6-K 1 ebr20250514_6k1.htm 6-K

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

 


 

FORM 6-K

 

Report of Foreign Private Issuer
Pursuant to Rule 13a-16 or 15d-16 of the

Securities Exchange Act of 1934

 

For the month of May, 2025

 

Commission File Number 1-34129

 


 

CENTRAIS ELÉTRICAS BRASILEIRAS S.A. - ELETROBRÁS

(Exact name of registrant as specified in its charter)




BRAZILIAN ELECTRIC POWER COMPANY

(Translation of Registrant's name into English)




Rua da Quitanda, 196 – 24th floor,
Centro, CEP 20091-005,
Rio de Janeiro, RJ, Brazil

(Address of principal executive office)



Indicate by check mark whether the registrant files or will file annual reports under cover Form 20-F or Form 40-F. 

Form 20-F ___X___ Form 40-F _______

Indicate by check mark whether the registrant by furnishing the information contained in this Form is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934.

Yes _______ No___X____

 
 

 

 

 
 

 

FRRCM - Investor Relations Board

Report to Investors - Annex III - 2Q24

Operating Information of Subsidiaries

 

 

I. Market Data of Eletrobras Companies
                                       
I.1 Installed Capacity and Physical Guarantee – MW
Company Comprehensive Responsibility (a) Comprehensive Liability under Law 13.182/15 (b) Comprehensive Liability under O&M (c) Regime SPE (d) SPE under O&M (e) Regime Net aggregation 2025 Total (a+b+c+d+e)          
Installed Capacity Physical Guarantee Installed Capacity Physical Guarantee Installed Capacity Physical Guarantee Installed Capacity Physical Guarantee Installed Capacity Physical Guarantee Installed Capacity Physical Guarantee Installed Capacity Physical Guarantee          
Eletrobras Holding 2,127 1,283 2,082 949 4,645 2,351  5,257  3,228  403   103  -  -  14,514   7,914          
Eletronorte 9,815 4,897 0 0 78 62  4,948   2,146  -  -  -  - 14,840   7,105          
Chesf 5,808 2,672 1,050 458 3,602 1,666  2,579 1,190  -  -  -  - 13,039  5,986          
CGT Eletrosul 741 242 0 0 0 0   1,225  668  -  - 113  -   1,966   910          
Total 18,490 9,094 3,132 1,406 8,325 4,079   14,009  7,233   403   103 113  - 44,359   21,915          
                                       
Company Full Responsibility Consolidated SPEs SPEs recognized by equity method Net aggregation 2025 Total
Installed Capacity Physical Guarantee Law 13,182/15 Physical Guarantee Decoupled Physical Guarantee Share Total Physical Guarantee Installed Capacity Physical Guarantee Law 13,182/15 Physical Guarantee Decoupled Physical Guarantee Share Total Physical Guarantee Installed Capacity Physical Guarantee Law 13,182/15 Physical Guarantee Decoupled Physical Guarantee Share Total Physical Guarantee Installed Capacity Physical Guarantee Installed Capacity Physical Guarantee
Eletrobras Holding 8,854 759 2,888 935 4,582 4,355 0 2,720 0 2,720 1,305 0 611 0 611 - - 14,514  7,914
Eletronorte 9,893 0 4,934 25 4,959 920 0 487 0 487 4,028 0 1,658 0 1,658 - -   14,840  7,105
Chesf 10,460 506 2,718 1,572 4,795 0 0 0 0 0 2,579 0 1,190 0 1,190 - -   13,039  5,986
CGT Eletrosul 741 0 242 0 242 475 0 248 0 248 750 0 420 0 420  168 -  1,966  910
Total 29,947 1,265 10,782 2,532 14,579 5,751 0 3,456 0 3,456 8,661 0 3,880 0 3,880  168 -   44,359 21,915
                                       
Company Power plant Total Physical Guarantee (Mwm) (100% of Assets) Installed Capacity (MW) (100%)  % Stake Total Physical Guarantee (Mwm) (Proportional) Installed Capacity (MW) (Proportional) Classification        
 Total (Mwm) (100% of Assets) Quoted (MWm) (1) Decoupled (MWm) (1) Law 13,182  (MWm) (2) % Decoupled Physical Guarantee  Total (Mwm) (100% of Assets) Quoted (MWm) (1) Decoupled (MWm) (1) Law 13,182  (MWm) (2) % Decoupled Physical Guarantee        
Chesf Funil 5 2 3 0 60% 30 100.00% 5 2 3 0 60% 30 Full Responsibility        
Chesf Pedra 2 1 1 0 60% 20 100.00% 2 1 1 0 60% 20 Full Responsibility        
Chesf Paulo Afonso Complex 1,659 612 1,010 37 60% 4,280 100.00% 1,659 612 1,010 37 60% 4,280 Full Responsibility        
Chesf Sobradinho 458 0 46 412 na 1,050 100.00% 458 0 46 412 na 1,050 Full Responsibility        
Chesf Luiz Gonzaga (Itaparica) 727 268 443 16 60% 1,480 100.00% 727 268 443 16 60% 1,480 Full Responsibility        
Chesf Boa Esperança (Castelo Branco) 136 50 83 3 60% 237 100.00% 136 50 83 3 60% 237 Full Responsibility        
Chesf Xingó 1,730 638 1,053 38 60% 3,162 100.00% 1,730 638 1,053 38 60% 3,162 Full Responsibility        
Chesf Curemas 1 0 1 0 na 4 100.00% 1 0 1 0 na 4 Full Responsibility        
Chesf Casa Nova I A 7 0 7 0 na 27 100.00% 7 0 7 0 na 27 Full Responsibility        
Chesf Casa Nova II 9 0 9 0 na 33 100.00% 9 0 9 0 na 33 Full Responsibility        
Chesf Casa Nova III 9 0 9 0 na 28 100.00% 9 0 9 0 na 28 Full Responsibility        
Chesf Acauã 3 0 3 0 na 6 100.00% 3 0 3 0 na 6 Full Responsibility        
Chesf Angical 2 5 0 5 0 na 10 100.00% 5 0 5 0 na 10 Full Responsibility        
Chesf Arapapá 2 0 2 0 na 4 100.00% 2 0 2 0 na 4 Full Responsibility        
Chesf Caititu 2 5 0 5 0 na 10 100.00% 5 0 5 0 na 10 Full Responsibility        
Chesf Caititu 3 5 0 5 0 na 10 100.00% 5 0 5 0 na 10 Full Responsibility        
Chesf Carcará 5 0 5 0 na 10 100.00% 5 0 5 0 na 10 Full Responsibility        
Chesf Coqueirinho 2 7 0 7 0 na 16 100.00% 7 0 7 0 na 16 Full Responsibility        
Chesf Corrupião 3 4 0 4 0 na 10 100.00% 4 0 4 0 na 10 Full Responsibility        
Chesf Papagaio 5 0 5 0 na 10 100.00% 5 0 5 0 na 10 Full Responsibility        
Chesf Tamanduá Mirim 2 7 0 7 0 na 16 100.00% 7 0 7 0 na 16 Full Responsibility        
Chesf Teiú 2 4 0 4 0 na 8 100.00% 4 0 4 0 na 8 Full Responsibility        
CGT Eletrosul HPP Governador Jayme Canet Júnior 92 0 92 0 na 178 100.00% 92 0 92 0 na 178 Full Responsibility        
CGT Eletrosul HPP Passo São João 39 0 39 0 na 77 100.00% 39 0 39 0 na 77 Full Responsibility        
CGT Eletrosul HPP São Domingos 36 0 36 0 na 48 100.00% 36 0 36 0 na 48 Full Responsibility        
CGT Eletrosul PCH Barra do Rio Chapéu 9 0 9 0 na 15 100.00% 9 0 9 0 na 15 Full Responsibility        
CGT Eletrosul PCH João Borges 10 0 10 0 na 19 100.00% 10 0 10 0 na 19 Full Responsibility        
CGT Eletrosul Cerro Chato I Wind Farm 11 0 11 0 na 30 100.00% 11 0 11 0 na 30 Full Responsibility        
CGT Eletrosul Cerro Chato II Wind Farm 11 0 11 0 na 30 100.00% 11 0 11 0 na 30 Full Responsibility        
CGT Eletrosul Cerro Chato III Wind Farm 11 0 11 0 na 30 100.00% 11 0 11 0 na 30 Full Responsibility        
CGT Eletrosul WPP Coxilha Negra 2 (18) 0 0 0 0 na 97 100.00% 0 0 0 0 na 97 Full Responsibility        
CGT Eletrosul WPP Coxilha Negra 3 0 0 0 0 na 105 100.00% 0 0 0 0 na 105 Full Responsibility        
CGT Eletrosul WPP Coxilha Negra 4 0 0 0 0 na 63 100.00% 0 0 0 0 na 63 Full Responsibility        
CGT Eletrosul WPP Coxilha Seca 13 0 13 0 na 30 100.00% 13 0 13 0 na 30 Full Responsibility        
CGT Eletrosul WPP Capão do Inglês 5 0 5 0 na 10 100.00% 5 0 5 0 na 10 Full Responsibility        
CGT Eletrosul WPP Galpões 4 0 4 0 na 8 100.00% 4 0 4 0 na 8 Full Responsibility        
CGT Eletrosul Solar Megawatt 0 0 0 0 na 1 100.00% 0 0 0 0 na 1 Full Responsibility        
Eletrobras Holding Jaguari 13 0 13 0 na 28 100.00% 13 0 13 0 na 28 Full Responsibility        
Eletrobras Holding Mascarenhas de Moraes 300 0 300 0 na 476 100.00% 300 0 300 0 na 476 Full Responsibility        
Eletrobras Holding Simplício 167 0 167 0 na 306 100.00% 167 0 167 0 na 306 Full Responsibility        
Eletrobras Holding Anta 16 0 16 0 na 28 100.00% 16 0 16 0 na 28 Full Responsibility        
Eletrobras Holding Batalha 47 0 47 0 na 53 100.00% 47 0 47 0 na 53 Full Responsibility        
Eletrobras Holding Serra da Mesa 606 0 606 0 na 1,275 48.46% 294 0 294 0 na 618 Full Responsibility        
Eletrobras Holding Manso 84 0 84 0 na 210 70.00% 58 0 58 0 na 147 Full Responsibility        
Eletrobras Holding Santa Cruz 401 0 401 0 na 500 100.00% 401 0 401 0 na 500 Full Responsibility        
Eletrobras Holding Furnas 625 250 375 0 60% 1,216 100.00% 625 250 375 0 60% 1,216 Full Responsibility        
Eletrobras Holding Luis Carlos Barreto (Estreito) 497 199 298 0 60% 1,050 100.00% 497 199 298 0 60% 1,050 Full Responsibility        
Eletrobras Holding Porto Colômbia 205 82 123 0 60% 320 100.00% 205 82 123 0 60% 320 Full Responsibility        
Eletrobras Holding Marimbondo 689 275 413 0 60% 1,440 100.00% 689 275 413 0 60% 1,440 Full Responsibility        
Eletrobras Holding Funil 102 41 61 0 60% 216 100.00% 102 41 61 0 60% 216 Full Responsibility        
Eletrobras Holding Corumbá I 220 88 132 0 60% 375 100.00% 220 88 132 0 60% 375 Full Responsibility        
Eletrobras Holding Itumbiara 949 0 190 759 na 2,082 100.00% 949 0 190 759 na 2,082 Full Responsibility        
Eletronorte Coaracy Nunes HPP 62 25 37 0 60% 78 100.00% 62 25 37 0 60% 78 Full Responsibility        
Eletronorte Tucuruí Complex 3,996 0 3,996 0 na 8,535 100.00% 3,996 0 3,996 0 na 8,535 Full Responsibility        
Eletronorte HPP Samuel 88 0 88 0 na 217 100.00% 88 0 88 0 na 217 Full Responsibility        
Eletronorte HPP Curuá-Una  30 0 30 0 na 43 100.00% 30 0 30 0 na 43 Full Responsibility        
Eletronorte HPP Balbina 126 0 126 0 na 250 100.00% 126 0 126 0 na 250 Full Responsibility        
Eletronorte TPP Araguaia 0 0 0 0 na 0 100.00% 0 0 0 0 na 0 Full Responsibility        
Eletronorte TPP Senador Arnon Afonso Farias de Mello 0 0 0 0 na 0 100.00% 0 0 0 0 na 0 Full Responsibility        
Eletronorte TPP Aparecida 150 0 150 0 na 166 100.00% 150 0 150 0 na 166 Full Responsibility        
Eletronorte TPP MAUÁ 3 507 0 507 0 na 591 100.00% 507 0 507 0 na 591 Full Responsibility        
Eletronorte TPP ANAMÃ 0 0 0 0 na 2 100.00% 0 0 0 0 na 2 Full Responsibility        
Eletronorte TPP ANORI 0 0 0 0 na 5 100.00% 0 0 0 0 na 5 Full Responsibility        
Eletronorte TPP CAAPIRANGA 0 0 0 0 na 2 100.00% 0 0 0 0 na 2 Full Responsibility        
Eletronorte TPP CODAJÁS 0 0 0 0 na 5 100.00% 0 0 0 0 na 5 Full Responsibility        
CGT Eletrosul Ibirapuitã I 9 0 9 0 na 25 100.00% 9 0 9 0 na 25 Consolidated SPE        
Eletrobras Holding Três Irmãos 207 0 207 0 na 808 49.90% 103 0 103 0 na 403 SPE by equity method        
Eletronorte Teles Pires 964 0 964 0 na 1,820 50.56% 487 0 487 0 na 920 Consolidated SPE        
Eletrobras Holding Teles Pires 964 0 964 0 na 1,820 24.72% 238 0 238 0 na 450 Consolidated SPE        
CGT Eletrosul Teles Pires 964 0 964 0 na 1,820 24.72% 238 0 238 0 na 450 Consolidated SPE        
Eletrobras Holding São Januário 10 0 10 0 na 21 100.00% 10 0 10 0 na 21 Consolidated SPE        
Eletrobras Holding Nossa Senhora de Fátima 14 0 14 0 na 30 100.00% 14 0 14 0 na 30 Consolidated SPE        
Eletrobras Holding Jandaia 14 0 14 0 na 27 100.00% 14 0 14 0 na 27 Consolidated SPE        
Eletrobras Holding São Clemente 10 0 10 0 na 21 100.00% 10 0 10 0 na 21 Consolidated SPE        
Eletrobras Holding Jandaia I 11 0 11 0 na 24 100.00% 11 0 11 0 na 24 Consolidated SPE        
Eletrobras Holding Serra do Facão 174 0 174 0 na 213 54.01% 94 0 94 0 na 115 SPE by equity method        
Eletrobras Holding Retiro Baixo 35 0 35 0 na 84 100.00% 35 0 35 0 na 84 Consolidated SPE        
Eletronorte Belo Monte 4,571 0 4,571 0 na 11,233 34.98% 1,599 0 1,599 0 na 3,929 SPE by equity method        
Chesf Belo Monte 4,571 0 4,571 0 na 11,233 15.00% 686 0 686 0 na 1,685 SPE by equity method        
Eletrobras Holding Santo Antônio 2,313 0 2,313 0 na 3,568 99.74% 2,307 0 2,307 0 na 3,559 Consolidated SPE        
Eletrobras Holding Peixe Angical 267 0 267 0 na 499 40.00% 107 0 107 0 na 200 SPE by equity method        
Chesf Jirau 2,102 0 2,102 0 na 3,750 20.00% 420 0 420 0 na 750 SPE by equity method        
CGT Eletrosul Jirau 2,102 0 2,102 0 na 3,750 20.00% 420 0 420 0 na 750 SPE by equity method        
Eletrobras Holding São Manoel 430 0 430 0 na 736 33.33% 143 0 143 0 na 245 SPE by equity method        
Chesf Sinop 243 0 243 0 na 402 24.50% 59 0 59 0 na 98 SPE by equity method        
Eletronorte Sinop 243 0 243 0 na 402 24.50% 59 0 59 0 na 98 SPE by equity method        
Eletrobras Holding Foz do Chapecó 409 0 409 0 na 855 40.00% 164 0 164 0 na 342 SPE by equity method        
Eletrobras Holding Baguari 82 0 82 0 na 140 100.00% 82 0 82 0 na 140 Consolidated SPE        
Chesf Caiçara I 15 0 15 0 na 27 49.00% 7 0 7 0 na 13 SPE by equity method        
Chesf Caiçara II 10 0 10 0 na 18 49.00% 5 0 5 0 na 9 SPE by equity method        
Chesf Junco I 13 0 13 0 na 24 49.00% 6 0 6 0 na 12 SPE by equity method        
Chesf Junco II 13 0 13 0 na 24 49.00% 7 0 7 0 na 12 SPE by equity method        
                                       
Company Power plant Total Physical Guarantee (Mwm) (100% of Assets) Installed Capacity (MW) (100%)  % Stake Total Physical Guarantee (Mwm) (Proportional) Installed Capacity (MW) (Proportional) Classification        
 Total (Mwm) (100% of Assets) Quoted (MWm) (1) Decoupled (MWm) (1) Law 13,182  (MWm) (2) % Decoupled Physical Guarantee  Total (Mwm) (100% of Assets) Quoted (MWm) (1) Decoupled (MWm) (1) Law 13,182  (MWm) (2) % Decoupled Physical Guarantee        
CGT Eletrosul WPP Coxilha Negra 3 0.00 0.00 0.00 0.00 na 105.00 100.00% 0.00 0.00 0.00 0.00 na 105.00 Net aggregation 2025        
CGT Eletrosul WPP Coxilha Negra 4 0.00 0.00 0.00 0.00 na 63 100.00% 0.00 0.00 0.00 0.00 na 63.00 Net aggregation 2025        
                                       
(1) Decoupling is equivalent to 60% of the total value of the physical guarantee for the year 2025. Projects under the O&M regime, whose concession has been renewed by law 14,182/21.
(2) Projects renewed by law 13,182/15.

 

2 

FRRCM - Investor Relations Board

Report to Investors - Annex III - 2Q24

Operating Information of Subsidiaries

 

II. Generation Data
                                             
II.1 Installed Capacity - MW
                                             
II.1.2 Generation Assets and Generated Energy 
                                             
II.1.2.1 Hydraulic Generation Assets and Generated Energy – Projects under Full Responsibility
                                             
Eletrobras Company Project Location Source Start of Concession Start of Operation End of Operation Installed Capacity Physical Guarantee Generated Energy (MWh)                    
                   
(State) (MW) (Average MW) 1Q25 2Q25 3Q25 4Q25                    
Eletronorte Tucuruí Complex (11) PA Hydraulics Jun-22 Dec-84 Jun-52 8,535.00 3,995.50  8,388,942                          
HPP Samuel RO Hydraulics Sep-79 Jul-89 Jul-32 216.75 88.10  306,957                          
HPP Curuá-Una (11) PA Hydraulics Jun-22 Jan-77 Jun-52 42.80  30.40 68,035                          
HPP Balbina AM Hydraulics Mar-77 Jan-89 Mar-27 249.75 125.70   130,641                          
Chesf Curemas PB Hydraulics (1) Jan-57 Feb-26 3.52 1.00  -                          
Eletrobras Holding Jaguari (15) SP Hydraulics Jan-21 Jan-72 (5) 27.6 12.70   3,144                          
Mascarenhas de Moraes (12) MG Hydraulics Jun-22 Apr-57 Jun-52 476.00 299.80  363,471                          
Simplício (16) RJ Hydraulics Aug-06 Jun-13 Dec-43 305.70 166.70  287,876                          
Anta RJ Hydraulics Aug-06 Aug-18 Dec-43 28.00 15.90 39,256                          
Batalha (16) MG Hydraulics Aug-06 May-14 Apr-43 52.50 47.00 88,343                          
Serra da Mesa (48.46%) (2) (3) (14) GO Hydraulics May/81 and Nov/04 Apr-98 May-46 1,275.00 605.70  707,360                          
Manso (70%) (3) (15) MT Hydraulics Feb-00 Nov-00 Sep-37 210.00 83.50  185,566                          
CGT Eletrosul HPP Governador Jayme Canet Júnior (4) (16) PR Hydraulics Jul-07 Nov-12 Jun-49 177.94 92.37  347,497                          
HPP Passo São João (18) RS Hydraulics Aug-06 Mar-12 May-46 77.00 39.10 15,065                          
HPP São Domingos MS Hydraulics Dec-02 Jun-13 Aug-39 48.00 36.40 67,314                          
PCH Barra do Rio Chapéu SC Hydraulics May-04 Feb-13 May-38 15.15 8.61 24,081                          
PCH João Borges SC Hydraulics Dec-05 Jul-13 Sep-39 19.00 10.14   8,916                          
                                             
                                             
II.1.2.2 Thermal Generation Assets and Generated Energy – Projects under Full Responsibility
                                             
Eletrobras Company Project Location Source Start of Concession Start of Operation End of Operation Installed Capacity Physical Guarantee Generated Energy (MWh) Fuel Type Metric Unit Fuel used for electric power production
1Q25 2Q25 3Q25 4Q25
(State) (MW) (Average MW) 1Q25 2Q25 3Q25 4Q25 Qty. BRL Million Qty. BRL Million Qty. BRL Million Qty. BRL Million
Eletronorte TPP Araguaia (5) MT Thermal Jul-15 Apr-16 Jun-20  (6)   NA   -        NA   NA   NA   NA             
TPP Senador Arnon Afonso Farias de Mello (6) RR Thermal Nov-00 Dec-90 (7)  NA   NA   -        NA   NA   NA   NA             
TPP Aparecida (20) AM Thermal N/D Feb-84 Jul-30 166.00 150.00  182,693        Natural Gas   m3    52,690,503 102.74            
TPP MAUÁ 3 (20) AM Thermal Nov-14 Sep-17 Nov-44 590.75   507.40  771,873        Natural Gas   m3   180,520,901 351.95            
Isolated System                                          
TPP ANAMÃ (20) AM Thermal N/D Dec-18 Nov-30  2.17  NA    2,746        Natural Gas   m3   996,732 2.06            
TPP ANORI (20) AM Thermal N/D Dec-18 Nov-30  4.57  NA    5,076        Natural Gas   m3   1,840,426 3.80            
TPP CAAPIRANGA (20) AM Thermal N/D Dec-18 Nov-30  2.17  NA    2,572        Natural Gas   m3   914,077  1.89            
TPP CODAJÁS (20) AM Thermal N/D Dec-18 Nov-30  4.57  NA    7,582        Natural Gas   m3   2,739,795 5.66            
Eletrobras Holding Santa Cruz (7) (8) (13) RJ Thermal Aug/63 and Mar/67 Jul-67 Jul-15 500.00 401.20  -        Natural Gas   m3  - -            
                                             
                                             
II.1.2.3 Thermal Generation Assets of PIEs and Generated Energy – Projects under Full Responsibility
                                             
Eletrobras Company Project Location Source Start of Concession Start of Operation End of Operation Installed Capacity Physical Guarantee Generated Energy (MWh) Fuel Type Metric Unit Fuel used for electric power production
1Q25 2Q25 3Q25 4Q25
(State) (MW) (Average MW) 1Q25 2Q25 3Q25 4Q25 Qty. BRL Million Qty. BRL Million Qty. BRL Million Qty. BRL Million
Eletronorte TPP Ponta Negra (PIE Gera) (9) AM Thermal NA NA NA  NA   NA   NA         NA   NA                 
TPP Manauara (PIE Manauara) (9) AM Thermal NA NA NA  NA   NA   NA         NA   NA                 
TPP Jaraqui (PIE Breitener Jaraqui) (9) AM Thermal NA NA NA  NA   NA   NA         NA   NA                 
TPP Tambaqui (PIE Breitner Tambaqui) (9) AM Thermal NA NA NA  NA   NA   NA         NA   NA                 
TPP Cristiano Rocha (PIE RAESA) (9) AM Thermal NA NA NA  NA   NA   NA         NA   NA                 
                                             
II.1.2.4 Wind Generation Assets and Generated Energy – Projects under Full Responsibility
                                             
Eletrobras Company Project Location Source Start of Concession Start of Operation End of Operation Installed Capacity Physical Guarantee Generated Energy (MWh)                    
                   
(State) (MW) (Average MW) 1Q25 2Q25 3Q25 4Q25                    
Chesf Casa Nova I A (10) BA Wind Jun-19 Dec-20 Jun-54 27.00 6.80  13,104                          
Casa Nova II BA Wind May-14 Dec-17 May-49 32.90 9.40   9,297                          
Casa Nova III BA Wind May-14 Feb-18 May-49 28.20 9.40   9,617                          
Acauã BA Wind Apr-14 Nov-19 Apr-49 6.00 3.10   2,259                          
Angical 2 BA Wind Apr-14 Sep-19 Apr-49 10.00 5.10 2,101                          
Arapapá BA Wind Apr-14 Nov-19 Apr-49 4.00 2.20   475                          
Caititu 2 BA Wind Apr-14 Jan-20 Apr-49 10.00 5.10   2,046                          
Caititu 3 BA Wind Apr-14 Jan-20 Apr-49 10.00 4.70 1,198                          
Carcará BA Wind Apr-14 Feb-20 Apr-49 10.00 4.60 1,013                          
Coqueirinho 2 BA Wind May-14 Sep-19 May-49 16.00 7.40   2,736                          
Corrupião 3 BA Wind Apr-14 Feb-20 Apr-49 10.00 4.20   1,352                          
Papagaio BA Wind May-14 Oct-19 May-49 10.00 4.90 1,821                          
Tamanduá Mirim 2 BA Wind Jun-14 Nov-19 Jun-49 16.00 7.40   2,992                          
Teiú 2 BA Wind Apr-14 Nov-19 Apr-49 8.00 4.20   846                          
CGT Eletrosul Cerro Chato I Wind Farm RS Wind Aug-10 Jan-12 Aug-45 30.00 11.33 19,045                          
Cerro Chato II Wind Farm RS Wind Aug-10 Aug-11 Aug-45 30.00 11.33 19,224                          
Cerro Chato III Wind Farm RS Wind Aug-10 Jun-11 Aug-45 30.00 11.33 19,449                          
WPP Coxilha Negra 2 (17) RS Wind Aug-22 Jul-24 Aug-57 96.60 NA 43,767                          
WPP Coxilha Negra 3 (18) RS Wind Sep-22 Dec-24 Sep-57 105.00 NA 23,912                          
WPP Coxilha Negra 4 (19) RS Wind Sep-22 Jan-25 Sep-57 63.00 NA   5,732                          
WPP Coxilha Seca RS Wind May-14 Dec-15 May-49 30.00 13.20 20,632                          
WPP Capão do Inglês RS Wind May-14 Dec-15 May-49 10.00 4.50   7,514                          
WPP Galpões RS Wind May-14 Dec-15 May-49 8.00 3.70   5,895                          
                                             
                                             
II.1.2.4 Solar Generation Assets and Generated Energy – Projects under Full Responsibility
                                             
Eletrobras Company Project Location Source Start of Concession Start of Operation End of Operation Installed Capacity Physical Guarantee Generated Energy (MWh)                    
                   
(State) (MW) (Average MW) 1Q25 2Q25 3Q25 4Q25                    
CGT Eletrosul Solar Megawatt SC Solar Jun-14 Sep-14 - 0.93  NA    306                          
                                             
(1) The concession for the exploration of the PCH Coremas was initially granted to the National Department of Works Against Droughts - DNOCS through Decree No. 53,417, of 1/20/1964 and later transferred to Companhia Hidro Elétrica do São Francisco - CHESF through Decree No. 74,971, of 11/26/1974.
(2) Decree No. 85,983, of May 6, 1981. Grant to FURNAS - Centrais Elétricas S.A. concession for a set of use of hydraulic energy of the stretch of the main course of the Tocantins River and its tributaries on the right and left banks, in the State of Goiás. 11.12.2004 - CA 05/2004 - HPP Serra da Mesa
(3) Shared HPPs, but FURNAS acquires the partner fraction through energy purchase contracts - considered GF and total generation of each HPP.
(4) The reported amounts refer to the Company's participation in the enterprise (Consórcio Governador Jayme Canet Júnior 49% Eletrosul).
(5)  Ordinance MME 331 of 08.14.2018 - Dou 08.15.2018, Authorize the decontracting, in its entirety, of the Thermoelectric Generating Power Plant called TPP Araguaia. Eletronorte, through CE-CRR-0118, of 06.20.2018, requested ANEEL to revoke the authorization grant of TPP Araguaia. However, the Association of Municipalities of Araguaia - AMA filed Public Civil Action No. 2803-97.2018.811.008 against Eletronorte in the Court and Justice of Mato Grosso, having been granted urgent relief. Eletronorte, through CE-CRR-0144, dated 08.07.2018, requested ANEEL to suspend the process. On 10.11.2018 Eletronorte filed a lawsuit before the Federal Court (Case No. 1021506-05.2018.4.01.3400) to discuss the matter but still pending judgment.
By determination of RD-0249/2019 of 08.08.2019, Eletronorte through CE-CRR-0157/2019 of 08.30.2019 requested SCG/ANEEL to resume the process aiming at the revocation of the authorization grant of TPP Araguaia, pursuant to MME Ordinance No. 331 of 08.14.2018. On 11.06.2019, SCG/ANEEL requested Eletronorte to demonstrate that said Public Civil Action has no more effects. Through correspondence s/n of 11.11.2019, Eletronorte's Legal Counsel presented the requested clarifications. SCG/ANEEL sent Memorandum No. 281/2019-SCG/ANEEL to the Federal Attorney's Office with ANEEL. Considering that there was no manifestation, Eletronorte reiterated the claim of CE-CRR-0157/2019, through CE-CRR-0079/2020, of 05.26.2020.
Eletronorte, through letter CE-PR-0077/2021, of 06/17/2021, informed that it carried out the administrative closure of the Contract and completed the demobilization of the plant in June/2020.
(6) TPP Senador Arnon Afonso Farias de Mello is assigned to Roraima Energia S.A., successor of Boa Vista Energia S.A., through a loan agreement. This project is not being considered in the installed capacity of Eletronorte.
(7) Aneel was requested to extend the concession in accordance with the legal terms and deadline through the request REQ.GCO.P.027.2013, dated 07.05.2013. The conditions of said concession remain in force.
(8) Decree No. 52,394 of 08/22/1963 - authorizes Companhia Hidreletrica do Vale do Paraiba to assemble a thermoelectric plant. Decree No. 60,350 of 03/10/1967 - grants to Central Elétrica de Furnas S.A. a concession for the use of hydraulic energy, authorization for the establishment of a thermoelectric plant and other measures.
(9) TPP Cristiano Rocha, Manauara, Ponta Negra, Tambaqui and Jaraqui are not part of Amazonas GT's own generation assets, they belong to the Independent Energy Producers – PIE, of which Amazonas GT buys its energy and resells them to Amazonas D through purchase of energy and Sale Agreements – CCVE. These energy purchase agreements of the PIE by Amazonas GT when it ends in May/2025, by contractual force, the PIE plants will be reverted to the equity of Amazonas GT (05/05/2025 reversal of the assets of the TPPs Tambaqui and Jaraqui and 05/21/2025 reversal of the assets of the TPPs Manauara, Ponta Negra and Cristiano Rocha), and it is up to them to operate them until November 30, 2030.
(10) Authorizing Resolution 7,907, of 06/18/2019, makes reference to the installed power of the Casa Nova A plant, but makes no reference to the physical guarantee of such plant. This is due to the fact that the Casa Nova A Plant does not have a Physical Guarantee defined by the MME. The amount presented of 6.8 MW comes from the plant's certification study, being only one reference.
(11) CONCESSION AGREEMENT No. 002/2022 – ANEEL - ELETRONORTE - New concession agreement for HPPs Tucuruí, Curuá-una and Coaracy Nunes, moving to 30 years.
(12) The Masc. de Moraes, Corumbá I, Estreito, Funil, Furnas, Marimbondo and P. Colômbia plants were granted the concession determined by Clause Two of Concession Agreement No. 003/2022 signed between Furnas and ANEEL on 06/17/2022 as the date of signature of the contract: 06/17/2022; the final term of the concession on 06/17/2052 was determined in Annex II of Concession Agreement No. 003/2022 signed between Furnas and ANEEL on 06/17/2022.
(13) By means of Order No. 481, of February 23, 2023, ANEEL released the generating unit and UG31, of 150,000.00 kW of TPP Santa Cruz to start commercial operation as of February 24, 2023. Through Order No. 1991, of June 23, 2023, ANEEL extended, for an indefinite period, the commercial operation of the generating unit and UG31, of 150,000.00 kW of TPP Santa Cruz.
(14) Alteration of Physical Guarantee through Ordinance No. 709/GM/MME, of November 30, 2022.
(15) According to Ordinance No. 409, of November 13, 2020, of the Ministry of Mines and Energy (MME), as of January 1, 2021, Furnas was designated as responsible for the Provision of the Electric Power Generation Service through the Jaguari Hydroelectric Power Plant, until the assumption of the winning utility company of the Plant bidding.
(16) According to concession and REH 2,932/2021. It is noteworthy that Authorizing Resolution No. 14.435/2023 added 469 days to the concession term. Therefore, the additional time granted by REH 2.932/2021, of 1,789 days, which would result in maturity on 09/07/2048, will need to be recalculated and approved by Aneel. New deadline according to Approval Resolution No. 3.242/2023.
(17) 23 generating units released for commercial operation totaling 96.6 MW.
(18) 25 generating units released for commercial operation totaling 105 MW.
(19) 15 generating units released for commercial operation totaling 63 MW.
(20) Plants with ownership transferred by Aneel order No. 151/2025, the assets were considered in 1Q25 due to the transfer operation still in progress.
                                             
