 17/12/2018 17/12/2048  R$96,609.87
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RCDM REA 2837/2011 10/09/2015 09/09/2044  R$279,564.89
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RCDM REA 2837/2011 10/09/2015 09/09/2044  R$279,564.89
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RCDM REA 5710/2016 17/12/2018 17/12/2048  R$96,609.87
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 19/11/2014 18/11/2035  R$4,583.31
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV CASCADURA /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 05/03/2015 04/03/2036  R$4,626.25
JACAREPAGUA EL 138 kV JACAREPAGUACURICICA II DIT   062/2001 IPCA RCDM REN 443/2011 13/12/2016 12/12/2046  R$ 1,006,429.16
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 14/12/2014 13/12/2035  R$4,593.43
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 14/12/2014 13/12/2035  R$4,593.43
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 14/12/2014 13/12/2035  R$4,593.43
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV GRAJAU /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV GRAJAU /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RCDM REA 5710/2016 27/09/2018 27/09/2049  R$254,455.37
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV CASCADURA /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV CASCADURA /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RCDM REA 5710/2016 24/01/2019 24/01/2049  R$271,525.24
JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV CASCADURA /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 05/03/2015 04/03/2036  R$4,626.25
JACAREPAGUA EL 138 kV JACAREPAGUACURICICA I DIT   062/2001 IPCA RCDM REN 443/2011 13/12/2016 12/12/2046  R$988,382.68
JACAREPAGUA BC 138 kV 100 Mvar JACAREPAGUA BC1B RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$190,670.37
JACAREPAGUA BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$190,670.37
JACAREPAGUA BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$964,139.16
JACAREPAGUA BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$874,375.62
L.C.BARRETO MG 500 kV L.C.BARRETO MG1 SP RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,004,078.84
L.C.BARRETO MG 500 kV L.C.BARRETO MG1 SP RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RMEL REN 443/2011 05/07/2016 04/07/2029  R$20,269.45
L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR2 SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$231,086.04
L.C.BARRETO MG 500 kV L.C.BARRETO MG1 SP RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032  R$4,041.27
L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR2 SP DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,168,504.07
L.C.BARRETO MG 500 kV L.C.BARRETO MG1 SP RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RMEL REN 443/2011 05/07/2016 04/07/2029  R$22,235.83
L.C.BARRETO MG 500 kV L.C.BARRETO MG1 SP RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RMEL REN 443/2011 05/07/2016 04/07/2029  R$31,824.74
L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR6 SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$231,086.04
L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR6 SP DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,168,504.07
L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR5 SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$231,086.04
L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR5 SP DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,168,504.07
L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR5 SP DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 1,059,713.69
L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR4 SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$231,086.04
L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR4 SP DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,168,504.07
L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR3 SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$231,086.04
L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR3 SP DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,168,504.07
L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR3 SP DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 1,059,713.69
L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR2 SP DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 1,059,713.69
L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR1 SP DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,168,504.07
L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR1 SP DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 1,059,713.69
L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR1 SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$231,086.04
L.C.BARRETO IB 345 kV MG 500 kV L.C.BARRETO MG1 SP IB3 RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
L.C.BARRETO IB 345 kV MG 500 kV L.C.BARRETO MG1 SP IB3 RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,036,883.85
L.C.BARRETO IB 345 kV MG 500 kV L.C.BARRETO MG1 SP IB2 RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
L.C.BARRETO IB 345 kV MG 500 kV L.C.BARRETO MG1 SP IB3 RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$940,347.61
L.C.BARRETO IB 345 kV MG 500 kV L.C.BARRETO MG1 SP IB2 RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RBNI REA 1814/2009 30/06/2012 29/06/2026  R$54,959.85
L.C.BARRETO IB 345 kV MG 500 kV L.C.BARRETO MG1 SP IB1 RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
L.C.BARRETO IB 345 kV MG 500 kV L.C.BARRETO MG1 SP IB1 RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RBNI REA 1814/2009 02/09/2012 01/09/2038  R$315,376.77
L.C.BARRETO EL 345 kV L.C.BARRETO LT 345 kV L.C.BARRETO /VOLTA GRANDE C-1 SP/MG  RB FT LT 345 kV L.C.BARRETO /VOLTA GRANDE C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
L.C.BARRETO EL 345 kV L.C.BARRETO LT 345 kV L.C.BARRETO /VOLTA GRANDE C-1 SP/MG  RB FT LT 345 kV L.C.BARRETO /VOLTA GRANDE C-1 SP/MG 062/2001 IPCA RBNI REA 1814/2009 09/07/2012 08/07/2026  R$18,342.87
L.C.BARRETO EL 345 kV L.C.BARRETO LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
L.C.BARRETO EL 345 kV L.C.BARRETO LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
L.C.BARRETO EL 345 kV L.C.BARRETO LT 345 kV JAGUARA-US /L.C.BARRETO C-1 MG/SP  RB FT LT 345 kV JAGUARA-US /L.C.BARRETO C-1 MG/SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
L.C.BARRETO EL 345 kV L.C.BARRETO LT 345 kV JAGUARA-US /L.C.BARRETO C-1 MG/SP  RB FT LT 345 kV JAGUARA-US /L.C.BARRETO C-1 MG/SP 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2042  R$76,324.15
L.C.BARRETO EL 345 kV L.C.BARRETO LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP  RB FT LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
L.C.BARRETO EL 345 kV L.C.BARRETO LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP  RB FT LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP 062/2001 IPCA RBNI REA 1814/2009 08/02/2012 07/02/2037  R$413,727.73
L.C.BARRETO EL 345 kV L.C.BARRETO LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP  RB FT LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,372,890.86
L.C.BARRETO EL 345 kV L.C.BARRETO LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP  RB FT LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
L.C.BARRETO EL 345 kV L.C.BARRETO LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP  RB FT LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP 062/2001 IPCA RBNI REA 1814/2009 06/05/2012 05/05/2037  R$417,296.80
LINHARES TR 230/138 kV LINHARES TRR1 ES RBF FT TR 230/138 kV LINHARES TRR1 ES 006/2010 IPCA RBL CC 006/2010 14/08/2018 12/07/2040  R$335,657.01
LINHARES TR 230/138 kV LINHARES TR1 ES RBF FT TR 230/138 kV LINHARES TR1 ES 006/2010 IPCA RBL CC 006/2010 14/08/2018 12/07/2040  R$ 1,006,968.99
LINHARES MG 230 kV LINHARES MG1 ES RB FT MG 230 kV LINHARES MG1 ES 006/2010 IPCA RBL CC 006/2010 14/08/2018 12/07/2040  R$943,919.14
LINHARES MC 230 kV TR 230/138 kV LINHARES TR1 ES RBF FT TR 230/138 kV LINHARES TR1 ES 006/2010 IPCA RBL CC 006/2010 14/08/2018 12/07/2040  R$419,223.28
LINHARES MC 138 kV TR 230/138 kV LINHARES TR1 ES RBF FT TR 230/138 kV LINHARES TR1 ES 006/2010 IPCA RBL CC 006/2010 14/08/2018 12/07/2040  R$325,667.36
LINHARES IB 230 kV MG 230 kV LINHARES MG1 ES IB1 RB FT MG 230 kV LINHARES MG1 ES 006/2010 IPCA RBL CC 006/2010 14/08/2018 12/07/2040  R$308,166.49
LINHARES EL 230 kV LINHARES LT 230 kV U.MASCARENHAS /LINHARES C-1 ES RB FT LT 230 kV U.MASCARENHAS /LINHARES C-1 ES 006/2010 IPCA RBL CC 006/2010 14/08/2018 12/07/2040  R$593,479.57
LINHARES EL 138 kV LINHARESDIST2 DIT   006/2010 IPCA RPEC CC 006/2010 14/08/2018 12/07/2040  R$458,900.22
LINHARES IB 138 kV MG 230 kV LINHARES MG1 ES IB1 DIT   006/2010 IPCA RPEC CC 006/2010 14/08/2018 12/07/2040  R$230,075.23
LINHARES EL 138 kV LINHARESDIST4 DIT   006/2010 IPCA RPEC CC 006/2010 14/08/2018 12/07/2040  R$458,900.22
LINHARES EL 138 kV LINHARESDIST3 DIT   006/2010 IPCA RPEC CC 006/2010 14/08/2018 12/07/2040  R$458,900.22
LINHARES EL 138 kV LINHARESDIST1 DIT   006/2010 IPCA RPEC CC 006/2010 14/08/2018 12/07/2040  R$458,900.22
LT138 kV JACUACANGA /BRISAMARRJ LT 138 kV JACUACANGA /BRISAMAR C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$573,955.79
LT138 kV JACUACANGA /BRISAMARRJ LT 138 kV JACUACANGA /BRISAMAR C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 2,902,250.99
LT138 kV JACUACANGA /BRISAMARRJ LT 138 kV JACUACANGA /BRISAMAR C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 13/11/2015 12/11/2050  R$ 0.01
LT138 kV MURIQUI/BRISAMARRJ LT 138 kV MURIQUI /BRISAMAR C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$223,577.19
LT138 kV SANTA CRUZ /BRISAMARRJ LT 138 kV SANTA CRUZ /BRISAMAR C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$260,889.00
LT138 kV SANTA CRUZ /BRISAMARRJ LT 138 kV SANTA CRUZ /BRISAMAR C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,319,204.99
LT230 kV ITUMBIARA/C. DOURADAMG/GO LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO RB FT LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$633,729.24
LT345 kV CORUMBA/ITUMBIARA GO/MG LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG RB FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,921,432.66
LT345 kV FURNAS /M. MORAES MG LT 345 kV FURNAS /M. MORAES C-1 MG RB FT LT 345 kV FURNAS /M. MORAES C-1 MG 062/2001 IPCA RBNI REA 2176/2009 07/12/2012 06/12/2040  R$37,960.08
LT345 kV FURNAS /M. MORAES MG LT 345 kV FURNAS /M. MORAES C-1 MG RB FT LT 345 kV FURNAS /M. MORAES C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,529,480.97
LT345 kV CORUMBA/ITUMBIARA GO/MG LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG RB FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 9,954,240.37
LT345 kV CORUMBA/ITUMBIARA GO/MG LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG RB FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 9,027,478.01
LT345 kV ITUMBIARA/P. COLOMBIA MG LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 4,888,708.41
LT345 kV L.C.BARRETO/VOLTA GRANDESP/MG LT 345 kV L.C.BARRETO /VOLTA GRANDE C-1 SP/MG RB FT LT 345 kV L.C.BARRETO /VOLTA GRANDE C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,094,486.96
LT345 kV MARIMBONDO /P. COLOMBIA MG LT 345 kV MARIMBONDO /P. COLOMBIA C-1 MG RB FT LT 345 kV MARIMBONDO /P. COLOMBIA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,872,788.79
LT345 kV P. COLOMBIA/VOLTA GRANDEMG LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG RB FT LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,094,486.96
LT 138 kV ALCANTARA /ADRIANOPOLIS RJ LT 138 kV ALCANTARA /ADRIANOPOLIS C-3 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$260,889.00
LT500 kV MARIMBONDO /AGUA VERMELHA MG/SP LT 500 kV MARIMBONDO /AGUA VERMELHA C-1 MG/SP RB FT LT 500 kV MARIMBONDO /AGUA VERMELHA C-1 MG/SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 6,046,999.99
LT500 kV MARIMBONDO /AGUA VERMELHA MG/SP LT 500 kV MARIMBONDO /AGUA VERMELHA C-1 MG/SP RB FT LT 500 kV MARIMBONDO /AGUA VERMELHA C-1 MG/SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 31,327,296.91
LT 138 kV ADRIANOPOLIS /CEPEL RJ LT 138 kV ADRIANOPOLIS /CEPEL C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$15,666.05
LT 138 kV ADRIANOPOLIS /CEPEL RJ LT 138 kV ADRIANOPOLIS /CEPEL C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$79,216.58
LT 138 kV ADRIANOPOLIS /CEPEL RJ LT 138 kV ADRIANOPOLIS /CEPEL C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$15,666.05
LT 138 kV ADRIANOPOLIS /CEPEL RJ LT 138 kV ADRIANOPOLIS /CEPEL C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$79,216.58
LT 138 kV ADRIANOPOLIS /MAGE RJ LT 138 kV ADRIANOPOLIS /MAGE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$385,625.88
LT 138 kV ADRIANOPOLIS /MAGE RJ LT 138 kV ADRIANOPOLIS /MAGE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$385,625.88
LT 138 kV ALCANTARA /ADRIANOPOLIS RJ LT 138 kV ALCANTARA /ADRIANOPOLIS C-3 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,319,204.99
LT 138 kV ALCANTARA /ADRIANOPOLIS RJ LT 138 kV ALCANTARA /ADRIANOPOLIS C-3 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 1,196,384.02
LT 138 kV ALCANTARA /ADRIANOPOLIS RJ LT 138 kV ALCANTARA /ADRIANOPOLIS C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$176,745.19
LT 138 kV ALCANTARA /ADRIANOPOLIS RJ LT 138 kV ALCANTARA /ADRIANOPOLIS C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$893,725.48
LT 138 kV ALCANTARA /ADRIANOPOLIS RJ LT 138 kV ALCANTARA /ADRIANOPOLIS C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$810,517.61
LT 138 kV ALCANTARA /ADRIANOPOLIS RJ LT 138 kV ALCANTARA /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$172,326.56
LT 138 kV ALCANTARA /ADRIANOPOLIS RJ LT 138 kV ALCANTARA /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$871,382.34
LT 138 kV ANGRA FUR /ANGRA AMPLA RJ LT 138 kV ANGRA FUR /ANGRA AMPLA C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$443,511.29
LT 138 kV ANGRA AMPLA /MURIQUI RJ LT 138 kV ANGRA AMPLA /MURIQUI C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$376,016.18
LT 138 kV ANGRA FUR /JACUACANGA RJ LT 138 kV ANGRA FUR /JACUACANGA C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$443,511.29
LT 138 kV ANGRA FUR /JACUACANGA RJ LT 138 kV ANGRA FUR /JACUACANGA C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 2,242,648.49
LT 138 kV ANGRA FUR /SANTA CRUZ RJ LT 138 kV ANGRA FUR /SANTA CRUZ C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 1,252,267.18
LT 138 kV ANGRA FUR /SANTA CRUZ RJ LT 138 kV ANGRA FUR /SANTA CRUZ C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 6,332,183.97
LT 138 kV C. PAULISTA /VOLTA REDONDA SP/RJ LT 138 kV C. PAULISTA /VOLTA REDONDA C-2 SP/RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 1,067,072.94
LT 138 kV C. PAULISTA /VOLTA REDONDA SP/RJ LT 138 kV C. PAULISTA /VOLTA REDONDA C-2 SP/RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 5,395,735.28
LT 138 kV C. PAULISTA /VOLTA REDONDA SP/RJ LT 138 kV C. PAULISTA /VOLTA REDONDA C-2 SP/RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 4,893,380.08
LT 138 kV C. PAULISTA /VOLTA REDONDA SP/RJ LT 138 kV C. PAULISTA /VOLTA REDONDA C-1 SP/RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 1,369,667.23
LT 138 kV C. PAULISTA /VOLTA REDONDA SP/RJ LT 138 kV C. PAULISTA /VOLTA REDONDA C-1 SP/RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 6,925,826.22
LT 138 kV C. PAULISTA /VOLTA REDONDA SP/RJ LT 138 kV C. PAULISTA /VOLTA REDONDA C-1 SP/RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 6,281,016.08
LT 138 kV CAMPOS /IRIRI RJ LT 138 kV CAMPOS /IRIRI C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 1,265,311.63
LT 138 kV CAMPOS /ROCHA LEAO RJ LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 1,434,889.47
LT 138 kV IMBARIE /SAO JOSE RJ LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$201,219.47
LT 138 kV IMBARIE /SAO JOSE RJ LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$922,751.67
LT 138 kV IMBARIE /ADRIANOPOLIS RJ LT 138 kV IMBARIE /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$234,800.10
LT 138 kV IMBARIE /SAO JOSE RJ LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$201,219.47
LT 138 kV IMBARIE /SAO JOSE RJ LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,017,481.51
LT 138 kV IMBARIE /SAO JOSE RJ LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,017,481.51
LT 138 kV IMBARIE /SAO JOSE RJ LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$922,751.67
LT 138 kV IRIRI /ROCHA LEAO RJ LT 138 kV IRIRI /ROCHA LEAO C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$169,577.85
LT 138 kV PARQUE EMAS /C. MAGALHAES GO/MT LT 138 kV PARQUE EMAS /C. MAGALHAES C-1 GO/MT DIT   062/2001 IPCA RCDM REA 2367/2010 17/11/2013 16/11/2046  R$18,082.54
LT 138 kV PARQUE EMAS /C. MAGALHAES GO/MT LT 138 kV PARQUE EMAS /C. MAGALHAES C-1 GO/MT DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$828,777.72
LT 138 kV PARQUE EMAS /C. MAGALHAES GO/MT LT 138 kV PARQUE EMAS /C. MAGALHAES C-1 GO/MT DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 4,190,777.38
LT 138 kV RIO VERDE FUR /C. DOURADA GO LT 138 kV RIO VERDE FUR /C. DOURADA C-2 GO DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 1,778,454.91
LT 138 kV RIO VERDE FUR /C. DOURADA GO LT 138 kV RIO VERDE FUR /C. DOURADA C-2 GO DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 8,992,892.13
LT 138 kV RIO CLARO /PARQUE EMAS GO LT 138 kV RIO CLARO /PARQUE EMAS C-1 GO DIT   062/2001 IPCA RCDM REA 2367/2010 17/11/2013 16/11/2046  R$18,082.54
LT 138 kV RIO CLARO /PARQUE EMAS GO LT 138 kV RIO CLARO /PARQUE EMAS C-1 GO DIT   062/2001 IPCA RCDM REA 2367/2010 17/11/2013 16/11/2046  R$18,082.54
LT 138 kV RIO CLARO /PARQUE EMAS GO LT 138 kV RIO CLARO /PARQUE EMAS C-1 GO DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$888,701.59
LT 138 kV RIO CLARO /PARQUE EMAS GO LT 138 kV RIO CLARO /PARQUE EMAS C-1 GO DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 4,493,787.02
LT 138 kV RIO VERDE FUR /RIO CLARO GO LT 138 kV RIO VERDE FUR /RIO CLARO C-1 GO DIT   062/2001 IPCA RCDM REA 2367/2010 17/11/2013 16/11/2046  R$18,082.54
LT 138 kV RIO VERDE FUR /RIO CLARO GO LT 138 kV RIO VERDE FUR /RIO CLARO C-1 GO DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$863,820.95
LT 138 kV RIO VERDE FUR /RIO CLARO GO LT 138 kV RIO VERDE FUR /RIO CLARO C-1 GO DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 4,367,976.17
LT 138 kV ROCHA LEAO /MAGE RJ LT 138 kV ROCHA LEAO /MAGE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$867,658.23
LT 138 kV ROCHA LEAO /MAGE RJ LT 138 kV ROCHA LEAO /MAGE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$867,658.23
LT 138 kV SAO JOSE /MAGE RJ LT 138 kV SAO JOSE /MAGE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$369,558.13
LT 138 kV SAO JOSE /MAGE RJ LT 138 kV SAO JOSE /MAGE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,868,698.73
LT 138 kV SAO JOSE /MAGE RJ LT 138 kV SAO JOSE /MAGE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 1,694,718.64
LT 138 kV SAO JOSE /MAGE RJ LT 138 kV SAO JOSE /MAGE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$369,558.13
LT 138 kV SAO JOSE /MAGE RJ LT 138 kV SAO JOSE /MAGE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,868,698.73
LT 138 kV SAO JOSE /MAGE RJ LT 138 kV SAO JOSE /MAGE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 1,694,718.64
LT 138 kV USI CAMPOS /CAMPOS RJ LT 138 kV USI CAMPOS /CAMPOS C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$47,894.22
LT 138 kV USI CAMPOS /CAMPOS RJ LT 138 kV USI CAMPOS /CAMPOS C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$10,444.03
LT 138 kV USI CAMPOS /CAMPOS RJ LT 138 kV USI CAMPOS /CAMPOS C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$10,444.03
LT 138 kV USI CAMPOS /CAMPOS RJ LT 138 kV USI CAMPOS /CAMPOS C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$52,811.05
LT 138 kV USI CAMPOS /CAMPOS RJ LT 138 kV USI CAMPOS /CAMPOS C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$52,811.05
LT 230 kV AGUAS LINDAS /BRAS. SUL GO/DF LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF RB FT LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBNI REA 2367/2010 24/11/2013 23/11/2039  R$9,208.30
LT 230 kV AGUAS LINDAS /BRAS. SUL GO/DF LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF RB FT LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 19,717,520.79
LT 230 kV AGUAS LINDAS /BRAS. SUL GO/DF LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF RB FT LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,789,156.73
LT 230 kV AGUAS LINDAS /BRAS. SUL GO/DF LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF RB FT LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,529,479.91
LT 230 kV BARRO ALTO /AGUAS LINDAS GO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO RB FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO 062/2001 IPCA RBNI REA 2367/2010 24/11/2013 23/11/2039  R$9,208.30
LT 230 kV BARRO ALTO /AGUAS LINDAS GO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO RB FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,830,496.41
LT 230 kV BARRO ALTO /AGUAS LINDAS GO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO RB FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 9,483,132.87
LT 230 kV BARRO ALTO /AGUAS LINDAS GO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO RB FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 8,600,231.69
LT 230 kV BARRO ALTO /NIQUELANDIA GO LT 230 kV BARRO ALTO /NIQUELANDIA C-2 GO RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-2 GO 028/2009 IPCA RBL CC 028/2009 01/07/2016 19/11/2039  R$ 5,528,182.55
LT 230 kV BARRO ALTO /NIQUELANDIA GO LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,561,305.76
LT 230 kV BARRO ALTO /NIQUELANDIA GO LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 8,088,554.51
LT 230 kV BARRO ALTO /NIQUELANDIA GO LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 7,335,491.74
LT 230 kV BRAS. GERAL /BRAS. SUL DF LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF RB FT LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$224,685.82
LT 230 kV BRAS. GERAL /BRAS. SUL DF LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF RB FT LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$224,685.82
LT 230 kV BRAS. SUL /PIRINEUS DF/GO LT 230 kV BRAS. SUL /PIRINEUS C-1 DF/GO RB FT LT 230 kV BRAS. SUL /PIRINEUS C-1 DF/GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,541,114.30
LT 230 kV ITUMBIARA /RIO VERDE FUR MG/GO LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,909,393.34
LT 230 kV ITUMBIARA /RIO VERDE FUR MG/GO LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 15,072,503.60
LT 230 kV ITUMBIARA /RIO VERDE FUR MG/GO LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 13,669,219.33
LT 230 kV ITUMBIARA /RIO VERDE FUR MG/GO LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,995,810.97
LT 230 kV ITUMBIARA /RIO VERDE FUR MG/GO LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 15,520,201.73
LT 230 kV ITUMBIARA /RIO VERDE FUR MG/GO LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 14,075,235.74
LT 230 kV PIRINEUS /XAVANTES GO LT 230 kV PIRINEUS /XAVANTES C-2 GO RB FT LT 230 kV PIRINEUS /XAVANTES C-2 GO 014/2011 IPCA RBL CC 014/2011 08/06/2018 09/12/2041  R$ 4,397,624.60
LT 230 kV PIRINEUS /XAVANTES GO LT 230 kV PIRINEUS /XAVANTES C-1 GO RB FT LT 230 kV PIRINEUS /XAVANTES C-1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$717,841.73
LT 230 kV PIRINEUS /XAVANTES GO LT 230 kV PIRINEUS /XAVANTES C-1 GO RB FT LT 230 kV PIRINEUS /XAVANTES C-1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,718,875.64
LT 230 kV PIRINEUS /XAVANTES GO LT 230 kV PIRINEUS /XAVANTES C-1 GO RB FT LT 230 kV PIRINEUS /XAVANTES C-1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,372,639.88
LT 230 kV RIO VERDE FUR /BARRA PEIXE GO/MT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 4,307,050.37
LT 230 kV RIO VERDE FUR /BARRA PEIXE GO/MT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 22,313,253.82
LT 230 kV RIO VERDE FUR /BARRA PEIXE GO/MT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 20,235,839.27
LT 230 kV RIO VERDE FUR /C. DOURADA GO LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO RB FT LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,520,514.04
LT 230 kV RIO VERDE FUR /C. DOURADA GO LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO RB FT LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 13,057,862.03
LT 230 kV RIO VERDE FUR /C. DOURADA GO LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO RB FT LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 11,842,145.45
LT 230 kV RIO VERDE FUR /RONDONOPOLIS GO/MT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,456,704.96
LT 230 kV RIO VERDE FUR /RONDONOPOLIS GO/MT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 17,907,925.07
LT 230 kV RIO VERDE FUR /RONDONOPOLIS GO/MT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 16,240,656.62
LT 230 kV RIO VERDE FUR /RONDONOPOLIS GO/MT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,701,554.90
LT 230 kV RIO VERDE FUR /RONDONOPOLIS GO/MT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 19,176,403.10
LT 230 kV RIO VERDE FUR /RONDONOPOLIS GO/MT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 17,391,036.47
LT 230 kV S.DA MESA /NIQUELANDIA GO LT 230 kV S.DA MESA /NIQUELANDIA C-2 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-2 GO 028/2009 IPCA RBL CC 028/2009 27/09/2017 19/11/2039  R$ 8,318,137.68
LT 230 kV S.DA MESA /NIQUELANDIA GO LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,512,308.42
LT 230 kV S.DA MESA /NIQUELANDIA GO LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 7,834,717.22
LT 230 kV S.DA MESA /NIQUELANDIA GO LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 7,105,287.27
LT 230 kV U.MASCARENHAS /LINHARES ES LT 230 kV U.MASCARENHAS /LINHARES C-1 ES RB FT LT 230 kV U.MASCARENHAS /LINHARES C-1 ES 006/2010 IPCA RBL CC 006/2010 14/08/2018 12/07/2040  R$ 5,098,062.91
LT 345 kV ADRIANOPOLIS /COMPERJ RJ LT 345 kV ADRIANOPOLIS /COMPERJ C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /COMPERJ C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,307,130.14
LT 345 kV ADRIANOPOLIS /ITUTINGA RJ/MG LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 4,840,064.55
LT 345 kV ADRIANOPOLIS /ITUTINGA RJ/MG LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 4,840,064.55
LT 345 kV ADRIANOPOLIS /JACAREPAGUA RJ LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$924,233.43
LT 345 kV ADRIANOPOLIS /NOVA IGUACU RJ LT 345 kV ADRIANOPOLIS /NOVA IGUACU C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /NOVA IGUACU C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$316,185.12
LT 345 kV ADRIANOPOLIS /VENDA PEDRAS RJ LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,602,446.77
LT 345 kV ADRIANOPOLIS /VENDA PEDRAS RJ LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBNI REA 5538/2015 01/07/2016 31/12/2042  R$ 3,046,990.37
LT 345 kV ADRIANOPOLIS /VENDA PEDRAS RJ LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 13,482,325.56
LT 345 kV ATIBAIA 2 /MOGI CRUZES SP LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP RB FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,480,837.10
LT 345 kV ATIBAIA 2 /MOGI CRUZES SP LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP RB FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 3698/2012 18/09/2013 17/09/2045  R$158,373.24
LT 345 kV ATIBAIA 2 /MOGI CRUZES SP LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP RB FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 4420/2013 10/09/2013 31/12/2042  R$241,389.35
LT 345 kV ATIBAIA 2 /POCOS CALDAS SP/MG LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,480,837.10
LT 345 kV ATIBAIA 2 /POCOS CALDAS SP/MG LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBNI REA 4420/2013 10/09/2013 31/12/2042  R$241,389.35
LT 345 kV BANDEIRANTES /SAMAMBAIA GO/DF LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,769,899.52
LT 345 kV BANDEIRANTES /SAMAMBAIA GO/DF LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 19,530,471.61
LT 345 kV BANDEIRANTES /SAMAMBAIA GO/DF LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 17,712,140.39
LT 345 kV BANDEIRANTES /SAMAMBAIA GO/DF LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,818,543.39
LT 345 kV BANDEIRANTES /SAMAMBAIA GO/DF LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 19,782,477.69
LT 345 kV BANDEIRANTES /SAMAMBAIA GO/DF LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 17,940,684.14
LT 345 kV BARREIRO 1 /PIMENTA MG LT 345 kV BARREIRO 1 /PIMENTA C-1 MG RB FT LT 345 kV BARREIRO 1 /PIMENTA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 4,815,742.61
LT 345 kV BARRO BRANCO /OURO PRETO 2 MG LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG RB FT LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,935,876.31
LT 345 kV BARRO BRANCO /OURO PRETO 2 MG LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG RB FT LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG 062/2001 IPCA RBNI REA 8920/2020 01/09/2017 31/08/2045  R$12,144.52
LT 345 kV BRAS. SUL /SAMAMBAIA DF LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$437,794.78
LT 345 kV BRAS. SUL /SAMAMBAIA DF LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,268,054.77
LT 345 kV BRAS. SUL /SAMAMBAIA DF LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,056,893.72
LT 345 kV BRAS. SUL /SAMAMBAIA DF LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$364,828.99
LT 345 kV BRAS. SUL /SAMAMBAIA DF LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,890,045.64
LT 345 kV BRAS. SUL /SAMAMBAIA DF LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,714,078.10
LT 345 kV CAMPINAS /GUARULHOS SP LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,140,330.05
LT 345 kV CAMPINAS /POCOS CALDAS SP/MG LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,064,563.48
LT 345 kV CAMPOS /MACAE MERCHAN RJ LT 345 kV CAMPOS /MACAE MERCHAN C-3 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-3 RJ 006/2005 IGPM RBL CC 006/2005 02/06/2010 04/03/2035  R$ 25,800,293.51
LT 345 kV CAMPOS /MACAE MERCHAN RJ LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,164,651.98
LT 345 kV CAMPOS /MACAE MERCHAN RJ LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 11,214,270.79
LT 345 kV CAMPOS /MACAE MERCHAN RJ LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 10,170,196.74
LT 345 kV CAMPOS /MACAE MERCHAN RJ LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,164,651.98
LT 345 kV CAMPOS /MACAE MERCHAN RJ LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 11,214,270.79
LT 345 kV CAMPOS /RIO NOVO DO SUL RJ/ES LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES RB FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,894,309.95
LT 345 kV CAMPOS /RIO NOVO DO SUL RJ/ES LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES RB FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 14,994,362.07
LT 345 kV CAMPOS /RIO NOVO DO SUL RJ/ES LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES RB FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES 062/2001 IPCA RBNI DSP 1405/2022 01/07/2022 30/06/2056  R$60,452.60
LT 345 kV CAMPOS /RIO NOVO DO SUL RJ/ES LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES RB FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,894,309.95
LT 345 kV CAMPOS /RIO NOVO DO SUL RJ/ES LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES RB FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 14,994,362.07
LT 345 kV CAMPOS /RIO NOVO DO SUL RJ/ES LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES RB FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES 062/2001 IPCA RBNI DSP 1405/2022 01/07/2022 30/06/2056  R$60,452.60
LT 345 kV COMPERJ /LAGOS RJ LT 345 kV COMPERJ /LAGOS C-1 RJ RB FT LT 345 kV COMPERJ /LAGOS C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,705,988.71
LT 345 kV CORUMBA /BRAS. SUL GO/DF LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 6,177,770.83
LT 345 kV CORUMBA /BRAS. SUL GO/DF LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 32,004,772.83
LT 345 kV CORUMBA /BRAS. SUL GO/DF LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 29,025,055.87
LT 345 kV ESTREITO /FURNAS MG LT 345 kV ESTREITO /FURNAS C-1 MG RB FT LT 345 kV ESTREITO /FURNAS C-1 MG 062/2001 IPCA RBNI REA 2176/2009 07/12/2012 06/12/2040  R$34,265.02
LT 345 kV ESTREITO /FURNAS MG LT 345 kV ESTREITO /FURNAS C-1 MG RB FT LT 345 kV ESTREITO /FURNAS C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,724,056.43
LT 345 kV ESTREITO /L.C.BARRETO MG/SP LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP RB FT LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP 062/2001 IPCA RBNI REA 2176/2009 07/12/2012 06/12/2040  R$ 0.01
LT 345 kV ESTREITO /L.C.BARRETO MG/SP LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP RB FT LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$642,099.02
LT 345 kV ESTREITO /L.C.BARRETO MG/SP LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP RB FT LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,326,480.33
LT 345 kV ESTREITO /L.C.BARRETO MG/SP LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP RB FT LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,016,777.46
LT 345 kV ESTREITO /L.C.BARRETO MG/SP LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP RB FT LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP 062/2001 IPCA RBNI REA 2176/2009 07/12/2012 06/12/2040  R$135,718.05
LT 345 kV ESTREITO /L.C.BARRETO MG/SP LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP RB FT LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$642,099.02
LT 345 kV ESTREITO /M. MORAES MG LT 345 kV ESTREITO /M. MORAES C-1 MG RB FT LT 345 kV ESTREITO /M. MORAES C-1 MG 062/2001 IPCA RBNI REA 2176/2009 07/12/2012 06/12/2040  R$30,795.96
LT 345 kV ESTREITO /M. MORAES MG LT 345 kV ESTREITO /M. MORAES C-1 MG RB FT LT 345 kV ESTREITO /M. MORAES C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$379,422.15
LT 345 kV FURNAS /ITUTINGA MG LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 4,840,064.55
LT 345 kV FURNAS /ITUTINGA MG LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 4,815,742.61
LT 345 kV FURNAS /PIMENTA MG LT 345 kV FURNAS /PIMENTA C-1 MG RB FT LT 345 kV FURNAS /PIMENTA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,605,247.54
LT 345 kV FURNAS /POCOS CALDAS MG LT 345 kV FURNAS /POCOS CALDAS C-2 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-2 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,186,173.14
LT 345 kV FURNAS /POCOS CALDAS MG LT 345 kV FURNAS /POCOS CALDAS C-1 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,186,173.14
LT 345 kV GUARULHOS /IBIUNA SP LT 345 kV GUARULHOS /IBIUNA C-2 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,545,724.69
LT 345 kV GUARULHOS /IBIUNA SP LT 345 kV GUARULHOS /IBIUNA C-2 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-2 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 8,007,834.67
LT 345 kV GUARULHOS /IBIUNA SP LT 345 kV GUARULHOS /IBIUNA C-2 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-2 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 7,262,287.10
LT 345 kV GUARULHOS /IBIUNA SP LT 345 kV GUARULHOS /IBIUNA C-1 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,545,724.69
LT 345 kV GUARULHOS /IBIUNA SP LT 345 kV GUARULHOS /IBIUNA C-1 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 8,007,834.67
LT 345 kV GUARULHOS /IBIUNA SP LT 345 kV GUARULHOS /IBIUNA C-1 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 7,262,287.10
LT 345 kV GUARULHOS /NORDESTE SP LT 345 kV GUARULHOS /NORDESTE C-1 SP RB FT LT 345 kV GUARULHOS /NORDESTE C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$802,623.77
LT 345 kV GUARULHOS /POCOS CALDAS SP/MG LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 4,475,235.56
LT 345 kV GUARULHOS /POCOS CALDAS SP/MG LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 4,426,591.69
LT 345 kV IBIUNA /TIJUCO PRETO SP LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBNI REA 1410/2008 04/11/2015 03/11/2055  R$145,263.44
LT 345 kV IBIUNA /TIJUCO PRETO SP LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,999,137.26
LT 345 kV IBIUNA /TIJUCO PRETO SP LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 10,356,799.51
LT 345 kV IBIUNA /TIJUCO PRETO SP LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 9,392,557.98
LT 345 kV IBIUNA /TIJUCO PRETO SP LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,999,137.26
LT 345 kV IBIUNA /TIJUCO PRETO SP LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 10,356,799.51
LT 345 kV IBIUNA /TIJUCO PRETO SP LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 9,392,557.98
LT 345 kV ITAPETI /NORDESTE SP LT 345 kV ITAPETI /NORDESTE C-1 SP RB FT LT 345 kV ITAPETI /NORDESTE C-1 SP 007/2006 IPCA RBL CC 007/2006 27/04/2006 27/04/2036  R$ 5,925,803.08
LT 345 kV ITAPETI /TIJUCO PRETO SP LT 345 kV ITAPETI /TIJUCO PRETO C-4 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-4 SP 007/2006 IPCA RBL CC 007/2006 27/04/2006 27/04/2036  R$ 3,037,959.52
LT 345 kV ITAPETI /TIJUCO PRETO SP LT 345 kV ITAPETI /TIJUCO PRETO C-3 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-3 SP 007/2006 IPCA RBL CC 007/2006 27/04/2006 27/04/2036  R$ 3,037,959.52
LT 345 kV ITUMBIARA /BANDEIRANTES MG/GO LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 4,377,947.83
LT 345 kV ITUMBIARA /BANDEIRANTES MG/GO LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 22,680,547.67
LT 345 kV ITUMBIARA /BANDEIRANTES MG/GO LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 4,377,947.83
LT 345 kV L.C.BARRETO /POCOS CALDAS SP/MG LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 4,791,420.68
LT 345 kV L.C.BARRETO /POCOS CALDAS SP/MG LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 4,815,742.61
LT 345 kV MACAE MERCHAN /LAGOS RJ LT 345 kV MACAE MERCHAN /LAGOS C-1 RJ RB FT LT 345 kV MACAE MERCHAN /LAGOS C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$291,863.19
LT 345 kV MACAE MERCHAN /VENDA PEDRAS RJ LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ RB FT LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,967,275.75
LT 345 kV MACAE MERCHAN /VENDA PEDRAS RJ LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ RB FT LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBNI REA 5538/2015 01/07/2016 31/12/2042  R$ 3,046,990.37
LT 345 kV MACAE MERCHAN /VENDA PEDRAS RJ LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ RB FT LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 15,372,371.20
LT 345 kV MOGI CRUZES /NORDESTE SP LT 345 kV MOGI CRUZES /NORDESTE C-1 SP RB FT LT 345 kV MOGI CRUZES /NORDESTE C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$535,082.51
LT 345 kV NOVA IGUACU /JACAREPAGUA RJ LT 345 kV NOVA IGUACU /JACAREPAGUA C-1 RJ RB FT LT 345 kV NOVA IGUACU /JACAREPAGUA C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$608,048.31
LT 345 kV PADRE FIALHO /BARRO BRANCO MG LT 345 kV PADRE FIALHO /BARRO BRANCO C-1 MG RB FT LT 345 kV PADRE FIALHO /BARRO BRANCO C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,935,876.31
LT 345 kV PADRE FIALHO /BARRO BRANCO MG LT 345 kV PADRE FIALHO /BARRO BRANCO C-1 MG RB FT LT 345 kV PADRE FIALHO /BARRO BRANCO C-1 MG 062/2001 IPCA RBNI REA 8920/2020 01/09/2017 31/08/2045  R$12,144.52
LT 345 kV RIO NOVO DO SUL /VIANA ES LT 345 kV RIO NOVO DO SUL /VIANA C-1 ES RB FT LT 345 kV RIO NOVO DO SUL /VIANA C-1 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,945,754.59
LT 345 kV RIO NOVO DO SUL /VIANA ES LT 345 kV RIO NOVO DO SUL /VIANA C-1 ES RB FT LT 345 kV RIO NOVO DO SUL /VIANA C-1 ES 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 10,080,243.41
LT 345 kV RIO NOVO DO SUL /VIANA ES LT 345 kV RIO NOVO DO SUL /VIANA C-1 ES RB FT LT 345 kV RIO NOVO DO SUL /VIANA C-1 ES 062/2001 IPCA RBNI DSP 1405/2022 01/07/2022 30/06/2056  R$60,452.60
LT 345 kV RIO NOVO DO SUL /VITORIA ES LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES RB FT LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,553,802.90
LT 345 kV RIO NOVO DO SUL /VITORIA ES LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES RB FT LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 13,230,319.48
LT 345 kV RIO NOVO DO SUL /VITORIA ES LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES RB FT LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES 062/2001 IPCA RBNI DSP 1405/2022 01/07/2022 30/06/2056  R$60,452.60
LT 345 kV VIANA /VITORIA ES LT 345 kV VIANA /VITORIA C-1 ES RB FT LT 345 kV VIANA /VITORIA C-1 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$695,607.27
LT 345 kV VIANA /VITORIA ES LT 345 kV VIANA /VITORIA C-1 ES RB FT LT 345 kV VIANA /VITORIA C-1 ES 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,603,687.02
LT 345 kV VITORIA /PADRE FIALHO ES/MG LT 345 kV VITORIA /PADRE FIALHO C-1 ES/MG RB FT LT 345 kV VITORIA /PADRE FIALHO C-1 ES/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 5,443,547.49
LT 500 kV ADRIANOPOLIS /B. FLUMINENSE RJ LT 500 kV ADRIANOPOLIS /B. FLUMINENSE C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /B. FLUMINENSE C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$615,247.09
LT 500 kV ADRIANOPOLIS /GRAJAU RJ LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,334,373.36
LT 500 kV ADRIANOPOLIS /GRAJAU RJ LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 12,093,535.20
LT 500 kV ADRIANOPOLIS /SAO JOSE RJ LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,400,624.01
LT 500 kV ADRIANOPOLIS /SAO JOSE RJ LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 7,256,121.12
LT 500 kV ADRIANOPOLIS /SAO JOSE RJ LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 6,580,559.79
LT 500 kV ADRIANOPOLIS /TERMINAL RIO RJ LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-2 RJ RB FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-2 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,054,709.30
LT 500 kV ADRIANOPOLIS /TERMINAL RIO RJ LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-2 RJ RB FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-2 RJ 062/2001 IPCA RBNI DSP 1387/2022 01/07/2021 30/06/2057  R$37,601.73
LT 500 kV ADRIANOPOLIS /TERMINAL RIO RJ LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,054,709.30
LT 500 kV ADRIANOPOLIS /TERMINAL RIO RJ LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,464,063.41
LT 500 kV ADRIANOPOLIS /TERMINAL RIO RJ LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,955,346.71
LT 500 kV ADRIANOPOLIS /TERMINAL RIO RJ LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ 062/2001 IPCA RBNI DSP 1387/2022 01/07/2022 30/06/2057  R$37,601.73
LT 500 kV ANGRA FUR /C. PAULISTA RJ/SP LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP RB FT LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,621,168.60
LT 500 kV ANGRA FUR /C. PAULISTA RJ/SP LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP RB FT LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 18,759,951.06
LT 500 kV ANGRA FUR /NOVA IGUACU RJ LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ RB FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,867,267.44
LT 500 kV ANGRA FUR /NOVA IGUACU RJ LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ RB FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 20,034,899.19
LT 500 kV ANGRA FUR /NOVA IGUACU RJ LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ RB FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 18,169,604.62
LT 500 kV ANGRA FUR /ZONA OESTE RJ LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ RB FT LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,058,656.97
LT 500 kV ANGRA FUR /ZONA OESTE RJ LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ RB FT LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 15,845,783.90
LT 500 kV ANGRA FUR /ZONA OESTE RJ LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ RB FT LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 14,370,505.48
LT 500 kV ARARAQUARA FURNAS /CAMPINAS SP LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 6,011,843.01
LT 500 kV ARARAQUARA FURNAS /CAMPINAS SP LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 31,145,161.46
LT 500 kV ARARAQUARA FURNAS /CAMPINAS SP LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RMEL REN 443/2011 31/08/2017 30/08/2047  R$156,624.95
LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS SP/MG LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 6,187,627.90
LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS SP/MG LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 32,055,838.70
LT 500 kV B. FLUMINENSE /C. PAULISTA RJ/SP LT 500 kV B. FLUMINENSE /C. PAULISTA C-1 RJ/SP RB FT LT 500 kV B. FLUMINENSE /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 5,625,116.27
LT 500 kV B.DESPACHO 3 /OURO PRETO 2 MG LT 500 kV B.DESPACHO 3 /OURO PRETO 2 C-1 MG RB FT LT 500 kV B.DESPACHO 3 /OURO PRETO 2 C-1 MG 003/2009 IPCA RBL CC 003/2009 28/01/2009 28/01/2039  R$ 11,576,448.24
LT 500 kV C. PAULISTA /FERNAO DIAS SP LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP RB FT LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,109,418.60
LT 500 kV C. PAULISTA /FERNAO DIAS SP LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP RB FT LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 10,928,126.83
LT 500 kV C. PAULISTA /FERNAO DIAS SP LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP RB FT LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP 062/2001 IPCA RBNI DSP 199/2023 01/07/2023 25/01/2056  R$154,854.39
LT 500 kV C. PAULISTA /ITAJUBA 3 SP/MG LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG RB FT LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,863,319.76
LT 500 kV C. PAULISTA /ITAJUBA 3 SP/MG LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG RB FT LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 9,653,178.70
LT 500 kV C. PAULISTA /RESENDE SP/RJ LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ RB FT LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,968,790.69
LT 500 kV C. PAULISTA /RESENDE SP/RJ LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ RB FT LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 10,199,585.04
LT 500 kV C. PAULISTA /RESENDE SP/RJ LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ RB FT LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ 062/2001 IPCA RBNI DSP 183/2023 01/07/2023 22/12/2054  R$39,008.64
LT 500 kV C. PAULISTA /TAUBATE SP LT 500 kV C. PAULISTA /TAUBATE C-1 SP RB FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,918,029.06
LT 500 kV C. PAULISTA /TAUBATE SP LT 500 kV C. PAULISTA /TAUBATE C-1 SP RB FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 15,117,242.11
LT 500 kV C. PAULISTA /TAUBATE SP LT 500 kV C. PAULISTA /TAUBATE C-1 SP RB FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 13,709,792.58
LT 500 kV C. PAULISTA /TAUBATE SP LT 500 kV C. PAULISTA /TAUBATE C-1 SP RB FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP 062/2001 IPCA RBNI REA 4347/2013 28/03/2017 27/03/2032  R$10,497.47
LT 500 kV C. PAULISTA /TIJUCO PRETO SP LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 6,363,412.78
LT 500 kV C. PAULISTA /TIJUCO PRETO SP LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 32,966,515.94
LT 500 kV C. PAULISTA /TIJUCO PRETO SP LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 29,897,258.52
LT 500 kV FERNAO DIAS /CAMPINAS SP LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP RB FT LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 5,730,587.20
LT 500 kV FERNAO DIAS /CAMPINAS SP LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP RB FT LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 29,688,077.89
LT 500 kV FERNAO DIAS /CAMPINAS SP LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP RB FT LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP 062/2001 IPCA RBNI DSP 199/2023 01/07/2023 25/01/2056  R$154,854.39
LT 500 kV GURUPI /MIRACEMA TO LT 500 kV GURUPI /MIRACEMA C-1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 9,000,186.03
LT 500 kV GURUPI /MIRACEMA TO LT 500 kV GURUPI /MIRACEMA C-1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 46,626,674.48
LT 500 kV GURUPI /MIRACEMA TO LT 500 kV GURUPI /MIRACEMA C-1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 42,285,625.31
LT 500 kV IBIUNA /BATEIAS SP/PR LT 500 kV IBIUNA /BATEIAS C-2 SP/PR RB FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR 034/2001 IGPM RBL CC 034/2001 21/03/2003 09/05/2031  R$ 67,858,642.46
LT 500 kV IBIUNA /BATEIAS SP/PR LT 500 kV IBIUNA /BATEIAS C-1 SP/PR RB FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR 034/2001 IGPM RBL CC 034/2001 21/03/2003 09/05/2031  R$ 67,858,642.46
LT 500 kV IBIUNA /ITATIBA SP LT 500 kV IBIUNA /ITATIBA C-1 SP RB FT LT 500 kV IBIUNA /ITATIBA C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 3,023,499.99
LT 500 kV IBIUNA /ITATIBA SP LT 500 kV IBIUNA /ITATIBA C-1 SP RB FT LT 500 kV IBIUNA /ITATIBA C-1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 15,663,648.46
LT 500 kV IBIUNA /ITATIBA SP LT 500 kV IBIUNA /ITATIBA C-1 SP RB FT LT 500 kV IBIUNA /ITATIBA C-1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 14,205,327.25
LT 500 kV IBIUNA /ITATIBA SP LT 500 kV IBIUNA /ITATIBA C-1 SP RB FT LT 500 kV IBIUNA /ITATIBA C-1 SP 062/2001 IPCA RBNI REA 6605/2017 01/07/2018 17/06/2052  R$17,850.11
LT 500 kV IBIUNA /ITATIBA SP LT 500 kV IBIUNA /ITATIBA C-1 SP RB FT LT 500 kV IBIUNA /ITATIBA C-1 SP 062/2001 IPCA RBNI REA 5861/2016 10/02/2021 09/02/2036  R$15,125.64
LT 500 kV ITATIBA /CAMPINAS SP LT 500 kV ITATIBA /CAMPINAS C-1 SP RB FT LT 500 kV ITATIBA /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$914,081.39
LT 500 kV ITATIBA /CAMPINAS SP LT 500 kV ITATIBA /CAMPINAS C-1 SP RB FT LT 500 kV ITATIBA /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,735,521.63
LT 500 kV ITATIBA /CAMPINAS SP LT 500 kV ITATIBA /CAMPINAS C-1 SP RB FT LT 500 kV ITATIBA /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,294,633.82
LT 500 kV ITATIBA /CAMPINAS SP LT 500 kV ITATIBA /CAMPINAS C-1 SP RB FT LT 500 kV ITATIBA /CAMPINAS C-1 SP 062/2001 IPCA RBNI REA 6605/2017 01/07/2018 17/06/2052  R$17,850.11
LT 500 kV ITUMBIARA /SAO SIMAO-SE MG LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG RB FT LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 5,836,058.13
LT 500 kV ITUMBIARA /SAO SIMAO-SE MG LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG RB FT LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 30,234,484.23
LT 500 kV MARIMBONDO /MARIMBONDO II MG LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$105,470.93
LT 500 kV MARIMBONDO /MARIMBONDO II MG LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$366,148.58
LT 500 kV MARIMBONDO /MARIMBONDO II MG LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG 062/2001 IPCA RBNI REA 8887/2020 28/08/2017 27/08/2045  R$168,365.77
LT 500 kV MARIMBONDO /MARIMBONDO II MG LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$70,313.95
LT 500 kV MARIMBONDO /MARIMBONDO II MG LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$543,604.26
LT 500 kV MARIMBONDO /MARIMBONDO II MG LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG 062/2001 IPCA RBNI REA 8887/2020 29/08/2017 28/08/2045  R$168,365.77
LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS MG/SP LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 6,750,139.52
LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS MG/SP LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 35,150,263.62
LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS MG/SP LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP 062/2001 IPCA RBNI REA 8887/2020 28/08/2017 27/08/2045  R$168,365.77
LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS MG/SP LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 6,750,139.52
LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS MG/SP LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 34,790,672.49
LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS MG/SP LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP 062/2001 IPCA RBNI REA 8887/2020 21/07/2017 20/07/2045  R$168,365.77
LT 500 kV NOVA IGUACU /GRAJAU RJ LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ RB FT LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,372,709.82
LT 500 kV NOVA IGUACU /GRAJAU RJ LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ RB FT LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 7,111,507.91
LT 500 kV NOVA IGUACU /GRAJAU RJ LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ RB FT LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 6,449,410.39
LT 500 kV NOVA IGUACU /SAO JOSE RJ LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ RB FT LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$808,610.46
LT 500 kV NOVA IGUACU /SAO JOSE RJ LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ RB FT LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,189,115.28
LT 500 kV NOVA IGUACU /SAO JOSE RJ LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ RB FT LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,799,099.15
LT 500 kV POCOS CALDAS /ITAJUBA 3 MG LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 4,886,819.76
LT 500 kV POCOS CALDAS /ITAJUBA 3 MG LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 25,316,827.16
LT 500 kV S.DA MESA /GURUPI GO/TO LT 500 kV S.DA MESA /GURUPI C-1 GO/TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 9,000,186.03
LT 500 kV S.DA MESA /GURUPI GO/TO LT 500 kV S.DA MESA /GURUPI C-1 GO/TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 46,626,674.48
LT 500 kV S.DA MESA /GURUPI GO/TO LT 500 kV S.DA MESA /GURUPI C-1 GO/TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 42,285,625.31
LT 500 kV S.DA MESA /SAMAMBAIA GO/DF LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 8,736,508.71
LT 500 kV S.DA MESA /SAMAMBAIA GO/DF LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 45,260,658.62
LT 500 kV S.DA MESA /SAMAMBAIA GO/DF LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 41,046,788.63
LT 500 kV S.DA MESA /SAMAMBAIA GO/DF LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 8,754,087.19
LT 500 kV S.DA MESA /SAMAMBAIA GO/DF LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 45,351,726.35
LT 500 kV S.DA MESA /SAMAMBAIA GO/DF LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 41,129,377.74
LT 500 kV TERMINAL RIO /C. PAULISTA RJ/SP LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP RB FT LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 4,957,133.71
LT 500 kV TERMINAL RIO /C. PAULISTA RJ/SP LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP RB FT LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RBNI DSP 1387/2022 01/07/2022 30/06/2057  R$37,601.73
