EX-99.1 2 ex99-1.htm

 

Exhibit 99.1

 

Nova Minerals Announces 41m @ 4.6 g/t Au from Surface at the RPM deposit on its Estelle Gold-Antimony Project, in Alaska

 

Anchorage, Alaska, October 9, 2024 - Nova Minerals Limited (“Nova” or the “Company”) (NASDAQ: NVA) (ASX: NVA) (FRA: QM3) is pleased to announce further high-grade intercepts from the first eight holes of the 21 hole reverse circulation (RC) drilling program conducted in the RPM starter pit area in 2024, within its over 500km2 flagship Estelle Gold Project, located in the Tintina Gold Belt in Alaska. The shallow drilling program was focused on near surface mineralization <50m in depth in support of the RPM starter mine Feasibility Study (FS) currently underway.

 

Highlights

 

Results from shallow infill and step-out drilling confirms continuity of near surface high-grade mineralization at RPM North with multiple broad intersections grading > 5 g/t Au from surface and sample interval grades up to 39 g/t Au
   
High-grade gold intersections targeting near surface mineralization above the current high-grade Measured and Indicated core continue at RPM North with all holes ending in mineralization. Significant results include (Table 1 and Figures 1 and 2):

 

  RPMRC-24005
       
      43m @ 4.4 g/t Au from 2m including;
      23m @ 7.3 g/t Au from 2m
      13m @ 10.7 g/t Au from 2m
       2m @ 39.2 g/t Au from 13m
         
  RPMRC-24006
       
      21m @ 3.5 g/t Au from 2m including;
      19m @ 3.9 g/t Au from 3m
       6m @ 7.1 g/t Au from 5m
         
  RPMRC-24007
       
      14m @ 1.9 g/t Au from 2m including;
      12m @ 2.1 g/t Au from 4m
         
  RPMRC-24008
       
      45m @ 3.4 g/t Au from surface including;
      31m @ 4.7 g/t Au from 3m
       8m @ 10.5 g/t Au from 22m

 

Additional significant results received from extensional drilling outside of the current resource model shows near surface mineralization continues towards the South-Southwest with the deposit remaining wide open. These results include (Table 1 and Figures 1 and 3):

 

 
 

 

  RPMRC-24001
       
      24m @ 0.6 g/t Au from 6m
         
  RPMRC-24002
       
      45m @ 0.6 g/t Au from 3m including;
      20m @ 1.1 g/t Au from 25m
      12m @ 1.5 g/t Au from 26m
         
  RPMRC-24003
       
      25m @ 0.5 g/t Au from 17m
         
  RPMRC-24004
       
      31m @ 0.6 g/t Au from 3m

 

All drill holes end in gold mineralization.
   
Assay results from 13 remaining holes from the 2024 drill program at RPM to follow.
   
Assay results from the over 500 soil and 225 rock samples collected as part of the extensive 2024 surface exploration and mapping program targeting gold, antimony and other critical minerals from traverses at Stibium, Wombat, West Wing, Muddy Creek, RPM, Styx, and the new claims added in 2023, will be reported by area once received and processed.
   
Resource update including both the 2023 and 2024 drill results to be completed once all results are received.
   
RPM starter mine Feasibility Study (FS), and updated economic study of the Estelle wide project in progress, with the aim to commence with a smaller scale, low capex, high-margin starter mine at RPM as soon as possible, which will provide cashflow to fund the expansion of the larger Estelle project organically.
   
Whittle Consulting engaged to complete project optimization, METS Engineering engaged to complete metallurgical and process design work, and Roughstock Mining engaged for pit and engineering design.

 

Nova Minerals CEO, Mr Christopher Gerteisen commented: “These results speak for themselves and we believe will add considerable value to the upcoming resource update and ultimately the FS which will be focused on RPM as a scale-able low capex/high margin project with future expansion plans achieved through cashflow as soon as possible.