II.1.2.1.2 Generation Losses - %
Eletrobras Companies 1Q25 2Q25 3Q25 4Q25                            
In the quarter Accumulated In the quarter Accumulated In the quarter Accumulated In the quarter Accumulated                            
Eletronorte 2.82 2.82                                        
Chesf 2.92 2.92                                        
Eletrobras Holding 2.51 2.51                                        
CGT Eletrosul 2.40 2.40                                        

 

 

3 

FRRCM - Investor Relations Board

Report to Investors - Annex III - 2Q24

Operating Information of Subsidiaries

 

II.1.2.2 Hydraulic Generation Assets and Generated Energy – Projects under Full Responsibility under O&M Regime - renewed by law 14.182/21
Eletrobras Company Project Location Source Start of Concession Start of Operation End of Operation Installed Capacity Total Physical Guarantee Decoupled Physical Guarantee (6) Total Generated Energy (MWh)    
   
(State) (MW) (Average MW) (Average MW) 1Q25 2Q25 3Q25 4Q25    
Eletronorte HPP Coaracy Nunes (2) AP Hydraulics Jun-22 Dec-75 Jun-52 78.00   62.20   37.32   131,920          
Chesf  Funil (1) BA Hydraulics Jun-22 Aug-62 Jun-52 30.00  4.80  2.92  11,503          
Pedra (1) BA Hydraulics Jun-22 Nov-78 Jun-52  20.01  1.74  1.06   6,340          
Complexo de Paulo Afonso (1) BA Hydraulics Jun-22 Jan-55 Jun-52 4,279.60 1,658.80 1,009.94  2,325,868          
Luiz Gonzaga (Itaparica) (1) PE Hydraulics Jun-22 Jun-88 Jun-52   1,479.60 727.00 442.62   1,042,521          
Boa Esperança (Castelo Branco) (1) PI Hydraulics Jun-22 Apr-70 Jun-52 237.30 136.20 82.92 131,142          
Xingó (1) SE Hydraulics Jun-22 Dec-94 Jun-52 3,162.00 1,729.80 1,053.17  2,625,793          
Eletrobras Holding Furnas (3) MG Hydraulics Jun-22 Sep-63 Jun-52 1,216.00 625.00 375.00 551,623          
Luis Carlos Barreto (Estreito) (3) SP/MG Hydraulics Jun-22 Mar-69 Jun-52 1,050.00 497.20 298.32 582,397          
Porto Colômbia (3) MG/SP Hydraulics Jun-22 Jun-73 Jun-52 320.00 205.40 123.24 344,233          
Marimbondo (3) SP/MG Hydraulics Jun-22 Oct-75 Jun-52 1,440.00 688.70 413.22 1,610,405          
Funil (3) RJ Hydraulics Jun-22 Mar-70 Jun-52 216.00 102.40 61.44 187,967          
Corumbá I (3) GO Hydraulics Jun-22 Oct-96 Jun-52 375.00 219.50 131.70 642,337          
                               
                               
II.1.2.3 Hydraulic Generation Assets and Generated Energy – Projects under Full Responsibility renewed by law 13.182/15
Eletrobras Company Project Location Source Start of Concession Start of Operation End of Operation Installed Capacity Total Physical Guarantee Physical Guarantee (Law 13,182) Total Generated Energy (MWh)    
(State) (MW) (Average MW) (Average MW) 1Q25 2Q25 3Q25 4Q25    
Chesf Sobradinho (1) (4) BA Hydraulics Jun-22 Nov-79 Jun-52   1,050.30 457.50  411.75   619,771          
Funil (4) BA Hydraulics Jun-22 Aug-62 Jun-52 30.00  4.80   0.11  11,503          
Pedra (4) BA Hydraulics Jun-22 Nov-78 Jun-52  20.01  1.74  0.04   6,340          
Complexo de Paulo Afonso (4) BA Hydraulics Jun-22 Jan-55 Jun-52  4,279.60 1,658.80   36.66  2,325,868          
Luiz Gonzaga (Itaparica) (4) PE Hydraulics Jun-22 Jun-88 Jun-52   1,479.60 727.00   16.07   1,042,521          
Boa Esperança (Castelo Branco) (4) PI Hydraulics Jun-22 Apr-70 Jun-52  237.30 136.20  3.01 131,142          
Xingó (4) SE Hydraulics Jun-22 Dec-94 Jun-52   3,162.00 1,729.80   38.23  2,625,793          
Eletrobras Holding Itumbiara (3) (5) GO/MG Hydraulics Jun-22 Apr-80 Jun-52 2,082.00 948.90 759.12  1,560,407          
                               
                               
(1) The hydraulic plants had their old concession contract 006/2004 replaced by the new concession contract 001/2022. The new concessions were granted through the privatization of Eletrobras, under the terms of Law 14,182, of July 12, 2021.
(2) CONCESSION AGREEMENT No. 002/2022 – ANEEL - ELETRONORTE - New concession agreement for HPPs Tucuruí, Curuá-una and Coaracy Nunes, moving to 30 years.
(3) The plants of Corumbá I, Estreito, Funil, Furnas, Marimbondo, P. Colombia and Itumbiara were granted the concession determined by Clause Two of the Concession Agreement No. 003/2022 signed between Furnas and ANEEL on 06/17/2022 as the date of signature of the agreement: 06/17/2022; the final term of the concession on 06/17/2052 was determined in Annex II of Concession Agreement No. 003/2022 signed between Furnas and ANEEL on 06/17/2022.
(4) To comply with Law 13.182/2015, Sobradinho plant provides 90% of its Physical Guarantee and the other CHESF shareholder plants provide 2.21% of their physical guarantees to serve industrial consumers served by this law.
(5) In order to comply with Law 13.182/2015, the Itumbiara plant provides 80% of its Physical Guarantee to serve industrial consumers located in the Southeast/Midwest submarket.
(6) decoupling is equivalent to 60% of the total value of the physical guarantee for the year 2025.

 

 

4 

FRRCM - Investor Relations Board

Report to Investors - Annex III - 2Q24

Operating Information of Subsidiaries

 

ACR Contracts - Quantity
                     
Eletrobras Company Auction
(if Bilateral Contract Regulated inform client)
Compromised Plants Source Start Date End Date Submarket Current Volume
(MWaverage)
Price Updated
(BRL/MWh)
Accounting Position
(Procurement
/Supply)
Indexed
Eletronorte CBR - OC 87495/2013 (Amazonas D) Balbina (Own) HYDRO 5/1/2013 3/1/2027  N  130.32 419.04 Procurement IPCA
Reserve Power Auction (MP1232/2024) Tambaqui (Resale)(1)(2) TERM 6/13/2024 5/18/2025  N  60.00 1,649.37 Procurement IPCA
Reserve Power Auction (MP1232/2024) Jaraqui (Resale)(1)(2) TERM 6/13/2024 5/18/2025  N  60.00 1,651.42 Procurement IPCA
Reserve Power Auction (MP1232/2024) Manauara (Resale)(1)(2) TERM 6/13/2024 5/18/2025  N  60.00 1,509.29 Procurement IPCA
Reserve Power Auction (MP1232/2024) Ponta Negra (Resale)(1)(2) TERM 6/13/2024 5/18/2025  N  60.00 1,514.41 Procurement IPCA
Reserve Power Auction (MP1232/2024) Cristiano Rocha (Resale)(1)(2) TERM 6/13/2024 5/18/2025  N  65.00 1,547.16 Procurement IPCA
Reserve Power Auction (MP1232/2024) TPP APARECIDA (2) TERM 6/13/2024 11/30/2030  N  145.00 662.40 Procurement IPCA
CCVE 008/2018 (Amazonas D - Sist. Isolated) Caapiranga  (Own) TERM 12/5/2018 11/30/2030  N  1.22 1,425.35 Procurement IPCA
CCVE 006/2018 (Amazonas D - Sist. Isolated) Anamã (Own) TERM 12/5/2018 11/30/2030  N  1.33 1,415.95 Procurement IPCA
CCVE 009/2018 (Amazonas D - Sist. Isolated) Codajás (Own) TERM 12/5/2018 11/30/2030  N  3.75 1,417.91 Procurement IPCA
CCVE 007/2018 (Amazonas D - Sist. Isolated) Anori (Own) TERM 12/5/2018 11/30/2030  N  2.45 1,399.16 Procurement IPCA
CCESI 001/2019 (Amazonas D - Sist. Isolated) Coari (Reseller)(1) TERM 1/3/2020 11/30/2030  N  13.88 982.81 Procurement IPCA
11th New Energy Auction Teles Pires HYDRO 1/1/2015 12/31/2044  SE  576.00 128.82 Procurement IPCA
CGT Eletrosul 1st New Energy Auction Passo São João HYDRO 1/1/2010 12/31/2039 S 37.00 310.46 Procurement IPCA
3rd New Energy Auction Governador Jayme Canet Júnior HYDRO 1/1/2011 12/31/2040 S 94.08 302.84 Procurement IPCA
5th New Energy Auction São Domingos HYDRO 1/1/2012 12/31/2041 SE/CO 36.00 325.60 Procurement IPCA
2nd Reserve Energy Auction CERRO CHATO I EOL 7/1/2012 6/30/2032 S 11.00 295.68 Procurement IPCA
2nd Reserve Energy Auction CERRO CHATO II EOL 7/1/2012 6/30/2032 S 11.00 286.80 Procurement IPCA
2nd Reserve Energy Auction CERRO CHATO III EOL 7/1/2012 6/30/2032 S 11.00 295.67 Procurement IPCA
Chesf 5th Reserve Energy Auction Acauã EOL 9/1/2015 8/31/2035  NE  2.60 198.10 Procurement IPCA
5th Reserve Energy Auction Angical 2 EOL 9/1/2015 8/31/2035  NE  4.90 198.10 Procurement IPCA
5th Reserve Energy Auction Arapapá EOL 9/1/2015 8/31/2035  NE  1.90 198.10 Procurement IPCA
5th Reserve Energy Auction Caititu 2 EOL 9/1/2015 8/31/2035  NE  5.10 198.10 Procurement IPCA
5th Reserve Energy Auction Caititu 3 EOL 9/1/2015 8/31/2035  NE  4.70 198.10 Procurement IPCA
5th Reserve Energy Auction Carcará EOL 9/1/2015 8/31/2035  NE  4.60 198.10 Procurement IPCA
5th Reserve Energy Auction Corrupião 3 EOL 9/1/2015 8/31/2035  NE  4.20 198.10 Procurement IPCA
5th Reserve Energy Auction Teiú 2 EOL 9/1/2015 8/31/2035  NE  3.70 198.10 Procurement IPCA
32nd Existing Energy Auction A-1 Chesf ANY 1/1/2025 12/31/2026  NE  340.00 160.91 Procurement N/A
33rd Existing Energy Auction A-2 Chesf ANY 1/1/2026 12/31/2027  NE  80.00 160.05 Procurement N/A
Eletrobras Holding 1st New Energy Auction Manso HYDRO 1/1/2008 12/31/2037  SE/CO  35.00 268.37 Procurement IPCA
1st New Energy Auction Manso HYDRO 1/1/2010 12/31/2039  SE/CO  55.00 309.53 Procurement IPCA
1st New Energy Auction Batalha HYDRO 1/1/2010 12/31/2039  SE/CO  47.00 316.93 Procurement IPCA
1st New Energy Auction Simplício HYDRO 1/1/2010 12/31/2039  SE/CO  185.00 320.19 Procurement IPCA
Saesa - Structuring auction HPP Santo Antonio HYDRO 12/1/2012 12/31/2041  SE/CO  1,551.24 198.03 Procurement IPCA
Saesa - 19th New Energy Auction HPP Santo Antonio Expansion HYDRO 1/1/2017 12/31/2046  SE/CO  129.60 207.43 Procurement IPCA
1st New Energy Auction HPP Baguari HYDRO 1/1/2010 12/31/2039  SE/CO  77.00 317.17 Procurement IPCA
1st New Energy Auction HPP Retiro Baixo HYDRO 1/1/2009 12/31/2038  SE/CO  36.00 314.96 Procurement IPCA
                     
(1) Energy sales contracts resulting from the process of unbundling of Amazonas Distribuidora -> Process: 48500.004245/2012-43 -ANEEL. The amounts of energy traded come from the purchase of PIEs.
(2) The sales contracts for PIEs and TPP Aparecida (originally a contract for availability) became Reserve Energy Contracts, according to MP1232/2024.
 
                     
ACR Contracts - Availability
                     
Eletrobras Company Auction
(if Bilateral Contract Regulated inform client)
Compromised Plants Source Start Date End Date Submarket Current Volume
(MWaverage)
Updated Fixed Revenue
(BRL thousand/year)
Accounting Position
(Procurement
/Supply)
Indexed
Eletronorte 20th New Energy Auction Mauá 3 TERM 1/1/2019 11/30/2030 N 484.40 1,445,433.23 Procurement IPCA
CGT Eletrosul 17th New Energy Auction WPP Coxilha Seca EOL 1/1/2016 12/31/2035 S 8.30 17,455.74 Procurement IPCA
17th New Energy Auction WPP Capão do Inglês EOL 1/1/2016 12/31/2035  S  2.80 5,903.89 Procurement IPCA
17th New Energy Auction WPP Galpões EOL 1/1/2016 12/31/2035 S 2.10 4,460.11 Procurement IPCA
Chesf 18th New Energy Auction Casa Nova II EOL 1/1/2018 12/31/2037 NE 7.10 14,940.31 Procurement IPCA
18th New Energy Auction Casa Nova III EOL 3/1/2018 12/31/2037  NE  5.50 11,570.22 Procurement IPCA
17th New Energy Auction Coqueirinho 2 EOL 9/19/2019 12/31/2035 NE 7.30 14,946.79 Procurement IPCA
17th New Energy Auction Papagaio EOL 10/4/2019 12/31/2035  NE  4.70 9,586.02 Procurement IPCA
18th New Energy Auction Tamanduá Mirim 2 EOL 11/14/2019 12/31/2037  NE  7.20 14,451.90 Procurement IPCA
Furnas 5th New Energy Auction Santa Cruz Nova TERM 1/1/2012 12/31/2026  SE/CO  245.70 343,259.84 Procurement IPCA
                     

 

5 

FRRCM - Investor Relations Board

Report to Investors - Annex III - 2Q24

Operating Information of Subsidiaries

 

 

PIEs resulting from the process of deverticalization of Amazonas Distribuidora
                             
The purchase of energy and Sale Agreements from the PIEs (quantity contracts) are due to the process of unbundling of Amazonas Distribuidora -> Process: 48500.004245/2012-43 -ANEEL.
Eletronorte buys energy from the PIEs, the price of which does not include the cost of fuel (gas). Eletronorte sells the same amount purchased from the PIEs to the distributor Amazonas Energia, including the fuel cost in the fee, so that the energy purchase and sale operations do not reflect the economic impact for Eletronorte ("pass-through"). The gas supply contact that serves the Amazon thermal plants was made between Eletronorte and Petrobras.
Eletronorte's energy purchase contracts for the PIEs expire in May 2025, as well as the current sales contracts for Amazonas Energia. From that date, the assets will be converted to Eletronorte.
As a result of MP 855/2018, new energy sales contracts will be entered into with Amazonas Energia for supply after that date, of the CCEAR type, with a term until November 2030 (date linked to the Gas supply contract).
Purchase of Energy Agreements from PIEs (contracts by quantity)
                      1Q25 2Q25 3Q25 4Q25
Eletrobras Company Counterparty Compromised Plants Source Start Date End Date Submarket Current Volume
(MWaverage)
Price Updated
(BRL/MWh)
Accounting Position
(Procurement
/Supply)
Indexed BRL Million BRL Million BRL Million BRL Million
Eletronorte PIE TAMBAQUI Tambaqui TERM 7/1/2021 5/18/2025  N  60.00 451.04 Procurement IGP-M 59,988.96      
PIE JARAQUI Jaraqui TERM 7/1/2021 5/18/2025  N  60.00 451.50 Procurement IGP-M 60,051.00      
PIE MANAUARA Manauara TERM 7/1/2021 5/18/2025  N  60.00 405.20 Procurement IGP-M 53,919.48      
PIE Gera Ponta Negra TERM 7/1/2021 5/18/2025  N  60.00 420.96 Procurement IGP-M 56,004.71      
PIE Cristiano Rocha Cristiano Rocha TERM 7/1/2021 5/18/2025  N  65.00 438.37 Procurement IGP-M 63,183.40      
PIE Coari Coari TERM 1/3/2020 11/30/2030  N  13.88 430.17 Procurement IGP-M 13,288.53      
                             
Energy Sale Contracts, from the Energy Purchases of the PIEs, for the distributor (quantity contracts)
                      1Q25 2Q25 3Q25 4Q25
Eletrobras Company Auction
(if Bilateral Contract Regulated inform client)
Compromised Plants Source Start Date End Date Submarket Current Volume
(MWaverage)
Price Updated
(BRL/MWh)
Accounting Position
(Procurement
/Supply)
Indexed BRL Thousand BRL Thousand BRL Thousand BRL Thousand
Eletronorte Reserve Power Auction (MP1232/2024) Tambaqui TERM 6/13/2024 5/18/2025  N  60.00 1649.37 Procurement IPCA 178,251.22      
Reserve Power Auction (MP1232/2024) Jaraqui TERM 6/13/2024 5/18/2025  N  60.00 1651.42 Procurement IPCA 178,506.77      
Reserve Power Auction (MP1232/2024) Manauara TERM 6/13/2024 5/18/2025  N  60.00 1509.29 Procurement IPCA 162,856.70      
Reserve Power Auction (MP1232/2024) Ponta Negra TERM 6/13/2024 5/18/2025  N  60.00 1514.41 Procurement IPCA 164,562.22      
Reserve Power Auction (MP1232/2024) Cristiano Rocha TERM 6/13/2024 5/18/2025  N  65.00 1547.16 Procurement IPCA 179,486.43      
  CCESI 001/2019 (Amazonas D - Sist. Isolated) Coari TERM 1/3/2020 11/30/2030  N  13.88 982.81 Procurement IPCA 29,240.29      
                             
ACR Contracts - Availability - Thermal
                      1Q25 2Q25 3Q25 4Q25
Eletrobras Company Auction
(if Bilateral Contract Regulated inform client)
Compromised Plants Source Start Date End Date Submarket Current Volume
(MWaverage)
Updated Fixed Revenue
(BRL thousand/year)
Accounting Position
(Procurement
/Supply)
Indexed BRL Million BRL Million BRL Million BRL Million
Eletronorte 20th New Energy Auction Mauá 3 TERM 1/1/2019 11/30/2030 N 484.4 1,445,433.23 Procurement IPCA   338,400.07      
Eletrobras Holding 5th New Energy Auction Santa Cruz Nova TERM 1/1/2012 12/31/2026  SE/CO  245.70 343,259.84 Procurement IPCA  90,908.53      
(1) The contract for the sale of TPP Aparecida (originally contract for availability) became a Reserve Energy contract, according to MP1232/2024, as of 06/13/2024.
                             
CVU and Thermal Inflexibility with Availability Contracts
                             
Eletrobras Company Power plant Installed Capacity 1Q25 2Q25 3Q25 4Q25        
(MW)  Average inflexibility (MWavg) Average CVU
(BRL/MWh)
 Average inflexibility (MWavg) Average CVU
(BRL/MWh)
 Average inflexibility (MWavg) Average CVU
(BRL/MWh)
 Average inflexibility (MWavg) Average CVU
(BRL/MWh)
       
Eletronorte TPP Mauá 3 590.8 252.1 126.4                    
Eletrobras Holding TPP Santa Cruz 500.0 0 273.43                    

 

6 

FRRCM - Investor Relations Board

Report to Investors - Annex III - 2Q24

Operating Information of Subsidiaries

 

Eletrobras Total Eletrobras Unit 1Q25 2Q25 3Q25 4Q25
  Physical Guarantee  MWaverage 948.0      
  GAGO&M  BRL million 41.02      
  GAGImprovements  BRL million 44.85      
  CAIMI BRL million 5.07      
  Adjustment by Unavailability BRL million 5.19      
  R&D BRL million 1.49      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) BRL million 53.12      
  CFURH BRL million 11.23      
  PIS/COFINS BRL million 16.51      
  TOTAL BRL million 178.49 0.00 0.00 0.00
             
  Furnas Unit 1Q25 2Q25 3Q25 4Q25
  Physical Guarantee  MWaverage 250.00      
  GAGO&M  BRL million 10.20      
  GAGImprovements  BRL million 9.22      
  CAIMI BRL million 1.32      
  Adjustment by Unavailability BRL million 1.49      
  R&D BRL million 0.36      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) BRL million 13.44      
  CFURH BRL million 1.31      
  PIS/COFINS BRL million 3.81      
  TOTAL BRL million 41.15 0.00 0.00 0.00
             
  Luis Carlos Barreto (Estreito) Unit 1Q25 2Q25 3Q25 4Q25
  Physical Guarantee  MWaverage 198.88      
  GAGO&M  BRL million 8.13      
  GAGImprovements  BRL million 10.03      
  CAIMI BRL million 1.11      
  Adjustment by Unavailability BRL million 1.27      
  R&D BRL million 0.34      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) BRL million 13.04      
  CFURH BRL million 1.71      
  PIS/COFINS BRL million 3.63      
  TOTAL BRL million 39.26 0.00 0.00 0.00
             
  Porto Colômbia Unit 1Q25 2Q25 3Q25 4Q25
  Physical Guarantee  MWaverage 82.16      
  GAGO&M  BRL million 3.75      
  GAGImprovements  BRL million 4.05      
  CAIMI BRL million 0.36      
  Adjustment by Unavailability BRL million 0.11      
  R&D BRL million 0.10      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) BRL million 2.12      
  CFURH BRL million 1.05      
  PIS/COFINS BRL million 1.18      
  TOTAL BRL million 12.73 0.00 0.00 0.00
             
  Marimbondo Unit 1Q25 2Q25 3Q25 4Q25
  Physical Guarantee  MWaverage 275.48      
  GAGO&M  BRL million 11.17      
  GAGImprovements  BRL million 14.14      
  CAIMI BRL million 1.56      
  Adjustment by Unavailability BRL million 1.93      
  R&D BRL million 0.47      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) BRL million 18.55      
  CFURH BRL million 4.60      
  PIS/COFINS BRL million 5.34      
  TOTAL BRL million 57.77 0.00 0.00 0.00
             
  Funil Unit 1Q25 2Q25 3Q25 4Q25
  Physical Guarantee  MWaverage 40.96      
  GAGO&M  BRL million 2.68      
  GAGImprovements  BRL million 2.56      
  CAIMI BRL million 0.24      
  Adjustment by Unavailability BRL million 0.08      
  R&D BRL million 0.07      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) BRL million 1.24      
  CFURH BRL million 0.60      
  PIS/COFINS BRL million 0.76      
  TOTAL BRL million 8.23 0.00 0.00 0.00
             
  Corumbá I Unit 1Q25 2Q25 3Q25 4Q25
  Physical Guarantee  MWaverage 87.80      
  GAGO&M  BRL million 3.64      
  GAGImprovements  BRL million 3.72      
  CAIMI BRL million 0.40      
  Adjustment by Unavailability BRL million 0.30      
  R&D BRL million 0.13      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) BRL million 4.47      
  CFURH BRL million 1.92      
  PIS/COFINS BRL million 1.48      
  TOTAL BRL million 16.05 0.00 0.00 0.00
             
  Jaguari Unit 1Q25 2Q25 3Q25 4Q25
  Physical Guarantee  MWaverage 12.70      
  GAGO&M  BRL million 1.46      
  GAGImprovements  BRL million 1.12      
  CAIMI BRL million 0.09      
  Adjustment by Unavailability BRL million 0.00      
  R&D BRL million 0.03      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) BRL million 0.26      
  CFURH BRL million 0.04      
  PIS/COFINS BRL million 0.30      
  TOTAL BRL million 3.30 0.00 0.00 0.00
             
             
Eletronorte Total Eletronorte Unit 1Q25 2Q25 3Q25 4Q25
  Physical Guarantee  MWaverage 24.88      
  GAGO&M  BRL million 1.41      
  GAGImprovements  BRL million 1.23      
  CAIMI BRL million 0.09      
  Adjustment by Unavailability BRL million 0.18      
  R&D BRL million 0.04      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) BRL million 0.64      
  CFURH BRL million 0.91      
  PIS/COFINS BRL million 0.40      
  TOTAL BRL million 4.89 0.00 0.00 0.00
             
  Coaracy Nunes Unit 1Q25 2Q25 3Q25 4Q25
  Physical Guarantee  MWaverage 24.88      
  GAGO&M  BRL million 1.41      
  GAGImprovements  BRL million 1.23      
  CAIMI BRL million 0.09      
  Adjustment by Unavailability BRL million 0.18      
  R&D BRL million 0.04      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) BRL million 0.64      
  CFURH BRL million 0.91      
  PIS/COFINS BRL million 0.40      
  TOTAL BRL million 4.89 0.00 0.00 0.00
             
             
Chesf Total Chesf Unit 1Q25 2Q25 3Q25 4Q25
  Physical Guarantee  MWaverage 1,665.70      
  GAGO&M  BRL million 63.96      
  GAGImprovements  BRL million 81.98      
  CAIMI BRL million 10.19      
  Adjustment by Unavailability BRL million 14.04      
  R&D BRL million 2.84      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) BRL million 86.22      
  CFURH BRL million 45.85      
  PIS/COFINS BRL million 31.10      
  TOTAL BRL million 336.18 0.00 0.00 0.00
             
  Funil Unit 1Q25 2Q25 3Q25 4Q25
  Physical Guarantee  MWaverage 1.88      
  GAGO&M  BRL million 0.51      
  GAGImprovements  BRL million 0.52      
  CAIMI BRL million 0.03      
  Adjustment by Unavailability BRL million -0.11      
  R&D BRL million 0.02      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) BRL million 0.62      
  CFURH BRL million 0.07      
  PIS/COFINS BRL million 0.17      
  TOTAL BRL million 1.83 0.00 0.00 0.00
             
  Complexo Paulo Afonso Unit 1Q25 2Q25 3Q25 4Q25
  Physical Guarantee  MWaverage 648.86      
  GAGO&M  BRL million 32.21      
  GAGImprovements  BRL million 42.93      
  CAIMI BRL million 4.74      
  Adjustment by Unavailability BRL million 5.33      
  R&D BRL million 1.38      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) BRL million 42.59      
  CFURH BRL million 16.80      
  PIS/COFINS BRL million 14.88      
  TOTAL BRL million 160.86 0.00 0.00 0.00
             
  Pedra Unit 1Q25 2Q25 3Q25 4Q25
  Physical Guarantee  MWaverage 0.68      
  GAGO&M  BRL million 0.31      
  GAGImprovements  BRL million 0.29      
  CAIMI BRL million 0.02      
  Adjustment by Unavailability BRL million -0.06      
  R&D BRL million 0.01      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) BRL million 0.20      
  CFURH BRL million 0.05      
  PIS/COFINS BRL million 0.08      
  TOTAL BRL million 0.90 0.00 0.00 0.00
             
  Luiz Gonzaga Unit 1Q25 2Q25 3Q25 4Q25
  Physical Guarantee  MWaverage 284.38      
  GAGO&M  BRL million 10.84      
  GAGImprovements  BRL million 13.04      
  CAIMI BRL million 1.64      
  Adjustment by Unavailability BRL million 3.13      
  R&D BRL million 0.47      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) BRL million 14.13      
  CFURH BRL million 7.58      
  PIS/COFINS BRL million 5.18      
  TOTAL BRL million 56.01 0.00 0.00 0.00
             
  Boa Esperança Unit 1Q25 2Q25 3Q25 4Q25
  Physical Guarantee  MWaverage 53.28      
  GAGO&M  BRL million 3.07      
  GAGImprovements  BRL million 2.58      
  CAIMI BRL million 0.26      
  Adjustment by Unavailability BRL million 0.49      
  R&D BRL million 0.09      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) BRL million 1.54      
  CFURH BRL million 2.32      
  PIS/COFINS BRL million 1.06      
  TOTAL BRL million 11.41 0.00 0.00 0.00
             
  Xingó Unit 1Q25 2Q25 3Q25 4Q25
  Physical Guarantee  MWaverage 676.63      
  GAGO&M  BRL million 17.02      
  GAGImprovements  BRL million 22.62      
  CAIMI BRL million 3.50      
  Adjustment by Unavailability BRL million 5.27      
  R&D BRL million 0.87      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) BRL million 27.14      
  CFURH BRL million 19.04      
  PIS/COFINS BRL million 9.73      
  TOTAL BRL million 105.18 0.00 0.00 0.00

 

7 

FRRCM - Investor Relations Board

Report to Investors - Annex III - 2Q24

Operating Information of Subsidiaries

 

II.1.3.Sold Energy
                   
II.1.3.1 Energy Sold by projects not renewed by Law 12.783/13 and Law 13.182/15
Eletrobras Company Buyer 1Q25 2Q25 3Q25 4Q25
BRL Million MWh BRL Million MWh BRL Million MWh BRL Million MWh
Eletronorte (1) Eletrobras System 48.23 333,868            
Others 2,123.07 6,747,320            
Chesf Eletrobras System 181.71 2,493,672            
Others 284.65 2,040,942            
Eletrobras Holding (2) Eletrobras System 135.19 868,928            
Others 3,330.49 19,160,916            
CGT Eletrosul Eletrobras System 1.46 5,098            
Others 262.19 1,357,602            
                   
Notes:         
(1) Includes the SPE consolidated by Eletronorte: HPPs Teles Pires (from 4Q25)
(2) Includes SPEs previously consolidated by Furnas: HPP Santo Antônio (from 3Q22), HPPs Baguari and Retiro Baixo (from 4Q25)
Note: until 1Q25, sales to related parties (Eletrobras System) were only being opened for the subsidiaries Eletronorte, Chesf, Furnas and CGT Eletrosul. 
As of 2Q25, all sales made between subsidiaries and consolidated SPEs, described in notes 1 and 2, are reported in the "Eletrobras System" line. The 1Q25 data were updated considering this premise.
                   