LT 500 kV TERMINAL RIO /RESENDE RJ LT 500 kV TERMINAL RIO /RESENDE C-1 RJ RB FT LT 500 kV TERMINAL RIO /RESENDE C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,988,343.02
LT 500 kV TERMINAL RIO /RESENDE RJ LT 500 kV TERMINAL RIO /RESENDE C-1 RJ RB FT LT 500 kV TERMINAL RIO /RESENDE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 15,481,513.01
LT 500 kV TERMINAL RIO /RESENDE RJ LT 500 kV TERMINAL RIO /RESENDE C-1 RJ RB FT LT 500 kV TERMINAL RIO /RESENDE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 14,040,149.03
LT 500 kV TERMINAL RIO /RESENDE RJ LT 500 kV TERMINAL RIO /RESENDE C-1 RJ RB FT LT 500 kV TERMINAL RIO /RESENDE C-1 RJ 062/2001 IPCA RBNI DSP 1387/2022 01/07/2022 30/06/2057  R$37,601.73
LT 500 kV TERMINAL RIO /RESENDE RJ LT 500 kV TERMINAL RIO /RESENDE C-1 RJ RB FT LT 500 kV TERMINAL RIO /RESENDE C-1 RJ 062/2001 IPCA RBNI DSP 183/2023 01/07/2023 22/12/2054  R$39,008.64
LT 500 kV TIJUCO PRETO /TAUBATE SP LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP RB FT LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$548,448.84
LT 500 kV TIJUCO PRETO /TAUBATE SP LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP RB FT LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,841,312.98
LT 500 kV TIJUCO PRETO /TAUBATE SP LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP RB FT LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,576,780.29
LT 500 kV ZONA OESTE /NOVA IGUACU RJ LT 500 kV ZONA OESTE /NOVA IGUACU C-1 RJ RB FT LT 500 kV ZONA OESTE /NOVA IGUACU C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,017,964.59
LT 500 kV ZONA OESTE /NOVA IGUACU RJ LT 500 kV ZONA OESTE /NOVA IGUACU C-1 RJ RB FT LT 500 kV ZONA OESTE /NOVA IGUACU C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,273,702.50
LT 500 kV ZONA OESTE /NOVA IGUACU RJ LT 500 kV ZONA OESTE /NOVA IGUACU C-1 RJ RB FT LT 500 kV ZONA OESTE /NOVA IGUACU C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,782,708.83
LT 600 kV F.IGUACU 50HZ /IBIUNA PR/SP LT 600 kV F.IGUACU 50HZ /IBIUNA C-4 PR/SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 23,860,145.78
LT 600 kV F.IGUACU 50HZ /IBIUNA PR/SP LT 600 kV F.IGUACU 50HZ /IBIUNA C-3 PR/SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 23,860,145.78
LT 600 kV F.IGUACU 50HZ /IBIUNA PR/SP LT 600 kV F.IGUACU 50HZ /IBIUNA C-2 PR/SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 23,045,409.10
LT 600 kV F.IGUACU 50HZ /IBIUNA PR/SP LT 600 kV F.IGUACU 50HZ /IBIUNA C-1 PR/SP DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 23,045,409.10
LT 750 kV F.IGUACU 60HZ /IVAIPORA PR LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 17,690,575.18
LT 750 kV F.IGUACU 60HZ /IVAIPORA PR LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 89,453,735.19
LT 750 kV F.IGUACU 60HZ /IVAIPORA PR LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 81,125,389.51
LT 750 kV F.IGUACU 60HZ /IVAIPORA PR LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 17,263,008.40
LT 750 kV F.IGUACU 60HZ /IVAIPORA PR LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 87,291,711.38
LT 750 kV F.IGUACU 60HZ /IVAIPORA PR LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 79,164,655.02
LT 750 kV F.IGUACU 60HZ /IVAIPORA PR LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$ 17,209,562.56
LT 750 kV F.IGUACU 60HZ /IVAIPORA PR LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 87,021,458.40
LT 750 kV F.IGUACU 60HZ /IVAIPORA PR LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 78,919,563.21
LT 750 kV ITABERA /IVAIPORA SP/PR LT 750 kV ITABERA /IVAIPORA C-3 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 14,189,151.78
LT 750 kV ITABERA /IVAIPORA SP/PR LT 750 kV ITABERA /IVAIPORA C-2 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 13,771,823.79
LT 750 kV ITABERA /IVAIPORA SP/PR LT 750 kV ITABERA /IVAIPORA C-2 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 71,346,785.77
LT 750 kV ITABERA /IVAIPORA SP/PR LT 750 kV ITABERA /IVAIPORA C-2 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 64,704,238.16
LT 750 kV ITABERA /IVAIPORA SP/PR LT 750 kV ITABERA /IVAIPORA C-1 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 13,823,989.79
LT 750 kV ITABERA /IVAIPORA SP/PR LT 750 kV ITABERA /IVAIPORA C-1 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 71,617,038.74
LT 750 kV ITABERA /IVAIPORA SP/PR LT 750 kV ITABERA /IVAIPORA C-1 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 64,949,329.97
LT 750 kV ITABERA /TIJUCO PRETO SP LT 750 kV ITABERA /TIJUCO PRETO C-3 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 16,275,791.75
LT 750 kV ITABERA /TIJUCO PRETO SP LT 750 kV ITABERA /TIJUCO PRETO C-2 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 15,858,463.75
LT 750 kV ITABERA /TIJUCO PRETO SP LT 750 kV ITABERA /TIJUCO PRETO C-2 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 82,156,904.82
LT 750 kV ITABERA /TIJUCO PRETO SP LT 750 kV ITABERA /TIJUCO PRETO C-2 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 74,507,910.61
LT 750 kV ITABERA /TIJUCO PRETO SP LT 750 kV ITABERA /TIJUCO PRETO C-1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 15,910,629.75
LT 750 kV ITABERA /TIJUCO PRETO SP LT 750 kV ITABERA /TIJUCO PRETO C-1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 82,427,157.80
LT 750 kV ITABERA /TIJUCO PRETO SP LT 750 kV ITABERA /TIJUCO PRETO C-1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 74,753,002.42
M. MORAES TR 345/138 kV M. MORAES TRR2 MG RBF FT TR 345/138 kV M. MORAES TRR2 MG 062/2001 IPCA RBNI REA 1365/2008 27/03/2015 26/03/2047  R$ 1,754,192.23
M. MORAES TR 345/138 kV M. MORAES TR12 MG RBF FT TR 345/138 kV M. MORAES TR12 MG 062/2001 IPCA RBNI REA 1365/2008 23/07/2013 22/07/2043  R$ 5,267,003.40
M. MORAES TR 345/138 kV M. MORAES TR11 MG RBF FT TR 345/138 kV M. MORAES TR11 MG 062/2001 IPCA RBNI REA 1938/2009 14/12/2018 14/12/2058  R$ 6,254,427.25
M. MORAES TR 138/138 kV M. MORAES TREG11 MG RBF FT TR 345/138 kV M. MORAES TR11 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$258,827.47
M. MORAES TR 138/13,8 kV M. MORAES TRR3 MG DIT   062/2001 IPCA RCDM REA 10553/2021 20/03/2023 20/03/2058  R$ 1,108,007.84
M. MORAES TR 138/13,8 kV M. MORAES TR12 MG DIT   062/2001 IPCA RCDM REA 10553/2021 30/12/2022 30/12/2057  R$ 1,108,007.84
M. MORAES MG 345 kV M. MORAES MG1 MG RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBNI REA 1365/2008 30/11/2018 30/11/2058  R$187,839.06
M. MORAES MG 345 kV M. MORAES MG1 MG RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBNI REA 1938/2009 15/08/2014 14/08/2041  R$312,860.88
M. MORAES MG 345 kV M. MORAES MG1 MG RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$645,089.30
M. MORAES MG 345 kV M. MORAES MG1 MG RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,341,971.90
M. MORAES MG 345 kV M. MORAES MG1 MG RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032  R$4,600.93
M. MORAES MC 345 kV TR 345/138 kV M. MORAES TR12 MG  RBF FT TR 345/138 kV M. MORAES TR12 MG 062/2001 IPCA RBNI REA 1365/2008 23/07/2013 22/07/2040  R$ 1,352,433.62
M. MORAES MC 345 kV TR 345/138 kV M. MORAES TR11 MG MC2 RBF FT TR 345/138 kV M. MORAES TR11 MG 062/2001 IPCA RBNI REA 1938/2009 14/12/2018 14/12/2051  R$958,924.16
M. MORAES MC 345 kV TR 345/138 kV M. MORAES TR11 MG MC1 RBF FT TR 345/138 kV M. MORAES TR11 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,265.74
M. MORAES MC 138 kV TR 345/138 kV M. MORAES TR12 MG  RBF FT TR 345/138 kV M. MORAES TR12 MG 062/2001 IPCA RBNI REA 1365/2008 23/07/2013 22/07/2040  R$843,437.96
M. MORAES MC 138 kV TR 345/138 kV M. MORAES TR11 MG MC2 RBF FT TR 345/138 kV M. MORAES TR11 MG 062/2001 IPCA RBNI REA 1938/2009 14/12/2018 14/12/2048  R$396,291.80
M. MORAES MC 138 kV TR 345/138 kV M. MORAES TR11 MG MC1 RBF FT TR 345/138 kV M. MORAES TR11 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$88,677.44
M. MORAES MC 138 kV TR 138/13,8 kV M. MORAES TR12 MG  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$90,853.06
M. MORAES MC 138 kV TR 138/13,8 kV M. MORAES TR12 MG  DIT   062/2001 IPCA RMEL REN 643/2014 20/05/2014 19/05/2034  R$14,579.21
M. MORAES MC 138 kV TR 138/13,8 kV M. MORAES TR12 MG  DIT   062/2001 IPCA RCDM REA 1814/2009 26/11/2018 25/11/2050  R$110,141.03
M. MORAES MC 13,8 kV TR 138/13,8 kV M. MORAES TR12 MG  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$36,109.72
M. MORAES MC 13,8 kV TR 138/13,8 kV M. MORAES TR12 MG  DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$182,591.53
M. MORAES MC 13,8 kV TR 138/13,8 kV M. MORAES TR12 MG  DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$165,591.85
M. MORAES IB 345 kV MG 345 kV M. MORAES MG1 MG IB5 RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
M. MORAES IB 345 kV MG 345 kV M. MORAES MG1 MG IB4 RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
M. MORAES IB 345 kV MG 345 kV M. MORAES MG1 MG IB3 RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
M. MORAES IB 345 kV MG 345 kV M. MORAES MG1 MG IB3 RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBNI REA 2040/2009 06/04/2015 05/04/2042  R$89,205.68
M. MORAES IB 345 kV MG 345 kV M. MORAES MG1 MG IB3 RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBNI REA 1523/2008 29/09/2016 28/09/2047  R$295,205.10
M. MORAES IB 345 kV MG 345 kV M. MORAES MG1 MG IB2 RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
M. MORAES IB 345 kV MG 345 kV M. MORAES MG1 MG IB2 RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,036,883.85
M. MORAES IB 345 kV MG 345 kV M. MORAES MG1 MG IB2 RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$940,347.61
M. MORAES IB 345 kV MG 345 kV M. MORAES MG1 MG IB1 RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBNI REA 1938/2009 14/12/2018 14/12/2050  R$900,188.28
M. MORAES IB 138 kV MG 345 kV M. MORAES MG1 MG IB1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$70,192.63
M. MORAES IB 138 kV MG 345 kV M. MORAES MG1 MG IB1 DIT   062/2001 IPCA RCDM REA 1814/2009 05/05/2013 04/05/2040  R$233,498.38
M. MORAES EL 345 kV M. MORAES LT 345 kV FURNAS /M. MORAES C-1 MG  RB FT LT 345 kV FURNAS /M. MORAES C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
M. MORAES EL 345 kV M. MORAES LT 345 kV ESTREITO /M. MORAES C-1 MG  RB FT LT 345 kV ESTREITO /M. MORAES C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
M. MORAES EL 345 kV M. MORAES LT 345 kV ESTREITO /M. MORAES C-1 MG  RB FT LT 345 kV ESTREITO /M. MORAES C-1 MG 062/2001 IPCA RBNI REA 1523/2008 06/04/2015 05/04/2044  R$293,291.56
M. MORAES EL 345 kV M. MORAES LT 345 kV ESTREITO /M. MORAES C-1 MG  RB FT LT 345 kV ESTREITO /M. MORAES C-1 MG 062/2001 IPCA RBNI REA 2040/2009 06/04/2015 05/04/2042  R$77,666.05
M. MORAES EL 138 kV M. MORAES LT 138 kV MORRO DO CIPO /M. MORAES C-2 SP/MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
M. MORAES EL 138 kV M. MORAES LT 138 kV MORRO DO CIPO /M. MORAES C-2 SP/MG DIT   062/2001 IPCA RCDM REA 1814/2009 24/02/2014 23/02/2042  R$294,783.15
M. MORAES EL 138 kV M. MORAES LT 138 kV MORRO DO CIPO /M. MORAES C-1 SP/MG  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
M. MORAES EL 138 kV M. MORAES LT 138 kV MORRO DO CIPO /M. MORAES C-1 SP/MG  DIT   062/2001 IPCA RCDM REA 1814/2009 27/04/2014 26/04/2043  R$135,953.61
M. MORAES EL 138 kV M. MORAES LT 138 kV MORRO DO CIPO /M. MORAES C-1 SP/MG  DIT   062/2001 IPCA RCDM REA 1814/2009 27/04/2014 26/04/2041  R$39,729.68
M. MORAES EL 138 kV M. MORAES LT 138 kV MORRO DO CIPO /M. MORAES C-1 SP/MG  DIT   062/2001 IPCA RCDM REA 1814/2009 27/04/2014 26/04/2041  R$61,739.66
M. MORAES EL 138 kV M. MORAES LT 138 kV MORRO DO CIPO /M. MORAES C-1 SP/MG  DIT   062/2001 IPCA RCDM REA 1814/2009 27/04/2014 26/04/2040  R$58,833.95
M. MORAES EL 138 kV M. MORAES LT 138 kV JAGUARA-US /M. MORAES C-1 MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
M. MORAES EL 138 kV M. MORAES LT 138 kV JAGUARA-US /M. MORAES C-1 MG DIT   062/2001 IPCA RCDM REA 1814/2009 08/10/2013 07/10/2040  R$291,481.66
M. MORAES EL 138 kV M. MORAES LT 138 kV FRANCA /M. MORAES C-2 SP/MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
M. MORAES EL 138 kV M. MORAES LT 138 kV FRANCA /M. MORAES C-2 SP/MG DIT   062/2001 IPCA RCDM REA 1814/2009 22/07/2013 21/07/2039  R$156,620.80
M. MORAES EL 138 kV M. MORAES LT 138 kV FRANCA /M. MORAES C-2 SP/MG DIT   062/2001 IPCA RMEL REN 643/2014 24/10/2014 23/10/2035  R$14,801.06
M. MORAES EL 138 kV M. MORAES LT 138 kV FRANCA /M. MORAES C-1 SP/MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
M. MORAES EL 138 kV M. MORAES LT 138 kV FRANCA /M. MORAES C-1 SP/MG DIT   062/2001 IPCA RCDM REA 1814/2009 05/05/2013 04/05/2039  R$155,539.40
M. MORAES EL 138 kV M. MORAES LT 138 kV FRANCA /M. MORAES C-1 SP/MG DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$685,016.80
M. MORAES EL 138 kV M. MORAES LT 138 kV FRANCA /M. MORAES C-1 SP/MG DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$621,240.19
M. MORAES EL 138 kV M. MORAES LT 138 kV CASSIA /M. MORAES C-2 MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
M. MORAES EL 138 kV M. MORAES LT 138 kV CASSIA /M. MORAES C-2 MG DIT   062/2001 IPCA RCDM REA 1814/2009 17/12/2013 16/12/2040  R$293,155.07
M. MORAES EL 138 kV M. MORAESFRANCA 3 DIT   062/2001 IPCA RCDM REA 1814/2009 30/09/2012 29/09/2038  R$763,903.80
M. MORAES EL 13,8 kV M. MORAESDIST2 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$40,385.75
M. MORAES EL 13,8 kV M. MORAESDIST1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$40,385.75
M. MORAES EL 13,8 kV M. MORAESDIST1 DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$204,213.63
M. MORAES EL 13,8 kV M. MORAESDIST1 DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$185,200.88
MACAE MERCHAN RTB 345 kV 60 Mvar MACAE MERCHAN RT1 RJ RB FT RTB 345 kV 60 Mvar MACAE MERCHAN RT1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$391,216.93
MACAE MERCHAN RTB 345 kV 20 Mvar MACAE MERCHAN RTR1 RJ RB FT RTB 345 kV 20 Mvar MACAE MERCHAN RTR1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$130,405.64
MACAE MERCHAN MG 345 kV MACAE MERCHAN MG1 RJ RB FT MG 345 kV MACAE MERCHAN MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$656,602.36
MACAE MERCHAN MG 345 kV MACAE MERCHAN MG1 RJ RB FT MG 345 kV MACAE MERCHAN MG1 RJ 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032  R$6,355.36
MACAE MERCHAN MC 345 kV RTB 345 kV 60 Mvar MACAE MERCHAN RT1 RJ  RB FT RTB 345 kV 60 Mvar MACAE MERCHAN RT1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$190,185.35
MACAE MERCHAN IB 345 kV MG 345 kV MACAE MERCHAN MG2 RJ IB3 RB FT MG 345 kV MACAE MERCHAN MG2 RJ 006/2005 IGPM RBL CC 006/2005 02/06/2010 04/03/2035  R$ 1,118,553.35
MACAE MERCHAN IB 345 kV MG 345 kV MACAE MERCHAN MG1 RJ IB2 RB FT MG 345 kV MACAE MERCHAN MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
MACAE MERCHAN IB 345 kV MG 345 kV MACAE MERCHAN MG1 RJ IB1 RB FT MG 345 kV MACAE MERCHAN MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
MACAE MERCHAN EL 345 kV MACAE MERCHAN LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ RB FT LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
MACAE MERCHAN EL 345 kV MACAE MERCHAN LT 345 kV MACAE MERCHAN /LAGOS C-1 RJ  RB FT LT 345 kV MACAE MERCHAN /LAGOS C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
MACAE MERCHAN EL 345 kV MACAE MERCHAN LT 345 kV CAMPOS /MACAE MERCHAN C-3 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-3 RJ 006/2005 IGPM RBL CC 006/2005 02/06/2010 04/03/2035  R$ 2,899,009.81
MACAE MERCHAN EL 345 kV MACAE MERCHAN LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ  RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
MACAE MERCHAN EL 345 kV MACAE MERCHAN LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ  RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
MARIMBONDO TR 500/345 kV MARIMBONDO TRR1 MG RB FT TR 500/345 kV MARIMBONDO TRR1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$504,189.36
MARIMBONDO TR 500/345 kV MARIMBONDO TR9 MG RB FT TR 500/345 kV MARIMBONDO TR9 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,511,686.56
MARIMBONDO RTB 500 kV 100 MVAr MARIMBONDO RT4 MG RB FT RTB 500 kV 100 MVAr MARIMBONDO RT4 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$532,121.35
MARIMBONDO RTB 13,8 kV 50 Mvar MARIMBONDO RT2 MG RB FT RTB 13,8 kV 50 Mvar MARIMBONDO RT2 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$146,796.84
MARIMBONDO RTB 13,8 kV 50 Mvar MARIMBONDO RT2 MG RB FT RTB 13,8 kV 50 Mvar MARIMBONDO RT2 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$760,500.80
MARIMBONDO RTB 13,8 kV 50 Mvar MARIMBONDO RT1 MG RB FT RTB 13,8 kV 50 Mvar MARIMBONDO RT1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$146,796.84
MARIMBONDO RTB 13,8 kV 50 Mvar MARIMBONDO RT1 MG RB FT RTB 13,8 kV 50 Mvar MARIMBONDO RT1 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$760,500.80
MARIMBONDO MG 500 kV MARIMBONDO MG1 MG RB FT MG 500 kV MARIMBONDO MG1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,629,655.78
MARIMBONDO MG 500 kV MARIMBONDO MG1 MG RB FT MG 500 kV MARIMBONDO MG1 MG 062/2001 IPCA RBNI REA 4347/2013 06/07/2015 05/07/2040  R$20,750.04
MARIMBONDO MG 500 kV MARIMBONDO MG1 MG RB FT MG 500 kV MARIMBONDO MG1 MG 062/2001 IPCA RBNI REA 6787/2017 13/11/2020 13/11/2051  R$126,583.81
MARIMBONDO MG 500 kV MARIMBONDO MG1 MG RB FT MG 500 kV MARIMBONDO MG1 MG 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032  R$2,158.41
MARIMBONDO MG 500 kV MARIMBONDO MG1 MG RB FT MG 500 kV MARIMBONDO MG1 MG 062/2001 IPCA RMEL REN 443/2011 13/07/2017 12/07/2031  R$56,991.36
MARIMBONDO MG 500 kV MARIMBONDO MG1 MG RB FT MG 500 kV MARIMBONDO MG1 MG 062/2001 IPCA RBNI REA 5861/2016 21/12/2017 20/12/2034  R$22,897.31
MARIMBONDO MC 500 kV TR 500/345 kV MARIMBONDO TR9 MG  RB FT TR 500/345 kV MARIMBONDO TR9 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$327,073.06
MARIMBONDO MC 500 kV TR 500/345 kV MARIMBONDO TR9 MG  RB FT TR 500/345 kV MARIMBONDO TR9 MG 062/2001 IPCA RBNI REA 5861/2016 26/01/2020 25/01/2035  R$143,778.48
MARIMBONDO MC 500 kV TR 13,8/500 kV MARIMBONDO TRG8 MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$335,097.51
MARIMBONDO MC 500 kV TR 13,8/500 kV MARIMBONDO TRG8 MG DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,694,445.99
MARIMBONDO MC 500 kV TR 13,8/500 kV MARIMBONDO TRG8 MG DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 1,536,689.22
MARIMBONDO MC 500 kV TR 13,8/500 kV MARIMBONDO TRG7 MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$335,097.51
MARIMBONDO MC 500 kV TR 13,8/500 kV MARIMBONDO TRG6 MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$335,097.51
MARIMBONDO MC 500 kV TR 13,8/500 kV MARIMBONDO TRG5 MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$335,097.51
MARIMBONDO MC 500 kV TR 13,8/500 kV MARIMBONDO TRG4 MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$335,097.51
MARIMBONDO MC 500 kV TR 13,8/500 kV MARIMBONDO TRG3 MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$335,097.51
MARIMBONDO MC 500 kV TR 13,8/500 kV MARIMBONDO TRG2 MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$335,097.51
MARIMBONDO MC 500 kV TR 13,8/500 kV MARIMBONDO TRG1 MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$335,097.51
MARIMBONDO MC 500 kV RTB 500 kV 100 MVAr MARIMBONDO RT4 MG  RB FT RTB 500 kV 100 MVAr MARIMBONDO RT4 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$306,236.98
MARIMBONDO MC 345 kV TR 500/345 kV MARIMBONDO TR9 MG  RB FT TR 500/345 kV MARIMBONDO TR9 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,265.74
MARIMBONDO MC 345 kV TR 500/345 kV MARIMBONDO TR9 MG  RB FT TR 500/345 kV MARIMBONDO TR9 MG 062/2001 IPCA RBNI REA 5861/2016 26/01/2020 25/01/2035  R$135,222.15
MARIMBONDO MC 13,8 kV RTB 13,8 kV 50 Mvar MARIMBONDO RT2 MG  RB FT RTB 13,8 kV 50 Mvar MARIMBONDO RT2 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,394.97
MARIMBONDO MC 13,8 kV RTB 13,8 kV 50 Mvar MARIMBONDO RT1 MG  RB FT RTB 13,8 kV 50 Mvar MARIMBONDO RT1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,394.97
MARIMBONDO IB 500 kV MG 500 kV MARIMBONDO MG1 MG IB4 RB FT MG 500 kV MARIMBONDO MG1 MG 062/2001 IPCA RBNI REA 6787/2017 13/11/2020 13/11/2051  R$ 1,548,324.16
MARIMBONDO IB 500 kV MG 500 kV MARIMBONDO MG1 MG IB3 RB FT MG 500 kV MARIMBONDO MG1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$347,094.43
MARIMBONDO IB 500 kV MG 500 kV MARIMBONDO MG1 MG IB2 RB FT MG 500 kV MARIMBONDO MG1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$347,094.43
MARIMBONDO IB 500 kV MG 500 kV MARIMBONDO MG1 MG IB1 RB FT MG 500 kV MARIMBONDO MG1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$347,094.43
MARIMBONDO EL 500 kV MARIMBONDO LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG  RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
MARIMBONDO EL 500 kV MARIMBONDO LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG  RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG 062/2001 IPCA RBNI REA 7761/2019 13/12/2017 12/12/2032  R$10,581.71
MARIMBONDO EL 500 kV MARIMBONDO LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG  RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
MARIMBONDO EL 500 kV MARIMBONDO LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG  RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG 062/2001 IPCA RBNI REA 7761/2019 13/12/2017 12/12/2032  R$10,581.71
MARIMBONDO EL 500 kV MARIMBONDO LT 500 kV MARIMBONDO /AGUA VERMELHA C-1 MG/SP  RB FT LT 500 kV MARIMBONDO /AGUA VERMELHA C-1 MG/SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
MARIMBONDO EL 500 kV MARIMBONDO LT 500 kV MARIMBONDO /AGUA VERMELHA C-1 MG/SP  RB FT LT 500 kV MARIMBONDO /AGUA VERMELHA C-1 MG/SP 062/2001 IPCA RBNI REA 7761/2019 13/12/2017 12/12/2032  R$10,581.71
MARIMBONDO II IB 500 kV MG 500 kV MARIMBONDO II MG4 MG IB6 RB FT MG 500 kV MARIMBONDO II MG4 MG 062/2001 IPCA RBNI REA 8887/2020 28/08/2017 27/08/2049  R$197,407.08
MARIMBONDO II IB 500 kV MG 500 kV MARIMBONDO II MG4 MG IB5 RB FT MG 500 kV MARIMBONDO II MG2 MG 062/2001 IPCA RBNI REA 8887/2020 28/08/2017 27/08/2049  R$197,407.08
MARIMBONDO II EL 500 kV MARIMBONDO II LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP 062/2001 IPCA RBNI REA 8887/2020 28/08/2017 27/08/2046  R$183,503.25
MARIMBONDO II EL 500 kV MARIMBONDO II LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP 062/2001 IPCA RBNI REA 8887/2020 29/08/2017 28/08/2046  R$183,503.25
MARIMBONDO II EL 500 kV MARIMBONDO II LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG 062/2001 IPCA RBNI REA 8887/2020 28/08/2017 27/08/2046  R$183,503.25
MARIMBONDO II EL 500 kV MARIMBONDO II LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG 062/2001 IPCA RBNI REA 8887/2020 21/07/2017 20/07/2046  R$183,503.25
MOGI TR 345/230 kV MOGI TRR1 SP RB FT TR 345/230 kV MOGI TRR1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$343,068.21
MOGI TR 345/230 kV MOGI TRR1 SP RB FT TR 345/230 kV MOGI TRR1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,777,311.00
MOGI TR 345/230 kV MOGI TRR1 SP RB FT TR 345/230 kV MOGI TRR1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,611,839.32
MOGI CRUZES TR 345/230 kV MOGI CRUZES TR2 SP RB FT TR 345/230 kV MOGI CRUZES TR2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,028,520.01
MOGI CRUZES TR 345/230 kV MOGI CRUZES TR2 SP RB FT TR 345/230 kV MOGI CRUZES TR2 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,328,386.26
MOGI CRUZES TR 345/230 kV MOGI CRUZES TR2 SP RB FT TR 345/230 kV MOGI CRUZES TR2 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,832,301.41
MOGI CRUZES TR 345/230 kV MOGI CRUZES TR1 SP RB FT TR 345/230 kV MOGI CRUZES TR1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,028,520.01
MOGI CRUZES TR 345/230 kV MOGI CRUZES TR1 SP RB FT TR 345/230 kV MOGI CRUZES TR1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,328,386.26
MOGI CRUZES TR 345/230 kV MOGI CRUZES TR1 SP RB FT TR 345/230 kV MOGI CRUZES TR1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,832,301.41
MOGI CRUZES MG 345 kV MOGI CRUZES MG1 SP RB FT MG 345 kV MOGI CRUZES MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$790,521.55
MOGI CRUZES MG 345 kV MOGI CRUZES MG1 SP RB FT MG 345 kV MOGI CRUZES MG1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,095,403.25
MOGI CRUZES MG 345 kV MOGI CRUZES MG1 SP RB FT MG 345 kV MOGI CRUZES MG1 SP 062/2001 IPCA RBNI REA 4347/2013 20/04/2017 19/04/2044  R$127,911.96
MOGI CRUZES MC 345 kV TR 345/230 kV MOGI CRUZES TR2 SP RB FT TR 345/230 kV MOGI CRUZES TR2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
MOGI CRUZES MC 345 kV TR 345/230 kV MOGI CRUZES TR2 SP RB FT TR 345/230 kV MOGI CRUZES TR2 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,168,504.07
MOGI CRUZES MC 345 kV TR 345/230 kV MOGI CRUZES TR2 SP RB FT TR 345/230 kV MOGI CRUZES TR2 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,059,713.69
MOGI CRUZES MC 345 kV TR 345/230 kV MOGI CRUZES TR1 SP RB FT TR 345/230 kV MOGI CRUZES TR1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
MOGI CRUZES MC 345 kV TR 345/230 kV MOGI CRUZES TR1 SP RB FT TR 345/230 kV MOGI CRUZES TR1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,168,504.07
MOGI CRUZES MC 230 kV TR 345/230 kV MOGI CRUZES TR2 SP RB FT TR 345/230 kV MOGI CRUZES TR2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$115,491.35
MOGI CRUZES MC 230 kV TR 345/230 kV MOGI CRUZES TR2 SP RB FT TR 345/230 kV MOGI CRUZES TR2 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$598,318.49
MOGI CRUZES MC 230 kV TR 345/230 kV MOGI CRUZES TR2 SP RB FT TR 345/230 kV MOGI CRUZES TR2 SP 062/2001 IPCA RBNI REA 4347/2013 20/04/2017 19/04/2046  R$64,275.13
MOGI CRUZES MC 230 kV TR 345/230 kV MOGI CRUZES TR1 SP RB FT TR 345/230 kV MOGI CRUZES TR1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$115,491.35
MOGI CRUZES MC 230 kV TR 345/230 kV MOGI CRUZES TR1 SP RB FT TR 345/230 kV MOGI CRUZES TR1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$598,318.49
MOGI CRUZES MC 230 kV TR 345/230 kV MOGI CRUZES TR1 SP RB FT TR 345/230 kV MOGI CRUZES TR1 SP 062/2001 IPCA RBNI REA 4347/2013 20/04/2017 19/04/2046  R$64,275.13
MOGI CRUZES IB 345 kV MG 345 kV MOGI CRUZES MG1 SP IB1 RB FT MG 345 kV MOGI CRUZES MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
MOGI CRUZES IB 345 kV MG 345 kV MOGI CRUZES MG1 SP IB1 RB FT MG 345 kV MOGI CRUZES MG1 SP 062/2001 IPCA RBNI REA 1814/2009 22/10/2012 21/10/2038  R$383,641.03
MOGI CRUZES IB 230 kV MG 345 kV MOGI CRUZES MG1 SP IB1 RB FT MG 345 kV MOGI CRUZES MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$91,404.31
MOGI CRUZES IB 230 kV MG 345 kV MOGI CRUZES MG1 SP IB1 RB FT MG 345 kV MOGI CRUZES MG1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$473,532.34
MOGI CRUZES IB 230 kV MG 345 kV MOGI CRUZES MG1 SP IB1 RB FT MG 345 kV MOGI CRUZES MG1 SP 062/2001 IPCA RBNI REA 4347/2013 20/04/2017 19/04/2046  R$161,009.52
MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV MOGI CRUZES /NORDESTE C-1 SP  RB FT LT 345 kV MOGI CRUZES /NORDESTE C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV MOGI CRUZES /NORDESTE C-1 SP  RB FT LT 345 kV MOGI CRUZES /NORDESTE C-1 SP 062/2001 IPCA RBNI REA 1814/2009 06/04/2015 05/04/2044  R$386,225.98
MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV MOGI CRUZES /NORDESTE C-1 SP  RB FT LT 345 kV MOGI CRUZES /NORDESTE C-1 SP 062/2001 IPCA RMEL REN 443/2011 22/03/2015 21/03/2036  R$11,044.25
MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV MOGI CRUZES /NORDESTE C-1 SP  RB FT LT 345 kV MOGI CRUZES /NORDESTE C-1 SP 062/2001 IPCA RMEL REN 443/2011 22/03/2015 21/03/2036  R$11,044.25
MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV MOGI CRUZES /NORDESTE C-1 SP  RB FT LT 345 kV MOGI CRUZES /NORDESTE C-1 SP 062/2001 IPCA RMEL REN 443/2011 22/03/2015 21/03/2036  R$11,044.25
MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-2 SP  RB FT LT 345 kV ITAPETI /MOGI CRUZES C-2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-2 SP  RB FT LT 345 kV ITAPETI /MOGI CRUZES C-2 SP 062/2001 IPCA RBNI REA 1814/2009 06/04/2015 05/04/2045  R$208,506.00
MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-2 SP  RB FT LT 345 kV ITAPETI /MOGI CRUZES C-2 SP 062/2001 IPCA RBNI REA 1814/2009 06/04/2015 05/04/2042  R$177,820.02
MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-2 SP  RB FT LT 345 kV ITAPETI /MOGI CRUZES C-2 SP 062/2001 IPCA RBNI REA 1814/2009 06/04/2015 05/04/2042  R$76,194.85
MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-1 SP RB FT LT 345 kV ITAPETI /MOGI CRUZES C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-1 SP RB FT LT 345 kV ITAPETI /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 1814/2009 16/02/2013 15/02/2039  R$343,710.16
MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-1 SP RB FT LT 345 kV ITAPETI /MOGI CRUZES C-1 SP 062/2001 IPCA RMEL REN 443/2011 01/03/2015 29/02/2036  R$11,025.46
MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-1 SP RB FT LT 345 kV ITAPETI /MOGI CRUZES C-1 SP 062/2001 IPCA RMEL REN 443/2011 01/03/2015 29/02/2036  R$11,025.46
MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-1 SP RB FT LT 345 kV ITAPETI /MOGI CRUZES C-1 SP 062/2001 IPCA RMEL REN 443/2011 01/03/2015 29/02/2036  R$11,025.46
MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP  RB FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP  RB FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 1814/2009 11/08/2012 10/08/2038  R$393,460.98
MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP  RB FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP 062/2001 IPCA RMEL REN 443/2011 08/02/2015 07/02/2036  R$11,000.90
MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP  RB FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP 062/2001 IPCA RMEL REN 443/2011 08/02/2015 07/02/2036  R$11,000.90
MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP  RB FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP 062/2001 IPCA RMEL REN 443/2011 08/02/2015 07/02/2036  R$11,000.90
MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP RB FT LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$167,845.88
MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP RB FT LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP 062/2001 IPCA RBNI REA 2040/2009 06/04/2015 05/04/2042  R$38,834.03
MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP RB FT LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP 062/2001 IPCA RBNI REA 3578/2012 06/04/2015 05/04/2052  R$33,969.95
MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP RB FT LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP 062/2001 IPCA RBNI REA 4347/2013 20/04/2017 19/04/2046  R$120,386.47
MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP RB FT LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP 062/2001 IPCA RBNI REA 2837/2011 03/05/2017 02/05/2048  R$148,321.42
MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP RB FT LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP 062/2001 IPCA RBNI REA 2837/2011 03/05/2017 02/05/2049  R$137,186.82
MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV MOGI /MOGI CRUZES C-1 SP RB FT LT 230 kV MOGI /MOGI CRUZES C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$167,845.88
MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV MOGI /MOGI CRUZES C-1 SP RB FT LT 230 kV MOGI /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 2837/2011 06/04/2015 05/04/2042  R$117,178.84
MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV MOGI /MOGI CRUZES C-1 SP RB FT LT 230 kV MOGI /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 3578/2012 06/04/2015 05/04/2052  R$33,969.95
MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV MOGI /MOGI CRUZES C-1 SP RB FT LT 230 kV MOGI /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 4347/2013 20/04/2017 19/04/2046  R$29,836.69
MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV ITAPETI /MOGI CRUZES C-1 SP RB FT LT 230 kV ITAPETI /MOGI CRUZES C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$167,845.88
MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV ITAPETI /MOGI CRUZES C-1 SP RB FT LT 230 kV ITAPETI /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 2040/2009 06/04/2015 05/04/2042  R$92,424.98
MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV ITAPETI /MOGI CRUZES C-1 SP RB FT LT 230 kV ITAPETI /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 2837/2011 06/04/2015 05/04/2044  R$192,004.47
MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV ITAPETI /MOGI CRUZES C-1 SP RB FT LT 230 kV ITAPETI /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 3578/2012 06/04/2015 05/04/2052  R$33,969.95
MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV ITAPETI /MOGI CRUZES C-1 SP RB FT LT 230 kV ITAPETI /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 4347/2013 20/04/2017 19/04/2046  R$59,673.39
NIQUELANDIA MG 230 kV NIQUELANDIA MG1 GO RB FT MG 230 kV NIQUELANDIA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$329,223.17
NIQUELANDIA MG 230 kV NIQUELANDIA MG1 GO RB FT MG 230 kV NIQUELANDIA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,705,584.92
NIQUELANDIA MG 230 kV NIQUELANDIA MG1 GO RB FT MG 230 kV NIQUELANDIA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,546,791.10
NIQUELANDIA MG 230 kV NIQUELANDIA MG1 GO RB FT MG 230 kV NIQUELANDIA MG1 GO 062/2001 IPCA RMEL REN 443/2011 30/11/2017 29/11/2032  R$19,649.20
NIQUELANDIA MG 230 kV NIQUELANDIA MG1 GO RB FT MG 230 kV NIQUELANDIA MG1 GO 062/2001 IPCA RMEL REN 443/2011 08/12/2017 07/12/2032  R$8,727.64
NIQUELANDIA IB 230 kV MG 230 kV NIQUELANDIA MG1 GO IB1 RB FT MG 230 kV NIQUELANDIA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$105,014.11
NIQUELANDIA IB 230 kV MG 230 kV NIQUELANDIA MG1 GO IB1 RB FT MG 230 kV NIQUELANDIA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$544,039.71
NIQUELANDIA IB 230 kV MG 230 kV NIQUELANDIA MG1 GO IB1 RB FT MG 230 kV NIQUELANDIA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$493,388.38
NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV S.DA MESA /NIQUELANDIA C-2 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-2 GO 028/2009 IPCA RBL CC 028/2009 27/09/2017 19/11/2039  R$702,945.98
NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$172,304.70
NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$892,647.68
NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$809,540.16
NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO 062/2001 IPCA RBNI REA 3578/2012 22/04/2019 21/04/2049  R$26,200.10
NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV NIQUELANDIA /CODEMIN C-1 GO DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$176,532.05
NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV NIQUELANDIA /CODEMIN C-1 GO DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$892,647.68
NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV NIQUELANDIA /CODEMIN C-1 GO DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$809,540.16
NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV BARRO ALTO /NIQUELANDIA C-2 GO  RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-2 GO 028/2009 IPCA RBL CC 028/2009 01/07/2016 19/11/2039  R$672,494.09
NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO  RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$172,304.70
NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO  RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$892,647.68
NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO  RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$809,540.16
NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO  RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO 062/2001 IPCA RBNI REA 3578/2012 06/05/2016 05/05/2044  R$40,068.51
NIQUELANDIA EL 230 kV NIQUELANDIADIST1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$176,532.05
NIQUELANDIA EL 230 kV NIQUELANDIADIST1 DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$892,647.68
NIQUELANDIA EL 230 kV NIQUELANDIADIST1 DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$809,540.16
NORDESTE EL 345 kV NORDESTE LT 345 kV ITAPETI /NORDESTE C-1 SP RB FT LT 345 kV ITAPETI /NORDESTE C-1 SP 007/2006 IPCA RBL CC 007/2006 27/04/2006 27/04/2036  R$ 2,279,105.81
OURO PRETO 2 TR 500/345 kV OURO PRETO 2 TRR1 MG RB FT TR 500/345 kV OURO PRETO 2 TRR1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$448,067.59
OURO PRETO 2 TR 500/345 kV OURO PRETO 2 TR5 MG RB FT TR 500/345 kV OURO PRETO 2 TR5 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,345,439.52
OURO PRETO 2 RTL 345 kV 60 MVAr OURO PRETO 2 RTS5 MG RB FT RTL 345 kV 60 MVAr OURO PRETO 2 RTS5 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$391,216.93
OURO PRETO 2 MG 345 kV OURO PRETO 2 MG2 MG RB FT MG 345 kV OURO PRETO 2 MG2 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$796,886.98
OURO PRETO 2 MG 345 kV OURO PRETO 2 MG2 MG RB FT MG 345 kV OURO PRETO 2 MG2 MG 062/2001 IPCA RBNI REA 8314/2019 28/04/2021 27/04/2036  R$108,449.11
OURO PRETO 2 MC 500 kV TR 500/345 kV OURO PRETO 2 TR5 MG  RB FT TR 500/345 kV OURO PRETO 2 TR5 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$327,073.06
OURO PRETO 2 MC 345 kV TR 500/345 kV OURO PRETO 2 TR5 MG  RB FT TR 500/345 kV OURO PRETO 2 TR5 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,265.74
OURO PRETO 2 MC 345 kV RTL 345 kV 60 MVAr OURO PRETO 2 RTS5 MG  RB FT RTL 345 kV 60 MVAr OURO PRETO 2 RTS5 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$126,860.75
OURO PRETO 2 MC 345 kV BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG  RB FT BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$204,915.28
OURO PRETO 2 MC 345 kV BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG  RB FT BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG 062/2001 IPCA RMEL REN 643/2014 25/11/2016 24/11/2048  R$221,325.40
OURO PRETO 2 IB 500 kV MG 345 kV OURO PRETO 2 MG2 MG IB3 RB FT MG 345 kV OURO PRETO 2 MG2 MG 003/2009 IPCA RBL CC 003/2009 28/01/2009 28/01/2039  R$228,930.54
OURO PRETO 2 IB 345 kV MG 345 kV OURO PRETO 2 MG2 MG IB1 RB FT MG 345 kV OURO PRETO 2 MG2 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
OURO PRETO 2 EL 500 kV OURO PRETO 2 LT 500 kV B.DESPACHO 3 /OURO PRETO 2 C-1 MG RB FT LT 500 kV B.DESPACHO 3 /OURO PRETO 2 C-1 MG 003/2009 IPCA RBL CC 003/2009 28/01/2009 28/01/2039  R$629,753.71
OURO PRETO 2 EL 345 kV OURO PRETO 2 LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG  RB FT LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
OURO PRETO 2 EL 345 kV OURO PRETO 2 LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG  RB FT LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG 062/2001 IPCA RBNI REA 8314/2019 10/03/2021 09/03/2036  R$73,834.40
OURO PRETO 2 BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG RB FT BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$252,035.01
OURO PRETO 2 BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG RB FT BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,305,701.29
OURO PRETO 2 BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG RB FT BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,184,137.54
P. COLOMBIA TR 345/138 kV P. COLOMBIA TR6R MG RBF FT TR 345/138 kV P. COLOMBIA TR6 MG 062/2001 IPCA RBNI REA 6198/2017 31/01/2020 31/01/2055  R$ 1,525,169.53
P. COLOMBIA TR 345/138 kV P. COLOMBIA TR6 MG RBF FT TR 345/138 kV P. COLOMBIA TR6 MG 062/2001 IPCA RBNI REA 6198/2017 31/01/2020 31/01/2055  R$ 4,575,508.59
P. COLOMBIA TR 138/138 kV P. COLOMBIA TRD6 MG RBF FT TR 345/138 kV P. COLOMBIA TR6 MG 062/2001 IPCA RBNI REA 6198/2017 31/01/2020 31/01/2055  R$ 4,118,203.89
P. COLOMBIA TR 138/13,8 kV P. COLOMBIA TRSA MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$22,900.97
P. COLOMBIA MG 345 kV P. COLOMBIA MG1 MG RB FT MG 345 kV P. COLOMBIA MG1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$618,512.17
P. COLOMBIA MG 345 kV P. COLOMBIA MG1 MG RB FT MG 345 kV P. COLOMBIA MG1 MG 062/2001 IPCA RBNI REA 6198/2017 31/01/2020 31/01/2052  R$233,037.83
P. COLOMBIA MG 345 kV P. COLOMBIA MG1 MG RB FT MG 345 kV P. COLOMBIA MG1 MG 062/2001 IPCA RBNI REA 6198/2017 31/01/2020 31/01/2051  R$44,462.15
P. COLOMBIA MG 345 kV P. COLOMBIA MG1 MG RB FT MG 345 kV P. COLOMBIA MG1 MG 062/2001 IPCA RBNI REA 6198/2017 31/01/2020 31/01/2055  R$142,737.70
P. COLOMBIA MG 345 kV P. COLOMBIA MG1 MG RB FT MG 345 kV P. COLOMBIA MG1 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,204,285.51
P. COLOMBIA MG 345 kV P. COLOMBIA MG1 MG RB FT MG 345 kV P. COLOMBIA MG1 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,905,959.26
P. COLOMBIA MG 345 kV P. COLOMBIA MG1 MG RB FT MG 345 kV P. COLOMBIA MG1 MG 062/2001 IPCA RMEL REN 443/2011 13/07/2017 12/07/2031  R$9,750.26
P. COLOMBIA MG 345 kV P. COLOMBIA MG1 MG RB FT MG 345 kV P. COLOMBIA MG1 MG 062/2001 IPCA RBNI REN 1020/2022 22/11/2022 21/11/2053  R$107,818.57
P. COLOMBIA MC 345 kV TR 345/138 kV P. COLOMBIA TR6 MG RBF FT TR 345/138 kV P. COLOMBIA TR6 MG 062/2001 IPCA RBNI REA 6198/2017 31/01/2020 31/01/2047  R$ 1,364,369.91
P. COLOMBIA MC 138 kV TR 345/138 kV P. COLOMBIA TR6 MG RBF FT TR 345/138 kV P. COLOMBIA TR6 MG 062/2001 IPCA RBNI REA 6198/2017 31/01/2020 31/01/2044  R$806,859.03
P. COLOMBIA MC 138 kV TR 138/13,8 kV P. COLOMBIA TRSA MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$97,927.93
P. COLOMBIA MC 138 kV TR 138/13,8 kV P. COLOMBIA TRSA MG DIT   062/2001 IPCA RCDM REA 6198/2017 30/12/2019 30/12/2052  R$40,299.83
P. COLOMBIA MC 138 kV TR 138/13,8 kV P. COLOMBIA TRSA MG DIT   062/2001 IPCA RMEL REN 443/2011 31/08/2017 30/08/2040  R$4,963.84
P. COLOMBIA MC 138 kV TR 138/13,8 kV P. COLOMBIA TRSA MG DIT   062/2001 IPCA RMEL REN 443/2011 31/08/2017 30/08/2040  R$4,963.84
P. COLOMBIA MC 138 kV TR 138/13,8 kV P. COLOMBIA TRSA MG DIT   062/2001 IPCA RMEL REN 443/2011 31/08/2017 30/08/2040  R$4,963.84
P. COLOMBIA MC 138 kV TR 13,8/138 kV P. COLOMBIA TRG4 MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$97,927.93
P. COLOMBIA MC 138 kV TR 13,8/138 kV P. COLOMBIA TRG3 MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$97,927.93
P. COLOMBIA MC 138 kV TR 13,8/138 kV P. COLOMBIA TRG3 MG DIT   062/2001 IPCA RCDM REA 6198/2017 30/12/2019 30/12/2052  R$40,299.83
P. COLOMBIA MC 138 kV TR 13,8/138 kV P. COLOMBIA TRG2 MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$97,927.93
P. COLOMBIA MC 138 kV TR 13,8/138 kV P. COLOMBIA TRG2 MG DIT   062/2001 IPCA RMEL REN 443/2011 15/03/2013 14/03/2041  R$134,849.03
P. COLOMBIA MC 138 kV TR 13,8/138 kV P. COLOMBIA TRG1 MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$97,927.93
P. COLOMBIA MC 138 kV TR 13,8/138 kV P. COLOMBIA TRG1 MG DIT   062/2001 IPCA RMEL REN 443/2011 08/02/2013 07/02/2041  R$134,452.50
P. COLOMBIA MC 13,8 kV TR 138/13,8 kV P. COLOMBIA TRSA MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$36,109.72
P. COLOMBIA MC 13,8 kV TR 138/13,8 kV P. COLOMBIA TRSA MG DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$182,591.53
P. COLOMBIA IB 345 kV MG 345 kV P. COLOMBIA MG1 MG IB2 RB FT MG 345 kV P. COLOMBIA MG1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
P. COLOMBIA IB 345 kV MG 345 kV P. COLOMBIA MG1 MG IB1 RB FT MG 345 kV P. COLOMBIA MG1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
P. COLOMBIA IB 345 kV MG 345 kV P. COLOMBIA MG1 MG IB1 RB FT MG 345 kV P. COLOMBIA MG1 MG 062/2001 IPCA RBNI REA 1814/2009 29/05/2012 28/05/2037  R$393,700.51
P. COLOMBIA IB 138 kV MG 345 kV P. COLOMBIA MG1 MG IB1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$78,514.10
P. COLOMBIA IB 138 kV MG 345 kV P. COLOMBIA MG1 MG IB1 DIT   062/2001 IPCA RCDM REA 6198/2017 31/01/2020 31/01/2050  R$96,488.53
P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG  RB FT LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG  RB FT LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG 062/2001 IPCA RBNI REA 1814/2009 18/07/2012 17/07/2037  R$425,341.72
P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG  RB FT LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG 062/2001 IPCA RMEL REN 443/2011 05/07/2017 04/07/2040  R$11,776.97
P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG  RB FT LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG 062/2001 IPCA RMEL REN 443/2011 05/07/2017 04/07/2040  R$11,776.97
P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG  RB FT LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG 062/2001 IPCA RMEL REN 443/2011 05/07/2017 04/07/2040  R$11,776.97
P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV MARIMBONDO /P. COLOMBIA C-1 MG  RB FT LT 345 kV MARIMBONDO /P. COLOMBIA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV MARIMBONDO /P. COLOMBIA C-1 MG  RB FT LT 345 kV MARIMBONDO /P. COLOMBIA C-1 MG 062/2001 IPCA RMEL REN 443/2011 03/07/2017 02/07/2040  R$11,774.87
P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV MARIMBONDO /P. COLOMBIA C-1 MG  RB FT LT 345 kV MARIMBONDO /P. COLOMBIA C-1 MG 062/2001 IPCA RMEL REN 443/2011 03/07/2017 02/07/2040  R$11,774.87
P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV MARIMBONDO /P. COLOMBIA C-1 MG  RB FT LT 345 kV MARIMBONDO /P. COLOMBIA C-1 MG 062/2001 IPCA RMEL REN 443/2011 03/07/2017 02/07/2040  R$11,774.87
P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG  RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG  RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBNI REA 1814/2009 05/10/2012 04/10/2037  R$436,145.38
P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG  RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RMEL REN 443/2011 04/07/2017 03/07/2040  R$11,775.92
P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG  RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RMEL REN 443/2011 04/07/2017 03/07/2040  R$11,775.92
P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG  RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RMEL REN 443/2011 04/07/2017 03/07/2040  R$11,775.92
P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV CATU 1 /P. COLOMBIA C-1 SP/MG  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV CATU 1 /P. COLOMBIA C-1 SP/MG  DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$723,202.62
P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV CATU 1 /P. COLOMBIA C-1 SP/MG  DIT   062/2001 IPCA RMEL REN 443/2011 10/08/2017 09/08/2046  R$23,436.00
P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV CATU 1 /P. COLOMBIA C-1 SP/MG  DIT   062/2001 IPCA RMEL REN 443/2011 10/08/2017 09/08/2046  R$23,436.00
P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV CATU 1 /P. COLOMBIA C-1 SP/MG  DIT   062/2001 IPCA RMEL REN 443/2011 10/08/2017 09/08/2046  R$23,436.00
P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV CATU 1 /P. COLOMBIA C-1 SP/MG  DIT   062/2001 IPCA RMEL REN 443/2011 10/08/2017 09/08/2046  R$23,436.00
P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV CATU 1 /P. COLOMBIA C-1 SP/MG  DIT   062/2001 IPCA RMEL REN 443/2011 10/08/2017 09/08/2046  R$16,982.62
P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV CATU 1 /P. COLOMBIA C-1 SP/MG  DIT   062/2001 IPCA RMEL REN 443/2011 10/08/2017 09/08/2046  R$16,982.62
P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-3 SP/MG  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-3 SP/MG  DIT   062/2001 IPCA RMEL REN 443/2011 30/06/2017 29/06/2040  R$4,943.12
P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-3 SP/MG  DIT   062/2001 IPCA RMEL REN 443/2011 30/06/2017 29/06/2040  R$4,943.12
P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-3 SP/MG  DIT   062/2001 IPCA RMEL REN 443/2011 30/06/2017 29/06/2040  R$4,943.12
P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-2 SP/MG  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-2 SP/MG  DIT   062/2001 IPCA RMEL REN 443/2011 29/06/2017 28/06/2040  R$4,942.67
P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-2 SP/MG  DIT   062/2001 IPCA RMEL REN 443/2011 29/06/2017 28/06/2040  R$4,942.67
P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-2 SP/MG  DIT   062/2001 IPCA RMEL REN 443/2011 29/06/2017 28/06/2040  R$4,942.67
P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-1 SP/MG  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-1 SP/MG  DIT   062/2001 IPCA RMEL REN 443/2011 28/06/2017 27/06/2040  R$4,942.22
P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-1 SP/MG  DIT   062/2001 IPCA RMEL REN 443/2011 28/06/2017 27/06/2040  R$4,942.22
P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-1 SP/MG  DIT   062/2001 IPCA RMEL REN 443/2011 28/06/2017 27/06/2040  R$4,942.22
P. COLOMBIA EL 138 kV P. COLOMBIADIST1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
P. COLOMBIA EL 138 kV P. COLOMBIABARRETOS DIT   062/2001 IPCA RCDM REN 1020/2022 22/11/2022 21/11/2049  R$ 1,283,623.81
P. COLOMBIA EL 13,8 kV P. COLOMBIADIST2 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$40,385.75
P. COLOMBIA EL 13,8 kV P. COLOMBIADIST2 DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$204,213.63
P. COLOMBIA EL 13,8 kV P. COLOMBIADIST1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$40,385.75
P. COLOMBIA EL 13,8 kV P. COLOMBIADIST1 DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$204,213.63
PARQUE EMAS MG 138 kV PARQUE EMAS MG1 GO DIT   062/2001 IPCA RCDM REA 2367/2010 17/11/2013 16/11/2038  R$663,158.41
PARQUE EMAS EL 138 kV PARQUE EMAS LT 138 kV RIO CLARO /PARQUE EMAS C-1 GO  DIT   062/2001 IPCA RCDM REA 2367/2010 17/11/2013 16/11/2039  R$908,990.21
PARQUE EMAS EL 138 kV PARQUE EMAS LT 138 kV PARQUE EMAS /C. MAGALHAES C-1 GO/MT DIT   062/2001 IPCA RCDM REA 2367/2010 17/11/2013 16/11/2039  R$855,745.62
PIRINEUS MG 230 kV PIRINEUS MG1 GO RB FT MG 230 kV PIRINEUS MG1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$300,123.16
PIRINEUS IB 230 kV MG 230 kV PIRINEUS MG1 GO IB1 RB FT MG 230 kV PIRINEUS MG1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$105,014.11
PIRINEUS EL 230 kV PIRINEUS LT 230 kV PIRINEUS /XAVANTES C-2 GO RB FT LT 230 kV PIRINEUS /XAVANTES C-2 GO 014/2011 IPCA RBL CC 014/2011 08/06/2018 09/12/2041  R$697,360.05
PIRINEUS EL 230 kV PIRINEUS LT 230 kV PIRINEUS /XAVANTES C-1 GO  RB FT LT 230 kV PIRINEUS /XAVANTES C-1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$178,247.06
PIRINEUS EL 230 kV PIRINEUS LT 230 kV BRAS. SUL /PIRINEUS C-1 DF/GO  RB FT LT 230 kV BRAS. SUL /PIRINEUS C-1 DF/GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$178,247.06
POCOS CALDAS TT 13,8/0 kV POCOS CALDAS TRT5 MG RBF FT TR 345/138 kV POCOS CALDAS TR5 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$69,798.40
POCOS CALDAS TT 13,8/0 kV POCOS CALDAS TRT4 MG RBF FT TR 345/138 kV POCOS CALDAS TR4 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$69,798.40
POCOS CALDAS TT 13,8/0 kV POCOS CALDAS TRT3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$69,798.40
POCOS CALDAS TT 13,8/0 kV POCOS CALDAS TRT2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$69,798.40
POCOS CALDAS TT 13,8/0 kV POCOS CALDAS TRT1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$69,798.40
POCOS CALDAS TR 500/345 kV POCOS CALDAS TRR1 MG RB FT TR 500/345 kV POCOS CALDAS TRR1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$504,189.36
POCOS CALDAS TR 500/345 kV POCOS CALDAS TR51 MG RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,511,686.56
POCOS CALDAS TR 345/138 kV POCOS CALDAS TRR1 MG RBF FT TR 345/138 kV POCOS CALDAS TRR1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$196,538.44
POCOS CALDAS TR 345/138 kV POCOS CALDAS TR6 MG RBF FT TR 345/138 kV POCOS CALDAS TR6 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$721,601.44
POCOS CALDAS TR 345/138 kV POCOS CALDAS TR5 MG RBF FT TR 345/138 kV POCOS CALDAS TR5 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$721,601.44
POCOS CALDAS TR 345/138 kV POCOS CALDAS TR4 MG RBF FT TR 345/138 kV POCOS CALDAS TR4 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$589,615.33
POCOS CALDAS TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$589,615.33
POCOS CALDAS TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RBNI REA 4347/2013 02/07/2015 01/07/2040  R$5,187.73
POCOS CALDAS TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,054,581.52
POCOS CALDAS TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RMEL REN 443/2011 10/04/2017 09/04/2040  R$4,913.61
POCOS CALDAS TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RMEL REN 443/2011 10/04/2017 09/04/2040  R$4,913.61
POCOS CALDAS TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RMEL REN 443/2011 10/04/2017 09/04/2040  R$4,913.61
POCOS CALDAS TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$589,615.33
POCOS CALDAS TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$589,615.33
POCOS CALDAS RTL 500 kV 136 Mvar POCOS CALDAS RTIJ MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$591,699.53
POCOS CALDAS RTB 13,8 kV 50 Mvar POCOS CALDAS RT5 MG RB FT RTB 13,8 kV 50 Mvar POCOS CALDAS RT5 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$146,796.84
POCOS CALDAS RTB 13,8 kV 50 Mvar POCOS CALDAS RT4 MG RB FT RTB 13,8 kV 50 Mvar POCOS CALDAS RT4 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$146,796.84
POCOS CALDAS RTB 13,8 kV 25 Mvar POCOS CALDAS RT2 MG RBF FT RTB 13,8 kV 25 Mvar POCOS CALDAS RT2 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$132,389.09
POCOS CALDAS RTB 13,8 kV 25 Mvar POCOS CALDAS RT1 MG RBF FT RTB 13,8 kV 25 Mvar POCOS CALDAS RT1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$132,389.09
POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,610,027.37
POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 8,340,963.38
POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 7,564,400.77
POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RMEL REN 643/2014 17/10/2016 16/10/2039  R$49,197.93
POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032  R$ 406.14
POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 28/05/2017 27/05/2040  R$16,663.59
POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 28/05/2017 27/05/2040  R$16,663.59
POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 28/05/2017 27/05/2040  R$16,663.59
POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 05/07/2016 04/07/2029  R$14,054.21
POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 05/07/2016 04/07/2029  R$20,269.45
POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 05/07/2016 04/07/2029  R$20,269.45
POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 05/07/2016 04/07/2029  R$31,824.74
POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RBNI REA 7761/2019 31/05/2019 30/05/2034  R$13,881.54
POCOS CALDAS MC 500 kV TR 500/345 kV POCOS CALDAS TR51 MG  RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$327,073.06
POCOS CALDAS MC 500 kV TR 500/345 kV POCOS CALDAS TR51 MG  RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RMEL REN 643/2014 23/12/2016 22/12/2045  R$51,736.10
POCOS CALDAS MC 500 kV TR 500/345 kV POCOS CALDAS TR51 MG  RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RMEL REN 443/2011 20/01/2017 19/01/2046  R$51,824.90