 

With further 2024 drill results to follow in short order, these results, along with the 2023 drilling will be included in the upcoming resource update. We look forward to updating all stakeholders on these fronts as we continue to progress on our path towards production and early cashflow at RPM within the greater Estelle gold and critical minerals district.”

 

 
 

 

RPM Drilling Discussion

 

A total of 21 RC holes were drilled at RPM as part of the 2024 drilling program, of which assay results for eight holes have now been received and are reported in this announcement. The drilling was focused on near surface mineralization <50m in depth and had two main objectives.

 

1. The first and primary objective was to infill and prove up near surface inferred resources that define the up dip extension of the steep to vertical dipping RPM North high-grade core zone. A new drill pad (Pad 24-1) was located between the two previous drill pads (Pad 1 and Pad 23-1) at RPM North to fill this data gap and prove up this high-grade material (Figures 1 and 2). The initial assay results from holes RPMRC-24005 to RPMRC-24008 indicate this objective was achieved.
   
2. The secondary objective of the shallow 2024 drill program was to extend drilling to the South and Southwest of the current RPM North resource to begin to test a potential link with the RPM Valley zone situated approximately 150m to the Southwest. Highly prospective mineralized intrusive rocks have been observed in this area in recent geological mapping and confirmed with anomalous surface sample results. The results returned from holes RPMRC-24001 to RPMRC -24004 indicate the RPM North deposit remains wide open to the South-Southwest and is potentially connected to the RPM Valley zone (Figures 1 and 3). This warrants further follow-up diamond drilling to test the considerable resource upside potential.

 

These latest results continue to prove up areas of thick intervals of high-grade gold mineralization (+2g/t) within the existing RPM North resource area, confirming the continuity of the high-grade bonanza core zone, as well as indicating the potential for significant extensions to the existing resource. A representative cross-section (Figures 2 and 3) clearly shows the latest drill holes intersecting up and down dip continuity to mineralization outside of the current resource grade shell. This has the potential to significantly grow the resource in the upcoming MRE update.

 

Geological observations also indicate the mineralized intrusive unit is a steeply dipping funnel shaped body which flares out to have a wider footprint near the surface where substantial up-dip potential remains.

 

In the central core zone where the intrusive unit is thick and continuous the deposit remains wide open with further significant resource upside potential, up-dip, down-dip, and throughout the intrusive, particularly to the South which remains largely untested by drilling.

 

The majority of the holes drilled in 2024 were collared in granodiorite intrusive rocks, the primary host of mineralization at RPM. The granodiorite-hornfels contact was intercepted to the north from Pad 24-1 and to the south from Pad 23-1 where gold mineralization is encountered in both the intrusive and the hornfels. The drillhole intersections as well as observed outcrop between these two drill pads consist entirely of granodiorite crosscut by quartz-tourmaline-sulfide veins, with massive quartz zones of over 1-m thick hosting samples up to 291 g/t Au.

 

 
 

 

 

Figure 1. RPM North plan view with all drill holes to date

 

 
 

 

 

Figure 2. RPM North Section A-A’_070azi showing continuity of mineralization

 

 
 

 

 

Figure 3. RPM North Section B-B’_270azi showing continuity of mineralization

 

 
 

 

Table 1. Significant intercepts*

 

Hole_ID  From (m)  To (m)  Interval (m)  Au g/t
RPMRC-24001  6  30  24  0.6
RPMRC-24002  3  48  45  0.6
including  25  45  20  1.1
   26  38  12  1.5
RPMRC-24003  17  42  25  0.5
RPMRC-24004  3  34  31  0.6
RPMRC-24005  2  45  43  4.4
including  2  44  42  4.6
   2  25  23  7.3
   2  15  13  10.7
   13  15  2  39.2
RPMRC-24006  2  23  21  3.5
including  3  22  19  3.9
   5  11  6  7.1
RPMRC-24007  2  16  14  1.9
including  4  16  12  2.1
RPMRC-24008  0  45  45  3.4
including  3  37  34  4.3
   3  34  31  4.7
   22  30  8  10.5

 