II.1.3.2 Energy Sold by the renewed projects under Law 12.783/13 – O&M Regime
Eletrobras Company Buyer 1Q25 2Q25 3Q25 4Q25
BRL Million MWh BRL Million MWh BRL Million MWh BRL Million MWh
Eletronorte Eletrobras System                
Others 4.89 53,741            
Chesf  Eletrobras System                
Others 336.18 3,597,955            
Eletrobras Holding  Eletrobras System                
Others 178.49 2,047,637            
CGT Eletrosul Eletrobras System                
Others                
                   
                   
 
II.1.3.2 Energy Sold by renewed projects under Law 13,182
Eletrobras Company Buyer 1Q25 2Q25 3Q25 4Q25
BRL Million MWh BRL Million MWh BRL Million MWh BRL Million MWh
Eletronorte Eletrobras System                
Others                
Chesf  Eletrobras System                
Others 7.70 42,511            
Eletrobras Holding  Eletrobras System                
Others 22.34 107,102            
CGT Eletrosul Eletrobras System                
Others                

 

8 

FRRCM - Investor Relations Board

Report to Investors - Annex III - 2Q24

Operating Information of Subsidiaries

 

  Energy Balance                
                   
   Energy Balance (MWavg) 1Q25 2025 2026 2027
  Resources that do not impact the energy balance (1)     964 0 0
                   
  Resources (A)     16,213 16,621 17,692
  Company Resources (2) (3) (4) (5)     14,155 15,418 16,570
  Hydraulic     13,915 15,161 16,313
  Wind     240 257 257
  Purchase of Energy(6)     2,058 1,204 1,122
  Limit =>     Lower Higher Lower Higher Lower Higher
  Sales (B)     11,180 13,680 9,003 11,003 6,820 8,320
  ACR – Except quotas     3,424 3,503 3,070
  ACL – Bilateral Contracts + MCP performed (range)(6)     7,756 10,256 5,500 7,500 3,750 5,250
  Average Prices Contracts performed                
  Limit =>     Lower Higher Lower Higher Lower Higher
  Average Price of Sale Contracts (ACR and ACL - BRL/MWh)     170 180 185 205 190 220
   Balance (A - B)     5,032 2,532 7,618 5,618 10,873 9,373
   Balance considering hedge estimate (9)     2,500 0 4,859 2,859 7,904 6,404
  Decontracted Energy considering hedge estimate (9)     15% 0% 29% 17% 45% 36%
                   
  Contracts entered into until 12/31/2024.       
  It should be noted that the balance sheet takes into account the SPEs consolidated by Furnas: HPP Santo Antônio (as of 3Q22), HPPs Baguari and Retiro Baixo (as of 4Q23), whether in resources, sales or average prices. Likewise, the SPE consolidated by Eletronorte is being considered: HPP Teles Pires (as of 4Q23).
(1) . The balance sheet does not include, whether in resources, requirements(sales) or average prices, the PIEs contracts arising from the process of unbundling of Amazonas Distribuidora, the contracts of thermal plants by availability and the Physical Guarantee Quotas. These appeals are presented only in 2024, disregarded, due to divestments, for the following years.
(2) The Own Resources include the Decoupling plants (new PIEs) and the New Grants (Sobradinho, Itumbiara, Tucuruí, Curuá-Una and Mascarenhas de Moraes). For hydroelectric projects, an estimate of GFIS2 was considered, that is, the Physical Guarantee considering the Adjustment Factors due to Internal Losses, Losses in the Basic Network and Availability and adjustments due to the particularities of the portfolio.
(3) Revised amounts for  Physical Guarantees are taken into consideration as defined in Ordinance No. 709/GM/MME, of November 30, 2022.
(4) With the decoupling, the plants currently under quota regime now have a new concession under the Independent Energy Producer - PIE regime, gradually occurring in a period of 5 years from 2023. The Physical Guarantee values were defined in Ordinance GM/MME No. 544/21.
(5) Considering the new concession grants from 2023 for the Sobradinho, Itumbiara, Tucuruí, Curuá-Una and Mascarenhas de Moraes plants, whose Physical Guarantee values were defined in GM/MME Ordinance No. 544/21.
(6) The balances from 2025 to 2027 consider around 200 MWavg of intercompany transactions, with effect on the purchase of energy and sales lines in the ACL. 
                   
  Physical Guarantee Quotas of Hydroelectric Plants (MWavg)   2025 2026 2027        
    Quotas for Physical Guarantees (7) (8) 2,626 1,313 -0        
(7)  The Physical Guarantee of the HPP Jaguari, of 12.7 MWavg, whose concession is under the provisional administration of Furnas, is not included here.
(8) Decoupling occurs gradually over a period of 5 years from 2023. The Physical Guarantee values considered from 2023 were those defined in Ordinance GM/MME No. 544/21.
(9) The values present an estimate of the non-contracted energy. For the year 2024, the estimated value of 88.0% was considered. For the other years, a historical average value of GSF, from 2018 to 2023, of 81.8% was considered. Source: CCEE, obtained on the CCEE website, at the following link: https://www.ccee.org.br/dados-e-analises/dados-geracao, in the MRE option on the panel.
It is important to note that this amount is merely an estimate based on events that have occurred in the past. The graph with the historical GSF values is shown below.

 

 

 

9 

FRRCM - Investor Relations Board

Report to Investors - Annex III - 2Q24

Operating Information of Subsidiaries

 

II.1.4 Energy Purchased for Resale
Eletrobras Company Buyer 1Q25 2Q25 3Q25 4Q25
BRL Million MWh BRL Million MWh BRL Million MWh BRL Million MWh
Eletronorte (1) Eletrobras System 0.42 4,464            
Others 311.54 715,878            
Chesf Eletrobras System 0.18 1,860            
Others 59.85 203,724            
Eletrobras Holding (2) Eletrobras System 322.08 3,352,650            
Others 591.41 2,494,643            
CGT Eletrosul Eletrobras System 44.89 356,739            
Others 88.62 319,572            
                   
Note: Gross values. The accounting publishes net amounts of recoverable PIS/COFINS.
Note: It includes only purchase contracts, not considering the negative values of the CCEE accounting.
(1) Includes the SPE consolidated by Eletronorte: HPP Teles Pires (as of 4Q23).
(2) Includes SPEs consolidated by Furnas: HPP Santo Antônio (from 3Q22), HPPs Baguari and Retiro Baixo (from 4Q23)

 

10 

FRRCM - Investor Relations Board

Report to Investors - Annex III - 2Q24

Operating Information of Subsidiaries

 

II.1.5 Average fee – BRL/MWh
           
II.1.5.1 Projects not renewed under Law No. 12.783/13          
Eletrobras Company 1Q25 2Q25 3Q25 4Q25 2025
Eletronorte  306.63        
Chesf (1) 103.57        
Eletrobras Holding (1) 173.22        
CGT Eletrosul 193.48        
           
(1) Includes projects affected by Law 13,182.
- Selling prices calculated from the total revenue divided by the energy sold.
- Purchase prices calculated from the total expenditure divided by the energy purchased.
- Does not include projects not renewed by Law 12,783/13.
- Includes SPEs consolidated by Furnas: HPP Santo Antônio (from 3Q22), HPPs Baguari and Retiro Baixo (from 4Q23).  Includes the SPE consolidated by Eletronorte: HPP Teles Pires (as of 4Q23).
           
II.1.5.2 Projects renewed under the terms of Law No. 12,783 – O&M Regime          
Eletrobras Company 1Q25 2Q25 3Q25 4Q25 2025
Eletronorte 90.97        
Chesf  93.44        
Eletrobras Holding 87.17        
CGT Eletrosul 0        
           
Note: Estimated rates considering the ratio between the Total Revenue in the period and the Physical Guarantee in the period (MWh).

 

11 

FRRCM - Investor Relations Board

Report to Investors - Annex III - 2Q24

Operating Information of Subsidiaries

 

III.1.1 Extension of Transmission Lines - Projects not renewed under Law 12,783/13 –km
Eletrobras Company  765 KV 750 KV 600 KV 525 KV 500 KV 440 KV 345 KV 230 KV 138 KV <138 KV Total
Eletronorte   -  -  -  -  -  -  - 1,796.07  -   111.00  1,907.07
Chesf   -  -  -  -   255.97  -  -   2,359.82  -  -  2,615.79
Eletrobras Holding *  -  -  -  - 1,276.66  - 174.90   347.05  -  -   1,798.61
CGT Eletrosul  -  -  -  1,971.20  -  -  - 1,070.70  -  -  3,041.90
Total   -  -  -  1,971.20 1,532.63  - 174.90   5,573.64  -   111.00  9,363.37
                       
III.1.2 Extension of Transmission Lines – Projects renewed pursuant to Law 12.783/13 - km
Eletrobras Company 765 KV 750 KV 600 KV 525 KV 500 KV 440 KV 345 KV 230 KV 138 KV <138 KV Total
Eletronorte   -  -  -  -   3,236.46  -  -   5,379.60 222.17  2.30  8,840.53
Chesf   -  -  -  - 5,436.14  -  -  13,356.48   368.60 173.58   19,334.80
Eletrobras Holding *  2,711.20  -   3,227.80  -   4,056.20  -   6,285.48   2,047.50 1,338.40 162.80   19,829.38
CGT Eletrosul  -  -  -   2,805.90  -  -  -   4,976.49  1,020.10  -  8,802.49
Total   2,711.20  -   3,227.80   2,805.90  12,728.80  -   6,285.48 25,760.07   2,949.27 338.68   56,807.20
                       
III.1.3 Other - lines without RAP defined in REH - km
Eletrobras Company 765 KV 750 KV 600 KV 525 KV 500 KV 440 KV 345 KV 230 KV 138 KV <138 KV Total
Eletronorte   -  -  -  - 10.71  -  - 2.85 218.09  2.80  234.45
Chesf   -  -  -  -  -  -  -  75.70  93.80   21.30  190.80
Eletrobras Holding *  -  -  -  -  -  -  -  67.30 415.70  -  483.00
CGT Eletrosul  -  -  -  59.30  -  -  -  40.30  53.40   89.00  242.00
Total   -  -  -  59.30 10.71  -  -  186.15   780.99   113.10   1,150.25
                       
I.2 Transmission Lines - Km
Company Bidding Agreements
(a)
Renewed Contracts (b) Other Contracts(c) SPEs (d) Total            
Chesf  2,615.79  19,334.80 190.80 1,832.08 23,973.47            
Eletronorte  1,907.07   8,840.53   234.45 1,072.64  12,054.69            
CGT Eletrosul  3,041.90   8,802.49   242.00 4.60  12,090.99            
Eletrobras Holding *  1,798.61  19,829.38   483.00   3,867.23 25,978.22            
Total   9,363.37 56,807.20 1,150.25   6,776.55 74,097.37            
                     
                       
                       
Company Corporate voltage ≥ 230 KV Corporate voltage ≥ 230 KV Total Corporate SPE voltage ≥ 230 KV SPE voltage ≤ 230 KV TOTAL SPE Corporate + SPE        
Chesf    21,484.11   657.28   22,141.39 1,832.08  - 1,832.08 23,973.47        
Eletronorte   10,425.69   556.36  10,982.05 1,072.64  - 1,072.64  12,054.69        
CGT Eletrosul   10,923.89  1,162.50  12,086.39 4.60  -  4.60  12,090.99        
Eletrobras Holding *  20,194.09  1,916.90   22,110.99 3,629.15   238.08 3,867.23 25,978.22        
Total 63,027.78   4,293.04 67,320.82   6,538.47   238.08 6,776.55 74,097.37        
                       
*Furnas projects are being accounted for as Eletrobras due to the incorporation of Furnas by Eletrobras, including Vale do São Bartolomeu and Triângulo Mineiro Transmissora

 

 

12 

FRRCM - Investor Relations Board

Report to Investors - Annex III - 2Q24

Operating Information of Subsidiaries

 

Corporate Transmission 1Q25
                                     
This tab contains the total RAP associated with active modules at the time of publication of ReH 3348/2024, in addition to the RAP associated with modules planned at that time and that have entered into commercial operation since then, throughout 3Q24 to 1Q25.                
The RAP value present in the "List of Modules" tab and not present in this tab refers to modules expected to come into operation after 1Q25.                          
                                     
Projects renewed pursuant to Law 12.783/13
Company Contract Readjustment index No. of associated substations Total Km RAP PRT MME 579/12 (O&M) RAP Financial Component - PRT MME 120/16  RAP Economic Component - PRT MME 120/16  RAP Reinforcements and Improvements RAP Total approved
cycle 2024/2025
(Ref. Jun/24)
RAP add-on - works that entered into commercial operation (Ref. Jun/24) RAP Total
(Ref. Jun/24)
Duration of the contract Reduction Date of RAP 50% after 15 years Next readjustment date      
     
(I) (II) (III) (IV) (V = I+II+III+IV) (VI) (VII = V + VI) Start Date End Date      
FURNAS 062/2001 IPCA 69 19,829.4 1,392,127,863.97 3,180,173,229.09 1,299,908,194.85 646,792,454.87 6,519,001,742.78 85,507,135.89 6,604,508,878.67 jan/13 jan/43 N/A 1-Jul-25      
CHESF 061/2001 IPCA 121 19,334.8 968,420,376.47 1,988,347,515.45 954,462,847.81 684,786,611.33 4,596,017,351.06 14,247,691.60 4,610,265,042.66 jan/13 jan/43 N/A      
ELETRONORTE 058/2001 IPCA 51 8,840.5 595,195,393.11 927,563,049.84 335,166,629.21 449,902,503.16 2,307,827,575.32 11,980,268.39 2,319,807,843.71 jan/13 jan/43 N/A      
CGT ELETROSUL   057/2001 IPCA 54 8,802.5 365,817,489.19 434,724,641.30 98,177,667.77 234,156,639.73 1,132,876,437.99 56,365,347.08 1,189,241,785.07 jan/13 jan/43 N/A      
TOTAL       56,807.2 3,321,561,122.74 6,530,808,435.68 2,687,715,339.64 2,015,638,209.09 14,555,723,107.15 168,100,442.96 14,723,823,550.11              
                                     
Notes                                    
1. The values of the RAP cycle 2024/2025 established through Approval Resolution 3,348/2024 are at prices of June/2024.
2. PRT MME 579/12 - Defined the initial RAP, referred to in art. 13 of Provisional Measure No. 579, of 2012 (converted into Law 12,783/2013), of the facilities that are part of the electric power transmission concessions under art. 6 of said Provisional Measure, subject to the decision provided for in art. 12. 
(I) The opening of the total amount of RAP PRT MM 579/12 (O&M) is presented in the "RAP of the 2024/2025 cycle" column of the "List of Modules" tab of the spreadsheet, when filtering "PRT 579/2012" in the "RAP Act" column.
3. PRT MME 120/16 - determined that the amounts approved by ANEEL related to the assets provided for in art. 15, § 2 of Law 12,783/2013 become part of the Regulatory Remuneration Base (BRR) of the transmitters and that the cost of capital is added to the respective Permitted Annual Revenues (RAP). The payment of said RBSE indemnity considers two components: (ii) Financial component: refers to the capital cost of RBSE assets, which was not paid to the transmitters between 01.01.2013 and 06.30.2017, which will be paid until the 2027-2028 tariff cycle, according to the reprofiling defined by ANEEL in the 2018 Periodic Tariff Review; and (ii) Economic component: refers to the capital cost of assets classified as RBSE and not yet depreciated on the base date of the tariff review. This portion of revenue is due to the extended transmitters as long as such assets are not fully depreciated.
(II) The opening of the total amount of RAP Financial Component - PRT MM 120/16 is presented in the column "RAP of cycle 2024/2025" of the tab "List of Modules" of the spreadsheet, when filtering "PRT 120/2016" in the column "RAP Act" and "Financial Component calculated for the period from January/2013 to June/2017, with a payment term of 8 years, as stated in § 3 and § 4, of Art. 1, of PRT 120/2016. * Revised revenue in the 2020-2021 cycle. * Revenue revised 07-05-2024" in column "Revenue Description".
(III) The opening of the total value of RAP Economic Component - PRT MM 120/16 is presented in the column "RAP of cycle 2024/2025" of the tab "List of Modules" of the spreadsheet, when filtering "PRT 120/2016" in the column "RAP Act" and "Installment of RAP calculated according to PRT 120/2016 and included from the 2017-2018 cycle. * Revenue revised 07-05-2024" in column "Revenue Description".
4. RAP Reinforcements and Improvements - Revenues currently received due to reinforcements and improvements that entered into commercial operation until the last annual adjustment of RAP in July 2024.
(IV) The opening of the total value of RAP Reinforcements and Improvements is presented in the "RAP of cycle 2024/2025" column of the "List of Modules" tab of the spreadsheet, when filtering "RBNI, RCDM and RMEL" in the "revenue type" in the "RAP Act" column.
5. (V) Total RAP approved for the 2024/2025 cycle through ReH 3,348/2024 associated with renewed contracts associated with projects in commercial operation in the Annual Adjustment of RAP cycle 2024/2025.
6. (VI) Additional RAP associated with the authorized reinforcement and improvement works that entered into commercial operation from the last adjustment until 1Q25. The list of these works is presented when filtering the "Quarter" column of the "List of Modules" tab of the spreadsheet.
7. (VII) Total RAP associated with the renewed contracts considers the incorporation of large-scale authorized reinforcement and improvement works, with revenue previously defined by ANEEL, which entered into commercial operation until 1Q25.
 
Bidding Projects                             Approved RAP (*) + Additional RAP (**)
Company Contract Readjustment index No. of associated substations Total Km RAP Auction RAP Reinforcements and Improvements RAP Total approved
cycle 2024/2025
(Ref. Jun/24)
RAP add-on - works that entered into commercial operation (Ref. Jun/24) RAP Total
(Ref. Jun/24)
Duration of the contract Reduction Date of RAP 50% after 15 years
Next readjustment date   Company RAP Renewed RAP Bidders Regulatory RAP
(I) (II) (III = I + II) (IV) (V = III +IV) Start Date End Date   CHESF 4,610,265,043 617,245,186 5,227,510,228
CHESF 007/2005 IGPM   2 208.1 11,959,394.39 18,921,919.12 30,881,313.51 0.00 30,881,313.51 3/4/2005 3/4/2035 Dec/22 1-Jul-25   RAP approved 4,596,017,351 612,659,822 5,208,677,173
008/2005 IGPM   2 119.8 8,266,197.46 0.00 8,266,197.46 0.00 8,266,197.46 3/4/2005 3/4/2035 Sep/24   RAP add-on 14,247,692 4,585,364 18,833,055
010/2007 IPCA   2 94.5 12,773,162.08 9,603,400.21 22,376,562.29 0.00 22,376,562.29 6/14/2007 6/14/2037 Aug/27   FURNAS 6,604,508,879 385,771,147 6,990,280,026
012/2007 IPCA   4 316 17,414,770.86 0.00 17,414,770.86 0.00 17,414,770.86 6/14/2007 6/14/2037 Sep/25 and Apr/29   RAP approved 6,519,001,743 385,771,147 6,904,772,890
005/2008 IPCA   3 110.2 6,597,175.80 358,296.65 6,955,472.45 0.00 6,955,472.45 3/17/2008 3/17/2038 N/A   RAP add-on 85,507,136 0 85,507,136
014/2008 IPCA   2 145.01 6,767,141.74 5,111,100.09 11,878,241.83 0.00 11,878,241.83 10/16/2008 10/16/2038 N/A   ELETRONORTE 2,319,807,844 700,213,416 3,020,021,260
006/2009 IPCA   3 49 18,901,797.44 14,112,473.36 33,014,270.80 0.00 33,014,270.80 1/28/2009 1/28/2039 N/A   RAP approved 2,307,827,575 692,259,459 3,000,087,034
017/2009 IPCA   5 95.84 36,139,619.58 8,366,499.76 44,506,119.34 0.00 44,506,119.34 8/3/2009 8/3/2039 N/A   RAP add-on 11,980,268 7,953,957 19,934,226
018/2009 IPCA   2 144.8 11,082,065.75 0.00 11,082,065.75 0.00 11,082,065.75 8/3/2009 8/3/2039 N/A   CGT ELETROSUL   1,189,241,785 631,411,917 1,820,653,702
004/2010 IPCA   4 34.28 47,224,568.66 4,322,865.57 51,547,434.23 0.00 51,547,434.23 7/12/2010 7/12/2040 N/A   RAP approved 1,132,876,438 631,411,917 1,764,288,355
007/2010 IPCA   1 0 16,088,745.84 0.00 16,088,745.84 0.00 16,088,745.84 7/12/2010 7/12/2040 N/A   RAP add-on 56,365,347 0 56,365,347
013/2010 IPCA   1 0 11,911,200.58 3,914,221.73 15,825,422.31 0.00 15,825,422.31 10/6/2010 10/6/2040 N/A   VSB 0 50,534,763 50,534,763
014/2010 IPCA   1 0 2,166,724.87 6,988,270.66 9,154,995.53 0.00 9,154,995.53 10/6/2010 10/6/2040 N/A   RAP approved 0 50,534,763 50,534,763
019/2010 IPCA   7 321.0025 23,126,288.19 8,799,576.24 31,925,864.43 0.00 31,925,864.43 11/23/2010 11/23/2040 N/A   RAP add-on 0 0 0
020/2010 IPCA   2 115 9,404,490.58 4,580,002.03 13,984,492.61 0.00 13,984,492.61 11/23/2010 11/23/2040 N/A   TMT 0 54,635,374 54,635,374
021/2010 IPCA   2 91.3 10,592,626.37 799,855.18 11,392,481.55 0.00 11,392,481.55 11/23/2010 11/23/2040 N/A   RAP approved 0 54,635,374 54,635,374
008/2011 IPCA   5 285.77 64,201,697.89 29,397,172.75 93,598,870.64 0.00 93,598,870.64 10/13/2011 10/13/2041 N/A   RAP add-on 0 0 0
009/2011 IPCA   2 64.1 8,160,812.32 4,445,119.89 12,605,932.21 0.00 12,605,932.21 10/13/2011 10/13/2041 N/A   Total 14,723,823,550 2,439,811,802 17,163,635,352
010/2011 IPCA   3 65.4 15,773,334.42 4,373,439.19 20,146,773.61 0.00 20,146,773.61 10/13/2011 10/13/2041 N/A   RAP approved 14,555,723,107 2,427,272,481 16,982,995,588
017/2011 IPCA   2 45.6 13,971,549.89 4,553,765.28 18,525,315.17 0.00 18,525,315.17 12/9/2011 12/9/2041 N/A   RAP add-on 168,100,443 12,539,321 180,639,764
005/2012 IPCA   4 42 28,527,985.61 584,235.33 29,112,220.94 4,585,363.58 33,697,584.52 5/10/2012 5/10/2042 N/A   (*) Approved RAP associated with active modules of ReH 3348/2024.  
017/2012 IPCA   2 0 16,750,598.97 0.00 16,750,598.97 0.00 16,750,598.97 6/1/2012 6/1/2042 N/A   (**) RAP associated with planned modules that came into operation during 3Q24 to 1Q25
018/2012 IPCA   6 207.8 21,780,646.08 0.00 21,780,646.08 0.00 21,780,646.08 6/1/2012 6/1/2042 N/A          
019/2012 IPCA   3 60.3 36,713,049.34 27,131,964.24 63,845,013.58 0.00 63,845,013.58 6/1/2012 6/1/2042 N/A   Check 0 0 #REF!
FURNAS 034/2001 IGPM   2 664.6 240,946,442.53 11,335,375.23 252,281,817.76 0.00 252,281,817.76 5/9/2001 5/9/2031 Mar-18 1-Jul-25   Check 0 0 -
006/2005 IGPM   2 89.8 31,292,918.62 95,793.97 31,388,712.59 0.00 31,388,712.59 3/4/2005 3/4/2035 Jun-25          
007/2006 IPCA   3 71.1 27,417,208.38 199,922.40 27,617,130.78 0.00 27,617,130.78 4/27/2006 4/27/2036 jan/28 and jan/30          
003/2009 IPCA   2 179.7 15,165,129.75 0.00 15,165,129.75 0.00 15,165,129.75 1/28/2009 1/28/2039 N/A   Company km Renewed km Not Renewed (*) km Total
028/2009 IPCA   3 187.1 17,248,809.27 0.00 17,248,809.27 0.00 17,248,809.27 11/19/2009 11/19/2039 N/A   CHESF 19,334.8 2,806.6 22,141.4
006/2010 IPCA   2 95 12,149,263.63 0.00 12,149,263.63 0.00 12,149,263.63 7/12/2010 7/12/2040 N/A   ELETROBRAS 19,829.4 1,821.7 21,651.1
014/2011 IPCA   2 51.4 6,019,753.13 0.00 6,019,753.13 0.00 6,019,753.13 12/9/2011 12/9/2041 N/A   ELETRONORTE 8,840.5 2,141.5 10,982.0
016/2012 IPCA   1 0 13,539,357.84 10,361,172.23 23,900,530.07 0.00 23,900,530.07 5/10/2012 5/10/2042 N/A   CGT ELETROSUL   8,802.5 3,283.9 12,086.4
ELETRONORTE 007/2008 IPCA   2 35.93 4,956,268.03 9,975,264.48 14,931,532.51 0.00 14,931,532.51 3/17/2008 3/17/2038 N/A 1-Jul-25   Total 56,807.2 10,053.7 66,860.9
001/2009 IPCA   2 95 13,368,525.92 18,283,184.58 31,651,710.50 0.00 31,651,710.50 1/28/2009 1/28/2039 N/A   (*) Includes TLs of contracts without approved RAP  
002/2009 IPCA   1 0 13,881,358.17 8,792,925.54 22,674,283.71 0.00 22,674,283.71 1/28/2009 1/28/2039 N/A          
010/2009 IPCA   2 44 98,709,108.52 2,164,599.79 100,873,708.31 7,953,957.21 108,827,665.52 2/26/2009 2/26/2039 N/A          
012/2009 IPCA   2 111 319,447,466.82 0.00 319,447,466.82 0.00 319,447,466.82 2/26/2009 2/26/2039 N/A          
021/2009 IPCA   7 985.63 97,090,991.04 5,955,664.60 103,046,655.64 0.00 103,046,655.64 11/19/2009 11/19/2039 N/A          
022/2009 IPCA   3 546.9 55,456,669.30 77,759.51 55,534,428.81 0.00 55,534,428.81 11/19/2009 11/19/2039 N/A          
009/2010 IPCA   2 59.08 7,964,164.20 0.00 7,964,164.20 0.00 7,964,164.20 7/12/2010 7/12/2040 N/A          
004/2011 IPCA   1 0 4,198,168.94 5,288,661.70 9,486,830.64 0.00 9,486,830.64 6/28/2011 6/28/2041 N/A          
012/2011 IPCA   2 0 9,120,811.15 0.00 9,120,811.15 0.00 9,120,811.15 12/9/2011 12/9/2041 N/A          
013/2011 IPCA   1 0 2,916,408.41 0.00 2,916,408.41 0.00 2,916,408.41 12/9/2011 12/9/2041 N/A          
014/2012 IPCA   2 29.53 14,611,458.46 0.00 14,611,458.46 0.00 14,611,458.46 5/7/2012 5/7/2042 N/A          
CGT ELETROSUL   004/2004 IGPM   3 371.9 83,347,456.54 12,829.27 83,360,285.81 0.00 83,360,285.81 2/18/2004 2/18/2034 Nov-20 1-Jul-25          
010/2005 IGPM   4 375.8 73,661,522.58 78,496,916.00 152,158,438.58 0.00 152,158,438.58 3/4/2005 3/4/2035 Apr/23          
005/2006 IPCA   2 257.4 30,081,048.57 9,932.09 30,090,980.66 0.00 30,090,980.66 4/27/2006 4/27/2036 May/24          
004/2008 IPCA   2 238 9,012,543.41 11,626.62 9,024,170.03 0.00 9,024,170.03 3/17/2008 3/17/2038 N/A          
005/2009 IPCA   1 0 7,166,476.53 602,381.57 7,768,858.10 0.00 7,768,858.10 1/28/2009 1/28/2039 N/A          
011/2010 IPCA   4 0 18,641,754.95 11,486,310.19 30,128,065.14 0.00 30,128,065.14 10/6/2010 10/6/2040 N/A          
012/2010 IPCA   3 36.6 5,026,177.01 566,045.30 5,592,222.31 0.00 5,592,222.31 10/6/2010 10/6/2040 N/A          
002/2011 IPCA   3 231.3 4,067,533.05 10,424,008.64 14,491,541.69 0.00 14,491,541.69 6/16/2011 6/16/2041 N/A          
004/2012 IPCA   6 783.1 96,905,436.58 738,262.80 97,643,699.38 0.00 97,643,699.38 5/10/2012 5/10/2042 N/A          
020/2012 IPCA   5 473.2 149,312,326.23 16,626,580.36 165,938,906.59 0.00 165,938,906.59 8/27/2012 10/8/2042 N/A          
007/2014 IPCA   6 274.6 30,010,368.77 534,245.16 30,544,613.93 0.00 30,544,613.93 1/29/2014 1/29/2044 N/A          
008/2014 IPCA   1 0 4,670,134.35 0.00 4,670,134.35 0.00 4,670,134.35 1/29/2014 1/29/2044 N/A          
TMT
(SPE 100% ELETROBRAS)
004/2013 IPCA   2 297 54,635,373.70 0.00 54,635,373.70 0.00 54,635,373.70 8/14/2013 8/14/2043 N/A 1-jul-25          
VSB
(SPE 100% ELETROBRAS)
014/2013 IPCA   1 163 50,534,762.93 0.00 50,534,762.93 0.00 50,534,762.93 10/9/2013 10/9/2043 N/A 1-jul-25          
Total     157.00 9,363.38 2,078,868,842.02   348,403,639.31 2,427,272,481.33  12,539,320.79  2,439,811,802.12                  
                                     