POCOS CALDAS MC 500 kV TR 500/345 kV POCOS CALDAS TR51 MG  RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RMEL REN 443/2011 20/01/2017 19/01/2046  R$51,824.90
POCOS CALDAS MC 500 kV TR 500/345 kV POCOS CALDAS TR51 MG  RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RMEL REN 443/2011 23/12/2016 22/12/2040  R$10,299.39
POCOS CALDAS MC 500 kV TR 500/345 kV POCOS CALDAS TR51 MG  RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RMEL REN 443/2011 23/12/2016 22/12/2040  R$10,299.39
POCOS CALDAS MC 500 kV TR 500/345 kV POCOS CALDAS TR51 MG  RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RMEL REN 443/2011 23/12/2016 22/12/2040  R$10,299.39
POCOS CALDAS MC 500 kV TR 500/345 kV POCOS CALDAS TR51 MG  RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RBNI REA 5861/2016 10/02/2021 09/02/2036  R$105,323.02
POCOS CALDAS MC 345 kV TR 500/345 kV POCOS CALDAS TR51 MG  RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
POCOS CALDAS MC 345 kV TR 500/345 kV POCOS CALDAS TR51 MG  RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RMEL REN 643/2014 23/12/2016 22/12/2039  R$34,871.35
POCOS CALDAS MC 345 kV TR 500/345 kV POCOS CALDAS TR51 MG  RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RBNI REA 5861/2016 10/02/2021 09/02/2036  R$105,323.02
POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR6 MG RBF FT TR 345/138 kV POCOS CALDAS TR6 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR5 MG RBF FT TR 345/138 kV POCOS CALDAS TR5 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR4 MG RBF FT TR 345/138 kV POCOS CALDAS TR4 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR4 MG RBF FT TR 345/138 kV POCOS CALDAS TR4 MG 062/2001 IPCA RBNI REA 1814/2009 24/06/2012 23/06/2037  R$434,219.22
POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR4 MG RBF FT TR 345/138 kV POCOS CALDAS TR4 MG 062/2001 IPCA RBNI REA 4347/2013 02/07/2015 01/07/2040  R$5,187.73
POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR4 MG RBF FT TR 345/138 kV POCOS CALDAS TR4 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,168,504.07
POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR4 MG RBF FT TR 345/138 kV POCOS CALDAS TR4 MG 062/2001 IPCA RBNI REA 5861/2016 09/12/2021 08/12/2036  R$93,976.71
POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RBNI REA 1814/2009 24/04/2012 23/04/2038  R$354,096.41
POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RBNI REA 8314/2019 09/07/2019 08/07/2034  R$87,146.89
POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR2 MG  RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR2 MG  RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBNI REA 1814/2009 06/03/2012 05/03/2038  R$352,415.43
POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR2 MG  RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBNI REA 4347/2013 02/07/2015 01/07/2040  R$10,375.45
POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR2 MG  RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,168,504.07
POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR2 MG  RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,059,713.69
POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR2 MG  RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RMEL REN 443/2011 26/05/2017 25/05/2040  R$11,750.30
POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR2 MG  RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RMEL REN 443/2011 26/05/2017 25/05/2040  R$11,750.30
POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR2 MG  RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RMEL REN 443/2011 26/05/2017 25/05/2040  R$11,750.30
POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR1 MG  RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR1 MG  RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBNI REA 1814/2009 26/02/2012 25/02/2037  R$425,653.85
POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR1 MG  RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBNI REA 4347/2013 02/07/2015 01/07/2040  R$10,375.45
POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR1 MG  RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,168,504.07
POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR1 MG  RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,059,713.69
POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR1 MG  RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RMEL REN 443/2011 15/03/2017 14/03/2040  R$11,689.15
POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR1 MG  RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RMEL REN 443/2011 15/03/2017 14/03/2040  R$11,689.15
POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR1 MG  RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RMEL REN 443/2011 15/03/2017 14/03/2040  R$11,689.15
POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR1 MG  RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBNI REA 5861/2016 08/08/2021 07/08/2036  R$156,721.30
POCOS CALDAS MC 345 kV BC 345 kV 150 Mvar POCOS CALDAS BC2 MG  RB FT BC 345 kV 150 Mvar POCOS CALDAS BC2 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$230,003.46
POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR6 MG  RBF FT TR 345/138 kV POCOS CALDAS TR6 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$88,677.44
POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR5 MG RBF FT TR 345/138 kV POCOS CALDAS TR5 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$88,677.44
POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR4 MG RBF FT TR 345/138 kV POCOS CALDAS TR4 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$88,677.44
POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR4 MG RBF FT TR 345/138 kV POCOS CALDAS TR4 MG 062/2001 IPCA RBNI REA 7761/2019 04/04/2021 03/04/2036  R$13,881.54
POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR4 MG RBF FT TR 345/138 kV POCOS CALDAS TR4 MG 062/2001 IPCA RBNI REA 5861/2016 09/12/2021 08/12/2036  R$93,976.71
POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$88,677.44
POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RMEL REN 443/2011 10/04/2017 09/04/2046  R$24,753.76
POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RMEL REN 443/2011 10/04/2017 09/04/2046  R$24,753.76
POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RMEL REN 443/2011 10/04/2017 09/04/2046  R$24,753.76
POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RBNI REA 8314/2019 09/07/2019 08/07/2034  R$87,146.89
POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RBNI REA 7761/2019 04/04/2021 03/04/2036  R$13,881.54
POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR2 MG  RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$88,677.44
POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR2 MG  RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$459,405.39
POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR2 MG  RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$416,633.71
POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR2 MG  RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RMEL REN 443/2011 26/05/2017 25/05/2040  R$4,930.85
POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR2 MG  RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RMEL REN 443/2011 26/05/2017 25/05/2040  R$4,930.85
POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR2 MG  RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RMEL REN 443/2011 26/05/2017 25/05/2040  R$4,930.85
POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR2 MG  RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBNI REA 7761/2019 07/04/2021 06/04/2036  R$13,881.54
POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR1 MG  RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$88,677.44
POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR1 MG  RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$459,405.39
POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR1 MG  RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$416,633.71
POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR1 MG  RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RMEL REN 443/2011 15/03/2017 14/03/2040  R$4,905.20
POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR1 MG  RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RMEL REN 443/2011 15/03/2017 14/03/2040  R$4,905.20
POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR1 MG  RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RMEL REN 443/2011 15/03/2017 14/03/2040  R$4,905.20
POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR1 MG  RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBNI REA 7761/2019 04/04/2021 03/04/2036  R$13,881.54
POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR1 MG  RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBNI REA 5861/2016 08/08/2021 07/08/2036  R$156,721.30
POCOS CALDAS MC 138 kV BC 138 kV 150 Mvar POCOS CALDAS BC1 MG  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$94,313.91
POCOS CALDAS MC 13,8 kV TR 500/345 kV POCOS CALDAS TR51 MG  RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$17,820.99
POCOS CALDAS MC 13,8 kV TR 500/345 kV POCOS CALDAS TR51 MG  RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RMEL REN 643/2014 23/12/2016 22/12/2045  R$6,932.59
POCOS CALDAS MC 13,8 kV TR 345/138 kV POCOS CALDAS TR6 MG  RBF FT TR 345/138 kV POCOS CALDAS TR6 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$35,245.01
POCOS CALDAS MC 13,8 kV TR 345/138 kV POCOS CALDAS TR5 MG RBF FT TR 345/138 kV POCOS CALDAS TR5 MG 062/2001 IPCA RBNI REA 1497/2008 22/12/2012 21/12/2043  R$51,313.77
POCOS CALDAS MC 13,8 kV TR 345/138 kV POCOS CALDAS TR2 MG  RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$35,245.01
POCOS CALDAS MC 13,8 kV TR 345/138 kV POCOS CALDAS TR2 MG  RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RMEL REN 443/2011 26/05/2017 25/05/2041  R$ 601.71
POCOS CALDAS MC 13,8 kV TR 345/138 kV POCOS CALDAS TR2 MG  RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RMEL REN 443/2011 26/05/2017 25/05/2041  R$ 601.71
POCOS CALDAS MC 13,8 kV TR 345/138 kV POCOS CALDAS TR2 MG  RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RMEL REN 443/2011 26/05/2017 25/05/2041  R$ 601.71
POCOS CALDAS MC 13,8 kV TR 345/138 kV POCOS CALDAS TR1 MG  RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$35,245.01
POCOS CALDAS MC 13,8 kV TR 345/138 kV POCOS CALDAS TR1 MG  RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RMEL REN 643/2014 21/10/2016 20/10/2045  R$6,899.10
POCOS CALDAS MC 13,8 kV RTB 13,8 kV 50 Mvar POCOS CALDAS RT5 MG  RB FT RTB 13,8 kV 50 Mvar POCOS CALDAS RT5 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,394.97
POCOS CALDAS MC 13,8 kV RTB 13,8 kV 50 Mvar POCOS CALDAS RT4 MG  RB FT RTB 13,8 kV 50 Mvar POCOS CALDAS RT4 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,394.97
POCOS CALDAS MC 13,8 kV RTB 13,8 kV 25 Mvar POCOS CALDAS RT2 MG  RBF FT RTB 13,8 kV 25 Mvar POCOS CALDAS RT2 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,394.97
POCOS CALDAS MC 13,8 kV RTB 13,8 kV 25 Mvar POCOS CALDAS RT1 MG  RBF FT RTB 13,8 kV 25 Mvar POCOS CALDAS RT1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,394.97
POCOS CALDAS MC 13,8 kV RTB 13,8 kV 25 Mvar POCOS CALDAS RT1 MG  RBF FT RTB 13,8 kV 25 Mvar POCOS CALDAS RT1 MG 062/2001 IPCA RMEL REN 443/2011 31/05/2017 30/05/2031  R$8,937.74
POCOS CALDAS MC 13,8 kV RTB 13,8 kV 25 Mvar POCOS CALDAS RT1 MG  RBF FT RTB 13,8 kV 25 Mvar POCOS CALDAS RT1 MG 062/2001 IPCA RMEL REN 443/2011 15/03/2017 14/03/2031  R$9,160.42
POCOS CALDAS IB 345 kV MG 500 kV POCOS CALDAS MG1 MG IB1 RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
POCOS CALDAS IB 345 kV MG 500 kV POCOS CALDAS MG1 MG IB1 RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RBNI REA 1814/2009 16/06/2012 15/06/2038  R$313,118.36
POCOS CALDAS IB 345 kV MG 500 kV POCOS CALDAS MG1 MG IB1 RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RBNI REA 4347/2013 02/07/2015 01/07/2040  R$31,126.34
POCOS CALDAS IB 345 kV MG 500 kV POCOS CALDAS MG1 MG IB1 RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,036,883.85
POCOS CALDAS IB 345 kV MG 500 kV POCOS CALDAS MG1 MG IB1 RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$940,347.61
POCOS CALDAS IB 138 kV MG 500 kV POCOS CALDAS MG1 MG IB1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$70,192.63
POCOS CALDAS IB 138 kV MG 500 kV POCOS CALDAS MG1 MG IB1 DIT   062/2001 IPCA RMEL REN 643/2014 15/10/2016 14/10/2045  R$48,425.27
POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RMEL REN 643/2014 10/12/2016 09/12/2045  R$47,685.77
POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RMEL REN 443/2011 25/02/2017 24/02/2046  R$47,925.59
POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RMEL REN 443/2011 02/05/2017 01/05/2046  R$48,102.25
POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RMEL REN 443/2011 02/05/2017 01/05/2046  R$69,713.40
POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RMEL REN 443/2011 02/05/2017 01/05/2040  R$16,624.57
POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RMEL REN 443/2011 02/05/2017 01/05/2040  R$16,624.57
POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RMEL REN 443/2011 02/05/2017 01/05/2040  R$16,624.57
POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RMEL REN 443/2011 10/12/2016 09/12/2040  R$10,946.66
POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RMEL REN 443/2011 10/12/2016 09/12/2040  R$10,946.66
POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RMEL REN 443/2011 10/12/2016 09/12/2040  R$10,946.66
POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RMEL REN 443/2011 02/05/2017 01/05/2047  R$44,065.87
POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG  RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG  RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 643/2014 07/11/2016 06/11/2042  R$117,990.79
POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG  RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 11/02/2017 10/02/2046  R$47,874.83
POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG  RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 11/02/2017 10/02/2046  R$47,874.83
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RBNI REA 4347/2013 02/07/2015 01/07/2040  R$5,187.73
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RMEL REN 443/2011 11/05/2017 10/05/2040  R$11,734.44
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RMEL REN 443/2011 11/05/2017 10/05/2040  R$11,734.44
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RMEL REN 443/2011 11/05/2017 10/05/2040  R$11,734.44
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBNI REA 4347/2013 02/07/2015 01/07/2040  R$5,187.73
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 31/05/2017 30/05/2040  R$11,755.60
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 31/05/2017 30/05/2040  R$11,755.60
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 31/05/2017 30/05/2040  R$11,755.60
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RBNI REA 4347/2013 02/07/2015 01/07/2040  R$5,187.73
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RMEL REN 443/2011 03/03/2017 02/03/2040  R$11,676.35
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RMEL REN 443/2011 03/03/2017 02/03/2040  R$11,676.35
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RMEL REN 443/2011 03/03/2017 02/03/2040  R$11,676.35
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBNI REA 4347/2013 02/07/2015 01/07/2040  R$5,187.73
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 17/02/2017 16/02/2040  R$11,668.93
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 17/02/2017 16/02/2040  R$11,668.93
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 17/02/2017 16/02/2040  R$11,668.93
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV FURNAS /POCOS CALDAS C-2 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-2 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV FURNAS /POCOS CALDAS C-2 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-2 MG 062/2001 IPCA RBNI REA 4347/2013 02/07/2015 01/07/2040  R$5,187.73
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV FURNAS /POCOS CALDAS C-2 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-2 MG 062/2001 IPCA RMEL REN 443/2011 23/03/2017 22/03/2040  R$11,697.69
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV FURNAS /POCOS CALDAS C-2 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-2 MG 062/2001 IPCA RMEL REN 443/2011 23/03/2017 22/03/2040  R$11,697.69
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV FURNAS /POCOS CALDAS C-2 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-2 MG 062/2001 IPCA RMEL REN 443/2011 23/03/2017 22/03/2040  R$11,697.69
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV FURNAS /POCOS CALDAS C-1 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-1 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV FURNAS /POCOS CALDAS C-1 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-1 MG 062/2001 IPCA RBNI REA 4347/2013 02/07/2015 01/07/2040  R$5,187.73
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV FURNAS /POCOS CALDAS C-1 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-1 MG 062/2001 IPCA RMEL REN 443/2011 08/01/2017 07/01/2040  R$11,633.56
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV FURNAS /POCOS CALDAS C-1 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-1 MG 062/2001 IPCA RMEL REN 443/2011 08/01/2017 07/01/2040  R$11,633.56
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV FURNAS /POCOS CALDAS C-1 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-1 MG 062/2001 IPCA RMEL REN 443/2011 08/01/2017 07/01/2040  R$11,633.56
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBNI REA 4347/2013 02/07/2015 01/07/2040  R$5,187.73
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,372,890.86
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,245,071.61
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 28/05/2017 27/05/2040  R$11,752.42
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 28/05/2017 27/05/2040  R$11,752.42
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 28/05/2017 27/05/2040  R$11,752.42
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG  RB FT LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG  RB FT LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBNI REA 2040/2009 22/11/2012 21/11/2037  R$413,350.09
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG  RB FT LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBNI REA 4347/2013 02/07/2015 01/07/2040  R$5,187.73
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG  RB FT LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 29/01/2017 28/01/2040  R$11,656.11
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG  RB FT LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 29/01/2017 28/01/2040  R$11,656.11
POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG  RB FT LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 29/01/2017 28/01/2040  R$11,656.11
POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV S.J.B.VISTA II /POCOS CALDAS C-2 SP/MG DIT   062/2001 IPCA RCDM REA 2737/2011 27/05/2013 26/05/2038  R$124,888.67
POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV S.J.B.VISTA II /POCOS CALDAS C-2 SP/MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV S.J.B.VISTA II /POCOS CALDAS C-2 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 12/04/2017 11/04/2040  R$4,914.50
POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV S.J.B.VISTA II /POCOS CALDAS C-2 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 12/04/2017 11/04/2040  R$4,914.50
POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV S.J.B.VISTA II /POCOS CALDAS C-2 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 12/04/2017 11/04/2040  R$4,914.50
POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV S.J.B.VISTA II /POCOS CALDAS C-1 SP/MG DIT   062/2001 IPCA RCDM REA 2737/2011 27/05/2013 26/05/2038  R$124,888.67
POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV S.J.B.VISTA II /POCOS CALDAS C-1 SP/MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV POCOS CALDAS (D) /POCOS CALDAS C-2 MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV POCOS CALDAS (D) /POCOS CALDAS C-2 MG DIT   062/2001 IPCA RMEL REN 443/2011 15/05/2017 14/05/2040  R$4,925.98
POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV POCOS CALDAS (D) /POCOS CALDAS C-2 MG DIT   062/2001 IPCA RMEL REN 443/2011 15/05/2017 14/05/2040  R$4,925.98
POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV POCOS CALDAS (D) /POCOS CALDAS C-2 MG DIT   062/2001 IPCA RMEL REN 443/2011 15/05/2017 14/05/2040  R$4,925.98
POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV POCOS CALDAS (D) /POCOS CALDAS C-1 MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV POCOS CALDAS (D) /POCOS CALDAS C-1 MG DIT   062/2001 IPCA RMEL REN 443/2011 14/05/2017 13/05/2040  R$4,925.53
POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV POCOS CALDAS (D) /POCOS CALDAS C-1 MG DIT   062/2001 IPCA RMEL REN 443/2011 14/05/2017 13/05/2040  R$4,925.53
POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV POCOS CALDAS (D) /POCOS CALDAS C-1 MG DIT   062/2001 IPCA RMEL REN 443/2011 14/05/2017 13/05/2040  R$4,925.53
POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV DME POCOS CAL /POCOS CALDAS C-2 MG  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV DME POCOS CAL /POCOS CALDAS C-1 MG  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
POCOS CALDAS BC 345 kV 150 Mvar POCOS CALDAS BC2 MG RB FT BC 345 kV 150 Mvar POCOS CALDAS BC2 MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$232,536.06
POCOS CALDAS BC 138 kV 150 Mvar POCOS CALDAS BC1 MG DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$216,011.20
RESENDE MG 500 kV RESENDE MG1 RJ RB FT MG 500 kV RESENDE MG1 RJ 062/2001 IPCA RBNI DSP 183/2023 01/07/2023 22/12/2051  R$77,778.30
RESENDE IB 500 kV MG 500 kV RESENDE MG1 RJ IB2 RB FT MG 500 kV RESENDE MG1 RJ 062/2001 IPCA RBNI DSP 183/2023 01/07/2023 22/12/2052  R$267,270.94
RESENDE EL 500 kV RESENDE LT 500 kV TERMINAL RIO /RESENDE C-1 RJ  RB FT LT 500 kV TERMINAL RIO /RESENDE C-1 RJ 062/2001 IPCA RBNI DSP 183/2023 01/07/2023 22/12/2048  R$239,872.33
RESENDE EL 500 kV RESENDE LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ  RB FT LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ 062/2001 IPCA RBNI DSP 183/2023 01/07/2023 22/12/2048  R$239,872.33
RIO CLARO MG 138 kV RIO CLARO MG1 GO DIT   062/2001 IPCA RCDM REA 2367/2010 17/11/2013 16/11/2038  R$629,099.58
RIO CLARO EL 138 kV RIO CLARO LT 138 kV RIO VERDE FUR /RIO CLARO C-1 GO DIT   062/2001 IPCA RCDM REA 2367/2010 17/11/2013 16/11/2040  R$910,223.21
RIO CLARO EL 138 kV RIO CLARO LT 138 kV RIO CLARO /PARQUE EMAS C-1 GO  DIT   062/2001 IPCA RCDM REA 2367/2010 17/11/2013 16/11/2040  R$910,223.21
RIO NOVO DO SUL MG 345 kV RIO NOVO DO SUL MG3 ES RB FT MG 345 kV RIO NOVO DO SUL MG3 ES 062/2001 IPCA RBNI DSP 1405/2022 01/07/2022 30/06/2053  R$115,676.23
RIO NOVO DO SUL EL 345 kV RIO NOVO DO SUL LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES RB FT LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES 062/2001 IPCA RBNI DSP 1405/2022 01/07/2022 30/06/2050  R$206,050.73
RIO NOVO DO SUL EL 345 kV RIO NOVO DO SUL LT 345 kV RIO NOVO DO SUL /VIANA C-1 ES RB FT LT 345 kV RIO NOVO DO SUL /VIANA C-1 ES 062/2001 IPCA RBNI DSP 1405/2022 01/07/2022 30/06/2050  R$206,050.73
RIO NOVO DO SUL EL 345 kV RIO NOVO DO SUL LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES  RB FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES 062/2001 IPCA RBNI DSP 1405/2022 01/07/2021 30/06/2050  R$206,050.73
RIO NOVO DO SUL EL 345 kV RIO NOVO DO SUL LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES RB FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES 062/2001 IPCA RBNI DSP 1405/2022 01/07/2022 30/06/2050  R$206,050.73
RIO VERDE FUR TT 13,8/0 kV RIO VERDE FUR TRT3 GO RBF FT TR 230/138 kV RIO VERDE FUR TR3 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$69,798.40
RIO VERDE FUR TT 13,8/0 kV RIO VERDE FUR TRT2 GO RBF FT TR 230/138 kV RIO VERDE FUR TR2 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$69,798.40
RIO VERDE FUR TT 13,8/0 kV RIO VERDE FUR TRT1 GO RBF FT TR 230/138 kV RIO VERDE FUR TR1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$69,798.40
RIO VERDE FUR TR 230/138 kV RIO VERDE FUR TRR1 GO RBF FT TR 230/138 kV RIO VERDE FUR TRR1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$142,847.01
RIO VERDE FUR TR 230/138 kV RIO VERDE FUR TRR1 GO RBF FT TR 230/138 kV RIO VERDE FUR TRR1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$740,038.13
RIO VERDE FUR TR 230/138 kV RIO VERDE FUR TRR1 GO RBF FT TR 230/138 kV RIO VERDE FUR TRR1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$671,138.90
RIO VERDE FUR TR 230/138 kV RIO VERDE FUR TR3 GO RBF FT TR 230/138 kV RIO VERDE FUR TR3 GO 062/2001 IPCA RBNI REA 2367/2010 10/10/2012 09/10/2041  R$ 2,041,643.52
RIO VERDE FUR TR 230/138 kV RIO VERDE FUR TR2 GO RBF FT TR 230/138 kV RIO VERDE FUR TR2 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$430,232.88
RIO VERDE FUR TR 230/138 kV RIO VERDE FUR TR1 GO RBF FT TR 230/138 kV RIO VERDE FUR TR1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$430,232.88
RIO VERDE FUR TR 230/138 kV RIO VERDE FUR TR1 GO RBF FT TR 230/138 kV RIO VERDE FUR TR1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,228,879.31
RIO VERDE FUR TR 230/138 kV RIO VERDE FUR TR1 GO RBF FT TR 230/138 kV RIO VERDE FUR TR1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,021,365.59
RIO VERDE FUR RTB 230 kV 45 MVAr RIO VERDE FUR RT5 GO RB FT RTB 230 kV 45 MVAr RIO VERDE FUR RT5 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$343,002.32
RIO VERDE FUR RTB 230 kV 15 MVAr RIO VERDE FUR RTR2 GO RB FT RTB 230 kV 15 MVAr RIO VERDE FUR RTR2 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$114,334.11
RIO VERDE FUR RTB 138 kV 15 Mvar RIO VERDE FUR RT4 GO DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$124,758.62
RIO VERDE FUR RTB 13,8 kV 5 Mvar RIO VERDE FUR RT1 GO RBF FT RTB 13,8 kV 5 Mvar RIO VERDE FUR RT1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$98,935.32
RIO VERDE FUR RTB 13,8 kV 25 Mvar RIO VERDE FUR RT3 GO RBF FT RTB 13,8 kV 25 Mvar RIO VERDE FUR RT3 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$132,389.09
RIO VERDE FUR RTB 13,8 kV 25 Mvar RIO VERDE FUR RT3 GO RBF FT RTB 13,8 kV 25 Mvar RIO VERDE FUR RT3 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$685,859.49
RIO VERDE FUR RTB 13,8 kV 25 Mvar RIO VERDE FUR RT2 GO RBF FT RTB 13,8 kV 25 Mvar RIO VERDE FUR RT2 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$132,389.09
RIO VERDE FUR RTB 13,8 kV 25 Mvar RIO VERDE FUR RT2 GO RBF FT RTB 13,8 kV 25 Mvar RIO VERDE FUR RT2 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$685,859.49
RIO VERDE FUR MG 230 kV RIO VERDE FUR MG1 GO RB FT MG 230 kV RIO VERDE FUR MG1 GO 062/2001 IPCA RBNI REA 2969/2011 30/01/2013 29/01/2036  R$209,675.67
RIO VERDE FUR MG 230 kV RIO VERDE FUR MG1 GO RB FT MG 230 kV RIO VERDE FUR MG1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$484,679.35
RIO VERDE FUR MG 230 kV RIO VERDE FUR MG1 GO RB FT MG 230 kV RIO VERDE FUR MG1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,510,946.56
RIO VERDE FUR MG 230 kV RIO VERDE FUR MG1 GO RB FT MG 230 kV RIO VERDE FUR MG1 GO 062/2001 IPCA RMEL REN 443/2011 25/08/2017 24/08/2031  R$8,779.83
RIO VERDE FUR MC 230 kV TR 230/138 kV RIO VERDE FUR TR3 GO RBF FT TR 230/138 kV RIO VERDE FUR TR3 GO 062/2001 IPCA RBNI REA 2367/2010 10/10/2012 09/10/2038  R$971,285.01
RIO VERDE FUR MC 230 kV TR 230/138 kV RIO VERDE FUR TR3 GO RBF FT TR 230/138 kV RIO VERDE FUR TR3 GO 062/2001 IPCA RBNI REA 5484/2015 22/03/2019 21/03/2049  R$37,629.83
RIO VERDE FUR MC 230 kV TR 230/138 kV RIO VERDE FUR TR2 GO  RBF FT TR 230/138 kV RIO VERDE FUR TR2 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$127,805.26
RIO VERDE FUR MC 230 kV TR 230/138 kV RIO VERDE FUR TR1 GO RBF FT TR 230/138 kV RIO VERDE FUR TR1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$127,805.26
RIO VERDE FUR MC 230 kV RTB 230 kV 45 MVAr RIO VERDE FUR RT5 GO  RB FT RTB 230 kV 45 MVAr RIO VERDE FUR RT5 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$122,565.79
RIO VERDE FUR MC 138 kV TR 230/138 kV RIO VERDE FUR TR3 GO RBF FT TR 230/138 kV RIO VERDE FUR TR3 GO 062/2001 IPCA RBNI REA 2367/2010 10/10/2012 09/10/2038  R$760,949.37
RIO VERDE FUR MC 138 kV TR 230/138 kV RIO VERDE FUR TR3 GO RBF FT TR 230/138 kV RIO VERDE FUR TR3 GO 062/2001 IPCA RBNI REA 2367/2010 10/10/2012 09/10/2039  R$328,471.66
RIO VERDE FUR MC 138 kV TR 230/138 kV RIO VERDE FUR TR2 GO  RBF FT TR 230/138 kV RIO VERDE FUR TR2 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$88,677.44
RIO VERDE FUR MC 138 kV TR 230/138 kV RIO VERDE FUR TR1 GO RBF FT TR 230/138 kV RIO VERDE FUR TR1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$88,677.44
RIO VERDE FUR MC 138 kV RTB 138 kV 15 Mvar RIO VERDE FUR RT4 GO  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$86,344.90
RIO VERDE FUR MC 13,8 kV TR 230/138 kV RIO VERDE FUR TR2 GO  RBF FT TR 230/138 kV RIO VERDE FUR TR2 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$17,820.99
RIO VERDE FUR MC 13,8 kV TR 230/138 kV RIO VERDE FUR TR1 GO  RBF FT TR 230/138 kV RIO VERDE FUR TR1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$17,820.99
RIO VERDE FUR MC 13,8 kV RTB 13,8 kV 5 Mvar RIO VERDE FUR RT1 GO  RBF FT RTB 13,8 kV 5 Mvar RIO VERDE FUR RT1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,394.97
RIO VERDE FUR MC 13,8 kV RTB 13,8 kV 25 Mvar RIO VERDE FUR RT3 GO  RBF FT RTB 13,8 kV 25 Mvar RIO VERDE FUR RT3 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,394.97
RIO VERDE FUR MC 13,8 kV RTB 13,8 kV 25 Mvar RIO VERDE FUR RT2 GO  RBF FT RTB 13,8 kV 25 Mvar RIO VERDE FUR RT2 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,394.97
RIO VERDE FUR MC 13,8 kV BC 13,8 kV 10 Mvar RIO VERDE FUR BC3 GO  RBF FT BC 13,8 kV 10 Mvar RIO VERDE FUR BC3 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$57,000.46
RIO VERDE FUR MC 13,8 kV BC 13,8 kV 10 Mvar RIO VERDE FUR BC2 GO  RBF FT BC 13,8 kV 10 Mvar RIO VERDE FUR BC2 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$57,000.46
RIO VERDE FUR MC 13,8 kV BC 13,8 kV 10 Mvar RIO VERDE FUR BC1 GO  RBF FT BC 13,8 kV 10 Mvar RIO VERDE FUR BC1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$57,000.46
RIO VERDE FUR IB 230 kV MG 230 kV RIO VERDE FUR MG1 GO IB1 RB FT MG 230 kV RIO VERDE FUR MG1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$105,014.11
RIO VERDE FUR IB 138 kV MG 230 kV RIO VERDE FUR MG1 GO IB1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$70,192.63
RIO VERDE FUR IB 138 kV MG 230 kV RIO VERDE FUR MG1 GO IB1 DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$354,934.38
RIO VERDE FUR IB 138 kV MG 230 kV RIO VERDE FUR MG1 GO IB1 DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$321,889.18
RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$178,247.06
RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$923,432.89
RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$837,459.19
RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$178,247.06
RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT 062/2001 IPCA RMEL REN 443/2011 24/08/2014 23/08/2038  R$2,117.36
RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT 062/2001 IPCA RMEL REN 443/2011 24/08/2014 23/08/2038  R$2,117.36
RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT 062/2001 IPCA RMEL REN 443/2011 24/08/2014 23/08/2038  R$2,117.36
RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO RB FT LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$178,247.06
RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT  RB FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$178,247.06
RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT  RB FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$923,432.89
RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT  RB FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$837,459.19
RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$178,247.06
RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$923,432.89
RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$178,247.06
RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO 062/2001 IPCA RMEL REN 443/2011 30/01/2015 29/01/2039  R$2,135.96
RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO 062/2001 IPCA RMEL REN 443/2011 30/01/2015 29/01/2039  R$2,135.96
RIO VERDE FUR EL 138 kV RIO VERDE FUR LT 138 kV RIO VERDE FUR /RIO CLARO C-1 GO  DIT   062/2001 IPCA RCDM REA 2969/2011 03/11/2013 02/11/2039  R$53,328.83
RIO VERDE FUR EL 138 kV RIO VERDE FUR LT 138 kV RIO VERDE FUR /RIO CLARO C-1 GO  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
RIO VERDE FUR EL 138 kV RIO VERDE FUR LT 138 kV RIO VERDE FUR /RIO CLARO C-1 GO  DIT   062/2001 IPCA RMEL REN 443/2011 30/11/2014 29/11/2035  R$4,685.51
RIO VERDE FUR EL 138 kV RIO VERDE FUR LT 138 kV RIO VERDE FUR /RIO CLARO C-1 GO  DIT   062/2001 IPCA RMEL REN 443/2011 30/11/2014 29/11/2035  R$4,685.51
RIO VERDE FUR EL 138 kV RIO VERDE FUR LT 138 kV RIO VERDE FUR /RIO CLARO C-1 GO  DIT   062/2001 IPCA RMEL REN 443/2011 30/11/2014 29/11/2035  R$4,685.51
RIO VERDE FUR EL 138 kV RIO VERDE FUR LT 138 kV RIO VERDE FUR /C. DOURADA C-2 GO DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
RIO VERDE FUR EL 138 kV RIO VERDE FUR LT 138 kV RIO VERDE FUR /C. DOURADA C-2 GO DIT   062/2001 IPCA RMEL REN 643/2014 15/05/2016 14/05/2038  R$14,694.87
RIO VERDE FUR EL 138 kV RIO VERDE FUR LT 138 kV RIO VERDE CLG /RIO VERDE FUR C-1 GO DIT   062/2001 IPCA RCDM REA 2969/2011 13/01/2013 12/01/2038  R$52,130.88
RIO VERDE FUR EL 138 kV RIO VERDE FUR LT 138 kV RIO VERDE CLG /RIO VERDE FUR C-1 GO DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
RIO VERDE FUR EL 138 kV RIO VERDE FURPERDIGAO C1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
RIO VERDE FUR CR 230 kV 37,2 Mvar RIO VERDE FUR BC1 GO RB FT CR 230 kV 37,2 Mvar RIO VERDE FUR BC1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$151,689.88
RIO VERDE FUR CR 230 kV 34 Mvar RIO VERDE FUR BC3 GO RB FT CR 230 kV 34 Mvar RIO VERDE FUR BC3 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$146,077.57
RIO VERDE FUR CR 230 kV 216 Mvar RIO VERDE FUR BC2 GO RB FT CR 230 kV 216 Mvar RIO VERDE FUR BC2 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$465,277.82
RIO VERDE FUR BC 13,8 kV 10 Mvar RIO VERDE FUR BC3 GO RBF FT BC 13,8 kV 10 Mvar RIO VERDE FUR BC3 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$44,138.98
RIO VERDE FUR BC 13,8 kV 10 Mvar RIO VERDE FUR BC3 GO RBF FT BC 13,8 kV 10 Mvar RIO VERDE FUR BC3 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$228,667.94
RIO VERDE FUR BC 13,8 kV 10 Mvar RIO VERDE FUR BC2 GO RBF FT BC 13,8 kV 10 Mvar RIO VERDE FUR BC2 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$44,138.98
RIO VERDE FUR BC 13,8 kV 10 Mvar RIO VERDE FUR BC2 GO RBF FT BC 13,8 kV 10 Mvar RIO VERDE FUR BC2 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$228,667.94
RIO VERDE FUR BC 13,8 kV 10 Mvar RIO VERDE FUR BC1 GO RBF FT BC 13,8 kV 10 Mvar RIO VERDE FUR BC1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$44,138.98
RIO VERDE FUR BC 13,8 kV 10 Mvar RIO VERDE FUR BC1 GO RBF FT BC 13,8 kV 10 Mvar RIO VERDE FUR BC1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$228,667.94
ROCHA LEAO MG 138 kV ROCHA LEAO MG1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$275,904.28
ROCHA LEAO MG 138 kV ROCHA LEAO MG1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,395,130.89
ROCHA LEAO MC 138 kV BC 138 kV 75 Mvar ROCHA LEAO BC2 RJ  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$89,119.95
ROCHA LEAO MC 138 kV BC 138 kV 75 Mvar ROCHA LEAO BC1 RJ  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$89,119.95
ROCHA LEAO IB 138 kV MG 138 kV ROCHA LEAO MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$70,192.63
ROCHA LEAO IB 138 kV MG 138 kV ROCHA LEAO MG1 RJ IB1 DIT   062/2001 IPCA RMEL REN 643/2014 21/04/2016 20/04/2046  R$152,511.75
ROCHA LEAO IB 138 kV MG 138 kV ROCHA LEAO MG1 RJ IB1 DIT   062/2001 IPCA RMEL REN 443/2011 06/02/2017 05/02/2046  R$28,473.63
ROCHA LEAO IB 138 kV MG 138 kV ROCHA LEAO MG1 RJ IB1 DIT   062/2001 IPCA RMEL REN 443/2011 06/02/2017 05/02/2046  R$28,473.63
ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-2 RJ DIT   062/2001 IPCA RCDM REN 643/2014 14/12/2013 13/12/2037  R$64,933.35
ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 19/04/2016 18/04/2044  R$27,117.37
ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 08/03/2016 07/03/2046  R$185,171.09
ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 12/01/2016 11/01/2038  R$14,251.73
ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-1 RJ DIT   062/2001 IPCA RCDM REN 643/2014 15/11/2013 14/11/2037  R$64,763.75
ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 15/09/2015 14/09/2045  R$117,677.68
ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 06/11/2015 05/11/2043  R$38,854.86
ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 15/09/2015 14/09/2042  R$26,715.06
ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 19/04/2016 18/04/2044  R$27,117.37
ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 12/05/2015 11/05/2036  R$13,963.53
ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV IRIRI /ROCHA LEAO C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV IRIRI /ROCHA LEAO C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 18/12/2015 17/12/2046  R$118,401.34
ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV IRIRI /ROCHA LEAO C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 18/12/2015 17/12/2043  R$38,973.47
ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV IRIRI /ROCHA LEAO C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 19/12/2015 18/12/2043  R$26,893.88
ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV IRIRI /ROCHA LEAO C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 20/04/2016 19/04/2044  R$27,119.52
ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV IRIRI /ROCHA LEAO C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 29/09/2015 28/09/2036  R$4,711.63
ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV IRIRI /ROCHA LEAO C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 29/09/2015 28/09/2036  R$4,711.63
ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV IRIRI /ROCHA LEAO C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 29/09/2015 28/09/2036  R$4,711.63
ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 06/11/2015 05/11/2046  R$118,067.30
ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 15/09/2015 14/09/2042  R$38,717.49
ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 06/11/2015 05/11/2043  R$26,809.84
ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 20/04/2016 19/04/2044  R$27,119.52
ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 29/09/2015 28/09/2036  R$14,134.90
ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 23/09/2015 22/09/2036  R$14,126.31
ROCHA LEAO EL 138 kV ROCHA LEAODIST2 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
ROCHA LEAO EL 138 kV ROCHA LEAODIST2 DIT   062/2001 IPCA RMEL REN 643/2014 04/12/2015 03/12/2041  R$75,265.46
ROCHA LEAO EL 138 kV ROCHA LEAODIST2 DIT   062/2001 IPCA RMEL REN 643/2014 15/06/2016 14/06/2046  R$186,358.79
ROCHA LEAO EL 138 kV ROCHA LEAODIST2 DIT   062/2001 IPCA RMEL REN 643/2014 19/11/2016 18/11/2045  R$27,497.19
ROCHA LEAO EL 138 kV ROCHA LEAODIST2 DIT   062/2001 IPCA RMEL REN 643/2014 09/03/2016 08/03/2038  R$14,315.13
ROCHA LEAO EL 138 kV ROCHA LEAODIST1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,470.49
ROCHA LEAO EL 138 kV ROCHA LEAODIST1 DIT   062/2001 IPCA RMEL REN 643/2014 17/09/2015 16/09/2040  R$74,848.61
ROCHA LEAO EL 138 kV ROCHA LEAODIST1 DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$685,016.80
ROCHA LEAO EL 138 kV ROCHA LEAODIST1 DIT   062/2001 IPCA RMEL REN 643/2014 17/09/2015 16/09/2036  R$14,117.70
ROCHA LEAO BC 138 kV 75 Mvar ROCHA LEAO BC2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$172,690.75
ROCHA LEAO BC 138 kV 75 Mvar ROCHA LEAO BC2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$873,223.90
ROCHA LEAO BC 138 kV 75 Mvar ROCHA LEAO BC2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$791,924.77
ROCHA LEAO BC 138 kV 75 Mvar ROCHA LEAO BC1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$172,690.75
ROCHA LEAO BC 138 kV 75 Mvar ROCHA LEAO BC1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$873,223.90
ROCHA LEAO BC 138 kV 75 Mvar ROCHA LEAO BC1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$791,924.77
S.DA MESA TR 500/230 kV S.DA MESA TRR1 GO RB FT TR 500/230 kV S.DA MESA TRR1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$427,339.78
S.DA MESA TR 500/230 kV S.DA MESA TRR1 GO RB FT TR 500/230 kV S.DA MESA TRR1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,213,891.20
S.DA MESA TR 500/230 kV S.DA MESA TRR1 GO RB FT TR 500/230 kV S.DA MESA TRR1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,007,772.91
S.DA MESA TR 500/230 kV S.DA MESA TR2 GO RB FT TR 500/230 kV S.DA MESA TR2 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,283,194.26
S.DA MESA TR 500/230 kV S.DA MESA TR1 GO RB FT TR 500/230 kV S.DA MESA TR1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,283,194.26
S.DA MESA TR 500/230 kV S.DA MESA TR1 GO RB FT TR 500/230 kV S.DA MESA TR1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 6,647,760.49
S.DA MESA TR 500/230 kV S.DA MESA TR1 GO RB FT TR 500/230 kV S.DA MESA TR1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 6,028,838.90
S.DA MESA TR 230/138 kV S.DA MESA TRR1 GO RBF FT TR 230/138 kV S.DA MESA TRR1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$105,627.56
S.DA MESA TR 230/138 kV S.DA MESA TRR1 GO RBF FT TR 230/138 kV S.DA MESA TRR1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$547,217.78
S.DA MESA TR 230/138 kV S.DA MESA TRR1 GO RBF FT TR 230/138 kV S.DA MESA TRR1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$496,270.56
S.DA MESA TR 230/138 kV S.DA MESA TR6 GO RBF FT TR 230/138 kV S.DA MESA TR6 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$313,549.12
S.DA MESA TR 230/138 kV S.DA MESA TR6 GO RBF FT TR 230/138 kV S.DA MESA TR6 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,624,383.40
S.DA MESA TR 230/138 kV S.DA MESA TR6 GO RBF FT TR 230/138 kV S.DA MESA TR6 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,473,149.62
S.DA MESA TR 230/138 kV S.DA MESA TR5 GO RBF FT TR 230/138 kV S.DA MESA TR5 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$313,549.12
S.DA MESA TR 230/138 kV S.DA MESA TR5 GO RBF FT TR 230/138 kV S.DA MESA TR5 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,624,383.40
S.DA MESA TR 230/138 kV S.DA MESA TR5 GO RBF FT TR 230/138 kV S.DA MESA TR5 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,473,149.62
S.DA MESA TR 230/138 kV S.DA MESA TR4 GO RBF FT TR 230/138 kV S.DA MESA TR4 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$313,549.12
S.DA MESA TR 230/138 kV S.DA MESA TR4 GO RBF FT TR 230/138 kV S.DA MESA TR4 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,624,383.40
S.DA MESA TR 230/138 kV S.DA MESA TR4 GO RBF FT TR 230/138 kV S.DA MESA TR4 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,473,149.62
S.DA MESA RTN 69 kV 0,5 Mvar S.DA MESA RTTSMSB2 GO RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$10,888.22
S.DA MESA RTN 69 kV 0,5 Mvar S.DA MESA RTNSMSB1 GO RB FT RTL 500 kV 73,4 Mvar S.DA MESA RTSMSB1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$10,888.22
S.DA MESA RTN 69 kV 0,5 Mvar S.DA MESA RTNSMGU1 GO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$10,888.22
S.DA MESA RTL 500 kV 73,4 Mvar S.DA MESA RTSMSB1 GO RB FT RTL 500 kV 73,4 Mvar S.DA MESA RTSMSB1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$472,201.85
S.DA MESA RTL 500 kV 73,4 Mvar S.DA MESA RTSMSB1 GO RB FT RTL 500 kV 73,4 Mvar S.DA MESA RTSMSB1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,446,305.19
S.DA MESA RTL 500 kV 73,4 Mvar S.DA MESA RTSMSB1 GO RB FT RTL 500 kV 73,4 Mvar S.DA MESA RTSMSB1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,218,548.63
S.DA MESA RTL 500 kV 24,45 Mvar S.DA MESA RTR1 GO RB FT RTL 500 kV 24,45 Mvar S.DA MESA RTR1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$228,356.26
S.DA MESA RTL 500 kV 24,45 Mvar S.DA MESA RTR1 GO RB FT RTL 500 kV 24,45 Mvar S.DA MESA RTR1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,183,030.32
S.DA MESA RTL 500 kV 24,45 Mvar S.DA MESA RTR1 GO RB FT RTL 500 kV 24,45 Mvar S.DA MESA RTR1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,072,887.51
S.DA MESA RTL 500 kV 136 Mvar S.DA MESA RTSMSB2 GO RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$591,699.53
S.DA MESA RTL 500 kV 136 Mvar S.DA MESA RTSMSB2 GO RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,065,379.02
S.DA MESA RTL 500 kV 136 Mvar S.DA MESA RTSMSB2 GO RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,779,985.28
S.DA MESA RTL 500 kV 136 Mvar S.DA MESA RTSMGU1 GO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$591,699.53
S.DA MESA RTL 500 kV 136 Mvar S.DA MESA RTSMGU1 GO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,065,379.02
S.DA MESA RTL 500 kV 136 Mvar S.DA MESA RTSMGU1 GO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,779,985.28
S.DA MESA MG 500 kV S.DA MESA MG1 GO RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,175,246.49
S.DA MESA MG 500 kV S.DA MESA MG1 GO RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBNI REA 5148/2015 25/07/2018 25/07/2050  R$138,970.83
S.DA MESA MG 500 kV S.DA MESA MG1 GO RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBNI REA 6153/2016 30/11/2022 30/11/2053  R$523,727.48
S.DA MESA MG 500 kV S.DA MESA MG1 GO RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBNI REA 6153/2016 30/11/2022 30/11/2049  R$ 3,867,993.32
S.DA MESA MG 500 kV S.DA MESA MG1 GO RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBNI REA 6370/2017 15/12/2020 15/12/2051  R$27,626.09
S.DA MESA MG 500 kV S.DA MESA MG1 GO RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RMEL REN 443/2011 25/04/2017 24/04/2031  R$167,051.68
S.DA MESA MG 500 kV S.DA MESA MG1 GO RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RMEL REN 443/2011 08/12/2017 07/12/2032  R$9,712.37
S.DA MESA MG 500 kV S.DA MESA MG1 GO RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBNI REA 8314/2019 24/11/2020 23/11/2035  R$54,855.43
S.DA MESA MC 69 kV RTN 69 kV 0,5 Mvar S.DA MESA RTTSMSB2 GO  RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$7,396.01
S.DA MESA MC 69 kV RTN 69 kV 0,5 Mvar S.DA MESA RTNSMSB1 GO  RB FT RTL 500 kV 73,4 Mvar S.DA MESA RTSMSB1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$7,396.01
S.DA MESA MC 69 kV RTN 69 kV 0,5 Mvar S.DA MESA RTNSMGU1 GO  RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$7,396.01
S.DA MESA MC 500 kV TR 500/230 kV S.DA MESA TR2 GO  RB FT TR 500/230 kV S.DA MESA TR2 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$327,073.06
S.DA MESA MC 500 kV TR 500/230 kV S.DA MESA TR1 GO RB FT TR 500/230 kV S.DA MESA TR1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$327,073.06
S.DA MESA MC 500 kV TR 500/230 kV S.DA MESA TR1 GO RB FT TR 500/230 kV S.DA MESA TR1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,694,445.99
S.DA MESA MC 500 kV TR 500/230 kV S.DA MESA TR1 GO RB FT TR 500/230 kV S.DA MESA TR1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,536,689.22
S.DA MESA MC 500 kV RTL 500 kV 73,4 Mvar S.DA MESA RTSMSB1 GO  RB FT RTL 500 kV 73,4 Mvar S.DA MESA RTSMSB1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$198,155.23
S.DA MESA MC 500 kV RTL 500 kV 136 Mvar S.DA MESA RTSMSB2 GO  RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$198,155.23
S.DA MESA MC 500 kV RTL 500 kV 136 Mvar S.DA MESA RTSMGU1 GO  RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$198,155.23
S.DA MESA MC 500 kV CR 500 kV 107 MVAr S.DA MESA BC1 GO RB FT CR 500 kV 107 MVAr S.DA MESA BC1 GO 062/2001 IPCA RBNI REA 6370/2017 15/12/2020 15/12/2046  R$206,214.55
S.DA MESA MC 230 kV TR 500/230 kV S.DA MESA TR2 GO  RB FT TR 500/230 kV S.DA MESA TR2 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$127,805.26
S.DA MESA MC 230 kV TR 500/230 kV S.DA MESA TR1 GO RB FT TR 500/230 kV S.DA MESA TR1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$127,805.26
S.DA MESA MC 230 kV TR 500/230 kV S.DA MESA TR1 GO RB FT TR 500/230 kV S.DA MESA TR1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$662,112.32
S.DA MESA MC 230 kV TR 500/230 kV S.DA MESA TR1 GO RB FT TR 500/230 kV S.DA MESA TR1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$600,468.16
S.DA MESA MC 230 kV TR 230/138 kV S.DA MESA TR6 GO RBF FT TR 230/138 kV S.DA MESA TR6 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$127,805.26
S.DA MESA MC 230 kV TR 230/138 kV S.DA MESA TR6 GO RBF FT TR 230/138 kV S.DA MESA TR6 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$662,112.32
S.DA MESA MC 230 kV TR 230/138 kV S.DA MESA TR6 GO RBF FT TR 230/138 kV S.DA MESA TR6 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$600,468.16
S.DA MESA MC 230 kV TR 230/138 kV S.DA MESA TR5 GO RBF FT TR 230/138 kV S.DA MESA TR5 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$127,805.26
S.DA MESA MC 230 kV TR 230/138 kV S.DA MESA TR5 GO RBF FT TR 230/138 kV S.DA MESA TR5 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$662,112.32
S.DA MESA MC 230 kV TR 230/138 kV S.DA MESA TR4 GO RBF FT TR 230/138 kV S.DA MESA TR4 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$127,805.26
S.DA MESA MC 230 kV TR 230/138 kV S.DA MESA TR4 GO RBF FT TR 230/138 kV S.DA MESA TR4 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$662,112.32
S.DA MESA MC 230 kV TR 230/138 kV S.DA MESA TR4 GO RBF FT TR 230/138 kV S.DA MESA TR4 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$600,468.16
S.DA MESA MC 230 kV BC 230 kV 150 Mvar S.DA MESA BC2 GO RB FT BC 230 kV 150 Mvar S.DA MESA BC2 GO 062/2001 IPCA RBNI REA 5148/2015 25/07/2018 25/07/2042  R$767,818.71
S.DA MESA MC 230 kV BC 230 kV 150 Mvar S.DA MESA BC1 GO RB FT BC 230 kV 150 Mvar S.DA MESA BC1 GO 062/2001 IPCA RBNI REA 5148/2015 25/07/2018 25/07/2042  R$767,818.71
S.DA MESA MC 138 kV TR 230/138 kV S.DA MESA TR6 GO RBF FT TR 230/138 kV S.DA MESA TR6 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$95,582.88
S.DA MESA MC 138 kV TR 230/138 kV S.DA MESA TR5 GO RBF FT TR 230/138 kV S.DA MESA TR5 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$95,582.88
S.DA MESA MC 138 kV TR 230/138 kV S.DA MESA TR4 GO RBF FT TR 230/138 kV S.DA MESA TR4 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$95,582.88
S.DA MESA MC 138 kV TR 230/138 kV S.DA MESA TR4 GO RBF FT TR 230/138 kV S.DA MESA TR4 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$495,179.99
S.DA MESA MC 138 kV TR 230/138 kV S.DA MESA TR4 GO RBF FT TR 230/138 kV S.DA MESA TR4 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$449,077.61
S.DA MESA IB 500 kV MG 500 kV S.DA MESA MG1 GO IB5 RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$347,094.43
S.DA MESA IB 500 kV MG 500 kV S.DA MESA MG1 GO IB4 RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$347,094.43
S.DA MESA IB 500 kV MG 500 kV S.DA MESA MG1 GO IB3 RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$347,094.43
S.DA MESA IB 500 kV MG 500 kV S.DA MESA MG1 GO IB2 RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$347,094.43
S.DA MESA IB 500 kV MG 500 kV S.DA MESA MG1 GO IB1 RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$347,094.43
S.DA MESA IB 230 kV MG 500 kV S.DA MESA MG1 GO IB1 RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$105,014.11
S.DA MESA IB 230 kV MG 500 kV S.DA MESA MG1 GO IB1 RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$544,039.71
S.DA MESA IB 230 kV MG 500 kV S.DA MESA MG1 GO IB1 RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$493,388.38
S.DA MESA IB 138 kV MG 500 kV S.DA MESA MG1 GO IB1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$78,514.10
S.DA MESA IB 138 kV MG 500 kV S.DA MESA MG1 GO IB1 DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$397,012.48
S.DA MESA IB 138 kV MG 500 kV S.DA MESA MG1 GO IB1 DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$360,049.72
S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,919,850.95
S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,741,108.47
S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBNI REA 5861/2016 14/03/2021 13/03/2036  R$16,374.92
S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBNI REA 8314/2019 14/03/2021 13/03/2036  R$31,962.23
S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,919,850.95
S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,741,108.47
S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBNI REA 5861/2016 13/03/2021 12/03/2036  R$16,373.85
S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBNI REA 8314/2019 13/03/2021 12/03/2036  R$31,960.16
S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /GURUPI C-1 GO/TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /GURUPI C-1 GO/TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,919,850.95
S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /GURUPI C-1 GO/TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,741,108.47
S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /GURUPI C-1 GO/TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBNI REA 5861/2016 24/11/2020 23/11/2035  R$16,257.92
S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /GURUPI C-1 GO/TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBNI REA 8314/2019 24/11/2020 23/11/2035  R$31,733.86
S.DA MESA EL 230 kV S.DA MESA LT 230 kV S.DA MESA /NIQUELANDIA C-2 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-2 GO 028/2009 IPCA RBL CC 028/2009 27/09/2017 19/11/2039  R$702,945.98
S.DA MESA EL 230 kV S.DA MESA LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$178,247.06
S.DA MESA EL 230 kV S.DA MESA LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$923,432.89
S.DA MESA EL 230 kV S.DA MESA LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$837,459.19
S.DA MESA EL 230 kV S.DA MESA LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO 062/2001 IPCA RBNI REA 3578/2012 22/04/2019 21/04/2049  R$26,200.10
S.DA MESA EL 138 kV S.DA MESA LT 138 kV PORANGATU /S.DA MESA C-1 GO DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
S.DA MESA EL 138 kV S.DA MESA LT 138 kV PORANGATU /S.DA MESA C-1 GO DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$723,202.62
S.DA MESA EL 138 kV S.DA MESA LT 138 kV PORANGATU /S.DA MESA C-1 GO DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$655,870.82