* At 0.1 g/t Au cutoff and a minimum 10m width

 

 
 

 

Table 2. Drill hole details

 

Hole_ID  UTM_E  UTM_N 

ELEV (m)

 

EOH (m)

  AZI  DIP  Assays
RPMRC-24001  501995  6848795.9  1772  31  180  -45  Reported 9/10/24
RPMRC-24002  501991  6848802.8  1772  48  270  -60  Reported 9/10/24
RPMRC-24003  501992  6848801  1771  42  210  -60  Reported 9/10/24
RPMRC-24004  501993  6848802  1773  34  0  -90  Reported 9/10/24
RPMRC-24005  501955  6848871  1743  45  70  -60  Reported 9/10/24
RPMRC-24006  501955  6848869.6  1744  23  100  -50  Reported 9/10/24
RPMRC-24007  501954  6848868.4  1746  16  130  -50  Reported 9/10/24
RPMRC-24008  501954  6848868.7  1742  47  0  -90  Reported 9/10/24
RPMRC_24009  501954  6848869.5  1746  47  145  -50  Pending
RPMRC_24010  501954  6848869.5  1746  43  145  -70  Pending
RPMRC_24011  501954  6848870  1744  21  150  -50  Pending
RPMRC_24012  501954  6848869  1743  40  160  -50  Pending
RPMRC_24013  501953  6848870.1  1744  34  175  -50  Pending
RPMRC_24014  501952  6848871  1745  24  190  -50  Pending
RPMRC_24015  501953  6848870.2  1743  26  220  -60  Pending
RPMRC_24016  501953  6848870.2  1744  39  250  -60  Pending
RPMRC_24017  501954  6848869.9  1743  29  280  -70  Pending
RPMRC_24018  501956  6848868.9  1745  16  130  -50  Pending
RPMRC_24019  501955  6848869.8  1744  66  130  -70  Pending
RPMRC_24020  501957  6848869.4  1743  28  115  -60  Pending
RPMRC_24021  501956  6848870.2  1742  34  85  -70  Pending

 

Estelle Next Steps

 

Estelle is a major mineralized trend, hosting gold, antimony, silver, copper, and other critical elements and Nova is working to begin production as early as possible with the potential to operate for decades supplying the minerals the world needs.

 

A Feasibility study has commenced for RPM with METS Engineering engaged for metallurgical and process design, RoughStock Mining for pit and engineering design, and Whittle Consulting for complete project optimization, from starter operation with the view of minimizing capex, to finding a steady state mine plan to clear expansion plans. The studies currently underway have the objective of:

 

Getting RPM into production as soon as possible
   
Early year low capex with high margin to fund expansion of the greater Estelle Project
   
Optimized mine plan for highest grade with least strip material for early years
   
Pit Slope scope and design
   
Optimum flow sheet design to increase recovery whilst decreasing reagents to bring down operating costs
   
Plant size, design, and location

 

 
 

 

In addition, the Company is also very aware of the value of a domestically sourced critical mineral antimony, and in parallel with the above plans in the FS, we are also looking at our antimony discoveries at both Stibium and Styx in particular from many angles with multiple parties to potentially establish a small scale, stand-alone, quick start up antimony-gold mine, with potential US Dept. of Defense (DoD) support to fully secure the US supply chain.

 

 

Figure 4. Estelle development optionality

 

Qualified Persons

 

Vannu Khounphakdee, Professional Geologist and member of Australian Institute of Geoscientists contracted by Nova Minerals to provide geologic consulting services. Mr. Khounphakdee holds a Master of Science in Mine Geology and Engineering. He is a qualified person with at least 5 years experience with this type of project. By reason of education, affiliation with a professional association, and past relevant work experience, Mr. Khounphakdee fulfills the requirements of Qualified Person (QP) for the purposes of SEC Regulation SK-1300 for data QA/QC checks relevant to this announcement.