Notes                                    
1. The values of the RAP cycle 2024/2025 established through Approval Resolution 3,348/2024 are at prices of June/2024.
2. RAP Auction - amounts associated with the projects subject to auction.
(I) The opening of the total value of the RAP Auction is presented in the "RAP of cycle 2024/2025" column of the "RAP Data ReH 3,348/2024" tab of the spreadsheet, by filtering "RBL, RICG and RPEC" in the "RAP Act" column and filtering "active status" in the "RAP Status" column.
3. RAP Reinforcements and Improvements - Revenues currently received due to reinforcements and improvements that entered into commercial operation until the last annual adjustment of RAP in July 2024.
(II) The opening of the total value of RAP Reinforcements and Improvements is presented in the "RAP cycle 2024/2025" column of the "RAP Data ReH 3,348/2024" tab of the spreadsheet, when filtering the bidding concession contracts and filtering "RBNI, RCDM and RMEL" in the "revenue type" in the "RAP Act" column and the RAP status column as "Active".
4. (III) Total RAP approved for the 2024/2025 cycle through ReH 3,348/2024 associated with the bidding contracts associated with the projects in commercial operation in the Annual Adjustment of RAP cycle 2024/2025.
5. (IV) Additional RAP associated with the authorized reinforcement and improvement works that entered into commercial operation from the last adjustment until 3Q24. The list of these works is presented when filtering the "Quarter" column of the "RAP Data ReH 3,348/2024" tab of the spreadsheet. 
7. (V) Total RAP associated with the bidding contracts considers the incorporation of large-scale authorized reinforcement and improvement works, with revenue previously defined by ANEEL, which entered into commercial operation until 4Q24.
8. The information associated with the 100% Eletrobras SPE concession contracts whose projects are in commercial operation are considered.
Other contracts (**)
                                     
Company Total Km                                  
                                 
CHESF 190.8                                  
ELETROBRAS 483                                  
ELETRONORTE 234.446                                  
CGT ELETROSUL   242                                  
                                     
Notes                                    
(**) Transmission lines associated with the connection of power plants, free consumers, sectioning, etc., without a revenue contract approved by REH 3216/2023

 

13 
 
Growth in Transmission
                                                         
This tab contains projects that have not yet started commercial operation and projects that have started commercial operation over the last quarter (projects with 100% physical progress).
Parts of these projects are listed in the "List of Modules" tab.
The data presented here refers to the sample of projects included in ANEEL's Transmission Management System (SIGET).
Projects enter this sampling when they become part of SIGET, and leave when they are canceled in SIGET or when they entered commercial operation until the beginning of the current quarter.
All projects to reinforce and improve this tab are considered large. This tab contains neither small reinforcement nor small improvement. 
                                                         
Investment (projects that have not yet entered into commercial operation) Capex (BRL bn) RAP (BRL bn)                                                
Total Present in Modules List of tab "RAP Data ReH 3348_2024" Not present in Modules List of tab "RAP Data ReH 3348_2024"                                                
Auction 01/2022 0.12 0.01 0.01 0.00                                                
Auction 01/2023 0.68 0.07 0.07 0.00                                                
Auction 01/2024 5.56 0.61 0.00 0.61                                                
Reinforcement 3.54 0.57 0.44 0.13                                                
Improvement (ex HVDC) 3.22 0.49 0.47 0.01                                                
Eletrobras Consolidated 13.13 1.75 1.00 0.75                                                
TNE * 3.30 0.38 0.00 0.38                                                
Total 16.43 2.130 1.00 1.13                                                
* Base date: 01/2024. CAPEX and RAP referring to the entire project and does not include an ongoing arbitration process to adjust the RAP.
                                                         
Check 0.00 0.00 -1.00 -0.75                                                
                                                         
Investment (projects that have not yet entered into commercial operation) Capex (BRL bn) RAP (BRL bn)                                                
Total Present in Modules List of tab "RAP Data ReH 3348_2024" Not present in Modules List of tab "RAP Data ReH 3348_2024"                                                
Reinforcement & Improvement (ex HVDC) 6.77 1.05 0.91 0.14                                                
Reinforcement 3.54 0.57 0.44 0.13                                                
renewed 3.42 0.55 0.42 0.13                                                
bidders 0.12 0.02 0.02 0.00                                                
Improvement (ex HVDC) 3.22 0.49 0.47 0.01                                                
renewed 5.03 0.48 0.47 0.01                                                
bidders -1.81 0.00 0.00 0.00                                                
                                                         
Physical Characteristics (1) (2) Values                                                      
Lines Extension (km) 2,363                                                      
Transformation Cap. (MVA) 12,005                                                      
(1) Projects that have not yet entered into commercial operation.
(2) Excludes Itaipu HVDC revitalization project.
                                                         