S.DA MESA EL 138 kV S.DA MESA LT 138 kV MINACU /S.DA MESA C-1 GO DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
S.DA MESA EL 138 kV S.DA MESA LT 138 kV MINACU /S.DA MESA C-1 GO DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$723,202.62
S.DA MESA EL 138 kV S.DA MESA LT 138 kV MINACU /S.DA MESA C-1 GO DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$655,870.82
S.DA MESA CR 500 kV 107 MVAr S.DA MESA BC1 GO RB FT CR 500 kV 107 MVAr S.DA MESA BC1 GO 062/2001 IPCA RBNI REA 6370/2017 15/12/2020 15/12/2040  R$ 8,183,592.64
S.DA MESA BC 230 kV 150 Mvar S.DA MESA BC2 GO RB FT BC 230 kV 150 Mvar S.DA MESA BC2 GO 062/2001 IPCA RBNI REA 5148/2015 25/07/2018 25/07/2038  R$ 1,298,856.06
S.DA MESA BC 230 kV 150 Mvar S.DA MESA BC1 GO RB FT BC 230 kV 150 Mvar S.DA MESA BC1 GO 062/2001 IPCA RBNI REA 5148/2015 25/07/2018 25/07/2038  R$ 1,298,856.06
SAMAMBAIA TR 500/345 kV SAMAMBAIA TRR1 DF RB FT TR 500/345 kV SAMAMBAIA TRR1 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$607,424.94
SAMAMBAIA TR 500/345 kV SAMAMBAIA TRR1 DF RB FT TR 500/345 kV SAMAMBAIA TRR1 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,146,846.61
SAMAMBAIA TR 500/345 kV SAMAMBAIA TRR1 DF RB FT TR 500/345 kV SAMAMBAIA TRR1 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,853,868.05
SAMAMBAIA TR 500/345 kV SAMAMBAIA TR7 DF RB FT TR 500/345 kV SAMAMBAIA TR7 DF 062/2001 IPCA RBNI REA 3814/2012 27/07/2016 26/07/2049  R$ 6,008,674.35
SAMAMBAIA TR 500/345 kV SAMAMBAIA TR3 DF RB FT TR 500/345 kV SAMAMBAIA TR3 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,822,274.82
SAMAMBAIA TR 500/345 kV SAMAMBAIA TR3 DF RB FT TR 500/345 kV SAMAMBAIA TR3 DF 062/2001 IPCA RBNI REA 3814/2012 27/07/2016 26/07/2051  R$27,583.02
SAMAMBAIA TR 500/345 kV SAMAMBAIA TR2 DF RB FT TR 500/345 kV SAMAMBAIA TR2 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,822,274.82
SAMAMBAIA TR 500/345 kV SAMAMBAIA TR2 DF RB FT TR 500/345 kV SAMAMBAIA TR2 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 9,440,539.83
SAMAMBAIA TR 500/345 kV SAMAMBAIA TR2 DF RB FT TR 500/345 kV SAMAMBAIA TR2 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 8,561,604.15
SAMAMBAIA TR 500/345 kV SAMAMBAIA TR2 DF RB FT TR 500/345 kV SAMAMBAIA TR2 DF 062/2001 IPCA RMEL REA 11449/2022 05/05/2022 05/05/2057  R$ 4,154,680.99
SAMAMBAIA TR 500/345 kV SAMAMBAIA TR1 DF RB FT TR 500/345 kV SAMAMBAIA TR1 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,822,274.82
SAMAMBAIA TR 500/345 kV SAMAMBAIA TR1 DF RB FT TR 500/345 kV SAMAMBAIA TR1 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 9,440,539.83
SAMAMBAIA TR 500/345 kV SAMAMBAIA TR1 DF RB FT TR 500/345 kV SAMAMBAIA TR1 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 8,561,604.15
SAMAMBAIA TR 345/138 kV SAMAMBAIA TRR2 DF RBF FT TR 345/138 kV SAMAMBAIA TRR2 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$240,533.81
SAMAMBAIA TR 345/138 kV SAMAMBAIA TR8 DF RBF FT TR 345/138 kV SAMAMBAIA TR8 DF 062/2001 IPCA RBNI REA 3893/2013 29/09/2016 28/09/2049  R$ 3,135,660.08
SAMAMBAIA TR 345/138 kV SAMAMBAIA TR6 DF RBF FT TR 345/138 kV SAMAMBAIA TR6 DF 062/2001 IPCA RBNI REA 1938/2009 10/10/2012 09/10/2041  R$ 2,857,609.65
SAMAMBAIA TR 345/138 kV SAMAMBAIA TR5 DF RBF FT TR 345/138 kV SAMAMBAIA TR5 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$721,601.44
SAMAMBAIA TR 345/138 kV SAMAMBAIA TR4 DF RBF FT TR 345/138 kV SAMAMBAIA TR4 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$721,601.44
SAMAMBAIA RTN 69 kV 0,5 Mvar SAMAMBAIA RTNSMSB2 DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$10,888.22
SAMAMBAIA RTN 69 kV 0,5 Mvar SAMAMBAIA RTNSMSB1 DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$10,888.22
SAMAMBAIA RTL 500 kV 89,1 Mvar SAMAMBAIA RTSMSB1 DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$509,759.36
SAMAMBAIA RTL 500 kV 89,1 Mvar SAMAMBAIA RTSMSB1 DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,640,876.94
SAMAMBAIA RTL 500 kV 89,1 Mvar SAMAMBAIA RTSMSB1 DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,395,005.31
SAMAMBAIA RTL 500 kV 136 Mvar SAMAMBAIA RTSMSB2 DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$591,699.53
SAMAMBAIA RTL 500 kV 136 Mvar SAMAMBAIA RTSMSB2 DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,065,379.02
SAMAMBAIA RTL 500 kV 136 Mvar SAMAMBAIA RTSMSB2 DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,779,985.28
SAMAMBAIA MG 500 kV SAMAMBAIA MG2 DF RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBNI REA 3814/2012 27/07/2016 26/07/2043  R$ 1,062,236.15
SAMAMBAIA MG 500 kV SAMAMBAIA MG2 DF RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBNI REA 3893/2013 29/09/2016 28/09/2045  R$688,266.80
SAMAMBAIA MG 500 kV SAMAMBAIA MG2 DF RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,431,919.02
SAMAMBAIA MG 500 kV SAMAMBAIA MG2 DF RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBNI REA 2837/2011 06/04/2016 05/04/2042  R$305,813.68
SAMAMBAIA MG 500 kV SAMAMBAIA MG2 DF RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBNI REA 6247/2017 26/11/2019 26/11/2051  R$355,014.71
SAMAMBAIA MG 500 kV SAMAMBAIA MG2 DF RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 7,418,249.12
SAMAMBAIA MG 500 kV SAMAMBAIA MG2 DF RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 6,727,593.30
SAMAMBAIA MG 500 kV SAMAMBAIA MG2 DF RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBNI REA 6247/2017 26/11/2019 26/11/2051  R$150,919.52
SAMAMBAIA MG 500 kV SAMAMBAIA MG2 DF RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBNI REA 6247/2017 06/04/2020 06/04/2052  R$132,507.63
SAMAMBAIA MG 500 kV SAMAMBAIA MG2 DF RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RMEL REN 443/2011 25/04/2017 24/04/2031  R$424,772.97
SAMAMBAIA MC 69 kV RTN 69 kV 0,5 Mvar SAMAMBAIA RTNSMSB2 DF  RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$7,396.01
SAMAMBAIA MC 69 kV RTN 69 kV 0,5 Mvar SAMAMBAIA RTNSMSB1 DF  RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$7,396.01
SAMAMBAIA MC 500 kV TR 500/345 kV SAMAMBAIA TR7 DF RB FT TR 500/345 kV SAMAMBAIA TR7 DF 062/2001 IPCA RBNI REA 3814/2012 27/07/2016 26/07/2046  R$ 2,175,637.73
SAMAMBAIA MC 500 kV TR 500/345 kV SAMAMBAIA TR3 DF  RB FT TR 500/345 kV SAMAMBAIA TR3 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$327,073.06
SAMAMBAIA MC 500 kV TR 500/345 kV SAMAMBAIA TR2 DF  RB FT TR 500/345 kV SAMAMBAIA TR2 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$327,073.06
SAMAMBAIA MC 500 kV TR 500/345 kV SAMAMBAIA TR2 DF  RB FT TR 500/345 kV SAMAMBAIA TR2 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,694,445.99
SAMAMBAIA MC 500 kV TR 500/345 kV SAMAMBAIA TR2 DF  RB FT TR 500/345 kV SAMAMBAIA TR2 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,536,689.22
SAMAMBAIA MC 500 kV TR 500/345 kV SAMAMBAIA TR1 DF RB FT TR 500/345 kV SAMAMBAIA TR1 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$327,073.06
SAMAMBAIA MC 500 kV TR 500/345 kV SAMAMBAIA TR1 DF RB FT TR 500/345 kV SAMAMBAIA TR1 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,694,445.99
SAMAMBAIA MC 500 kV TR 500/345 kV SAMAMBAIA TR1 DF RB FT TR 500/345 kV SAMAMBAIA TR1 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,536,689.22
SAMAMBAIA MC 500 kV RTL 500 kV 89,1 Mvar SAMAMBAIA RTSMSB1 DF  RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$198,155.23
SAMAMBAIA MC 500 kV RTL 500 kV 136 Mvar SAMAMBAIA RTSMSB2 DF  RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$198,155.23
SAMAMBAIA MC 500 kV CR 500 kV 270 Mvar SAMAMBAIA BC1 DF RB FT CR 500 kV 270 Mvar SAMAMBAIA BC1 DF 062/2001 IPCA RBNI REA 6247/2017 26/11/2019 26/11/2043  R$728,360.80
SAMAMBAIA MC 500 kV CR 500 kV 252 Mvar SAMAMBAIA BC3 DF RB FT CR 500 kV 252 Mvar SAMAMBAIA BC3 DF 062/2001 IPCA RBNI REA 6247/2017 26/11/2019 26/11/2043  R$826,794.94
SAMAMBAIA MC 500 kV CR 500 kV 252 Mvar SAMAMBAIA BC2 DF RB FT CR 500 kV 252 Mvar SAMAMBAIA BC2 DF 062/2001 IPCA RBNI REA 6247/2017 06/04/2020 06/04/2044  R$687,455.62
SAMAMBAIA MC 345 kV TR 500/345 kV SAMAMBAIA TR7 DF RB FT TR 500/345 kV SAMAMBAIA TR7 DF 062/2001 IPCA RBNI REA 3814/2012 27/07/2016 26/07/2046  R$ 1,773,587.17
SAMAMBAIA MC 345 kV TR 500/345 kV SAMAMBAIA TR3 DF  RB FT TR 500/345 kV SAMAMBAIA TR3 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
SAMAMBAIA MC 345 kV TR 500/345 kV SAMAMBAIA TR2 DF  RB FT TR 500/345 kV SAMAMBAIA TR2 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
SAMAMBAIA MC 345 kV TR 500/345 kV SAMAMBAIA TR2 DF  RB FT TR 500/345 kV SAMAMBAIA TR2 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,168,504.07
SAMAMBAIA MC 345 kV TR 500/345 kV SAMAMBAIA TR2 DF  RB FT TR 500/345 kV SAMAMBAIA TR2 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,059,713.69
SAMAMBAIA MC 345 kV TR 500/345 kV SAMAMBAIA TR1 DF RB FT TR 500/345 kV SAMAMBAIA TR1 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
SAMAMBAIA MC 345 kV TR 500/345 kV SAMAMBAIA TR1 DF RB FT TR 500/345 kV SAMAMBAIA TR1 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,168,504.07
SAMAMBAIA MC 345 kV TR 500/345 kV SAMAMBAIA TR1 DF RB FT TR 500/345 kV SAMAMBAIA TR1 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,059,713.69
SAMAMBAIA MC 345 kV TR 345/138 kV SAMAMBAIA TR8 DF RBF FT TR 345/138 kV SAMAMBAIA TR8 DF 062/2001 IPCA RBNI REA 3893/2013 29/09/2016 28/09/2046  R$ 2,131,215.89
SAMAMBAIA MC 345 kV TR 345/138 kV SAMAMBAIA TR6 DF RBF FT TR 345/138 kV SAMAMBAIA TR6 DF 062/2001 IPCA RBNI REA 1938/2009 10/10/2012 09/10/2039  R$ 1,509,599.12
SAMAMBAIA MC 345 kV TR 345/138 kV SAMAMBAIA TR5 DF  RBF FT TR 345/138 kV SAMAMBAIA TR5 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
SAMAMBAIA MC 345 kV TR 345/138 kV SAMAMBAIA TR4 DF  RBF FT TR 345/138 kV SAMAMBAIA TR4 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$225,552.31
SAMAMBAIA MC 345 kV BC 345 kV 150 Mvar SAMAMBAIA BC5 DF  RB FT BC 345 kV 150 Mvar SAMAMBAIA BC5 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$213,278.01
SAMAMBAIA MC 345 kV BC 345 kV 150 Mvar SAMAMBAIA BC4 DF RB FT BC 345 kV 150 Mvar SAMAMBAIA BC4 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$213,278.01
SAMAMBAIA MC 138 kV TR 345/138 kV SAMAMBAIA TR8 DF RBF FT TR 345/138 kV SAMAMBAIA TR8 DF 062/2001 IPCA RBNI REA 3893/2013 29/09/2016 28/09/2045  R$467,984.57
SAMAMBAIA MC 138 kV TR 345/138 kV SAMAMBAIA TR6 DF RBF FT TR 345/138 kV SAMAMBAIA TR6 DF 062/2001 IPCA RBNI REA 1938/2009 10/10/2012 09/10/2038  R$862,098.52
SAMAMBAIA MC 138 kV TR 345/138 kV SAMAMBAIA TR5 DF  RBF FT TR 345/138 kV SAMAMBAIA TR5 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$95,582.88
SAMAMBAIA MC 138 kV TR 345/138 kV SAMAMBAIA TR4 DF  RBF FT TR 345/138 kV SAMAMBAIA TR4 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$95,582.88
SAMAMBAIA IB 500 kV MG 500 kV SAMAMBAIA MG2 DF IB4 RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$347,094.43
SAMAMBAIA IB 500 kV MG 500 kV SAMAMBAIA MG2 DF IB3 RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$347,094.43
SAMAMBAIA IB 500 kV MG 500 kV SAMAMBAIA MG2 DF IB2 RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBNI REA 3814/2012 27/07/2016 26/07/2047  R$ 1,716,968.49
SAMAMBAIA IB 345 kV MG 500 kV SAMAMBAIA MG2 DF IB1 RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
SAMAMBAIA IB 345 kV MG 500 kV SAMAMBAIA MG2 DF IB1 RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBNI REA 4068/2013 08/11/2015 07/11/2043  R$78,260.50
SAMAMBAIA IB 345 kV MG 500 kV SAMAMBAIA MG2 DF IB1 RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,036,883.85
SAMAMBAIA IB 345 kV MG 500 kV SAMAMBAIA MG2 DF IB1 RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$940,347.61
SAMAMBAIA IB 138 kV MG 500 kV SAMAMBAIA MG1 DF IB2 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$78,514.10
SAMAMBAIA EL 500 kV SAMAMBAIA LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
SAMAMBAIA EL 500 kV SAMAMBAIA LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,919,850.95
SAMAMBAIA EL 500 kV SAMAMBAIA LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,741,108.47
SAMAMBAIA EL 500 kV SAMAMBAIA LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
SAMAMBAIA EL 500 kV SAMAMBAIA LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,919,850.95
SAMAMBAIA EL 500 kV SAMAMBAIA LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,741,108.47
SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF 062/2001 IPCA RBNI REA 4068/2013 02/11/2015 01/11/2043  R$78,971.75
SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,372,890.86
SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,245,071.61
SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF 062/2001 IPCA RBNI REA 4068/2013 01/11/2015 31/10/2043  R$78,994.05
SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,372,890.86
SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,245,071.61
SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,372,890.86
SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,245,071.61
SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$265,004.38
SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,372,890.86
SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,245,071.61
SAMAMBAIA EL 138 kV SAMAMBAIA LT 138 kV BRAS. NORTE /SAMAMBAIA C-1 DF  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
SAMAMBAIA EL 138 kV SAMAMBAIASUDOESTE DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
SAMAMBAIA EL 138 kV SAMAMBAIASAMAM. OESTE C2 DIT   062/2001 IPCA RCDM REA 2837/2011 06/04/2016 05/04/2045  R$960,166.47
SAMAMBAIA EL 138 kV SAMAMBAIASAMAM. OESTE C1 DIT   062/2001 IPCA RCDM REA 2837/2011 06/04/2016 05/04/2045  R$950,946.00
SAMAMBAIA EL 138 kV SAMAMBAIARIO VERMELHO DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
SAMAMBAIA EL 138 kV SAMAMBAIARIACHO FUNDO DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
SAMAMBAIA EL 138 kV SAMAMBAIAMONJOLO DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
SAMAMBAIA CR 500 kV 270 Mvar SAMAMBAIA BC1 DF RB FT CR 500 kV 270 Mvar SAMAMBAIA BC1 DF 062/2001 IPCA RBNI REA 6247/2017 26/11/2019 26/11/2039  R$ 22,905,622.68
SAMAMBAIA CR 500 kV 252 Mvar SAMAMBAIA BC3 DF RB FT CR 500 kV 252 Mvar SAMAMBAIA BC3 DF 062/2001 IPCA RBNI REA 6247/2017 26/11/2019 26/11/2039  R$ 15,687,481.54
SAMAMBAIA CR 500 kV 252 Mvar SAMAMBAIA BC2 DF RB FT CR 500 kV 252 Mvar SAMAMBAIA BC2 DF 062/2001 IPCA RBNI REA 6247/2017 06/04/2020 06/04/2040  R$ 15,861,930.54
SAMAMBAIA BC 345 kV 150 Mvar SAMAMBAIA BC5 DF RB FT BC 345 kV 150 Mvar SAMAMBAIA BC5 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$232,536.06
SAMAMBAIA BC 345 kV 150 Mvar SAMAMBAIA BC5 DF RB FT BC 345 kV 150 Mvar SAMAMBAIA BC5 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,204,684.33
SAMAMBAIA BC 345 kV 150 Mvar SAMAMBAIA BC5 DF RB FT BC 345 kV 150 Mvar SAMAMBAIA BC5 DF 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,092,525.49
SAMAMBAIA BC 345 kV 150 Mvar SAMAMBAIA BC4 DF RB FT BC 345 kV 150 Mvar SAMAMBAIA BC4 DF 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$232,536.06
SANTA CRUZ TR 138/34,5 kV SANTA CRUZ TR34 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$110,177.05
SANTA CRUZ TR 138/34,5 kV SANTA CRUZ TR12 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$119,315.04
SANTA CRUZ MG 138 kV SANTA CRUZ MG1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$382,864.26
SANTA CRUZ MG 138 kV SANTA CRUZ MG1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2045  R$3,517.78
SANTA CRUZ MG 138 kV SANTA CRUZ MG1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 05/10/2015 04/10/2028  R$56,133.87
SANTA CRUZ MC 138 kV TR 19/138 kV SANTA CRUZ TRG4 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$97,927.93
SANTA CRUZ MC 138 kV TR 19/138 kV SANTA CRUZ TRG4 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$495,179.99
SANTA CRUZ MC 138 kV TR 19/138 kV SANTA CRUZ TRG4 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$449,077.61
SANTA CRUZ MC 138 kV TR 19/138 kV SANTA CRUZ TRG3 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$97,927.93
SANTA CRUZ MC 138 kV TR 16,5/138 kV SANTA CRUZ TR11 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$97,927.93
SANTA CRUZ MC 138 kV TR 16,5/138 kV SANTA CRUZ TR11 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$495,179.99
SANTA CRUZ MC 138 kV TR 16,5/138 kV SANTA CRUZ TR11 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$449,077.61
SANTA CRUZ MC 138 kV TR 138/34,5 kV SANTA CRUZ TR34 RJ  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$97,927.93
SANTA CRUZ MC 138 kV TR 138/34,5 kV SANTA CRUZ TR34 RJ  DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$495,179.99
SANTA CRUZ MC 138 kV TR 138/34,5 kV SANTA CRUZ TR34 RJ  DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$449,077.61
SANTA CRUZ MC 138 kV TR 138/34,5 kV SANTA CRUZ TR12 RJ  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$97,927.93
SANTA CRUZ MC 138 kV TR 13,2/138 kV SANTA CRUZ TRG2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$97,927.93
SANTA CRUZ MC 138 kV TR 13,2/138 kV SANTA CRUZ TRG1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$97,927.93
SANTA CRUZ IB 138 kV MG 138 kV SANTA CRUZ MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$78,514.10
SANTA CRUZ IB 138 kV MG 138 kV SANTA CRUZ MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$397,012.48
SANTA CRUZ IB 138 kV MG 138 kV SANTA CRUZ MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$360,049.72
SANTA CRUZ EL 138 kV SANTA CRUZ LT 138 kV SANTA CRUZ /ZONA OESTE C-1 RJ  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
SANTA CRUZ EL 138 kV SANTA CRUZ LT 138 kV SANTA CRUZ /ZONA INDUSTR. C-3 RJ  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
SANTA CRUZ EL 138 kV SANTA CRUZ LT 138 kV SANTA CRUZ /ZONA INDUSTR. C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
SANTA CRUZ EL 138 kV SANTA CRUZ LT 138 kV SANTA CRUZ /ZONA INDUSTR. C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
SANTA CRUZ EL 138 kV SANTA CRUZ LT 138 kV SANTA CRUZ /PALMARES C-2 RJ  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
SANTA CRUZ EL 138 kV SANTA CRUZ LT 138 kV SANTA CRUZ /PALMARES C-1 RJ  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
SANTA CRUZ EL 138 kV SANTA CRUZ LT 138 kV SANTA CRUZ /BRISAMAR C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
SANTA CRUZ EL 138 kV SANTA CRUZ LT 138 kV SANTA CRUZ /BRISAMAR C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
SANTA CRUZ EL 138 kV SANTA CRUZ LT 138 kV ANGRA FUR /SANTA CRUZ C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
SAO GONCALO TR 69/13,8 kV SAO GONCALO TR2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$22,029.28
SAO GONCALO TR 69/13,8 kV SAO GONCALO TR1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$22,029.28
SAO GONCALO MG 69 kV SAO GONCALO MG1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$173,092.53
SAO GONCALO MC 69 kV TR 69/13,8 kV SAO GONCALO TR2 RJ  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,399.66
SAO GONCALO MC 69 kV TR 69/13,8 kV SAO GONCALO TR1 RJ  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$45,399.66
SAO GONCALO MC 13,8 kV TR 69/13,8 kV SAO GONCALO TR2 RJ  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$36,109.72
SAO GONCALO MC 13,8 kV TR 69/13,8 kV SAO GONCALO TR1 RJ  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$36,109.72
SAO GONCALO MC 13,8 kV TR 13,8/0,48 kV SAO GONCALO TR3 RJ  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$39,190.43
SAO GONCALO EL 69 kV SAO GONCALODIST1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$56,026.74
SAO GONCALO EL 13,8 kV SAO GONCALODIST3 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$40,385.75
SAO GONCALO EL 13,8 kV SAO GONCALODIST2 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$40,385.75
SAO GONCALO EL 13,8 kV SAO GONCALODIST1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$40,385.75
SAO JOSE TT 13,8/0 kV SAO JOSE TRT14 RJ RBF FT TR 500/138 kV SAO JOSE TR14 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$69,798.40
SAO JOSE TT 13,8/0 kV SAO JOSE TRT13 RJ RBF FT TR 500/138 kV SAO JOSE TR13 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$69,798.40
SAO JOSE TT 13,8/0 kV SAO JOSE TRT12 RJ RBF FT TR 500/138 kV SAO JOSE TR12 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$69,798.40
SAO JOSE TT 13,8/0 kV SAO JOSE TRT11 RJ RBF FT TR 500/138 kV SAO JOSE TR11 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$69,798.40
SAO JOSE TR 500/138 kV SAO JOSE TRR1 RJ RBF FT TR 500/138 kV SAO JOSE TRR1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$467,083.68
SAO JOSE TR 500/138 kV SAO JOSE TRR1 RJ RBF FT TR 500/138 kV SAO JOSE TRR1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,419,789.85
SAO JOSE TR 500/138 kV SAO JOSE TRR1 RJ RBF FT TR 500/138 kV SAO JOSE TRR1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,194,501.93
SAO JOSE TR 500/138 kV SAO JOSE TR14 RJ RBF FT TR 500/138 kV SAO JOSE TR14 RJ 062/2001 IPCA RMEL REA 5457/2015 21/11/2017 20/11/2051  R$ 5,768,665.11
SAO JOSE TR 500/138 kV SAO JOSE TR13 RJ RBF FT TR 500/138 kV SAO JOSE TR13 RJ 062/2001 IPCA RMEL REA 5457/2015 12/12/2016 11/12/2050  R$ 5,375,706.61
SAO JOSE TR 500/138 kV SAO JOSE TR12 RJ RBF FT TR 500/138 kV SAO JOSE TR12 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,401,251.05
SAO JOSE TR 500/138 kV SAO JOSE TR12 RJ RBF FT TR 500/138 kV SAO JOSE TR12 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 7,259,369.56
SAO JOSE TR 500/138 kV SAO JOSE TR12 RJ RBF FT TR 500/138 kV SAO JOSE TR12 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 6,583,505.78
SAO JOSE TR 500/138 kV SAO JOSE TR11 RJ RBF FT TR 500/138 kV SAO JOSE TR11 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,401,251.05
SAO JOSE TR 500/138 kV SAO JOSE TR11 RJ RBF FT TR 500/138 kV SAO JOSE TR11 RJ 062/2001 IPCA RMEL REA 5457/2015 21/11/2017 20/11/2051  R$ 2,052,428.27
SAO JOSE TR 500/138 kV SAO JOSE TR11 RJ RBF FT TR 500/138 kV SAO JOSE TR11 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 7,259,369.56
SAO JOSE TR 500/138 kV SAO JOSE TR11 RJ RBF FT TR 500/138 kV SAO JOSE TR11 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 6,583,505.78
SAO JOSE MG 500 kV SAO JOSE MG1 RJ RB FT MG 500 kV SAO JOSE MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,051,508.71
SAO JOSE MG 500 kV SAO JOSE MG1 RJ RB FT MG 500 kV SAO JOSE MG1 RJ 062/2001 IPCA RBNI REA 2837/2011 18/06/2016 17/06/2044  R$102,086.35
SAO JOSE MG 500 kV SAO JOSE MG1 RJ RB FT MG 500 kV SAO JOSE MG1 RJ 062/2001 IPCA RBNI REA 2837/2011 18/06/2016 17/06/2044  R$102,086.35
SAO JOSE MG 500 kV SAO JOSE MG1 RJ RB FT MG 500 kV SAO JOSE MG1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 5,447,482.32
SAO JOSE MG 500 kV SAO JOSE MG1 RJ RB FT MG 500 kV SAO JOSE MG1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 4,940,309.36
SAO JOSE MG 500 kV SAO JOSE MG1 RJ RB FT MG 500 kV SAO JOSE MG1 RJ 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032  R$1,485.36
SAO JOSE MG 500 kV SAO JOSE MG1 RJ RB FT MG 500 kV SAO JOSE MG1 RJ 062/2001 IPCA RMEL REN 443/2011 14/03/2016 13/03/2029  R$9,815.77
SAO JOSE MC 500 kV TR 500/138 kV SAO JOSE TR14 RJ  RBF FT TR 500/138 kV SAO JOSE TR14 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$327,073.06
SAO JOSE MC 500 kV TR 500/138 kV SAO JOSE TR14 RJ  RBF FT TR 500/138 kV SAO JOSE TR14 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,694,445.99
SAO JOSE MC 500 kV TR 500/138 kV SAO JOSE TR14 RJ  RBF FT TR 500/138 kV SAO JOSE TR14 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,536,689.22
SAO JOSE MC 500 kV TR 500/138 kV SAO JOSE TR13 RJ  RBF FT TR 500/138 kV SAO JOSE TR13 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$327,073.06
SAO JOSE MC 500 kV TR 500/138 kV SAO JOSE TR13 RJ  RBF FT TR 500/138 kV SAO JOSE TR13 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,694,445.99
SAO JOSE MC 500 kV TR 500/138 kV SAO JOSE TR13 RJ  RBF FT TR 500/138 kV SAO JOSE TR13 RJ 062/2001 IPCA RBNI REA 7761/2019 14/09/2021 13/09/2036  R$548,803.18
SAO JOSE MC 500 kV TR 500/138 kV SAO JOSE TR12 RJ RBF FT TR 500/138 kV SAO JOSE TR12 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$327,073.06
SAO JOSE MC 500 kV TR 500/138 kV SAO JOSE TR12 RJ RBF FT TR 500/138 kV SAO JOSE TR12 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,694,445.99
SAO JOSE MC 500 kV TR 500/138 kV SAO JOSE TR12 RJ RBF FT TR 500/138 kV SAO JOSE TR12 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,536,689.22
SAO JOSE MC 500 kV TR 500/138 kV SAO JOSE TR11 RJ RBF FT TR 500/138 kV SAO JOSE TR11 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$327,073.06
SAO JOSE MC 500 kV TR 500/138 kV SAO JOSE TR11 RJ RBF FT TR 500/138 kV SAO JOSE TR11 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,694,445.99
SAO JOSE MC 138 kV TR 500/138 kV SAO JOSE TR14 RJ  RBF FT TR 500/138 kV SAO JOSE TR14 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$95,582.88
SAO JOSE MC 138 kV TR 500/138 kV SAO JOSE TR14 RJ  RBF FT TR 500/138 kV SAO JOSE TR14 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$495,179.99
SAO JOSE MC 138 kV TR 500/138 kV SAO JOSE TR14 RJ  RBF FT TR 500/138 kV SAO JOSE TR14 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$449,077.61
SAO JOSE MC 138 kV TR 500/138 kV SAO JOSE TR13 RJ  RBF FT TR 500/138 kV SAO JOSE TR13 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$95,582.88
SAO JOSE MC 138 kV TR 500/138 kV SAO JOSE TR13 RJ  RBF FT TR 500/138 kV SAO JOSE TR13 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$495,179.99
SAO JOSE MC 138 kV TR 500/138 kV SAO JOSE TR13 RJ  RBF FT TR 500/138 kV SAO JOSE TR13 RJ 062/2001 IPCA RBNI REA 7761/2019 14/09/2021 13/09/2036  R$548,803.18
SAO JOSE MC 138 kV TR 500/138 kV SAO JOSE TR12 RJ RBF FT TR 500/138 kV SAO JOSE TR12 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$95,582.88
SAO JOSE MC 138 kV TR 500/138 kV SAO JOSE TR11 RJ RBF FT TR 500/138 kV SAO JOSE TR11 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$95,582.88
SAO JOSE MC 138 kV BC 138 kV 150 Mvar SAO JOSE BC3 RJ BC3/BC4 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$92,800.88
SAO JOSE MC 138 kV BC 138 kV 150 Mvar SAO JOSE BC1 RJ BC1/BC2 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$92,800.88
SAO JOSE IB 500 kV MG 500 kV SAO JOSE MG1 RJ IB3 RB FT MG 500 kV SAO JOSE MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$347,094.43
SAO JOSE IB 500 kV MG 500 kV SAO JOSE MG1 RJ IB2 RB FT MG 500 kV SAO JOSE MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$347,094.43
SAO JOSE IB 500 kV MG 500 kV SAO JOSE MG1 RJ IB1 RB FT MG 500 kV SAO JOSE MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$347,094.43
SAO JOSE IB 138 kV MG 500 kV SAO JOSE MG1 RJ IB4 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$78,514.10
SAO JOSE IB 138 kV MG 500 kV SAO JOSE MG1 RJ IB3 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$78,514.10
SAO JOSE IB 138 kV MG 500 kV SAO JOSE MG1 RJ IB2 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$78,514.10
SAO JOSE IB 138 kV MG 500 kV SAO JOSE MG1 RJ IB2 DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$397,012.48
SAO JOSE IB 138 kV MG 500 kV SAO JOSE MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$78,514.10
SAO JOSE IB 138 kV MG 500 kV SAO JOSE MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$397,012.48
SAO JOSE EL 500 kV SAO JOSE LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ  RB FT LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
SAO JOSE EL 500 kV SAO JOSE LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ  RB FT LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,919,850.95
SAO JOSE EL 500 kV SAO JOSE LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ  RB FT LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,741,108.47
SAO JOSE EL 500 kV SAO JOSE LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
SAO JOSE EL 500 kV SAO JOSE LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,919,850.95
SAO JOSE EL 500 kV SAO JOSE LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,741,108.47
SAO JOSE EL 138 kV SAO JOSE LT 138 kV TRIAGEM /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
SAO JOSE EL 138 kV SAO JOSE LT 138 kV TRIAGEM /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$723,202.62
SAO JOSE EL 138 kV SAO JOSE LT 138 kV TRIAGEM /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
SAO JOSE EL 138 kV SAO JOSE LT 138 kV TRIAGEM /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$723,202.62
SAO JOSE EL 138 kV SAO JOSE LT 138 kV SAO JOSE /MAGE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
SAO JOSE EL 138 kV SAO JOSE LT 138 kV SAO JOSE /MAGE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$723,202.62
SAO JOSE EL 138 kV SAO JOSE LT 138 kV SAO JOSE /MAGE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
SAO JOSE EL 138 kV SAO JOSE LT 138 kV SAO JOSE /MAGE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$723,202.62
SAO JOSE EL 138 kV SAO JOSE LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
SAO JOSE EL 138 kV SAO JOSE LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$723,202.62
SAO JOSE EL 138 kV SAO JOSE LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
SAO JOSE EL 138 kV SAO JOSE LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$723,202.62
SAO JOSE EL 138 kV SAO JOSE LT 138 kV GOV.L.BRIZOLA /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
SAO JOSE EL 138 kV SAO JOSE LT 138 kV GOV.L.BRIZOLA /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$723,202.62
SAO JOSE EL 138 kV SAO JOSE LT 138 kV GOV.L.BRIZOLA /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$655,870.82
SAO JOSE EL 138 kV SAO JOSE LT 138 kV GOV.L.BRIZOLA /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
SAO JOSE EL 138 kV SAO JOSE LT 138 kV GOV.L.BRIZOLA /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$723,202.62
SAO JOSE EL 138 kV SAO JOSE LT 138 kV GOV.L.BRIZOLA /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$655,870.82
SAO JOSE EL 138 kV SAO JOSE LT 138 kV CORDOVIL /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
SAO JOSE EL 138 kV SAO JOSE LT 138 kV CORDOVIL /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$723,202.62
SAO JOSE EL 138 kV SAO JOSE LT 138 kV CORDOVIL /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$655,870.82
SAO JOSE EL 138 kV SAO JOSE LT 138 kV CORDOVIL /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
SAO JOSE EL 138 kV SAO JOSE LT 138 kV CORDOVIL /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$723,202.62
SAO JOSE EL 138 kV SAO JOSE LT 138 kV CORDOVIL /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$655,870.82
SAO JOSE EL 138 kV SAO JOSE LT 138 kV CASCADURA /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
SAO JOSE EL 138 kV SAO JOSE LT 138 kV CASCADURA /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$723,202.62
SAO JOSE EL 138 kV SAO JOSE LT 138 kV CASCADURA /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
SAO JOSE EL 138 kV SAO JOSE LT 138 kV CASCADURA /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$723,202.62
SAO JOSE EL 138 kV SAO JOSEW. LUIZ DIT   062/2001 IPCA RCDM REA 2837/2011 18/06/2016 17/06/2045  R$962,717.30
SAO JOSE EL 138 kV SAO JOSEVILAR TELES C1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
SAO JOSE EL 138 kV SAO JOSEVILAR TELES C1 DIT   062/2001 IPCA RMEL REN 643/2014 08/09/2015 07/09/2040  R$43,615.42
SAO JOSE EL 138 kV SAO JOSEROSALI DIT   062/2001 IPCA RCDM REA 2837/2011 18/06/2016 17/06/2045  R$962,717.30
SAO JOSE EL 138 kV SAO JOSEILHA POMBOS C1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$143,022.20
SAO JOSE BC 138 kV 150 Mvar SAO JOSE BC3 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$216,011.20
SAO JOSE BC 138 kV 150 Mvar SAO JOSE BC3 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,092,277.04
SAO JOSE BC 138 kV 150 Mvar SAO JOSE BC1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$216,011.20
SAO JOSE BC 138 kV 150 Mvar SAO JOSE BC1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,092,277.04
SAO JOSE BC 138 kV 100 Mvar SAO JOSE BC4 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$190,670.37
SAO JOSE BC 138 kV 100 Mvar SAO JOSE BC4 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$964,139.16
SAO JOSE BC 138 kV 100 Mvar SAO JOSE BC2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$190,670.37
SAO JOSE BC 138 kV 100 Mvar SAO JOSE BC2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$964,139.16
TERMINAL RIO RTB 500 kV 46 Mvar TERMINAL RIO RTR1 RJ RB FT RTB 500 kV 45,33 Mvar TERMINAL RIO RTR1 RJ 062/2001 IPCA RBNI DSP 1387/2022 01/07/2022 30/06/2058  R$101,889.20
TERMINAL RIO RTB 500 kV 136 Mvar TERMINAL RIO RT2 RJ RB FT RTB 500 kV 136 Mvar TERMINAL RIO RT2 RJ 062/2001 IPCA RBNI DSP 1387/2022 01/07/2022 30/06/2058  R$305,667.59
TERMINAL RIO RTB 500 kV 136 Mvar TERMINAL RIO RT1 RJ RB FT RTB 500 kV 136 Mvar TERMINAL RIO RT1 RJ 062/2001 IPCA RBNI DSP 1387/2022 01/07/2022 30/06/2058  R$305,667.59
TERMINAL RIO MG 500 kV TERMINAL RIO MG4 RJ RB FT MG 500 kV TERMINAL RIO MG4 RJ 062/2001 IPCA RBNI DSP 1387/2022 01/07/2022 30/06/2053  R$233,621.07
TERMINAL RIO MC 500 kV RTB 500 kV 136 Mvar TERMINAL RIO RT2 RJ RB FT RTB 500 kV 136 Mvar TERMINAL RIO RT2 RJ 062/2001 IPCA RBNI DSP 1387/2022 01/07/2022 30/06/2051  R$236,671.68
TERMINAL RIO MC 500 kV RTB 500 kV 136 Mvar TERMINAL RIO RT1 RJ RB FT RTB 500 kV 136 Mvar TERMINAL RIO RT1 RJ 062/2001 IPCA RBNI DSP 1387/2022 01/07/2022 30/06/2051  R$236,671.68
TERMINAL RIO IB 500 kV MG 500 kV TERMINAL RIO MG1 RJ IB9 RB FT MG 500 kV TERMINAL RIO MG1 RJ 062/2001 IPCA RBNI DSP 1387/2022 01/07/2022 30/06/2054  R$289,779.29
TERMINAL RIO IB 500 kV MG 500 kV TERMINAL RIO MG1 RJ IB8 RB FT MG 500 kV TERMINAL RIO MG1 RJ 062/2001 IPCA RBNI DSP 1387/2022 01/07/2022 30/06/2054  R$289,779.29
TERMINAL RIO IB 500 kV MG 500 kV TERMINAL RIO MG1 RJ IB7 RB FT MG 500 kV TERMINAL RIO MG1 RJ 062/2001 IPCA RBNI DSP 1387/2022 01/07/2022 30/06/2054  R$289,779.29
TERMINAL RIO IB 500 kV MG 500 kV TERMINAL RIO MG1 RJ IB6 RB FT MG 500 kV TERMINAL RIO MG1 RJ 062/2001 IPCA RBNI DSP 1387/2022 01/07/2022 30/06/2054  R$289,779.29
TERMINAL RIO EL 500 kV TERMINAL RIO LT 500 kV TERMINAL RIO /RESENDE C-1 RJ  RB FT LT 500 kV TERMINAL RIO /RESENDE C-1 RJ 062/2001 IPCA RBNI DSP 1387/2022 01/07/2022 30/06/2051  R$264,276.39
TERMINAL RIO EL 500 kV TERMINAL RIO LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP RB FT LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RBNI DSP 1387/2022 01/07/2022 30/06/2051  R$264,276.39
TERMINAL RIO EL 500 kV TERMINAL RIO LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-2 RJ RB FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-2 RJ 062/2001 IPCA RBNI DSP 1387/2022 01/07/2022 30/06/2051  R$264,276.39
TERMINAL RIO EL 500 kV TERMINAL RIO LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ 062/2001 IPCA RBNI DSP 1387/2022 01/07/2022 30/06/2051  R$264,276.39
TIJUCO PRETO TT 69/0,22 kV TIJUCO PRETO TT3 SP RB FT TR 750/500 kV TIJUCO PRETO TR3 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$69,798.40
TIJUCO PRETO TT 69/0,22 kV TIJUCO PRETO TT3 SP RB FT TR 750/500 kV TIJUCO PRETO TR3 SP 062/2001 IPCA RMEL REN 443/2011 02/11/2014 01/11/2038  R$5,148.81
TIJUCO PRETO TT 69/0,22 kV TIJUCO PRETO TT2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$69,798.40
TIJUCO PRETO TT 69/0,22 kV TIJUCO PRETO TT1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$69,798.40
TIJUCO PRETO TT 20/0,22 kV TIJUCO PRETO TT4 SP RB FT TR 750/345 kV TIJUCO PRETO TR4 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$69,798.40
TIJUCO PRETO TR 765/345 kV TIJUCO PRETO TRR3 SP RB FT TR 750/345 kV TIJUCO PRETO TRR3 SP 062/2001 IPCA RBNI REA 3698/2012 21/03/2016 20/03/2049  R$ 2,217,075.47
TIJUCO PRETO TR 750/69 kV TIJUCO PRETO RIATP3 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$821,925.66
TIJUCO PRETO TR 750/69 kV TIJUCO PRETO RIATP3 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP 062/2001 IPCA RMEL REA 11449/2022 04/05/2022 04/05/2058  R$710,510.17
TIJUCO PRETO TR 750/500 kV TIJUCO PRETO TRR1 SP RB FT TR 750/500 kV TIJUCO PRETO TRR1 SP 062/2001 IPCA RMEL REA 11449/2022 04/05/2022 04/05/2057  R$ 4,685,078.62
TIJUCO PRETO TR 750/500 kV TIJUCO PRETO TR3 SP RB FT TR 750/500 kV TIJUCO PRETO TR3 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,341,848.97
TIJUCO PRETO TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,341,848.97
TIJUCO PRETO TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 12,132,263.60
TIJUCO PRETO TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 11,002,722.34
TIJUCO PRETO TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,341,848.97
TIJUCO PRETO TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 12,132,263.60
TIJUCO PRETO TR 750/345 kV TIJUCO PRETO TRR2 SP RB FT TR 750/345 kV TIJUCO PRETO TRR2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$729,076.39
TIJUCO PRETO TR 750/345 kV TIJUCO PRETO TRR2 SP RB FT TR 750/345 kV TIJUCO PRETO TRR2 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,777,078.31
TIJUCO PRETO TR 750/345 kV TIJUCO PRETO TR7 SP RB FT TR 750/345 kV TIJUCO PRETO TR7 SP 062/2001 IPCA RBNI REA 2010/2009 28/11/2014 27/11/2045  R$ 6,374,108.86
TIJUCO PRETO TR 750/345 kV TIJUCO PRETO TR6 SP RB FT TR 750/345 kV TIJUCO PRETO TR6 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,187,229.16
TIJUCO PRETO TR 750/345 kV TIJUCO PRETO TR6 SP RB FT TR 750/345 kV TIJUCO PRETO TR6 SP 062/2001 IPCA RMEL REA 11449/2022 22/04/2022 22/04/2057  R$243,929.87
TIJUCO PRETO TR 750/345 kV TIJUCO PRETO TR5 SP RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,187,229.16
TIJUCO PRETO TR 750/345 kV TIJUCO PRETO TR5 SP RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 11,331,234.92
TIJUCO PRETO TR 750/345 kV TIJUCO PRETO TR5 SP RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 10,276,271.25
TIJUCO PRETO TR 750/345 kV TIJUCO PRETO TR5 SP RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RMEL REA 11449/2022 22/04/2022 22/04/2057  R$ 7,081,664.83
TIJUCO PRETO TR 750/345 kV TIJUCO PRETO TR4 SP RB FT TR 750/345 kV TIJUCO PRETO TR4 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,187,229.16
TIJUCO PRETO TR 750/345 kV TIJUCO PRETO TR4 SP RB FT TR 750/345 kV TIJUCO PRETO TR4 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 11,331,234.92
TIJUCO PRETO TR 750/345 kV TIJUCO PRETO TR4 SP RB FT TR 750/345 kV TIJUCO PRETO TR4 SP 062/2001 IPCA RMEL REA 11449/2022 22/04/2022 22/04/2057  R$ 7,324,002.07
TIJUCO PRETO TR 500/69 kV TIJUCO PRETO TREGR1 SP RB FT TR 750/500 kV TIJUCO PRETO TRR1 SP 062/2001 IPCA RMEL REA 11449/2022 04/05/2022 04/05/2057  R$ 3,030,785.08
TIJUCO PRETO TR 500/69 kV TIJUCO PRETO TREG3 SP RB FT TR 750/500 kV TIJUCO PRETO TR3 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,753,836.25
TIJUCO PRETO TR 500/69 kV TIJUCO PRETO TREG2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,753,836.25
TIJUCO PRETO TR 500/69 kV TIJUCO PRETO TREG2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RMEL REN 443/2011 07/12/2014 06/12/2035  R$46,526.32
TIJUCO PRETO TR 500/69 kV TIJUCO PRETO TREG1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 1,753,836.25
TIJUCO PRETO TR 500/69 kV TIJUCO PRETO TREG1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RMEL REN 643/2014 22/03/2015 21/03/2036  R$46,978.40
TIJUCO PRETO RTL 750 kV 360 Mvar TIJUCO PRETO RIATPR SP RB FT RTL 750 kV 360 Mvar TIJUCO PRETO RIATPR SP 062/2001 IPCA RMEL REN 643/2014 19/12/2013 18/12/2045  R$ 2,350,967.61
TIJUCO PRETO RTL 750 kV 329 Mvar TIJUCO PRETO RIATP2 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$821,925.66
TIJUCO PRETO RTL 750 kV 329 Mvar TIJUCO PRETO RIATP2 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,258,096.43
TIJUCO PRETO RTL 750 kV 329 Mvar TIJUCO PRETO RIATP2 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,861,658.00
TIJUCO PRETO RTL 750 kV 329 Mvar TIJUCO PRETO RIATP1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$821,925.66
TIJUCO PRETO RTL 750 kV 329 Mvar TIJUCO PRETO RIATP1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,258,096.43
TIJUCO PRETO RTL 750 kV 329 Mvar TIJUCO PRETO RIATP1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,861,658.00
TIJUCO PRETO RTB 69 kV 180 MVAr TIJUCO PRETO RT2 SP RB FT RTB 69 kV 180 MVAr TIJUCO PRETO RT2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$173,422.33
TIJUCO PRETO RTB 69 kV 180 MVAr TIJUCO PRETO RT2 SP RB FT RTB 69 kV 180 MVAr TIJUCO PRETO RT2 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$898,437.73
TIJUCO PRETO RTB 69 kV 180 MVAr TIJUCO PRETO RT2 SP RB FT RTB 69 kV 180 MVAr TIJUCO PRETO RT2 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$814,791.14
TIJUCO PRETO RTB 69 kV 180 MVAr TIJUCO PRETO RT1 SP RB FT RTB 69 kV 180 MVAr TIJUCO PRETO RT1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$173,422.33
TIJUCO PRETO RTB 69 kV 180 MVAr TIJUCO PRETO RT1 SP RB FT RTB 69 kV 180 MVAr TIJUCO PRETO RT1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$898,437.73
TIJUCO PRETO RTB 69 kV 180 MVAr TIJUCO PRETO RT1 SP RB FT RTB 69 kV 180 MVAr TIJUCO PRETO RT1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$814,791.14
TIJUCO PRETO RTB 345 kV 66,33 Mvar TIJUCO PRETO RLCCR SP RB FT RTB 345 kV 66,33 Mvar TIJUCO PRETO RLCCR SP 062/2001 IPCA RMEL REN 643/2014 15/02/2013 14/02/2049  R$39,717.53
TIJUCO PRETO RTB 345 kV 0 Mvar TIJUCO PRETO RLCCB SP RB FT RTB 345 kV 0 Mvar TIJUCO PRETO RLCCB SP 062/2001 IPCA RBNI REA 1410/2008 28/12/2012 27/12/2042  R$191,512.63
TIJUCO PRETO RTB 345 kV 0 Mvar TIJUCO PRETO RLCCA SP RB FT RTB 345 kV 0 Mvar TIJUCO PRETO RLCCA SP 062/2001 IPCA RBNI REA 1410/2008 28/12/2012 27/12/2042  R$191,512.69
TIJUCO PRETO MG 750 kV TIJUCO PRETO MG1 SP RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBNI REA 1410/2008 04/11/2015 03/11/2043  R$676,566.02
TIJUCO PRETO MG 750 kV TIJUCO PRETO MG1 SP RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBNI REA 1410/2008 04/11/2015 03/11/2044  R$ 2,738,300.91
TIJUCO PRETO MG 750 kV TIJUCO PRETO MG1 SP RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBNI REA 2010/2009 01/10/2013 30/09/2047  R$179,974.84
TIJUCO PRETO MG 750 kV TIJUCO PRETO MG1 SP RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,720,057.25
TIJUCO PRETO MG 750 kV TIJUCO PRETO MG1 SP RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 14,091,622.50
TIJUCO PRETO MG 750 kV TIJUCO PRETO MG1 SP RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2045  R$1,060.59
TIJUCO PRETO MG 750 kV TIJUCO PRETO MG1 SP RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 443/2011 21/03/2016 20/03/2029  R$3,786.22
TIJUCO PRETO MG 750 kV TIJUCO PRETO MG1 SP RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBNI REA 8314/2019 09/07/2019 08/07/2034  R$9,286.25
TIJUCO PRETO MG 750 kV TIJUCO PRETO MG1 SP RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBNI REA 8314/2019 09/07/2019 08/07/2034  R$9,286.25
TIJUCO PRETO MG 750 kV TIJUCO PRETO MG1 SP RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBNI REA 8314/2019 09/07/2019 08/07/2034  R$9,286.25
TIJUCO PRETO MG 750 kV TIJUCO PRETO MG1 SP RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBNI REA 8314/2019 09/07/2019 08/07/2034  R$28,957.45
TIJUCO PRETO MC 750 kV TR 750/69 kV TIJUCO PRETO RIATP3 SP  RB FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$61,972.12
TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR3 SP  RB FT TR 750/500 kV TIJUCO PRETO TR3 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$514,900.84
TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR3 SP  RB FT TR 750/500 kV TIJUCO PRETO TR3 SP 062/2001 IPCA RMEL REN 643/2014 01/02/2015 31/01/2040  R$20,449.08
TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR3 SP  RB FT TR 750/500 kV TIJUCO PRETO TR3 SP 062/2001 IPCA RBNI REA 5484/2015 21/12/2021 20/12/2036  R$401,144.06
TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR2 SP  RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$514,900.84
TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR2 SP  RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,667,513.08
TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR2 SP  RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,419,161.56
TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR2 SP  RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RMEL REN 443/2011 25/05/2014 24/05/2034  R$66,944.75
TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR2 SP  RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBNI REA 5484/2015 21/12/2021 20/12/2036  R$403,492.22
TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR1 SP  RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$514,900.84
TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR1 SP  RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RMEL REN 643/2014 19/10/2014 18/10/2043  R$317,305.47
TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR1 SP  RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,667,513.08
TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR1 SP  RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,419,161.56
TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR1 SP  RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RMEL REN 443/2011 01/02/2015 31/01/2036  R$22,841.37
TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR1 SP  RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RMEL REN 443/2011 01/02/2015 31/01/2036  R$22,841.37
TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR1 SP  RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RMEL REN 443/2011 01/02/2015 31/01/2036  R$22,841.37
TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR1 SP  RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RMEL REN 443/2011 22/02/2015 21/02/2039  R$6,600.32
TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR1 SP  RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RMEL REN 443/2011 23/02/2015 22/02/2039  R$6,600.66
TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR1 SP  RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RBNI REA 5484/2015 21/12/2021 20/12/2036  R$391,144.70
TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR7 SP  RB FT TR 750/345 kV TIJUCO PRETO TR7 SP 062/2001 IPCA RBNI REA 2010/2009 28/11/2014 27/11/2043  R$ 1,101,442.50
TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR7 SP  RB FT TR 750/345 kV TIJUCO PRETO TR7 SP 062/2001 IPCA RMEL REN 443/2011 21/10/2014 20/10/2035  R$67,902.78
TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR7 SP  RB FT TR 750/345 kV TIJUCO PRETO TR7 SP 062/2001 IPCA RBNI REA 5484/2015 21/05/2021 20/05/2036  R$53,165.67
TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR6 SP  RB FT TR 750/345 kV TIJUCO PRETO TR6 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$514,900.84
TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR6 SP  RB FT TR 750/345 kV TIJUCO PRETO TR6 SP 062/2001 IPCA RMEL REN 443/2011 01/06/2014 31/05/2034  R$66,997.67
TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR6 SP  RB FT TR 750/345 kV TIJUCO PRETO TR6 SP 062/2001 IPCA RBNI REA 5484/2015 21/05/2021 20/05/2036  R$110,353.91
TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR5 SP  RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$514,900.84
TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR5 SP  RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,667,513.08
TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR5 SP  RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,419,161.56
TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR5 SP  RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RMEL REN 443/2011 19/10/2014 18/10/2035  R$67,887.97
TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR5 SP  RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RBNI REA 5484/2015 21/05/2021 20/05/2036  R$326,874.79
TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR4 SP  RB FT TR 750/345 kV TIJUCO PRETO TR4 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$514,900.84
TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR4 SP  RB FT TR 750/345 kV TIJUCO PRETO TR4 SP 062/2001 IPCA RBNI REA 5484/2015 21/05/2021 20/05/2036  R$335,949.36
TIJUCO PRETO MC 750 kV RTL 750 kV 329 Mvar TIJUCO PRETO RIATP2 SP  RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$61,972.12
TIJUCO PRETO MC 750 kV RTL 750 kV 329 Mvar TIJUCO PRETO RIATP1 SP  RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$61,972.12
TIJUCO PRETO MC 69 kV RTB 69 kV 180 MVAr TIJUCO PRETO RT2 SP  RB FT RTB 69 kV 180 MVAr TIJUCO PRETO RT2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,394.97
TIJUCO PRETO MC 69 kV RTB 69 kV 180 MVAr TIJUCO PRETO RT2 SP  RB FT RTB 69 kV 180 MVAr TIJUCO PRETO RT2 SP 062/2001 IPCA RMEL REN 443/2011 16/10/2014 15/10/2035  R$7,069.33
TIJUCO PRETO MC 69 kV RTB 69 kV 180 MVAr TIJUCO PRETO RT1 SP  RB FT RTB 69 kV 180 MVAr TIJUCO PRETO RT1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,394.97
TIJUCO PRETO MC 69 kV RTB 69 kV 180 MVAr TIJUCO PRETO RT1 SP  RB FT RTB 69 kV 180 MVAr TIJUCO PRETO RT1 SP 062/2001 IPCA RMEL REN 443/2011 09/09/2014 08/09/2034  R$7,044.09
TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR3 SP  RB FT TR 750/500 kV TIJUCO PRETO TR3 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$327,073.06
TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR3 SP  RB FT TR 750/500 kV TIJUCO PRETO TR3 SP 062/2001 IPCA RMEL REN 643/2014 22/03/2015 21/03/2036  R$50,230.95
TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR3 SP  RB FT TR 750/500 kV TIJUCO PRETO TR3 SP 062/2001 IPCA RMEL REN 443/2011 22/03/2015 21/03/2039  R$7,153.30
TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR3 SP  RB FT TR 750/500 kV TIJUCO PRETO TR3 SP 062/2001 IPCA RMEL REN 443/2011 22/03/2015 21/03/2039  R$7,153.30
TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR3 SP  RB FT TR 750/500 kV TIJUCO PRETO TR3 SP 062/2001 IPCA RBNI REA 5484/2015 21/12/2021 20/12/2036  R$275,244.35
TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR2 SP  RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$327,073.06
TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR2 SP  RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RMEL REN 643/2014 03/05/2015 02/05/2042  R$49,662.77
TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR2 SP  RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RMEL REN 643/2014 08/03/2015 07/03/2036  R$46,909.00
TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR2 SP  RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,694,445.99
TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR2 SP  RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,536,689.22
TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR2 SP  RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RMEL REN 443/2011 08/03/2015 07/03/2036  R$15,636.35
TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR2 SP  RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RMEL REN 443/2011 08/03/2015 07/03/2036  R$15,636.35
TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR2 SP  RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RMEL REN 443/2011 08/03/2015 07/03/2036  R$15,636.35
TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR2 SP  RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBNI REA 5484/2015 21/12/2021 20/12/2036  R$403,492.22
TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR1 SP  RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$327,073.06
TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR1 SP  RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RMEL REN 643/2014 16/09/2014 15/09/2043  R$299,145.02
TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR1 SP  RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RMEL REN 643/2014 26/04/2015 25/04/2042  R$49,650.08
TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR1 SP  RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RMEL REN 643/2014 10/05/2015 09/05/2042  R$49,692.03
TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR1 SP  RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,694,445.99
TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR1 SP  RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,536,689.22
TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR1 SP  RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RMEL REN 443/2011 06/03/2015 05/03/2036  R$15,633.03
TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR1 SP  RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RBNI REA 5484/2015 21/12/2021 20/12/2036  R$391,144.70
TIJUCO PRETO MC 345 kV TR 750/345 kV TIJUCO PRETO TR7 SP  RB FT TR 750/345 kV TIJUCO PRETO TR7 SP 062/2001 IPCA RBNI REA 2010/2009 28/11/2014 27/11/2042  R$658,297.52
TIJUCO PRETO MC 345 kV TR 750/345 kV TIJUCO PRETO TR7 SP  RB FT TR 750/345 kV TIJUCO PRETO TR7 SP 062/2001 IPCA RBNI REA 5484/2015 21/05/2021 20/05/2036  R$53,165.67
TIJUCO PRETO MC 345 kV TR 750/345 kV TIJUCO PRETO TR6 SP  RB FT TR 750/345 kV TIJUCO PRETO TR6 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,265.74
TIJUCO PRETO MC 345 kV TR 750/345 kV TIJUCO PRETO TR6 SP  RB FT TR 750/345 kV TIJUCO PRETO TR6 SP 062/2001 IPCA RBNI REA 5484/2015 21/05/2021 20/05/2036  R$110,353.91
TIJUCO PRETO MC 345 kV TR 750/345 kV TIJUCO PRETO TR5 SP  RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,265.74
TIJUCO PRETO MC 345 kV TR 750/345 kV TIJUCO PRETO TR5 SP  RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,068,587.41
TIJUCO PRETO MC 345 kV TR 750/345 kV TIJUCO PRETO TR5 SP  RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RMEL REN 443/2011 19/10/2014 18/10/2035  R$10,890.66
TIJUCO PRETO MC 345 kV TR 750/345 kV TIJUCO PRETO TR5 SP  RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RBNI REA 5484/2015 21/05/2021 20/05/2036  R$326,874.79
TIJUCO PRETO MC 345 kV TR 750/345 kV TIJUCO PRETO TR4 SP  RB FT TR 750/345 kV TIJUCO PRETO TR4 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,265.74
TIJUCO PRETO MC 345 kV TR 750/345 kV TIJUCO PRETO TR4 SP  RB FT TR 750/345 kV TIJUCO PRETO TR4 SP 062/2001 IPCA RMEL REN 643/2014 30/11/2014 29/11/2043  R$259,003.29
TIJUCO PRETO MC 345 kV TR 750/345 kV TIJUCO PRETO TR4 SP  RB FT TR 750/345 kV TIJUCO PRETO TR4 SP 062/2001 IPCA RBNI REA 5484/2015 21/05/2021 20/05/2036  R$335,949.36
TIJUCO PRETO MC 345 kV RTB 345 kV 0 Mvar TIJUCO PRETO RLCCB SP RB FT RTB 345 kV 0 Mvar TIJUCO PRETO RLCCB SP 062/2001 IPCA RBNI REA 1410/2008 28/12/2012 27/12/2037  R$235,431.33
TIJUCO PRETO MC 345 kV RTB 345 kV 0 Mvar TIJUCO PRETO RLCCA SP RB FT RTB 345 kV 0 Mvar TIJUCO PRETO RLCCA SP 062/2001 IPCA RBNI REA 1410/2008 28/12/2012 27/12/2037  R$235,431.33
TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC9 SP  RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC9 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$196,552.56
TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC9 SP  RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC9 SP 062/2001 IPCA RMEL REN 643/2014 27/02/2014 26/02/2043  R$249,151.77
TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC9 SP  RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC9 SP 062/2001 IPCA RBNI REA 5484/2015 08/05/2018 07/05/2033  R$98,937.52
TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP MC2 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$213,278.01
TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP MC2 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP 062/2001 IPCA RMEL REN 643/2014 27/02/2014 26/02/2043  R$249,151.77
TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP MC2 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP 062/2001 IPCA RBNI REA 5484/2015 08/05/2018 07/05/2033  R$39,267.16
TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP MC1 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$196,552.56
TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP MC1 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP 062/2001 IPCA RMEL REN 643/2014 06/12/2014 05/12/2044  R$236,048.26
TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP MC1 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP 062/2001 IPCA RBNI REA 5484/2015 08/05/2018 07/05/2033  R$39,267.16
TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC7 SP  RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC7 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$196,552.56
TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC7 SP  RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC7 SP 062/2001 IPCA RMEL REN 643/2014 23/03/2014 22/03/2043  R$249,215.36
TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC7 SP  RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC7 SP 062/2001 IPCA RBNI REA 5484/2015 08/05/2018 07/05/2033  R$39,267.16
TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC6 SP  RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC6 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$196,552.56
TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC6 SP  RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC6 SP 062/2001 IPCA RMEL REN 643/2014 01/02/2014 31/01/2043  R$248,970.82
TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC6 SP  RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC6 SP 062/2001 IPCA RBNI REA 5484/2015 08/05/2018 07/05/2033  R$39,267.16
TIJUCO PRETO MC 345 kV BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP  RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$196,552.56
TIJUCO PRETO MC 345 kV BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP  RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP 062/2001 IPCA RMEL REN 643/2014 18/04/2014 17/04/2043  R$232,126.14
TIJUCO PRETO MC 345 kV BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP  RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP 062/2001 IPCA RBNI REA 5484/2015 08/05/2018 07/05/2033  R$39,267.16
TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP MC2 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$213,278.01
TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP MC2 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP 062/2001 IPCA RBNI REA 5484/2015 08/05/2018 07/05/2033  R$39,267.16
TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP MC1 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$196,552.56
TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP MC1 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP 062/2001 IPCA RMEL REN 643/2014 03/05/2014 02/05/2043  R$232,360.48
TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP MC1 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP 062/2001 IPCA RBNI REA 5484/2015 08/05/2018 07/05/2033  R$39,267.16
TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP  RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$196,552.56
TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP  RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP 062/2001 IPCA RMEL REN 643/2014 13/03/2014 12/03/2043  R$231,489.78
TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP  RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP 062/2001 IPCA RBNI REA 5484/2015 08/05/2018 07/05/2033  R$39,267.16
TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP MC2 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$213,278.01
TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP MC2 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP 062/2001 IPCA RBNI REA 5484/2015 08/05/2018 07/05/2033  R$39,267.16
TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP MC1 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$196,552.56
TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP MC1 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP 062/2001 IPCA RMEL REN 643/2014 26/02/2014 25/02/2043  R$231,251.65
TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP MC1 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP 062/2001 IPCA RBNI REA 5484/2015 08/05/2018 07/05/2033  R$98,937.52
TIJUCO PRETO MC 345 kV BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP MC2 RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$213,278.01
TIJUCO PRETO MC 345 kV BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP MC2 RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP 062/2001 IPCA RBNI REA 5484/2015 08/05/2018 07/05/2033  R$98,937.52
TIJUCO PRETO MC 345 kV BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP MC1 RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$196,552.56
TIJUCO PRETO MC 345 kV BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP MC1 RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP 062/2001 IPCA RMEL REN 643/2014 05/04/2014 04/04/2043  R$244,252.85
TIJUCO PRETO MC 345 kV BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP MC1 RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP 062/2001 IPCA RBNI REA 5484/2015 08/05/2018 07/05/2033  R$98,937.52
TIJUCO PRETO MC 20 kV CS 330/-220 MVAr TIJUCO PRETO CS1 SP  RB FT CS 330/-220 MVAr TIJUCO PRETO CS1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$47,655.63
TIJUCO PRETO IB 750 kV MG 750 kV TIJUCO PRETO MG1 SP IB5 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBNI REA 2010/2009 01/10/2013 30/09/2041  R$327,793.80
TIJUCO PRETO IB 750 kV MG 750 kV TIJUCO PRETO MG1 SP IB4 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$618,807.76
TIJUCO PRETO IB 750 kV MG 750 kV TIJUCO PRETO MG1 SP IB3 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$618,807.76
TIJUCO PRETO IB 750 kV MG 750 kV TIJUCO PRETO MG1 SP IB3 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 643/2014 15/01/2015 14/01/2045  R$298,531.14
TIJUCO PRETO IB 750 kV MG 750 kV TIJUCO PRETO MG1 SP IB2 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$618,807.76
TIJUCO PRETO IB 750 kV MG 750 kV TIJUCO PRETO MG1 SP IB1 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$618,807.76
TIJUCO PRETO IB 500 kV MG 750 kV TIJUCO PRETO MG1 SP IB3 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$347,094.43
TIJUCO PRETO IB 500 kV MG 750 kV TIJUCO PRETO MG1 SP IB2 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$347,094.43
TIJUCO PRETO IB 500 kV MG 750 kV TIJUCO PRETO MG1 SP IB1 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$347,094.43
TIJUCO PRETO IB 500 kV MG 750 kV TIJUCO PRETO MG1 SP IB1 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 643/2014 28/09/2014 27/09/2043  R$271,927.09
TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB9 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB9 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 643/2014 12/11/2014 11/11/2043  R$238,505.74
TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB8 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB7 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB7 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 643/2014 08/09/2014 07/09/2043  R$222,905.90
TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB6 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB6 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 643/2014 02/08/2014 01/08/2043  R$222,298.15
TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB5 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB5 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 643/2014 25/05/2014 24/05/2043  R$235,588.11
TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB4 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB4 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 643/2014 14/12/2014 13/12/2044  R$224,461.41
TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB13 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB12 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB12 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 643/2014 21/05/2014 20/05/2043  R$221,139.54
TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB11 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB11 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 643/2014 15/05/2014 14/05/2043  R$235,396.08
TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB11 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 443/2011 22/02/2015 21/02/2042  R$27,427.70
TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB11 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 443/2011 22/02/2015 21/02/2042  R$27,427.70
TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB10 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB10 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 643/2014 27/07/2014 26/07/2043  R$236,686.15
TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB1 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB1 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 643/2014 09/03/2014 08/03/2043  R$236,742.70
TIJUCO PRETO IB 345 kV MG 345 kV TIJUCO PRETO MG2 SP IB3 RB FT MG 345 kV TIJUCO PRETO MG2 SP 007/2006 IPCA RBL CC 007/2006 27/04/2006 27/04/2036  R$670,194.96
TIJUCO PRETO IB 345 kV MG 345 kV TIJUCO PRETO MG2 SP IB2 RB FT MG 345 kV TIJUCO PRETO MG2 SP 007/2006 IPCA RBL CC 007/2006 27/04/2006 27/04/2036  R$670,194.96
TIJUCO PRETO EL 750 kV TIJUCO PRETO LT 750 kV ITABERA /TIJUCO PRETO C-3 SP  RB FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$584,626.93
TIJUCO PRETO EL 750 kV TIJUCO PRETO LT 750 kV ITABERA /TIJUCO PRETO C-3 SP  RB FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBNI REA 5861/2016 07/12/2017 06/12/2037  R$12,908.91
TIJUCO PRETO EL 750 kV TIJUCO PRETO LT 750 kV ITABERA /TIJUCO PRETO C-3 SP  RB FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBNI REA 5861/2016 09/07/2019 08/07/2034  R$11,160.19
TIJUCO PRETO EL 750 kV TIJUCO PRETO LT 750 kV ITABERA /TIJUCO PRETO C-2 SP  RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$584,626.93
TIJUCO PRETO EL 750 kV TIJUCO PRETO LT 750 kV ITABERA /TIJUCO PRETO C-2 SP  RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RMEL REN 643/2014 28/05/2015 27/05/2045  R$288,485.68
TIJUCO PRETO EL 750 kV TIJUCO PRETO LT 750 kV ITABERA /TIJUCO PRETO C-2 SP  RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBNI REA 5861/2016 09/07/2019 08/07/2034  R$11,160.19
TIJUCO PRETO EL 750 kV TIJUCO PRETO LT 750 kV ITABERA /TIJUCO PRETO C-1 SP  RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$584,626.93
TIJUCO PRETO EL 750 kV TIJUCO PRETO LT 750 kV ITABERA /TIJUCO PRETO C-1 SP  RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,028,738.44
TIJUCO PRETO EL 750 kV TIJUCO PRETO LT 750 kV ITABERA /TIJUCO PRETO C-1 SP  RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,746,756.02
TIJUCO PRETO EL 750 kV TIJUCO PRETO LT 750 kV ITABERA /TIJUCO PRETO C-1 SP  RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBNI REA 5861/2016 09/07/2019 08/07/2034  R$11,160.19
TIJUCO PRETO EL 500 kV TIJUCO PRETO LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP  RB FT LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
TIJUCO PRETO EL 500 kV TIJUCO PRETO LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP  RB FT LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP 062/2001 IPCA RMEL REN 643/2014 05/04/2015 04/04/2042  R$66,271.51
TIJUCO PRETO EL 500 kV TIJUCO PRETO LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP  RB FT LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP 062/2001 IPCA RMEL REN 643/2014 07/09/2015 06/09/2036  R$47,653.03
TIJUCO PRETO EL 500 kV TIJUCO PRETO LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP  RB FT LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP 062/2001 IPCA RMEL REN 643/2014 07/09/2015 06/09/2030  R$53,434.50
TIJUCO PRETO EL 500 kV TIJUCO PRETO LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP  RB FT LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP 062/2001 IPCA RBNI REA 4347/2013 25/04/2017 24/04/2032  R$9,224.76
TIJUCO PRETO EL 500 kV TIJUCO PRETO LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$370,582.20
TIJUCO PRETO EL 500 kV TIJUCO PRETO LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBNI REA 2837/2011 20/01/2013 19/01/2028  R$18,793.57
TIJUCO PRETO EL 500 kV TIJUCO PRETO LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 643/2014 12/04/2015 11/04/2042  R$45,754.42
TIJUCO PRETO EL 500 kV TIJUCO PRETO LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,919,850.95
TIJUCO PRETO EL 500 kV TIJUCO PRETO LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 443/2011 19/01/2014 18/01/2034  R$45,103.49
TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-3 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-3 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-3 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-3 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,272,974.20
TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-2 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-2 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-2 SP 062/2001 IPCA RMEL REN 643/2014 17/08/2014 16/08/2043  R$228,021.34
TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-2 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-2 SP 062/2001 IPCA RMEL REN 443/2011 11/01/2015 10/01/2036  R$10,973.67
TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-2 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-2 SP 062/2001 IPCA RMEL REN 443/2011 11/01/2015 10/01/2036  R$10,973.67
TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-2 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-2 SP 062/2001 IPCA RMEL REN 443/2011 11/01/2015 10/01/2036  R$10,973.67
TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-1 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-1 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 643/2014 31/08/2014 30/08/2043  R$228,277.83
TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-1 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 443/2011 22/02/2015 21/02/2036  R$11,017.29
TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-1 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 443/2011 22/02/2015 21/02/2036  R$11,017.29
TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-1 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 443/2011 22/02/2015 21/02/2036  R$11,017.29
TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV ITAPETI /TIJUCO PRETO C-4 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-4 SP 007/2006 IPCA RBL CC 007/2006 27/04/2006 27/04/2036  R$ 1,961,466.11
TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV ITAPETI /TIJUCO PRETO C-3 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-3 SP 007/2006 IPCA RBL CC 007/2006 27/04/2006 27/04/2036  R$ 1,961,466.11
TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV ITAPETI /TIJUCO PRETO C-3 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-3 SP 007/2006 IPCA RMEL REN 443/2011 30/04/2014 29/04/2047  R$188,733.61
TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV ITAPETI /TIJUCO PRETO C-2 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV ITAPETI /TIJUCO PRETO C-2 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,272,974.20
TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 643/2014 23/11/2014 22/11/2043  R$229,640.37
TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,272,974.20
TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 443/2011 08/02/2015 07/02/2036  R$11,000.90
TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 443/2011 08/02/2015 07/02/2036  R$11,000.90
TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 443/2011 08/02/2015 07/02/2036  R$11,000.90
TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 643/2014 24/08/2014 23/08/2043  R$228,149.59
TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP  RB FT LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP  RB FT LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,272,974.20
TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP  RB FT LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,154,457.41
TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP  RB FT LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP 062/2001 IPCA RMEL REN 443/2011 21/02/2014 20/02/2034  R$10,639.70
TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP  RB FT LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP 062/2001 IPCA RMEL REN 443/2011 21/02/2014 20/02/2034  R$10,639.70
TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP  RB FT LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP 062/2001 IPCA RMEL REN 443/2011 21/02/2014 20/02/2034  R$10,639.70
TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV B. SANTISTA /TIJUCO PRETO C-2 SP RB FT LT 345 kV B. SANTISTA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV B. SANTISTA /TIJUCO PRETO C-2 SP RB FT LT 345 kV B. SANTISTA /TIJUCO PRETO C-2 SP 062/2001 IPCA RMEL REN 643/2014 09/08/2014 08/08/2043  R$227,874.79
TIJUCO PRETO CS 330/-220 MVAr TIJUCO PRETO CS1 SP RB FT CS 330/-220 MVAr TIJUCO PRETO CS1 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$ 2,135,820.97
TIJUCO PRETO CS 330/-220 MVAr TIJUCO PRETO CS1 SP RB FT CS 330/-220 MVAr TIJUCO PRETO CS1 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 11,064,907.85
TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC9 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC9 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$252,035.01
TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$252,035.01
TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC7 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC7 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$252,035.01
TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC6 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC6 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$252,035.01
TIJUCO PRETO BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$252,035.01
TIJUCO PRETO BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,305,701.29
TIJUCO PRETO BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,184,137.54
TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$252,035.01
TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,305,701.29
TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,184,137.54
TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$252,035.01
TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,305,701.29
TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,184,137.54
TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$252,035.01
TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,305,701.29
TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,184,137.54
TIJUCO PRETO BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$252,035.01
U.MASCARENHAS EL 230 kV U.MASCARENHAS LT 230 kV U.MASCARENHAS /LINHARES C-1 ES RB FT LT 230 kV U.MASCARENHAS /LINHARES C-1 ES 006/2010 IPCA RBL CC 006/2010 14/08/2018 12/07/2040  R$593,479.57
UHE S.DA MESA MG 500 kV UHE S.DA MESA MG1 GO RB FT MG 500 kV UHE S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$636,605.90
UHE S.DA MESA MG 500 kV UHE S.DA MESA MG1 GO RB FT MG 500 kV UHE S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,298,022.50
UHE S.DA MESA MG 500 kV UHE S.DA MESA MG1 GO RB FT MG 500 kV UHE S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 2,990,969.13
UHE S.DA MESA MC 500 kV TR 15/500 kV UHE S.DA MESA TRG3 GO DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$335,097.51
UHE S.DA MESA MC 500 kV TR 15/500 kV UHE S.DA MESA TRG3 GO DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,694,445.99
UHE S.DA MESA MC 500 kV TR 15/500 kV UHE S.DA MESA TRG3 GO DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 1,536,689.22
UHE S.DA MESA MC 500 kV TR 15/500 kV UHE S.DA MESA TRG2 GO DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$335,097.51
UHE S.DA MESA MC 500 kV TR 15/500 kV UHE S.DA MESA TRG2 GO DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,694,445.99
UHE S.DA MESA MC 500 kV TR 15/500 kV UHE S.DA MESA TRG2 GO DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 1,536,689.22
UHE S.DA MESA MC 500 kV TR 15/500 kV UHE S.DA MESA TRG1 GO DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$335,097.51
UHE S.DA MESA MC 500 kV TR 15/500 kV UHE S.DA MESA TRG1 GO DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$ 1,694,445.99
UHE S.DA MESA MC 500 kV TR 15/500 kV UHE S.DA MESA TRG1 GO DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$ 1,536,689.22
USI CAMPOS TR 138/69 kV USI CAMPOS TR2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$85,942.73
USI CAMPOS TR 138/69 kV USI CAMPOS TR1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$85,942.73
USI CAMPOS MG 138 kV USI CAMPOS MG1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$338,195.97
USI CAMPOS MC 69 kV TR 138/69 kV USI CAMPOS TR3 RJ  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,910.09
USI CAMPOS MC 69 kV TR 138/69 kV USI CAMPOS TR2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,910.09
USI CAMPOS MC 69 kV TR 138/69 kV USI CAMPOS TR2 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 26/07/2014 25/07/2043  R$117,315.64
USI CAMPOS MC 69 kV TR 138/69 kV USI CAMPOS TR2 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 26/07/2014 25/07/2040  R$48,663.18
USI CAMPOS MC 69 kV TR 138/69 kV USI CAMPOS TR1 RJ  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$53,910.09
USI CAMPOS MC 69 kV TR 138/69 kV USI CAMPOS TR1 RJ  DIT   062/2001 IPCA RCDM REA 1814/2009 19/10/2014 18/10/2044  R$118,029.83
USI CAMPOS MC 69 kV TR 138/69 kV USI CAMPOS TR1 RJ  DIT   062/2001 IPCA RCDM REA 1814/2009 10/09/2015 09/09/2042  R$12,543.89
USI CAMPOS MC 69 kV TR 138/69 kV USI CAMPOS TR1 RJ  DIT   062/2001 IPCA RCDM REA 1814/2009 10/09/2015 09/09/2042  R$12,543.89
USI CAMPOS MC 69 kV TR 138/69 kV USI CAMPOS TR1 RJ  DIT   062/2001 IPCA RCDM REA 1814/2009 10/09/2015 09/09/2045  R$24,622.69
USI CAMPOS MC 138 kV TR 138/69 kV USI CAMPOS TR3 RJ  DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$94,247.00
USI CAMPOS MC 138 kV TR 138/69 kV USI CAMPOS TR3 RJ  DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 30/06/2028  R$476,567.09
USI CAMPOS MC 138 kV TR 138/69 kV USI CAMPOS TR3 RJ  DIT   062/2001 IPCA RPC PRT 120/2016 01/07/2017 31/12/2042  R$432,197.61
USI CAMPOS MC 138 kV TR 138/69 kV USI CAMPOS TR2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$94,247.00
USI CAMPOS MC 138 kV TR 138/69 kV USI CAMPOS TR1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$94,247.00
USI CAMPOS MC 138 kV TR 138/69 kV USI CAMPOS TR1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 20/07/2015 19/07/2042  R$54,373.74
USI CAMPOS MC 138 kV TR 138/69 kV USI CAMPOS TR1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 23/08/2015 22/08/2042  R$54,508.18
USI CAMPOS MC 138 kV TR 138/69 kV USI CAMPOS TR1 RJ DIT   062/2001 IPCA RCDM REN 443/2011 11/12/2015 10/12/2046  R$114,584.23
USI CAMPOS IB 69 kV MG 138 kV USI CAMPOS MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$34,065.28
USI CAMPOS IB 69 kV MG 138 kV USI CAMPOS MG1 RJ IB1 DIT   062/2001 IPCA RCDM REA 1814/2009 10/09/2015 09/09/2042  R$11,471.51
USI CAMPOS IB 69 kV MG 138 kV USI CAMPOS MG1 RJ IB1 DIT   062/2001 IPCA RCDM REA 1814/2009 10/09/2015 09/09/2042  R$11,471.51
USI CAMPOS IB 69 kV MG 138 kV USI CAMPOS MG1 RJ IB1 DIT   062/2001 IPCA RCDM REA 1814/2009 11/06/2016 10/06/2047  R$113,609.72
USI CAMPOS IB 138 kV MG 138 kV USI CAMPOS MG1 RJ IB2 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$78,514.10
USI CAMPOS IB 138 kV MG 138 kV USI CAMPOS MG1 RJ IB2 DIT   062/2001 IPCA RMEL REN 643/2014 26/02/2015 25/02/2042  R$54,273.61
USI CAMPOS IB 138 kV MG 138 kV USI CAMPOS MG1 RJ IB2 DIT   062/2001 IPCA RCDM REA 1814/2009 15/04/2016 14/04/2047  R$145,748.77
USI CAMPOS EL 69 kV USI CAMPOSDIST4 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$59,253.04
USI CAMPOS EL 69 kV USI CAMPOSDIST3 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$59,253.04
USI CAMPOS EL 69 kV USI CAMPOSDIST2 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$59,253.04
USI CAMPOS EL 69 kV USI CAMPOSDIST1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$59,253.04
USI CAMPOS EL 69 kV USI CAMPOSDIST1 DIT   062/2001 IPCA RCDM REA 1814/2009 10/03/2013 09/03/2040  R$121,511.96
USI CAMPOS EL 138 kV USI CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,660.34
USI CAMPOS EL 138 kV USI CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 25/09/2016 24/09/2044  R$66,231.79
USI CAMPOS EL 138 kV USI CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 23/09/2016 22/09/2044  R$27,037.18
USI CAMPOS EL 138 kV USI CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,660.34
USI CAMPOS EL 138 kV USI CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 19/06/2016 18/06/2044  R$92,673.71
USI CAMPOS EL 138 kV USI CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-1 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 19/06/2016 18/06/2047  R$119,431.67
USI CAMPOS EL 138 kV USI CAMPOSDIST4 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,660.34
USI CAMPOS EL 138 kV USI CAMPOSDIST4 DIT   062/2001 IPCA RCDM REA 2376/2010 26/05/2014 25/05/2040  R$45,324.16
USI CAMPOS EL 138 kV USI CAMPOSDIST4 DIT   062/2001 IPCA RMEL REN 643/2014 31/01/2016 30/01/2044  R$65,202.52
USI CAMPOS EL 138 kV USI CAMPOSDIST3 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,660.34
USI CAMPOS EL 138 kV USI CAMPOSDIST3 DIT   062/2001 IPCA RCDM REA 2376/2010 01/06/2014 31/05/2040  R$45,348.55
USI CAMPOS EL 138 kV USI CAMPOSDIST3 DIT   062/2001 IPCA RMEL REN 643/2014 28/02/2016 27/02/2044  R$26,671.03
USI CAMPOS EL 138 kV USI CAMPOSDIST3 DIT   062/2001 IPCA RMEL REN 643/2014 12/10/2016 11/10/2045  R$39,225.94
USI CAMPOS EL 138 kV USI CAMPOSDIST2 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,660.34
USI CAMPOS EL 138 kV USI CAMPOSDIST1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$135,660.34
VENDA PEDRAS EL 345 kV VENDA PEDRAS LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ RB FT LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBNI REA 5538/2015 01/07/2016 31/12/2042  R$951,958.83
VENDA PEDRAS EL 345 kV VENDA PEDRAS LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ  RB FT LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBNI REA 5538/2015 01/07/2016 31/12/2042  R$951,958.83
VIANA TR 345/138 kV VIANA TRR4 ES RBF FT TR 345/138 kV VIANA TRR4 ES 062/2001 IPCA RBNI REA 5148/2015 29/08/2019 29/08/2054  R$ 1,556,170.51
VIANA TR 345/138 kV VIANA TRR1 ES RBF FT TR 345/138 kV VIANA TRR1 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$240,533.81
VIANA TR 345/138 kV VIANA TR4 ES RBF FT TR 345/138 kV VIANA TR4 ES 062/2001 IPCA RBNI REA 5148/2015 29/08/2019 29/08/2054  R$ 4,668,511.53
VIANA TR 345/138 kV VIANA TR3 ES RBF FT TR 345/138 kV VIANA TR3 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$721,601.44
VIANA TR 345/138 kV VIANA TR2 ES RBF FT TR 345/138 kV VIANA TR2 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$721,601.44
VIANA TR 345/138 kV VIANA TR1 ES RBF FT TR 345/138 kV VIANA TR1 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$721,601.44
VIANA RTL 345 kV 60 Mvar VIANA RT1 ES RB FT RTL 345 kV 60 Mvar VIANA RT1 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$194,265.72
VIANA RTL 345 kV 60 Mvar VIANA RT1 ES RB FT RTL 345 kV 60 Mvar VIANA RT1 ES 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,006,419.71
VIANA MG 345 kV VIANA MG1 ES RB FT MG 345 kV VIANA MG1 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$859,892.51
VIANA MG 345 kV VIANA MG1 ES RB FT MG 345 kV VIANA MG1 ES 062/2001 IPCA RBNI REA 5148/2015 29/08/2019 29/08/2050  R$46,489.46
VIANA MG 345 kV VIANA MG1 ES RB FT MG 345 kV VIANA MG1 ES 062/2001 IPCA RBNI REA 5148/2015 29/08/2019 29/08/2038  R$427,201.20
VIANA MG 345 kV VIANA MG1 ES RB FT MG 345 kV VIANA MG1 ES 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032  R$5,947.33
VIANA MC 345 kV TR 345/138 kV VIANA TR4 ES RBF FT TR 345/138 kV VIANA TR4 ES 062/2001 IPCA RBNI REA 5148/2015 29/08/2019 29/08/2046  R$ 1,281,992.42
VIANA MC 345 kV TR 345/138 kV VIANA TR3 ES  RBF FT TR 345/138 kV VIANA TR3 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,265.74
VIANA MC 345 kV TR 345/138 kV VIANA TR2 ES  RBF FT TR 345/138 kV VIANA TR2 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,265.74
VIANA MC 345 kV TR 345/138 kV VIANA TR1 ES  RBF FT TR 345/138 kV VIANA TR1 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$206,265.74
VIANA MC 345 kV RTL 345 kV 60 Mvar VIANA RT1 ES  RB FT RTL 345 kV 60 Mvar VIANA RT1 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$126,860.75
VIANA MC 345 kV RTL 345 kV 60 Mvar VIANA RT1 ES  RB FT RTL 345 kV 60 Mvar VIANA RT1 ES 062/2001 IPCA RMEL REN 443/2011 21/11/2014 20/11/2044  R$288,370.31
VIANA MC 345 kV RTL 345 kV 60 Mvar VIANA RT1 ES  RB FT RTL 345 kV 60 Mvar VIANA RT1 ES 062/2001 IPCA RMEL REN 443/2011 21/11/2014 20/11/2041  R$43,991.50
VIANA MC 138 kV TR 345/138 kV VIANA TR4 ES RBF FT TR 345/138 kV VIANA TR4 ES 062/2001 IPCA RBNI REA 5148/2015 29/08/2019 29/08/2042  R$643,761.43
VIANA MC 138 kV TR 345/138 kV VIANA TR3 ES  RBF FT TR 345/138 kV VIANA TR3 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$91,990.10
VIANA MC 138 kV TR 345/138 kV VIANA TR2 ES  RBF FT TR 345/138 kV VIANA TR2 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$91,990.10
VIANA MC 138 kV TR 345/138 kV VIANA TR1 ES  RBF FT TR 345/138 kV VIANA TR1 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$91,990.10
VIANA IB 345 kV MG 345 kV VIANA MG1 ES IB3 RB FT MG 345 kV VIANA MG1 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
VIANA IB 345 kV MG 345 kV VIANA MG1 ES IB2 RB FT MG 345 kV VIANA MG1 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
VIANA IB 345 kV MG 345 kV VIANA MG1 ES IB1 RB FT MG 345 kV VIANA MG1 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
VIANA IB 138 kV MG 345 kV VIANA MG1 ES IB2 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$78,514.10
VIANA EL 345 kV VIANA LT 345 kV VIANA /VITORIA C-1 ES  RB FT LT 345 kV VIANA /VITORIA C-1 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
VIANA EL 345 kV VIANA LT 345 kV RIO NOVO DO SUL /VIANA C-1 ES  RB FT LT 345 kV RIO NOVO DO SUL /VIANA C-1 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
VIANA EL 138 kV VIANADIST6 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$139,341.27
VIANA EL 138 kV VIANADIST5 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$139,341.27
VIANA EL 138 kV VIANADIST4 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$139,341.27
VIANA EL 138 kV VIANADIST3 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$139,341.27
VIANA EL 138 kV VIANADIST2 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$139,341.27
VIANA EL 138 kV VIANADIST1 DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$139,341.27
VITORIA TT 13,8/0 kV VITORIA TRT4 ES RBF FT TR 345/138 kV VITORIA TR4 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$69,798.40
VITORIA TT 13,8/0 kV VITORIA TRT3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$69,798.40
VITORIA TT 13,8/0 kV VITORIA TRT2 ES RBF FT TR 345/138 kV VITORIA TR2 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$69,798.40
VITORIA TT 13,8/0 kV VITORIA TRT1 ES RBF FT TR 345/138 kV VITORIA TR1 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$69,798.40
VITORIA TR 345/138 kV VITORIA TRR2 ES RBF FT TR 345/138 kV VITORIA TRR2 ES 062/2001 IPCA RBNI REA 6189/2017 28/08/2020 28/08/2055  R$ 1,535,252.69
VITORIA TR 345/138 kV VITORIA TRR1 ES RBF FT TR 345/138 kV VITORIA TRR1 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$240,533.81
VITORIA TR 345/138 kV VITORIA TRR1 ES RBF FT TR 345/138 kV VITORIA TRR1 ES 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,246,117.77
VITORIA TR 345/138 kV VITORIA TRR1 ES RBF FT TR 345/138 kV VITORIA TRR1 ES 062/2001 IPCA RMEL REN 443/2011 10/11/2016 09/11/2039  R$11,584.75
VITORIA TR 345/138 kV VITORIA TR5 ES RBF FT TR 345/138 kV VITORIA TR5 ES 062/2001 IPCA RBNI REA 6189/2017 28/08/2020 28/08/2055  R$ 4,605,758.11
VITORIA TR 345/138 kV VITORIA TR4 ES RBF FT TR 345/138 kV VITORIA TR4 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$721,601.44
VITORIA TR 345/138 kV VITORIA TR4 ES RBF FT TR 345/138 kV VITORIA TR4 ES 062/2001 IPCA RBNI REA 5484/2015 12/10/2015 11/10/2041  R$127,513.68
VITORIA TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$721,601.44
VITORIA TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RBNI REA 5484/2015 10/01/2016 09/01/2042  R$120,773.63
VITORIA TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,738,353.32
VITORIA TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 3,390,304.14
VITORIA TR 345/138 kV VITORIA TR2 ES RBF FT TR 345/138 kV VITORIA TR2 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$721,601.44
VITORIA TR 345/138 kV VITORIA TR2 ES RBF FT TR 345/138 kV VITORIA TR2 ES 062/2001 IPCA RBNI REA 5484/2015 20/12/2015 19/12/2041  R$120,606.61
VITORIA TR 345/138 kV VITORIA TR2 ES RBF FT TR 345/138 kV VITORIA TR2 ES 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,738,353.32
VITORIA TR 345/138 kV VITORIA TR1 ES RBF FT TR 345/138 kV VITORIA TR1 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$721,601.44
VITORIA TR 345/138 kV VITORIA TR1 ES RBF FT TR 345/138 kV VITORIA TR1 ES 062/2001 IPCA RBNI REA 5484/2015 08/11/2015 07/11/2041  R$103,044.76
VITORIA TR 345/138 kV VITORIA TR1 ES RBF FT TR 345/138 kV VITORIA TR1 ES 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 3,738,353.32
VITORIA TR 345/13,8 kV VITORIA TRSC01 ES RB FT CS 60/-30 MVAr VITORIA CS1 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$254,086.82
VITORIA TR 345/13,8 kV VITORIA TRSC01 ES RB FT CS 60/-30 MVAr VITORIA CS1 ES 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,316,330.93
VITORIA TR 345/13,8 kV VITORIA TRSC01 ES RB FT CS 60/-30 MVAr VITORIA CS1 ES 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,193,777.53
VITORIA RTL 345 kV 60 Mvar VITORIA RT3 ES RB FT RTL 345 kV 60 Mvar VITORIA RT3 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$391,216.93
VITORIA RTB 345 kV 60 Mvar VITORIA RT2 ES RB FT RTB 345 kV 60 Mvar VITORIA RT2 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$391,216.93
VITORIA RTB 345 kV 60 Mvar VITORIA RT2 ES RB FT RTB 345 kV 60 Mvar VITORIA RT2 ES 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 2,026,751.94
VITORIA RTB 345 kV 60 Mvar VITORIA RT2 ES RB FT RTB 345 kV 60 Mvar VITORIA RT2 ES 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$ 1,838,056.73
VITORIA MG 345 kV VITORIA MG1 ES RB FT MG 345 kV VITORIA MG1 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$823,717.96
VITORIA MG 345 kV VITORIA MG1 ES RB FT MG 345 kV VITORIA MG1 ES 062/2001 IPCA RBNI REA 6189/2017 28/08/2020 28/08/2048  R$ 1,306,907.71
VITORIA MG 345 kV VITORIA MG1 ES RB FT MG 345 kV VITORIA MG1 ES 062/2001 IPCA RBNI REA 6189/2017 28/08/2020 28/08/2051  R$482,812.36
VITORIA MG 345 kV VITORIA MG1 ES RB FT MG 345 kV VITORIA MG1 ES 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 4,267,381.69
VITORIA MG 345 kV VITORIA MG1 ES RB FT MG 345 kV VITORIA MG1 ES 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032  R$10,848.79
VITORIA MG 345 kV VITORIA MG1 ES RB FT MG 345 kV VITORIA MG1 ES 062/2001 IPCA RBNI REA 4347/2013 31/10/2017 30/10/2045  R$10,992.38
VITORIA MC 345 kV TR 345/138 kV VITORIA TR5 ES RBF FT TR 345/138 kV VITORIA TR5 ES 062/2001 IPCA RBNI REA 6189/2017 28/08/2020 28/08/2046  R$ 1,439,673.33
VITORIA MC 345 kV TR 345/138 kV VITORIA TR4 ES  RBF FT TR 345/138 kV VITORIA TR4 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$198,107.74
VITORIA MC 345 kV TR 345/138 kV VITORIA TR4 ES  RBF FT TR 345/138 kV VITORIA TR4 ES 062/2001 IPCA RMEL REN 643/2014 26/09/2014 25/09/2043  R$272,949.67
VITORIA MC 345 kV TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$198,107.74
VITORIA MC 345 kV TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RMEL REN 643/2014 30/09/2014 29/09/2043  R$264,927.64
VITORIA MC 345 kV TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RMEL REN 643/2014 06/11/2014 05/11/2041  R$37,532.60
VITORIA MC 345 kV TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RMEL REN 643/2014 10/11/2014 09/11/2041  R$37,545.62
VITORIA MC 345 kV TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RMEL REN 643/2014 19/11/2014 18/11/2041  R$37,574.97
VITORIA MC 345 kV TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RMEL REN 643/2014 10/01/2016 09/01/2044  R$38,723.50
VITORIA MC 345 kV TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RMEL REN 443/2011 06/08/2017 05/08/2040  R$11,802.72
VITORIA MC 345 kV TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RMEL REN 443/2011 06/08/2017 05/08/2040  R$11,802.72
VITORIA MC 345 kV TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RMEL REN 443/2011 06/08/2017 05/08/2040  R$11,802.72
VITORIA MC 345 kV TR 345/138 kV VITORIA TR2 ES RBF FT TR 345/138 kV VITORIA TR2 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$198,107.74
VITORIA MC 345 kV TR 345/138 kV VITORIA TR2 ES RBF FT TR 345/138 kV VITORIA TR2 ES 062/2001 IPCA RMEL REN 643/2014 03/07/2015 02/07/2045  R$269,973.32
VITORIA MC 345 kV TR 345/138 kV VITORIA TR2 ES RBF FT TR 345/138 kV VITORIA TR2 ES 062/2001 IPCA RMEL REN 643/2014 03/07/2015 02/07/2042  R$76,408.02
VITORIA MC 345 kV TR 345/138 kV VITORIA TR1 ES RBF FT TR 345/138 kV VITORIA TR1 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$198,107.74
VITORIA MC 345 kV TR 345/138 kV VITORIA TR1 ES RBF FT TR 345/138 kV VITORIA TR1 ES 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,026,323.80
VITORIA MC 345 kV TR 345/138 kV VITORIA TR1 ES RBF FT TR 345/138 kV VITORIA TR1 ES 062/2001 IPCA RMEL REN 443/2011 18/05/2017 17/05/2040  R$11,741.83
VITORIA MC 345 kV TR 345/138 kV VITORIA TR1 ES RBF FT TR 345/138 kV VITORIA TR1 ES 062/2001 IPCA RMEL REN 443/2011 23/07/2017 22/07/2040  R$11,795.89
VITORIA MC 345 kV TR 345/138 kV VITORIA TR1 ES RBF FT TR 345/138 kV VITORIA TR1 ES 062/2001 IPCA RMEL REN 443/2011 23/07/2017 22/07/2040  R$11,795.89
VITORIA MC 345 kV TR 345/13,8 kV VITORIA TRSC01 ES  RB FT CS 60/-30 MVAr VITORIA CS1 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$198,107.74
VITORIA MC 345 kV TR 345/13,8 kV VITORIA TRSC01 ES  RB FT CS 60/-30 MVAr VITORIA CS1 ES 062/2001 IPCA RMEL REN 643/2014 12/09/2015 11/09/2042  R$38,402.44
VITORIA MC 345 kV RTL 345 kV 60 Mvar VITORIA RT3 ES  RB FT RTL 345 kV 60 Mvar VITORIA RT3 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$126,860.75
VITORIA MC 345 kV RTB 345 kV 60 Mvar VITORIA RT2 ES  RB FT RTB 345 kV 60 Mvar VITORIA RT2 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$170,898.78
VITORIA MC 345 kV RTB 345 kV 60 Mvar VITORIA RT2 ES  RB FT RTB 345 kV 60 Mvar VITORIA RT2 ES 062/2001 IPCA RMEL REN 643/2014 23/12/2014 22/12/2044  R$240,750.56
VITORIA MC 345 kV RTB 345 kV 60 Mvar VITORIA RT2 ES  RB FT RTB 345 kV 60 Mvar VITORIA RT2 ES 062/2001 IPCA RMEL REN 643/2014 17/05/2015 16/05/2042  R$35,748.98
VITORIA MC 138 kV TR 345/138 kV VITORIA TR5 ES RBF FT TR 345/138 kV VITORIA TR5 ES 062/2001 IPCA RBNI REA 6189/2017 28/08/2020 28/08/2043  R$908,702.77
VITORIA MC 138 kV TR 345/138 kV VITORIA TR4 ES  RBF FT TR 345/138 kV VITORIA TR4 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$81,211.75
VITORIA MC 13,8 kV TR 345/138 kV VITORIA TR4 ES  RBF FT TR 345/138 kV VITORIA TR4 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$35,245.01
VITORIA MC 13,8 kV TR 345/138 kV VITORIA TR3 ES  RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$17,820.99
VITORIA MC 13,8 kV TR 345/138 kV VITORIA TR2 ES  RBF FT TR 345/138 kV VITORIA TR2 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$17,820.99
VITORIA MC 13,8 kV TR 345/138 kV VITORIA TR1 ES  RBF FT TR 345/138 kV VITORIA TR1 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$17,820.99
VITORIA MC 13,8 kV TR 345/13,8 kV VITORIA TRSC01 ES  RB FT CS 60/-30 MVAr VITORIA CS1 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$35,245.01
VITORIA MC 13,8 kV CS 60/-30 MVAr VITORIA CS1 ES  RB FT CS 60/-30 MVAr VITORIA CS1 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$47,655.63
VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC9 ES  RBF FT BC 13,8 kV 10 MVAr VITORIA BC9 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,425.40
VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC8 ES  RBF FT BC 13,8 kV 10 MVAr VITORIA BC8 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,425.40
VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC7 ES  RBF FT BC 13,8 kV 10 MVAr VITORIA BC7 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,425.40
VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC6 ES  RBF FT BC 13,8 kV 10 MVAr VITORIA BC6 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,425.40
VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC5 ES  RBF FT BC 13,8 kV 10 MVAr VITORIA BC5 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,425.40
VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC4 ES  RBF FT BC 13,8 kV 10 MVAr VITORIA BC4 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,425.40
VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC3 ES  RBF FT BC 13,8 kV 10 MVAr VITORIA BC3 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,425.40
VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC2 ES  RBF FT BC 13,8 kV 10 MVAr VITORIA BC2 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,425.40
VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC12 ES  RBF FT BC 13,8 kV 10 MVAr VITORIA BC12 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,425.40
VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC11 ES  RBF FT BC 13,8 kV 10 MVAr VITORIA BC11 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,425.40
VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC10 ES  RBF FT BC 13,8 kV 10 MVAr VITORIA BC10 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$49,425.40
VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC1 ES  RBF FT BC 13,8 kV 10 MVAr VITORIA BC1 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$57,000.46
VITORIA IB 345 kV MG 345 kV VITORIA MG1 ES IB2 RB FT MG 345 kV VITORIA MG1 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
VITORIA IB 345 kV MG 345 kV VITORIA MG1 ES IB1 RB FT MG 345 kV VITORIA MG1 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$200,146.11
VITORIA EL 345 kV VITORIA LT 345 kV VITORIA /PADRE FIALHO C-1 ES/MG  RB FT LT 345 kV VITORIA /PADRE FIALHO C-1 ES/MG 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
VITORIA EL 345 kV VITORIA LT 345 kV VIANA /VITORIA C-1 ES  RB FT LT 345 kV VIANA /VITORIA C-1 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
VITORIA EL 345 kV VITORIA LT 345 kV VIANA /VITORIA C-1 ES  RB FT LT 345 kV VIANA /VITORIA C-1 ES 062/2001 IPCA RBNI REA 2040/2009 06/04/2015 05/04/2036  R$30,328.56
VITORIA EL 345 kV VITORIA LT 345 kV VIANA /VITORIA C-1 ES  RB FT LT 345 kV VIANA /VITORIA C-1 ES 062/2001 IPCA RMEL REN 643/2014 23/07/2015 22/07/2045  R$225,796.89
VITORIA EL 345 kV VITORIA LT 345 kV VIANA /VITORIA C-1 ES  RB FT LT 345 kV VIANA /VITORIA C-1 ES 062/2001 IPCA RMEL REN 643/2014 23/07/2015 22/07/2042  R$73,310.02
VITORIA EL 345 kV VITORIA LT 345 kV VIANA /VITORIA C-1 ES  RB FT LT 345 kV VIANA /VITORIA C-1 ES 062/2001 IPCA RMEL REN 643/2014 15/06/2016 14/06/2044  R$54,328.51
VITORIA EL 345 kV VITORIA LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES  RB FT LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$245,717.82
VITORIA EL 345 kV VITORIA LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES  RB FT LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES 062/2001 IPCA RBNI REA 2040/2009 06/04/2015 05/04/2036  R$30,328.56
VITORIA EL 345 kV VITORIA LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES  RB FT LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES 062/2001 IPCA RMEL REN 643/2014 18/05/2015 17/05/2042  R$52,867.17
VITORIA EL 345 kV VITORIA LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES  RB FT LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$ 1,272,974.20
VITORIA EL 138 kV VITORIA LT 138 kV VITORIA /PITANGA C-3 ES DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$94,172.97
VITORIA EL 138 kV VITORIA LT 138 kV VITORIA /PITANGA C-3 ES DIT   062/2001 IPCA RCDM REA 1814/2009 03/06/2012 02/06/2036  R$63,889.88
VITORIA EL 138 kV VITORIA LT 138 kV VITORIA /PITANGA C-3 ES DIT   062/2001 IPCA RMEL REN 443/2011 18/05/2017 17/05/2040  R$4,927.30
VITORIA EL 138 kV VITORIA LT 138 kV VITORIA /PITANGA C-2 ES DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$94,172.97
VITORIA EL 138 kV VITORIA LT 138 kV VITORIA /PITANGA C-2 ES DIT   062/2001 IPCA RMEL REN 643/2014 19/06/2016 18/06/2044  R$45,674.90
VITORIA EL 138 kV VITORIA LT 138 kV VITORIA /PITANGA C-2 ES DIT   062/2001 IPCA RMEL REN 643/2014 14/03/2016 13/03/2044  R$32,882.52
VITORIA EL 138 kV VITORIA LT 138 kV VITORIA /PITANGA C-1 ES DIT   062/2001 IPCA RPC PRT 579/2012 01/01/2013 01/01/2043  R$94,172.97
VITORIA EL 138 kV VITORIA LT 138 kV VITORIA /PITANGA C-1 ES DIT   062/2001 IPCA RMEL REN 643/2014 05/06/2016 04/06/2044  R$45,624.59
VITORIA EL 138 kV VITORIA LT 138 kV VITORIA /PITANGA C-1 ES DIT   062/2001 IPCA RMEL REN 643/2014 03/04/2016 02/04/2044  R$32,922.39
VITORIA CS 60/-30 MVAr VITORIA CS1 ES RB FT CS 60/-30 MVAr VITORIA CS1 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$773,224.13
VITORIA BC 13,8 kV 10 MVAr VITORIA BC9 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC9 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$44,138.98
VITORIA BC 13,8 kV 10 MVAr VITORIA BC9 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC9 ES 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$228,667.94
VITORIA BC 13,8 kV 10 MVAr VITORIA BC9 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC9 ES 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$207,378.43
VITORIA BC 13,8 kV 10 MVAr VITORIA BC8 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC8 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$44,138.98
VITORIA BC 13,8 kV 10 MVAr VITORIA BC8 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC8 ES 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$228,667.94
VITORIA BC 13,8 kV 10 MVAr VITORIA BC8 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC8 ES 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$207,378.43
VITORIA BC 13,8 kV 10 MVAr VITORIA BC7 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC7 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$44,138.98
VITORIA BC 13,8 kV 10 MVAr VITORIA BC7 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC7 ES 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$228,667.94
VITORIA BC 13,8 kV 10 MVAr VITORIA BC7 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC7 ES 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$207,378.43
VITORIA BC 13,8 kV 10 MVAr VITORIA BC6 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC6 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$44,138.98
VITORIA BC 13,8 kV 10 MVAr VITORIA BC5 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC5 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$44,138.98
VITORIA BC 13,8 kV 10 MVAr VITORIA BC4 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC4 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$44,138.98
VITORIA BC 13,8 kV 10 MVAr VITORIA BC3 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC3 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$44,138.98
VITORIA BC 13,8 kV 10 MVAr VITORIA BC3 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC3 ES 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$228,667.94
VITORIA BC 13,8 kV 10 MVAr VITORIA BC3 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC3 ES 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$207,378.43
VITORIA BC 13,8 kV 10 MVAr VITORIA BC2 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC2 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$44,138.98
VITORIA BC 13,8 kV 10 MVAr VITORIA BC2 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC2 ES 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$228,667.94
ITUMBIARA MG 500 kV ITUMBIARA MG1 MG RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBNIA REA 9185/2020      R$71,611.79
ITUMBIARA MG 500 kV ITUMBIARA MG1 MG RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBNIA REA 9185/2020      R$89,482.30
ITUMBIARA IB 500 kV MG 500 kV ITUMBIARA MG1 MG IB5 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBNIA REA 9185/2020      R$ 1,576,242.42
ITUMBIARA IB 500 kV MG 500 kV ITUMBIARA MG1 MG IB4 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBNIA REA 9185/2020      R$ 1,576,242.42
VITORIA BC 13,8 kV 10 MVAr VITORIA BC2 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC2 ES 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$207,378.43
VITORIA BC 13,8 kV 10 MVAr VITORIA BC12 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC12 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$44,138.98
VITORIA BC 13,8 kV 10 MVAr VITORIA BC11 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC11 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$44,138.98
VITORIA BC 13,8 kV 10 MVAr VITORIA BC10 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC10 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$44,138.98
VITORIA BC 13,8 kV 10 MVAr VITORIA BC1 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC1 ES 062/2001 IPCA RBSE PRT 579/2012 01/01/2013 01/01/2043  R$44,138.98
VITORIA BC 13,8 kV 10 MVAr VITORIA BC1 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC1 ES 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 30/06/2028  R$228,667.94
VITORIA BC 13,8 kV 10 MVAr VITORIA BC1 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC1 ES 062/2001 IPCA RBSE PRT 120/2016 01/07/2017 31/12/2042  R$207,378.43
XAVANTES EL 230 kV XAVANTES LT 230 kV PIRINEUS /XAVANTES C-2 GO RB FT LT 230 kV PIRINEUS /XAVANTES C-2 GO 014/2011 IPCA RBL CC 014/2011 08/06/2018 09/12/2041  R$697,360.05
ZONA OESTE TR 500/138 kV ZONA OESTE TRR1 RJ RBF FT TR 500/138 kV ZONA OESTE TRR1 RJ 016/2012 IPCA RBL CC 016/2012 24/03/2016 10/05/2042  R$ 1,941,803.39
ZONA OESTE TR 500/138 kV ZONA OESTE TR1 RJ RBF FT TR 500/138 kV ZONA OESTE TR1 RJ 016/2012 IPCA RBL CC 016/2012 24/03/2016 10/05/2042  R$ 5,825,407.95
ZONA OESTE MG 500 kV ZONA OESTE MG2 RJ RB FT MG 500 kV ZONA OESTE MG2 RJ 016/2012 IPCA RBL CC 016/2012 24/03/2016 10/05/2042  R$ 2,098,461.22
ZONA OESTE MG 500 kV ZONA OESTE MG2 RJ RB FT MG 500 kV ZONA OESTE MG2 RJ 016/2012 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032  R$3,976.37
ZONA OESTE MG 138 kV ZONA OESTE MG1 RJ DIT   062/2001 IPCA RCDM REA 3698/2012 19/06/2016 18/06/2045  R$349,662.63
ZONA OESTE MC 500 kV TR 500/138 kV ZONA OESTE TR1 RJ RBF FT TR 500/138 kV ZONA OESTE TR1 RJ 016/2012 IPCA RBL CC 016/2012 24/03/2016 10/05/2042  R$ 1,222,246.88
ZONA OESTE MC 138 kV TR 500/138 kV ZONA OESTE TR1 RJ RBF FT TR 500/138 kV ZONA OESTE TR1 RJ 016/2012 IPCA RBL CC 016/2012 24/03/2016 10/05/2042  R$344,863.69
ZONA OESTE IB 500 kV MG 500 kV ZONA OESTE MG2 RJ IB3 RB FT MG 500 kV ZONA OESTE MG2 RJ 016/2012 IPCA RBL CC 016/2012 24/03/2016 10/05/2042  R$ 1,305,878.90
ZONA OESTE IB 138 kV MG 500 kV ZONA OESTE MG2 RJ IB1 DIT   016/2012 IPCA RPEC CC 016/2012 24/03/2016 10/05/2042  R$289,218.99
ZONA OESTE EL 138 kV ZONA OESTE LT 138 kV ZONA OESTE /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RCDM REA 3698/2012 19/06/2016 18/06/2046  R$ 1,060,690.85
ZONA OESTE EL 138 kV ZONA OESTE LT 138 kV ZONA OESTE /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RCDM REA 3698/2012 19/06/2016 18/06/2046  R$ 1,060,690.85
ZONA OESTE EL 138 kV ZONA OESTE LT 138 kV SANTA CRUZ /ZONA OESTE C-2 RJ DIT   062/2001 IPCA RCDM REA 3698/2012 19/06/2016 18/06/2045  R$ 1,091,259.73
ZONA OESTE EL 138 kV ZONA OESTE LT 138 kV SANTA CRUZ /ZONA OESTE C-1 RJ DIT   062/2001 IPCA RCDM REA 3698/2012 19/06/2016 18/06/2045  R$ 1,091,259.73
RIO VERDE FUR MG 230 kV RIO VERDE FUR MG1 GO RB FT MG 230 kV RIO VERDE FUR MG1 GO 062/2001 IPCA RBNIA REA 10722/2021      R$101,417.03
ZONA OESTE MG 500 kV ZONA OESTE MG2 RJ RB FT MG 500 kV ZONA OESTE MG2 RJ 016/2012 IPCA RBNIA 9469/2020      R$94,620.53
ZONA OESTE MC 138 kV TR 500/138 kV ZONA OESTE TR1 RJ RBF FT TR 500/138 kV ZONA OESTE TR1 RJ 016/2012 IPCA RBNIA 9469/2020      R$13,262.86
ZONA OESTE TR 500/138 kV ZONA OESTE TR2 RJ RBF FT TR 500/138 kV ZONA OESTE TR2 RJ 016/2012 IPCA RBNIA 9469/2020      R$ 7,232,793.96
ZONA OESTE MC 500 kV TR 500/138 kV ZONA OESTE TR2 RJ  RBF FT TR 500/138 kV ZONA OESTE TR2 RJ 016/2012 IPCA RBNIA 9469/2020      R$ 1,734,277.38
ZONA OESTE MC 138 kV TR 500/138 kV ZONA OESTE TR2 RJ  RBF FT TR 500/138 kV ZONA OESTE TR2 RJ 016/2012 IPCA RBNIA 9469/2020      R$880,806.27
ITUMBIARA IB 500 kV MG 500 kV ITUMBIARA MG1 MG IB5 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBNIA REA 9185/2020      R$ 1,576,242.42
ITUMBIARA IB 500 kV MG 500 kV ITUMBIARA MG1 MG IB4 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBNIA REA 9185/2020      R$ 1,576,242.42
ITUMBIARA MG 500 kV ITUMBIARA MG1 MG RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBNIA REA 9185/2020      R$71,611.79
ITUMBIARA MG 500 kV ITUMBIARA MG1 MG RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBNIA REA 9185/2020      R$89,482.30
ITUMBIARA TR 500/345 kV ITUMBIARA TR53 MG RB FT TR 500/345 kV ITUMBIARA TR53 MG 062/2001 IPCA RMELP REA 9185/2020      R$ 5,250,119.58
BARREIRO 1 MG 345 kV BARREIRO 1 MG2 MG RB FT MG 345 kV BARREIRO 1 MG2 MG 062/2001 IPCA RBNIA REA 8565/2020      R$54,855.01
BARREIRO 1 EL 345 kV BARREIRO 1 LT 345 kV BARREIRO 1 /PIMENTA C-1 MG RB FT LT 345 kV BARREIRO 1 /PIMENTA C-1 MG 062/2001 IPCA RBNIA REA 8565/2020      R$805,290.77
ADRIANOPOLIS RTB 13,8 kV 50 MVAr ADRIANOPOLIS RT3 RJ RB FT RTB 13,8 kV 50 MVAr ADRIANOPOLIS RT3 RJ 062/2001 IPCA RMELP REA 8707/2020      R$497,015.98
IVAIPORA RTL 750 kV 329 Mvar IVAIPORA RIA2 PR RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RMELP REA 11449/2022      R$ 1,151,229.72