 

Hans Hoffman is a State of Alaska Certified Professional Geologist contracted by Nova Minerals to provide geologic consulting services. Mr. Hoffman is a member of the American Institute of Professional Geologists and holds a Bachelor of Science degree in Geological Engineering with a double major in Geology and Geophysics. He is a qualified person with at least 5 years of experience with these types of projects. By reason of education, affiliation with a professional association, and past relevant work experience, Mr. Hoffman fulfills the requirements of Qualified Person (QP) for the purposes of SEC Regulation SK-1300 for the technical information presented in this announcement.

 

 
 

 

Christopher Gerteisen, Chief Executive Officer of Nova Minerals, is a Professional Geologist and member of Australian Institute of Geoscientists, and has supervised the preparation of this news release and has reviewed and approved the scientific and technical information contained herein. Mr. Gerteisen is a “qualified person” for the purposes of SEC Regulation S-K 1300.

 

Data Verification

 

For the 2024 reverse circulation drilling program, 1.52m chip samples were riffle split (dry) to obtain 3-5 kg samples at the drill site, these samples were crushed to achieve >90% passing a 2mm sieve and split down to 225 g to 275 g samples at Nova’s on-site prep facility. Samples were then sent to ALS Fairbanks for additional prep and chemical analysis. Field duplicates (RC) for recent data were collected every 1 in 20 samples at the same time using the same method (riffle split) as the parent sample. Blank material was inserted 1 in 40 samples. Standard Reference Material (SRM) was inserted 1 in 20 samples. Three different SRMs at three different grades levels were used.

 

ALS is a certified commercial laboratory and is independent of Nova Minerals. Gold analyses were completed by Au-ICP21 which is gold by fire assay and ICP-AES. For overlimits greater than 10 g/t Au analyses were completed by fire assay and gravimetric finish.

 

About Nova Minerals Limited

 

Nova Minerals Limited is a Gold, Antimony and Critical Minerals exploration and development company focused on advancing the Estelle Project, comprised of 514 km2 of State of Alaska mining claims, which contains multiple mining complexes across a 35 km long mineralized corridor of over 20 advanced Gold and Antimony prospects, including two already defined multi-million ounce resources, and several drill ready Antimony prospects with massive outcropping stibnite vein systems observed at surface. The 85% owned project is located 150 km northwest of Anchorage, Alaska, USA, in the prolific Tintina Gold Belt, a province which hosts a >220 million ounce (Moz) documented gold endowment and some of the world’s largest gold mines and discoveries including, Barrick’s Donlin Creek Gold Project and Kinross Gold Corporation’s Fort Knox Gold Mine. The belt also hosts significant Antimony deposits and was a historical North American Antimony producer.

 

Further discussion and analysis of the Estelle Gold Project is available through the interactive Vrify 3D animations, presentations, and videos, all available on the Company’s website. www.novaminerals.com.au

 

Forward Looking Statements

 

This press release contains “forward-looking statements” that are subject to substantial risks and uncertainties. All statements, other than statements of historical fact, contained in this press release are forward-looking statements. Forward-looking statements contained in this press release may be identified by the use of words such as “anticipate,” “believe,” “contemplate,” “could,” “estimate,” “expect,” “intend,” “seek,” “may,” “might,” “plan,” “potential,” “predict,” “project,” “target,” “aim,” “should,” “will” “would,” or the negative of these words or other similar expressions, although not all forward-looking statements contain these words. Forward-looking statements are based on Nova Minerals Limited’s current expectations and are subject to inherent uncertainties, risks and assumptions that are difficult to predict. Further, certain forward-looking statements are based on assumptions as to future events that may not prove to be accurate. These and other risks and uncertainties are described more fully in the section titled “Risk Factors” in the final prospectus related to the public offering filed with the Securities and Exchange Commission. Forward-looking statements contained in this announcement are made as of this date, and Nova Minerals Limited undertakes no duty to update such information except as required under applicable law.

 

For Additional Information Please Contact

 

Craig Bentley

Director of Finance & Compliance & Investor Relations

E: craig@novaminerals.com.au

M: +61 414 714 196