Data of authorized projects planned to enter into commercial operation
Index Investment Type Eletrobras Company Consolidation % of Interest Project Investment Base Date Investment (BRL Million) Physical progress of the project (%) Line Extension
(km)
Voltage
(kV)
Transformation Capacity (MVA) Reactive Compensation (MVAR) Location (State) Is it or is it not on the module list? Forecast of Start of Operation Termination of the Concession RAP (BRL Million) RAP base date Readjustment Index Reinforcement / Improvement / Expansion Realized Investment 1Q25 (BRL Million) Investment
 Realized 2Q25 (BRL Million)
Investment
 Realized 3Q25 (BRL Million)
Investment
 Realized 4Q25 (BRL Million)
Concession Agreement CA Renewed or Bid? Project (I) Notes
1 Transmission Line Chesf Chesf 100% Sectioning of the TL 500 kV Luiz Gonzaga - Milagres C1 at SS Milagres II mar-25 59.63 48 2 500 0 0 CE, PE Yes 21/11/25 31/12/42  8.97 jun-24 IPCA Reinforcement 0.15       061/2001 Renewed T2019-090  
2 Transmission Line Chesf Chesf 100% Sectioning of the TL 500 kV Sobradinho - Luiz Gonzaga C2 at SS Juazeiro III mar-25 48.72 84 1 500 0 0 BA, PE Yes 18/07/25 31/12/42  7.53 jun-24 IPCA Reinforcement 6.28       061/2001 Renewed T2019-074  
3 Transmission Line Chesf Chesf 100% Secc. TL 500 kV Angelim II - Recife II at SS Suape II. mar-25 237.76 98 50 500 0 0 PE Yes 05/05/25 31/12/42   22.95 jun-24 IPCA Reinforcement 12.47       061/2001 Renewed T2019-073  
4 Transmission Line Chesf Chesf 100% Secc. TL 230 Olindina/Catu at SS Alagoinhas II mar-25 31.30 25 1 230 0 0 BA Yes 11/11/25 31/12/42  5.15 jun-24 IPCA Reinforcement 0.06       061/2001 Renewed T2022-113  
5 Transmission Line Chesf Chesf 100% Reinforcement - Sectioning of TL Banabuiú-Milagres C2 at SS Icó. mar-25 23.79 10 3 230 0 0 CE Yes 28/07/26 31/12/42  3.94 jun-24 IPCA Reinforcement 0.02       061/2001 Renewed T2023-128  
6 Transmission Line Chesf Chesf 100% Reinforcement - Sectioning of TL P.Afonso III-Bom Nome C3 at SS Floresta II. mar-25 23.01 6 2 230 0 0 PE Yes 28/07/26 31/12/42  3.94 jun-24 IPCA Reinforcement 0.01       061/2001 Renewed T2023-129  
7 Transmission Line Chesf Chesf 100% Reinforcement - Sectioning of TL P.Afonso III-Bom Nome C2 at SS Tacaratu. mar-25 34.84 13 14 230 0 0 PE Yes 18/08/26 31/12/42  5.74 jun-24 IPCA Reinforcement 0.01       061/2001 Renewed T2023-130  
8 Transmission Line Chesf Chesf 100% Reinforcement - Sectioning of TL P.Afonso III-Floresta II C1 at SS Tacaratu. mar-25 11.20 13 7 230 0 0 PE Yes 27/07/26 31/12/42  1.75 jun-24 IPCA Reinforcement 0.02       061/2001 Renewed T2023-131  
9 Transmission Line Eletronorte Eletronorte 100% Sectioning of TL 138kV Rondonópolis-Couto Magalhães at SS Petrovina mar-25 32.55 91 1 138 0 0 MT Yes 30/10/25 31/12/42  4.10 jun-24 IPCA Reinforcement 1.26       058/2001 Renewed T2021-072  
10 Transmission Line Furnas Furnas 100% SS Iriri 2R - Sectioning TL 138kV Rocha Leão / Campos C1 mar-25 10.72 93 1 138 0 0 RJ Yes 30/05/25 31/12/42  2.01 jun-24 IPCA Reinforcement 2.59       062/2001 Renewed T2019-066  
11 Transmission Line Furnas Furnas 100% Secc. TL 345kV Venda das Pedras - Macaé C1 at SS Lagos mar-25 67.96 23 2 345 0 0 RJ Yes 16/12/25 31/12/42   10.52 jun-24 IPCA Reinforcement 0.34       062/2001 Renewed T2022-112  
12 Transmission Line Nova Era Janapu Furnas 100% TL 500 kV Janaúba 6 – Presidente Juscelino C1 ago-23 681.33 34 303 500 0 470 MG Yes 30/09/28 29/09/53   73.96 jun-24 IPCA Expansion NA       009/2023 Bidder T2023-182  
13 Substation CGT Eletrosul CGT Eletrosul 100% Improvement at SS Curitiba - replacement of the single-phase autotransformer TF1, Phases B and C, 672 MVA (Completed) mar-25 20.00 100 0 525 0 0 PR Yes 09/03/25 31/12/42  5.53 jun-24 IPCA Improvement 2.70       057/2001 Renewed T2021-098  
14 Substation CGT Eletrosul CGT Eletrosul 100% Improvement at SS Gravataí - replacement of phases A and C, TF1 525/230 kV, 224 MVA each mar-25 53.41 88 0 525 0 0 RS Yes 31/07/25 31/12/42  5.53 jun-24 IPCA Improvement 1.83       057/2001 Renewed T2021-099  
15 Substation CGT Eletrosul CGT Eletrosul 100% Reinforcement at SS Gravataí - Installation of a bank of 525 kV, (3+1R)x50 Mvar bar reactors and connections mar-25 43.1 61 0 525 0 150 RS Yes 31/07/25 31/12/42  8.37 jun-24 IPCA Reinforcement 1.48       057/2001 Renewed T2022-069  
16 Substation CGT Eletrosul CGT Eletrosul 100% Improvement at SS Gravatai: single-phase reactor replacement, RE2, 525 kV, 3x50 Mvar, Phases A and C mar-25 14.5 53 0 525 0 0 RS Yes 30/09/25 31/12/42  1.83 jun-24 IPCA Improvement 0.50       057/2001 Renewed T2023-002  
17 Substation CGT Eletrosul CGT Eletrosul 100% Improvement at SS Campos Novos: single-phase reactor replacement, RE1, 525 kV, 3x33,333 Mvar mar-25 10.9 41 0 525 0 0 SC Yes 15/03/26 31/12/42  2.60 jun-24 IPCA Improvement 0.02       057/2001 Renewed T2023-003  
18 Substation CGT Eletrosul CGT Eletrosul 100% Improvement at SS Campos Novos: single-phase reactor replacement, 525 kV, 33.333 Mvar, Reserve Phase 1 mar-25 3.6 52 0 525 0 0 SC Yes 15/03/26 31/12/42  0.87 jun-24 IPCA Improvement 0.01       057/2001 Renewed T2023-004  
19 Substation CGT Eletrosul CGT Eletrosul 100% Improvement at SS Campos Novos: single-phase reactor replacement, RE2, 525 kV, 3x33.333 Mvar mar-25 10.9 46 0 525 0 0 SC Yes 15/03/26 31/12/42  2.60 jun-24 IPCA Improvement 0.02       057/2001 Renewed T2023-005  
20 Substation CGT Eletrosul CGT Eletrosul 100% Improvement at SS Itá: single-phase reactor replacement, RE1, 525 kV, 3x50 Mvar mar-25 14.2 45 0 525 0 0 SC Yes 15/03/26 31/12/42  2.74 jun-24 IPCA Improvement 0.00       057/2001 Renewed T2023-006  
21 Substation CGT Eletrosul CGT Eletrosul 100% Improvement at SS Itá: replacement of single-phase reactor, RTR1, 525 kV, 50 Mvar, Reserve Phase 1 mar-25 4.7 28 0 525 0 0 SC Yes 15/03/26 31/12/42  0.91 jun-24 IPCA Improvement 0.00       057/2001 Renewed T2023-007  
22 Substation CGT Eletrosul CGT Eletrosul 100% Improvement at SS Gravataí 2: replacement of the capacitor bank, BC4, 230 kV, 100 Mvar mar-25 6.8 10 0 230 0 0 RS Yes 31/05/26 31/12/42  0.63 jun-24 IPCA Improvement 0.00       057/2001 Renewed T2023-008  
23 Substation CGT Eletrosul CGT Eletrosul 100% Improvement at SS Gravataí 2: replacement of the capacitor bank, BC5, 230 kV, 100 Mvar mar-25 6.8 10 0 230 0 0 RS Yes 30/06/26 31/12/42  0.63 jun-24 IPCA Improvement 0.00       057/2001 Renewed T2023-009  
24 Substation CGT Eletrosul CGT Eletrosul 100% Improvement at SS Palhoça: replacement of the capacitor bank, BC1, 230 kV, 50 Mvar mar-25 2.0 8 0 230 0 0 SC Yes 15/03/26 31/12/42  0.55 jun-24 IPCA Improvement 0.01       057/2001 Renewed T2023-010  
25 Substation CGT Eletrosul CGT Eletrosul 100% Improvement at SS Gravataí: replacement of single-phase autotransformer, TF2, 525/230 kV, 3x224 MVA mar-25 62.5 53 0 525 0 0 RS Yes 31/12/25 31/12/42  7.88 jun-24 IPCA Improvement 2.14       057/2001 Renewed T2023-011  
26 Substation CGT Eletrosul CGT Eletrosul 100% Improvement at SS Gravataí: Replacement of TF3 single-phase autotransformer, 525/230 kV, 3x224 MVA mar-25 62.5 38 0 525 0 0 RS Yes 31/12/25 31/12/42  7.88 jun-24 IPCA Improvement 2.14       057/2001 Renewed T2023-012  
27 Substation CGT Eletrosul CGT Eletrosul 100% Improvement at SS Passo Fundo: replacement of TF3 single-phase autotransformer, 230/138 kV, 3x28 MVA mar-25 10.1 12 0 230 0 0 RS Yes 15/03/26 31/12/42  3.56 jun-24 IPCA Improvement 0.02       057/2001 Renewed T2023-013  
28 Substation CGT Eletrosul CGT Eletrosul 100% Improvement at SS Passo Fundo: replacement of the autotransformer, 230/138 kV, 28 MVA, Reserve Phase mar-25 3.4 18 0 230 0 0 RS Yes 15/03/26 31/12/42  1.19 jun-24 IPCA Improvement 0.01       057/2001 Renewed T2023-014  
29 Substation CGT Eletrosul CGT Eletrosul 100% Improvement of SS Campo Grande: replacement of Capacitor Bank, BC1, 138 kV, 30 Mvar mar-25 2.2 10 0 230 0 0 MS Yes 15/03/26 31/12/42  0.44 jun-24 IPCA Improvement 0.00       057/2001 Renewed T2023-028  
30 Substation CGT Eletrosul CGT Eletrosul 100% Improvement at SS Londrina: replacement of autotransformer bank, TF3, 525/230 kV, 3x224 MVA mar-25 52.5 9 0 525 0 0 PR Yes 15/03/26 31/12/42  7.88 jun-24 IPCA Improvement 0.09       057/2001 Renewed T2023-029  
31 Substation CGT Eletrosul CGT Eletrosul 100% Improvement at SS Blumenau: replacement of Phase C of TF6, 525/230 kV, 224 MVA mar-25 15.3 12 0 525 0 0 SC Yes 15/03/26 31/12/42  2.63 jun-24 IPCA Improvement 0.10       057/2001 Renewed T2023-030  
32 Substation CGT Eletrosul CGT Eletrosul 100% Improvement at SS Curitiba: replacement of Phase A of RE1, 525 kV, 50 Mvar mar-25 2.3 34 0 525 0 0 PR Yes 15/03/26 31/12/42  0.91 jun-24 IPCA Improvement 0.00       057/2001 Renewed T2023-031  
33 Substation CGT Eletrosul CGT Eletrosul 100% Improvement at SS Santo Ângelo: replacement of the bank of single-phase reactors, RE1, 525 kV, 3x50 Mvar mar-25 6.9 33 0 525 0 0 RS Yes 11/09/26 31/12/42  2.74 jun-24 IPCA Improvement 0.01       057/2001 Renewed T2023-032  
34 Substation CGT Eletrosul CGT Eletrosul 100% Improvement at SS Dourados: replacement of three-phase autotransformer, TF1, 230/138 kV, 75 MVA mar-25 13.3 16 0 230 0 0 MS Yes 15/03/26 31/12/42  2.03 jun-24 IPCA Improvement 0.01       057/2001 Renewed T2023-033  
35 Substation CGT Eletrosul CGT Eletrosul 100% Improvement at SS Dourados: replacement of TF3 three-phase autotransformer, 230/138 kV, 75 MVA mar-25 13.3 14 0 230 0 0 MS Yes 15/01/26 31/12/42  2.03 jun-24 IPCA Improvement 0.01       057/2001 Renewed T2023-034  
36 Substation CGT Eletrosul CGT Eletrosul 100% Improvement at SS Dourados: replacement of the three-phase autotransformer, TF4, 230/138 kV, 75 MVA mar-25 13.3 14 0 230 0 0 MS Yes 15/03/26 31/12/42  2.03 jun-24 IPCA Improvement 0.01       057/2001 Renewed T2023-035  
37 Substation CGT Eletrosul CGT Eletrosul 100% Reinforcement at SS Joinville: replacement TF1 138/69 kV - 50 MVA by TF of 138/69 kV – 66 MVA mar-25 5.7 27 0 138 16 0 SC Yes 29/07/25 31/12/42  1.49 jun-24 IPCA Reinforcement 0.07       057/2001 Renewed T2023-142  
38 Substation CGT Eletrosul CGT Eletrosul 100% Reinforcement at SS Jorge Lacerda A: replacement TF5 230/138 kV - 79 MVA by TF of 230/138 kV – 120 MVA mar-25 23.4 16 0 230 41 0 SC Yes 30/04/26 31/12/42  4.74 jun-24 IPCA Reinforcement 0.02       057/2001 Renewed T2023-138  
39 Substation CGT Eletrosul CGT Eletrosul 100% Reinforcement at SS Jorge Lacerda A: replacement of TF7 230/138 kV - 79 MVA, by TR of 120 MVA mar-25 23.4 14 0 230 41 0 SC Yes 17/04/26 31/12/42  4.74 jun-24 IPCA Reinforcement 0.02       057/2001 Renewed T2023-145  
40 Substation CGT Eletrosul CGT Eletrosul 100% Reinforcement at SS Jorge Lacerda A: replacement of the existing TF8 138/69 kV - 25 MVA, by TF of 60 MVA mar-25 23.4 21 0 138 35 0 SC Yes 14/09/25 31/12/42  3.03 jun-24 IPCA Reinforcement 0.02       057/2001 Renewed T2023-148  
41 Substation CGT Eletrosul CGT Eletrosul 100% Reinforcement at SS Jorge Lacerda A: replacement of the existing TF9 - 138/69 kV - 50 MVA, by TF of 60 MVA mar-25 23.4 14 0 138 10 0 SC Yes 15/04/26 31/12/42  3.06 jun-24 IPCA Reinforcement 0.02       057/2001 Renewed T2023-149  
42 Substation CGT Eletrosul CGT Eletrosul 100% Reinforcement at SS Anastácio: Installation of the 2nd 27 Mvar bar reactor at 230 kV mar-25 15.7 14 0 230 0 27 MS Yes 21/12/25 31/12/42  2.70 jun-24 IPCA Reinforcement 0.03       057/2001 Renewed T2023-201  
43 Substation CGT Eletrosul CGT Eletrosul 100% Reinforcement at SS Dourados: Replacement of 27 Mvar Bar Reactor 1 with 1x50Mvar, 230 kV mar-25 10.6 14 0 230 0 23 MS Yes 21/12/25 31/12/42  1.25 jun-24 IPCA Reinforcement 0.03       057/2001 Renewed T2023-202  
44 Substation CGT Eletrosul CGT Eletrosul 100% Improvement at SS Caxias do Sul 5: BC1 Capacitor Bank Replacement, 13.8 kV, 3.6 Mvar mar-25 1.6 5 0 14 0 0 RS Yes 31/05/27 31/12/42  0.32 jun-24 IPCA Improvement 0.00       057/2001 Renewed T2024-012  
45 Substation CGT Eletrosul CGT Eletrosul 100% Improvement at SS Caxias do Sul 5: BC2 Capacitor Bank Replacement, 13.8 kV, 3.6 Mvar mar-25 1.6 5 0 14 0 0 RS Yes 31/05/27 31/12/42  0.32 jun-24 IPCA Improvement 0.00       057/2001 Renewed T2024-013  
46 Substation CGT Eletrosul CGT Eletrosul 100% Improvement at SS Caxias do Sul 5: BC3 Capacitor Bank Replacement, 13.8 kV, 3.6 Mvar mar-25 1.6 5 0 14 0 0 RS Yes 31/05/27 31/12/42  0.32 jun-24 IPCA Improvement 0.00       057/2001 Renewed T2024-014  
47 Substation CGT Eletrosul CGT Eletrosul 100% Improvement at SS Caxias do Sul 5: BC4 Capacitor Bank Replacement, 13.8 kV, 3.6 Mvar mar-25 1.6 5 0 14 0 0 RS Yes 31/05/27 31/12/42  0.32 jun-24 IPCA Improvement 0.00       057/2001 Renewed T2024-015  
48 Substation CGT Eletrosul CGT Eletrosul 100% SS GRAVATAÍ 3: Installation of the 2nd Transformer 230/69 kV, 3x 55 MVA, at SS Gravataí 3. mar-25 35.4 4 0 230 165 0 RS Yes 15/10/26 31/12/42  5.93 jun-24 IPCA Reinforcement 0.07       057/2001 Renewed T2024-005  
49 Substation Chesf Chesf 100% SS Milagres - Installation of the fourth 230/69 kV, 100 MVA transformer and connections mar-25 41.1 96 0 230 100 0 CE Yes 29/08/25 31/12/42  3.51 jun-24 IPCA Reinforcement 1.69       061/2001 Renewed T2019-032  
50 Substation Chesf Chesf 100% Installation of the 1st Bar Reactor Bank 500 kV - 3X50 MVA in Sobral III Substation mar-25 44.5 81 0 500 0 150 CE Yes 31/05/25 31/12/42  5.31 jun-24 IPCA Reinforcement 4.18       061/2001 Renewed T2019-072  
51 Substation Chesf Chesf 100% SS São João do Piauí - Installation of the second autotransformer 500/230 kV, 300 MVA and connections. mar-25 63.3 60 0 500 300 0 PI Yes 30/06/25 31/12/42  6.87 jun-24 IPCA Reinforcement 3.34       061/2001 Renewed T2019-029  
52 Substation Chesf Chesf 100% SS Jacaracanga TR1 (Improvements) mar-25 15.3 41 0 230 0 0 BA Yes 29/06/25 31/12/42  1.77 jun-24 IPCA Improvement 0.95       061/2001 Renewed T2020-010  
53 Substation Chesf Chesf 100% SS Jacaracanga TR2 (Improvements) mar-25 14.6 21 0 230 0 0 BA Yes 23/10/25 31/12/42  1.77 jun-24 IPCA Improvement 0.52       061/2001 Renewed T2020-012  
54 Substation Chesf Chesf 100% SS Jardim (Improvements) mar-25 15.7 70 0 230 0 0 SE Yes 30/04/25 31/12/42  1.77 jun-24 IPCA Improvement 1.11       061/2001 Renewed T2020-014  
55 Substation Chesf Chesf 100% SS Matatu (Improvements) mar-25 14.4 26 0 230 0 0 BA Yes 17/09/25 31/12/42  1.77 jun-24 IPCA Improvement 0.24       061/2001 Renewed T2020-016  
56 Substation Chesf Chesf 100% SS Angelim II mar-25 13.9 36 0 500 0 150 PE Yes 02/11/25 31/12/42  3.28 jun-24 IPCA Reinforcement 2.11       061/2001 Renewed T2021-026  
57 Substation Chesf Chesf 100% SS Olindina mar-25 13.1 79 0 500 0 150 BA Yes 09/08/25 31/12/42  3.28 jun-24 IPCA Reinforcement 0.60       061/2001 Renewed T2021-028  
58 Substation Chesf Chesf 100% SS Campina Grande III - 500 kV Reactor Bank mar-25 29.6 98 0 500 0 150 PB Yes 28/04/25 13/10/41  3.69 jun-24 IPCA Reinforcement 15.00       008/2011 Bidder T2022-028  
59 Substation Chesf Chesf 100% Improvement at SS Camacari II - replacement of RT1 reactor, 500 kV, 100 Mvar mar-25 20.2 43 0 500 0 0 BA Yes 30/08/25 31/12/42  2.38 jun-24 IPCA Improvement 5.68       061/2001 Renewed T2022-080  
60 Substation Chesf Chesf 100% Improvement at SS Camacari II - replacement of RTR1 reserve reactor, 500 kV, 33.3 Mvar mar-25 6.8 43 0 500 0 0 BA Yes 30/08/25 31/12/42  0.79 jun-24 IPCA Improvement 2.94       061/2001 Renewed T2022-081  
61 Substation Chesf Chesf 100% Reinforcement at SS Recife II - RT2 reactor replacement, 500 kV, 100 Mvar mar-25 9.6 46 0 500 0 0 PE Yes 15/12/25 31/12/42  2.38 jun-24 IPCA Improvement 7.50       061/2001 Renewed T2022-083  
62 Substation Chesf Chesf 100% Improvement at SS Recife II - replacement of RTR1 reserve reactor, 500 kV, 33.3 Mvar mar-25 2.81 46 0 500 0 0 PE Yes 15/12/25 31/12/42  0.79 jun-24 IPCA Improvement 2.79       061/2001 Renewed T2022-084  
63 Substation Chesf Chesf 100% Improvement at U.Sobradinho 500 kV - replacement of the RTR1 reserve shunt reactor, 500 kV, 33.3 Mvar mar-25 8.00 45 0 500 0 0 BA Yes 30/08/25 31/12/42  0.79 jun-24 IPCA Improvement 2.56       061/2001 Renewed T2022-086  
64 Substation Chesf Chesf 100% SS Bongi - Installation of the 5th transformer and replacement of three transformers mar-25 150.44 77 0 230 500 0 PE Yes 15/10/25 31/12/42   15.41 jun-24 IPCA Reinforcement 16.10       061/2001 Renewed T2022-032  
65 Substation Chesf Chesf 100% SS Teresina II - 2nd reactor bank 500 kV mar-25 60.90 28 0 500 0 200 PI Yes 05/11/25 31/12/42  8.14 jun-24 IPCA Reinforcement 0.28       061/2001 Renewed T2022-065  
66 Substation Chesf Chesf 100% SS Camaçari II (Completed) mar-25 17.21 100 0 230 0 100 BA Yes 27/11/24 31/12/42  0.39 jun-24 IPCA Reinforcement 0.47       061/2001 Renewed T2022-099  
67 Substation Chesf Chesf 100% SS São João do Piauí 3rd Trafo 500/230 3x100 MVA mar-25 51.24 38 0 500 300 0 PI Yes 21/12/25 31/12/42   13.84 jun-24 IPCA Improvement 0.57       061/2001 Renewed T2022-101  
68 Substation Chesf Chesf 100% Improvement at SS Fortaleza: Replacement of transformer 04T2 of SS FTZ. mar-25 6.84 10 0 230 0 0 CE Yes 30/03/26 31/12/42  2.32 jun-24 IPCA Improvement 2.46       061/2001 Renewed T2023-051  
69 Substation Chesf Chesf 100% Improvement at SS Fortaleza: Replacement of transformer 04T4 of SS FTZ. mar-25 6.77 10 0 230 0 0 CE Yes 30/03/26 31/12/42  2.32 jun-24 IPCA Improvement 0.04       061/2001 Renewed T2023-052  
70 Substation Chesf Chesf 100% Improvement at SS Maceió: Replacement of transformer 04T3 of SS MCO. mar-25 4.28 10 0 230 0 0 AL Yes 30/03/26 31/12/42  2.32 jun-24 IPCA Improvement 2.44       061/2001 Renewed T2023-054  
71 Substation Chesf Chesf 100% Improvement at SS Angelim II: Replacement of Single-phase Reactor, 50 MVAr, operational position 05ER mar-25 2.79 42 0 500 0 0 PE Yes 23/11/25 31/12/42  0.88 jun-24 IPCA Improvement 0.93       061/2001 Renewed T2023-055  
72 Substation Chesf Chesf 100% Improvement at SS Angelim II: Replacement of 3 Single Phase Reactors, 3x50 MVAr, position 05E3 mar-25 8.49 46 0 500 0 0 PE Yes 23/11/25 31/12/42  2.63 jun-24 IPCA Improvement 2.80       061/2001 Renewed T2023-056  
73 Substation Chesf Chesf 100% Improvement at SS Angelim II: Replacement of 3 Single Phase Reactors, 3x50 MVAr, position 05E2 mar-25 8.22 53 0 500 0 0 PE Yes 23/11/25 31/12/42  2.63 jun-24 IPCA Improvement 2.82       061/2001 Renewed T2023-057  
74 Substation Chesf Chesf 100% Improvement at SS Olindin II: Replacement of a Single Phase Reactor, 50 MVAr, operational position 05ER mar-25 2.75 30 0 500 0 0 BA Yes 02/11/25 31/12/42  0.88 jun-24 IPCA Improvement 0.95       061/2001 Renewed T2023-058  
75 Substation Chesf Chesf 100% Improvement at SS Olindin II: Replacement of 3 Single Phase Reactors, 3x50 MVAr, position 05E1 mar-25 1.14 30 0 500 0 0 BA Yes 02/11/25 31/12/42  2.63 jun-24 IPCA Improvement 2.85       061/2001 Renewed T2023-059  
76 Substation Chesf Chesf 100% Reinforcement at SS Barreiras: installation of TR3, 230/138 kV, 100 MVA. mar-25 22.61 70 0 230 100 0 BA Yes 25/10/25 31/12/42  5.49 jun-24 IPCA Reinforcement 1.67       061/2001 Renewed T2023-080  
77 Substation Chesf Chesf 100% Reinforcement at SS Bom Nome: Installation of the 4th TF 230/138 kV - 100 MVA mar-25 23.12 26 0 230 100 0 PE Yes 11/01/26 31/12/42  4.69 jun-24 IPCA Reinforcement 4.10       061/2001 Renewed T2023-109  
78 Substation Chesf Chesf 100% Reinforcement at SS Bom Jesus da Lapa: replacement of TR3 230/69 kV mar-25 9.23 35 0 230 61 0 BA Yes 11/08/25 31/12/42  2.24 jun-24 IPCA Reinforcement 0.09       061/2001 Renewed T2023-110  
79 Substation Chesf Chesf 100% Reinforcement at SS S. João do Piauí: replacement of TR3 230/69 kV 33 MVA with 100 MVA mar-25 12.11 25 0 230 67 0 PI Yes 14/07/25 31/12/42  2.05 jun-24 IPCA Reinforcement 0.08       061/2001 Renewed T2023-112  
80 Substation Chesf Chesf 100% Reinforcement at SS S. João do Piauí: replacement of TR4 230/69 kV 33 MVA with 100 MVA mar-25 11.87 25 0 230 67 0 PI Yes 14/07/25 31/12/42  2.05 jun-24 IPCA Reinforcement 0.01       061/2001 Renewed T2023-113  
81 Substation Chesf Chesf 100% Reinforcement at SS Boa Esperança: replacement of the ATR1 500/230 kV bank mar-25 32.72 18 0 500 150 0 MA Yes 21/08/25 31/12/42  6.41 jun-24 IPCA Reinforcement 2.91       061/2001 Renewed T2023-107  
82 Substation Chesf Chesf 100% Reinforcement at SS Boa Esperança: replacement of the reserve phase of ATR1 500/230 kV mar-25 10.91 18 0 500 50 0 MA Yes 21/08/25 31/12/42  2.14 jun-24 IPCA Reinforcement 0.97       061/2001 Renewed T2023-108  
83 Substation Chesf Chesf 100% Reinforcement at SS Bom Jesus da Lapa: Replacement of TR2 230/69 kV - 33 MVA to 100 MVA mar-25 14.27 20 0 230 67 0 BA Yes 10/11/25 31/12/42  2.05 jun-24 IPCA Reinforcement 0.05       061/2001 Renewed T2023-159  
84 Substation Chesf Chesf 100% Reinforcement at SS Açu II: Replacement of TR4 230/69 kV - 39 MVA to 100 MVA mar-25 12.90 20 0 230 61 0 RN Yes 10/11/25 31/12/42  2.05 jun-24 IPCA Reinforcement 0.05       061/2001 Renewed T2023-160  
85 Substation Chesf Chesf 100% Reinforcement at SS Irecê: Replacement of TR2 and TR3 230/69 kV - 33 MVA by two 100 MVA TRs mar-25 53.15 20 0 230 134 0 BA Yes 05/12/25 31/12/42  7.94 jun-24 IPCA Reinforcement 0.94       061/2001 Renewed T2023-161  
86 Substation Chesf Chesf 100% Reinforcement at SS Itabaiana: Replacement of 1st and 2nd TR 230/69 kV - 100 MVA to 150 MVA mar-25 55.67 15 0 230 100 0 SE Yes 05/01/27 31/12/42  8.56 jun-24 IPCA Reinforcement 0.97       061/2001 Renewed T2023-162  
87 Substation Chesf Chesf 100% Reinforcement at SS Olindina: Installation of the 3rd bank of 3 x 50 Mvar bar reactors at 500 kV mar-25 8.22 15 0 500 0 150 BA Yes 05/12/25 31/12/42  6.76 jun-24 IPCA Reinforcement 0.07       061/2001 Renewed T2023-181  
88 Substation Chesf Chesf 100% SS MOSSORÓ IV: Installation of the 2nd 230/69 kV Transformer mar-25 24.25 7 0 230 230 0 RN Yes 25/08/26 01/06/42  3.35 jun-24 IPCA Reinforcement 0.10       018/2012 Bidder T2024-006  
89 Substation Chesf Chesf 100% Reinforcement at SS Camaçari IV: Installation of the 1st Bar Reactor Bank at 500 kV mar-25 40.41 8 0 500 0 150 BA Yes 19/03/26 12/07/40  5.55 jun-24 IPCA Reinforcement 0.07       007/2010 Bidder T2024-011  
90 Substation Chesf Chesf 100% Improvement at SS São João do Piauí: Replacement of Autotransformer Bank 500/230 kV, 3x100 MVA mar-25 29.67 11 0 500 0 0 PI Yes 21/03/27 31/12/42  4.95 jun-24 IPCA Improvement 0.05       061/2001 Renewed T2024-029  
91 Substation Chesf Chesf 100% Improvement at SS Pirapama II: Replacement of Three-Phase Transformer TR1, 230/69/13.8 kV, 100 MVA mar-25 12.44 11 0 230 0 0 PE Yes 30/08/26 31/12/42  2.06 jun-24 IPCA Improvement 0.04       061/2001 Renewed T2024-030  
92 Substation Chesf Chesf 100% Improvement at SS Campina Grande II: Replacement of Three-Phase Transformer TR3 230/69 kV, 100 MVA mar-25 12.44 6 0 230 0 0 PB Yes 21/02/27 31/12/42  2.07 jun-24 IPCA Improvement 0.07       061/2001 Renewed T2024-031  
93 Substation Chesf Chesf 100% Improvement at SS Campina Grande II: Replacement of Three-Phase Transformer TR4 230/69 kV, 100 MVA mar-25 12.44 6 0 230 0 0 PB Yes 21/02/27 31/12/42  2.07 jun-24 IPCA Improvement 0.02       061/2001 Renewed T2024-032  
94 Substation Chesf Chesf 100% Reinforcement at SS Zebu: Installation of the 4th TF 230/69 mar-25 24.69 2 0 230 100 0 AL Yes 22/09/26 03/08/39  3.40 jun-24 IPCA Reinforcement 0.04       017/2009 Bidder T2024-034  
95 Substation Chesf Chesf 100% Reinforcement at SS Coremas: Installation of the 4th TR 230/69 kV mar-25 25.12 6 0 230 100 0 PB Yes 30/08/26 31/12/42  4.25 jun-24 IPCA Reinforcement 0.10       061/2001 Renewed T2024-103  
96 Substation Eletronorte Eletronorte 100% Improvement at SS P. Dutra - RT4 reactor replacement, 500 kV, 3x50 MVAr mar-25 12.52 83 0 500 0 0 MA Yes 01/12/25 31/12/42  2.51 jun-24 IPCA Improvement 0.39       058/2001 Renewed T2022-034  
97 Substation Eletronorte Eletronorte 100% Improvement at SS P. Dutra - RT5 reactor replacement, 500 kV, 3x33.33 MVAr mar-25 12.52 83 0 500 0 0 MA Yes 04/10/25 31/12/42  2.38 jun-24 IPCA Improvement 0.39       058/2001 Renewed T2022-035  
98 Substation Eletronorte Eletronorte 100% Improvement at SS P. Dutra - RT6 reactor replacement, 500 kV, 3x33.33 MVAr mar-25 12.52 13 0 500 0 0 MA Yes 04/04/26 31/12/42  2.39 jun-24 IPCA Improvement 0.39       058/2001 Renewed T2022-036  
99 Substation Eletronorte Eletronorte 100% Improvement at SS Imperatriz - replacement of RT6 reactor, 500 kV, 3x45.33 MVAr mar-25 19.28 49 0 500 0 0 MA Yes 04/08/25 31/12/42  2.41 jun-24 IPCA Improvement 8.55       058/2001 Renewed T2022-040  
100 Substation Eletronorte Eletronorte 100% Improvement at the SS Imperatriz - replacement of the single-phase RTR6 reactor, 500 kV, 1x45.33 MVAr mar-25 6.43 56 0 500 0 0 MA Yes 04/08/25 31/12/42  0.80 jun-24 IPCA Improvement 2.85       058/2001 Renewed T2022-041  
101 Substation Eletronorte Eletronorte 100% Improvement SS P. Dutra - RT1 reactor replacement, 500 kV, 3x50 MVAR mar-25 16.84 18 0 500 0 0 MA Yes 04/04/26 31/12/42  2.44 jun-24 IPCA Improvement 0.26       058/2001 Renewed T2022-042  
102 Substation Eletronorte Eletronorte 100% Improvement at SS São Luis II - RT3 reactor replacement, 500 kV, 3x45.33 MVAR mar-25 16.48 41 0 500 0 0 MA Yes 04/06/25 31/12/42  2.41 jun-24 IPCA Improvement 2.25       058/2001 Renewed T2022-043  
103 Substation Eletronorte Eletronorte 100% Improvement at SS São Luís II - replacement of the reserve reactor RTR1, 500 kV, 1x45.33 MVAR mar-25 5.49 57 0 500 0 0 MA Yes 04/06/25 31/12/42  0.80 jun-24 IPCA Improvement 0.75       058/2001 Renewed T2022-044  
104 Substation Eletronorte Eletronorte 100% Improvement at SS Marabá - RT1 reactor replacement, 500 kV, 3x50 MVAR mar-25 3.03 84 0 500 0 0 PA Yes 04/10/25 31/12/42  2.61 jun-24 IPCA Improvement 0.27       058/2001 Renewed T2022-045  
105 Substation Eletronorte Eletronorte 100% Improvement at SS Marabá - Replace the MBCL7-01, BC1 500 kV, 3x116 MVAr series capacitor bank mar-25 68.45 70 0 500 0 0 PA Yes 04/10/25 31/12/42   11.94 jun-24 IPCA Improvement 6.19       058/2001 Renewed T2022-055  
106 Substation Eletronorte Eletronorte 100% SS Imperatriz - Replacement of the Series Capacitor Bank mar-25 42.59 33 0 500 0 163 MA Yes 28/11/25 31/12/42   15.26 jun-24 IPCA Reinforcement 1.20       058/2001 Renewed T2022-102  
107 Substation Eletronorte Eletronorte 100% SS 230/138 kV Caladinho II and sectioning of TL 230 kV Coletora Porto Velho - Porto Velho, C2. ago-22 115.82 96 6 230 80 0 RO Yes 01/06/25 30/09/52   13.97 jun-24 IPCA Expansion NA       013/2022 Bidder T2022-127  
108 Substation Eletronorte Eletronorte 100% Reinforcement at SS Sorriso: Installation of the 4th TF 230/69/13.8 kV, 1 x 60 MVA three-phase mar-25 26.36 31 0 230 60 0 MT Yes 30/09/25 31/12/42  4.37 jun-24 IPCA Reinforcement 0.98       058/2001 Renewed T2023-104  
109 Substation Eletronorte Eletronorte 100% Improvement at SS Rondonópolis: Replacement of capacitor bank 13.8 kV, number 1. mar-25 0.77 3 0 14 0 0 MT Yes 02/08/27 31/12/42  0.16 jun-24 IPCA Improvement 0.04       058/2001 Renewed T2023-065  
110 Substation Eletronorte Eletronorte 100% Improvement at SS Rondonópolis: Replacement of capacitor bank 13.8 kV, number 3. mar-25 0.77 3 0 14 0 0 MT Yes 02/08/27 31/12/42  0.16 jun-24 IPCA Improvement 0.04       058/2001 Renewed T2023-066  
111 Substation Eletronorte Eletronorte 100% Improvement at SS Rondonópolis: Replacement of capacitor bank 13.8 kV, number 2. mar-25 0.77 3 0 14 0 0 MT Yes 02/08/27 31/12/42  0.16 jun-24 IPCA Improvement 0.04       058/2001 Renewed T2023-067  
112 Substation Eletronorte Eletronorte 100% Improvement at SS Vila do Conde: replacement of power autotransformer bench - VCAT7 02 mar-25 49.27 7 0 500 0 0 PA Yes 02/08/27 31/12/42  8.33 jun-24 IPCA Improvement 1.74       058/2001 Renewed T2023-068  
113 Substation Eletronorte Eletronorte 100% Improvement at SS Vila do Conde: replacement of the power autotransformer bank - VCAT7 01 mar-25 32.85 7 0 500 0 0 PA Yes 02/08/27 31/12/42  5.56 jun-24 IPCA Improvement 1.16       058/2001 Renewed T2023-069  
114 Substation Eletronorte Eletronorte 100% Improvement at SS Marabá: reactor replacement - MBRE7 04 SUB MARABA only Phases A and V. mar-25 10.84 8 0 500 0 0 PA Yes 02/08/27 31/12/42  1.84 jun-24 IPCA Improvement 0.38       058/2001 Renewed T2023-070  
115 Substation Eletronorte Eletronorte 100% Improvement at SS Transamazônica: replacement of the 230 kV 30 MVAr reactor - TMRE6.01 jul-23 10.30 70 0 230 0 0 PA Yes 31/07/25 31/12/42  1.15 jun-24 IPCA Improvement 0.09       058/2001 Renewed T2023-071  
116 Substation Eletronorte Eletronorte 100% Improvement at SS São Luís I: replacement of power transformer No. 03 230/69kV of 100MVA. mar-25 14.24 4 0 230 0 0 MA Yes 02/08/27 31/12/42  2.34 jun-24 IPCA Improvement 0.00       058/2001 Renewed T2023-072  
117 Substation Eletronorte Eletronorte 100% Improvement at SS São Luís II: replacement of power autotransformers No. 01 500/230kV of 200MVA. mar-25 45.21 5 0 500 0 0 MA Yes 02/08/27 31/12/42  7.37 jun-24 IPCA Improvement 0.00       058/2001 Renewed T2023-073  
118 Substation Eletronorte Eletronorte 100% Improvement at SS Couto Magalhaes: replacement of transformer 138/13.8kV - 15MVA - NUMBER 1 mar-25 5.62 5 0 138 0 0 MT Yes 02/02/27 31/12/42  0.93 jun-24 IPCA Improvement 0.22       058/2001 Renewed T2023-074  
119 Substation Eletronorte Eletronorte 100% Improvement at SS Coxipó: replacement of Reactor 230kV 30MVAr number 1 of SS Coxipó - CXRE6-01 mar-25 6.98 6 0 230 0 0 MT Yes 02/02/27 31/12/42  1.16 jun-24 IPCA Improvement 0.30       058/2001 Renewed T2023-075  
120 Substation Eletronorte Eletronorte 100% Improvement at SS Coxipó: replacement of Reactor 230kV 30MVAr number 2 of SS Coxipó - CXRE6-02. mar-25 6.96 6 0 230 0 0 MT Yes 02/02/27 31/12/42  1.16 jun-24 IPCA Improvement 0.30       058/2001 Renewed T2023-076  
121 Substation Eletronorte Eletronorte 100% Reinforcement at SS Pimenta Bueno: Installation of the 3rd Autotransformer 230/138 kV, 55 MVA. mar-25 27.24 11 0 230 55 0 RO Yes 19/01/26 31/12/42  4.58 jun-24 IPCA Reinforcement 0.00       058/2001 Renewed T2023-114  
122 Substation Eletronorte Eletronorte 100% Reinforcement at SS Marabá: replacement of the TF3 230/69 kV, 33 MVA, with a new 100 MVA unit. mar-25 14.19 18 0 230 67 0 PA Yes 23/02/26 31/12/42  2.34 jun-24 IPCA Reinforcement 0.00       058/2001 Renewed T2023-137  
123 Substation Eletronorte Eletronorte 100% Reinforcement at SS Presidente Dutra: replacement of TR1 500/230 kV, (3+1)x100 MVA, by (3+1)x150 MVA. mar-25 33.83 5 0 500 150 0 MA Yes 15/11/26 31/12/42   11.37 jun-24 IPCA Reinforcement 0.04       058/2001 Renewed T2023-134  
124 Substation Eletronorte Eletronorte 100% Reinforcement at SS Marabá: replacement of TR1 500/230 kV, 3x100 MVA, by 3x150 MVA. mar-25 61.85 9 0 500 150 0 PA Yes 21/04/26 31/12/42   10.39 jun-24 IPCA Reinforcement 0.12       058/2001 Renewed T2023-136  
125 Substation Eletronorte Eletronorte 100% SS P. Dutra- Replacement of BC1 500 kV, 390 Mvar, from TL Imperatriz-PDutra, by another 543Mvar. mar-25 93.13 5 0 500 0 153 MA Yes 20/10/27 31/12/42   17.66 jun-24 IPCA Reinforcement 0.11       058/2001 Renewed T2023-153  
126 Substation Eletronorte Eletronorte 100% SS Imperatriz- Replacement BC1 500 kV, 390 Mvar, of TL Imperatriz-PDutra, for another 543MVAr. mar-25 93.30 4 0 500 0 153 MA Yes 20/10/27 31/12/42   17.66 jun-24 IPCA Reinforcement 0.54       058/2001 Renewed T2023-154  
127 Substation Eletronorte Eletronorte 100% Improvement at SS Rondonópolis: RT1 Line Reactor Replacement 230 kV, 30Mvar mar-25 6.60 1 0 230 0 0 MT Yes 21/03/28 31/12/42  1.06 jun-24 IPCA Improvement 0.00       058/2001 Renewed T2024-069  
128 Substation Eletronorte Eletronorte 100% Improvement at SS Imperatriz: TF4 Three Phase Transformer Replacement, 230/69/13.8 kV, 100 MVA mar-25 12.44 2 0 230 0 0 MA Yes 21/09/28 31/12/42  2.04 jun-24 IPCA Improvement 0.02       058/2001 Renewed T2024-070  
129 Substation Eletronorte Eletronorte 100% Improvement at SS São Luis I: Replacement of Three-Phase Transformer TF4 230/69 kV, 100 MVA mar-25 12.44 0 0 230 0 0 MA Yes 21/09/28 31/12/42  2.04 jun-24 IPCA Improvement 0.01       058/2001 Renewed T2024-071  
130 Substation Eletronorte Eletronorte 100% Improvement at SS Presidente Dutra: Replacement of Reactor Bank RT3, 525 kV, 150 Mvar mar-25 14.67 1 0 525 0 0 MA Yes 21/09/28 31/12/42  2.43 jun-24 IPCA Improvement 0.00       058/2001 Renewed T2024-072  
131 Substation Eletronorte Eletronorte 100% Improvement at SS Presidente Dutra: Replacement of Reactor Bank RT2, 525 kV, 150 Mvar mar-25 14.67 1 0 525 0 0 MA Yes 21/09/28 31/12/42  2.43 jun-24 IPCA Improvement 0.00       058/2001 Renewed T2024-073  
132 Substation Eletronorte Eletronorte 100% Improvement at SS Presidente Dutra: Replacement of RTR1 Reserve Reactor, 525 kV, 50 Mvar mar-25 4.89 1 0 525 0 0 MA Yes 21/09/28 31/12/42  0.81 jun-24 IPCA Improvement 0.00       058/2001 Renewed T2024-074  
133 Substation Eletronorte Eletronorte 100% Reinforcement in SS Rondonópolis: replacement of transformer RPAT6-01 230/138/13.8 kV mar-25 31.25 1 0 230 78 0 MT Yes 28/11/26 31/12/42  5.21 jun-24 IPCA Reinforcement 0.00       058/2001 Renewed T2024-119  
134 Substation Eletronorte Eletronorte 100% Reinforcement in SS Rondonópolis: replacement of transformer RPAT6-02 230/138/13.8 kV mar-25 31.25 1 0 230 78 0 MT Yes 28/11/26 31/12/42  5.21 jun-24 IPCA Reinforcement 0.00       058/2001 Renewed T2024-127  
135 Substation Furnas Furnas 100% SS Adrianópolis - Reactor Replacement, AT53, AT1B, AT2A and AT2B mar-25 70.26 96 0 500 0 0 RJ Yes 31/08/25 31/12/42  0.93 jun-24 IPCA Improvement 0.09       062/2001 Renewed T2019-021  
136 Substation Furnas Furnas 100% SS Angra 7R mar-25 10.89 83 0 500 0 0 RJ Yes 20/02/26 31/12/42  1.52 jun-24 IPCA Improvement 0.00       062/2001 Renewed T2017-068  
137 Substation Furnas Furnas 100% SS Campos 20R mar-25 78.49 96 0 138 0 0 RJ Yes 30/05/25 31/12/42   10.69 jun-24 IPCA Improvement 1.20       062/2001 Renewed T2017-073  
138 Substation Furnas Furnas 100% SS Itaberá 9R mar-25 81.94 93 0 765 0 330 SP Yes 13/05/25 31/12/42  9.99 jun-24 IPCA Reinforcement 0.35       062/2001 Renewed T2021-046  
139 Substation Furnas Furnas 100% SS Poços de Caldas 19R mar-25 72.14 77 0 500 40 0 MG Yes 30/07/25 31/12/42   12.04 jun-24 IPCA Reinforcement 0.69       062/2001 Renewed T2021-075  
140 Substation Furnas Furnas 100% SS Campinas mar-25 39.80 78 0 500 0 136 SP Yes 15/07/25 31/12/42   10.60 jun-24 IPCA Reinforcement 1.65       062/2001 Renewed T2021-053  
141 Substation Furnas Furnas 100% SS Vitória - replacement of phase A of the single-phase transformer TR4, 345/138 kV, 75 MVA. mar-25 7.70 19 0 345 0 0 ES Yes 31/07/25 31/12/42  1.00 jun-24 IPCA Improvement 1.39       062/2001 Renewed T2022-001  
142 Substation Furnas Furnas 100% SS Bras. Sul - revitalization of single-phase transformer TR1, 345/138 kV, 3x50 MVA mar-25 5.77 60 0 345 0 0 DF Yes 21/05/25 31/12/42  4.66 jun-24 IPCA Improvement 0.13       062/2001 Renewed T2022-002  
143 Substation Furnas Furnas 100% SS Poços de Caldas - replacement of the reserve transformer, 345/138 kV, 1x50 MVA  (Completed) mar-25 11.74 100 0 345 0 0 MG Yes 27/12/24 31/12/42  1.52 jun-24 IPCA Improvement 0.10       062/2001 Renewed T2022-003  
144 Substation Furnas Furnas 100% SS Poços de Caldas - replacement of phase C of transformer TR1, 345/138 kV, 1x50 MVA  (Completed) mar-25 10.07 100 0 345 0 0 MG Yes 19/02/25 31/12/42  1.32 jun-24 IPCA Improvement 0.09       062/2001 Renewed T2022-004  
145 Substation Furnas Furnas 100% SS Poços de Caldas - replacement of the single-phase transformer TR2, 345/138 kV, 3x50 MVA mar-25 34.11 90 0 345 0 0 MG Yes 09/05/25 31/12/42  4.56 jun-24 IPCA Improvement 0.30       062/2001 Renewed T2022-005  
146 Substation Furnas Furnas 100% SS Ivaiporã - replacement of phase B and C of the single-phase reactor RIA1, 750 kV, 2x110 MVAr mar-25 23.65 45 0 750 0 0 PR Yes 26/06/25 31/12/42  2.39 jun-24 IPCA Improvement 0.28       062/2001 Renewed T2022-006  
147 Substation Furnas Furnas 100% SS Ivaiporã - replacement of phase A of the single-phase reactor RIA2, 750 kV, 1x110 MVAr mar-25 11.82 89 0 750 0 0 PR Yes 15/04/25 31/12/42  1.20 jun-24 IPCA Improvement 0.14       062/2001 Renewed T2022-007  
148 Substation Furnas Furnas 100% SS Campos - replacement of phase A and B of the single-phase reactor RT5, 345 kV, 2x20 MVAr mar-25 16.83 72 0 345 0 0 RJ Yes 30/05/25 31/12/42  1.01 jun-24 IPCA Improvement 1.21       062/2001 Renewed T2022-008  
149 Substation Furnas Furnas 100% SS Cach. Paulista - replacement of the single-phase transformer TR57, 500/138 kV, 3x83.33 MVA mar-25 41.08 15 0 500 0 0 SP Yes 05/04/27 31/12/42  6.09 jun-24 IPCA Improvement 0.32       062/2001 Renewed T2022-010  
150 Substation Furnas Furnas 100% SS Cach. Paulista - replacement of the single-phase transformer TR59, 500/138 kV, 3x83.33 MVA mar-25 41.08 15 0 500 0 0 SP Yes 05/04/27 31/12/42  6.09 jun-24 IPCA Improvement 0.32       062/2001 Renewed T2022-011  
151 Substation Furnas Furnas 100% SS Cach. Paulista - replacement of the reserve transformer TRR1, 500/138 kV, 1x83.33 MVA mar-25 6.69 18 0 500 0 0 SP Yes 05/04/27 31/12/42  2.03 jun-24 IPCA Improvement 0.05       062/2001 Renewed T2022-012  
152 Substation Furnas Furnas 100% SS Campinas - replacement of the single-phase transformer TR51, 500/345 kV, 3x186.66 MVA mar-25 40.16 62 0 500 0 0 SP Yes 05/04/27 31/12/42  9.00 jun-24 IPCA Improvement 3.15       062/2001 Renewed T2022-013  
153 Substation Furnas Furnas 100% SS Araraquara FUR - Replacement of RTPC reactor, 500kV, 3x24.4667 MVAr mar-25 15.57 81 0 500 0 0 SP Yes 29/11/25 31/12/42  2.37 jun-24 IPCA Improvement 0.25       062/2001 Renewed T2022-047  
154 Substation Furnas Furnas 100% SS Araraquara FUR - Replacement of reactor RMR1, 500kV, 3x24.4667 MVAr mar-25 15.43 79 0 500 0 0 SP Yes 15/10/25 31/12/42  2.37 jun-24 IPCA Improvement 0.25       062/2001 Renewed T2022-048  
155 Substation Furnas Furnas 100% SS Araraquara FUR - Replacement of reactor, RMR2, 500kV, 3x24.4667 MVAr mar-25 15.43 92 0 500 0 0 SP Yes 06/06/25 31/12/42  2.37 jun-24 IPCA Improvement 0.25       062/2001 Renewed T2022-049  
156 Substation Furnas Furnas 100% SS Araraquara FUR - Replacement of reactor, RTCA, 500kV, 3x24,4667 MVAr mar-25 15.43 85 0 500 0 0 SP Yes 19/08/25 31/12/42  2.37 jun-24 IPCA Improvement 0.25       062/2001 Renewed T2022-050  
157 Substation Furnas Furnas 100% SS Ivaiporã - Replacement of compensation series TL 765kV Ivaiporã / Itaberá C1 mar-25 130.78 59 0 765 0 0 PR Yes 14/03/26 31/12/42   23.90 jun-24 IPCA Improvement 1.37       062/2001 Renewed T2022-058  
158 Substation Furnas Furnas 100% SS Ivaiporã - Replacement of compensation series TL 765kV Ivaiporã / Itaberá C2 mar-25 130.78 78 0 765 0 0 PR Yes 15/08/25 31/12/42   23.90 jun-24 IPCA Improvement 1.37       062/2001 Renewed T2022-059  
159 Substation Furnas Furnas 100% SS Ivaiporã - Replacement of compensation series TL 765kV Ivaiporã / Itaberá C3  (Completed) mar-25 130.78 100 0 765 0 0 PR Yes 28/01/25 31/12/42   23.90 jun-24 IPCA Improvement 1.37       062/2001 Renewed T2022-060  
160 Substation Furnas Furnas 100% SS Itaberá - Replacement of the series compensation of 765kV Itaberá / Tijuco Preto C1 mar-25 222.50 81 0 765 0 0 SP Yes 14/03/26 31/12/42   24.98 jun-24 IPCA Improvement 1.27       062/2001 Renewed T2022-061  
161 Substation Furnas Furnas 100% SS Itaberá - Replacement of the series compensation of 765kV Itaberá / Tijuco Preto C2 mar-25 222.50 80 0 765 0 0 SP Yes 15/08/25 31/12/42   24.98 jun-24 IPCA Improvement 1.27       062/2001 Renewed T2022-062  
162 Substation Furnas Furnas 100% SS Itaberá - Replacement of the series compensation of TL 765kV Itaberá / Tijuco Preto C3  (Completed) mar-25 222.50 100 0 765 0 0 SP Yes 28/01/25 31/12/42   24.98 jun-24 IPCA Improvement 1.27       062/2001 Renewed T2022-063  
163 Substation Furnas Furnas 100% SS Itabera - Replacement of phases A and B of the RT1 765kV reactor bank mar-25 11.17 97 0 765 0 0 SP Yes 05/04/25 31/12/42  2.31 jun-24 IPCA Improvement 0.02       062/2001 Renewed T2022-064  
164 Substation Furnas Furnas 100% SS Vitória - Installation of the 1st Bar Reactor Bank 345kV, (3+1)x20 Mvar  (Completed) mar-25 41.64 100 0 345 0 0 ES Yes 09/01/25 31/12/42  4.44 jun-24 IPCA Improvement 0.61       062/2001 Renewed T2022-070  
165 Substation Furnas Furnas 100% SS Cachoeira Paulista - Replacement of single-phase reserve reactor RTR2 mar-25 6.69 12 0 500 0 0 SP Yes 14/09/27 31/12/42  0.89 jun-24 IPCA Improvement 0.05       062/2001 Renewed T2022-103  
166 Substation Furnas Furnas 100% SS Araraquara - Replacement of Single Phase Reserve Reactor RTR1, 500kV, 27MVAr mar-25 5.37 64 0 500 0 0 SP Yes 15/10/25 31/12/42  0.82 jun-24 IPCA Improvement 0.09       062/2001 Renewed T2022-104  
167 Substation Furnas Furnas 100% SS Ivaiporã - Replacement of the TL Series Capacitor Bank for Foz do Iguaçu - C1 mar-25 130.78 53 0 750 0 0 PR Yes 14/03/26 31/12/42   24.19 jun-24 IPCA Improvement 1.37       062/2001 Renewed T2022-117  
168 Substation Furnas Furnas 100% SS Ivaiporã - Replacement of the TL Series Capacitor Bank for Foz do Iguaçu - C2 mar-25 130.78 77 0 750 0 0 PR Yes 15/08/25 31/12/42   24.19 jun-24 IPCA Improvement 1.37       062/2001 Renewed T2022-118  
169 Substation Furnas Furnas 100% SS Ivaiporã - Replacement of the TL Series Capacitor Bank for Foz do Iguaçu - C3  (Completed) mar-25 130.78 100 0 750 0 0 PR Yes 27/01/25 31/12/42   24.19 jun-24 IPCA Improvement 1.37       062/2001 Renewed T2022-119  
170 Substation Furnas Furnas 100% Revitalization of the HVDC System mar-25 1,812.33 33 0 600 0 0 PR No 04/10/26 31/12/42 - jun-24 IPCA Improvement 82.25       062/2001 Renewed T2023-001  
171 Substation Furnas Furnas 100% SS USI Campos mar-25 6.94 9 0 138 53 0 RJ Yes 07/01/26 31/12/42  2.23 jun-24 IPCA Reinforcement 0.00       062/2001 Renewed T2022-133  
172 Substation Furnas Furnas 100% SS USI CAMPOS - replacement of 67 MVA AT03 by 73 MVA TR03 mar-25 7.83 9 0 138 6 0 RJ Yes 07/02/26 31/12/42  2.19 jun-24 IPCA Reinforcement 0.00       062/2001 Renewed T2022-134  
173 Substation Furnas Furnas 100% SS 138/13.8 kV Angra - Transformation 138/13.8 kV - 15 MVA. mar-25 15.01 10 0 138 8 0 RJ Yes 07/05/26 31/12/42  2.55 jun-24 IPCA Reinforcement 0.01       062/2001 Renewed T2023-187  
174 Substation Furnas Furnas 100% Reinforcement at SS Resende: Installation of the 1st RTB 500 kV - (3+1)x66.66 Mvar mar-25 22.84 8 0 500 0 200 RJ Yes 21/12/25 31/12/42  4.39 jun-24 IPCA Reinforcement 0.02       062/2001 Renewed T2023-167  
175 Substation Furnas Furnas 100% Installation of the reserve phase for the 1st RTB 500 kV - (3+1)x66.66 Mvar, at SS Resende. mar-25 4.17 8 0 500 0 0 RJ Yes 21/12/25 31/12/42  0.80 jun-24 IPCA Reinforcement 0.00       062/2001 Renewed T2023-167-A  
176 Substation Furnas Furnas 100% Reinforcement at SS Ivaiporã: Installation of the 2nd RTB 765 kV - 3x110 Mvar mar-25 54.08 0 0 765 0 330 PR Yes 25/01/26 31/12/42  6.48 jun-24 IPCA Reinforcement 0.00       062/2001 Renewed T2023-166  
177 Substation Furnas Furnas 100% Installation of the reserve phase for the 2nd RTB 765 kV - (3+1)x66.66 Mvar, at SS Ivaiporã mar-25 10.30 1 0 765 0 0 PR Yes 25/01/26 31/12/42  1.21 jun-24 IPCA Reinforcement 0.00       062/2001 Renewed T2023-166-A  
178 Substation Furnas Furnas 100% Reinforcement at SS Baixada Fluminense: Installation of the 1st RTB 500 kV - (3+1)x66.66 Mvar mar-25 42.54 4 0 500 0 200 RJ Yes 25/01/26 31/12/42  7.07 jun-24 IPCA Reinforcement 0.01       062/2001 Renewed T2023-168  
179 Substation Furnas Furnas 100% Installation of the reserve phase for the 1st RTB 500 kV - (3+1)x66.66 Mvar, at SS Baixada Fluminense mar-25 4.73 5 0 500 0 0 RJ Yes 25/01/26 31/12/42  0.78 jun-24 IPCA Reinforcement 0.00       062/2001 Renewed T2023-168-A  
180 Substation Furnas Furnas 100% Reinforcement at SS Ibiúna: Installation of the 1st RTB 345 kV - 3x44 Mvar mar-25 33.47 1 0 345 0 132 SP Yes 25/01/26 31/12/42  5.49 jun-24 IPCA Reinforcement 0.01       062/2001 Renewed T2023-169  
181 Substation Furnas Furnas 100% Installation of the reserve phase for the 1st RTB 345 kV - (3+1)x44 Mvar, at SS Ibiúna. mar-25 2.94 4 0 345 0 0 SP Yes 25/01/26 31/12/42  0.54 jun-24 IPCA Reinforcement 0.00       062/2001 Renewed T2023-169-A  
182 Substation Furnas Furnas 100% Reinforcement at SS Ibiúna: Installation of the 2nd RTB 345 kV - 3x44 Mvar mar-25 19.38 4 0 345 0 132 SP Yes 25/01/26 31/12/42  3.24 jun-24 IPCA Reinforcement 0.01       062/2001 Renewed T2023-171  
183 Substation Furnas Furnas 100% Installation of the reserve phase for the 2nd RTB 345 kV - (3+1)x44 Mvar, at SS Ibiúna mar-25 2.94 4 0 345 0 0 SP Yes 25/01/26 31/12/42  0.54 jun-24 IPCA Reinforcement 0.00       062/2001 Renewed T2023-171-A  
184 Substation Furnas Furnas 100% Reinforcement at SS Vitória: Replacement of ATR1 345/138 kV by new bank (3+1)x133.33MVA. mar-25 68.45 5 0 345 175 0 ES Yes 26/07/26 31/12/42   11.25 jun-24 IPCA Reinforcement 0.02       062/2001 Renewed T2023-190  
185 Substation Furnas Furnas 100% SS Guarulhos: Installation of the first bank of busbar reactors at 345 kV mar-25 34.79 9 0 345 0 132 SP Yes 23/02/26 31/12/42  5.45 jun-24 IPCA Reinforcement 0.00       062/2001 Renewed T2024-001  
186 Substation Furnas Furnas 100% SS Guarulhos: Installation of a reserve phase for RT1, 345 kV, 44MVar mar-25 3.87 6 0 345 0 0 SP Yes 23/02/26 31/12/42  0.57 jun-24 IPCA Reinforcement 0.00       062/2001 Renewed T2024-002  
187 Substation Furnas Furnas 100% SS Guarulhos: Installation of second bar reactor bank, 345 kV, 3x44MVar mar-25 34.79 9 0 345 0 132 SP Yes 23/02/26 31/12/42  5.43 jun-24 IPCA Reinforcement 0.00       062/2001 Renewed T2024-003  
188 Substation Furnas Furnas 100% SS Guarulhos: Installation of a reserve phase for RT2, 345 kV, 44MVar mar-25 3.87 6 0 345 0 0 SP Yes 23/02/26 31/12/42  0.57 jun-24 IPCA Reinforcement 0.00       062/2001 Renewed T2024-004  
189 Substation Furnas Furnas 100% Improvement at SS TIJUCO PRETO: BC03 Capacitor Bank Replacement mar-25 8.31 5 0 345 0 0 SP Yes 12/09/27 31/12/42  0.77 jun-24 IPCA Improvement 0.03       062/2001 Renewed T2024-075  
190 Substation Furnas Furnas 100% Improvement at SS BANDEIRANTES 345 Kv: Replacement of capacitor bank mar-25 3.51 5 0 345 0 0 GO Yes 08/10/26 31/12/42  0.63 jun-24 IPCA Improvement 0.02       062/2001 Renewed T2024-076  
191 Substation Furnas Furnas 100% Improvement at SS P. COLOMBIA 138 Kv: Replacement of TR5MVA transformer mar-25 2.96 49 0 138 0 0 MG Yes 08/04/27 31/12/42  0.54 jun-24 IPCA Improvement 0.51       062/2001 Renewed T2024-077  
192 Substation Furnas Furnas 100% Improvement at SS Ivaipora Fur: Replacement of RT1A reactor PHASES A, B and C mar-25 3.60 2 0 69 0 0 PR Yes 08/04/27 31/12/42  0.70 jun-24 IPCA Improvement 0.00       062/2001 Renewed T2024-079  
193 Substation Furnas Furnas 100% Improvement at SS Tijuco Preto: Replacement of BC07 345 kV Capacitor Bank mar-25 2.08 5 0 345 0 0 SP Yes 12/09/27 31/12/42  1.80 jun-24 IPCA Improvement 0.01       062/2001 Renewed T2024-080  
194 Substation Furnas Furnas 100% Improvement at SS Ivaipora Fur: Replacement of TRRG09V power transformer mar-25 16.02 1 0 525 0 0 PR Yes 08/04/27 31/12/42  2.54 jun-24 IPCA Improvement 0.00       062/2001 Renewed T2024-082  
195 Substation Furnas Furnas 100% Improvement at SS IVAIPORA FUR: Replacement of RT1B reactor PHASE A, B and C mar-25 3.60 0 0 69 0 0 PR Yes 08/04/27 31/12/42  0.70 jun-24 IPCA Improvement 0.00       062/2001 Renewed T2024-083  
196 Substation Furnas Furnas 100% Improvement at SS TIJUCO PRETO: Replacement of RTIATP2 reactor PHASES B and C mar-25 38.89 5 0 765 0 0 SP Yes 12/09/27 31/12/42  2.64 jun-24 IPCA Improvement 0.03       062/2001 Renewed T2024-085  
197 Substation Furnas Furnas 100% Improvement at SS IVAIPORA FUR: Replacement of RT1C reactor PHASE A, B and C mar-25 3.60 2 0 69 0 0 PR Yes 08/04/27 31/12/42  0.70 jun-24 IPCA Improvement 0.00       062/2001 Renewed T2024-086  
198 Substation Furnas Furnas 100% Improvement at SS TIJUCO PRETO: Replacement of reactor RT01 PHASES A, B and C mar-25 4.37 5 0 69 0 0 SP Yes 12/09/27 31/12/42  0.69 jun-24 IPCA Improvement 0.00       062/2001 Renewed T2024-088  
199 Substation Furnas Furnas 100% Improvement at SS TIJUCO PRETO: Replacement of reactor RT02 PHASE A, B and C mar-25 4.37 4 0 69 0 0 SP Yes 08/04/28 31/12/42  0.69 jun-24 IPCA Improvement 0.00       062/2001 Renewed T2024-089  
200 Substation Furnas Furnas 100% Improvement at SS BANDEIRANTES: Replacement of LINE REACTOR - RTBDSB1 PHASES A, B and C mar-25 104.71 5 0 345 0 0 GO Yes 08/04/26 31/12/42  1.66 jun-24 IPCA Improvement 0.02       062/2001 Renewed T2024-090  
201 Substation Furnas Furnas 100% Improvement at SS IVAIPORA FUR: Replacement of AT129V power transformer - RESERVE AUTOTRAFO mar-25 21.49 1 0 765 0 0 PR Yes 08/04/27 31/12/42  3.41 jun-24 IPCA Improvement 0.01       062/2001 Renewed T2024-091  
202 Substation Furnas Furnas 100% Improvement at SS RIO VERDE FUR: Replacement of AT76V power transformer - RESERVE AUTOTRAFO mar-25 8.55 4 0 230 0 0 GO Yes 08/04/27 31/12/42  1.17 jun-24 IPCA Improvement 0.00       062/2001 Renewed T2024-092  
203 Substation Furnas Furnas 100% Improvement at SS BANDEIRANTES: Replacement of AT87V power transformer - RESERVE AUTOTRAFO mar-25 9.39 5 0 345 0 0 GO Yes 08/04/26 31/12/42  1.60 jun-24 IPCA Improvement 0.01       062/2001 Renewed T2024-093  
204 Substation Furnas Furnas 100% Improvement at SS Itaberá: Replacement of RIV1 line reactor bank 765 kV, 3x109.67 Mvar mar-25 22.49 5 0 765 0 0 SP Yes 08/04/28 31/12/42  2.03 jun-24 IPCA Improvement 0.01       062/2001 Renewed T2024-095  
205 Substation Furnas Furnas 100% Improvement at SS Adrianópolis: Replacement of transformer bank TR2A 345/138 kV, 3x75 MVA mar-25 11.67 0 0 345 0 0 RJ Yes 08/10/26 31/12/42  4.56 jun-24 IPCA Improvement 0.08       062/2001 Renewed T2024-096  
206 Substation Furnas Furnas 100% Improvement at SS Marimbondo: Replacement of reserve transformer TRR1 500/345 kV, 62.33 Mvar mar-25 41.95 4 0 500 0 0 MG Yes 08/04/27 31/12/42  1.59 jun-24 IPCA Improvement 0.07       062/2001 Renewed T2024-097  
207 Substation Furnas Furnas 100% Improvement at SS Rio Verde Furnas: Replacement of autotransformer bank TR1 230/138 kV mar-25 25.64 3 0 230 0 0 GO Yes 08/04/27 31/12/42  3.51 jun-24 IPCA Improvement 0.00       062/2001 Renewed T2024-100  
208 Substation Furnas Furnas 100% Improvement at SS Barro Alto: Replacement of transformer bank TR1 230/69 kV, 3x16.67 MVA mar-25 48.06 5 0 230 0 0 GO Yes 08/04/27 31/12/42  2.44 jun-24 IPCA Improvement 0.13       062/2001 Renewed T2024-101  
209 Substation Furnas Furnas 100% Improvement at SS Brasília Sul: Replacement of C-phase of autotransformer TR4, 345/138 kV, 50 MVA mar-25 11.51 5 0 345 0 0 DF Yes 08/04/27 31/12/42  1.37 jun-24 IPCA Improvement 0.00       062/2001 Renewed T2024-102  
210 Substation Furnas Furnas 100% Improvement at SS Ivaipora Fur: AT01 power transformer replacement PHASES A and C mar-25 54.49 1 0 750 0 0 PR Yes 25/04/27 31/12/42  6.82 jun-24 IPCA Improvement 0.01       062/2001 Renewed T2024-078  
211 Substation Furnas Furnas 100% Improvement in SS MARIMBONDO 500 kV: Replacement of power transformer AT09 500/345KV PHASE A, B and C mar-25 10.49 4 0 500 0 0 MG Yes 25/04/27 31/12/42  6.65 jun-24 IPCA Improvement 0.02       062/2001 Renewed T2024-081  
212 Substation Furnas Furnas 100% Improvement at SS TIJUCO PRETO: TRRG 03 power transformer replacement - PHASES A, B and C mar-25 83.12 5 0 500 0 0 SP Yes 25/04/28 31/12/42   12.97 jun-24 IPCA Improvement 0.00       062/2001 Renewed T2024-087  
213 Substation Furnas Furnas 100% Improvement at SS Tijuco Preto: Replacement of TR3 750/500 kV, 3x550 MVA autotransformer bank mar-25 65.30 5 0 750 0 0 SP Yes 25/04/28 31/12/42   10.17 jun-24 IPCA Improvement 0.00       062/2001 Renewed T2024-098  
214 Substation Furnas Furnas 100% Reinforcement at SS Campinas: Replacement of 345/138 kV autotransformer bank TR1 mar-25 27.41 0 0 345 150 0 SP Yes 13/11/26 31/12/42  4.68 jun-24 IPCA Reinforcement 0.00       062/2001 Renewed T2024-122  
215 Substation Furnas Furnas 100% Reinforcement at SS Campinas: Replacement of the backup autotransformer 345/138 kV, from 50MVA to 100 MVA mar-25 9.53 0 0 345 0 0 SP Yes 13/11/26 31/12/42  1.56 jun-24 IPCA Reinforcement 0.00       062/2001 Renewed T2024-123  
216 Substation Furnas Furnas 100% Reinforcement at SS Campinas: Replacement of 345/138 kV autotransformer bank TR2 mar-25 27.41 0 0 345 150 0 SP Yes 13/11/26 31/12/42  4.68 jun-24 IPCA Reinforcement 0.00       062/2001 Renewed T2024-133  
217 Substation Furnas Furnas 100% Reinforcement at SS Campinas: Replacement of 345/138 kV TR3 autotransformer bank mar-25 27.41 0 0 345 150 0 SP Yes 13/11/26 31/12/42  4.68 jun-24 IPCA Reinforcement 0.00       062/2001 Renewed T2024-134  
218 Substation Furnas Furnas 100% Reinforcement at SS Campinas: Replacement of 345/138 kV TR4 autotransformer bank mar-25 27.41 0 0 345 150 0 SP Yes 13/11/26 31/12/42  4.68 jun-24 IPCA Reinforcement 0.00       062/2001 Renewed T2024-135  
219 Substation Furnas Furnas 100% Improvement at SS Ivaiporã: Replacement of TRRG01 power transformer mar-25 90.45 0 0 500 0 0 PR No 30/09/27 31/12/42   13.92 jun-24 IPCA Improvement 0.02       062/2001 Renewed T2024-190 ReA 15.480/2024
220 Substation Nova Era Catarina Eletronorte 100% SS 230/138 kV Chapecoense and existing TL sectioning mai-24 183.25 13 15 230 300 0 SC No 30/06/26 28/06/54   12.06 jun-24 IPCA Expansion NA       012/2024 Bidder T2024-201 Auction 001/2024
221 Substation and Transmission Line Nova Era Ceará Eletronorte 100% SS 500/230 kV Morada Nova, TL 500 kV Morada Nova - Pacatuba, various TL and existing TL sectioning mai-24 981.50 13 337 500 900 0 CE No 30/06/29 28/06/54 118.66 jun-24 IPCA Expansion NA       006/2024 Bidder T2024-195 Auction 001/2024
222 Substation and Transmission Line Nova Era Integração Eletronorte 100% SS 500/230 kV Zebu III, SS 500/230/138 kV Bom Nome II, various TL and existing TL sectioning mai-24 2,643.00 12 1082 500 3900 1290 PB, PE, AL, BA No 30/12/29 28/06/54 313.01 jun-24 IPCA Expansion NA       008/2024 Bidder T2024-197 Auction 001/2024
223 Substation and Transmission Line Nova Era Teresina Eletronorte 100% SS 500 kV Teresina IV, SS 500 kV Crateús, various TL and existing TL sectioning mai-24 1,755.00 18 534 500 0 960 PI, CE No 30/06/29 28/06/54 168.31 jun-24 IPCA Expansion NA       004/2024 Bidder T2024-193 Auction 001/2024
224 Substation Furnas Furnas 100% Reinforcement at SS São José: Replacement of TR11 with TF 500/138kV, 3 x 300 MVA mar-25 54.94 0 0 500 700 0 RJ No 11/06/27 31/12/42   12.68 jun-24 IPCA Reinforcement 0.00       062/2001 Renewed T2024-225 ReA 15.683/2024
225 Substation Furnas Furnas 100% Reinforcement at SS São José: Replacement of TR12 with TF 500/138kV, 3 x 300 MVA mar-25 54.94 0 0 500 300 0 RJ No 11/06/27 31/12/42   12.68 jun-24 IPCA Reinforcement 0.00       062/2001 Renewed T2024-226 ReA 15.683/2024
226 Substation Furnas Furnas 100% Reinforcement at SS São José: Replacement of the Reserve Phase for TR11 and TR12 - TF 500/138kV, 1 x 300 MVA mar-25 13.57 0 0 500 0 0 RJ No 11/06/27 31/12/42  3.13 jun-24 IPCA Reinforcement 0.00       062/2001 Renewed T2024-227 ReA 15.683/2024
227 Substation Eletronorte Eletronorte 100% Reinforcement at SS Presidente Dutra: Bar reactor reserve phase 50 MVar - 550 kV mar-25 5.33 16 0 500 0 50 MA No 07/10/26 31/12/42  0.73 jun-24 IPCA Reinforcement 0.00       058/2001 Renewed T2024-156 Order 3.019/2024
228 Substation Eletronorte Eletronorte 100% Reinforcement at SS Imperatriz: Installation of the 4th TR230/69 kV - 100 MVA and connections mar-25 27.91 1 0 230 100 0 MA No 09/04/27 31/12/42  4.17 jun-24 IPCA Reinforcement 0.00       058/2001 Renewed T2024-151 Order 3.019/2024
229 Substation Eletronorte Eletronorte 100% Reinforcement at SS Ji-Paraná: Replacement of the 60 MVA TR1 230/69 kV with 100 MVA mar-25 58.47 1 0 230 40 0 RO No 09/04/27 31/12/42  4.09 jun-24 IPCA Reinforcement 0.00       058/2001 Renewed T2024-152 Order 3.019/2024
230 Substation Eletronorte Eletronorte 100% Reinforcement at SS Ji-Paraná: Installation of the 3rd TF 230/138/13.8 kV mar-25 41.79 1 0 230 100 0 RO No 09/04/27 31/12/42  4.84 jun-24 IPCA Reinforcement 0.00       058/2001 Renewed T2024-153 Order 3.019/2024
231 Substation Eletronorte Eletronorte 100% Reinforcement at SS Vilhena: 3rd TF 230/69/13.8 kV mar-25 26.99 1 0 230 60 0 RO No 09/04/27 31/12/42  3.95 jun-24 IPCA Reinforcement 0.00       058/2001 Renewed T2024-157 Order 3.019/2024
232 Substation Eletronorte Eletronorte 100% Reinforcement at SS Ji-Paraná: Replacement of the 60 MVA TR2 230/69 kV with 100 MVA mar-25 27.03 1 0 230 40 0 RO No 09/04/27 31/12/42  4.09 jun-24 IPCA Reinforcement 0.00       058/2001 Renewed T2024-215 Order 3.019/2024
233 Substation Eletronorte Eletronorte 100% Reinforcement at SS Nobres: Installation of the 3rd TF 230/138/13.8 kV mar-25 30.70 1 0 230 100 0 MT No 23/04/27 31/12/42  5.09 jun-24 IPCA Reinforcement 0.00       058/2001 Renewed T2024-154 ReA 15.559/2024
234 Substation Eletronorte Eletronorte 100% Reinforcement at SS Porto Franco: 4th TR 230/69/13.8 kV - 100 MVA and connections mar-25 39.63 1 0 230 100 0 MA No 23/04/27 31/12/42  5.28 jun-24 IPCA Reinforcement 0.01       058/2001 Renewed T2024-155 ReA 15.559/2024
235 Substation Eletronorte Eletronorte 100% Reinforcement at SS Porto Velho: Installation of the 5th TF 230/69 kV – 1 x 150 MVA and Connections mar-25 36.97 1 0 230 150 0 RO No 28/05/27 31/12/42  4.77 jun-24 IPCA Reinforcement 0.00       058/2001 Renewed T2024-228 Order 3.603/2024
236 Substation Chesf Chesf 100% Reinforcement at SS Arapiraca III: Installation of the 3rd 230/69 kV Three-Phase Power Transformer mar-25 29.09 6 0 230 100 0 AL No 09/04/27 06/10/40  3.30 jun-24 IPCA Reinforcement 0.04       013/2010 Renewed T2024-191 Order 3.012/2024
237 Substation Chesf Chesf 100% Reinforcement at SS Teixeira de Freitas II: Installation of the 3rd 230/138 kV Single Phase AT - 3 x 33.33 MVA mar-25 39.05 7 0 230 100 0 BA No 09/04/27 16/10/38  4.63 jun-24 IPCA Reinforcement 0.01       014/2008 Renewed T2024-192 Order 3.012/2024
238 Substation Chesf Chesf 100% Reinforcement at SS IBICOARA: Installation of the 3rd ATF 230/138 kV, 1 x 100 MVA and connections mar-25 28.19 0 0 230 100 0 BA No 28/05/27 14/06/37  3.77 jun-24 IPCA Reinforcement 0.00       010/2007 Renewed T2024-230 Order 3.602/2024
239 Transmission Line Chesf Chesf 100% Reinforcement: Sectioning of TL 230kV Bom Nome-PauloAfonso III C3 at SS Zebu III mar-25 15.30 1 2 230 0 0 AL No 03/01/30 31/12/42  2.58 jun-24 IPCA Reinforcement 0.00       061/2001 Renewed T2024-237 Order 3.614/2024
240 Transmission Line Chesf Chesf 100% Reinforcement: Sectioning of TL 230kV Floresta II-PauloAfonso III C2 at SS Zebu III. mar-25 12.08 1 2 230 0 0 AL No 03/01/30 31/12/42  1.98 jun-24 IPCA Reinforcement 0.00       061/2001 Renewed T2024-238 Order 3.614/2024
241 Transmission Line Chesf Chesf 100% Reinforcement: Reconditioning TL 230 kV ITAPEBI /EUNAPOLIS C-1 BA.  fev-25 46.01 1 0 230 0 0 BA No 03/08/27 31/12/42  7.54 jun-24 IPCA Reinforcement 0.00       061/2001 Renewed T2024-242 ReA 15.815/2025
242 Transmission Line Chesf Chesf 100% Reinforcement: Reconditioning TL 230 kV ITAPEBI /EUNAPOLIS C2 BA.  fev-25 46.01 1 0 230 0 0 BA No 03/08/27 31/12/42  7.54 jun-24 IPCA Reinforcement 0.00       061/2001 Renewed T2024-243 ReA 15.815/2025
243 Transmission Line Chesf Chesf 100% Reinforcement: Reconditioning TL 230 kVSAPEAÇU - SANTO ANTONIO DE JESUS C-1.  fev-25 32.31 1 0 230 0 0 BA No 31/07/27 31/12/42  5.29 jun-24 IPCA Reinforcement 0.00       061/2001 Renewed T2025-001 ReA 15.816/2025
244 Transmission Line Chesf Chesf 100% Reinforcement: Reconditioning TL 230 kVSAPEAÇU - SANTO ANTONIO DE JESUS C-2.  fev-25 32.31 1 0 230 0 0 BA No 31/07/27 31/12/42  5.29 jun-24 IPCA Reinforcement 0.00       061/2001 Renewed T2025-002 ReA 15.816/2025
245 Substation Eletronorte Eletronorte 100% SS Rondonopolis reinforcement: Installation of the 3rd ATF 230/138 kV – 150 MVA (5th substation unit).  fev-25 33.05 0 0 230 150 0 MT No 31/07/27 31/12/42  5.51 jun-24 IPCA Reinforcement 0.00       058/2001 Renewed T2025-004 ReA 15.818/2025
246 Substation Eletronorte Eletronorte 100% SS Sinop reinforcement: Installation of the 4th ATF 230/138 kV – 150 MVA.  fev-25 33.05 0 0 230 150 0 MT No 31/07/27 31/12/42  5.51 jun-24 IPCA Reinforcement 0.00       058/2001 Renewed T2025-005 ReA 15.818/2025
247 Substation Eletronorte Eletronorte 100% SS Nova Mutum reinforcement: Installation of the 4th ATF 230/69 kV – 75 MVA.  fev-25 26.44 1 0 230 75 0 MT No 20/07/27 31/12/42  4.35 jun-24 IPCA Reinforcement 0.00       058/2001 Renewed T2025-006 Order 073/2025
248 Substation Eletronorte Eletronorte 100% SS Nova Mutum reinforcement: TF1 230/69 kV replacement.  fev-25 24.89 1 0 230 45 0 MT No 20/07/27 31/12/42  4.62 jun-24 IPCA Reinforcement 0.00       058/2001 Renewed T2025-007 Order 073/2025