 

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

V. Employees - Effective staff      
       
V.1 Employees by capacity      
Eletrobras Company Administrative Operational Total
CGT Eletrosul  253  697  950
Chesf  573 1,782 2,355
Eletrobras  632  58  690
Eletronorte  429 1,295 1,724
Eletropar  1  1
Furnas  631 1,577 2,208
Grand Total 2,519 5,409 7,928
       
Concept of Effective Framework:      
Employees in the company      
Groups: External Advisor + Employees + Employee Managers + Requested + Requested Managers
Includes: Amnesties in the company      
Does not include: Employee director, statutory director, assignees, disability retirees and unpaid leave

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

Eletrobras Company Investments 2024          
*Source: Controllership Department (FRPCA)          
           
VII.1 Corporate Investment and Partnerships          
Generation jan-24 fev-24 mar-24 1Q24 Total Realized
 Eletrobras 
 Eletronorte   9,211,903.5  43,509,042.8  24,927,631.4 77,648,577.7 77,648,577.7
 Chesf   15,719,807.0  67,787,007.7  16,511,291.5 100,018,106.2 100,018,106.2
 Furnas   1,859,221.8  7,883,972.2  12,084,623.7 21,827,817.6 21,827,817.6
 CGT Eletrosul   14,997,716.0  123,437,611.7  136,109,651.6 274,544,979.4 274,544,979.4
 SAESA   1,948,540.9  4,452,876.3  1,742,000.9 8,143,418.0 8,143,418.0
 Baguari  155,848.8 39,102.2 47,066.9  242,017.8  242,017.8
 Teles Pires  7,677.6 222,102.3  229,779.9  229,779.9
           
Generation - Expansion jan-24 fev-24 mar-24 1Q24 Total Realized
 Eletrobras 
 Eletronorte  257,450.9 101,141.4 180,889.7  539,482.0  539,482.0
 Chesf  223,601.4  1,048,491.4  1,219,520.9 2,491,613.7 2,491,613.7
 Furnas  142,613.5  1,009,436.9  2,285,851.3 3,437,901.8 3,437,901.8
 CGT Eletrosul   15,003,792.4  123,301,776.1  135,767,248.5 274,072,817.0 274,072,817.0
 SAESA 
 Baguari 
 Teles Pires 
           
Generation - Maintenance / Modernization jan-24 fev-24 mar-24 1Q24 Total Realized
 Eletrobras 
 Eletronorte   8,954,452.6  43,407,901.3  24,746,741.7 77,109,095.6 77,109,095.6
 Chesf   15,496,205.6  66,738,516.4  15,291,770.6 97,526,492.6 97,526,492.6
 Furnas   1,716,608.2  6,874,535.3  9,798,772.4 18,389,915.9 18,389,915.9
 CGT Eletrosul  -6,076.4 135,835.6 342,403.1  472,162.4  472,162.4
 SAESA   1,948,540.9  4,452,876.3  1,742,000.9 8,143,418.0 8,143,418.0
 Baguari  155,848.8 39,102.2 47,066.9  242,017.8  242,017.8
 Teles Pires  7,677.6 222,102.3  229,779.9  229,779.9
           
           
Generation -Partnerships* jan-24 fev-24 mar-24 1Q24 Total Realized
 Eletrobras 
 Eletronorte 
 Chesf 
 Furnas 
 CGT Eletrosul 
           
Generation - Acquisition Partnerships jan-24 fev-24 mar-24 1Q24 Total Realized
 Eletrobras 
 Eletronorte 
 Chesf 
 Furnas 
 CGT Eletrosul 
           
           
Generation - Contribution Partnerships jan-24 fev-24 mar-24 1Q24 Total Realized
 Eletrobras 
 Eletronorte 
 Chesf 
 Furnas 
 CGT Eletrosul 
           
           
Transmission jan-24 fev-24 mar-24 1Q24 Total Realized
 Eletrobras   5,112,954.0 5,112,954.0 5,112,954.0
 Eletronorte   33,110,697.1  91,908,477.8  85,421,948.6 210,441,123.5 210,441,123.5
 Chesf   28,714,866.9  66,516,568.0  93,558,265.9 188,789,700.8 188,789,700.8
 Furnas   11,530,850.6  45,942,361.5  91,110,531.2 148,583,743.3 148,583,743.3
 CGT Eletrosul   43,960,645.9  6,318,123.3  26,548,224.2 76,826,993.5 76,826,993.5
 SAESA 
 Lot 4 (Nova Era)   1,626,515.6 173,286.0 222,560.1 2,022,361.7 2,022,361.7
 Teles Pires 
           
Transmission - Expansion jan-24 fev-24 mar-24 1Q24 Total Realized
 Eletrobras 
 Eletronorte  315,064.5 190,435.2 240,151.4  745,651.1  745,651.1
 Chesf 124,242.8 135,613.3 880,179.1 1,140,035.2 1,140,035.2
 Furnas 
 CGT Eletrosul 
 SAESA 
 Baguari 
 Lot 4 (Nova Era)   1,626,515.6 173,286.0 222,560.1 2,022,361.7 2,022,361.7
           
Transmission - Reinforcements and Improvements jan-24 fev-24 mar-24 1Q24 Total Realized
 Eletrobras 
 Eletronorte   30,061,645.0  88,330,969.1  74,957,602.5 193,350,216.6 193,350,216.6
 Chesf  22,149,220.0  61,334,123.8  87,808,578.5 171,291,922.4 171,291,922.4
 Furnas   11,460,125.5  45,361,913.1  87,498,369.5 144,320,408.2 144,320,408.2
 CGT Eletrosul   43,787,527.7  6,052,384.3  25,662,768.5 75,502,680.5 75,502,680.5
 SAESA 
 Baguari 
 Teles Pires 
           
Transmission - Maintenance jan-24 fev-24 mar-24 1Q24 Total Realized
 Eletrobras 
 Eletronorte   1,066,035.2  1,121,638.5  7,058,762.9 9,246,436.6 9,246,436.6
 Chesf  6,222,122.0  3,999,501.9  2,748,488.0 12,970,111.9 12,970,111.9
 Furnas  66,186.6 576,570.6  3,534,682.8 4,177,440.1 4,177,440.1
 CGT Eletrosul  48,184.1 132,270.7 412,864.6  593,319.4  593,319.4
 SAESA 
 Baguari 
 Teles Pires 
           
Transmission - Other jan-24 fev-24 mar-24 1Q24 Total Realized
 Eletrobras 
 Eletronorte   1,667,952.4  2,265,435.0  3,165,431.7 7,098,819.1 7,098,819.1
 Chesf 219,282.2  1,047,329.0  2,121,020.2 3,387,631.4 3,387,631.4
 Furnas  4,538.4 3,877.8 77,478.9  85,895.1  85,895.1
 CGT Eletrosul  124,934.1 133,468.3 472,591.2  730,993.6  730,993.6
 SAESA 
 Baguari 
 Teles Pires 
           
Transmission - Financial Inversions in Partnerships jan-24 fev-24 mar-24 1Q24 Total Realized
 Eletrobras 
 Eletronorte 
 Chesf 
 Furnas 
 CGT Eletrosul 
           
Transmission - Financial Investments Acquisition jan-24 fev-24 mar-24 1Q24 Total Realized
 Eletrobras 
 Eletropar 
 Eletronorte 
 Chesf 
 Furnas 
 CGT Eletrosul 
 SAESA 
           
Transmission - Financial Investments Contribution jan-24 fev-24 mar-24 1Q24 Total Realized
 Eletrobras   5,112,954.0 5,112,954.0 5,112,954.0
 Eletropar 
 Eletronorte 
 Chesf 
 Furnas 
 CGT Eletrosul 
 SAESA 
           
Environmental jan-24 fev-24 mar-24 1Q24 Total Realized
 Eletrobras 
 Eletronorte  10,367.0  2,997,466.0  8,896,238.3 11,904,071.3 11,904,071.3
 Chesf 634,442.8  2,086,664.6  3,023,153.2 5,744,260.7 5,744,260.7
 Furnas  969,377.6  5,428,520.6  5,987,064.8 12,384,963.0 12,384,963.0
 Eletrosul  8,163.7 654,649.4 - 1,186,427.1 -523,614.0 -523,614.0
 SAESA   5,217,483.4  24,656,255.5  5,980,693.3 35,854,432.2 35,854,432.2
 Baguari   1,425,868.5  1,054,997.8 520,986.6 3,001,852.9 3,001,852.9
 Teles Pires 
           
Infrastructure jan-24 fev-24 mar-24 1Q24 Total Realized
 Eletrobras  574,495.0  5,467,939.5  1,526,319.6 7,568,754.1 7,568,754.1
 Eletronorte  738,843.9 273,388.3 247,840.1 1,260,072.3 1,260,072.3
 Chesf  1,032,109.1 768,444.2  2,903,625.3 4,704,178.6 4,704,178.6
 Furnas  508,516.9  2,896,610.0  1,129,810.1 4,534,937.0 4,534,937.0
 Eletrosul  407,869.8 -737,223.6 792,294.1  462,940.3  462,940.3
 SAESA  45,209.2 17,245.8 92,177.6  154,632.6  154,632.6
 Baguari  27,738.6 27,738.6 27,738.6  83,215.8  83,215.8
 Teles Pires  107,299.5  107,299.5  107,299.5
           
Company       Investment 2023
jan-24 fev-24 mar-24 1Q24 Total
 Eletrobras   5,687,449.0  5,467,939.5  1,526,319.6 12,681,708.1 12,681,708.1
 Eletronorte   43,071,811.6  138,688,374.8  119,493,658.4 301,253,844.7 301,253,844.7
 Chesf  46,101,225.8  137,158,684.5  115,996,336.0 299,256,246.3 299,256,246.3
 Furnas   14,867,966.9  62,151,464.3  110,312,029.9 187,331,461.0 187,331,461.0
 Eletrosul   59,374,395.5  129,673,160.8  162,263,742.9 351,311,299.2 351,311,299.2
 SAESA   7,211,233.4  29,126,377.5  7,814,871.8 44,152,482.7 44,152,482.7
 Baguari   1,609,455.8  1,121,838.6 595,792.1 3,327,086.5 3,327,086.5
 Teles Pires  7,677.6 329,401.9  337,079.4  337,079.4
 Lot 4 (Nova Era)   1,626,515.6 173,286.0 222,560.1 2,022,361.7 2,022,361.7
Total  179,557,731  503,890,528  518,225,311  1,201,673,570  1,201,673,570

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

VI.2 Investments in new projects
                               
VI.2.1 Generation
                               
VI.2.1.1 Integral Responsibility
Eletrobras Company Power plant Source Location
(State)
Investment (BRL Million) Installed Capacity (MW) Physical Guarantee (MW) Start of Concession Start of Operation Beginning of Construction Termination of the Concession Physical Schedule of
Work Performed (%)
Contract Type (Availability or Quantity) Expected annual revenue
(BRL Million)
Investment
Total Expected
Planned Total Investment Reference Date Investment
Accomplished
CGT Eletrosul (1) CGH Cachoeira Branca Hydro MS 13.33 Apr-22 12.06 1.05 0.97 (10) Dec-23 Sep-20   97.80% Quantity 5.1 (7)
CGT Eletrosul (4) WPP Coxilha Negra Wind RS 2,199.32 Dec-21 1,456.83 302.40 114.7 (2) 9/1/2022 Feb-24 Aug-22 9/1/2057 68.55% Quantity 241.33 (3)
Chesf WPP Casa Nova B Wind BA 102.94 Oct-21 49.96 27.00 10.78 02/07/2023 (5) 09/01/2024 (8) Jul-23 2/7/2058 14.59% (6) Quantity 18.50
(1) The request for connection as Distributed Generation was made on 12/29/22 with Energisa and in April it approved the last protocol. The execution of the network and installation of the recloser were carried out in March/23. The CUSD has yet to be signed so that Energisa can connect the Eletrosul network to its distribution network and start commissioning with load. After signing, the distributor has up to 120 days to carry out the connection work to its network (they do not allow it to be performed by the system user).
(2) Considered P90.    
(3) Considered nominal net annual revenue for the year 2025 for the generation scenario P90 Base.    
(4) Grant issued on 08/23/2022.    
(5) Authorizing Resolution No. 13,606 of 02/07/2023.  
(6) This percentage represents the evolution from the remaining stage (60% previously implanted). In this first quarter, progress was made in the implementation of RMT (segment 1) and manufacture of wind turbines, corresponding to 62.5%, according to the schedule.
(7) Considered annual revenue in Distributed Generation - BRL 600/MWh and Physical Guarantee of 0.97MW.
(8) Access opinion under review by ONS, expected to be issued in March 2024
(9) Expected date for mobilizing the construction of the medium voltage network
(10) Awaiting commissioning by Energisa

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

VI.2.1.2 Special Purpose Entities
SPE Power plant Source Companies
Eletrobras
(%)
Location
(State)
Capacity
Installed
(MW)
Guarantee
Physics
(MW)
Beginning of
Construction
Forecast of
Beginning of
 Operation
End of
Concession
Investment
 Predicted
(BRL Million)
Date of
Investment Reference
 Predicted
Investment Realized
(BRL Million) 
Physical Advancement
Accomplished
(%)
Partners Commercialized Energy     Energy purchased for resale Energy Sold 
ACR (%) Average Price (BRL/MWh) ACL
(%)
1Q24 2Q24 3Q24 4Q24 Buyer Type 1Q24 2Q24 3Q24 4Q24
BRL million MWh BRL million MWh BRL million MWh BRL million MWh BRL million MWh BRL million MWh BRL million MWh BRL million MWh
Itaguaçu da Bahia Energia Renováveis S.A. (1) (2) Itaguaçu da Bahia I Wind 98 BA 298.20 136.46 - - Apr-57 2,265.05 fev-22 3.77 0% Casa dos Ventos Energias Renováveis S.A. (2%)  -   -   -   -               -   -             
                                                                       
(1) According to the Business Plan in force.
(2) Furnas' participation in SPE is through the holding Brasil Ventos Energia S.A. (BVE), in which Furnas' shareholding is 100%.

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

VI.2.2 Transmission 1Q24
VI.2.2.1 Integral Responsibility
VI.2.2.1.1 Transmission Lines
Eletrobras Company Undertaking Base Date
of the
Investment
Investment
(BRL Million)
Investment Realized
(BRL Million)
Extension
from:
Lines
(km)
Voltage
(kV)
Capacity
 of Transformation (MVA)
Compensation
Reactive
(MVAR)
Location
 (State)
Start
of Operation
Termination
of the Concession
RAP
(BRL Million)
Base date
of RAP
Readjustment Index Reinforcement and
Improvement
/
Expansion
Investment
year 2024
(BRL Million)
CHESF Sectioning of the TL 500 kV Luiz Gonzaga - Milagres C1 at SS Milagres II 01/2024 45.00 0.19 1.5 500 0 0 CE, PE 06/2025 12/2042 8.63 7/2023 IPCA Reinforcement and Improvement 0.08
Sectioning of the TL 500 kV Sobradinho - Luiz Gonzaga C2 at SS Juazeiro III 01/2024 64.90 11.25 0.64 500 0 0 BA, PE 11/2024 12/2042 7.25 7/2023 IPCA Reinforcement and Improvement 22.86
Reheading of TL 230 kV Recife II - Pirapama II C2 at SS Jaboatão II 01/2024 3.73 3.73 0 230 0 0 PE 05/2024 12/2042 1.29 7/2023 IPCA Reinforcement and Improvement 0.00
Secc. TL 500 kV Angelim II - Recife II at SS Suape II. 01/2024 247.75 162.16 49.74 500 0 0 PE 09/2024 12/2042 22.09 7/2023 IPCA Reinforcement and Improvement 81.62
Secc. TL 230 Olindina/Catu at SS Alagoinhas II 01/2024 27.20 0.24 0.94 230 0 0 BA 11/2025 12/2042 4.96 7/2023 IPCA Reinforcement and Improvement 0.00
Reinforcement - Sectioning of TL Banabuiú-Milagres C2 at SS Icó. 01/2024 39.33 0.17 3.4 230 0 0 CE 07/2026 12/2042 3.73 7/2023 IPCA Reinforcement and Improvement 1.55
Reinforcement - Sectioning of TL P.Afonso III-Bom Nome C3 at SS Floresta II. 01/2024 35.07 0.04 2 230 0 0 PE 07/2026 12/2042 3.57 7/2023 IPCA Reinforcement and Improvement 1.39
Reinforcement - Sectioning of TL P.Afonso III-Bom Nome C2 at SS Tacaratu. 01/2024 33.17 0.01 14 230 0 0 PE 08/2026 12/2042 5.28 7/2023 IPCA Reinforcement and Improvement 0.79
Reinforcement - Sectioning of TL P.Afonso III-Floresta II C1 at SS Tacaratu. 01/2024 41.18 0.08 7 230 0 0 PE 07/2026 12/2042 1.68 7/2023 IPCA Reinforcement and Improvement 0.68
ELETRONORTE Sectioning of TL 138kV Rondonópolis-Couto Magalhães at SS Petrovina 01/2024 40.42 19.85 0.56 138 0 0 MT 05/2024 12/2042 3.94 7/2023 IPCA Reinforcement and Improvement 32.69
FURNAS TL 138kV Angra/Angra (ENEL) 01/2024 78.75 72.61 0 138 0 0 RJ 04/2024 12/2042 4.15 7/2023 IPCA Reinforcement and Improvement 2.07
SS Iriri 2R - Sectioning TL 138kV Rocha Leão / Campos C1 01/2024 12.42 2.42 0.5 138 0 0 RJ 09/2024 12/2042 1.94 7/2023 IPCA Reinforcement and Improvement 9.16
Secc. TL 345kV Venda das Pedras - Macaé C1 at SS Lagos 01/2024 64.81 0.46 2 345 0 0 RJ 12/2025 12/2042 10.12 7/2023 IPCA Reinforcement and Improvement 6.27
NOVA ERA JANAPU
(SPE 100% FURNAS)
LT 500 kV Janaúba 6 – Presidente Juscelino C1 01/2024 674.21 #N/D 302.85 500 0 470 MG 10/2026 09/2053 68.70 7/2023 IPCA Ampliation 137.47

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

VI.2.2.1.2 Substations
Eletrobras Company Undertaking Base Date
of the
Investment
Investment
(BRL Million)
Investment Realized
(BRL Million)
Extension
from:
Lines
(km)
Voltage
(kV)
Capacity
 of Transformation (MVA)
Compensation
Reactive
(MVAR)
Location
 (State)
Start
of Operation
Termination
of the Concession
RAP
(BRL Million)
Base date
of RAP
Readjustment Index Reinforcement and
Improvement
/
Expansion
Investment
year 2024
(BRL Million)
CGT ELETROSUL Improvement at SS Farroupilha - three-phase transformer replacement - TF2 - 230/69 kV - 88 MVA 01/2024 13.28 11.29 0 230 0 0 RS 07/2024 12/2042 2.13 7/2023 IPCA Reinforcement and Improvement 3.19
Improvement at SS Assis - replacement of single-phase transformer TF1 - 440/230 kV, 336 MA 01/2024 27.69 20.84 0 440 0 0 SP 11/2024 12/2042 6.42 7/2023 IPCA Reinforcement and Improvement 5.98
Improvement at SS Assis - replacement of reserve single-phase transformer - TFR1, 440/230 kV, 112 MVA 01/2024 9.23 6.95 0 440 0 0 SP 11/2024 12/2042 2.14 7/2023 IPCA Reinforcement and Improvement 1.99
SS Areia Improvement - Single Phase Autotransformer Replacement, TF2, 525/230 kV, 672 MVA 01/2024 33.63 24.95 0 525 0 0 PR 11/2024 12/2042 9.19 7/2023 IPCA Reinforcement and Improvement 13.23
Improvement at SS Blumenau - replacement of capacitor bank BC1, 230 kV, 125 MVAr 01/2024 8.26 1.46 0 230 0 0 SC 08/2024 12/2042 0.60 7/2023 IPCA Reinforcement and Improvement 7.28
Improvement at SS Blumenau - replacement of capacitor bank BC2, 230 kV, 125 MVAr 01/2024 8.26 1.46 0 230 0 0 SC 08/2024 12/2042 0.60 7/2023 IPCA Reinforcement and Improvement 7.28
Improvement at SS Blumenau - replacement of single-phase autotransformer TF5, Phases A, B and C, 672 MVA 01/2024 30.64 22.38 0 525 0 0 SC 11/2024 12/2042 9.19 7/2023 IPCA Reinforcement and Improvement 15.63
Improvement at SS Curitiba - replacement of the single-phase reactor RE2, 525 kV, 150 MVAr, Phases A, B and C 01/2024 6.48 7.58 0 525 0 0 PR 11/2024 12/2042 2.50 7/2023 IPCA Reinforcement and Improvement 0.00
Improvement at SS Curitiba - replacement of the single-phase reserve reactor RER1, 525 kV, 50 MVAr 01/2024 2.16 2.53 0 525 0 0 PR 11/2024 12/2042 0.83 7/2023 IPCA Reinforcement and Improvement 0.00
Improvement at SS Curitiba - replacement of the single-phase autotransformer reserve 525/230 kV, 224 MVA 01/2024 8.79 9.27 0 525 0 0 PR 11/2024 12/2042 3.06 7/2023 IPCA Reinforcement and Improvement 0.47
Improvement at SS Curitiba - replacement of the single-phase autotransformer TF2, 525/230 kV, 672 MVA 01/2024 25.89 27.81 0 525 0 0 PR 11/2024 12/2042 9.19 7/2023 IPCA Reinforcement and Improvement 0.93
Improvement at SS Gravataí - replacement of the reserve single-phase autotransformer, 525/230 kV, 224 MVA 01/2024 2.82 1.49 0 525 0 0 RS 11/2024 12/2042 3.06 7/2023 IPCA Reinforcement and Improvement 0.70
Improvement at SS Curitiba - replacement of the single-phase autotransformer TF1, Phases B and C, 672 MVA 01/2024 36.05 16.10 0 525 0 0 PR 02/2025 12/2042 5.28 7/2023 IPCA Reinforcement and Improvement 21.93
Improvement at SS Gravataí - replacement of phases A and C, TF1 525/230 kV, 224 MVA each 01/2024 4.85 2.58 0 525 0 0 RS 02/2025 12/2042 5.28 7/2023 IPCA Reinforcement and Improvement 1.19
Reinforcement at SS Gravataí - Installation of a bank of 525 kV, (3+1R)x50 Mvar bar reactors and connections 01/2024 4.35 3.95 0 525 0 150 RS 01/2025 12/2042 7.61 7/2023 IPCA Reinforcement and Improvement 0.70
Improvement at SS Gravatai: single-phase reactor replacement, RE2, 525 kV, 3x50 Mvar, Phases A and C 01/2024 3.39 0.96 0 525 0 0 RS 06/2025 12/2042 1.68 7/2023 IPCA Reinforcement and Improvement 1.03
Improvement at SS Campos Novos: single-phase reactor replacement, RE1, 525 kV, 3x33,333 Mvar 01/2024 13.48 0.00 0 525 0 0 SC 01/2026 12/2042 2.38 7/2023 IPCA Reinforcement and Improvement 0.82
Improvement at SS Campos Novos: single-phase reactor replacement, 525 kV, 33.333 Mvar, Reserve Phase 1 01/2024 4.68 0.00 0 525 0 0 SC 01/2026 12/2042 0.79 7/2023 IPCA Reinforcement and Improvement 0.26
Improvement at SS Campos Novos: single-phase reactor replacement, RE2, 525 kV, 3x33.333 Mvar 01/2024 13.73 0.00 0 525 0 0 SC 01/2026 12/2042 2.38 7/2023 IPCA Reinforcement and Improvement 0.81
Improvement at SS Itá: single-phase reactor replacement, RE1, 525 kV, 3x50 Mvar 01/2024 14.72 0.00 0 525 0 0 SC 01/2026 12/2042 2.51 7/2023 IPCA Reinforcement and Improvement 1.22
Improvement at SS Itá: replacement of single-phase reactor, RTR1, 525 kV, 50 Mvar, Reserve Phase 1 01/2024 4.91 0.00 0 525 0 0 SC 01/2026 12/2042 0.84 7/2023 IPCA Reinforcement and Improvement 0.41
Improvement at SS Gravataí 2: replacement of the capacitor bank, BC4, 230 kV, 100 Mvar 01/2024 2.31 0.00 0 230 0 0 RS 01/2026 12/2042 0.41 7/2023 IPCA Reinforcement and Improvement 0.16
Improvement at SS Gravataí 2: replacement of the capacitor bank, BC5, 230 kV, 100 Mvar 01/2024 2.31 0.00 0 230 0 0 RS 01/2026 12/2042 0.41 7/2023 IPCA Reinforcement and Improvement 0.16
Improvement at SS Palhoça: replacement of the capacitor bank, BC1, 230 kV, 50 Mvar 01/2024 1.95 0.00 0 230 0 0 SC 01/2026 12/2042 0.34 7/2023 IPCA Reinforcement and Improvement 0.16
Improvement at SS Gravataí: replacement of single-phase autotransformer, TF2, 525/230 kV, 3x224 MVA 01/2024 60.47 4.08 0 525 0 0 RS 06/2025 12/2042 7.22 7/2023 IPCA Reinforcement and Improvement 19.80
Improvement at SS Gravataí: Replacement of TF3 single-phase autotransformer, 525/230 kV, 3x224 MVA 01/2024 60.49 4.12 0 525 0 0 RS 06/2025 12/2042 7.22 7/2023 IPCA Reinforcement and Improvement 19.80
Improvement at SS Passo Fundo: replacement of TF3 single-phase autotransformer, 230/138 kV, 3x28 MVA 01/2024 16.95 0.00 0 230 0 0 RS 01/2026 12/2042 3.02 7/2023 IPCA Reinforcement and Improvement 1.10
Improvement at SS Passo Fundo: replacement of the autotransformer, 230/138 kV, 28 MVA, Reserve Phase 01/2024 6.25 0.00 0 230 0 0 RS 01/2026 12/2042 1.07 7/2023 IPCA Reinforcement and Improvement 0.37
Improvement of SS Campo Grande: replacement of Capacitor Bank, BC1, 138 kV, 30 Mvar 01/2024 2.08 0.00 0 230 0 0 MS 01/2026 12/2042 0.37 7/2023 IPCA Reinforcement and Improvement 0.36
Improvement at SS Londrina: replacement of autotransformer bank, TF3, 525/230 kV, 3x224 MVA 01/2024 43.29 0.00 0 525 0 0 PR 01/2026 12/2042 7.22 7/2023 IPCA Reinforcement and Improvement 5.16
Improvement at SS Blumenau: replacement of Phase C of TF6, 525/230 kV, 224 MVA 01/2024 12.21 0.00 0 525 0 0 SC 01/2026 12/2042 2.06 7/2023 IPCA Reinforcement and Improvement 1.32
Improvement at SS Curitiba: replacement of Phase A of RE1, 525 kV, 50 Mvar 01/2024 5.30 0.00 0 525 0 0 PR 01/2026 12/2042 0.84 7/2023 IPCA Reinforcement and Improvement 0.85
Improvement at SS Santo Ângelo: replacement of the bank of single-phase reactors, RE1, 525 kV, 3x50 Mvar 01/2024 11.44 0.00 0 525 0 0 RS 01/2026 12/2042 1.82 7/2023 IPCA Reinforcement and Improvement 1.80
Improvement at SS Dourados: replacement of three-phase autotransformer, TF1, 230/138 kV, 75 MVA 01/2024 11.29 0.00 0 230 0 0 MS 01/2026 12/2042 2.02 7/2023 IPCA Reinforcement and Improvement 1.08
Improvement at SS Dourados: replacement of TF3 three-phase autotransformer, 230/138 kV, 75 MVA 01/2024 11.49 0.00 0 230 0 0 MS 01/2026 12/2042 1.93 7/2023 IPCA Reinforcement and Improvement 1.06
Improvement at SS Dourados: replacement of the three-phase autotransformer, TF4, 230/138 kV, 75 MVA 01/2024 11.72 0.00 0 230 0 0 MS 01/2026 12/2042 1.93 7/2023 IPCA Reinforcement and Improvement 1.03
Reinforcement at SS Joinville: replacement TF1 138/69 kV - 50 MVA by TF of 138/69 kV – 66 MVA 01/2024 9.79 0.04 0 138 16 0 SC 07/2025 12/2042 1.43 7/2023 IPCA Reinforcement and Improvement 1.23
Reinforcement at SS Jorge Lacerda A: replacement TF5 230/138 kV - 79 MVA by TF of 230/138 kV – 120 MVA 01/2024 28.21 0.09 0 230 41 0 SC 08/2025 12/2042 4.47 7/2023 IPCA Reinforcement and Improvement 2.07
Reinforcement at SS Jorge Lacerda A: replacement of TF7 230/138 kV - 79 MVA, by TR of 120 MVA 01/2024 28.21 0.09 0 230 41 0 SC 08/2025 12/2042 4.47 7/2023 IPCA Reinforcement and Improvement 2.07
Reinforcement at SS Jorge Lacerda A: replacement of the existing TF8 138/69 kV - 25 MVA, by TF of 60 MVA 01/2024 18.01 0.09 0 138 35 0 SC 08/2025 12/2042 2.85 7/2023 IPCA Reinforcement and Improvement 1.32
Reinforcement at SS Jorge Lacerda A: replacement of the existing TF9 - 138/69 kV - 50 MVA, by TF of 60 MVA 01/2024 18.01 0.09 0 138 10 0 SC 04/2026 12/2042 2.85 7/2023 IPCA Reinforcement and Improvement 1.32
Reinforcement at SS Anastácio: Installation of the 2nd 27 Mvar bar reactor at 230 kV 01/2024 16.91 0.00 0 230 0 27 MS 12/2025 12/2042 2.53 7/2023 IPCA Reinforcement and Improvement 1.53
Reinforcement at SS Dourados: Replacement of 27 Mvar Bar Reactor 1 with 1x50Mvar, 230 kV 01/2024 8.13 0.00 0 230 0 23 MS 12/2025 12/2042 1.18 7/2023 IPCA Reinforcement and Improvement 0.76
Improvement at SS Caxias do Sul 5: BC1 Capacitor Bank Replacement, 13.8 kV, 3.6 Mvar 01/2024 0.62 0.00 0 13.8 0 0 RS 03/2027 12/2042 0.22 7/2023 IPCA Reinforcement and Improvement 0.01
Improvement at SS Caxias do Sul 5: BC2 Capacitor Bank Replacement, 13.8 kV, 3.6 Mvar 01/2024 0.62 0.00 0 13.8 0 0 RS 03/2027 12/2042 0.22 7/2023 IPCA Reinforcement and Improvement 0.01
Improvement at SS Caxias do Sul 5: BC3 Capacitor Bank Replacement, 13.8 kV, 3.6 Mvar 01/2024 0.62 0.00 0 13.8 0 0 RS 03/2027 12/2042 0.22 7/2023 IPCA Reinforcement and Improvement 0.01
Improvement at SS Caxias do Sul 5: BC4 Capacitor Bank Replacement, 13.8 kV, 3.6 Mvar 01/2024 0.62 0.00 0 13.8 0 0 RS 03/2027 12/2042 0.22 7/2023 IPCA Reinforcement and Improvement 0.01