 

 

 

FRRCM - Investor Relations Board

Report to Investors - Annex III - 2Q24

Operating Information of Subsidiaries

 

V. Employees - Effective staff
       
V.1 Employees by capacity
Eletrobras Company Administrative Operational Total
CGT Eletrosul 193 666 859
Chesf 619 1,668 2,287
Eletrobras Holding 1,193 1,554 2,747
Eletronorte 271 1,161 1,432
Grand Total 2,276 5,049 7,325
       
Concept of Effective Framework:
Employees in the company
Groups: External Advisor + Employees + Employee Managers + Requested + Requested Managers
Includes: Amnesties in the company
Does not include: Employee director, statutory director, assignees, disability retirees and unpaid leave

 

15 
 
Eletrobras Company Investments 2025
*Source: Controllership Department (FRPCA)
                 
VII.1 Corporate Investment and Partnerships
Generation jan-25 fev-25 mar-25 1Q25 2Q25 3Q25 4Q25 Total Realized
 Eletrobras  4,000,586 10,385,665 8,330,482 22,716,734 0 0 0 22,716,734
 Eletronorte  12,891,685 11,923,789 4,943,203 29,758,677 0 0 0 29,758,677
 Chesf  18,170,855 31,687,035 30,759,254 80,617,144 0 0 0 80,617,144
 CGT Eletrosul  21,403,517 6,993,997 5,029,339 33,426,852 0 0 0 33,426,852
 Total  56,466,644 60,990,486 49,062,278 166,519,408 0 0 0 166,519,408
                 
Generation - Expansion jan-25 fev-25 mar-25 1Q25 2Q25 3Q25 4Q25 Total Realized
 Eletrobras  0 2,806 79,419 82,225 0 0 0 82,225
 Eletronorte  76,420 25,464 1,700 103,584 0 0 0 103,584
 Chesf  536,037 2,142,542 651,330 3,329,909 0 0 0 3,329,909
 CGT Eletrosul  21,402,822 6,785,691 4,993,842 33,182,355 0 0 0 33,182,355
 Total  22,015,279 8,956,502 5,726,291 36,698,073 0 0 0 36,698,073
                 
Generation - Maintenance / Modernization jan-25 fev-25 mar-25 1Q25 2Q25 3Q25 4Q25 Total Realized
 Eletrobras  4,000,586 10,382,859 8,251,063 22,634,508 0 0 0 22,634,508
 Eletronorte  12,815,266 11,898,325 4,941,503 29,655,094 0 0 0 29,655,094
 Chesf  17,634,818 29,544,494 30,107,924 77,287,236 0 0 0 77,287,236
 CGT Eletrosul  695 208,306 35,496 244,498 0 0 0 244,498
 Total  34,451,365 52,033,984 43,335,986 129,821,335 0 0 0 129,821,335
                 
Generation -  Partnerships jan-25 fev-25 mar-25 1Q25 2Q25 3Q25 4Q25 Total Realized
 Eletrobras  0 0 0 0 0 0 0 0
 Eletronorte  0 0 0 0 0 0 0 0
 Chesf  0 0 0 0 0 0 0 0
 CGT Eletrosul  0 0 0 0 0 0 0 0
 Total  0 0 0 0 0 0 0 0
                 
Generation - Partnerships, Acquisition jan-25 fev-25 mar-25 1Q25 2Q25 3Q25 4Q25 Total Realized
 Eletrobras  0 0 0 0 0 0 0 0
 Eletronorte  0 0 0 0 0 0 0 0
 Chesf  0 0 0 0 0 0 0 0
 CGT Eletrosul  0 0 0 0 0 0 0 0
 Total  0 0 0 0 0 0 0 0
                 
Generation - Partnerships, Contributions jan-25 fev-25 mar-25 1Q25 2Q25 3Q25 4Q25 Total Realized
 Eletrobras  0 0 0 0 0 0 0 0
 Eletronorte  0 0 0 0 0 0 0 0
 Chesf  0 0 0 0 0 0 0 0
 CGT Eletrosul  0 0 0 0 0 0 0 0
 Total  0 0 0 0 0 0 0 0
                 
Transmission jan-25 fev-25 mar-25 1Q25 2Q25 3Q25 4Q25 Total Realized
 Eletrobras  31,632,765 34,788,286 150,334,776 216,755,827 0 0 0 216,755,827
 Eletronorte  36,247,114 51,970,504 67,539,784 155,757,402 0 0 0 155,757,402
 Chesf  60,746,542 86,232,719 81,566,375 228,545,636 0 0 0 228,545,636
 CGT Eletrosul  14,705,502 25,003,047 14,721,515 54,430,064 0 0 0 54,430,064
 Total  143,331,924 197,994,556 314,162,450 655,488,930 0 0 0 655,488,930
                 
Transmission - Expansion jan-25 fev-25 mar-25 1Q25 2Q25 3Q25 4Q25 Total Realized
 Eletrobras  1,621,449 2,297,771 3,071,425 6,990,645 0 0 0 6,990,645
 Eletronorte  5,700,576 11,991,203 29,161,073 46,852,851 0 0 0 46,852,851
 Chesf   16,529 219,405 24,436 260,371 0 0 0 260,371
 CGT Eletrosul  0 0 0 0 0 0 0 0
 Total  7,338,553 14,508,380 32,256,934 54,103,867 0 0 0 54,103,867
                 
Transmission - Reinforcements and Improvements jan-25 fev-25 mar-25 1Q25 2Q25 3Q25 4Q25 Total Realized
 Eletrobras  29,732,219 32,428,233 147,246,650 209,407,101 0 0 0 209,407,101
 Eletronorte  28,707,850 39,840,921 38,226,568 106,775,339 0 0 0 106,775,339
 Chesf   60,730,013 86,013,314 81,541,939 228,285,266 0 0 0 228,285,266
 CGT Eletrosul  13,630,591 23,955,314 14,210,807 51,796,711 0 0 0 51,796,711
 Total  132,800,672 182,237,781 281,225,963 596,264,417 0 0 0 596,264,417
                 
Transmission - Maintenance jan-25 fev-25 mar-25 1Q25 2Q25 3Q25 4Q25 Total Realized
 Eletrobras  0 0 0 0 0 0 0 0
 Eletronorte  0 0 0 0 0 0 0 0
 Chesf   0 0 0 0 0 0 0 0
 CGT Eletrosul  0 0 0 0 0 0 0 0
 Total  0 0 0 0 0 0 0 0
                 
Transmission - Other jan-25 fev-25 mar-25 1Q25 2Q25 3Q25 4Q25 Total Realized
 Eletrobras  279,098 62,282 16,702 358,081 0 0 0 358,081
 Eletronorte  1,838,689 138,380 152,143 2,129,212 0 0 0 2,129,212
 Chesf   0 0 0 0 0 0 0 0
 CGT Eletrosul  1,074,912 1,047,733 510,708 2,633,353 0 0 0 2,633,353
 Total  3,192,698 1,248,395 679,553 5,120,646 0 0 0 5,120,646
                 
Transmission - Partnerships jan-25 fev-25 mar-25 1Q25 2Q25 3Q25 4Q25 Total Realized
 Eletrobras  0 0 0 0 0 0 0 0
 Eletronorte  0 0 0 0 0 0 0 0
 Chesf  0 0 0 0 0 0 0 0
 CGT Eletrosul  0 0 0 0 0 0 0 0
 Total  0 0 0 0 0 0 0 0
                 
Transmission - Partnerships, Acquisitions jan-25 fev-25 mar-25 1Q25 2Q25 3Q25 4Q25 Total Realized
 Eletrobras  0 0 0 0 0 0 0 0
 Eletronorte  0 0 0 0 0 0 0 0
 Chesf  0 0 0 0 0 0 0 0
 CGT Eletrosul  0 0 0 0 0 0 0 0
 Total  0 0 0 0 0 0 0 0
                 
Transmission - Partnerships, Contributions jan-25 fev-25 mar-25 1Q25 2Q25 3Q25 4Q25 Total Realized
 Eletrobras  0 0 0 0 0 0 0 0
 Eletronorte  0 0 0 0 0 0 0 0
 Chesf  0 0 0 0 0 0 0 0
 CGT Eletrosul  0 0 0 0 0 0 0 0
 Total  0 0 0 0 0 0 0 0
                 
Environmental jan-25 fev-25 mar-25 1Q25 2Q25 3Q25 4Q25 Total Realized
 Eletrobras  3,654,149 13,075,863 6,105,354 22,835,366 0 0 0 22,835,366
 Eletronorte  1,741,244 6,266,574 7,289,432 15,297,249 0 0 0 15,297,249
 Chesf   1,609,293 2,525,162 2,130,239 6,264,694 0 0 0 6,264,694
 CGT Eletrosul  637,066 619,851 1,261,118 2,518,035 0 0 0 2,518,035
 Total  7,641,752 22,487,450 16,786,143 46,915,345 0 0 0 46,915,345
                 
Environmental - Generation jan-25 fev-25 mar-25 1Q25 2Q25 3Q25 4Q25 Total Realized
 Eletrobras  3,163,647 10,642,478 4,958,616 18,764,741 0 0 0 18,764,741
 Eletronorte  1,206,958 5,567,175 5,405,734 12,179,867 0 0 0 12,179,867
 Chesf   1,154,862 1,616,544 1,132,923 3,904,329 0 0 0 3,904,329
 CGT Eletrosul  240,991 390,619 542,823 1,174,433 0 0 0 1,174,433
 Total  5,766,458 18,216,816 12,040,096 36,023,370 0 0 0 36,023,370
                 
Environmental - Transmission jan-25 fev-25 mar-25 1Q25 2Q25 3Q25 4Q25 Total Realized
 Eletrobras  490,502 2,433,386 1,146,737 4,070,625 0 0 0 4,070,625
 Eletronorte  534,286 699,398 1,883,698 3,117,382 0 0 0 3,117,382
 Chesf   454,432 908,617 997,317 2,360,365 0 0 0 2,360,365
 CGT Eletrosul  396,075 229,233 718,295 1,343,602 0 0 0 1,343,602
 Total  1,875,294 4,270,634 4,746,047 10,891,975 0 0 0 10,891,975
                 
Environmental - ESG jan-25 fev-25 mar-25 1Q25 2Q25 3Q25 4Q25 Total Realized
 Eletrobras  0 0 0 0 0 0 0 0
 Eletronorte  0 0 0 0 0 0 0 0
 Chesf   0 0 0 0 0 0 0 0
 CGT Eletrosul  0 0 0 0 0 0 0 0
 Total  0 0 0 0 0 0 0 0
                 
Infrastructure jan-25 fev-25 mar-25 1Q25 2Q25 3Q25 4Q25 Total Realized
 Eletrobras  6,681,223 14,058,687 11,390,744 32,130,654 0 0 0 32,130,654
 Eletronorte  117,988 1,430,407 1,016,883 2,565,279 0 0 0 2,565,279
 Chesf   1,093,025 3,190,103 2,643,509 6,926,637 0 0 0 6,926,637
 CGT Eletrosul  27,960 1,013,204 735,014 1,776,178 0 0 0 1,776,178
 Total  7,920,197 19,692,401 15,786,150 43,398,748 0 0 0 43,398,748
                 
Infrastructure Real Estate jan-25 fev-25 mar-25 1Q25 2Q25 3Q25 4Q25 Total Realized
 Eletrobras  2,997,844 5,584,439 3,397,930 11,980,212 0 0 0 11,980,212
 Eletronorte  0 0 256,452 256,452 0 0 0 256,452
 Chesf   0 1,016,020 1,130,855 2,146,874 0 0 0 2,146,874
 CGT Eletrosul  0 901,546 249,879 1,151,425 0 0 0 1,151,425
 Total  2,997,844 7,502,004 5,035,115 15,534,963 0 0 0 15,534,963
                 
Movable Assets Infrastructure jan-25 fev-25 mar-25 1Q25 2Q25 3Q25 4Q25 Total Realized
 Eletrobras  1,005,627 1,531,578 2,551,301 5,088,506 0 0 0 5,088,506
 Eletronorte  53,594 1,225,373 729,496 2,008,463 0 0 0 2,008,463
 Chesf   309,760 1,073,482 259,410 1,642,652 0 0 0 1,642,652
 CGT Eletrosul  27,960 111,658 485,135 624,753 0 0 0 624,753
 Total  1,396,941 3,942,091 4,025,341 9,364,373 0 0 0 9,364,373
                 
Infrastructure - IT jan-25 fev-25 mar-25 1Q25 2Q25 3Q25 4Q25 Total Realized
 Eletrobras  2,677,753 6,942,671 5,441,514 15,061,937 0 0 0 15,061,937
 Eletronorte  64,395 205,034 30,935 300,364 0 0 0 300,364
 Chesf   783,264 1,100,602 1,253,245 3,137,111 0 0 0 3,137,111
 CGT Eletrosul  0 0 0 0 0 0 0 0
 Total  3,525,412 8,248,307 6,725,693 18,499,412 0 0 0 18,499,412
                 
Company Investment 2025              
jan-25 fev-25 mar-25 1Q25 2Q25 3Q25 4Q25 Total
 Eletrobras  45,968,724 72,308,501 176,161,356 294,438,581 0 0 0 294,438,581
 Eletronorte  50,998,032 71,591,274 80,789,301 203,378,607 0 0 0 203,378,607
 Chesf   81,619,715 123,635,019 117,099,378 322,354,112 0 0 0 322,354,112
 CGT Eletrosul  36,774,046 33,630,098 21,746,986 92,151,130 0 0 0 92,151,130
 Total  215,360,516 301,164,893 395,797,022 912,322,431 0 0 0 912,322,431

 

 

 

FRRCM - Investor Relations Board

Report to Investors - Annex III - 2Q24

Operating Information of Subsidiaries

 

VI.2.2.2 Special Purpose Entities
                             
VI.2.2.2.1 Transmission Lines
SPE Purpose
(From - To)
Companies
Eletrobras (%)
Investment
 Predicted
(BRL Million)
Planned Investment Reference Date Lines Extension (km) Voltage (kV) Beginning of
 Operation
Termination of the Concession RAP
(BRL Million)
RAP base date
cycle 2024/2025
Readjustment index
 of RAP
Contract Reinforcement / Improvement / Expansion Renewed or Bid?
Transnorte Energia S.A.  Eng. Lechuga - Ecuador CD Eletronorte (50.38%) 2,257.67 Sep-22 788.0 500 - Jan-42 261.44 Jul-24 IPCA 003/2012 Expansion Bidder
Ecuador - Boa Vista CD 667.4 500 -

 

 

17 

FRRCM - Investor Relations Board

Report to Investors - Annex III - 2Q24

Operating Information of Subsidiaries

 

VI.2.2.2.2 Substations
SPE SS Companies
Eletrobras (%)
Investment
Predicted
(BRL Million)
Planned Investment Reference Date Transformation Capacity (MVA) Location (State) Start of Operation Termination of the Concession RAP
(BRL Million)
RAP base date
cycle 2023/203
Readjustment index
 of RAP
Contract Reinforcement / Improvement / Expansion Renewed or Bid?
Transnorte Energia S.A. (1) Eng. Lechuga Eletronorte (50.38%) 491.09 Sep/2022 - AM Oct-25 Jan-42 116.9 Sep-23 IPCA 003/2012 Expansion Bidder
Ecuador - RR Oct-25
Boa Vista 800 May-15
Luziânia Niquelândia Transmissora S.A. (2) Luziânia Eletrobras (49%) 65.69 Aug-23 225.0 GO Jan/26 May-42 8.7 Jun-23 IPCA 010/2012 Reinforcement Bidder
                             
Note:                            
(1) The investment of the substations are considered in the SPE-LT-Implementation tab.
(2) Implementation of reinforcement of the SPE Luziânia-Niquelândia provided for in the REA 14.803/2023, of August 1, 2023.

 

 

18 

FRRCM - Investor Relations Board

Report to Investors - Annex III - 2Q24

Operating Information of Subsidiaries

 

VI.2 Investments in new projects
                                                         
VI.2.1 Generation
                                                         
VI.2.1.1 Full Responsibility
Eletrobras Company Power plant Source Location
(State)
Investment (BRL Million) Installed Capacity (MW) Physical Guarantee (MW) Start of Concession Start of Operation Beginning of Construction Termination of the Concession Physical Schedule of
Work Performed (%)
Contract Type (Availability or Quantity) Buyer Type Energy Sold 
Investment
Total Expected
Planned Total Investment Reference Date Investment
Accomplished
Realized 1Q25 Realized 2Q25 Realized 3Q25 Realized 4Q25 1Q25 2Q25 3Q25 4Q25
BRL million MWh BRL million MWh BRL million MWh BRL million MWh
CGT Eletrosul (1) CGH Cachoeira Branca Hydro MS 13.33 Apr-22 12.06 0.00       1.05 0.97 (7) Dec-23 Sep-20 (7) 97.80% Quantity - - 0 0            
CGT Eletrosul (3) WPP Coxilha Negra Wind RS  2,398.49 (8) Jul-24  2,292.61 33.18       302.40 114.7 (2) 9/1/2022 Jul-24 Aug-22 9/1/2057 97.43% Quantity  -   -  20 86,774.18 (9)            
Chesf WPP Casa Nova B Wind BA 150.74 (10) Oct-21 100.90 3.22       27.00 10.78 02/07/2023 (4) 09/31/2027 (6) Jul-23 2/7/2058 65.93% (5) Quantity - - 0 0            
                                                         
(1) The request for connection as Distributed Generation was made on 12/29/22 with Energisa and in April it approved the last protocol. The execution of the network and installation of the recloser were carried out in March/23. The CUSD has yet to be signed so that Energisa can connect the Eletrosul network to its distribution network and start commissioning with load. After signing, the distributor has up to 120 days to carry out the connection work to its network (they do not allow it to be performed by the system user).
(2) Considered P90.
(3) Grant issued on 08/23/2022.
(4) Authorizing Resolution No. 13.606 of 02/07/2023.
(5) This percentage represents the evolution from the remaining stage (40% of the project).
(6) Date of entry into operation may be adjusted due to the ONS Access Opinion and the progress of the services of replacement of the inserts and subsequent assembly of the wind turbines.
(7) Awaiting commissioning by Energisa The technical team completed the preparation of the report that subsidizes the request for inclusion of HPP Cachoeira Branca as an additional Generating Unit of HPP São Domingos. This document should be filed with Aneel in 1Q25. In parallel, the additional documents requested in the access budget (former access opinion) of the local utility company - Energisa were sent. This already enables the CUSD signature to connect this additional UG, as originally provided for in the CGH project.
(8) Estimated budget updated by the IPCA from BRL 2,199.32 in December/2021 to BRL 2,398.49 in July/2024
(9) The energy sold considers the total verified consolidated generation of the generation assets, including generation under test.
(10) Adjusted budget with the inclusion of the insert replacement additive, contracting of specific cleaning of the log factory and other charges. 

 

 

19 

FRRCM - Investor Relations Board

Report to Investors - Annex III - 2Q24

Operating Information of Subsidiaries

 

VI.2.1.2 Special Purpose Entities
SPE Power plant Source Companies
Eletrobras
(%)
Percentage
Total for
Eletrobras (%)
Location
(State)
Capacity
Installed
(MW)
Guarantee
Physics
(MW)
Beginning of
Construction
Forecast of
Beginning of
 Operation
End of
Concession
Investment
 Predicted
(BRL Million)
Date of
Investment Reference
 Predicted
Investment Realized
(BRL Million) 
Physical Advancement
Accomplished
(%)
Partners Commercialized Energy     Energy purchased for resale Energy Sold 
ACR (%) Average Price (BRL / MWh) ACL
(%)
1Q25 2Q25 3Q25 4Q25 Buyer Type 1Q25 2Q25 3Q25 4Q25
BRL million MWh BRL million MWh BRL million MWh BRL million MWh BRL million MWh BRL million MWh BRL million MWh BRL million MWh
Itaguaçu da Bahia Energia Renováveis S.A. (1) (2) Itaguaçu da Bahia I Wind 98 98.00% BA - - - - - - - - 0% Casa dos Ventos Energias Renováveis S.A. (2%) -  -  -  -  -                  -  -            
                                                                         
(1) Eletrobras Holding's interest in SPE is through the holding company Brasil Ventos Energia S.A. (BVE), in which the equity interest of Eletrobras Holding is 100%.
(2) Business plan of the project currently under review.

 

20 

FRRCM - Investor Relations Board

Report to Investors - Annex III - 2Q24

Operating Information of Subsidiaries

 

VII. SPEs Data
                                                                         
VII.1 Operational data
VII.1.1 Generation
VII.1.1.1 Operational Assets and Generated Energy
SPE Power plant Source Companies
Eletrobras (%)
Percentage
Total for
Eletrobras (%)
Location
(State)
Capacity
Installed
(MW)
Guarantee
Physics
(MWm)
Generated Energy  Beginning of
Operation
End of
 Concession
Partners Commercialized Energy Energy purchased for resale Energy Sold   
1Q25
(MWh)
2Q25
(MWh)
3Q25
(MWh)
4Q25
(MWh)
ACR ACL
(%)
1Q25 2Q25 3Q25 4Q25 Buyer Type 1Q25 2Q25 3Q25 4Q25  
(%) Average Price (BRL/MWh) BRL million MWh BRL million MWh BRL million MWh BRL million MWh BRL million MWh BRL million MWh BRL million MWh BRL million MWh Contract
Eólica Ibirapuitã S.A. Ibirapuitã I Wind CGT Eletrosul (100.00%) 100.00% RS 25.20 9.30 13,707.67       Aug-15 Feb-47 - 0% - 100% 0.119 1,505.50             Eletrobras Companies ACR 0 0             MME Ordinance No. 68/2012
ACL 0 0            
Others ACR 0 0            
ACL 3.15 15,392.92            
Rouar S.A. (6) Artilleros  Wind Holding (50.00%) 50.00% Tarariras (Colonia)  65.10  N/A  35,577.00       Apr-15 Dec-36 Administração Nacional de Usinas y Trasmisiones TPP (50.00%)  -   -   -   -  -             TPP - 13.55 35,661.00             K45373/2013
Usina de Energia Eólica Caiçara I S.A. (1) Caiçara I Wind CHESF (49.00%) 49.00% RN 27.00   15.10  15,304.95       Dec-15 Jun-47 Envolver Participações S.A. (51.00%) 100% 233.44 0% 0.0 0.0             Eletrobras Companies ACR 0 0             MME Ordinance No. 399/2012
ACL 0 0            
Others ACR 6.10 26,136.00            
ACL 0 0            
Usina de Energia Eólica Caiçara II S.A. (1) Caiçara II Wind CHESF (49.00%) 49.00% RN  18.00 9.60   15,659.51       Dec-15 Jul-47 Envolver Participações S.A. (51.00%) 100% 231.83 0% 0.00 0.0             Eletrobras Companies ACR 0.00 0.00             MME Ordinance No. 417/2012
ACL 0.00 0.00            
Others ACR 5.71 24,624.00            
ACL 0.00 0.00            
Usina de Energia Eólica Junco I S.A. (1) Junco I Wind CHESF (49.00%) 49.00% RN 24.00   13.10  17,807.77       Dec-15 Jul-47 Envolver Participações S.A. (51.00%) 100% 231.78 0% 0.0 0.0             Eletrobras Companies ACR 0 0             MME Ordinance No. 388/2012
ACL 0 0            
Others ACR 6.76 29,160.00            
ACL 0.00 0.00            
Usina de Energia Eólica Junco II S.A. (1) Junco II Wind CHESF (49.00%) 49.00% RN 24.00  13.30  12,339.86       Dec-15 Jul-47 Envolver Participações S.A. (51.00%) 100% 231.71 0% 0.00 0.0             Eletrobras Companies ACR 0.00 0.00             MME Ordinance No. 418/2012
ACL 0.00 0.00            
Others ACR 4.65 20,088.00            
ACL 0.00 0.00            
HPP Baguari(9) Consortium HPP Baguari Hydraulics Holding (100.00%) (7) 100.00% MG   140.00  81.90 150.24       Sep-09 Mar-46 - 100% 316.71 0%  -  -             Eletrobras Companies ACR 0 0              
ACL 0 0             001/2006 - MME
Others ACR 28.64  90,430.17              
ACL 0 0              
Chapecoense Geração S.A. HPP Foz do Chapecó Hydraulics Holding (40.00%) 40.00% SC/RS  855.00   408.90 612,173.00       Oct-10 Feb-42 CPFL Geração de Energia S.A. - CPFL-G (51%)
Cia. Estadual de Geração de Energia Elétrica - CEEE-G (9%)
100% 379.31 0% 16,555 95,040             Eletrobras Companies ACR 0.00 0.00              
ACL 0.00 0.00             128/2001 - Aneel
Others ACR 365.43 963,401.21              
ACL 0.00 0.00              
Companhia Energética Sinop S.A. HPP Sinop Hydraulics Chesf (24.50%)
Eletronorte (24.50%)
49.00% MT   401.88   242.80 629,092.70       Sep-19 Jan-50 EDF Brasil Holding (51.00%) 91% 208.48 9% 15.78 97,200.00             Eletrobras Companies ACR 0 0              
ACL 3.00 12,355.20              
Others ACR 101.67 487,672.80             001/2014 - MME
ACL 7.21 75,600.00              
Empresa de Energia São Manoel S.A. HPP São Manoel Hydraulics Holding (33.333%) 33.333% PA  735.84   430.40   1,294,735.64       Dec-17 Dec-49 EDP - Energias do Brasil S.A. (33.334%)
China Three Gorges Brasil Energias Ltda. (33.333%)
69% 155.78 31% 11.79   108,000.00             Eletrobras Companies ACR 0.00 0.00              
ACL 0.00 0.00             002/2014 - MME
Others ACR 97.41 625,320.00              
ACL 44.72 291,600.00              
Jirau Energia S.A. HPP Jirau Hydraulics CHESF (20.00%)
CGT Eletrosul (20.00%)
40.00% RO  3,750.00 2,101.50   6,067,172.43       Sep-13 Dec-45 Mizha Participações S.A. (20%)
Engie (40%)
69% 182.03 31% 40.1 226,213.6             Eletrobras Companies ACR 0.00 0.00              
ACL 116.70 395,092.51             002/2008 - MME
Others ACR 652.97 3,587,244.69              
ACL 183.17 636,107.16              
Enerpeixe S.A. HPP Peixe Angical Hydraulics Holding (40.00%) 40.00% TO  498.75   266.60 562,302.28       Jun-06 May-42 EDP - Energias do Brasil S.A. (60%) 0% - 100% 71.93 11.79             Eletrobras Companies ACR 0 0              
ACL 0 0             130/2001 - Aneel
Others ACR 0 0              
ACL 118.73 745,200.00              
Madeira Energia S.A. HPP Santo Antônio Hydraulics Holding (99.736%) (7) 99.7362% RO  3,568.30   2,313.30   5,879,886.65       Mar-12 Oct-47 Caixa Fundo de Investimento em Participações Amazônia Energia (0.1307%)
Novonor Energia do Brasil S.A. (0.1215%)
SAAG Investimentos S.A. (0.0701%)
61% 201.88 39% 236.3 1,202,309.6             Eletrobras Companies ACR 0 0             001/2008 - MME
  ACL 52.43 324,000.00            
SAAG Investimentos S.A. (8) Holding (83.42%) Andrade Gutierrez Participações S.A. (16.58%) Others ACR 774.83 3,838,089.81            
  ACL 447.10 1,505,166.52            
Norte Energia S.A. HPP B. Monte  Hydraulics CHESF (15.00%)
Eletronorte (34.98%)
49.98% PA  11,233.10   4,571.00 15,842,794.00       Apr/16 Aug-45 Petros (10.00%)
Belo Monte Part (10.00%)
Funcef (10.00%)
Other (20.02%)
66% 174.84 34% 151.8 1,794,590.40             Eletrobras Companies ACR 0 0              
ACL 0 0             001/2010 - MME
Others ACR 1,276.67 7,302,028.57              
ACL 652.62 3,549,755.87              
Retiro Baixo Energética S.A. HPP Retiro Baixo Hydraulics Holding (100.00%) (7) 100.00% MG 83.66  34.80 68.21       Mar-10 Mar-47 - 100% 226.71 0% 0.6 6             Eletrobras Companies ACR 0 0              
ACL 0 0             007/2006 - MME
Others ACR 26.06 114,950.23              
ACL 0 0              
Serra do Facão Energia S.A. (2) HPP Serra do Facão Hydraulics Holding (54.013%) 54.0130% GO   212.58   174.40 155,024.90       Jul-10 Nov-40 Alcoa Alumínio S.A. (34.9737%)
DME Energética S.A. (11.0133%)
71% 337.80 29% 5.5 54,033.60             Eletrobras Companies ACR 0.00 0.00              
ACL 0.00 0.00             129/2001 - Aneel
Others ACR 93.13 275,692.65              
ACL 38.07 110,160.00              
Teles Pires Participações S.A. HPP Teles Pires Hydraulics Eletronorte (50.56%)
Holding (24.72%)
CGT Eletrosul (24.72%)
100.000% PA/MT   1,819.80   964.20   3,395,309.81       Nov-15 Jan-47 - 64% 128.82 36% 0.0 0.0             Eletrobras Companies ACR 0 0              
ACL 47.07 324,554.00             002/2011 - MME
Others ACR 167.23 1,298,115.00              
ACL 48.99 337,801.00              
Tijoá Participações e Investimentos S.A. (3) HPP Três Irmãos Hydraulics Holding (49.90%) 49.90% SP 807.50 206.70 721,128.00       Nov-93 Oct-44 Juno Participações e Investimentos S.A. (50.1%) - - -  -  -             Eletrobras Companies ACR 0.00 0.00              
ACL 0.00 0.00             003/2014 - MME
Others ACR 0.00 0.00              
ACL 0.00 0.00              
Energia dos Ventos V S.A. (4) (5) São Januário Wind Holding (100%) 100.00% CE 21.00 9.70 11,674.63       Jun-20 Jul-47 - 92% 229.71 8%  0.18 3,132.00             Eletrobras Companies ACR 0 0             MME Ordinance No. 432/2012
Energia dos Ventos VI S.A.  (4) (5) Nossa Senhora de Fátima Wind Holding (100%) 100.00% CE 30.00 13.60 14,703.62       Jun-20 Aug-47 ACL 1.95 21,600.00             MME Ordinance No. 459/2012 
Energia dos Ventos VII S.A.  (4) (5) Jandaia Wind Holding (100%) 100.00% CE 27.00 14.10 17,828.12       May-20 Aug-47 Others ACR 23.67 103,032.00             MME Ordinance No. 458/2012
Energia dos Ventos VIII S.A.  (4) (5) São Clemente Wind Holding (100%) 100.00% CE 21.00 10.20 11,063.64       May-20 Jul-47 ACL 0.00 0.00             MME Ordinance No. 446/2012
Energia dos Ventos IX S.A.  (4) (5) Jandaia I Wind Holding (100%) 100.00% CE 24.00 10.60 13,213.26       May-20 Jul-47 MME Ordinance No. 409/2012
                                                                         
Note: Chapada do Piauí I Holding S.A. and Chapada do Piauí II Holding S.A. were removed from the report because they were sold on 06.30.2024
(1) Vamcruz I Participações S.A.
(2) The shareholding of Holding in Serra do Facão Energia S.A. refers to the total shares (54.013%), which considers the common shares (43.0262%) also the preferred shares (100%).
(3) Tijoá operates the HPP Três Irmãos under Special Administration regime (Law No. 12,783/2013).
(4) Fortim Wind Complex.
(5) The Holding Company's interest in the SPEs is through the holding company Brasil Ventos Energia S.A. (BVE), in which the Holding Company's shareholding is 100%.
(6) Considered Exchange rate of 03/31/2025 of BRL 5.7422/ USD (Bacen Ptax Sale)
(7) Equity interest in which Eletrobras Companies increased their interest in 4Q23.
(8) The SPE has as its corporate purpose the shareholding in Madeira Energia S.A., in which its percentage of interest is 0.0701%.
(9) HPP Baguari Consortium is composed of SPEs Baguari I Geração de Energia Elétrica S.A. (51%) and Baguari Energia S.A. (49%).