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

CHESF SS Milagres - Installation of the fourth 230/69 kV, 100 MVA transformer and connections 01/2024 46.09 11.95 0 230/69 100 0 CE 12/2024 12/2042 3.37 7/2023 IPCA Reinforcement and Improvement 8.27
SS Icó - Installation of the third transformer, 230/69 kV, 100 MVA and connections. 01/2024 16.35 14.37 0 230/69 100 0 CE 04/2024 12/2042 2.85 7/2023 IPCA Reinforcement and Improvement 5.07
SS Eunápolis - installation of the first capacitor bank in three-phase derivation 230 kV - 20 MVar 01/2024 13.86 12.84 0 230 0 20 BA 05/2024 12/2042 1.79 7/2023 IPCA Reinforcement and Improvement 4.65
Installation of the 1st Bar Reactor Bank 500 kV - 3X50 MVA in Sobral III Substation 01/2024 32.16 20.39 0 500 0 150 CE 07/2024 12/2042 5.11 7/2023 IPCA Reinforcement and Improvement 6.11
SS São João do Piauí - Installation of the second autotransformer 500/230 kV, 300 MVA and connections. 01/2024 60.24 50.65 0 500/230 300 0 PI 06/2024 12/2042 6.61 7/2023 IPCA Reinforcement and Improvement 6.50
SS Governador Mangabeira (Improvements) 01/2024 19.72 14.82 0 230 0 0 BA 05/2024 12/2042 1.70 7/2023 IPCA Reinforcement and Improvement 6.35
SS Jacaracanga TR1 (Improvements) 01/2024 16.63 1.50 0 230 0 0 BA 11/2024 12/2042 1.70 7/2023 IPCA Reinforcement and Improvement 10.26
SS Jacaracanga TR2 (Improvements) 01/2024 20.11 1.43 0 230 0 0 BA 11/2024 12/2042 1.70 7/2023 IPCA Reinforcement and Improvement 8.81
SS Jardim (Improvements) 01/2024 14.60 6.45 0 230 0 0 SS 05/2024 12/2042 1.70 7/2023 IPCA Reinforcement and Improvement 10.71
SS Matatu (Improvements) 01/2024 16.96 1.31 0 230 0 0 BA 11/2024 12/2042 1.70 7/2023 IPCA Reinforcement and Improvement 10.67
SS Banabuiú (Improvements) 01/2024 0.04 0.04 0 230 0 0 CE 05/2024 12/2042 1.08 7/2023 IPCA Reinforcement and Improvement 0.00
SS Angelim II 01/2024 2.36 2.36 0 500 0 150 PE 12/2024 12/2042 3.15 7/2023 IPCA Reinforcement and Improvement 0.00
SS Olindina 01/2024 29.55 2.07 0 500 0 150 BA 12/2024 12/2042 3.15 7/2023 IPCA Reinforcement and Improvement 11.94
SS Poções II - 3rd Trafo 01/2024 22.44 9.40 0 230/138 100 0 BA 07/2024 05/2042 4.41 7/2023 IPCA Reinforcement and Improvement 6.66
SS Campina Grande III - 500 kV Reactor Bank 01/2024 34.02 2.35 0 500 0 150 PB 04/2025 10/2041 3.54 7/2023 IPCA Reinforcement and Improvement 15.48
Improvement at SS Camacari II - replacement of RT1 reactor, 500 kV, 100 Mvar 01/2024 9.85 2.59 0 500 0 0 BA 05/2025 12/2042 2.29 7/2023 IPCA Reinforcement and Improvement 7.29
Improvement at SS Camacari II - replacement of RTR1 reserve reactor, 500 kV, 33.3 Mvar 01/2024 12.76 1.36 0 500 0 0 BA 05/2025 12/2042 0.76 7/2023 IPCA Reinforcement and Improvement 11.41
Reinforcement at SS Recife II - RT2 reactor replacement, 500 kV, 100 Mvar 01/2024 10.18 3.77 0 500 0 0 PE 05/2025 12/2042 2.29 7/2023 IPCA Reinforcement and Improvement 6.41
Improvement at SS Recife II - replacement of RTR1 reserve reactor, 500 kV, 33.3 Mvar 01/2024 5.63 1.39 0 500 0 0 PE 05/2025 12/2042 0.76 7/2023 IPCA Reinforcement and Improvement 4.26
Improvement at U.Sobradinho 500 kV - replacement of the RTR1 reserve shunt reactor, 500 kV, 33.3 Mvar 01/2024 5.79 1.45 0 500 0 0 BA 05/2025 12/2042 0.76 7/2023 IPCA Reinforcement and Improvement 4.35
SS Bongi - Installation of the 5th transformer and replacement of three transformers 01/2024 104.17 9.29 0 230 500 0 PE 10/2025 12/2042 18.94 7/2023 IPCA Reinforcement and Improvement 20.27
SS Teresina II - 2nd reactor bank 500 kV 01/2024 59.80 3.33 0 500 0 200 PI 05/2025 12/2042 7.83 7/2023 IPCA Reinforcement and Improvement 13.98
SS Camaçari II 01/2024 13.49 6.84 0 230 0 100 BA 07/2024 07/2040 2.07 7/2023 IPCA Reinforcement and Improvement 7.85
SS São João do Piauí 3rd Trafo 500/230 3x100 MVA 01/2024 55.39 2.90 0 500/230 300 0 PI 03/2025 12/2042 13.32 7/2023 IPCA Reinforcement and Improvement 10.54
Improvement at SS Fortaleza: Replacement of transformer 04T2 of SS FTZ. 01/2024 11.78 0.11 0 230 0 0 CE 03/2026 12/2042 2.20 7/2023 IPCA Reinforcement and Improvement 1.94
Improvement at SS Fortaleza: Replacement of transformer 04T4 of SS FTZ. 01/2024 11.77 0.10 0 230 0 0 CE 03/2026 12/2042 2.20 7/2023 IPCA Reinforcement and Improvement 1.94
Improvement at SS Maceió: Replacement of transformer 04T3 of SS MCO. 01/2024 10.37 0.09 0 230 0 0 AL 03/2026 12/2042 1.45 7/2023 IPCA Reinforcement and Improvement 1.74
Improvement at SS Angelim II: Replacement of Single-phase Reactor, 50 MVAr, operational position 05ER 01/2024 5.12 0.06 0 500 0 0 PE 11/2025 12/2042 0.82 7/2023 IPCA Reinforcement and Improvement 0.06
Improvement at SS Angelim II: Replacement of 3 Single Phase Reactors, 3x50 MVAr, position 05E3 01/2024 15.24 0.06 0 500 0 0 PE 11/2025 12/2042 2.47 7/2023 IPCA Reinforcement and Improvement 0.18
Improvement at SS Angelim II: Replacement of 3 Single Phase Reactors, 3x50 MVAr, position 05E2 01/2024 15.24 0.06 0 500 0 0 PE 11/2025 12/2042 2.47 7/2023 IPCA Reinforcement and Improvement 0.18
Improvement at SS Olindin II: Replacement of a Single Phase Reactor, 50 MVAr, operational position 05ER 01/2024 5.16 0.10 0 500 0 0 BA 08/2025 12/2042 0.82 7/2023 IPCA Reinforcement and Improvement 0.06
Improvement at SS Olindin II: Replacement of 3 Single Phase Reactors, 3x50 MVAr, position 05E1 01/2024 15.32 0.08 0 500 0 0 BA 04/2026 12/2042 2.47 7/2023 IPCA Reinforcement and Improvement 0.25
Reinforcement at SS Barreiras: installation of TR3, 230/138 kV, 100 MVA. 01/2024 32.37 0.08 0 230 100 0 BA 05/2025 12/2042 5.13 7/2023 IPCA Reinforcement and Improvement 2.63
Reinforcement at SS Bom Nome: Installation of the 4th TF 230/138 kV - 100 MVA 01/2024 27.78 0.18 0 230/138 100 0 PE 01/2026 01/2026 4.51 7/2023 IPCA Reinforcement and Improvement 0.00
Reinforcement at SS Bom Jesus da Lapa: replacement of TR3 230/69 kV 01/2024 12.83 0.10 0 230/69 61 0 BA 07/2025 01/2026 2.16 7/2023 IPCA Reinforcement and Improvement 0.30
Reinforcement at SS S. João do Piauí: replacement of TR3 230/69 kV 33 MVA with 100 MVA 01/2024 12.76 0.14 0 230/69 67 0 PI 07/2025 07/2025 1.97 7/2023 IPCA Reinforcement and Improvement 0.19
Reinforcement at SS S. João do Piauí: replacement of TR4 230/69 kV 33 MVA with 100 MVA 01/2024 12.46 0.03 0 230/69 67 0 PI 07/2025 07/2025 1.97 7/2023 IPCA Reinforcement and Improvement 0.00
Reinforcement at SS Boa Esperança: replacement of the ATR1 500/230 kV bank 01/2024 48.49 0.04 0 500 150 0 MA 08/2025 12/2042 5.85 7/2023 IPCA Reinforcement and Improvement 0.29
Reinforcement at SS Boa Esperança: replacement of the reserve phase of ATR1 500/230 kV 01/2024 16.16 0.01 0 500 50 0 MA 08/2025 12/2042 1.95 7/2023 IPCA Reinforcement and Improvement 0.10
Reinforcement at SS Bom Jesus da Lapa: Replacement of TR2 230/69 kV - 33 MVA to 100 MVA 01/2024 17.43 0.01 0 230 67 0 BA 11/2025 12/2042 1.97 7/2023 IPCA Reinforcement and Improvement 0.00
Reinforcement at SS Açu II: Replacement of TR4 230/69 kV - 39 MVA to 100 MVA 01/2024 17.61 0.11 0 230 61 0 RN 11/2025 12/2042 1.97 7/2023 IPCA Reinforcement and Improvement 0.09
Reinforcement at SS Irecê: Replacement of TR2 and TR3 230/69 kV - 33 MVA by two 100 MVA TRs 01/2024 35.07 0.03 0 230 134 0 BA 12/2025 12/2042 7.64 7/2023 IPCA Reinforcement and Improvement 0.20
Reinforcement at SS Itabaiana: Replacement of 1st and 2nd TR 230/69 kV - 100 MVA to 150 MVA 01/2024 25.63 0.01 0 230 100 0 SS 01/2027 12/2042 8.23 7/2023 IPCA Reinforcement and Improvement 0.00
Reinforcement at SS Olindina: Installation of the 3rd bank of 3 x 50 Mvar bar reactors at 500 kV 01/2024 11.12 0.06 0 500 0 150 BA 12/2025 12/2042 6.50 7/2023 IPCA Reinforcement and Improvement 0.11
SS MOSSORÓ IV: Installation of the 2nd 230/69 kV Transformer 01/2024 17.45 0.02 0 230 230 0 RN 08/2026 06/2042 3.22 7/2023 IPCA Reinforcement and Improvement 0.00
Reinforcement at SS Camaçari IV: Installation of the 1st Bar Reactor Bank at 500 kV 06/2023 40.35 0.01 0 500 0 150 BA 03/2026 07/2040 5.34 7/2023 IPCA Reinforcement and Improvement #N/D
Improvement at SS São João do Piauí: Replacement of 1 Autotransformer 500/230 kV, 100 MVA 06/2023 9.89 #N/D 0 500 0 0 PI 03/2027 12/2042 1.59 7/2023 IPCA Reinforcement and Improvement #N/D
Improvement at SS São João do Piauí: Replacement of Autotransformer Bank 500/230 kV, 3x100 MVA 06/2023 29.67 #N/D 0 500 0 0 PI 03/2027 12/2042 4.76 7/2023 IPCA Reinforcement and Improvement #N/D
Improvement at SS Pirapama II: Replacement of Three-Phase Transformer TR1, 230/69/13.8 kV, 100 MVA 06/2023 12.44 #N/D 0 230 0 0 PE 08/2026 12/2042 1.99 7/2023 IPCA Reinforcement and Improvement #N/D
Improvement at SS Campina Grande II: Replacement of Three-Phase Transformer TR3 230/69 kV, 100 MVA 06/2023 12.44 #N/D 0 230 0 0 PB 02/2027 12/2042 2.00 7/2023 IPCA Reinforcement and Improvement #N/D
Improvement at SS Campina Grande II: Replacement of Three-Phase Transformer TR4 230/69 kV, 100 MVA 06/2023 12.44 #N/D 0 230 0 0 PB 02/2027 12/2042 2.00 7/2023 IPCA Reinforcement and Improvement #N/D
Reinforcement at SS Zebu: Installation of the 4th TF 230/69 06/2023 24.57 #N/D 0 230 100 0 AL 09/2026 08/2039 3.27 7/2023 IPCA Reinforcement and Improvement #N/D
Reinforcement at SS Coremas: Installation of the 4th TR 230/69 kV 06/2023 24.97 #N/D 0 230 100 0 PB 08/2026 12/2042 4.09 7/2023 IPCA Reinforcement and Improvement #N/D

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

ELETRONORTE SS Guamá - Replacement of power transformer TR1 230/69 kV- (3+1)x50 MVA (Improvement) 01/2024 33.93 17.57 0 230 0 0 PA 06/2024 12/2042 3.31 7/2023 IPCA Reinforcement and Improvement 21.70
SS Vila do Conde - Replacement of 4 banks of capacitors 230 kV, 111 MVAr each. (Improvement) 01/2024 56.31 29.77 0 230 0 0 PA 07/2024 12/2042 1.92 7/2023 IPCA Reinforcement and Improvement 45.49
SS Colinas - Replacement of fixed series compensation BC2 500 kV, 161 MVA (Improvement) 01/2024 66.75 36.28 0 500 0 0 TO 04/2024 12/2042 11.24 7/2023 IPCA Reinforcement and Improvement 51.86
SS Pres. Dutra- Replacement of compensation series BC2 500 kV, 454 Mvar. (Improvement) 01/2024 58.10 45.40 0 500 0 0 MA 05/2024 12/2042 13.72 7/2023 IPCA Reinforcement and Improvement 16.67
SS Vilhena - installation of the RT9 reactor of 230kV bar. 01/2024 8.53 12.08 0 230 0 60 RO 04/2024 12/2042 2.24 7/2023 IPCA Reinforcement and Improvement 0.00
SS Marabá: Replacement TF2 230/69 kV, 33MVA, per 100 MVA unit 01/2024 32.06 21.70 0 230 67 0 PA 05/2024 12/2042 4.84 7/2023 IPCA Reinforcement and Improvement 20.55
Improvement at SS P. Dutra - RT4 reactor replacement, 500 kV, 3x50 MVAr 01/2024 22.54 2.76 0 500 0 0 MA 08/2024 12/2042 2.41 7/2023 IPCA Reinforcement and Improvement 9.96
Improvement at SS P. Dutra - RT5 reactor replacement, 500 kV, 3x33.33 MVAr 01/2024 22.53 2.74 0 500 0 0 MA 08/2024 12/2042 2.29 7/2023 IPCA Reinforcement and Improvement 9.96
Improvement at SS P. Dutra - RT6 reactor replacement, 500 kV, 3x33.33 MVAr 01/2024 20.88 1.09 0 500 0 0 MA 04/2026 12/2042 2.30 7/2023 IPCA Reinforcement and Improvement 9.96
Improvement at SS Imperatriz - replacement of RT2 reactor, 500 kV, 3x50 MVAr 01/2024 15.02 2.06 0 500 0 0 MA 07/2024 12/2042 2.41 7/2023 IPCA Reinforcement and Improvement 13.71
Improvement at SS Imperatriz - replacement of RT6 reactor, 500 kV, 3x45.33 MVAr 01/2024 22.53 0.59 0 500 0 0 MA 04/2026 12/2042 2.31 7/2023 IPCA Reinforcement and Improvement 6.14
Improvement at the SS Imperatriz - replacement of the single-phase RTR6 reactor, 500 kV, 1x45.33 MVAr 01/2024 7.51 0.20 0 500 0 0 MA 04/2026 12/2042 0.77 7/2023 IPCA Reinforcement and Improvement 2.05
Improvement SS P. Dutra - RT1 reactor replacement, 500 kV, 3x50 MVAR 01/2024 63.79 0.74 0 500 0 0 MA 04/2026 12/2042 2.35 7/2023 IPCA Reinforcement and Improvement 8.03
Improvement at SS São Luis II - RT3 reactor replacement, 500 kV, 3x45.33 MVAR 01/2024 19.07 0.44 0 500 0 0 MA 04/2026 12/2042 2.32 7/2023 IPCA Reinforcement and Improvement 6.80
Improvement at SS São Luís II - replacement of the reserve reactor RTR1, 500 kV, 1x45.33 MVAR 01/2024 6.34 0.13 0 500 0 0 MA 04/2026 12/2042 0.77 7/2023 IPCA Reinforcement and Improvement 2.27
Improvement at SS Marabá - RT1 reactor replacement, 500 kV, 3x50 MVAR 01/2024 12.61 1.74 0 500 0 0 PA 07/2024 12/2042 2.51 7/2023 IPCA Reinforcement and Improvement 2.95
Improvement at SS Marabá - Replace the MBCL7-01, BC1 500 kV, 3x116 MVAr series capacitor bank 01/2024 59.54 1.74 0 500 0 0 PA 10/2025 12/2042 11.49 7/2023 IPCA Reinforcement and Improvement 15.43
SS Porto Velho: Installation of 2 500 kV bar reactors, (6 + 1R) x 50 Mvar and connection modules 01/2024 61.70 6.13 0 500 0 300 RO 11/2024 02/2039 7.65 7/2023 IPCA Reinforcement and Improvement 46.75
SS Imperatriz - Replacement of the Series Capacitor Bank 01/2024 57.15 0.45 0 500 0 163 MA 02/2026 12/2042 14.68 7/2023 IPCA Reinforcement and Improvement 4.66
SS 230/138 kV Caladinho II and sectioning of TL 230 kV Coletora Porto Velho - Porto Velho, C2. 01/2024 124.30 16.22 6.36 230 80 0 RO 07/2025 09/2052 13.44 7/2023 IPCA Expansion 87.94
Reinforcement at SS Sorriso: Installation of the 4th TF 230/69/13.8 kV, 1 x 60 MVA three-phase 01/2024 25.58 0.00 0 230 60 0 MT 12/2025 12/2042 4.05 7/2022 IPCA Reinforcement and Improvement 0.05
Improvement at SS Rondonópolis: Replacement of capacitor bank 13.8 kV, number 1. 01/2024 4.09 0.00 0 13.8 0 0 MT 08/2027 12/2042 0.15 7/2023 IPCA Reinforcement and Improvement 0.07
Improvement at SS Rondonópolis: Replacement of capacitor bank 13.8 kV, number 3. 01/2024 4.09 0.00 0 13.8 0 0 MT 08/2027 12/2042 0.15 7/2023 IPCA Reinforcement and Improvement 0.07
Improvement at SS Rondonópolis: Replacement of capacitor bank 13.8 kV, number 2. 01/2024 4.09 0.00 0 13.8 0 0 MT 08/2027 12/2042 0.15 7/2023 IPCA Reinforcement and Improvement 0.07
Improvement at SS Vila do Conde: replacement of power autotransformer bench - VCAT7 02 01/2024 109.99 0.00 0 500 0 0 PA 08/2027 12/2042 7.61 7/2023 IPCA Reinforcement and Improvement 0.23
Improvement at SS Vila do Conde: replacement of the power autotransformer bank - VCAT7 01 01/2024 58.54 0.00 0 500 0 0 PA 08/2027 12/2042 5.07 7/2023 IPCA Reinforcement and Improvement 0.12
Improvement at SS Marabá: reactor replacement - MBRE7 04 SUB MARABA only Phases A and V. 01/2024 15.08 0.00 0 500 0 0 PA 08/2027 12/2042 1.66 7/2023 IPCA Reinforcement and Improvement 0.22
Improvement at SS Transamazônica: replacement of the 230 kV 30 MVAr reactor - TMRE6.01 07/2023 6.56 0.47 0 230 0 0 PA 09/2024 12/2042 1.05 7/2023 IPCA Reinforcement and Improvement #N/D
Improvement at SS São Luís I: replacement of power transformer No. 03 230/69kV of 100MVA. 01/2024 24.06 0.00 0 230 0 0 MA 08/2027 12/2042 2.14 7/2023 IPCA Reinforcement and Improvement 0.24
Improvement at SS São Luís II: replacement of power autotransformers No. 01 500/230kV of 200MVA. 01/2024 57.49 0.00 0 500 0 0 MA 08/2027 12/2042 6.72 7/2023 IPCA Reinforcement and Improvement 0.27
Improvement at SS Couto Magalhaes: replacement of transformer 138/13.8kV - 15MVA - NUMBER 1 01/2024 15.15 0.00 0 138 0 0 MT 02/2027 12/2042 0.84 7/2023 IPCA Reinforcement and Improvement 0.33
Improvement at SS Coxipó: replacement of Reactor 230kV 30MVAr number 1 of SS Coxipó - CXRE6-01 01/2024 12.71 0.00 0 230 0 0 MT 02/2027 12/2042 1.06 7/2023 IPCA Reinforcement and Improvement 0.28
Improvement at SS Coxipó: replacement of Reactor 230kV 30MVAr number 2 of SS Coxipó - CXRE6-02. 01/2024 12.71 0.00 0 230 0 0 MT 02/2027 12/2042 1.06 7/2023 IPCA Reinforcement and Improvement 0.28
Reinforcement at SS Pimenta Bueno: Installation of the 3rd Autotransformer 230/138 kV, 55 MVA. 01/2024 28.15 0.00 0 230 55 0 RO 01/2026 01/2026 4.42 7/2023 IPCA Reinforcement and Improvement 1.02
Reinforcement at SS Marabá: replacement of the TF3 230/69 kV, 33 MVA, with a new 100 MVA unit. 01/2024 19.90 0.00 0 230 67 0 PA 02/2026 12/2042 2.24 7/2023 IPCA Reinforcement and Improvement 0.04
Reinforcement at SS Presidente Dutra: replacement of TR1 500/230 kV, (3+1)x100 MVA, by (3+1)x150 MVA. 01/2024 65.46 0.00 0 500 150 0 MA 09/2025 12/2042 10.67 7/2023 IPCA Reinforcement and Improvement 1.22
Reinforcement at SS Marabá: replacement of TR1 500/230 kV, 3x100 MVA, by 3x150 MVA. 01/2024 62.32 0.00 0 500 150 0 PA 09/2025 12/2042 9.90 7/2023 IPCA Reinforcement and Improvement 0.24
SS P. Dutra- Replacement of BC1 500 kV, 390 Mvar, from TL Imperatriz-PDutra, by another 543Mvar. 01/2024 89.96 0.00 0 500 0 153 MA 10/2027 12/2042 16.99 7/2023 IPCA Reinforcement and Improvement 0.17
SS Imperatriz- Replacement BC1 500 kV, 390 Mvar, of TL Imperatriz-PDutra, for another 543MVAr. 01/2024 90.01 0.00 0 500 0 153 MA 10/2027 12/2042 16.99 7/2023 IPCA Reinforcement and Improvement 0.22
Improvement at SS Marabá: Replacement of TF1 power transformer 230/13.8 kV, 160 MVA 06/2023 15.79 #N/D 0 230 0 0 PA 03/2028 12/2042 2.54 7/2023 IPCA Reinforcement and Improvement #N/D
Improvement at SS Rondonópolis: RT1 Line Reactor Replacement 230 kV, 30Mvar 45383 6.67 #N/D 0 230 0 0 MT 03/2028 12/2042 1.06 7/2023 IPCA Reinforcement and Improvement 0.00
Improvement at SS Imperatriz: TF4 Three Phase Transformer Replacement, 230/69/13.8 kV, 100 MVA 06/2023 12.44 #N/D 0 230 0 0 MA 09/2028 12/2042 1.93 7/2023 IPCA Reinforcement and Improvement #N/D
Improvement at SS São Luis I: Replacement of Three-Phase Transformer TF4 230/69 kV, 100 MVA 06/2023 12.44 #N/D 0 230 0 0 MA 09/2028 12/2042 1.93 7/2023 IPCA Reinforcement and Improvement #N/D
Improvement at SS Presidente Dutra: Replacement of Reactor Bank RT3, 525 kV, 150 Mvar 06/2023 14.67 #N/D 0 500 0 0 MA 09/2028 12/2042 2.27 7/2023 IPCA Reinforcement and Improvement #N/D
Improvement at SS Presidente Dutra: Replacement of Reactor Bank RT2, 525 kV, 150 Mvar 06/2023 14.67 #N/D 0 500 0 0 MA 09/2028 12/2042 2.27 7/2023 IPCA Reinforcement and Improvement #N/D
Improvement at SS Presidente Dutra: Replacement of RTR1 Reserve Reactor, 525 kV, 50 Mvar 06/2023 4.89 #N/D 0 500 0 0 MA 09/2028 12/2042 0.76 7/2023 IPCA Reinforcement and Improvement #N/D

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

FURNAS SS Adrianópolis - Reactor Replacement, AT53, AT1B, AT2A and AT2B 01/2024 63.13 63.00 0 345/138 0 0 RJ 04/2024 12/2042 10.81 7/2023 IPCA Reinforcement and Improvement 0.01
SS Itumbiara 18R 01/2024 114.81 98.42 0 500/345 0 0 MG 06/2024 12/2042 17.70 7/2023 IPCA Reinforcement and Improvement 13.05
SS Angra 7R 01/2024 11.04 10.66 0 500 0 0 RJ 04/2024 12/2042 1.46 7/2023 IPCA Reinforcement and Improvement 0.22
SS Campos 20R 01/2024 95.74 68.69 0 138 0 0 RJ 08/2024 12/2042 11.72 7/2023 IPCA Reinforcement and Improvement 23.63
SS Itaberá 9R 01/2024 78.37 31.31 0 765 0 330 SP 11/2024 12/2042 9.61 7/2023 IPCA Reinforcement and Improvement 50.63
SS Adrianópolis 01/2024 61.46 38.49 0 500 0 135.9 RJ 07/2024 12/2042 10.04 7/2023 IPCA Reinforcement and Improvement 9.23
SS Poços de Caldas 19R 01/2024 37.31 39.60 0 500 40 0 MG 08/2024 12/2042 11.58 7/2023 IPCA Reinforcement and Improvement 12.06
SS Bandeirantes 14R 01/2024 8.98 8.17 0 345/230 0 0 GO 04/2024 12/2042 1.52 7/2023 IPCA Reinforcement and Improvement 2.08
SS Campinas 01/2024 43.59 23.82 0 500 0 136 SP 12/2024 12/2042 10.20 7/2023 IPCA Reinforcement and Improvement 17.48
SS Vitória - replacement of phase A of the single-phase transformer TR4, 345/138 kV, 75 MVA. 01/2024 9.04 0.03 0 345/138 0 0 ES 04/2025 12/2042 0.95 7/2023 IPCA Reinforcement and Improvement 0.91
SS Bras. Sul - revitalization of single-phase transformer TR1, 345/138 kV, 3x50 MVA 01/2024 20.29 3.68 0 345/138 0 0 DF 03/2025 12/2042 4.41 7/2023 IPCA Reinforcement and Improvement 19.75
SS Poços de Caldas - replacement of the reserve transformer, 345/138 kV, 1x50 MVA 01/2024 6.76 5.98 0 345/138 0 0 MG 02/2025 12/2042 1.46 7/2023 IPCA Reinforcement and Improvement 2.46
SS Poços de Caldas - replacement of phase C of transformer TR1, 345/138 kV, 1x50 MVA 01/2024 5.84 5.19 0 345/138 0 0 MG 02/2025 12/2042 1.27 7/2023 IPCA Reinforcement and Improvement 2.11
SS Poços de Caldas - replacement of the single-phase transformer TR2, 345/138 kV, 3x50 MVA 01/2024 21.11 17.94 0 345/138 0 0 MG 02/2025 12/2042 4.39 7/2023 IPCA Reinforcement and Improvement 7.15
SS Ivaiporã - replacement of phase B and C of the single-phase reactor RIA1, 750 kV, 2x110 MVAr 01/2024 21.37 5.26 0 750 0 0 PR 04/2025 12/2042 2.30 7/2023 IPCA Reinforcement and Improvement 15.00
SS Ivaiporã - replacement of phase A of the single-phase reactor RIA2, 750 kV, 1x110 MVAr 01/2024 10.69 2.63 0 750 0 0 PR 04/2025 12/2042 1.15 7/2023 IPCA Reinforcement and Improvement 7.50
SS Campos - replacement of phase A and B of the single-phase reactor RT5, 345 kV, 2x20 MVAr 01/2024 6.38 1.01 0 345 0 0 RJ 04/2025 12/2042 0.93 7/2023 IPCA Reinforcement and Improvement 5.38
SS Bras. Sul - replacement of the single-phase transformer TR6, 345/230 kV, 3x75 MVA 01/2024 17.05 9.80 0 345/230 0 0 DF 10/2024 12/2042 5.42 7/2023 IPCA Reinforcement and Improvement 9.64
SS Cach. Paulista - replacement of the single-phase transformer TR57, 500/138 kV, 3x83.33 MVA 01/2024 36.18 0.06 0 500/138 0 0 SP 04/2027 12/2042 5.79 7/2023 IPCA Reinforcement and Improvement 1.66
SS Cach. Paulista - replacement of the single-phase transformer TR59, 500/138 kV, 3x83.33 MVA 01/2024 36.18 0.06 0 500/138 0 0 SP 04/2027 12/2042 5.79 7/2023 IPCA Reinforcement and Improvement 1.66
SS Cach. Paulista - replacement of the reserve transformer TRR1, 500/138 kV, 1x83.33 MVA 01/2024 5.90 0.02 0 500/138 0 0 SP 04/2027 12/2042 1.93 7/2023 IPCA Reinforcement and Improvement 0.27
SS Campinas - replacement of the single-phase transformer TR51, 500/345 kV, 3x186.66 MVA 01/2024 72.85 0.19 0 500/345 0 0 SP 11/2026 12/2042 8.59 7/2023 IPCA Reinforcement and Improvement 31.26
SS Itaberá - replacement of phase C of the single-phase reactor RIV2, 750 kV, 1x110 MVAr 01/2024 10.09 9.10 0 750 0 0 SP 04/2024 12/2042 1.13 7/2023 IPCA Reinforcement and Improvement 1.17
SS Araraquara FUR - Replacement of RTPC reactor, 500kV, 3x24.4667 MVAr 01/2024 10.19 6.38 0 500 0 0 SP 05/2025 12/2042 2.28 7/2023 IPCA Reinforcement and Improvement 6.23
SS Araraquara FUR - Replacement of reactor RMR1, 500kV, 3x24.4667 MVAr 01/2024 10.19 6.38 0 500 0 0 SP 08/2025 12/2042 2.28 7/2023 IPCA Reinforcement and Improvement 6.23
SS Araraquara FUR - Replacement of reactor, RMR2, 500kV, 3x24.4667 MVAr 01/2024 10.19 6.38 0 500 0 0 SP 09/2025 12/2042 2.28 7/2023 IPCA Reinforcement and Improvement 6.23
SS Araraquara FUR - Replacement of reactor, RTCA, 500kV, 3x24,4667 MVAr 01/2024 10.19 6.38 0 500 0 0 SP 09/2025 12/2042 2.28 7/2023 IPCA Reinforcement and Improvement 6.23
SS Ivaiporã - Replacement of compensation series TL 765kV Ivaiporã / Itaberá C1 01/2024 107.21 21.37 0 65 0 0 PR 03/2026 12/2042 22.99 7/2023 IPCA Reinforcement and Improvement 28.41
SS Ivaiporã - Replacement of compensation series TL 765kV Ivaiporã / Itaberá C2 01/2024 107.03 21.37 0 65 0 0 PR 08/2025 12/2042 22.99 7/2023 IPCA Reinforcement and Improvement 28.41
SS Ivaiporã - Replacement of compensation series TL 765kV Ivaiporã / Itaberá C3 01/2024 85.79 0.13 0 65 0 0 PR 01/2026 12/2042 22.99 7/2023 IPCA Reinforcement and Improvement 28.41
SS Itaberá - Replacement of the series compensation of 765kV Itaberá / Tijuco Preto C1 01/2024 128.68 29.16 0 765 0 0 SP 03/2026 12/2042 24.03 7/2023 IPCA Reinforcement and Improvement 37.08
SS Itaberá - Replacement of the series compensation of 765kV Itaberá / Tijuco Preto C2 01/2024 128.69 29.16 0 765 0 0 SP 08/2025 12/2042 24.03 7/2023 IPCA Reinforcement and Improvement 37.08
SS Itaberá - Replacement of the series compensation of TL 765kV Itaberá / Tijuco Preto C3 01/2024 128.72 29.16 0 765 0 0 SP 01/2026 12/2042 24.03 7/2023 IPCA Reinforcement and Improvement 37.08
SS Itabera - Replacement of phases A and B of the RT1 765kV reactor bank 01/2024 6.04 2.19 0 765 0 0 SP 04/2025 12/2042 2.22 7/2023 IPCA Reinforcement and Improvement 3.85
SS Viana - Installation of the 1st Bar Reactor Bank (3+1)x20 01/2024 28.69 15.79 0 345 0 0 ES 09/2025 12/2042 3.71 7/2023 IPCA Reinforcement and Improvement 11.07
SS Vitória - Installation of the 1st Bar Reactor Bank 345kV, (3+1)x20 Mvar 01/2024 53.42 19.20 0 345 0 0 ES 03/2025 12/2042 4.43 7/2023 IPCA Reinforcement and Improvement 19.46
SS Cachoeira Paulista - Replacement of single-phase reserve reactor RTR2 01/2024 5.89 0.01 0 500 0 0 SP 09/2027 12/2042 0.86 7/2023 IPCA Reinforcement and Improvement 0.27
SS Araraquara - Replacement of Single Phase Reserve Reactor RTR1, 500kV, 27MVAr 01/2024 3.69 2.47 0 500 0 0 SP 09/2025 12/2042 0.79 7/2023 IPCA Reinforcement and Improvement 2.17
SS Ivaiporã - Replacement of Single Phase Reserve Reactor RTR1, 750kV, 110MVAr 01/2024 11.45 3.41 0 750 0 0 PR 09/2025 12/2042 1.33 7/2023 IPCA Reinforcement and Improvement 7.50
SS Ivaiporã - Replacement of the TL Series Capacitor Bank for Foz do Iguaçu - C1 01/2024 109.82 24.17 0 750 0 0 PR 11/2026 12/2042 23.28 7/2023 IPCA Reinforcement and Improvement 28.41
SS Ivaiporã - Replacement of the TL Series Capacitor Bank for Foz do Iguaçu - C2 01/2024 109.82 24.17 0 750 0 0 PR 11/2026 12/2042 23.28 7/2023 IPCA Reinforcement and Improvement 28.41
SS Ivaiporã - Replacement of the TL Series Capacitor Bank for Foz do Iguaçu - C3 01/2024 24.03 24.17 0 750 0 0 PR 11/2026 12/2042 23.28 7/2023 IPCA Reinforcement and Improvement 0.00
Revitalization of the HVDC System 01/2024 1929.62 30.13 0 600 0 0 PR 01/2026 12/2042 0.00 7/2023 IPCA Reinforcement and Improvement 925.26
SS USI Campos 01/2024 7.54 7.54 0 138/69 53 0 RJ 02/2026 12/2042 2.14 7/2023 IPCA Reinforcement and Improvement 0.00
SS USI CAMPOS - replacement of 67 MVA AT03 by 73 MVA TR03 01/2024 7.37 7.26 0 138 6 0 RJ 02/2026 12/2042 2.03 7/2023 IPCA Reinforcement and Improvement 0.16
SS 138/13.8 kV Angra - Transformation 138/13.8 kV - 15 MVA. 01/2024 16.09 0.09 0 138 7.5 0 RJ 05/2026 12/2042 2.35 7/2023 IPCA Reinforcement and Improvement 0.00
Reinforcement at SS Resende: Installation of the 1st RTB 500 kV - (3+1)x66.66 Mvar 01/2024 35.98 0.03 0 500 0 200 RJ 12/2025 12/2042 4.08 7/2023 IPCA Reinforcement and Improvement 0.13
Installation of the reserve phase for the 1st RTB 500 kV - (3+1)x66.66 Mvar, at SS Resende. 01/2024 11.99 0.01 0 500 0 0 RJ 12/2025 12/2042 0.75 7/2023 IPCA Reinforcement and Improvement 0.04
Reinforcement at SS Ivaiporã: Installation of the 2nd RTB 765 kV - 3x110 Mvar 06/2023 39.06 0.00 0 765 0 330 PR 01/2026 12/2042 6.23 7/2023 IPCA Reinforcement and Improvement #N/D
Installation of the reserve phase for the 2nd RTB 765 kV - (3+1)x66.66 Mvar, at SS Ivaiporã 06/2023 7.27 0.00 0 765 0 0 PR 01/2026 12/2042 1.16 7/2023 IPCA Reinforcement and Improvement #N/D
Reinforcement at SS Baixada Fluminense: Installation of the 1st RTB 500 kV - (3+1)x66.66 Mvar 01/2024 165.02 0.02 0 500 0 200 RJ 01/2026 12/2042 6.80 7/2023 IPCA Reinforcement and Improvement 0.02
Installation of the reserve phase for the 1st RTB 500 kV - (3+1)x66.66 Mvar, at SS Baixada Fluminense 01/2024 55.01 0.01 0 500 0 0 RJ 01/2026 12/2042 0.75 7/2023 IPCA Reinforcement and Improvement 0.01
Reinforcement at SS Ibiúna: Installation of the 1st RTB 345 kV - 3x44 Mvar 01/2024 12.58 0.01 0 345 0 132 SP 01/2026 12/2042 5.28 7/2023 IPCA Reinforcement and Improvement 0.01
Installation of the reserve phase for the 1st RTB 345 kV - (3+1)x44 Mvar, at SS Ibiúna. 01/2024 7.43 0.00 0 345 0 0 SP 01/2026 12/2042 0.52 7/2023 IPCA Reinforcement and Improvement 0.00
Reinforcement at SS Ibiúna: Installation of the 2nd RTB 345 kV - 3x44 Mvar 01/2024 12.58 0.01 0 345 0 132 SP 01/2026 12/2042 3.12 7/2023 IPCA Reinforcement and Improvement 0.01
Installation of the reserve phase for the 2nd RTB 345 kV - (3+1)x44 Mvar, at SS Ibiúna 01/2024 7.43 0.00 0 345 0 0 SP 01/2026 12/2042 0.52 7/2023 IPCA Reinforcement and Improvement 0.00
Reinforcement at SS Vitória: Replacement of ATR1 345/138 kV by new bank (3+1)x133.33MVA. 01/2024 45.07 0.07 0 345 175 0 ES 07/2026 12/2042 10.82 7/2023 IPCA Reinforcement and Improvement 0.00
SS Guarulhos: Installation of the first bank of busbar reactors at 345 kV 01/2024 36.76 0.01 0 345 0 132 SP 02/2027 12/2042 5.24 7/2023 IPCA Reinforcement and Improvement 0.48
SS Guarulhos: Installation of a reserve phase for RT1, 345 kV, 44MVar 01/2024 3.83 0.00 0 345 0 0 SP 02/2027 12/2042 0.55 7/2023 IPCA Reinforcement and Improvement 0.05
SS Guarulhos: Installation of second bar reactor bank, 345 kV, 3x44MVar 01/2024 36.64 0.01 0 345 0 132 SP 02/2027 12/2042 5.22 7/2023 IPCA Reinforcement and Improvement 0.48
SS Guarulhos: Installation of a reserve phase for RT2, 345 kV, 44MVar 01/2024 3.83 0.00 0 345 0 0 SP 02/2027 12/2042 0.55 7/2023 IPCA Reinforcement and Improvement 0.05
Improvement at SS TIJUCO PRETO: BC03 Capacitor Bank Replacement 06/2023 3.95 #N/D 0 345 0 0 SP 04/2028 02/2027 0.74 7/2023 IPCA Reinforcement and Improvement #N/D
Improvement at SS BANDEIRANTES 345 Kv: Replacement of capacitor bank 06/2023 3.41 #N/D 0 345 0 0 GO 05/2024 02/2027 0.61 7/2023 IPCA Reinforcement and Improvement #N/D
Improvement at SS P. COLOMBIA 138 Kv: Replacement of TR5MVA transformer 06/2023 3.16 #N/D 0 138 0 0 MG 04/2027 02/2027 0.52 7/2023 IPCA Reinforcement and Improvement #N/D
Improvement at SS Ivaipora Fur: Replacement of RT1A reactor PHASES A, B and C 06/2023 4.04 #N/D 0 69 0 0 PR 04/2027 02/2027 0.67 7/2023 IPCA Reinforcement and Improvement #N/D
Improvement at SS Tijuco Preto: Replacement of BC07 345 kV Capacitor Bank 06/2023 9.40 #N/D 0 345 0 0 SP 04/2028 02/2027 1.73 7/2023 IPCA Reinforcement and Improvement #N/D
Improvement at SS Ivaipora Fur: Replacement of TRRG09V power transformer 06/2023 14.85 #N/D 0 525 0 0 PR 04/2027 02/2027 2.45 7/2023 IPCA Reinforcement and Improvement #N/D
Improvement at SS IVAIPORA FUR: Replacement of RT1B reactor PHASE A, B and C 06/2023 4.04 #N/D 0 69 0 0 PR 04/2027 02/2027 0.67 7/2023 IPCA Reinforcement and Improvement #N/D
Improvement at SS TIJUCO PRETO: Replacement of RTIATP2 reactor PHASES B and C 06/2023 15.48 #N/D 0 765 0 0 SP 04/2028 02/2027 2.54 7/2023 IPCA Reinforcement and Improvement #N/D
Improvement at SS IVAIPORA FUR: Replacement of RT1C reactor PHASE A, B and C 06/2023 4.04 #N/D 0 69 0 0 PR 04/2027 02/2027 0.67 7/2023 IPCA Reinforcement and Improvement #N/D
Improvement at SS TIJUCO PRETO: Replacement of reactor RT01 PHASES A, B and C 06/2023 4.00 #N/D 0 69 0 0 SP 04/2028 02/2027 0.66 7/2023 IPCA Reinforcement and Improvement #N/D
Improvement at SS TIJUCO PRETO: Replacement of reactor RT02 PHASE A, B and C 06/2023 4.00 #N/D 0 69 0 0 SP 04/2028 02/2027 0.66 7/2023 IPCA Reinforcement and Improvement #N/D
Improvement at SS BANDEIRANTES: Replacement of LINE REACTOR - RTBDSB1 PHASES A, B and C 06/2023 9.74 #N/D 0 345 0 0 GO 04/2026 02/2027 1.59 7/2023 IPCA Reinforcement and Improvement #N/D
Improvement at SS IVAIPORA FUR: Replacement of AT129V power transformer - RESERVE AUTOTRAFO 06/2023 19.92 #N/D 0 765 0 0 PR 04/2027 02/2027 3.28 7/2023 IPCA Reinforcement and Improvement #N/D
Improvement at SS RIO VERDE FUR: Replacement of AT76V power transformer - RESERVE AUTOTRAFO 06/2023 6.79 #N/D 0 230 0 0 GO 04/2027 02/2027 1.12 7/2023 IPCA Reinforcement and Improvement #N/D
Improvement at SS BANDEIRANTES: Replacement of AT87V power transformer - RESERVE AUTOTRAFO 06/2023 9.39 #N/D 0 345 0 0 GO 04/2026 02/2027 1.54 7/2023 IPCA Reinforcement and Improvement #N/D
Improvement at SS Itaberá: Replacement of RIV1 line reactor bank 765 kV, 3x109.67 Mvar 06/2023 11.83 #N/D 0 765 0 0 SP 04/2028 02/2027 1.95 7/2023 IPCA Reinforcement and Improvement #N/D
Improvement at SS Adrianópolis: Replacement of transformer bank TR2A 345/138 kV, 3x75 MVA 06/2023 26.77 #N/D 0 345 0 0 RJ 10/2026 02/2027 4.39 7/2023 IPCA Reinforcement and Improvement #N/D
Improvement at SS Marimbondo: Replacement of reserve transformer TRR1 500/345 kV, 62.33 Mvar 06/2023 9.25 #N/D 0 500 0 0 MG 04/2027 02/2027 1.53 7/2023 IPCA Reinforcement and Improvement #N/D
Improvement at SS Rio Verde Furnas: Replacement of autotransformer bank TR1 230/138 kV 06/2023 20.37 #N/D 0 230 0 0 GO 04/2027 02/2027 3.37 7/2023 IPCA Reinforcement and Improvement #N/D
Improvement at SS Barro Alto: Replacement of transformer bank TR1 230/69 kV, 3x16.67 MVA 06/2023 14.19 #N/D 0 230 0 0 GO 04/2027 02/2027 2.35 7/2023 IPCA Reinforcement and Improvement #N/D
Improvement at SS Brasília Sul: Replacement of C-phase of autotransformer TR4, 345/138 kV, 50 MVA 06/2023 8.01 #N/D 0 345 0 0 DF 04/2027 02/2027 1.32 7/2023 IPCA Reinforcement and Improvement #N/D

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

VI.2.2.2 Special Purpose Entities
                         
VI.2.2.2.1 Transmission Lines
SPE Purpose
(From - To)
Companies
Eletrobras (%)
Investment
 Predicted
(BRL Million)
Planned Investment Reference Date Investment Realized
(BRL Million) 
Lines Extension (km) Voltage (kV) Beginning of
 Operation
Termination of the Concession RAP
(BRL Million)
RAP base date
cycle 2023/2023
Readjustment index
 of RAP
Transnorte Energia S.A.  Eng. Lechuga - Ecuador CD Eletronorte (50.38%) 2,253.42 Sep-22 400.00 788.0 500 - Jan-42 313.81 Sep-23 IPCA
Ecuador - Boa Vista CD 667.4 500 -
SPE Nova Era Janapu Transmissora S.A. Janaúba 6 – Presidente Juscelino C1 Furnas (100%) 681.33 Jun-23 6.00 302.9 500 - Sep-53 68.70 Jun-23 IPCA

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

VI.2.2.2.2 Substations
SPE SS Companies
Eletrobras (%)
Investment
Predicted
(BRL Million)
Planned Investment Reference Date Investment Realized
(BRL Million) 
Transformation Capacity (MVA) Location (State) Start of Operation Termination of the Concession RAP
(BRL Million)
RAP base date
cycle 2023/203
Readjustment index
 of RAP
Transnorte Energia S.A. (1) Eng. Lechuga Eletronorte (49%) 491.09 Sep/2022 - - AM Oct-25 Jan-42 50.3 Sep-23 IPCA
Ecuador - RR Oct-25
Boa Vista 800 May-15
Luziânia Niquelândia Transmissora S.A. (2) Luziânia Eletrobras (49%) 65.69 Jan-24 - 225.0 GO Jan/26 May-42 8.71 Jun-23 IPCA
                         
Note:                        
(1) The investment of the substations are considered in the SPE-LT-Implementation tab.    
(2) Implementation of reinforcement of the SPE Luziânia-Niquelândia provided for in the REA 14.803/2023, of August 1, 2023.    