 

 

21 

FRRCM - Investor Relations Board

Report to Investors - Annex III - 2Q24

Operating Information of Subsidiaries

 

VII.1.2 Transmission
                     
VII.1.2.1 Operational assets 
                     
VII.1.2.1.1 Transmission Lines
SPE Purpose
(From-to)
Eletrobras Companies (%) Extension
(km)
Voltage
(kV)
Start of Operation   Termination of the Concession RAP Cycle
24-25
RAP of 07.01.2024 - 03.31.2025
(BRL Million)
Readjustment Index Contract
Belo Monte Transmissora de Energia SPE S.A. (1) Xingu - Strait C1 and C2 (Bipole 1) Eletronorte (24.5%)
Holding (24.5%)
4,152.00 800 Dec-17 Jun-44 389.87 292.4 IPCA 014/2014 - Aneel
Goiás Transmissão S.A. Rio Verde Norte – Trindade C1 and C2 Holding (49%) 373.90 500 Dec-13 Jul-40 34.25 30.36 IPCA 002/2010 - Aneel
Trindade – Xavantes C1 and C2 74.12 230 Dec-13 4.14
Trindade – Carajás C1 30.53 230 Dec-13 2.09
Interligação Elétrica do Madeira S.A. (1) Porto Velho Coletora - Araraquara 2 C1 and C2 (Bipole 1) Chesf (24.5%)
Holding (24.5%)
4,858.96 600 Nov-13 Feb-39 387.70 290.8 IPCA 013/2009 - Aneel
Interligação Elétrica Garanhuns S.A. L.Gonzaga - Garanhuns II Chesf (49%) 218.00 500 Nov-15 Dec-41 86.76 65.10 IPCA 022/2011 - Aneel
Garanhuns II - Campina Grande III 194.00 500 Nov-15
Garanhuns II - Pau Ferro 209.00 500 Dec-15
Garanhuns II - Angelim I 12.00 230 Mar-16
Lago Azul Transmissão S.A. (5) Barro Alto - Itapaci C2 (5) 69.34 230 Sep-16 May-44 5.62 (5) IPCA 003/2014 - Aneel
MGE Transmissão S.A. Mosque - Mutum C1 Holding (49%) 136.18 500 Jun-21 Jul-40 16.05 23.47 IPCA 008/2010 - Aneel
Mutum - Viana 2 C1 118.57 500 Jun-21 13.92
Viana 2 – Viana C1 and C2 15.00 345 Aug-14 1.32
Mata de Santa Geneva Transmissão S.A. Araraquara 2 - Itatiba C1 Holding (49.9%) 414.26 500 Mar-20 May-44 59.85 44.89 IPCA  
  Itatiba – Batteries C1 222.59 500 Mar-20 106.80 80.1 IPCA 001/2014 - Aneel
  Araraquara 2 - Fernão Dias C1 249.60 500 May-20 100.18 75.13 IPCA  
Paranaíba Transmissora de Energia S.A. Barriers II - Rio das Éguas C1 Holding (24.5%) 239.07 500 Jan-17 May-43 38.78 108.32 IPCA 007/2013 - Aneel
Rio das Éguas - Luziânia C1 368.04 500 Jul-16 59.26
Luziânia - Pirapora 2 C1 346.19 500 May-16 46.35
Sistema de Transmissão do Nordeste S.A. Teresina II -Tiangua II CHESF (49.0%) 636.2 500 Oct-21 Feb-34 118.40 88.25 IGP-m 005/2004 - Aneel
Tiangua II -Sobral III Oct-21
Sobral III -Pecem II Apr-14
Pecem II - Fortaleza II  Oct-14
Pecem II – Pacatuba    
Fortaleza II – Pacatuba     
Transenergia Renovável S.A. Chapadão – Jataí C1 and C2 Holding (49%) 276.10 230 Dec-12 Apr-39 10.38 29.56 IPCA 009/2009 - Aneel
Barra dos Coqueiros – Quirinópolis C1 51.31 230 Apr-11 Apr-39 1.69
Palmeiras – Edéia C1 (3) 58.58 230 Feb-12 Apr-39 2.02
Jataí – Mineiros C1 61.41 138 Dec-12 Apr-39 6.49
Mineiros - Morro Vermelho C1 46.85 138 Dec-12 Apr-39 5.99
Jataí - TPP Jataí C1 51.57 138 Dec-12 Aug-26 3.04
Jataí - TPP Água Emendada C1 32.56 138 Dec-22 Aug-26 2.15
Morro Vermelho - TPP Alto Taquari C1 30.11 138 Dec-12 Aug-26 1.60
Quirinópolis - TPP Quirinópolis C1 33.88 138 Apr-11 Aug-26 0.22
Quirinópolis - TPP Boa Vista C1 16.35 138 Apr-11 Aug-26 1.29
Edéia - TPP Tropical Bionenergia I and II C1 48.88 138 Nov-13 Aug-26 2.52
Transenergia São Paulo S.A. EL 138 kV Itatiba  Dist 1 to 8 Holding (49%) 0.00 138 Aug-12 Nov-39 3.08 2.31 IPCA 024/2009 - Aneel
Triângulo Mineiro Transmissora S.A. Marimbondo II - Assis C1 Holding (100%) 296.50 500 Dec-16 Aug-43 37.55 23.85 IPCA 004/2013 - Aneel
Vale do São Bartolomeu Transmissora de Energia S.A. Luziânia - Brasília Leste C1 Holding (100%) 68.86 500 Feb-18 Oct-43 34.03 25.52 IPCA 014/2013 - Aneel
Luziânia - Brasília Leste C2 66.99 500 Feb-18
Samambaia - Brasília Sul C3 14.00 345 May-16
Brasília Sul - Brasília Geral C3 13.55 230 Apr-17
HPP Baguari Consortium (2) HPP Baguari - Baguari C1 and C2  Holding (100%) 1.21 230 Nov-09 Mar-46 N/A N/A N/A -
  HPP Baguari - Baguari C3 and C4 1.36 230 May-10 Mar-46 N/A N/A N/A  
Chapecoense Geração S.A. (2) HPP Foz do Chapecó - Foz do Chapecó C1 and C2 Holding (40%) 2.93 230 Oct-10 Feb-42 N/A N/A N/A -
HPP Foz do Chapecó - Foz do Chapecó C3 and C4 2.90 230 Oct-10 Feb-42 N/A N/A N/A
Empresa de Energia São Manoel S.A. (2) HPP São Manoel - Paranaíta C1 Holding (33.333%) 40.00 500 Dec-17 Dec-49 N/A N/A N/A -
Enerpeixe S.A. (2) Peixe Angical – Peixe 2 C1 Holding (40%) 20.00 500 Apr-08 May-42 N/A N/A N/A -
Madeira Energia S.A. (2) HPP Santo Antônio - Coletora Porto Velho C1 Holding (99.736%) 12.64 500 Mar-12 Oct-47 N/A N/A N/A -
HPP Santo Antônio - Porto Velho Coletora C2 12.64 500 Mar-12
SAAG Investimentos S.A. (2) (4) HPP Santo Antônio - Porto Velho Coletora C3 and C4 Holding (83.42%) 25.14 500 Jun-14 Oct-47 N/A N/A N/A -
HPP Santo Antônio - Porto Velho C1 and C2 44.24 230 Jan-17
Retiro Baixo Energética S.A. (2) Retiro Baixo – Curvelo 2 C1 Holding (100%) 45.06 138 Mar-10 Aug-41 N/A N/A N/A -
Serra do Facão Energia S.A. (2) Serra do Facão – Catalão C1 and C2 Holding (54.013%) 65.60 138 Jul-10 Nov-40 N/A N/A N/A -
Teles Pires Participações S.A. (2) Teles Pires - Paranaíta C1 and C2 Eletronorte (50.56%)
Holding (24.72%)
CGT Eletrosul (24.72%)
18.60 500 Nov-15 Jan-47 N/A N/A N/A -
Brasil Ventos Energia S.A. - Fortim (2) Jandaia - Russas II C1 Holding (100%) 68.76 230 Mar-20 Jul-47 N/A N/A N/A -
Norte Energia S.A. (2) SS Belo Monte – SS Xingu  CHESF (15.00%)
Eletronorte (34.98%)
67.50 500 Apr-16 Aug-45 N/A N/A N/A -
SS Pimental – SS Altamira  64.00 230 Apr-16
                     
(1) For direct current projects, the assumption of accounting for the network extension was changed in order to align with the assumptions adopted by the Ministry of Mines and Energy - MME. The network kilometer accounting considers the extension per pole and no longer per stretch as reported in previous quarters.
(2) There is no RAP because they are facilities of restricted interest to the generating plants
(3) ANEEL, through ORDER No. 2,714, of 09.27.2023, granted partial provision to the claim of TER, for recognition of the entry into commercial operation of TL 230 kV Palmeiras-Edéia and its transmission functions, with the respective right to receive revenue, as of 02.17.2012.
(4) The SPE has as its corporate purpose the shareholding in Madeira Energia S.A., in which its percentage of interest is 5.1114%.
(5) SPE sold on 02/18/2025 to CelgPar

 

 

22 

FRRCM - Investor Relations Board

Report to Investors - Annex III - 2Q24

Operating Information of Subsidiaries

 

VII.1.2.1.2 Substations
SPE Substation Eletrobras Companies (%) Transformation Capacity - MVA Status Start of Operation Termination of the Concession RAP Cycle
24-25
RAP of 07.01.2024 - 03.31.2025
(BRL Million)
Readjustment Index Include the contract number information
Belo Monte Transmissora de Energia SPE S.A. 4,000 MW Converter Station at SS Xingu (2) Eletronorte (24.5%)
Holding (24.5%)
4,752 Asset Dec-17 Jun-44 429.5 322.1 IPCA  
792 Reserve 014/2014 - Aneel
3,850 MW Converter Station at SS Estreito (2) 4,661 Asset Dec-17 Jun-44  
777 Reserve  
Caldas Novas Transmissão S.A. Corumbá (Expansion) (3) Holding (49.9%) 150 Asset Aug-13 Jun-41 7.8 5.5 IPCA 003/2011 - Aneel
Goiás Transmissão S.A. Carajas Holding (49%)   Asset Nov-13 Jul-40 0.6 38.5 IPCA  
Rio Verde   Asset 7.4  
Trindade 1,200 Asset 26.8 002/2010 - Aneel
  133 Reserve 1.2  
Trindade (1st Expansion) (7) 400 Asset 14.0  
Xavantes   Asset 1.3  
Interligação Elétrica do Madeira S.A. Rectifier Station at SS Coletora Porto Velho (Bipole 2) (2) Chesf (24.5%)
Holding (24.5%)
3,832 Asset Jun-15 Feb-39 334.5 250.9 IPCA 015/2009 - Aneel
639 Reserve
Inverter Station at SS Araraquara 2 (Bipole 2) (2) 3,608 Asset Jun-15 Feb-39
601 Reserve
Interligação Elétrica Garanhuns S.A. Garanhuns II Chesf (49%) 600 Asset Nov-15 Dec-41 63.1 47.3 IPCA 022/2011 - Aneel
Garanhuns II 200 Reserve Nov-15
Pau Ferro 1,500 Asset Dec-15
Pau Ferro 250 Reserve Dec-15
Luziânia Niquelândia Transmissora S.A. Luziânia Holding (49%) 450 Asset Jun-14 May-42 23.4 16.7 IPCA 010/2012 - Aneel
Niquelândia 30 Asset Aug-15
Mata de Santa Geneva Transmissora S.A. (4) Santa Barbara (C.Estático)  (2) Holding (49.9%) -   Apr-19 May-44 15.3 11.5 IPCA 001/2014 - Aneel
Fernão Dias  3,600 Asset Nov-20 22.9 17.2 IPCA
400 Reserve    
Static Compensator at SS Itatiba (2) -   Feb-20 16.6 12.4 IPCA
MGE Transmissão S.A. (4) Mesquita Holding (49%)   Asset Aug-14 Jul-40 3.04 27.2 IPCA 008/2010 - Aneel
Mutum (Expansion)   Asset Jun-21 0.65
Viana   Asset Aug-14 2.74
Viana 2 900 Asset Aug-14 14.49
300 Reserve Aug-14 1.59
Viana 2 (Enlargement) 900 Asset Jan-21 13.80
Paranaíba Transmissora de Energia S.A. Pirapora 2 (2) Holding (24.5%) -   May-16 May-43 50.2 37.7 IPCA 007/2013 - Aneel
Luziânia (2) -   May-16
Rio das Éguas (2) -   Jul-16
Barreiras II (2) -   Jan-17
Sistema de Transmissão do Nordeste S.A. Sobral III CHESF (49.0%) -  -  Jan-06 Feb-34 53.3 40.4 IGP-m 005/2004 - Aneel
Fortaleza II -  -  Jan-06
Teresina II -  -  Jan-06
Pecem II -  -   - 
Tiangua II -  -   - 
  Paracatuba -  -   - 
Transenergia Renovável S.A. B. Coqueiros Holding (49%) - Asset Apr-11 Apr-39 0.39 20.7 IPCA 009/2009 - Aneel
Chapadão - Asset Jan-13 Apr-39 0.78
Edéia 150 Asset Feb-12 Apr-39 7.18
Edéia (1st Expansion) 150 Asset Apr-19 May-40 0.77
Jataí 450 Asset Dec-12 Apr-39 12.97
Morro Vermelho - Asset Dec-12 Apr-39 3.20
Mineiros - Asset Dec-12 Apr-39 2.59
Palmeiras   Asset Feb-12 Apr-39 0.39
Quirinópolis 225 Asset Apr-11 Apr-39 8.01
Transenergia São Paulo S.A. (5) Itatiba Holding (49%) 1,200 Asset Aug-12 Nov-39 15.60 18.3 IPCA 024/2009 - Aneel
133 Reserve May-14 8.82
Transnorte Energia S.A. Boa Vista (C.Estático) Eletronorte (50.38%) 150 Asset May-15 Jan-42 16.82 8.6 IPCA 003/2012 - Aneel
Triângulo Mineiro Transmissora S.A. Marimbondo II  (2) Holding (100%) 2,992 Asset Dec-16 Aug-43 17.1 10.9 IPCA 004/2013 - Aneel
Assis (2) -  
Vale do São Bartolomeu Transmissora de Energia S.A. Brasília Leste Holding (100%) 1,080 Asset Feb-18 Oct-43 16.5 12.4 IPCA 014/2013 - Aneel
180 Reserve
Empresa de Energia São Manoel S.A. (1) HPP São Manoel Holding (33.333%) 780 Asset Dec-17 Dec-49 N/A N/A N/A -
390 Reserve
Enerpeixe S.A. (1) HPP Peixe Angical Holding (40%) 525 Asset Jun-06 May-42 N/A N/A N/A -
175 Reserve
Madeira Energia S.A. (1) HPP Santo Antônio Holding (99.736%) 3,639 Asset Mar-12 Oct-47 N/A N/A N/A  
  500 Asset -
SAAG Investimentos S.A. (6) Holding (83.42%) 1,220 Reserve  
  250 Reserve  
Retiro Baixo Energética S.A. (1) HPP Retiro Baixo Holding (100%) 100 Asset Mar-10 Aug-41 N/A N/A N/A -
Serra do Facão Energia S.A. (1) HPP Serra do Facão Holding (54.013%) 236 Asset Jul-10 Nov-40 N/A N/A N/A -
118 Reserve
Teles Pires Participações S.A. (1) HPP Teles Pires Eletronorte (50.56%)
Holding (24.72%)
CGT Eletrosul (24.72%)
2,025 Asset Nov-15 Jan-47 N/A N/A N/A -
Brasil Ventos Energia S.A. - Fortim (1) Jandaia Holding (100%) 140 Asset Mar-20 Jul-47 N/A N/A N/A -
Eólica Ibirapuitã S.A. (1) SS Cerro Chato CGT Eletrosul (100.00%) 35 Asset Aug-15 Feb-47 N/A N/A N/A -
Rouar S.A.(1) SS Coletora Rouar Holding (50.00%) 70 Asset Dec-14 Dec-36 N/A N/A N/A -
Companhia Energética Sinop S.A.(1) SS HPP Sinop - TE01 Chesf (24.50%)
Eletronorte (24.50%)
228 Asset Oct-19 Jan-50 N/A N/A N/A  
SS HPP Sinop - TE02 228 Asset Sep-19 Jan-50 N/A N/A N/A -
SS HPP Sinop - TE Reserve 228 Reserve - Jan-50 N/A N/A N/A  
Jirau Energia S.A. (1) SS JIRAU (13 x 340 MVA) CHESF (20.00%)
CGT Eletrosul (20.00%)
4,420 Asset Sep-13 Dec-45 N/A N/A N/A -
SS JIRAU (1 x 340 MVA) 340 Reserve Sep-13 Dec-45 N/A N/A N/A
Norte Energia S.A.(1) SS Belo Monte (18 x 680 MVA) CHESF (15.00%)
Eletronorte (34.98%)
12,340 Asset Apr-16 Aug-45 N/A N/A N/A -
SS Belo Monte (2 x 680 MVA) 1,360 Reserve Apr-16 Aug-45 N/A N/A N/A
SS Pimental (3 x 90MVA) 270 Asset Apr-16 Aug-45 N/A N/A N/A
SS Pimental (1 x 90MVA) 90 Reserve Apr-16 Aug-45 N/A N/A N/A
Usina de Energia Eólica Caiçara I S.A. (1) SS Amazonas CHESF (49.00%) 150 Asset Dec-15 Jun-47 N/A N/A N/A -
Asset Dec-15 Jun-47 N/A N/A N/A
Usina de Energia Eólica Caiçara II S.A. (1) CHESF (49.00%) Asset Dec-15 Jun-47 N/A N/A N/A -
Asset Dec-15 Jun-47 N/A N/A N/A
Usina de Energia Eólica Junco I S.A. (1) CHESF (49.00%) Asset Dec-15 Jun-47 N/A N/A N/A -
Asset Dec-15 Jun-47 N/A N/A N/A
Usina de Energia Eólica Junco II S.A. (1) CHESF (49.00%) Asset Dec-15 Jun-47 N/A N/A N/A -
Asset Dec-15 Jun-47 N/A N/A N/A
                     
Note: The Companies of Chapada do Piauí I Holding S.A. and Chapada do Piauí II Holding S.A. were removed from the report because they were sold on 06.30.2024
(1) There is no RAP because facilities are of restricted interest to the generating plant.
(2) The accessed substation does not belong to the SPE. 
(3) The Caldas Novas Transmissão project is responsible for the operation and maintenance of the SS
Corumbá. 
(4) Total RAP SS were considered because the expansions have already been completed.
(5) The TSP project is responsible for the operation and maintenance of the Itatiba substation, which does not have a transmission line, so we have considered the total RAP in the substation.
(6) The SPE has as its corporate purpose the shareholding in Madeira Energia S.A., in which its percentage of interest is 0.0701%.
(7) According to ReA No. 9,997/2021, refers to the installation of the 1st 500 kV bar reactor - (3+1) x 50 Mvar.

 

 

23 

FRRCM - Investor Relations Board

Report to Investors - Annex III - 2Q24

Operating Information of Subsidiaries

 

 VII.2 Loans and Financing – BRL million 
 SPE   Eletrobras Companies (%)   Short Term - Up to 12 months (a)   Long Term - After 12 months (b)   Total (a+b)  
 Loans   Debentures   Loans   Debentures 
 Baguari Energia S.A.   Holding (100%)   -   -   -   -   -
 Baguari I S.A.   Holding (100%)  12  - 9  - 20.5
 Belo Monte Transmissora de Energia S.A.   Eletronorte (24.5%)
Holding (24.5%) 
 373.8   132.0 1,605.1  558.8  2,669.7
 Caldas Novas Transmissão S.A.   Holding (49.9%)  1.0  - 1.9  -   2.9
 Chapecoense Geração S.A.    Holding (40.00%)    140.6   103.6  209.2   183.4  636.8
 Companhia Energética Sinop S.A.    Chesf (24.50%)
Eletronorte (24.50%) 
 50.1 25.8   1,048.2  283.7   1,407.8
 Empresa de Energia São Manoel S.A.   Holding (33.333%)  186.9 52 1,192.90 361.5   1,793.3
 Energia dos Ventos IX S.A.    Holding (100%)    7.4   80.3  -  87.7
 Energia dos Ventos V S.A.    Holding (100%)    6.7   73.2  -  79.9
 Energia dos Ventos VI S.A.    Holding (100%)    9.5     102.3  -  111.8
 Energia dos Ventos VII S.A.    Holding (100%)    8.9     91.1  -    100.0
 Energia dos Ventos VIII S.A.    Holding (100%)    6.6     72,657.5  -    72,664.0
 Jirau Energia S.A.   CHESF (20.00%)
CGT Eletrosul (20.00%) 
 736.0    8,629.8  -  9,365.8
 Enerpeixe S.A.   Holding (40.00%)    89.4   772.9  862.3
 Eólica Ibirapuitã S.A.    CGT Eletrosul (100.00%)   -   -   -   -   -
 Goiás Transmissão S.A.   Holding (49%)    50   427  476.3
 Interligação Elétrica do Madeira S.A.   Chesf (24.5%)
Holding (24.5%) 
163.7  - 633.4  -   797.1
 Interligação Elétrica Garanhuns S.A.   Chesf (49%)  19.35   52.63  - 72.0
 Lago Azul Transmissora S.A. (2)   (2)   -   -   -   -   -
 Luziânia Niquelândia Transmissora S.A.   Holding (49%)    76.2    - 76.2
 Madeira Energia S.A.   Holding (99.73%)   61.4  442.3  305.8  4,548.5  5,358.0
 Mata de Santa Geneva Transmissora S.A.   Holding (49.9%)  - 0.19  - 3.61   3.8
 MGE Transmissão S.A.   Holding (49%)  14   48    62.1
 Norte Energia S.A.   CHESF (15.00%)
Eletronorte (34.98%) 
946.62 152.17 26,386.23 724.05 28,209.1
 Paranaíba Transmissora de Energia S.A.   Holding (24.5%)   51.3  21.7  288.5 45.3  406.8
 Retiro Baixo Energética S.A.   Holding (100.00%)  11.02  -  -  -   11.0
 Rouar S.A. (1)   Holding (50.00%)   14.9  -   154.2  -   169.0
 Serra do Facão Energia S.A.   Holding (54.013%)     -  -  -  -
 Sistema de Transmissão Nordeste S.A.   Chesf (24.50%)
Eletronorte (24.50%) 
 -  -  -  -  -
 Teles Pires Participações S.A.   Eletronorte (50.56%)
Holding (24.72%)
CGT Eletrosul (24.72%) 
  188.4  -   1,776.4  -   1,964.8
 Tijoá Participações e Investimentos S.A.   Juno Participações e Investimentos S.A. (50.1%)   -  -  -  -  -
 Transenergia Renovável S.A.   Holding (49%)    20   105   124.8
 Transenergia São Paulo S.A.   Holding (49%)    17   141   158.7
 Triângulo Mineiro Transmissora S.A.   Holding (100%)  0 0 0 0  -
 Usina de Energia Eólica Caiçara I S.A.    CHESF (49.00%)  4.54 -   28.77 0.00 33.3
 Usina de Energia Eólica Caiçara II S.A.    CHESF (49.00%)  4.51   28.58 -    33.1
 Usina de Energia Eólica Junco I S.A.    CHESF (49.00%)  5.46   34.59 0.00 40.0
 Usina de Energia Eólica Junco II S.A.    CHESF (49.00%)  3.11   19.67 -   22.8
 Vale do São Bartolomeu Transmissora de Energia S.A.   Holding (100%)   -  -  -  -  -
Transnorte Energia S.A. Eletronorte (50.38%) 3.19 537.13 800.00 1,850.00   3,190.3
             
 Note:             
(1) Considered Exchange rate of 03/31/2025 of BRL 5.7422/ USD (Bacen Ptax Sale)
(2) SPE sold on 02/18/2025 to CelgPar
 Note: The Companies of Chapada do Piauí I Holding S.A. and Chapada do Piauí II Holding S.A. were removed from the report because they were sold on 06.30.2024 

 

24 

FRRCM - Investor Relations Board

Report to Investors - Annex III - 2Q24

Operating Information of Subsidiaries

 

V.III Loans and Financing – BRL Million
                   
Eletrobras Parent Company
Parent company 2025 2026 2027 2028 2029 2030 2031 After 2031 Total (MN + ME)
By creditor  3,821  5,396  5,135  4,381  5,580  6,518  5,657  8,769   45,256
Others 3,821 5,396 5,135 4,381 5,580 6,518 5,657 8,769 45,256
CGT Eletrosul 2025 2026 2027 2028 2029 2030 2031 After 2031 Total (MN + ME)
By creditor 1,617.16 613.91 528.13 451.06 365.58 79.69 609.81 167.33 4,432.68
Eletrobras 157.03 201.37 80.70 74.34 76.96 79.69 82.54 167.33 919.96
Others 1,460.14 412.54 447.43 376.72 288.62 0.00 527.27 0.00 3,512.72
Chesf 2025 2026 2027 2028 2029 2030 2031 After 2031 Total (MN + ME)
By creditor 263.64 136.56 140.68 140.62 1,124.07 79.48 6,388.96 655.25 8,929.24
Eletrobras 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Others 263.64 136.56 140.68 140.62 1,124.07 79.48 6,388.96 655.25 8,929.24
Eletronorte 2025 2026 2027 2028 2029 2030 2031 After 2031 Total (MN + ME)
By creditor 846.27 1,546.46 939.81 640.39 229.51 169.47 2,470.22 1,407.27 8,249.41
Eletrobras 417.93 384.43 269.75 155.07 155.07 155.07 64.61 815.33 2,417.28
Others 428.34 1,162.03 670.05 485.32 74.44 14.39 2,405.61 591.94 5,832.12
Teles Pires 2025 2026 2027 2028 2029 2030 2031 After 2031 Total (MN + ME)
By creditor 129.99 174.03 175.55 177.19 178.63 180.08 181.21 762.00 1,958.68
Eletrobras 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Others 129.99 174.03 175.55 177.19 178.63 180.08 181.21 762.00 1,958.68
SAESA 2025 2026 2027 2028 2029 2030 2031 After 2031 Total (MN + ME)
By creditor 488.21 427.88 434.36 441.42 440.76 396.99 364.03 2,364.30 5,357.96
Eletrobras 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Others 488.21 427.88 434.36 441.42 440.76 396.99 364.03 2,364.30 5,357.96

 

25 

FRRCM - Investor Relations Board

Report to Investors - Annex III - 2Q24

Operating Information of Subsidiaries

 

ELETRONUCLEAR - OPERATIONAL DATA
                                             
I. Market Data
                                         
I.1 Installed Capacity and Physical Guarantee – MW
Company Comprehensive Responsibility (a) Comprehensive Liability under Law 13.182/15 (b) Comprehensive Liability under O&M (c) Regime SPE (d) SPE under O&M (e) Regime Net Aggregation 1Q25 Total (a+b+c+d+e)                
Installed Capacity Physical Guarantee Installed Capacity Physical Guarantee Installed Capacity Physical Guarantee Installed Capacity Physical Guarantee Installed Capacity Physical Guarantee Installed Capacity Physical Guarantee Installed Capacity Physical Guarantee                
Eletronuclear   1,990 1,714.5  - -  -  -   -  -  -  -  -  -   1,990 1,714.5                
                                             
II. Generation Data
                                             
II.1 Installed Capacity - MW
                                             
II.1.2 Generation Assets and Generated Energy 
                                             
Eletrobras Company Project Location Source Start of Concession Start of Operation End of Operation Installed Capacity Physical Guarantee Generated Energy (MWh) (1)   Fuel Type Metric Unit Fuel used for electric power production
    1Q25 2Q25 3Q25 4Q25
(State) (MW) (Average MW) 1Q25 2Q25 3Q25 4Q25 Qty. BRL Million Qty. BRL Million Qty. BRL Million Qty. BRL Million
Eletronuclear Angra I (2) RJ Nuclear Jul-70 Jan-85 Dec-44 640.00 509.80   1,110,680       Uranium kg 30,923  R$70,993.02            
Angra II (2) RJ Nuclear May-74 Sep-00 Aug-40 1,350 1,205 2,666,741       Uranium kg 70,942  R$  150,675.70            
               
(1) Generated Energy referenced to SIN Center of Gravity
(2) The CNAAA Plants do not operate under the concession regime. They are operating under the authorization regime. Angra I has an operating license given by MME Ordinance No. 416 of 07/13/1970 and Angra 2 has an operating license given by Exp. Mot. MME No. 300 of 05/28/1974.
                                             
II.1.2.1.2 Generation Losses - %
Eletrobras Companies 1Q25 2Q25 3Q25 4Q25                          
In the quarter Accumulated In the quarter Accumulated In the quarter Accumulated In the quarter Accumulated                            
Eletronuclear 5.88 5.88                                        
                                             
Note: Losses in Generation, meets the formula: (Gross-Net (500kV))/Grossx100
                                             
ACR Contracts - Availability
                                             
Eletrobras Company Auction
(if Bilateral Contract Regulated inform client)
Compromised Plants Source Start Date End Date Submarket Current Volume
(MWaverage)
Updated Fixed Revenue
(BRL thousand/year)
Accounting Position
(Procurement
/Supply)
Indexed                        
Eletronuclear Nuclear Power Quotas Angra I and Angra II NUCLEAR NA NA  SE/CO  1,555.22 4,111,686.15 Procurement NA                        
                                             
II.1.3.Sold Energy
                                             
II.1.3.1 Energy Sold by projects not renewed by Law 12.783/13 and Law 13.182/15
Eletrobras Company Buyer 1Q25 2Q25 3Q25 4Q25                        
BRL Million MWh BRL Million MWh BRL Million MWh BRL Million MWh                          
Eletronuclear Eletrobras System                                          
Others 1,027,921.54 3,394,503                                      
                                             
II.1.5 Average fee – BRL/MWh
                                             
II.1.5.1 Projects not renewed under Law No. 12.783/13
                                             
Eletrobras Company 1Q25 2Q25 3Q25 4Q25 2024                                  
Electronuclear (1) 308.74                                          
                                   
(1) Defined fee considering the Fixed Revenue of Eletronuclear by the contracted energy.
Note: Estimated rates considering the ratio between the Total Revenue in the period and the Physical Guarantee in the period (MWh).
                                             
                                             
VI.2 Investments in new projects
                                             
VI.2.1 Generation
                                             
VI.2.1.1 Full Responsibility
Eletrobras Company Power plant Source Location
(State)
Investment (BRL Million) Installed Capacity (MW) Physical Guarantee (MW) Start of Concession Start of Operation Beginning of Construction Termination of the Concession Physical Schedule of Work Performed (%) Contract Type (Availability or Quantity) Estimated annual revenue (BRL million)              
Total Predicted Investment Planned Total Investment Reference Date Investment Realized              
Electronuclear (1) (2) (3) (4)  Angra 3 Nuclear RJ 29.243.7 (1) Sep-21 12,130.00 1,405.00 1282.7 (5) (5) 08/01/2031 (4) Nov-09 Jun-68 67.38% ND ND              
                   
(1) The direct cost budget approved by the Executive Board, according to RDE 1687.005/23, of 01/03/2023, is BRL 29,243.7 million, of which BRL 10,654.1 million has already been realized.  The indirect costs added to the enterprise are those legally allowed, such as: internal engineering, administration, capitalized financial charges, etc. Law 14,120, of March 1, 2021 - Federal Official Gazette of 03.02.2021, established that the sale price of the energy to be generated by the Angra 3 Plant will result from the study carried out by BNDES, which must be approved by CNPE, and must cumulatively consider the economic and financial viability of the enterprise and its financing under market conditions, observing the principles of reasonableness and fee moderation.  
(2) There is still no operating license for Angra 3. It is considered 40 years from Jul/28 by analogy with Angra 1 and 2.
(3) Ordinance No. 1.118/SPE/MME, of December 30, 2021, of the Energy Planning and Decommissioning Secretariat of the Ministry of Mines and Energy defined the Angra 3 Power Plant's physical energy guarantee at 1,282.7 average MW.
(4) Estimate based on the most current studies on the Angra 3 project prepared by BNDES
(5) The CNAAA Plants do not operate under the concession regime. They are operating under the authorization regime. Angra 3 is licensed for initial exploration given by Decree No. 75,870 of 06/13/1975 and current by DNAEE Ordinance No. 315 of 07/31/1997.
Note: The amounts refer to the end of February 2025, that is, they already anticipate amounts of investment made and physical execution that will be available in the next monthly monitoring report of the Angra 3 Project.
                                             
                                             
V.III Loans and Financing – BRL Million                                        
                                             
Eletronuclear 2025 2026 2027 2028 2029 After 2029 Total (MN + ME)                              
By creditor  866.24  491.89   496.35  501.92  526.55 4,732.51 7,615.45                              
Eletrobras Holding   34.27   45.69   45.69 45.69   38.08  - 209.43                              
Others 831.97 446.19 450.66  456.22 488.47 4,732.51 7,406.02                              

 

 

 

 

26 

SIGNATURE

 

 

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

Date: May 14, 2025

CENTRAIS ELÉTRICAS BRASILEIRAS S.A. - ELETROBRÁS
     
By:

/SEduardo Haiama


 
 

Eduardo Haiama

Vice-President of Finance and Investor Relations

 

 

 

FORWARD-LOOKING STATEMENTS

 

This document may contain estimates and projections that are not statements of past events but reflect our management’s beliefs and expectations and may constitute forward-looking statements under Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities and Exchange Act of 1934, as amended. The words “believes”, “may”, “can”, “estimates”, “continues”, “anticipates”, “intends”, “expects”, and similar expressions are intended to identify estimates that necessarily involve known and unknown risks and uncertainties. Known risks and uncertainties include, but are not limited to: general economic, regulatory, political, and business conditions in Brazil and abroad; fluctuations in interest rates, inflation, and the value of the Brazilian Real; changes in consumer electricity usage patterns and volumes; competitive conditions; our level of indebtedness; the possibility of receiving payments related to our receivables; changes in rainfall and water levels in reservoirs used to operate our hydroelectric plants; our financing and capital investment plans; existing and future government regulations; and other risks described in our annual report and other documents filed with the CVM and SEC. Estimates and projections refer only to the date they were expressed, and we do not assume any obligation to update any of these estimates or projections due to new information or future events. Future results of the Company’s operations and initiatives may differ from current expectations, and investors should not rely solely on the information contained herein. This material contains calculations that may not reflect precise results due to rounding.