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

VII. SPEs Data
                                                                       
VII.1 Operational data
VII.1.1 Generation
VII.1.1.1 Operational Assets and Generated Energy
SPE Power plant Source Companies
Eletrobras (%)
Percentage
Total for
Eletrobras (%)
Location
(State)
Capacity
Installed
(MW)
Guarantee
Physics
(MWm)
Generated Energy  Beginning of
Operation
End of
 Concession
Partners Commercialized Energy Energy purchased for resale Energy Sold 
1Q24
(MWh)
2Q24
(MWh)
3Q24
(MWh)
4Q24
(MWh)
ACR ACL
(%)
1Q24 2Q24 3Q24 4Q24 Buyer Type 1Q24 2Q23 3Q23 4Q23
(%) Average Price (BRL/MWh) BRL million MWh BRL million MWh BRL million MWh BRL million MWh BRL million MWh BRL million MWh BRL million MWh BRL million MWh
V. de Santa Joana IX Energia Renováveis S.A. (1) Santa Joana IX Wind Holding (49%) 49.00% PI 29.60 15.80  10,695.85       Aug-15 Mar-49 Contour Global Holding Ltda (51.00%) 100% 198.41 0%  -              Eletrobras Companies ACR 0.00 0.00            
ACL 0.00 0.00            
Other ACR 5.72 28,828.80            
ACL 0.00 0.00            
V. de Santa Joana X Energia Renováveis S.A. (1) Santa Joana X  Wind Holding (49%) 49.00% PI 29.60 16.00  10,477.52       Jul-15 Mar-49 Contour Global Holding Ltda (51.00%) 100% 198.30 0%  -              Eletrobras Companies ACR 0.00 0.00            
ACL 0.00 0.00            
Other ACR 5.89 29,702.40            
ACL 0.00 0.00            
V. de Santa Joana XI Energia Renováveis S.A. (1) Santa Joana XI  Wind Holding (49%) 49.00% PI 29.60 16.00  10,484.82       Jul-15 Mar-49 Contour Global Holding Ltda (51.00%) 100% 198.41 0%  -              Eletrobras Companies ACR 0.00 0.00            
ACL 0.00 0.00            
Other ACR 6.11 30,794.40            
ACL 0.00 0.00            
V. de Santa Joana XII Energia Renováveis S.A.(1) Santa Joana XII  Wind Holding (49%) 49.00% PI 28.90 16.90  12,588.64       Jul-15 Mar-49 Contour Global Holding Ltda (51.00%) 100% 198.41 0%  -              Eletrobras Companies ACR 0.00 0.00            
ACL 0.00 0.00            
Other ACR 6.63 33,415.20            
ACL 0.00 0.00            
V. de Santa Joana XIII Energia Renováveis S.A.(1) Santa Joana XIII  Wind Holding (49%) 49.00% PI 29.60 16.00  11,224.48       Jul-15 Mar-49 Contour Global Holding Ltda (51.00%) 100% 198.18 0%  -              Eletrobras Companies ACR 0.00 0.00            
ACL 0.00 0.00            
Other ACR 5.80 29,265.60            
ACL 0.00 0.00            
V. de Santa Joana XV Energia Renováveis S.A.(1) Santa Joana XV  Wind Holding (49%) 49.00% PI 28.90 16.20  13,622.40       Jul-15 Mar-49 Contour Global Holding Ltda (51.00%) 100% 198.41 0%  -              Eletrobras Companies ACR 0.00 0.00            
ACL 0.00 0.00            
Other ACR 6.50 32,760.00            
ACL 0.00 0.00            
V. de Santa Joana XVI Energia Renováveis S.A. (1) Santa Joana XVI  Wind Holding (49%) 49.00% PI 28.90 17.40  13,384.00       Jul-15 Mar-49 Contour Global Holding Ltda (51.00%) 100% 198.41 0%  -              Eletrobras Companies ACR 0.00 0.00            
ACL 0.00 0.00            
Other ACR 6.63 33,415.20            
ACL 0.00 0.00            
V. de Santa Joana I Energia Renováveis S.A. (2) Santa Joana I  Wind Holding (49%) 49.00% PI 28.90 15.00  13,821.10       Jan-16 Jun-49 Contour Global Holding Ltda (51.00%) 100% 236.72 0%  -              Eletrobras Companies ACR 0.00 0.00            
ACL 0.00 0.00            
Other ACR 7.60 32,104.80            
ACL 0.00 0.00            
V. de Santa Joana III Energia Renováveis S.A. (2) Santa Joana III  Wind Holding (49%) 49.00% PI 29.60 13.40  10,776.60       Mar-16 Jun-49 Contour Global Holding Ltda (51.00%) 100% 236.11 0%  -              Eletrobras Companies ACR 0.00 0.00            
ACL 0.00 0.00            
Other ACR 6.91 29,265.60            
ACL 0.00 0.00            
V. de Santa Joana IV Energia Renováveis S.A. (2) Santa Joana IV Wind Holding (49%) 49.00% PI 28.90 14.20  13,948.80       Jan-16 May-49 Contour Global Holding Ltda (51.00%) 100% 236.35 0%  -              Eletrobras Companies ACR 0.00 0.00            
ACL 0.00 0.00            
Other ACR 7.33 31,012.80            
ACL 0.00 0.00            
V. de Santa Joana V Energia Renováveis S.A. (2) Santa Joana V Wind Holding (49%) 49.00% PI 28.90 15.70  11,627.60       Jan-16 Jun-49 Contour Global Holding Ltda (51.00%) 100% 236.41 0%  -              Eletrobras Companies ACR 0.00 0.00            
ACL 0.00 0.00            
Other ACR 7.20 30,456.00            
ACL 0.00 0.00            
V. de Santa Joana VII Energia Renováveis S.A. (2) Santa Joana VII Wind Holding (49%) 49.00% PI 27.20 14.90  14,004.50       Jan-16 Jun-49 Contour Global Holding Ltda (51.00%) 100% 236.49 0%  -              Eletrobras Companies ACR 0.00 0.00            
ACL 0.00 0.00            
Other ACR 7.56 31,968.00            
ACL 0.00 0.00            
V. de Santo Augusto IV Energia Renováveis S.A. (2) Saint Augustus IV Wind Holding (49%) 49.00% PI 28.90 15.50  14,028.70       Feb-16 Jun-49 Contour Global Holding Ltda (51.00%) 100% 233.89 0%  -              Eletrobras Companies ACR 0.00 0.00            
ACL 0.00 0.00            
Other ACR 7.78 33,264.00            
ACL 0.00 0.00            
Eólica Ibirapuitã S.A. Ibirapuitã I Wind CGT Eletrosul (100.00%) 100.00% RS 25.20 9.26  15,925.77       Aug-15 Feb-47 - 0% - 100%                 Eletrobras Companies ACR 0.00 0.00            
ACL 0.00 0.00            
Other ACR 0.00 0.00            
ACL 2.74 13,168.09            
Rouar S.A. (8) Artilleros  Wind Holding (50.00%) 50.00% Uruguay (Colonia) 65.10 N/A 38,110.00       Apr-15 Dec-36 Administração Nacional de Usinas y Trasmisiones TPP (50.00%)  -   -   -   -   -              TPP - 14.97 38,110.21            
Usina de Energia Eólica Caiçara I S.A. (3) Caiçara I Wind CHESF (49.00%) 49.00% RN 27.00 13.50  13,524.38       Dec-15 Jun-47 Envolver Participações S.A. (51.00%) 100% 482.28 0% - -             Eletrobras Companies ACR 0.00 0.00            
ACL 0.00 0.00            
Other ACR 6.50 13,479.47            
ACL 0.00 0.00            
Usina de Energia Eólica Caiçara II S.A. (3) Caiçara II Wind CHESF (49.00%) 49.00% RN 18.00 9.60  9,900.93       Dec-15 Jul-47 Envolver Participações S.A. (51.00%) 100% 452.51 0% - -             Eletrobras Companies ACR 0.00 0.00            
ACL 0.00 0.00            
Other ACR 4.48 9,893.96            
ACL 0.00 0.00            
Usina de Energia Eólica Junco I S.A. (3) Junco I Wind CHESF (49.00%) 49.00% RN 24.00 11.20  12,565.85       Dec-15 Jul-47 Envolver Participações S.A. (51.00%) 100% 490.42 0% - -             Eletrobras Companies ACR 0.00 0.00            
ACL 0.00 0.00            
Other ACR 5.87 11,966.75            
ACL 0.00 0.00            
Usina de Energia Eólica Junco II S.A. (3) Junco II Wind CHESF (49.00%) 49.00% RN 24.00 11.80  12,978.80       Dec-15 Jul-47 Envolver Participações S.A. (51.00%) 100% 425.47 0% - -             Eletrobras Companies ACR 0.00 0.00            
ACL 0.00 0.00            
Other ACR 5.50 12,927.90            
ACL 0.00 0.00            
HPP Baguari Consortium (11) HPP Baguari Hydraulics Furnas (100.00%) (9) 100.00% MG 140.00 81.90  210,564.97        Sep-09 Mar-46 - 100% 303.93 0%  -              Eletrobras Companies ACR 0.00 0.00            
ACL 0.00 0.00            
Other ACR 51.96 170,968.47            
ACL 0.00 0.00            
Chapecoense Geração S.A. HPP Foz do Chapecó Hydraulics Furnas (40.00%) 40.00% SC/RS 855.00 408.90  470,113.63       Oct-10 Feb-42 CPFL Geração de Energia S.A. - CPFL-G (51%)
Cia. Estadual de Geração de Energia Elétrica - CEEE-G (9%)
100% 375.24 0% 14.4 96,096.0             Eletrobras Companies ACR 0.00 0.00            
ACL 0.00 0.00            
Other ACR 353.87 943,051.20            
ACL 0.00 0.00            
Companhia Energética Sinop S.A. HPP Sinop Hydraulics Chesf (24.50%)
Eletronorte (24.50%)
49.00% MT 401.88 242.80  352,491.28       Sep-19 Jan-50 EDF TPP Norte Fluminense (51.00%) 97% 198.87 3% 11.6 43,680.0             Eletrobras Companies ACR 0.00 0.00            
ACL 2.88 12,492.48            
Other ACR 93.43 469,808.31            
ACL 0.00 0.00            
Empresa de Energia São Manoel S.A. HPP São Manoel Hydraulics Furnas (33.333%) 33.333% PA 735.84 430.40 1,129,285.76       Dec-17 Dec-49 EDP - Energias do Brasil S.A. (33.334%)
China Three Gorges Brasil Energias Ltda. (33.333%)
74% 148.59 26%  -              Eletrobras Companies ACR 0.00 0.00            
ACL 0.00 0.00            
Other ACR 93.95 632,268.26            
ACL 33.63 196,650.00            
Jirau Energia S.A. HPP Jirau Hydraulics CHESF (20.00%)
CGT Eletrosul (20.00%)
40.00% RO 3750.00 2101.50 5,374,882.43       Sep-13 Dec-45 Mizah Energia (20%)
Engie (40%)
67% 175.65 33% 63.5 950,598.0             Eletrobras Companies ACR 0.00 0.00            
ACL 119.60 424,476.72            
Other ACR 617.44 3,515,188.49            
ACL 185.72 636,719.72            
Enerpeixe S.A. HPP Peixe Angical Hydraulics Furnas (40.00%) 40.00% TO 498.75 266.60  911,024.18       Jun-06 May-42 EDP - Energias do Brasil S.A. (60%) 0% - 100%  -   -              Eletrobras Companies ACR 0.00 0.00            
ACL 0.00 0.00            
Other ACR 0.00 0.00            
ACL 85.39 810,000.00            
Madeira Energia S.A. HPP Santo Antônio Hydraulics Furnas (99.736%) (9) 99.7362% RO 3568.30 2313.30 6,159,059.97       Mar-12 Oct-47 Caixa Fundo de Investimento em Participações Amazônia Energia (0.1307%)
Novonor Energia do Brasil S.A. (0.1215%)
SAAG Investimentos S.A. (0.0701%)
63% 193.81 37% 162.7 877,148.6             Eletrobras Companies ACR 0.00 0.00            
ACL 9.29 87,360.00            
SAAG Investimentos S.A. (10) Furnas (83.42%) Andrade Gutierrez Participações S.A. (16.58%) Other ACR 724.96 3.740.641            
ACL 423.99 1,515,423.88            
Norte Energia S.A. HPP B. Monte  Hydraulics CHESF (15.00%)
Eletronorte (34.98%)
49.98% PA 11,233.1 4,571.0 9,801,350.05       Apr/16 Aug-45 Petros (10.00%)
Belo Monte Part (10.00%)
Funcef (10.00%)
Other (20.02%)
75% 167.91 25% 101.0 1,537,348             Eletrobras Companies ACR 0,00  0,00            
ACL 0,00 0,00            
Other ACR 1,185.00 7,057,508.00            
ACL 394.00 3,979,114.00            
Retiro Baixo Energética S.A. HPP Retiro Baixo Hydraulics Furnas (100.00%) (9) 100.00% MG 83.66 34.80 95,302.79       Mar-10 Mar-47 - 100% 302.54 0% 0.3 4,200.0             Eletrobras Companies ACR 0.00 0.00            
ACL 0.00 0.00            
Other ACR 23.97 79,230.29            
ACL 0.00 0.00            
Serra do Facão Energia S.A. (4) HPP Serra do Facão Hydraulics Furnas (54.013%) 54.0130% GO 212.58 174.40  123,780.60        Jul-10 Nov-40 Alcoa Alumínio S.A. (34.9737%)
DME Energética S.A. (11.0133%)
70% 324.29 30% 7.05 90,096.00             Eletrobras Companies ACR 0.00 0.00            
ACL 0.00 0.00            
Other ACR 86,04 265.320,24            
ACL 36,72 111.384,00            
Teles Pires Participações S.A. HPP Teles Pires Hydraulics Eletronorte (50.56%)
Furnas (24.72%)
CGT Eletrosul (24.72%)
100.000% PA/MT 1819.80 964.20 2,668,053.15       Nov-15 Jan-47 - 62% 123.89 38% 12.1 65,520.0             Eletrobras Companies ACR 0.00 0.00            
ACL 0.00 0.00            
Other ACR 157.28 1,269,506.72            
ACL 98.26 669,713.73            
Tijoá Participações e Investimentos S.A. (5) HPP Três Irmãos Hydraulics Furnas (49.90%) 49.90% SP 807.50 206.70  592,676.83        Nov-93 Oct-44 Juno Participações e Investimentos S.A. (50.1%) - - -  -   -              Eletrobras Companies ACR 0.00 0.00            
ACL 0.00 0.00            
Other ACR 0.00 0.00            
ACL 0.00 0.00            
Energia dos Ventos V S.A. (6) (7) São Januário Wind Furnas (100%) 100.00% CE 21.00 9.70 10,239.74       Jun-20 Jul-47 - 100% 233.35 0%                 Eletrobras Companies ACR 0.00 0.00            
Energia dos Ventos VI S.A.(6) (7) Nossa Senhora de Fátima Wind Furnas (100%) 100.00% CE 30.00 13.60 13,422.01       Jun-20 Aug-47 ACL 0.00 0.00            
Energia dos Ventos VII S.A.(6) (7) Jandaia Wind Furnas (100%) 100.00% CE 27.00 14.10 15,091.14       May-20 Aug-47 Other ACR 24.31 104,176.83            
Energia dos Ventos VIII S.A.(6) (7) São Clemente Wind Furnas (100%) 100.00% CE 21.00 10.20 10,353.28       May-20 Jul-47 ACL 0.00 0.00            
Energia dos Ventos IX S.A.(6) (7) Jandaia I Wind Furnas (100%) 100.00% CE 24.00 10.60 12,110.29       May-20 Jul-47
                                                                       
(1) Chapada do Piauí I Holding S.A.                                    
(2) Chapada do Piauí II Holding S.A.                                    
(3) Vamcruz I Participações S.A.
(4) The shareholding of Furnas in Serra do Facão Energia S.A. refers to the total shares (54.013%), which considers the common shares (43.0262%) also the preferred shares (100%).
(5) Tijoá operates the HPP Três Irmãos under Special Administration regime (Law No. 12,783/2013).
(6) Fortim Wind Complex.
(7) Furnas' participation in the SPE is through the holding Brasil Ventos Energia S.A. (BVE), in which Furnas' shareholding is 100%.
(8) Considered Exchange on 03/28/2024 of BRL 4.9962/USD (Bacen Ptax Sale)
(9) Equity interest in which Eletrobras Companies increased their interest in 4Q23.
(10) The SPE has as its corporate purpose the shareholding in Madeira Energia S.A., in which its percentage of interest is 0.0701%.
(11) HPP Baguari Consortium is composed of SPEs Baguari I Geração de Energia Elétrica S.A. (51%) and Baguari Energia S.A. (49%).

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

VII.1.2 Transmission
                   
VII.1.2.1 Operational assets 
                   
VII.1.2.1.1 Transmission Lines             REH 3216/2023    
SPE Purpose
(From-to)
Eletrobras Companies (%) Extension
(km)
Voltage
(kV)
Start of Operation   Termination of the Concession RAP on 12.31.2023
(BRL Million)
RAP on 03.31.2024
(BRL Million)
Readjustment Index
Belo Monte Transmissora de Energia SPE S.A. (1) Xingu - Strait C1 and C2 (Bipole 1) Eletronorte (24.5%)
Furnas (24.5%)
4,152.00 800 Dec-17 Jun-44 377.4 377.4 IPCA
Goiás Transmissão S.A. Rio Verde Norte – Trindade C1 and C2 Furnas (49%) 373.90 500 Nov-13 Jul-40 52.3 52.3 IPCA
Trindade – Xavantes C1 and C2 74.12 230 Nov-13
Trindade – Carajás C1 30.53 230 Dec-13
Interligação Elétrica do Madeira S.A. (1) Porto Velho Coletora - Araraquara 2 C1 and C2 (Bipole 1) Chesf (24.5%)
Furnas (24.5%)
4,858.96 600 Nov-13 Feb-39 372.7 372.7 IPCA
Interligação Elétrica Garanhuns S.A. L.Gonzaga - Garanhuns II Chesf (49%) 218.00 500 Nov-15 Dec-41 95.6 95.6 IPCA
Garanhuns II - Campina Grande III 194.00 500 Nov-15
Garanhuns II - Pau Ferro 209.00 500 Dec-15
Garanhuns II - Angelim I 12.00 230 Mar-16
Lago Azul Transmissão S.A. Barro Alto - Itapaci C2 Furnas (49.9%) 69.34 230 Sep-16 May-44 5.5 5.5 IPCA
MGE Transmissão S.A. Mosque - Mutum C1 Furnas (49%) 136.18 500 Jun-21 Jul-40 33.6 33.6 IPCA
Mutum - Viana 2 C1 118.57 500 Jun-21
Viana 2 – Viana C1 and C2 15.00 345 Aug-14
Mata de Santa Geneva Transmissão S.A. Itatiba – Batteries C1 Furnas (49.9%) 414.26 500 Mar-20 May-44 223.0 223.0 IPCA
Araraquara 2 - Itatiba C1 222.59 500 Mar-20 IPCA
Araraquara 2 - Fernão Dias C1 249.60 500 May-20 IPCA
Paranaíba Transmissora de Energia S.A. Barriers II - Rio das Éguas C1 Furnas (24.5%) 239.07 500 Jan-17 May-43 160.2 160.2 IPCA
Rio das Éguas - Luziânia C1 368.04 500 Jul-16
Luziânia - Pirapora 2 C1 346.19 500 May-16
Sistema de Transmissão do Nordeste S.A. Teresina II -Sobral III CHESF (49.0%) 633.0 500 Jan-06 Feb-34 158.2 158.2 IGP-m
Teresina II -Fortaleza II Jan-06
Sobral III - Fortaleza II  Jan-06
Transenergia Renovável S.A. Chapadão – Jataí C1 and C2 Furnas (49%) 276.10 230 Dec-12 May-40 46.3 46.3 IPCA
Barra dos Coqueiros – Quirinópolis C1 51.31 230 Apr-11
Palmeiras – Edéia C1 (3) 58.58 230 Feb-12
Jataí – Mineiros C1 61.41 138 Dec-12
Mineiros - Morro Vermelho C1 46.85 138 Dec-12
Jataí - TPP Jataí C1 51.57 138 Dec-12
Jataí - TPP Água Emendada C1 32.56 138 Dec-12
Morro Vermelho - TPP Alto Taquari C1 30.11 138 Dec-12
Quirinópolis - TPP Quirinópolis C1 33.88 138 Apr-11
Quirinópolis - TPP Boa Vista C1 16.35 138 Apr-11
Edéia - TPP Tropical Bionenergia I and II C1 48.88 138 Nov-13
Transenergia São Paulo S.A. EL 138 kV Itatiba  Dist 1 to 8 Furnas (49%) 0.00 138 Aug-12 Nov-39 N/A N/A IPCA
Triângulo Mineiro Transmissora S.A. Marimbondo II - Assis C1 Furnas (100%) 296.50 500 Dec-16 Aug-43 42.6 42.6 IPCA
Vale do São Bartolomeu Transmissora de Energia S.A. Luziânia - Brasília Leste C1 Furnas (90%) 68.86 500 Feb-18 Oct-43 33.1 33.1 IPCA
Luziânia - Brasília Leste C2 66.99 500 Feb-18
Samambaia - Brasília Sul C3 14.00 345 May-16
Brasília Sul - Brasília Geral C3 13.55 230 Apr-17
HPP Baguari Consortium (2) HPP Baguari - Baguari C1 and C2  Furnas (100%) 1.21 230 Nov-09 Aug-41 N/A N/A N/A
HPP Baguari - Baguari C3 and C4 1.36 230 May-10 Aug-41 N/A N/A N/A
Chapecoense Geração S.A. (2) HPP Foz do Chapecó - Foz do Chapecó C1 and C2 Furnas (40%) 2.93 230 Oct-10 Feb-42 N/A N/A N/A
HPP Foz do Chapecó - Foz do Chapecó C3 and C4 2.90 230 Oct-10 Feb-42 N/A N/A N/A
Empresa de Energia São Manoel S.A. (2) HPP São Manoel - Paranaíta C1 Furnas (33.333%) 40.00 500 Dec-17 Apr-49 N/A N/A N/A
Enerpeixe S.A. (2) Peixe Angical – Peixe 2 C1 Furnas (40%) 20.00 500 Apr-08 May-42 N/A N/A N/A
Madeira Energia S.A. (2) HPP Santo Antônio - Coletora Porto Velho C1 Furnas (99.736%) 12.64 500 Mar-12 Oct-47 N/A N/A N/A
HPP Santo Antônio - Porto Velho Coletora C2 12.64 500 Mar-12
SAAG Investimentos S.A. (4) HPP Santo Antônio - Porto Velho Coletora C3 and C4 Furnas (83.42%) 25.14 500 Jun-14 Oct-47 N/A N/A N/A
HPP Santo Antônio - Porto Velho C1 and C2 40.00 230 Jan-17
Retiro Baixo Energética S.A. (2) Retiro Baixo – Curvelo 2 C1 Furnas (100%) 45.06 138 Mar-10 Aug-41 N/A N/A N/A
Serra do Facão Energia S.A. (2) Serra do Facão – Catalão C1 and C2 Furnas (54.013%) 65.60 138 Jul-10 Nov-36 N/A N/A N/A
Teles Pires Participações S.A. (2) Teles Pires - Paranaíta C1 and C2 Eletronorte (50.56%)
Furnas (24.72%)
CGT Eletrosul (24.72%)
18.60 500 Nov-15 Jan-47 N/A N/A N/A
Brasil Ventos Energia S.A. - Fortim (2) Jandaia - Russas II C1 Furnas (100%) 68.76 230 Mar-20 Jul-47 N/A N/A N/A
Norte Energia S.A. SS Belo Monte – SS Xingu  CHESF (15.00%)
Eletronorte (34.98%)
67.50 500 Apr-16 Aug-45 N/A N/A N/A
SS Pimental – SS Altamira  64.00 230 Apr-16
                   
(1) For direct current projects, the assumption of accounting for the network extension was changed in order to align with the assumptions adopted by the Ministry of Mines and Energy - MME. The network kilometer accounting considers the extension per pole and no longer per stretch as reported in previous quarters.
(2) There is no RAP because facilities are of restricted interest to the generating plant.
(3) ANEEL, through ORDER No. 2,714, of 09.27.2023, granted partial provision to the claim of TER, for recognition of the entry into commercial operation of TL 230 kV Palmeiras-Edéia and its transmission functions, with the respective right to receive revenue, as of 02.17.2012.
(4) The SPE has as its corporate purpose the shareholding in Madeira Energia S.A., in which its percentage of interest is 5.1114%.

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

VII.1.2.1.2 Substations             REH 3216/2023  
SPE Substation Eletrobras Companies (%) Transformation Capacity - MVA Status Start of Operation Termination of the Concession RAP on 12.31.2023
(BRL Million)
RAP on 03.31.2024
(BRL Million)
Readjustment Index
Belo Monte Transmissora de Energia SPE S.A. 4,000 MW Converter Station at SS Xingu (2) Eletronorte (24.5%)
Furnas (24.5%)
4,752.00 Asset Dec-17 Jun-44 413.1 413.1 IPCA
 792.00 Reserve
3,850 MW Converter Station at SS Estreito (2) 4,660.80 Asset Dec-17 Jun-44
 776.80 Reserve
Caldas Novas Transmissão S.A. Corumbá (Expansion) (3) Furnas (49.9%)  150.00 Asset Aug-13 Jun-41 6.8 6.8 IPCA
Goiás Transmissão S.A. Trindade Furnas (49%) 1,200.00 Asset Nov-13 Jul-40 36.4 36.4 IPCA
 133.33 Reserve
Trindade (1st Expansion) (7)  400.00 Asset
Interligação Elétrica do Madeira S.A. Rectifier Station at SS Coletora Porto Velho (Bipole 2) (2) Chesf (24.5%)
Furnas (24.5%)
3,831.96 Asset Jun-15 Feb-39 320.6 320.6 IPCA
 638.66 Reserve
Inverter Station at SS Araraquara 2 (Bipole 2) (2) 3,608.04 Asset Jun-15 Feb-39
 601.34 Reserve
Interligação Elétrica Garanhuns S.A. Garanhuns II Chesf (49%)  600.00 Asset Nov-15 Dec-41 36.5 36.5 IPCA
Garanhuns II  200.00 Reserve Nov-15
Pau Ferro 1,500.00 Asset Dec-15
Pau Ferro  250.00 Reserve Dec-15
Luziânia Niquelândia Transmissora S.A. Luziânia Holding (49%)  450.00 Asset Jun-14 May-42 22.5 22.5 IPCA
Niquelândia  30.00 Asset Aug-15
Mata de Santa Geneva Transmissora S.A. (4) Santa Barbara (C.Estático)(2) Furnas (49.9%)  -    Apr-19 May-44 89.0 89.0 IPCA
Fernão Dias  3,600.00 Asset Nov-20 IPCA
 400.00 Reserve
Static Compensator at SS Santa Bárbara D'Oeste (2)  -    Apr-19 IPCA
Static Compensator at SS Itatiba (2)  -    Feb-20 IPCA
MGE Transmissão S.A. (4) Viana 2 (Enlargement) Furnas (49%)  900.00 Asset Jan-21 Jul-40 31.5 31.5 IPCA
Viana 2  900.00 Asset Aug-14 Jul-40 IPCA
 300.00 Reserve
Paranaíba Transmissora de Energia S.A. Pirapora 2 (2) Furnas (24.5%)  -    Jan-17 May-43 21.3 21.3 IPCA
Luziânia (2)  -    Apr-17
Rio das Éguas (2)  -    Apr-17
Barreiras II (2)  -    May-17
Sistema de Transmissão do Nordeste S.A. Sobral III CHESF (49.0%)  -    Jan-06 Feb-34 13.6 13.6 IGP-m
Fortaleza II  -    Jan-06
Teresina II  -    Jan-06
Transenergia Renovável S.A. Jataí Furnas (49%)  450.00 Asset Dec-12 May-40 34.7 34.7 IPCA
Quirinópolis  225.00 Asset Apr-11
Edéia  300.00 Asset Feb-12
Edéia (1st Expansion)  150.00 Asset  
Mineiros  -  Reserve Dec-12
Morro Vermelho  -  Reserve Dec-12
Transenergia São Paulo S.A. (5) Itatiba Furnas (49%) 1,200.00 Asset Aug-12 Nov-39 28.5 28.5 IPCA
 133.34 Reserve
Transnorte Energia S.A. Boa Vista (C.Estático) Eletronorte (50.38%)  150.00 Asset May-15 Jan-42 16.2 16.2 IPCA
Triângulo Mineiro Transmissora S.A. Marimbondo II(2) Furnas (100%)  -    Dec-16 Aug-43 10.4 10.4 IPCA
Assis (2)  -   
Vale do São Bartolomeu Transmissora de Energia S.A. Brasília Leste Furnas (90%) 1,080.00 Asset Feb-18 Oct-43 16.0 16.0 IPCA
 180.00 Reserve
Empresa de Energia São Manoel S.A. (1) HPP São Manoel Furnas (33.333%)  780.00 Asset Dec-17 Apr-49 N/A N/A N/A
 390.00 Reserve
Enerpeixe S.A. (1) HPP Peixe Angical Furnas (40%)  525.00 Asset Jun-06 May-42 N/A N/A N/A
 175.00 Reserve
Madeira Energia S.A. (1) HPP Santo Antônio Furnas (99.736%) 3,639.00 Asset Mar-12 Oct-47 N/A N/A N/A
   500.00 Asset
SAAG Investimentos S.A. (6) Furnas (83.42%) 1,220.00 Reserve
   250.00 Reserve
Retiro Baixo Energética S.A. (1) HPP Retiro Baixo Furnas (100%)  100.00 Asset Mar-10 Aug-41 N/A N/A N/A
Serra do Facão Energia S.A. (1) HPP Serra do Facão Furnas (54.013%)  236.20 Asset Jul-10 Nov-36 N/A N/A N/A
 118.10 Reserve
Teles Pires Participações S.A. (1) HPP Teles Pires Eletronorte (50.56%)
Furnas (24.72%)
CGT Eletrosul (24.72%)
2,025.00 Asset Nov-15 Jan-47      
Brasil Ventos Energia S.A. - Fortim (1) Jandaia Furnas (100%)  140.00 Asset Mar-20 Jul-47 N/A N/A N/A
V. de Santa Joana IX Energia Renováveis S.A. (1) SS Chapada 2 Holding (49%)  240.00 Asset Aug-15 Mar-49 N/A N/A N/A
V. de Santa Joana X Energia Renováveis S.A. (1) Holding (49%) Jul-15 Mar-49
V. de Santa Joana XI Energia Renováveis S.A. (1) Holding (49%) Jul-15 Mar-49
V. de Santa Joana XII Energia Renováveis S.A.(1) Holding (49%) Jul-15 Mar-49
V. de Santa Joana XIII Energia Renováveis S.A.(1) Holding (49%) Jul-15 Mar-49
V. de Santa Joana XV Energia Renováveis S.A.(1) Holding (49%) Jul-15 Mar-49
V. de Santa Joana XVI Energia Renováveis S.A. (1) Holding (49%) Jul-15 Mar-49
V. de Santa Joana I Energia Renováveis S.A. (1) SS Chapada 3 Holding (49%)  240.00 Asset Jan-16 Jun-49 N/A N/A N/A
V. de Santa Joana III Energia Renováveis S.A. (1) Holding (49%) Mar-16 Jun-49
V. de Santa Joana IV Energia Renováveis S.A. (1) Holding (49%) Jan-16 May-49
V. de Santa Joana V Energia Renováveis S.A. (1) Holding (49%) Jan-16 Jun-49
V. de Santa Joana VII Energia Renováveis S.A. (1) Holding (49%) Jan-16 Jun-49
V. de Santo Augusto IV Energia Renováveis S.A. (1) Holding (49%) Feb-16 Jun-49
Eólica Ibirapuitã S.A. (1) SS Cerro Chato CGT Eletrosul (100.00%) 35.00 Asset Aug-15 Feb-47 N/A N/A N/A
Rouar S.A.(1)   Holding (50.00%)              
Companhia Energética Sinop S.A.(1) SS HPP Sinop - TE01 Chesf (24.50%)
Eletronorte (24.50%)
228.00 Asset Oct-19 Jan-50 N/A N/A N/A
SS HPP Sinop - TE02 228.00 Asset Sep-19 Jan-50 N/A N/A N/A
SS HPP Sinop - TE Reserve 228.00 Reserve - Jan-50 N/A N/A N/A
Jirau Energia S.A. (1) SS JIRAU (13 x 340 MVA) CHESF (20.00%)
CGT Eletrosul (20.00%)
 4,420.00 Asset Sep-13 Dec-45 N/A N/A N/A
SS JIRAU (1 x 340 MVA) 340.00 Reserve Sep-13 Dec-45 N/A N/A N/A
Norte Energia S.A.(1) SS Belo Monte (18 x 680 MVA) CHESF (15.00%)
Eletronorte (34.98%)
 12,340.00 Asset Apr-16 Aug-45 N/A N/A N/A
SS Belo Monte (2 x 680 MVA)  1,360.00 Reserve Apr-16 Aug-45 N/A N/A N/A
SS Pimental (3 x 90MVA) 270.00 Asset Apr-16 Aug-45 N/A N/A N/A
SS Pimental (1 x 90MVA) 90.00 Reserve Apr-16 Aug-45 N/A N/A N/A
Usina de Energia Eólica Caiçara I S.A. (1) SS Amazonas CHESF (49.00%)  150.00 Asset Dec-15 Dec-35 N/A N/A N/A
Asset Dec-15 Dec-35 N/A N/A N/A
Usina de Energia Eólica Caiçara II S.A. (1) CHESF (49.00%) Asset Dec-15 Dec-35 N/A N/A N/A
Asset Dec-15 Dec-35 N/A N/A N/A
Usina de Energia Eólica Junco I S.A. (1) CHESF (49.00%) Asset Dec-15 Dec-35 N/A N/A N/A
Asset Dec-15 Dec-35 N/A N/A N/A
Usina de Energia Eólica Junco II S.A. (1) CHESF (49.00%) Asset Dec-15 Dec-35 N/A N/A N/A
Asset Dec-15 Dec-35 N/A N/A N/A
                   
                   
(1) There is no RAP because facilities are of restricted interest to the generating plant.
(2) The accessed substation does not belong to the SPE. 
(3) The Caldas Novas Transmissão enterprise is responsible for the operation and maintenance of the SS
Corumbá. 
(4) Total RAP SS were considered because the expansions have already been completed.
(5) The TSP project is responsible for the operation and maintenance of the Itatiba substation, which does not have a transmission line, so we have considered the total RAP in the substation.
(6) The SPE has as its corporate purpose the shareholding in Madeira Energia S.A., in which its percentage of interest is 0.0701%.
(7) According to ReA No. 9,997/2021, refers to the installation of the 1st 500 kV bar reactor - (3+1) x 50 Mvar.
                   
Note: Applied the new protocol for accounting the number of Substations and Transformation Capacity.

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

 VII.2 Loans and Financing – BRL million 
 SPE   Eletrobras Companies (%)   Short Term - Up to 12 months (a)   Long Term - After 12 months (b)   Total (a+b)
 Loans   Debentures   Loans   Debentures 
 Baguari Energia S.A.   Furnas (100%)   -   -   -   - 
 Baguari I S.A.   Furnas (100%)  14.2  -  18.9  -  33.0
 Belo Monte Transmissora de Energia S.A.   Eletronorte (24.5%)
Furnas (24.5%) 
347.5 111.1  2,895.8 954.9  4,309.3
 Caldas Novas Transmissão S.A.   Furnas (49.9%)  1.0 2.8 3.8
 Chapada do Piauí I Holding S.A.   Holding (49%)  68.6 21.2 486.0 133.4 709.2
 Chapada do Piauí II Holding S.A.  Holding (49%)  63.4 365.4 428.8
 Chapecoense Geração S.A.  Furnas (40.00%)  174.2 131.7 594.4 325.5  1,225.7
Companhia Energética Sinop S.A.  Chesf (24.50%)
Eletronorte (24.50%)
42.8 19.3  1,104.3 346.1  1,512.5
 Empresa de Energia São Manoel S.A.   Furnas (33.333%)  63.4 29.2  1,512.0 276.9  1,881.5
 Energia dos Ventos IX S.A.  Furnas (100%)  6.4  -  84.2  -  90.6
 Energia dos Ventos V S.A.  Furnas (100%)  5.7  -  76.7  -  82.4
 Energia dos Ventos VI S.A.  Furnas (100%)  8.1  -  107.4  -  115.5
 Energia dos Ventos VII S.A.  Furnas (100%)  7.6  -  96.2  -  103.8
 Energia dos Ventos VIII S.A.  Furnas (100%)  5.6  -  76.3  -  81.8
 Jirau Energia S.A.   CHESF (20.00%)
CGT Eletrosul (20.00%) 
688.0  9,225.0  9,913.0
 Enerpeixe S.A.   Furnas (40.00%)  149.1 392.2 541.3
 Eólica Ibirapuitã S.A.  CGT Eletrosul (100.00%)   -   -   -   - 
 Goiás Transmissão S.A.   Furnas (49%)  34.6 288.4 323.0
 Interligação Elétrica do Madeira S.A.   Chesf (24.5%)
Furnas (24.5%) 
178.6 68.6  1,192.6 393.0  1,832.8
 Interligação Elétrica Garanhuns S.A.   Chesf (49%)  15.8 75.8 91.6
 Lago Azul Transmissora S.A.   Furnas (49.9%)   -   -   -   - 
 Luziânia Niquelândia Transmissora S.A.   Holding (49%)  1.4 12.7 14.1
 Madeira Energia S.A.   Furnas (99.73%)  84.8 998.3 450.8  8,400.7  9,934.7
 Mata de Santa Geneva Transmissora S.A.   Furnas (49.9%)  106.0  1,716.3  1,822.3
 MGE Transmissão S.A.   Furnas (49%)  13.9 59.5 73.4
 Norte Energia S.A.   CHESF (15.00%)
Eletronorte (34.98%) 
860.7 78.0  26,956.8 808.8  28,704.4
 Paranaíba Transmissora de Energia S.A.   Furnas (24.5%)  74.9 28.7 457.0 95.4 656.0
 Retiro Baixo Energética S.A.   Furnas (100.00%)  14.6 8.7 23.3
 Rouar S.A. (1)   Holding (50.00%)  13.0  -  147.0  -  160.0
 Serra do Facão Energia S.A.   Furnas (54.013%) 
 Sistema de Transmissão Nordeste S.A.   Chesf (24.50%)
Eletronorte (24.50%) 
 Teles Pires Participações S.A.  Eletronorte (50.56%)
Furnas (24.72%)
CGT Eletrosul (24.72%)
187.0 69.1  1,936.5 383.8  2,576.4
 Transenergia Renovável S.A.   Furnas (49%)  10.5 87.8 98.3
 Transenergia São Paulo S.A.   Furnas (49%)  11.8 98.5 110.3
 Triângulo Mineiro Transmissora S.A.   Furnas (100%) 
 Usina de Energia Eólica Caiçara I S.A.  CHESF (49.00%)  5.29 49.55 54.84
 Usina de Energia Eólica Caiçara II S.A.  CHESF (49.00%)  2.95 3.86 6.81
 Usina de Energia Eólica Junco I S.A.  CHESF (49.00%)  4.34 40.61 44.94
 Usina de Energia Eólica Junco II S.A.  CHESF (49.00%)  4.30 40.24 44.54
 Vale do São Bartolomeu Transmissora de Energia S.A.   Furnas (90%) 
 Transnorte Energia S.A.  Eletronorte (50.38%)  -  25.1 450.0 475.1
             
 Note:             
 (1) Considered Exchange on 03/28/2024 of BRL 4.9962/USD (Bacen Ptax Sale) 

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

V.III Loans and Financing – BRL Million
                   
Eletrobras Parent Company
Parent company 2024 2025 2026 2027 2028 2029 2030 After 2030 Total (MN + ME)
By creditor 6,743.96 4,895.71 3,618.27 2,786.69 2,778.98 2,651.54 6,090.50 6,054.39 35,620.05
Other 6,743.96 4,895.71 3,618.27 2,786.69 2,778.98 2,651.54 6,090.50 6,054.39 35,620.05
CGT Eletrosul 2024 2025 2026 2027 2028 2029 2030 After 2030 Total (MN + ME)
By creditor 535.72 1,096.80 593.43 506.27 436.79 345.23 74.89 233.20 3,822.33
Eletrobras 149.02 193.80 195.99 75.21 69.79 72.29 74.89 233.20 1,064.19
Other 386.70 903.00 397.44 431.07 367.00 272.94 0.00 0.00 2,758.14
Chesf 2024 2025 2026 2027 2028 2029 2030 After 2030 Total (MN + ME)
By creditor 128.54 111.32 118.24 123.52 123.40 111.78 64.54 2,252.90 3,034.25
Eletrobras 24.19 0.00 0.00 0.00 0.00 0.00 0.00 2,150.00 2,174.19
Other 104.35 111.32 118.24 123.52 123.40 111.78 64.54 102.90 860.06
Eletronorte 2024 2025 2026 2027 2028 2029 2030 After 2030 Total (MN + ME)
By creditor 595.52 882.02 1,049.56 939.81 640.39 229.51 195.59 2,890.37 7,422.78
Eletrobras 500.29 545.28 384.43 269.75 155.07 155.07 155.07 2,879.94 5,044.92
Other 95.24 336.74 665.13 670.05 485.32 74.44 40.51 10.43 2,377.86
Furnas 2024 2025 2026 2027 2028 2029 2030 After 2030 Total (MN + ME)
By creditor 2,646.59 2,223.29 2,811.09 2,690.48 1,799.69 1,053.83 477.95 3,219.35 16,922.28
Eletrobras 50.82 48.42 51.40 54.57 57.94 61.51 35.08 0.00 359.76
Other 2,595.77 2,174.88 2,759.69 2,635.91 1,741.74 992.32 442.87 3,219.35 16,562.52

 
 

FRRCM - Investor Relations Board
Report to Investors - Annex III - 1Q24
Operating Information of Subsidiaries

ELETRONUCLEAR - OPERATIONAL DATA
                                             
I. Market Data
                 
I.1 Installed Capacity and Physical Guarantee – MW                
Company Comprehensive Responsibility (a) Comprehensive Liability under Law 13.182/15 (b) Comprehensive Liability under O&M (c) Regime SPE (d) SPE under O&M (e) Regime Net Aggregation 1Q24 Total (a+b+c+d+e)                
Installed Capacity Physical Guarantee Installed Capacity Physical Guarantee Installed Capacity Physical Guarantee Installed Capacity Physical Guarantee Installed Capacity Physical Guarantee Installed Capacity Physical Guarantee Installed Capacity Physical Guarantee                
Eletronuclear 1,990 1,714.5  -   -   -   -   1,990 1,714.5                
                                             
II. Generation Data                
                                             
II.1 Installed Capacity - MW                
                                             
II.1.2 Generation Assets and Generated Energy                 
                                             
Eletrobras Company Undertaking Location Source Start of Concession Start of Operation End of Operation Installed Capacity Physical Guarantee Generated Energy (MWh) (1)   Fuel Type Metric Unit Fuel used for electric power production
    1Q24 2Q24 3Q24 4Q24
(State) (MW) (Average MW) 1Q24 2Q24 3Q24 4Q24 Qty. BRL Million Qty. BRL Million Qty. BRL Million Qty. BRL Million
Eletronuclear Angra I (2) RJ Nuclear Jul-70 Jan-85 Dec-24 640.00 509.80  1,232,375       Uranium kg NA NA            
Angra II (2) RJ Nuclear May-74 Sep-00 Aug-40 1,350 1,205 2,664,260       Uranium kg NA NA            
               
(1) Generated Energy referenced to SIN Center of Gravity
(2) The CNAAA Plants do not operate under the concession regime. They are operating under the authorization regime. Angra I has an operating license given by MME Ordinance No. 416 of 07/13/1970 and Angra 2 has an operating license given by Exp. Mot. MME No. 300 of 05/28/1974.
                                             
II.1.2.1.2 Generation Losses - %                            
Eletrobras Companies 1Q24 2Q24 3Q24 4Q24                          
In the quarter Accumulated In the quarter Accumulated In the quarter Accumulated In the quarter Accumulated                            
Eletronuclear 5.89 5.89                                        
                                             
Note: Losses in Generation, meets the formula: (Gross-Net (500kV))/Grossx100                    
                                             
ACR Contracts - Availability                        
                                             
Eletrobras Company Auction
(if Bilateral Contract Regulated inform client)
Compromised Plants Source Start Date End Date Submarket Current Volume
(MWaverage)
Updated Fixed Revenue
(BRL thousand/year)
Accounting Position
(Procurement
/Supply)
Indexed                        
Eletronuclear Nuclear Power Quotas Angra I and Angra II NUCLEAR NA NA  SE/CO  1,555.22 4,776,403.16 Procurement NA                        
                                             
II.1.3.Sold Energy                        
                                             
II.1.3.1 Energy Sold by enterprises not renewed by Law 12.783/13 and Law 13.182/15                          
Eletrobras Company Buyer 1Q24 2Q24 3Q24 4Q24                        
BRL Million MWh BRL Million MWh BRL Million MWh BRL Million MWh                          
Eletronuclear Eletrobras System - -                                      
Other 1,194,101.00 3,416,847                                      
                                             
II.1.5 Average fee – BRL/MWh                          
                                             
II.1.5.1 Projects not renewed under Law No. 12.783/13                                  
                                             
Eletrobras Company 1Q24 2Q24 3Q24 4Q24 2024                                  
Electronuclear (1) 349.47                                          
                                   
(1) Defined fee considering the Fixed Revenue of Eletronuclear by the contracted energy.                            
                                         
Note: Estimated rates considering the ratio between the Total Revenue in the period and the Physical Guarantee in the period (MWh).                            
                                             
                                             
VI.2 Investments in new projects                            
                                             
VI.2.1 Generation                          
                                             
VI.2.1.1 Integral Responsibility              
Eletrobras Company Power plant Source Location
(State)
Investment (BRL Million) Installed Capacity (MW) Physical Guarantee (MW) Start of Concession Start of Operation Beginning of Construction Termination of the Concession Physical Schedule of Work Performed (%) Contract Type (Availability or Quantity) Estimated annual revenue (BRL million)              
Total Predicted Investment Planned Total Investment Reference Date Investment Realized              
Electronuclear (1) (2) (3) (4)  Angra 3 Nuclear RJ 29.243.7 (1) Sep-21 11,837.60 1,405.00 1282.7 (5) (5) 07/01/2028 (14) Nov-09 Jun-68 67.12% ND ND              
                   
(1) The direct cost budget approved by the Executive Board, according to RDE 1687.005/23, of 01/03/2023, is BRL 29,243.7 million, of which BRL 10,654.1 million has already been realized.The indirect costs added to the enterprise are those legally allowed, such as: internal engineering, administration, capitalized financial charges, etc. Law 14,120, of March 1, 2021 - Federal Official Gazette of 03.02.2021, established that the sale price of the energy to be generated by the Angra 3 Plant will result from the study carried out by BNDES, which must be approved by CNPE, and must cumulatively consider the economic and financial viability of the enterprise and its financing under market conditions, observing the principles of reasonableness and fee moderation.              
(2) There is still no operating license for Angra 3. It is considered 40 years from Jul/28 by analogy with Angra 1 and 2.              
(3) Ordinance No. 1.118/SPE/MME, of December 30, 2021, of the Energy Planning and Decommissioning Secretariat of the Ministry of Mines and Energy defined the Angra 3 Power Plant's physical energy guarantee at 1,282.7 average MW.              
(4) According to RDE No. 1687.005/23, of January 3, a new date for the start of operation of Angra 3 was approved based on the studies now underway by BNDES to make the Angra 3 enterprise viable.               
(5) The CNAAA Plants do not operate under the concession regime. They are operating under the authorization regime. Angra 3 is licensed for initial exploration given by Decree No. 75,870 of 06/13/1975 and current by DNAEE Ordinance No. 315 of 07/31/1997.              
Note: In the case of the physical progress of the work, according to a note in the project monitoring report, there were changes in the measurement of the Piping, Support and Fire Protection Engineering and Ventilation Engineering areas, which led to a reduction in the progress of the general undertaking and project and supply engineering compared to the previous month.              
                                             
                                             
V.III Loans and Financing – BRL Million                            
                                             
Eletronuclear 2024 2025 2026 2027 2028 2029 After 2029 Total (MN + ME)                            
By creditor  335.92  423.57 438.96  438.22  440.82  460.13 4,160.48  6,698.10                            
Furnas 37.90  43.49 43.49  43.49  43.49  36.24  -  248.12                            
Other 298.02  380.07 395.47  394.73  397.33  423.88 4,160.48  6,449.98                            

 
 

SIGNATURE

 

 

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

Date: May 9, 2024

CENTRAIS ELÉTRICAS BRASILEIRAS S.A. - ELETROBRÁS
     
By:

/SEduardo Haiama


 
 

Eduardo Haiama

Vice-President of Finance and Investor Relations

 

 

 

FORWARD-LOOKING STATEMENTS

 

This press release may contain forward-looking statements. These statements are statements that are not historical facts, and are based on management's current view and estimates offuture economic circumstances, industry conditions, company performance and financial results. The words "anticipates", "believes", "estimates", "expects", "plans" and similar expressions, as they relate to the company, are intended to identify forward-looking statements. Statements regarding the declaration or payment of dividends, the implementation of principal operating and financing strategies and capital expenditure plans, the direction of future operations and the factors or trends affecting financial condition, liquidity or results of operations are examples of forward-looking statements. Such statements reflect the current views of management and are subject to a number of risks and uncertainties. There is no guarantee that the expected events, trends or results will actually occur. The statements are based on many assumptions and factors, including general economic and market conditions, industry conditions, and operating factors. Any changes in such assumptions or factors could cause actual results to differ materially from current expectations.